1 The Equator Principles and the IFC Performance Standards Itaú Case Study in Energy Project Financing By Rafael Mol* 2015

2 Introduction Performance Standard 1 Assessment and Management of Environmental and Social Risks and Impacts Performance Standard 2 Labor and Working Conditions Performance Standard 3 Resource Efficiency and Pollution Prevention Performance Standard 4 Community Health, Safety and Security Performance Standard 5 Land Acquisition and Involuntary Resettlement Performance Standard 6 Biodiversity Conservation and Sustainable Management of Living Natural Resources Performance Standard 7 Indigenous Peoples Performance Standard 8 Cultural Heritage Conclusion

3 Aligned with its Sustainability and Environmental and Social Responsibility strategy, Itaú Unibanco believes that the adherence to voluntary commitments reinforces the way we address the topic and guides our practices in the business fronts. Therefore, since 2004, Itaú Unibanco has voluntarily adopted the Equator Principles (EP): a set of guidelines and criteria for identifying and assessing the environmental and social impacts and risks in Project Finance deals whose investment amount is equal or above US$ 10 million. Since we adopted the Equator Principles, we have financed over R$ 6 billion in projects, representing a capital investment of nearly R$ 60 billion. The Equator Principles have been adopted by 80 financial institutions, including the major European, American and Brazilian banks. The first revision of the document occurred in The current and third version was released more recently, in The Equator Principles III show the continuous improvement of the environmental and social risk management in project financing. The scope of application of EP III, for example, was extended. Formerly, compliance with the criteria prescribed by the Equator Principles was only required for long-term financing. Currently, the client must be compliant with such criteria in an earlier stage, when the bridge loan is granted. Thus, in seeking long-term financing for its project, the client will already be more prepared to meet the related requirements, avoiding rework and long negotiations. However, the new version of the Equator Principles maintained as primary technical criteria of analysis the International Finance Corporation (IFC) Performance Standards, which are parameters internationally recognized as best industry practices that should be adopted in projects to avoid, minimize or mitigate adverse impacts caused by their activities.

4 From the perspective of the Equator Principles, the analysis of the project is done not only before closing the deal, but also periodically during the tenor of the deal. The adoption by the client of measures designed to mitigate possible environmental and social impacts and risks in its project is monitored on a regular basis by the bank through an action plan that is an integral part of the contracting instrument. The criteria the client commits to meet includes the establishment of a communication channel with the stakeholders and communities impacted, which includes necessarily the implementation of a mechanism to receive and handle complaints on the part of the affected parties, in such a way that the projectcommunity relationship is always based on transparency. In addition to adopting this commitment, Itaú was also the first bank from an emerging market to be a member of the EP Steering Committee and occupy the position of Chair of the Steering Committee ( ). Considering that Itau finances project in different sectors, we selected the main environmental and social challenges and dilemmas faced by our teams. Please note that the Performance Standards are based on topics and not all standards apply to all projects. Each of these guidelines should be applied to an extent and depth that is proportionate to the impact and risk posed by the respective project. The examples provided here represent higher risk projects that necessarily require these standards to be applied in a more in-depth manner.

5 Performance Standard 1 Assessment and Management of Environmental and Social Risks and Impacts This standard is said to be applicable to 100% of the projects, since it does not address a specific technical matter, but the structure that is necessary for a project to be able to identify, mitigate and monitor its environmental and social risks and impacts, thus moving forward in the adherence of the remaining standards. This requirement works like an umbrella for the other standards. By structuring an effective and continuous environmental and social management system, the project is required to promote a solid and sustainable performance, providing better financial, social and environmental results. To achieve this, the project should continually and systematically: i) identify and assess all risks and impacts on environment, workers or other communities affected; ii) adopt a mitigation hierarchy to firstly anticipate and avoid these impacts and, only when this is not possible, avoid, minimize or, ultimately, remedy / neutralize; and iii) ensure the engagement and absorb complaints of projectaffected people Itaú s experience shows that many of the conditions under this standard are already required by the Brazilian legislation. However, the Brazilian legislation does not require the performance of a systemic and continuous assessment to improve this management system. That is, the legal requirement to assess environmental impacts can be sufficiently fulfilled by means a single report which is submitted to the proper agency as a condition to obtain environmental permits for a project. In financing a large hydropower plant in Brazil, under the Equator Principles criteria, Itaú required the implementation of a procedure whereby the environmental impacts of the project could be reassessed on a semi-annual basis, since unexpected circumstances may arise during the development of such a large-sized project. New impacts, which have not been previously identified in the planning phase, may arise as works progress. The adoption of this dynamic and continuous assessment has enabled the early identification and mitigation of the impacts that would be caused by an erosion process that has spread across an area larger than that originally identified as affected. This avoided putting the life of several families living in the region at risk. Moreover, the process of resettlement of these families was conducted in a very orderly manner, resulting in better quality of life, as people were granted access to electric power and drinkable water in their new homes.

6 Many projects end up limiting their environmental and social management process to the mere fulfillment of the requirements upon which obtaining environmental permits is contingent, which is not necessarily sufficient to manage all their risks under the criteria prescribed by the Equator Principles. We had several experiences with clients in which we could notice that the adoption of the best industry practices is extremely important to avoid possible delays, unexpected events and additional costs in the project development. Due to our requirements, our clients, in most of the cases, need to reinforce their environmental and social teams not only to meet minimum legal requirements, but also to develop more sophisticated actions, implementation and verification of compliance with policies and procedures. We had a case where the client, before initiating its relationship with Itaú, used to treat environmental and social issues as secondary. When Itaú financed its first projects, we requested the Executive Board to prepare periodic reports on the achievement of environmental and social management goals and that such Board made strategic decisions on environmental and social matters based on the performance results attained. Due to concrete improvement results obtained from this strategy, the client made of IFC Performance Standards its policy at an institutional level. In addition, the client, since the beginning of a new project, structures the social and environmental teams considering the IFC Performance Standards, based on the criteria set forth by IFC.

7 Performance Standard 2 Labor and Working Conditions Inspired by several international conventions and instruments, including the International Labour Organization (ILO), this standard focuses on the protection of workers basic rights. Therefore, its objective is to provide safe and healthy working conditions to this important project-affected group, in such a way to ensure that: i) the local legislation is strictly complied with; ii) there is no unequal treatment; and iii) an improvement in the relations between workers and managers is promoted, especially workers belonging to more vulnerable groups. Chile, a country where Itaú finances a hydropower project, has very politically engaged communities. Protests and strikes are, however, common. To avoid that shutdowns can adversely affect the schedule of this project, Itaú requested the creation of a In financing a large hydropower plant in Brazil, Itaú has identified that, after some long strikes and shutdowns on the part of workers, the client should establish collective bargaining agreements in advance to be able to address complaints that might give rise to new strikes. We then began to work in conjunction with the client to specific communication channel so that their complaints may be addressed in a more agile and efficient manner. The main result obtained was a reduction in the number of working days lost to strikes, which remained at levels lower than that of the country s average. Moreover, this project had another peculiarity, since the client opted to engage various specialized construction firms, rather than a large construction firm that concentrated all the other subcontractors. Due to this diversity of contractors and subcontractors involved in the project, we requested the client to reinforce its management under its supplier chain and also to extend labor benefits policies to all workers in the supplier chain. In addition, incentives, such as bonuses, for these firms to improve their performance in health and occupational safety were created. This resulted, among others, in the continuous improvement of the labor accident levels. anticipate the negotiations that would result from the renewal of the next collective bargaining agreements for the civil construction workers. This way, we managed to reduce the number of strikes and shutdowns.

