1 Mieke (M.B.G.) Ketelaars, Deltares, Unit Strategy and Policy Arjan (A.A.M.) Venmans, Deltares, Unit Geo-Engineering MAKING CRADLE-TO-CRADLE WORK: FIRST STEPS FOR DUTCH INFRASTRUCTURE CHALLENGES SUMMARY The Dutch government and in particular the Dutch Directorate-General of Public Works and Water Management (Rijkswaterstaat, RWS) have set ambitious goals with respect to sustainability. One very significant goal is that from % of their purchases is sustainable. RWS has specific goals with respect to reduction of CO 2 emissions, energy neutral design, sustainable use of materials and spatial quality of infrastructures. Deltares the Dutch research institute for enabling Delta life and the Water INNovation programme (WINN) of RWS are working together to realize (more) sustainable infrastructure. Together they have applied the inspiring Cradle-to-Cradle (C2C) concept [3] to two infrastructures projects in order to embed the RWS sustainability ambitions in the program of requirements. In this paper we show how the C2C concept can help RWS to achieve its sustainable ambitions with regard to infrastructure projects. We describe the process and the practical applications the C2C concept has for the redesign of a lock and construction of a motorway.
2 1. SUSTAINABILITY Sustainable development has been defined by the UN commission Brundtland (Our common future) from 1987 as: a development that fulfils the needs of the present generation, without compromising the ability of the future generations to fulfil their needs. The Brundtland definition is commonly accepted, and is used in Dutch national environmental policy. Some of the core principles of sustainability are [1]: no transfers of negative effects in time and space; interdependency between scales: sustainability at the local level does not necessarily means sustainability at the higher level, or vice versa; Sustainability is a multi-actor problem, because it is about the needs of people. Consequently, an integral approach is needed, because sectors are only one piece of the whole puzzle. Sustainable development and especially the realization of sustainable infrastructure is a complex problem. The main characteristic of the realization of infrastructure projects is the large amount of soil that has to be moved and the large amount of materials needed to realize roads, fly-overs, underpasses, dams or bridges. In this chapter, we will introduce the Cradle-to-Cradle approach. The Cradle-to-Cradle concept provides guidance and heuristics for identification of concrete sustainability ambitions of a project. However, to translate C2C into concrete and practical solutions is still problematic. In 2002 Michael Braungart en William McDonough the founding fathers of the C2C concept published the book Cradle to Cradle, Remaking the Way We Make Things [3]. Braungart and McDonough claim that economical growth, sustainability and enjoying life can go together. The Cradle-to-Cradle approach states that we should not make our industrial systems less bad ( ecoefficiency ), but we should make them good ( eco-effectivity ). This implies a transition of the current industrial systems towards sustainable systems. Braungart and McDonough argue that all materials used fall into one of two categories: technical or biological nutrients. Through better designs and smarter usage of materials technical nutrients can be strictly limited to non-toxic, nonharmful synthetic materials that have no negative effects on the natural environment. They can be used in continuous cycles as the same product without losing their integrity or quality. In this manner these materials can be used over and over again instead of being "downcycled" into lesser products, ultimately becoming waste. Biological nutrients are organic materials that, once used, can be disposed of in any natural environment and decompose into the soil, providing food for small life forms without affecting the natural environment. The three principles of Cradle-to Cradle are: Closing the biological and technical cycles; Making use of renewable energy and specially the abundance of the sun's energy; Creating more (bio)diversity. The next section evaluates the usefulness of this approach to account on the ambitions of Rijkswaterstaat. Figure 1: Closing the biological and technical and biological cycles
3 2. THE SUSTAINABILITY GOALS OF RIJKSWATERSTAAT The Dutch government and in particular the Dutch Directorate-General of Public Works and Water Management (Rijkswaterstaat, RWS) have set ambitious goals with respect to sustainability. The Dutch national government wants 100% of their purchases to be sustainable. RWS has specific goals with respect to reduction of CO 2 emissions, energy neutral design, sustainable use of materials and spatial quality of infrastructures. In their strategic programme RWS Sustainable [4] RWS states their ambitions as follows: Energy: objects are self-sufficient or supply their own energy; there should be a significant contribution from RWS to the national ambition of 20% energy use from renewable sources; Sustainable use of materials: minimizing the amount of materials needed, maximize re-use of materials and management of the material chain; Sustainable production methods, according to the national ambition of a reduction of 20% CO 2 emissions; and Spatial quality of the infrastructure; a positive contribution to the surroundings and the society. Figure 2: The sustainability ambitions of Rijkswaterstaat.
4 3. APPLYING THE C2C CONCEPT TO INFRASTRUCTURE PROJECTS, GENERAL APPROACH In 2008 Deltares and RWS have studied the challenges of applying C2C to infrastructure works to push sustainability a step further [5]. The main conclusion of this study was that the C2C approach can make a real difference, provided the concept is applied in an early stage of the process of decision-making. Knowing that, a general approach to implementing the C2C concept was developed and applied to different infrastructure projects. This chapter explains the general approach. Examples for a lock and a motorway are presented in chapter 4. Any practical application of C2C to infrastructure projects needs to take into consideration that each project is unique, since each project is a tailored response to a particular infrastructure need. Accordingly, in practical applications the requirements of the project and wishes of the project organisation and other stakeholders are guiding and of decisive importance. A general approach was developed to translate sustainability ambitions to design alternatives. This approach involves the following steps: a. Create an image of the present situation Collect information about the present situation and the surroundings, including facts about the present value of the area (historic, ecological or cultural), stakeholders wishes and present problems or needs. b. Formulate a set of C2C principles Project organisation and a variety of specialists (for example, ecologists or energy experts) sit together to conceive new (ideal) designs of the construction. The ideas and design constraints generated by this group are translated to a number of (graphical) designs by a landscape architect or an artist. All wishes, requirements and ideas of the participants will be listed and sorted out. c. Look for alternatives to increase added/project value The new design(s) of the construction are developed further by looking for possible combinations of functions, for example the combination of the function of flood protection with the ecological or recreational function of an area. Also, possibilities are investigated to increase (bio)diversity, close material cycles, reuse material in beneficial ways and decrease energy usage and dependence on non-renewable resources. d. Evaluate changes on sustainability and feasibility The project organisation evaluates the changes introduced by the ideal C2C designs with respect to their sustainability ambitions and the project constrains. These constraints may have a financial, planning, legal or technical nature. The project organisation decides what aspects of the ideal designs will be realised or stimulated in the project. Questions raised in the evaluation may be: Which elements in the design do best match the RWS sustainability goals? What priority do we give to the designs within the limitations of our budget? Which parts of the design can we expect to be realised with the current knowledge of the contractors, at this specific project site, within the time provided? How do the designs contribute to longer term goals on the way to true C2C motorways? Which uncertainties exist in the performance of the design and how can we deal with those? Can we offer a testing ground where elements of the designs can be demonstrated, monitored and evaluated? Which conflicts do the designs cause with previous agreements with stakeholders, procurement rules or RWS policy? How can these be solved?
