1 Reclamation Guidelines MAAPT 63 rd Asphalt Conference December 7, 2016 Terry Beaudry MnDOT Grading Base, Recycling, and Aggregate Engineer
2 Outline 2 Design and Preliminary Work Construction Production and Inspection Common Problems Cold In Place Recycling (CIR) Cold Central Plant Recycling (CCPR) Stabilized Full Depth Reclamation (SFDR) Full Depth Reclamation (FDR) Hot In Place Recycling (HIR)
3 Preliminary Work - All 3 Assess Roadway Conditions Core every 1000 for depth & Condition of HMA, Base, and Subgrade Assess gradation, depth, FAA crushing percentages of HMA (burn) DCP after core removed, then auger for base sample Perform Ground Penetrating Radar (GPR) to supplement coring Assess whether there are weak spots that you want to repair, preferably with lime/cement stabilization, fabric may also be used Perform assessment and a mix design. Designs for CIR, CCPR, and SFDR are in Grading and Base Manual Assess for what would be best project fix Need to meet design criteria MnPave, GE, SN, or other.
4 Cores - Note Height and Gradation 4
5 CIR Design and Preliminary Work 5 Cold In Place Recycling Want at least 1-2 HMA to remain in place. Rule of Thumb want at least 4-5 in situ HMA. Roads that are predominately structurally sound. Paver Laid so close to one lift of hot mix for ride quality. Make sure you do not over-mill, want rock and crushing in final product, or need to add rock, cement and/or lime to mix design Consider as alternative on second or third OL as successive overlays tend not to last as long as first ones Note that you can t fix profile, i.e. no excess material. May be used for BOC, Iowa has had great success with crack suppression Consider where there are no or few areas where additional structure is needed If strength needed in isolated spots, mill off HMA and remove base, then fix by cement treating subgrade then bringing back as CCPR 20 year design life Economically good alternative to 3 4 overlay as reflective cracking is alleviated
6 CCPR Design and Preliminary Work 6 Cold Central Plant Recycling Both CIR and CCPR produce the same product. One should only choose CCPR where the project dictates that CIR cannot be used because of project constraints. For most central plant cold mix (CCPR) projects the asphalt is milled from the project and stockpiled on site for CCPR. A Cold in place mixing device (may use the same mixer as used for CIR projects), processes the mix and then the mix is hauled back, placed, and compacted.
7 CCPR (cont.) 7 Cold Central Plant Mix CCPR mix is produced by mixing RAP with an emulsion or foaming bitumen. If cement is required by mix design, place immediately after mixing Since there is extra handling, it is more expensive than CIR
8 Uses for CCPR I believe that two good uses of CCPR would be the following: Best: Where you have a full depth bituminous section over very little or no base over a weak subgrade. Remove all but 2 of HMA, stabilize with subgrade and lime or cement, and compact. Bring back 4-8 of the CCPR mix (4 maximum lifts), place and compact. So some typical MnDOT Full Depth HMA roads with 10 HMA: Mill 8 Stabilize 6 12 of subgrade (leave 2 HMA for a platform and incorporation into the subgrade) Bring Back 1 to 2 four inch max lifts of CCPR Place new HMA on top Good alternative to white-topping: fixes weak subgrade, therefore longer life is anticipated May be less expensive (perform economic analysis) No grade raise 100% in place recyclable next time road is repaired 8
9 Uses for CCPR (continued) 9 Good Use: On shoulders where either the width or the Structure underneath the HMA is not adequate to support a CIR train. Mill the shoulder, haul the milling to a central site on the project, process, then bring back CCPR mix, place and compact. Competitive if replacing 1.5 of HMA: i.e. 3 CCPR plus 1.5 HMA is approximately equal to 3 HMA on shoulder.
10 SFDR Design and Preliminary Work 10 Use SFDR where you need to beef up base over a large portion of project, or HMA is too thin for CIR (less than 4 ), otherwise use CIR or FDR Design so that you only go into base 1 2 use your depth checks, less $ more uniform Make sure you do not over-mill, want rock and crushing in final product, or need to add cement and or lime to mix design Be willing to repair week areas if needed. Again - Consider starting on second or third OL where added strength in the base is needed as successive overlays tend not to last as long as first ones Consider isolated areas where additional structure is not needed If needed in isolated spots, fix by cement treating subgrade then bringing back as Cold Mix 20 year design life Economically good alternative to 3 4 overlay Reflective cracking is alleviated
11 SFDR Design & Preliminary Work (cont.) 11 SFDR Full Depth Reclamation Blade Laid SFDR two passes pulverize then inject, FDR one pass SFDR higher oil demand than CIR SFDR oil demand depends on amount of base incorporated
12 CIR versus SFDR versus FDR Perform an economic analysis for CIR, FDR, & SFDR to determine total cost which depends upon how much HMA is needed for each design.
