April 8, 2015 Olympic Medical Center Rebecca Lawson, P.E. LHG. Connie Groven, P.E. Audrey Kuklok

Size: px
Start display at page:

Download "April 8, 2015 Olympic Medical Center Rebecca Lawson, P.E. LHG. Connie Groven, P.E. Audrey Kuklok"

Transcription

1 April 8, 2015 Olympic Medical Center Rebecca Lawson, P.E. LHG. Connie Groven, P.E. Audrey Kuklok

2 Overview of harbor cleanup projects Rayonier Mill Update Western Port Angeles Harbor Update K Ply Mill Draft Remedial Investigation/Feasibility Study Draft Cleanup Action Plan Draft Agreed Order Other Documents SEPA and Public Participation Plan Questions

3 Port Angeles Cleanup Sites Port Angeles Sediments Investigation Rayonier Mill Study Area Marine Portion Upland Portion Rayonier Mill Off-Property Soil Dioxin Study Marine Trades Area K Ply Unocal Bulk Plant #0601 Western Port Angeles Harbor

4

5 Getting to Study Area Cleanup Collect additional soil and groundwater data Ecology finishes Harbor Sediments Investigation Upland data summary report (Volume I) Marine data summary report (Volume II) Preliminary cleanup standards section Development of alternatives section Evaluate Interim Action alternatives (Volume III) Draft Interim Action Plan Public Comment Period

6 Next Steps Ecology reviewing: Agency Review Draft (ARD) Interim Action Alternatives Evaluation Report (Vol III) Feb 2015 Rayonier will submit: Public Review Draft (PRD) Interim Action Alternatives Evaluation Report (Vol III) Summer 2015 Anticipated public comment period Fall 2015 Final Upland, Marine, & Alternatives Reports Early 2016 ARD Interim Action Plan Spring 2016 Anticipated public comment period Summer 2016

7

8 Getting to Western Harbor cleanup Supplemental Harbor Sediments Investigation Remedial Investigation/ Feasibility Study Selection of Cleanup Action Site Cleanup

9 Progress Agreed order and work plan signed May 2013 Sampling plan approved June 2013 Fieldwork completed July 2013 White Paper and RI/FS extension for technical issues May 2014 Next Steps PLPs will submit: Agency Review Draft RI/FS 90 days after resolution of issues Public Review Draft RI/FS 60 days after receipt of comments A cleanup plan will be developed and implemented under a separate legal agreement.

10 Draft Remedial Investigation/Feasibility Study Draft Cleanup Action Plan Draft Agreed Order State Environmental Policy Act (SEPA) review Public Participation Plan

11

12 Port s log yard Peninsula Plywood (PenPly) Rayonier s PenPly K Ply Pipeline General Petroleum/ExxonMobil Potentially Liable Persons (PLPs) Port of Port Angeles Rayonier ExxonMobil

13 Site Background 1920s today: Bulk fuel plants at various times 1990 order: Rayonier hydraulic oil and PCP spill 2005 order: Marine Trades Area order with port and Chevron 2012 order: Split K Ply from MTA

14

15 Media Contaminants Soil Groundwater Indoor Air Gasoline COC COC COC Diesel COC COC COC BTEX COC COC COC Heavy Oil COC COC Pentachlorophenol Dioxins/furans COC COC

16 Prevent harm to aquatic organisms & consumers of organisms Prevent direct contact by workers Prevent inhalation by future workers Vadose Zone Smear Zone Remove free product

17 Contaminant of Concern Soil (mg/kg) Groundwater (µg/kg) Diesel 2, Gasoline Heavy Oil 2, Benzene Ethylbenzene 6 Toluene 7 Xylenes 9 Pentachlorophenol 330 Dioxins/furans

18 Soil Standard POC: Throughout the site Groundwater Conditional POC: At the bulkhead Air Standard POC: Throughout the site. Assess indoor air with vapor assessment prior to future construction.

19 Gasoline, Benzene and Heavy Oil Results in Soil

20 Gasoline and benzene in groundwater

21

22 Alternative 1 Alternative 2 Alternative 3 Alternative 4 Air Sparge Curtain remove hot spots Chemical oxidation capping remove hot spots bioremediation if needed Removal of all contaminated soil above water table partial removal below water table enhanced bioremediation Removal of all contaminated soil enhanced bioremediation Benefit score: 15 $2.4 million Benefit Score: 16 $7.0 million Benefit Score: 19 $5.2 million Benefit Score: 22 $7.4 million

23 Harmless

24

25 Bulkhead Area Benzene Area Smear zone Concrete Pad Area

26 Cleanup Area During construction After construction Bulkhead excavation area Concrete pad excavation area Benzene groundwater area Remaining smear zone soil Excavation of vadose and smear zone soils to cleanup levels Bioremediation Excavation of vadose soils to cleanup levels and smear zone soils to remediation levels Bioremediation Bioremediation injections Monitoring of soil and groundwater Additional bioremediation through injections or infiltration galleries Monitored/enhanced natural attenuation of remaining soils

27 Cleanup Area During construction After construction Former stack area Excavate and relocate Pentachlorophenal area Hog fuel storage areas Excavation and disposal off-site Excavation and disposal off-site Log pond area Institutional Controls, Further studies

28 Implements the Cleanup Action Plan o Task 1: Engineering Design Report o Task 2: Construction o Task 3: Groundwater and soil monitoring o Task 4: Log pond fill area investigation o Task 5: Institutional controls o Task 6: Progress reports Outlines schedule

29 Action Finalize RI/FS, CAP and AO Draft Engineering Design Report (EDR) Final EDR Construction Construction completion report Install wells and recheck groundwater Quarterly GW monitoring Due Date and Triggering Event After public comment period 60 days after signature of AO and final CAP 30 days after Ecology comments Begin within 120 of EDR approval 90 days after construction Within 90 days after construction Begins within 14 days after wells installed Estimated Calendar dates May/June 2015 August 2015 (May 2015) October 2015 (June 2015) March 2016 (August 2015) September 2016 December 2016 January 2017

30 Action Long term monitoring Draft log pond fill study Final log pond fill study Supplemental investigation of log pond Draft Environmental Covenant Quarterly and Annual Report Five year reviews Due Date and Triggering Event Every 5 years for soil, according to monitoring plan for GW. 90 days prior to lease end 30 days after receipt of Ecology s comments Begin within 60 days of removal of log debarker 30 days after construction completion report approved Quarterly for 2 years, then annual 5 years after covenant recording Estimated Calendar dates Until cleanup levels are met Late 2016 Early 2017 Spring 2017 October until end Every 5 years

31 SEPA Determination of Nonsignificance Public Participation Plan

32 April 2 May 4, 2015 Agreed Order Draft Cleanup Action Plan (CAP) Remedial Investigation/Feasible Study (RI/FS) State Environmental Policy Act (SEPA) review Public Participation Plan Send written comments to Site Manager Connie Groven through May 4, 2015 Connie.Groven@ecy.wa.gov Questions?

