Lower Trent & Erewash Catchment Management Plan. Lower Trent & Erewash Catchment Management Plan
|
|
- Victoria Barker
- 5 years ago
- Views:
Transcription
1 Lower Trent & Erewash Catchment Management Plan Draft Version May
2 Lower Trent & Erewash Catchment Management Plan Written on behalf of the Lower Trent & Erewash Catchment Partnership 2
3 1 Introduction 1.1 Purpose of this document This document provides the baseline to take forward the work of the Lower Trent & Erewash Catchment Partnership. It describes the Lower Trent & Erewash catchment and the issues that need to be tackled. Wherever available, a data and evidence approach has been used to support the areas and project identified for future development. The summary tables (Section 4.2) show the multiple benefits for each project against the Lower Trent & Erewash Catchment Partnership goals. Annex 3 contains the specifications for each project including the current status of the project; the lead organisation and next steps required to make it happen. 1.2 The Catchment Based Approach Back in 2012 Defra launched the Catchment Based Approach (CaBA). The Catchment Based Approach encourages organisations to manage land and water in a balanced way, by identifying the pressures on the water environment, by working together to agree common objective and by implementing solutions. A key principle is encouraging organisations to work in partnership and to deliver a range of benefits through a single initiative. 1.3 River Lower Trent & Erewash Catchment The catchment of the Lower Trent and Erewash is a very large sub catchment covering an area of approximately 2045km 2, extending from the River Dove confluence with the River Trent south west of the city of Derby and finishing at Alkborough Flats where the Trent flows into the Humber Estuary. Within this area the River Trent is 174 km long with its main tributaries including the rivers Derwent, Soar, Erewash, Leen, Greet, Devon, Idle, Torne and Eau and the Dover Beck. Nottinghamshire is its principal county, with parts of Derbyshire, Leicestershire, Lincolnshire, South Yorkshire and North Lincolnshire incorporated. The catchment is a very long one touching a number of counties and to better service its needs the SW corner between its confluences with the Rivers Dove and Derwent is being managed by the Derwent Catchment Partnership. This plan will therefore cover the catchment immediately downstream of its confluence with the Derwent to the Humber Estuary. Nottingham is the principal urban area within its catchment with other major settlements being Ilkeston, Newark, Gainsborough and Scunthorpe. The catchment contains a variety of landscapes, predominantly the Trent and Belvoir Vales but also includes the Humberhead Levels, the Northern Lincolnshire Edge and 3
4 Nottinghamshire and Leicestershire Wolds. The bedrock geology of Triassic and Jurassic mudstones has given rise to fertile, clayey soils across much of the area, while extensive deposits of alluvium and sand and gravel have given rise to a wider variety of soils, especially in the flood plains. The dominant land use across the catchment is rural, mostly arable production with a small portion in pasture. Diffuse nutrient pollution (phosphate) from agricultural run-off is considered to be a major contributing factor to the overall WFD status of the catchment. Other key issues causing water quality problems come from overflow from sewage works, surface water run-off from quarry workings and the road network. There are also some communities at risk of flooding within the catchment. Before CaBA there were already many projects ongoing across the Lower Trent that delivered benefits for the water environment. However, few of them looked at the catchment as a whole. The Lower Trent & Erewash Catchment Partnership has brought many well established organisations together to discuss their work and future aspirations at the catchment scale. The work reinforces the strength of some of the existing projects and allows the partners to look more widely at opportunities to work with partners to bring about benefits that may not be achievable by working alone. Figure 1 Map of the Lower Trent & Erewash Catchment 4
5 2 The Lower Trent & Erewash Catchment Partnership The Lower Trent & Erewash Catchment Partnership has been developed in response to the Defra Catchment Based Approach policy using funding by Defra and the EA. A range of organisations have been meeting to look at the options across the Lower Trent & Erewash since the start of The Lower Trent & Erewash catchment partnership has a wide and active membership. The Catchment Based Approach has brought a catchment scale focus to the members recognising the wider benefits that can be achieved by a coordinated partnership. The organisations that attend the meetings are listed below. Canal and River Trust Broxtowe Borough Council Environment Agency Groundwork Nottingham Keep Britain Tidy (via WatersideCare) Nottinghamshire County Council Nottinghamshire Wildlife Trust National Farmers Union Natural England Severn Trent Water Trent Rivers Trust (catchment host) Trent Valley IDB 2.1 Lower Trent & Erewash Catchment Vision The Lower Trent & Erewash catchment partnership has an agreed vision for the long term on the Lower Trent & Erewash. Vision for the Lower Trent & Erewash Catchment Partnership "A Lower Trent & Erewash catchment that has a healthy, functioning water environment including rivers, lakes and groundwater. Key pressures in the Lower Trent & Erewash Catchment at a glance Diffuse pollution from roads and urban areas Heavily modified river channels Rural point source and diffuse pollution Separation of the river from its floodplain Loss of riparian wetland habitats Raised levels of phosphates Risk of properties and roads flooding Impeded fish passage 5
6 2.2 Lower Trent & Erewash Catchment Partnership Objectives Biodiversity and Natural Processes Long term objectives There is a rich and diverse collection of habitats and species within the catchment rivers and their floodplains. Areas of high conservation value are in good condition and are connected by wildlife corridors. Fish can move freely throughout the catchment with ample spawning and nursery areas. Flood Risk Management Rain water is stored and managed to reduce the risk of flooding through the use of urban and rural sustainable drainage solutions wherever possible. Properties and livelihoods are not impacted by flood risk and are resilient to future climate change. Floodplains are managed to store flood water as well as other local benefits. Opportunities for Natural Flood Management (NFM) schemes are explored and implemented where possible. Community Involvement and Recreation There is a high level of public understanding of the importance of rivers and floodplains to provide places for people and wildlife. Communities are involved with a local river project. There is a range of recreation and accessible sites along the river and throughout the catchment. Water quality Water quality from point and diffuse sources is improved. There is a raised awareness of pollution risk from residential, commercial, rural and urban sources. Addressing issues in high priority areas within the catchment Our priority areas benefit from focused attention to help them achieve relevant catchment objectives. Partners supporting each other and working together in our priority areas to maximise achievements. 6
