Tweed Shire Council DRAFT Water Supply Asset Management Plan

Size: px
Start display at page:

Download "Tweed Shire Council DRAFT Water Supply Asset Management Plan"

Transcription

1 Tweed Shire Council DRAFT Water Supply Asset Management Plan April 2011

2 Version Control This Document is a live Council document and is subject to periodic review. The validity and currency of the document is critical in applying its content as it contains significant asset management and performance data that is real-time based. If you are reading this document leases check the version date below to make sure that the document is correct. Version Version Date Status V1 April 2011 Final Draft - Water Unit Submission to EMT V2 April 2011 Final Draft - Water Unit Submission to Council for Exhibition

3 Table of Contents 1 Introduction Background and Rationale for Council s Involvement Community Strategic Plan and Objectives Service Contribution to Community Outcomes Water Supply Principal Objectives Community Satisfaction with the Service Community Input Approach Levels of Service The Existing Situation Public Water Supply Systems Overall Condition of Assets Risk Management Maintenance and Operating Future Demand/Utilisation New Capital Expenditure Proposed Future Capital Works Programme How Growth Capital Works are to be Funded Other Capital Works Policies Renewals Capital Expenditure Funding the Annual Net Cost Licences/Property Designations The Supply of Water for Fire Fighting Purposes Integrated Water Cycle Management Demand Management Organisation and Management Service Delivery Options Standards and Guidelines Asset Management Processes, Systems and Data Management Quality Management Improvement Plan Contents i

4

5 1 Introduction 1.1 Background and Rationale for Council s Involvement The NSW State Government has delegated to Local Government the responsibility for provision of water supply services for NSW country towns. The statutory framework for provision of this service by Councils is provided by the Local Government Act Community Strategic Plan and Objectives Council s Vision for the Tweed Shire Area as a basis for the Tweed Community Strategic Plan 2011/2021 is: The Tweed will be recognised for its desirable lifestyle, strong community, unique character, and environment and the opportunities its residents enjoy. with a mission statement of: Working with the community and partners, provide leadership in facilitating and delivering services that manage growth sustainably, create opportunity and enhance the value of our civic and natural assets for this and future generations. A key objective of the Strategic Plan under the theme Civic Leadership which applies to Council s water supply service is: Water Supply Objective (1.3.3): To properly manage and maintain existing and future assets based on principles of equity and sustainability. A key objective of the Strategic Plan under the theme Supporting Community Life which applies to Council s water supply service is: Water Supply Objective (2.3.2): To provide a secure, high quality and reliable drinking water supply service which meets health and environment requirements and projected demand. A key objective of the Strategic Plan under the theme Caring for the Environment which applies to Council s water supply service is: Water Supply Objective (4.3.1): To manage water resources sustainability and minimise impact on the environment by achieving more integration of water supply, wastewater and stormwater services. Page 1

6 1.3 Service Contribution to Community Outcomes The Community Strategic Plan outcomes to which the water supply service primarily relates are shown in Table 1. Table 1 Community Outcomes Community Outcome How the Water Supply Service Contributes Civic Leadership Responsible and transparent decision making to set the overall direction and long-term goals for the Shire. By ensuring water supply services are provided within a strategic business planning framework. By ensuring legislative requirements are met in delivering the service. By ensuring community input is provided for and its expectations and capacity to pay are considered in setting levels of service. By ensuring assets are properly managed within an a whole of life cycle cost approach Supporting Community Life People are healthy, safe, connected and in harmony with the natural environment, to retain and improve the quality of community life. By ensuring high quality reliable water supply services are provided for urban properties and systems are properly managed, maintained and monitored. By ensuring fire fighting capacity is available for urban properties Strengthening The Economy The region s economic base is strengthened and diversified in a way that complements the Tweed s environmental and social values. By ensuring aadequately located and pressured connections for fire fighting are provided. By ensuring the water supply service is cost effective. By ensuring a long-term perspective is incorporated into the management and planning decisions for current and future service. By ensuring water supply contingencies are provided for in the service as appropriate. By ensuring that the service can meet sustainable growth projections. Caring For The Environment Council and community value, respect and actively participate in the care and management of the natural environment. By managing the extractions of fresh water to minimise the detrimental effects on the natural environment. By ensuring the water supply service considers and addresses issues related to the environment. By achieving more integration of water and water supply services. By promoting water cycle education Page 2

7 1.4 Water Supply Principal Objectives Council s principal objectives for the provision of water supply services are: to provide water supply services within a strategic business planning framework to meet legislative requirement including licence requirements regarding surface and ground water supply extraction conditions to provide additional system capacity to meet sustainable growth projections to efficiently and sustainably operate the water supply systems to provide an equitable, responsive and cost effective water supply service to provide a high quality, reliable and sufficient water supply service to promote water cycle education including conservation and reuse to manage assets on a whole of life cycle cost basis to ensure the on-going effective provision of water supply services to put in place a sound management regime for all matters relating to the provision of the water supply service Council has several roles with respect to water supply services: to co-ordinate the setting of community outcomes for water supply services to monitor and report the progress that is being made towards achievement of those outcomes to provide water supply services to the urban community to properly manage the water supply assets to ensure that all customers are provided with safe and adequate water supplies to ensure that fire hydrants are installed in the reticulated areas, and that they are maintained and charged with water Council services the main urban communities of the Shire. Council works with the wider rural community to promote the use of alternative water supply systems such as rainwater tanks, groundwater sources and recycled water. 1.5 Community Satisfaction with the Service Council has undertaken an extensive community engagement campaign via several means to inform the community and encourage public input into the Community Strategic Plan 2011/2021. The plan states that submissions called for Council to focus on its core roles and Council will respond with a rigorous program to manage and maintain council assets. Leading issues conveyed through an online survey, forums and in written submissions related to the provision of water supply and wastewater services included: Restrictions on population growth Decisions based on sustainability Listen to / act upon community feedback Transparency in consultation / decision making Water management, including rain water tanks Opposition to dams Protect waterways Protect biodiversity. Page 3

8 Independent research conducted by phone survey of 300 residents also provided a sample of opinion which reflects the wider views of the Tweed community. Survey participants indicated the most important issues confronting the Tweed included, amongst others: Quality water supply, wastewater and garbage services Protecting its natural attributes / biodiversity Other related results were: Water supply, wastewater and garbage services rated an average 8/10 in importance and 7/10 on how well they were being provided. 13% indicated water supply and wastewater services were one of three areas important enough to warrant allocating more money (within a limited budget). In contrast, it was found that the same percentage chose to cut allocations from these areas in preference to other areas. 1.6 Community Input Approach Council endeavours to accommodate the interests of stakeholders and will involve them in the decision process at a level in the accordance with the Council s Consultation Policy and as required by statute. Comment and community review is received as part of Council s consultation in preparing the 4 year delivery programme for water services. Individual strategies and policy will be publically exhibited for comment as part of their preparation. 2 Levels of Service The key water supply levels of service attributes that Council desires to be measured against are: environment sustainability and efficiency of service delivery quality of water supplied reliability, availability and adequacy of the water supply systems including ability of reticulation to provide water for fire fighting purposes system capacity to accommodate growth affordability to customers responsive, effective and equitable service to customers meeting legislative requirements The following table details customer s expectations for the water supply service and Council s service indicators and target levels. The information is grouped under service attributes for the quadruple bottom line categories of environment, social/cultural, economic and governance. Page 4

9 Quadruple Bottom Line Service Attributes Table 2 Water Supply Levels of Service Customer Expectations Water Level of Service Indicator Target Less than 180 kwh per 1000 connected assessments Sustainable Energy consumption Less than 160 net tonnes CO2-equivalents of GHG emissions per 1000 connected assessments Environment (protecting the environment) Efficient Potential environmental will be identified and properly managed by Council in providing and managing the service. Percentage of unaccounted for water. Average annual residential water supplied (kl/property) Average annual residential water supplied (L/p/day) Average annual water supplied (L/p/day) Less than 10% of annual treated water production volume. 180 kl/year 180 L/p/day 300 L/p/day Percent increase in annual volume of water extracted Less than percent increase in population growth % of extracted water treated and delivered to system Greater than 95% Quality Connected properties will receive good quality drinking water delivered under pressure, which is clear and has no obvious taste or smell. Percent of time treated water supplied to ADWG. Number of water quality complaints Number of moderate / major water public health incidents. 100% of the time. Less than 3 per 1,000 connected assessments per year Nil Unplanned interruption time. Service to 95% restored in less than 5 hours. Notified Planned interruption time. Service to 95% restored in less than 12 hours. Social/cultural) (supporting community life) Reliable Connected properties can be assured of a continuous supply. Number of unplanned interruptions. Number of water main failures. Number of water service connection failures. Less than 35 per 1000 connected assessments per year. Less than 10 breaks per 100 km of mains per year. Less than 10 breaks per 1000 connected assessments per year. Available Sufficient Properties designated rateable to water supply are able to connect to the system. Council will provide a water supply service of sufficient capacity Percent of time water restrictions applying. 0% Residential water services installed in 7 working days of application 100% Percent of properties meeting a minimum flow of 4.5 L/min and pressure of 200 kpa at the property boundary 100% Maximum water pressure at the property boundary of 750 kpa. 100% Page 5