Georgia-Pacific Mill Site DTSC Cleanup Update. Special City Council Meeting February 2, 2017 Town Hall, Fort Bragg, CA

Georgia-Pacific Mill Site DTSC Cleanup Update. Special City Council Meeting February 2, 2017 Town Hall, Fort Bragg, CA 1 Georgia-Pacific Mill Site DTSC Cleanup Update Special City Council Meeting February 2, 2017 Town Hall, Fort Bragg, CA 2 Tonight s Agenda Presentation to the City Council - DTSC Background - who we are,

More information

FINAL PLAN OF REMEDIAL ACTION. Burns and McBride. South Market and A Streets August 19, 2008

FINAL PLAN OF REMEDIAL ACTION. Burns and McBride. South Market and A Streets August 19, 2008 FINAL PLAN OF REMEDIAL ACTION Burns and McBride South Market and A Streets August 19, 2008 Wilmington, Delaware DNREC Project No. DE-0325 This Revised Final Plan of Remedial Action (Final Plan) presents

More information

Cleanup Action Plan Illahee Foods 5507 Illahee Rd NE Bremerton, WA Port of Illahee PO Box 2357 Bremerton, WA 98310

Cleanup Action Plan Illahee Foods 5507 Illahee Rd NE Bremerton, WA Port of Illahee PO Box 2357 Bremerton, WA 98310 Cleanup Action Plan Illahee Foods 5507 Illahee Rd NE Bremerton, WA 98310 Prepared for: Mr. Jim Aho Port of Illahee PO Box 2357 Bremerton, WA 98310 Prepared by: G-Logics, Inc. 40 2nd Avenue SE Issaquah,

More information

PROJECT OVERVIEW. Site Assessment for Proposed Coke Point Dredged Material Containment Facility at Sparrows Point

PROJECT OVERVIEW. Site Assessment for Proposed Coke Point Dredged Material Containment Facility at Sparrows Point PROJECT OVERVIEW Site Assessment for Proposed Coke Point Dredged Material Containment Facility at Sparrows Point Capacity of existing placement sites for dredged material from the Baltimore Harbor remains

More information

Lecture 1: Introduction to Soil Remediation Engineering

Lecture 1: Introduction to Soil Remediation Engineering ENGI 9621 Soil Remediation Engineering Lecture 1: Introduction to Soil Remediation Engineering Spring 2012 Faculty of Engineering & Applied Science 1 1.1 Definition of soil remediation engineering a sub-discipline

More information

6.1 Koppers Oroville Wood Treatment Facility, California

6.1 Koppers Oroville Wood Treatment Facility, California 6.1 Koppers Oroville Wood Treatment Facility, California The Koppers Oroville site is a former wood treating facility that operated from 1948 until it closed in 2001. The site occupies approximately 205

More information

THERMAL REMEDIATION OF A CLOSED GASOLINE SERVICE STATION PRESENTATION AND DISCUSSION LED BY: GLEN VALLANCE PROJECT MANAGER, CGRS

THERMAL REMEDIATION OF A CLOSED GASOLINE SERVICE STATION PRESENTATION AND DISCUSSION LED BY: GLEN VALLANCE PROJECT MANAGER, CGRS THERMAL REMEDIATION OF A CLOSED GASOLINE SERVICE STATION IPEC 13 November 2013 CLIQUEZ ET MODIFIEZ LE TITRE PRESENTATION AND DISCUSSION LED BY: GLEN VALLANCE PROJECT MANAGER, CGRS 1. IN-SITU THERMAL REMEDIATION

More information

TABLE OF CONTENTS 1.0 SUMMARY OF SITE CONDITIONS Site History Summary of the Remedial Investigation Summary of Site Risks 12

TABLE OF CONTENTS 1.0 SUMMARY OF SITE CONDITIONS Site History Summary of the Remedial Investigation Summary of Site Risks 12 TABLE OF CONTENTS Page Number 1.0 SUMMARY OF SITE CONDITIONS 5 1.1 Site History 5 1.2 Summary of the Remedial Investigation 9 1.3 Summary of Site Risks 12 2.0 REMEDIAL ACTION OBJECTIVES 14 3.0 SUMMARY

More information

Collect deeper soil samples and groundwater from beneath site?

Collect deeper soil samples and groundwater from beneath site? Uncertainties for which sampling is (i.e., to be incorporated into Work Plan). No. Uncertainty Recommended Resolution/ 1 SS005 No evidence of Acquire samples from three closest MOGas in soil. Tank as surface

More information

Toronto Port Lands Community Based Risk Assessment. Meggen Janes, PMP, P. Eng., M.Sc. Project Manager, CH2M

Toronto Port Lands Community Based Risk Assessment. Meggen Janes, PMP, P. Eng., M.Sc. Project Manager, CH2M Toronto Port Lands Community Based Risk Assessment Meggen Janes, PMP, P. Eng., M.Sc. Project Manager, CH2M June 2017 Community-Based Risk Assessment What is a CBRA? What s the study area? Why is a CBRA

More information

PermeOx. Plus. Enhanced Aerobic Biodegradation

PermeOx. Plus. Enhanced Aerobic Biodegradation PermeOx Plus Enhanced Aerobic Biodegradation Introduction Successful bioremediation of petroleum contamination through aerobic microbial respiration depends on a number of factors including the presence

More information

Sustainable and Innovative Remediation of the Remote and Historic Hay Camp Abattoir and Warden Station Wood Buffalo National Park

Sustainable and Innovative Remediation of the Remote and Historic Hay Camp Abattoir and Warden Station Wood Buffalo National Park Sustainable and Innovative Remediation of the Remote and Historic Hay Camp Abattoir and Warden Station Wood Buffalo National Park Brent O'Rae, B.Sc. (Env.), PMP Contaminated Sites Specialist Resource Conservation,

