Evaluation Of The Cleanup Of Lead Paint Dust In Houses - LSZ, Inc.

Size: px
Start display at page:

Download "Evaluation Of The Cleanup Of Lead Paint Dust In Houses - LSZ, Inc."

Transcription

1 1 of 19 04/15/2008 8:44 AM Evaluation Of The Cleanup Of Lead Paint Dust In Houses Pinchin Project C5560 May 5, 1995 Prepared for: Prepared by: Research Division Canada Mortgage and Housing Corporation 700 Montreal Road Ottawa, Ontario K1A 0P7 CMHC Project Manager: Don Fugler Pinchin Environmental Consultants Ltd Coopers Avenue Mississauga, Ontario L4Z 1R9 Principal Consultant: Bruce Stewart, CIH, ROH Table of Contents A. Disclaimer B. Abstract C. Executive Summary 1.0 Introduction 1.1 Background 1.2 Project Objectives 1.3 Cleaning Methods 2.0 Testing Procedures 2.1 Schedule 2.2 Selection of Houses 2.3 Measurements of Lead in Paint 2.4 Test Room Preparation 2.5 Paint Disturbance 2.6 Cleaning Procedures 2.7 Surface Contamination Testing 2.8 Personal Airborne Exposure Measurements 3.0 Results 3.1 Lead Concentrations in Paint 3.2 Lead Surface Contaminations Before Cleaning 3.3 Lead Surface Contaminations After Cleaning 3.4 Airborne Lead Measurements 4.0 Conclusions 5.0 References Appendix Detailed Field Data Disclaimer This study was conducted for Canada Mortgage and Housing Corporation under

2 2 of 19 04/15/2008 8:44 AM Part IX of the National Housing Act. The analysis, interpretations and recommendations are those of the consultant and do not necessarily reflect the views of Canada Mortgage and Housing Corporation or those divisions of the Corporation that assisted in the study and its publication. Abstract A field research project was conducted to evaluate the effectiveness of various cleaning procedures for the cleanup of lead paint dust from floors. Twenty test rooms were identified in nine houses as having lead-based paint on walls, by X-ray fluorescence and chemical testing. The rooms were isolated, and sections of the walls were power-sanded to create lead paint dust. Four different cleaning protocols were used to clean floors in the rooms. Wipe samples were taken before and after cleaning to determine the level of lead contamination. The results of post-cleaning samples were compared to the current and proposed U.S. federal guidelines for acceptable cleanliness after lead abatement, of 2,150 micrograms per square metre, and 1,076 micrograms per square metre, respectively. Two cleaning methods, one that used a combination of sweeping and a utility vacuum, and another that used a utility vacuum followed by mopping with a household cleaner, did not meet the U.S. criteria. These two methods represent the cleaning procedures commonly available to householders. Two more elaborate methods, that used Ledizolv, a lead-specific cleaning agent, or trisodium phosphate, in combination with either a utility vacuum or a High Efficiency Particulate Air filtered vacuum, both met the criteria. Airborne dust concentrations during power sanding of leaded paint were shown to be up to 83 times the currently recommended industrial exposure limit of 50 micrograms per cubic metre of air. Airborne concentrations were also elevated during dry sweeping with a broom. Key Words A. Lead abatement B. Lead based paint C. Lead paint dust D. Renovations E. X-ray fluorescence Executive Summary Pinchin Environmental Consultants Ltd. was retained by Canada Mortgage and Housing Corporation to conduct a field research project to evaluate the effectiveness of four cleaning methods used for the cleanup of lead paint dust from floors in houses. Renovation projects in older houses may disturb and release lead from lead paint, which will require effective cleanup. The criteria for adequate cleaning for the purpose of this study was the ability to meet the clearance standards set by the U.S. Department of Housing and Urban Development (HUD). There are no Canadian federal or provincial standards for lead dust cleanup. A total of 20 test rooms were identified in 9 houses in Windsor, Ontario. The presence of lead in paint was determined by on-site X-ray fluorescence measurement and laboratory chemical analysis. The test rooms were isolated and areas of lead paint were power-sanded to create airborne dust containing lead paint. Following a settling period, the floors were cleaned of dust by one of four methods, which include commonly used household cleaning methods, as well as specialized cleaning agents and procedures developed for cleanup after lead paint abatement. The four cleaning methods were: Cleaning Method 1: Step 1. Sweep the floor dry with a corn broom.

3 3 of 19 04/15/2008 8:44 AM Step 2. Vacuum the floor with a utility vacuum (shop vacuum). Cleaning Method 2: Step 1. Vacuum the floor with a household vacuum cleaner. Step 2. Mop the floor with a commercial household cleanser. Cleaning Method 3: Step 1. Vacuum the floor with a utility vacuum. Step 2. Mop the floor with a 2% solution of Ledizolv, a commercial lead-cleaning product. Step 3. Rinse the floor with clean water. Cleaning Method 4: Step 1. Vacuum with a High Efficiency Particulate Air filtered (HEPA) vacuum. Step 2. Mop with a Tri-Sodium Phosphate (TSP) cleaner, 2 tablespoons per gallon of water. Step 3. Rinse the floor with clean water. Step 4. Vacuum the floor with a HEPA vacuum. The degree of lead contamination on the floors was determined by wipe samples taken before and after cleaning, following a HUD protocol for surface sampling and analysis. The wipe samples showed that Cleaning Methods 1 and 2 were inadequate to meet the cleanliness criteria of the current or the proposed U.S. federal standards. This indicates that cleaning techniques as currently practiced in Canadian households are not adequate to meet U.S. national standards for clean-up of lead dust. Cleaning Methods 3 and 4 did meet both the current and proposed HUD criteria. However, the cleaning agent or type of vacuum cleaner used in these latter methods are not currently available to householders and small contracting firms. Householders and contractors should be advised to follow effective cleaning methods when lead dust is suspected. Airborne lead measurements made during the power-sanding of leaded paint showed extremely high levels, up to 83 times the allowable exposure for the period of the disturbance. Uncontrolled power sanding, without effective locally-exhausted dust collection, should be discouraged. Airborne lead measurements made during cleaning showed excessive exposures only during the use of dry sweeping. Dry sweeping should also be discouraged. 1.0 Introduction Pinchin Environmental Consultants Ltd. was retained by the Research Division of Canada Mortgage and Housing Corporation to conduct a field research project to investigate the effectiveness of various methods for the clean-up of lead paint dust in houses. This document is the final report of this project. 1.1 Background In the past, many types of consumer paints were formulated with lead compounds. Up until the 1940's, lead compounds were commonly used in paint as the hyde or blocking agent of the paint. Lead pigments were also used to provide the colour of the paint, especially where colour-fastness was required. Some lead compounds were added to oil-based paints and varnishes, as drying agents. The amount of total lead in consumer paints was limited by federal legislation in 1976, to no more than 0.5% by weight of the dried paint film (1). Houses built before 1976 may contain lead paint on walls, wood and plaster trim, and on components, such as radiators, ironwork, doors, cupboards, etc. In houses built after the Second World War, lead paint may be found on walls, but is more likely limited to trim, exterior paint, and components. Older houses may have lead

4 4 of 19 04/15/2008 8:44 AM paint anywhere. The total amount of lead on surfaces can amount to levels as high as 20 milligrams per square centimetre of surface area (mg/cm2). Renovations to older housing may disturb lead paint through such common activities as sanding walls and trim for surface preparation, removal of paint for re-finishing, and demolition of walls and components. All these activities will release lead-containing dust to the household. In addition, deterioration of lead-based paint through weathering, water damage, or abrasion at friction surfaces (such as at windows) can release finely divided lead dust. The chief concern regarding exposure to lead in houses is the possible exposure of young children, especially under 6 years of age. Young children can come in contact with lead paint and dust particles on floors, windowsills, furnishings, etc. During times of renovation, there is the potential for children to receive hazardous exposures to lead. In the United States, there have been many reports of severe lead poisoning to children resulting from renovations in older houses. Sanding of leaded paint during a renovation can release sufficient lead dust to seriously harm children and the fetus carried by a pregnant woman (2). There are no Canadian standards for the acceptable level of lead dust that could be used to evaluate the significance of lead contamination in houses. The United States Department of Housing and Urban Development (HUD), which sets housing policy in the United States, has set a clearance criteria for lead abatement work. That criteria requires floor surfaces to have less than 2,150 micrograms of lead per square metre (ug/m2), before the residents can return to the house (3). Samples are collected by wiping known areas of surfaces with a moistened tissue to collect the loose, available surface contamination. In 1994, the U.S. Environmental Protection Agency recommended a criteria of 1,076 ug/m2 for surface dust in houses following lead abatement work (4). HUD will adopt this lower standard in the 1995 revisions to the Guidelines for Lead-Based Paint Hazard Identification and Abatement (5). 1.2 Project Objectives The objective of this project was to evaluate the effectiveness of various cleaning methods as applied to the clean-up of lead paint dust present on the floors of houses. The project required the identification and supply of 20 test houses or rooms with known lead paint, the controlled disturbance of lead-based paint to produce lead-containing dust on the floors, and the clean-up of this dust by one of four cleaning methods. Surface contamination tests were taken before and after the cleaning. The residual contamination levels were compared to the current and proposed HUD clearance criteria. In addition, airborne lead measurements were made to evaluate the possible hazard during lead paint disturbance, and during vacuum and wet-cleaning. 1.3 Cleaning Methods Four cleaning methods were set by CMHC and Pinchin, to cover a wide range of complexity from the simplest, commonly used household methods, to the specialized cleaning method recommended by the HUD Guidelines. These are as follows: Cleaning Method 1: Step 1. Sweep the floor dry with a corn broom. Step 2. Vacuum the floor with a utility vacuum (shop vacuum). Cleaning Method 2: Step 1. Vacuum the floor with a household vacuum cleaner. Step 2. Mop the floor with a commercial household cleanser. Cleaning Method 3:

