RSPO ANNUAL SURVEILLANCE ASSESSMENT-4 PUBLIC SUMMARY REPORT

Size: px
Start display at page:

Download "RSPO ANNUAL SURVEILLANCE ASSESSMENT-4 PUBLIC SUMMARY REPORT"

Transcription

1 PT. TÜV NO.RD Indonesia of 37 RSPO ANNUAL SURVEILLANCE ASSESSMENT-4 PUBLIC SUMMARY REPORT PT. TÜV NORD Indonesia System Certification Management Has assessed PT. PP LONDON SUMATRA Tbk < Gunung Melayu Mill and its Supply Bases> for Compliance to RSPO Principles and Criteria for Sustainable Palm Oil Production Date of assessment for North Sumatera Region: September 18, 2013 Report Number: P&C-I-135 Head Office System Certification Management Perkantoran Hijau Arkadia Tower F, 7 th Fl Suite 706 Jl. Let. Jend. TB Simatupang Kav. 88 Jakarta Indonesia Tel : Fax : Laboratory Division Jl. Jababeka XVII E Blok U No.. 27B Kawasan Industri Jababeka I Cikarang Bekasi Indonesia Tel : Fax : Branch Office Intiland Tower 11 th Fl, Suite 1E Jl. Panglima Sudirman Surabaya Indonesia Tel : Fax : President Director: Mr. Robert Napitupulu rnapitupulu@tuv-nord.com Website: or

2 PT. TÜV NO.RD Indonesia : 2 of 37 List of Contents 1 Scope of Surveillance Assessment Report Type of Assessment (Mill, Estate and Mill, etc.) Location, mill, and or hectare statement Production volume of all certfiied products Certification detais Description of Supply Base Description of Plantation (Fruit Sources) Age Profile of Palm Progress of Time-bound Plan (for other management units and justifications) Organizational Information/Contact Person Assessment Process Assessment Methodology (Program, Site Visits) General Overview Assessment Agenda Assessment Team Lead Assessor: Sudarmadjii Assessment Team Members Certification Body Assessment Findings Summary of the Findings by Criteria Identified Non Conformances and Noteworthy positive components Detail of Non Conformity Resume of Audit Results Status of non-conformities (both minor and major) previously identified Issues Raised by Stakeholders Certified Organization s Acknowledgement of Internal Responsibility Date of next surveillance visit Date of closing non-conformities (both major and minor) Formal Sign-off of Surveillance Assessment Findings... 31

3 : 3 of 37 List of Figures Figure 1. Location Maps of Gunung Melayu Mill and Supply Bases... 5 List of Tables Table 1-1 Location of the mill and supply bases... 4 Table 1-2. Production volume of CPO and PK to be claimed... 6 Table 1-3: Production volumes of FFB and its source... 6 Table 1-4:. Statistic of supply base... 6 Table 1-5: Age Profile of Palms... 7 Table 1-6 Time bound plan for mills and estates under PT. PP London Sumatra Tbk....7 Table 2-1 Audit Schedule... 9 Table 3-1 Summary of Findings by Criteria Table 3-2 Resume of Audit Results List of Appendices Appendix 1 List of Abbreviations Appendix 2 Summary of the findings for compliance with the RSPO Supply Chain Module E (Mass Balance) ver. November Appendix 3. Detail of nonconformities...36

4 : 4 of 37 1 Scope of Surveillance Assessment Report 1.1 Type of Assessment (Mill, Estate and Mill, etc.) PT. London Sumatra Tbk in North Sumatera Region operations consist of four mills and 12 estates, i.e: Gunung Melayu Mill (GMM) which is supplied by two estates: Gunung Melayu Estate (GME), and Sei Rumbiya Estate (SRE. The annual surveillance assessment 3 was done as per National Interpretation of RSPO Principle and Criteria for Sustainable Palm Oil Production - Republic of Indonesia (RSPO Indonesian National International <INA-NI. ver. May 2008 Standard), as well as RSPO Supply Chain Standard for Mills (module E: Mass Balance) ver. November The scope of this annual surveillance assessment 4 was for Gunung Melayu Mill (GMM) and its supply bases,. Gunung Melayu Estate (GME), but for Sei Rumbiya Estate was not audited. The mill solely processes FFB from their own estates. 1.2 Location, mill, and or hectare statement. The detail of coordinate s location can be seen in the table below:. Table 1-1: Location of the mill and supply bases Name of Mill and Plantation Location GPS Coordinates Longitude (E) Latitude (N) Gunung Melayu POM (GMM) Gunung Melayu Estate (GME) Sei Rumbiya Estate (SRE) Asahan Regency, Province of North Sumatra 99 34'26" 2 42'4" Asahan Regency, Province of North Sumatra 99 33'39" 2 41'40" Labuhan Batu Regency, Province of North Sumatra 100 5'5" 1 1'30"

5 : 5 of 37 Figure 1. Location Maps of Gunung Melayu Mill and Supply Bases

6 : 6 of 37 Figure 2. Maps of Gunung Melayu Estate

7 : 7 of Production volume of all certified products The production tonnages for CPO and PK for period of certificate and projected output are listed in Table 1-2. (These figures exclude any output product from non-certified suppliers). Table 1-2. Production volume of CPO and PK to be claimed Name of mill Certification production 2009 (tonnes) Actual production 2011 (tonnes) Actual production 2012 (tonnes) Projected production 2013 (tonnes) CPO PK CPO PK CPO PK CPO PK Gunung Melayu Mill Capacity 30 FFB/ hour 34,885 8,821 30,314 7,890 xxx xxx xxx xxx *Source data: Based on production report 2011, 2012 and budget Certification details PT. PP London Sumatra Tbk RSPO membership number : since 11 April Gunung Melayu Mill Unit Certificate number as part of Lonsum North Sumatra Region : TNI RSPO Date of previous assessment: June 18 28, 2012 Date of certification approved/ issued: valid until Description of Supply Base Description of Plantation (Fruit Sources) Oil palm fruit is sourced solely from company owned estates. The certified FFB counted from 2 (two) company owned estates is listed in Table 1-3. Table 1-3: Production volumes of FFB and its source Sources of FFB* Actual Production volume of FFB in 2011 (tonnes) Actual production volume of FFB in 2012 (tonnes) Projected production volume of FFB in 2013 (tonnes) Gunung Melayu Estate (GME) 94,656 xxx xxxx Sei Rumbiya Estate (SRE) 33,078 xxx xxxx Total FFB own estates 127,734 xxx xxx FFB from smallholder FFB purchased Total FFB Received 127,734 xxx xxx * Source : Based on production report 2011, 2012 and budget 2013 Table 1-4. Statistic area summary of supply base. Estates Total (Ha) Planted with Oil Palm (Ha) Area Summary* Mature (Ha) Immature (Ha) Gunung Melayu Estate (GME) 4, , , Sei Rumbiya Estate (SRE) 5, , , Total 10, , , *Source : Hectare statement in September 2013

8 : 8 of Palm Age Profile Table 1-5. Palm Age Profile Estates 0 5 (Ha) % 6 10 (Ha) % (Ha) % (Ha) % (Ha) Gunung Melayu , , , Sungai Rumbiya , Total , , , , Source: Hectare statement in January 2013 % Total (Ha) 1.6. Progress of Time-bound Plan (for other management units and justifications). The company will use the experience obtained in the main assessment to ensure that the other management units conform to the RSPO principles and criteria. Progress of this plan of time-bound certification has been verified. There were some changes made from the previous time bound plan due to technical condition in each management unit. The updated time bound plan is can be seen below. Table 1-6. Time bound plan for mills and estates under PT.PP London Sumtra Tbk: No Mills Location Proposed Time for Certification Revised Time Bound Plan 1 Gunung Bais Musi Rawas, Sumatera Selatan December 2011 December Arta Kencana Lahat, Sumatera Selatan December 2012 December Belani Elok Musi Rawas, Sumatera Selatan December 2013 December Sei Lakitan Musi Rawas, Sumatera Selatan December 2014 December Terawas Musi Rawas, Sumatera Selatan December 2015 December Pahu Makmur Kutai Barat, Sumatera Selatan December 2016 December 2016 Proposed Time for No Estates Location Certification Revised Time Bound Plan 1 Gunung Bais Musi Rawas, Sumatera Selatan December 2011 December Arta Kencana Lahat, Sumatera Selatan December 2012 December Kencana Sari Lahat, Sumatera Selatan December 2012 December Sei Kepayang Musi Rawas, Sumatera Selatan December 2013 December Bukit Hijau Musi Rawas, Sumatera Selatan December 2013 December Ketapat Bening Musi Rawas, Sumatera Selatan December 2013 December Belani Elok Musi Rawas, Sumatera Selatan December 2013 December Batu Cemerlang Musi Rawas, Sumatera Selatan December 2014 December Sei Lakitan Musi Rawas, Sumatera Selatan December 2014 December Riam Indah Musi Rawas, Sumatera Selatan December 2014 December Sei Gemang Musi Rawas, Sumatera Selatan December 2014 December Terawas* Musi Rawas, Sumatera Selatan December 2015 December Issuy Makmur Kutai Barat, Kalimantan Timur December 2016 December Pahu Makmur Kutai Barat, Kalimantan Timur December 2016 December 2016 *Note : Terawas Estate only for seedling estate 1.7. Organizational Information/Contact Person Contact Person Mr.Muhammad Waras Position Head of Environment and CSR Co-ordination Department Organization name PT PP London Sumatra Indonesia Tbk Address Jl. Ahmad Yani No.2 Postal code, city PO Box 1154, Medan North Sumatra Country Indonesia Telephone Nr Fax Nr muhammad.waras@londonsumatra.com

9 PT. TÜV NO.RD Indonesia : 9 of Assessment Process 2.1. Assessment Methodology (Program, Site Visits) General Overview The assessment was carried out by referring to TÜV NORD Indonesia Certification Procedure, PRSPO-TNI-01 Rev Assessment Agenda The annual surveillance assessment 4 was conducted on September 16 to 27, 2013 for all North Sumatera Region, was led by Ms. Wieke Savitri (WS), Ms.Karlina Bone (KB) as auditors team member and was assisted by Mr. Dr. Supijatna (SUP) as Agronomy expert, Mr Dr.Sahruddin and Mr. Fahroby Faletehan as socio-economic expert and. The audit schedule available as below. Table 2-1 Audit Schedule Client: Address: MR Name, Pos.: PT. PP London Sumatra Indonesia Tbk Jl. Jend. A. Yani No. 2 PO Box 1154, Medan Mr. Adi Bastomi, Env. Manager/ Mr. Muhammad Waras Number of Mills: 4 Number of estate(s): 8 Order No. - Business No. - Standard: RSPO P&C (Principles & Criteria) May 2008 Type of audit: Annual Surveillance Audit 4 (ASA-3) Lead Auditor: Wieke Savitri (WS) Trainee/Expert: Audit date: Septemeber 16 27, 2013 Dr. Supijatna (SUP), Fahroby Falatehan (FF), Dr. Saharuddin. Auditor(s): Karlina Bone (KB), Dede (DD) Audit days on-site1 work days Name/ location of Mills Name/ location of Estates Audit date 1. Gunung Melayu 2. Dolok 3. Begerpang 4. Turangie 1. Gunung Melayu, 2. Dolok, Bah Lias 3. Begerpang, Rambong Sialang. 4. Turangie, Bungara, Pulo Rambong 1) Site / Shift / Date / Time Organizational Unit Auditor (Abbrev.) Interviewpartner Requirements Day Begerpang POM & Estate Opening meeting All auditor team All team Introduction auditor team and confirmation of audit schedule

