1 San Francisco Water Power Sewer Services of the San Francisco Public Utilities Commission 525 Golden Gate Avenue, 13th Floor San Francisco, CA T F Try September 13, 2016 TO: THROUGH: FROM: RE: Commissioner Francesca Vietor, President Commissioner Anson Moran, Vice President Commissioner Ann Moller Caen Commissioner Vince Courtney Commissioner Ike Kwon Harlan L. Kelly, Jr., General Manager Steven R. Ritchie, Assistant General Manager,. ater Water Supply Assessment for the 1629 Market Street Project 1.0 Summary 1.1 Introduction Under the Water Supply Assessment law (Sections through of the California Water Code), urban water suppliers like the San Francisco Public Utilities Commission (SFPUC) must furnish a Water Supply Assessment (WSA) to the city or county that has jurisdiction to approve the environmental documentation for certain qualifying projects (as defined in Water Code Section (a)) subject to the California Environmental Quality Act (CEQA). The WSA process typically relies on information contained in a water supplier's Urban Water Management Plan (UWMP), and involves answering specific questions related to the estimated water demand of the proposed project. This memo serves as the WSA for the proposed 1629 Market Street Project ("proposed project"), for use in the preparation of an environmental impact report by the City and County of San Francisco Planning Department (case no ENV, San Francisco Planning Department) Urban Water Management Plan The SFPUC's most current UWMP is the UWMP update for 2015, which was adopted in June The water demand projections in the UWMP incorporated 2012 Land Use Allocation (LUA 2012) housing and employment growth projections from the San Francisco Planning Department. The WSA for a qualifying project within the SFPUC's retail service area may use information from the UWMP. Therefore, the 2015 UWMP is incorporated via references throughout this WSA shown in bold, italicized text. The UWMP may be accessed at Edwin M. Lee Mayor Francesca Vietor President Anson Moran Vice President Ann Moller Caen Commissioner Vince Courtney Commissioner Ike Kwon Commissioner Harlan L. Kelly, Jr. General Manager

2 Memo to Commissioners WSA for 1629 Market Street Project September 13, 2016 Page 2 of Basis for Requiring a WSA for the Proposed Project The proposed project has not been the subject of a previous WSA, nor has it been part of a larger project for which a WSA was completed. The proposed project qualifies for preparation of a WSA under Water Code Section 10912(a) because it is a mixed-use residential development that includes more than 500 dwelling units. The proposed project is characterized further in Section Conclusion of this WSA In this WSA, the SFPUC concludes that there are adequate water supplies to serve the proposed project and cumulative retail water demands during normal years, single dry years, and multiple dry years over a 20-year planning horizon from 2020 through Additional information on supply sufficiency is provided in Section 4.2, Findings. 1.2 Proposed Project Description The project sponsor, Strada Brady, LLC, proposes to completely demolish the United Association Local 38 Plumbers and Pipefitter s Union Hall (UA Local 38) building, partially demolish the retail building at 1637 Market Street and add a vertical addition, and rehabilitate the Civic Center Hotel and add a vertical addition. The proposed project would include construction of approximately 477 market-rate residential rental units and about 9,275 square feet of retail/restaurant space along Market, 12th, and Brady Streets in four buildings (including the two vertical additions added to the rehabilitated Civic Center Hotel and behind the retained Market Street façade of the retail building at 1637 Market Street); construction of a fifth building containing an additional 107 units of affordable housing with on-site social services; and construction of a sixth building containing an approximately 27,300-square-foot new union hall and offices for UA Local 38. The planned Brady Street open space would be developed, in addition to open space in courtyards between the four market-rate buildings, which would extend southward from Market Street with their principal axes perpendicular to the street. Each of these four buildings and the supportive housing building, which would front on Colton Street, would include additional common open space for residents on the rooftops. The project site is located on the south side of Market Street between Brady and 12th streets, within San Francisco s Market and Octavia Area Plan. Refer to Attachment B for further details on the proposed project. 2.0 Water Supply This section reviews San Francisco s existing and planned water supplies. 2.1 Regional Water System See Section 3.1 of the UWMP for descriptions of the Regional Water System (RWS) and Section 6.1 of the UWMP for water rights held by City and County of San Francisco and the SFPUC Water System Improvement Program (WSIP). 2.2 Existing Retail Supplies Retail water supplies from the RWS are described in Section 6.1 of the UWMP. Local groundwater supplies, including the Westside Groundwater Basin, Central Groundwater Sub Basin, and Sunol Filter Gallery Subsurface Diversions, are described in Section of the UWMP. Local recycled water supplies, including the Harding Park Recycled Water Project and Pacifica Recycled Water Project, are described in Section of the UWMP.

3 Memo to Commissioners WSA for 1629 Market Street Project September 13, 2016 Page 3 of Planned Retail Water Supply Sources The San Francisco Groundwater Supply Project is described in Section of the UWMP. The proposed Westside and Eastside Recycled Water Projects, as well as non-potable water supplies associated with onsite water systems implemented in compliance with San Francisco s Non-potable Water Ordinance (Health Code Chapter 12C), are also described in Section of the UWMP. 2.4 Summary of Current and Future Retail Water Supplies A breakdown of water supply sources for meeting SFPUC retail water demand through 2040 in normal years is provided in Section of the UWMP. 2.5 Dry-Year Water Supplies A description of dry-year supplies developed under WSIP is provided in Section 7.2 of the UWMP. Other water supply reliability projects and efforts that are currently underway or completed are described in Section 7.4 of the UWMP. A breakdown of water supply sources for meeting SFPUC retail water demand through 2040 in multiple dry years are provided in Section 7.5 of the UWMP. For a single dry year, the retail RWS allocation and, thus, the breakdown of water supply sources would be the same as those in a normal year. 3.0 Water Demand This section reviews the climatic and demographic factors that may affect San Francisco s water use, projected retail water demands, and the demand associated with the proposed project. 3.1 Climate San Francisco has a Mediterranean climate. Summers are cool and winters are mild with infrequent rainfall. Temperatures in the San Francisco area average 57 degrees Fahrenheit annually, ranging from the mid-40s in winter to the upper 60s in late summer. Strong onshore flow of wind in summer keeps the air cool, generating fog through September. The warmest temperatures generally occur in September and October. Rainfall in the San Francisco area averages about 22 inches per year and is generally confined to the wet season from late October to early May. Except for occasional light drizzles from thick marine stratus clouds, summers are nearly completely dry. A summary of the temperature and rainfall data for the City of San Francisco is included in Table 1.

4 Memo to Commissioners WSA for 1629 Market Street Project September 13, 2016 Page 4 of 7 Month Table 1: San Francisco Climate Summary Average Maximum Temperature ( F) Average Minimum Temperature ( F) Average Monthly Rainfall (inches) January February March April May June July August September October November December Annual Average Source: Western Regional Climate Center ( data from two San Francisco monitoring stations (Mission Dolores/SF# and Richmond/SF#047767). 3.2 Projected Growth Projections of population growth in the retail service area through 2040 are presented in Section of the UWMP. The corresponding LUA 2012projections for housing and employment in San Francisco, which are incorporated into the projected retail water demands, are provided in Appendix E of the UWMP. 3.3 Projected Retail Water Demands For the 2015 UWMP, the SFPUC developed a new set of models that incorporate socioeconomic factors to project retail demands through These models incorporate the latest housing and employment projections from LUA See Section 4.1 of the UWMP for tabulated retail water demand projections through 2040 and a description of the model methodology. 3.4 Proposed Project Water Demand Strada Brady, LLC s water resource consultants provided a memo describing the methods and assumptions used to estimate the water demand of the proposed project, along with the resulting demand (Attachment B). The SFPUC reviewed the memo to ensure that the methodology is appropriate for the types of proposed water uses, the assumptions are valid and thoroughly documented along with verifiable data sources, and a professional standard of care was used. The SFPUC concluded that the demand estimates provided by Strada Brady, LLC s consultants are reasonable. Water demand associated with the proposed project over the 20-year planning horizon is shown in the following table.

