Wholesale water agency created by State Legislature in Mission is to provide safe and reliable water supply to member agencies Service area
|
|
- Clement Stevenson
- 5 years ago
- Views:
Transcription
1 Wholesale water agency created by State Legislature in member agencies 36-member board of directors 3 million people $188 billion economy Mission is to provide safe and reliable water supply to member agencies Service area 950,000 acres 97% county s population 1
2 (Final) 26 TAF (5%) 80 TAF (13%) 552 TAF (95%) Total = 578 TAF 70 TAF (11%) 85 TAF (14%) 274 TAF (45%) 24 TAF (4%) 18 TAF (3%) 61 TAF (10%) 190 TAF (24%) TAF (10%) 103 TAF (13%) 44 TAF (6%) 56 TAF (7%) 231 TAF (30%) 27 TAF (4%) 48 TAF (6%) Total = 612 TAF Metropolitan Water District Total = 779 TAF Recycled Water Imperial Irrigation District Transfer All American & Coachella Canal Lining Seawater Desalination Groundwater Conservation (existing and additional) Local Surface Water TAF=Thousand Acre-Feet
3 New, local water supply Reduces need for imported water Drought-proof supply Improved water quality More expensive than existing imported supplies Cost on par with other new, local water supplies Enhances regional supply reliability and local control 3
4 Not Important 8% Unsure 10% Important 82% Not Important 6% Unsure 8% Important 86% Not Important 15% Unsure 3% Important 82% Importance of Seawater Desalination to Supply Reliability 4
5 Mouth of Lagoon Outfall
6 Carlsbad site first identified in 1991 Water Authority Study Poseidon 2001 Study Due Diligence by Water Authority Poseidon obtained long term lease 2 EIRs established environmental feasibility Water Authority City of Carlsbad/ Poseidon Included in 2005 and 2010 State mandated Urban Water Management Plans
7 6 year permitting and entitlement process by Poseidon 12 local discretionary approvals 7 state agency discretionary approvals 21 Public Hearings- 85 hours of testimony Dozens of technical studies 14 legal challenges Unanimous support of state & federal legislative delegations and hundreds of letters of support Reclaimed water pipelines
8 Project Components TOVWTP TOVWTP Improvements P3 relining 5-miles Pacific Ocean Carlsbad Desal WTP Encina Power Station New 54-inch steel pipe 10-miles San Marcos Pipeline Interconnection Pipeline 4 Pipeline 3 8 8
9 Developer/Owner Poseidon Resources Construction/Operation of the Plant WPA between Water Authority and Poseidon Contractor Kiewit/Shea Desalination IDE Technologies is process technology provider Plant operations and Maintenance also provided by IDE 9
10 WPA outlines commercial and financial terms for production and delivery of water Establishes risk transfer to private developer Outlines terms of potential purchase of plant by Water Authority Water Authority Board approved WPA on Nov 29, 2012 Board initially approved a term-sheet in 2010 as basis for negotiations Water Authority conducted comprehensive project and financial due diligence effort prior to approval of the WPA 10
11 Permit, Design and Build the Desal Plant Permit, Design and Build the Conveyance Pipeline (design-build agreement) Own, operate and maintain the Desal Plant Supply Product Water that meets water quality requirements 11
12 Timely Construction of TOVWTP Improvements and Pipeline 3 Rehabilitation Own, operate and maintain the Conveyance Pipeline, the TOVWTP Improvements and Pipeline 3 Take or Pay for Product Water if it meets specifications (minimum commitment of 48,000 AF/Year) 12
13 Total Capital Cost Total desalination plant Total conveyance pipeline Financing costs Water Authority improvements and oversight Total Capital Costs $537 million $159 million $227 million $80 million $1.003 billion Total O&M Costs (Plant and Pipeline) $49 - $54 million annually Total Unit Cost 1 56,000 acre feet per year 48,000 acre feet per year $2,014/AF $2,257/AF 1 Includes debt service, operations, Water Authority construction oversight and administrative costs 13
14 Carlsbad Desalination Project $2,014 $2,257 Mission Basin Narrows $1,717 Otay River $1,475 $2,086 City of SD RWS* $1,975 2,375** North San Diego County Regional Reuse $1,628 $1,730 Camp Pendleton Desalination (100 mgd) (50 mgd) $1,900 $2, ,000 1,500 2,000 2,500 3,000 $/AF Brackish Groundwater Recycled / IPR Seawater Desalination *Cost range includes wastewater related costs that may reduce the unit cost by up to $600/AF. ** Incentive funding reduced at 2011 value of $275. RWS assumes deduction for incentives on 20 year NPV basis.