10 Quadruple Bottom Line Social/cultural) (supporting community life Economic (strengthening the economy) Service Attributes Sufficient Capacity Affordable Customer Expectations Water Level of Service Indicator Target Council will provide a water supply service of sufficient capacity Water will be provided (and appropriately located) for fire fighting. Council will provide a water supply service sufficient to meet planned demand. The service is being provided at a reasonable cost. Percent of properties meeting design flow and pressure as determined from the current land use zoning density and Council's publicised design criteria Minimum flow and water pressure at hydrant for fire fighting 100% Planned annual capital expenditure for growth. Greater than 85% Annual bill based on 200 kl/annum will be comparable across region and metropolitan centres 11 L/min. at 150 kpa (residential). 20 L/min. at 150 kpa (commercial, industrial, high rise). No more than10% annual increase Responsive Information and requests in relation to the service and complaints will be dealt with properly and in a timely manner. Notification time for planned interruptions to affected connected assessments. Availability of information on problems with water supply 48 hrs Information on problem provided on Council s Service Centre line within 30 mins. Governance (civic leadership) Equitable Customers are treated equally with charges fairly calculated and applied. A user pays system is implemented (fixed service charge and pay for each kilolitre of water used) Annual review and adoption of user pays tariff charges Compliant Council meets its legislative requirements. Number of occurrences where legislative requirements are not met Nil breaches Effective Customers satisfied with the level of service provided. Number of water supply system customer requests Less than 30 per 1000 connected assessments Page 6

11 3 The Existing Situation 3.1 Public Water Supply Systems Tweed Shire Council owns and operates water supply systems in three discrete areas - Tweed District, Uki and Tyalgum. The treatment plants servicing the Tweed District and Uki areas comply with the requirements of the Australian Drinking Water Quality Guidelines. The Tyalgum plant is to be upgraded to meet these requirements. Urban assessments are serviced with a connection to their respective water supply system. At present Council has no plans to supply a water service to any of the Shire rural areas, which typically rely on rainwater tanks. Key water supply statistics are provided in Table 3 and the age and material profiles for reticulation and trunk main pipelines in Figures 1 and 2 Table 3 Water Supply Statistics Permanent population supplied 73,534 Number of residential connections 32,284 Number of non-residential connections 1,976 Raw water transfer mains length 3 km Reticulation mains length 505 km Trunk mains length 185 km Total length of water mains 693 km Pumping stations - potable and non-potable 27 Number of service reservoirs 41 Volume Treated (2009/10) 10,550 ML/yr Figure 1 Water Pipeline Age Profile Page 7

12 Figure 2 Water Pipeline Material Profile (by % of total Length) 3.2 Overall Condition of Assets Pipeline Assets Council has developed a systematic documented process for condition grading and assessment of the likelihood of failure for pipeline assets based on visual observations of pipe structural condition and performance history data (e.g. main breaks). Where this information is not available a coarse condition grade is determined from age and material type. Likelihood of failure in conjunction with consequence of failure derived from spatial information determines the overall risk - from low to extreme. The risk together with hydraulic capacity drives the development and implementation of maintenance and improvement programmes, including: Water main renewals and rehabilitation Critical water mains condition assessment Repairs to water mains as necessary Water supply system augmentation works to increase capacity to meet peak demand days, fire fighting flow requirements etc. Page 8

13 Figure 3 Water Pipeline Condition Profile (by % of total Length) Non-pipeline Assets Figure 4 Water Pumping Stations Overall Condition Profile Page 9

14 Figure 5 Reservoirs Overall Condition Profile Figure 6 Water Treatment Plants Overall Condition Profile 3.3 Risk Management Council has recently adopted an Enterprise Risk Management Framework consisting of a Risk Management Policy and accompanying Risk Management Plan in accordance with AS/NZS 4360:1999 Risk Management. The associated documents establish the standards, systems and processes for evaluating and managing risk across Council and are adopted by the Water Unit to assess the risks to the water supply business function. An analysis of the risks to the business functions has been undertaken in accordance with Council s likelihood and consequence risk rating process, with the addition of the consequence criteria Public Health. Key risk categories considered were: Environmental Health and Safety Strategic Fraud / Corruption Financial Staffing Operational Activities Legal / Compliance Reputational Public Safety and Well Being Page 10

15 The overall risk assessment comprised an evaluation of the effectiveness of single or multiple controls to reduce the level of each risk. Action plans are required to be prepared for where the remaining residual risks rating are still categorised as extreme, very high and high. Business Continuity Management Council has developed a suite of priority Business Continuity Plans to respond to possible disruptions to vital water supply functions from a range of threats. Each plan documents business contingency arrangements and procedures. These are intended to enable Council to respond to an event that lasts for an unacceptable period of time and be able to return to performing its critical functions as soon as possible after the interruption event. The priority plans were identified via a risk evaluation of the possible key threats to critical water supply functions according to Council s risk evaluation protocol. The high level risks for which continuity plans have been developed to date are major contamination of the raw water or treated water supplies, prolonged drought, major flood and tsunami. The individual plans feed into Council s Corporate Risk Management Plan as a control measure of an inherent risk. Council intends to prepare the balance of individual continuity plans in priority order of risk rating. Page 11

16 4 Maintenance and Operating Approach The water supply assets of Council are owned and operated by the Operations Section of the Water Unit in accordance with established policies and procedures. Each of the water supply system assets is maintained and operated to a standard to ensure: the standard of the asset does not decline below a level at which the standard of service can be achieved the appropriate level of service is maintained the consumers get value for money A maintenance management strategy based on a Reliability Centred Approach and associated plan has been developed for the water supply systems. The maintenance strategy and plan is being implemented through the implementation of computerised maintenance management and geographical information systems. The estimated cost of operations and maintenance for the next ten years is shown in Table 4 and Figure 7 following. These costs exclude support costs - management, engineering and supervision, interest expenses and payroll tax. The significant increase in operating costs for pump stations is primarily related to an allowance in the predicted increases in electricity costs and the high level of treatment being provided. Other costs have been increased to allow for the CPI increase and anticipated growth. Figure 7 Operation and Maintenance Expenditure Proposed 2011/ /21 (excludes support costs) Page 12

17 Table 4 Operation and Maintenance Costs 2011/ /21 ($000 s) (excluding support costs) Dams and Weirs Operation Maintenance Mains Maintenance 1,377 1,403 1,430 1,458 1,485 1,514 1,543 1,573 1,603 1,634 Reservoirs Operation Maintenance Pumping Stations Operation (excl. energy) Energy 1,064 1,192 1,335 1,495 1,674 1,875 2,100 2,352 2,634 2,951 Maintenance Treatment Operation (excl chemical) 1,000 1,041 1,085 1,131 1,179 1,232 1,287 1,346 1,407 1,474 Chemical Maintenance Other Operation Maintenance Water Purchase Total Annual Operations & Maintenance 6,633 6,594 6,895 7,218 7,565 7,942 8,347 8,787 9,263 9,782 Page 13

18 5 Future Demand/Utilisation The historical growth in connected properties is shown in the figure below. Figure 8 Water - Properties Connected Council recognises that future demands for water supply services will be influenced by: Population growth and demographics Changes in community expectations Industrial demand Technological change Changes in legislation Integrated Water Cycle Management initiatives. Technological change has the ability to impact on the demand for a service. These changes can reduce or increase the demand for water supply infrastructure. Relevant examples are: household water saving devices such as dual flush toilets, low-flow shower heads and front-loading washing machines which reduce water demand use of rain water tanks for some internal household use greywater re-use schemes Similarly, technological advances can have an effect on the cost of maintenance and operation of assets. Relevant examples are: advances in treatment process may make further quality improvements cost effective, but will likely raise overall costs of service advances in effluent treatment may enable greater use of effluent and stormwater in the place of potable water will increase overall cost of service improvements in pump efficiency and network design will decrease power consumption material improvements increase the base lives of assets advances in water leakage detection Page 14

19 The potential impact of these technologies is currently unquantifiable, so no direct allowances have been made for them in this Plan. 6 New Capital Expenditure 6.1 Proposed Future Capital Works Programme New works are those works that create a new asset that did not previously exist, or works that upgrade or improve an existing asset beyond its existing capacity. They result from growth or changes to levels of service. Assets may also be created at no direct cost to Council (i.e. reticulation in subdivisional developments). The creation of new assets is approached differently depending on whether it is an urban or industrial development, within or adjacent to an existing water supply system, or whether it is the introduction of a new system into a previously un-serviced area. Development within, or adjacent to existing water supply systems is typically driven by a developer subdividing land. These developments are guided and controlled by zoning and development control plan rules, administered under the Environmental Planning and Assessment Act. As part of the development consent process, the design of all water supply assets which will be vested to the Council, are checked against Council Development Standards. Expenditure on proposed new and upgrade capital works (excluding developer provided assets) over the next 10 years is shown as follows. Figure 9 CAPEX New and Upgrade Works Expenditure Proposed 2011/ / How Growth Capital Works are to be Funded Council funds the cost of the growth component of new capital works by the recoupment of developer contributions collected for such works and raising loans to cover cash flow requirements. Developers pay a contribution levied as part of the Development Application process, for the capacity taken up by the development. The Water Development Serving Plan (DSP) sets out the growth-related works to be funded by developer contributions and the associated charges per Equivalent Tenement (ET). Additional works, not identified in the DSP have to be funded by the developer directly and work within the development site is to be funded and constructed by the developer to Council s standards. The 2011/12 developer charge payable is $11,020 per ET and is increased annually by CPI and is fully reviewed every 5 years. Page 15