8

9 Performance Standard 3 Resource Efficiency and Pollution Prevention While acknowledging that environmental resources are scarce, this standard promotes the efficient use of them as well as the prevention and control of pollution, including that derived from the effect of greenhouse gas emission To achieve this, Performance Standard 3 suggests the adoption of feasible technologies and good international industry practices in an effort to avoid and minimize adverse impacts on human health and environment. A case that illustrates this standard is Itaú s experience in financing a large-sized transmission line in Brazil. The client was required to prepare a specific study to show that the technology adopted, if compared to the conventional ones, would generate energy efficiency gains as transmission losses would be reduced. The use of such technology resulted in annual savings of more than 2000 GWh. This standard has also been applied in the scope of a project financing for the construction of a gas thermoelectricity plant in Northeast Brazil. Since the air emission standards required by the Brazilian environmental and social legislation are less restrictive than the international ones, adopted by the IFC, the client ended up using a technology more efficient than that originally planned to be able to obtain our financing. Therefore, in meeting the requirements of the good international industry practices, the client mitigated the effects caused by air emissions

10 Performance Standard 4 Community Health, Safety and Security This standard addresses new impacts or worsening of existing impacts of the project on surrounding communities. In addition, its objective is to help the project, its employees and structures to anticipate and avoid adverse impacts on the project surrounding communities. Its objective is to help the project, its employees and structures to anticipate and avoid adverse impacts on the health, safety and security of the affected population throughout the project operation and development, whether these impacts have been anticipated or are unexpected, whether they are direct or indirect. In Itaú s view, the social issues are more challenging as they are more subjective and sensitive when compared to others. For this reason, we have even refused to finance a hydroelectricity project in a needy region in Northern Brazil. We understood that the impacts that would be caused to local populations would not be mitigated due to the mismatch between the social investment and works schedules submitted by the client. The region s social scenario, which already was not favorable, could become even worse, and social claims might arise, affecting the progress of the project works. In contrast, we had a case involving the financing of a hydropower plant that was set up in a malariaendemic area in North Regional of Brazil. The most significant risk would be the hydropower plant s reservoir making the situation worse, since the accumulated water could make for the proliferation of the malariacarrying mosquitoes. Instead of neglecting this possibility, the project seized the opportunity and developed a program to combat malaria, obtained financing

11 from the World Bank, and was granted awards. As a result of this action, the local health scenario was significantly improved. We had also a successful experience with a hydropower plant in the Andes region where water is a scarce and disputed resource. Although the project retains all water use rights required, and technical studies have shown that the availability of water for use by local people would not be affected, the population expected the hydropower plant to interfere in their right to use water and in water quality. Based on the best international industry practices, the company then conduct additional studies which analyzed scenarios and also considered the effects of climate change on the shortage of water in the region. In addition, the client adopted the concept of participative monitoring under which the population was invited to engage in campaigns to monitor the quantity and quality of this water. Feeling part of the process, the community was led to take responsibilities over their activities and disclose the results to other families in the region.

12 Performance Standard 5 Land Acquisition and Involuntary Resettlement This standard is based on the assumption that an involuntary resettlement process, if poorly conducted, may be disastrous both to the affected population and environmental resources involved. Involuntary resettlement refers both to physical displacement (relocation of people, even though they are not formal owners) and economic displacement (loss of assets or access to assets that leads to loss of income sources or means of livelihood). For this reason, the first significant recommendation is that involuntary resettlement should be avoided, either by finding alternative sites for the project or by means of a negotiation process seeking an friendly settlement. When involuntary resettlement is unavoidable, the project should implement to the stakeholders a sufficient process that includes disclosure, consultation and informed participation. A fair negotiation is also necessary to offset loss of assets and services. The long-term objective of this process should be the enhancement, restoration or even the improvement of the standards of living of the displaced persons. A lesson learned in applying this standard is that, in some cases, the socioeconomic registry of the affected population which should be the first step to start the resettlement process should not be something static. In a gas pipeline projected we analyzed in Colombia, for example, was identified that this registry was completed within a very short range of time. Given FARC's strong presence in Colombia until recently, many people were in the process of returning to their land, so such registry should be continuously extended in order to track this social process. We then requested the client to extend the registry process to ensure that all returning families are also included. A population that deserves special attention during the resettlement process is that of rural workers, since they are more sensitive to changes in their means of livelihood and production. Itau s experience in this context comes from the financing of a hydropower plant in Northern Brazil, in which Itau identified that the resettled people needed not only a fair compensation but also technical support to help them reorganize their activities. It was also agreed, that this technical support must continue until clear triggers of efficiency improvement and economic returns was reached.

13

14 Performance Standard 6 Biodiversity Conservation and Sustainable Management of Living Natural Resources The requirements set out in this standard were guided by the UN Convention on Biological Diversity (CBD). It defines how a project should manage, throughout its execution and operation, the protection and conservation of biodiversity at all its levels, maintain the benefits from ecosystem services (benefits that people and companies obtain from ecosystems) and promote the sustainable management of living natural resources. A case that illustrates the application of this principle is the financing of a hydropower plant in the Andes region. Because the project was close to a conservation unit, the use of explosives to drill the necessary tunnels was restricted and a drilling technology that kept disturbance to the local fauna and flora to a minimum was employed. Another example is how two hydropower plants in Brazil managed the risk associated with their impacts on biodiversity, specifically fishes. The construction of damns could represent a threat to the continuity of important species of long-distance migratory fishes, since this would fragment their habitat. Therefore, both projects conducted genetic studies of these populations of fishes to identify their behaviors. These studies revealed that, prior to the construction of dams, they were already naturally segregated in their habitat, and were divided into genetic subgroups. In practice, the challenges related to this topic are enormous when the project is located in or close to a protected area, such as conservation units or areas with fauna and flora species in danger of extinction. Long-term monitoring actions (30 years) were planned to verify, by means of indicators, if there would be numeric variation of the individuals of these species during the project life cycle, and no relevant changes have been identified so far. In addition, several fish transposition approaches were tested and an alternative considered less invasive to species was elected. Finally, an artificial reproduction center was also proposed to ensure that these species, if in danger based on the figures obtained by the indicators, can be reproduced in laboratory. Please note that the first three actions have so far shown sufficient for the indicators to remain at adequate levels, without the need to implement the fourth action.