5 Memo to Commissioners WSA for 1629 Market Street Project September 13, 2016 Page 5 of 7 Table 2: Water Demand Based on Project Phasing Demand of Proposed Project (mgd) Potable Demand Non-potable Demand Total Demand mgd = million gallons per day Notes: The proposed project would be completed and ready for occupancy by The San Francisco Planning Department has determined that the proposed project is encompassed within the projections presented in LUA 2012 as indicated in the letter from the Planning Department to the SFPUC (Attachment A). Therefore, the demand of the proposed project is also encompassed within the San Francisco retail water demands that are presented in Section 4.1 of the UWMP, which considers retail water demand based on the LUA 2012 projections. The following table shows the demand of the proposed project relative to total retail demand. Table 3: Proposed Project Demand Relative to Total Retail Demand Total Retail Demand (mgd) Total Demand of Proposed Project (mgd) Portion of Total Retail Demand % 0.08% 0.07% 0.07% Notes: 1. Retail water demands per Table 4-1 of the UWMP. 2. The proposed project is accounted for in the LUA 2012 projections and subsequent retail water demand projections. 4.0 Conclusion 4.1 Comparison of Projected Supply and Demand Section 7.5 of the UWMP compares the SFPUC s retail water supplies and demands through 2040 during normal year, single dry-, and multiple dry-year periods. See Table 4, below, which is adapted from the UWMP (Table 7-4). As explained previously in Section 3.4, water demands associated with the proposed project are already captured in the retail demand projections presented in the UWMP. The proposed project is expected to represent up to 0.08 percent of the total retail water demand.

6 Memo to Commissioners WSA for 1629 Market Street Project September 13, 2016 Page 6 of 7 Table 4: Projected Supply and Demand Comparison (mgd) Normal Year Single Dry Year 1 Multiple Dry Years Year 1 1 Year 2 2 Year 3 2 Total Retail Demand Total Retail Supply Surplus/(Deficit) Total Retail Demand Total Retail Supply Surplus/(Deficit) Total Retail Demand Total Retail Supply Surplus/(Deficit) Total Retail Demand Total Retail Supply Surplus/(Deficit) Total Retail Demand Total Retail Supply Surplus/(Deficit) (1.1) (1.1) Notes: 1. During a single dry year and multiple dry year 1, a system-wide shortage of 10% is in effect. Under the Water Shortage Allocation Plan (WSAP), the retail supply allocation at this stage of shortage is 36.0% of available RWS supply, or 85.9 mgd. However, due to the Phased WSIP Variant, only 81 mgd of RWS supply can be delivered. RWS supply is capped at this amount. 2. During multiple dry years 2 and 3, a system-wide shortage of 20% is in effect. Under the WSAP, the retail supply allocation at this stage of shortage is 37.5% of available RWS supply, or 79.5 mgd. RWS supply is capped at this amount. 3. Total retail demands correspond to those in Table 4-1 of the UWMP, and reflect both passive and active conservation, as well as water loss. 4. Total retail supplies correspond to those in Table 6-7 of the UWMP. Procedures for RWS allocations and the WSAP are described in Section 8.3 of the UWMP. Groundwater and recycled water are assumed to be used before RWS supplies to meet retail demand. However, if groundwater and recycled water supplies are not available, up to 81 mgd, or the corresponding capped amount in dry years, of RWS supply could be used. The LUA 2012 projections result in a retail demand in 2035 of 85.9 mgd, which represents a 5.0 mgd, or 6 percent, increase over the 2035 demand projected in the 2010 UWMP. The ability to meet the demand of the retail customers is in large part due to development of 10 mgd of local WSIP supplies, including conservation, groundwater, and recycled water. These supplies are anticipated to be fully implemented over the next 10 to 15 years. If planned future water supply projects (i.e., San Francisco Groundwater Supply Project, Westside Recycled Water Project, Eastside Recycled Water Project, and onsite non-potable supplies) are not implemented, normal-year supplies may not be enough to meet projected retail demands. To balance any water supply deficits during normal years, the SFPUC may import additional water from the RWS beyond the retail allocation of 81 mgd, with mitigation implemented by the SFPUC and potential environmental surcharges if RWS deliveries exceed the 265 mgd interim supply limitation.

7 Memo to Commissioners WSA for 1629 Market Street Project September 13, 2016 Page 7 of 7 If dry-year supply projects (i.e., Calaveras Dam Replacement Project, Lower Crystal Springs Dam Improvements Project, Alameda Creek Recapture, Regional Groundwater Storage and Recovery Project, and water transfers) are not implemented, existing dry year supplies may not be enough to meet projected retail demands. To balance any water supply deficits during dry years, the SFPUC may reduce system deliveries and impose customer rationing. The SFPUC remains committed to meeting the level of service goals and objectives outlined under WSIP. In addition, the SFPUC continues to explore other future supplies, including: Development of additional conservation and recycling. Development of additional groundwater supplies. Securing of additional water transfer volumes. Increasing Tuolumne River supply. 4.2 Findings Regarding the availability of water supplies to serve the proposed project beginning in 2021, the SFPUC finds, based on the entire record before it, as follows: During normal years, single dry years, and multiple dry years, the SFPUC has sufficient water supplies to serve the proposed project. With the addition of planned retail supplies, the SFPUC has sufficient water supplies available to serve its retail customers, including the demands of the proposed project, existing customers, and foreseeable future development. Approval of this WSA by the Commission is not equivalent to approval of the development project for which the WSA is prepared. A WSA is an informational document required to be prepared for use in the City s environmental review of a project under CEQA. It assesses the adequacy of water supplies to serve the proposed project and cumulative demand. Furthermore, this WSA is not a will serve letter and does not verify the adequacy of existing distribution system capacity to serve the proposed project. A will serve letter and/or hydraulic analysis must be requested separately from the SFPUC City Distribution Division to verify hydraulic capacity. If there are any questions or concerns, please contact Steve Ritchie at (415) or SRitchie@sfwater.org.

8

9 Attachment A Communications from San Francisco Planning Department

10

11 DATE: June 13, 2013 TO: FROM: RE: SF Planning EP Planners & SFPUC Planners Scott T. Edmondson, AICP; Aksel Olsen Project Types Represented in the Land Use Allocation This Memorandum explains the Planning Department s Land Use Allocation (LUA) and the types of projects included in the LUA. The 2012 LUA is the most recent update and uses the Association of Bay Area Governments (ABAG) May 2012 Jobs-Housing Connection Scenario. As this memorandum explains, the Planning Department expects that the LUA will encompass the vast majority of development proposals that project sponsors will present to the Planning Department. This memorandum also identifies possible unusual circumstances under which EP Planners and the SF PUC Planners may want to consult further with the Planning Department s Information and Analysis Group to determine whether a project is encompassed within the LUA. ABAG s Projections of San Francisco s Economic Growth and the LUA The LUA takes ABAG s 30-year projections of citywide household and job growth and allocates them to smaller geographic units, in this case, the traffic analysis zones of the SF Transportation Authority s Countywide Transportation Model. Thus, the LUA does not project growth but simply allocates ABAG s growth projections to subarea locations within the city. The current 2012 LUA uses ABAG s Jobs-Housing Connection Scenario projections for San Francisco and covers the period from 2010 to 2040; these projections were released in May 2012 and are represented in five-year increments. ABAG derives its demographic and economic growth projections from assumptions about long-term demographic and economic growth. 1 ABAG maintains its own set of regional models and develops each forecast with its in-house experts and private economic consultants. 2 The forecasting is informed by the best information and assumptions available through federal and State agencies, such as the State Department of Finance, and private sources. However, ABAG develops its forecast based on local knowledge from over 50 years of forecasting and develops the forecast to reflect local conditions in contrast to more general forecasting assumptions of State or federal sources. ABAG s estimate of total citywide growth for the 30-year period is expected to best represent actual growth at the end of the 30- year period. However, projected growth for any portion of the projection period, such as growth in a oneyear or a five-year period, would be expected to vary from actual growth in such periods. Within the 30- year growth projection period, higher than average growth periods could be followed by lower than average growth periods such that growth over the period would ultimately equal the projected 30-year Memo