5 5 of 19 04/15/2008 8:44 AM Step 1. Vacuum the floor with a utility vacuum. Step 2. Mop the floor with a 2% solution of Ledizolv, a commercial lead cleaner. Step 3. Rinse the floor with clean water. Cleaning Method 4: Step 1. Vacuum with a High Efficiency Particulate Air filtered (HEPA) vacuum. Step 2. Mop with Tri-Sodium Phosphate (TSP), 2 tablespoons per gallon of water. Step 3. Rinse the floor with clean water. Step 4. Vacuum the floor with a HEPA vacuum. 2.0 Testing Procedures 2.1 Schedule An initial trial of four rooms, cleaned by the four different methods, was conducted in August The initial trial allowed the team to evaluate the isolation methods and worker protection. A few minor changes were made to the procedures, and these are discussed below. The remaining 16 rooms were tested in the period of late October to mid November, Detailed information on the tests performed in each room, environmental factors, room descriptions, etc. are given on a room-by-room basis, in Appendix. 2.2 Selection of Houses For this project, 20 test rooms were to be identified. To be included, the test rooms had to meet the following criteria: Have a significant concentration of lead paint on at least one wall, of approximately 3 mg/cm2 or more. Be of residential construction, ie. a house or apartment. Based on the XRF measurements, 9 houses were selected for this study, providing 20 test rooms. The houses, all in Windsor, Ontario, were scheduled for demolition and were made available for this research program. The houses all dated from the 1930's and 1940's. 2.3 Measurements of Lead in Paint A Scitec Corporation MAP-3 spectrum-based X-ray fluorescence (XRF) analyzer was used to measure lead paint concentrations on-site. The Scitec instrument is specifically designed and calibrated to measure the lead content of paint, on a variety of substrates. The analyzer measures the sum of lead present, in all paint layers, to a depth of at least 6 mm. The response of the XRF analyzer was checked several times per day, against a reference paint block. In addition to the XRF measurements scrapings of paint were taken from the Test Rooms 1-4, by knife collection, and were analyzed by acid digestion and chemical analysis, at Entech Laboratories, Mississauga. For Test Rooms 5-16, a more detailed chemical testing procedure was used. The purpose of this procedure was to give chemical test data that could be compared to the results of the XRF instrument. An XRF measurement was first made, and the footprint of the instrument was marked on the wall. Then known areas of paint, of a minimum area of 16 square centimetres, were removed from within the footprint of the XRF instrument, using a heat gun with built-in scraper blade. At the time of the testing, it appeared that the heat gun procedure removed all layers of paint effectively. However, as is discussed below in Results, there was a very poor correlation between the XRF results and chemical testing, suggesting that the heat gun method for removal of paint samples was not effective in removing all layers of paint.

6 6 of 19 04/15/2008 8:44 AM 2.4 Test Room Preparation Preparation of the rooms started with removal of furniture, boxes, or any other loose articles. Temporary power and lighting was provided. Cupboards, built-in cabinets, and other items that could not be removed, and which would collect dust during the paint disturbance, were sealed over with 6 mil polyethylene and tape, to prevent the possible transfer of dust from these surfaces to the floor during cleaning. Any openings to the room, ie. broken windows, vents, transfer grilles, etc., were sealed with polyethylene and tape. Double flap doors were built at the entrance to the room, by attaching two sheets of polyethylene sheeting to the two sides of the door casing, and affixing the plastic at the headers and to the alternate jambs. The double flap doors served to minimize air movement on entry or exit from the test room. If carpeting was present, it was removed, and the underlying floor cleaned of debris and staples, to allow effective cleaning. 2.5 Paint Disturbance The paint disturbance consisted of sanding a known amount of paint off a wall, plus the removal of some painted wood trim. A 6" angle grinder fitted with a medium abrasive pad and rubber backing pad was used to grind off the wall paint, in all rooms except Test Room 1. In Test Room 1, a belt sander was used to remove the paint, but this method was ineffective, and tended to gouge the plaster; this method was abandoned after the first room. In disturbing the paint, the angle grinder was held in light contact with the paint, so that the paint was feathered off the plaster, and the minimum amount of plaster was removed. A known area of wall paint was disturbed (0.44 square metres in Test Room 1, and 0.36 square metres in all other rooms). This area of disturbance was adequate to give a considerable coating of dust, equivalent to about 0.1 mm to 1 mm of settled dust. In most rooms, the paint was disturbed at one 60 cm by 60 cm location. In a few larger rooms, the area to be disturbed was split between two locations, to assist in producing a more uniform level of dust on the floors. The technician performing the grinding wore disposable coveralls with attached hood and boot covers, and was protected with a full-facepiece powered air purifying respirator equipped with a high efficiency filter cartridge. Based on the maximum airborne concentration measured during the testing, this respiratory protection was adequate. The dust levels during the sanding were very high; visibility across the rooms was limited. After completing the sanding, which took approximately minutes per room, the room was left undisturbed for a minimum of 16 hours, to allow the airborne dust to settle. The paint disturbance also included the removal of some trim components, commonly painted with lead paint. In Test Rooms 1-4, this was the removal of the longest piece of baseboard. However, when the baseboard was removed, this allowed considerable amounts of airborne dust to be transferred out of the test room and into adjacent areas. To prevent the inadvertent tracking of contamination into the test rooms, from supposedly clean areas, the removal of baseboard was not performed in Test Rooms Rather, the casing trim at one door was removed as part of the paint disturbance. However, it should be noted that this disturbance released a very small amount of paint debris compared to the sanding of the wall paint. 2.6 Cleaning Procedures A few minor changes were made in the cleaning procedures and surface testing protocol, based on the initial experience. In the initial trial TSP was used as the cleaning agent in Method 3, rather than Ledizolv, due to the latter product being

7 7 of 19 04/15/2008 8:44 AM unavailable at that time. For the subsequent tests, Ledizolv was used. The cleaning of the floors in all four methods was preceded by a vacuum cleaning of settled dust on vertical surfaces within the test room (except for the floor), including the tops of baseboards, window sills, polyethylene sheeting over articles, etc. The purpose of this pre-clean was to eliminate a possible source of paint dust contamination that might later contaminate the cleaned floor. For Test Rooms 1-4, this cleaning was performed with a HEPA vacuum. For the remaining test rooms, the vacuum assigned to the cleaning method was used. For consistency, the same two technicians performed all of the cleaning tasks; in fact at least 80% of the cleaning was performed by the same technician. The four cleaning methods were performed as follows: Method 1: A. The floor was swept with a corn broom, in one direction only. B. The floor was vacuumed, first in one direction, and then in the perpendicular direction, with a utility vacuum (Model 500 Wet/Dry Utility Vacuum, Shop Vac Canada, 4 gallon canister, 1.25 HP peak, 165 Watts peak air power). This vacuum was selected as one of the most economical utility vacuums available (under $50 retail price), and would be typical of the basic utility vacuum present in many households or used by small contractors. The vacuum was used with the liner bag available for this model, which would provide some increased collection efficiency, compared to operation without the liner bag. The vacuum had been pre-loaded to at least 10% capacity with dust and debris prior to use in the test rooms, by vacuuming existing debris in the apartment. Method 2: A. The floor was vacuumed, in one direction and then in the perpendicular direction, with a household vacuum cleaner fitted with a floor brush (Filterqueen Model 700). This vacuum was chosen to be typical of the equipment commonly used in household cleaning. The vacuum had been fitted with a new filter prior to this work, and was pre-loaded with some debris. This model discharges air upwards from the top of the vacuum body. B. The floor was mopped, in one direction and then in the perpendicular direction, with the same solution of a common household cleaner (Mr. Clean), mixed with water according to the recommendations on the container. This product was chosen as representative of a common household cleanser that does not require a rinse step. The cleaning solution was held in a plastic household-type bucket and applied with a sponge mop. The dirty sponge mop was rinsed and squeezed out into the cleaning solution, as is typical of common household cleaning. Method 3: A. The floor was vacuumed, in one direction and then in the perpendicular direction, with the utility vacuum described above. B. The floor was mopped, in one direction and then in the perpendicular direction, with the same solution of a specific lead-cleaning detergent (Ledizolv ). The Ledizolv was mixed to form a 2% solution, as recommended by the manufacturer (8 fluid ounces to 2.5 Imperial gallons). The cleaning solution was held in a plastic household-type bucket. The

8 8 of 19 04/15/2008 8:44 AM sponge mop was wrung out into the bucket, as is typical of household cleaning. C. The floor was rinsed, in one direction and then in the perpendicular direction, with the same clean rinse water held in a clean bucket. The same mop-head as had been used for the Ledizolv wash, was used for the rinse stage. Method 4: The cleaning procedure recommended by the HUD Guidelines. A. The floor was vacuumed with a wet-dry HEPA vacuum (Tiger Model B-5 DS, TigerVac Inc., Montreal, 1200 Watts total power), in one direction and then in the perpendicular direction operated without a collection bag. B. The floor was mopped, in one direction and then in the perpendicular direction, with a solution of tri-sodium phosphate (TSP) in water. The TSP solution was made up to the concentration suggested on the product container for heavy duty cleaning (2 tablespoons per gallon of water). The cleaning solution was applied to the floor by a garden-type water sprayer, and the mop-head was wrung out into a dirty water bucket. In this HUD-specified procedure, the clean TSP wash solution is not contaminated by the dirt collected by the mop-head. C. The floor was rinsed, in one direction and then in the perpendicular direction, with water. The rinse water was applied to the floor by a garden-type water sprayer, and the mop-head was wrung out into a dirty rinse water bucket. D. The floor was vacuumed again with the wet-dry HEPA vacuum. A number of steps were taken to prevent transfer of contamination into the rooms: A. The vacuums were inspected before each use B. New mop-heads and brooms were used for each test room. C. New coveralls and boot covers were donned for each entry into a test room. D. All equipment was vacuumed and wet-cleaned after work was complete in each house. 2.7 Surface Contamination Testing Pre-cleaning and post-cleaning surface contaminant tests were taken by wiping known areas of the floor with the HUD recommended surface sampling procedure. The technician donned new latex gloves, and wiped a marked location of known area with a moistened baby wipe (Huggies Unscented Baby Wipes, Kimberley Clark, Neenah, Wisconsin; alcohol-free and aloe-free). The test area was wiped once in one direction with overlapping S-strokes; the wipe was folded; the area was re-wiped in the perpendicular direction; the wipe was folded once again; the area was wiped once again, in the original direction. The wipe was then placed into a sterile 60 ml specimen jar. The wipes were analyzed for lead at Entech Laboratories, Mississauga, by acid digestion and either Atomic Absorption or Inductively-Coupled Plasma Emission spectroscopy. A total of three field blank wipes were collected by donning new gloves, folding a clean wipe three times, and placing into a sample container. The test area wiped was 30 cm X 30 cm for all samples taken, except for the pre-clean sample taken in Test Room 2, for which an area of 20 cm X 20 cm was sampled.