13 Design for Depth of SFDR or FDR Plan Material Removed after Reclamation 13 Photo used from Ruston Paving Company website
14 HIR Design and Preliminary Work 14 Hot In Place Recycling Where Used: Raveling of HMA Treats the top 2-3 only Has been used in some for Minnesota counties and cities, but not for State work Do not have a special provision, within the Bituminous Unit
15 Economics 15 Assumptions: Oil at $45/Barrel PG graded foaming oil at $385/ton (Metro short haul), and adequate rock and crushing in mix design HMA at $60/ton = $3.25/sy inch CIR 2% new oil at 4 = $2 + $1.70 = $3.70/sy = $0.925/sy inch 90/10 HMA/Base 2.25% at 6 = $4.85/sy = $0.80/sy inch 50/50 HMA/Base 3.25% at 6 = $6.15/sy = $$1.025/sy inch Overlay year design life CIR/SFDR 20+ year design life (with low initial maintenance)
16 TCRACKH, count/km Iowa Field Performance 70 Average High Severity Transverse Cracking 10 Year Span (3-4 inches HMA Surface) HMA/PCC HMA/HMA HMA/CIP/PCC HMA/CIP/HMA HMA/PCC (MILLED) HMA/HMA (MILLED) Cumulative Trucks, millions
17 Production with all Stabilized 17 Have Preconstruction Meeting Review Weather Requirements Review Equipment requirements Review Depth of Reclamation Review Maximum Size Requirements Review QC/QA checks Take in place moisture before stabilizing FDR, want to be close to optimum moisture, the emulsion or foamed asphalt counts as extra moisture Compaction will be tested by DCP unstabilized or Nuke Gauge for stabilized
18 QC/QA Tests 18 Gradation Maximum Size Requirements Depth Checks Ball Test Foaming Tests Calibration area for density check with nuke gauge Yield Checks Forms and procedures are in the Grading and Manual and website
19 Measuring Grinding Depth 19 A. General Measuring grinding depth in the field is a method of determining the grindinbg depth of HMA and base for (S)FDR and CIR B. Equipment Tape measure, Straight Edge, and Shovel C. Procedure 1. Always wear the proper safety equipment and never stand close to a reclaimer while it is in motion, wait until it is a safe distance away before measuring. 2. Use a shovel to reach the bottom of the reclaim layer, use the adjacent bituminous pavement as a guide. 3. Place the straight edge on the bituminous pavement and the tape measure on the bottom of the reclamation cut and measure the cut depth the nearest 0.5-inch. Measure the cut depth on both sides. Measure both HMA and Base against a non reclaimed HMA.
20 Ball Test Test to see if you can form a ball (if not mix may be too lean) If emulsion is used, let it harden for a half hour, foam test right away, break open with fingers: Should/may flex slightly look if uniform no blobs of oil.
21 Measuring Expansion Ratio & Half-Life of Foamed Asphalt in the Field 21 Figure 28 Measuring Expansion Ratio for Foamed Asphalt NOTE: BAD SAFETY PRACTCE. WEAR GLOVES!
22 Problems FDR and SFDR: Chunks 22
23 Problems SFDR & CIR 23 Material Sticking to Tires
24 Other Problems 24 Incorrect or poor Equipment to reclaim or Compact Teeth Too Dull Reclaiming too fast - chunks Milling too Deep No Rock left in reclaim Material Check Cores and GPR beforehand Reclaiming too Deep Either going into the subgrade or little base to compact against Be aware of 50/50 blend thought process in design May not have structure or adequate rock or going into subgrade For SFDR higher oil demand, HMA 2% oil, Base 4.5% oil demand
25 MnDOT Inspectors Guide For FDR and SFDR On Grading and Base Website Eleven Pages Quick Read Preliminary Responsibilities Coring, GPR, & DCP Choosing Method Mix Design Equipment Requirements Weather Pre-meeting with Contractor Inspector Responsibilities Field Tests Depth Checks and Gradation Ball and Tire Test Compaction Tests Foaming Tests Common Problems 25
How to Select the Appropriate Pavement Rehabilitation Option. David Rettner, PE American Engineering Testing, Inc.
1 How to Select the Appropriate Pavement Rehabilitation Option David Rettner, PE American Engineering Testing, Inc. 2 Pavement Rehabilitation Selection Understanding the Problem 3 Pavement Assessment Pavement
More informationCold In-Place Recycling
Cold In-Place Recycling Dan Schellhammer, P.E. Midstate Reclamation and Trucking In 1991, Midstate brought the first reclaimer into the state of Minnesota Emphasis on asphalt recycling techniques (milling,
More informationMNDOT PAVEMENT DESIGN MANUAL
MNDOT PAVEMENT DESIGN MANUAL Chapter 9 truction and Rehabilitation Alternates MnDOT Pavement Engineer Date Contents Introduction... 1 900 Existing Pavement-Types... 2 910 Rehabilitation with HMA Overlay
More informationPuerto Rico. Pavement Preservation Conference and Technology Implementation. US. Department of Transportation Federal Highway Administration
Puerto Rico Pavement Preservation Conference and Technology Implementation US. Department of Transportation Federal Highway Administration Cold In-Place Asphalt Recycling Overview Michael L. Polak E.J.