7 2.3 Our Priority Areas The Lower Trent & Erewash catchment is a very large and long catchment with major urban communities separated by long distances e.g. Nottingham near the south of the catchment is over 70 miles from Scunthorpe in the North. Rural communities are similarly spread and so lack a sense of shared ownership and engagement over the catchment as a whole. The use of priority areas or hubs better enables the engagement of partners as well as local communities to work together to improve the water quality. Four Hubs have been identified in the catchment: Trent Valley Erewash and Leen Dover Beck and Greet Bottesford Beck and Eau The Trent Valley Hub also acts to link the three other Hubs. The partnership meeting held on 14 th December 2016 reviewed and agreed these Hubs as having issues that the partnership could work together on to help achieve the catchments objectives. Partners currently have projects and/or potential projects in the Hubs and this provides a core of activity on which to build. Section 3 below provides further evidence as to the issues in the Hubs that the partnership could work together to address. 7
8 Figure 2 Map of the Hubs 3 Data and evidence 3.1 Nationally consistent evidence base CaBA data package for Lower Trent & Erewash catchment: ( The 'CaBA Data&GIS User Guide' explains which layers are available, what they mean and how they can be used. There are over 100 data layers available for this catchment which identify the spatial pattern of opportunities; issues, characteristics and the possible sources of the issues. This weight of evidence is being improved by collecting local datasets and working with local organisations in 8
9 the catchment. This data coupled with 'Local Evidence' and 'Priority Places' below provide the weight of evidence required to deliver projects which will benefit the lives of people and wildlife living in this the catchment. 3.2 Local Evidence In addition to the national datasets available in the CaBA data package and via government open data initiatives, local data and evidence (including modelling) is important for helping to pinpoint issues, identify solutions and monitor outcomes in our catchment. Details of key monitoring and modelling resources and tools which are being used in this catchment can be found in Annex Priority places A number of key CaBA organisations are prioritising where they will undertake actions to meet their particular aims, and these actions can potentially impact on other aspects of the water environment. We have used the following resources to help the partnership focus delivery where it will bring the greatest benefit: Catchment Data Explorer This is central to the CaBA planning process and we have used it to help identify where the issues are and the likely causes. Below is an extract for the Lower Trent and Erewash Catchment but details on all sub-catchments and water bodies can be found at the above link. Number of water bodies in this Management Catchment Water body categories Natural Artificial Heavily modified Total River, canals and surface water transfers Lake Coastal Estuarine Groundwater Total Ecological and chemical classification for surface waters 2015 Cycle 2 9
10 Ecological status or potential Chemical status Number of water bodies Bad Poor Moderate Good High Fail Good Summary of ecological status or potential and chemical status and objectives for surface water bodies (number of water bodies) including those with less stringent objectives and extended deadlines (blue shaded cells) Ecological status or potential Chemical status Bad Poor Moderate Good High Total Fail Good Total By By By Extended Deadline Beyond Total Less Stringent Less Stringent Reasons for not achieving good status and reasons for deterioration in this Management Catchment The table below shows the number of reasons for not achieving good status (RNAGS) and reasons for deterioration (RFD), split by sector. Sector RFD RNAG Grand Total Agriculture and rural land management Domestic General Public Industry Local and Central Government Mining and quarrying Navigation No sector responsible Other Recreation Sector under investigation Urban and transport Waste treatment and disposal Water Industry Grand Total
11 The tables show that the catchment is failing on Ecological Status and that after water companies, rural land management is a large contributor to the reasons for failure Catchment Flood Management Plan We have used this to check planned actions for reducing flood risk in this catchment in order to identify opportunities to create multi-benefit actions, and to identify opportunities to add flood risk benefits to other planned projects Countryside Stewardship Statements of Priorities We have used this to identify where Natural England has identified water quality or flooding as a priority issue for allocation of countryside stewardship grants. 11
12 3.3.4 EA Local evidence reviews and prioritisation tool: We have used these to understand where the Environment Agency has prioritised waterbodies for future work and EA funding, where actions will provide WFD, flood risk, biodiversity and other benefits Local Authority spatial plans: Greater Nottingham: Newark and Sherwood District Council: North Lincolnshire: We have used these to identify where green infrastructure measures could be targeted, and funded from infrastructure levy, to provide flood risk, water quality, biodiversity and recreational benefits. 12
13 3.3.6 Severn Trent Water RSA plan. We have used this to understand where the priorities are for Severn Trent Water and identify opportunities for partnership working Nottinghamshire Biodiversity Group Biodiversity Opportunity Mapping: We have used this to understand where the priorities are for biodiversity, particularly wetland habitats, and identify opportunities for partnership working to address these issues. There are many organisations looking to prioritise where they spend money and undertake actions to provide the best outcome for their particular objectives. The best way to make use of these different prioritisation tools and plans is to use them in combination to identify areas of the catchment, and possible projects, which will provide benefits to multiple partners, as this will provide a strong business case for future funding bids Minerals Local Plans We have used the Nottinghamshire Minerals Local Plan to identify the scope for the delivery of wetland habitat at a landscape scale via post minerals development. The RSPB Bigger and Better vision for 2050 builds on this with recognising the value of a linked up network of wetland habitats. We have used the RSPB Futurescapes documents and to help identify areas of priority. 3.4 Justification for the Hubs River Erewash and River Lean Catchments The River Erewash is made up of 10 waterbodies 2 of which are at Poor status, the remainder of which are Moderate Ecological status. The River Leen waterbodies are at Moderate Ecological status. Both of these catchments have established community engagement from Friends of Groups and previous projects. Within the River Leen flooding is an issue on the Day Brook. The Catchment Flood Management Plan (see above) categorises the Erewash as needing actions to reduce flood risk. The Broxtowe Biodiversity Opportunity Mapping (BOM) shows that within the Erewash Valley there are significant opportunities for wetland habitats being creation, enhancement, enlargement and reconnection: In the Ashfield BOM the value of the Leen Catchment as a focal area having the potential for improving the existing wetland network along the River Leen and its tributaries is highlighted. The Sherwood BOM also recognises the value of enhancing existing the wetland habitat network along the Leen: 13