20 6.3 Other Capital Works Policies Other key financial policies relating to water supply capital programming and expenditure are listed below. The repayment period for all new loans will generally be 20 years except for shorter life assets. Council regularly reviews its current loan portfolio to determine whether savings can be made. The new capital expenditure forecasts for the next ten years are indicative only and will be updated on a rolling basis. The capital forecasts that are presented cannot be interpreted to mean that the associated work will always be undertaken as the whole Plan is subject to change, primarily as a result of changes in the rate of growth and where the growth is occurring. Except in the event of there being a serious environmental or health issue (in which case Council may instigate action), extensions and new water supply systems will only be considered if: Page 16 More than 80% of affected residents support the scheme; and they, and/ or sub-dividers and developers are prepared to pay the full cost to implement the scheme; and they are responsible for and maintain and meet all annual costs of operating the system along with meeting ongoing legislative and licence requirements imposed by state government authorities and Council Council may consider maintaining the scheme and meeting the annual costs if the systems were constructed to Council s standards, the annual costs are comparable to current costs per connection and all properties pay all of the annual access and users charges as applicable. 7 Renewals Capital Expenditure Renewal expenditure is major work that does not increase the asset s design capacity but restores, rehabilitates, replaces or renews an existing asset to its original capacity. Work over and above restoring an asset to original capacity is classified as new works expenditure. Assets are considered for renewal: as they near the end of their effective working life where the cost of maintenance becomes uneconomical if the levels of service are not being met when the risk of failure of critical assets is sufficiently high Renewal decisions are based on the cost effectiveness of renewing the asset and the assessment of the acceptability of the risk of asset failure. Renewal decisions are supported by records of failures (including main breaks), work carried out, annual maintenance and repair reports and staff knowledge of the systems. In addition, the theoretical life expectancies of asset components have been used for the purpose of financial projections. The monitoring of asset reliability as part of planned maintenance, various inspections, operational activity and the investigation of customer complaints identifies non-performing assets. Indicators of non-performing assets include: structural failure repeated asset failure loss of hydraulic performance ineffective and/ or uneconomic operation insufficient treatment excessive energy consumption The cost of renewal capital works is estimated to total approximately $30 million over the next ten years. The cost of renewal work is funded from operational revenue through a provision for the annual depreciation of wastewater assets. Council s aim is to preserve the service potential capacity of all of its water supply assets on a continuous basis. A significant number of these renewals projects will be incorporated with new capital

21 projects or in conjunction with road works undertaken by Council, to provide for increased capacity to cater for the projected growth in the Shire. Figure 10 CAPEX Renewal Expenditure Proposed 2011/ / Funding the Annual Net Cost Water supply pricing for customers are in accordance with NSW Office of Water guidelines. Residential properties pay a uniform annual access charge. Business Assessments pay the water access charge based on the residential charge multiplied by the ratio of the cross sectional area of their water meter compared to a minimum 20mm size. All water used as measured by Council s water meter at each property is charged to each consumer. This volumetric charge is on a per kilolitre basis and includes a step price increase for residential properties (excess water charge). The projected total annual costs (excluding depreciation) and the proposed method of funding for the next ten years, is indicated in Figure 11 as follows. Page 17

22 Figure 11 Summary of Forecast Cash Flow 2011/ /21 ($000 s) 9 Licences/Property Designations A very important aspect of the water supply function is in ensuring that the Shire s natural water sources are managed responsibly. Surface water licences from the NSW Office of Water for the abstraction of natural water are held by Council for the operation of all water supply systems. These usually stipulate the quantity of the water allowed and a maximum rate for its extraction. A licence from the Department of Environment, Climate Change and Water is held that stipulates the allowable quantity and quality of discharge of wastewater from the Bray Park water treatment plant. 10 The Supply of Water for Fire Fighting Purposes The reticulated systems provide for fire fighting with the use of fire hydrants. Council does not permit public water systems that cannot be supplied by gravity from the local service reservoir to meet fire fighting requirements as set out by Council s design specification D11 as it references the Water Reticulation Code of Australia. Some high areas may also be serviced by an on-demand pressure booster system. Systematic testing of fire hydrants is carried out and a program of hydrant repairs/replacements is in place for those hydrants not meeting minimum flow or pressure requirements. 11 Integrated Water Cycle Management Council is required to develop and implement an Integrated Water Cycle Management Strategy (IWCM). IWCM is the integrated management of the water supply, wastewater and stormwater services within a whole of catchment strategic framework and provides a long term focus on their integrated delivery. A goal of the strategy is to reduce where possible surface and ground water source extractions by appropriate substitution of effluent, stormwater and rainwater tanks along with the implementation of demand management initiatives. Council has prepared a Context Study and Strategy Report in order to define the catchment, water resource and urban issues faced and to outline a broad strategy for the future. From the report Council adopted a range of IWCM Strategy actions, in December 2006, which have been regularly reviewed and updated in February 2009 and in January 2011 which are listed below. Page 18

23 Table 6 IWCM Strategy Action Plan (as updated Feb. 2011) Item Action Develop Quality Management Plan Develop Environmental Management Plan Overarching Strategies and Plans Implement Asset Management Plans Implement WSUD and ESD Principles Liaise with proponents of developments to promote WSUD and ESD Implement Water Education and Training Adopt Demand Management Implementation Plan Adopt Drought Management Implementation Plan Develop Risk Based Water Quality Management Plan Urban Water Develop and Implement Leakage Reduction Program Determine preferred option for the augmentation of the water supply Procure upgraded WTP at Tyalgum Investigate and determine requirement for upgrading the WTP at Uki Urban Wastewater Optimise existing wastewater infrastructure Determine options for augmentation of the wastewater Infrastructure Maximise water recycling (effluent reuse) opportunities Urban Stormwater Review Urban Stormwater Quality Management Plan Update Development Design Specification D7 Stormwater Quality Identify targeted retrofit program for retention/treatment hotspots Catchment Management Review On-site Sewage Management Strategy Develop Drinking Water Catchment Management Plan 11.1 Demand Management Water Supply demand management aims to modify customer demands for services (quality, quantity, pressure and reliability) such that water is conserved in order to: promote water conservation optimise utilisation/performance of existing assets reduce or defer the need for new assets meet Council s and Government strategic objectives (including social, environmental and political) deliver a more sustainable service respond to customer needs The residential consumption rate for all Tweed systems was an average 201 L/p/day in 2007/08, 205 L/p/day in 2008/09 and 197 L/p/day in 2009/10. Council s 2013 residential target is 180 L/p/day with a whole of shire usage target of 300 L/p/day. Page 19

24 Council has implemented restrictions on the Tweed District system to limit demand only once since the construction of the Clarrie Hall Dam in 1983, during the 2002/03 drought. Ideally, Council aims not to introduce harsh restrictions on the water supply in the future other than during prolonged drought or for emergency purposes. Water loss management is a component of a Demand Management Programme. Unaccounted for water which comprises illegal consumption, system leakage and under-registration of meters was approximately 12 to 15% of the overall water produced for the 3 years 2007/08 to 2009/10. This is relatively high compared to the present target of 10% (and 7% long term). A Demand Management Program is a key element in Council s IWCM Strategy. In response, Council is now undertaking an Implementation Plan for recommendations developed as part of the Demand Management Strategy. This strategy is underway in stages, focusing firstly on residential and secondly on non-residential water use. A fulltime Demand Management Program leader is employed whose primary role is to implement the recommendations. The main project elements being implemented for the Demand Management Strategy over a 3-year timeframe are listed below. It is envisaged that a number of activities will continue on an ongoing basis, remaining an integral part of Council s Integrated Water Cycle Management Strategy. DMS Program Planning Performance Tracking Framework Water Billing Process Residential Retrofits and Rebates Rainwater Tank Program Top 20 Water Users Non-Residential Program Council Audits Training of TSC Staff Open Space Irrigation Guidelines Water Efficient Garden Policy Unaccounted for Water Other Major Water Users Top 100 Permanent Water Restrictions Recycled Water Projects Leakage Reduction Program Water Sensitive Urban Design/ESD. Water conservation is presently enforced by the following: All new dwellings must contain six litre/three litre dual flush toilet cisterns and shower heads that deliver less than 9 litres/minute. Any replacement toilets or shower heads must also comply with these requirements. Council encourages: Installation of water efficient shower roses, low volume washing machines and dishwashers. A new residential home retrofit and rebate scheme for water efficient shower heads is being developed and implemented. Approximately 50% of all households have participated in past showerhead programs so this new program will target those households yet to take part. Collection of stormwater for garden irrigation and drip irrigation systems to deliver water to the plant roots and minimise runoff. Installation of a rainwater tank connected to external uses, toilet flushing and cold water to washing machines is proposed in all new and existing development areas. Council s target is for 100% of new single dwellings to have a minimum 5,000 L rainwater tank connected to a minimum 160 m 2 roof area. Appropriately sized tanks connecting 80% to 90% of the roof area are recommended for multi dwellings and other buildings. Rainwater tanks supplement the bulk water supply and reduce the intensity and frequency of stormwater runoff from urban areas. Page 20