More informationFull Depth Reclamation
Full Depth Reclamation FDR Has Been Around A While 2 3 What is Full Depth Reclamation (FDR)? Full Depth Reclamation is a pavement rehabilitation technique in which the full flexible pavement section and
More informationAirport Pavement Rehabilitation 2015 Minnesota Airports Conference
Airport Pavement Rehabilitation 2015 Minnesota Airports Conference St. Cloud, Minnesota April 16, 2015 David L. Rettner, P. E. American Engineering Testing, Inc. Pavement Life Cycle Routine Maintenance
More informationCOLD IN-PLACE RECYCLING (CIR) Starting with what is there i.e. in situ materials
COLD IN-PLACE RECYCLING (CIR) Starting with what is there i.e. in situ materials Definitions: ARRA (Asphalt Recycling/Reclaiming Ass.) Cold In-Place Recycling (CIR) is the on-site recycling process to
More informationExtraction and Sieve Analysis ( µm minus) Forming Marshall Specimens, Field Method
3.56 COLD IN-PLACE RECYCLING 3.56.1 GENERAL This specification covers the requirements for Cold In-Place Recycling (CIR) which consists of reclaiming the existing asphalt pavement; sizing the reclaimed
More informationBASE CONSTRUCTION MATERIALS A Aggregate
BASE CONSTRUCTION 2211 AGGREGATE BASE 2211.1 DESCRIPTION This work consists of placing aggregate base. 2211.2 MATERIALS A Aggregate... 3138 Provide the class of aggregate as required by the contract. 2211.3
More informationWhat is it? What is Granular Base Stabilization ti (GBS)? Emulsion Full Depth Reclamation Process
Emulsion Full Depth Reclamation and Granular Base Stabilization An Engineered Approach 47 th Idaho Asphalt Conference Rocktober 25 th, 2007 Full Depth Reclamation (FDR) What is it? Rehabilitation technique
More informationMNDOT PAVEMENT DESIGN MANUAL
MNDOT PAVEMENT DESIGN MANUAL Chapter 4 HMA (Hot-Mix Asphalt) MnDOT Pavement Engineer Date Contents Introduction... 1 400 New/Reconstructed HMA Pavements... 2 410 - Reclamation/Recycling of Existing HMA
More informationRenae Kuehl, PE, SRF Consulting Group Dan Wegman, PE, Braun Intertec Corporation November 2, 2017
BASE STABILIZATION GUIDANCE AND ADDITIVE SELECTION FOR PAVEMENT DESIGN Renae Kuehl, PE, SRF Consulting Group Dan Wegman, PE, Braun Intertec Corporation November 2, 2017 Who is the LRRB? Serves local agencies
More informationProject Selection for In-Place Recycling and CRAB. Types of Cold Recycling
Project Selection for In-Place Recycling and CRAB 54 th Annual Idaho Asphalt Conference Moscow, Idaho October 23, 2014 Stephen A (Steve) Cross, PhD, PE Professor, Oklahoma State University Technical Director
More informationWarm Mix Asphalt (WMA) Guide Specification for Highway Construction
Warm Mix Asphalt (WMA) Guide Specification for Highway Construction Division 400 - Asphalt Pavements and Surface Treatments SECTION 4XX - WARM MIX ASPHALT (WMA) PAVEMENT Warm mix asphalt (WMA) is the generic
More informationFull-Depth Reclamation with Cement
Full-Depth Reclamation with Cement 28th Annual Regional Local Roads Conference David L. Rettner Sr. Vice President American Engineering Testing, Inc. Design Construction Field Testing Performance Types
More informationPavement Maintenance Best Practices. Thomas J. Wood
Pavement Maintenance Best Practices Thomas J. Wood Agenda Why pavement maintenance / preservation is important Dealing with cracks When to apply a surface treatment Fog Sealing Micro Milling UTBWC Thin
More informationFULL DEPTH RECLAMATION FOR CITIES AND COUNTIES. OTEC - October 27, 2015
FULL DEPTH RECLAMATION FOR CITIES AND COUNTIES OTEC - October 27, 2015 OVERVIEW Time + Traffic + Environment = Deterioration Temporary repairs include overlays or mill and fills to extend service life
More informationCOLD-IN-PLACE RECYCLING
COLD-IN-PLACE RECYCLING A Cost Effective Pavement Preservation Treatment Kit Black, P.E. October 15, 2013 Footer Text Outline 1 2 3 4 5 6 7 Definition Equipment & Construction Process Project Selection
More informationNOTICE TO BIDDERS ADDENDUM NO. 1
NOTICE TO BIDDERS ADDENDUM NO. 1 This Addendum changes the terms of the Bid Proposal and/or plans associated with the Monroe County Road Commission project indicated below. By submitting a bid, any and
More informationSession TH83. Using In-Place Recycling Technologies to address the needs of the Owner Agencies FHWA and ARRA Advances 2014
Session TH83 Using In-Place Recycling Technologies to address the needs of the Owner Agencies FHWA and ARRA Advances 2014 Victor (Lee) Gallivan FHWA- Office of Asset Management, Pavement and Construction
More informationRecommended Mix Design Guidelines For Cold Recycling Using Foamed (Expanded) Asphalt Recycling Agent CR202