15 Performance Standard 7 Indigenous Peoples This standard is based on the assumption that traditional peoples, including indigenous, represent a vulnerable segment of the population, especially when a project impacts directly or indirectly their material and non-material resources. It also provides recommendations of actions that should be adopted for these peoples to benefit from the impacts generated by the project.. Especially in Brazil, the indigenous issue is very complex and still an important insecurity factor in the development of infrastructure projects. In this regard, we have adopted a very conservative approach as we have required these projects to implement alternative actions and make decisions to avoid impacts on these populations. An example of this approach was when Itaú, in financing The objective of this standard is to respect the unique characteristics of these peoples, obtaining their free, prior and informed consent in relation to the proposed actions and establishing a continuous and culturally adequate communication channel. the construction of a large transmission line, required the client to adopt an alternative design that did not affect directly indigenous land, even though the route was longer. Projects should always be designed to generate benefits to these populations, like in the case of one of the hydropower plants we financed in Northern Brazil, and whose entrepreneur, even after indepth studies that revealed that the project would not impact indigenous land, adopted measures to benefit communities in the region that lived in poor conditions. Firstly, the project contracted etymologic studies which, besides helping government agencies to rescue the cultural origins of that community, allowed to identify that that population was in danger, mainly due to problems related to land security (for example, invasion of illegal miners and woodcutters) and diseases caused by lack of access to basic sanitation resources. As a result of this study, a program requiring the adoption of surveillance measures in the territorial boundaries of these communities and the provision of basic sanitation infrastructure was created.

16 Performance Standard 8 Cultural Heritage The last standard provides recommendations to protect the cultural heritage that may be affected by the project and, in some cases, promote the equitable sharing of benefits from the use of such cultural heritage. To achieve this, all works must be monitored by an archeologist, and the involved workers must be properly trained to identify archeological remains and keep them in safe until its rescue. To meet this standard, our experience also shows that engaging local archeologists and sociologists, or at least having a vast local knowledge, to conduct an appropriate analysis of the characteristics of this heritage and recommend proper handling and isolation actions. For example, at the above-mentioned hydropower plant in Chile, the existence of Inca Empire heritage was identified in the area impacted by the project. Such historic heritage, known as Inka Trail, is hardly identified by archeologists who are not from that region or who are not at least researchers of the Incan civilization. However, as the choice was to engage local professionals, the correct identification of the area and its characteristics enabled the adoption of the due care during the explosion activities, for example, in a way not to impact such an important Mankind Cultural Heritage.

17 Conclusion The cases outlined here reflect Itaú Unibanco s experiences in requiring, as part of the conditions precedent for granting credit, the adoption of measures to manage environmental and social risks and impacts, according to the IFC Performance Standards. Real-life solutions and lessons learned from some of the biggest challenges we faced over more than 10 years as signatories of the Equator Principles and as an institution financing infrastructure projects in the energy industry were presented.. We hope the lessons learned and presented here may go beyond the mere disclosure but reinforce the transparency approach valued by our environmental and social risk management guidelines. We believe that the demystification of the difficulties to fully implement the Equator Principles encourages the adoption of such criteria by other financial institutions besides being meaningful to other stakeholders. We are confident that this initiative will inspire a better alignment of these practices in the global financial services industry, in addition to significantly increase the breadth of positive effects while seeking sustainable development. To talk to Itaú Unibanco about the Equator Principles, contact us by sustentabilidade@itau-unibanco.com.br Rafael Mol is a senior environmental and social risk analyst in the wholesale segment of Itaú bank, so-called Itaú BBA. Specialist in risks related to the implementation, development and operation of projects in the energy and oil & gas sectors, Mol also provides climate change advisory services. Holder of a bachelor s degree in Environmental Engineering from the University of São Paulo (USP), Mol has also completed postgraduate studies on Environmental Management and Businesses in the Energy Sector and on Health and Safety Engineering at USP.

18 The information contained in this material is for the exclusive use of Itaú Unibanco. Any means of reproduction or disclosure of this material is expressly prohibited.

Principles for environmental and social responsibility

Principles for environmental and social responsibility issued by: Principles for environmental and social responsibility Sustainable development is dependent on a balance between economic considerations, social responsibility and environmental protection.

More information

Review Indicators Alignment Review Evaluation / Recommendations

Review Indicators Alignment Review Evaluation / Recommendations Human Rights Key objective: Support universal respect for, and observance of, human rights and fundamental freedoms for all Measures in place to uphold human rights principles of accountability and rule

More information

Sustainability Plan Colombia

Sustainability Plan Colombia Sustainability Plan 2016 Colombia Legal notice 2 Our vision of corporate responsibility and the preparation of this Plan 3 Stakeholders' expectations and the corresponding actions of the Plan 6 Program

More information

Review and Update of the World Bank s Environmental and Social Safeguard Policies Phase 3 Feedback Summary

Review and Update of the World Bank s Environmental and Social Safeguard Policies Phase 3 Feedback Summary Review and Update of the World Bank s Environmental and Social Safeguard Policies Phase 3 Feedback Summary Date: January 13, 2016 Location (City, Country): Ankara, Turkey Audience (Government, Implementing

More information

Review and Update of the World Bank s Environmental and Social Safeguard Policies Phase 3 Feedback Summary

Review and Update of the World Bank s Environmental and Social Safeguard Policies Phase 3 Feedback Summary Review and Update of the World Bank s Environmental and Social Safeguard Policies Phase 3 Feedback Summary Date: December 9 & 10, 2015 Location: Beirut, Lebanon Audience: Ministries, Implementing agencies,

More information

1 October. Public Information

1 October. Public Information ANZ S LAND ACQUISITION POSITION STATEMENT 1 October 2016 Public Information CONTENTS ANZ s land acquisition position statement 3 ANZ s commitment to sustainable development 3 Our human rights standards

More information

Review and Update of the World Bank s Environmental and Social Safeguard Policies Phase 3 Feedback Summary

Review and Update of the World Bank s Environmental and Social Safeguard Policies Phase 3 Feedback Summary Review and Update of the World Bank s Environmental and Social Safeguard Policies Phase 3 Feedback Summary Date: December 4, 2015 Location (City, Country): Tashkent, Uzbekistan Audience (Government, Implementing

More information

Review and Update of the World Bank s Environmental and Social Safeguard Policies Phase 3 Feedback Summary

Review and Update of the World Bank s Environmental and Social Safeguard Policies Phase 3 Feedback Summary Review and Update of the World Bank s Environmental and Social Safeguard Policies Phase 3 Feedback Summary Date: January 28, 2016 Location (City, Country): Jakarta, Indonesia Audience: Civil Society Organizations

More information

FSC Principles and Criteria for Forest Stewardship

FSC Principles and Criteria for Forest Stewardship Country/ Organization Initiative Membership Governing bodies Type and implementation approach Feedstock(s) covered Type(s) of biofuels covered Link Overview. FSC Principles and Criteria for Forest Stewardship