More information

PROPOSED PLAN OF REMEDIAL ACTION FOR THE REICHHOLD CHEMICAL SITE CHESWOLD, DELAWARE

PROPOSED PLAN OF REMEDIAL ACTION FOR THE REICHHOLD CHEMICAL SITE CHESWOLD, DELAWARE PROPOSED PLAN OF REMEDIAL ACTION FOR THE REICHHOLD CHEMICAL SITE CHESWOLD, DELAWARE July 1999 DNREC Project DE-245 Prepared by: Delaware Department of Natural Resources and Environmental Control Division

More information

Enhanced Anaerobic Biodegradation of a Refinery Benzene Groundwater Plume

Enhanced Anaerobic Biodegradation of a Refinery Benzene Groundwater Plume Enhanced Anaerobic Biodegradation of a Refinery Benzene Groundwater Plume Robert (Rory) S. Johnston, PE Michael Eberle SAWEA CONFERENCE DECEMBER 2007 Presentation Outline Go With the Flow Anaerobic Process

More information

FACT PATTERN THE RESERVATION

FACT PATTERN THE RESERVATION FACT PATTERN THE RESERVATION Great Lakes Tribal Reservation Surrounded by Big River National Forest Big River flows through Reservation and into Big Lake General Environmental Concerns Wild rice areas

More information

ECSI Number: Responsible Party: Klamath County. QTime Number: Entry Date: 9/22/04 (VCP)

ECSI Number: Responsible Party: Klamath County. QTime Number: Entry Date: 9/22/04 (VCP) ECSI Number: 1213 Responsible Party: Klamath County QTime Number: 37941 Entry Date: 9/22/04 (VCP) Proposed Remedial Action Staff Report - Addendum Chiloquin Forest Products Chiloquin, Klamath County, Oregon

More information

In-Well Stripping and Two-Phase Extraction Methods. Presenter Mehmet Pehlivan, PG, CHG Bays Environmental Remediation Management

In-Well Stripping and Two-Phase Extraction Methods. Presenter Mehmet Pehlivan, PG, CHG Bays Environmental Remediation Management In-Well Stripping and Two-Phase Extraction Methods Presenter Mehmet Pehlivan, PG, CHG Bays Environmental Remediation Management In-well stripping methods use wells to strip VOCs from groundwater which

More information

Rock Fill Layer Management and Maintenance Plan Former BNSF Site 13 Highway 99 Eugene, Oregon

Rock Fill Layer Management and Maintenance Plan Former BNSF Site 13 Highway 99 Eugene, Oregon Rock Fill Layer Management and Maintenance Plan 13 Highway 99 Prepared for: Half Moon LLC P.O. Box 25112 97402 PBS Project No. 51833.000 Rock Fill Layer Management and Maintenance Plan TABLE OF CONTENTS

More information

Central Plateau Inner Area Cleanup Principles

Central Plateau Inner Area Cleanup Principles Central Plateau Inner Area Cleanup Principles What are Cleanup Principles? Cleanup Principles are the initial conditions and approaches to developing cleanup decisions in the Inner Area These Principles

More information

Rhode Island Standards for Hydrocarbon Contaminated Groundwater a Groundwater Objectives (GA and GB) b

Rhode Island Standards for Hydrocarbon Contaminated Groundwater a Groundwater Objectives (GA and GB) b Rhode Island Standards for Hydrocarbon Contaminated Groundwater a Groundwater Objectives (GA and GB) b Product Parameter/ Constituent Lab Test c Protocol &Number Cleanup Level d,e,h GA Groundwater Cleanup

More information

Re: West of 4 th Site Agreed Order #DE10402 West of 4th Group s Proposed Path Forward for Remedy Selection

Re: West of 4 th Site Agreed Order #DE10402 West of 4th Group s Proposed Path Forward for Remedy Selection November 21, 2016 Mr. Ed Jones Washington State Department of Ecology, NWRO 3190 160th Avenue SE Bellevue, Washington 98008-5452 Re: West of 4 th Site Agreed Order #DE10402 West of 4th Group s Proposed

More information

IXPER 70C Calcium Peroxide CASE STUDY

IXPER 70C Calcium Peroxide CASE STUDY IXPER 70C INTRODUCTION TO ENHANCED AEROBIC BIOREMEDIATION Enhanced aerobic bioremediation is a well-established and viable remediation technology for in situ degradation of a variety of petroleum hydrocarbon

More information

Mill Street Corridor Assessment/Cleanup Overview

Mill Street Corridor Assessment/Cleanup Overview Mill Street Corridor Assessment/Cleanup Overview Former S. Bent Mill Site Site History Overview Circa 1867 to 1992 - S. Bent Mill Company (furniture manufacturing) Circa early 1900s - expansion of the

More information

Site Background December 2005

Site Background December 2005 Site Background December 2005 The South of Runway 18-36 Area consists of the lowland area surrounding the southern portion of runway 18-36. It extends from the East Canal of the airport ditch system on

More information

Portland Harbor Superfund Site - Introduction

Portland Harbor Superfund Site - Introduction Portland Harbor Superfund Site - Introduction Dean Marriott March 28, 2012 Overview Describe Portland Harbor Explain Superfund and other efforts associated with clean-up of Portland Harbor Describe the

More information

NJDEP Vapor Intrusion Guidance

NJDEP Vapor Intrusion Guidance NEW JERSEY VAPOR INTRUSION GUIDANCE Kenneth J. Kloo, Brownfield Administrator ASTSWMO 2008 Mid-Year Meeting Mobile, Alabama April 23 & 24, 2008 NJDEP Vapor Intrusion Guidance VAPOR INTRUSION GUIDANCE NEW

More information

Bench- and Pilot-Scale Treatability Testing of ISCO and Surfactant Enhanced Biodegradation of Long Chain Petroleum Hydrocarbons

Bench- and Pilot-Scale Treatability Testing of ISCO and Surfactant Enhanced Biodegradation of Long Chain Petroleum Hydrocarbons Bench- and Pilot-Scale Treatability Testing of ISCO and Surfactant Enhanced Biodegradation of Long Chain Petroleum Hydrocarbons Steven R. Hammer, P.E. SLR Consulting October 2014 Our Site Current site

