1 Appendices A B Construction Emissions Calculations Construction Schedule Calculation Worksheets Operation Emissions B1 B2 B3 Operational Emissions Calculations Calculation Worksheets Roadway Segment Traffic Data CO Localized Emissions CO Screening Procedure and Flow Charts CO Analysis and CALINE4 Model Output Files PM Hot-Spot Analysis and Conformity Determination TCWG Conformity Determination Qualitative PM Hot-Spot Analysis Submitted to TCWG B4 B5 C D Localized NO 2 Concentration Estimation AERMOD Model Output Greenhouse Gas Emissions Calculation Worksheets Project in 2008 RTP and Final 2008 RTIP Project Listing Health Risk Assessment for the Gerald Desmond Bridge Replacement Project

2

3 Construction Schedule Calculation Worksheets Appendix A Construction Emissions

4

5 Gerald Desmond Bridge Replacement Project Construction Schedule - Summary Utility Relocation Main Span East CIP Low Level Approach West CIP Low Level Approach Segmental High Level Approaches Old Bridge Demolition Construction Activity Tower 1 (Bent 15) Foundation Tower 2 (Bent 16) Foundation Transition Pier 1 (Bent 17) Foundation Transition Pier 2 (Bent 18) Foundation Erect Tower 1 (Bent 15) Erect Tower 2 (Bent 16) Erect Transition Piers (Bent 17, 18) Tower 1 Deck Construction Tower 2 Deck Construction A Line (Mainline) - East Side A Line (Mainline) - West Side B Line C Line D Line E Line M Line N Line S3_Main Line_West Approach S3_Ramp D S3_Ramp E S5_Ramp E East _High Level Approach Foundation West _High Level Approach Foundation East _High Level Approach Columns West _High Level Approach Columns East _High Level Approach Deck West _High Level Approach Deck Jun Jul Jun Jul Jun Jul Jun Jul Jun Jul Jun Jul Jan Feb Mar Apr May Aug Sep Oct Nov Dec Jan Feb Mar Apr May Aug Sep Oct Nov Dec Jan Feb Mar Apr May Aug Sep Oct Nov Dec Jan Feb Mar Apr May Aug Sep Oct Nov Dec Jan Feb Mar Apr May Aug Sep Oct Nov Dec Jan Feb Mar Apr May Aug Sep Oct Nov Dec Summary Schedule

6 Gerald Desmond Bridge Replacement Project Construction Emissions Timeline #1 YEAR 1 - Maximum Daily Emissions (Month 9) 2011 (September) Utility Relocation and Main Spans Hours Number of Peak Emissions (lbs/day) per Day Equipment CO NO X VOC PM 10 PM 2.5 Dump Truck Flatbed Truck Pile Driver Concrete Truck Crane Pickup Truck Main Spans Total Unmitigated Mitigated Offsite Emissions Offsite Haul Trucks (Roundtrips) Offsite Delivery Trucks (Roundtrips) Offsite Trash Trucks (Roundtrips) Truck trip Total Worker Trips (Phase 1 and 2) Worker Trips (Phase 3) Worker TripsTotal Fugitive Dust (yd3 per day) Fugitive Dust (acres per day) - Max Fugitive Dust (square footage per month) - Demol. Fugutive Dust Total Unmitigated Mitigated Off-site Total Unmitigated Mitigated On-site Total Unmitigated Mitigated Regional Total Unmitigated Mitigated Summary Table Maximum Daily Emissions - Year 1 Unmitigated (lbs/day) On-site Off-site Total SCAQMD Regional Significance Threshold Over/Under Exceed Threshold? Mitigated (lbs/day) On-site Off-site Total SCAQMD Regional Significance Threshold Over/Under Exceed Threshold? CO NOx VOC PM 10 PM (8) No Yes No No No (4) No Yes No No No Timeline 1 page 1 of 6

7 Gerald Desmond Bridge Replacement Project Construction Emissions Timeline #2 YEAR 2 - Maximum Daily Emissions (Month 9) 2012 (September) Peak Emissions (lbs/day) Hours Number of Approach Spans per Day Equipment CO NO X VOC PM 10 PM 2.5 Drilling Rig Screed Machine Dump Truck Generator Flatbed truck Concrete Pump Pile Driver Concrete Truck Backhoe/Loader Scraper Bulldozer Crane Pickup Trucks Total - Approach Spans Unmitigated Mitigated Main Spans Flatbed truck Concrete Truck Crane Total - Main Spans Unmitigated Mitigated Offsite Emissions Offsite Haul Trucks (Roundtrips) Offsite Delivery Trucks (Roundtrips) Offsite Trash Trucks (Roundtrips) Truck Trip Total Worker Trips (Phase 1 and 2) - Site Prep Worker Trips (Phase 3) - Worker Trips (Phase 3) Worker Trips Total Asphalt (acres per month) Fugitive Dust (yd3 per day) Fugitive Dust (acres per day) - Max Fugitive Dust (square footage per month) - Demol. Fugutive Dust Total Unmitigated Mitigated Off-site Total Unmitigated Mitigated On-site Total Unmitigated Mitigated Regional Total Unmitigated Mitigated Summary Table Maximum Daily Emissions - Year 2 Unmitigated (lbs/day) On-site Off-site Total SCAQMD Regional Significance Threshold Over/Under Exceed Threshold? Mitigated (lbs/day) On-site Off-site Total SCAQMD Regional Significance Threshold Over/Under Exceed Threshold? CO NOx VOC PM 10 PM (650) No Yes No No No (613) No Yes No No No Timeline 2 page 2 of 6

8 Gerald Desmond Bridge Replacement Project Construction Emissions Timeline #3 YEAR 3 - Maximum Daily Emissions (Month 3) Approach Spans Trip Length No. of Eq. CO NOx 2013 (March) VOC PM 10 PM 2.5 Drilling Rig Dump Truck Generator Flatbed truck Concrete Pump Pile Driver Screed Machine Backhoe/Loader Concrete Truck Scraper Bulldozer Crane Pickup Truck Total East Approaches Unmitigated Mitigated Main Span Generator Flatbed truck Concrete Truck Crane Total West Approaches Unmitigated Mitigated Offsite Emissions Offsite Haul Trucks (Roundtrips) Offsite Delivery Trucks (Roundtrips) Offsite Trash Trucks (Roundtrips) Truck Trip Total Worker Trips (Phase 1 and 2) Worker Trips (Phase 3) Worker Trips - Calculated Total Asphalt (acres per month) Fugitive Dust (acres per day) - Normal Fugitive Dust (yd3 per day) Fugitive Dust (acres per day) - Max Fugitive Dust (square footage per month) - Demol. Fugitive Dust Total Unmitigated Mitigated Off-site Total Unmitigated Mitigated On-site Total Unmitigated Mitigated Regional Total Unmitigated Mitigated Summary Table Maximum Daily Emissions - Year 3 CO NOx VOC PM 10 PM 2.5 Unmitigated (lbs/day) On-site Off-site Total SCAQMD Regional Significance Threshold Over/Under 331 (342) Exceed Threshold? No Yes No No No Mitigated (lbs/day) On-site Off-site Total SCAQMD Regional Significance Threshold Over/Under 341 (321) Exceed Threshold? No Yes No No No Timeline 3_March page 3 of 6

9 Gerald Desmond Bridge Replacement Project Construction Emissions Timeline #3-a YEAR 3 - Maximum Daily Emissions (Month 9) 2013 (September) Approach Spans Trip Length No. of Eq. CO NOx VOC PM 10 PM 2.5 Generator Flatbed truck Concrete Pump Concrete Truck Crane Pickup Truck Total Approach Spans Unmitigated Mitigated Main Spans Flatbed truck Concrete Truck Total Main Spans Unmitigated Mitigated Offsite Emissions Offsite Haul Trucks (Roundtrips) Offsite Delivery Trucks (Roundtrips) Offsite Trash Trucks (Roundtrips) Truck Trip Total Worker Trips (Phase 1 and 2) - Site Prep Worker Trips (Phase 3) Worker Trips - Calculated Total Asphalt (acres per month) Fugitive Dust (yd3 per day) Fugitive Dust (acres per day) - Max Fugitive Dust (square footage per month) - Demo Fugitive Dust Total Unmitigated Mitigated Off-site Total Unmitigated Mitigated On-site Total Unmitigated Mitigated Regional Total Unmitigated Mitigated Summary Table Maximum Daily Emissions - Year 3 CO NOx VOC PM 10 PM 2.5 Unmitigated (lbs/day) On-site Off-site Total SCAQMD Regional Significance Threshold Over/Under 463 (76) Exceed Threshold? No Yes No No No Mitigated (lbs/day) On-site Off-site Total SCAQMD Regional Significance Threshold Over/Under 466 (68) Exceed Threshold? No Yes No No No Timeline 3 _Sep page 4 of 6

10 Gerald Desmond Bridge Replacement Project Construction Emissions Timeline #4 Old Bridge Demolition - Maximum Daily Emissions 2015 (October) Bridge Demolition Trip Length Number of Eq. CO NOX VOC PM10 PM2.5 Sawcutters Dump Truck Excavators Barge Cranes/Genie Lifts Pickup Truck Total Bridge Demolition Unmitigated Mitigated Offsite Emissions Offsite Haul Trucks (Roundtrips) Offsite Delivery Trucks (Roundtrips) Offsite Trash Trucks (Roundtrips) Truck Trip Total Worker Trips (Phase 1 and 2) Worker Trips (Phase 3) Worker Trips - Calculated Total Asphalt (acres per month) Fugitive Dust (acres per day) - Normal Fugitive Dust (yd3 per day) Fugitive Dust (acres per day) - Max Fugitive Dust (square footage per month) - Demo 27, Fugitive Dust Total Unmitigated Mitigated Off-site Total Unmitigated Mitigated On-site Total Unmitigated Mitigated Regional Total Unmitigated Mitigated Summary Table Maximum Daily Emissions CO NOx VOC PM 10 PM 2.5 Unmitigated On-site Off-site Total SCAQMD Regional Significance Threshol Over/Under Exceed Threshold? No No No No No Mitigated On-site Off-site Total SCAQMD Regional Significance Threshol Over/Under Exceed Threshold? No No No No No Old Bridge Demolition page 5 of 6