5 e. Formulate specifications and procurement strategy The selected aspects are translated into a set of project specifications ( Programma van Eisen, PvE). Additionally a reference design may be supplied as part of the invitation to tender. The procurement strategy is adapted to provide stimuli for the contractor to develop creative solutions to fulfil the sustainability ambitions. This may include including bonuses for the best score on a certain ambition or dialogue rounds with RWS to detail the design. Up to this point in time, the approach has been used to develop tailor-made specifications. Eventually, a set of specifications will emerge which is generic for similar infrastructure projects of RWS. This generic set will probably consist of a combination of baseline specifications, defining a minimum ambition, and specifications that contain incentives reflecting advanced ambitions. Even with this set of generic specifications we highly recommend that the approach described above is applied to every new project. This will create awareness and enthusiasm in the project organizations and stimulate them to consider their own ambitions. We consider mobilizing the enthusiasm of the people in the project organizations a major success factor in developing the RWS sustainability ambitions. In several projects we visited the project organization stated they wanted to be best-in-their-class with respect to sustainability, meaning they wanted to perform above the current standards. The approach is depicted in the following scheme. a. Create an image of the present situation b. Create an image of the (project) purpose c. Look for alternatives to increase added / project value d. Evaluate changes on sustainability and feasibility e. Formulate specifications and procurement strategy
6 4. EXPERIENCE WITH THE USE OF CRADLE-TO-CRADLE 4.1 Redesign of locks at Eefde The challenge Shipping to the eastern part of the Netherlands passes through the locks in the Twente canal near Eefde. The locks at Eefde are notorious for their long and unpredictable waiting time. Therefore, both the Twente canal and the locks will be renovated to make it suitable for more and larger ships. Traditionally solutions are focused on a better utilization of the current locks or the construction of a second wider set of locks. The challenge here is to explore whether a C2C-design would be possible The Cradle-to-cradle approach step by step The general approach given in the previous chapter was applied to the design problem. Step a: image of the present situation The construction of the second lock chamber will release an amount of m 3 soil. New lock doors and new banks have to be made. The present locks and the operation buildings are historical monuments. Step b: formulate a set of C2C principles In order to close the technical cycle and to avoid transport, beneficial applications of the released soil need to be found close to the site; Renewable materials should be used for the shore and the lock doors, and The locks should be in harmony with and add value to its surroundings. Figure 3: Looking for alternatives to increase added / project value to the Eefde lock project Step c: look for alternatives to increase added/project value Opportunities identified in workshops: Maximize the reuse of materials (soil) for beneficial use in the surroundings; Production of solar energy, and Increase spatial quality: ecological and recreational values.
7 Step d: evaluate changes on sustainability and feasibility The project organisation has decided to ask tendering contractors for a proposal for 13 topics related to the following three principles: Closing the biological and technical cycles: materials. Example: in what aspects will the proposal exceed the Dutch national baseline requirements? Making use of renewable energy: water and energy. Example: how will the design reduce water loss during operation of the locks below the baseline of 30%? Creation of more (bio)diversity. Examples: how does the proposal increase ecological and natural values above those in the present situation (= baseline); how will the proposal make the locks more attractive for smaller recreational vessels than at present? Step e: formulate a program of requirements and procurement strategy For this project, a so-called ambition document is written. For each subject: a. A minimum requirement is formulated ( baseline ); b. An incentive to challenge the contractor to exceed the minimum requirement; c. Some suggestions for inspiration are given in the document; d. Examples of the state of the art are given, if necessary documented with a photo, and e. References of literature with more background are given. 4.2 Construction of a motorway The challenge In order to relieve / reduce traffic congestion on one of the main motorways in the western part of the Netherlands a new parallel motorway will be built. The project is currently in the tender phase, so exact details on the actual design cannot be given at this moment. The challenge in this project is: how can a C2C vision help in the development of a generic but coherent set of measures for Dutch highways? Cradle-to-cradle step by step Step a: image of the present situation The construction of this motorway will release an amount of nearly 1 million m 3 soil. A new 8 km road, a land tunnel of 1 km length, 2 flyovers and an aquaduct have to be built. The motorway passes both through a rural area of high ecological and recreational value, and through one of the most densely populated parts of the Netherlands. Step b: formulate a set of C2C principles A first workshop was held with the project organisation to create an image of the project purpose, ambitions of the team and interests of the stakeholders. The following opportunities are identified in the first workshop: 1. Optimal integration of the road in its surroundings and the creation of benefit for the landscape. 2. Optimisation of the energy system (construction and operation) where the minimum possible of energy is needed from outside the system. 3. Optimal balance of materials where released materials are used as efficiently as possible. 4. Sharing of the benefits of the road with the public. 5. Limitation of damage and inconvenience to the public during the construction phase. 6. Limitation of damage and inconvenience to the public during the operation phase. Step c: look for alternatives to increase added/project value After the workshop a multidisciplinary team elaborated alternative designs. Examples of the designs related to the opportunities identified in step b are: 1. Create transit zones for animals along and across the motorway; integrate the water management system of the motorway into the water management system of the surrounding polder. 2. Harvest solar energy by placing PV panels and integrating heat collectors in the pavement. 3. Make a balance of released and incoming soil and concrete; reward re-use of excess material in the vicinity of the project.