15 82% funded through Bonds issued via the California Pollution Control Financing Authority Plant Bonds issued as Tax-Exempt Private Activity Bonds with Poseidon as sponsor Pipeline Bonds issued as Tax-Exempt Governmental Purpose Bonds with the Water Authority as sponsor Bonds sold on December 24, 2012 Interest rate 4.78% 18% Cash Equity from Stonepeak Infrastructure 15
16 Approximately 35 months to construct, start-up and commission plant Approximately 30 months to complete conveyance pipeline and Water Authority improvements On-line by
17 Questions?
San Diego County Water Authority Special Water Planning Committee Meeting October 10, 2012
Public Workshop on issues related to the Carlsbad Desalination Project San Diego County Water Authority Special Water Planning Committee Meeting 1 October 10, 2012 Wholesale water agency created by State
More informationCommittee on Water. Desalination as a Water Source
Committee on Water Committee on Water Desalination as a Water Source Water Supply Reliability for San Diego County NARUC Summer Policy Summit July 17, 2017 Bob Yamada Director of Water Resources San Diego
More informationAWWA PRESENTATION. Carlsbad Desalination Project October 27, 2015
AWWA PRESENTATION Carlsbad Desalination Project October 27, 2015 Agenda I. Introduction II. Market Demand - Seawater Desalination III. Public Private Partnerships IV. Case Study: Carlsbad POSEIDON WATER
More informationWater Finance Conference. Carlsbad Desalination Project August 30, 2016
Water Finance Conference Carlsbad Desalination Project August 30, 2016 Agenda I. Introduction II. Market For Seawater Desalination III. Carlsbad Desalination Plant I. Development II. III. Financing Construction
More informationCarlsbad Desalination WTP: Design and Delivery. Peter V. Tymkiw, PE, BCEE October 29, 2015
Carlsbad Desalination WTP: Design and Delivery Peter V. Tymkiw, PE, BCEE October 29, 2015 DRIVER: A Two-Decade Legacy of Complex and Interrelated Challenges California s water supply is fragile Inadequate
More informationWESTCAS June 21, Maureen Stapleton, General Manager San Diego County Water Authority
WESTCAS June 21, 2017 Maureen Stapleton, General Manager San Diego County Water Authority San Diego County Water Authority Wholesale water agency and regional water planner created by state Legislature
More informationSan Diego, A Cadillac Desert; Presentation by: Dana Fi Friehauf, fpe P.E. Water Resources Manager
San Diego, A Cadillac Desert; Sustainable Strategies for Living in a Desert Presentation by: Dana Fi Friehauf, fpe P.E. Water Resources Manager Green Lunch Bag Series September 24, 2014 San Diego County
More informationAmortized annual capital cost ($) + Annual Operating Cost ($) = Unit Cost ($/acre-foot) Annual beneficially used water production in acre-feet (AF)
Attention: Water Planning Committee Unit Cost of New Local Water Supply Alternatives (Information) Purpose This report discusses current unit costs for new local water supply alternatives including water
More information400,000. MILLION GALLONS of water per day. The Desalination Plant and Process Locations. Welcome and Overview. people in San Diego County
The Carlsbad Desalination Plant is capable of delivering more than 50 million gallons of fresh, desalinated drinking water per day enough to serve approximately 400,000 people in San Diego County. Commercial
More informationWelcome to the Breakfast at the BMC Lecture Series
Welcome to the Breakfast at the BMC Lecture Series Is California s state of emergency restrictions on water usage affecting the San Diego economy and real estate industry? A special thanks to our sponsors:
More informationVallecitos Water District 2015 Urban Water Management Plan Page 6-1