More information

Review and Update of the World Bank s Environmental and Social Safeguard Policies Phase 3 Feedback Summary

Review and Update of the World Bank s Environmental and Social Safeguard Policies Phase 3 Feedback Summary Review and Update of the World Bank s Environmental and Social Safeguard Policies Phase 3 Feedback Summary Date: January 14, 2016 Location (City, Country): KIGALI, RWANDA Audience: Governments Key: C =

More information

1 Environmental and Social Action Plan

1 Environmental and Social Action Plan 1 and Social Plan The table below constitutes the ESAP. It identifies the required actions during pre-construction, construction and operation of the project. of the actions is the responsibility of Koridori

More information

Environmental, Social and Governance (ESG) management

Environmental, Social and Governance (ESG) management 28 Environmental, Social and Governance (ESG) management Our policy The development of solar projects involves environmental and social implications. In alignment with Scatec Solar s policies, requirements

More information

Nordea Asset Management Protecting shareholder value & securing the license to operate; managing community risk

Nordea Asset Management Protecting shareholder value & securing the license to operate; managing community risk Nordea Asset Management Protecting shareholder value & securing the license to operate; managing community risk PHOTO istockphoto GRAPHIC DESIGN Lina Johansson. Sense Design FEBRUARY 2015 Protecting shareholder

More information

Miro Forestry Company Policies & Procedures

Miro Forestry Company Policies & Procedures Miro Forestry Company Policies & Procedures Approved by: Andrew Collins, CEO 16 th March 2017 Contents OCCUPATIONAL HEALTH AND SAFETY Policy... 3 LABOUR Policy... 4 ENVIRONMENTAL and SUSTAINABILITY Policy...

More information

Main Check Items. 1 Are wastes properly treated and disposed of in accordance with the laws and regulations of the host country?

Main Check Items. 1 Are wastes properly treated and disposed of in accordance with the laws and regulations of the host country? Checklist: 16. Power Transmission and Distribution Lines(1) Confirmation of and Social (1) ESIA and Permits 1 Have ESIA reports been officially completed? Have ESIA reports been written in the official

More information

CONDUCTING E&S DUE DILIGENCE ALIGNED WITH IFC PERFORMANCE STANDARDS A FOCUS ON FINANCIAL INTERMEDIARIES

CONDUCTING E&S DUE DILIGENCE ALIGNED WITH IFC PERFORMANCE STANDARDS A FOCUS ON FINANCIAL INTERMEDIARIES CONDUCTING E&S DUE DILIGENCE ALIGNED WITH IFC PERFORMANCE STANDARDS A FOCUS ON FINANCIAL INTERMEDIARIES EMIOLA ABASS June 13, 2017 COURSE OBJECTIVE This course has been designed to provide guidance to

More information

Managing E&S risks through the Equator Principles: Intesa Sanpaolo s view IAIA Florence, April 2015

Managing E&S risks through the Equator Principles: Intesa Sanpaolo s view IAIA Florence, April 2015 Managing E&S risks through the Equator Principles: Intesa Sanpaolo s view IAIA Florence, April 2015 The Intesa Sanpaolo Group: who we are 2 Managing Environmental and Social risks: why should banks worry?

More information

Environmental Checklist: 17. Roads, Railways and Bridges(1) Confirmation of Environmental and Social Considerations. Environmental Item

Environmental Checklist: 17. Roads, Railways and Bridges(1) Confirmation of Environmental and Social Considerations. Environmental Item Checklist: 17. Roads, Railways and Bridges(1) 1. Permits and Approvals, Explanations (1) ESIA and Permits (2) Explanations to the Public Main Check s 1 Have ESIA reports been officially completed? Have

More information

Environmental Checklist: 17. Roads, Railways and Bridges(1) Confirmation of Environmental and Social Considerations. Environmental Item

Environmental Checklist: 17. Roads, Railways and Bridges(1) Confirmation of Environmental and Social Considerations. Environmental Item Checklist: 17. Roads, Railways and Bridges(1) 1. Permits and Approvals, Explanations (1) ESIA and Permits (2) Explanations to the Public Main Check s 1 Have ESIA reports been officially completed? Have

More information

Sector guide - Energy

Sector guide - Energy Sector guide - Energy The purpose of this document is to serve as a guide for the identification and management of the environmental and social risks and opportunities of the services provided to the customers

More information

Performance Standard 6 V2

Performance Standard 6 V2 Introduction 1. Performance Standard 6 recognizes that protecting and conserving biodiversity, maintaining ecosystem services, and sustainably managing living natural resources are fundamental to sustainable

More information

Review and Update of the World Bank s Environmental and Social Safeguard Policies Phase 3 Feedback Summary

Review and Update of the World Bank s Environmental and Social Safeguard Policies Phase 3 Feedback Summary Review and Update of the World Bank s Environmental and Social Safeguard Policies Phase 3 Feedback Summary Date: 18 December 2015 Location: Abuja, Nigeria Audience: Non-Government Stakeholders ESF Issue

More information

COMPLIANCE WITH THE INTERNATIONAL COUNCIL FOR MINING AND METALS ASSURANCE PROCEDURE

COMPLIANCE WITH THE INTERNATIONAL COUNCIL FOR MINING AND METALS ASSURANCE PROCEDURE COMPLIANCE WITH THE INTERNATIONAL COUNCIL FOR MINING AND METALS ASSURANCE PROCEDURE As a member of the International Council on Mining and Metals (ICMM), Anglo American is required to adhere to the ICMM

More information

Review and Update of the World Bank s Environmental and Social Safeguard Policies Phase 3 Feedback Summary

Review and Update of the World Bank s Environmental and Social Safeguard Policies Phase 3 Feedback Summary Review and Update of the World Bank s Environmental and Social Safeguard Policies Phase 3 Feedback Summary Date: January 14, 2016 Location (City, Country): Istanbul, Turkey Audience (Government, Implementing

More information

Multilateral Investment Guarantee Agency. Performance Standards on Environmental and Social Sustainability

Multilateral Investment Guarantee Agency. Performance Standards on Environmental and Social Sustainability Multilateral Investment Guarantee Agency Performance Standards on Environmental and Social Sustainability Performance Standard on Environmental and Social Sustainability TABLE OF CONTENTS Overview i Performance

More information

Environmental and Social Policy

Environmental and Social Policy Environmental and Social Policy Contents Foreword 2 Purpose 2 Commitments 2 Environmental and Social Assessment 3 Operations financed directly 4 Operations financed through Financial Intermediaries 4 Environmental

More information

Guidelines for the Environmental and Social Screening of Activities Proposed under the Simplified Approval Process

Guidelines for the Environmental and Social Screening of Activities Proposed under the Simplified Approval Process Guidelines for the Environmental and Social Screening of Activities Proposed under the Simplified Approval Process 10 January 2018 Introduction 1. Environmental and social screening is an essential and