Recommended Mix Design Guidelines For Cold Recycling Using Foamed (Expanded) Asphalt Recycling Agent CR202 8/25/2017 NOTICE It is not intended or recommended that these guidelines be used verbatim within
More informationNJDOT STATE REPORT NORTHEAST PAVEMENT PRESERVATION PARTNERSHIP ANNUAL MEETING APRIL 29 MAY 1, 2015 NEWARK, DELAWARE
NJDOT STATE REPORT NORTHEAST PAVEMENT PRESERVATION PARTNERSHIP ANNUAL MEETING APRIL 29 MAY 1, 2015 NEWARK, DELAWARE OVERVIEW Pavement Specification Changes Status of NJDOT Highway System NJDOT Pavement
More informationMnPavement Rehabilitation Best Practices LRRB Inv 808
MnPavement Rehabilitation Best Practices LRRB Inv 808 Gene Skok (UofM) Shongtao Dai (MnDOT( MnDOT) 12 th Minnesota Pavement Conference February 14, 2008 Mn/DOT Office of Materials and Road Research Outline
More informationMIDLAND COUNTY ROAD COMMISSION
MIDLAND COUNTY ROAD COMMISSION BID FORM Sealed Proposals will be received at the office of the Board of Road Commissioners, County of Midland, at 2334 N. Meridian Road, Sanford, Michigan, 48657, until:
More informationA. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT).
SECTION 32 01 16 ASPHALT OVERLAY PART 1 - GENERAL 1.1 SCOPE OF WORK A. This Section specifies the requirements for scarifying, grinding, sweeping and repair of existing asphalt concrete pavement to establish
More informationSECTION 402 PLANT MIX BITUMINOUS SURFACE LEVELING
SECTION 402 PLANT MIX BITUMINOUS SURFACE LEVELING 402.1 Description. This work shall consist of placing, spreading and compacting a bituminous mixture as shown on the plans or as directed by the engineer.
More informationADOT s Use of RAP in Asphaltic Concrete
ADOT s Use of RAP in Asphaltic Concrete Updated & Presented by: Nye McCarty, P.E. Originally prepared by: Chad Auker & Scott Weinland ADOT Construction-Materials Group Overview ADOT s Existing RAP Specification
More informationSECTION 2200 PAVING CITY OF BLUE SPRINGS, MISSOURI CONSTRUCTION SPECIFICATIONS
SECTION 2200 PAVING CITY OF BLUE SPRINGS, MISSOURI CONSTRUCTION SPECIFICATIONS The City of Blue Springs hereby adopts Section 2200 of the Kansas City Metropolitan Chapter of APWA Construction and Material
More informationPavement Design. TTP Orientation Seminar 2017
Pavement Design TTP Orientation Seminar 2017 What are Pavements? Engineered structures in contact with the earth's surface built to facilitate movement of people and goods Pedestrians Personal vehicles
More informationNova Scotia 2009 Pavement Preservation. Jim Chisholm Highway Construction Services
Nova Scotia 2009 Pavement Preservation Jim Chisholm Highway Construction Services 2009 Construction Overview Pavement Preservation Hot Mix Asphalt Overlays Cold in Place Recycling Pulverization/Graveling/HMA
More informationRehabilitation Recommendations for FM 97 in Gonzales County
Rehabilitation Recommendations for FM 97 in Gonzales County Technical Memorandum TM-14-04 Prepared for Texas Department of Transportation Maintenance Division Prepared by Texas A&M Transportation Institute
More informationCold Foam In-Place Recycling (CIR)
Cold Foam In-Place Recycling (CIR) FONSECA/McELROY GRINDING CO., INC. Cold Foam CIR CIR Method/Foamed Asphalt Cold In-Place Recycling Foamed Asphalt Hot Bitumen Water Air Foamed Asphalt The larger surface
More information550 Surface Treatments
Table of Contents 550 Surface Treatments... 550-1 550.1 Introduction... 550-1 551 Crack Sealing... 550-1 551.1 Project Selection... 550-1 551.2 Design Considerations... 550-1 552 Chip Sealing... 550-2
More informationJanuary 2008 No. 700
January 2008 No. 700 INDEX FOR SPECIFICATIONS FOR GRANULAR BASE COURSE Page 700. 1 SCOPE...1 1.1 Pre-Construction Meeting...1 1.2 Mobilization of Equipment...1 700. 3 MATERIALS 3.1 Granular Base Course
More informationFull Depth Pavement Reclamation
Full Depth Pavement Reclamation Delaware County, Ohio Chris Bauserman, PE, PS April 28, 2015 Background Population has increased from 55,000 in 1989 to approximately 200,000 Explosive growth in residential,
More informationThe Cardiac Arrest of Hot Mix Asphalt Pavements
The Cardiac Arrest of Hot Mix Asphalt Pavements Timothy R. Murphy, P.E. President What Are You Really Going To Remember from this Convention? What will you really remember most about today? 70% of what
More informationRecycling and Reclamation of Airfield Pavements
Recycling and Reclamation of Airfield Pavements 35 th Airports Conference FAA Eastern Region, Hershey, PA April 4, 2012 Presented by: Mark D. McGuire, P.E. Items for Discussion Brief Introduction (Mark
More information1301 SCOPE. This section covers asphaltic concrete (AC) pavement for roadways and parking areas.