More information

Fort George G. Meade

Fort George G. Meade Fort George G. Meade Restoration Advisory Board Meeting September 18, 2014 Preliminary Assessment/ Site Inspection (PA/SI) Update Southwest Areas of Interest (AOIs) 1 Ft Meade PA/SI Last RAB update of

More information

American Creosote Works Site

American Creosote Works Site U.S. Environmental Protection Agency American Creosote Works Site Pensacola, Florida April 2017 Public meeting scheduled to discuss the proposed Cleanup Plan Wednesday April 26, 2017 at 6:00 p.m. Sanders

More information

Former Georgia-Pacific Mill Site

Former Georgia-Pacific Mill Site May 2018 The mission of DTSC is to protect California s people and environment from harmful effects of toxic substances by restoring contaminated resources, enforcing hazardous waste laws, reducing hazardous

More information

Attenuation Factors for Hydrocarbons Associated With a Diesel Spill

Attenuation Factors for Hydrocarbons Associated With a Diesel Spill Attenuation Factors for Hydrocarbons Associated With a Diesel Spill By Lindsay Breyer, CIH and James B. Cowart, PE Walsh Environmental Scientists and Engineers, Boulder, Colorado Site Location: Mandan,

More information

Remediation of BTEX in Shallow, Silty Clay Soil Successes and Insights

Remediation of BTEX in Shallow, Silty Clay Soil Successes and Insights Remediation of BTEX in Shallow, Silty Clay Soil Successes and Insights Brian D. Symons, P.E. FOTH Infrastruture & Environment, LLC Overland Park, Kansas What We Want to Learn? Complexities of Nature Treatment

More information

Dr. Xiaosong Chen, PE

Dr. Xiaosong Chen, PE Dr. Xiaosong Chen, PE (1) One Successful Case Study - Why Thermal Remediation (2) Several Failed Case Studies - What Challenge we encountered Area: 600 m 2 * 14 m bgs Former chemical industrial area Lithology:

More information

Transmitted via . Mr. Nate Nemani U.S. Environmental Protection Agency Region 5 77 West Jackson Boulevard LU-9J Chicago, IL

Transmitted via  . Mr. Nate Nemani U.S. Environmental Protection Agency Region 5 77 West Jackson Boulevard LU-9J Chicago, IL Transmitted via E-mail Mr. Nate Nemani U.S. Environmental Protection Agency Region 5 77 West Jackson Boulevard LU-9J Chicago, IL 60604-3590 Arcadis of Michigan, LLC 28550 Cabot Drive Suite 500 Novi Michigan

More information

Solidification/Stabilization

Solidification/Stabilization 1 Solidification/Stabilization ITRC Technical And Regulatory Guidance Document: Development of Performance Specifications for Solidification/Stabilization (S/S-1, 2011) Remediation Technologies Symposium

More information

Remediation of Hydrocarbon Contaminated Soils at MCAGCC, Twentynine Palms, CA

Remediation of Hydrocarbon Contaminated Soils at MCAGCC, Twentynine Palms, CA Remediation of Hydrocarbon Contaminated Soils at MCAGCC, Twentynine Palms, CA Al Pollack (Battelle Memorial Institute) Mike Ellitt & Leon Bowling (MCAGCC) George Reed (El Adobe Partners, Inc.) Marine Corps

More information

Construction Dewatering General Permit (GP) & Groundwater Remediation GP. Navigating the Permitting Process

Construction Dewatering General Permit (GP) & Groundwater Remediation GP. Navigating the Permitting Process Construction Dewatering General Permit (GP) & Groundwater Remediation GP Navigating the Permitting Process IECA Conference November 18, 2014 Margo Griffin Permits Section Water Quality Control Division

More information

87th Air Base Wing. Joint Base McGuire-Dix-Lakehurst Restoration Advisory Board 16 November 2017

87th Air Base Wing. Joint Base McGuire-Dix-Lakehurst Restoration Advisory Board 16 November 2017 87th Air Base Wing Joint Base McGuire-Dix-Lakehurst Restoration Advisory Board 16 November 2017 87th Air Base Wing Review of Action Items Mr. Michael Figura, P.E. Program Manager, Environmental Restoration

More information

Proposed Plan Closed Sanitary Landfill

Proposed Plan Closed Sanitary Landfill Fort George G. Meade Proposed Plan Closed Sanitary Landfill Public Meeting May 18, 2016 1 18MAY2017 Public Meeting Purpose U.S. Army is inviting the public to comment on the proposed environmental actions

More information

REGULATED STORAGE TANK DIVISION CORRECTIVE ACTION PLAN FACILITY:

REGULATED STORAGE TANK DIVISION CORRECTIVE ACTION PLAN FACILITY: REGULATED STORAGE TANK DIVISION CORRECTIVE ACTION PLAN FACILITY: Kerr-McGee Service Station #6400 Highway 270 & Old Military Road Malvern, Arkansas ID # 30000062 LUST #30-002 AUTHORIZATION Name: Title:

More information

ANALYSIS OF BROWNFIELDS CLEANUP ALTERNATIVES

ANALYSIS OF BROWNFIELDS CLEANUP ALTERNATIVES ANALYSIS OF BROWNFIELDS CLEANUP ALTERNATIVES FORMER NORTHERN STATE HOSPITAL SEDRO-WOOLLEY, WASHINGTON Prepared for PORT OF SKAGIT October 26, 2018 Project No. 0624.04.10 Prepared by Maul Foster & Alongi,

More information

Multi-Component Remediation of Petroleum and Metals at a Former Power Plant in San Francisco, California

Multi-Component Remediation of Petroleum and Metals at a Former Power Plant in San Francisco, California Multi-Component Remediation of Petroleum and Metals at a Former Power Plant in San Francisco, California October 2 nd, 2014 Insert then choose Picture select your picture. Right click your picture and

More information

Parcel E (Site 03) Treatability Study and Parcel C Remedial Action

Parcel E (Site 03) Treatability Study and Parcel C Remedial Action Parcel E (Site 03) Treatability Study and Parcel C Remedial Action Hunters Point Naval Shipyard ACTIVITY NAME Community Meeting Parcel C Cleanup Actions Hunters Point Naval Shipyard in 1941 34 BRAC Program