10 0 of 37 1) Site / Shift / Date / Time Organizational Unit Auditor (Abbrev.) Interviewpartner Begerpang POM KB, WS RSPO team, contractors, employees, labour union. other stakeholers Requirements - Verification of last ASA corrective action - General issues for RSPO certification assessment - The SPO documentations and records - Justification for RSPO principles and criteria - Principle 1.1, Principle - 2: Principle 3: Quality, SM-K3 and Environmental Management System including EHS policy - Involved personnel and responsibilities - Chemical stores. - Monitoring and measurement of environmental performance of waste water treatment plant. - Mill operation including inspection of incoming FFB, FFB transport, road maintenance and workshops for heavy trucks, loaders, etc. - Principle - 4 : 4.1, 4.4, 4.7, Principle 5 : 5.3, 5.4, Principle 6 : 6.1, 6.2, 6.3, 6.4, 6.5, 6.6, 6.7, 6.8, 6.9, 6.10, Principle 8 : Supply Chain of FFB & CPO Begerpang Estate DD, SP RSPO team, contractors, employees, labour union, - Verification of last ASA corrective action - Land and conversion planting - Replanting program - Good Agricultural Practices - IPM (Integrated Pest Management) - Decreased paraquat use and handling of chemical packaging wastes - HCV identification, Flora, fauna, ecology and biodiversity - Zero burning - Principle - 4 : 4.1, 4.2, 4.3, 4.4, 4.5, 4.6, 4.7, Principle 5 : 5.1, 5.2, 5.3, Principle 6 : 6.1, 6.2, 6.3, 6.4,, 6.5, 6.6, 6.7, 6.8, 6.9, 6.10, Principle 8 : 8.1 End of audit Day 1

11 PT. TÜV NO.RD Indonesia 1 of 37 1) Site / Shift / Date / Time Organizational Unit Auditor (Abbrev.) Day : Rambong Sialang Estate Interviewpartner 2) Requirements Pergulaan Village for public consultation WS, SH Site visit to nearby villages to meet stakeholders and checking: progress of Local Ccmmunity CSR programs and resolution of conflicts (if any) Rambong Sialang Estate KB, DD, SP, - - Principle 1.1, Principle - 2: 2.1, 2.2,2.3 - Principle 3: Principle - 4 : 4.1, 4.2, 4.3, 4.4, 4.5, 4.6, 4.7, Principle 5 : 5.1, 5.2,5.3, 5.5, Principle 6 : 6.1, 6.2, 6.3, 6.4, 6.6.5, 6.6, 6.7, 6.8,6.9, 6.10, Principle 8 : Verification of last ASA corrective action - Land and conversion planting - Replanting program - Good Agricultural Practices - IPM (Integrated Pest Management) - Decreased paraquat use and handling of chemical packaging wastes - HCV identification, Flora, fauna, ecology and biodiversity - Zero burning - Continous improvement Auditor review and prepare reporting Closing meeting End of audit day 2 and travelling to Gunung Melayu

12 2 of 37 1) Site / Shift / Date / Time Organizational Unit Auditor (Abbrev.) Day : Gunung Melayu POM & Estate Interviewpartner 2) Requirements Gunung Melayu POM KB,DD, SH RSPO team, contractors, - Verification of last ASA corrective action employees, - General issues for RSPO certification labour union assessment - The SPO documentations and records - Justification for RSPO principles and criteria - Principle 1.1, Principle - 2: Principle 3: Quality, SM-K3 and Environmental Management System including EHS policy - Involved personnel and responsibilities - Chemical stores. - Monitoring and measurement of environmental performance of waste water treatment plant. - Mill operation including inspection of incoming FFB, FFB transport, road maintenance and workshops for heavy trucks, loaders, etc. - Principle - 4 : 4.1, 4.4, 4.7, Principle 5 : 5.3, 5.4, Principle 6 : 6.1, 6.2, 6.3, 6.4, 6.5, 6.6, 6.7, 6.8, 6.9, 6.10, Principle 8 : Supply Chain of FFB & CPO Gunung Melayu Estate WS, SP. RSPO team, contractors, employees, labour union, - Verification of last ASA corrective action - General issues for RSPO certification assessment - The SPO documentations and records - Justification for RSPO principles and criteria - Principle 1.1, Principle - 2: Principle 3: Land and conversion planting - Replanting program - Quality, SM-K3 and Environmental Management System including EHS policy - Good Agricultural Practices - IPM (Integrated Pest Management) - Decreased paraquat use and handling of chemical packaging wastes - HCV identification, Flora, fauna, ecology and biodiversity - Zero burning - Principle - 4 : 4.1, 4.2, 4.3, 4.4, 4.5, 4.6, 4.7, Principle 5 : 5.1, 5.2, 5.3, Principle 6 : 6.1, 6.2, 6.3, 6.4,, 6.5, 6.6, 6.7, 6.8, 6.9, 6.10, Principle 8 : Auditor review and prepare reporting Closing meeting End of Day 3

13 PT. TÜV NO.RD Indonesia 3 of 37 1) Site / Shift / Date / Time Organizational Unit Auditor (Abbrev.) Interviewpartner 2) Requirements Day : Bah Lias Estate Bah Lias Estate WS, KB, DD, SP, SH stakeholders - - Principle 1.1, Principle - 2: 2.1, 2.2,2.3 - Principle 3: Principle - 4 : 4.1, 4.2, 4.3, 4.4, 4.5, 4.6, 4.7, Principle 5 : 5.1, 5.2,5.3, 5.5, Principle 6 : 6.1, 6.2, 6.3, 6.4, 6.6.5, 6.6, 6.7, 6.8,6.9, 6.10, Principle 8 : Verification of last ASA corrective action - Land and conversion planting - Replanting program - Good Agricultural Practices - IPM (Integrated Pest Management) - Decreased paraquat use and handling of chemical packaging wastes - HCV identification, Flora, fauna, ecology and biodiversity - Zero burning - Continous improvement Auditor review and prepare reporting Closing meeting End of audit day 4, Dr. Supijatna & Dr. Saharuddin back to Medan

14 4 of 37 1) Site / Shift / Date / Time Organizational Unit Day 5-: : Dolok POM & Estate Auditor (Abbrev.) Interviewpartner 2) Requirements Dolok POM KB RSPO team, contractors, employees, labour union - Verification of last ASA corrective action - General issues for RSPO certification assessment - The SPO documentations and records - Justification for RSPO principles and criteria - Principle 1.1, Principle - 2: Principle 3: Quality, SM-K3 and Environmental Management System including EHS policy - Involved personnel and responsibilities - Chemical stores. - Monitoring and measurement of environmental performance of waste water treatment plant. - Mill operation including inspection of incoming FFB, FFB transport, road maintenance and workshops for heavy trucks, loaders, etc. - Principle - 4 : 4.1, 4.4, 4.7, Principle 5 : 5.3, 5.4, Principle 6 : 6.1, 6.2, 6.3, 6.4, 6.5, 6.6, 6.7, 6.8, 6.9, 6.10, Principle 8 : Supply Chain of FFB & CPO

15 PT. TÜV NO.RD Indonesia 5 of 37 1) Site / Shift / Date / Time Organizational Unit Auditor (Abbrev.) Interviewpartner 2) Dolok Estate WS, DD RSPO team, contractors, employees, labour union, Requirements - Verification of last ASA corrective action - General issues for RSPO certification assessment - The SPO documentations and records - Justification for RSPO principles and criteria - Principle 1.1, Principle - 2: Principle 3: Land and conversion planting - Replanting program - Quality, SM-K3 and Environmental Management System including EHS policy - Good Agricultural Practices - IPM (Integrated Pest Management) - Decreased paraquat use and handling of chemical packaging wastes - HCV identification, Flora, fauna, ecology and biodiversity - Zero burning - Principle - 4 : 4.1, 4.2, 4.3, 4.4, 4.5, 4.6, 4.7, Principle 5 : 5.1, 5.2, 5.3, Principle 6 : 6.1, 6.2, 6.3, 6.4,, 6.5, 6.6, 6.7, 6.8, 6.9, 6.10, Principle 8 : Auditor review and preparing report WS, KB, DD End of audit day 5 and travelling to Medan 1) Site / Shift / Date / Time Organizational Unit Day 6-: : Head Office Auditor (Abbrev.) Interviewpartner 2) Requirements Closing meeting WS, KB, DD End of audit day 6 and back to Jakarta

16 PT. TÜV NO.RD Indonesia 6 of 37 1) Site / Shift / Date / Time Organizational Unit Auditor (Abbrev.) Interviewpartner 2) Requirements Day -7: travelinng from Medan to Langkat Day 8 : : Pulo Rambong Estate Pulo Rambong Estate WS, KB SP, FF RSPO team, contractors, - Verification of last ASA corrective action employees, - General issues for RSPO certification labour union assessment and other - The SPO documentations and records stakeholders - Justification for RSPO principles and, criteria - Principle 1.1, Principle - 2: Principle 3: Land and conversion planting - Replanting program - Quality, SM-K3 and Environmental Management System including EHS policy - Good Agricultural Practices - IPM (Integrated Pest Management) - Decreased paraquat use and handling of chemical packaging wastes - HCV identification, Flora, fauna, ecology and biodiversity - Zero burning - Principle - 4 : 4.1, 4.2, 4.3, 4.4, 4.5, 4.6, 4.7, Principle 5 : 5.1, 5.2, 5.3, Principle 6 : 6.1, 6.2, 6.3, 6.4,, 6.5, 6.6, 6.7, 6.8, 6.9, 6.10, Principle 8 : 8.1 End of audit day 8

17 PT. TÜV NO.RD Indonesia 7 of 37 1) Site / Shift / Date / Time Organizational Unit Auditor (Abbrev.) Interviewpartner 2) Requirements Day 9 : : Bungara Estate & Turangie Estate Bungara Estate 2. Turangie Estate KB, SP WS, FF RSPO team, contractors, employees, labour union and other stakeholders, RSPO team, contractors, employees, labour union and other stakeholders - Verification of last ASA corrective action - General issues for RSPO certification assessment - The SPO documentations and records - Justification for RSPO principles and criteria - Principle 1.1, Principle - 2: Principle 3: Land and conversion planting - Replanting program - Quality, SM-K3 and Environmental Management System including EHS policy - Good Agricultural Practices - IPM (Integrated Pest Management) - Decreased paraquat use and handling of chemical packaging wastes - HCV identification, Flora, fauna, ecology and biodiversity - Zero burning - Principle - 4 : 4.1, 4.2, 4.3, 4.4, 4.5, 4.6, 4.7, Principle 5 : 5.1, 5.2, 5.3, Principle 6 : 6.1, 6.2, 6.3, 6.4,, 6.5, 6.6, 6.7, 6.8, 6.9, 6.10, Principle 8 : 8.1 End of audit day 9 : Dr. Supijatna and Mr. Fahroby back to Jakarta