8 4. Communicate the added value of the motorway in local media and information centres. 5. Minimize transport of raw materials; stabilize the ground water level. 6. Prevent disruption of the separation between surface water and groundwater systems. The original design mainly addressed the opportunities integration in the landscape (1) and limitation of damage and inconvenience (5 and 6). The added value of the alternative designs is in energy use (2) and material re-use (3), with contributions to integration in the landscape (1) and communication (4). The added value of the alternative design could have been higher if the analysis had been performed in an earlier stage of the project. Step d: evaluate changes on sustainability and feasibility In a second workshop with the project organisation, the alternative designs were evaluated. The project organisation decided to concentrate on three main points that deal with: 1. Use of materials; 2. Making use of renewable energy; and 3. Creation of more (bio)diversity. Step e: formulate a program of requirements and procurement strategy For this project, a program of requirements and a procurement strategy has been made to challenge the (building) contractor. Special attention in the program of requirements is given to: the reuse of materials, the integration of a motorway within its environment, avoiding hindrance during the construction of the road and the minimizing of energy during the construction and during the use of the road.
9 5. EVALUATION OF THE IMPACT OF THE C2C APPROACH ON THE RIJKSWATERSTAAT AMBITIONS As we could see in chapter 2, the C2C approach fits well to the Rijkswaterstaat ambitions with respect to sustainability, mainly because many RWS projects involve the reuse of large volumes of materials. However, the strength of the C2C approach is to inspire the project team to create a design with more value. The additional value is usually found in adding more functions to the design. The challenge of applying an approach to sustainability in practice, especially the C2C approach, is to really account for the sustainability ambition of Rijkswaterstaat. These ambitions on energy, sustainable use of materials and spatial quality of the infrastructure were the starting points in the workshops in both cases. In the first place, the C2C approach helps to create an image of the opportunities for sustainability for the project. Second, the approach is useful to determine our ambitions according to sustainability for infrastructure projects. Finally, the concept provides tools and examples how to make these ambitions more concrete. However, the additional question of how Rijkswaterstaat can stimulate contractors to act in a C2Cway is at this moment not quite clear. Because of the fact that Rijkswaterstaat is the biggest customer in the Netherlands, there is a big market for the contractors to get a good return on their investments. The challenge for Rijkswaterstaat is to search how to stimulate contractors to offer solutions which account to the ambitions on sustainability of Rijkswaterstaat. Rijkswaterstaat also has to invest in sustainable solutions.
10 6. SOME REMARKS WITH REGARD TO THE USE OF THE CRADLE-TO-CRADLE CONCEPT FOR INFRASTRUCTURE PROJECTS 1. The concept of Cradle-to-Cradle is inspirational. Using the C2C concept a real good contribution can be achieved to the sustainable ambitions with respect to heighten the spatial quality of the infrastructure and to close cycles. Especially the closing of the technical loop is important for Rijkswaterstaat because of the large amounts of soil that has to be replaced and the materials is needed to realize roads, fly-overs, underpasses, dams or bridges. 2. The cases presented have shown that Cradle-to-Cradle can support the achievement of the ambitions or goals of the Dutch government on sustainability. However the contribution of the C2C concept to lower the CO 2 emission has not (yet) been determined besides the saving of CO 2 by closing the technical loops. In addition, the use of renewable energy for infrastructure projects at this moment is minimal. LITERATURE 1. Van der Brugge, R. (2009) The dynamics of social-ecological transitions. The case of Dutch water management. Dissertation. Erasmus University Rotterdam. 2. Rijsberman, M. A. and F. H. v. d. Ven (2000). "Different approaches to assessment of design and management of sustainable urban water systems." Environmental Impact Assessment Review 20: Braungart en McDonough (2002) Cradle-to-Cradle remake the way we make things. 4. Rijkswaterstaat (2009) Programme RWS Sustainable. 5. DHV, Deltares and Rijkswaterstaat Waterdienst (2009) Verkenning Cradle-to-Cradle werkprocessen natte Rijkswaterstaatprojecten.
SHOWCASING VENLO CITY HALL CRADLE TO CRADLE!