Section 6: S System Supplies Ince its formation in 1955, the (VWD) has received 100 percent of its water supply from the San Diego County Authority (SDCWA), of which it is one of 24 member agencies. The
More informationWATER RELIABILIT Y TO SAN DIEGO S ECONOMY
T H E I M P O R TA N C E O F WATER RELIABILIT Y TO SAN DIEGO S ECONOMY RELIABLE WATER INFRASTRUCTURE IS AN INVESTMENT IN THE REGIONAL ECONOMY Clean, reliable water supplies provide numerous economic benefits
More informationIndirect Potable Reuse for Groundwater Recharge Succession Strategy for Recycled Water
EASTERN MUNICIPAL WATER DISTRICT Indirect Potable Reuse for Groundwater Recharge Succession Strategy for Recycled Water Paul D. Jones II, P.E. General Manager, Eastern Municipal Water District March 11,
More informationEconomic Analyses Conducted on the Bay Delta Conservation Plan
Economic Analyses Conducted on the Bay Delta Conservation Plan Presented by: David Sunding July 23, 2013 Copyright 2012 The Brattle Group, Inc. www.brattle.com Antitrust/Competition Commercial Damages
More informationCadiz Inc. Corporate Presentation November 2017
Cadiz Inc. Corporate Presentation November 2017 Cadiz Valley 1,300 square-mile watershed in Mojave Desert. Aquifer system holds approx. 20 million AF, like Lake Mead. Natural recharge 32,500 AF/year. Cadiz
More informationCity of Corpus Christi Raw Water Supply Strategies
City of Corpus Christi Raw Water Supply Strategies Council Presentation July 24, 2018 1 Current Water Supply 2 2017 Corpus Christi Regional Customer Water Demand 10% 1% 3% 6% 3% 4% City of Corpus Christi
More informationADOPT A RESOLUTION OF THE CITY COUNCIL IN SUPPORT OF THE CALIFORNIA WATERFIX AND CALIFORNIA ECO RESTORE
ADOPT A RESOLUTION OF THE CITY COUNCIL IN SUPPORT OF THE CALIFORNIA WATERFIX AND CALIFORNIA ECO RESTORE Presented by Gary Takara City Council September 18, 2017 Agenda Item 12 Recommendations Find that
More informationBrackish Desalination Water Supply Planning for Resiliency and Growth
Brackish Desalination Water Supply Planning for Resiliency and Growth Paul D. Jones II February 2, 2017 1 emwd.org EMWD Agency Overview Established in 1950 Unique agency, serving: Water/wastewater/recycled
More informationSeawater Desalination Concerns & Benefits
Presentation to the Southern California Association of Governments Seawater Desalination Concerns & Benefits Presented by Kevin L. Wattier, General Manager December 11, 2003 Outline Seawater Desalination
More informationAn Update of Coastal Desalination Status in the West Coast
An Update of Coastal Desalination Status in the West Coast Joseph Wong, Brown and Caldwell CA-NV AWWA Fall Conference September 30 October 3, 2013 Sacramento, California Map of Proposed Desalination Plants
More informationCity of San Diego Pure Water Project October 2014
City of San Diego Pure Water Project October 2014 SDCTA Position: SUPPORT Rationale for Position: Substantial study has demonstrated a potable reuse project within the City of San Diego would be safe,
More informationVALLECITOS WATER DISTRICT WATER, WASTEWATER, AND RECYCLED WATER MASTER PLAN. November 2010
VALLECITOS WATER DISTRICT WATER, WASTEWATER, AND RECYCLED WATER MASTER PLAN VALLECITOS WATER DISTRICT WATER, WASTEWATER, AND RECYCLED WATER MASTER PLAN Prepared For: Vallecitos Water District 201 Vallecitos
More informationGot Desalination. In Your Water Portfolio? Mark Lambert, CEO IDE Americas. Texas Desalination Association, 2016
Got Desalination In Your Water Portfolio? Mark Lambert, CEO IDE Americas Texas Desalination Association, 2016 IDE Technologies Industrial Water Treatment Seawater Desalination Wastewater Reuse 2 A Full
More informationSupplemental Supply Option: Desalination DEEP WATER DESAL PROJECT