18 PT. TÜV NO.RD Indonesia 8 of 37 1) Site / Shift / Date / Time Organizational Unit Auditor (Abbrev.) Interviewpartner 2) Requirements Day 10 : : Turangie POM Turangie POM WS, KB RSPO team, contractors, employees, labour union. other stakeholers - Verification of last ASA corrective action - General issues for RSPO certification assessment - The SPO documentations and records - Justification for RSPO principles and criteria - Principle 1.1, Principle - 2: Principle 3: Quality, SM-K3 and Environmental Management System including EHS policy - Involved personnel and responsibilities - Chemical stores. - Monitoring and measurement of environmental performance of waste water treatment plant. - Mill operation including inspection of incoming FFB, FFB transport, road maintenance and workshops for heavy trucks, loaders, etc. - Principle - 4 : 4.1, 4.4, 4.7, Principle 5 : 5.3, 5.4, Principle 6 : 6.1, 6.2, 6.3, 6.4, 6.5, 6.6, 6.7, 6.8, 6.9, 6.10, Principle 8 : Supply Chain of FFB & CPO Auditor review and preparing report WS, KB End of audit day 10 and traveling to Medan Day 11: : Head Office Closing meeting WS, KB End of audit day 11 and back to Jakarta Wieke Savitri Place, Date Lead Auditor

19 PT. TÜV NO.RD Indonesia 9 of Assessment Team Lead Assessor: Wieke Savitri Educational Background Qualification Has a bachelor degree from Agriculture Faculty, Bogor Agricultural University Compliance Working Experience RSPO Training Other Training Experience related to RSPO : PUPUK Foundation (Perkumpulan Untuk Peningkatan Usaha Kecil, A Non Government Organization for promoting small scale enterprises supported and financed by GTZ-Germany and Swiss Contact, as Management Consultant. Responsibilities : To arrange projects regarding business management, human resources, marketing and IT to promote small scale enterprises : PT. Varia Industri Tirta and PT.Tirta Investama. Bottled water companies under DaNo.ne management as Quality Control Manager/ Quality Assurance Manager/ Internal Auditor and Trainer. Responsibilities : deliver training and implementing management systems for ISO 9001, ISO 14001, HACCP, GMP, ISO 22000, 5S, QCC, SPC : Danone-Aqua Foundation as Associate Representative in factory. Responsibilities: to develop community development programs for people living around factory : PT. Tribina Mediartha Sarana. A consulting company, as a Consultant and Trainer. Responsibilities : deliver training and consultancy for companies and organizations for ISO 9001, ISO 14001, SMK3, HACCP, GMP, ISO 22000, 5S, QCC, SPC : PT. Global Certification Indonesia. Certification Body based in UK as Operations Manager. Responsibilities: Running daily operation and reporting to Head Office in UK Now: PT. TUV NO.RD Indonesia as ISO 9001/RSPO/ISPO Lead Auditor. Branch Manager Surabaya Office. Responsibilities : Running daily operation in Branch Office, conduct audit and reporting. Certified RSPO Lead Auditor Training by ProForest-Wild Asia on July 7-11, 2008, Indonesia. Internal Auditor Training of Environmental Management System (ISO 14001:1996) EARA -RIET REDECON, 2000, Indonesia. Internal training SMK3, Indonesia Workshop for Community-based Environmental Educators by the United Nations of Environmental Program, 2002, Thailand Process based audit ISO 9001;2000 by PSB Certification, 2002, Indonesia ISO by SAI Global, 2005, Indonesia ISO 9001:2000 Advanced Lead Auditor Training Course, by IQCS International Certification Services, 2006, Indonesia ISO 9001:2008 upgrading training, by TUV NORD Indonesia ISPO training in 2011 RSPO to date (Aug May 2013) More than 25 x pre-assessments and main assessment of RSPO P&C in Indonesia, (RSPO P&C) 1 x NPP assessments in Indonesia 3 x RSPO SCC assessments in Indonesia Assessment Team Members RSPO REQUIREMENT Fluent in main local languages and English. ASSESSOR Wieke Saviitri (WS), Karlina Bone (KB),Supijatna (SUP), Saharuddin (SH), Fahroby Falatehan (FF), Dede (DD) QUALIFICATIONS Indonesian citizen, fluent both in Bahasa and English COMPLIA NCE Field working experience in the palm oil sector, or a SUP He holds a doctorate in Environmental and Natural Resources Management from Bogor Agricultural University (IPB), and has a strong background and experience in Agronomy aspects. He

20 PT. TÜV NO.RD Indonesia : 20 of 37 demonstrable equivalent. has been working in IPB since 1986 as a lecturer in Agronomy, including Palm Oil Plantation subject. Good agricultural practices (GAP), integrated pest management (IPM), pesticide and fertilizer use. SUP WS KB He has extensive experiences in research, such as in plant water and nutrient requirements, irrigation and fertilizer application, seedling selection and Integrated Pest Management; Several research subjects that had been done, for example: Research of high grow fertilizer effect on growth and production of oil palm, She has a bachelor degree in Agricultural Faculty from Bogor Agricultural University (IPB) She has a bachelor degree in Biological Science, in ecology major from Instiitute Techlology of Bandung (ITB). Done a research in a nitrification and denitrification in a recirculation water treatment project. DD He has bachelor degree in Forestry Faculty from Bogor Agricultural University( IPB ). Health and Safety assessment on the farm and in processing facilities. (For example OHSAS or occupational. Health and safety assurance system). WS KB As audit team member in some OHSAS audit such as Bakrie Sumatra Plantation Group in North Sumatera and South Sumatera. Observed audit in OHSAS Audit as a trainee for Indonesian contractors, such as PT. Inti Indah, PT. Virajaya Riauputra, etc. Other than that, observed as a trainee as well RSPO P&C for PT. Inti Indo Sawit - Tungkal Ulu (CA), PT. London Sumatra (ASA III), UPOIC (CA stage 1 and stage 2), PT. Sahabat Mewah Makmur (ASA I), etc. SH He holds doctorate in Social Economic Science from Bogor Agricultural University and has been working in IPB as a lecturer in Social Economic Science. He has experience to handle social economic issues, particularly to handle conflict. Social-economic issues FF He has a bachelor degree in Agriculture Social Economy from Bogor Agricultural University (IPB) and from University of Indonesia (UI), Master of Planning and Public Policy, Faculty of Economics ( ). Has been working as a lecturer in Agriculture Social Economy Department, Bogor Agricultural University. And involved in numerous researches for social economic projects, etc WS She has a bachelor degree from Bogor Agricultural University. which has subjects in Agricultural and Rural Sociology, Social Research Methodology. She has experience as an enumerator/ data processing for socio-economic projects researches during her study in university. She also has experience in Danone-Aqua Foundation as Associate Representative with responsibilities to develop community development programs.. Environmental and ecological assessmenting. (For example experience with organic agriculture, ISO 14001) SUP WS KB He qualifies in biodiversity assessment and biodiversity science. Underwent auditor training in oil palm estates and palm oil mill in EMS and RSPO P & C. Member of the team in RSPO assessment of PT. Perkebunan Nusantara IV, and many more. She has experience in implementing ISO and also as internal auditor for other factories in PT Tirta Investama.. She has a bachelor degree in Biological Science, in ecology major. Done a research in a nitrification and denitrification in a recirculation water treatment project Certification Body PT. TÜV NO.RD Indonesia is a subsidiary of the German TÜV NORD Group. Our company is a market leader in Indonesia for inspection, testing and certification services. We offer not just a high added value service but also the trust and confidence embedded in our issued certificates/reports. We satisfy not only our direct customers but also other stakeholders, like regulators and interested society including NGOs, through our competent auditors, inspectors and analysts. PT. TÜV NORD Indonesia, under its HQ in Germany, is a member of International Accreditation Forum (IAF) and accredited by DAAK German and by the Indonesian Accreditation Committee (KAN). Services provided by the Strategic Business Unit Systems Certifications are: Food Safety Management System ISO

21 : 21 of , Information Security Management System ISO 27001, Social Accountability SA 8000, Food Hygiene HACCP, Medical Device Directive MDD, ISO 13485, Occupational Health and Safety OHSAS 18001, Product Certification: GS-Mark, CE-Mark, SNI Mark, Inspection for ISPS Code, Clean Development Mechanism (CDM) Validation & Verification, British Retail Consortium, BRC Issue 5 and ISCC. 3. Assessment Findings 3.1. Summary of the Findings by Criteria Objective evidences were obtained separately for each of the indicators for mills and estates in the annual surveillance assessment. The results for each indicator from the different operational areas were aggregated to assess the overall conformances of the company s operations to each criterion. A statement is made for each indicator on the finding. A summary of the Non-Conformities is given in Section During the annual surveillance assessment-4, 3 (three) major non-conformities and 6 (six) minor nonconformities have been raised against RSPO Principals and criteria, whilst 0 (zero) major non-conformities have been raised against RSPO Supply Chain Standard module E (mass balance). Gunung Melayu Mill (GMM) and its supply bases have prepared a Corrective Active Plan which each date for implementation has been accepted by PT. TÜV NORD Indonesia. Thus, Gunung Melayu Mill (GMM) and its supply bases are still recommended to extend the certification of RSPO Principal and Criteria which valid until 29 April The following is a summary of the findings for compliance with the RSPO Principles & Criteria for Indonesian National International <INA-NI ver. May 2008 Standard). While a summary of the findings for compliance with the RSPO Supply Chain Module E (Mass Balance) ver. November 2011 is attached in Appendix 2. Summary of the findings for compliance with the RSPO Supply Chain Module E (Mass Balance) ver. November