12 SF Planning EP Planners & PUC Planners June 13, 2013 total. All projection methodologies make assumptions based on the best available information at the time. To minimize the effects of imprecision intrinsic to any projections methodology when used in for planning decisions, ABAG follows professional best practices and updates its projections every two years. Accordingly, the Planning Department updates its LUA every two years. The planning practice of frequently updating projections and plans allows the incorporation of new information over time to provide for the most up-to-date projections. The SFPUC updates its Urban Water Management Plan (UWMP) every five years. The UWMP typically relies on LUA projections or similar information. But, because the LUA is updated every two years, the SFPUC may want to review the LUA issued within SFPUC s 5-year UWMP cycle; and if it varies in a significant way from the SFPUC s projections used in its UWMP, discuss with Planning whether it should make any changes in its own water supply needs assessment during an UWMP cycle. Types of Projects Included in the LUA The LUA translates ABAG s projected household and job growth into total expected development in San Francisco over a 30-year period. The LUA translates ABAG s household growth into residential housing units and ABAG s job growth into commercial space. 3 Thus, the LUA projections of housing units and commercial space include all project types expected from San Francisco growth, such as housing, office, retail, production-distribution-repair (PDR), visitor, and cultural-institutional-educational (CIE). The LUA does not exclude any project type or potential growth. As such, the LUA and the ABAG economic projections upon which it is based contain the best estimates available of reasonably foreseeable growth and development in San Francisco over a 30-year period. Unusual Circumstances The LUA can be considered to include all reasonably expected growth and development and it is frequently updated to correct for expected variations. Nevertheless, there are possible unusual circumstances under which the EP Planners or SFPUC Planners may want to request further Planning Department consultation with the Information and Analysis Group to determine if a particular project falls within the LUA. ABAG s projections and the Department s LUA take into account urban economic trends and based on that information capture all reasonably foreseeable growth in San Francisco. Limited capital and aggregate demand of any urban economy constrains growth. However, occasionally the reality or perception may arise that a project lies outside the normal growth constraints of the San Francisco economy for some reason, and therefore lies outside ABAG s projection s and the Department s current spatial allocation in its LUA. One can envision the rare case of a project arising outside the City s economy (demand and capital) from an organization not located in San Francisco using nonprofit foundation funds or private donations to construct a large institutional project in San Francisco, such as a major hospital, a university, or an office complex. These projects would represent spending and demand beyond that normally active in the San Francisco economy, and therefore represent net additions to projected growth beyond that captured by ABAG s projections and reflected in the Department s LUA. Indicative characteristics of such projects 2

13 SF Planning EP Planners & PUC Planners June 13, 2013 would include those with non-local sponsors, of large size, and for an institutional land use. Alternatively, very large project proposals from local project sponsors active in the SF economy involving a large site, land assembly, a planned unit development (PUDs), master plans, or area plan and rezoning proposals may warrant individual assessment for a range of reasons even though they are likely captured in ABAG s projections and the LUA. Such projects would be similar to recent projects such as Hunters Point/Candlestick, Park Merced, Treasure Island, Pier 70 Master Plan, Eastern Neighborhoods, or the Transit Center District Plan. The bi-annual update of ABAG s projections and the LUA would be able to capture development associated with such projects. However, should such a project be proposed between updates, the EP Planners and SFPUC could treat its appearance as sufficient cause to request the Planning Department s assistance in determining whether to consider the project outside the latest LUA projections. 1 Please see ABAG s summary of its research and forecasting on its website: 2 ABAG describes its current Jobs-Housing Scenario policy-based forecast here: 3 The LUA citywide totals only differ slightly, up to within one percent of ABAG totals (+/-). The difference is produced by LUA s complex method of translating ABAG projections into development (residential units and commercial space) and allocating total citywide growth to subarea locations. The minor difference between the LUA and ABAG citywide totals is real in absolute terms, but not in the sense that they are different projections. The one percent difference does not constitute a difference of projections. ABAG and MTC consider variation of one percent in citywide totals, plus or minus, as sufficiently representing ABAG s projections for consistency with the MTC regional projections and modeling purposes (congestion management, etc.). Even if a few versions of the LUA must be done to make minor subarea spatial allocation corrections, as long as the LUA s citywide totals are within one percent of ABAG s projections, and ABAG s projections have not changed, the LUA citywide totals have not effectively changed either. Any of those LUA versions citywide totals fully represent the same unchanged ABAG projection totals. 3

14

15 Attachment B 1629 Market Street Project Demand Memo

16

17 550 Kearny Street Suite 800 San Francisco, CA phone fax memorandum date September 12, 2016 to from subject Debra Dwyer, San Francisco Planning Department, Environmental Planning William Goodman and Katie Hofstetter, Strada Investment Group 1629 Market Street: Water Supply Assessment Request The purpose of the memorandum is to provide the specific project information necessary for the San Francisco Public Utilities Commission (SFPUC) to prepare a Water Supply Assessment (WSA) for the proposed 1629 Market Street project (proposed project). This memo provides a brief project description, description of alternatives, and estimated project water and wastewater demands for the proposed project, based on the calculations developed in the SFPUC Non-Potable Water Calculator, Version 3.3. Project Description The project sponsor, Strada Brady, LLC, proposes to completely demolish the United Association Local 38 Plumbers and Pipefitter s Union Hall (UA Local 38) building, partially demolish the retail building at 1637 Market Street and add a vertical addition, and rehabilitate the Civic Center Hotel and add a vertical addition. The proposed project (Assessor s Block 3505, Lots 001, 007, 008, 027, 028, 029, 031, 031A, 032, 032A, 033, 033A, 034, and 035) would include construction of approximately 477 market-rate residential rental units and about 9,275 square feet of retail/restaurant space along Market, 12th, and Brady Streets in four buildings (including the two vertical additions added to the rehabilitated Civic Center Hotel and behind the retained Market Street façade of the retail building at 1637 Market Street); construction of a fifth building containing an additional 107 units of affordable housing with on-site social services; and construction of a sixth building containing an approximately 27,300-square-foot new union hall and offices for UA Local 38. The planned Brady Street open space would be developed, in addition to open space in courtyards between the four market-rate buildings, which would extend southward from Market Street with their principal axes perpendicular to the street. Each of these four buildings and the supportive housing building, which would front on Colton Street, would include additional common open space for residents on the rooftops. The project site is located on the south side of Market Street between Brady and 12th streets, within San Francisco s Market and Octavia Area Plan. Table 1 provides a summary of the relevant project information.

18 1629 Market Street: Water Supply Assessment Request TABLE 1 PROJECT INFORMATION Project Name 1629 Market Street Case No. Estimated Construction Date Project Contact Project Address ENV Early-2020 Debra Dwyer (415) , debra.dwyer@sfgov.org 1629 Market Street Block/Lot 3505/ 001, 007, 008, 027, 028, 029, 031, 031A, 032, 032A, 033, Project Site Size Proposed Project Days In Operation Per Year 033A, 034, and ,618 square feet (2.2-acres) 365 residential days (260 office working days; 352 retail days) The residential and retail/restaurant component would comprise four market-rate, eight- to ten-story, 65- to 85- foot-tall buildings along Market, Brady, and 12th streets and within the project site area containing 477 dwelling units, two of which would provide rooftop decks. An approximately 140-foot-long portion of the existing frontage of the 1637 Market Street retail building would be retained and used for the proposed retail uses along Market Street. Similarly, the existing Civic Center Hotel at 12th and Market streets would be retained with a vertical addition for residential uses and retail uses on the ground floor. The fifth residential building would contain 107 affordable housing units in a six-story building located on Colton Street; a rooftop deck also would be provided. The proposed residential and retail/restaurant component would contain approximately 498,142 gross square feet (gsf) of residential space, 9,275 gsf of retail/restaurant space on the first and second floors (approximately 6,275 gsf of retail and 3,000 gsf of restaurant), and approximately 17,542 gsf of common residential open space in the form of roof decks, and ground-floor open space. Project characteristics are shown in Table 2. Proposed Use Total Proposed (gsf) Residential Uses 498,142 Retail/Restaurant 9,275 Office 27,296 Basement/Parking/Mechanical/Loading 98,736 TOTAL 633,449 Total Site Area 97,617 Impervious Roof Area a 55,989 Other Impervious Area b 17,968 Open Space c 20,750 Total Dwelling Units 584 units Height of Buildings 65 to 85 feet Notes: a Excludes green roof features (factored under open space) b Includes sidewalks and impervious alley and courtyard areas. c Includes residential access roof decks, and publicly-accessible open spaces. SOURCE: Kennerly Architecture and Planning, Strada Investment Group, June The UA Local 38 component would comprise a 27,296 gsf, four-story, 65-foot-tall building on the corner of Market Street and 12th streets. An approximately 4,535-square-foot, publicly-accessible mid-block alley would separate two of the residential components and afford pedestrian connectivity through the project site, providing access from Market Street to the 18,148-square-foot Brady Square Park. 2

