Sea Level Rise, Saltwater Intrusion and Endangered Fisheries - Shifting Baselines for the Bay Delta Conservation Plan

Size: px
Start display at page:

Download "Sea Level Rise, Saltwater Intrusion and Endangered Fisheries - Shifting Baselines for the Bay Delta Conservation Plan"

Transcription

1 Golden Gate University School of Law GGU Law Digital Commons Publications Faculty Scholarship Spring 2015 Sea Level Rise, Saltwater Intrusion and Endangered Fisheries - Shifting Baselines for the Bay Delta Conservation Plan Paul S. Kibel Golden Gate University School of Law, pkibel@ggu.edu Follow this and additional works at: Part of the Environmental Law Commons, and the Water Law Commons Recommended Citation 38 Environs 259 (2015). This Article is brought to you for free and open access by the Faculty Scholarship at GGU Law Digital Commons. It has been accepted for inclusion in Publications by an authorized administrator of GGU Law Digital Commons. For more information, please contact jfischer@ggu.edu.

2 Sea Level Rise, Saltwater Intrusion and Endangered Fisheries - Shifting Baselines for the Bay Delta Conservation Plan Paul Stanton Kibel* I. W HEN IS A FUTURE BASELINE REQUIRED? NEXUS BETWEEN X2 AND DELTA FISHERIES USFWS BIOLOGICAL OPINION FOR THE DELTA SMELT Ill. NEXLfS BETWEEN X2 AND SEA LEVEL RISE RECLAMATION CLIMATE IMPACTASSESSMENT IV DRAFT EIR-EIS FOR THE BAY DELTA CONSERVATION PLAN A. O verview of B D C P B. Appendix 2.C of the BDC P C. Appendix 29A of the Draft EIR-EIS for the BDCP D. CEQA Baseline in the Draft EIR-EIS and BDCP V. CONCLUSION - BDCP AS POTENTIAL TEST CASE ON SHIFTING B A SE LIN ES I. WHEN IS A FUTURE BASELINE REQUIRED? UC Davis School of Law's March 2015 symposium on The Future of CEQA, out of which this article evolved, focused on how the substantive law governing the operation of the California Environmental Quality Act might change in the coming decades. In my presentation for the symposium's final panel, I suggested that certain changes in CEQA substantive law may well be driven by the increasing recognition that the background conditions against which projects will operate will themselves change significantly in the future. * Professor Paul Stanton Kibel teaches water law at Golden Gate University (GGU) School of Law In San Francisco where he also directs the GGU Center on Urban Environmental Law (CUEL). He is also natural resource counsel for the Water and Power Law Group in Berkeley. He holds a B.A. from Colgate University and LL.M from Boalt Hall Law School at the University of California at Berkeley, and is the author of the forthcoming book UNDERSTANDING WATER RIGHTS IN CALIFORNIA AND THE WEST (LexisNexis). This article evolved from a paper the author presented at The Future of CEQA symposium held at the University of California at Davis School of Law on March 13, The article covers developments through the end of March 2015.

3 University of California, Davis [Vol. 38:2 The basic environmental impact assessment paradigm, under the federal National Environmental Policy Act (NEPA) 1 and state laws such as the California Environmental Quality Act (CEQA) 2, is as follows: set forth an accurate project description 3, describe baseline environmental conditions at the time the project is being considered for approval 4, assess the impacts of the proposed project on baseline environmental conditions 5, and then present a reasonable range of alternatives and feasible mitigation to reduce the significant adverse impacts of the project on baseline environmental conditions. 6 The critical temporal assumption to this basic environmental impact assessment paradigm is that appropriate alternatives and mitigation will be determined in reference to a set of baseline environmental conditions at a fixed point in time when the environmental impact assessment document is being prepared. At the time NEPA and CEQA were adopted, around 1970, this temporal assumption made sense. In 1970, it was perhaps difficult to envision a situation where a lead agency could credibly predict future changes in background conditions that would occur independent of the project being considered or similar nearby proposed projects. Grounding environmental impact assessment on a comparison of project impacts against existing conditions was a logical approach. The effects of climate change, however, present a challenge to the viability of this basic environmental impact assessment paradigm, particularly for projects that will operate many decades into the future. 7 With climate change, the background environmental conditions against which long-term projects operate will change: air and water temperatures will be higher, the snowpack will be smaller, sea levels will rise. As these background environmental conditions shift during the project's operation, the project's impacts on the environment will also change and may become more severe. Yet, if the environmental impact assessment remains tethered to the baseline conditions when the environmental impact assessment was prepared, and disregards the ways such baseline conditions will shift as a result of climate change, the assessment will fail to identify the true impacts of the project during its anticipated lifetime. Thus, effective alternatives and mitigation to address these true impacts will not be considered or incorporated into the project. In 2013, the California Supreme Court issued a landmark CEQA holding that 1 42 U.S.C CAL. PUB. RES. CODE MICHAEL REMY, TINA THOMAS, JAMES MOOSE & WHITMAN MANLEY, GUIDE TO CEQA/CALIFORNIA ENVIRONMENTAL QUALITY ACT (11 th ed. 2007). 4 Id. at Id. at Id. at , See generally Paul Stanton Kibel, A Salmon Eye Lens on Climate Adaptation, 19 OCEAN & COASTAL L.J. 65 (2013).

4 2015] Sea Level Rise, Saltwater Intrusion and Endangered Fisheries 261 authorized state and local agencies in California to depart from the basic environmental impact assessment paradigm to more effectively address changes in baseline conditions that are expected to occur during the lifetime of a proposed project. 8 In its decision in Neighbors for Smart Rail v. Exposition Metro Line Construction Authority (Smart Rail), the Court reviewed an environmental impact report ("EIR") for a Los Angeles urban light rail project which considered air quality and traffic impacts against a future environmental baseline that included anticipated population increases in the vicinity of the project. 9 The use of this future baseline had been affirmed by the California Court of Appeal, which held: "[t]he important point, in our view, is the reliability of the projections and the inevitability of the changes on which those projections are based... Population growth, with its concomitant effects on traffic and air quality, is not hypothetical in Los Angeles County; it is inevitable." 10 On review, the issue was presented to the California Supreme Court in Smart Rail as an "either/or" question: when is it appropriate to use a future baseline for CEQA analysis instead of, in lieu of, an existing conditions baseline? A key aspect of the Court's 2013 Smart Rail decision was its rejection of this proposed "either/or" framework for evaluating the relationship between existing and future baselines."1 Instead, the Court focused on the appropriate use of "multiple" baselines in CEQA documents. 12 That is, in Smart Rail, the Court held that it is permissible for a lead agency to use a future baseline when there are inevitable changes in the environmental setting that will occur during the duration of the project. 1 3 But, and this is a very important but, the Court made clear that while there may be situations where it is permissible or even advisable for a lead CEQA agency to use a future baseline in its environmental impact analysis, this does not mean that the lead agency is generally allowed to forgo analysis of the project's impact as compared to existing conditions. 14 As the Court explained in Smart Rail, "nothing in CEQA law precludes an agency...from considering both types of baselines - existing and future conditions - in its primary analysis of the project's significant adverse 5 impact."' The California Supreme Court then further elaborated: 8 Neighbors for Smart Rail v. Exposition Metro Line Construct. Auth., 57 Cal. 4th 439 (2013). 9 Id. at Neighbors for Smart Rail v. Exposition Metro Line Construct. Auth., 141 Cal. Rptr. 3d 1, (Cal. Ct. App. 2012). i Smart Rail, 57 Cal. 4th at Id. at Id. at Id. at Id. at 454.

5 University of California, Davis [Vol. 38:2 Even when a project is intended and expected to improve conditions in the long term - 20 or 30 years after an EIR is prepared - decision makers and members of the public are entitled under CEQA to know the short- and medium-term environmental costs of achieving that desirable improvement... Though we might rationally choose to endure short- or medium-term hardship for a long-term, permanent benefit, deciding to make that tradeoff requires some knowledge about the severity and duration of the near-term hardship. An EIR stating that in 20 or 30 years the project will improve the environment, but neglecting, without justification, to provide any evaluation of the project's impacts in the meantime, does not give due consideration of both the short-term and long-term effects of the project. 16 The Court cautioned that allowing CEQA lead agencies to ignore near-term effects on existing conditions "would sanction the unwarranted omission of information on years or decades of a project's environmental impacts and open the door to gamesmanship in the choice of baselines." '1 7 From this holding, we understand that the Court's multiple baselines approach is grounded in CEQA's requirement that both short-term and long-term project impacts must be evaluated. Otherwise, if a CEQA lead agency were allowed only to focus on a distant point in time in the future with changed baseline conditions, it would be allowed to bypass analysis of the more immediate effects of the project on existing conditions. 18 With Smart Rail, it is now generally permissible for a lead CEQA agency to employ a future baseline in addition to an existing baseline. The anticipated and inevitable shifts in environmental conditions (e.g. rising temperatures, snowpack reduction, sea level rise) resulting from climate change, due to their inevitable nature, appear to fall within Smart Rail's bounds of when the use of such where multiple baselines would be peimissible. 1 9 The question left open by Smart Rail is whether there are situations where CEQA not only permits the use of a future baseline but requires it. Although in one sense this is a CEQA-specific question, the answer to this question may also have implications for how climate change is addressed under NEPA and other non-california state environmental impact assessment laws. As such, these other jurisdictions may look to California's answer and approach as guidance and persuasive precedent. This article suggests that this open question may soon be addressed in 16 Id. at Id. at The CEQA obligation to assess both short-term and long-term impacts is set forth in the CEQA Guidelines. See CAL. CODE REGS., tit. 14, (West 2015). 19 THE LAW OF ADAPTATION TO CLIMATE CHANGE: U.S. AND INTERNATIONAL ASPECTS 5-6, 95, (Michael B. Gerrard and Katrina Fischer Kuh eds., 2012).