11 Gerald Desmond Bridge Replacement Project Construction Emissions Rehabilitation Alternative Bridge Rehabilitation 2012 (September) Phase Trip Length Number of Eq. CO NOX VOC PM10 PM2.5 Concrete Truck Concrete Pump Dump Truck Excavator Cranes/Lifts Bulldozer (Liebherr Crawler) Saw Cutter Total Unmitigated Mitigated Offsite Emissions Offsite Haul Trucks (Roundtrips) Offsite Delivery Trucks (Roundtrips) Offsite Trash Trucks (Roundtrips) Truck Trip Total Worker Trips (Phase 1 and 2) Worker Trips (Phase 3) Worker Trips - Calculated Total Asphalt (acres per month) Fugitive Dust (acres per day) - Normal Fugitive Dust (yd3 per day) Fugitive Dust (acres per day) - Max Fugitive Dust (square footage per month) - Demol 0.00 Fugitive Dust Total Unmitigated Mitigated Off-site Total Unmitigated Mitigated On-site Total Unmitigated Mitigated Regional Total Unmitigated Mitigated Summary Table Maximum Daily Emissions CO NOx VOC PM 10 PM 2.5 Unmitigated On-site Off-site Total SCAQMD Regional Significance Threshold Over/Under Exceed Threshold? No No No No No Mitigated On-site Off-site Total SCAQMD Regional Significance Threshold Over/Under Exceed Threshold? No No No No No Rehab Alternative page 6 of 6

12 SCAQMD Rule 403

13 (Adopted May 7, 1976) (Amended November 6, 1992) (Amended July 9, 1993) (Amended February 14, 1997) (Amended December 11, 1998)(Amended April 2, 2004) RULE 403. FUGITIVE DUST (a) (b) (c) Purpose The purpose of this Rule is to reduce the amount of particulate matter entrained in the ambient air as a result of anthropogenic (man-made) fugitive dust sources by requiring actions to prevent, reduce or mitigate fugitive dust emissions. Applicability The provisions of this Rule shall apply to any activity or man-made condition capable of generating fugitive dust. Definitions (1) ACTIVE OPERATIONS means any source capable of generating fugitive dust, including, but not limited to, earth-moving activities, construction/demolition activities, disturbed surface area, or heavy- and light-duty vehicular movement. (2) AGGREGATE-RELATED PLANTS are defined as facilities that produce and / or mix sand and gravel and crushed stone. (3) AGRICULTURAL HANDBOOK means the region-specific guidance document that has been approved by the Governing Board or hereafter approved by the Executive Officer and the U.S. EPA. For the South Coast Air Basin, the Board-approved region-specific guidance document is the Rule 403 Agricultural Handbook dated December For the Coachella Valley, the Board-approved region-specific guidance document is the Rule 403 Coachella Valley Agricultural Handbook dated April 2, (4) ANEMOMETERS are devices used to measure wind speed and direction in accordance with the performance standards, and maintenance and calibration criteria as contained in the most recent Rule 403 Implementation Handbook. (5) BEST AVAILABLE CONTROL MEASURES means fugitive dust control actions that are set forth in Table 1 of this Rule

14 (6) BULK MATERIAL is sand, gravel, soil, aggregate material less than two inches in length or diameter, and other organic or inorganic particulate matter. (7) CEMENT MANUFACTURING FACILITY is any facility that has a cement kiln at the facility. (8) CHEMICAL STABILIZERS are any non-toxic chemical dust suppressant which must not be used if prohibited for use by the Regional Water Quality Control Boards, the California Air Resources Board, the U.S. Environmental Protection Agency (U.S. EPA), or any applicable law, rule or regulation. The chemical stabilizers shall meet any specifications, criteria, or tests required by any federal, state, or local water agency. Unless otherwise indicated, the use of a non-toxic chemical stabilizer shall be of sufficient concentration and application frequency to maintain a stabilized surface. (9) CONSTRUCTION/DEMOLITION ACTIVITIES means any on-site mechanical activities conducted in preparation of, or related to, the building, alteration, rehabilitation, demolition or improvement of property, including, but not limited to the following activities: grading, excavation, loading, crushing, cutting, planing, shaping or ground breaking. (10) CONTRACTOR means any person who has a contractual arrangement to conduct an active operation for another person. (11) DISTURBED SURFACE AREA means a portion of the earth's surface which has been physically moved, uncovered, destabilized, or otherwise modified from its undisturbed natural soil condition, thereby increasing the potential for emission of fugitive dust. This definition excludes those areas which have: (A) been restored to a natural state, such that the vegetative ground cover and soil characteristics are similar to adjacent or nearby natural conditions; (B) been paved or otherwise covered by a permanent structure; or (C) sustained a vegetative ground cover of at least 70 percent of the native cover for a particular area for at least 30 days. (12) DUST SUPPRESSANTS are water, hygroscopic materials, or non-toxic chemical stabilizers used as a treatment material to reduce fugitive dust emissions

15 (13) EARTH-MOVING ACTIVITIES means the use of any equipment for any activity where soil is being moved or uncovered, and shall include, but not be limited to the following: grading, earth cutting and filling operations, loading or unloading of dirt or bulk materials, adding to or removing from open storage piles of bulk materials, landfill operations, weed abatement through disking, and soil mulching. (14) DUST CONTROL SUPERVISOR means a person with the authority to expeditiously employ sufficient dust mitigation measures to ensure compliance with all Rule 403 requirements at an active operation. (15) FUGITIVE DUST means any solid particulate matter that becomes airborne, other than that emitted from an exhaust stack, directly or indirectly as a result of the activities of any person. (16) HIGH WIND CONDITIONS means that instantaneous wind speeds exceed 25 miles per hour. (17) INACTIVE DISTURBED SURFACE AREA means any disturbed surface area upon which active operations have not occurred or are not expected to occur for a period of 20 consecutive days. (18) LARGE OPERATIONS means any active operations on property which contains 50 or more acres of disturbed surface area; or any earth-moving operation with a daily earth-moving or throughput volume of 3,850 cubic meters (5,000 cubic yards) or more three times during the most recent 365-day period. (19) OPEN STORAGE PILE is any accumulation of bulk material, which is not fully enclosed, covered or chemically stabilized, and which attains a height of three feet or more and a total surface area of 150 or more square feet. (20) PARTICULATE MATTER means any material, except uncombined water, which exists in a finely divided form as a liquid or solid at standard conditions. (21) PAVED ROAD means a public or private improved street, highway, alley, public way, or easement that is covered by typical roadway materials, but excluding access roadways that connect a facility with a public paved roadway and are not open to through traffic. Public paved roads are those open to public access and that are owned by any federal, state, county, municipal or any other governmental or quasi-governmental agencies. Private paved roads are any paved roads not defined as public

16 (22) PM 10 means particulate matter with an aerodynamic diameter smaller than or equal to 10 microns as measured by the applicable State and Federal reference test methods. (23) PROPERTY LINE means the boundaries of an area in which either a person causing the emission or a person allowing the emission has the legal use or possession of the property. Where such property is divided into one or more sub-tenancies, the property line(s) shall refer to the boundaries dividing the areas of all sub-tenancies. (24) RULE 403 IMPLEMENTATION HANDBOOK means a guidance document that has been approved by the Governing Board on April 2, 2004 or hereafter approved by the Executive Officer and the U.S. EPA. (25) SERVICE ROADS are paved or unpaved roads that are used by one or more public agencies for inspection or maintenance of infrastructure and which are not typically used for construction-related activity. (26) SIMULTANEOUS SAMPLING means the operation of two PM 10 samplers in such a manner that one sampler is started within five minutes of the other, and each sampler is operated for a consecutive period which must be not less than 290 minutes and not more than 310 minutes. (27) SOUTH COAST AIR BASIN means the non-desert portions of Los Angeles, Riverside, and San Bernardino counties and all of Orange County as defined in California Code of Regulations, Title 17, Section The area is bounded on the west by the Pacific Ocean, on the north and east by the San Gabriel, San Bernardino, and San Jacinto Mountains, and on the south by the San Diego county line. (28) STABILIZED SURFACE means any previously disturbed surface area or open storage pile which, through the application of dust suppressants, shows visual or other evidence of surface crusting and is resistant to winddriven fugitive dust and is demonstrated to be stabilized. Stabilization can be demonstrated by one or more of the applicable test methods contained in the Rule 403 Implementation Handbook. (29) TRACK-OUT means any bulk material that adheres to and agglomerates on the exterior surface of motor vehicles, haul trucks, and equipment (including tires) that have been released onto a paved road and can be removed by a vacuum sweeper or a broom sweeper under normal operating conditions

17 (30) TYPICAL ROADWAY MATERIALS means concrete, asphaltic concrete, recycled asphalt, asphalt, or any other material of equivalent performance as determined by the Executive Officer, and the U.S. EPA. (31) UNPAVED ROADS means any unsealed or unpaved roads, equipment paths, or travel ways that are not covered by typical roadway materials. Public unpaved roads are any unpaved roadway owned by federal, state, county, municipal or other governmental or quasi-governmental agencies. Private unpaved roads are all other unpaved roadways not defined as public. (32) VISIBLE ROADWAY DUST means any sand, soil, dirt, or other solid particulate matter which is visible upon paved road surfaces and which can be removed by a vacuum sweeper or a broom sweeper under normal operating conditions. (33) WIND-DRIVEN FUGITIVE DUST means visible emissions from any disturbed surface area which is generated by wind action alone. (34) WIND GUST is the maximum instantaneous wind speed as measured by an anemometer. (d) Requirements (1) No person shall cause or allow the emissions of fugitive dust from any active operation, open storage pile, or disturbed surface area such that: (A) the dust remains visible in the atmosphere beyond the property line of the emission source; or (B) the dust emission exceeds 20 percent opacity (as determined by the appropriate test method included in the Rule 403 Implementation Handbook), if the dust emission is the result of movement of a motorized vehicle. (2) No person shall conduct active operations without utilizing the applicable best available control measures included in Table 1 of this Rule to minimize fugitive dust emissions from each fugitive dust source type within the active operation. (3) No person shall cause or allow PM 10 levels to exceed 50 micrograms per cubic meter when determined, by simultaneous sampling, as the difference between upwind and downwind samples collected on high-volume particulate matter samplers or other U.S. EPA-approved equivalent 403-5