14 From project forms already submitted by the partners there is ongoing work and potential for more within these catchments making it suitable as a Hub Dover Beck and River Greet The Dover Beck is at Moderate status but the River Greet is at Poor status. Both catchments have flooding issues that need addressing. Work has been undertaken over the last 2 years in engaging landowners in addressing some of the issues from agriculture. Agriculture is the 2 nd highest cause of Reasons for the Failing to meet WFD status of good, in the catchment. The Hub could provide opportunity to continue and extend the work already carried out to a wider rural area. The Dover Beck has been identified as a priority for Seven Trent Water and forms part of their local RSA. All of the above points make this a suitable Hub to build on work already undertaken in the catchment and address WFD and partner issues Bottesford Beck Bottesford Beck is at Moderate status. It has a very active Friends of Bottesford Beck group that have been successful in raising funds and carrying out works both on the Beck and adjoining community sites. This Hub would provide the opportunity to support this group and work with neighbouring groups such as that at Scotter Trent Valley The Trent Valley links the other Hubs and provides opportunity to develop catchment scale funding for projects on the Trent. Perhaps unsurprisingly, the Trent Valley BOM maps indicate that wetland habitats are considered to be the habitats which should be subject to most activity, with considerable opportunities identified for the re-creation of extensive areas of reedbed and wet grassland within the Trent Valley. The Rushcliffe BOM maps also indicate that there are considered to be a number of opportunities for wetland habitats both enhancing existing sites and connecting them in the floodplain of the Trent Valley river catchments and its tributaries. The Nottinghamshire Minerals Plan and RSPB Bigger and Better visions supports the landscape level development of post mineral wetland habitats in the Trent Valley see section above. 14
15 4 Projects for delivery A series of Delivery Projects' have been developed by the Lower Trent & Erewash CP group since it started meeting. This working document identifies these projects and provides a draft specification for the work. As the partnership has discussed the projects, those with the most backing have been developed further, while others with less backing have been dropped. 4.1 General principles used to identify and prioritise Delivery Projects for the Lower Trent & Erewash Catchment The general principles used to identify these projects are listed below: At the events held at Gainsborough and Flintham in February 2014 a long list of projects were identified by the partners This list has been discussed, revised and refined during a number of meetings and partner discussion. Other projects have been added to the list as new stakeholders have become involved in the partnership. This approach ensures that the limited resources of the CaBA partnership are used to develop projects which attract the most support from the group. The approach is all about direction of travel, rather than achieving a threshold water quality or ecological status. This is makes the use of evidence much simpler and easier to understand. The rivers in the catchment are highly modified with significant industrial and urban pollution. Catchment scale water quality and overall habitat are likely to be very difficult to bring back in a way that will give high quality ecology due to multiple upstream sources of pollution and pressure. The projects are on rivers, groundwater and reservoirs where there will be multiple benefits. The CaBA Data and GIS package has been used with summary and water body documents to focus in on the main opportunities which will bring multiple benefits. Preference is given to opportunities in areas where there is already some activity which can be built on; it is easier to make progress when activity has already started on the ground. +++ indicates the main rationale behind a project, it does not mean that the project will deliver big improvements. ++ indicates secondary benefits from the project. + indicates minor benefits from the project. The summary table below could be used to change or refine the suggested projects, in consultation with the steering group, to better deliver the catchment strategy. All 'Delivery Projects' should deliver benefits for WFD as well as CaBA if they are to be supported by the Environment Agency. 15
16 Each project should incorporate Environment Agency measures from the list of cost beneficial measures where possible. Each project should have a 'lead partner to drive it forward. Priority 1 projects have agreement. Priority 2 projects have an 'owner' who will proceed when there is an opportunity. Priority 3 projects need an owner to progress and Priority 4 projects are blue sky. Projects progress when the opportunity arises. Once a project is 'agreed' by the delivery group as a priority 2 (it has an owner), it is the responsibility of the owner to move the project forward. 4.2 Projects Summary Table The summary tables below show the multiple benefits for each project against Lower Trent & Erewash Catchment Partnership Objectives. Section 4.3 contains the specifications for each project including the current status of the project; the lead organisation and next steps required to make it happen. Appendix 2 contains the discussions and decisions from the delivery group. These are used to update the priority of each project and remove projects with little support and add in new projects as the opportunity arises. 16