Supplemental Supply Option: Desalination DEEP WATER DESAL PROJECT CONCEPT: The Deep Water Desalination (DWD) Project would consist of a Desalination Facility at the Moss Landing Area and co-located with
More informationSierra Mountains. LA Aqueduct. Supplies Conservation
Sierra Mountains LA Aqueduct Delta State Water Project Supplies Groundwater and Recycling Colorado River Aqueduct Supplies Conservation Groundwater Recovery CRA 21% SWP 29% Local Supplies & LA Aqueduct
More informationBrackish Desalination Water Supply Planning for Resiliency and Growth
Brackish Desalination Water Supply Planning for Resiliency and Growth Joe Mouawad, P.E. November 17, 2016 1 emwd.org EMWD Overview Established in 1950 Unique agency, serving: Water/wastewater/recycled
More informationLos Angeles 3 rd Regional
Los Angeles 3 rd Regional Investors Conference Los Angeles, California March 31, 2016 Metropolitan Water District of Southern California 1 Metropolitan Water District of of Southern California 2 Metropolitan
More informationBusiness Plan
2019-2023 Business Plan 2019-2023 Business Plan October 2018 This page intentionally left blank Table of Contents MESSAGE FROM THE GENERAL MANAGER 1 INTRODUCTION Overview 2 Business Plan Key Focus Areas
More informationMetropolitan Water District. July 25, 2013
Metropolitan Water District July 25, 2013 The Mission of the Metropolitan Water District is to provide its service area with adequate and reliable supplies of high-quality water to meet present and future
More informationColorado River Challenges Impacts to Southern Arizona
Colorado River Challenges Impacts to Southern Arizona 2 3 4 5 Colorado River Basics 7 States, 2 Nations Annual Flow 15.0 MAF 40 Million People All of the Major Cities in Southwest 5.5m Irrigated Acres
More informationSAN DIEGO COUNTY WATER AUTHORITY NOTICE OF PREPARATION OF A DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT REPORT
DATE: September 18, 2015 SAN DIEGO COUNTY WATER AUTHORITY NOTICE OF PREPARATION OF A DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT REPORT TO: State Clearinghouse Governor s Office of Planning and Research Post
More informationMonetizing Spare Water Treatment Capacity for Transfers: What it Takes to Get it Done
AWWA ACE18 Innovating the Future of Water Monetizing Spare Water Treatment Capacity for Transfers: What it Takes to Get it Done Paul Selsky Brown and Caldwell pselsky@brwncald.com June 2018 1 American
More informationPartnerships Changing Water Management Challenges & Strategies. David MacIntyre Parsons Brinckerhoff
Partnerships Changing Water Management Challenges & Strategies David MacIntyre Parsons Brinckerhoff Outline Introduction Regulatory Agency Partnerships Water/Wastewater/Stormwater Utility Partnerships
More informationStaff contact: Mr. Bob Holden, Principal Engineer Phone: (831) Fax: (831)
SUPPLEMENT TO THE MAY 2013 NOTICE OF PREPARATION FOR THE MONTEREY PENINSULA GROUNDWATER REPLENISHMENT (PURE WATER MONTEREY) PROJECT ENVIRONMENTAL IMPACT REPORT TO: Agencies, Interested Parties, and Members
More informationIrvine Ranch Water District s Groundwater Banking Program
Irvine Ranch Water District s Groundwater Banking Program National Water Research Institute Drought Response Workshop October 8, 2013 1 Today s Discussion Introduction to IRWD Drought Preparedness at IRWD:
More informationvii. water policy Current Issues...74 Desalination...76 Water Transfer...78
vii. water policy Current Issues................................74 Desalination..................................76 Water Transfer...............................78 73 CURRENT ISSUES Current Issues The
More information20. UTILITIES AND SERVICE SYSTEMS
June 28, 2018 Page 20-1 20. UTILITIES AND SERVICE SYSTEMS This EIR chapter describes existing conditions for and distribution, collection and, and solid waste disposal and recycling in the planning area.