9 9 of 19 04/15/2008 8:44 AM In Test Rooms 1-4, there was one pre-clean wipe test taken, and 5 post-clean samples taken. The pre-clean wipe was collected at the centre of the room. The post-clean samples were taken, one at the centre of the room, and the remaining 4 samples half-way along the 4 diagonals between the centre and each of the 4 corners. In Test Rooms 5-20, there were 2 pre-clean wipe tests taken, and 4 post-clean samples. The pre-clean samples were taken at 1/3 and 2/3 of the distance along a line running down the middle of the room, in the longest direction. The post-clean samples were taken half-way along the 4 diagonals between the centre and each of the 4 corners. The amount of damage to the floor was noted, both generally across the floor, and at each specific test location. Two samples of wall contamination were taken in Test Rooms 2 and 3, in order to measure the amount of lead dust on the walls that might be released to the floors either during or after the cleaning. 2.8 Personal Airborne Exposure Measurements Task-based measurements of airborne lead concentrations were made during the paint disturbance in 3 rooms, and during the cleaning operations in 18 rooms. Samples of airborne lead were collected by drawing known volumes of air through cellulose ester filters held in closed-face sampling cassettes. A battery-operated pump, flow-calibrated before the work, was worn by the technician, with the sampling cassette clipped on their shoulder. In this way, the personal exposure was estimated. Analysis was performed at Entech Laboratories. The air sampling and analysis followed the U.S. National Institute for Occupational Safety and Health (NIOSH) Method The sampling data is given in the room-by-room field information of Appendix. 3.0 Results and Discussion Tables 1 to 4 present the detailed results for this project, organized by Cleaning Methods 1 to 4 respectively. For each test room, the following results are given: A. Average lead concentration in paint on walls, by XRF (mg/cm2) B. Average lead concentration in paint on walls, by chemical testing (%) C. Floor type D. Floor condition E. Pre-cleaning lead surface concentrations on floors (ug/m2) F. Post-cleaning lead surface concentrations on floors (ug/m2) Figure 1 presents the post-cleaning floor concentrations, plotted by cleaning method, and in relation to the current and proposed HUD criteria for floor cleanliness. 3.1 Lead Concentrations in Paint The concentrations of lead paint disturbed in the 20 Test Rooms, as measured by the XRF procedure, ranged from 2.0 mg/cm2 to 10.3 mg/cm2, and averaged 3.9 mg/cm2. The percentages of lead in paint as measured by scraping or heat gun removal, were from 0.01% to 1.13%. For Test Rooms 5-20, there was an effort made to produce data that would allow a test of the correlation between the XRF results and the chemical tests. The samples for chemical analysis were taken from known areas, with a heat gun procedure, so that it might be possible to compare the XRF and chemical test results on a mass per unit area basis. Figure 2 shows the relationship between the XRF concentrations

10 10 of 19 04/15/2008 8:44 AM and the chemical tests, both taken at the same location. There is a very poor correlation, with the results of the chemical tests all appearing to be lower than the XRF results. Yet, the surface concentrations showed that there was a large amount of lead dust deposited on the floors, so it appears unlikely that the chemical tests were correct. The under-reporting of lead by the chemical tests is likely caused by an under-sampling of the paint by the heat gun method. It is likely that the lowest (and therefore oldest) paint layers, the layers most likely to contain high concentrations of lead, were not effectively collected in this test. It is recommended that correlation testing of this type involve the collection of a bulk sample well into the substrate material. 3.2 Lead Surface Contaminations Before Cleaning The amount of lead contamination on the floors before cleaning is given in Tables 1 to 4. For Test Rooms 8 and 10, the degree of lead contamination on the floor was considerably lower than the remainder of the rooms (1,290 ug/m2 and 4,220 ug/m2, respectively). Since the pre-cleaning lead concentrations were too low, the post-cleaning data for these rooms is considered suspect, and therefore these 2 data sets are rejected. These data sets are not included in the discussion of the remaining 18 data sets. The surface lead concentrations on the floors before cleaning, for the 18 acceptable data sets, ranged from 33,900 ug/m2 to 228,000 ug/m2, and averaged 103,000 ug/m2. The highest surface contamination concentrations corresponded to the highest XRF measurements of lead in paint. Figure 3 shows the relationship between the amount of lead in the paint that was disturbed, as measured by X-ray fluorescence, and the average pre-cleaning lead concentration on the floor. It should be noted that the pre-cleaning floor concentration data is relatively imprecise, as only one or two samples were collected, and the bulk distribution of dust on the floor was visibly non-uniform. Nevertheless, Figure 3 shows a good positive correlation between the amount of lead in the paint that was disturbed, and the floor lead concentration. The XRF results did appear to properly measure the relative amount of lead in the paint. This supports our belief that the poor correlation between the XRF concentrations and the chemical tests was not due to inaccurate XRF measurements, and instead was due to the ineffectiveness of the heat gun sample collection procedure. Two measurements were made of lead contamination on the walls, prior to cleaning. The purpose of these tests was to determine the amount of lead on the walls relative to the level on the floors, so that if dust collected on the walls were to be transferred to the floors during the cleaning, whether this would represent a significant risk to the validity of the data. The two concentrations were 800 ug/m2 (Test Room 2) and 2,530 ug/m2 (Test Room 3). These concentrations are much lower than the pre-cleaning contamination levels measured on the floors, and represent about the same contamination level as the floors after cleaning. Therefore, since there was not a gross transfer of dust from the walls, and the lead content of this dust was low, there is very little chance that the contamination on walls affected the post-cleaning floor concentrations. Three field blank wipes were taken, and gave results of <1 ug, < 1 ug, and 2 ug of lead. These concentrations, even if an averaging calculation assumes the concentration to be at the detection limit, represent a surface concentration measurement of 15 ug/m2, which is very much below the lowest post-cleaning concentration reported. 3.3 Lead Surface Contaminations After Cleaning

11 11 of 19 04/15/2008 8:44 AM Table 1 gives the results for Cleaning Method 1, which is the broom sweeping and utility vacuum procedure. Three of the 5 data sets met the current HUD clearance criteria, and none of the 5 data sets met the proposed clearance criteria. Test Room 5, which had a floor in poor condition, had a much higher post-cleaning surface contamination than the other rooms. Table 2 gives the results for Cleaning Method 2 (household vacuum, household cleaner). Only one of the 5 data sets met the current HUD criteria, and none met the proposed criteria. There was more variation in results than seen with Method 1, and again the highest level of post-cleaning contamination was measured in a room with vinyl tiles in poor condition. Table 3 gives the results for Cleaning Method 3 (utility vacuum, mop with Ledizolv, rinse). All of the 4 acceptable data sets met both the current and the proposed HUD criteria. This included two rooms that were reported as having 3% damage to sheet flooring and 25% of vinyl floor tiles as surface-cracked. Table 4 gives the results for Cleaning Method 4 (HEPA vacuum, TSP wash, rinse, HEPA vacuum). Of the four acceptable data sets, 4 of 4 met the current HUD criteria, and 3 of 4 met the proposed criteria. All of the floors, including sheet flooring, strip hardwood, and vinyl tile, were in good condition. The data for the cleaning methods was also analyzed by determining the percentage of lead dust remaining after cleaning, by dividing the average post-cleaning concentration by the pre-cleaning concentration. This analysis would tend to compensate for any possible inverse relationship between the amount of pre-cleaning lead, and the degree of effectiveness, especially when comparing test rooms with considerably different starting contaminant levels. The average percentage of lead remaining after Cleaning Methods 1, 2, 3 and 4 was 6.7%, 14.9%, 1.5%, and 0.8%, respectively. This analysis again shows that Methods 3 and 4 are much more effective in removing lead paint dust, than Methods 1 and 2. Figure 4 shows the relationship between post-cleaning floor concentrations and the condition of the floor, ranked as Good, Fair or Poor. A ranking of Poor meant a visual estimate of damage of more than 5%; Fair was any amount of damage, up to 5%; Good meant no damage. Note that the cleaning method assignment did not consider the floor condition, so that all methods were not equally challenged by floors in good and poor condition. The test rooms for Methods 3 and 4 had fewer floors in poor condition. As illustrated in Figure 4, there is a strong association between the ability to clean satisfactorily, and the condition of the floor. Floor surfaces in Poor condition could not be satisfactorily cleaned, with any method. This conclusion matched the field observations that the wet cleaning methods tended to continually transfer dust held in cracks, crevices, areas of missing floor, and under cupped floor tiles, back onto the cleaned floor surfaces. Floors that are in poor condition should be protected with plastic sheeting or other cleanable surface, before any paint disturbance, or if contaminated with lead dust, should be removed or permanently covered, for example, with a new layer of underlay and a new finished floor. 3.4 Airborne Lead Measurements Table 5 gives the results of the task-based airborne lead measurements. During disturbance of the lead paint by power sanding, personal exposures ranged from 1,600 ug/m3 to 4,320 ug/m3. For reference, the occupational exposure limit, which represents the maximum exposure recommended for industrial workers averaged over an 8 hour work period (and does not provide adequate protection for children, pregnant women, or men wishing to conceive a child), depending on the jurisdiction, is 50 ug/m3 to 150 ug/m3. The highest airborne exposure measured during this work was 83 times over the 50 ug/m3 limit.