More information

Performance Requirements

Performance Requirements Environmental and Social Policy 15 Performance Requirements PR 1: Environmental and Social Appraisal and Management Introduction 1. The EBRD considers it important that all companies receiving EBRD financing

More information

Performance Standard 6

Performance Standard 6 Introduction 1. recognizes that protecting and conserving biodiversity, maintaining ecosystem services, and sustainably managing living natural resources are fundamental to sustainable development. The

More information

Mining & Communities

Mining & Communities Mining & Communities Supporting human rights-based development in the context of industrial mining in Guinea Abridged version of the Practical guide for civil society organizations and local authorities

More information

Independent Accountability Mechanism for IFC & MIGA, World Bank Group

Independent Accountability Mechanism for IFC & MIGA, World Bank Group Independent Accountability Mechanism for IFC & MIGA, World Bank Group Meeting with Civil Society Organizations in Accra, Ghana December 14, 2017 What is CAO? Independent accountability mechanism ( grievance

More information

CPFL Renováveis in the market

CPFL Renováveis in the market Praia Formosa Wind Farm CPFL Renováveis in the market 16 Annual Report Annual Report 17 business model GRI G-3; G-; G-6; G-8 CPFL Renováveis business model CPFL Renováveis operates in the national electricity

More information

REDD+ Social & Environmental Standards

REDD+ Social & Environmental Standards REDD+ Social & Environmental Standards CI/Photo by John Martin Version 1 June 2010 GGCA/Photo by Eric Hidalgo Standards to support the design and implementation of government-led REDD+ programs that respect

More information

RESPECTING PEOPLE AND COMMUNITIES: ANZ S APPROACH TO O HUMAN RIGHTS 1 October 2016

RESPECTING PEOPLE AND COMMUNITIES: ANZ S APPROACH TO O HUMAN RIGHTS 1 October 2016 RESPECTING PEOPLE ANDD COMMUNITIES: ANZ S APPROA ACH TOO HUMAN RIGHTS 1 October 2016 CONTENTS Introduction 3 How we apply our standards 4 Our standards 4 People 4 Customers 5 Communities 5 Suppliers 6

More information

World Bank Environmental and Social Framework (ESF) Frequently Asked Questions (FAQ) October 2018

World Bank Environmental and Social Framework (ESF) Frequently Asked Questions (FAQ) October 2018 World Bank Environmental and Social Framework (ESF) Frequently Asked Questions (FAQ) October 2018 You can find more information and resources on the ESF at our website: www.worldbank.org/esf Does the ESF

More information

Corporate Social Responsibility. Best Practice Principles. For. Wan Hai Lines Ltd.

Corporate Social Responsibility. Best Practice Principles. For. Wan Hai Lines Ltd. Corporate Social Responsibility Best Practice Principles For Wan Hai Lines Ltd. Chapter 1 General Principles Article 1 The Principles has been stipulated according to the Corporate Social Responsibility

More information

IFC SUSTAINABILITY FRAMEWORK

IFC SUSTAINABILITY FRAMEWORK IFC S SUSTAINABILITY FRAMEWORK RECENT UPDATES AND CHANGES REIDAR KVAM ENVIRONMENT, SOCIAL AND GOVERNANCE DEPARTMENT IFC SUSTAINABILITY FRAMEWORK 2 1 REVIEW AND UPDATE PROCESS April 2006 IFC introduces

More information

PROJECT CONCEPT PRELIMINARY QUESTIONAIRE PART I: GENERAL INFORMATION. GEF: OTHER(S) (Specify)

PROJECT CONCEPT PRELIMINARY QUESTIONAIRE PART I: GENERAL INFORMATION. GEF: OTHER(S) (Specify) PROJECT CONCEPT PRELIMINARY QUESTIONAIRE PART I: GENERAL INFORMATION Interested Organization Name: Project Location: Projected amount of required project funding ($ /USD): TOTAL: Project Sector or Similar:

More information

Key Principles Covered by Our Updated Sustainability Policy:

Key Principles Covered by Our Updated Sustainability Policy: Key Principles Covered by Our Updated Sustainability Policy: ENVIRONMENTAL SUSTAINABILITY: PROTECTING THE DIVERSITY OF LIFE ON EARTH 1. No Development on High Carbon Stock (HCS) Forests 2. No Development

More information

DRAFT FOR CONSULTATION OCTOBER 7, 2014

DRAFT FOR CONSULTATION OCTOBER 7, 2014 The Board has authorized the release of this document for consultation purposes to seek feedback on its content. It has not endorsed the content of the draft, and the Committee on Development Effectiveness

More information

ENVIRONMENTAL AND SOCIAL ACTION PLAN ÖKSÜT GOLD MINE, TURKEY (THE 'PROJECT')

ENVIRONMENTAL AND SOCIAL ACTION PLAN ÖKSÜT GOLD MINE, TURKEY (THE 'PROJECT') ENVIRONMENTAL AND SOCIAL ACTION PLAN ÖKSÜT GOLD MINE, TURKEY (THE 'PROJECT') DRAFT FOR DISCLOSURE PURPOSES. FINAL ESAP TO BE AGREED POST DISCLOSURE AND PRIOR TO FINANCING DECISION PR1 Assessment and of

More information

Corporate Social Responsibility Framework

Corporate Social Responsibility Framework PTT Exploration and Production Public Company Limited Corporate Social Responsibility Framework Document Code: Revision No. 1.1 1 February 2013 PTT Exploration and Production Public Company Limited Approval

More information

Business Principles. Business Principles

Business Principles. Business Principles Business Principles Business Principles 1 1.1. Introduction As one of Europe s leading independent oil and gas companies, Cairn Energy PLC ( Cairn or the Company ) aims to discover, develop and deliver

More information

Guidance Note 1 Social and Environmental Assessment and Management Systems

Guidance Note 1 Social and Environmental Assessment and Management Systems This Guidance Note 1 corresponds to Performance Standard 1. Please also refer to the Performance Standards 2-8 as well as the corresponding Guidance Notes for additional information. Bibliographical information

More information

10 G Street, NE Suite 800 Washington, DC USA (PH) +1 (202) (FAX) +1 (202)

10 G Street, NE Suite 800 Washington, DC USA (PH) +1 (202) (FAX) +1 (202) 10 G Street, NE Suite 800 Washington, DC 20002 USA (PH) +1 (202) 729-7600 (FAX) +1 (202) 729-7610 www.wri.or INTRODUCTION The World Resources Institute (WRI) thanks the World Bank for the opportunity to

More information

Bosnia and Herzegovina Route Donja Gračanica - Klopče and Svilaj - Odzak (Part of Corridor Vc) ENVIRONMENTAL AND SOCIAL ASSESSMENT