25 The take-up of rainwater tanks in response to Council s new policy will be monitored with a view to offering a rebate if it is warranted. The NSW Government rebate on rainwater tanks is due to finish on 30 June Council will liaise with the Department of Planning to resolve any differences between Council s rainwater tank policy and the State Government s BASIX requirements for development. 12 Organisation and Management Council s structure provides for four (4) divisions with clearly defined responsibilities and functions shown below. Table 7 Function / Responsibility of Council Divisions Division Technology and Corporate Services Function / Responsibility Finance, Revenue and Customer Service, Corporate Governance, Information Technology, Human Resources Planning and Regulation Development Assessment, Planning Reforms, Development Engineering, Regulatory Services, Building and Environment Health Community and Natural Resources Water, Community and Cultural Services, Natural Resource Management, Waste Management, Entomology and Administration Engineering and Operations Design, Works, Contracts, Planning and Infrastructure, Recreation The structure also includes Business and Economic Development and Communications and Marketing units. The Water Unit is within the Community and Natural Resources Division and is responsible for the Water Supply and Wastewater functions of Council. Page 21

26 Table 8 Function / Responsibility of Community and Natural Resources Division Water Community and Natural Resources Community and Cultural Services Natural Resource Management Waste Management Entomology Administration Function / Responsibility Water Supply Function, Wastewater Function, Mechanical & Electrical Services, Laboratory Services and Water Cycle Education Art gallery, Museum, Cultural, Community Waterways, Coastal, Biodiversity, Sustainability and Sustainable Agriculture Waste, Environment Education and Landfill Insects and Native Animals Administrative and Secretary Support Figure 12 Organisational Chart - Community and Natural Resources Division Page 22

27 The Manager, Water has the responsibility for the delivery of the Water Supply function. Key positions and responsibilities within the Unit are: Strategic and Assets Engineer o Strategic business planning, including determining customer service levels, risk management, pricing and Policy o Asset management including development of asset renewals and replacement programs o Develop and maintain policies and standards o Coordinate development of forward Capital Works programs o Coordinate development of Unit s systems and procedures Capital Works Engineer o Coordination and effective and timely implementation of the water and wastewater capital works program. Operations Engineer o Operation and maintenance of Council s water and wastewater systems to meet levels of service required by Government, Council and the community Laboratory Coordinator o Operate the Council s Water Quality laboratory Mechanical and Electrical Coordinator o Provide Mechanical and Electrical Services to support operations, maintenance and capital work activities o Develop and maintain policy and standards Business Accountant o Financial management of the water supply and wastewater activities Service Delivery Options Council has a number of options available for the delivery of water supply services to the community. The options and status include: Full service contract Full in-house service provision Contracting out part of the services Sharing of resources with Councils or Government Departments Private public partnerships Councils utilises a combination of maintaining an in-house capability for core activities and contacting out parts of the service provision for specialist consulting, construction services, which includes knowledge transfer for staff training and up skilling and for dealing with varying workloads. In delivering the service the role of the asset manager (as the agent of Council) must be retained in house which comprises of: establishing and identifying the actual cost of owning and operating assets aligning the cost of assets with the organisation s business or service direction reducing the recurrent costs of asset ownership without impacting on the business or service level requirements maximising the utilisation of current and future assets to avoid unnecessary capital expenditure maintaining a lifecycle approach to the strategic planning and management of the assets and facilities establishing transparency and accountability for the costs associated with the ownership and management of assets providing effective processes, procedures, information management tools and procurement strategies to enable the effective delivery of services. Page 23

28 12.2 Standards and Guidelines Council standards and specifications for the construction of assets will reflect the best current technologies, national standards and legislative requirements. All new water supply assets constructed by or for Council or acquired from subdivision developments will be constructed in accordance with the latest edition of the relevant standard, updated regularly to incorporate relevant experiences and changes in best practice. Development standards will form the technical basis of all renewal contracts. In evaluating renewal options the life cycle costs will be considered in the interests of minimising the total long-term costs while still meeting the required levels of service. The standardisation in designs and specifications will be considered in the interests of facilitating replacement and operational simplicity and effectiveness, and where beneficial to Council may be adopted. 13 Asset Management Processes, Systems and Data Management The majority of the components of the piped network including as-built data are listed in electronic format in an up to date GIS spatial software system. Each component has been given a unique identifier which indicates the scheme and type of component. The remaining components are shown on the drawings issued at the time each scheme was constructed, electronic spreadsheets or on hard copy scanned records. The Delivery Programme addresses the areas of required improvement for the activities listed in Table 9 for asset management processes, information systems and data management. Table 9 Asset Management Processes, Systems and Data - Activities Process System Data Demand Analysis Asset Registers Asset Classification Level of Service Financial System Asset identification Knowledge of Assets Condition Assessment Accounting/ Economics Maintenance Management Contract Management Customer Enquiries Asset Attributes, Textual Data Asset Attributes, Spatial Data Historical Condition and Performance Data Risk Management Work Planning Maintenance Data Operations Risk Management Future Prediction Data Maintenance Performance Monitoring Optimised Life Cycle Strategy Design, Project Management Asset Utilisation Quality Assurance/ Continuous Improvement Optimised Renewal Strategy Forward Works Programme Integration of Systems Plans and Records GIS SCADA Network modelling Life Cycle Costs Water Quality Page 24

29 13.1 Quality Management Although an overarching Quality Management Plan has not been developed for the water supply service, a number of prepared and implemented plans and strategies exist that address many of the elements that would be included in such a plan. They are aimed at improving and providing consistent performance of the water supply service, resulting in improved customer and stakeholder satisfaction. The status of Quality Management for particular water activities is summarised in Table 10. Table 10 Status of Quality Management Activity Quality Status Water Activity Management Plan Prepared in 2007 and to be updated by July Asset Management Monitoring of service levels via customer work request system. Obtained from planned and reactive maintenance. Proactive condition assessment of trunk mains. Maintenance Management Strategy and implementation via computerised maintenance management system (MEX). Operations Management Manuals document procedures and information. Pipeline Renewals Planning based on risk analysis (AssetPlan). Non Pipeline Renewals Planning based on risk analysis (Assetic is proposed). Valuations Methodology documented and recently updated in July Assetic is corporate asset register, new additions annually and full revaluation 4 yearly. Levels of Service Statements documented and currently under review. Reflects community desires through public consultation (service level review). Risk Management Risk analysis and controls documented and annually reviewed in accordance with Council s Risk Management Processes. Documented Business Continuity planning for priority risks Knowledge Management System (KMS) Documented Water Unit knowledge system, including library, plan register and operations and maintenance manuals. Policies Development Draft documented policies currently being reviewed and finalised. Performance Reporting Corporate, NWI & Government compliance reporting undertaken and comprehensive data management systems to be developed. 14 Improvement Plan Ongoing monitoring, review and updating of this plan is undertaken to improve the quality of asset management planning and accuracy of the financial projections. This process uses improved knowledge of customer expectations and enhanced asset management processes, systems and data to optimise decisionmaking, review outputs, develop strategies and extend the planning horizon. The priority asset related improvement actions over the next 4 years considered to be the most important for delivery of the water supply service and thus included in Council s Delivery Programme are listed in Table 11. Page 25

30 Table 11 Future Key Improvement Actions Programme Water Supply Ref. No. Delivery Programme Key Actions (Strategies) and Operational Key Actions Responsibility Improve Water Supply And Wastewater Quality Management Systems Manager, Water Financial Year 2011/ / / / Review And Enhance Existing Quality Processes And Develop Quality Management Plans Manager, Water Improve Water Supply And Wastewater Environmental Management Systems Manager, Water Review and enhance existing Environmental Processes and Develop an Environmental Management Plan Manager, Water Development And Implement Energy Management Improvements Manager, Water Update Water Supply And Wastewater Strategic Business Plan Manager, Water Update Strategic Business Plans Manager, Water Develop Water Supply And Wastewater Risk Management Action Plans Manager, Water Develop And Implement Action Plans For High Risks Asset Engineer Refine Business Continuity (Emergency Response) Plans Operations Engineer Deliver Improvement Actions Identified In The Business Continuity Plans Operations Engineer Develop And Enhance Water Supply And Wastewater Knowledge And Data Management Systems Manager, Water Implementation Of Maintenance Management Asset Engineer Develop Critical Spares Register Asset Engineer Asset Enhancement, Asset Valuation, Depreciation And Predictive Modelling Asset Engineer Plant, Network Control And Telemetry Systems Strategic & Assets Engineer Development Of Electronic Plant Log Sheets Treatment Plant Engineer Develop Water Quality Data To Meet Reporting Requirements Including Geographical & Sectoral Descriptors Treatment Plant Engineer Develop And Enhance Water Supply And Wastewater Policy And Procedure Manager, Water Develop Policy encompassing connections, metering, easements, water carriers, backflow prevention, watermain extensions, rain water tanks, protection of and access to sewer mains, caravan dumping points, private pumping stations, limits of responsibility for sewer connection, wastewater treatment buffer zones, sewer main extensions, drainage diagrams, inspections and rectification and planting near sewers Operations Engineer Page 24