SECTION 1300 - ASPHALTIC CONCRETE PAVEMENT 1301 SCOPE. This section covers asphaltic concrete (AC) pavement for roadways and parking areas. 1302 GENERAL. Pavement shall be constructed to the lines, grades,
More informationReclaimed Asphalt Pavement
Reclaimed Asphalt Pavement Roy Guevara CDOT Asphalt Pavement Program Rocky Mountain Asphalt Conference February 2010 Benefits of Using RAP Benefits of Using RAP Conservation of materials Benefits of Using
More informationCombining Preservation Treatments
Combining Preservation Treatments W. Pierre Peltier GM Sales & Business Development Strawser Construction Inc. Terry Asphalt Materials Inc. Preservation involves a paradigm shift from worst first to more
More informationPrepaving Conferences
Prepaving Conferences Presenters ODOT: Bob Townsend Assistant Project Manager The Dalles Construction Office Knife River: Tyrone Belgarde Project Superintendent Knife River Corporation-Northwest Prepaving
More informationPerformance of Thin Bituminous Treatments for Low-Volume Roads. Greg Johnson Minnesota Department of Transportation June 25, 2003
Performance of Thin Bituminous Treatments for Low-Volume Roads Greg Johnson Minnesota Department of Transportation June 25, 2003 Overview Introduction MN Historical Perspective Current Performance Double
More informationSECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS
SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS Section Page SECTION 14 RESTORATION OF SURFACES... 14.1 14-1 GENERAL... 14.1 14-2 PRIVATE ROADS... 14.1 14-3 STREETS AND PARKING LOTS... 14.1 14-3.01
More information4-07 Asphalt Treated Permeable Base (ATPB)
1 1 0 1 0 1 Supplement Division with the following: (November 0,, APWA GSP) -0 Asphalt Treated Permeable Base (ATPB) -0.1 Description Asphalt treated permeable base (ATPB) consists of a compacted course
More informationSHRP2 R21 Composite Pavement Systems Project Overview
SHRP2 R21 Composite Pavement Systems Project Overview Michael I. Darter & Shreenath Rao Applied Research Associates, Inc. 2100 Louisiana Transportation Conference Baton Rouge, LA 10 January 2011 SHRP2
More informationPAVEMENT MANAGEMENT REPORT 2011
PAVEMENT MANAGEMENT REPORT 2011 COUNTY OF RIVERSIDE TRANSPORTATION DEPARTMENT PAVEMENT MANAGEMENT REPORT Table of Contents Page Executive Summary Current Total Miles Current Road Network Condition. Current
More informationPavement Preservation with Thin Lift Concrete Overlays. Dale Harrington, P.E. Representing the National Concrete Pavement Technology Center
Pavement Preservation with Thin Lift Concrete Overlays Dale Harrington, P.E. Representing the National Concrete Pavement Technology Center Concrete Overlay Guide second edition Contents 1. Overview of
More informationThe Cardiac Arrest of Hot Mix Asphalt Pavements. Timothy R. Murphy, P.E., M. ASCE President
The Cardiac Arrest of Hot Mix Asphalt Pavements Timothy R. Murphy, P.E., M. ASCE President Our Job is to Evaluate Risk LCCA Durability Process Control Rugged review of practices with numerous agencies
More informationAsphalt Guidelines. Courtney Rousseau, P.E. Lloyd Consulting Group, LLC
Asphalt Guidelines Courtney Rousseau, P.E. Lloyd Consulting Group, LLC Objectives Review typical asphalt sections and other key components to ensure optimal material usage for your project Review hot mix
More informationSECTION AGGREGATES
SECTION 32 05 00 AGGREGATES PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Aggregate base 2. Engineered fill 3. Backfill 4. Fine filter aggregate (non-frost susceptible fill) 5. Riprap 6. Recreational
More informationINTELLIGENT PAVING SPEC & PROJECTS
MINNESOTA DEPARTMENT OF TRANSPORTATION INTELLIGENT PAVING SPEC & PROJECTS 59 th Annual Asphalt Contractors Workshop / MN Quality Initiative Workshop Rebecca Embacher February 19, 2015 IMPLEMENTATION TIME
More informationasphalt (PWMA) processes in accordance with these Specifications. PWMA processes include organic 9
Proposed Special Provision for Description Section -0.1 is supplemented with the following: This Work shall consist of providing and placing one or more layers of plant-mixed porous hot mix asphalt (PHMA)
More informationAn Overview of Low Cost Pavement Alternatives in Canada