19 1629 Market Street: Water Supply Assessment Request Tables 3, 4, and 5 show information pertinent to the estimate of water demand for the proposed project; this includes the proposed office, retail/restaurant, and residential square footages as well as the site coverage data. The land uses and site coverage data are based on the total square footage of the proposed project, as well as total employment, housing unit occupancy, and square footage of impervious or landscaped area. As the types of retail uses are not known at this time, it is assumed for the purposes of calculating water demand that the building would employ general retail uses. Consistent with the City s Non-Potable Water Ordinance, it is likely that actual project water demand will be lower, after incorporation of the use of low-flow fixtures and other water saving measures (including reuse), that are not yet fully defined at this time. TABLE 3 PROPOSED PROJECT, BUILDING INPUTS GSF Per Land Use Commercial Use Occupancy Proposed Use Total Proposed (gsf) Days in Use FTE Transient FTE Estimated FTE Estimated Transient FTE Office 27, Retail 6, Restaurant 3, TOTAL 36, Between the general office, retail, and restaurant care uses on site, it is anticipated that the project would employ approximately 127 FTEs and 80 transient FTEs at buildout. Likewise, for residential occupancy of the proposed project, default values of 2.01 persons per household were used for an estimated 1,174 residents living onsite at buildout. Data Inputs TABLE 4 PROPOSED PROJECT, RESIDENTIAL INPUTS Residential Type multi-family Occupancy 2.01 persons per household unit Number of Residential Units 584 units Residential Gross Area 498,142 gsf Number of Residential Occupants 1,174 people Days in Operation 365 days Project coverage refers to the permeability of materials used onsite. Just over half of the project site would be covered in impervious surfaces, which would include the roof and sidewalk/alleyway areas. More than half of the site area would consist of rooftop open spaces, which would be a mix of paving and landscaped areas. TABLE 5 PROPOSED PROJECT, COVERAGE Surface Area Impervious Area 73,957 gsf Roof 55,989 gsf Sidewalks/ Open Space 17,968 gsf Pervious Area 20,750 gsf Landscaped Area a 11,979 gsf Green Roof 8,771 gsf a Open Space does not assume turfgrass, as features do not involve turfgrass development 3

20 1629 Market Street: Water Supply Assessment Request Proposed Project Demand Table 6 shows the estimated daily and annual water demand for the proposed project by land use category. As shown, the total water use for the project would be 62,038 gallons per day (gpd), or million gallons per year (gpy). Of the total water demand, 62,038 gpd would be for indoor water use and 463 gpd would be for irrigation purposes. In addition, SFPUC estimates that approximately 90 percent pf water supplied is discharged as wastewater into the sewer system; therefore, the project would discharge around 55,834 mgd, or 20.3 million gpy, of wastewater. Lastly, because the project would comply with the City s Non-potable Water Ordinance, other water saving measures not yet determined at this time, but which could involve water efficient fixtures and onsite reuse, could result in the availability of 28,080 gpd, or 10,249,153 gpy of greywater to offset projected water demand. TABLE 6 - PROPOSED PROJECT, ESTIMATED DEMAND Proposed Use Estimated Daily Water Demand (gpd) Estimated Annual Water Demand (gpy) Commercial water demand 1, ,589 Potential greywater generated and available for reuse 32 11,688 Multi-Family water demand 55,348 20,201,921 Potential greywater generated and available for reuse 28,048 10,237,465 HVAC/Cooling water demand a 5,627 2,053,860 Irrigation N/A 168,832 TOTAL b 62,038 22,764,202 Wastewater Discharge (at 90% non-landscape water supplied) 55,834 20,335,833 Total Greywater Available For Reuse 28,080 10,249,153 a Assumes 171,155 gal/month b Does not reflect offset of potable demands with greywater sources 4

San Francisco Water Prwcfr3r Sewer Services of the San Francisco Public Utilities Commission

San Francisco Water Prwcfr3r Sewer Services of the San Francisco Public Utilities Commission San Francisco Water Prwcfr3r Sewer Services of the San Francisco Public Utilities Commission 525 Golden Gate Avenue, 13th Floor San Francisco, CA 94102 r 415.554.3155 F 415.554.3161 TTY 415.554.3488 September

More information

San Francisco Water Power Sewer Services of the San Francisco Public Utilities Commission

San Francisco Water Power Sewer Services of the San Francisco Public Utilities Commission San Francisco Water Power Sewer Services of the San Francisco Public Utilities Commission 525 Golden Gate Avenue, 13th Floor San Francisco, CA 94102 T 415.554.3155 F 415.554.3161 TTY 415.554.3488 September

More information

San Francisco rt:n wer Services of the San Francisco Public Utilities Commission

San Francisco rt:n wer Services of the San Francisco Public Utilities Commission San Francisco rt:n wer Services of the San Francisco Public Utilities Commission 525 Golden Gate Avenue, 13th Floor San Francisco, CA 94102 -r 415.554.3155 F 415.554.3161 m 415.554.3488 March 27, 2018

More information

San Francisco Water Power Sewer Services of the San Francisco Public Utilities Commission

San Francisco Water Power Sewer Services of the San Francisco Public Utilities Commission San Francisco Water Power Sewer Services of the San Francisco Public Utilities Commission 525 Golden Gate Avenue, 13th Floor San Francisco, CA 94102 T 415.554.3155 F 415.554.3161 TTY 415.554.3488 January

More information

Appendix 8-1 Water Supply Assessment

Appendix 8-1 Water Supply Assessment Appendix 8-1 Water Supply Assessment AGENDA ITEM Public Utilities Commission City and County of San Francisco DEPARTMENT Water Enterprise AGENDA NO. 14 Approve Water Supply Assessment: Regular Calendar

More information

San Francisco Water Power Sewer Services of the San Francisco Public Utilities Commission

San Francisco Water Power Sewer Services of the San Francisco Public Utilities Commission San Francisco Water Power Sewer Services of the San Francisco Public Utilities Commission 525 Golden Gate Avenue, 13th Floor San Francisco, CA 94102 T 415.554.3155 F 415.554.3161 Try 415.554.3488 February

More information

Francisco, CA _ T 415, p 41s e1 TTY Services of the San Francisco Public Utilities Commission

Francisco, CA _ T 415, p 41s e1 TTY Services of the San Francisco Public Utilities Commission San FranCISCO S. 525 Golden Gate Avenue, 13th Floor a n Francisco, CA 94102.... _ T 415,554.3155 Water Power Sewer p 41s.554.31e1 TTY 415.554.3488 Services of the San Francisco Public Utilities Commission

More information

San Francisco Water Power Sewer Service* of the San Francisco Public Utilities Commission

San Francisco Water Power Sewer Service* of the San Francisco Public Utilities Commission San Francisco Water Power Sewer Service* of the San Francisco Public Utilities Commission 525 Golden Gate Avenue, 13th Floor San Francisco, CA 94102 T 415.554.3155 F 415.554.3161 TTY 415.554.3488 MEMORANDUM

More information

Appendix G. Utilities Resource Data

Appendix G. Utilities Resource Data Utilities Resource Data This page intentionally left blank. . Utilities Resource Data Table G-1. Summary of San Francisco Green Building Ordinance 2008 2009 2010 2012 and Beyond Commercial >5,000 gross

More information

%&&2^ Harlan L. Kelly, Jr., General Manager

%&&2^ Harlan L. Kelly, Jr., General Manager San Francisco Water Powe Sewer Services of the San Francisco Public Utiiities Commission 525 Golden Gate Avenue, 13th Floor San Francisco, CA 94102 T 415.554.3155 F 415.554.3161 TTY 415.554.3488 MEMORANDUM

More information

San Francisco Water PowerS<

San Francisco Water PowerS< San Francisco Water PowerS< Services of the San Francisco Public Utilities Commission 525 Golden Gate Avenue, 13th Floor San Francisco, CA 94102 T 415.554.3155 F 415.554.3161 TTY 415.554.3488 DATE: TO:

More information

K. UTILITIES AND SERVICE SYSTEMS SETTING SEWER AND WASTEWATER TREATMENT PLANT CAPACITY WATER. IV. Environmental Setting, Impacts, and Mitigation

K. UTILITIES AND SERVICE SYSTEMS SETTING SEWER AND WASTEWATER TREATMENT PLANT CAPACITY WATER. IV. Environmental Setting, Impacts, and Mitigation K. UTILITIES AND SERVICE SYSTEMS This section describes the major utilities serving the project site and evaluates the effects of the proposed project on utilities and service systems. SETTING The project

More information

San Francisco Water Power Sewer Services of the San Francisco Public Utilities Commission

San Francisco Water Power Sewer Services of the San Francisco Public Utilities Commission San Francisco Water Power Sewer Services of the San Francisco Public Utilities Commission 525 Golden Gate Avenue, 13th Floor San Francisco, CA 94102 T 415.554.3155 F 415.554.3161 m 415.554.3488 February

More information

6.13 Utilities and Service Systems

6.13 Utilities and Service Systems 6.13 6.13.1 Introduction This section describes impacts for utilities and service systems that would result from construction and operation of the CEQA Alternatives. 6.13.2 Regulatory Setting There are

More information

20. UTILITIES AND SERVICE SYSTEMS

20. UTILITIES AND SERVICE SYSTEMS June 28, 2018 Page 20-1 20. UTILITIES AND SERVICE SYSTEMS This EIR chapter describes existing conditions for and distribution, collection and, and solid waste disposal and recycling in the planning area.