31 Ref. No. Delivery Programme Key Actions (Strategies) and Operational Key Actions Responsibility Develop And Enhance Water Supply And Wastewater Reporting Systems And Processes Manager, Water Financial Year 2011/ / / / Implementation Of Customer Request System Asset Engineer Implement Bureau Of Meteorology Reporting & WWTP Rain Gauge Upgrade Program Asset Engineer Improve Systems And Complete National Water Initiative And NSW Office Of Water Reporting Asset Engineer Review Water Supply And Wastewater Revenue Policy Manager, Water Implement Quarterly Billing Cycle And Enhanced Processes Operations Engineer Review Water Supply And Wastewater Strategic Supporting Plans Manager, Water yearly Review of Development Servicing Plan Strategic & Assets Engineer yearly Review of Long-Term Financial Plan Manager, Water yearly Review of Workforce Plan Manager, Water yearly Review of Levels Of Service Statements, Performance Measures And Targets Manager, Water Review Water Supply And Wastewater Development Policy And Standards Manager, Water Review And Update Development Control Plan Including Design Criteria And Standards Strategic & Assets Engineer Deliver Demand Management Strategy Manager, Water Implement Demand Management Actions And Priorities Manager, Water Implement Performance Tracking Framework For Demand Management Strategy Demand Mgt Plan Leader Develop And Promote A Permanent Water Saving Measures Demand Mgt Plan Leader Update and Promote Rainwater Tank Policy Demand Mgt Plan Leader Collaboratively Work With Top 20 Water Users To Reduce Water Consumption (Non-Residential Program) Demand Mgt Plan Leader Audit Council Properties And Undertake Internal Water Conservation Education Program Demand Mgt Plan Leader Develop And Adopt Open Space Irrigation Policy And Guidelines And Promote And Implement Education Program Demand Mgt Plan Leader Page Collaboratively Work With Other Major Water Users (Top 100) Demand Mgt Plan Leader Advocate To Government To Amend BASIX To Allow Council Minimum 5kl Rainwater Tanks Demand Mgt Plan Leader

The Next 5 Years What's in the Plan

The Next 5 Years What's in the Plan The Next 5 Years What's in the Plan 2018-2022 South Gippsland Water will submit a plan to the Essential Services Commission (ESC) in late September 2017 which will outline the: Services we provide to customers

More information

SA Water Strategic Plan Delivering water and wastewater services in efficient, responsive, sustainable and accountable ways

SA Water Strategic Plan Delivering water and wastewater services in efficient, responsive, sustainable and accountable ways SA Water Strategic Plan 2012-16 Delivering water and wastewater services in efficient, responsive, sustainable and accountable ways Contents 3 From the Chairman and Chief Executive 4 Our Business Context

More information

A 25 Year Strategic Plan

A 25 Year Strategic Plan A 25 Year Strategic Plan The challenges which face the provision of water services are identified as: Meeting Customer Needs at an Affordable Cost Providing Safe Water Supplies Managing Wastewater Protecting

More information

Development Servicing Plan Oran Park and Turner Road Recycled Water System

Development Servicing Plan Oran Park and Turner Road Recycled Water System Development Servicing Plan 2017 Oran Park and Turner Road Recycled Water System Table of Contents Executive Summary... 3 Oran Park & Turner Road recycled water system developer charge... 3 1 Development

More information

Tweed Shire Demand Management Strategy & Water Supply Augmentation Options Study A Brief Technical Review

Tweed Shire Demand Management Strategy & Water Supply Augmentation Options Study A Brief Technical Review Tweed Shire Demand Management Strategy & Water Supply Augmentation Options Study A Brief Technical Review quality solutions sustainable future Tweed Shire Demand Management Strategy & Water Supply Augmentation

More information

National Water Demand Management Policy

National Water Demand Management Policy National Water Demand Management Policy Introduction In 1997, the Ministry of Water and Irrigation developed Jordan s Water Strategy and the following four policies, which include: Water Utility Policy;

More information

National Performance Framework:

National Performance Framework: 2013-14 National Performance Framework: Urban performance reporting indicators and definitions handbook National Water Commission 2012-13 Performance Framework i Commonwealth of Australia 2014 This handbook

More information

Connecting to Sydney Water systems. This policy applies to all customers who want to connect to or disconnect from Sydney Water s systems.

Connecting to Sydney Water systems. This policy applies to all customers who want to connect to or disconnect from Sydney Water s systems. Policy Connecting to Sydney Water systems 1. Overview 1.1 At a glance This policy explains: the services we offer customers when customers need permission to connect and disconnect requirements for connecting

More information

UrbanSAT- Urban System Analysis Tool : For delivering urban water balancing and reporting

UrbanSAT- Urban System Analysis Tool : For delivering urban water balancing and reporting 19th International Congress on Modelling and Simulation, Perth, Australia, 12 16 December 2011 http://mssanz.org.au/modsim2011 UrbanSAT- Urban System Analysis Tool : For delivering urban water balancing

More information

Water Outlook for Melbourne

Water Outlook for Melbourne Water Outlook for Melbourne 1 December 2016 Water availability Melbourne s water availability is secure for next 12 months Melbourne s water storages are in the High Zone and are likely to remain in

More information

At commercial metered connections, Council owns the water meter and backflow preventer and charges for actual water used.

At commercial metered connections, Council owns the water meter and backflow preventer and charges for actual water used. Water Supply Why we do it To provide a constant, adequate, sustainable and high quality water supply to Gisborne s reticulated areas. What we do The Council provides reticulated water supplies for Gisborne

More information

Integrated Water Management Developer Guidance

Integrated Water Management Developer Guidance WESTERN WATER Western Water Whole-of-water-cycle Strategy Integrated Water Management Developer Guidance Edition 1, 2018 For more information call 1300 650 422 or visit us at WesternWater.com.au Development

More information

NATIONAL SUSTAINABILITY FRAMEWORK - Financial Planning & Reporting + Asset Planning & Management

NATIONAL SUSTAINABILITY FRAMEWORK - Financial Planning & Reporting + Asset Planning & Management National Competency Status Assessment Opinion Competency - Self Improvement Questionnaire NATIONAL SUSTAINABILITY FRAMEWORK - Financial Planning & Reporting + Asset Planning & Management Competency - Self

More information

10.0 ASSET MANAGEMENT PRACTICES. Table of Contents

10.0 ASSET MANAGEMENT PRACTICES. Table of Contents 10.0 ASSET MANAGEMENT PRACTICES Table of Contents 10.0 ASSET MANAGEMENT PRACTICES... 1 10.1 Current Asset Management Practices... 2 10.2 Asset Management Processes... 3 10.2.1 Attribute data collection

More information

Water, Wastewater and Refuse

Water, Wastewater and Refuse Water, Wastewater and Refuse - 116 - Wastewater KEY FACTS Council operates and maintains: 17 wastewater systems 16 wastewater treatment plants (11 ponds, 4 activated sludge plants) 333 kilometres of sewer

More information

Chapter 8 Objective: Invest in Our Future. 69 Irish Water Water Services Strategic Plan

Chapter 8 Objective: Invest in Our Future. 69 Irish Water Water Services Strategic Plan Chapter 8 Objective: Invest in Our Future 69 Irish Water Water Services Strategic Plan Our Strategic Aims Manage our assets and investments in accordance with best practice asset management principles

More information

ON-SITE WASTEWATER MANAGEMENT POLICY

ON-SITE WASTEWATER MANAGEMENT POLICY ON-SITE WASTEWATER MANAGEMENT POLICY Responsible Department: Responsible Section: Responsible Officer: Planning and Development Strategy and Land Use Senior Health & Environmental Coordinator Objectives

More information

Strategic Regional Priorities for the Hunter Joint Organisation Environment Division

Strategic Regional Priorities for the Hunter Joint Organisation Environment Division Strategic Regional Priorities for the Hunter Joint Organisation Environment Division Background Hunter Councils, and now the Hunter Joint Organisation of Councils has been delivering regional environmental

More information

Hoxton Park Recycled Water System

Hoxton Park Recycled Water System - Draft Development Servicing Plan 2016 Hoxton Park Recycled Water System Table of contents 1 Executive Summary... 1 1.1 Hoxton Park recycled water system developer charge... 1 2 Development Servicing

More information

Development Servicing Plan Hoxton Park Recycled Water System

Development Servicing Plan Hoxton Park Recycled Water System Development Servicing Plan 2016 Hoxton Park Recycled Water System Table of contents Executive Summary... 3 Hoxton Park recycled water system developer charge... 3 1 Development Servicing Plan methodology...