18 method for PM 10 monitoring. If sampling is conducted, samplers shall be: (A) Operated, maintained, and calibrated in accordance with 40 Code of Federal Regulations (CFR), Part 50, Appendix J, or appropriate U.S. EPA-published documents for U.S. EPA-approved equivalent method(s) for PM 10. (B) Reasonably placed upwind and downwind of key activity areas and as close to the property line as feasible, such that other sources of fugitive dust between the sampler and the property line are minimized. (4) No person shall allow track-out to extend 25 feet or more in cumulative length from the point of origin from an active operation. Notwithstanding the preceding, all track-out from an active operation shall be removed at the conclusion of each workday or evening shift. (5) After January 1, 2005, no person shall conduct an active operation with a disturbed surface area of five or more acres, or with a daily import or export of 100 cubic yards or more of bulk material without utilizing at least one of the measures listed in subparagraphs (d)(5)(a) through (d)(5)(e) at each vehicle egress from the site to a paved public road. (A) Install a pad consisting of washed gravel (minimum-size: one inch) maintained in a clean condition to a depth of at least six inches and extending at least 30 feet wide and at least 50 feet long. (B) Pave the surface extending at least 100 feet and at least 20 feet wide. (C) Utilize a wheel shaker/wheel spreading device consisting of raised dividers (rails, pipe, or grates) at least 24 feet long and 10 feet wide to remove bulk material from tires and vehicle undercarriages before vehicles exit the site. (D) Install and utilize a wheel washing system to remove bulk material from tires and vehicle undercarriages before vehicles exit the site. (E) Any other control measures approved by the Executive Officer and the U.S. EPA as equivalent to the actions specified in subparagraphs (d)(5)(a) through (d)(5)(d)

19 (e) Additional Requirements for Large Operations (1) Any person who conducts or authorizes the conducting of a large operation subject to this Rule shall implement the applicable actions specified in Table 2 of this Rule at all times and shall implement the applicable actions specified in Table 3 of this Rule when the applicable performance standards can not be met through use of Table 2 actions; and shall: (A) submit a fully executed Large Operation Notification (Form 403 N) to the Executive Officer within 7 days of qualifying as a large operation; (B) include, as part of the notification, the name(s), address(es), and phone number(s) of the person(s) responsible for the submittal, and a description of the operation(s), including a map depicting the location of the site; (C) maintain daily records to document the specific dust control actions taken, maintain such records for a period of not less than three years; and make such records available to the Executive Officer upon request; (D) after January 1, 2005, install and maintain project signage with project contact signage that meets the minimum standards of the Rule 403 Implementation Handbook, prior to initiating any earthmoving activities; (E) after January 1, 2005, identify a dust control supervisor that: (i) is employed by or contracted with the property owner or developer; (ii) is on the site or available on-site within 30 minutes during working hours; (iii) has the authority to expeditiously employ sufficient dust mitigation measures to ensure compliance with all Rule requirements; (iv) has completed the AQMD Fugitive Dust Control Class and has been issued a valid Certificate of Completion for the class; and (F) notify the Executive Officer in writing within 30 days after the site no longer qualifies as a large operation as defined by paragraph (c)(18)

20 (2) Any Large Operation Notification submitted to the Executive Officer or AQMD-approved dust control plan shall be valid for a period of one year from the date of written acceptance by the Executive Officer. Any Large Operation Notification accepted pursuant to paragraph (e)(1), excluding those submitted by aggregate-related plants and cement manufacturing facilities must be resubmitted annually by the person who conducts or authorizes the conducting of a large operation, at least 30 days prior to the expiration date, or the submittal shall no longer be valid as of the expiration date. If all fugitive dust sources and corresponding control measures or special circumstances remain identical to those identified in the previously accepted submittal or in an AQMD-approved dust control plan, the resubmittal may be a simple statement of no-change (Form 403NC). (f) (g) Compliance Schedule The newly amended provisions of this Rule shall become effective upon adoption. Pursuant to subdivision (e), any existing site that qualifies as a large operation will have 60 days from the date of Rule adoption to comply with the notification and recordkeeping requirements for large operations. Any Large Operation Notification or AQMD-approved dust control plan which has been accepted prior to the date of adoption of these amendments shall remain in effect and the Large Operation Notification or AQMD-approved dust control plan annual resubmittal date shall be one year from adoption of this Rule amendment. Exemptions (1) The provisions of this Rule shall not apply to: (A) Agricultural operations directly related to the raising of fowls or animals and agricultural operations, provided that the combined disturbed surface area within one continuous property line and not separated by a paved public road is 10 acres or less. (B) Agricultural operations within the South Coast Air Basin, whose combined disturbed surface area includes more than 10 acres provided that the person responsible for such operations: (i) voluntarily implements the conservation practices contained in the Rule 403 Agricultural Handbook; 403-8

21 (C) (D) (E) (F) (G) (H) (ii) completes and maintains the self-monitoring form documenting sufficient conservation practices, as described in the Rule 403 Agricultural Handbook; and (iii) makes the completed self-monitoring form available to the Executive Officer upon request. Agricultural operations outside the South Coast Air Basin, until January 1, 2005, whose combined disturbed surface area includes more than 10 acres provided that the person responsible for such operations: (i) voluntarily implements the conservation practices contained in the Rule 403 Coachella Valley Agricultural Handbook; and (ii) completes and maintains the self-monitoring form documenting sufficient conservation practices, as described in the Rule 403 Coachella Valley Agricultural Handbook; and (iii) makes the completed self-monitoring form available to the Executive Officer upon request. Active operations conducted during emergency life-threatening situations, or in conjunction with any officially declared disaster or state of emergency. Active operations conducted by essential service utilities to provide electricity, natural gas, telephone, water and sewer during periods of service outages and emergency disruptions. Any contractor subsequent to the time the contract ends, provided that such contractor implemented the required control measures during the contractual period. Any grading contractor, for a phase of active operations, subsequent to the contractual completion of that phase of earthmoving activities, provided that the required control measures have been implemented during the entire phase of earth-moving activities, through and including five days after the final grading inspection. Weed abatement operations ordered by a county agricultural commissioner or any state, county, or municipal fire department, provided that: 403-9

22 (i) mowing, cutting or other similar process is used which maintains weed stubble at least three inches above the soil; and (ii) any discing or similar operation which cuts into and disturbs the soil, where watering is used prior to initiation of these activities and a determination is made by the agency issuing the weed abatement order that, due to fire hazard conditions, rocks, or other physical obstructions, it is not practical to meet the conditions specified in clause (g)(1)(h)(i). The provisions this clause shall not exempt the owner of any property from stabilizing, in accordance with paragraph (d)(2), disturbed surface areas which have been created as a result of the weed abatement actions. (I) sandblasting operations. (2) The provisions of paragraphs (d)(1) and (d)(3) shall not apply: (A) When wind gusts exceed 25 miles per hour, provided that: (i) The required Table 3 contingency measures in this Rule are implemented for each applicable fugitive dust source type, and; (ii) records are maintained in accordance with subparagraph (e)(1)(c). (B) To unpaved roads, provided such roads: (i) are used solely for the maintenance of wind-generating equipment; or (ii) are unpaved public alleys as defined in Rule 1186; or (iii) are service roads that meet all of the following criteria: (a) are less than 50 feet in width at all points along the road; (b) are within 25 feet of the property line; and (c) have a traffic volume less than 20 vehicle-trips per day. (C) To any active operation, open storage pile, or disturbed surface area for which necessary fugitive dust preventive or mitigative actions are in conflict with the federal Endangered Species Act, as determined in writing by the State or federal agency responsible for making such determinations

23 (3) The provisions of (d)(2) shall not apply to any aggregate-related plant or cement manufacturing facility that implements the applicable actions specified in Table 2 of this Rule at all times and shall implement the applicable actions specified in Table 3 of this Rule when the applicable performance standards of paragraphs (d)(1) and (d)(3) can not be met through use of Table 2 actions. (4) The provisions of paragraphs (d)(1), (d)(2), and (d)(3) shall not apply to: (A) Blasting operations which have been permitted by the California Division of Industrial Safety; and (B) Motion picture, television, and video production activities when dust emissions are required for visual effects. In order to obtain this exemption, the Executive Officer must receive notification in writing at least 72 hours in advance of any such activity and no nuisance results from such activity. (5) The provisions of paragraph (d)(3) shall not apply if the dust control actions, as specified in Table 2, are implemented on a routine basis for each applicable fugitive dust source type. To qualify for this exemption, a person must maintain records in accordance with subparagraph (e)(1)(c). (6) The provisions of paragraph (d)(4) shall not apply to earth coverings of public paved roadways where such coverings are approved by a local government agency for the protection of the roadway, and where such coverings are used as roadway crossings for haul vehicles provided that such roadway is closed to through traffic and visible roadway dust is removed within one day following the cessation of activities. (7) The provisions of subdivision (e) shall not apply to: (A) officially-designated public parks and recreational areas, including national parks, national monuments, national forests, state parks, state recreational areas, and county regional parks. (B) any large operation which is required to submit a dust control plan to any city or county government which has adopted a Districtapproved dust control ordinance. (C) any large operation subject to Rule 1158, which has an approved dust control plan pursuant to Rule 1158, provided that all sources of fugitive dust are included in the Rule 1158 plan. (8) The provisions of subparagraph (e)(1)(a) through (e)(1)(c) shall not apply to any large operation with an AQMD-approved fugitive dust control plan