17 Priority Cost K (if known) Address issues in one or more Hub Water quality Community involvement & recreation Flood Risk Management Biodiversity and natural processes Lower Trent & Erewash Catchment Management Plan Project Reference Project Name Lead Partner Status LTCP/001 Dover Beck TRT Completed ,500 1 LTCP/002 Leen, Lincoln Street GWN Completed LTCP/003 Ouse Dyke, Willlow Park GWN Completed ,500 1 LTCP/0015 Leen, Valley Road, Daybrook GWN Completed ,000 1 LTCP/004 The Dover Beck and Causeway Dyke TRT Completed ,500 1 Agricultural project LTCP/005 Phosphate removal STW Partner ,000 1 project in progress LTCP/006 Woodborough Wetland Scheme EA Partner ,000 1 project in progress LTCP/007 STW investigations STW Partner project in progress LTCP/008 Erewash at Bentinck NCC Potential NCC researching landowners hip LTCP/009 Farleys Brook at Hucknall NCC Removed LTCP/010 Leen at Papplewick NCC Removed LTCP/0011 Erewash at Giltbrook GWN Removed LTCP/0012 Leen, Valley Road, Daybrook GWN Potential GWGN pursuing funding
18 LTCP/0013 Trent, Leen & Erewash Wetlands for All (includes 15 sites) NWT Partner project in progress LTCP/0014 The Beck, Fledborough Beck, Sewer Drain TRT First year funded, in progress LTCP/0015 Southwell Frames Project TRT Match funding being sought LTCP/0016 Far Ings Eel Habitat TRT Funding being sought , , ,
19 19
20 4.3 Flagship projects Trent Freeway - restoring sustainable movement of people and wildlife in the Lower Trent Working as a partnership, the Environment Agency (EA), Canal & River Trust (CRT) and Trent Rivers Trust (TRT) are seeking to restore the Lower Trent as a green corridor for both people and wildlife. Through the project, people will be linked to the social history of the area and the part that the river played in shaping the towns and villages along its route. Fish passage will be enabled at nine weirs that would link the Humber Estuary Special Area of Conservation (SAC) at the top end to salmon spawning grounds on the Derwent and Dove Rivers and allow all species to move up and down river through improved habitats. The River Trent is the third longest river in England, the second largest in terms of flow. Over the centuries the River Trent has played a hugely important role in how the landscape and its people have developed, particularly through the movement of goods, people and wildlife. Over time the river has been engineered to derive benefits to humans in terms of navigation of boats and maintaining water levels for agricultural purposes. The weir structures installed to derive these benefits have been to the detriment of the natural functioning of the river, particularly in terms of free movement of fish. As such, nationally and internationally important species such as salmon, eels and river lamprey are currently unable to properly complete their migratory life cycle and their populations have declined as a result. Historically, salmon were so abundant in the Trent that a law was passed in the 18th century to limit the number of time a week to servants who complained of monotony! The project would cover the following areas of Heritage: Land and natural heritage: restoring sustainable fish populations and habitat improvements industrial maritime/transport: interpretation and engagement with the purpose of the nine weirs, their construction and continued maintenance Community heritage: role of River Trent as a freeway through history and the links to settlements along its route We would expect to submit a Stage 1 application in mid to late We anticipate this would be for a project running between This would be a 2 year development phase, followed by 5 year delivery phase. 5 Monitoring and Evaluation We need to monitor and evaluate the work that is done in the Catchment and this can be achieved using the following example monitoring plan template (based on PRAGMO) As each project is developed relevant monitoring needs can be included in this monitoring plan and results recorded. Additional evaluation can be brought in at a catchment or Hub level. 20
21 6 Work in progress. This plan is work in progress and will grow and adapt as we deliver projects to improve the catchment and as new threats emerge. The greater the collaboration between CaBA partners the more sustainable this plan will become and the greater the benefits to the catchment and the people and wildlife that live there. Component of CaBA Plan Initial Growing Sustainable 1) Vision and Objectives 2) Data & Evidence 3) Project plan 4) Monitoring plan Annexe 6.1 Local Evidence tools and resources MyScimap: A free online version of the sediment risk mapping tool. Farmscoper: Decision support tool for agricultural pollution management planning Freshwater Watch water quality survey toolkit, training and data management: From Feb/March 2017, FreshwaterWatch CaBA groups will have the ability to brand their own landing page and display maps with just their own group results Project Specifications NB The next stage is to enter the details of all of the project online at 8dfcd09f236284e 21
Oxon Ray Catchment Summary of significant issues affecting the water environment
Oxon Ray Catchment Summary of significant issues affecting the water environment Introduction This information pack has been produced to support the Challenges and Choices consultation document for the
More informationDon Catchment Vision
Don Catchment Vision Don Catchment Vision A healthy and biodiverse catchment that is valued and enjoyed, contributing to the economic and social well-being of local communities. Aims for the Don To identify
More informationBackground for: Upper Piddle Headwaters
Background for: Upper Piddle Headwaters Environment Agency Information Waterbody Upper Piddle Waterbody ID GB108044010120 Status Poor Failing elements Fish macrophytes (flows) Phytobenthos (nutrients)
More informationImproving the condition of Solway Tweed s water environment Tweed area management plan
Improving the condition of Solway Tweed s water environment Tweed area management plan 2010 2015 Supplementary to the river basin management plan for the Solway Tweed river basin district Page 1 of 20
More informationWorking together To improve our water environment Glazert Water
Working together To improve our water environment Glazert Water Potential options for river restoration and natural flood management in the Glazert catchment Draft summary report 1.0 Introduction 1 Report
More informationFENS, MARSHES AND SWAMPS. Jeremy Fraser and Carl Cornish. The Old Ragged School Brook Street Nottingham NG1 1EA. MOST RECENT UPDATE: May 2005
FENS, MARSHES AND SWAMPS AUTHORS: LEAD AGENCY: Jeremy Fraser and Carl Cornish Notts Wildlife Trust The Old Ragged School Brook Street Nottingham NG1 1EA MOST RECENT UPDATE: May 2005 Current status Wetlands
More informationThames Regional Flood and Coastal Committee (RFCC) Flood risk management and environmental benefits in the Thames River Basin, 2015 to 2021
Thames Regional Flood and Coastal Committee (RFCC) Flood risk management and environmental benefits in the Thames River Basin, 2015 to 2021 1. Thames Region Flood Risk Management Programme 1.1 A 2.3 billion
More informationWHITE-CLAWED CRAYFISH SPECIES ACTION PLAN
LOWLAND DERBYSHIRE LOCAL BIODIVERSITY ACTION PLAN WHITE-CLAWED CRAYFISH SPECIES ACTION PLAN 2007 2010 Picture courtesy of Chesterfield Borough Council Prepared by the Lowland Derbyshire Biodiversity Partnership