An Overview of Low Cost Pavement Alternatives in Canada Venkat Lakkavalli P. Eng., M. Sc. Leader, Pavement Engineering The City of Calgary Alberta, Canada Acknowledgement Acknowledge Authors, Co-authors
More informationCement Stabilized Aggregate Base
Supplemental Technical Specification for October 28, 2015 Cement Stabilized Aggregate Base SCDOT Designation: SC-M-308 (10/15) 1. SCOPE 1.1. Cement Stabilized Aggregate Base (CSAB) consists of aggregate,
More informationChip Sealing The Nuts and Bolts. Thomas J. Wood Research Project Supervisor MN/DOT
Chip Sealing The Nuts and Bolts Thomas J. Wood Research Project Supervisor MN/DOT Why do we do Pavement Preservation? The Answer is? To keep new pavements new longer! Is Pavement Preservation Cost Effective
More informationMaterials for Civil and Construction Engineers
Materials for Civil and Construction Engineers CHAPTER 9 Asphalt Binders and Asphalt Mixtures Bituminous Materials Asphalt Natural or Refined from petroleum oil Tar Asphalt Cement Cutback Emulsion 2 Source
More informationSOM August 2009 Alaska
Asphalt Rubber Finishing Course (ARFC) The end of the road for the tire. The beginning of the road for a quieter, smoother Pavement. SOM August 2009 Alaska Jim Delton, State Materials Engineer, Arizona
More informationDESIGN OF BITUMINOUS MIXTURES
Test Procedure for DESIGN OF BITUMINOUS MIXTURES TxDOT Designation: Tex-204-F Effective Date: August 2016 1. SCOPE 1.1 Use the methods in this procedure to determine the proper proportions of approved
More informationRe: The Responsible Use of Recycled Materials in Asphalt Mixtures Critical Look
SPECIAL BULLETIN 4-A QUALITY OF ASPHALT PAVEMENT TASK FORCE November 2016 Re: The Responsible Use of Recycled Materials in Asphalt Mixtures Critical Look This is a follow-up bulletin to Bulletin 4 and
More informationIntelligent Compaction and Pave-IR in Minnesota NCAUPG Technical Conference February 16, 2012 Greg Johnson Mn/DOT Asst. Bituminous Engr.
Intelligent Compaction and Pave-IR in Minnesota 2012 NCAUPG Technical Conference February 16, 2012 Greg Johnson Mn/DOT Asst. Bituminous Engr. Intelligent Compaction (Video) MnDOT Intelligent Compaction
More informationStudent Services & Classroom Addition
SECTION 321216 - ASPHALT PAVING PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationAlligator Cracking. Light. Medium. High
Alligator Cracking Description: A series of interconnecting cracks caused by fatigue failure on the asphalt concrete surface under repeated traffic loading. Causes: Loads in excess of the current pavement
More informationSECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS
SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS Section Page 14-1 GENERAL... 14.1 14-2 PRIVATE ROADS... 14.1 14-3 STREETS AND PARKING LOTS... 14.1 14-3.01 Aggregate Base... 14.1 14-3.02 Asphalt
More informationMICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR SUPERPAVE HMA MIXTURES. C&T:CJB 1 of 5 C&T:APPR:SJP:DBP: FHWA:APPR:
MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR SUPERPAVE HMA MIXTURES C&T:CJB 1 of 5 C&T:APPR:SJP:DBP:10-03-07 FHWA:APPR:10-05-07 a. Description. This work shall consist of furnishing a HMA
More informationBinder with a proven track record worldwide. Foamed bitumen
Binder with a proven track record worldwide. Foamed bitumen 02 03 Fit for the future with foamed bitumen. HIGH-QUALITY, COST-EFFICIENT, ENVIRONMENTALLY FRIENDLY. AND FUTURE-PROOF: COLD RECYCLING WITH FOAMED
More information603 - ASPHALT PAVEMENT SMOOTHNESS SECTION 603 ASPHALT PAVEMENT SMOOTHNESS
SECTION 603 ASPHALT PAVEMENT SMOOTHNESS 603.1 DESCRIPTION Determine the smoothness of the pavement surface and correct the deficiencies as specified in the Contract Documents. For the purposes of this
More informationITEM 340 DENSE-GRADED HOT-MIX ASPHALT (METHOD)
ITEM 340 DENSE-GRADED HOT-MIX ASPHALT (METHOD) 340.1. Description. Construct a pavement layer composed of a compacted, dense-graded mixture of aggregate and asphalt binder mixed hot in a mixing plant.
More informationROAD PAVEMENTS GENERAL
ROAD PAVEMENTS GENERAL Contents Clause Title Page 701 Pavement Construction... 2 702 Horizontal Alignments, Surface Levels and Surface Regularity of Pavement Courses... 2 703 Not Used... 4 704 Not Used...