More information

Final Program Environmental Impact Report

Final Program Environmental Impact Report October 30, 2008 Final Program Environmental Impact Report Volume 4 of 8 For the San Francisco Public Utilities Commission s WATER SYSTEM IMPROVEMENT PROGRAM San Francisco Planning Department File No.

More information

WATER SUPPLY ASSESSMENT STUDY

WATER SUPPLY ASSESSMENT STUDY WATER SUPPLY ASSESSMENT STUDY Facebook Campus Expansion Menlo Park, California Prepared for: City of Menlo Park Prepared by: Erler & Kalinowski, Inc. 3 February 2016 EKI B50071.00 Water Supply Assessment

More information

9 CEQA Alternatives. Alternatives

9 CEQA Alternatives. Alternatives 9 CEQA Alternatives 9 CEQA Alternatives CHAPTER 9 CEQA Alternatives Sections Tables 9.1 Introduction 9.2 Alternatives Analysis 9.3 Comparison of Alternatives to the Proposed WSIP 9.4 Alternatives Identification

More information

City and County of San Francisco San Francisco Planning Department. Summary Presentation on

City and County of San Francisco San Francisco Planning Department. Summary Presentation on City and County of San Francisco San Francisco Planning Department Summary Presentation on Draft Program Environmental Impact Report for the San Francisco Public Utilities Commission s Water System Improvement

More information

65 East Project (P18-045) Addendum to an Environmental Impact Report

65 East Project (P18-045) Addendum to an Environmental Impact Report 65 East Project (P18-045) Addendum to an Environmental Impact Report File Number/Project Name: 65 East Project (P18-045) Project Location and Surrounding Land Uses: The proposed project site consists of

More information

Planning Commission Motion No GENERAL PLAN REFERRAL HEARING DATE DECEMBER 19, 2013

Planning Commission Motion No GENERAL PLAN REFERRAL HEARING DATE DECEMBER 19, 2013 Planning Commission Motion No. 19052 GENERAL PLAN REFERRAL HEARING DATE DECEMBER 19, 2013 Date: December 12, 2013 Case No.: 2008.1122EPR Project Name: Zoning: P (Public) Zoning District OS (Open Space)

More information

CORBIN AND NORDHOFF IV. ENVIRONMENTAL IMPACT ANALYSIS ENV EIR N. UTILITIES AND SERVICES

CORBIN AND NORDHOFF IV. ENVIRONMENTAL IMPACT ANALYSIS ENV EIR N. UTILITIES AND SERVICES 3. WATER ENVIRONMENTAL SETTING The LADWP provides water service to the project area. It is the responsibility of the DWP to insure that the quality of the water meets all applicable standards for drinking

More information

CEQA Categorical Exemption Determination

CEQA Categorical Exemption Determination CEQA Categorical Exemption Determination PROPERTY INFORMATION/PROJECT DESCRIPTION Project Address REC & PARK: JURI COMMONS PARK RENOVATION Case No. 2018-009517ENV Block/Lot(s) 6532008 Permit No. Addition/

More information

WATER SUPPLY EVALUATION STUDY

WATER SUPPLY EVALUATION STUDY WATER SUPPLY EVALUATION STUDY ConnectMenlo General Plan and M-2 Area Zoning Update Menlo Park, California Prepared for: City of Menlo Park Prepared by: Erler & Kalinowski, Inc. 3 February 2016 EKI B50071.00

More information

Chapter 4. Environmental Setting and Impacts 4. ENVIRONMENTAL SETTING AND IMPACTS

Chapter 4. Environmental Setting and Impacts 4. ENVIRONMENTAL SETTING AND IMPACTS 4. ENVIRONMENTAL SETTING AND IMPACTS INTRODUCTION This chapter describes the existing environmental conditions in the Seawall Lot 337 and Pier 48 Mixed- Use Project (Mission Rock Project or proposed project)

More information

San Francisco Water Power Sewer Services of the San Frandsco Public Utilities Commission

San Francisco Water Power Sewer Services of the San Frandsco Public Utilities Commission San Francisco Water Power Sewer Services of the San Frandsco Public Utilities Commission OFFICE OFTHE GENERAL MANAGER 525 Golden Gate Avenue, 13th Floor San Francisco, CA 94102 T 415.554.3155 F 415.554.3161

More information

CEQA Categorical Exemption Determination

CEQA Categorical Exemption Determination CEQA Categorical Exemption Determination PROPERTY INFORMATION/PROJECT DESCRIPTION Project Address SF REC & PARK: 6335 FULTON STREET Case No. 2018-003817ENV Block/Lot(s) 1700001 Permit No. Addition/ Alteration

More information

City of White Plains Westchester County, NY. Draft Generic Environmental Impact Statement

City of White Plains Westchester County, NY. Draft Generic Environmental Impact Statement 60 South Broadway Rezoning Project City of White Plains Westchester County, NY Draft Generic Environmental Impact Statement July 2, 2014 60 SOUTH BROADWAY CB-3 REZONING AND ZONING TEXT AMENDMENTS DRAFT

More information

Commissioner Francesca Vietor, President Commissioner Anson B. Moran, Vice President Commissioner Ann Moller Caen Commissioner F. X.

Commissioner Francesca Vietor, President Commissioner Anson B. Moran, Vice President Commissioner Ann Moller Caen Commissioner F. X. SAN FRANCISCO PUBLIC UTILITIES COMMISSION OFFICE OF THE ASSISTANT GENERAL MANAGER, WATER 1155 Market Street, 11th Floor, San Francisco, CA 94103 Tel. (415) 934-5736 WATER WASTEWATER POWER GAVIN NEWSOM

More information

Memo to the Planning Commission HEARING DATE: MAY 20, 2010

Memo to the Planning Commission HEARING DATE: MAY 20, 2010 Memo to the Planning Commission HEARING DATE: MAY 20, 2010 Date: May 13, 2010 Case No.: 2007.0946BEMRTUZ Project Address: Candlestick Point and Hunters Point Shipyard Phase 2 Current Zoning: RH 2 (Residential,

More information

Addendum to Mitigated Negative Declaration

Addendum to Mitigated Negative Declaration REMARKS Background Addendum to Mitigated Negative Declaration Date of Publication of Addendum: Date of Final MND: March 29, 2012 Case No.: 2004.1004E Project Title: 1150 16 th Street Residential Retail

More information

4.K UTILITIES AND SERVICE SYSTEMS

4.K UTILITIES AND SERVICE SYSTEMS 4.K UTILITIES AND SERVICE SYSTEMS This section provides background information on utilities and service systems, including water supply, wastewater and stormwater systems, solid waste, and energy. The

More information

Case Report HEARING DATE: MARCH 21, 2018

Case Report HEARING DATE: MARCH 21, 2018 Central SoMa Plan HEARING DATE: MARCH 21, 2018 Project Name: Central SoMa Plan Date: March 14, 2018 Record Number: 2011.1356MTZU Staff Contact: Steve Wertheim, Principal Planner, Citywide Planning (415)

More information

Streamlining Regulations: San Francisco s Non-potable Water Program

Streamlining Regulations: San Francisco s Non-potable Water Program Services of the San Francisco Public Utilities Commission Streamlining Regulations: San Francisco s Non-potable Water Program February 4, 2013 Paula Kehoe, Water Resources Director San Francisco Public

More information

CHAPTER 2 Water Demands

CHAPTER 2 Water Demands CHAPTER 2 Water Demands This chapter provides an overview of the City s water service area and describes the City s historical annual water use. Subsequent sections of this chapter examine projected water

More information

SAN JOSE CAPITAL OF SILICON VALLEY

SAN JOSE CAPITAL OF SILICON VALLEY COUNCIL AGENDA: 09-22-15 ITEM: ) (, j k>) SAN JOSE CAPITAL OF SILICON VALLEY CITY COUNCIL STAFF REPORT File No. C15-031 Applicant: Joseph and Nina Pavone Location Northeast corner of Lincoln Avenue and

More information

San Francisco Water Power Sewer Operator of the Hetch Hetchy Regional Water System

San Francisco Water Power Sewer Operator of the Hetch Hetchy Regional Water System San Francisco Water Power Sewer Operator of the Hetch Hetchy Regional Water System Bureau of Environmental Management 1145 Market Street, Suite 500 San Francisco, CA 94103 T 415.934.5700 F 415.934.5750

More information

Water and Sewer Infrastructure

Water and Sewer Infrastructure Chapter 11: Water and Sewer Infrastructure A. INTRODUCTION This chapter evaluates the potential for significant adverse impacts on water and sewer infrastructure that could result from the proposed project.