6 2015] Sea Level Rise, Saltwater Intrusion and Endangered Fisheries 263 subsequent litigation challenging the CEQA climate change analysis for the Bay Delta Conservation Plan ("BDCP"), a fishery restoration-water supply project proposed in California. To understand the relevant CEQA climate change issues related to the BDCP, our starting point is the 2008 Biological Opinion issued by the United States Fish & Wildlife Service for the delta smelt, a fish species protected under the federal Endangered Species Act. 21 II. NEXUS BETWEEN X2 AND DELTA FISHERIES- OPINION FOR THE DELTA SMELT 2008 USFWS BIOLOGICAL In 2008, pursuant to the Endangered Species Act ("ESA"), the United States Fish & Wildlife Service ("USFWS") issued its biological opinion ("Bi-Op") for the delta smelt in connection with the proposed "coordinated operations" of the federal Central Valley Project ("CVP") and California's State Water Project ("SWP"). 22 The CVP and SWP, which deliver water to agricultural and urban water users throughout the state, both divert significant amounts of water from and upstream of the Delta where the fresh water of the Sacramento and San Joaquin Rivers flow into San Francisco Bay (hereinafter the "Delta" or "Bay Delta"). 23 In this 2008 Bi-Op, the USFWS determined that it could not issue an incidental take permit for the proposed CVP-SWP coordinated operations unless these operations ensured adequate fresh water flows into the Delta. 24 According to the USFWS, adequate fresh water flows would be met if "X2," which represents the distance salt water has traveled into the Delta by measuring "the intrusion of water with a salinity level of two parts per thousand, 25 was located at a distance of kilometers eastward of the Golden Gate Bridge. 26 This Bi-Op determined that maintaining X2 at this particular locational range was needed to ensure the survival and recovery of the endangered delta smelt. 27 This decision was based on data showing a strong correlation between increases in salinity levels beyond X2 levels and decreases in suitable abiotic habitat for 20 See generally CAL. DEPT. OF WATER RES., BAY DELTA CONSERVATION PLAN ENVIRONMENTAL IMPACT REPORT/ENVIRONMENTAL IMPACT STATEMENT HIGHLIGHTS (December 2013), Highlights of the DraftEIR-EIS_ sflb.ashx [hereinafter BDCP HIGHLIGHTS]. 21 U.S. FISH AND WILDLIFE SERV., FORMAL ENDANGERED SPECIES ACT CONSULTATION ON THE COORDINATED OPERATIONS OF THE CENTRAL VALLEY PROJECT AND STATE WATER PROJECT (Dec. 15, 2008), OPsBO_12-15_final signed.pdf [hereinafter REVISED DELTA SMELT BI-OP]. 22 Id. 23 See generally id. 24 Id. at Westlands Water District v. U.S. Dept. of Int., 376 F.3d 853, 876 (9th Cir. 2004). 26 REVISED DELTA SMELT BI-OP, supra note 21, at Id.

7 University of California, Davis [Vol. 38:2 delta smelt. 28 The Bi-Op explained that the location of"x2 is largely determined by Delta outflow, which in turn is largely determined by the difference between 29 total Delta inflow and the-total amount of water exported, and that the effects of the proposed CVP-SWP coordinated operation on X2 will have "significant adverse direct and indirect effects on delta smelt." ' 30 The Bi-Op contained a graph indicating that the proposed CVP-SWP coordinated operations would cause X2 to shift upstream to approximately 90 kilometers east of the Golden Gate Bridge. 31 The USFWS found that a shift of X2 upstream to this location, which was nearly 15% farther upstream than the 32 current average location of X2, could cause the delta smelt to go extinct. The 2008 USFWS Bi-Op for the delta smelt was challenged in federal court, and in April 2014, this Bi-Op was upheld by the Ninth Circuit Court of Appeals. 33 In its ruling in San Luis v. Jewell, the Ninth Circuit found that "[a]s the combined pumping operations of the SWP/CVP remove hundreds of gallons of fresh water from the Bay Delta, X2... shifts eastward towards the DeltaFalseThe Bi-Op determined that the 'long-term upstream shift in X2... has caused a long-term decrease in habitat area availability for the delta smelt' and it set forth an adaptive management program to minimize the effect of project pumping on X2." 34 In November 2014, the United States Supreme Court denied cert to review the Ninth Circuit Court of Appeal's decision in San Luis v. Jewell. 35 III. NEXUS BETWEEN X2 AND SEA LEVEL RISE RECLAMATION CLIMA TE. IMPACTASSESSMENT In September 2014, the Bureau of Reclamation released a report titled Climate Impact Assessment for the Sacramento and San Joaquin Basin ("Reclamation Climate Impact Assessment"). 36 Reclamation prepared the Climate Impact Assessment in connection with the operations of its Central Valley Project (CVP), which diverts, stores, and delivers waters from the Sacramento River and San Joaquin River watersheds and includes such 28 Id. at Id. at Id. at Id. at 265, fig. E Id. at 235, See San Luis & Delta-Mendota Water Authority v. Jewell, 747 F.3d 581 (9th Cir. 2014). 34 Id. at San Luis & Delta-Mendota Water Authority v. Jewell, 747 F.3d 581 (9th Cir. 2014), cert denied sub nom., 135 S.Ct 948 (Jan. 12, 2015). 36 U.S. BUREAU OF RECLAMATION, U.S. DEPT. OF INT., SACRAMENTO AND SAN JOAQUIN BASINS CLIMATE IMPACT ASSESSMENT (September 2014), wcra/docs/ssjbia/ssjbia.pdf [hereinafter CLIMATE IMPACT ASSESSMENT].

8 2015] Sea Level Rise, Saltwater Intrusion and Endangered Fisheries 265 structures as Shasta Dam on the Sacramento and Friant Dam on the San Joaquin. 37 The report focused on how projected salinity increases induced by sea level rise would impact CVP agricultural and urban water supplies, rather than impacts on smelt or fisheries. 38 On page 39 of the 2014 Reclamation Climate Impact Assessment there is a section titled "Delta Salinity" that contains a table showing salinity measurements and projections, see Figure 1 below. Percent Change from CTNoCC Metric Period CTNoCC CT Q5 CAT12 CTQ5 CAT12 Delta Salinity ,782 1,985 2,198 11% 23% Emmaton (average ,768 2,268 2,751 28% 56% annual EC in p ,151 3,940 4,036 83% 88% Delta Salinity - Jersey ,536 1,654 1,807 8% 18% Point (average annual ,600 1,885 2,211 18% 38% EC in ps/cm) ,718 2,629 2,837 53% 65% Figure 1. Summary of Salinity Monitoring, Climate Impact Assessment for the Sacramento and San Joaquin Basin 39 Figure 1 focuses on two salinity monitoring locations in the Delta, one at a location called Emmaton and the other at a location upstream called Jersey Point. 40 The table shows the anticipated twenty-first century increases in salinity levels at these locations resulting from climate change-induced sea level rise and saltwater intrusion. 4 1 For the period from , Table 7 projects a 28%-56% increase in salinity levels at Emmaton and an 18%-38% increase in salinity levels at Jersey Point. For the period from , Table 7 projects an 83%-88% increase in salinity at Emmaton and a 53%-65% increase in salinity at Jersey Point. Taken together, this data indicates that, as a result of climate induced sea level rise, salinity levels in these two Delta locations are expected to rise by 53-88% over the coming century. 42 Keep in mind, these are not the projections of environmental groups or the United States Environmental Protection Agency or 37 Central Valley Project, U. S. DEPT. OF INT., Name=Central+Valley+Project (last visited April 16, 2015). 38 Climate Impact Assessment, supra note 36, at 39 ("Delta salinity conditions provide a measure of the risk to in-delta and export water users that their water supplies will have a higher salinity than what is required to be in compliance with the standards for urban and agricultural beneficial uses set by the [State Water Resources Control Board]."). 19 ld. at 40, tbl Id. 41 Id. 42 Id.