24 provided that there is no change to the sources and controls as identified in the AQMD-approved fugitive dust control plan. (h) Fees Any person conducting active operations for which the Executive Officer conducts upwind/downwind monitoring for PM 10 pursuant to paragraph (d)(3) shall be assessed applicable Ambient Air Analysis Fees pursuant to Rule Applicable fees shall be waived for any facility which is exempted from paragraph (d)(3) or meets the requirements of paragraph (d)(3)

25 TABLE 1 BEST AVAILABLE CONTROL MEASURES (Applicable to All Construction Activity Sources) Source Category Control Measure Guidance Backfilling 01-1 Clearing and grubbing Stabilize backfill material when not actively handling; and Stabilize backfill material during handling; and Stabilize soil at completion of activity. Maintain stability of soil through pre-watering of site prior to clearing and grubbing; and Stabilize soil during clearing and grubbing activities; and Stabilize soil immediately after clearing and grubbing activities. Mix backfill soil with water prior to moving Dedicate water truck or high capacity hose to backfilling equipment Empty loader bucket slowly so that no dust plumes are generated Minimize drop height from loader bucket Maintain live perennial vegetation where possible Apply water in sufficient quantity to prevent generation of dust plumes Clearing forms Crushing Use water spray to clear forms; or Use sweeping and water spray to clear forms; or Use vacuum system to clear forms. Stabilize surface soils prior to operation of support equipment; and Stabilize material after crushing. Use of high pressure air to clear forms may cause exceedance of Rule requirements Follow permit conditions for crushing equipment Pre-water material prior to loading into crusher Monitor crusher emissions opacity Apply water to crushed material to prevent dust plumes

26 TABLE 1 BEST AVAILABLE CONTROL MEASURES (Applicable to All Construction Activity Sources) Source Category Control Measure Guidance Cut and fill Pre-water soils prior to cut and fill activities; and Stabilize soil during and after cut and fill activities. For large sites, pre-water with sprinklers or water trucks and allow time for penetration Use water trucks/pulls to water soils to depth of cut prior to subsequent cuts Demolition mechanical/manual Stabilize wind erodible surfaces to reduce dust; and Stabilize surface soil where support equipment and vehicles will operate; and Stabilize loose soil and demolition debris; and Comply with AQMD Rule Apply water in sufficient quantities to prevent the generation of visible dust plumes Disturbed soil Stabilize disturbed soil throughout the construction site; and Stabilize disturbed soil between structures Limit vehicular traffic and disturbances on soils where possible If interior block walls are planned, install as early as possible Apply water or a stabilizing agent in sufficient quantities to prevent the generation of visible dust plumes Earth-moving activities Pre-apply water to depth of proposed cuts; and Re-apply water as necessary to maintain soils in a damp condition and to ensure that visible emissions do not exceed 100 feet in any direction; and Stabilize soils once earth-moving activities are complete. Grade each project phase separately, timed to coincide with construction phase Upwind fencing can prevent material movement on site Apply water or a stabilizing agent in sufficient quantities to prevent the generation of visible dust plumes

27 TABLE 1 BEST AVAILABLE CONTROL MEASURES (Applicable to All Construction Activity Sources) Source Category Control Measure Guidance Importing/exporting of bulk materials Stabilize material while loading to reduce fugitive dust emissions; and Maintain at least six inches of freeboard on haul vehicles; and Stabilize material while transporting to reduce fugitive dust emissions; and Stabilize material while unloading to reduce fugitive dust emissions; and Comply with Vehicle Code Section Use tarps or other suitable enclosures on haul trucks Check belly-dump truck seals regularly and remove any trapped rocks to prevent spillage Comply with track-out prevention/mitigation requirements Provide water while loading and unloading to reduce visible dust plumes Landscaping 10-1 Stabilize soils, materials, slopes Apply water to materials to stabilize Maintain materials in a crusted condition Maintain effective cover over materials Stabilize sloping surfaces using soil binders until vegetation or ground cover can effectively stabilize the slopes Hydroseed prior to rain season Road shoulder maintenance Apply water to unpaved shoulders prior to clearing; and Apply chemical dust suppressants and/or washed gravel to maintain a stabilized surface after completing road shoulder maintenance. Installation of curbing and/or paving of road shoulders can reduce recurring maintenance costs Use of chemical dust suppressants can inhibit vegetation growth and reduce future road shoulder maintenance costs

28 TABLE 1 BEST AVAILABLE CONTROL MEASURES (Applicable to All Construction Activity Sources) Source Category Control Measure Guidance Screening Pre-water material prior to screening; and Limit fugitive dust emissions to opacity and plume length standards; and Stabilize material immediately after screening. Dedicate water truck or high capacity hose to screening operation Drop material through the screen slowly and minimize drop height Install wind barrier with a porosity of no more than 50% upwind of screen to the height of the drop point Staging areas Stabilize staging areas during use; and Stabilize staging area soils at project completion. Limit size of staging area Limit vehicle speeds to 15 miles per hour Limit number and size of staging area entrances/exists Stockpiles/ Bulk Material Handling Stabilize stockpiled materials. Stockpiles within 100 yards of off-site occupied buildings must not be greater than eight feet in height; or must have a road bladed to the top to allow water truck access or must have an operational water irrigation system that is capable of complete stockpile coverage. Add or remove material from the downwind portion of the storage pile Maintain storage piles to avoid steep sides or faces

29 TABLE 1 BEST AVAILABLE CONTROL MEASURES (Applicable to All Construction Activity Sources) Source Category Control Measure Guidance Traffic areas for construction activities Stabilize all off-road traffic and parking areas; and Stabilize all haul routes; and Direct construction traffic over established haul routes. Apply gravel/paving to all haul routes as soon as possible to all future roadway areas Barriers can be used to ensure vehicles are only used on established parking areas/haul routes Trenching Stabilize surface soils where trencher or excavator and support equipment will operate; and Stabilize soils at the completion of trenching activities. Pre-watering of soils prior to trenching is an effective preventive measure. For deep trenching activities, pre-trench to 18 inches soak soils via the pre-trench and resuming trenching Washing mud and soils from equipment at the conclusion of trenching activities can prevent crusting and drying of soil on equipment Truck loading Pre-water material prior to loading; and Ensure that freeboard exceeds six inches (CVC 23114) Empty loader bucket such that no visible dust plumes are created Ensure that the loader bucket is close to the truck to minimize drop height while loading Turf Overseeding Apply sufficient water immediately prior to conducting turf vacuuming activities to meet opacity and plume length standards; and Cover haul vehicles prior to exiting the site. Haul waste material immediately off-site

30 TABLE 1 BEST AVAILABLE CONTROL MEASURES (Applicable to All Construction Activity Sources) Source Category Control Measure Guidance Unpaved roads/parking lots Stabilize soils to meet the applicable performance standards; and Limit vehicular travel to established unpaved roads (haul routes) and unpaved parking lots. Vacant land 20-1 In instances where vacant lots are 0.10 acre or larger and have a cumulative area of 500 square feet or more that are driven over and/or used by motor vehicles and/or off-road vehicles, prevent motor vehicle and/or off-road vehicle trespassing, parking and/or access by installing barriers, curbs, fences, gates, posts, signs, shrubs, trees or other effective control measures. Restricting vehicular access to established unpaved travel paths and parking lots can reduce stabilization requirements

31 TABLE 2 DUST CONTROL MEASURES FOR LARGE OPERATIONS FUGITIVE DUST SOURCE CATEGORY Earth-moving (except construction cutting and filling areas, and mining operations) Earth-moving: Construction fill areas: CONTROL ACTIONS (1a) Maintain soil moisture content at a minimum of 12 percent, as determined by ASTM method D- 2216, or other equivalent method approved by the Executive Officer, the California Air Resources Board, and the U.S. EPA. Two soil moisture evaluations must be conducted during the first three hours of active operations during a calendar day, and two such evaluations each subsequent four-hour period of active operations; OR (1a-1) For any earth-moving which is more than 100 feet from all property lines, conduct watering as necessary to prevent visible dust emissions from exceeding 100 feet in length in any direction. (1b) Maintain soil moisture content at a minimum of 12 percent, as determined by ASTM method D- 2216, or other equivalent method approved by the Executive Officer, the California Air Resources Board, and the U.S. EPA. For areas which have an optimum moisture content for compaction of less than 12 percent, as determined by ASTM Method 1557 or other equivalent method approved by the Executive Officer and the California Air Resources Board and the U.S. EPA, complete the compaction process as expeditiously as possible after achieving at least 70 percent of the optimum soil moisture content. Two soil moisture evaluations must be conducted during the first three hours of active operations during a calendar day, and two such evaluations during each subsequent fourhour period of active operations

32 TABLE 2 (Continued) FUGITIVE DUST SOURCE CATEGORY Earth-moving: Construction cut areas and mining operations: Disturbed surface areas (except completed grading areas) Disturbed surface areas: Completed grading areas Inactive disturbed surface areas CONTROL ACTIONS (1c) Conduct watering as necessary to prevent visible emissions from extending more than 100 feet beyond the active cut or mining area unless the area is inaccessible to watering vehicles due to slope conditions or other safety factors. (2a/b) Apply dust suppression in sufficient quantity and frequency to maintain a stabilized surface. Any areas which cannot be stabilized, as evidenced by wind driven fugitive dust must have an application of water at least twice per day to at least 80 percent of the unstabilized area. (2c) Apply chemical stabilizers within five working days of grading completion; OR (2d) (3a) (3b) (3c) (3d) Take actions (3a) or (3c) specified for inactive disturbed surface areas. Apply water to at least 80 percent of all inactive disturbed surface areas on a daily basis when there is evidence of wind driven fugitive dust, excluding any areas which are inaccessible to watering vehicles due to excessive slope or other safety conditions; OR Apply dust suppressants in sufficient quantity and frequency to maintain a stabilized surface; OR Establish a vegetative ground cover within 21 days after active operations have ceased. Ground cover must be of sufficient density to expose less than 30 percent of unstabilized ground within 90 days of planting, and at all times thereafter; OR Utilize any combination of control actions (3a), (3b), and (3c) such that, in total, these actions apply to all inactive disturbed surface areas