More information

EXAMPLE Stormwater Management Plans w/ CSS BMP Sizing Calculator (v2.1)

EXAMPLE Stormwater Management Plans w/ CSS BMP Sizing Calculator (v2.1) 525 Golden Gate Avenue, 11th Floor San Francisco, CA 94102 EXAMPLE Stormwater Management Plans w/ CSS BMP Sizing Calculator (v2.1) The following example Stormwater Management Plans (SMPs) are provided

More information

CEQA Categorical Exemption Determination

CEQA Categorical Exemption Determination CEQA Categorical Exemption Determination PROPERTY INFORMATION/PROJECT DESCRIPTION Project Address Block/Lot(s) REC & PARK: 210V HYDE STREET 0336/003 Case No. 2017-016267ENV Permit No. Addition/ Alteration

More information

# 7 ) UN MY PLACE HOTEL SPECIAL USE PERMIT PUBLIC HEARING

# 7 ) UN MY PLACE HOTEL SPECIAL USE PERMIT PUBLIC HEARING # 7 ) UN-53-16 MY PLACE HOTEL SPECIAL USE PERMIT PUBLIC HEARING STAFF REPORT To: Planning Commission Meeting date: September 14, 2016 Item: UN-53-16 Prepared by: Marc Jordan GENERAL INFORMATION: Applicant:

More information

Streamlining Regulations: San Francisco s Non-potable Water Program

Streamlining Regulations: San Francisco s Non-potable Water Program Services of the San Francisco Public Utilities Commission Streamlining Regulations: San Francisco s Non-potable Water Program October 9, 2012 Paula Kehoe, Water Resources Director Sarah Rhodes, Water Resources

More information

CHAPTER 3 Water Supply

CHAPTER 3 Water Supply CHAPTER 3 3.1 WATER SUPPLY OVERVIEW This chapter describes the sources of water available to the City and MID. The chapter includes a description of each water source, including limitations, water quality

More information

PARCEL P-12 DEVELOPMENT & URBAN DESIGN GUIDELINES

PARCEL P-12 DEVELOPMENT & URBAN DESIGN GUIDELINES PARCEL P-12 DEVELOPMENT & URBAN DESIGN GUIDELINES Development Guidelines Parcel P-12 is an approximately 30,000 square feet parcel located in the South Cove Urban Renewal Area, owned by the Boston Redevelopment

More information

4. ENVIRONMENTAL SETTING AND IMPACTS A. INTRODUCTION TO CHAPTER 4 FORMAT OF THE ENVIRONMENTAL ANALYSIS

4. ENVIRONMENTAL SETTING AND IMPACTS A. INTRODUCTION TO CHAPTER 4 FORMAT OF THE ENVIRONMENTAL ANALYSIS 4. ENVIRONMENTAL SETTING AND IMPACTS A. INTRODUCTION TO CHAPTER 4 Chapter 4, Environmental Setting and Impacts, addresses the physical environmental effects of the Proposed Project. This Introduction to

More information

APPENDIX C WATER SUPPLY ASSESSMENT CORRESPONDENCE

APPENDIX C WATER SUPPLY ASSESSMENT CORRESPONDENCE APPENDIX C WATER SUPPLY ASSESSMENT CORRESPONDENCE This page intentionally left blank. a CITY OF OAKLAND Planning, Building and Neighborhood Preservation Department 250 Frank H. Ogawa Plaza, Suite 3315,

More information

CEQA Categorical Exemption Determination

CEQA Categorical Exemption Determination CEQA Categorical Exemption Determination PROPERTY INFORMATION/PROJECT DESCRIPTION Project Address REC & PARK: Rose de Vents - 100 John F. Kennedy Drive Case No. 2018-014948ENV Block/Lot(s) Permit No. Addition/

More information

Final Water Supply Assessment

Final Water Supply Assessment Final Water Supply Assessment for the Proposed Treasure Island Yerba Buena Island Project November 2009 Prepared by: In coordination with the San Francisco Public Utilities Commission, Water Enterprise

More information

CEQA Categorical Exemption Determination

CEQA Categorical Exemption Determination CEQA Categorical Exemption Determination PROPERTY INFORMATION/PROJECT DESCRIPTION Project Address Block/Lot(s) Case No. Permit No. Addition/ Alteration Demolition (requires HRE for Category B Building)

More information

The City and MID adopted this 2010 UWMP in Copies of the adoption resolutions are included in Appendix B. ES-1

The City and MID adopted this 2010 UWMP in Copies of the adoption resolutions are included in Appendix B. ES-1 ES.1 INTRODUCTION This (UWMP) has been prepared for the City of Modesto (City) and the Modesto Irrigation District (MID) by West Yost Associates (West Yost) as a joint UWMP. This 2010 UWMP for the City

More information

3. Water Conservation Program

3. Water Conservation Program 3. Water Conservation Program The City of Tumwater s conservation program consists of both independent and regional cooperative efforts. Tumwater partners with the LOTT Alliance, the regional wastewater

More information

Environmental and Development Services Department Planning Division San Pablo Avenue, El Cerrito, CA (510) FAX: (510)

Environmental and Development Services Department Planning Division San Pablo Avenue, El Cerrito, CA (510) FAX: (510) Environmental and Development Services Department Planning Division 10890 San Pablo Avenue, El Cerrito, CA 94530 (510) 215-4330 - FAX: (510) 233-5401 N O T I C E O F P R E P A R A T I O N DATE: April 4,

More information

San Francisco Public Utilities Commission Hydrological Conditions Report for September 2017 J. Chester, C. Graham, & N. Waelty, October 10, 2017

San Francisco Public Utilities Commission Hydrological Conditions Report for September 2017 J. Chester, C. Graham, & N. Waelty, October 10, 2017 San Francisco Public Utilities Commission Hydrological Conditions Report for September 2017 J. Chester, C. Graham, & N. Waelty, October 10, 2017 Cherry Lake this winter (above) and last week (below). Currently

More information

3.0 CUMULATIVE IMPACT ANALYSIS METHODOLOGY

3.0 CUMULATIVE IMPACT ANALYSIS METHODOLOGY 3.0 CUMULATIVE IMPACT ANALYSIS METHODOLOGY 1. PURPOSE The purpose of this section is to explain the methodology for the cumulative project analysis presented in this EIR. This section is important because,

More information

From: City of Santa Cruz, Planning Dept., 809 Center Street, Room 206, Santa Cruz, CA 95060

From: City of Santa Cruz, Planning Dept., 809 Center Street, Room 206, Santa Cruz, CA 95060 CITY OF SANTA CRUZ Notice of Exemption To: Clerk of the Board Office of Planning and Research County of Santa Cruz 1400 Tenth Street, Room 121 Governmental Center Sacramento, CA 95814 701 Ocean Street

More information

CHAPTER 9 Supply and Demand Comparison

CHAPTER 9 Supply and Demand Comparison CHAPTER 9 Water Code 10635,(c) Every urban water supplier shall include, as part of its urban water management plan, an assessment of the reliability of its water service to its customers during normal,

More information

PERMITTED USES: Within the MX Mixed Use District the following uses are permitted:

PERMITTED USES: Within the MX Mixed Use District the following uses are permitted: 6.24 - MX - MIXED USE DISTRICT 6.24.1 INTENT: The purpose of the MX Mixed Use District is to accommodate the development of a wide-range of residential and compatible non-residential uses (including major

More information

WASTEWATER INTRODUCTION ENVIRONMENTAL SETTING

WASTEWATER INTRODUCTION ENVIRONMENTAL SETTING 3.14.4 WASTEWATER INTRODUCTION This section of the Draft EIR describes the wastewater disposal conditions in the area surrounding the project site. The analysis focuses on potential impacts to wastewater

More information

Section 3.8.2, Regional Initiatives: update section on San Mateo County Green Building Ordinance to reflect ordinance language.