More information

Memorandum of Understanding

Memorandum of Understanding Memorandum of Understanding between the NSW Ministry of Health and Sydney Water Corporation July 2016 MoU between Sydney Water and NSW Ministry of Health - July 2016 Page 1 of 11 1. Introduction and purpose

More information

Melbourne Water Outlook 2019

Melbourne Water Outlook 2019 Melbourne Water Outlook 2019 30 November 2018 Melbourne s water supplies are secure for the coming year Our water storages are in the high (secure) zone. Melbourne s water security is dependent on how

More information

Solo Water. Retail Supply Management Plan IMS-OPER-B-8314-SW

Solo Water. Retail Supply Management Plan IMS-OPER-B-8314-SW Retail Supply Management Plan IMS-OPER-B-8314-SW Document Status Revision Date Revision Details Author Review Approved A 4/12/2013 IPART Application Harvest B. Irwin B. Irwin 1 08/9/2017 General Review

More information

Risk analysis. Appendix 14. This appendix is divided into two parts: Appendix 14 (A) Risks within management control

Risk analysis. Appendix 14. This appendix is divided into two parts: Appendix 14 (A) Risks within management control Risk analysis Appendix 14 Risk analysis This appendix is divided into two parts: Appendix 14 (A) Risks within management control Appendix 14 (B) Risks outside management control PAGE 361 Appendix 14 Risk

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN 2018-2020 DOCUMENT CONTROL Document Controller: Manager Adopted: 22 February 2018 Document number: EP0128 Rev Date Description Prepared Approved 1.0 Feb 2018 Initial issue

More information

Environment Plan Sydney Water s objectives, targets and actions to protect the environment and enhance the liveability of our communities.

Environment Plan Sydney Water s objectives, targets and actions to protect the environment and enhance the liveability of our communities. Environment Plan 18 Sydney Water s objectives, targets and actions to protect the environment and enhance the liveability of our communities. Environment Plan 18 Introduction Sydney Water s vision is to

More information

Guidelines for preparing Strategic Asset Management Plans. July 2010

Guidelines for preparing Strategic Asset Management Plans. July 2010 Guidelines for preparing Strategic Asset Management Plans July 2010 This publication has been compiled by Queensland Water Supply Regulator, Water Supply Division, Department of Energy and Water Supply.

More information

Storm Water Management

Storm Water Management Storm Water Management Policy September 2014 2 Sustainable drainage feature designed to control and manage flows through a series of check dams 3 Document Name: Storm Water Management Controlled Copy No:

More information

Draft approval framework for the use of non-drinking water in Western Australia

Draft approval framework for the use of non-drinking water in Western Australia Draft approval framework for the use of non-drinking water in Western Australia Urban developments Looking after all our water needs SCT_Online Print_Final_A4.indd 1 31/05/10 11:08 AM Draft approval framework

More information

South Australian Water Corporation HIGHLIGHTS

South Australian Water Corporation HIGHLIGHTS South Australian Water Corporation HIGHLIGHTS 2015-16 CONTENTS CHIEF EXECUTIVE S MESSAGE 2 2015-16 HIGHLIGHTS 3 GREAT CUSTOMER EXPERIENCE 4 SAFE, CLEAN WATER 6 RELIABLE SERVICES 8 HEALTHY ENVIRONMENT 10

More information

MELBOURNE S WATER SUPPLY IS SECURE

MELBOURNE S WATER SUPPLY IS SECURE December 2017 MELBOURNE S WATER SUPPLY IS SECURE Our water storages are in the High (Secure) Zone and we encourage our customers to continue to use water wisely. Melbourne s water supply system 1, which

More information

Monitoring Plan for

Monitoring Plan for Monitoring Plan for 2015-16 November 2015 MONITORING PLAN FOR 2015-16 Contents Foreword... 3 1 Our Vision and Strategy... 4 2 Industry Structure... 5 3 Adjusted Outputs for 2015-16 due to reduced funding...

More information

AUDIT GUIDELINES: ELECTRICITY, GAS AND WATER LICENSING: AUDIT TEMPLATE FOR SMALLER ORGANISATIONS

AUDIT GUIDELINES: ELECTRICITY, GAS AND WATER LICENSING: AUDIT TEMPLATE FOR SMALLER ORGANISATIONS AUDIT GUIDELINES: ELECTRICITY, GAS AND WATER LICENSING: AUDIT TEMPLATE FOR SMALLER ORGANISATIONS This document is available from the Economic Regulation Authority website www.era.wa.gov.au. For further

More information

2018 Water and Wastewater Budget Summary

2018 Water and Wastewater Budget Summary 2018 Water and Wastewater Budget Summary Each day, clean, safe water travels through the City s watermains for use by residents and businesses. Similarly, wastewater flows through the City s sewer system

More information

LOS ANGELES DEPARTMENT OF WATER AND POWER

LOS ANGELES DEPARTMENT OF WATER AND POWER LOS ANGELES DEPARTMENT OF WATER AND POWER FISCAL YEAR 2015-2016 GOALS AND OBJECTIVES The goals and objectives of the Los Angeles Department of Water and Power (LADWP) for Fiscal Year 2015-16 are in alignment

More information

URBAN WATER QUALITY STRATEGY FOR OTAGO. Caring for Otago s environment: Enabling communities to thrive

URBAN WATER QUALITY STRATEGY FOR OTAGO. Caring for Otago s environment: Enabling communities to thrive URBAN WATER QUALITY STRATEGY FOR OTAGO Caring for Otago s environment: Enabling communities to thrive 1 CONTENTS Water quality in Otago 3 About this strategy 4 Who is involved 4 Otago s vision for water

More information

Jemena Gas Networks (NSW) Ltd. Jemena's revised 5-year plan: 2015/ /20

Jemena Gas Networks (NSW) Ltd. Jemena's revised 5-year plan: 2015/ /20 Jemena Gas Networks (NSW) Ltd Jemena's revised 5-year plan: 2015/16-2019/20 CUSTOMER overview february 2015 1 An appropriate citation for this paper is: Customer Overview of JGN s Revised 5-year plan:

More information

STORMWATER HARVESTING, AN INNOVATIVE WAY OF MEETING THE CATCHMENT WIDE NEEDS OF THE BUILT AND SOCIAL ENVIRONMENTS

STORMWATER HARVESTING, AN INNOVATIVE WAY OF MEETING THE CATCHMENT WIDE NEEDS OF THE BUILT AND SOCIAL ENVIRONMENTS STORMWATER HARVESTING, AN INNOVATIVE WAY OF MEETING THE CATCHMENT WIDE NEEDS OF THE BUILT AND SOCIAL ENVIRONMENTS Bronwyn Rhynd, CPEng, MIPENZ, IntPE ABSTRACT Catchment wide stormwater management objectives

More information

DRAFT SUBMISSION REGARDING

DRAFT SUBMISSION REGARDING DRAFT SUBMISSION REGARDING Biodiversity Certification Draft Assessment Methodology DATE July 2010 Opening: The Local Government Association of NSW and Shires Association of NSW (the Associations) are the

More information

Alternative water sources and Integrated water management

Alternative water sources and Integrated water management Service delivery Alternative water sources and Integrated water management Strategic Goals Our Aim Contribute to a more sustainable, prosperous, liveable and healthy community by planning and delivering

More information

Business Plan: Drinking Water Supply

Business Plan: Drinking Water Supply Business Plan: Drinking Water Supply How does this service contribute to the results identified in the City of London Strategic Plan? A Sustainable Infrastructure Compliance with all regulatory requirements

More information

Two Case Studies of Stormwater Harvesting: The Coburg and Merrifield Projects, Victoria, Australia

Two Case Studies of Stormwater Harvesting: The Coburg and Merrifield Projects, Victoria, Australia Two Case Studies of Stormwater Harvesting: The Coburg and Merrifield Projects, Victoria, Australia J. McGrath*, G. Wilson**, D. Elliott**, J. Baumann*, H. Wahjudi* * Dalton Consulting Engineers, 255 Whitehorse

More information

CUSTOMER CHARTER A SUMMARY OF YOUR RIGHTS AND RESPONSIBILITIES

CUSTOMER CHARTER A SUMMARY OF YOUR RIGHTS AND RESPONSIBILITIES CUSTOMER CHARTER A SUMMARY OF YOUR RIGHTS AND RESPONSIBILITIES At Queensland Urban Utilities, we are focused on providing accountable, efficient and innovative customer service. As our customers, you

More information

Wetland Design Manual. Supporting document: Planning, funding and. management

Wetland Design Manual. Supporting document: Planning, funding and. management Wetland Design Manual Supporting document: Planning, funding and management Contents Introduction... 2 Water Industry Act (1994)... 2 Water Act (1989)... 3 Planning and Environment Act (1987)... 3 Subdivisions

More information

Palmerston North City Council Policy

Palmerston North City Council Policy Palmerston North City Council Policy PRESSURE SEWER S YSTEMS POLICY - DRAFT SEPTEMBER 2018 Oasis 8384024 Palmerston North City Council Pressure Sewer Systems Policy September 2018 1 Introduction... 3 2