22 : 22 of 37 Table 3-1 Summary of Findings by Criteria FINDINGS/COMMENTS Criterion 1.1 (C.1.1) Provide adequate information to other stakeholders on environmental social and legal issues relevant with RSPO Criteria, in appropriate languages and forms to allow for effective participation in decision-making GMM has a procedure for communicating with stakeholders as decribed in Prosedur Komunikasi, or Communication Procedure, (EMS-P05 Rev.4 dated on 10 August 2009). All the heads in the mill / estates are required to provide adequate information as required by the RSPO criteria. The requests for information are recorded in the Daftar Permintaan dan Tanggapan dari Pemangku Kepentingan or List of information and response from Stakeholder (Form No. SPO-01) for each mill/ estate. The response(s) are prepared by the heads of mill / estates or by the Area Manager Agronomy depending on their importance. Stakeholders aspiration, especially for asking donation will be transfered to Area Manager Agronomy before reported monthly to Environment & CSR Dept Department in Head Office and approved by BOD. As said by interviewed Estate Manager, donation less than Rp ,- could be approved by Estate Manager without forwarded to AMA. The records of requests / responses will be kept for 5 (five) years as stated in Procedure Control of Records. Criterion 1.2 (C.1.2) Management documents are publicly available, except where these are prevented by commercial confidentiality or where disclosure of information would result in negative environmental or social outcomes All management documents on legal, environmental, health safety and social issues are publicly available upon request. The legal documents are : Izin Lokasi (Site Permit), Izin Usaha Perkebunan (Plantation Operation Permit) HGU (Land Use Title The environmental documents for AMDAL (Environmental Impact Analysis) was approved by Badan Lingkungan Hidup Daerah (BAPEDALDA). Various environmental parameters and also social impact are measured and reported six-monthly in Laporan Pelaksanaan Rencana Pengelolaan Lingkungan Hidup dan Rencana Pemantauan Lingkungan Hidup (RKL & RPL). Since GMM is a labour-intensive company, it is required to comply with the mandatory SMK3 (Occupational Health and Safety Management System). Progress on the Health and Safety Program (K3 program) is reported regularly to the Ministry of Labour of Republic of Indonesia. All the records are properly kept for the proper periods as stated in Procedure Control of Records dated on , e.g., safety, health and environment reports for 5 years, social records 5 years and legal records indefinitely, and are available on request. Notwithstanding this, environmental and social data are presented during the yearly public consultation with stakeholders as part of its CSR program, e.g., Posyandu (integrated healthcare service post and health education to promote human hygiene), sanitation and nutrition intake for infants, pregnant and breast-feeding women, agricultural skills training for the locals (estate workers and smallholders), honor for school teachers, scholarships available, renovation aid for schools, roads, worship buildings. Criterion 2.1 (C.2.1) There is compliance with all applicable local, national and ratified international laws and regulations GMM keeps copies of all the legislations / regulations applicable to it from the applicable regulation list in Prosedur EMS-PO2 rev.4 Legal Requirements dated on , compiled by Environmental & CSR Departrment in Head Office which has to keep track of its (LONSUM s) legal requirements and makes sure that they are complied with., that covers Legislation (Perundangan), Regulation (Peraturan), Decree (Keputusan) & Directives (Pedoman), Permit (Perijinan), Treaties (Pakta), Convention (Konvensi) and Protocol; Judgement of Court (Putusan pengadilan). The Legal Department in Head Office is responsible for validating / renewing licenses and permits, especially land permit, while Head of Engineering & Processing responsible for license/ of mill operation since GMM has ISO certification for its environmental management and also SM-K3 for Health Safety Environment. for keeping the mill / estates operating within the national laws / regulations, and is required to keep up to date with any changes in the laws / regulations. However, it was found that : Company Registration Permit from Regent of Asahan No. 503/SITU/BPP/1385/IX/2008 valid from 26 September 2008 that requires permit holders to re-register each year, however, re-registration. in 2013 was not available. A major nonconformity has been raised. (See NCR-GM-01). Compliance Status : Comply after correction and corrective action Criterion 2.2 (C.2.2) The right to use the land can be demonstrated and is not legitimately contested by local communities with demonstrable rights Currently, there are no claims on GMM land by anyone. General Affairs department and Legal department are responsible to solve if there is a conflict of land acquired, however, if the land conflict can not be resolved by negotiation, the last option is to bring it into court. Mills manager and estates manager have registered properly for the certificate of HGU in land acquiring register list. The whole land use for oil palm planted by identification and demarcated by stone boundary shall be managed. There was evidence that legal boundary periodically monitored There is mechanism to monitor the boundary stones periodically, to ensure that they are not broken, had been moved or missing, if this case happens, an action plan should be carried out to fix the boundary stone accordingly. Compliance status : Full.

23 PT. TÜV NO.RD Indonesia : 23 of 37 Criterion 2.3 (C.2.3) Use of land for oil palm does not diminish the legal rights or customary rights of other users, without their free, prior and informed consent. It was confirmed during surveillance assessment as well as during interview with stakeholders that there was no customary right of other users. Compliance status: Full Criterion 3.1 (C.3.1) There is an implemented management plan that aims to achieve long term economic and financial viability GMM has 5 years projection ( ) for its crop, including key performance data for its mill and estates as part of its long term economic planning for all corporate of PT. PP London Sumatra Tbk (Lonsum). For GMM (Gunung Melayu Mill, Gunung Melayu Estate, and Sei Rumbiya Estate) there is 10 years projection from including mill allocation, production of FFB (tonnage) FFB/ ha (yield); OER, by predicting inflation rate; exchange rate; interest rate; portion cash; dividen; non deductible expensive; working hours; turnover; a% allowance for doubtful accounts, age of asset; price of FFB purchase; cost to build a mill. Criterion 4.1 (C.4.1) Operating Procedures are appropriately documented and consistently implemented and monitored GMM has Standard Operating Procedures with the best practices for its mill and estate operations. The mill and estates have been certified to, EMS ISO and HSE management SMK3 by the Ministry of Labour of Indonesia. Most of the Standard Operation Procedures are incorporated in the SM-K3 management system. The following procedures have been implemented for sustainable palm oil production a. SOP for Oil Palm (containing aspects from nursery, land preparation, planting, upkeep, harvesting, waste management, HCV, emergency preparedness and response, and environmental monitoring). b. SOP for Palm Oil Mill (containing stages of process, boiler, power generation, water treatment, land application, electrical system, quality (inc monitoring of CPO parameters), dispatch and laboratory). c. Manual and SOP for Environment Management System, Health & Safety and SPO (containing application of pesticides, use of PPE, emergency preparadness). Daily Implementation and Monitoring of the SOP is documented in reported in LPF (Lonsum Procedure Form). The LPF report should be approved by Acting Assistant Manager and verified by Assistant. The results of the daily reports are summarized in monthly report. Monthly report contains figures of crop protection activities, fertilizer application, climate data, block list and hectares, nurseries statemnt, field upkeep, crop harvest and statistics, personal data, stores and fixed asset. Other kind of Monitoring kinds include site visit, monthly meeting. Criterion 4.2 (C.4.2) Practices to maintain soil fertility at, or where possible improve soil fertility to, a level that ensures optimal and sustained yield There are some agronomic practice to improve and maintain soil fertility implemented in LONSUM/ GMM : 1. Plant Legume Cover Crops 2. Pruning and frond stacking 3. Weeding, especially wild fern (Stenochlaena palustris) 4. Fertilizing Recommendation of fertilizing dosage is prepared by BLRS (Bah Lias Research Station/ Sumatera BioScience), its own laboratory in Medan, North Sumatera. After taking sample of Leaf Sampling Unit of in ratio area of 5% of 17th leaf of 28 trees in a row in February each year, BLRS analyses the leaf samples and recommends the dosage of fertilizer application. Each sample represents every 25 ha area. The recommendation will be submitted to the estate by September the same year. The fertilization frecuency is once or twice a year. Criterion 4.3 (C.4.3) Practices to minimize and control erosion and degradation of soils As there are no fragile soils (including peat) according to a HCV assessment, GMM does not have any plan to manage them. Practices to minimise and control erosion in GMM are : 1. Plant Legume Cover Crops, one year before planting time, the legume cover crop is planted for increase the soil fertility and control soil erosion. 2. Pruning and frond stacking. Road maintenance. Regular road maintenance is carried out (grading, compacting and cambering) and also ditch maintenance according to annual program. Criterion 4.4 (C.4.4) Practices to maintain the quality and availability of surface and ground water

24 : 24 of 37 GMM has facilitated provision of water in storage tanks consume daily operation mills and estates and employee s housing. The water for industrial use is supplied from the river and for households. Record of BOD and record of water using per ton FFB, was available which during 2012 the average was below the LONSUM standard 1.25 m3/ ton FFB processed. The BOD levels and other parameters refers to with the local requirements in the Liquid Waste regulations in environmental decree by Province of South Sumatra. The BOD data are submitted six-monthly in RKL/ RPL to BAPEDALDA (Regional Environmental Monitoring Body). Checks on records show that all the data are comply with regulation. To avoid the contamination of river water, GMM installing HCV area along the riparian zones a 50 meter belt along the river banks - and no replanting of oil palm will be done along all river banks as stated in SOP OP5.10 : HCV. Compliance status : Full Criterion 4.5 (C.4.5) Pests, diseases, weeds and invasively-introduced species are effectively managed using appropriate Integrated Pest Management (IPM) Techniques GMM has formulated an Integrated Pest Management (IPM), practiced incorporating cultural, biological, mechanical or physical methods, by : 1. Identification of pests, diseases and weeds before it become an outbreak of maximum level 2. Introducing of beneficial plants for hosts of pests. 3. Introduction Barn Owl (Tyto alba) 4. Planting LCC 5. Frond stacking 6. Minimise use of agrochemicals. Oil Palm Leaf Eater Control includes detection, cencus, examination, treatments, evaluation, monitoring and organisation. Planting beneficial plants, such as Bunga pukul delapan (Turnera subulata) and air mata pengantin (Antigonom leptosus) to harbour predators of the crop pests. MRF (Monthly Requisition for Fund) reported the use of benefecial plants (Antigonon leptopus, Turnera subulata). Eradication of outbreaks of leaf-eating bagworm (ulat api, especially Setora nitens) is by biological control using a virus taken from the insects themselves. GMM conduct monitoring of pesticide toxicity units (a.i. /LD 50 per tonne of FFB or per hectare. The barn owl (Burung hantu, scientifically Tyto alba) is protected and encouraged as a natural predator of rats. The use of pesticides has to be minimised by only implementing for severe infestation in selected area instead of blanket method, Criterion 4.6 (C.4.6) Agrochemicals are used in a way that does No.t endanger health or the environment. There is No. prophylactic use of pesticides, except in specific situations identified in national Best Practice guidelines. Where agrochemicals are used that are categorized as World Health Organization Type 1A or 1B, or are listed by the Stockholm or Rotterdam Conventions, growers are actively seeking to identify alternatives, and this is documented. There is a List of pesticides used and pesticides stocks is listed in the Balance Stock Agrochemical in 2011 and 2012., those can be bought for application are in accordance with the Permentan No 1/2001, WHO and Rotterdam convention, are issued and distributed to Procurement division. Only procurement division can buy and supply the matter. GMM has a procedure on how to apply agrochemicals, refers to Peraturan Menteri Pertanian No. 07/Permentan /SR.140/ /2007, or Regulation No. 07/ Permentan /SR.140/ 2/2007 Ministry of Agriculture Republic of Indonesia.. All the agrochemicals used are registered and approved by Pusat Perizinan dan Investasi Sekertariat Jenderal Departemen Pertanian 2008, or Invesation and Permit Center, Agriculture Department, Republic of Indonesia The application of pesticides refers to SOP OP Guide to the safe use of Pesticides (March 2008). Checks on the records of agrochemicals used found that they complied with the regulation. However, it was founf that : Certificate for workers who handle restricted pesticides such as paraquat were.not available. This is not in accordance with Kepmentan Article 5. A Major nonconformity has been raised (See NCR-GM-02). GMM has a procedure to store agrochemical wastes and empty containers in a secured area a B3 (hazardous and toxic materials) waste warehouse - before collection by a licensed contractor. Records of the hazardous wastes stored are kept properly and in compliance with the Material Safety Data Sheet (MSDS) in Government Regulation (PP) No. 74 of GMM has policy that pregnant and breast-feeding women are prohibited from working with pesticides. There was evidence of regular medical check-ups for workers involved in handling hazardous chemicals.for permanent workers, however, it was found that: There were no records of medical check-up which conducted in February 2013 for daily workers exposed to hazardous chemicals in the Division II e.g: Mr. Sumarjan Sinaga, Karsan, Amru Faisal. A Minor nonconformity has been raised (See NCR-GM-03). Compliance Status : Comply after correction and corrective action for major nonconformity. Compliance Status : Open minor nonconformity. Criterion 4.7 (C.4.7) An occupational health and safety plan is documented, effectively communicated and implemented. GMM has established a safety, health and environment policy and certified SMK3. The organisation structure of Panitia Pembina Keselamatan dan Kesehatan Kerja (P2K3), or Guiding Committee on Occupational Health and Safety, has been established. Explanation and communication of the policy is the responsibility of the safety engineer (SM-P2K3) who daily monitors and inspects all facilities in the mill and estates for emergencies. There are regular monthly meetings between the management and workers on health and safety issues. All the permanent employees and contract workers are insured under JAMSOSTEK A record of JAMSOSTEK payment installment was sighted. Employee above 55 years old have pension. However, it was found that:

25 : 25 of 37 All daily workers have not been included in the JAMSOSTEK/Social Security insurance, employee data per August 2013 showed more than 10 people, for example in the Division VI were 63 people, as required by Peraturan Kementerian Sosial, Tenaga Kerja dan Transmigrasi No50 tahun A minor nonconformity has been raised (See NCR-GM-04). All employees, especially those in high risk work, undergo an annual health examination with the results submitted in Laporan Hasil Pemeriksaan Kesehatan Berkala Tenaga Kerja to Dinas Tenaga Kerja Balai Hiperkes Dan Keselamatan Kerja Provinsi Sumatera Utara (Department of Labor, Province of North Sumatra). Record of healthy employee available. The point check were : Cholinesterase (pesticide), Audiometric ( hearing), Spirometri (lung), Work Environmental tested were : Noisy, Dusty, Vibrations at work place, Luminosity,. All the operations have been risk assessed for obtaining SMK3 certification. The P2K3 team identified and analysed the risks for all routine and non-routine activities. The records of risk analysis are documented properly. GMM has developed procedures for accidents and emergency preparadness The effectiveness of this procedure is tested every year. Workers in hazardous areas are provided training to minimize their risk in an annual training program on safety and health issues including training for boiler operators, K3 regulations and legislations of the Republic of Indonesia, elevation equipment (crane / gondola). A record of work accidents was compiled by the company physician every month. Records of work accidents are kept 5 years and regularly submitted to DISNAKER, the Regional Labor Department, and JAMSOSTEK for insurance claims. In a work accident, the P2K3 team will meet immediately to investigate the cause and recommend corrective and preventive action. The P2K3 team has assigned to assure that all P2K3 and K3 equipment, such as fire extinguishers, PPE, hydrants, P3K tool kits (medical box) are available on worksites by regular checking in the mill and estates. However, it was found that: Appointed personnel in emergency response organization structure has not been completely received training related to emergency response training, for example Pak Suheri A Minor NonConformity was raised. (See NCR-GM-05). Compliance status : Open minor non-conformity Criterion 4.8 (C.4.8) All staff, workers, smallholders and contractors are appropriately trained. GMM has developed training procedure that require the Mill / estate managers have to identified the training needs in each section / department to organize an annual training program which also covers contractors and farmers eventhough in North Sumatera Region LONSUM do not received FFB from smallholders. However, it was found that: Training programs in 2013 and personnel training records are not available A Major NonConformity was raised. (See NCR-GM-06). Compliance Status : Comply after correction and corrective action Criterion 5.1 (C.5.1) Environment aspects of plantation and mill management, including replanting, that have environmental impacts are identified, and plans to mitigate the negative impacts and promote the positive ones are made, implemented and monitored, to demonstrate continuous improvement. GMM has developed criteria to determinate methods to replanting oil palms in Impact of plantation and mill which is identified in AMDAL Document, AMDAL/RKL/RPL of Oil Palm Plantation and Palm Oil Mill. GMM conducted an environmental impact assessment (ANDAL) of its mill and estates operations in 2004 which has not been revised because there has been no change in its operations that could have differently affected the environmental and socioeconomic issues. Any adverse impacts identified will be studied for mitigation. Assessment is also being carried out on the environmental management and monitoring (RKL/RPL). GMM had previously assessed its environmental impact in obtaining ISO certification (for environmental management) for its mill and estates. Six-monthly reports of RKL/RPL are submitted to BAPEDALDA (local environmental controlling body) available for Semester II 2012 and Semester I Criterion 5.2 (C.5.2) The status of rare, threatened or endangered species and High Conservation Value habitats, if any, that exist in the plantation or that could be affected by plantation or mill management, shall be identified and their conservation taken into account in management plans and operations. GMM has prepared and developed all information as well for flora and fauna which a are comprehensively identified in Executive Summary of High Conservation Value Report The HCV s areas are recognized with HCV s 4.1, 4.2, and 6, which most of HCV s are available in the whole of the plantations. The HCV s area at the field is well identified with signboards. Identification of HCV s was updated for 2010 and its accordance government regulation No. 07 Tahun The identification of HCV s whole in LONSUM was documented in List of Protected Species. Compliance status : Full. Criterion 5.3 (C.5.3) Waste is reduced, recycled, re-used and disposed of in an environmentally and socially responsible manner GMM has identified all waste and pollutions sources in the mill and estates and listed them in accordance with its related procedure SOP OP Identification of waste sources,,the records of actual wastes in the mill and estates are documented properly. Suitable methods have been established to minimize the production of wastes and to minimize their environmental impacts. GMM has, in fact, already implemented waste management and disposal to avoid / reduce pollution and developed SOP OP 5.8. Waste Management.to obtain its ISO certification. EFB is used to mulch young palms in the field near mill in Gunung Melayu Estate liquid wastes treated as in Instalasi Pengolah Air Limbah /IPAL (waste water treatment) to reduce their BOD and COD, with their ph monitored to the requisite standards. Analyses of POME for BOD, COD and ph are done regularly to ensure the parameters meet the standards, the report in Semester II 2012 and Semester I 2013 showing compliance. GMM has a licence to store the wastes in accordance with decree before collection by a licensed waste collector. The

RSPO ANNUAL SURVEILLANCE ASSESSMENT3 PUBLIC SUMMARY REPORT

RSPO ANNUAL SURVEILLANCE ASSESSMENT3 PUBLIC SUMMARY REPORT of 36 RSPO ANNUAL SURVEILLANCE ASSESSMENT3 PUBLIC SUMMARY REPORT PT. TÜV NORD Indonesia System Certification Management Has assessed PT. PP LONDON SUMATRA Tbk < Gunung Melayu Mill and its Supply Bases>

More information

PT. PP London Sumatra Indonesia Plantation Tbk. - Begerpang Mill and Its Supply Bases

PT. PP London Sumatra Indonesia Plantation Tbk. - Begerpang Mill and Its Supply Bases 2 nd Annual Surveillance Audit for PT. PP London Sumatra Indonesia Plantation Tbk. - Begerpang Mill and Its Supply Bases FMS40033 RSPO Member Name: PT. PP London Sumatra Indonesia Tbk. RSPO Membership

More information

PT. PP London Sumatera Indonesia Tbk. Begerpang Mill and Its Supply Base

PT. PP London Sumatera Indonesia Tbk. Begerpang Mill and Its Supply Base Certification Audit for PT. PP London Sumatera Indonesia Tbk. Begerpang Mill and Its Supply Base FMS40033 RSPO Membership number: 1-0015-04-000-00 RSPO Member Name: PT. PP London Sumatra Indonesia Tbk

More information

MOODY INTERNATIONAL CERTIFICATION (M) SDN BHD ( W)

MOODY INTERNATIONAL CERTIFICATION (M) SDN BHD ( W) Report No.: R9280/12-2 (MRICOP-PMU) Appendix Page: 15 of 32 Fuel storage rooms Personal protective equipment storage room Buffer zones at the estates Buffer zones at the estates Water sampling points Water

More information

[ ]Stage-1 [ ] Stage-2 [ ] Surveillance [ ] Re-Certification

[ ]Stage-1 [ ] Stage-2 [ ] Surveillance [ ] Re-Certification PT. MUTUAGUNG LESTARI ASSESSMENT REPORT Roundtable on Sustainable Palm Oil Certification R S P O [ ]Stage-1 [ ] Stage-2 [] Surveillance [ ] Re-Certification Name of Management Organisation : BELANI ELOK

More information

PT INTI INDOSAWIT SUBUR TUNGKAL ULU GROUP Jambi Province, Sumatra, INDONESIA

PT INTI INDOSAWIT SUBUR TUNGKAL ULU GROUP Jambi Province, Sumatra, INDONESIA PUBLIC SUMMARY REPORT RSPO ANNUAL SURVEILLANCE ASSESSMENT (ASA01) And SCHEME SMALLHOLDER INITIAL ASSESSMENT PT INTI INDOSAWIT SUBUR TUNGKAL ULU GROUP Jambi Province, Sumatra, INDONESIA Report Author Senniah

More information

PT PP London Sumatra Indonesia Tbk

PT PP London Sumatra Indonesia Tbk Particulars About Your Organisation 1.1 Name of your organization PT PP London Sumatra Indonesia Tbk 1.2 What is/are the primary activity(ies) or product(s) of your organization? Oil Palm Growers Palm

More information

RSPO NEW PLANTING PROCEDURES Summary Report of Planning and Management PT. Usaha Sawit Unggul Tabuyung Estate, North Sumatra, Indonesia.

RSPO NEW PLANTING PROCEDURES Summary Report of Planning and Management PT. Usaha Sawit Unggul Tabuyung Estate, North Sumatra, Indonesia. RSPO NEW PLANTING PROCEDURES Summary Report of Planning and Management PT. Usaha Sawit Unggul Tabuyung Estate, North Sumatra, Indonesia. EXECUTIVE SUMMARY PT. Usaha Sawit Unggul (PT. USU) is subsidiary

More information

2016 Sustainability Report April 2016

2016 Sustainability Report April 2016 2016 Sustainability Report April 2016 Presentation Outline Business Overview Sustainability Statement & Approach Sustainability Commitment & Performance Appendix: Managing Our Material Issues 2 Business

More information

PT. PP London Sumatera Indonesia Tbk. Dolok Mill and Its Supply Base

PT. PP London Sumatera Indonesia Tbk. Dolok Mill and Its Supply Base Surveillance Audit for PT. PP London Sumatera Indonesia Tbk. Dolok Mill and Its Supply Base FMS40044 RSPO Membership number: 1-0015-04-000-00 RSPO Member Name: PT PP London Sumatra Indonesia Tbk Audited

More information

PT. Salim Ivomas Pratama Tbk

PT. Salim Ivomas Pratama Tbk Particulars About Your Organisation 1.1 Name of your organization PT. Salim Ivomas Pratama Tbk 1.2 What is/are the primary activity(ies) or product(s) of your organization? Oil Palm Growers Palm Oil Processors

More information

RSPO Trial Certification Assessment. PT Hindoli Smallholders

RSPO Trial Certification Assessment. PT Hindoli Smallholders RSPO Trial Certification Assessment PT Hindoli Smallholders Corrective for Nonconformities PT HINDOLI Report Prepared By: Senior Plasma Operation Manager Program Assurance Manager : 30/07/2009 PT HINDOLI

More information

RSPO. Summary Report of Planning and Management PT. Teguh Jayaprima Abadi Kutai Kartanegara District East Kalimantan Province, Indonesia

RSPO. Summary Report of Planning and Management PT. Teguh Jayaprima Abadi Kutai Kartanegara District East Kalimantan Province, Indonesia Summary Report of Planning and Management PT. Teguh Jayaprima Abadi Kutai District East Kalimantan Province, Indonesia 1. Executive Summary PT Teguh Jayaprima Abadi (PT TJA) is a company in Indonesia which