33 TABLE 2 (Continued) FUGITIVE DUST SOURCE CATEGORY CONTROL ACTIONS Unpaved Roads (4a) Water all roads used for any vehicular traffic at least once per every two hours of active operations [3 times per normal 8 hour work day]; OR (4b) Water all roads used for any vehicular traffic once daily and restrict vehicle speeds to 15 miles per hour; OR (4c) Apply a chemical stabilizer to all unpaved road surfaces in sufficient quantity and frequency to maintain a stabilized surface. Open storage piles (5a) Apply chemical stabilizers; OR (5b) (5c) (5d) Apply water to at least 80 percent of the surface area of all open storage piles on a daily basis when there is evidence of wind driven fugitive dust; OR Install temporary coverings; OR Install a three-sided enclosure with walls with no more than 50 percent porosity which extend, at a minimum, to the top of the pile. This option may only be used at aggregate-related plants or at cement manufacturing facilities. All Categories (6a) Any other control measures approved by the Executive Officer and the U.S. EPA as equivalent to the methods specified in Table 2 may be used

H. Dust Suppressant - water, hygroscopic materials, or non-toxic chemical stabilizers used

H. Dust Suppressant - water, hygroscopic materials, or non-toxic chemical stabilizers used KERN COUNTY AIR POLLUTION CONTROL DISTRICT RULE 402 -FUGITIVE DUST (Adopted 11/29/93, Amended 3/07/94, 9/7/95, 11/3/4) I. Purpose The purpose of this Rule is to reduce the amount of respirable particulate

More information

CITY OF PALM DESERT FRED WARING DRIVE PALM DESERT, CALIFORNIA TEL: (760) FAX: (760)

CITY OF PALM DESERT FRED WARING DRIVE PALM DESERT, CALIFORNIA TEL: (760) FAX: (760) NOTICE TO GRADING PERMIT APPLICANTS New Dust Control Ordinance Requirements On November 13, 2003, the City Council of the City of Palm Desert unanimously passed Ordinance 1056 which revised Title 24, Chapter

More information

Appendix B Maricopa County Dust Abatement Rule 310

Appendix B Maricopa County Dust Abatement Rule 310 Wickenburg Interim Improvement Study Draft Environmental Assessment Appendix B Maricopa County Dust Abatement Rule 310 SECTION 100 - GENERAL MARICOPA COUNTY AIR POLLUTION CONTROL REGULATIONS REGULATION

More information

Asbestos Dust Mitigation Plan Application 1. ADMINISTRATIVE INFORMATION

Asbestos Dust Mitigation Plan Application 1. ADMINISTRATIVE INFORMATION ASBESTOS AIRBORNE TOXIC CONTROL MEASURE FOR CONSTRUCTION, GRADING, QUARRYING AND SURFACE MINING OPERATIONS 93105, Title 17, California Code of Regulations Asbestos Dust Mitigation Plan Application 1. ADMINISTRATIVE

More information

Construction Best Management Practices Handbook BEST MANAGEMENT PRACTICES

Construction Best Management Practices Handbook BEST MANAGEMENT PRACTICES Construction Best Management Practices Handbook www.montereysea.org BEST MANAGEMENT PRACTICES 26 www.montereysea.org Construction Best Management Practices Handbook VEHICLE TRACKING AND DUST CONTROL IN

More information

APPENDIXG FUGITIVE DUST CONTROL PLAN

APPENDIXG FUGITIVE DUST CONTROL PLAN APPENDIXG FUGITIVE DUST CONTROL PLAN As required by 324.5524 a fugitive dust control plan has been prepared. Pertinent sections are as follows: (1) The provisions of this section, including subsection

More information

RULE 8021 CONSTRUCTION, DEMOLITION, EXCAVATION, EXTRACTION, AND OTHER EARTHMOVING ACTIVITIES (Adopted November 15, 2001; Amended August 19, 2004)

RULE 8021 CONSTRUCTION, DEMOLITION, EXCAVATION, EXTRACTION, AND OTHER EARTHMOVING ACTIVITIES (Adopted November 15, 2001; Amended August 19, 2004) RULE 8021 CONSTRUCTION, DEMOLITION, EXCAVATION, EXTRACTION, AND OTHER EARTHMOVING ACTIVITIES (Adopted November 15, 2001; Amended August 19, 2004) 1.0 Purpose The purpose of this rule is to limit fugitive

More information

New Administration Building

New Administration Building New Administration Building Stormwater Pollution Prevention Plan Hudson Valley Community College Troy, New York Prepared for: Hudson Valley Community College 80 Vandenburgh Avenue Troy, New York 12180

More information

Targeted Constituents Sediment Nutrients Trash Metals Bacteria Oil and Grease Organics. Potential Alternatives. EC-5 Soil Binders

Targeted Constituents Sediment Nutrients Trash Metals Bacteria Oil and Grease Organics. Potential Alternatives. EC-5 Soil Binders Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Category

More information

Water Pollution Control for Work in Sensitive Areas

Water Pollution Control for Work in Sensitive Areas Water Pollution Control for Work in Sensitive Areas 10-1. WATER POLLUTION CONTROL The Contractor is advised that failure to fully comply with the provisions of this Section, and all requirements listed

More information

CCR RULE FUGITIVE DUST CONTROL PLAN

CCR RULE FUGITIVE DUST CONTROL PLAN Prepared for: FORT ARMISTEAD ROAD LOT 15 LANDFILL, LLC 1005 Brandon Shores Road Baltimore, Maryland CCR RULE FUGITIVE DUST CONTROL PLAN FORT ARMISTEAD ROAD LOT 15 LANDFILL BALTIMORE, MARYLAND Prepared

More information

STORAGE, HANDLING, AND TRANSPORT OF COKE, COAL AND SULFUR

STORAGE, HANDLING, AND TRANSPORT OF COKE, COAL AND SULFUR (Adopted December 2, 1983)(Amended June 11, 1999) (Amended July 11, 2008) RULE 1158. STORAGE, HANDLING, AND TRANSPORT OF COKE, COAL AND SULFUR (a) (b) (c) Purpose The purpose of this rule is to reduce

More information

CCR COMPLIANCE FUGITIVE DUST CONTROL PLAN. Prepared for: Tucson Electric Power Company Springerville Generating Station Springerville, Arizona

CCR COMPLIANCE FUGITIVE DUST CONTROL PLAN. Prepared for: Tucson Electric Power Company Springerville Generating Station Springerville, Arizona CCR COMPLIANCE FUGITIVE DUST CONTROL PLAN Prepared for: Tucson Electric Power Company Springerville Generating Station Springerville, Arizona Prepared by: CB&I Environmental & Infrastructure, Inc. Pittsburgh,

More information

NELSON PLANT CCR FUGITIVE DUST CONTROL PLAN

NELSON PLANT CCR FUGITIVE DUST CONTROL PLAN NELSON PLANT CCR FUGITIVE DUST CONTROL PLAN Revision 0 October 19, 2015 1 1.0 Introduction This document represents the CCR Fugitive Dust Control Plan (Plan) for the Entergy Nelson Plant (Nelson) as required

More information

SECTION TRENCHING & BACKFILLING

SECTION TRENCHING & BACKFILLING SECTION 02225 - TRENCHING & BACKFILLING 1.0 GENERAL 1.1 Work included in this Section includes trenching and backfilling for underground pipelines and related structures only. 1.2 Reference Specifications

More information

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS Section Page SECTION 14 RESTORATION OF SURFACES... 14.1 14-1 GENERAL... 14.1 14-2 PRIVATE ROADS... 14.1 14-3 STREETS AND PARKING LOTS... 14.1 14-3.01

More information

FUGITIVE DUST CONTROL PLAN HUNTLEY GENERATION STATION 3500 RIVER ROAD TONAWANDA, NEW YORK. PREPARED FOR: Huntley Power, LLC Tonawanda, New York

FUGITIVE DUST CONTROL PLAN HUNTLEY GENERATION STATION 3500 RIVER ROAD TONAWANDA, NEW YORK. PREPARED FOR: Huntley Power, LLC Tonawanda, New York FUGITIVE DUST CONTROL PLAN HUNTLEY GENERATION STATION 3500 RIVER ROAD TONAWANDA, NEW YORK PREPARED FOR: Huntley Power, LLC Tonawanda, New York PREPARED BY: GZA GeoEnvironmental of New York Buffalo, New

More information

Air Quality Conservation Management Practices Program for San Joaquin Valley

Air Quality Conservation Management Practices Program for San Joaquin Valley Air Quality Conservation Management Practices Program for San Joaquin Valley Minimizing Agricultural PM10 from Animal Feeding Operations (AFOs) Poultry Operations May 2004 1 For more information, contact:

More information

RULE 402 Fugitive Dust - Adopted 11/29/93, Amended 3/07/94, 9/7/95, 11/3/04, 3/12/15

RULE 402 Fugitive Dust - Adopted 11/29/93, Amended 3/07/94, 9/7/95, 11/3/04, 3/12/15 RULE 402 Fugitive Dust - Adopted 11/29/93, Amended 3/07/94, 9/7/95, 11/3/04, 3/12/15 I. Purpose Fugitive dust contains varying sizes of respirable particulate matter including those with an aerodynamic