9 University of California, Davis [Vol. 38:2 the USFWS. These are the projections of the Bureau of Reclamation, which operates the CVP. While there was no mention in Table 7 of the 2014 Reclamation Climate Impact Assessment of the current location of X2 or of the upstream location where X2 is projected to shift as a result of climate change induced sea level rise, the implications of Table 7 for X2 are plain to see. If sea level rise will cause salinity levels in the Delta to increase by 53-88% in the coming century, then it follows that sea level rise will also cause X2 to shift much further upstream. The information presented in Table 7 of the 2014 Reclamation Climate Impact Assessment is therefore quite bad news for the delta smelt. IV DRAFT EIR-EIS FOR THE BAY DELTA CONSERVATION PLAN A. Overview of BDCP There are two underlying purposes of the BDCP, which are often referred to as the co-equal goals of the BDCP. 43 These co-equal goals are: (i) to restore the Delta's ecosystem and fisheries; and (ii) to improve water supply reliability. 44 The BDCP was drafted as a multi-species habitat conservation plan (HCP) to satisfy the requirements of Section 10 of the federal Endangered Species Act. 45 As an HCP, the focus of the BDCP was on the restoration of several ESA-listed fisheries in the Delta, namely the endangered delta smelt and several endangered salmon and steelhead trout runs. 46 Additionally, the BDCP proposed a series of components that would guide the activities of the Bureau of Reclamation's CVP and the California Department of Water Resources' SWP for many decades, perhaps as long as 50 years out. 47 The components of the BDCP (as presented in the last draft environmental impact assessment documented issued in late 2013) include the following main three items. First, the BDCP proposes moving the main point of Delta diversion for the CVP and SWP from the south Delta to the north Delta and construction of two new tunnels to transport water from the new north point of diversion to agricultural and urban water users south of the Delta. 48 Second, the BDCP outlines a series of riparian enhancement projects designed to improve spawning 43 See Rita Schmidt Sudman, Meeting the Co-Equal Goals? The Bay Delta Conservation Plan, WESTERN WATER, May/June 2013, available at 44 BDCP HIGHLIGHTS, supra note 20, at 2 ("The plan would help restore fish and wildlife species in the Delta and to improve reliability of water supplies..."). 41 Id. at Id. at Id. at 2 ("It is a planning document, to be implemented over 50 years..."). 48 Id. at 3, 7-10.

10 2015] Sea Level Rise, Saltwater Intrusion and Endangered Fisheries 267 habitat for fisheries. 49 Third, the BDCP anticipates a potential 18%. increase in the amount of fresh water diverted out of or upstream of the Delta - diversions sometimes called Delta exports. 5 An 18% increase in fresh water diversions out of the Delta would result in a significant decrease in the amount of fresh water flowing both into and through the Delta. There are four lead agencies for the BDCP - the federal Bureau of Reclamation, USFWS, and National Marine Fisheries Service, as well as California's Department of Water Resources ("DWR"). 51 Because the BDCP is a joint.undertaking of these agencies, a joint EIR-EIS is being prepared pursuant to the NEPA and CEQA. The analysis below focuses on the CEQA-specific analysis in the December 2013 Draft EIR-EIS for the BDCP ("Draft EIR-EIS") rather than the NEPA-specific analysis in this document. B. Appendix 2. C of the BDCP Appendix 2.C of the BDCP was titled "Climate Change Implications and Assumptions" and reports: "Scenarios modeled by the California Climate Action Team project sea level rise increases along the California coast of 1.0 to 1.5 feet by 2050, and 1.8. to 4.6 feet by However, if California's sea level continues to mirror global trends, increases in sea level during this century could be considerably greater." 52 So in Appendix 2.C. of the BDCP DWR acknowledges that the best available evidence indicates that by the end of the century sea level rise could be 4.6 feet (54 inches) and possibly higher. 53 C. Appendix 29A of the Draft EIR-EJS for the BDCP Appendix 29A of the Draft EIR-EIS for the BDCP is titled "Effects of Sea Level Rise on Delta Tidal Flows and Salinity." 54 Figure 29A-13 (shown below in Figure 2) presents a graph showing how projected increases in sea level rise 49 Id. 50 U.S. BUREAU OF RECLAMATION, U.S. FISH & WILDLIFE SERV., NAT'L MARINE FISHERIES SERV., CAL. DEPT. OF WATER RES., DRAFT ENVIRONMENTAL IMPACT REPORT/ENVIRONMENTAL IMPACT STATEMENT FOR THE BAY DELTA CONSERVATION PLAN, fig [hereinafter DRAFT EIR/EIS], available at DraftEIR-EIS.aspx.Figure,5-17 compares annual delta water exports under the No Action alternative and under BDCP alternative 4H I. Figure 5-17 annual shows delta water exports under the No Action alternative to be 4,441 AF and annual delta water exports under BDCP alternative 4HI to be 5,455 AF (which is an increase of 18%). s1 Id. at ES U.S. BUREAU OF RECLAMATION, U.S. FISH & WILDLIFE SERV., NAT'L MARINE FISHERIES SERV., CAL. DEPT. OF WATER RES., 2013 PUBLIC DRAFT BAY DELTA CONSERVATION PLAN, 2.C-12 [hereinafter DRAFT B DCP], available at PublicReviewDrafiBDCP.aspx. 53 Id. 54 DRAFT EIR/EIS, supra note 50, at Appendix 29A.

11 University of California, Davis [Vol. 38:2 are expected to shift the location of X2. 30 =m SLR 45 amr SLR 60 am SLR,s S140 a. GI.R IMdltan I-cea In X2 (krnl..m.imum InCre"e In X2 kmj Soa Lav R1 o tonal Figure 2. Simulated Daily Increases in X2 (Draft BDCP EIR-EIS) 55 According to this chart, a 30 centimeter sea level rise would cause X2 to shift approximately 1-2 kilometers upstream, a 45 centimeter sea level rise would cause X2 to shift 2-4 kilometers upstream, and a 140 centimeter sea level rise would cause X2 to shift kilometers upstream. 56 As noted above, Appendix 2.C of the Draft BDCP acknowledged that sea level may rise more than 4.5 feet (or 140 centimeters). 57 Reading Appendix 2.C and Appendix 29A together, the Draft BDCP and EIR-EIS concede that climate change-induced sea level rise may cause the location of X2 to shift as much as 1 1 kilometers upstream from its current location.58 Yet, pursuant to the analysis and methodology in the 2008 USWFWS Bi-Op, if X2 were to shift I I kilometers upstream (to a location approximately 90 kilometers east from the Golden Gate Bridge), the delta smelt faces the likelihood of extinction. 59 The projected upstream shift in X2 due to sea level rise places X2 close to the location where the USFWS has determined that delta smelt cannot survive, and the only way to counteract this anticipated upstream shift in X2 would be to ensure that additional fresh water flows into the Delta. 60 Appendix 2.C and Appendix 29A of the Draft BDCP and EIR-EIS, respectively, therefore disclose the effect that climate change-induced sea level 55 Id. at App. 29A, fig. 29A Id. 57 DRAFT BDCP, supra note 52, at Appendix 2.C. 58 Id.; DRAFr EIR/EIS, supra note 50, at Appendix 29A. 59 REVISED DELTA SMELT BI-OP, supra note 21, at Id. at ,

12 2015] Sea Level Rise, Saltwater Intrusion and Endangered Fisheries 269 rise will have on salinity levels and the location of X2. 61 These appendices, however, do not then contain subsequent analysis of how these expected changes in salinity levels and the location of X2 will impact the recovery and survival of the endangered delta smelt. D. CEQA Baseline in the Draft EIR-EIS and BDCP As noted above, DWR (which operates California's State Water Project) was the lead CEQA agency in connection with the Draft EIR-EIS prepared for the BDCP. In Appendix 3D of the BDCP EIR-EIS, DWR explains the baseline conditions it would be using in connection with its CEQA environmental impact analysis. 62 In Appendix 3D, DWR states: "The CEQA baseline for assessing the significance of impacts of any proposed project is normally the environmental setting, or existing conditions, at the time the NOP [Notice of Preparation] is issued (State CEQA Guidelines Section 15125)... This directive was recently interpreted and applied by the California Supreme Court (Neighbors for Smart Rail)... According to the Court [in Smart Rail], the CEQA Guidelines establish the default of an existing conditions baseline even for projects expected to be in operation for many years or decades... [A]ny sole reliance on such a future baseline is only permissible where a CEQA lead agency can show, based on substantial evidence, that an existing conditions analysis would be misleading or without informational value... The CEQA baseline [for the BDCP] is existing conditions at the time of the NOP [February 2009]. " 63 This characterization of the Smart Rail holding is not wholly inaccurate but is certainly an incomplete and arguably misleading description of the decision. More specifically, the characterization of Smart Rail in Appendix 3D of the EIR-EIS fails to mention the California Supreme Court's express endorsement of the use of multiple baselines (that include future as well as existing conditions baselines) as a preferred approach to sole reliance on a future baseline 64 Appendix 3D's characterization of Smart Rail suggests that CEQA would somehow prohibit or preclude DWR from using a future baseline to consider the effects of climate change-induced sea level rise on Delta fisheries, and this is erroneous. The California Supreme Court's decision in Smart Rail lends no support to this characterization and in fact contradicts it. 65 In Smart Rail, the California Supreme Court expressed reservations about the use of a future. 61 DRAFT BDCP, supra note 52, at Appendix 2.C; DRAFT EIR/EIS, supra note 50, at Appendix 29A. 62 DRAFT EIR/EIS, supra note 50, at Appendix 3D. 63 Id. at 3D See discussion supra Part I & notes 8-19; Neighbors for Smart Rail v. Exposition Metro Line Const. Auth., 57 Cal. 4th 439, (2013). 65 Id.