12 12 of 19 04/15/2008 8:44 AM Table 5 also gives the results of personal exposures measured during the cleaning of the floors. Exposures during Cleaning Method 1 averaged 105 ug/m3, above the most recently recommended industrial exposure limit. This high concentration is probably due to the broom sweeping performed in Method 1, and not the use of the utility vacuum, as airborne concentrations during Cleaning Method 3, which used the same utility vacuum, were not excessive. The personal concentrations measured during cleaning by Methods 2, 3, and 4 averaged 30 ug/m3, 22 ug/m3, and 17 ug/m3, respectively. All these methods employ a vacuum cleaning followed by wet cleaning. Interestingly, the average concentration during Method 3, which used the $50 utility vacuum, was not higher, and in fact was lower than during Method 2, which used a much more expensive household vacuum. Although it is good industrial hygiene and public health practice to require HEPA vacuums for removal of toxic materials, this advice may not be required for lead dust arising from sanding. We caution that this finding may not apply to lead dust from other sources, ie. environmental dust, fumes arising from hot work, or dust from chalking of paint. Airborne concentrations measured by Cleaning Method 4, at 17 ug/m3, averaged the lowest of the 4 methods. This may be due to the use of the HEPA vacuum, or the discharge pattern of the HEPA vacuum blower, or the higher air exchange rate with the HEPA vacuum, or possibly even the longer measurement period for Method 4, allowing a longer settling and filtration period. The results for Method 3 indicated that Ledizolv, as applied thoroughly, first in one direction, and then in the opposite direction, using the same cleaning solution, followed by a similar bi-directional rinse, gave surface concentrations that met current and proposed HUD standards. While these findings reflect favorably on this product, it is possible that other cleaning products not tested in this project, if applied as carefully, might also have given acceptable results. 4.0 Conclusions The following conclusions are made, based on the data collected in this project. 4.1 Cleaning of lead paint dust by either i) a utility vacuum followed by Ledizolv and rinsing, or ii) HEPA vacuum cleaning, TSP cleaning, rinsing, and HEPA vacuuming, will likely reduce floor concentrations of lead to levels below both the current and proposed HUD clearance criteria. 4.2 Cleaning of lead paint dust by either i) broom cleaning and a utility vacuum, or ii) household vacuum, followed by mopping with a household cleaner, will not meet either the current or proposed HUD clearance criteria. 4.3 Power sanding of leaded paint produces extremely high and dangerous airborne dust exposure levels, and should be prohibited, without adequate protection. 4.4 Dry sweeping of leaded dust produces high concentrations of airborne dust, and should be discouraged. 4.5 The use of heat guns to collect paint samples for lead determination may not adequately collect all layers of paint, and thereby may under-represent the extent of lead in paint. 4.6 The cleaning of lead dust from floors with major damage is ineffective, in the rooms tested. We recommend that significantly damaged floors be covered with polyethylene sheeting or other protection prior to lead paint disturbance, or the flooring be removed or permanently covered.

13 13 of 19 04/15/2008 8:44 AM 4.7 TSP cleaning solution, as tested in this study, was able to achieve the required level of cleanliness on floors at a much lower concentration than recommended in the HUD guidelines. 5.0 References A. Regulation Respecting the Advertising, Sale and Import of Liquid Coating Materials; made under the Hazardous Products Act, (Canadian federal government) 1976 (as amended) B. Marino, P.E., et al; A Case Report of Lead Paint Poisoning during Renovation of a Victorian Farmhouse; American Journal of Public Health; October 1990; 10: C. Prepublication Copy: Guidelines for the Evaluation and Control of Lead-Based Paint Hazards in Housing; prepared for U.S. Department of Housing and Urban Development, February 1995 D. Goldman, L.R.; Guidance on Residential Lead-Based Paint, Lead-Contaminated Dust, and Lead-Contaminated Soil; U.S. Environmental Protection Agency; July 1994 E. Jonathan Wilson; National Centre for Lead-Safe Housing; Columbia, Maryland; Personal communication, March 1995 Appendix Figure 1: Evaluation of Cleanup of Lead Paint Dust in Houses Figure 2: XRF Lead in Paint Measurements vs. Heat Gun Scraping and Chemical Analysis Figure 3: Pre-Cleaning Floor Lead Contamination vs. XRF Lead in Paint Concentration Figure 4: Post-Cleaning Lead Contamination on Floor vs. Floor Condition Detailed Field Data Table 1 Effectiveness of Floor Cleaning by Cleaning Method 1 (Dry Sweep, Utility Vacuum) Test Room Test Conditions Pre-Cleaning (ug/m 2 ) Post-Cleaning (ug/m 2 ) 1 Average XRF: 5.6 Lead %: 0.9%, 2.5% Floor Type: Sheet flooring Floor Condition: 3% damage 46,000 Average = 46,000 1,310 2,480 2,110 2,530 2,070

14 14 of 19 04/15/2008 8:44 AM Average = 2,100 5 Average XRF: , ,000 10,000 18,200 Lead %: 1.95% Average = 90,400 33,200 Floor Type: Vinyl tile 11,400 Floor Condition: Poor Average = 18,200 7 Average XRF: 2.2 Lead %: 0.44% Floor Type: Sheet flooring Floor Condition: 15% damaged 88,400 76,200 Average = 82,300 3,170 3,480 3,670 1,640 Average = 2, Average XRF: 2.0 Lead %: 1.57% Floor Type: Vinyl tile 65,700 55,600 Average = 60,700 1,140 3,130 1,030 2,890 Average = 2, Average XRF: 2.3 Lead %: 1.91% Floor Type: Sheet flooring Floor Condition: 5% damage 21, ,000 Average = 107,000 2,220 2,440 2,110 1,780 Average = 2,140 NB: For reference, the current HUD cleanliness criteria for floors is 2,150 ug/m 2. HUD proposes to reduce this criteria to 1,076 ug/m 2. Table 2 Effectiveness of Floor Cleaning by Cleaning Method 2 (Household Vacuum, Mop with Household Cleanser) Test Room Test Conditions Pre-Cleaning (ug/m 2 ) Post-Cleaning (ug/m 2 ) 2 Average XRF: 3.9 Lead %: 0.2% 145,000 Average = 5,380 4,000

15 15 of 19 04/15/2008 8:44 AM Floor Type: Sheet flooring 145,000 2,380 Floor Condition: 10% damaged 3,100 4,680 Average = 3,910 6 Average XRF: 3.0 Lead %: 1.40% Floor Type: Vinyl tile Floor Condition: Poor 91, Average = 45,900 21,300 60,900 20,200 17,600 Average = 30,000 9 Average XRF: 4.0 Lead %: 0.60% Floor Type: Sheet flooring Floor Condition: 20% damaged 86, ,000 Average = 104,300 2,670 10,900 2,670 1,530 Average = 4, Average XRF: 4.5 Lead %: 0.60% Floor Type: Sheet flooring 116,000 62,200 Average = 89,100 1,530 1,230 1, Average = 1, Average XRF: 10.3 Lead %: 1.68% Floor Type: Strip hardwood Floor Condition: 3% damaged 166, ,000 Average = 228,000 1,210 1,710 3,700 2,520 Average = 2,290 NB: For reference, the current HUD cleanliness criteria for floors is 2,150 ug/m 2. HUD proposes to reduce this criteria to 1,076 ug/m 2. Table 3 Effectiveness of Floor Cleaning by Cleaning Method 3 (Utility Vacuum, Mop with Ledizolv, Rinse)

16 16 of 19 04/15/2008 8:44 AM Test Room Test Conditions Pre-Cleaning (ug/m 2 ) Post-Cleaning (ug/m 2 ) 3 Average XRF: 2.9 Lead %: 1.7%, 1.6 % Floor Type: Sheet flooring 33,900 Average = 33,900 1, ,067 (TSP was used for wash rather than Ledizolv) Average = Average XRF: 3.1 Lead %: 0.01% (?) Floor Type: Sheet flooring Floor Condition: 3% damaged 12 Average XRF: 3.1 Lead %: 0.76% Floor Type: Strip hardwood 16 Average XRF: 3.4 Lead %: 2.64% Floor Type: Vinyl tile 1, **** 220,000 26,700 Average = 123,000 2, ,000 Average = 57, **** 1,020 1, Average = 947 1,030 1, Average = Average XRF: 2.4 Lead %: 0.75% Floor Type: Vinyl tile Floor Condition: 25% surface cracks 188,000 19,300 Average = 103,650 1,240 1, ,200 Average = 1,076 NB: For reference, the current HUD cleanliness criteria for floors is 2,150 ug/m 2. HUD proposes to reduce this criteria to 1,076 ug/m 2. **** Insufficient lead dust was created in Test Room 8 for a valid test of cleaning ability. The results for Test Room 8

17 17 of 19 04/15/2008 8:44 AM were not included in the overall analysis. Table 4 Effectiveness of Floor Cleaning by Cleaning Method 4 (HEPA Vacuum, TSP Wash, Rinse) Test Room Test Conditions Pre-Cleaning (ug/m 2 ) Post-Cleaning (ug/m 2 ) 4 Average XRF: 4.4 Lead %: 1.3%, 1.3% Floor Type: Sheet flooring 98,700 Average = 98,700 1,580 1,760 1,410 1, Average = 1, Average XRF: 1.6 Lead %: 0.27% Floor Type: Vinyl tile 4,220 4,220 **** ,560 1,110 **** 11 Average XRF: 3.3 Lead %: 1.16% Floor Type: Vinyl tile 40,000 44,400 Average = 42, Average = Average XRF: 4.0 Lead %: 0.93% Floor Type: Strip hardwood 19 Average XRF: 9.5 Lead %: 1.02% Floor Type: Strip 207, ,000 Average =165, ,000 82,800 Average = 226, Average =