More informationWorkshop #3 Distribution of Poseidon Resources Ocean Desalinated Water. Board of Directors July 6, 2016
Workshop #3 Distribution of Poseidon Resources Ocean Desalinated Water Board of Directors July 6, 2016 1 Workshop #3 Topics Continue distribution options discussion Review new distribution option (Option
More informationCarlsbad Seawater Desalination Project ( Project ) consists of 50 MGD (56,000 AFY)
1 Carlsbad Seawater Desalination Project ( Project ) consists of 50 MGD (56,000 AFY) Developed and owned by Poseidon Resources Channelside LP ( Poseidon ) Co-located with Encina Power Station (which relies
More informationCosts of Saving Water in South Texas with Irrigation District Infrastructure Rehabilitation
COLLEGE OF AGRICULTURE AND LIFE SCIENCES TR-438 2013 Irrigation District Infrastructure Rehabilitation Using Capital Budgeting with RGIDECON By M. Edward Rister, Ronald D. Lacewell, and Allen W. Sturdivant
More informationDoheny Ocean Desalination Project Alternative Power Supply Analysis
Doheny Ocean Desalination Project Alternative Power Supply Analysis CalDesal Conference - February 2018 South Coast Water District Created in 1932 Five-member Board of Directors Serves 40,000 residents
More informationOrange County Water District. SCAP May 4, 2015
Orange County Water District SCAP May 4, 2015 Orange County Water District Created in 1933 Manage and protect the groundwater basin Serve approximately 2.4 million residents 19 Groundwater Producers 10
More informationSouth Orange County Watershed Management Area Public Workshop. September 19, 2012
South Orange County Watershed Management Area Public Workshop September 19, 2012 AGENDA 8:00 8:45 Purpose of the IRWMP Regional Goals Prop 84 Implementation $ Results of Project Self Scoring Process for
More informationCypress Chamber of Commerce. John Kennedy Executive Director of Engineering & Water Resources Orange County Water District July 11, 2017
Cypress Chamber of Commerce John Kennedy Executive Director of Engineering & Water Resources Orange County Water District July 11, 2017 California Imported Water Central Valley Project 1931 State Water
More informationWhere Do We Get Our Water? 2015 Environmental and Occupational Health Technical Symposium
Where Do We Get Our Water? The Role of Governance in Shaping Water Policy Drinking Water Policy in California 2015 Environmental and Occupational Health Technical Symposium Whiskey is for drinking and
More informationSalt or Sewer? Supplemental Water Supplies for Santa Cruz County
Salt or Sewer? Supplemental Water Supplies for Santa Cruz County Northern California Chapter of WateReuse August 22, 2014 Todd Reynolds, P.E. Dawn Taffler, P.E., LEED AP Pasatiempo Capitola Rio Del Mar
More informationSuccessful Procurement and Finance Methods: The Southwest Florida Experience
Successful Procurement and Finance Methods: The Southwest Florida Experience Eugene A. Schiller 1 The focus of this paper is to share a few thoughts based on my 30 years of participating in various public-private
More informationSection 5 - Supply Allocation Methodology (Updated April 2012)
Section 5 - Supply Allocation Methodology (Updated April 2012) 5.1 Introduction As outlined in the Drought Response Matrix discussed in Section 4, after the Water Authority s Board of Directors has exhausted
More informationOC Water Reliability Study
OC Water Reliability Study South Orange County (SOC) Update June 2016 Municipal Water District of Orange County 1 Where South Orange County (SOC) Gets Its Water = 90% Import & 10% Local Bay Delta Area
More informationMarina Coast Water District: A California Special District STATE OF THE DISTRICT
Marina Coast Water District: A California Special District STATE OF THE DISTRICT DIRECTORS Dr. THOMAS P. MOORE President JAN SHRINER Vice President HOWARD GUSTAFSON WILLIAM Y. LEE PETER LE Interim General
More informationDRAFT Master Water Reclamation Plan. City Council Meeting March 28, 2017
DRAFT Master Water Reclamation Plan City Council Meeting March 28, 2017 Presentation Overview Tonight s Overall Goals Acknowledge Input City has Received Reminder: Where We are in the Process Present the
More informationMonterey GWR Project: a Sustainable Return on Investment Assessment of Desalination and Water Reuse
Subscribe to HDR Publications SUSTAINABLE RETURN ON INVESTMENT Monterey GWR Project: a Sustainable Return on Investment Assessment of Desalination and Water Reuse By Jeremy Cook Senior Economist, Omaha,
More informationDoheny Desalination Project. Technical Studies. October 31, 2017
