EC-16 Grain Elevator & Feed Mill Calculation Form

Size: px
Start display at page:

Download "EC-16 Grain Elevator & Feed Mill Calculation Form"

Transcription

1 EC-16 Grain Elevator & Feed Mill Calculation Form Air Quality Permit Program Doc Type: Permit Application Instructions on Page 10 This form is only for particulate matter (PM, PM 10, and PM 2.5) emissions from receiving, processing, storing, and shipping grain. Do not include calculations for operations which are classified as insignificant activities. See Form IA-01. For fuel-fired grain dryers, complete and include form EC-08. For boilers, complete and include Form EC-02. For engines/generators, complete and include Form EC-03. For fugitive emissions from storage piles or roads, complete and include Form EC-15. 1a) AQ Facility ID No.: 1b) AQ File No.: 2) Facility Name: 3) This facility is a (choose one): Country Grain Elevator (with or without a co-located feed mill) -- Go to Question 4 Terminal Elevator (with or without feed mill operations) -- Go to Question 5 Feed mill only -- Go to Question 5 4) Determining Capacity of a Country Grain Elevator 4a) Amount of grain received in Year 1 tons/year 4b) Amount of grain received in Year 2 tons/year 4c) Amount of grain received in Year 3 tons/year 4d) Amount of grain received in Year 4 tons/year 4e) Amount of grain received in Year 5 tons/year 4f) Highest of numbers in 4a) - 4e) tons/year 4g) Country elevator capacity (C CE) ( [item 4f] x 1.2 ) tons/year 5) Throughput (C A) tons/year 6) Operating Limitations, if applicable: (Skip this item if filling out this form for Registration Pemit Option D.) 7) Identification of Unit and Equipment ID number(s) (Skip this question if you are applying for a Registration Permit) 7A) Receiving A1 EU straight truck hopper truck railcar barge or ship led by CE A2 EU straight truck hopper truck railcar barge or ship led by CE A3 EU straight truck hopper truck railcar barge or ship led by CE If more than 3 receiving locations, copy this form or attach additional information. aq-f1-ec16 2/25/10 Page 1 of 12

2 7B) Grain Loadout B1 EU truck railcar barge or ship led by CE B2 EU truck railcar barge or ship led by CE B3 EU truck railcar barge or ship led by CE If more than 3 loading locations, copy this form or attach additional information. 7C) Grain Cleaners C1 EU Type: led by: CE C1 EU Type: led by: CE C1 EU Type: led by: CE If more than 3 grain cleaners, copy this form or attach additional information. 7D) Internal Handling (includes headhouse, legs, belts, distributor, scales, etc.) Includes EU numbers: Includes CE numbers: 7E) Grain Dryers E1 EU Column dryer Rack dryer led by CE E2 EU Column dryer Rack dryer led by CE E3 EU Column dryer Rack dryer led by CE If more than 3 grain dryers, copy this form or attach additional information. 7F) Bin Vents Includes EU numbers: Includes CE numbers: 7G) Milling Operations G1 EU Hammermill Flaker Cracker led by CE G2 EU Hammermill Flaker Cracker led by CE G3 EU Hammermill Flaker Cracker led by CE If more than 3 milling units, copy this form or attach additional information. 7H) Pellet Cooling H1 EU led by CE H2 EU led by CE H3 EU led by CE If more than 3 pellet coolers used, copy this form or attach additional information. 7I) Feed Loadout Includes EU numbers: Includes CE numbers: aq-f1-ec16 2/25/10 Page 2 of 12