More information

FUGITIVE DUST CONTROL PLAN DUNKIRK GENERATION STATION 106 POINT DRIVE NORTH DUNKIRK, NEW YORK. PREPARED FOR: Dunkirk Power, LLC Dunkirk, New York

FUGITIVE DUST CONTROL PLAN DUNKIRK GENERATION STATION 106 POINT DRIVE NORTH DUNKIRK, NEW YORK. PREPARED FOR: Dunkirk Power, LLC Dunkirk, New York FUGITIVE DUST CONTROL PLAN DUNKIRK GENERATION STATION 106 POINT DRIVE NORTH DUNKIRK, NEW YORK PREPARED FOR: Dunkirk Power, LLC Dunkirk, New York PREPARED BY: GZA GeoEnvironmental of New York Buffalo, New

More information

PART II - CODE OF ORDINANCES Chapter 16 - CONSTRUCTION, REHABILITATION AND PROPERTY MAINTENANCE REGULATIONS ARTICLE VIII. PROPERTY MAINTENANCE

PART II - CODE OF ORDINANCES Chapter 16 - CONSTRUCTION, REHABILITATION AND PROPERTY MAINTENANCE REGULATIONS ARTICLE VIII. PROPERTY MAINTENANCE Sec. 16-291. Construction site management. (a) Construction site management plan required. No building permit shall be issued unless a construction site management plan has been submitted and approved

More information

Gainesville Technical Center 5399 Wellington Branch Drive Gainesville VA Phone (703)

Gainesville Technical Center 5399 Wellington Branch Drive Gainesville VA Phone (703) Gainesville Technical Center 5399 Wellington Branch Drive Gainesville VA 20155 Phone (703) 754-6750 Work Request # UNDERGROUND DISTRIBUTION FACILITIES AGREEMENT (FOR COMMERCIAL CUSTOMER) Developer/Builder/Owner

More information

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS Section Page 14-1 GENERAL... 14.1 14-2 PRIVATE ROADS... 14.1 14-3 STREETS AND PARKING LOTS... 14.1 14-3.01 Aggregate Base... 14.1 14-3.02 Asphalt

More information

A. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT).

A. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT). SECTION 32 01 16 ASPHALT OVERLAY PART 1 - GENERAL 1.1 SCOPE OF WORK A. This Section specifies the requirements for scarifying, grinding, sweeping and repair of existing asphalt concrete pavement to establish

More information

EXCAVATION & BACKFILLING GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013

EXCAVATION & BACKFILLING GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013 GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 PART 1 GENERAL 1.1 Description The Work of this Section shall be all labour, materials, equipment and supervision necessary

More information

SECTION CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS

SECTION CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS PART 1 GENERAL 1.1 DESCRIPTION A. Temporary Utilities: Electricity, lighting, heating, cooling, ventilation, water, and sanitary facilities. B. Temporary Controls: Barriers, fencing, erosion control, exterior

More information

SECTION A1 EXCAVATION AND BACKFILL GENERAL

SECTION A1 EXCAVATION AND BACKFILL GENERAL SECTION A1 EXCAVATION AND BACKFILL GENERAL The work under this section shall include all excavation to such width and depth as shown on the drawings, specified herein, or ordered by the Engineer. Such

More information

SECTION 10 - TRENCHING AND BACKFILLING

SECTION 10 - TRENCHING AND BACKFILLING SECTION 10 - TRENCHING AND BACKFILLING 10.1 General A. Work included in this Section includes trenching and backfilling for underground pipelines and related structures only. 10.1.1 Related requirements

More information

SECTION FLEXIBLE PAVING

SECTION FLEXIBLE PAVING SECTION 321200 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. Include GENERAL CONDITIONS and applicable parts of Division 1 as part of this Section. B. Examine all Drawings and other Sections of the Specifications

More information

Tree Protection Policy

Tree Protection Policy Appendix F Tree Protection Policy The following is according to the City of Hamilton s special provision SP-97. General Tree Protection shall be in accordance with OPSS 801 as amended by this special provision.

More information

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES. Granular Backfill (Wingwalls) (Set Price)

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES. Granular Backfill (Wingwalls) (Set Price) SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES 204.1 DESCRIPTION Excavate for the structures as shown in the Contract Documents. Unless specified otherwise, backfill the completed structures to the

More information

SECTION TRENCH EXCAVATION AND BACKFILL

SECTION TRENCH EXCAVATION AND BACKFILL SECTION 02221 - TRENCH EXCAVATION AND BACKFILL CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Sections... 2 1.03 Reference Standards... 2 1.04 Quality Assurance... 2 1.05 Measurement

More information

Attachment 1 Findings and Conditions

Attachment 1 Findings and Conditions 2451 Ridge Road Use Permit #04-10000066 Attachment 1 Findings and Conditions APRIL 10, 2008 CEQA FINDINGS 1. The project is categorically exempt from the provisions of the California Environmental Quality

More information

Permit Requirements: Building Codes: The City of Clanton has adopted the following codes which are enforced by the Building Department:

Permit Requirements: Building Codes: The City of Clanton has adopted the following codes which are enforced by the Building Department: Permit Requirements: Any owner, authorized agent, or contractor who desires to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure, or to erect, install,

More information

DIVISION 3 PAVEMENT (FLEXIBLE AND RIGID) CONSTRUCTION SPECIFICATIONS

DIVISION 3 PAVEMENT (FLEXIBLE AND RIGID) CONSTRUCTION SPECIFICATIONS OPS GENERAL CONDITIONS OF CONTRACT NOV 2006 General Conditions of Contract DIVISION 1 GENERAL S OCT 92 102 Weighing of Materials NOV 2004 106 Electrical Work NOV 2003 120 The Use of Explosives APR 2006

More information

STANDARD CONSTRUCTION DETAILS EROSION CONTROL REVISED - JANUARY 2018

STANDARD CONSTRUCTION DETAILS EROSION CONTROL REVISED - JANUARY 2018 STANDARD CONSTRUCTION DETAILS REVISED - JANUARY 2018 TABLE OF CONTENTS STORM WATER POLLUTION PLAN NOTES - - - - - - - - - - - - - - - - - - - - - - - - - SD-EC01 SILT FENCE NOTES - - - - - - - - - - -

More information

SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT. Final Methodology to Calculate Particulate Matter (PM) 2.5 and PM 2.5 Significance Thresholds

SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT. Final Methodology to Calculate Particulate Matter (PM) 2.5 and PM 2.5 Significance Thresholds SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT Final Methodology to Calculate Particulate Matter (PM) 2.5 and PM 2.5 Significance Thresholds October 2006 Executive Officer Barry R. Wallerstein, D. Env. Deputy

More information

4.12 AIR QUALITY INTRODUCTION

4.12 AIR QUALITY INTRODUCTION 4.12 AIR QUALITY INTRODUCTION Air quality is an environmental factor that helps to define the quality of life throughout the San Joaquin Valley. In Fresno County, ambient air quality conditions presently

More information

Construction Management Plan (CMP) 227 Princess Highway, Dandenong

Construction Management Plan (CMP) 227 Princess Highway, Dandenong Construction Management Plan (CMP) 227 Princess Highway, Dandenong - Construction Management Plan (CMP) June 2017 S2966 CMP.D2 PREPARED BY: Sustainable Development Consultants 2nd Floor, 555 Riversdale

More information

PROPOSED CONSTRUCTION BUILDING CODES FOR TURF AND LANDSCAPE IRRIGATION SYSTEMS

PROPOSED CONSTRUCTION BUILDING CODES FOR TURF AND LANDSCAPE IRRIGATION SYSTEMS APPENDIX F Adopted: March 15, 2012 Effective: March 15, 2012 PROPOSED CONSTRUCTION BUILDING CODES FOR TURF AND LANDSCAPE IRRIGATION SYSTEMS PART 1: GENERAL A. Description. 1. Purpose. To establish uniform

More information

610 - DOUBLE ASPHALT SURFACE TREATMENT SECTION 610 DOUBLE ASPHALT SURFACE TREATMENT

610 - DOUBLE ASPHALT SURFACE TREATMENT SECTION 610 DOUBLE ASPHALT SURFACE TREATMENT SECTION 610 DOUBLE ASPHALT SURFACE TREATMENT 610.1 DESCRIPTION Construct a wearing surface composed of an asphalt prime coat followed by the applications of 2 asphalt seal coats and cover material as specified

More information

ORDINANCE NO. An ordinance amending Chapter 51, Dallas Development Code: Ordinance No , as

ORDINANCE NO. An ordinance amending Chapter 51, Dallas Development Code: Ordinance No , as 9-1-15 ORDINANCE NO. An ordinance amending Chapter 51, Dallas Development Code: Ordinance No. 10962, as amended, and Chapter 51A, Dallas Development Code: Ordinance No. 19455, as amended, of the Dallas

More information

SECTION RIPRAP, BOULDERS, AND BEDDING

SECTION RIPRAP, BOULDERS, AND BEDDING SECTION 31 37 00 RIPRAP, BOULDERS, AND BEDDING PART 1 GENERAL 1.01 SECTION INCLUDES A. The WORK includes excavation, grading, and installation of riprap, boulders, soil riprap, void-filled riprap, and

More information

MAINE MEDICAL CENTER

MAINE MEDICAL CENTER MAINE MEDICAL CENTER Construction Projects at the East Tower, Visitor Garage, Central Utility Plant Construction Management Plan December 15, 2017 Prepared for: Portland Department of Planning & Urban

More information

SITE DESIGN ENGINEER'S STATEMENT:

SITE DESIGN ENGINEER'S STATEMENT: SITE DESIGN ENGINEER'S STATEMENT: THESE DETAILED PLANS AND SPECIFICATIONS WERE PREPARED UNDER MY DIRECTION AND SUPERVISION. SAID PLANS AND SPECIFICATIONS HAVE BEEN PREPARED ACCORDING TO THE CRITERIA ESTABLISHED