Doheny Desalination Project Technical Studies October 31, 2017 Agenda Brine Dispersion and Coastal Hazards Analysis Southeast Intake Wells/Updated Slant Well Modeling Cultural Resources Hydrology Study
More informationCalifornia Water Commission. June 28, 2018
California Water Commission June 28, 2018 1 Los Vaqueros Reservoir Off-stream reservoir in Contra Costa County Operated in conjunction with four Delta intakes Capacity of 160 TAF Uses: Water quality Drought
More informationMarina Coast Water District: A California Special District ORD COMMUNITY WATER AUGMENTATION
Marina Coast Water District: A California Special District ORD COMMUNITY WATER AUGMENTATION DIRECTORS Dr. THOMAS P. MOORE President JAN SHRINER Vice President HOWARD GUSTAFSON WILLIAM Y. LEE PETER LE Interim
More informationAlChE Conference 2015
AlChE Conference 2015 International Society for Water Solutions Mark Lambert/ November 2015 1 If we could produce fresh water from salt water at a low cost, that would indeed be a great service to humanity,
More informationAPPENDIX D Water Agency Profile: City of San Diego
APPENDIX D Water Agency Profile: City of San Diego Recycled Water Summary 2005 2010 2015 2020 2025 Source 1 Total Water Demand 227,456 239,426 246,378 256,460 266,438 2005 UWMP, Table 2-9 2 Wastewater
More informationWelcome to the Advanced Water Purification Facility
Welcome to the Advanced Water Purification Facility SAN DIEGO IS DOWNSTREAM San Diego 1996 1998 2000 2002 2004 2006 2008 2010 2012 2014 Water Supply Challenges: Limited local & imported supplies Population
More informationCalifornia League of Cities Briefing on Water Supply Issues
California League of Cities Briefing on Water Supply Issues Stephen N. Arakawa Manager, Bay-Delta Initiatives The Metropolitan Water District of Southern California May 5, 2016 California WaterFix: Securing
More informationMonterey GWR Project: a Sustainable Return on Investment Assessment of Desalination and Water Reuse
Subscribe to HDR Publications SUSTAINABLE RETURN ON INVESTMENT Monterey GWR Project: a Sustainable Return on Investment Assessment of Desalination and Water Reuse By Jeremy Cook Senior Economist, Omaha,
More informationCity of Santa Cruz REGIONAL RECYCLED WATER FACILITIES PLANNING STUDY. Presentation for City of Santa Cruz Water Commission August 7, 2017
City of Santa Cruz REGIONAL RECYCLED WATER FACILITIES PLANNING STUDY Presentation for City of Santa Cruz Water Commission August 7, 2017 Photo of San Lorenzo River at Water Street Bridge on February 7,
More informationTDS/TIN Mitigation Plan
TDS/TIN Mitigation Plan San Jacinto River Watershed Groundwater Management Zones: Complying with Total Dissolved Solids & Total Inorganic Nitrogen Water Quality Objectives Presentation by Jayne Joy, P.E.
More informationFuture Water Demand and the Role of Alternative Sources and Water Reuse in Texas
Future Water Demand and the Role of Alternative Sources and Water Reuse in Texas Industrial Water Reuse and Desalination Texas Industrial Water Management Forum November 6, 2014 Erika Mancha The following
More informationMetropolitan Water District of Southern California 2018 STATE LEGISLATIVE PRIORITIES AND PRINCIPLES
2018 STATE LEGISLATIVE PRIORITIES AND PRINCIPLES Adopted December, 2017 State Legislative Priorities and Principles for 2018 After consulting with Metropolitan member agency legislative coordinators in
More informationCadiz Inc. CORPORATE OVERVIEW
Cadiz Inc. CORPORATE OVERVIEW March 2017 2 SAFE HARBOR AGREEMENT December 2016 During the course of this presentation, we will make forward-looking statements. Any statement that is not a historical fact
More informationProject Application Form
To have your project included in the IRWM Plan this form must be completed and returned to Emmalynne Hu (ehu@rmcwater.com; 408-240-8160) at RMC Water and Environment by 5:00 PM, May 9, 2007. A public workshop
More information8-2. Communications and Legislation Committee. Board of Directors. 12/11/2018 Board Meeting. Subject. Executive Summary. Details
Board of Directors Communications and Legislation Committee 12/11/2018 Board Meeting Subject Adopt Federal Legislative Priorities and Principles for 2019; the General Manager has determined that the proposed
More informationTampa Bay Water: A Case Study SRF National Workshop November 2, 2015
Tampa Bay Water: A Case Study 2015 SRF National Workshop November 2, 2015 Who We Are New Port Richey Tampa St. Petersburg Agency Mission and Vision Mission: Tampa Bay Water reliably provides clean, safe
More informationMonterey GWR Project: a Sustainable Return on Investment Assessment of Desalination and Water Reuse