More information

Western Water Guide to New

Western Water Guide to New Western Water Guide to New Customer Contributions Western Water July 2014 VERSION CONTROL PAGE Document History and Version Control Date Approved Brief Description 0.0 August 2013 Creation of original

More information

Position Specification General Manager Customer & Community. October 2014

Position Specification General Manager Customer & Community. October 2014 02-13-CHW-06 Position Specification General Manager Customer & Community October 2014 Contents 1.0 Organisational Background 2 1.1 Our region 2 1.2 Our services 3 1.3 Our core functions 3 1.4 What guides

More information

General Manager Customer Delivery

General Manager Customer Delivery General Manager Customer Delivery Position Description (final) Customer Delivery Group Position number: TBA Job family: Executive Hours worked per week: as required Manager s title: Managing Director Does

More information

LOS ANGELES DEPARTMENT OF WATER AND POWER

LOS ANGELES DEPARTMENT OF WATER AND POWER LOS ANGELES DEPARTMENT OF WATER AND POWER FISCAL YEAR 2016-2017 GOALS AND OBJECTIVES The goals and objectives of the Los Angeles Department of Water and Power (LADWP) for Fiscal Year 2016-17 are in alignment

More information

Draft Business Plan. Part A (extract) Summary of Company Strategy

Draft Business Plan. Part A (extract) Summary of Company Strategy Draft Business Plan Part A (extract) Summary of Company Strategy Note: The full version of Part A of the Draft Business Plan will be published by 11 August 2008. NORTHUMBRIAN WATER LIMITED: OPERATING AREAS

More information

NSW DEPARTMENT OF EDUCATION AND COMMUNITIES

NSW DEPARTMENT OF EDUCATION AND COMMUNITIES NSW DEPARTMENT OF EDUCATION AND COMMUNITIES Position Description POSITION DETAILS Position Title: Reports to: Manager, Asset Management Unit (Various locations) Manager, Delivery Date: April 2010 PRIMARY

More information

Activity Summary: Sewerage and the Treatment and Disposal of Sewage

Activity Summary: Sewerage and the Treatment and Disposal of Sewage Activity Summary: Sewerage and the Treatment and Disposal of Sewage Activity name Activity description Sewerage and the Treatment and Disposal of Sewage The Kaipara District Council operates six community

More information

Water, Wastewater and Stormwater 2017 Budget 2018 Plan

Water, Wastewater and Stormwater 2017 Budget 2018 Plan Executive Summary Water, Wastewater and Stormwater In May 2000, the E.coli outbreak and water contamination events in the Town of Walkerton led to an inquiry under Justice Dennis O Conner. The recommendations

More information

Attachment 4. Brimbank City Council Submission to EPA Ministerial Advisory Committee 2015

Attachment 4. Brimbank City Council Submission to EPA Ministerial Advisory Committee 2015 Attachment 4 Brimbank City Council Submission to EPA Ministerial Advisory Committee 2015 About Brimbank Brimbank City is located in Melbourne s west, one of the fastest growing regions in Australia. The

More information

Sewerage and Water Board of New Orleans Strategic Plan

Sewerage and Water Board of New Orleans Strategic Plan Sewerage and Water Board of New Orleans Strategic Plan 2011-2020 Mission, Vision, and Values Our mission is to provide safe drinking water to everyone in New Orleans; to remove waste water for safe return

More information

e21723a Minimum Performance Standards for Showerheads in Australia- the Benefits and the Barriers

e21723a Minimum Performance Standards for Showerheads in Australia- the Benefits and the Barriers e21723a Minimum Performance Standards for Showerheads in Australia- the Benefits and the Barriers ABSTRACT Denise Day and Stuart White Institute for Sustainable Futures This paper discusses the potential

More information

APPENDIX 1 DRAFT REVIEW AGAINST THE CODE OF CORPORATE GOVERNANCE

APPENDIX 1 DRAFT REVIEW AGAINST THE CODE OF CORPORATE GOVERNANCE APPENDIX 1 DRAFT REVIEW AGAINST THE CODE OF CORPORATE GOVERNANCE 2016-17 Introduction The main principle underpinning the development of the new Delivering Good Governance in Local Government: Framework

More information

Manager Wastewater Treatment

Manager Wastewater Treatment POSITION DESCRIPTION Manager Wastewater Treatment 1 POSITION DETAILS Position Title: Reports to: Department: Location: Manager Wastewater Treatment General Manager Operations Operations Traralgon Date:

More information

Potable Water Supply, Wastewater & Reuse Element

Potable Water Supply, Wastewater & Reuse Element Potable Water Supply, Wastewater & Reuse Element GOAL ONE: HIGH QUALITY AND AFFORDABLE POTABLE WATER WILL BE AVAILABLE TO MEET THE EXISTING AND PROJECTED DEMANDS OF PINELLAS COUNTY UTILITY CUSTOMERS. 1.1.

More information

How is our District Plan shaping up? Matamata-Piako District Council Network Utilities 70 July 2015

How is our District Plan shaping up? Matamata-Piako District Council Network Utilities 70 July 2015 Network Utilities 70 July 2015 Network Utilities Key Issues Council provides network utilities (such as water, stormwater and wastewater services) to houses and businesses within the District as well as

More information

draft Environment Strategy

draft Environment Strategy draft Environment Strategy Our Commitment Our vision is to be the lifestream of Sydney for generations to come. We want to be world-class, delivering essential services that our customers love, in our

More information

IMPACT OF RAINWATER TANKS ON THE LEVELS OF SERVICE FOR WATER SUPPLY IN AUCKLAND

IMPACT OF RAINWATER TANKS ON THE LEVELS OF SERVICE FOR WATER SUPPLY IN AUCKLAND IMPACT OF RAINWATER TANKS ON THE LEVELS OF SERVICE FOR WATER SUPPLY IN AUCKLAND Klein, R., & Lester A., Watercare Services Ltd, Reed, C.J. Tonkin & Taylor Ltd, Reed, J.P., CH2M Beca Ltd ABSTRACT Rainwater

More information

Irish Water Capital Investments

Irish Water Capital Investments An Coimisiún um Rialáil Fóntas Commission for Regulation of Utilities Irish Water Capital Investments Monitoring Report January to June 2017 Information Paper Reference: CRU/18/057 Date Published: 04/04/2018

More information

Asset Management Policy

Asset Management Policy Asset Management Policy January 2018 Introduction Our Asset Management Policy was last published in 2014. It is being updated to reflect our commitment to regularly review and improve all of our Asset

More information

Your recycled water guide

Your recycled water guide Your recycled water guide Introducing Class A Recycled Water... Westernport Water will now be supplying Class A recycled water to new residential properties and developments on Phillip Island. The Phillip

More information

Job Capsule Supplementary Information: Service Manager Temporary Accommodation Circa 51,000

Job Capsule Supplementary Information: Service Manager Temporary Accommodation Circa 51,000 Job Capsule Supplementary Information: Service Manager Temporary Accommodation Circa 51,000 Department/ Location Reports to Staffing responsibilities Housing Options Service Assistant Director of Operations

More information

Water Conservation Report

Water Conservation Report Water Conservation Report 2016-2017 Table of contents Executive summary... 3 Introduction and regulatory context... 13 1.1 Approval of the ELWC Methodology... 14 Our five-year plan... 15 2.1 The value

More information

2 Final Business Plan PR09

2 Final Business Plan PR09 Northumbrian Water Limited: Operating areas North East operating area Northumbrian Water provides water and sewerage services to 2.6 million people in the North East of England. The major population centres

More information

Role Description Manager, Facilities Operations

Role Description Manager, Facilities Operations Role Description Manager, Facilities Operations Cluster Agency Division/Branch/Unit Location Department of Justice Australian Museum Corporate Resources/Facilities and Security Transformation Sydney CBD

More information

WATER END-USE AND EFFICIENCY PROJECT (WEEP) A CASE STUDY

WATER END-USE AND EFFICIENCY PROJECT (WEEP) A CASE STUDY WATER END-USE AND EFFICIENCY PROJECT (WEEP) A CASE STUDY M Heinrich 1 1 BRANZ, MatthiasHeinrich@branz.co.nz Abstract Twelve homes on the Kapiti Coast (New Zealand) have been monitored for eight months

More information

CORPORATE STANDARD ROUTINE MAJOR WORKS DEVELOPERS AND ACCREDITED SUPPLIERS VERSION: 1.0

CORPORATE STANDARD ROUTINE MAJOR WORKS DEVELOPERS AND ACCREDITED SUPPLIERS VERSION: 1.0 CORPORATE STANDARD ROUTINE MAJOR WORKS DEVELOPERS AND ACCREDITED SUPPLIERS VERSION: 1.0 Contents 1. Introduction... 5 2. Purpose... 5 3. Scope... 5 3.1 Audience... 6 4. Definitions... 6 5. The delivery

More information

CORPORATE STANDARD ROUTINE MINOR WORKS DEVELOPERS AND ACCREDITED SUPPLIERS

CORPORATE STANDARD ROUTINE MINOR WORKS DEVELOPERS AND ACCREDITED SUPPLIERS CORPORATE STANDARD ROUTINE MINOR WORKS DEVELOPERS AND ACCREDITED SUPPLIERS VERSION: 1.0 2.0 Corporate Standard Routine Minor Works Developers and Accredited Suppliers Contents 1. Introduction... 4 2. Purpose...