More information

SACHSE EROSION CONTROL GUIDELINES

SACHSE EROSION CONTROL GUIDELINES SACHSE EROSION CONTROL GUIDELINES Section I. Definitions The following words, terms, and phrases, when used in this guideline, shall have the meanings ascribed to them in this Section, except where the

More information

B. DESCRIPTION OF CONSTRUCTION ACTIVITIES

B. DESCRIPTION OF CONSTRUCTION ACTIVITIES Chapter 15: Construction Impacts A. INTRODUCTION This chapter describes activities required for construction of Alternative A (the no action alternative) and the three build alternatives: Alternatives

More information

SECTION IV. PIPELINE EXCAVATION AND BACKFILL

SECTION IV. PIPELINE EXCAVATION AND BACKFILL SECTION IV. PIPELINE EXCAVATION AND BACKFILL A. Description of Work B. Surface Types C. Backfill D. Surface Restoration A. DESCRIPTION OF WORK 1. Extent: Excavation of trenches for pipelines shall include

More information

Air Pollution Control District

Air Pollution Control District Santa Barbara County Air Pollution Control District DRAFT Pennit to Operate 14066 Page 1 of9 EQUIPMENT OWNER: Union Oil Company 205643 EQUIPMENT OPERATOR: Chevron Environmental Management Company EQUIPMENT

More information

City of Jacksonville Development Guide Building Permits

City of Jacksonville Development Guide Building Permits City of Jacksonville TX City of Jacksonville Development Guide Building Permits A publication to help understand the Building Permit process in the City Jacksonville. Building Department 2011 J Revised

More information

CITY OF LETHBRIDGE SECTION Construction Specifications Page 1 of 7 BACKFILL REGULATIONS FOR PUBLIC RIGHT-OF-WAYS

CITY OF LETHBRIDGE SECTION Construction Specifications Page 1 of 7 BACKFILL REGULATIONS FOR PUBLIC RIGHT-OF-WAYS Construction Specifications Page 1 of 7 1. GENERAL 1.1 The following specifications apply to compaction of all water, sewer and shallow utility service cuts, repairs, replacements, mainbreaks, extensions,

More information

Section XXV Preconstruction Assessments and Damage Mitigation Procedures

Section XXV Preconstruction Assessments and Damage Mitigation Procedures Section XXV Preconstruction Assessments and Damage Mitigation Procedures A. Introduction - In recent years, HRSD has received an increasing number of complaints from residents and locality staff regarding

More information

Erosion & Sedimentation Control Policy

Erosion & Sedimentation Control Policy Issue Date 10/22/2010 Page 1 of 8 Erosion & Sedimentation Control Policy Introduction: Soil erosion is the removal of soil by water, wind, ice or gravity and sediment deposition occurs when the rate of

More information

Oakland Planning Commission August 3, 2016 Case File Number: PLN Item #5: Additional Construction Emissions Analysis

Oakland Planning Commission August 3, 2016 Case File Number: PLN Item #5: Additional Construction Emissions Analysis Oakland Planning Commission August 3, 216 Case File Number: PLN16133 Item #5: Additional Construction Emissions Analysis July 5, 216 Memo to: Justin Osler, The Martin Group From: Allan Daly Subject: Evaluation

More information

SECTION TRENCHING, BACKFILL AND COMPACTION

SECTION TRENCHING, BACKFILL AND COMPACTION SECTION 312333 TRENCHING, BACKFILL AND COMPACTION PART 1 - GENERAL 1.1 SUMMARY A. Section Includes 1. Native Backfill Material 2. Crushed Stone Bedding 3. Select Backfill Material 4. Shoring and Bracing

More information

ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS

ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS 6.1 DESCRIPTION This work shall consist of constructing curbs, gutters, sidewalks, ramps, local depressions and driveways of the form and dimensions shown

More information

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES 204.1 DESCRIPTION Excavate for the structures as shown in the Contract Documents. Unless specified otherwise, backfill the completed structures to the

More information

Town of Essex, Vermont January, 2017 Standard Specifications For Construction CHAPTER 3 EROSION AND SEDIMENT CONTROL

Town of Essex, Vermont January, 2017 Standard Specifications For Construction CHAPTER 3 EROSION AND SEDIMENT CONTROL CHAPTER 3 EROSION AND SEDIMENT CONTROL CHAPTER 3 EROSION AND SEDIMENT CONTROL Section 300 General Summary All projects constructed within the Town of Essex shall be constructed in strict accordance with

More information

Concrete Waste Management

Concrete Waste Management Categories EC SE TC WE NS WM Erosion Control Sediment Control Tracking Control Wind Erosion Control Non-Stormwater Management Control Waste Management and Materials Pollution Control Legend: Primary Category

More information

Particulate Matter Rules Update BAAQMD BACWA Meeting

Particulate Matter Rules Update BAAQMD BACWA Meeting AGENDA ITEM 3 Particulate Matter Rules Update BAAQMD BACWA Meeting Guy Gimlen Rule Development Slide 1 PM Basics Particulate Matter is a diverse mix of airborne solid particles and liquid droplets that

More information

Project Summary Characterization of Mud/Dirt Carryout onto Paved Roads from Construction and Demolition Activities

Project Summary Characterization of Mud/Dirt Carryout onto Paved Roads from Construction and Demolition Activities EPA United States National Risk Management Environmental Protection Research Laboratory Agency Research Triangle Park, NC 27711 Research and Development EPA/600/SR-95/171 January 1996 Project Summary Characterization

More information

SECTION UNCLASSIFIED EXCAVATION AND GRADING

SECTION UNCLASSIFIED EXCAVATION AND GRADING SECTION 02210 UNCLASSIFIED EXCAVATION AND GRADING PART 1 GENERAL 1.1 DESCRIPTION Work in this section includes the excavation, undercut excavating, grading, earthwork and compaction required as shown on

More information

Environmental Leadership Program Inspection Form Portable Asphalt Facility

Environmental Leadership Program Inspection Form Portable Asphalt Facility Environmental Leadership Program Inspection Form Portable Asphalt Facility Company Name -Name & Location of Facility: Date of Inspection: FID Number Name of Inspector: Names of Inspection Participants:

More information

General Permit No.: OHR Page 53 of 146

General Permit No.: OHR Page 53 of 146 Page 53 of 146 Part 8 Sector-Specific Requirements for Industrial Activity Subpart J Sector J Non-Metallic Mineral Mining and Dressing. You shall comply with Part 8 sector-specific requirements associated

More information

PART 1 GENERAL REQUIREMENTS

PART 1 GENERAL REQUIREMENTS PART 1 GENERAL REQUIREMENTS Contract Closeout Plan 110 Arrow diagram for project close-out...3 Erosion Control 121 Straw bale barrier... 5 122 Silt fence... 7 123 Diversion dike... 9 124 Inlet protection...

More information

Storm Water Pollution Prevention Plan (SWP3) Checklist

Storm Water Pollution Prevention Plan (SWP3) Checklist . Summit Soil and Water Conservation District Storm Water Pollution Prevention Plan (SWP3) Checklist Modified from the Ohio EPA SWP3 Checklist (Revised January 2017) SITE NAME: REVIEWER: DATE RECEIVED:

More information

PUBLIC WORKS DEPARTMENT GENERAL NOTES

PUBLIC WORKS DEPARTMENT GENERAL NOTES PUBLIC WORKS DEPARTMENT GENERAL NOTES 1. All construction shall be in strict accordance with the standards of the City of Southlake and governed by the North Central Texas Council of Government's Standard

More information

Municipality of Waterville Public Sidewalk Repair Policy

Municipality of Waterville Public Sidewalk Repair Policy Municipality of Waterville Public Sidewalk Repair Policy Purpose - The purpose of this policy is to protect the public health, safety and welfare of the citizens and inhabitants of the Municipality by

More information

Stabilized Construction Entrance/Exit TC-1

Stabilized Construction Entrance/Exit TC-1 Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control WM Waste Management and Materials Pollution Control Legend: Primary Objective

More information

Excavate drilled shafts in accordance with Item 416, Drilled Shaft Foundations.

Excavate drilled shafts in accordance with Item 416, Drilled Shaft Foundations. Item Excavation and Backfill for Structures 1. DESCRIPTION 2. MATERIALS Excavate for placement and construction of structures and backfill structures. Cut and restore pavement. Use materials that meet

More information

A. Texas Department Transportation 2004 Standard Specifications for Construction of Highways, Streets and Bridges (TxDOT):

A. Texas Department Transportation 2004 Standard Specifications for Construction of Highways, Streets and Bridges (TxDOT): SECTION 31 32 13.16 CEMENT STABILIZATION PART 1 GENERAL 1.1 SCOPE OF WORK A. This Section pertains to the specifications for cement stabilization of sandy or silty soil and consists of pulverizing, addition

More information

CITY OF TACOMA RIGHT-OF-WAY RESTORATION POLICY. Guidance on restoration of City Rights-of-Way

CITY OF TACOMA RIGHT-OF-WAY RESTORATION POLICY. Guidance on restoration of City Rights-of-Way CITY OF TACOMA RIGHT-OF-WAY RESTORATION POLICY Guidance on restoration of City Rights-of-Way Public Works Department Directors Office 747 Market Street Suite 408 Tacoma, WA 98402 253-591-5525 Right-of-Way

More information

I. Site Name and Location

I. Site Name and Location HALEY & ALDRICH, INC. 6500 Rockside Road Suite 200 Cleveland, OH 44131 216.739.0555 MEMORANDUM File No. 41938-009 SUBJECT: CCR Fugitive Dust Control Plan - Initial Jeffrey Energy Center St. Marys, Kansas