SHOWCASING VENLO CITY HALL CRADLE TO CRADLE! The municipality of Venlo has the ambition to have fully integrated the Cradle-to-Cradle philosophy in its operations by 2030. Designed by Kraaijvanger Architects,
More informationKILEN SWEDEN S FIRST CRADLE TO CRADLE INSPIRED NEIGHBORHOOD INVITATION ARCHITECTURAL COMMISSION
KILEN SWEDEN S FIRST CRADLE TO CRADLE INSPIRED NEIGHBORHOOD? INVITATION ARCHITECTURAL COMMISSION Ronneby wants your help! Gothenburg Jönköping Växjö Tingsryd Kalmar Helsingør Copenhagen Sölvesborg Karlshamn
More informationProcura+ Case Study. Sustainable Reconstruction of the Motorway A6. Procura+ award winning tender
Procura+ Case Study Sustainable Reconstruction of the Motorway A6 Procura+ award winning tender Image: parkway6.nl Procura+ Participant: Contract: Savings: Rijkswaterstaat Sustainable Reconstruction of
More information6266/16 AM/am 1 DG E 1A
Council of the European Union Brussels, 22 February 2016 (OR. en) 6266/16 NOTE From: To: General Secretariat of the Council Council ENV 80 COMPET 63 AGRI 74 TRANS 49 MI 89 IND 34 CONSOM 35 ECOFIN 117 ENER
More informationLocation: UNESCO Headquarters Paris Date March 3 & 4, 2014 Time am
International conference Creative design for sustainable urban development CHINESE ECO-CITIES, Creative technologies & infrastructure for sustainable city development? Meine Pieter van Dijk Professor UNESCO-IHE
More informationSubject: Invitation for views on the preparation, scope and content of the post-2020 global biodiversity framework (Ref.: SCBD/OES/DC/RH/KNM/87538)
Subject: Invitation for views on the preparation, scope and content of the post-2020 global biodiversity framework (Ref.: SCBD/OES/DC/RH/KNM/87538) With regard to Notification 2018-102, Japan would like
More informationWorking for the government (at IenM - KiM)
Working for the government (at IenM - KiM) Jan van der Waard KiM Netherlands Institute for Transport Policy Analysis What about you? Who wants to work in university, research institute, consulting, government?
More informationSTAKEHOLDERS ANALYSIS REPORT
12/5/2012 UNICEF CO & BEMONI PUBLIC UNION STAKEHOLDERS ANALYSIS REPORT UNICEF-EU HIT-A Project 2 1. Introduction The present Stakeholders Analysis Report is developed within the framework of the project
More informationINTEGRATED SOLID WASTE MANAGEMENT TOWARDS GREEN ECONOMY IN VIETNAM
INTEGRATED SOLID WASTE MANAGEMENT TOWARDS GREEN ECONOMY IN VIETNAM Dr. Nguyen Van Tai, ISPONRE, MONRE Hanoi, 18/03/ 2013 1 Contents 1. Greening Vietnam s economy: advances, challenges and key points 2.
More informationGuidelines for the Preparation of Case Studies
Guidelines for the Preparation of Case Studies Applicants for initial registration are required to demonstrate the following. Principle 1 The applicant must demonstrate that he or she is able to practise
More informationHow to improve circularity of smart meters?
The Fair Meter Initiative Circularity Innovations in Smart Meters How to improve circularity of smart meters? Author: Joe Andrews Senior Product Manager, Landis+Gyr March 2018 Page 1 Materials Toxicity
More informationIntroduction to the Cradle to Cradle Design SM Framework
Introduction to the Cradle to Cradle Design SM Framework Version 7.02 By McDonough Braungart Design Chemistry Introduction to the Cradle to Cradle Design SM Framework The world will not evolve past its
More informationJaclyn Gault, Urban Studies Department
Jaclyn Gault, Urban Studies Department CRADLE TO CRADLE: REMAKING THE WAY WE MAKE THINGS By William McDonough & Michael Braungart North Point Press, 2002 Table of Contents Introduction: This Book Is Not
More informationBRIDGE MANAGEMENT IN THE NETHERLANDS; PRIORITISATION BASED ON NETWORK PERFORMANCE
First International Conference on Bridge Maintenance, Safety and Management IABMAS 2002 Barcelona, 14 17 July, 2002 IABMAS BRIDGE MANAGEMENT IN THE NETHERLANDS; PRIORITISATION BASED ON NETWORK PERFORMANCE
More informationORAL PAPER PROCEEDINGS
ITA - AITES WORLD TUNNEL CONGRESS 21-26 April 2018 Dubai International Convention & Exhibition Centre, UAE ORAL PAPER PROCEEDINGS Long-term vision and working programme on tunnels in the Netherlands Karin
More informationStakeholder analysis and national Nearly Zero Energy Building Renovation clusters
Promotion of smart and integrated NZEB renovation measures in the European renovation market (NeZeR) Contract N : IEE/13/763/ SI2.674877 01-03-2014 28-02-2017 Stakeholder analysis and national Nearly Zero
More informationIn-car traffic management services Amsterdam Practical Trial (APT)
In-car traffic management services Amsterdam Practical Trial (APT) About this Best Practice Case Main learning aspect is how Rijkswaterstaat used a Design contest to create a Practical Trial in Amsterdam.