More information

Former Potrero Power Plant Site Remediation WELCOME. PG&E Community Open House

Former Potrero Power Plant Site Remediation WELCOME. PG&E Community Open House WELCOME PG&E Community Open House Former Potrero Power Plant Site Remediation Former Potrero Power Plant Site Header 1 This is paragraph style 1 Photo taken: March 2012. What is a Manufactured Gas Plant

More information

ISOTEC Case Study No. 67 ISCO TREATMENT PROGRAM: IMPACTED GROUNDWATER TREATMENT UTILIZING ACTIVATED SODIUM PERSULFATE

ISOTEC Case Study No. 67 ISCO TREATMENT PROGRAM: IMPACTED GROUNDWATER TREATMENT UTILIZING ACTIVATED SODIUM PERSULFATE ISOTEC Case Study No. 67 ISCO TREATMENT PROGRAM: IMPACTED GROUNDWATER TREATMENT UTILIZING ACTIVATED SODIUM PERSULFATE ISCO Treatment Program: O&G Superfund Site Site O&G Superfund Drum Reconditioning Site;

More information

Ellsworth Air Force Base Environmental Restoration Program announces the completion of its 2010 Five Year Review for Ellsworth Air Force Base

Ellsworth Air Force Base Environmental Restoration Program announces the completion of its 2010 Five Year Review for Ellsworth Air Force Base Ellsworth Air Force Base Environmental Restoration Program announces the completion of its 2010 Five Year Review for Ellsworth Air Force Base Ellsworth Air Force Base is a Federal "Superfund" site under

More information

Phase 1 ESA Phase 2 ESA Site Assessment. Cleanup Planning Cleanup CNFA NFA. Gas Tank Removal at Closed Gas Station

Phase 1 ESA Phase 2 ESA Site Assessment. Cleanup Planning Cleanup CNFA NFA. Gas Tank Removal at Closed Gas Station Phase 1 ESA Phase 2 ESA Site Assessment Cleanup Planning Cleanup CNFA NFA Gas Tank Removal at Closed Gas Station Hazardous Substance - Hazardous waste, CERCLA hazardous substances, petroleum, other substances

More information

85M102006D. The Shaw Group Inc.

85M102006D. The Shaw Group Inc. Two Projects, One City, One Solution: S/S Ernest F. Stine, Ph.D. and Charles M. Wilk LEHP, QEP, LEED AP Stabilization/Solidification Protects human health and the environment by immobilizing hazardous

More information

Creamer Environmental. Containment, Caps & Liners. 12 Old Bridge Road C ed ar Grov e, N e w Jer s e y

Creamer Environmental. Containment, Caps & Liners. 12 Old Bridge Road C ed ar Grov e, N e w Jer s e y Containment, Caps & Liners While excavation and treatment are common solutions for many soil and groundwater remediation projects, containment can sometimes be a more appropriate and more economical alternative.,

More information

Fort George G. Meade. Performance Based Acquisition (PBA) Five-Year Summary. Restoration Advisory Board Meeting November 20, 2014

Fort George G. Meade. Performance Based Acquisition (PBA) Five-Year Summary. Restoration Advisory Board Meeting November 20, 2014 Fort George G. Meade Performance Based Acquisition (PBA) Five-Year Summary Restoration Advisory Board Meeting November 20, 2014 Presentation Agenda PBA Site Locations CERCLA Recap CERCLA Progress during

More information

New York State Department of Environmental Conservation. Receive Site Fact Sheets by . See For More Information to Learn How.

New York State Department of Environmental Conservation. Receive Site Fact Sheets by  . See For More Information to Learn How. New York State Department of Environmental Conservation FACT SHEET State Superfund Program Receive Site Fact Sheets by Email. See For More Information to Learn How. Northrop Grumman - Bethpage Facility

More information

Fort George G. Meade. Architect of the Capitol - Project Briefing - Restoration Advisory Board Meeting March 20, 2014

Fort George G. Meade. Architect of the Capitol - Project Briefing - Restoration Advisory Board Meeting March 20, 2014 Fort George G. Meade Architect of the Capitol - Project Briefing - Restoration Advisory Board Meeting March 20, 2014 1 Presentation Agenda Status of the CERCLA Process for AOC Site Information Location

More information

Port Angeles Harbor Sediments Investigation Community Meeting. Peter defur, Ph.D. Laura Williams Environmental Stewardship Concepts, LLC May 7, 2012

Port Angeles Harbor Sediments Investigation Community Meeting. Peter defur, Ph.D. Laura Williams Environmental Stewardship Concepts, LLC May 7, 2012 Port Angeles Harbor Sediments Investigation Community Meeting Peter defur, Ph.D. Laura Williams Environmental Stewardship Concepts, LLC May 7, 2012 Purpose To characterize the nature and distribution of

More information

APPLICATION FOR 2013 WEDA ENVIRONMENTAL EXCELLENCE AWARD ENVIRONMENTAL DREDGING CATEGORY RIVER RAISIN AREA OF CONCERN PROJECT, MONROE, MICHIGAN

APPLICATION FOR 2013 WEDA ENVIRONMENTAL EXCELLENCE AWARD ENVIRONMENTAL DREDGING CATEGORY RIVER RAISIN AREA OF CONCERN PROJECT, MONROE, MICHIGAN APPLICATION FOR 2013 WEDA ENVIRONMENTAL EXCELLENCE AWARD ENVIRONMENTAL DREDGING CATEGORY RIVER RAISIN AREA OF CONCERN PROJECT, MONROE, MICHIGAN SUMMARY The construction team of Environmental Restoration,

More information

Results from the LLNL Gasoline Spill Cleanup

Results from the LLNL Gasoline Spill Cleanup Results from the LLNL Gasoline Spill Cleanup A worked example of thermal remediation and site closure for NAPL below the water table. Roger Aines LLNL A Collaborative Effort By LLNL and UC Berkeley, Funded

More information

PROTOCOL NO. 5: Petroleum Hydrocarbon Analytical Methods and Standards

PROTOCOL NO. 5: Petroleum Hydrocarbon Analytical Methods and Standards PROTOCOL FOR THE CONTAMINATED SITES REGULATION UNDER THE ENVIRONMENT ACT PROTOCOL NO. 5: Petroleum Hydrocarbon Analytical Methods and Standards Prepared pursuant to Part 6 Administration, Section 21, Contaminated