Bosnia and Herzegovina Route Donja Gračanica - Klopče and Svilaj - Odzak (Part of Corridor Vc) ENVIRONMENTAL AND SOCIAL ASSESSMENT Bosnia and Herzegovina Route Donja Gračanica - Klopče and Svilaj - Odzak (Part of Corridor Vc) ENVIRONMENTAL AND SOCIAL ASSESSMENT Environmental and Social Action Plan August 2016 Project: Bosnia and Herzegovina

More information

IDB Safeguards and REDD+

IDB Safeguards and REDD+ IDB Safeguards and REDD+ Environmental Safeguards Unit (VPS/ESG) Gender & Diversity Unit (SCL/GDI) Environment, Rural Development and Disaster Risk Management (INE/RND) Sustainable Energy and Climate Change

More information

ANNEXE 2: THE TERMS OF REFERENCE FOR ESIA AND RAP. 1. Objectives. The aim of the study is to achieve the following objectives:

ANNEXE 2: THE TERMS OF REFERENCE FOR ESIA AND RAP. 1. Objectives. The aim of the study is to achieve the following objectives: ANNEXE 2: THE TERMS OF REFERENCE FOR ESIA AND RAP 1. Objectives The aim of the study is to achieve the following objectives: Review of existing EIA and RAP reports on sections of the line which are not

More information

Principles, standards, the mitigation hierarchy and no net loss. 06 November, Sebastian Winkler Forest Trends

Principles, standards, the mitigation hierarchy and no net loss. 06 November, Sebastian Winkler Forest Trends Principles, standards, the mitigation hierarchy and no net loss 06 November, 2013 Sebastian Winkler Forest Trends Definition Contents (i) Why BBOP & Why Principles (ii) The Standard (iii) Mitigation hierarchy

More information

COMPLIANCE WITH THE INTERNATIONAL COUNCIL FOR MINING AND METALS ASSURANCE PROCEDURE 2017

COMPLIANCE WITH THE INTERNATIONAL COUNCIL FOR MINING AND METALS ASSURANCE PROCEDURE 2017 COMPLIANCE WITH THE INTERNATIONAL COUNCIL FOR MINING AND METALS ASSURANCE PROCEDURE 2017 As a member of the International Counsel on Mining and Metals (ICMM), Anglo American adheres to the ICMM Assurance

More information

CODE OF CONDUCT April 2017

CODE OF CONDUCT April 2017 SODEXO SUPPLIER CODE OF CONDUCT April 2017 Sodexo Supplier Code of Conduct Summary Introduction... 3 1. Business integrity... 4 2. Human rights and fundamental rights at work... 5 Elimination of all forms

More information

Environmental and Social Review Summary

Environmental and Social Review Summary Environmental and Social Review Summary 1. Overview of Scope of IDB Invest E&S Review The focus of the environmental and social review is to ensure that the Client s operations in Brazil conform to the

More information

JCM Power. The Environmental and Social Governance (ESG) Policy

JCM Power. The Environmental and Social Governance (ESG) Policy JCM Power The Environmental and Social Governance (ESG) Policy 21 St. Clair Avenue East Suite 500 Toronto, Ontario, Canada M4T 1L9 1-647-447-1662 info@jcmpower.ca Contents 1. Our Corporate Vision and Mission...

More information

SAMOA ENVIRONMENTAL AND SOCIAL SCREENING AND ASSESSMENT FRAMEWORK FOR A POST-TSUNAMI RECOVERY PROJECT

SAMOA ENVIRONMENTAL AND SOCIAL SCREENING AND ASSESSMENT FRAMEWORK FOR A POST-TSUNAMI RECOVERY PROJECT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized SAMOA ENVIRONMENTAL AND SOCIAL SCREENING AND ASSESSMENT FRAMEWORK FOR A POST-TSUNAMI

More information

Executive summary. Greening with jobs WORLD EMPLOYMENT SOCIAL OUTLOOK

Executive summary. Greening with jobs WORLD EMPLOYMENT SOCIAL OUTLOOK Executive summary Greening with jobs WORLD EMPLOYMENT SOCIAL OUTLOOK 2018 Action to limit global warming to 2 C will create jobs The long-term goal of the 2015 Paris Agreement is to keep the increase in

More information

MUFG Adopts Environmental Policy Statement, Human Rights Policy Statement, and Environmental and Social Policy Framework

MUFG Adopts Environmental Policy Statement, Human Rights Policy Statement, and Environmental and Social Policy Framework Mitsubishi UFJ Financial Group, Inc. (MUFG) MUFG Adopts Environmental Policy Statement, Human Rights Policy Statement, and Environmental and Social Policy Framework Tokyo, 15 May 2018 --- MUFG pursues

More information

Mezitli Wastewater Treatment Plant

Mezitli Wastewater Treatment Plant Mezitli Wastewater Treatment Plant Revised Environmental and Social Action Plan (ESAP) October 2017 Issued by: Mersin Water and Sewage Administration (MESKI) Table of Contents 1. Environmental and Social

More information

Summary - Agri-Commodities Policy

Summary - Agri-Commodities Policy Sustainable Banking / Summary Sustainability Sector Policy for Agri-Commodities Summary - Agri-Commodities Policy Why does ABN AMRO have a sector policy for Agri-commodities? Agriculture is one of the

More information

Revised mapping of the CITES Strategic Vision: objectives and the Aichi Targets in the Strategic Plan for Biodiversity

Revised mapping of the CITES Strategic Vision: objectives and the Aichi Targets in the Strategic Plan for Biodiversity Revised mapping of the CITES Strategic Vision: 2008 2020 objectives and the Aichi Targets in the Strategic Plan for Biodiversity 2010-2020. Analysis of how CITES Strategic Vision objectives contribute

More information

Human Rights Policy. 1. Introduction. Rabobank Group

Human Rights Policy. 1. Introduction. Rabobank Group Human Rights Policy Rabobank Group 1. Introduction... P 1 1.1 Sustainability and human rights... P 1 1.2 Objectives of this policy... P 1 2. Scope of application and basis of the Human Rights Policy...

More information

Our Supplier Code of Conduct

Our Supplier Code of Conduct Our Supplier Code of Conduct May 2018 Table of Contents Introduction... 3 Definitions... 3 1. Environmental Management... 4 2. Human Rights... 5 3. Diversity and Inclusion... 7 4. Society... 7 5. Product

More information

Critical Ecosystem Partnership Fund Indigenous Peoples Planning Framework 1

Critical Ecosystem Partnership Fund Indigenous Peoples Planning Framework 1 Critical Ecosystem Partnership Fund Indigenous Peoples Planning Framework 1 This Indigenous Peoples Planning Framework (IPPF) has been prepared to ensure that the World Bank s Indigenous Peoples policy

More information

Sustainability. Plan for the United States

Sustainability. Plan for the United States Sustainability Plan for the United States Contents Legal Notice. 2 Corporate Responsibility Vision and the development of this Plan. 3 Stakeholders expectations and the corresponding actions of the Plan.