More informationDragon1 Official Statement
Dragon1 Official Statement Version: 2.23d Date: 8th April 2013 Author: The Dragon1 Company Introduction This document provides a summary of the essence of Dragon1 and the uniqueness of Dragon1 compared
More informationReport 2 Research programme RUG: Planning approaches for sustainable roads Content and coherence
Faculty of Spatial Sciences Report 2 Research programme RUG: Planning approaches for sustainable roads Content and coherence Taede Tillema and Jos Arts Faculty of Spatial Sciences, University of Groningen
More informationSummary version. PRIORITY AXIS 1 Promoting Mediterranean innovation capacity to develop smart and sustainable growth
MED 2014+ INTERVENTION STRATEGY Summary version PRIORITY AXIS 1 Promoting Mediterranean innovation capacity to develop smart and sustainable growth INVESTMENT PRIORITY 1b: Promoting business investment
More informationFinancing of Water Programmes in the Netherlands. Pascal Mousset Head of Department for Procurement and Contracting Advice, Rijkswaterstaat
Financing of Water Programmes in the Netherlands Pascal Mousset Head of Department for Procurement and Contracting Advice, : responsible for managing roads and waterways since 1798. 1798 - established
More informationHow to better integrate and deliver WFD measures in Rural Development Programs ( )
How to better integrate and deliver WFD measures in Rural Development Programs (2014-2020) Cooperation with farmers through the Deltaplan Agricultural Water Management Douwe Jonkers Ministry for Infrastructure
More informationPRODUCT QUALITY CRADLE TO CRADLE CERTIFIED
REDEFINING PRODUCT QUALITY CRADLE TO CRADLE CERTIFIED CM GREAT DESIGN IS A CHOICE Traditionally, as designers set out to create a new product, they draft a list of essential questions about how the product
More informationStrategies of Circular Economy in the Netherlands
Strategies of Circular Economy in the Netherlands Herman Huisman Netherlands circular in 2050 Conama, Circular Economy ST-33 Ministry of Infrastructure and Environment, RWS Madrid, November 28, 2016 Development
More informationMaTr SUPPLEMENT OF SCOPE OF SERVICES AND REMUNERATION MODELS
MaTr id SUPPLEMENT OF SCOPE OF SERVICES AND REMUNERATION MODELS INTRODUCTION Client: EASME Project: MaTrID Date: 2014-06-17 Author: Klemens Leutgöb, e7 Energie Markt Analyse GmbH, Austria Agris Kamenders,
More informationSustainable Growth for Solar PV in the Asia-Pacific Region: Proactive Planning is Key
1 Sustainable Growth for Solar PV in the Asia-Pacific Region: Proactive Planning is Key Rising electricity demands in the Asia-Pacific region have to be met in order to ensure access to electricity supply
More informationStrategic Spatial Planning Revisited:
Strategic Spatial Planning Revisited: Experiences from Europe Louis Albrechts Key-note: 3rd Regional Development and Governance Symposium Mersin, 27-28 November 2008 1 Four main questions. First, what
More informationDesign and Construction policy for sustainable buildings and Campus environments
ESTATES SUPPORT SERVICE Design and Construction policy for sustainable buildings and Campus environments 1.0 INTRODUCTION The Higher Education Funding Council for England, responding to Governmental direction,
More informationSustainable Public Procurement at Rijkswaterstaat
Sustainable Public Procurement at The use of DuboCalc, the Environmental Cost Indicator and the A6 project Jeroen van Alphen Sustainable Public Procurement Advisor June 2017 Executive agency of the Dutch
More informationThe EU action plan for the Circular Economy and links to GPP
DOI: 10.18427/iri-2017-0063 Public Procurement and the Circular Economy Orsolya DIÓFÁSI-KOVÁCS Corvinus University of Budapest, Budapest, Hungary Introduction The European Union adopted the Circular Economy
More informationCouncil conclusions on eco-innovation:enabling the transition towards a circular economy
Council of the European Union PRESS EN PRESS RELEASE Brussels, 18 December 2018 Council conclusions on eco-innovation:enabling the transition towards a circular economy RECALLING: The UNGA Resolution of
More informationCOMMENTS ON GREEN PAPER ON PPP AND COMMUNITY LAW ON PUBLIC CONTRACTS AND CONCESSIONS
COMMENTS ON GREEN PAPER ON PPP AND COMMUNITY LAW ON PUBLIC CONTRACTS AND CONCESSIONS 1. General The European Dredging Association is pleased to respond to the Commission Green Paper COM(2004)327. EuDA
More informationLife-Cycle Cost Approach to Bridge Management in the Netherlands
IBMC3-17 LIFE-CYCLE COST CONSIDERATIONS Life-Cycle Cost Approach to Bridge Management in the Netherlands H. E. KLATTER Netherlands Ministry of Transport, Public Works, and Water Management J. M. VAN NOORTWIJK
More informationRoom for Rivers a transition in river management policy. Sophie Vermooten
Room for Rivers a transition in river management policy Sophie Vermooten Sophie.vermooten@deltares.nl Zagreb, 12 th of February 2014 What is Deltares? Independent research institute in the field of water,
More informationSustainable Product Development In Waste Collection Related Products
Sustainable Product Development In Waste Collection Related Products Sjef de Bruijn & Reinier den Boer, Environmental Solutions Europe Holding (ESEH), R&D Contact Sjef de Bruijn & Reinier den Boer Environmental
More informationEnergy Norway response to the ERGEG consultation on the Framework guidelines on Capacity Calculation and Congestion Management for Electricity
Your reference Our reference Date DM-308213 9 November 2010 ERGEG 28 rue le Titien 1000 Brussels Energy Norway response to the ERGEG consultation on the Framework guidelines on Capacity Calculation and
More informationThe implementation of a test centre for traffic applications in the Netherlands
The implementation of a test centre for traffic applications in the Netherlands dr. W.J.W. Geurts ing. E.R. van der Ster ing. A.M.M. van Lent Dutch Ministry of Transport, Public Works and Water Management
More informationTUNNEL TECHNICAL INSTALLATION TESTING ASSURES DEMONSTRABLE TUNNEL SAFETY
- 101 - TUNNEL TECHNICAL INSTALLATION TESTING ASSURES DEMONSTRABLE TUNNEL SAFETY Boersen P.AM., Sogeti Nederland B.V., Netherlands ABSTRACT A tunnel technical installation of a road tunnel is mainly a
More informationTHE ACCUMULATION OF FUTURE VALUES
THE ACCUMULATION OF FUTURE VALUES THE BASIS FOR MULTIPLE INVESTMENTS FOR REDEVELOPMENT OF NON SANITARY LANDFILLS Ron Nap, senior policy developer expert on spatial planning of subsurface space (The Netherlands)
More informationMethodology for the case studies
Methodology for the case studies AUTHORS Marie-José Smits, Researcher, Wageningen University and Research Geert Woltjer, Researcher, Wageningen University and Research With contributions from: With thanks
More informationSustainability: Building the future today
Sustainability: Building the future today By: J.A.M. Baken, General Manager Ecofys BV 1 C.A.M. Stap, Managing Director Energy in the Built Environment, Ecofys BV 1. Introduction There is little need to
More informationC2CPII Built Environment Team.