13 University of California, Davis [Vol. 38:2 conditions baseline in lieu of an existing conditions baseline, not the use of a future conditions baseline in addition to an existing conditions baseline. The definition of the CEQA baseline presented in Appendix 3D of the BDCP EIR-EIS was also set forth in a December 2013 document co-prepared by DWR titled Highlights of Bay Delta Conservation Plan Environmental Impact Report/Environmental Impact Statement ("BDCP Highlights"). 66 The section of BDCP Highlights on "Water Supply" explained that "[s]ea level rise will push salt water further east into the Delta, requiring upstream water releases 'to push sea water out of the Delta and achieve in-delta water quality standards. These operational changes, would in turn, decrease available water supply for south of Delta users. ' 67 The section of the BDCP Highlights on "Water Quality" then finds that "seawater intrusion caused by sea level rise or decreased Delta outflow...can increase the concentration of salts. Conversely, Delta outflow can decrease the effects of seawater intrusion." 68 BDCP Highlights thus explicitly and repeatedly notes how sea level rise will impact Delta salinity levels and how increasing fresh water flows in the Delta would help counter this seawater intrusion. However, after noting that sea level rise will require additional instream flow to push saltwater intrusion back, the section of BDCP Highlights labeled "Environmental Baseline" provides: "In order to measure the magnitude of any impact, agencies must first identify a baseline condition to serve as a point of impact comparison...the CEQA baseline standard normally requires a project 69 to review its impacts relative to 'change from existing conditions.' The section of BDCP Highlights on "Water Quality" also goes on to clarify: "Existing conditions... are the conditions at the time the NOP [CEQA Notice of Preparation] was issued - that is, These conditions do not include projections of future sea level rise and climate change Again, this characterization of CEQA baseline conditions does not take into account the California Supreme Court's endorsement of multiple baselines in Smart Rail, which permits CEQA lead agencies to use a future conditions baseline, in addition to an existing conditions baseline. 7 1 Similar to Appendix 2.C of the BDCP and Appendix 29A of the Draft EIR- EIS, the BDCP Highlights document acknowledges the ways sea level rise will impact Delta salinity and how this will require increased instream fresh water flow into the Delta, while simultaneously taking the position that this information regarding sea level rise will not be considered in the CEQA 66 BDCP HIGHLIGHTS, supra note Id. at Id. at Id. at Id. at 19 (emphasis added). 71 See citations supra note 64.

14 2015] Sea Level Rise, Saltwater Intrusion and Endangered Fisheries 271 environmental impact assessment analysis of the BDCP. As a result of DWR's exclusive reliance on an existing conditions baseline for its CEQA analysis in the Draft EIR-EIS, notwithstanding the disclosure in Appendix 2.C. of the BDCP and Appendix 29A of the Draft EIR-EIS that confirm the impacts of sea level rise on salinity levels and X2, the CEQA analysis in the Draft EIR-EIS does not factor the information on sea level rise and salinity levels into its significance determinations, alternatives analysis or mitigation analysis. 72 That is, the information in Appendix 2C and Appendix 29A is not then integrated into the rest-of the CEQA analysis. This information is, so to speak, left out in the cold of the appendices. More to the point, the CEQA analysis does not consider (in the context of severity of projects impacts, alternatives or mitigation) how additional fresh water flows into the Delta (and a corresponding reduction in the amount of fresh water diversion) would be needed to prevent the upstream shift of X2 resulting from sea level rise. One possible explanation for this disregard of the sea level rise impacts on delta smelt is hinted at in Appendix 3D of the Draft EIR-EIS. More specifically, Appendix 3D disclosed: DWR did not assume full implementation of a particular requirement of the [2008] delta smelt BiOp, known as the 'Fall X2' salinity standard, which in certain water year types can require large upstream reservoir releases in fall months for wet and above normal wet years to maintain the location of 'X2' as approximately river kilometers inland from the Golden Gate Bridge...DWR determined that full implementation of the Fall X2 salinity standard was not certain to occur within a reasonable near-term time frame because of a recent court decision...as of [spring 2011], in litigation challenging the delta smelt BiOp filed by various water users, which DWR intervened, the United States District Court found that the USFWS failed to full explain the specific rationale used to determine the location for Fall X2 included in the RPA and remanded to the USFWS... This uncertainty, together with CEQA's focus on existing conditions, led to the decision to use a CEQA baseline without the implementation of the Fall X2 action in the draft EIR/EIS. 73 Putting aside the question of the credibility of this explanation, with the 2014 reversal of the referenced federal district court decision by the Ninth Circuit Court of Appeals in San Luis v. Jewell and the United States Supreme Court's denial of review, 74 there is now no longer any uncertainty as to status of the X2 requirements in the 2008 USFWS delta smelt Bi-Op. The X2 requirements in the Bi-Op have now been upheld by the courts, so it would then follow that * 72 BDCP HIGHLIGHTS, supra note 20, at DRAFT EIRIEIS, supra note 50, at See discussion and citations supra Part II & notes

15 University of California, Davis [Vol. 38:2 DWR should now assume (in its CEQA analysis) that these X2 requirements will be fully implemented. It is also perhaps understandable why DWR and the contractors that receive water from the State Water Project are reluctant to engage in environmental analysis which would demonstrate that more fresh water needs to be left instream to flow into the Delta, since this would result in reduced SWP water exports above and out of the Delta. However, the omission of this analysis renders the CEQA analysis in the Draft EIR-EIS legally vulnerable. Given that Appendix 2.C of the BDCP and Appendix 29A of the Draft EIR-EIS expressly concede and document the extent to which climate change-induced sea level rise will move X2 upstream, and given the well-established link between the position of X2 and the survival of the endangered delta smelt, DWR may have a difficult time convincing a court that there is substantial evidence to support the remainder of its CEQA fisheries impact analysis which assumes that X2 will remain in the same location. Such reliance on an assumption explicitly acknowledged by a lead CEQA agency to be incorrect may constitute an unlawful abuse of discretion. 5 V. CONCLUSION- BDCP AS POTENTIAL TEST CASE ON SHIFTING BASELINES As noted above, the effects of climate change present unique challenges to the basic environmental impact assessment paradigm, particularly for projects that will operate well into the future. This is because under the basic environmental impact assessment paradigm, the determination of significant adverse impacts and the identification of appropriate alternatives and mitigation to address such impacts are developed in reference to a single set of baseline conditions. 76 Yet, with climate change, the baseline conditions against which long-term projects operate will shift. 77 This means that the severity of the project's impacts and the measures needed to effectively counter these more severe project impacts will shift too. In this context, the BDCP may serve as important test case to assess whether, under circumstances where climate change impacts are inevitable and quantifiable, the lack of consideration of future baseline conditions (alongside existing baseline conditions) may constitute a violation of CEQA. The BDCP may be the right test case on this question because the failure to consider the impacts of sea level rise on the survival of the endangered fisheries that are a primary focus of the BDCP arguably taints the remaining fisheries impact analysis of the project. Without the use of such a future baseline, the CEQA analysis of how much 75 See CAL. CODE CIV. PROC (c) (West 2015). 76 REMY ET AL., supra note 3, at THE LAW OF ADAPTATION, supra note 19, at 5-6, 95,

16 2015] Sea Level Rise, Saltwater Intrusion and Endangered Fisheries 273 fresh water flow is needed to restore the delta smelt becomes delusional. The fisheries impact analysis remains tethered to long-term assumptions of saltwater intrusion and X2 that everyone (including the agencies that operate the CVP and 78 SWP) knows to be incorrect. More specifically, in this instance, the failure to use a future baseline results in fundamental flaws in the CEQA analysis of how the BDCP's proposed export of an additional 18% of fresh water from the Delta is likely to impact the endangered delta smelt. 79 Under these circumstances, a.reviewing court may be persuaded that the use of a future baseline to address expected sea level rise is not merely permissible under CEQA but required. The recognition of such a requirement under CEQA could in turn, help influence the way sea level rise specifically and climate change more generally, is factored into other non-california environmental impact assessment laws. This would help shift the standard environmental impact assessment paradigm to take full account of how the impacts of long-term projects will change as climate change alters the background conditions against which such projects operate. 78 See DRAFT BDCP, supra note 52, at Appendix 2.C.; DRAFT EIR/EIS, supra note 50, at Appendix 29A; BDCP HIGHLIGHTS, supra note 20, at See citation and discussion supra note 50.

Chapter 2 Project Objectives and Purpose and Need

Chapter 2 Project Objectives and Purpose and Need Chapter Project Objectives and Purpose and Need The BDCP sets out a comprehensive conservation strategy for the Delta designed to restore and protect ecosystem health, water supply reliability, and water

More information

2.1 Overview. Chapter 2 Project Objectives and Purpose and Need

2.1 Overview. Chapter 2 Project Objectives and Purpose and Need 1 Chapter The BDCP sets out a comprehensive conservation strategy for the Delta designed to restore and protect ecosystem health, water supply, and water quality within a stable regulatory framework. The

More information

Administrative Final 1

Administrative Final 1 1 For the (ARWA), we appreciate the opportunity to comment on the final environmental impact report/environmental impact statement (FEIR/EIS) for the California WaterFix project. These agencies rely, in

More information

Water and Power Policy Group

Water and Power Policy Group Water and Power Policy Group Retrospective Analysis of Changed Central Valley Project and State Water Project Conditions Due to Changes in Delta Regulations January 213 Retrospective Analysis January 213

More information

California WaterFix (Alternative 4A)/Recirculated Environmental Analysis Frequently Asked Questions

California WaterFix (Alternative 4A)/Recirculated Environmental Analysis Frequently Asked Questions Updated August 2015 California WaterFix (Alternative 4A)/Recirculated Environmental Analysis Frequently Asked Questions 1. What is the purpose and need for California WaterFix (Alternative 4A)? The California