Subscribe to HDR Publications & E-Newsletters at www.hdrinc.com/about-hdr/publications SUSTAINABLE RETURN ON INVESTMENT Monterey GWR Project: a Sustainable Return on Investment Assessment of Desalination
More informationOverview of Conjunctive Management in California Let s Have a Frank Discussion
Overview of Conjunctive Management in California Let s Have a Frank Discussion Mark S. Nordberg, P.G. Division of Integrated Regional Water Management North Central Region Office Geology and Groundwater
More informationKern Water Bank. Kern Water Bank Authority
Kern Water Bank Kern Water Bank Authority THE KERN WATER BANK Ensuring a Reliable Water Supply to the Southern San Joaquin Valley Providing for Exceptional Upland and Riparian Habitat Kern Water Bank Authority
More informationCalifornia Urban Water Agencies Water Supply Reliability Report
Progress Update on Water Conservation, Supply Diversification and Resource Management California Urban Water Agencies Water Supply Reliability Report August 2012 San Francisco Public Utilities Commission;
More informationMMWD Drought Resiliency Committee Meeting
MMWD Drought Resiliency Committee Meeting December 11, 2015 Purpose and Agenda Purpose: Identify opportunities and feasibility of implementing a recycled water system supplied by CMSA to augment MMWD s
More informationIntegrated Resources Planning Committee Item 7a December 12, 2016
Integrated Resources Planning Committee Item 7a December 12, 2016 Long history encouraging local resource development Integrated Resources Plan Policy principles IRP Committee Item 7a Slide 3 12/12/2016
More informationPajaro River Watershed Integrated Regional Water Management Plan Update Project Solicitation Form
Pajaro River Watershed Integrated Regional Water Management Plan Update PROJECT OVERVIEW General Project Information Project Title: South County Recycled Water Pipeline - Short-Term CIP Implementation
More informationSouth OC Water Providers: Integrated Water Planning
TRI-CITY WATER SAVERS City of Dana Point City of San Clemente City of San Juan Capistrano South Coast Water District Mike Dunbar, General Manager South Coast Water District H20 for HOAs Water Forum March
More informationWater for Southern California: How Bay-Delta is Key to All of the Above Strategy
Water for Southern California: How Bay-Delta is Key to All of the Above Strategy Stephen N. Arakawa Manager, Bay-Delta Initiatives The Metropolitan Water District of Southern California October 15, 2016
More informationPlans and Goals for 2016
Plans and Goals for 2016 Board Members Employees Calleguas MWD Water wholesaler 630,000 people 19 member purveyors???? AF/year annual demand Historical Deliveries on pace to sell 76,000 AF this year Mission
More informationWater Conservation: The SAWS Way
Water Conservation: The SAWS Way June 21, 2012 Brazos Valley Conservation Symposium Mark A. Peterson Project Coordinator - Conservation SAWS at a Glance Page 2 Water System Over 440,000 Customer Connections
More informationEnergy Management Strategies at Metropolitan Water District. Roy L Wolfe, Ph.D.
Energy Management Strategies at Metropolitan Water District Roy L Wolfe, Ph.D. Japan U.S. Joint Conference on Drinking Water Quality Management and Wastewater Control California Water and Energy March
More informationAGENDA FOR MAY 27, 2010
WATER PLANNING COMMITTEEE AGENDA FOR MAY 27, 2010 Javier Saunders Chair Rua Petty Vice Chair Betty Ferguson Vice Chair Marilyn Dailey Lynne Heidel Keith Lewinger Bud Lewis John Linden Barry Martin Dan
More informationJanuary 9, Bill Rose Gary Bousquet
January 9, 2014 Bill Rose Gary Bousquet Status of BDCP Design Role of Water Authority Review Schedule July August Board Review Process Background & Options to Review Review Update September Costs and Funding
More informationDistrict s Regional Planning and Water Reliability Strategy
Honorable LAFCO Commissioners Orange County LAFCO 2677 N. Main Street, Ste. 1050 Santa Ana, CA 92705 Re: Questions Raised at the July 11, 2018 LAFCO Study Session Honorable LAFCO Commissioners: Thank you
More informationWater Resource Planning in Washington County, Utah and the Lake Powell Pipeline
Water Resource Planning in Washington County, Utah and the Lake Powell Pipeline Nevada Water Resource Association February 3, 2011 Corey Cram Washington County Water Conservancy District Washington County
More informationGoodyear Applies GIS Technology to Plan Water Resources Development
Goodyear Applies GIS Technology to Plan Water Resources Development Richard Humpherys, Carollo Engineers Mark Holmes, City of Goodyear Water Resources GIS is THE tool to Plan Water Resources Development
More informationSPECIAL WATER PLANNING COMMITTEE WORKSHOP. Board Room. February 10, :30 p.m. Hershell Price Vice Chair