More information

APPLICATION OF SUBSURFACE VAPOUR ASSESSMENT AT HYDROCARBON IMPACTED SITES

APPLICATION OF SUBSURFACE VAPOUR ASSESSMENT AT HYDROCARBON IMPACTED SITES APPLICATION OF SUBSURFACE VAPOUR ASSESSMENT AT HYDROCARBON IMPACTED SITES Mitch Kenaschuk, P.Eng. Peter Olmsted, M.Sc.,P.Eng. October 2004 OUTLINE Introduction Regulatory Framework and Methodology Vapour

More information

2013 IPEC Conference San Antonio

2013 IPEC Conference San Antonio 2013 IPEC Conference San Antonio CLIQUEZ ET MODIFIEZ LE TITRE IN-SITU THERMAL REMEDIATION BENEATH A HISTORIC HOME AUTHORS: GRANT GECKELER, WALTER MULICA (GLOBAL TECHNOLOGIES), HATEM SAADAOUI, PHILIPPE

More information

Pennsylvania Clean-up Standards for Hydrocarbon Contaminated Groundwater

Pennsylvania Clean-up Standards for Hydrocarbon Contaminated Groundwater Pennsylvania Clean-up Standards for Hydrocarbon Contaminated Groundwater Product Parameter/ Constituent Lab Test Protocol & Number Water Standard / Action Level Leaded Gasoline, Aviation Gasoline, Jet

More information

REMEDIATION OF A PETROLEUM SPILL USING PURE OXYGEN

REMEDIATION OF A PETROLEUM SPILL USING PURE OXYGEN REMEDIATION OF A PETROLEUM SPILL USING PURE OXYGEN COLTER BAY VILLAGE MARINA TETON NATIONAL PARK, WY John Archibald,, Inc J.S. Roemmel, SECOR International isoc TECHNOLOGY Microporous Hollow Fiber Mass

More information

FIVE-YEAR REVIEW PROCESS CAMP RAVENNA

FIVE-YEAR REVIEW PROCESS CAMP RAVENNA FIVE-YEAR REVIEW PROCESS CAMP RAVENNA James R Stachowski, PE Environmental Engineer US Army Corps of Engineers, Buffalo November 16, 2016 US Army Corps of Engineers Introduction Basis for doing five-year

More information

Public Presentation. Proposed Plan for Parcels E and UC-3 Hunters Point Naval Shipyard

Public Presentation. Proposed Plan for Parcels E and UC-3 Hunters Point Naval Shipyard Public Presentation Proposed Plan for Parcels E and UC-3 Hunters Point Naval Shipyard Keith Forman, Navy Environmental Coordinator BRAC Program Management Office February 28, 2013 1 Welcome and Introductions

More information

FEASIBILITY STUDY FORMER SEWAGE TREATMENT PLANT SITE NAS SOUTH WEYMOUTH RAB MEETING NOVEMBER 9, Phoebe Call Tetra Tech NUS, Inc.

FEASIBILITY STUDY FORMER SEWAGE TREATMENT PLANT SITE NAS SOUTH WEYMOUTH RAB MEETING NOVEMBER 9, Phoebe Call Tetra Tech NUS, Inc. NAS SOUTH WEYMOUTH FORMER SEWAGE TREATMENT PLANT SITE FEASIBILITY STUDY RAB MEETING NOVEMBER 9, 2006 Phoebe Call Tetra Tech NUS, Inc. Project Manager Diane Baxter Tetra Tech NUS, Inc. STP Site Manager

More information

Kirtland Air Force Base Fuel Spill Cleanup October 23, 2014

Kirtland Air Force Base Fuel Spill Cleanup October 23, 2014 Kirtland Air Force Base Fuel Spill Cleanup October 23, 2014 Welcome Col. Tony Haught Commander U.S. Air Force 377 th Mission Support Group 2 Revised Public Meeting Format Greater opportunities for public

More information

Limited Remedial Action Reference Documentation For Site Professionals

Limited Remedial Action Reference Documentation For Site Professionals Limited Remedial Action Reference Documentation For Site Professionals Version 1.2 May 2011 New Brunswick Department of Environment TABLE OF CONTENTS Section 1: Limited Remedial Action (LRA) Background...p.

More information

Remediation Strategies: Protecting Assets and Managing Cashflow. Presented by Dan Felten, PE, LSP, LEP

Remediation Strategies: Protecting Assets and Managing Cashflow. Presented by Dan Felten, PE, LSP, LEP Remediation Strategies: Protecting Assets and Managing Cashflow Presented by Dan Felten, PE, LSP, LEP NISTM National UST Conference, June 17, 2014 How many consultants does it take to change a light bulb?

More information

TABLE NO. 2 Industrial-Commercial

TABLE NO. 2 Industrial-Commercial Phase II Environmental Site Assessments (ESAs) What is a Phase II? An intrusive investigation of a site to collect samples of environmental media (i.e. soil, groundwater, surface water, and soil gas) for

More information

Managing a MGP Site Containing 121,000 Tons of Soils Containing Highly Impacted and Multiple Contaminates Of Concern (COC) Clinton, Iowa

Managing a MGP Site Containing 121,000 Tons of Soils Containing Highly Impacted and Multiple Contaminates Of Concern (COC) Clinton, Iowa Managing a MGP Site Containing 121,000 Tons of Soils Containing Highly Impacted and Multiple Contaminates Of Concern (COC) Clinton, Iowa Dean Hargens, Alliant Energy Frank Kellogg, DCI Environmental. Inc.

More information

The total estimated project costs and funding sources are summarized in the table below. Description Total Project Expenditures 20

The total estimated project costs and funding sources are summarized in the table below. Description Total Project Expenditures 20 The total estimated project costs and funding sources are summarized in the table below. Description 2005-2008 2009-2012 Total Project Expenditures 2005-2006 Environmental Site Assessment, Remediation

More information

The Port of Bellingham

The Port of Bellingham The Port of Bellingham Revitalizing Bellingham s Waterfront Mike Stoner, Environmental Director June 8, 2015 1 The Bellingham Bay Demonstration Pilot 2 100 Years of Industrial Use 3 4 Community Uncertainty

More information

Installation Restoration Program Framework: Introduction to CERCLA

Installation Restoration Program Framework: Introduction to CERCLA 1 NAVAL SUPPORT FACILITY, INDIAN HEAD Installation Restoration Program Framework: Introduction to Joseph Rail NAVFAC Washington April 16, 2015 2 Installation Restoration Program : Comprehensive Environmental