18 18 of 19 04/15/2008 8:44 AM hardwood Average = 439 NB: For reference, the current HUD cleanliness criteria for floors is 2,150 ug/m 2. HUD proposes to reduce this criteria to 1,076 ug/m 2. **** Insufficient lead dust was created in Test Room 10 for a valid test of cleaning ability. The results for Test Room 10 were not included in the overall analysis. Table 5 Airborne Lead Concentrations During Lead Paint Disturbance and Cleaning Of Dust Activity Test Room Sample Number Exposure Period (minutes) Airborne Concentration (ug/m 3 ) Paint disturbance Cleaning by Method 1 Cleaning by Method 2 Cleaning by Method , , ,320 Average: 1, Average: < Average: <7 Average: 22 Cleaning by

19 19 of 19 04/15/2008 8:44 AM Method < Average: 17 NB: For reference, the current occupational exposure limit for industrial exposure to airborne lead is a concentration of ug/m 3, depending on the jurisdiction. Children, pregnant women and males wishing to conceive a child are encouraged to maintain exposures below the industrial exposure limit. Home About Us Purchase Online Sample Locate Dealers Site Map Lead Hazards Lead Dust Cleaning Ledizolv Cleaner Ledizolv MSDS For Our Dealers

BP U.S. Pipelines and Logistics (USPL) Safety Manual Page 1 of 8

BP U.S. Pipelines and Logistics (USPL) Safety Manual Page 1 of 8 Safety Manual Page 1 of 8 1. Purpose This policy assists in protecting USPL workers from exposure to lead and to gain compliance with state and federal regulations. 2. Scope The OSHA requirements and this

More information

BP U.S. Pipelines and Logistics (USPL) Safety Manual Page 1 of 8

BP U.S. Pipelines and Logistics (USPL) Safety Manual Page 1 of 8 BP U.S. Pipelines and Logistics (USPL) Safety Manual Page 1 of 8 1. Purpose This policy assists in protecting USPL workers from exposure to lead and to gain compliance with state and federal regulations.

More information

These procedures are to be followed by all persons required to perform the following work:

These procedures are to be followed by all persons required to perform the following work: These procedures are to be followed by all persons required to perform the following work: Entry into any ceiling space above which an asbestos-containing fireproofing or thermal insulation is present.

More information

APPE NDIX F TY PE 2 ASBE STOS WORK PROCEDURES

APPE NDIX F TY PE 2 ASBE STOS WORK PROCEDURES APPE NDIX F TY PE 2 ASBE STOS WORK PROCEDURES TY PE 2 WOR K PR OCE DUR ES These procedures are to be followed by all maintenance personnel and contractors performing the following work at KPDSB buildings.

More information

LEAD-BASED PAINT PRESENT

LEAD-BASED PAINT PRESENT June 5, 2009 Mr. A.L. 26 ##th Street ###, NY 11102 Via email: LEAD-BASED PAINT PRESENT Door Components Enclosed you will find the results of the Lead-Based Paint Inspection (utilizing an X-Ray Fluorescence

More information

EPA s Lead Program Rule At-A-Glance

EPA s Lead Program Rule At-A-Glance EPA s Lead Program Rule At-A-Glance FLOW CHART 1: Do the Requirements Apply to the Renovation? If you will be getting paid to do work that disturbs painted surfaces in a pre-1978 home, apartment building,

More information

Asbestos cement products in your home

Asbestos cement products in your home Asbestos cement products in your home What is asbestos? Asbestos is a naturally occurring fibrous crystalline mineral, found in rock formations. Three main types of asbestos have been mined in Australia,

More information

EPA s New Renovation, Repair and Painting Rule

EPA s New Renovation, Repair and Painting Rule When is Compliance with the EPA Renovation, Repair, and Painting Rule Required? Scope of Rule: Renovation, repair and painting activities on target housing or child-occupied facility built before 1978

More information

DUQUESNE UNIVERSITY ASBESTOS OPERATIONS & MAINTENANCE PROGRAM

DUQUESNE UNIVERSITY ASBESTOS OPERATIONS & MAINTENANCE PROGRAM DUQUESNE UNIVERSITY ASBESTOS OPERATIONS & MAINTENANCE PROGRAM Revised January 2017 Prepared by: Environmental Health and Safety Department TABLE OF CONTENTS Page Introduction 1 Scope 1 Policy Statement

More information

Project 6668 Second beach Concession-Stanley Park Drive,Vancouver, BC Division 02080

Project 6668 Second beach Concession-Stanley Park Drive,Vancouver, BC Division 02080 PART 1 GENERAL 1.0 Instructions To Bidders Hazardous Materials Contractors are responsible for the information as provided in the City of Vancouver Invitation to Tender including all available documents,

More information

1.1 SUMMARY.1 Comply with requirements of this Section when performing following work:

1.1 SUMMARY.1 Comply with requirements of this Section when performing following work: Page 1 of 6 Part 1 General 1.1 SUMMARY.1 Comply with requirements of this Section when performing following work:.1 Removing roofing materials that are suspected of containing asbestos using wet material

More information

Project 6668 Kerrisdale Senoirs Centre-5851 West Boulevard,Vancouver, BC Division 02080

Project 6668 Kerrisdale Senoirs Centre-5851 West Boulevard,Vancouver, BC Division 02080 PART 1 GENERAL 1.0 Instructions To Bidders Hazardous Materials Contractors are responsible for the information as provided in the Invitation to Tender including all available documents, meeting minutes,

More information

Lead Based Paint Policy

Lead Based Paint Policy Lead Based Paint Policy 1. Guidance for the removal or maintenance of lead-based paint has undergone changes that affect the painting industry. The U.S. Department of Housing and Urban Development (HUD)

More information

Certification Number: NAT Lead Renovation, Repair and Painting Program

Certification Number: NAT Lead Renovation, Repair and Painting Program Certification Number: NAT-117534-2 Lead Renovation, Repair and Painting Program August 2018 Lead Renovation, Repair and Painting Program TABLE of CONTENTS I. Purpose II. Risk Identification III. Responsibilities

More information

1.1 SUMMARY.1 Comply with requirements of this Section when performing the following work:

1.1 SUMMARY.1 Comply with requirements of this Section when performing the following work: 125 Syndicate Avenue, Thunder Bay, Ontario Page 1 of 5 Part 1 General 1.1 SUMMARY.1 Comply with requirements of this Section when performing the following work:.1 Removing asbestos-containing transite

More information

UC Irvine Environmental Health & Safety SECTION: TITLE: Lead Compliance Program

UC Irvine Environmental Health & Safety SECTION: TITLE: Lead Compliance Program UC Irvine Environmental Health & Safety SECTION: TITLE: Lead Compliance Program INITIATOR: Susan Robb REVISION DATE REVIEW DATE December 2012 July 2016 1. Program Description 2. Scope 3. Definitions 4.

More information

Appendix B PROCEDURES FOR REMOVAL OF MOULD-CONTAMINATED MATERIALS

Appendix B PROCEDURES FOR REMOVAL OF MOULD-CONTAMINATED MATERIALS Appendix B PROCEDURES FOR REMOVAL OF MOULD-CONTAMINATED MATERIALS The following procedures are presented as a guide. Comprehensive site-specific technical specifications for the removal of mould-contaminated

More information

BP OIL -- TOLEDO REFINERY. Refinery Wide. Lead Exposure Management Plan. Authorized By: Robert Myak (signature on file)

BP OIL -- TOLEDO REFINERY. Refinery Wide. Lead Exposure Management Plan. Authorized By: Robert Myak (signature on file) BP OIL -- TOLEDO REFINERY Document Type: Practice Effective Date: September 18, 2014 Owner: Matthew Grimes Refinery Wide Lead Exposure Management Plan Authorized By: Robert Myak (signature on file) Practice

More information

Interior Containment: Limit Access and Post Signs

Interior Containment: Limit Access and Post Signs Interior Containment: Limit Access and Post Signs Notify residents to stay away from the work area. Do not allow residents or pets near the work area. Do not allow eating, drinking, or smoking in the work

More information

Asbestos in the Workplace: A Guide to Removal of Friable Asbestos Containing Materials

Asbestos in the Workplace: A Guide to Removal of Friable Asbestos Containing Materials Asbestos in the Workplace: A Guide to Removal of Friable Asbestos Containing Materials Revised November 21, 2013 Application Code of Practice Where asbestos is present or believed to be present in a workplace

More information

An Evaluation of Residual Lead Dust Following Lead Abatement Clean-up and Clearance Activities

An Evaluation of Residual Lead Dust Following Lead Abatement Clean-up and Clearance Activities U.S. Department of Housing and Urban Development Office of Healthy Homes and Lead Hazard Control An Evaluation of Residual Lead Dust Following Lead Abatement Clean-up and Clearance Activities Final Report

More information

REMOVAL AND DISPOSAL OF MATERIALS CONTAINING LEAD. A. General provisions of the Contract, including General and Supplementary Conditions.