Section 3.8.2, Regional Initiatives: update section on San Mateo County Green Building Ordinance to reflect ordinance language. Memo To: Thomas Rogers, City of Menlo Park From: Mark Hoffheimer Date: March 6, 2012 Subject: Task H: Sustainability Revisions Purpose In accordance with the requirement that the Sustainability section

More information

Sustainable Design Plan

Sustainable Design Plan Draft Jan 2012 4 Contents 4.1 Sustainable Approach to Design and Development 4.1.1 Understanding Sustainability 4.1.2 Response to Context and Location 4.2 Energy 4.2.1 Energy and Transportation 4.2.2 Local

More information

TOWN OF SAN ANSELMO PLANNING COMMISSION STAFF REPORT. For the meeting of March 20, Agenda Item 6A

TOWN OF SAN ANSELMO PLANNING COMMISSION STAFF REPORT. For the meeting of March 20, Agenda Item 6A TOWN OF SAN ANSELMO PLANNING COMMISSION STAFF REPORT For the meeting of March 20, 2017 Agenda Item 6A Owners: Grace Fisher Design Professional: Buildergirl Construction Project Address: 318 The Alameda

More information

ARTICLE IV. ZONING DISTRICTS DIVISION 9. M-X MIXED USE DISTRICT. (2) Ensure sensitivity to the surrounding neighborhood;

ARTICLE IV. ZONING DISTRICTS DIVISION 9. M-X MIXED USE DISTRICT. (2) Ensure sensitivity to the surrounding neighborhood; ARTICLE IV. ZONING DISTRICTS 36-263 DIVISION 9. M-X MIXED USE DISTRICT Sec. 36-261. Purpose. The purposes of the M-X mixed use district are to: (1) Provide areas for mixed use development that are carefully

More information

SAN FRANCISCO PUBLIC UTILITIES COMMISSION STRATEGIC PLAN

SAN FRANCISCO PUBLIC UTILITIES COMMISSION STRATEGIC PLAN 2020 SAN FRANCISCO PUBLIC UTILITIES COMMISSION STRATEGIC PLAN Mayor Edwin M. Lee Commissioners Francesca Vietor, President Anson Moran, Vice President Ann Moller Caen Vince Courtney Ike Kwon Executive

More information

City of Palo Alto (ID # 7047) City Council Staff Report

City of Palo Alto (ID # 7047) City Council Staff Report City of Palo Alto (ID # 7047) City Council Staff Report Report Type: Consent Calendar Meeting Date: 6/13/2016 Summary Title: East Palo Alto Comment Letter Title: Approval and Authorization for the City

More information

Initial Study Community Plan Evaluation

Initial Study Community Plan Evaluation Initial Study Community Plan Evaluation Case No.: 2014 002026ENV Project Address: 1726 1730 Mission Street Zoning: UMU (Urban Mixed Use) District 68 X Height and Bulk District Block/Lot: 3532/004A and

More information

ENVIRONMENTAL IMPACT ANALYSIS WATER RESOURCES: WATER SUPPLY 1. ENVIRONMENTAL CONDITIONS. a. Physical Setting. (1) Water Supply

ENVIRONMENTAL IMPACT ANALYSIS WATER RESOURCES: WATER SUPPLY 1. ENVIRONMENTAL CONDITIONS. a. Physical Setting. (1) Water Supply IV. E.2. ENVIRONMENTAL IMPACT ANALYSIS WATER RESOURCES: WATER SUPPLY 1. ENVIRONMENTAL CONDITIONS a. Physical Setting (1) Water Supply The Los Angeles Department of Water and Power (LADWP) owns, operates,

More information

5 CEQA Required Conclusions

5 CEQA Required Conclusions 5 CEQA Required Conclusions This section presents a summary of the impacts of the proposed Pacifica General Plan on several subject areas specifically required by CEQA, including significant irreversible

More information

PPA Case No U for 585 Bryant St

PPA Case No U for 585 Bryant St SAN FRANCISCO PLANNING DEPARTMENT ULUW DATE: July 25, 2014 TO: FROM: RE: Charles Muller Joshua Switzky, Planning Department PPA for 585 Bryant St Please find the attached Preliminary Project Assessment

More information

SFPUC Water Conservation Program November 2012

SFPUC Water Conservation Program November 2012 Services of the San Francisco Public Utilities Commission SFPUC Water Conservation Program November 2012 1 Water Customers Daly City Hayward Palo Alto San Jose SFPUC Service Area Demands San Francisco

More information

THE VALLEY HOSPITAL 223 NORTH VAN DIEN AVENUE BLOCK 3301 LOT 51 VILLAGE OF RIDGEWOOD, NEW JERSEY PREPARED: JUNE 19, 2013 PRESENTED: JULY 16, 2013

THE VALLEY HOSPITAL 223 NORTH VAN DIEN AVENUE BLOCK 3301 LOT 51 VILLAGE OF RIDGEWOOD, NEW JERSEY PREPARED: JUNE 19, 2013 PRESENTED: JULY 16, 2013 THE VALLEY HOSPITAL 223 NORTH VAN DIEN AVENUE BLOCK 3301 LOT 51 VILLAGE OF RIDGEWOOD, NEW JERSEY PREPARED: JUNE 19, 2013 PRESENTED: JULY 16, 2013 ph: 201.666.1811 jhb@burgis.com 25 Westwood Avenue, Westwood

More information

SAIV FRANCISCO PLANNING DEPARTMENT

SAIV FRANCISCO PLANNING DEPARTMENT ~~P~o covnr~o~ s v x ~ m ~,~ a~b3s;:...;o? 5ti SAIV FRANCISCO PLANNING DEPARTMENT Certificate of Determination I NFILL PROJECT ENVIRONMENTAL REVIEW Case No.: 2015-018056ENV Project Address: Zoning: NCT

More information

1.0 INTRODUCTION A. PURPOSE OF THE DRAFT EIR 1-1

1.0 INTRODUCTION A. PURPOSE OF THE DRAFT EIR 1-1 1.0 INTRODUCTION This Draft Environmental Impact Report (Draft EIR or EIR) has been prepared for the 1020 S. Figueroa Street Project (the Project). Jia Yuan USA Co., Inc., the Applicant, proposes to develop

More information

Preliminary Mitigated Negative Declaration

Preliminary Mitigated Negative Declaration Preliminary Mitigated Negative Declaration Date: December 27, 2017 Case No.: 2015 012994ENV Project Title: 200 214 Van Ness Avenue (San Francisco Conservatory of Music Mixed Use Project) Zoning: C 3 G

More information

David Balducci, Align Real Estate Doug Flaming, Doug Flaming Construction Management, Inc. Shari Libicki, Sarah Manzano, Kevin Warner

David Balducci, Align Real Estate Doug Flaming, Doug Flaming Construction Management, Inc. Shari Libicki, Sarah Manzano, Kevin Warner MEMO Date: 1/13/17 To From CC David Balducci, Align Real Estate Doug Flaming, Doug Flaming Construction Management, Inc. Shari Libicki, Sarah Manzano, Kevin Warner Amara Morrison, Wendel Rosen Black &

More information

ADDITIONAL GENERAL PLAN EDITS TO CONSIDER

ADDITIONAL GENERAL PLAN EDITS TO CONSIDER ADDITIONAL GENERAL PLAN EDITS TO CONSIDER OVERVIEW During the circulation period for the Draft Environmental Impact Report, additional changes, edits, and clarifications to the Draft General Plan have

More information

EXECUTIVE SUMMARY UNIVERSITY OF CALIFORNIA, SAN DIEGO REVELLE COLLEGE APARTMENTS AND COMMONS DINING RENOVATION PROJECT

EXECUTIVE SUMMARY UNIVERSITY OF CALIFORNIA, SAN DIEGO REVELLE COLLEGE APARTMENTS AND COMMONS DINING RENOVATION PROJECT EXECUTIVE SUMMARY UNIVERSITY OF CALIFORNIA, SAN DIEGO REVELLE COLLEGE APARTMENTS AND COMMONS DINING RENOVATION PROJECT FINAL INITIAL STUDY/MITIGATED NEGATIVE DECLARATION (STATE CLEARINGHOUSE NO. 2008101108)

More information

CITY OF SUSANVILLE PLANNING DIVISION PROJECT & ENVIRONMENTAL QUESTIONNAIRE

CITY OF SUSANVILLE PLANNING DIVISION PROJECT & ENVIRONMENTAL QUESTIONNAIRE This form is available on line at www.cityofsusanville.org CITY OF SUSANVILLE PLANNING DIVISION PROJECT & ENVIRONMENTAL QUESTIONNAIRE This document will assist the Planning Divisions evaluation of the

More information

Honorable Mayor and Members of the City Council. Submitted by: Dan Marks, Director, Planning and Development

Honorable Mayor and Members of the City Council. Submitted by: Dan Marks, Director, Planning and Development Office of the City Manager To: From: Honorable Mayor and Members of the City Council Phil Kamlarz, City Manager Submitted by: Dan Marks, Director, Planning and Development Subject: EXECUTIVE SUMMARY Senate

More information

DRAFT MEMORANDUM OF UNDERSTANDING BETWEEN THE SAN FRANCISCO PUBLIC UTILITIES COMMISSION AND THE SAN FRANCISCO RECREATION AND PARK DEPARTMENT

DRAFT MEMORANDUM OF UNDERSTANDING BETWEEN THE SAN FRANCISCO PUBLIC UTILITIES COMMISSION AND THE SAN FRANCISCO RECREATION AND PARK DEPARTMENT DRAFT MEMORANDUM OF UNDERSTANDING BETWEEN THE SAN FRANCISCO PUBLIC UTILITIES COMMISSION AND THE SAN FRANCISCO RECREATION AND PARK DEPARTMENT FOR THE APPLICATION AND MANAGEMENT OF WATER USE EFFICIENCY PROGRAMS