More informationCATCHMENT RESTORATION FUND: RIVER REA RESTORATION PROJECT
CATCHMENT RESTORATION FUND: RIVER REA RESTORATION PROJECT Project Summary The River Rea Restoration Project was a partnership project to improve watercourses in the River Rea Catchment affected by sedimentation,
More informationWater of Leith catchment profile
catchment profile Introduction The catchment covers a total area of 122 km 2 and predominantly drains the north western slopes of the Pentland Hills from its source in the Colzium springs. The natural
More informationClyde area management plan
Improving the quality of Scotland s water environment Clyde area management plan 2010 2015 Supplementary to the river basin management plan for the Scotland river basin district Table of contents Introduction
More informationRiver restoration and flood management fact or fiction: a British perspective
River restoration and flood management fact or fiction: a British perspective Dr Jenny Mant Head of Water Management Jenny.Mant@ricardo.com jenny.mant@ricardo.com 6/2/2017 A Retrospective Look 2007 UK
More informationRiver Avon catchment profile
River Avon catchment profile Introduction From its head waters near Greengairs, North Lanarkshire, the River Avon runs to enter the Firth of Forth at Grangemouth, draining a catchment of ~188km 2. The
More informationThe Water Framework Directive and the catchment based approach in your area
The Water Framework Directive and the catchment based approach in your area Teresa Brown Catchment Co-ordinator For the Upper and Bedford Ouse, Old Bedford and Middle Level The Water Framework Directive
More information1 General questions on zone and catchment management plans
1 General questions on zone and catchment management plans 1.1 What is a zone plan? The Waikato region is divided into eight zones. There is a separate, non statutory, zone plan for each one. The key purpose
More informationImproving the River Petteril Online Story Map featuring a case study in catchment management
Improving the River Petteril Online Story Map featuring a case study in catchment management Summary The Improving the River Petteril story map presents a catchment management case study for the River
More informationResponse from the Institute of Fisheries Management to the Government s A Green Future: Our 25 Year Plan to Improve the Environment
Response from the Institute of Fisheries Management to the Government s A Green Future: Our 25 Year Plan to Improve the Environment SUMMARY The Institute of Fisheries Management welcomes the Government
More informationGrovelands Park Wetlands, Enfield
Grovelands Park Wetlands, Enfield Description This project was undertaken as part of the Salmons Brook Healthy River Challenge, an initiative designed to improve water quality in the Salmons Brook and
More informationENVIRONMENTAL BRIEFING: WATER FRAMEWORK DIRECTIVE MAY 2013
ENVIRONMENTAL BRIEFING: WATER FRAMEWORK DIRECTIVE MAY 2013 The EU Water Framework Directive (WFD) promotes a new approach to water management through river basin planning. It aims to prevent deterioration
More informationHigh Speed Rail: Investing in Britain s Future. Consultation on the route from the West Midlands to Manchester, Leeds and beyond
High Speed Rail: Investing in Britain s Future. Consultation on the route from the West Midlands to Manchester, Leeds and beyond Response from The Wildlife Trusts January 2014 Contact: Paul Wilkinson,
More informationRiver Carron catchment profile
River Carron catchment profile Introduction From its source in the Campsie Fells, the River Carron drains an area of approximately 192 km 2 before entering the Firth of Forth via the Carron Estuary at
More informationThe main factors currently affecting rivers and streams in Nottinghamshire are:
HABITAT ACTION PLAN FOR RIVERS AND STREAMS Nottingham Local Biodiversity Action Plan AUTHOR: LEAD AGENCY: Steve Betts, Environment Agency Environment Agency Trentside Offices Scarrington Road West Bridgford
More informationCase study 11. Low Stanger Floodplain Reconnection Project
Case study 11. Low Stanger Floodplain Reconnection Project Author: Ian Creighton Main driver: Flood alleviation Project stage: Completed 2015 Photo 1: Downstream breach, Low Stranger Farm (source: West
More informationBUSINESS PLAN
BUSINESS PLAN 2017 2020 Industry and Nature in Harmony in one of Europe s great estuaries Humber Nature Partnership Waters Edge Visitor Centre Maltkiln Road Barton upon Humber DN18 5JR Tel: 01652 631525
More informationA consultation on the Draft River Basin Management Plan Dee River Basin District
1 A consultation on the Draft River Basin Management Plan Dee River Basin District December 2008 The Environment Agency works with other regulators and co-deliverers to protect the water environment in
More informationStatement of Particulars Western Wales Flood Risk Management Plan
Statement of Particulars Western Wales Flood Risk Management Plan FINAL 22 September 2015 Date Our purpose is to ensure that the natural resources of Wales are sustainably maintained, used and enhanced,
More informationSomerset Flood Action Plan Progress Update June, 2014
Somerset Flood Action Plan Progress Update June, 2014 This is an update on the progress being made on the Levels and Moors Flood Action Plan (FAP). The FAP is coordinated by Somerset County Council but
More informationCranbrook Drain/Counter Drain Flood Risk Management Strategy
Cranbrook Drain/Counter Drain Flood Risk Management Strategy Flood Risk Management Principles and Specification Environment Agency Submission to Cambridgeshire County Council in Support of Proposals to
More informationEye Water and Berwick coastal catchment profiles
Eye Water and Berwick coastal catchment profiles These catchment profiles have been produced together because the Eye Water priority catchment work includes water bodies within both catchments, the land
More informationCase study 6. Chelmer Valley Local Nature Reserve
Case study 6. Chelmer Valley Local Nature Reserve Author: Trevor Bond Main driver: Habitat improvement Project stage: Completed spring 2016 Photo 1: River Chelmer, Chelmer Valley Local Nature Reserve (source:
More informationPrioritizing Local Action. Strengthening the Resilience of the Taunton River Watershed
Prioritizing Local Action Strengthening the Resilience of the Taunton River Watershed No Really, We re Here to Help 6/12/14 Healthy and Resilient Taunton Watershed Project EPA s Healthy Watershed Program
More informationSouth Essex Catchment Plan
South Essex Catchment Plan 2015-2018 A strategic plan which seeks to bring positive change to people, wildlife and the environment through better management of land and water Executive Summary The Water
More informationWorking together to deliver a consistent supply of high quality water. Our approach to catchment management
Working together to deliver a consistent supply of high quality water Our approach to catchment management 1 Our approach to catchment management At South Staffs Water we are committed to providing a consistent
More informationSOUTHWELL A flooded community aims for resilience