More information

BAY DELTA CONSERVATION PLAN/ CALIFORNIA WATERFIX

BAY DELTA CONSERVATION PLAN/ CALIFORNIA WATERFIX FINAL ENVIRONMENTAL IMPACT REPORT/ ENVIRONMENTAL IMPACT STATEMENT FOR THE BAY DELTA CONSERVATION PLAN/ CALIFORNIA WATERFIX VOLUME I. FINAL EIR/EIS FOR THE BDCP/CALIFORNIA WATERFIX P REPARED FOR: California

More information

Frequently Asked Questions Updated July 17, 2015

Frequently Asked Questions Updated July 17, 2015 Frequently Asked Questions Updated July 17, 2015 1. What is California WaterFix? California WaterFix is a proposal backed by the administrations of Governor Edmund G. Brown Jr. and President Barack Obama

More information

Section V: Water Accounting and Water Supply Reliability

Section V: Water Accounting and Water Supply Reliability Section V: Accounting and Supply Reliability A. Quantifying the Supplier s Supplies 1. Agricultural Supplier Quantities Table 38 shows typical water diversions from the CA Aqueduct during the representative

More information

Section V: Water Accounting and Water Supply Reliability

Section V: Water Accounting and Water Supply Reliability Section V: Accounting and Supply Reliability A. Quantifying the Supplier s Supplies 1. Agricultural Supplier Quantities Table 46 illustrate the District s water. The District routinely transfers and/or

More information

Section V: Water Accounting and Water Supply Reliability

Section V: Water Accounting and Water Supply Reliability Section V: Water Accounting and Water Reliability A. Quantifying the Water Supplier s Water Supplies 1. Agricultural Water Supplier Water Quantities Table 41 shows typical water diversions from the CA

More information

Appendix 5G Comparison of FEIRS Alternative 4A Modeling Results to the California Water Fix Section BA Proposed Action Modeling Results

Appendix 5G Comparison of FEIRS Alternative 4A Modeling Results to the California Water Fix Section BA Proposed Action Modeling Results Appendix G Comparison of FEIRS Alternative A Modeling Results to the California Water Fix Section BA Proposed Action Modeling Results 6 7 8 9 0 6 7 8 9 0 6 7 8 9 0 6 7 Appendix G Comparison of FEIRS Alternative

More information

SUMMARY OF METROPOLITAN S RESPONSES TO COMMENTS REGARDING METROPOLITAN S DRAFT 2015 URBAN WATER MANAGEMENT PLAN

SUMMARY OF METROPOLITAN S RESPONSES TO COMMENTS REGARDING METROPOLITAN S DRAFT 2015 URBAN WATER MANAGEMENT PLAN SUMMARY OF METROPOLITAN S RESPONSES TO COMMENTS REGARDING METROPOLITAN S DRAFT 2015 URBAN WATER MANAGEMENT PLAN The Metropolitan Water District of Southern California ( Metropolitan ) received comments

More information

BAY DELTA CONSERVATION PLAN/ CALIFORNIA WATERFIX

BAY DELTA CONSERVATION PLAN/ CALIFORNIA WATERFIX FINAL ENVIRONMENTAL IMPACT REPORT/ ENVIRONMENTAL IMPACT STATEMENT FOR THE BAY DELTA CONSERVATION PLAN/ CALIFORNIA WATERFIX VOLUME II. RESPONSES TO COMMENTS ON THE DRAFT EIR/EIS AND RDEIR/SDEIS P R E P

More information

Update on California WaterFix and Metropolitan Water District s (MWD s) Review Process (Presentation)

Update on California WaterFix and Metropolitan Water District s (MWD s) Review Process (Presentation) August 16, 2017 Attention: Imported Water Committee Update on California WaterFix and Metropolitan Water District s (MWD s) Review Process (Presentation) Purpose The purpose of this memo is to provide

More information

Comments on Sites Reservoir Project Draft Environmental Impact Statement and Environmental Impact Report

Comments on Sites Reservoir Project Draft Environmental Impact Statement and Environmental Impact Report January 15, 2018 Jim Watson Sites Project Authority P.O. Box 517 Maxwell, CA 95955 Michael Dietl U.S. Bureau of Reclamation Mid-Pacific Region 2800 Cottage Way Sacramento, CA 95825 Sent via email to: EIR-EIS-Comments@SitesProject.org

More information

PLEASE CONSIDER THE ENVIRONMENT: NEPA ENVIRONMENTAL REVIEW AND ESA CONSULTATION IN SAN LUIS & DELTA-MENDOTA WATER AUTHORITY V.

PLEASE CONSIDER THE ENVIRONMENT: NEPA ENVIRONMENTAL REVIEW AND ESA CONSULTATION IN SAN LUIS & DELTA-MENDOTA WATER AUTHORITY V. PLEASE CONSIDER THE ENVIRONMENT: NEPA ENVIRONMENTAL REVIEW AND ESA CONSULTATION IN SAN LUIS & DELTA-MENDOTA WATER AUTHORITY V. SALAZAR I. INTRODUCTION The first Earth Day was celebrated April 22, 1970.

More information

Water for Southern California: How Bay-Delta is Key to All of the Above Strategy

Water for Southern California: How Bay-Delta is Key to All of the Above Strategy Water for Southern California: How Bay-Delta is Key to All of the Above Strategy Stephen N. Arakawa Manager, Bay-Delta Initiatives The Metropolitan Water District of Southern California October 15, 2016

More information

1. PURPOSE OF AND NEED FOR ACTION

1. PURPOSE OF AND NEED FOR ACTION 1. PURPOSE OF AND NEED FOR ACTION INTRODUCTION The Bureau of Reclamation (Reclamation) and the San Joaquin River Group Authority (Authority) are jointly preparing this Environmental Impact Statement/Environmental

More information

The Conflict between Water Quality and Water Rights. U.S. v. State Water Resources Control Board. California Court of Appeal, First District (1986)

The Conflict between Water Quality and Water Rights. U.S. v. State Water Resources Control Board. California Court of Appeal, First District (1986) Chapter 2 --Water Quality The Conflict between Water Quality and Water Rights U.S. v. State Water Resources Control Board California Court of Appeal, First District (1986) 182 Cal.App.3d 82 Racanelli,

More information

Sierra Mountains. LA Aqueduct. Supplies Conservation

Sierra Mountains. LA Aqueduct. Supplies Conservation Sierra Mountains LA Aqueduct Delta State Water Project Supplies Groundwater and Recycling Colorado River Aqueduct Supplies Conservation Groundwater Recovery CRA 21% SWP 29% Local Supplies & LA Aqueduct

More information

Revised 8-4. Board of Directors Water Planning and Stewardship Committee. September 11, 2007 Board Meeting. Subject. Description

Revised 8-4. Board of Directors Water Planning and Stewardship Committee. September 11, 2007 Board Meeting. Subject. Description Board of Directors Water Planning and Stewardship Committee September 11, 2007 Board Meeting Subject Adopt criteria for conveyance options in implementation of Long Term Delta Plan Description Revised

More information

Appendix G Alternative 4A (Proposed Project) Compatibility with the Delta Plan

Appendix G Alternative 4A (Proposed Project) Compatibility with the Delta Plan Appendix G Alternative A (Proposed Project) Compatibility with the Delta Plan Appendix G Alternative A (Proposed Project) Compatibility with the Delta Plan 0 0 This appendix is intended to discuss an approach

More information

31.1 Irreversible and Irretrievable Commitments of Resources/Significant Irreversible Environmental Changes

31.1 Irreversible and Irretrievable Commitments of Resources/Significant Irreversible Environmental Changes Chapter This chapter provides an overview of other CEQA and NEPA considerations based on the technical analyses presented in Chapters. This chapter addresses significant irreversible and irretrievable

More information

California League of Cities Briefing on Water Supply Issues

California League of Cities Briefing on Water Supply Issues California League of Cities Briefing on Water Supply Issues Stephen N. Arakawa Manager, Bay-Delta Initiatives The Metropolitan Water District of Southern California May 5, 2016 California WaterFix: Securing

More information

APPENDIX A NOTICE OF PREPARATION/ NOTICE OF INTENT. Proposed Lower Yuba River Accord June 2007 Draft EIR/EIS

APPENDIX A NOTICE OF PREPARATION/ NOTICE OF INTENT. Proposed Lower Yuba River Accord June 2007 Draft EIR/EIS APPENDIX A NOTICE OF PREPARATION/ NOTICE OF INTENT Proposed Lower Yuba River Accord June 2007 Draft EIR/EIS Proposed Lower Yuba River Accord June 2007 Draft EIR/EIS Interested Parties NOTICE OF PREPARATION

More information

BDCP Public Meeting. November 29, 2012

BDCP Public Meeting. November 29, 2012 BDCP Public Meeting November 29, 2012 BDCP Proposed Project Update and Response to Agency Comments ICF International California Department of Water Resources California Department of Fish and Game U.S.

More information

Chapter 3 Planning Objectives and Constraints and the Alternative Development Process

Chapter 3 Planning Objectives and Constraints and the Alternative Development Process Chapter 3 Planning Objectives and Constraints and the Alternative Development Process Planning Objectives and Constraints The planning objectives for the NODOS Investigation are consistent with the Federal

More information

EXHIBIT ARWA-500 PART 2 TESTIMONY OF TOM GOHRING, P.E.