REMOVAL AND DISPOSAL OF MATERIALS CONTAINING LEAD. A. General provisions of the Contract, including General and Supplementary Conditions. 028333 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. General provisions of the Contract, including General and Supplementary Conditions. B. Contract Drawings. 1.2 SUMMARY A. The lead removal work is in support

More information

AIR POLLUTION CONTROL REGULATION NO. 24 REMOVAL OF LEAD BASED PAINT FROM EXTERIOR SURFACES

AIR POLLUTION CONTROL REGULATION NO. 24 REMOVAL OF LEAD BASED PAINT FROM EXTERIOR SURFACES STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS DEPARTMENT OF ENVIRONMENTAL MANAGEMENT OFFICE OF AIR RESOURCES AIR POLLUTION CONTROL REGULATION NO. 24 REMOVAL OF LEAD BASED PAINT FROM EXTERIOR SURFACES

More information

Working with leadbased

Working with leadbased OR-OSHA Oregon DHS Working with leadbased paint Remodeling Painting Abatement About this publication Working with lead-based paint is produced by Oregon OSHA, a division of the Department of Consumer and

More information

CADMIUM AWARENESS Revision Date: 04/2017

CADMIUM AWARENESS Revision Date: 04/2017 CADMIUM AWARENESS 7.1 PURPOSE 7.1.1 The purpose of this policy is to provide guidelines for safely working with cadmium. It includes provisions for training, PPE guidelines, monitoring, medical surveillance,

More information

Lead Plan. Berryessa Union School District 1376 Piedmont Road, San Jose CA

Lead Plan. Berryessa Union School District 1376 Piedmont Road, San Jose CA Lead Plan Berryessa Union School District 1376 Piedmont Road, San Jose CA 95132 408-923-1800 Updated October 2018 TABLE OF CONTENTS Basics of a Lead Health & Safety Program Page 3 Guidelines for Working

More information

OAK GROVE SCHOOL DISTRICT LEAD PLAN

OAK GROVE SCHOOL DISTRICT LEAD PLAN OAK GROVE SCHOOL DISTRICT LEAD PLAN BASICS OF A LEAD HEALTH & SAFETY PROGRAM All of the following protective measures are important for preventing work-related lead poisoning to be in compliance with Cal/OSHA

More information

LOS ANGELES COMMUNITY COLLEGES OFFICE OF THE CHANCELLOR ADMINISTRATIVE REGULATIONS INDEX NUMBER B-4

LOS ANGELES COMMUNITY COLLEGES OFFICE OF THE CHANCELLOR ADMINISTRATIVE REGULATIONS INDEX NUMBER B-4 LOS ANGELES COMMUNITY COLLEGES OFFICE OF THE CHANCELLOR ADMINISTRATIVE REGULATIONS INDEX NUMBER B-4 REFERENCE: ISSUE DATE: January, 1983 CHANGES: TOPIC: Asbestos INITIATED BY: Business Services DATE OF

More information

Standard Operating Procedures for the Control of Lead During Building Maintenance and Construction Activities. Type 1 Lead Operations

Standard Operating Procedures for the Control of Lead During Building Maintenance and Construction Activities. Type 1 Lead Operations Standard Operating Procedures for the Control of Lead During Building Maintenance and Construction Activities Type 1 Lead Operations Lead is a heavy metal that has and continues to be widely used in industry

More information

INTRODUCTION TO THE PROGRAM

INTRODUCTION TO THE PROGRAM INTRODUCTION TO THE PROGRAM Structure and Organization Information in this program is presented in a definite order, so that employees will see the relationships between the various groups of information

More information

Lead in the Workplace Lead and Worker Health Employer responsibilities Worker Protection through Safe Practices...

Lead in the Workplace Lead and Worker Health Employer responsibilities Worker Protection through Safe Practices... LEAD EXPOSURE A Simplified Guide Table of Contents Lead in the Workplace... 3 Lead and Worker Health... 3 Employer responsibilities... 4 Worker Protection through Safe Practices... 4 Understanding Blood

More information

Lead Risk Assessment Report For the property at: 2933 Del Marr Circle Colorado Springs, CO 80910

Lead Risk Assessment Report For the property at: 2933 Del Marr Circle Colorado Springs, CO 80910 Lead Risk Assessment Report For the property at: 2933 Del Marr Circle Colorado Springs, CO 80910 Property Owner: Barnes McCammon 2933 Del Marr Circle, Colorado Springs, CO 80910 (719) 359-6652 Year built:

More information

TITLE 250 DEPARTMENT OF ENVIRONMENTAL MANAGEMENT

TITLE 250 DEPARTMENT OF ENVIRONMENTAL MANAGEMENT 250-RICR-120-05-24 TITLE 250 DEPARTMENT OF ENVIRONMENTAL MANAGEMENT CHAPTER 120 AIR RESOURCES SUBCHAPTER 05 AIR POLLUTION CONTROL PART 24 - Removal of Lead Based Paint from Exterior Surfaces 24.1 Purpose

More information

AIR POLLUTION CONTROL REGULATION NO. 24 REMOVAL OF LEAD BASED PAINT FROM EXTERIOR SURFACES

AIR POLLUTION CONTROL REGULATION NO. 24 REMOVAL OF LEAD BASED PAINT FROM EXTERIOR SURFACES 24.1 Definitions AIR POLLUTION CONTROL REGULATION NO. 24 REMOVAL OF LEAD BASED PAINT FROM EXTERIOR SURFACES As used in these regulations, the following terms shall, where the context permits, be construed

More information

RESULTS OF AN ASBESTOS and LEAD PAINT IDENTIFICATION SURVEY. Prepared For: Town of Bethlehem 2155 Main Street Bethlehem, New Hampshire 03574

RESULTS OF AN ASBESTOS and LEAD PAINT IDENTIFICATION SURVEY. Prepared For: Town of Bethlehem 2155 Main Street Bethlehem, New Hampshire 03574 RESULTS OF AN ASBESTOS and LEAD PAINT IDENTIFICATION SURVEY Prepared For: Town of Bethlehem 2155 Main Street Bethlehem, New Hampshire 03574 Performed at: Summit/Cruft Building 2111 Main Street Bethlehem,

More information

Lead Safe Practices and Compliance

Lead Safe Practices and Compliance Lead Safe Practices and Compliance Purpose: The purpose of the Lead Policy is to ensure that activities (e.g. renovations, painting, demo, etc.) that could potentially involve disturbing or removal of

More information

Asbestos Abatement Standard Procedures Indoor Environment Group, Inc.

Asbestos Abatement Standard Procedures Indoor Environment Group, Inc. The following work procedures are specified on all full containment asbestos abatement projects that we design. A. Preliminary Air Sampling: Many buildings contain background fiber levels prior to, or

More information

Developed and Presented by: Wisconsin Healthcare Engineering Association

Developed and Presented by: Wisconsin Healthcare Engineering Association Infection Control Risk Assessment (ICRA) Developed and Presented by: Wisconsin Healthcare Engineering Association What is an ICRA? An Infection Control Risk Assessment is a tool devised to protect patients

More information

Lead-Safe Weatherization Updates & RRP Similarities/Differences

Lead-Safe Weatherization Updates & RRP Similarities/Differences Lead-Safe Weatherization Updates & RRP Similarities/Differences Rob DeSoto, DOE-Golden Mike Vogel, Montana State University MT Wx Training Center 1 Lead used in paints for many years. Most problems with

More information

Read Health Canada s Tools for schools Action Kit s Introduction, Backgrounder and pages 14-3 to

Read Health Canada s Tools for schools Action Kit s Introduction, Backgrounder and pages 14-3 to DRAFT Renovation and Repair Checklist Excerpted from Tools for Schools Action Kit, Health Canada. Date: To be completed by: Facilities maintenance staff School Custodial staff Contract service providers

More information

Respirable Silica Exposure Control Program

Respirable Silica Exposure Control Program Respirable Silica Exposure Control Program Purpose The purpose of the Silica Program is to provide information, guidelines, control measures and training to eliminate exposures to respirable silica dust

More information

APPROACH FOR IMPLEMENTION OF HUD S LEAD SAFE HOUSING RULE REGULATIONS (24 CFR Part 35, Subpart H, )

APPROACH FOR IMPLEMENTION OF HUD S LEAD SAFE HOUSING RULE REGULATIONS (24 CFR Part 35, Subpart H, ) January 16, 2008 Mississippi Development Authority Homeowner Elevation Grant Program and Small Rental Assistance Program in Hancock, Harrison, Jackson, and Pearl River Counties, Mississippi APPROACH FOR

More information

University of Toronto Asbestos Management Program PROCEDURAL CHECKLIST FOR TYPE 1 ASBESTOS ACTIVITIES

University of Toronto Asbestos Management Program PROCEDURAL CHECKLIST FOR TYPE 1 ASBESTOS ACTIVITIES University of Toronto Asbestos Management Program PROCEDURAL CHECKLIST FOR TYPE 1 ASBESTOS ACTIVITIES Project Description: Date Work Conducted: Completed by: (Name and Dept) NOTIFICATION/AWARENESS: 1.

More information

LEAD HAZARD CONTROL PROGRAM

LEAD HAZARD CONTROL PROGRAM LEAD HAZARD CONTROL PROGRAM Supervisor s Manual Prepared by Environmental Health and Safety Services Occupational Safety Programs GLOSSARY Abatement or Deleading CFR Control Measure Encapsulation EPA HEPA

More information

Mold Remediation. 1. Purpose and Requirements. 2. Scope. 3. General Responsibilities HS13_IAQ_SOP_002. Occupational Safety & Health

Mold Remediation. 1. Purpose and Requirements. 2. Scope. 3. General Responsibilities HS13_IAQ_SOP_002. Occupational Safety & Health Occupational Safety & Health HS13_IAQ_SOP_002 1. Purpose and Requirements When mold growth occurs indoors, adverse health problems may be reported by some building occupants, particularly those with allergies

More information

Certified Renovator Training Hands-On Skills Assessment Date: Address: City & State Student Name: Student Signature:

Certified Renovator Training Hands-On Skills Assessment Date: Address: City & State Student Name: Student Signature: Certified Renovator Training Hands-On Skills Assessment Date: Address: City & State Student Name: Student Signature: Skill Skill Set Description #1 Using EPA Recognized Test Kits and Paint Chip Sample

More information

LEAD-BASED PAINT INSPECTION REPORT CARNEGIE LIBRARY 314 WEST STEPHENSON STREET FREEPORT, ILLINOIS 61032

LEAD-BASED PAINT INSPECTION REPORT CARNEGIE LIBRARY 314 WEST STEPHENSON STREET FREEPORT, ILLINOIS 61032 LEAD-BASED PAINT INSPECTION REPORT CARNEGIE LIBRARY 314 WEST STEPHENSON STREET FREEPORT, ILLINOIS 61032 Prepared For: 201 PRAIRIE STREET, SUITE 208 ROCKFORD, ILLINOIS 61107 Inspector and Report Prepared