SOUTHWELL A flooded community aims for resilience Flooded community aims for resilience Tim Farr Jacky Huson Chair, Southwell Flood Forum Secretary, Southwell Flood Forum Background Southwell, Nottinghamshire
More informationWarwickshire Avon Catchment Partnership
Warwickshire Avon Catchment Partnership Working in Partnership Gina Rowe Living Landscapes Manager Tim Precious Wetland Project Officer Warwickshire Wildlife Trust Creating a Living Landscape www.warwickshirewildlifetrust.org.uk
More informationWATER RESOURCES ACT 1991 THE WALES ROD AND LINE (SALMON AND SEA TROUT) BYELAWS 2017 THE WALES NET FISHING (SALMON AND SEA TROUT) BYELAWS 2017
WATER RESOURCES ACT 1991 THE WALES ROD AND LINE (SALMON AND SEA TROUT) BYELAWS 2017 THE WALES NET FISHING (SALMON AND SEA TROUT) BYELAWS 2017 DOCUMENT NRW/6A SUMMARY PROOF OF EVIDENCE OF ROBERT VAUGHAN
More informationImproving the physical condition of Scotland s water environment. A supplementary plan for the river basin management plans
Improving the physical condition of Scotland s water environment A supplementary plan for the river basin management plans Contents Executive summary... 2 1. Introduction... 3 2. Vision... 4 3. Taking
More informationLatest headline evidence from the Defra Multi-objective Flood Management Demonstration Projects:
Latest headline evidence from the Defra Multi-objective Flood Management Demonstration Projects: Land use and management can make a significant contribution to reducing flood risk Primary aims In 2009
More informationSite Improvement Plan. River Kent SAC. Improvement Programme for England's Natura 2000 Sites (IPENS) Planning for the Future
Improvement Programme for England's Natura 2000 Sites (IPENS) Planning for the Future Site Improvement Plan River Kent Site Improvement Plans (SIPs) have been developed for each Natura 2000 site in England
More informationBiodiversity 2020: A strategy for England s wildlife and ecosystem services. Tom Butterworth
Biodiversity 2020: A strategy for England s wildlife and ecosystem services Tom Butterworth Biodiversity 2020 Sites & Habitats (& integrated approaches & ecosystems) Species People engagement Marine Natural
More informationDee River Basin Management Plan Summary
Dee River Basin Management Plan 2015 2021 Summary Updated December 2015 Published by: Cambria House 29 Newport Road Cardiff CF24 0TP 0300 065 3000 (Mon-Fri, 8am - 6pm) enquiries@naturalresourceswales.gov.uk
More informationChalleng es and choices WATER FRAMEWORK DIRECTIVE (WFD): CHALLENGES & CHOICES CONSULTATION RESPONSE (NATIONAL)
Challeng es and choices WATER FRAMEWORK DIRECTIVE (WFD): CHALLENGES & CHOICES CONSULTATION RESPONSE (NATIONAL) 18 th September 2013 Introduction to the Canal & River Trust and WFD The Canal & River Trust
More informationCase study 21. Lustrum Beck Flood Alleviation Scheme: Phase 2
Case study 21. Lustrum Beck Flood Alleviation Scheme: Phase 2 Authors: Joe Reed, Ted Thomas Main driver: Flood risk management Project stage: Detailed design Photo 1: Flooding event, September 2012 Project
More informationThe main factors currently affecting Nottinghamshire s lowland wet grasslands are:
HABITAT ACTION PLAN FOR LOWLAND WET GRASSLAND LEAD AGENCY: Royal Society for the Protection of Birds 46 The Green, South Bar, Banbury, Oxfordshire, OX16 9AB MOST RECENT UPDATE: May 1998 Current Status
More informationFriends of Bradford s Becks
Friends of Bradford s Becks Cleaning up the Beck for a better Bradford A proposal for investment in AMP7 to support a collaborative, catchment-based approach to water quality and regeneration for the Bradford
More informationWater for life and livelihoods
Water for life and livelihoods Dee River Basin District: Challenges and choices Facts and statistics Background information On 1 April Natural Resources Wales brought together the work of the Countryside
More informationImproving the quality of Scotland s water environment Orkney and Shetland area management plan
Improving the quality of Scotland s water environment Orkney and Shetland area management plan 2010 2015 Supplementary to the river basin management plan for the Scotland river basin district Executive
More informationThe Metropolitan Glasgow Strategic Drainage Partnership
Briefing Note 5 - Spring 2010 The Metropolitan Glasgow Strategic Drainage Partnership The Metropolitan Glasgow Strategic Drainage Partnership (MGSDP) is an innovative and collaborative venture between
More informationBIODIVERSITY AND DEVELOPMENT GUIDANCE FOR HAMPSHIRE
BIODIVERSITY AND DEVELOPMENT GUIDANCE FOR HAMPSHIRE RECOMMENDATIONS FOR INTEGRATING BIODIVERSITY INTO LOCAL DEVELOPMENT FRAMEWORKS Prepared by Mike Oxford On behalf of the Hampshire Biodiversity Partnership
More informationChapter 6 Objective: Protect and Enhance the Environment
Chapter 6 Objective: Protect and Enhance the Environment 49 Irish Water Water Services Strategic Plan Our Strategic Aims Ensure that Irish Water services are delivered in a sustainable manner which contributes
More informationBenefits of SSSIs in England and Wales
Benefits of SSSIs in England and Wales Sites of Special Scientific Interest Sites of Special Scientific Interest (SSSIs) are the best places for wildlife and geology nationally. There are 5,000 SSSIs in
More informationD9. Significant Ecological Areas Overlay
D9. Significant Ecological Areas Overlay D9.1. Background Auckland's indigenous biodiversity is unique with a diverse range of ecosystems reflecting the complex physical environment of the region. Natural
More informationGB River Esk from source to Baysdale Beck (Esk and Coast) Ecological Status: Moderate. Failing Elements: Fish, ph, Zinc
GB104027068090 River Esk from source to Baysdale Beck (Esk and Coast) Ecological Status: Moderate Failing Elements: Fish, ph, Zinc Costings Issues identified Solutions / work required Responsibility/Lead
More informationHumber Management Scheme. FAQs Water quality
Humber Management Scheme FAQs Water quality Key organisations and involvement in EMS management The Water Framework Directive (WFD) sets out how the water environment in England will be managed using a
More informationHABITAT ACTION PLAN FOR EUTROPHIC AND MESOTROPHIC STANDING WATERS
HABITAT ACTION PLAN FOR EUTROPHIC AND MESOTROPHIC STANDING WATERS AUTHOR: LEAD AGENCY: Eric Palmer, Nottinghamshire Wildlife Trust. Environment Agency Trentside Offices Scarrington Road West Bridgford
More informationCopyright United Utilities Water Limited
Copyright United Utilities Water Limited 2016 1 Contents 1. Aims... 2 2. Background... 2 3. Tracking supply-demand in West Cumbria... 3 4. Contingency plan... 3 5. River Ehen Special Area of Conservation
More informationWater for life and livelihoods
Water for life and livelihoods Western Wales River Basin District: Challenges and choices Facts and statistics Background information On 1 April Natural Resources Wales brought together the work of the
More informationThe Wildlife Trusts Biodiversity Benchmark Requirements
1 COMMIT 1.1 Policy Your organisation has a biodiversity policy in relation to its landholdings which is: a. a statement of your organisation s commitment to i. compliance with legal requirements relevant