More information

Revised Risk Management Plan

Revised Risk Management Plan R EPORT Revised Risk Management Plan Former Petroleum Terminals and Related Pipelines Located at Pier 64 and the Vicinity City and County of San Francisco, California August 2006 Table of Contents Section

More information

How You Can Participate

How You Can Participate Proposed Plan for Cleanup Action at the Former Facility Area Port Heiden, Alaska February 2008 You are invited to comment on the information and proposed cleanup alternatives discussed in this Proposed

More information

INVESTIGATIONS AND ABATEMENT OF PRODUCED WATER IMPACTS AND SEEPS TO SURFACE WATER

INVESTIGATIONS AND ABATEMENT OF PRODUCED WATER IMPACTS AND SEEPS TO SURFACE WATER INVESTIGATIONS AND ABATEMENT OF PRODUCED WATER IMPACTS AND SEEPS TO SURFACE WATER Introduction SECTION 319 NONPOINT SOURCE GRANT UPPER COLORADO RIVER BASIN (Segment 1426) Coke and Runnels Counties, Texas

More information

RISK BASED CLOSURE ALTERNATIVE TO REMEDIATION AT AN URBAN SITE. Brian H. Hackett CP, EMS LLC January 17, 2011

RISK BASED CLOSURE ALTERNATIVE TO REMEDIATION AT AN URBAN SITE. Brian H. Hackett CP, EMS LLC January 17, 2011 RISK BASED CLOSURE ALTERNATIVE TO REMEDIATION AT AN URBAN SITE Brian H. Hackett CP, EMS LLC January 17, 2011 OVERVIEW This presentation will illustrate the use of the Ohio Voluntary Action Program (OVAP)

More information

DECISION DOCUMENT. Kent Avenue Station Site Voluntary Cleanup Program Brooklyn, Kings County Site No. V00732 October 2013

DECISION DOCUMENT. Kent Avenue Station Site Voluntary Cleanup Program Brooklyn, Kings County Site No. V00732 October 2013 DECISION DOCUMENT Kent Avenue Station Site Voluntary Cleanup Program Brooklyn, Kings County Site No. V00732 October 2013 Prepared by Division of Environmental Remediation New York State Department of Environmental

More information

Transmitted via . Mr. Nate Nemani U.S. Environmental Protection Agency Region 5 77 West Jackson Boulevard LU-9J Chicago, IL

Transmitted via  . Mr. Nate Nemani U.S. Environmental Protection Agency Region 5 77 West Jackson Boulevard LU-9J Chicago, IL Transmitted via E-mail Mr. Nate Nemani U.S. Environmental Protection Agency Region 5 77 West Jackson Boulevard LU-9J Chicago, IL 60604-3590 Arcadis of Michigan, LLC 28550 Cabot Drive Suite 500 Novi Michigan

More information

Steve Mailath, M.Sc., P.Geol. April 10, 2014 WATER NATURAL RESOURCES ENVIRONMENT INFRASTRUCTURE ENERGY

Steve Mailath, M.Sc., P.Geol. April 10, 2014 WATER NATURAL RESOURCES ENVIRONMENT INFRASTRUCTURE ENERGY IN-SITU REMEDIATION OF HYDROCARBON IMPACTED GROUNDWATER IN PERMAFROST TERRAIN AT A REMOTE SITE. TIBBITT TO CONTWOYTO WINTER ROAD, NORTHWEST TERRITORIES Steve Mailath, M.Sc., P.Geol. April 10, 2014 WATER

More information

What is Ethylene Dibromide (EDB)?

What is Ethylene Dibromide (EDB)? What is Ethylene Dibromide (EDB)? EDB is a synthetic chemical that has been used as a lead scavenger in aviation gas and leaded gasoline. EDB was also used as a fumigant in agriculture. EDB was in aviation

More information

Ex-situ Treatment & CAMU Implications at the Springvilla Site

Ex-situ Treatment & CAMU Implications at the Springvilla Site Ex-situ Treatment & CAMU Implications at the Springvilla Site David Anderson, Oregon DEQ State Coalition for Remediation of Drycleaners Kansas City, September 2004 Introduction Q Cleanup of former dry

More information

5 SURVEY PLANNING AND DESIGN

5 SURVEY PLANNING AND DESIGN 5 SURVEY PLANNING AND DESIGN 5.1 Introduction This chapter is intended to assist the user in planning a strategy for conducting a final status survey, with the ultimate objective being to demonstrate compliance

More information

3.7 GROUNDWATER AND SOILS Introduction Environmental Setting Applicable Regulations Impacts and Mitigation Measures

3.7 GROUNDWATER AND SOILS Introduction Environmental Setting Applicable Regulations Impacts and Mitigation Measures . GROUNDWATER AND SOILS 0.. Introduction.. Environmental Setting.. Applicable Regulations.. Impacts and Mitigation Measures... Project Impacts and Mitigation... Proposed Project... Construction Impacts

More information

Prepared by Ken Summerour, P.G.

Prepared by Ken Summerour, P.G. EXO TECH, INC. Remediation Solutions Provider Specialize in innovative chemical delivery-based solutions (completed over 125 injections/blending applications at 75 + sites since 2006). We provide ISCO/ISCR/Enhanced

More information

SR (Sustained Release) ISCO Reagent CASE STUDY

SR (Sustained Release) ISCO Reagent CASE STUDY T r e a t m e n t T r a i n A p p r o a c h U s i n g R e m O x S R + I S C O R e a g e n t C y l i n d e r s a t F o r m e r D r y C l e a n e r SR (Sustained Release) ISCO Reagent INTRODUCTION Achieving

More information

ATHENS COUNTRY STORE REVISED MODIFIED CORRECTIVE ACTION PLAN REPORT ATTF CP-21

ATHENS COUNTRY STORE REVISED MODIFIED CORRECTIVE ACTION PLAN REPORT ATTF CP-21 ATHENS COUNTRY STORE REVISED MODIFIED CORRECTIVE ACTION PLAN REPORT ATTF CP-21 Athens Country Store 1303 East Elm Street Athens, Limestone Co., AL Fac ID 15310-083-009322 UST 91-07-20 PREPARED FOR Watkins