C2CPII Built Environment Team emily@c2ccertified.org thijs@c2ccertified.org stacy@c2ccertified.org Share and Follow C2Ccertified.org/builtpositive #builtpositive @C2Ccertified Built Positive C2C Cradle
More informationAdaptive Delta Management
Adaptive Delta Management Climate change threatens people living in delta areas all over the world. Climate change, land subsidence, increasing population and economic development increase the risk of
More informationGuidance document Life cycle assessment for the self-adhesive label
Guidance document Life cycle assessment for the self-adhesive label Prepared by Why is Life Cycle Assessment useful? Labels play a critical role in the communication and marketing of products. The growing
More information20,000 ATES SYSTEMS IN THE NETHERLANDS IN MAJOR STEP TOWARDS A SUSTAINABLE ENERGY SUPPLY. M.S. Godschalk, G. Bakema
20,000 ATES SYSTEMS IN THE NETHERLANDS IN 2020 - MAJOR STEP TOWARDS A SUSTAINABLE ENERGY SUPPLY ABSTRACT M.S. Godschalk, G. Bakema IF Technology Velperweg 37 6824 EA Arnhem, the Netherlands Tel: +31 26
More informationChapter 4. PP4 Province of Gelderland. 1. Overview Good practices Opportunities... 4
Chapter 4 PP4 Province of Gelderland 1. Overview... 1 2. Good practices... 3 3. Opportunities... 4 0 1. Overview The province of Gelderland is a 100% committed partner in the CircE project. The executive
More informationEnvironmental and climate change strategy
Environmental and climate change strategy for UiO s estate operations 2018 2020 2040 Space for an outstanding, green university and for Oslo, the city of knowledge Master Plan for UiO s Properties Contents
More informationDESIGN GUIDELINES FOR RENEWABLE ENERGY TECHNOLOGIES IN MOBILE PRODUCTS
INTERNATIONAL DESIGN CONFERENCE - DESIGN 2006 Dubrovnik - Croatia, May 15-18, 2006. DESIGN GUIDELINES FOR RENEWABLE ENERGY TECHNOLOGIES IN MOBILE PRODUCTS J.C. Diehl, P. van Gennip and A. Mestre Keywords:
More informationCountry profile. More from less material resource efficiency in Europe overview of policies, instruments and targets in 32 countries.
Country profile More from less material resource efficiency in Europe 2015 overview of policies, instruments and targets in 32 countries Lithuania May 2016 This country profile is based on information
More informationWater and 9 Billion People: Creating a Circular and Resilient water environment in high density living areas
POSITION PAPER 4 th AIWW 2017 Water and 9 Billion People: Creating a Circular and Resilient water environment in high density living areas 30 October 3 November 2017 Water management has entered into a
More informationThe Intelligent Energy Europe Programme: Call for Proposals 2012
The Intelligent Energy Europe Programme: Call for Proposals 2012 Emilio FONT DE MORA Project Officer Executive Agency for Competitiveness and Innovation Renewable Energy Unit Sofia, 28 February 2012 The
More informationStadtwerk: Lehen _ Solar energy in urban community in City of Salzburg, Austria
Available online at www.sciencedirect.com Energy Procedia 30 (2012 ) 866 874 SHC 2012 Stadtwerk: Lehen _ Solar energy in urban community in City of Salzburg, Austria DI Helmut Strasser 1, Mag. Norbert
More informationThinking beyond take-make-waste policies: business and societal value of the circular economy
Thinking beyond take-make-waste policies: business and societal value of the circular economy Experiences from a Dutch perspective Ton Bastein TNO Netherlands Organisation for Applied Scientific Research
More information7 CONCLUSIONS & RECOMMENDATIONS
7 CONCLUSIONS & RECOMMENDATIONS 7.1 The impact of soil sealing Soil sealing can be defined as the covering of soils by buildings, constructions and layers of completely or partly impermeable artificial
More informationRISK INVENTORY SERVICEABILITY HYDRAULIC STRUCTURES IN THE NETHERLANDS
RISK INVENTORY SERVICEABILITY HYDRAULIC STRUCTURES IN THE NETHERLANDS Dirk Jan Kiljan and Hans Janssen Rijkswaterstaat, Centre for Public Works, Utrecht, the Netherlands Abstract The water system in the
More informationPublic works unlocks potential for circularity
Public works unlocks potential for circularity Key facts Rijkswaterstaat s (RWS) procurement centre is responsible for the government-wide procurement of office furniture. The government estate has a commitment
More informationIWA World Water Congress and Exhibition 2020 Water for smart liveable cities Congress ambitions, summits and outcome
IWA World Water Congress and Exhibition 2020 Water for smart liveable cities Congress ambitions, summits and outcome The current document outlines our ambition for IWA 2020 in Copenhagen. It is based on
More informationREGIONAL REPORT ON THE SELECTION OF PRIORITY APPLICATIONS - Upper Austria
The regional context Introduction of the region REGIONAL REPORT ON THE SELECTION OF PRIORITY APPLICATIONS - Upper Austria In Upper Austria, renewable energy sources have a high political priority. The
More informationUsability of Life Cycle Assessment for Cradle to Cradle purposes
Usability of Life Cycle Assessment for Cradle to Cradle purposes Position Paper December 2011 >> Focus on sustainability, innovation and international Executive summary Life Cycle Assessment (LCA) is a
More informationOptimising Use Programme. Working together is key
Optimising Use Programme Working together is key Optimising Use programme Working together is key 1. The need for Optimising Use The Netherlands is an international logistics hub, for goods as well as
More informationWORK ING AND LEARNING IN A WORLD CRADLE-TO-CRADLE UNIVERSITY OF ORADEA FACULTY OF ENVIRONMENTAL PROTECTION
WORK ING AND LEARNING IN A WORLD CRADLE-TO-CRADLE UNIVERSITY OF ORADEA FACULTY OF ENVIRONMENTAL PROTECTION In Romania, the National Education Law has the vision to promote a values -oriented education,
More informationWater system and water chain in Dutch water and environmental legislation. Pieter Jong