More information

SECTION 5: ALTERNATIVES TO THE PROPOSED PROJECT

SECTION 5: ALTERNATIVES TO THE PROPOSED PROJECT City of American Canyon Broadway District Specific Plan Alternatives to the Proposed Project SECTION 5: ALTERNATIVES TO THE PROPOSED PROJECT 5.1 Introduction In accordance with CEQA Guidelines Section

More information

Hwang, Jin. Hi Yvonne & Earl,

Hwang, Jin. Hi Yvonne & Earl, Hwang, Jin From: Kay, Maria Sent: Tuesday, July 12, 2016 4:23 PM To: Rayas-glen, Yvonne; Moosbrugger, Earl Subject: Final Board Letter - Crossroads Hollywood WSA Attachments: Crossroads Hollywood BOARD

More information

Environmental Setting, Impacts, Standard Conditions of Approval, and Mitigation Measures

Environmental Setting, Impacts, Standard Conditions of Approval, and Mitigation Measures CHAPTER 4 Environmental Setting, Impacts, Standard Conditions of Approval, and Mitigation Measures This Draft EIR has been prepared in accordance with CEQA, as amended (Public Resources Code Section 21000,

More information

CP-3. Planned Commercial District-3. Section Use. Buildings and lots in the CP-3 district may be used for the following purposes:

CP-3. Planned Commercial District-3. Section Use. Buildings and lots in the CP-3 district may be used for the following purposes: CP-3 Planned Commercial District-3 Section 1510. Purpose. The CP-3 district, to be known as a "Planned Commercial District," is intended to preserve neighborhood-scaled commercial uses and to promote new

More information

Prepared by 2015 RETAIL WATER CONSERVATION PLAN

Prepared by 2015 RETAIL WATER CONSERVATION PLAN Prepared by 2015 RETAIL WATER CONSERVATION PLAN 2015 Retail Water Conservation Plan San Francisco Public Utilities Commission Water Enterprise June 2016 V11, issued June 22, 2016 This page intentionally

More information

MEMORANDUM PLANNING DIVISION COMMUNITY & NEIGHBORHOODS

MEMORANDUM PLANNING DIVISION COMMUNITY & NEIGHBORHOODS MEMORANDUM PLANNING DIVISION COMMUNITY & NEIGHBORHOODS To: From: Salt Lake City Historic Landmark Commission Ashley Scarff, Planner (801) 535-7660 or ashley.scarff@slcgov.com Date: April 4 th, 2019 Re:

More information

WHEREAS, the Board has previously so adopted a wastewater supply system comprehensive plan, and

WHEREAS, the Board has previously so adopted a wastewater supply system comprehensive plan, and LAKEHAVEN WATER AND SEWER DISTRICT King County, Washington Resolution No. 2017-1283 A RESOLUTION of the Board of Commissioners of the Lakehaven Water and Sewer District, King County, Washington, adopting

More information

North Woodbridge Urban Mixed Use Master Zoning Plan

North Woodbridge Urban Mixed Use Master Zoning Plan North Woodbridge Urban Mixed Use Master Zoning Plan 18 October 2005 Project Team: Potomac Communities A premier residential, business and visitor location on the Potomac River 2004-2008 Strategic Plan

More information

MARIN COUNTY COMMUNITY DEVELOPMENT AGENCY ALEX HINDS, DIRECTOR

MARIN COUNTY COMMUNITY DEVELOPMENT AGENCY ALEX HINDS, DIRECTOR MARIN COUNTY COMMUNITY DEVELOPMENT AGENCY ALEX HINDS, DIRECTOR TO: FROM: Members of the Planning Commission Tom Lai RE: Item 6: Planning Commission Hearing of November 26, 2007 Development Code Amendments

More information

1.1 Introduction

1.1 Introduction Table of Contents Executive Summary ES.1 Introduction... ES-1 ES.2 Plan Adoption... ES-1 ES.3 Plan Overview... ES-2 ES.3.1 Service Area... ES-2 ES.3.2 Water Demand... ES-3 ES.3.3 Projected Water Supply...

More information

5. OTHER CEQA CONSIDERATIONS A. GROWTH-INDUCING IMPACTS

5. OTHER CEQA CONSIDERATIONS A. GROWTH-INDUCING IMPACTS 5. OTHER CEQA CONSIDERATIONS Chapter 5, Other CEQA Considerations, includes a discussion of growth-inducing impacts, significant unavoidable impacts, significant irreversible impacts, and areas of known

More information

RESOLUTION NO. MARCIE L. EDWARDS General Manager

RESOLUTION NO. MARCIE L. EDWARDS General Manager RESOLUTION NO. BOARD LETTER APPROVAL MARTIN L. ADAMS Senior Assistant General Manager Water System MARCIE L. EDWARDS General Manager DATE: April 13June 2413, 2016 SUBJECT: Water Supply Assessment - Crossroads

More information

4.6 PUBLIC SERVICES AND UTILITIES A. SUMMARY

4.6 PUBLIC SERVICES AND UTILITIES A. SUMMARY 4.6 PUBLIC SERVICES AND UTILITIES A. SUMMARY This section discusses impacts to fire service, police service, wastewater facilities, and water supply to the CCSF Main Campus that could result from the proposed

More information

Stormwater Control Plan for Post Construction Requirements Exhibit 4

Stormwater Control Plan for Post Construction Requirements Exhibit 4 Stormwater Control Plan for Post Construction Requirements Exhibit 4 Application Submittal Where directions state Done that means no additional information or forms below that point needs to be filled

More information

ARTICLE 987. PD 987. PD 987 was established by Ordinance No , passed by the Dallas City Council on June 14, (Ord.

ARTICLE 987. PD 987. PD 987 was established by Ordinance No , passed by the Dallas City Council on June 14, (Ord. ARTICLE 987. PD 987. SEC. 51P-987.101. LEGISLATIVE HISTORY. PD 987 was established by Ordinance No. 30512, passed by the Dallas City Council on June 14, 2017. SEC. 51P-987.102. PROPERTY LOCATION AND SIZE.

More information

Table 17.A1 and Table 17.A2 below show water demand and supply for the Project respectively. Table 17.A1 Potable and Non-Potable Water Demand [1]

Table 17.A1 and Table 17.A2 below show water demand and supply for the Project respectively. Table 17.A1 Potable and Non-Potable Water Demand [1] 17. WATER SUPPLY A. 1. Provide projection of the average daily potable and non-potable water demands at the end of each phase of development. If significant seasonal demand variations will occur, discuss

More information

APPENDIX N Guidance for Preparing/Reviewing CEQA Initial Studies and Environmental Impact Reports

APPENDIX N Guidance for Preparing/Reviewing CEQA Initial Studies and Environmental Impact Reports APPENDIX N N.1 Guidance for Preparing and Reviewing CEQA Initial Studies Step 1: Consider the Project Characteristics as Provided by the Project Applicant Review the project application and draft plan

More information

Planada Community Services District Municipal Service Review

Planada Community Services District Municipal Service Review Final Report Planada Community Services District Municipal Service Review Prepared for: Merced County Local Agency Formation Commission Prepared by: April 2015 As Approved by LAFCO April 15, 2015 EPS #141037

More information

Department of Planning Services Division of Planning SARAH E. KEIFER, AICP Phone: 302/ Director of Planning Services FAX: 302/

Department of Planning Services Division of Planning SARAH E. KEIFER, AICP Phone: 302/ Director of Planning Services FAX: 302/ Kent County Department of Planning Services Division of Planning SARAH E. KEIFER, AICP Phone: 302/744-2471 Director of Planning Services FAX: 302/736-2128 KRISTOPHER S. CONNELLY, AICP Assistant Director

More information

San Francisco Public Utilities Commission Hydrological Conditions Report February 2018 J. Chester, C. Graham, & N. Waelty, March 6, 2018

San Francisco Public Utilities Commission Hydrological Conditions Report February 2018 J. Chester, C. Graham, & N. Waelty, March 6, 2018 San Francisco Public Utilities Commission Hydrological Conditions Report February 2018 J. Chester, C. Graham, & N. Waelty, March 6, 2018 Snow covered Cherry Lake after a winter storm. 1 System Storage

More information

TRANSIT CENTER DISTRICT PLAN

TRANSIT CENTER DISTRICT PLAN TRANSIT CENTER DISTRICT PLAN Public Workshop #2: Initial Findings and Proposals 04.30.2008 San Francisco Planning Department In partnership with: San Francisco Redevelopment Agency Transbay Joint Powers

More information