More information

Imperial County Air Pollution Control District Rule 806

Imperial County Air Pollution Control District Rule 806 RULE 806 CONSERVATION MANAGEMENT PRACTICES (Adopted 11/08/2005; Revised 10/16/2012) A. Purpose The purpose of this regulation is to reduce the amount of coarse Particulate Matter (PM-10) entrained in the

More information

Niagara Falls Storage Site Safety Measures During Remediation

Niagara Falls Storage Site Safety Measures During Remediation Niagara Falls Storage Site Safety Measures During Remediation On-Site Worker Protection Community and Environmental Protection Transportation and Disposal Safety Fully enclosed Retrieval Facility Regular

More information

IV. MITIGATION MONITORING PROGRAM

IV. MITIGATION MONITORING PROGRAM IV. MITIGATION MONITORING PROGRAM The Mitigation Monitoring Plan (MMP) has been prepared in accordance with Public Resources Code Section 21081.6, which requires a Lead or Responsible Agency that approves

More information

Flood Hazard Assessment Report Falls Gulch, Larimer County, Colorado January 16, 2013

Flood Hazard Assessment Report Falls Gulch, Larimer County, Colorado January 16, 2013 United States Department of Agriculture Natural Resources Conservation Service Denver Federal Center Building 56, Room 2604 P.O. Box 25426 Denver, CO 80225 720-544-2818-OFFICE alton.albin@co.usda.gov Flood

More information

A. Road Maintenance Activities, Temporary Haul Roads and Borrow Sites.

A. Road Maintenance Activities, Temporary Haul Roads and Borrow Sites. A. Road Maintenance Activities, Temporary Haul Roads and Borrow Sites. Within the boundaries of the HCP area, incidental take of SKR during the course of otherwise lawful activities may occur in connection

More information

DIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012

DIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012 PART FIVE DOCUMENTS FOR SITE AND INFRASTRUCTURE 31 00 00. EARTHWORK 31 10 00. SITE CLEARING.1 STRUCTURE REMOVAL: Include

More information

SECTION 1100 GRADING 1102 MATERIALS AND DEFINITIONS.

SECTION 1100 GRADING 1102 MATERIALS AND DEFINITIONS. SECTION 1100 GRADING 1101 SCOPE. This section covers the performance of all work required for grading the project in coordination with all previous work performed at the locations shown on the contract

More information

Los Angeles River Ecosystem Restoration Integrated Feasibility Study. Appendix F Air Quality

Los Angeles River Ecosystem Restoration Integrated Feasibility Study. Appendix F Air Quality Los Angeles River Ecosystem Restoration Integrated Feasibility Study Appendix F Air Quality Appendix F : Clean Air Act Applicability Analysis Appendix F 2: Air Quality Calculations Methodology and Data

More information

1.02 RELATED WORK: Refer to the following sections for related work: Section 4000-Concrete Materials and Methods

1.02 RELATED WORK: Refer to the following sections for related work: Section 4000-Concrete Materials and Methods SECTION 2000- EARTHWORK PART 1- GENERAL 1.01 SCOPE: This Section covers excavation, fill, and compaction of earth and rock for roadway, embankments, structural foundations, and planted areas. Topics include

More information

SITE PLAN CRITERIA FOR MUNICIPAL SOLID WASTE & RECYCLABLES STORAGE & ENCLOSURE REQUIREMENTS

SITE PLAN CRITERIA FOR MUNICIPAL SOLID WASTE & RECYCLABLES STORAGE & ENCLOSURE REQUIREMENTS SITE PLAN CRITERIA FOR MUNICIPAL SOLID WASTE & RECYCLABLES STORAGE & ENCLOSURE REQUIREMENTS April 2009 General Solid Waste and Recycling Service Responsibilities: The City of Denton is the exclusive provider

More information

TOWN OF OCEAN RIDGE CONSTRUCTION SITE MANAGEMENT HANDBOOK

TOWN OF OCEAN RIDGE CONSTRUCTION SITE MANAGEMENT HANDBOOK TOWN OF OCEAN RIDGE CONSTRUCTION SITE MANAGEMENT HANDBOOK I, swear (affirm) that I have read the Town of Ocean Ridge s Construction Site Management Handbook in its entirety and do hereby agree to comply

More information

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS Section Page 19-1 TRENCH EXCAVATION... 19.1 19-1.01 Exploratory Excavation... 19.1 19-1.02 Trench Width... 19.1 19-1.02.A Storm Drain

More information

I. Site Name and Location

I. Site Name and Location HALEY & ALDRICH, INC. 6500 Rockside Road Suite 200 Cleveland, OH 44131 216.739.0555 MEMORANDUM 17 April 2017 File No. 129778 005 SUBJECT: CCR Fugitive Dust Control Plan Revision #1 Jeffrey Energy Center

More information

PERMITTING AND CONSTRUCTION MANUAL

PERMITTING AND CONSTRUCTION MANUAL PUBLIC RIGHT-OF-WAY CONTENTS PERMITTING AND CONSTRUCTION MANUAL 1. INTRODUCTION 2. PUBLIC SERVICE PROVIDER REGISTRATION 3. CONSTRUCTION PERMITTING PROCEDURE 3.1 Permitting Process 3.2 Permit Application

More information

That the Planning Commission of the City of El Paso de Robles does hereby make the following findings:

That the Planning Commission of the City of El Paso de Robles does hereby make the following findings: RESOLUTION NO.: 02-044 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF EL PASO DE ROBLES TO APPROVE PLANNED DEVELOPMENT 02-003 (Food 4 Less) APN: 009-571-020 WHEREAS, Planned Development 02-003

More information

OUTLAW AUTOMATION INC. Safety Management System

OUTLAW AUTOMATION INC. Safety Management System Preparation: Safety Mgr Authority: President Issuing Dept: Safety Page: Page 1 of 6 Purpose The purpose of this program is to provide employees general information for working on owner client or other

More information

RECYCLED ASPHALT PAVEMENT AND ASPHALT MILLINGS (RAP) REUSE GUIDANCE MARCH 2013 (VERSION 1.0)

RECYCLED ASPHALT PAVEMENT AND ASPHALT MILLINGS (RAP) REUSE GUIDANCE MARCH 2013 (VERSION 1.0) RECYCLED ASPHALT PAVEMENT AND ASPHALT MILLINGS (RAP) REUSE GUIDANCE MARCH 2013 (VERSION 1.0) RECYCLED ASPHALT PAVEMENT AND ASPHALT MILLINGS (RAP) REUSE GUIDANCE MARCH 2013 A. GENERAL INFORMATION It is

More information

Austin Technical Manuals - Standard Specifications Preservation of Trees and Other Vegetation (610S) 03/27/2000

Austin Technical Manuals - Standard Specifications Preservation of Trees and Other Vegetation (610S) 03/27/2000 Austin Technical Manuals - Standard Specifications Preservation of Trees and Other Vegetation (610S) 03/27/2000 610S.1 This item shall govern the proper care and treatment of all trees and other vegetation

More information

Asphalt Rubber Chip Sealing DRAFT MAINTENANCE SPECIFICATION. March 22, 2007

Asphalt Rubber Chip Sealing DRAFT MAINTENANCE SPECIFICATION. March 22, 2007 Asphalt Rubber Chip Sealing DRAFT MAINTENANCE SPECIFICATION March 22, 2007 Description: This work consists of furnishing and applying asphalt rubber binder followed by an application of treated cover aggregate

More information

CEQA AIR QUALITY HANDBOOK. Guidelines for the Implementation of the. California Environmental Quality Act of 1970, as amended

CEQA AIR QUALITY HANDBOOK. Guidelines for the Implementation of the. California Environmental Quality Act of 1970, as amended CEQA AIR QUALITY HANDBOOK Guidelines for the Implementation of the California Environmental Quality Act of 1970, as amended As Amended by Imperial County Air Pollution Control District 150 South Ninth

More information

SECTION CURB RAMPS AND OTHER MINOR CONCRETE FACILITIES. Part 1 - General Work Included Related Requirements...

SECTION CURB RAMPS AND OTHER MINOR CONCRETE FACILITIES. Part 1 - General Work Included Related Requirements... SECTION 02530 CURB RAMPS AND OTHER MINOR CONCRETE FACILITIES CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Inspection And Tests... 1 1.04 Quality Assurance...

More information

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS Section Page 19-1 TRENCH EXCAVATION...19.1 19-1.01 Exploratory Excavation...19.1 19-1.02 Trench Width...19.1 19-1.02.A Storm Drain

More information

Section 505. CHIP SEALS

Section 505. CHIP SEALS Section 505. CHIP SEALS 505.01. Description. This work consists of preparing the pavement surface and providing and placing a single chip seal, double chip seal, or shoulder chip seal. 505.02. Materials.

More information

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions.

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions. SECTION 31 23 33 - TRENCHING, BACKFILLING AND COMPACTION PART 1 - GENERAL 1.1 SCOPE A. This Section specifies the requirements for excavating and backfilling for storm sewer, sanitary sewer, water distribution

More information

Environmental Guideline on Stone crushing plant set up temporarily for the purpose of a project by a public department

Environmental Guideline on Stone crushing plant set up temporarily for the purpose of a project by a public department 2017 [Type a quote from the document or the summary of an interesting point. You can position the text box anywhere in the document. Use the Drawing Tools tab to change the formatting of the pull quote

More information

State of Utah. Department of Environmental Quality DAQE-AN October 26, 2009

State of Utah. Department of Environmental Quality DAQE-AN October 26, 2009 Department of Environmental Quality State of Utah GARY R. HERBERT Governor Amanda Smith Executive Director DIVISION OF AIR QUALITY Cheryl Heying Director GREG BELL Lieutenant Governor DAQE-AN0141510002-09

More information

SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS

SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS Section Page 26-1 GENERAL... 26.1 26-2 PAVEMENT KEYCUTTING... 26.1 26-3 PAVEMENT PLANING... 26.2 26-4 PLANED PAVEMENT CONFORMS... 26.3