3 8) Potential from a Country Grain Elevator with or without a co-located feed mill. Skip to Question 9 for a terminal elevator or a stand-alone feed mill. (Skip this item if using this form for Registration Permit Option D - go to item 10.) 8a) 8b) 8c) 8d) 8e) 8f) PM EMISSIONS Receiving Grain Loadout Handling Bin Vents Grain Cleaning Grain Drying Milling Pellet Cooling Feed Loadout PM PM PM led PM Limited led PM (lb/ton) (lbs/year) (tons/year) % (tons/year) (tons/year) 8g) 8h) 8i) 8j) 8k) 8l) PM 10 EMISSIONS Receiving Grain Loadout Handling Bin Vents Grain Cleaning Grain Drying Milling Pellet Cooling Feed Loadout PM 10 PM 10 PM 10 led PM 10 Limited led PM 10 (lb/ton) (lbs/year) (tons/year) % (tons/year) (tons/year) PM 2.5 EMISSIONS Receiving Grain Loadout Handling Bin Vents Grain Cleaning Grain Drying Milling Pellet Cooling Feed Loadout Go to Item 10 (page 7). 8m) 8n) 8o) 8p) 8q) 8r) PM 2.5 PM 2.5 PM 2.5 led PM 2.5 Limited led PM 2.5 (lb/ton) (lbs/year) (tons/year) % (tons/year) (tons/year) aq-f1-ec16 2/25/10 Page 3 of 12

4 9) Potential from i) a Terminal Elevator with or without a co-located feed mill, or ii) a stand-alone Feed Mill. Use Question 8 for a country grain elevator, with or without a co-located feed mill. (Skip this item if using this form for Registration Permit Option D go to item 10.) 9a) 9b) 9c) 9d) 9e) 9f) 9g) PM EMISSIONS Receiving - 7A1 PM Equipment Capacity PM PM led PM Limited led PM (lb/ton) (tons/hour) (lbs/hour) (tons/year) % (tons/year) (tons/year) Receiving - 7A2 Receiving - 7A3 Grain Loadout - 7B1 Grain Loadout - 7B2 Grain Loadout - 7B3 Grain Cleaning - 7C1 Grain Cleaning - 7C2 Grain Cleaning - 7C3 Handling - 7D Grain Drying 7E1 Grain Drying 7E2 Grain Drying - 7E3 Bin Vents - 7F Milling 7G1 Milling 7G2 Milling 7G3 Pellet Cooling 7H1 Pellet Cooling 7H2 Pellet Cooling - 7H3 Feed Loadout - 7I aq-f1-ec16 2/25/10 Page 4 of 12

5 PM 10 EMISSIONS PM 10 Receiving - 7A1 Receiving - 7A2 Receiving - 7A3 Grain Loadout - 7B1 Grain Loadout - 7B2 Grain Loadout - 7B3 Grain Cleaning - 7C1 Grain Cleaning - 7C2 Grain Cleaning - 7C3 Handling - 7D Grain Drying 7E1 Grain Drying 7E2 Grain Drying - 7E3 Bin Vents - 7F Milling 7G1 Milling 7G2 Milling 7G3 Pellet Cooling 7H1 Pellet Cooling 7H2 Pellet Cooling - 7H3 Feed Loadout - 7I 9h) 9i) 9j) 9k) 9l) 9m) 9n) Equipment Capacity PM 10 PM 10 led PM 10 Limited led PM 10 (lb/ton) (tons/hour) (lbs/hour) (tons/year) % (tons/year) (tons/year) aq-f1-ec16 2/25/10 Page 5 of 12

6 PM 2.5 EMISSIONS PM 2.5 Receiving - 7A1 Receiving - 7A2 Receiving - 7A3 Grain Loadout - 7B1 Grain Loadout - 7B2 Grain Loadout - 7B3 Grain Cleaning - 7C1 Grain Cleaning - 7C2 Grain Cleaning - 7C3 Handling - 7D Grain Drying 7E1 Grain Drying 7E2 Grain Drying - 7E3 Bin Vents - 7F Milling 7G1 Milling 7G2 Milling 7G3 Pellet Cooling 7H1 Pellet Cooling 7H2 Pellet Cooling - 7H3 Feed Loadout - 7I 9o) 9p) 9q) 9r) 9sl) 9t) 9u) Equipment Capacity PM 2.5 PM 2.5 led PM 2.5 Limited led PM 2.5 (lb/ton) (tons/hour) (lbs/hour) (tons/year) % (tons/year) (tons/year) aq-f1-ec16 2/25/10 Page 6 of 12