SPECIAL WATER PLANNING COMMITTEE WORKSHOP Board Room February 10, 2011 1:30 p.m. Mitch Dion Chair Hershell Price Vice Chair Javier Saunders Vice Chair Brian Boyle Betty Ferguson Lynne Heidel Michael Hogan
More informationMEMORANDUM. Karla Nemeth. The Brattle Group. BDCP versus Alternative Supplies. DATE: May 21, 2014
MEMORANDUM TO: FROM: SUBJ: Karla Nemeth The Brattle Group BDCP versus Alternative Supplies DATE: May 21, 2014 Implementing the BDCP preserves approximately the current levels of State Water (SWP) deliveries
More informationCalifornia Drought, Water, Parks, Climate, Coastal Protection, and Outdoor Access for All Act of 2018 (Proposition 68) Item 5.7
California Drought, Water, Parks, Climate, Coastal Protection, and Outdoor Access for All Act of 2018 (Proposition 68) Item 5.7 1 Potential Funding Availability California Drought, Water, Parks, Climate,
More information8-5. Special Committee on Desalination and Recycling. Board of Directors. 3/9/2010 Board Meeting. Subject. Description
Board of Directors Special Committee on Desalination and Recycling 3/9/2010 Board Meeting Subject Authorize (1) Joint Groundwater Replenishment Study; (2) a professional services agreement to conduct the
More information3.3 GROUNDWATER ALLOCATION TRANSFERS FROM DEVELOPED PROPERTIES
approximately 12 miles east of the City of San Buenaventura and approximately 9 miles west of the City of Fillmore. The City of Santa Paula is responsible for water supply and distribution within the City
More informationTitle XVI Recycled Water Feasibility Study. RMCSD Board Meeting June 19, 2013
Title XVI Recycled Water Feasibility Study RMCSD Board Meeting Study Purpose Click to edit Master title style 1. Determine which developments are most cost-effective for recycled water service (e.g., leverage
More informationFacts. Groundwater. The big problem. Issues. Consequences of Subsidence. How can we help? 2 major aquifers. Louanne Nutile Mitch Jacobs Sam Bejarano
Facts Groundwater Louanne Nutile Mitch Jacobs Sam Bejarano 2 major aquifers Tucson Basin Aquifer and the Arva Valley Aquifer There are 4 well fields Central, Southside, Santa Cruz, and Arva Valley well
More informationProposed Calendar Year 2015 Rates and Charges
Proposed Calendar Year 2015 Rates and Charges Administrative and Finance Committee May 22, 2014 David Shank, Financial Planning Manager Agenda CY 2015 Rate and Charge Drivers and Highlights Proposed Rates
More informationTABLE OF CONTENTS 4.17 UTILITIES AND SERVICE SYSTEMS...
TABLE OF CONTENTS 4.17 UTILITIES AND SERVICE SYSTEMS... 4.17-1 4.17.0 Introduction... 4.17-1 4.17.1 Methodology... 4.17-2 4.17.2 Existing Conditions... 4.17-2 4.17.3 Impacts... 4.17-4 4.17.4 Applicant-Proposed
More informationReport. Office of the General Manager. Colorado River Management Report. Summary. Detailed Report
Report Office of the General Manager Summary Colorado River Management Report This report provides a summary of the activities related to the Colorado River during April and a response to a request from
More informationThe Future of Alternative Water Supplies in the SWFWMD. Workshop: Practicable Sustainability: Implementing Water Reuse/Supply/Resource Projects
The Future of Alternative Water Supplies in the SWFWMD Workshop: Practicable Sustainability: Implementing Water Reuse/Supply/Resource Projects 16 counties 10,000 sq. miles 98 local governments Population
More informationSouth Florida Water Management District Future Directions. Melissa Meeker, Executive Director
South Florida Water Management District Future Directions Melissa Meeker, Executive Director September 15, 2011 District Overview Oldest and largest of five water management districts Covers 18,000 square
More informationNotice of Public Hearing. Notice of Public Hearing
2015 URBAN WATER MANAGEMENT PLAN Table 8-2: Notification to Cities and Counties Retail: Notification to Cities and Counties City Name 60 Day Notice Notice of Public Hearing Dana Point Mission Viejo County
More information8 Resource Management Strategies
8 Resource Management Strategies This chapter addresses requirements set forth in the Resource Management Strategies (RMS) Standard in the 2012 IRWM Program Guidelines (DWR, 2012). As such, this chapter
More informationCity of Modesto - North Valley Regional Recycled Water Program (NVRRWP) William Wong Engineering Division Manager Utilities Department
City of Modesto - North Valley Regional Recycled Water Program (NVRRWP) William Wong Engineering Division Manager Utilities Department City of Modesto Wastewater System Provides sewer service for Modesto,
More information