EXHIBIT ARWA-500 PART 2 TESTIMONY OF TOM GOHRING, P.E. EXHIBIT ARWA-500 PART 2 TESTIMONY OF TOM GOHRING, P.E. 1. I am the Executive Director of the Water Forum. I hold a Bachelor of Science degree in Agricultural Engineering from the California Polytechnic

More information

Folsom Dam Water Control Manual Update

Folsom Dam Water Control Manual Update Folsom Dam Water Control Manual Update Stakeholder Discussion October 31, 2013 Location: Tsakopoulos Library Galleria, East Room, 828 I Street, Sacramento US Army Corps of Engineers WELCOME & INTRODUCTIONS

More information

APPENDIX A. 2-Gates Fish Protection Demonstration Project Background and Regulatory Constraints

APPENDIX A. 2-Gates Fish Protection Demonstration Project Background and Regulatory Constraints APPENDIX A 2-Gates Fish Protection Demonstration Project Background and Regulatory Constraints Project Background The Delta serves many functions and has many competing uses. It is a vital diversion point

More information

EXECUTIVE SUMMARY ES.1 BACKGROUND

EXECUTIVE SUMMARY ES.1 BACKGROUND EXECUTIVE SUMMARY ES.1 BACKGROUND The San Francisco Bay/Sacramento-San Joaquin Delta Estuary (Bay/Delta Estuary) is a critically important part of California s natural environment and economy. In recognition

More information

Special Meeting of the Imported Water Committee November 14, 2013

Special Meeting of the Imported Water Committee November 14, 2013 Presented by: Dennis Cushman, Assistant General Manager Ken Weinberg, Director of Water Resources Dana Friehauf, Principal Water Resource Specialist Special Meeting of the Imported Water Committee November

More information

Appendix 3A Identification of Water Conveyance Alternatives, Conservation Measure 1

Appendix 3A Identification of Water Conveyance Alternatives, Conservation Measure 1 Appendix A Identification of Water Conveyance Alternatives, 0 0 0 Appendix A Identification of Water Conveyance Alternatives, A. Introduction and Purpose of this Appendix The original purpose of this appendix,

More information

Acronyms and Abbreviations

Acronyms and Abbreviations F Fahrenheit AB BA Bay-Delta BiOp BMP C.F.R. CAISO Assembly Bill Biological Assessment San Francisco Bay Sacramento River and San Joaquin River Delta USFWS Biological Opinion Best Management Practice Code

More information

Purpose, Need and Objectives for the Los Vaqueros Reservoir Expansion Project

Purpose, Need and Objectives for the Los Vaqueros Reservoir Expansion Project CHAPTER 1 Purpose, Need and Objectives for the Los Vaqueros Reservoir Expansion Project 1.1 Introduction The San Francisco Bay/Sacramento San Joaquin Delta estuary is the largest estuary on the West Coast

More information

Case 3:17-cv Document 1 Filed 06/29/17 Page 1 of 16

Case 3:17-cv Document 1 Filed 06/29/17 Page 1 of 16 Case :-cv-0 Document Filed 0// Page of 0 Claire Woods, State Bar No. Michael E. Wall, State Bar No. 0 Katherine Poole, State Bar No. 0 Natural Resources Defense Council, Inc. Sutter Street, st Floor San

More information

FRANKS TRACT PILOT PROJECT Summary Paper March 19, 2007

FRANKS TRACT PILOT PROJECT Summary Paper March 19, 2007 FRANKS TRACT PILOT PROJECT Summary Paper March 19, 2007 DRAFT2 Introduction[1] The Flooded Islands Pre-Feasibility Study Report identified several project alternatives to alter the Delta hydrodynamics

More information

EXECUTIVE SUMMARY INTRODUCTION

EXECUTIVE SUMMARY INTRODUCTION EXECUTIVE SUMMARY INTRODUCTION The Yuba River Basin drains approximately 1,339 square miles of the western Sierra Nevada slope, including portions of Sierra, Placer, Yuba, and Nevada counties. The Yuba

More information

Investigation Highlights

Investigation Highlights Investigation Highlights May 2014 INVESTIGATION HIGHLIGHTS A Summary North-of-the-Delta Offstream Storage (NODOS) would provide a robust set of benefits, including water supply reliability for municipal

More information

ARROYO GRANDE CREEK HABITAT CONSERVATION PLAN FREQUENTLY ASKED QUESTIONS September 27, 2011

ARROYO GRANDE CREEK HABITAT CONSERVATION PLAN FREQUENTLY ASKED QUESTIONS September 27, 2011 WHAT IS THE ENDANGERED SPECIES ACT? The Endangered Species Act (Act) protects endangered and threatened species of wildlife and plants. When Congress passed the Act in 1973, it recognized that our rich

More information

PROJECT OVERVIEW. B.G. Heiland, P.E. June 15, 2016

PROJECT OVERVIEW. B.G. Heiland, P.E. June 15, 2016 PROJECT OVERVIEW B.G. Heiland, P.E. June 15, 2016 WATER DELIVERY UPGRADE PERMITTING APPROACH BDCP Habitat Conservation Plan under Section 10 of the U.S. Endangered Species Act. Natural Community Conservation

More information

D R A F T. Preliminary Scoping Report. Bay Delta Conservation Plan EIR/EIS Project. February California Department of Fish and Game

D R A F T. Preliminary Scoping Report. Bay Delta Conservation Plan EIR/EIS Project. February California Department of Fish and Game D R A F T Preliminary Scoping Report Bay Delta Conservation Plan EIR/EIS Project February 2009 California Department of Water Resources Bureau of Reclamation California Department of Fish and Game U.S.

More information

CHAPTER 8 FLOOD CONTROL 8.1 ENVIRONMENTAL SETTING/AFFECTED ENVIRONMENT YUBA REGION

CHAPTER 8 FLOOD CONTROL 8.1 ENVIRONMENTAL SETTING/AFFECTED ENVIRONMENT YUBA REGION CHAPTER 8 FLOOD CONTROL Floods can be damaging and costly, often resulting in loss of life or substantial property damage. Levees, dams, and reservoirs provide flood control throughout most of California.

More information

Chapter 8 National Economic Development and Locally Preferred Alternative

Chapter 8 National Economic Development and Locally Preferred Alternative Chapter 8 National Economic Development and Locally Preferred Alternative Determination of Feasibility This chapter considers the feasibility of the NED Plan and the Locally Preferred Alternative. As indicated

More information

Narrative Statement of Michael S. Kelly, Fishery Biologist National Marine Fisheries Service Background

Narrative Statement of Michael S. Kelly, Fishery Biologist National Marine Fisheries Service Background Narrative Statement of Michael S. Kelly, Fishery Biologist National Marine Fisheries Service Background In October 2001, the Southwest Region of the National Marine Fisheries Service (NOAA Fisheries) selected

More information

Economic Analyses Conducted on the Bay Delta Conservation Plan

Economic Analyses Conducted on the Bay Delta Conservation Plan Economic Analyses Conducted on the Bay Delta Conservation Plan Presented by: David Sunding July 23, 2013 Copyright 2012 The Brattle Group, Inc. www.brattle.com Antitrust/Competition Commercial Damages

More information

In the final EIR/EIS, FRWA commits to maintaining operational noise levels at or below existing background noise levels.

In the final EIR/EIS, FRWA commits to maintaining operational noise levels at or below existing background noise levels. Freeport Regional Water Authority and the U.S. Department of the Interior, Bureau of Reclamation Chapter 8. Responses to Comments from Individuals Mary McDonald (I40) Response to Comments of Mary McDonald

More information

PUBLIC DRAFT BAY DELTA CONSERVATION PLAN

PUBLIC DRAFT BAY DELTA CONSERVATION PLAN 1 APPENDIX G BACKGROUND ON THE PROCESS OF DEVELOPING THE BDCP CONSERVATION MEASURES PUBLIC DRAFT BAY DELTA CONSERVATION PLAN 1 1 ICF International. 01. Appendix G. Background on the Process of Developing

More information

Myths and Facts about a Drought Year in the San Joaquin Valley

Myths and Facts about a Drought Year in the San Joaquin Valley Myths and Facts about a Drought Year in the San Joaquin Valley 2013 has been the driest year on record in California and Southern Oregon. In the San Joaquin Valley, Hanford, California, got only 1.99 inches

More information

California Rushes In Keeping Water Instream for Fisheries Without Federal Law

California Rushes In Keeping Water Instream for Fisheries Without Federal Law William & Mary Environmental Law and Policy Review Volume 42 Issue 2 Article 4 California Rushes In Keeping Water Instream for Fisheries Without Federal Law Paul Stanton Kibel Repository Citation Paul

More information

2015 Restoration Allocation and Default Flow Schedule January 20, 2015

2015 Restoration Allocation and Default Flow Schedule January 20, 2015 Bureau of Reclamation 00 Cottage Way, MP- Sacramento, California 01 January 0, 01 1 Introduction The following transmits the 01 to the Restoration Administrator for the San Joaquin River Restoration Program

More information

SUPERSEDED. BDCP Conservation Measure 1: Water Facilities and Operation. BDCP Bay Delta Conservation Plan

SUPERSEDED. BDCP Conservation Measure 1: Water Facilities and Operation. BDCP Bay Delta Conservation Plan BDCP Bay Delta Conservation Plan March 2013 BDCP Conservation Measure 1: Water Facilities and Operation A cornerstone of the Bay Delta Conservation Plan (BDCP) strategy is to construct and operate a dual-conveyance

More information

SRCD s Review of Impacts the Proposed Bay Delta Conservation Plan (BDCP) and Companion EIR/EIS on the Suisun Marsh