More information

Summary 2018 Price Submission. A summary of our submission for water and sewerage pricing for the regulatory period

Summary 2018 Price Submission. A summary of our submission for water and sewerage pricing for the regulatory period Summary 2018 Price Submission A summary of our submission for water and sewerage pricing for the 2018-23 regulatory period Page 2 At a glance This submission proposes South East Water s five-year approach

More information

20185 Development Contributions Policy

20185 Development Contributions Policy 20185 Development Contributions Policy - 2 - [1] Introduction [1.1] Legislative Requirements and Powers.1 Council is required to have a Development Contributions Policy as a component of its Funding and

More information

Risk Management Strategy

Risk Management Strategy Risk Management Strategy 2017-2019 Created by: Role Name Title Author / Editor Kevin McMahon Head of Risk Management & Resilience Lead Executive Margo McGurk Director of Finance & Performance Approved

More information

Backflow Prevention Containment Policy

Backflow Prevention Containment Policy Backflow Prevention Containment Policy This policy was established in May 2011 and revised in September 2014 and has been adopted by the following water authorities in Victoria: Page 1 of 12 Contents Operating

More information

WHY NOT Install a Rainwater Tank step by step guide to assist you

WHY NOT Install a Rainwater Tank step by step guide to assist you WHY NOT Install a Rainwater Tank step by step guide to assist you Rainwater tanks have never been easier to install read on to find out more! Rainwater tanks are a simple and effective way to reduce your

More information

WATER SUPPLY ASSET MANAGEMENT PLAN

WATER SUPPLY ASSET MANAGEMENT PLAN Executive Summary 2012-22 WATER SUPPLY ASSET MANAGEMENT PLAN Hauraki District Council June 2012 Version Table of Contents 1. INTRODUCTION 1 1.1 Purpose of the Plan 1 1.2 Background and Rationale for the

More information

WESTERN REGIONAL WATER BALANCE

WESTERN REGIONAL WATER BALANCE WESTERN REGIONAL WATER BALANCE Greg Finlayson 1, Ryan Brotchie 1, Steven Roach 1, Lauren Mittiga 2, Abigail Farmer 3, John Chambers 3 1. GHD, Melbourne, VIC, Australia 2. Melbourne Water, Melbourne, VIC,

More information

Environmental Sustainability

Environmental Sustainability Guidelines for Implementing Total Management Planning Environmental Sustainability IMPLEMENTATION GUIDE 2 Environmental Sustainability: Implementation Guide TABLE OF CONTENTS Page No. LIST OF ACRONYMS

More information

caring for the coastal environment

caring for the coastal environment SYDNEY COASTAL COUNCILS GROUP INC. councils caring for the coastal environment SUBMISSION IPART Review of Sydney Water Pricing October 2015 079-15EN SYDNEY COASTAL COUNCILS GROUP INC. 456 Kent Street GPO

More information

Improving the way we price our network services. Consultation paper

Improving the way we price our network services. Consultation paper Improving the way we price our network services Consultation paper October 2015 Table of Contents 1 Overview... 4 2 Background... 6 3 Purpose... 7 4 Network tariff strategy... 7 4.1 Network tariff reform

More information

Catchment Water Quality Protection

Catchment Water Quality Protection Catchment Water Quality Protection Policy and Guidelines for Planning Permit Applications & Government Planning Initiatives Final31 Oct 2013 Policy Coliban Water s vision is to contribute to improving

More information

Irish Water One Year On

Irish Water One Year On Irish Water One Year On Delivering Engineering Services in Local Government Katherine Walshe, Regional Operations Manager 5 th February 2015 Irish Water - Rationale for Establishment Delivering the volume

More information

GREATER DANDENONG PLANNING SCHEME AMENDMENT C201

GREATER DANDENONG PLANNING SCHEME AMENDMENT C201 Planning and Environment Act 1987 GREATER DANDENONG PLANNING SCHEME AMENDMENT C201 Who is the planning authority? EXPLANATORY REPORT This amendment has been prepared by the City of Greater Dandenong who

More information

2. The report gives a brief history of the project, including the results of internal and external consultation with stakeholders.

2. The report gives a brief history of the project, including the results of internal and external consultation with stakeholders. 3. INFRASTRUCTURE DESIGN STANDARD General Manager responsible: Officer responsible: Author: General Managers of City Environment, Capital Programme, and Regulation and Democracy Services, DDI: 941-8608,

More information

Infrastructure Element

Infrastructure Element Infrastructure Element 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 INFRASTRUCTURE ELEMENT GOAL 1: To provide for environmentally

More information

Governance Institute of Australia Ltd

Governance Institute of Australia Ltd Governance Institute of Australia Ltd Management Policy 1. Overview management is a key element of effective corporate governance. In view of this, Governance Institute of Australia Ltd (Governance Institute)

More information

Strategic Resource Plan

Strategic Resource Plan [ OBJECTIVE] Performance EFFICIENCY AND GOOD GOVERNANCE Manage our resources wisely to achieve Council s strategic objectives. Strategic Resource Plan 2018-2022 60 BANYULE COUNCIL PLAN 2017-2021 (YEAR

More information

PAROO SHIRE COUNCIL Corporate Plan

PAROO SHIRE COUNCIL Corporate Plan Corporate Plan PAROO SHIRE COUNCIL Corporate Plan 2017-2022 2017-2021 - 2 - Our Shire Profile Paroo Shire is situated in South West Queensland covering an area of 47 727 km 2. It borders the Shires of

More information

Outlines for Water Saving Practices in Kuwait

Outlines for Water Saving Practices in Kuwait Outlines for Water Saving Practices in Kuwait M. Al-Senafy, A. Al-Khalid, A.Mukhopadhyay and K. Al-Fahad Water Resources Division Kuwait Institute for Scientific Research Introduction The increasing imbalance

More information

Conn. Agencies Regs d-2 Preparation of plans and schedule for submission

Conn. Agencies Regs d-2 Preparation of plans and schedule for submission As of February 1, 2012 Conn. Agencies Regs. 25-32d-2 Preparation of plans and schedule for submission (a) Each water company supplying water to 1,000 or more persons or 250 or more consumers, and any other

More information

Organisational LEGISLATIVE MANDATE UMGENI WATER 2.2 ACTIVITIES OF

Organisational LEGISLATIVE MANDATE UMGENI WATER 2.2 ACTIVITIES OF 2.0 Organisational Pro le 2.1 LEGISLATIVE MANDATE Umgeni Water is a public entity established in 1974 to provide water services - water supply and sanitation services - to other water services institutions

More information

Sub-regional Total Water Cycle Management Plans for South East Queensland

Sub-regional Total Water Cycle Management Plans for South East Queensland Sub-regional Total Water Cycle Management Plans for South East Queensland Patricia Hurikino Department of Energy and Water Supply Sanja Oldridge Sprout Water Management Framework - Sub-regional TWCM Plans

More information

Drainage Services Master Plan Aspirational Plan May 5, 2014

Drainage Services Master Plan Aspirational Plan May 5, 2014 May 5, 2014 Background Drainage Services provides wastewater and stormwater drainage services to Edmonton residents by planning, building, operating, and maintaining the pipes, tunnels, pump stations,

More information

1. SOURCES OF NATIONAL LEGISLATION (PRIMARY AND SECONDARY LEGISLATION)

1. SOURCES OF NATIONAL LEGISLATION (PRIMARY AND SECONDARY LEGISLATION) 1. SOURCES OF NATIONAL LEGISLATION (PRIMARY AND SECONDARY LEGISLATION) The national water legislative framework in the Republic of Macedonia is comprehensive and regulates, from different perspectives,

More information

Regulatory Compliance and Enforcement Framework

Regulatory Compliance and Enforcement Framework Contents 1. About us... 3 1.1 Our Mission and Values... 3 2. Relevant Legislation and Obligations... 4 3. Approach to Regulatory Compliance and Enforcement... 4 3.1 Our Approach... 4 3.2 Working with Stakeholders...

More information

Integrated Catchment Modelling

Integrated Catchment Modelling Integrated Catchment Modelling Modelling the whole water cycle in one package Ann Pugh Integrated Water Planning Historically water, wastewater and stormwater modelling occurred in silos with little integration

More information

Promote fiscally responsible asset management of existing and proposed new infrastructure.

Promote fiscally responsible asset management of existing and proposed new infrastructure. 10.0 Infrastructure Goals Promote fiscally responsible asset management of existing and proposed new infrastructure. Promote all sources of water as a valuable resource through the conservation of water,

More information

WATER SUPPLY DEMAND STRATEGY

WATER SUPPLY DEMAND STRATEGY WATER SUPPLY DEMAND STRATEGY Landsborough & Navarre Water Supply System Strategic Plan 2011-2060 TABLE OF CONTENTS 1. INTRODUCTION... 4 2. CURRENT WATER RESOURCE REVIEW... 8 3. WATER DEMAND FORECASTING...

More information