More informationPhase III Watershed Implementation Plans
Phase III Watershed Implementation Plans Including programmatic outcomes in your planning to provide co-benefits for your community and reduce pollution Rachel Felver Chesapeake Bay Program Director of
More informationLesson 2-2: Riparian Zones
2-14 Lesson 2-2: Riparian Zones Time of Lesson: 1 hour Rationale: The purpose of this lesson is to define what a riparian zone is and link its importance for fish and other animals, and humans, and the
More informationKent Biodiversity 2020 and beyond a strategy for the natural environment
Kent Biodiversity 2020 and beyond a strategy for the natural environment 2015-2025 Introduction Action for the natural environment in Kent and Medway will be delivered by many organisations and individuals
More informationMaitland Valley WATERSHED
Maitland Valley WATERSHED Report Card 2018 Maitland Conservation has prepared this report card as a summary of the state of your forests, wetlands, and water resources. WHERE ARE WE? We are one of 36 Conservation
More informationThree visions of the Mississippi River
Three visions of the Mississippi River Ecological Settlement Infrastructural Systems Analysis: Hierarchical scale of interacting subsystems from the free services of nature to the commerce of regional,
More informationthe snapshot version
the snapshot version 2012 Update Prepared by: Morro Bay National Estuary Program Morro Bay, California Morro Bay National Estuary Program The Morro Bay National Estuary Program works to protect and restore
More informationSite Improvement Plan. River Axe SAC. Improvement Programme for England's Natura 2000 Sites (IPENS) Planning for the Future
Improvement for England's Natura 2000 Sites (IPENS) Planning for the Future Site Improvement Plan River Axe Site Improvement Plans (SIPs) have been developed for each Natura 2000 site in England as part
More informationSite Improvement Plan. Cannock Chase SAC. Improvement Programme for England's Natura 2000 Sites (IPENS) Planning for the Future
Improvement Programme for England's Natura 2000 Sites (IPENS) Planning for the Future Site Improvement Plan Cannock Chase Site Improvement Plans (SIPs) have been developed for each Natura 2000 site in
More informationStorm Water Management
Storm Water Management Policy September 2014 2 Sustainable drainage feature designed to control and manage flows through a series of check dams 3 Document Name: Storm Water Management Controlled Copy No:
More informationPART 1. To: Scottish Consultation Authorities: PART 2
PART 1 To: Scottish Consultation Authorities: SEA.gateway@scotland.gsi.gov.uk PART 2 An SEA Screening Report is attached for the plan, programme or strategy (PPS) entitled: Scotland River Basin Management
More informationSW E N. South West Environment Network 2010 Environment Priorities
SW E N South West Environment Network 2010 Environment Priorities SWEN s 2010 Environmental Priorities The top four environmental priorities for the South West. At a time when the natural environment,
More informationSolving wicked problems on the Wye. Lessons for elsewhere?
Solving wicked problems on the Wye Lessons for elsewhere? Wye and Usk Foundation and partners 1996- Successfully dealt with issues within our control. - Salmon exploitation (Nets 2002, Rods 2012) - Riparian
More informationUse of modelling for protecting and improving water quality
Use of modelling for protecting and improving water quality 12 th October 2016 Name Organisation Hannah Green with thanks to Paul Simmons, Neil Murdoch, Paul Davidson Environment Agency Water Quality Outline
More information21 ST CENTURY DRAINAGE PROGRAMME CAPACITY ASSESSMENT FRAMEWORK EXECUTIVE SUMMARY
21 ST CENTURY DRAINAGE PROGRAMME CAPACITY ASSESSMENT FRAMEWORK EXECUTIVE SUMMARY Report Ref. No. 21CDP.CAF Programme Area & Reference Report Title Project Management Contractor Sub-Contractor Author of
More informationMURPHY DRAIN CATCHMENT
The RVCA produces individual reports for 16 catchments in the Lower Rideau subwatershed. Using data collected and analysed by the RVCA through its watershed monitoring and land cover classification programs,
More informationRiver Forth catchment profile
River Forth catchment profile Introduction The River Forth catchment encompasses a large area approximately 1029 km 2. As can be seen in Figure 1, the catchment not only contains the River Forth itself,
More informationHealthy Waterways: Healthy Catchments. South East Queensland, Australia
Healthy Waterways: Healthy Catchments Two decades of experience in South East Queensland, Australia Diane Tarte y November 2010 South East Queensland Catchments Moreton Bay Ramsar Site Population: 2.8
More informationUpper Wharfe Sub-Catchment Evidence Pack for the Water Framework Directive
Upper Wharfe Sub-Catchment Evidence Pack for the Water Framework Directive Executive summary of suggested EA priorities: Need Characterisation Study of Hebden Beck; this advanced study will identify the
More informationWater Framework Directive and EIA: our experience. Jo Murphy, MIEMA CEnv MCIM National Environmental Assessment Service (NEAS) 31 May 2012
Water Framework Directive and EIA: our experience Jo Murphy, MIEMA CEnv MCIM National Environmental Assessment Service (NEAS) 31 May 2012 The plan Me: Aims & objectives of the Water Framework Directive
More informationAs one of our greatest assets there is a need to take collective action to protect, enhance and value our environment for now and for future
1 As one of our greatest assets there is a need to take collective action to protect, enhance and value our environment for now and for future generations, ensuring that the Vale of Glamorgan is globally
More informationClimate Change Strategy for Wales. Adaptation Delivery Plan
Climate Change Strategy for Wales Adaptation Delivery Plan October 2010 1 ISBN 978 0 7504 5715 6 Crown Copyright October 2010 WAG10-03167 F0021011 Introduction As a result of past and current emissions,
More informationBiodiversity Offsetting in Doncaster. Guidance on the Process
Biodiversity Offsetting in Doncaster Guidance on the Process 1 Contents Chapter 1 - Introduction 1.1 What is biodiversity offsetting? Pg 3 1.2 Doncaster s role in the biodiversity offsetting pilot Pg 3
More informationCouncil CNL (15)43. Maintaining and improving river connectivity: the current position and experience in England
Agenda item 5.2 For information Council CNL (15)43 Maintaining and improving river connectivity: the current position and experience in England CNL(15)43 Maintaining and improving river connectivity: the
More informationSite Improvement Plan. Saltfleetby-Theddlethorpe Dunes & Gibraltar Point SAC
Improvement Programme for England's Natura 2000 Sites (IPENS) Planning for the Future Site Improvement Plan Site Improvement Plans (SIPs) have been developed for each Natura 2000 site in England as part
More informationFACTSHEET INTRODUCTION. help rebalance the water cycle, mitigate the effects of climate change and improve human health and livelihoods.