More information5/6/2010. Sustainable Pavement Management practices. Perpetual Pavement
Sustainable Pavement Management practices Jim Huddleston, P.E. Executive Director Asphalt Pavement Association of Oregon OIT Civil il Engineering i Professional Lecture Series May 5, 2010 Oregon Institute
More informationPlantmix Asphalt Industry of Kentucky Winter Meeting February 10, 2011
Plantmix Asphalt Industry of Kentucky Winter Meeting February 10, 2011 AASHTO Guidelines for Geometric Design of Very Low-Volume Local Roads (2001) ADT 400 AASHTO Guide for Design of Pavement Structures
More informationAsphalt Rubber Chip Sealing DRAFT MAINTENANCE SPECIFICATION. March 22, 2007
Asphalt Rubber Chip Sealing DRAFT MAINTENANCE SPECIFICATION March 22, 2007 Description: This work consists of furnishing and applying asphalt rubber binder followed by an application of treated cover aggregate
More information2014 APC/ Dist. 9-0 BITUMINOUS PAVING
2014 APC/ Dist. 9-0 BITUMINOUS PAVING To Be Covered- BLUE KNOB MC PILOT SPECIAL PROVISIONS TACK COAT LONGITUDINAL JOINT PERCENT WITHING TOLERANCE (PWT) SPEC LOCAL ACCEPTANCE- RETESTS SAFETY EDGE Importance
More informationVIRGINIA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR LATEX MODIFIED EMULSION TREATMENT (MICRO-SURFACING)
S312EM2-1110 VIRGINIA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR LATEX MODIFIED EMULSION TREATMENT (MICRO-SURFACING) August 10, 2010 I. DESCRIPTION This work shall include furnishing and placing
More informationAnia M. Anthony, M.Sc., P. Eng. Senior Surfacing Engineer Saskatchewan Ministry of Highways and Infrastructure
Techniques for Low Volume Roads in Saskatchewan Ania M. Anthony, M.Sc., P. Eng. Senior Surfacing Engineer Saskatchewan Ministry of Highways and Infrastructure The Western Canada Pavement Workshop Feb 1-2,
More informationSACRAMENTO COUNTY ASPHALT RUBBER HOT MIX-GAP GRADED (ARHM-GG):
SACRAMENTO COUNTY ASPHALT RUBBER HOT MIX-GAP GRADED (ARHM-GG): ARHM-GG shall conform to the provisions for Type "A" asphalt concrete in Section 39, "Asphalt Concrete," of the State Standard Specifications
More informationFAA s Mixture Specifications
FAA s Mixture Specifications - Revised P-401 (and P-403) - New P-601 (Fuel Resistant Mix) For SEAUPG, Nov 2014 By Mark Buncher 1 Univ. of KY. 2012 National Champs! F-18 Shockwave at Mach-1 Back to Airfield
More informationSECTION FLEXIBLE PAVING
SECTION 321200 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. Include GENERAL CONDITIONS and applicable parts of Division 1 as part of this Section. B. Examine all Drawings and other Sections of the Specifications
More information2016 Local Roads Workshop Selecting the Right Mix for Your Project MICHIGAN RIDES ON US
2016 Local Roads Workshop Selecting the Right Mix for Your Project MICHIGAN RIDES ON US 2937 Atrium Drive, Suite 202 Okemos, MI 48864 517-323-7800 www.apa-mi.org For each there are: Right mixes Wrong
More informationITEM 275 PORTLAND CEMENT TREATED MATERIALS (ROAD MIXED)
ITEM 275 PORTLAND CEMENT TREATED MATERIALS (ROAD MIXED) 275.1. Description. This Item shall govern for treating subgrade, new and/or existing base [with or without asphaltic concrete pavement (ACP)], or
More informationA Case Study of Work done by a HOT IN-PLACE RECYCLING (HIR) Machines
A Case Study of Work done by a HOT IN-PLACE RECYCLING (HIR) Machines Hisashi HOSOKAWA Yasushi KANZAKI CEO, Green ARM CO., Ltd., COO, Green ARM Co., Ltd., Japan Japan hhosokawa@green-arm.com kanzaki@green-arm.com
More informationAsphalt Institute. to Univ. of KY A.S.C.E. Student Chapter 10/5/16. Mark Buncher, Ph.D., P.E. Director of Engineering
Asphalt Institute to Univ. of KY A.S.C.E. Student Chapter 10/5/16 Mark Buncher, Ph.D., P.E. Director of Engineering Asphalt Institute US based association of international asphalt binder producers, manufacturers,
More informationUsing Pavement Management Data to Determine Asphalt Pavement Performance Cycles
Using Pavement Management Data to Determine Asphalt Pavement Performance Cycles 38 th Annual Rocky Mountain Asphalt Conference and Equipment Show February 23, 2011 Project Selection Criteria Project had
More information610 - DOUBLE ASPHALT SURFACE TREATMENT SECTION 610 DOUBLE ASPHALT SURFACE TREATMENT
SECTION 610 DOUBLE ASPHALT SURFACE TREATMENT 610.1 DESCRIPTION Construct a wearing surface composed of an asphalt prime coat followed by the applications of 2 asphalt seal coats and cover material as specified
More informationSection 505. CHIP SEALS
Section 505. CHIP SEALS 505.01. Description. This work consists of preparing the pavement surface and providing and placing a single chip seal, double chip seal, or shoulder chip seal. 505.02. Materials.