More information

LAND DEGRADATION NEUTRALITY FUND PROJECT

LAND DEGRADATION NEUTRALITY FUND PROJECT LAND DEGRADATION NEUTRALITY FUND PROJECT ENVIRONMENTAL & SOCIAL STANDARDS August 2017 This commercial document is intended for Professional clients only in accordance with MIFID TABLE OF CONTENTS 1. Introduction

More information

SPREP Environmental and Social Management System

SPREP Environmental and Social Management System SPREP Environmental and Social Management System Protecting Communities, People, and the Environment across the South Pacific December 2016 Table of Contents GLOSSARY 4 1 INTRODUCTION 6 1.1 SCOPE OF THE

More information

Corporate Social Responsibility Best Practice Principles of ASPEED Technology

Corporate Social Responsibility Best Practice Principles of ASPEED Technology Corporate Social Responsibility Best Practice Principles of ASPEED Technology Date:2015.06.03 ( Amended ) Chapter I General Principles Article 1 These Principles are adopted to assist the Company and its

More information

Construction and real estate sector supplement GRI application level C. A year of opportunity

Construction and real estate sector supplement GRI application level C. A year of opportunity GRI application level C A year of opportunity 1 GRI application level C Standard disclosures part I: Profile disclosures Profile Disclosure Level of reporting Location of disclosures 1. Strategy and analysis

More information

The Institute of Directors of South Africa ( IoDSA ) is the convener of the King Committee and the custodian of the King reports and practice notes.

The Institute of Directors of South Africa ( IoDSA ) is the convener of the King Committee and the custodian of the King reports and practice notes. ANDULELA INVESTMENT HOLDINGS LIMITED CORPORATE GOVERNANCE Corporate Governance Overview December 2016 The Board of Directors is committed to the implementation of good corporate governance within the group

More information

(7) Good Practices. <Myanmar> Good Practice 1: EIA Consultant Registration System in Environmental Impact Assessment Procedure

(7) Good Practices. <Myanmar> Good Practice 1: EIA Consultant Registration System in Environmental Impact Assessment Procedure (7) Good Practices Good Practice 1: EIA Consultant Registration System in Environmental Impact Assessment Procedure 1. Stage of EIA Process (2)Quality of EIA (screening; scoping; investigation,

More information

BIO DIVERSITY POLICY Textile, Acrylic Fibre & Overseas Spinning Business

BIO DIVERSITY POLICY Textile, Acrylic Fibre & Overseas Spinning Business BIO DIVERSITY POLICY The Textile, Acrylic fibre and Overseas spinning business of Aditya Birla Group, recognises that Biodiversity is at the core of sustainable development and it impacts the quality of

More information

A SUSTAINED COMMITMENT TO IMPROVED INDUSTRY PERFORMANCE

A SUSTAINED COMMITMENT TO IMPROVED INDUSTRY PERFORMANCE A SUSTAINED COMMITMENT TO IMPROVED INDUSTRY PERFORMANCE PRINCIPLES REPORTING ASSURANCE The Challenge for the Mining and Metals Industry Minerals and metals lie at the foundation of today s world. But the

More information

UNRAVELING THE MYRAID OF STANDARDS AND TOOLS

UNRAVELING THE MYRAID OF STANDARDS AND TOOLS UNRAVELING THE MYRAID OF STANDARDS AND TOOLS HYDRO POWER DEVELOPMENT IN MEKONG REGION: CYCLING THROUGH FROM POLICY TO IMPLEMENTATION WORKSHOP SEPTEMBER 12-13, 2013 Basin Wide National regulations Project

More information

IFC s Policy and Performance Standards on Social and Environmental Sustainability. November 10, 2006 Rachel Kyte

IFC s Policy and Performance Standards on Social and Environmental Sustainability. November 10, 2006 Rachel Kyte IFC s Policy and Performance Standards on Social and Environmental Sustainability November 10, 2006 Rachel Kyte Our Lessons from the Past 10 years Realization that IFC needs: Internal capacity to address

More information

RESPONSIBLE SOURCING POLICY

RESPONSIBLE SOURCING POLICY RESPONSIBLE SOURCING POLICY Introduction CCL Products (India) Limited herein after referred as CCL recognizes its responsibility to ensure sound social, ethical and environmental practices within its own

More information

Table A1 - Environmental and Social Safeguard Policies Policy Objectives and Operational Principles

Table A1 - Environmental and Social Safeguard Policies Policy Objectives and Operational Principles Operational Manual - Table A1 - Environmental and Social Safeguard Policies Policy and Staff Connections- World Bank Intranet WB External Site WBG Directory Help Site Map Feedback Home News & Events Countries

More information

RB s Policy on Human Rights and Responsible Business* - Detailed Requirements

RB s Policy on Human Rights and Responsible Business* - Detailed Requirements 1 of 6 A No Child Labour. Limitation of Work by Young Workers Definition of a child: any person less than 15 years of age; except: a) where local law stipulates a higher age for work or mandatory schooling,

More information

Wistron NeWeb Corporation Corporate Social Responsibility Best-Practice Principles

Wistron NeWeb Corporation Corporate Social Responsibility Best-Practice Principles Chapter I General Principles Wistron NeWeb Corporation Corporate Social Responsibility Best-Practice Principles Article 1 Article 2 Article 3 Article 4 Article 5 In order to assist Wistron NeWeb Corporation

More information

EBRD Performance Requirement 1

EBRD Performance Requirement 1 EBRD Performance Requirement 1 Assessment and Management of Environmental and Social Impacts and Issues Introduction 1. This Performance Requirement (PR) establishes the importance of integrated assessment

More information

Quality, trust and social commitment. CaixaBank's Human Rights Policy. May 2017

Quality, trust and social commitment. CaixaBank's Human Rights Policy. May 2017 CaixaBank's Human Rights Policy May 2017 Caixabank, SA, Barcelona, 2017 1 Contents 1 Introduction 2 Scope and field of application 3 Commitments and principles of conduct in 31 Our responsibility to our

More information

NATURAL RESOURCES SUSTAINBALE INVESTING GUIDELINES

NATURAL RESOURCES SUSTAINBALE INVESTING GUIDELINES NATURAL RESOURCES SUSTAINBALE INVESTING GUIDELINES Harvard Management Company (HMC) is committed to sustainable ownership of our natural resource investments. To accomplish this goal, HMC adopted five

More information

NATURAL RESOURCES SUSTAINABLE INVESTING GUIDELINES

NATURAL RESOURCES SUSTAINABLE INVESTING GUIDELINES NATURAL RESOURCES SUSTAINABLE INVESTING GUIDELINES Harvard Management Company (HMC) is committed to sustainable ownership of our natural resource investments. To accomplish this goal, HMC adopted five