1 FACTSHEET INTRODUCTION World Water Day, on 22 March every year, is about focusing attention on the importance of water. This year s theme, Nature for Water, explores nature-based solutions (NBS) to the
More informationBARNSLEY METROPOLITAN BOROUGH COUNCIL
BARNSLEY METROPOLITAN BOROUGH COUNCIL This matter is a Key Decision within the Council s definition and has been included in the relevant Forward Plan Joint Report of the Executive Directors for Communities
More informationPR19 Business Plan. Delivering the Water Industry Strategic Environmental Requirements (WISER)
PR19 Business Plan Delivering the Water Industry Strategic Environmental Requirements (WISER) 17 August 2018 Contents 1. Introduction... 3 2. Our business plan at a glance: 5 years, 5 pledges... 4 3. Meeting
More informationWillow Brook Catchment Project
Willow Brook Catchment Project Willow Brook Park Page 1 Contents 1. Introduction. 3 1.1 Background The Water Framework Directive and Drivers for Change... 3 1.2 The Willow Brook Catchment and Water Framework
More informationImproving the River Nene The Nene Valley Nature Improvement Area. Oliver Burke and Heather Ball
Improving the River Nene The Nene Valley Nature Improvement Area Oliver Burke and Heather Ball Source, 146m Elevation Northampton Navigation Peterborough Distance Tidal limit, -1m Making space for nature
More informationCouncil CNL(14)40. Annual Progress Report on Actions Taken Under Implementation Plans for the Calendar Year 2013
Agenda Item 6.1 For Information Council CNL(14)40 Annual Progress Report on s Taken Under Implementation Plans for the Calendar Year 2013 EU UK (Scotland) (Updated 12 May 2014) This APR was originally
More informationCentral Lincolnshire Green Infrastructure Steering Group. Biodiversity Opportunity Mapping Study for Central Lincolnshire
Central Lincolnshire Green Infrastructure Steering Group Biodiversity Opportunity Mapping Study October 2013 CONTENTS EXECUTIVE SUMMARY 1.0 INTRODUCTION 1 1.1 Background 1 1.2 Purpose 2 1.3 Objectives
More informationChapter 5 Design and Use of GIS-based Water Resources Database Models
Chapter 5 Design and Use of GIS-based Water Resources Database Models Abstract This chapter is about water resource database models for urban and regional environmental concerns. GIS database analysts
More informationAppendix B Business as Usual SEA Appraisal Matrix
Appendix B Business as Usual SEA Appraisal Matrix Key Scoring codes S++ Strongly supports the SEA objective S+ Supports the SEA objective N= Is neutral in effect C- Potentially conflicts with the SEA objective
More informationBIODIVERSITY ACTION PLAN
BIODIVERSITY ACTION PLAN FOR HAMPSHIRE V O L U M E O N E HAMPSHIRE BIODIVERSITY PARTNERSHIP BIODIVERSITY ACTION PLAN FOR HAMPSHIRE VOLUME ONE Compiled by Jacklyn Johnston on behalf of the Hampshire Biodiversity
More informationAgriculture and the Environment IX, Valuing Ecosystems: Policy, Economic and Management Interactions (2012)
DELIVERING ECOSYSTEM SERVICES IN NATIONAL TRUST LANDSCAPES: DEVELOPING A LAND CAPABILITY PROCESS KA Hearn 1 and TRE Thompson 2 1 National Trust, Heelis, Kemble Drive, Swindon, Wilts, SN2 2NA, UK, E-mail:
More informationLaHave River Watershed Project 2015 Field Report
LaHave River Watershed Project 2015 Field Report Prepared by S. Fredericks Bluenose Coastal Action Foundation 37 Tannery Road Lunenburg, N.S. B0J 2C0 April 2016 LaHave River Watershed Project 2015 Project
More informationConservation Authorities Act Review
Conservation Authorities Act Review What it is: As a first step, the Ministry of Natural Resources and Forestry has developed a Discussion Paper which is posted on the provincial government s Environmental
More informationCharter: Great Lakes Region Aquatic Habitat Connectivity Collaborative
Charter: Great Lakes Region Aquatic Habitat Connectivity Collaborative Preamble Aquatic Habitat Connectivity The nature and extent of habitat connectivity is a key contributor to biodiversity conservation
More informationThe draft criteria for BAP Rivers in the England Biodiversity Strategy that are relevant to Buckinghamshire and Milton Keynes are as follows;
Rivers and Streams Key associated species Bittern Black Poplar Brook Lamprey Bullhead Depressed River Mussel Daubenton s Bat Flowering Rush Freshwater Pea Mussel Kingfisher Otter Pipistrelle Reed Warbler
More informationWAT E R FOR GROWTH WATER MANAGEMENT PLAN
WAT E R FOR GROWTH WATER MANAGEMENT PLAN 2015-2040 THE GREATER LINCOLNSHIRE LEP CONSIDERS THE EFFECTIVE MANAGEMENT OF FLOOD RISK AND WATER RESOURCES TO BE A CRITICAL FACTOR IN ENABLING ECONOMIC GROWTH
More informationLincolnshire Coastal Vision
APPENDIX A Lincolnshire Coastal Vision Draft for discussion version 1.1: 22 nd May 2015 A Vision for Lincolnshire's Coast by 2030 We will sustain and grow coastal businesses and the economy We will sustain
More informationSite Improvement Plan. South Solway Mosses SAC. Improvement Programme for England's Natura 2000 Sites (IPENS) Planning for the Future
Improvement Programme for England's Natura 2000 Sites (IPENS) Planning for the Future Site Improvement Plan South Solway Mosses Site Improvement Plans (SIPs) have been developed for each Natura 2000 site
More information