More information

PT Sampoerna Agro Tbk

PT Sampoerna Agro Tbk Particulars About Your Organisation 1.1 Name of your organization PT Sampoerna Agro Tbk 1.2 What is/are the primary activity(ies) or product(s) of your organization? Oil Palm Growers Palm Oil Processors

More information

PT. DENDYMARKER INDAHLESTARI

PT. DENDYMARKER INDAHLESTARI Particulars About Your Organisation Organisation Name PT. DENDYMARKER INDAHLESTARI Corporate Website Address www.agro-investama.com Primary Activity or Product Oil Palm Growers Related Company(ies) Company

More information

Table A: ISSUES CITED IN THE ORIGINAL COMPLAINT. IOI Action Plan (April 28, 2017)

Table A: ISSUES CITED IN THE ORIGINAL COMPLAINT. IOI Action Plan (April 28, 2017) Action by 1 Adequate Standard Operating Procedures (SOPs) that are in compliance with RSPO P&C and national laws and regulations 1.1 Specific SOPs to be developed and/or updated are: July 2017 Completed

More information

Palm Oil Innovations Group Charter

Palm Oil Innovations Group Charter Palm Oil Innovations Group Charter POIG Charter V1.0 13 th Nov 2013 /1 Introduction The Palm Oil Innovations Group (POIG) aims to support the RSPO through building on RSPO standards and commitments and

More information

PT Bukit Barisan Indah Prima

PT Bukit Barisan Indah Prima Particulars About Your Organisation Organisation Name PT Bukit Barisan Indah Prima Corporate Website Address Primary Activity or Product Oil Palm Growers Related Company(ies) Company Primary Activity RSPO

More information

Summary Report of Planning & Management of PT Persada Graha Mandiri. Silat Hilir Sub-District, Kapuas Hulu District, West Kalimantan Province

Summary Report of Planning & Management of PT Persada Graha Mandiri. Silat Hilir Sub-District, Kapuas Hulu District, West Kalimantan Province Summary Report of Planning & Management of PT Persada Graha Mandiri Silat Hilir Sub-District, Kapuas Hulu District, West Kalimantan Province Executive Summary PT Persada Graha Mandiri (PGM) is located

More information

PT. Sampoerna Agro Tbk

PT. Sampoerna Agro Tbk Particulars About Your Organisation 1.1 Name of your organization PT. Sampoerna Agro Tbk 1.2 What is/are the primary activity(ies) or product(s) of your organization? Oil Palm Growers Palm Oil Processors

More information

MUSIM MAS ACTION PLAN TO ADDRESS POIG AUDIT COMPLIANCE

MUSIM MAS ACTION PLAN TO ADDRESS POIG AUDIT COMPLIANCE MUSIM MAS ACTION PLAN TO ADDRESS POIG AUDIT COMPLIANCE Musim Mas has engaged to carry out initial audit to verify level of compliance of Musim Mas operations with the POIG Charter and Indicators (v. March

More information

AT TÜV NORD GROUP, SERVICE AND RESPONSIBILITY HAVE MORE THAN 10,000 FACES

AT TÜV NORD GROUP, SERVICE AND RESPONSIBILITY HAVE MORE THAN 10,000 FACES AT TÜV NORD GROUP, SERVICE AND RESPONSIBILITY HAVE MORE THAN 10,000 FACES A leading international technology service provider Focus: people, technology, the environment and material assets Safety experts

More information

Oil Palm Growers Operational Profile 1.1 Please state your main activities as a palm oil grower Palm oil grower & miller Operations and Certification

Oil Palm Growers Operational Profile 1.1 Please state your main activities as a palm oil grower Palm oil grower & miller Operations and Certification Particulars About Your Organisation Organisation Name PT Cipta Usaha Sejati Corporate Website Address Primary Activity or Product Oil Palm Growers Related Company(ies) Membership Membership Number Membership

More information

Public Report Sustainable Forest Management System. Ownership of this report and the information contained within remain the property of AJA Europe

Public Report Sustainable Forest Management System. Ownership of this report and the information contained within remain the property of AJA Europe Public Report Sustainable Forest Management System Ownership of this report and the information contained within remain the property of AJA Europe SELECT OPTION AJA EUROPE JOB NUMBER: CLIENT NAME: TOTAL

More information

PT Smart Tbk. Particulars. RSPO Annual Communications of Progress Particulars Form. About Your Organisation. 1.1 Name of your organization

PT Smart Tbk. Particulars. RSPO Annual Communications of Progress Particulars Form. About Your Organisation. 1.1 Name of your organization Particulars About Your Organisation 1.1 Name of your organization PT Smart Tbk 1.2 What is/are the primary activity(ies) or product(s) of your organization? Oil Palm Growers Palm Oil Processors and/or

More information

Wilmar International Limited

Wilmar International Limited Particulars About Your Organisation 1.1 Name of your organization Wilmar International Limited 1.2 What is/are the primary activity(ies) or product(s) of your organization? Oil Palm Growers Palm Oil Processors

More information

Summary Report of Planning & Management of PT Satya Kisma Usaha. Central Tebo and Tengah Ilir Districts, Tebo Regency, Jambi Province

Summary Report of Planning & Management of PT Satya Kisma Usaha. Central Tebo and Tengah Ilir Districts, Tebo Regency, Jambi Province Summary Report of Planning & Management of PT Satya Kisma Usaha Central Tebo and Tengah Ilir Districts, Tebo Regency, Jambi Province Executive Summary PT Satya Kisma Usaha (hereinafter referred to as PT

More information

GAR/SMART Double Certification Experience (ISPO and ISCC EU) 3 rd Meeting of ISCC TC SEA Bangkok, 24 th March 2015

GAR/SMART Double Certification Experience (ISPO and ISCC EU) 3 rd Meeting of ISCC TC SEA Bangkok, 24 th March 2015 GAR/SMART Double Certification Experience (ISPO and ISCC EU) 3 rd Meeting of ISCC TC SEA Bangkok, 24 th March 2015 Content of Presentation 1 Introduction 4 ISCC for Smallholder 2 Certification Milestone

More information

PT Inti Indosawit Subur Related Information Other information on palm oil: Information regarding our operations can be found at Click here to visit th

PT Inti Indosawit Subur Related Information Other information on palm oil: Information regarding our operations can be found at Click here to visit th PT Inti Indosawit Subur Particulars Organisation Name Corporate Website Address Primary Activity or Product PT Inti Indosawit Subur http://www.asianagri.com/ Related Company(ies) Company Primary Activity

More information

RSPO ANNUAL SURVEILLANCE ASSESSMENT1 PUBLIC SUMMARY REPORT

RSPO ANNUAL SURVEILLANCE ASSESSMENT1 PUBLIC SUMMARY REPORT of 38 RSPO ANNUAL SURVEILLANCE ASSESSMENT1 PUBLIC SUMMARY REPORT PT. TÜV NORD Indonesia System Certification Management Has assessed PT. TAPIAN NADENGGAN and PT..SATYA KISMA USAHA

More information

PT. GAWI MAKMUR KALIMANTAN

PT. GAWI MAKMUR KALIMANTAN Particulars About Your Organisation Organisation Name PT. GAWI MAKMUR KALIMANTAN Corporate Website Address Primary Activity or Product Oil Palm Growers Related Company(ies) No Membership Membership Number

More information

RSPO NOTIFICATION OF PROPOSED NEW PLANTING

RSPO NOTIFICATION OF PROPOSED NEW PLANTING RSPO NOTIFICATION OF PROPOSED NEW PLANTING This notification shall be on the RSPO website for 30 days as required by the RSPO procedures for new plantings (http://www.rspo.org/?q=page/535). It has also

More information

RSPO NOTIFICATION OF PROPOSED NEW PLANTING

RSPO NOTIFICATION OF PROPOSED NEW PLANTING RSPO NOTIFICATION OF PROPOSED NEW PLANTING This notification shall be on the RSPO website for 30 days as required by the RSPO procedures for new plantings (http://www.rspo.org/?q=page/535 ). It has also

More information

Sustainability Journey

Sustainability Journey Issue no. 18 October 2018 In this issue: Landscape Conservation and Land-use Management Planning in Ketapang Region 2 Capacity Building to Support Sustainable Livelihood Development 3 Environmental Performance

More information

Sustainability Journey

Sustainability Journey In this issue: Rehabilitation Initiatives Environmental Health and Safety Campaign: Capacity Building and Engagement 3 Integration of Sustainable Development Goals Supporting Sustainable Livelihoods: Smallholder

More information

PT Cipta Usaha Sejati

PT Cipta Usaha Sejati Particulars About Your Organisation 1.1 Name of your organization PT Cipta Usaha Sejati 1.2 What is/are the primary activity(ies) or product(s) of your organization? Palm Oil Processors and/or Traders

More information

BETTER COTTON ASSURANCE PROGRAM

BETTER COTTON ASSURANCE PROGRAM BETTER COTTON ASSURANCE PROGRAM CONTINUOUS IMPROVEMENT PLAN TEMPLATE FOR SMALLHOLDERS APPLICABLE FROM 2014 HARVEST SEASON Orientation The Better Cotton Performance Scale for Smallholders includes as Minimum

More information

PT Austindo Nusantara Jaya Agri

PT Austindo Nusantara Jaya Agri Particulars About Your Organisation 1.1 Name of your organization PT Austindo Nusantara Jaya Agri 1.2 What is/are the primary activity(ies) or product(s) of your organization? Oil Palm Growers Palm Oil

More information

Sustainability Policy

Sustainability Policy Sustainability Policy Progress Report 4 Dec 2014-31 Mar 2015 Sustainability Commitments Musim Mas Sustainability Policy Bring benefits to the community. Quarterly Report on Progress ( December 2014 - March

More information

RSPO NOTIFICATION OF PROPOSED NEW PLANTING

RSPO NOTIFICATION OF PROPOSED NEW PLANTING RSPO NOTIFICATION OF PROPOSED NEW PLANTING This notification shall be on the RSPO website for 30 days as required by the RSPO procedures for new plantings (http://www.rspo.org/?q=page/535 ). It has also

More information

PT. Eagle High Plantations Tbk

PT. Eagle High Plantations Tbk Particulars About Your Organisation 1.1 Name of your organization PT. Eagle High Plantations Tbk 1.2 What is/are the primary activity(ies) or product(s) of your organization? Oil Palm Growers Palm Oil

More information

Key Principles Covered by Our Updated Sustainability Policy:

Key Principles Covered by Our Updated Sustainability Policy: Key Principles Covered by Our Updated Sustainability Policy: ENVIRONMENTAL SUSTAINABILITY: PROTECTING THE DIVERSITY OF LIFE ON EARTH 1. No Development on High Carbon Stock (HCS) Forests 2. No Development

More information

RSPO RSPO NOTIFICATION OF PROPOSED NEW PLANTING

RSPO RSPO NOTIFICATION OF PROPOSED NEW PLANTING RSPO RSPO NOTIFICATION OF PROPOSED NEW PLANTING This notification shall be on the RSPO website for 30 days as required by the RSPO procedures for new plantings (http://www.rspo.org/?q=page/535). It has