More information

Presenters' Contact Information

Presenters' Contact Information Presenters' Contact Information Paul Ranieri Conestoga-Rovers & Associates 2055 Niagara Falls Blvd. Suite Three, Niagara Falls, New York 14304 Phone: 716-297-2160 Email: pranieri@craworld.com CHEMICAL

More information

HAZARDOUS MATERIAL SPILLS INFORMATION REQUEST

HAZARDOUS MATERIAL SPILLS INFORMATION REQUEST Page 1 HAZARDOUS MATERIAL SPILLS INFORMATION REQUEST QAZI TOWING 41-01 23RD STREET LONG ISLAND CITY, NY 11101 Spill Number: 0412186 Close Date: ADDRESS CHANGE INFORMATION Revised street: 4101 23RD STREET

More information

EXECUTIVE COUNCIL 14 NOVEMBER 2006

EXECUTIVE COUNCIL 14 NOVEMBER 2006 386 EC2006-655 ENVIRONMENTAL PROTECTION ACT PETROLEUM HYDROCARBON REMEDIATION REGULATIONS Pursuant to section 25 of the Environmental Protection Act R.S.P.E.I. 1988, Cap. E-9, Council made the following

More information

6.12 Former UGI Columbia Manufactured Gas Plant, Columbia, Pennsylvania

6.12 Former UGI Columbia Manufactured Gas Plant, Columbia, Pennsylvania 6.12 Former UGI Columbia Manufactured Gas Plant, Columbia, Pennsylvania The UGI Columbia Gas Plant site is located on less than 1 acre in an industrial area of the Borough of Columbia, Lancaster County,

More information

Fort Detrick Remedial. Study. US Army Corps of Engineers Baltimore District

Fort Detrick Remedial. Study. US Army Corps of Engineers Baltimore District Fort Detrick Remedial Investigation/Feasibility Study Restoration Advisory Board Meeting 10 January 2001 7:30 PM Fort Detrick, Frederick, Maryland Fort Detrick RI/FS Area A Update Completed Date Revised

More information

CITIZENS GUIDE Proposed soil cleanup plans for Lockheed Martin s Middle River Complex. Introduction. In This Guide

CITIZENS GUIDE Proposed soil cleanup plans for Lockheed Martin s Middle River Complex. Introduction. In This Guide CITIZENS GUIDE Proposed soil cleanup plans for Lockheed Martin s Middle River Complex Fall 2013 Introduction What is a Remedial Action Plan? Why is Lockheed Martin filing one for cleanup of the soil in

More information

Modern Electroplating Site Update. Dudley Vision Advisory Task Force September 2008 Meeting

Modern Electroplating Site Update. Dudley Vision Advisory Task Force September 2008 Meeting Modern Electroplating Site Update Dudley Vision Advisory Task Force September 2008 Meeting 1 Modern Electroplating Uncontrolled Waste Site Key elements that define a site relative to MA DEP and US EPA

More information

Environmental Advisory Board Meeting Robins Air Force Base February 4, 2016

Environmental Advisory Board Meeting Robins Air Force Base February 4, 2016 Welcome Environmental Advisory Board Meeting Robins Air Force Base February 4, 2016 1 Welcome and Program Introduction Mr. Lex Stokes EAB Installation Co-chair 2 Acronyms and Abbreviations AS/SVE Air Sparge/Soil

More information

Comparing Apples to Apples with Ground-water, NAPL, and Soil Data

Comparing Apples to Apples with Ground-water, NAPL, and Soil Data Comparing Apples to Apples with Ground-water, NAPL, and Soil Data Subtitle: Conversion of NAPL, Soil, and Ground-water Data to Common Frames of Reference using the Effective NAPL Solubility Relationship

More information

Risk-Based Cleanup Actions for Closure of a Brownfield Site

Risk-Based Cleanup Actions for Closure of a Brownfield Site Risk-Based Cleanup Actions for Closure of a Brownfield Site H.W. Rice, J.F. Feild, L.C. Farr Jr. AMEC Earth and Environmental, Inc. 7376 SW Durham Road, Portland, Oregon 97224 USA ABSTRACT Operating as

More information

Vapor Intrusion Pathway Feasibility Study

Vapor Intrusion Pathway Feasibility Study Vapor Intrusion Pathway Feasibility Study East Hennepin Avenue Site Minneapolis, Minnesota Prepared for General Mills, Inc. April 2016 4300 MarketPointe Drive, Suite 200 Minneapolis, MN 55435 Phone: 952.832.2600

More information

None of the samples collected from any of the areas contained concentrations of lead greater than the residential soil PRG of 400 mg/kg.

None of the samples collected from any of the areas contained concentrations of lead greater than the residential soil PRG of 400 mg/kg. background area, and all of the samples collected from the background areas contained copper at concentrations greater than 50 mg/kg. Thus, concentrations of copper in the muliwai samples appear to be

More information

Valentine-Clark State Superfund Site Bridal Veil Pond Open Space Operable Unit City of Minneapolis, Hennepin County, Minnesota

Valentine-Clark State Superfund Site Bridal Veil Pond Open Space Operable Unit City of Minneapolis, Hennepin County, Minnesota October 12, 2007 SITE DESCRIPTION FINAL MINNESOTA DECISION DOCUMENT Valentine-Clark State Superfund Site Bridal Veil Pond Open Space Operable Unit City of Minneapolis, Hennepin County, Minnesota The Bridal

More information

RE: Public Comment Period regarding proposed closure of the following four Leaking Underground Fuel Tank (LUFT) Cases:

RE: Public Comment Period regarding proposed closure of the following four Leaking Underground Fuel Tank (LUFT) Cases: 2646 Palma Drive, #450 Ventura, CA 93003 P 805-654-9611 F 805-654-9613 October 17, 2014 UCSB Environmental Health & Safety Attn: Ms. Jodi Woods 565 Mesa Road Santa Barbara, California 93106-5132 RE: Public

More information

Enbridge Oil Spill. Kalamazoo. Marshall. Augusta Battle Creek. Galesburg Ceresco. Release Site. Morrow Lake

Enbridge Oil Spill. Kalamazoo. Marshall. Augusta Battle Creek. Galesburg Ceresco. Release Site. Morrow Lake Enbridge Oil Spill Augusta Galesburg Morrow Lake Release Site Area August 4, 2010 Area Area August 5, 4, 2010 Area August September 5, 20, 2010 2012 Area September 20, 2012 September 17, 2014 Talmadge

More information