More information

CONVENTION ON INTERNATIONAL TRADE IN ENDANGERED SPECIES OF WILD FAUNA AND FLORA

CONVENTION ON INTERNATIONAL TRADE IN ENDANGERED SPECIES OF WILD FAUNA AND FLORA SC62 Inf. 4 (English only / únicamente en inglés / seulement en anglais) CONVENTION ON INTERNATIONAL TRADE IN ENDANGERED SPECIES OF WILD FAUNA AND FLORA Sixty-second meeting of the Standing Committee Geneva

More information

Basic Policy for Nature Restoration

Basic Policy for Nature Restoration Basic Policy for Nature Restoration Basic Directions for Promotion of Nature Restoration (1) Status of Japan s Natural Environment The natural environment, based on biodiversity and a natural material

More information

Development of operational principles of any proposed EU no net loss initiative 1,2

Development of operational principles of any proposed EU no net loss initiative 1,2 Development of operational principles of any proposed EU no net loss initiative 1,2 Final version 12 July 2013 Introduction and approach 3 To develop operational principles, agreeing the definition and

More information

EBRD Performance Requirement 10

EBRD Performance Requirement 10 EBRD Performance Requirement 10 Information Disclosure and Stakeholder Engagement Introduction 1. This Performance Requirement (PR) recognises the importance of an open and transparent engagement between

More information

Everlight Electronics Co., Ltd. Corporate Social Responsibility Best Practice Principles

Everlight Electronics Co., Ltd. Corporate Social Responsibility Best Practice Principles Everlight Electronics Co., Ltd. Corporate Social Responsibility Best Practice Principles Chapter I - General Principles Article 1 To fulfill corporate social responsibility and boost improvements in economy,

More information

HERMES MICROVISION, INC. Corporate Social Responsibility Best Practice Principles

HERMES MICROVISION, INC. Corporate Social Responsibility Best Practice Principles HERMES MICROVISION, INC. Corporate Social Responsibility Best Practice Principles 1 Purpose 1.1 In order to fulfill the corporate social responsibility initiatives and to promote economic, environmental,

More information

EBRD Environmental and Social Action Plan

EBRD Environmental and Social Action Plan PR 1 Assessment and Management of Environmental and Social Impacts and Issues 1.1 to establish PIU and dedicate a responsible person (head of PIU) for coordination between the various departments so as

More information

UN-REDD Programme Social and Environmental Principles and Criteria Draft for Consultation 30 June 2011

UN-REDD Programme Social and Environmental Principles and Criteria Draft for Consultation 30 June 2011 Introduction and Purpose UN-REDD Programme Social and Environmental Principles and Criteria Draft for Consultation 30 June 2011 The UN-REDD Programme is working with partners and REDD+ countries to develop

More information

Setting Standards for Sustainable Development. Update and Review of the World Bank s Safeguard Policies

Setting Standards for Sustainable Development. Update and Review of the World Bank s Safeguard Policies Setting Standards for Sustainable Development Update and Review of the World Bank s Safeguard Policies Why the Review? World Bank Group Commitment The World Bank Group is committed to supporting countries

More information

China Airlines Co., Ltd. Corporate Social Responsibility and Sustainable Development Best Practice Principles. Chapter I General Principles

China Airlines Co., Ltd. Corporate Social Responsibility and Sustainable Development Best Practice Principles. Chapter I General Principles China Airlines Co., Ltd. Corporate Social Responsibility and Sustainable Development Best Practice Principles Approved by the 6 th meeting of the 20 th term board of directors on May 12, 2016 Approved

More information

Our vision: To be a global leader in advancing energy solutions that are economically sound and environmentally and socially responsible.

Our vision: To be a global leader in advancing energy solutions that are economically sound and environmentally and socially responsible. Citi s Energy & Power Sector Framework Energy powers our lives. Providing clean, reliable and affordable energy is one of the world s most critical development challenges. For our clients, from Base of

More information

COMPLIANCE WITH THE INTERNATIONAL COUNCIL FOR MINING AND METALS ASSURANCE PROCEDURE

COMPLIANCE WITH THE INTERNATIONAL COUNCIL FOR MINING AND METALS ASSURANCE PROCEDURE COMPLIANCE WITH THE INTERNATIONAL COUNCIL FOR MINING AND METALS ASSURANCE PROCEDURE As a member of the International Counsel on Mining and Metals (ICMM), Anglo American is required to adhere to the ICMM

More information

ANNEX 9: UNEP Environmental, Social and Economic Review Note (ESERN)

ANNEX 9: UNEP Environmental, Social and Economic Review Note (ESERN) Impact of Risk 1 (1-5) Probability of Risk (1-5) Significance of Risk (L, M, H) AEX 9: UEP Environmental, Social and Economic Review ote (ESER) I. Project Overview Identification Addis Project # 01578

More information

Respecting Human Rights and Labor Rights: Disclosure Statement

Respecting Human Rights and Labor Rights: Disclosure Statement Respecting Human Rights and Labor Rights: Disclosure Statement Our Organization, Business and Supply Chain Founded in 1806, Colgate-Palmolive is a consumer products company that serves people around the

More information

DRAFT FOR PUBLIC COMMENT Guidance Note for ESS10 Stakeholder Engagement and Information Disclosure

DRAFT FOR PUBLIC COMMENT Guidance Note for ESS10 Stakeholder Engagement and Information Disclosure The Guidance Notes provide guidance for the Borrower on the application of the Environmental and Social Standards (ESSs), which form part of the World Bank s 2016 Environmental and Social Framework. The

More information

PLAN A AND THE UNITED NATIONS SUSTAINABLE DEVELOPMENT GOALS

PLAN A AND THE UNITED NATIONS SUSTAINABLE DEVELOPMENT GOALS M&S PLAN A REPORT 2018 42 FRAMEWORKS AND ASSURANCE PLAN A AND THE UNITED NATIONS SUSTAINABLE DEVELOPMENT GOALS Launched in 2015, the 17 SDGs form a shared global agenda for environmental improvement, social

More information

Inventec Corporation Corporate Social Responsibility Best Practice Principles

Inventec Corporation Corporate Social Responsibility Best Practice Principles Inventec Corporation Corporate Social Responsibility Best Practice Principles (This English version is a translation based on the original Chinese version. Where any discrepancy arises between the two

More information

ENVIRONMENTAL IMPACT ASSESSMENT

ENVIRONMENTAL IMPACT ASSESSMENT UNITED NATIONS ECONOMIC COMMISSION FOR EUROPE TRANS-EUROPEAN NORTH-SOUTH MOTORWAY (TEM) 65th Steering Committee and EIA Workshop ENVIRONMENTAL IMPACT ASSESSMENT Best practices and challenges in Bosnia

More information

Global Paper Vision. Priorities for transforming paper production, trade and use

Global Paper Vision. Priorities for transforming paper production, trade and use ENVIRONMENTAL PAPER NETWORK, MARCH 2014 OUR VISION We share a common vision of a forest, pulp and paper industry that contributes to a clean, healthy, just and sustainable future for all life on earth.

More information