More information

WARREN COUNTY, IOWA CHAPTER 36 CHAPTER 36 CONTROL OF LEAD-BASED PAINT HAZARDS

WARREN COUNTY, IOWA CHAPTER 36 CHAPTER 36 CONTROL OF LEAD-BASED PAINT HAZARDS TITLE IV HEALTH REGULATIONS CHAPTER 36 CONTROL OF LEAD-BASED PAINT HAZARDS 36.01 Application 36.07 Enforcement 36.02 Definitions 36.08 Hearings 36.03 Elevated blood lead (EBL) inspections required 36.09

More information

Work Plan for Window Removal and Remediation Rooms: 200 Wing classrooms, Cafeteria and Kitchen Thomas Prince School Princeton, Massachusetts

Work Plan for Window Removal and Remediation Rooms: 200 Wing classrooms, Cafeteria and Kitchen Thomas Prince School Princeton, Massachusetts 1) Introduction Work Plan for Window Removal and Remediation Rooms: 200 Wing classrooms, Cafeteria and Kitchen Thomas Prince School Princeton, Massachusetts Triumvirate Environmental Inc. (TEI) shall perform

More information

Risk Assessment and Preventive Measures Checklist for Construction and Renovation. Location of Construction: Project Start Date: Estimated Duration:

Risk Assessment and Preventive Measures Checklist for Construction and Renovation. Location of Construction: Project Start Date: Estimated Duration: Risk Assessment and Preventive Measures Checklist for Construction and Renovation Location of Construction: Project Start Date: Estimated Duration: Project Manager (PM): Contractor(s): Infection Prevention

More information

Section Asbestos Removal

Section Asbestos Removal Section Cover Page Section 02 82 33 2017-10-01 Use this Section to specify removal of materials containing asbestos, as listed below. Always use in conjunction with Section 02 82 01 - Asbestos Control

More information

Protect Your Family From Lead in Your Home

Protect Your Family From Lead in Your Home Protect Your Family From Lead in Your Home United States Environmental Protection Agency United States Consumer Product Safety Commission United States Department of Housing and Urban Development SeptSeptember

More information

MODEL CRYSTALLINE SILICA EXPOSURE PLAN

MODEL CRYSTALLINE SILICA EXPOSURE PLAN PLAN TOOL TYPE GEOGRAPHY ALL BENEFITS MODEL CRYSTALLINE SILICA EXPOSURE PLAN Workers in various trades and industries, including mining, tunnelling, quarrying, masonry, metal foundries and ship and bridge

More information

Post Abatement Project Report - Sample Draft Form:

Post Abatement Project Report - Sample Draft Form: Post Abatement Project Report - Sample Draft Form: 3701-3215 (B) (B) Each lead abatement contractor or lead abatement project designer shall issue a report for each lead abatement project performed. The

More information

TECHNICAL DATA SHEET

TECHNICAL DATA SHEET Dy-Mark EPOXY COAT WATER-BASED DIRECTIONS FOR USE Dy-Mark All-In-One Epoxy Coat Water-Based is a fast dry floor coating that gives a professional finish to interior bare concrete floors. Epoxy Coat resists

More information

LOWE S INSTALLER LRRP CHECKLIST FOR RENOVATIONS PERFORMED IN PRE-1978 HOUSING AND CHILD-OCCUPIED FACILITIES

LOWE S INSTALLER LRRP CHECKLIST FOR RENOVATIONS PERFORMED IN PRE-1978 HOUSING AND CHILD-OCCUPIED FACILITIES LOWE S INSTALLER LRRP CHECKLIST FOR RENOVATIONS THE PURPOSE OF THIS FORM IS TO DOCUMENT COMPLIANCE WITH THE U.S. ENVIRONMENTAL PROTECTION AGENCY S LEAD RENOVATION, REPAIR, AND PAINTING RULE ( RRP RULE

More information

The following regulations and guidelines may apply to this policy:

The following regulations and guidelines may apply to this policy: FACILITIES MANAGEMENT OFFICE OF ENVIRONMENTAL HEALTH AND SAFETY Lead Compliance Policy 6/29/15 Last Revision Purpose: The purpose of this policy is to outline the management of lead containing material,

More information

Safety Policy Manual Policy No. 144

Safety Policy Manual Policy No. 144 Policy: Lead Management Program Page 1 of 11 APPLICATION NYU Langone PURPOSE To protect employees, patients, students, tenants, and members of the community from exposure to lead. To comply with regulations

More information

Resource Center. Investigation Areas

Resource Center. Investigation Areas Investigation Areas Depth Study: Re-Phasing The Project is a Phased project. The main focus of this analysis is rephasing the project with ICRA requirements in mind. I am looking to reduce the cost of

More information

GLOSSARY 13 ABATEMENT

GLOSSARY 13 ABATEMENT Chapter 13 Glossary GLOSSARY 13 ABATEMENT Is the process of eliminating or reducing lead paint hazards. The four abatement methods are: replacement of lead-painted components, encapsulation, enclosure,

More information

CLASS I AND II ABATEMENT PROJECT SUBMITTALS

CLASS I AND II ABATEMENT PROJECT SUBMITTALS 5.1 Pre-Work Submittals CLASS I AND II ABATEMENT PROJECT SUBMITTALS Abatement contractors shall submit the following in a bound notebook to AU or our designated representative at the mandatory pre-construction

More information

There are many surface contaminants that can interfere with coating adhesion. The following are the most common:

There are many surface contaminants that can interfere with coating adhesion. The following are the most common: ATB-103 General Coating Preparation Guidelines Introduction In real estate, the key phrase is Location! Location! Location! With paints and coatings, the phrase is Preparation! Preparation! Preparation!

More information

NYMS Program Lead Based Paint Compliance

NYMS Program Lead Based Paint Compliance NYMS Program Lead Based Paint Compliance Michelle Read DeGarmo is an EPA Certified Risk Assessor, accredited Lead Based Paint Training Program Manager, and former HUD Program Administrator. Michelle has

More information

EACO Mould Abatement Guidelines Edition 1

EACO Mould Abatement Guidelines Edition 1 Foreword This guideline has been prepared to assist building owners, constructors, contractors, subcontractors and workers who have duties under the Occupational Health and Safety Act and its Regulations

More information

"ASBESTOS AWARENESS IN THE WORKPLACE"

ASBESTOS AWARENESS IN THE WORKPLACE MAJOR PROGRAM POINTS "ASBESTOS AWARENESS IN THE WORKPLACE" Training For THE OSHA ASBESTOS STANDARD Quality Safety and Health Products, for Today...and Tomorrow Outline of Major Points Covered in the "Asbestos

More information

ASBESTOS SCIENCE TECHNOLOGIES, INC.

ASBESTOS SCIENCE TECHNOLOGIES, INC. ASBESTOS SCIENCE TECHNOLOGIES, INC. P.O. Box 505 Bangor, CA 95914 Phone (530) 518-0934 Email - astinc17@yahoo.com Report for Trinity Valley Elem. School Willow Creek, Ca. Mold Report - Rooms 12 through

More information

Guidelines for Collecting Qualitative Environmental Samples of Anthrax

Guidelines for Collecting Qualitative Environmental Samples of Anthrax Guidelines for Collecting Qualitative Environmental Samples of Anthrax Adapted from Centers for Disease Control Procedures for Collecting Environmental Samples of Anthrax (October 23, 2001 draft) Maryland

More information

In general, the management plan development process consisted of:

In general, the management plan development process consisted of: NWASCO SCHOOL DISTRICT #21 ASBESTOS MANAGEMENT PLAN PART I: GENERAL PROVISIONS OF THE MANAGEMENT PLAN 1.0 INTRODUCTION This Asbestos Management Plan was developed in accordance with the United States Department

More information

PIGEON DROPPINGS CLEAN UP WORK TABLE OF CONTENTS

PIGEON DROPPINGS CLEAN UP WORK TABLE OF CONTENTS PIGEON DROPPINGS CLEAN UP WORK TABLE OF CONTENTS PAGE PIGEON DROPPINGS CLEAN UP WORK... 1 1 GENERAL... 1 1.1 GENERAL CONDITIONS AND RELATED WORK... 1 1.2 DESCRIPTION OF WORK... 1 1.3 DOCUMENTS TO BE SUBMITTED...

More information

Lead in Construction Guidance

Lead in Construction Guidance Lead in Construction Guidance Scope All construction work where an employee may be occupationally exposed to lead, is covered by the OSHA 29 CFR 1926.62 Lead standard. Definitions The Action Level (AL)

More information

CARE & MAINTENANCE INITIAL CLEANING AND MAINTENANCE

CARE & MAINTENANCE INITIAL CLEANING AND MAINTENANCE Kaska adheres to the highest manufacturing standards so that you can enjoy your porcelain tile for years to come. As with every interior surfacing material, our products require nominal care in order to

More information

Risk Management and Safety. Lead Safety for Renovation, Repair, and Painting (RRP) Procedures

Risk Management and Safety. Lead Safety for Renovation, Repair, and Painting (RRP) Procedures Risk Management and Safety Lead Safety for Renovation, Repair, and Painting (RRP) Procedures Risk Management and Safety Phone: 307-766-3277 Fax: 307-766-6116 Website: www.uwyo.edu/risk May 2011 Table of

More information

CHESTER COUNTY HEALTH DEPARTMENT 405. CHILDHOOD LEAD POISONING PREVENTION REGULATION

CHESTER COUNTY HEALTH DEPARTMENT 405. CHILDHOOD LEAD POISONING PREVENTION REGULATION CHESTER COUNTY HEALTH DEPARTMENT 405. CHILDHOOD LEAD POISONING PREVENTION REGULATION 405.1. PURPOSE. The purpose of this Chapter is to protect and promote public health through the identification and elimination

More information

PREPARED FOR: Genesee County Land Bank 452 S. Saginaw Street, 2nd Floor Flint, MI