More information

Wild Asia Group Scheme WAGS-MPOB SPOC Beluran Telupid Sub-District, Beluran, Sandakan, Sabah, Malaysia

Wild Asia Group Scheme WAGS-MPOB SPOC Beluran Telupid Sub-District, Beluran, Sandakan, Sabah, Malaysia PUBLIC SUMMARY REPORT INDEPENDENT SMALLHOLDER GROUP INITIAL RSPO ASSESSMENT Wild Asia Group Scheme WAGS-MPOB SPOC Beluran Telupid Sub-District, Beluran, Sandakan, Sabah, Malaysia Report Author Senniah

More information

National Interpretation of RSPO Principles and Criteria for Sustainable Palm Oil Production

National Interpretation of RSPO Principles and Criteria for Sustainable Palm Oil Production Roundtable on Sustainable Palm Oil (RSPO) Malaysian National Interpretation Task Force (MYNI-TF) National Interpretation of RSPO Principles and Criteria for Sustainable Palm Oil Production Draft RSPO MYNI

More information

FRIEND OF THE SEA CERTIFICATION CRITERIA CHECKLIST FOR SEAWEED PRODUCTS

FRIEND OF THE SEA CERTIFICATION CRITERIA CHECKLIST FOR SEAWEED PRODUCTS FRIEND OF THE SEA CERTIFICATION CRITERIA CHECKLIST FOR SEAWEED PRODUCTS SEAWEED HARVESTING AND FARMING (Latest update: 19/03/2014) Friend of the Sea is a non-governmental organisation founded in 2007 whose

More information

RSPO Re-Certification Assessment Public Summary Report

RSPO Re-Certification Assessment Public Summary Report RSPO Re-Certification Assessment Public Summary Report Company Name IOI Corporation Bhd. Sakilan Mill and Supply Base Certification Unit: Sakilan Palm Oil Mill Jalan Sandakan - Telupid, Sandakan, Sabah,

More information

PT INTI INDOSAWIT SUBUR UKUI GROUP AND SCHEME SMALLHOLDERS Riau Province, Sumatra, INDONESIA

PT INTI INDOSAWIT SUBUR UKUI GROUP AND SCHEME SMALLHOLDERS Riau Province, Sumatra, INDONESIA PUBLIC SUMMARY REPORT RSPO THIRD ANNUAL SURVEILLANCE ASSESSMENT (ASA3) PT INTI INDOSAWIT SUBUR UKUI GROUP AND SCHEME SMALLHOLDERS Riau Province, Sumatra, INDONESIA Report Author: Aryo Gustomo revised March

More information

Malaysian Sustainable Palm Oil (MSPO)

Malaysian Sustainable Palm Oil (MSPO) Malaysian Sustainable Palm Oil (MSPO) 4 th International Plantation Industry Conference and Exhibition (IPiCEX 2014) 24 25 November 2014 Kuching, Sarawak Mohd Mokmin Bahari, Ainie Kuntom, A. Kushairi,

More information

Timber Legality Assurance System

Timber Legality Assurance System Timber Legality Assurance System Assessment Standard Ref # G100-188 Auditing Legality of Forest Management Sabah, Malaysia MTC Activity # 5.0 Page 1 Background Malaysia has taken steps to engage the European

More information

FSC Principles and Criteria for Forest Stewardship

FSC Principles and Criteria for Forest Stewardship Country/ Organization Initiative Membership Governing bodies Type and implementation approach Feedstock(s) covered Type(s) of biofuels covered Link Overview. FSC Principles and Criteria for Forest Stewardship

More information

Oil Palm Growers Operational Profile 1.1 Please state your main activities as a palm oil grower Palm oil grower & miller Palm oil mill/palm kernel cru

Oil Palm Growers Operational Profile 1.1 Please state your main activities as a palm oil grower Palm oil grower & miller Palm oil mill/palm kernel cru Particulars About Your Organisation Organisation Name Socfin Group (PT Socfindo and Socfinco SA) Corporate Website Address http://www.socfindo.co.id Primary Activity or Product Oil Palm Growers Related

More information

PT Tunas Baru Lampung Tbk

PT Tunas Baru Lampung Tbk Particulars About Your Organisation 1.1 Name of your organization PT Tunas Baru Lampung Tbk 1.2 What is/are the primary activity(ies) or product(s) of your organization? Palm Oil Processors and/or Traders

More information

RSPO Principles and Criteria for Sustainable Palm Oil Production

RSPO Principles and Criteria for Sustainable Palm Oil Production RSPO Principles and Criteria for Sustainable Palm Oil Production Country/ Organization Initiative Membership Governing bodies Type and implementation approach Feedstock(s) covered Type(s) of biofuels covered

More information

The Alberta Environmental Farm Plan Benchmarking Project

The Alberta Environmental Farm Plan Benchmarking Project The Alberta Environmental Farm Plan Benchmarking Project August 4 th, 2015 Final Report Table of Contents 1. The Alberta Farm Plan Benchmarking Project... 1 2. Methodology... 2 3. The Alberta Environmental

More information

PT. SOCFIN INDONESIA Aek Loba Mill and Its Supply Bases

PT. SOCFIN INDONESIA Aek Loba Mill and Its Supply Bases Audit Report 2 nd Annual Surveillance Audit for PT. SOCFIN INDONESIA Aek Loba Mill and Its Supply Bases FMS40085 RSPO Membership number: 1-0017-04-000-00 RSPO Member Name: Socfin Group (PT Socfindo and

More information

PT. SOCFIN INDONESIA Bangun Bandar Mill and Its Supply Bases

PT. SOCFIN INDONESIA Bangun Bandar Mill and Its Supply Bases Audit Report Surveillance Audit for PT. SOCFIN INDONESIA Bangun Bandar Mill and Its Supply Bases RSPO20008 RSPO Membership number: 800770800000 Audited Address: Bangun Bandar Mill: Kecamatan Dolok Masihul

More information

Specific text recommendations and definitions can be found in the Annex documents.

Specific text recommendations and definitions can be found in the Annex documents. ILRF July 23rd, 2014 Ms. Indra Nooyi Chairman and Chief Executive Officer PepsiCo 700 Anderson Hill Road Purchase, NY 10577 Dear Ms. Nooyi: On behalf of Rainforest Action Network, Greenpeace, International

More information

PT. Bakrie Sumatera Plantations TBK

PT. Bakrie Sumatera Plantations TBK Particulars About Your Organisation 1.1 Name of your organization PT. Bakrie Sumatera Plantations TBK 1.2 What is/are the primary activity(ies) or product(s) of your organization? Oil Palm Growers Palm

More information

Sime Darby Plantation Sdn Bhd

Sime Darby Plantation Sdn Bhd Particulars About Your Organisation 1.1 Name of your organization Sime Darby Plantation Sdn Bhd 1.2 What is/are the primary activity(ies) or product(s) of your organization? Oil Palm Growers Palm Oil Processors

More information

Indonesian Company Makes Scientific Breakthrough in Oil Palms

Indonesian Company Makes Scientific Breakthrough in Oil Palms Indonesian Company Makes Scientific Breakthrough in Oil Palms Sumatra Bioscience Announces Publication of World s First Patent to Produce F 1 Oil Palm Hybrids SINGAPORE 7 October 2008 Sumatra Bioscience,

More information

Public Report Sustainable Forest Management System. Ownership of this report and the information Contained herein remain the property of AJA Europe

Public Report Sustainable Forest Management System. Ownership of this report and the information Contained herein remain the property of AJA Europe Public Report Sustainable Forest Management System Ownership of this report and the information Contained herein remain the property of AJA Europe Brief Description of the concession PT Bukit Raya Mudisa

More information

INPUT TO RSPO PRINCIPLES AND CRITERIA FOR OIL PALM SMALLHOLDERS

INPUT TO RSPO PRINCIPLES AND CRITERIA FOR OIL PALM SMALLHOLDERS INPUT TO RSPO PRINCIPLES AND CRITERIA FOR OIL PALM SMALLHOLDERS Indonesian Palm Oil Commission (IPOC) Pilot Project Financed by: Ministry of Agriculture, Nature and Food Quality of Nederland through Trilateral

More information

PT Bakrie Sumatera Plantations TBK

PT Bakrie Sumatera Plantations TBK Particulars About Your Organisation Organisation Name PT Bakrie Sumatera Plantations TBK Corporate Website Address http://www.bakriesumatera.com Primary Activity or Product Oil Palm Growers Related Company(ies)

More information

RSPO NOTIFICATION OF PROPOSED NEW PLANTING

RSPO NOTIFICATION OF PROPOSED NEW PLANTING RSPO NOTIFICATION OF PROPOSED NEW PLANTING This notification shall be on the RSPO website for 30 days as required by the RSPO procedures for new plantings (http://www.rspo.org/?q=page/535). It has also

More information

SOMMAIRE CORPORATE SOCIAL RESPONSIBILITY SECTOR POLICY PALM OIL. Preamble... 2

SOMMAIRE CORPORATE SOCIAL RESPONSIBILITY SECTOR POLICY PALM OIL. Preamble... 2 CORPORATE SOCIAL RESPONSIBILITY SECTOR POLICY PALM OIL SOMMAIRE Preamble... 2 1. Sector Policy... 3 a) Objective...3 b) Scope...3 c) Context and limits of the policy...3 d) Group-level implementation mechanisms...4

More information

PT DHARMA SATYA NUSANTARA

PT DHARMA SATYA NUSANTARA Particulars About Your Organisation 1.1 Name of your organization PT DHARMA SATYA NUSANTARA 1.2 What is/are the primary activity(ies) or product(s) of your organization? Palm Oil Processors and/or Traders

More information

CEPA Certified and European Standard EN 16636:2015

CEPA Certified and European Standard EN 16636:2015 CEPA Certified and European Standard EN 16636:2015 Presentation to Skadedyrdagene 2016 Oslo, Norway, March 10 th 2016 By: Dr Peter Whittall Executive Director of Tripod Consulting Ltd Agenda A brief introduction

More information

PT. Eagle High Plantations Tbk

PT. Eagle High Plantations Tbk Particulars About Your Organisation 1.1 Name of your organization PT. Eagle High Plantations Tbk 1.2 What is/are the primary activity(ies) or product(s) of your organization? Oil Palm Growers Palm Oil

More information

LIST OF SUSTAINABILITY POLICY

LIST OF SUSTAINABILITY POLICY LIST OF SUSTAINABILITY POLICY 1. Sustainability Palm Oil Production Policy in FGV Group 2. Equal Opportunities Policy 3. Communications Policy 4. Steep Slope and Riparian Reserved Protection Policy 5.