SRCD s Review of Impacts the Proposed Bay Delta Conservation Plan (BDCP) and Companion EIR/EIS on the Suisun Marsh SRCD s Review of Impacts the Proposed Bay Delta Conservation Plan (BDCP) and Companion EIR/EIS on the Suisun Marsh By Steve Chappell, Executive Director Suisun RCD BDCP Document is Extremely Challenging

More information

Risky Business as Usual The California Supreme Court Upholds the BAU Approach to CEQA Climate Impact Analysis, but Sets a High Bar

Risky Business as Usual The California Supreme Court Upholds the BAU Approach to CEQA Climate Impact Analysis, but Sets a High Bar Environment, Land Use & Natural Resources Real Estate December 4, 2015 Risky Business as Usual The California Supreme Court Upholds the BAU Approach to CEQA Climate Impact Analysis, but Sets a High Bar

More information

Chapter 1 Introduction

Chapter 1 Introduction Chapter Introduction Note to Readers: Due to timing constraints, publication and release for public review of this Draft Supplemental EIR/EIS is being done by DWR as lead agency in compliance with the

More information

Los Angeles 3 rd Regional

Los Angeles 3 rd Regional Los Angeles 3 rd Regional Investors Conference Los Angeles, California March 31, 2016 Metropolitan Water District of Southern California 1 Metropolitan Water District of of Southern California 2 Metropolitan

More information

Bay Delta Conservation Plan/California WaterFix Final EIR/EIS

Bay Delta Conservation Plan/California WaterFix Final EIR/EIS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 Executive Summary ES.1 Introduction ES.1.1 Background and Context The Sacramento-San Joaquin

More information

Pud No. 1 of Jefferson County and City of Tacoma v. Washington Department Ecology et al. 511 U.S. 700 (1994).

Pud No. 1 of Jefferson County and City of Tacoma v. Washington Department Ecology et al. 511 U.S. 700 (1994). Chapter 2 - Water Quality Clean Water Act Section 401 Certification Pud No. 1 of Jefferson County and City of Tacoma v. Washington Department Ecology et al. 511 U.S. 700 (1994). Justice O'Connor delivered

More information

COMPLAINT FOR DECLARATORY AND INJUNCTIVE RELIEF

COMPLAINT FOR DECLARATORY AND INJUNCTIVE RELIEF Case 1:14-cv-01409 Document 1 Filed 08/18/14 Page 1 of 15 UNITED STATES DISTRICT COURT FOR THE DISTRICT OF COLUMBIA CENTER FOR ENVIRONMENTAL SCIENCE, ACCURACY & RELIABILITY, Case No. 14-cv-1409 2014 Tulare

More information

Appendix 3D Defining Existing Conditions, No Action Alternative, No Project Alternative, and Cumulative Impact Conditions

Appendix 3D Defining Existing Conditions, No Action Alternative, No Project Alternative, and Cumulative Impact Conditions 1 2 3 4 5 6 7 8 9 Appendix 3D Defining, No Action Alternative, No Alternative, and Impact 3D.1 Introduction The Proposed and alternatives will be compared in the (BDCP) Environmental Impact Report (EIR)/Environmental

More information

ARCHITECTURAL & ENGINEERING CONTRACTS TASK ORDER

ARCHITECTURAL & ENGINEERING CONTRACTS TASK ORDER ARCHITECTURAL & ENGINEERING CONTRACTS TASK ORDER Public Draft Habitat Conservation Plan/Natural Community Conservation Plan TASK ORDER NO. ICF-11 and Amendment 1 Contractor:. Request for Services under

More information

January 9, Bill Rose Gary Bousquet

January 9, Bill Rose Gary Bousquet January 9, 2014 Bill Rose Gary Bousquet Status of BDCP Design Role of Water Authority Review Schedule July August Board Review Process Background & Options to Review Review Update September Costs and Funding

More information

California s s Water Supplies and Uses

California s s Water Supplies and Uses California s s Water Supplies and Uses Presented to Delta Stewardship Council Presented by Joe Grindstaff September 21 1 Place to Place: Most precipitation falls in the mountains in the north and east

More information

ADOPT A RESOLUTION OF THE CITY COUNCIL IN SUPPORT OF THE CALIFORNIA WATERFIX AND CALIFORNIA ECO RESTORE

ADOPT A RESOLUTION OF THE CITY COUNCIL IN SUPPORT OF THE CALIFORNIA WATERFIX AND CALIFORNIA ECO RESTORE ADOPT A RESOLUTION OF THE CITY COUNCIL IN SUPPORT OF THE CALIFORNIA WATERFIX AND CALIFORNIA ECO RESTORE Presented by Gary Takara City Council September 18, 2017 Agenda Item 12 Recommendations Find that

More information

Agricultural Resources

Agricultural Resources 0 0 0 0..0 Agricultural Resources Impact AG-: Temporary Conversion, Short-Term Conversion, and Permanent Conversion of Important Farmland or of Land Subject to Williamson Act Contracts or in Farmland Security

More information

CALIFORNIA RUSHES IN KEEPING WATER INSTREAM

CALIFORNIA RUSHES IN KEEPING WATER INSTREAM CALIFORNIA RUSHES IN KEEPING WATER INSTREAM FOR FISHERIES WITHOUT FEDERAL LAW PAUL STANTON KIBEL * INTRODUCTION Many of California s anadromous and freshwater fisheries are 1 now in sharp decline. Salmon

More information

Pacheco Reservoir Expansion

Pacheco Reservoir Expansion California Water Commission Pacheco Reservoir Expansion Unique Opportunity for Fisheries Recovery, Flood Risk Reduction and Emergency Water Supply December 13, 2017 1 of 33 Project Partners Pacheco Pass

More information

Spring Forecast Based Operations, Folsom Dam, California

Spring Forecast Based Operations, Folsom Dam, California Spring Forecast Based Operations, Folsom Dam, California Paul E. Pugner, P.E. Chief, Water Management Section Sacramento District U.S. Army 1325 J Street, Room 1126 Sacramento, CA 95814-2922 Tel: (916)

More information

The BA modeling results again confirm that Folsom Reservoir drawdowns result from the proposed project, even as revised.

The BA modeling results again confirm that Folsom Reservoir drawdowns result from the proposed project, even as revised. 1 We represent the water suppliers who form the Water Agencies ("ARWA") group. On January 30, 2017, the North State Water Alliance ("Alliance") submitted comments on the California WaterFix Final EIR/EIS.

More information

Comments on the Upper San Joaquin River Basin Storage Investigation Draft Environmental Impact Statement

Comments on the Upper San Joaquin River Basin Storage Investigation Draft Environmental Impact Statement Natural Resources Defense Council The Bay Institute American Rivers Audubon California California Sportfishing Protection Alliance Friends of the River Melissa Harris Project Manager U.S. Bureau of Reclamation,

More information

2. Alternatives Analysis

2. Alternatives Analysis 2. Alternatives Analysis 2.1 Introduction This chapter summarizes the process used to develop the alternatives for the Sites Reservoir Project (Project). A detailed description of this comprehensive and

More information

Spring-Run Chinook Salmon

Spring-Run Chinook Salmon 0 0 0 0 Impact AQUA-0: Effects of Nonphysical Fish Barriers on Chinook Salmon (Winter-Run ESU) (Environmental Commitment ) Under Alternative A, an NPB at the divergence of Georgiana Slough from the Sacramento

More information

INFRASTRUCTURE. OPERATIONS. FINANCE AND COST ALLOCATION

INFRASTRUCTURE. OPERATIONS. FINANCE AND COST ALLOCATION MODERNIZING THE SYSTEM: CALIFORNIA WATERFIX INFRASTRUCTURE. OPERATIONS. FINANCE AND COST ALLOCATION A California WaterFix Dialogue: QUESTIONS AND ANSWERS SEPTEMBER 2017 Benefit Analysis and Assumptions...

More information

Water Operations 101. Jerry Johns and John Leahigh Department of Water Resources BDCP Steering Committee 5/8/09

Water Operations 101. Jerry Johns and John Leahigh Department of Water Resources BDCP Steering Committee 5/8/09 Water Operations 101 Jerry Johns and John Leahigh Department of Water Resources BDCP Steering Committee 5/8/09 Water Operations Overview Where Does BDCP Fit Into California Planning Hydrologic Variability

More information

The Los Vaqueros Reservoir Expansion Project

The Los Vaqueros Reservoir Expansion Project The Los Vaqueros Reservoir Expansion Project Marguerite Patil Special Assistant to the General Manager Contra Costa Water District SCVWD/CCWD Joint Meeting July 14, 2016 Today s Itinerary 11:00 11:50 Presentation

More information

Yakima River Basin Environmental & Salmon Restoration Act

Yakima River Basin Environmental & Salmon Restoration Act Yakima River Basin Environmental & Salmon Restoration Act Table of Contents SECTION 1. PURPOSE...Page 3 SECTION 2. DEFINITIONS...Page 3 TITLE I. BLACK ROCK WATER EXCHANGE PROJECT...Page 4 SECTION 101.