Water system and water chain in Dutch water and environmental legislation Pieter Jong Introductory remarks - General research question - Dutch situation; historical background of Dutch water law - European
More informationCURRICULUM VITAE IR PETRUS POSTMA
CURRICULUM VITAE IR PETRUS POSTMA Date of Birth / September 21, 1978 Place of Birth / Groningen Mobile / 0031 (0) 6 102 538 85 Email / Petrus@bloc.nl Website / www.bloc.nl Petrus Postma (b. 1978) studied
More informationMINISTERIAL MEETING URBAN POLICY CITIES EMPOWER EUROPE CONCEPT CONCLUSIONS DUTCH PRESIDENCY 2004
1. INTRODUCTION Context 1.1 Although there is not a single model of a European city, there is a growing recognition of the importance of the contribution that cities can and do make to the economic, environmental
More information1. Relevance of the research programme for national and regional adaptation policies Involvement of stakeholders... 2
Content 1. Relevance of the research programme for national and regional adaptation policies... 1 2. Involvement of stakeholders... 2 3. Knowledge transfer and valorisation... 4 1. Relevance of the research
More informationToyama Framework on Material Cycles
Toyama Framework on Material Cycles We, the G7 Ministers and high representatives, and European Commissioner responsible for the environment, based on our discussion on resource efficiency and the 3Rs
More informationCircular economy and textile fibres
Circular economy and textile fibres 27 November, 2016 Francois Souchet Project Manager Significant value is lost in linear systems Plastics, 40 years of effort with little achievement Negative externalities
More informationTHE BALTIC SEA MOTORWAY - RECENT DEVELOPMENT AND OUTLOOK FOR THE FUTURE
Journal of Maritime Research, Vol. IV. No. 2, pp. 21-30, 2007 Copyright 2007. SEECMAR Printed in Santander (Spain). All rights reserved ISSN: 1697-4840 THE BALTIC SEA MOTORWAY - RECENT DEVELOPMENT AND
More informationSustainable urban infrastructure development At the example of Munich 2058
Sustainable urban infrastructure development At the example of Munich 2058 Trade, urbanization and the environment Beijing Prof. Dr. Manfred Fischedick Vice President Cities have to deal with many challenges
More informationAtkins Submission All Party Parliamentary Committee for Excellence in the Built Environment inquiry into sustainable construction and the Green Deal
Atkins Submission All Party Parliamentary Committee for Excellence in the Built Environment inquiry into sustainable construction and the Green Deal Executive Summary Atkins has been at the forefront of
More informationCradle to Cradle Guidance in Public Procurement
Choice of market segment Cradle to Cradle Guidance in Public Procurement Ecolabels are useful for distinguishing sustainable products from less sustainable alternatives. However, the use of ecolabels in
More informationThe role of nature conservation in cross- sectoral adaptation strategies to climate change - and related activites of the BfN
The role of nature conservation in cross- sectoral adaptation strategies to climate change - and related activites of the BfN Cordula Epple Federal Agency for Nature Conservation Biodiversity Unit, Isle
More informationProRail furnishes for re-use
ProRail furnishes for re-use Key facts ProRail manages the national railway network infrastructure in the Netherlands. When the company decided to develop a new traffic control centre in Utrecht, REBus
More informationA VISION FOR HEATING AND COOLING PRIORITIES FOR TODAY AND TOMORROW
A VISION FOR HEATING AND COOLING PRIORITIES FOR TODAY AND TOMORROW EXECUTIVE SUMMARY EPEE, representing the heating, cooling and refrigeration industry in Europe, strongly supports the energy efficiency
More informationBuilding with Nature. Dr. Martin Scholten IMARES, Wageningen UR. Co-founder of EcoShape
Building with Nature Dr. Martin Scholten IMARES, Wageningen UR Co-founder of EcoShape Maasvlakte 2 Port of Khalifa Grensmaas Port of Melbourne Building in Nature Multiple-stakeholder concern Environmental
More informationThe Sand Engine - Zandmotor: a megasand nourishment for Delfland
The Sand Engine - Zandmotor: a megasand nourishment for Delfland Pieter Koen Tonnon, Jan van Dalfsen, Bert van der Valk, Jan Mulder, Arjen Boon, Herman Gerritsen and many more colleagues KfKI, Outline
More informationExecutive Summary (English)
Funded by APRIL 2019 GLOBAL ENERGY SYSTEM BASED ON 100% RENEWABLE ENERGY Power, Heat, Transport and Desalination Sectors (English) Study by P.O.Box 20 FI-53851 Lappeenranta Finland Tel.: +358 408171944
More informationUN ECE Implementation of the pilot SEA of the Orhei Town Master Plan Strategic Environmental Assessment (SEA) of the Master Plan of the Municipality
UN ECE Implementation of the pilot SEA of the Orhei Town Master Plan Strategic Environmental Assessment (SEA) of the Master Plan of the Municipality of Orhei SEA Environmental Report (summary) Chisinau-Orhei,
More informationCapturing the Stakeholder Values of a Construction Project
Capturing the Stakeholder Values of a Construction Project Ken Dooley Sustainability Consultant Olof Granlund Oy Finland ken.dooley @granlund.fi Piia Sormunen Manager, Energy and Environment Olof Granlund
More informationThe Netherlands Water Policy & Program Implementation: Issues & Challenges. George Peters Royal HaskoningDHV
The Netherlands Water Policy & Program Implementation: Issues & Challenges George Peters Royal HaskoningDHV Introduction George Peters M.Sc. Royal HaskoningDHV (1995) Graduated Civil & Geotechnical Engineering
More informationWeb lecture _transcript
Web lecture 7.2.2. _transcript In the previous modules you have seen that urbanization is a pervasive phenomenon in today s world. This makes it all the more relevant to investigate if urbanization as
More informationHow green is my plan?