More information

Community Enterprise Group - Suratthani

Community Enterprise Group - Suratthani Particulars About Your Organisation Organisation Name Community Enterprise Group - Suratthani Corporate Website Address chulita_poo@hotmail.com Primary Activity or Product Oil Palm Growers Related Company(ies)

More information

MSPO CERTICATION SUMMARY REPORT

MSPO CERTICATION SUMMARY REPORT MSPO CERTICATION SUMMARY REPORT HAP SENG PLANTATIONS (RIVER ESTATES) SDN BHD PLANTATION CENTRAL OFFICE GROUP STAGE 2 CERTIFICATION AUDIT Date: 25/01/2018 TUV NORD (Malaysia) Sdn Bhd No. 20, Jalan Tiara

More information

PEFC Certification System Netherlands - Scheme Description

PEFC Certification System Netherlands - Scheme Description PCSN SCHEME DOCUMENT PCSN VIII Issue 2 10-03-2017 PEFC Certification System Netherlands - Scheme Description PEFC Netherlands Kokermolen 11 3994 DG Houten The Netherlands Tel: +31 30 693 0040 Fax: +31

More information

IOI Corporation Berhad

IOI Corporation Berhad RSPO 1 st Annual Surveillance Assessment (ASA1_RC) IOI Corporation Berhad Head Office: Two IOI Square, IOI Resort, 62502 Putrajaya, Malaysia. Certification Unit: Sakilan Palm Oil Mill Mile 45, Sandakan/Telupid,

More information

POIG Charter. Version 1.0 November Palm Oil Innovation Group. Photo credit: Musim Mas

POIG Charter. Version 1.0 November Palm Oil Innovation Group. Photo credit: Musim Mas POIG Charter Version 1.0 November 2013 Photo credit: Musim Mas Photo credit: Agropalma Palm Oil Innovation Group Photo credit: Rainforest Action Network Palm Oil Innovation Group Charter Introduction The

More information

SGS RSPO RSPO PRINCIPLES & CRITERIA CERTIFICATION REPORT. Public Summary Information

SGS RSPO RSPO PRINCIPLES & CRITERIA CERTIFICATION REPORT. Public Summary Information SGS RSPO (Principles & Criteria) Doc. Number: GP 7002A Doc. Version date: 01 September 2012 Page: 1 of 77 RSPO PRINCIPLES & CRITERIA CERTIFICATION REPORT Public Summary Information Report Nr: MY02999 IOI

More information

PT. SOCFIN INDONESIA Tanah Gambus Mill and Its Supply Bases. Tanah Gambus, Kecamatan Lima Puluh, Kabupaten Batubara COMMERCIAL- IN CONFIDENCE

PT. SOCFIN INDONESIA Tanah Gambus Mill and Its Supply Bases. Tanah Gambus, Kecamatan Lima Puluh, Kabupaten Batubara COMMERCIAL- IN CONFIDENCE Audit Report Surveillance Audit for PT. SOCFIN INDONESIA Tanah Gambus Mill and Its Supply Bases RSPO20007 RSPO Membership number: 800770800000 Audited Address: Tanah Gambus Mill: Tanah Gambus, Kecamatan

More information

RSPO P&C Surveillance Assessment PUBLIC SUMMARY REPORT

RSPO P&C Surveillance Assessment PUBLIC SUMMARY REPORT TÜV NORD INTEGRA bvba Certification in agriculture and food Statiestraat 164 2600 Berchem Antwerp Belgium Phone: + 32 3 287 37 60 Fax: +32 3 287 37 61 www.tuv-nord-integra.com info@tuv-nord-integra.com

More information

Sustainability in P.T. Great Giant Pineapple

Sustainability in P.T. Great Giant Pineapple Sustainability in P.T. March, 2013 List of Content 1 Introduction and Company Profile 2 Fundamental of Sustainability in Great Giant Pineapple 3 GGP Sustainability Initiatives 1. Introduction and Company

More information

FSC INTERNATIONAL STANDARD

FSC INTERNATIONAL STANDARD Forest Stewardship Council FSC INTERNATIONAL STANDARD Forest management evaluations addendum Forest certification reports FSC-STD-20-007a (V1-0) EN ACCREDITATION Title: Document reference code: Scope:

More information

PT PERMATA SAWIT MANDIRI

PT PERMATA SAWIT MANDIRI PT PERMATA SAWIT MANDIRI KETAPANG REGENCY WEST KALIMANTAN PROVINCE INDONESIA SUMMARY OF HCV AND SEIA REPORTS MARCH 2014 PT Permata Sawit Mandiri-March 2014-HCV & SEIA Summary -Page 1 of 9 RSPO NEW PLANTING

More information

Sichon Palm Yangyuen Community Enterprise Group(TUV NORD THAILAND LTD)

Sichon Palm Yangyuen Community Enterprise Group(TUV NORD THAILAND LTD) Particulars About Your Organisation Organisation Name Sichon Palm Yangyuen Community Enterprise Corporate Website Address Primary Activity or Product Oil Palm Growers Related Company(ies) Membership Membership

More information

NATIONAL ORGANIC PROGRAM APPLICATION & ORGANIC SYSTEM PLAN - FARMS

NATIONAL ORGANIC PROGRAM APPLICATION & ORGANIC SYSTEM PLAN - FARMS NATIONAL ORGANIC PROGRAM APPLICATION & ORGANIC SYSTEM PLAN - FARMS 1 of 26 1. GENERAL INFORMATION: Name of Operation: Address: City: State: Zip Code: Mailing Address (if different): City: State: Zip Code:

More information

RSPO NOTIFICATION OF PROPOSED NEW PLANTING

RSPO NOTIFICATION OF PROPOSED NEW PLANTING RSPO NOTIFICATION OF PROPOSED NEW PLANTING This notification shall be on the RSPO website for 30 days as required by the RSPO procedures for new plantings (http://www.rspo.org/?q=page/535). It has also

More information

APP s New Mill (OKI) General Information

APP s New Mill (OKI) General Information APP s New Mill (OKI) General Information In July 2013, APP announced the majority share acquisition of PT. OKI Pulp & Paper Mills with detail shareholders: PT. Tjiwi Kimia Tbk, PT. Pindo Deli Tbk and PT.

More information

Section 3 Company Organisation and Certification Procedures

Section 3 Company Organisation and Certification Procedures OF&G ORGANIC STANDARDS AND CERTIFICATION MANUAL 3.0 Contents Page The describe how the company is structured and administered, and explains the certification procedures, the complaints procedures and the

More information

PT. Gawi Bahandep Sawit Mekar

PT. Gawi Bahandep Sawit Mekar Particulars About Your Organisation. Name of your organization PT. Gawi Bahandep Sawit Mekar.2 What is/are the primary activity(ies) or product(s) of your organization? Oil Palm Growers Palm Oil Processors

More information

GROWER GROUP CERTIFICATION FOR ORGANIC AGRICULTURE Group certification

GROWER GROUP CERTIFICATION FOR ORGANIC AGRICULTURE Group certification GROWER GROUP CERTIFICATION FOR ORGANIC AGRICULTURE Group certification The Organic Agriculture movement will not be successful until it reaches the small holder farmers. Previously, Organic Standards and

More information

RESOLUTE FP CANADA INC. ONTARIO WOODLANDS

RESOLUTE FP CANADA INC. ONTARIO WOODLANDS RESOLUTE FP CANADA INC. ONTARIO WOODLANDS DESCRIPTION OF COMPANY Resolute Forest Products owns and operates 40 pulp and paper mills and wood products facilities in the United States, Canada, and South

More information

RSPO PRINCIPLE AND CRITERIA 2 nd ANNUAL SURVEILLANCE ASSESSMENT Public Summary Report

RSPO PRINCIPLE AND CRITERIA 2 nd ANNUAL SURVEILLANCE ASSESSMENT Public Summary Report RSPO PRINCIPLE AND CRITERIA 2 nd ANNUAL SURVEILLANCE ASSESSMENT Public Summary Report PT. Inti Indosawit Subur: Ukui I Palm Oil Mill and its Supply Bases Client company Address: Jl. M.H Thamrin No.31 Jakarta

More information

Sustainable Intensification

Sustainable Intensification An Introduction IPNI Best Management Practice (BMP) Process Supported by Plantation Intelligence & Estate-Scale Experimentation Sustainable Intensification Reduced yield gaps, increased oil yields IPNI

More information

Action Plan to Build Full Fresh Fruit Bunch (FFB) Traceability

Action Plan to Build Full Fresh Fruit Bunch (FFB) Traceability Action Plan to Build Full Fresh Fruit Bunch (FFB) Traceability 1. Preamble Apical Group is one of the largest processors of palm oil/ palm kernel oil and exporters of palm oil products in Indonesia. It

More information

C.A.F.E. Practices List of Indicators that Require Documentation

C.A.F.E. Practices List of Indicators that Require Documentation C.A.F.E. Practices C.A.F.E. Practices List of Indicators that Require Documentation Starbucks Coffee Company V3.4 English Version December 2015 Table of Contents 1. Introduction... 3 2. Summary of Indicators

More information

HSE INTEGRATED MANAGEMENT SYSTEM MANUAL & QUALITY POLICY

HSE INTEGRATED MANAGEMENT SYSTEM MANUAL & QUALITY POLICY HSE INTEGRATED MANAGEMENT SYSTEM MANUAL & QUALITY POLICY Quality, Health, Safety & Environmental Integrated Management System Manual HAZARD : An object, physical effect, or condition with potential to

More information

RSPO P&C RECERTIFICATION ASSESSMENT PUBLIC SUMMARY REPORT

RSPO P&C RECERTIFICATION ASSESSMENT PUBLIC SUMMARY REPORT TUV NORD (Malaysia) SDN BHD No. 20, Jalan Tiara 3, Tiara Square, Taman Perindustrian UEP 47600 Selangor, Malaysia. Phone: +603 8023 2124 Fax: +603 8023 4410 RSPO P&C RECERTIFICATION ASSESSMENT PUBLIC SUMMARY

More information

Sime Darby Plantation Sdn Bhd SOU 4: Flemington Palm Oil Mill Perak, Malaysia

Sime Darby Plantation Sdn Bhd SOU 4: Flemington Palm Oil Mill Perak, Malaysia PUBLIC SUMMARY REPORT RSPO 1 st ANNUAL SURVEILLANCE ASSESSMENT (ASA01) Sime Darby Plantation Sdn Bhd SOU 4: Flemington Palm Oil Mill Perak, Malaysia Report Author: Senniah Appalasamy Revised December 2012

More information

FELDA GLOBAL VENTURES HOLDINGS BERHAD

FELDA GLOBAL VENTURES HOLDINGS BERHAD Particulars About Your Organisation 1.1 Name of your organization FELDA GLOBAL VENTURES HOLDINGS 1.2 What is/are the primary activity(ies) or product(s) of your organization? Oil Palm Growers Palm Oil

More information

RSPO NOTIFICATION OF PROPOSED NEW PLANTING

RSPO NOTIFICATION OF PROPOSED NEW PLANTING RSPO NOTIFICATION OF PROPOSED NEW PLANTING This notification shall be on the RSPO website for 30 days as required by the RSPO procedures for new plantings (http://www.rspo.org/?q=page/535). It has also

More information

PUBLIC SUMMARY SURVEILLANCE 1 AUDIT (FIRST CYCLE) ON SEGAN FOREST PLANTATION MANAGEMENT UNIT FOR FOREST PLANTATION MANAGEMENT CERTIFICATION

PUBLIC SUMMARY SURVEILLANCE 1 AUDIT (FIRST CYCLE) ON SEGAN FOREST PLANTATION MANAGEMENT UNIT FOR FOREST PLANTATION MANAGEMENT CERTIFICATION PUBLIC SUMMARY SURVEILLANCE 1 AUDIT (FIRST CYCLE) ON SEGAN FOREST PLANTATION MANAGEMENT UNIT FOR FOREST PLANTATION MANAGEMENT CERTIFICATION Certificate Number: FPMC 0002 Date of First Certification: 18

More information