More information

Economic Analysis of the California WaterFix

Economic Analysis of the California WaterFix Economic Analysis of the California WaterFix Benefits and Costs to Project Participants PREPARED FOR California Department of Water Resources PREPARED BY David L. Sunding, Ph.D. September 20, 2018 This

More information

Comments on Bay Delta Conservation Plan and Draft EIR/EIS

Comments on Bay Delta Conservation Plan and Draft EIR/EIS July 21, 2014 HAND DELIVERED Ryan Wulff National Marine Fisheries Service 650 Capitol Mall, Suite 5-100 Sacramento, CA 95814 VIA U.S. MAIL The Honorable Sally Jewell Secretary U.S. Department of the Interior

More information

AquAlliance v. United States Bureau of Reclamation: The Impact of Withholding Information from the Public

AquAlliance v. United States Bureau of Reclamation: The Impact of Withholding Information from the Public Ecology Law Quarterly Volume 44 Issue 2 Article 19 9-15-2017 AquAlliance v. United States Bureau of Reclamation: The Impact of Withholding Information from the Public Taylor Wetzel Follow this and additional

More information

Public Review Draft Part III Guidelines for the Application of Criteria for Financial Assistance for Local Projects.

Public Review Draft Part III Guidelines for the Application of Criteria for Financial Assistance for Local Projects. Bureau of Reclamation 800 Cottage Way, MP-170 Sacramento, Calif. 9585-1898 Public Review Draft for the Application of Criteria for March 9, 010 To: All Interested Parties and Organizations The U.S. Department

More information

NEPA Effects: The effects of NPB would not be adverse because it is intended to improve migration survival.

NEPA Effects: The effects of NPB would not be adverse because it is intended to improve migration survival. Alternative A Fish and Aquatic Resources 0 0 0 0 NEPA Effects: The effects of NPB would not be adverse because it is intended to improve migration survival. CEQA Conclusion: As discussed above, the NPB

More information

Notice of Intent to Prepare a Draft Environmental Impact Statement for the Intake. Diversion Dam Fish Passage Project, Dawson County, Montana

Notice of Intent to Prepare a Draft Environmental Impact Statement for the Intake. Diversion Dam Fish Passage Project, Dawson County, Montana This document is scheduled to be published in the Federal Register on 01/04/2016 and available online at http://federalregister.gov/a/2015-33066, and on FDsys.gov BILLING CODE: 3720-58 DEPARTMENT OF DEFENSE

More information

Case 1:09-cv LJO-BAM Document Filed 03/15/13 Page 1 of 8

Case 1:09-cv LJO-BAM Document Filed 03/15/13 Page 1 of 8 Case :0-cv-000-LJO-BAM Document 0- Filed 0// Page of 0 IGNACIA S. MORENO, Assistant Attorney General United States Department of Justice Environment & Natural Resources Division SETH M. BARSKY, Chief S.

More information

Executive Summary. Introduction

Executive Summary. Introduction Executive Summary ES. Introduction 0 This Draft Environmental Impact Statement (EIS) for the Coordinated Long-Term Operation of the Central Valley Project (CVP) and State Water Project (SWP) has been prepared

More information

Central Valley Project (CVP) Operations: In Brief

Central Valley Project (CVP) Operations: In Brief Central Valley Project (CVP) Operations: In Brief Charles V. Stern Specialist in Natural Resources Policy Pervaze A. Sheikh Specialist in Natural Resources Policy Betsy A. Cody Acting Senior Advisor to

More information

42 N. Sutter Street, Suite 506 Stockton, CA (209) Transmitted via

42 N. Sutter Street, Suite 506 Stockton, CA (209) Transmitted via 42 N. Sutter Street, Suite 506 Stockton, CA 95202 (209) 475-9550 www.restorethedelta.org Transmitted via email: kharrison@usbr.gov Katrina Harrison, Project Manager Bureau of Reclamation Bay Delta Office

More information

Freeport Regional Water Authority. c/o Gregg Ellis 2600 V Street Sacramento, CA 95818

Freeport Regional Water Authority. c/o Gregg Ellis 2600 V Street Sacramento, CA 95818 Notice of Preparation and Notice of Intent for the Freeport Regional Water Project, Sacramento, Environmental Impact Report/Environmental Impact Statement Freeport Regional Water Authority U.S. Bureau

More information

CONTRA COSTA WATER DISTRICT. Yield Study Report. for the Refinery Recycled Water Project. May Prepared by: In association with MBK Engineers

CONTRA COSTA WATER DISTRICT. Yield Study Report. for the Refinery Recycled Water Project. May Prepared by: In association with MBK Engineers CONTRA COSTA WATER DISTRICT Yield Study Report for the Refinery Recycled Water Project Prepared by: In association with MBK Engineers This page is intentionally left blank. Yield Study Report for the Refinery

More information

PROTEST - APPLICATION

PROTEST - APPLICATION State of California State Water Resources Control Board DIVISION OF WATER RIGHTS P.O. Box 2000, Sacramento, CA 95812-2000 Info: (916) 341-5300, FAX: (916) 341-5400, Web: http://www.waterrights.ca.gov PROTEST

More information

Farmington Dam Repurpose Project

Farmington Dam Repurpose Project Farmington Dam Repurpose Project 2017 $158,100,000 to re-purpose the Farmington Dam from flood protection only to a long-term water storage facility that increases water supply reliability to the region.

More information

Engineer s Report. Santa Clara Valley Water District California Aqueduct Reverse Flow Project Project No

Engineer s Report. Santa Clara Valley Water District California Aqueduct Reverse Flow Project Project No 17 Santa Clara Valley Water District California Aqueduct Reverse Flow Project Project No. 60061007-6810 Engineer s Report February 2015 Water Utility Capital Division This page intentionally left blank.

More information

MUNICIPAL AND INDUSTRIAL WATER SHORTAGE POLICY CENTRAL VALLEY PROJECT, CALIFORNIA Environmental Assessment

MUNICIPAL AND INDUSTRIAL WATER SHORTAGE POLICY CENTRAL VALLEY PROJECT, CALIFORNIA Environmental Assessment MUNICIPAL AND INDUSTRIAL WATER SHORTAGE POLICY CENTRAL VALLEY PROJECT, CALIFORNIA Environmental Assessment October 2005 Table of Contents Items Page CHAPTER 1 PURPOSE AND NEED Introduction...1-1 Background

More information

Response to Comments of Don and Tricia Nevis (Letter I25) See the master response to Public Outreach Process.

Response to Comments of Don and Tricia Nevis (Letter I25) See the master response to Public Outreach Process. Freeport Regional Water Authority and the U.S. Department of the Interior, Bureau of Reclamation Chapter 8. Responses to Comments from Individuals Don and Tricia Nevis (I25) Response to Comments of Don

More information

Regional water wholesaler Serves 6 counties, 19 million people Growth: 170,000 people/yr. $1 trillion regional economy

Regional water wholesaler Serves 6 counties, 19 million people Growth: 170,000 people/yr. $1 trillion regional economy Regional water wholesaler Serves 6 counties, 19 million people Growth: 170,000 people/yr. $1 trillion regional economy 50%+ of region s supply (4 million acre-ft/yr) 2 State Water Project (DWR) Delta

More information

NOTICE OF PREPARATION. Notice of Preparation of an Environmental Impact Report for the Kern Water Bank Conservation and Storage Project

NOTICE OF PREPARATION. Notice of Preparation of an Environmental Impact Report for the Kern Water Bank Conservation and Storage Project NOTICE OF PREPARATION To: Responsible, Federal and Trustee Agencies (Agency) From: Kern Water Bank Authority 1620 Mill Rock Way, Suite 500 Bakersfield, California 93311 (Address) Subject: Notice of Preparation

More information

Verified Petition for Writ of Mandate and Complaint for Declaratory and Injunctive Relief

Verified Petition for Writ of Mandate and Complaint for Declaratory and Injunctive Relief 0 0 THOMAS H. KEELING (SBN ) FREEMAN FIRM Grand Canal Boulevard, Suite Stockton, CA 0 Telephone: (0) - Facsimile: (0) - Email: tkeeling@freemanfirm.com Attorneys for Petitioners Central Delta Water Agency,

More information

Report to the House and Senate Committees on Appropriations

Report to the House and Senate Committees on Appropriations Report to the House and Senate Committees on Appropriations Distribution of Fiscal Year 2017 Funding for Water Conservation and Delivery- Pub. L. 114-322 (Section 4007), Water and Related Resources, Bureau

More information

CHAPTER 16 LAND USE 16.1 ENVIRONMENTAL SETTING/AFFECTED ENVIRONMENT YUBA REGION

CHAPTER 16 LAND USE 16.1 ENVIRONMENTAL SETTING/AFFECTED ENVIRONMENT YUBA REGION CHAPTER 16 LAND USE Counties and incorporated cities regulate land use within the Sacramento Valley. This section presents an overview of land use conditions in the Sacramento Valley, with specific attention

More information

Response to Comments of Rudy Swiridoff (Letter I14) The commentor s objection to the project is noted.

Response to Comments of Rudy Swiridoff (Letter I14) The commentor s objection to the project is noted. Freeport Regional Water Authority and the U.S. Department of the Interior, Bureau of Reclamation Chapter 8. Responses to Comments from Individuals Rudy Swiridoff (I14) Response to Comments of Rudy Swiridoff

More information

Rita Neal, County Counsel Office of County Counsel San Luis Obispo County Gov. Center, Room D320 San Luis Obispo, CA

Rita Neal, County Counsel Office of County Counsel San Luis Obispo County Gov. Center, Room D320 San Luis Obispo, CA Law Offices of B a b a k N a f i c y Via Electronic and US Mail Kathy Kively, General Manager Los Osos Community Services District P.O. Box 6669 Los Osos, CA 93412 kkively@losodoscsd.org 1504 Marsh Street

More information