PREPARED FOR: Genesee County Land Bank 452 S. Saginaw Street, 2nd Floor Flint, MI COMBINATION LEAD BASED PAINT INSPECTION AND RISK ASSESSMENT SURVEY FOR THE PROPERTY KNOWN AS: 1008 Dupont Flint, MI 48504 Owner s name: Genesee County Land Bank Owner s Phone #: 810-257-3090 Current Occupant

More information

PAINT REMOVAL SPECIFICATION CONTRACTOR GUIDE FOR LEAD PAINT REMOVAL

PAINT REMOVAL SPECIFICATION CONTRACTOR GUIDE FOR LEAD PAINT REMOVAL CONTENTS: PAINT REMOVAL SPECIFICATION CONTRACTOR GUIDE FOR LEAD PAINT REMOVAL 1.0 AWARENESS AND PRECAUTION 2.0 TEST SAMPLING & REMOVAL EVALUATION 3.0 SITE EVALUATION 4.0 SITE PREPARATION 5.0 SAFETY EQUIPMENT

More information

CHAPTER 18 CHILDHOOD LEAD POISONING PREVENTION REGULATION

CHAPTER 18 CHILDHOOD LEAD POISONING PREVENTION REGULATION CHAPTER 18 CHILDHOOD LEAD POISONING PREVENTION REGULATION Section 18-1 Purpose The purpose of this Chapter is to protect and promote public health through the identification and elimination of lead exposure

More information

Instructions for On-Site Coating of Vinyl Windows

Instructions for On-Site Coating of Vinyl Windows www.aqua-diy.com Instructions for On-Site Coating of Vinyl Windows Aqua DIY D100 is a high performance heat reflective water-based coating. It has been shipped to you with a thickness suitable for manual

More information

Work Practice for Penetrating or Removing Wallboard Systems with <1% Asbestos

Work Practice for Penetrating or Removing Wallboard Systems with <1% Asbestos University of Washington Facilities Services Maintenance & Alterations 9.5.02 Work Practice for Penetrating or Removing Wallboard Systems with

More information

Form 9: Infection Control Preventive Measures Level 4

Form 9: Infection Control Preventive Measures Level 4 Form 9: Infection Control This form is filled out by the construction planning team or designated person(s) to identify the required preventive measures for the activity described in Form 1 Infection Control

More information

A. Illinois Asbestos Abatement Act, as amended through Public Act , effective July 14, 1995.

A. Illinois Asbestos Abatement Act, as amended through Public Act , effective July 14, 1995. April 2012, rev. 00 02 8213 Asbestos Abatement 1. General 1.01 Summary of Work A. Contractor 1.02 Definitions 1. The Contractor shall provide removal and proper disposal of asbestos containing materials.

More information

Steps to LEAD SAFE. Renovation, Repair and Painting LEAD

Steps to LEAD SAFE. Renovation, Repair and Painting LEAD Steps to LEAD SAFE Renovation, Repair and Painting 1-800-424-LEAD www.epa.gov/lead Renovating, Repairing or Painting? Do you renovate, repair or paint homes or child-occupied facilities built before 1978?

More information

Adv. 3.2: Asbestos Abatement Rev

Adv. 3.2: Asbestos Abatement Rev ADVISORY NO. 3.2: ASBESTOS ABATEMENT TERMINOLOGY AND DEFINITIONS Abatement: Procedures to control fiber release from asbestos-containing materials, i.e., removal, encapsulation, or enclosure. Air Lock:

More information

Asbestos Management Program

Asbestos Management Program SUPERIOR-GREENSTONE DISTRICT SCHOOL BOARD Asbestos Management Program Introduction Asbestos, a designated substance, is a natural fibre commonly used in the manufacture of building materials. The use of

More information

Asbestos Management Program

Asbestos Management Program Oct. 10/06 Oct 10/06 1/13 Table of Contents 1 INTRODUCTION...2 2 PURPOSE...2 3 SCOPE...2 4 ROLES & RESPONSIBILITIES...2 5 INVENTORY...6 6 ACCESS CONTROL...6 7 INSPECTION...6 8 CLASSIFICATIONS OF ASBESTOS

More information

STANDARD OPERATING PROCEDURES FOR MOLD REMEDIATION

STANDARD OPERATING PROCEDURES FOR MOLD REMEDIATION West Virginia University Environmental Health and Safety STANDARD OPERATING PROCEDURES FOR MOLD REMEDIATION Revised February 2016 West Virginia University P.O Box 6551 Morgantown WV 26506 # 304-293-3792

More information

TECHNICAL DATA SHEET

TECHNICAL DATA SHEET Dy-Mark EPOXY COAT DIRECTIONS FOR USE Dy-Mark All-In-One Epoxy Coat is a durable floor coating that gives a professional finish to interior bare concrete floors. Epoxy Coat resists hot tyre pick-up and

More information

LEAD-BASED PAINT INSPECTION REPORT CITY HALL 230 WEST STEPHENSON STREET FREEPORT, ILLINOIS 61032

LEAD-BASED PAINT INSPECTION REPORT CITY HALL 230 WEST STEPHENSON STREET FREEPORT, ILLINOIS 61032 LEAD-BASED PAINT INSPECTION REPORT CITY HALL 230 WEST STEPHENSON STREET FREEPORT, ILLINOIS 61032 Prepared For: 201 PRAIRIE STREET, SUITE 208 ROCKFORD, ILLINOIS 61107 Inspector and Report Prepared By: INNERSPACE

More information

Poisonings from Housing. A Regulatory Update

Poisonings from Housing. A Regulatory Update Poisonings from Housing Renovations o Containing Lead Paint: A Regulatory Update Delaware Healthy Homes Summit March 12, 2014 Presented by: Demian P. Ellis, USEPA Region 3 What will be covered Overview

More information

University Health Services Health and Safety TABLE OF CONTENTS

University Health Services Health and Safety TABLE OF CONTENTS ADVISORY 12.6.1 GENERIC HEALTH AND ENVIRONMENTAL SPECIFICATIONS FOR THE ABATEMENT OF LEAD- BASED PAINT WITHIN UNIVERSITY OF CINCINNATI BUILDINGS TABLE OF CONTENTS I. INTRODUCTION II. III. IV. HAZARD RECOGNITION

More information

Chico State- Siskiyou Hall EXHIBIT B REQUIREMENTS FOR DISTURBANCE OF LEAD IN CONSTRUCTION TABLE OF CONTENTS

Chico State- Siskiyou Hall EXHIBIT B REQUIREMENTS FOR DISTURBANCE OF LEAD IN CONSTRUCTION TABLE OF CONTENTS Chico State- Siskiyou Hall EXHIBIT B REQUIREMENTS FOR DISTURBANCE OF LEAD IN CONSTRUCTION TABLE OF CONTENTS PART 1.0 GENERAL REQUIREMENTS.............................................. 1 1.1 Introduction.............................................................

More information

START WORK NOTIFICATION

START WORK NOTIFICATION START WORK NOTIFICATION This form must be submitted at least 3 buisness days before beginning work to the Rhode Island Department of Health by email at leadprogram@health.ri.gov or by fax at 401-222-2456.

More information

PASSED xxxx Photographic essay of samples taken. Test 1,2,3 Test 4. Exterior Lead Clearance Test

PASSED xxxx Photographic essay of samples taken. Test 1,2,3 Test 4. Exterior Lead Clearance Test Exterior Lead Clearance Test 10-18-13 PASSED On 10-11-13 the single (west unit side-side) family residential home located at xxxx Baltic Cleveland Ohio 44102, PASSED the exterior lead clearance test. Scope

More information

Asbestos in the Home

Asbestos in the Home Asbestos in the Home This document will help you understand asbestos: what it is, its health effects, where it is in your home, and what to do about it. What Is Asbestos? Asbestos is a mineral fiber. It

More information

Heavy Drop Gym Floor 2-1/2 Tile Installation and Maintenance Manual

Heavy Drop Gym Floor 2-1/2 Tile Installation and Maintenance Manual Heavy Drop Gym Floor 2-1/2 Tile Installation and Maintenance Manual Greatmats.com Toll free: 877-822-6622 117 Industrial Ave Fax: 715-825-4928 Milltown, WI 54858 info@greatmats.com TABLE OF CONTENTS BASE

More information

10.4 LEAD-BASED PAINT REQUIREMENTS AND RESPONSIBILITIES

10.4 LEAD-BASED PAINT REQUIREMENTS AND RESPONSIBILITIES 10.4 LEAD-BASED PAINT REQUIREMENTS AND RESPONSIBILITIES Regulation Background Lead-based paint requirements were originally written to implement Section 302 of the Lead-based Paint Poisoning and Prevention

More information

Rigid Core Installation & Maintenance Instructions

Rigid Core Installation & Maintenance Instructions Rigid Core Installation & Maintenance Instructions Suitability Rigid Core Click Vinyl Flooring is completely waterproof floating floor and has got exceptional acoustic and insulation properties due to

More information

Asbestos and Lead Considerations in Construction Projects. Sean Purcer Senior Consultant Anthony Price Senior Consultant

Asbestos and Lead Considerations in Construction Projects. Sean Purcer Senior Consultant Anthony Price Senior Consultant Asbestos and Lead Considerations in Construction Projects Sean Purcer Senior Consultant Anthony Price Senior Consultant Who We Are History Founded in 1990 by Environmental, Health and Safety (EHS) managers

More information

Tasks estimated to generate a TWA of 50 micrograms per cubic meter of air include:

Tasks estimated to generate a TWA of 50 micrograms per cubic meter of air include: Lead Exposure Compliance Program for Construction The purpose of this program is to inform interested persons, including employees, that Prairie Construction is complying with the OSHA Lead Standard, Title

More information

ASBESTOS SCIENCE TECHNOLOGIES, INC.

ASBESTOS SCIENCE TECHNOLOGIES, INC. ASBESTOS SCIENCE TECHNOLOGIES, INC. P.O. Box 505 Bangor, CA 95914 Phone (530) 518-0934 Email - astinc17@yahoo.com Report for Hoopa Valley Elementary School 11500 State Highway 96 Hoopa, Ca. 95546 Mold

More information