How green is my plan? URBAN & SUBURBAN How green is my plan? Neighbourhood plans offer communities the opportunity to develop a positive vision of their future. Pioneering towns, villages and neighbourhoods
More information1.1 ENVIRONMENTAL ASPECTS OF SUSTAINABLE DEVELOPMENT
1.1 ENVIRONMENTAL ASPECTS OF SUSTAINABLE DEVELOPMENT 1.1.1 INTRODUCTION Even at the beginning of the 1970s it became evident that, owing to the limited quantity of non-renewable resources (for instance
More informationSetting Emissions Reduction Targets in a Long-term Strategy: The Chilean Experience
Setting Emissions Reduction Targets in a Long-term Strategy: The Chilean Experience Marcia Montedonico, Head of Socioenvironmental Development Area, Energy Center, University of Chile Rodrigo Palma-Behnke,
More informationMSCA INDIVIDUAL FELLOWSHIPS EUROPEAN FELLOWSHIPS STANDARD PANEL
MSCA INDIVIDUAL FELLOWSHIPS EUROPEAN FELLOWSHIPS STANDARD PANEL EXCELLENCE Strengths: The proposed research is relevant and clearly presented. The research objectives are clearly defined and show innovative
More informationA model of communicating project objectives within client organizations
A model of communicating project objectives within client organizations Haponava Tatsiana, University of Twente, the Netherlands (email: t.haponava@utwente.nl) Al-Jibouri Saad, University of Twente the
More informationThe Dutch Road Noise Mitigation Program
The Dutch Road Noise Mitigation Program Nico Faber 1 1 AnteaGroup NL, Netherlands ABSTRACT In July 2012 a new law on noise pollution along major roads entered into force in the Netherlands. This law contains
More informationPERFORMANCE AND CAREER REVIEW
PERFORMANCE AND CAREER REVIEW GUIDE 2017 INTRODUCTION BY CHANTAL GAEMPERLE CHANTAL GAEMPERLE Group Executive Vice-President Human Resources and Synergies, LVMH Dear All, Time has come to reflect on our
More informationManifesto for successful Extended Producer Responsibility for packaging
Manifesto for successful Extended Producer Responsibility for packaging January 2013 Executive Summary The concept of Extended Producer Responsibility (EPR) is based on the principle that so-called obliged
More informationDiscussing the role of City Agencies in the EU Urban Agenda 1
European Agencies Network for citizenship, inclusion involvement and empowerment of communities through the urban transformation process CALL FOR PAPERS Discussing the role of City Agencies in the EU Urban
More informationGoals and objectives in the most recent action plan; The Copenhagen Climate Plan
1. Local contribution to global climate change Present details of the original and/or most recent Action Plan, including any relevant disadvantages or constraints resulting from historical and/or geographical
More informationWP 2.1. State of the art of public procurement policy and practices in the Baltic Sea Region
WP 2.1 State of the art of public procurement policy and practices in the Baltic Sea Region Katriina Alhola and Hanna Salmenperä Finnish Environment Institute Arnhem, 2nd October 2018 Tasks in 2.1 2 The
More informationBangladesh Delta Plan (BDP) 2100
Brief Presentation for the International Conference on Urbanizing Deltas of the World on Research Uptake Bangladesh Delta Plan (BDP) 2100 Catharien Terwisscha van Scheltinga, Bangladesh Delta Plan Formulation
More informationCOMMISSION OF THE EUROPEAN COMMUNITIES COMMUNICATION FROM THE COMMISSION. Guide to the Commission's architectural policy
EN EN EN COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, 23 rd of September 2009 C(2009) 7032 final COMMUNICATION FROM THE COMMISSION Guide to the Commission's architectural policy EN EN COMMUNICATION
More informationPCP experiences in Healthcare
PCP experiences in Healthcare EPP workshop, Suzan Ikävalko 12.5.2016 Agenda 1 Decipher mhealth PCP: Lessons learned 2 Case example: Noona ehealth services for cancer patients 3 Nordic PCP & PPI experiences
More informationBuild4Quality. BIM makes sense a business case for BIM. Paul Surin Head of Built Environment
Build4Quality BIM makes sense a business case for BIM Paul Surin Head of Built Environment Agenda Wienerberger who we are Wienerberger s business case The route to success The benefit of a manufacturers
More informationA Collaborative Approaches to Cities Development Hazem Galal, Global Leader for Cities and Local Government
A Collaborative Approaches to Cities Development Hazem Galal, Global Leader for Cities and Local Government A Dialogue on Cities and Climate Change Workshop, World Bank Role of the Private Sector in Managing
More informationSUSTAINABLE PROCUREMENT POLICY- BP017
SUSTAINABLE PROCUREMENT POLICY- BP017 1 of 8 Issue log Version 2.2 Originator (job title) Senior Procurement Manager Date ratified 02/01/2014 Document Manager Senior Procurement Manager Date issued 02/01/2015
More informationChallenges in Delivering Clean Air Zones lessons from the feasibility studies. Dr Guy Hitchcock Technical Director AQE, 21 st and 22 nd Nov 2018
Challenges in Delivering Clean Air Zones lessons from the feasibility studies Dr Guy Hitchcock Technical Director AQE, 21 st and 22 nd Nov 2018 2 Presentation content Background to Clean Air Zones The
More informationRoles and Responsibilities of Rijkwaterstaat. Eric Boessenkool
Roles and Responsibilities of Rijkwaterstaat Eric Boessenkool Topics Welcome to the Ministry of Infrastructure and the Environment historical development, current works and projects Deltaprogramme European
More information