More informationCity of Brandon Division 2 Standard Construction Specifications Section January 2000 Page 1 of 10 SOIL CEMENT BASE COURSE PART 1 GENERAL
January 2000 Page 1 of 10 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED WORK 1.04 APPROVALS PART 2 PRODUCTS 2.01 CEMENT 2.02 WATER The General Conditions of the Contract,
More informationReview of Cold In-Place Recycling: Environmental, Economical, and Performance Analysis
Review of Cold In-Place Recycling: Environmental, Economical, and Performance Analysis Introduction Cold in-place recycling (CIR) is a rehabilitation method that recycles existing asphalt pavement in-place,
More informationAsphalt Materials: Basics of RAP, Usage and Specifications
Asphalt 103 - Materials: Basics of RAP, Usage and Specifications 36 th Annual Rocky Mountain Asphalt Conference and Equipment Show February 19, 2009 Denver, Colorado By Tom Blair Director of Product Engineering
More informationTools and Tactics for Roadway Pavement Preservation: An Implementation Guide to Preserving High-Traffic-Volume Roadways
Appendix B Preventive Maintenance Treatment Technical Profiles Tools and Tactics for Roadway Pavement Preservation: An Implementation Guide to Preserving High-Traffic-Volume Roadways Preventive Maintenance
More informationRehabilitation Strategies for Bonded Concrete Overlays of Asphalt Pavements
University of Pittsburgh Rehabilitation Strategies for Bonded Concrete Overlays of Asphalt Pavements Authors: J. M Vandenbossche S. Sachs August 2013 1. Introduction Bonded concrete overlays of asphalt
More informationMINNESOTA DEPARTMENT OF TRANSPORTATION OFFICE OF MATERIALS ENGINEERING
Mn/DOT SD-15 (Rev. 2-2001) MINNESOTA DEPARTMENT OF TRANSPORTATION OFFICE OF MATERIALS ENGINEERING Federal Aid, State Funds, County and Municipal Federal Aid Projects This schedule outlines the minimum
More informationDesign and Construction of Concrete Overlays. By: James K. Cable, P.E. Cable Concrete Consultation
Design and Construction of Concrete Overlays By: James K. Cable, P.E. Cable Concrete Consultation PCC OVERLAY AGENDA Current design & construction features What is needed in a PCC overlay set of plans?
More informationOGFC Meets CRM : Where the Rubber meets the Rubber
OGFC Meets CRM : Where the Rubber meets the Rubber GEORGE B. WAY, P.E. Pavement Section Engineer Arizona Department of Transportation Materials Group March 25, 1998 The Asphalt Conference Atlanta, Georgia
More informationSuccessful Implementation of Warm Mix Asphalt in Ontario
Successful Implementation of Warm Mix Asphalt in Ontario Seyed Tabib, Senior Bituminous Engineer Materials Engineering and Research Office, Ministry of Transportation of Ontario Pamela Marks, Head Bituminous
More informationMix Design & Construction -1-
Mix Design & Construction -1- AGENDA RCC Mix Design RCC Mix Production RCC Construction Process -2- THE FINAL SURFACE TYPE WILL DICTATE THE NECESSARY TECHNIQUES & EQUIPMENT NEEDED TO BE SUCCESSFUL Natural
More informationMaterials 206: Handling RAP (Advanced) Contractor QC and Specifications
Materials 206: Handling RAP (Advanced) Contractor QC and Specifications 38 th Annual Rocky Mountain Asphalt Conference and Equipment Show February 25, 2011 Denver, Colorado By Tom Blair Director of Product
More informationCement Stabilized Soil (CSS) (Portland cement)
Cement Stabilized Soil (CSS) (Portland cement) 1.0 DESCRIPTION. This specification shall govern the process known as Cement Stabilized Soil (CSS). CSS consists of mixing the existing base, subbase and
More informationPavement Design. TTP Orientation Seminar 2011
Pavement Design TTP Orientation Seminar 2011 What are Pavements? Engineered structures in contact with the earth's surface built to facilitate movement of people and goods Pedestrians Personal vehicles
More information1985: FT02 Kuala Lumpur - Kuantan (Temerloh) 1988: FT08 Pagar Sasak - Merapoh, Pahang
Cold In-Place Recycling in Malaysia INTRODUCTION CIPR technique was first introduced in Malaysia in mid 1980 s. o o 1985: FT02 Kuala Lumpur - Kuantan (Temerloh) 1988: FT08 Pagar Sasak - Merapoh, Pahang
More informationTHIN ASPHALT OVERLAYS FOR PAVEMENT PRESERVATION
THIN ASPHALT OVERLAYS FOR PAVEMENT PRESERVATION Why Thin Asphalt Overlays? Shift from new construction to renewal and preservation Functional improvements for safety and smoothness are needed more than
More informationCITY OF FARGO SPECIFICATIONS AGGREGATE BASES
AGGREGATE BASES PART 1 DESCRIPTION OF WORK The work to be done under this section of the Specifications and the accompanying plans consists of all labor, material, accessories, and equipment necessary
More information