7 10) 10a) 10b) 10c) 10d) 10e) 10f) PM PM Equipment Throughput PM PM led PM (lb/ton) (tons/year) (lbs/year) (tons/year) % (tons/year) Receiving - A1 Receiving - A2 Receiving - A3 Loadout - B1 Loadout - B2 Loadout - B3 Grain Cleaning - C1 Grain Cleaning - C2 Grain Cleaning - C3 Handling - D Grain Drying E1 Grain Drying E2 Grain Drying - E3 Bin Vents - F Milling G1 Milling G2 Milling G3 Pellet Cooling H1 Pellet Cooling H2 Pellet Cooling H3 Feed Loadout I aq-f1-ec16 2/25/10 Page 7 of 12

8 10g) 10h) 10i) 10j) 10k) 10l) PM 10 PM 10 Equipment Throughput PM 10 PM 10 led PM 10 (lb/ton) (tons/year) (lbs/year) (tons/year) % (tons/year) Receiving - A1 Receiving - A2 Receiving - A3 Loadout - B1 Loadout - B2 Loadout - B3 Grain Cleaning - C1 Grain Cleaning - C2 Grain Cleaning - C3 Handling - D Grain Drying E1 Grain Drying E2 Grain Drying - E3 Bin Vents - F Milling G1 Milling G2 Milling G3 Pellet Cooling H1 Pellet Cooling H2 Pellet Cooling H3 Feed Loadout I aq-f1-ec16 2/25/10 Page 8 of 12

9 10m) 10n) 10o) 10p) 10q) 10r) PM 2.5 PM 2.5 Equipment Throughput PM 2.5 PM 2.5 led PM 2.5 (lb/ton) (tons/year) (lbs/year) (tons/year) % (tons/year) Receiving - A1 Receiving - A2 Receiving - A3 Loadout - B1 Loadout - B2 Loadout - B3 Grain Cleaning - C1 Grain Cleaning - C2 Grain Cleaning - C3 Handling - D Grain Drying E1 Grain Drying E2 Grain Drying - E3 Bin Vents - F Milling G1 Milling G2 Milling G3 Pellet Cooling H1 Pellet Cooling H2 Pellet Cooling H3 Feed Loadout I 11) List the sources used to obtain emission factors. Be as specific as possible. aq-f1-ec16 2/25/10 Page 9 of 12

10 Instructions for Form EC-16 1a) AQ Facility ID No. -- Fill in your Air Quality (AQ) Facility Identification (ID) Number (No.). This is the first eight digits of the permit number for all new permits issued under the operating permit program. If your facility has never been issued a permit under this program, leave this line blank. 1b) AQ File No. -- Fill in your AQ File Number. This is the first group of characters in your current Air Facility Permit. For example, for permit number 1899AB-93-OT-1, the AQ Facility ID number would be 1899AB. If you have never had an air quality permit, leave this line blank. 2) Facility Name -- Enter your facility name. 3) Facility Type -- Indicate whether this facility is a country grain elevator with or without a co-located feed mill, a terminal elevator with or without a co-located feed mill, or a feed mill only. A country grain elevator is any grain elevator that receives more than 50 percent of its grain directly from farmers in the immediate vicinity during the harvest season. If your operation can be described as a country grain elevator, either with or without an associated, co-located feed mill, go on to Question 4. A terminal elevator is an elevator that receives grain primarily from other elevators. A terminal elevator can also be considered any grain elevator that does not meet the definition of country grain elevator. If your operation can be described as a terminal grain elevator, either with or without an associated, co-located feed mill, skip Question 4 and begin with Question 5. 4) Determining Capacity of a Country Grain Elevator 4a-e) Amount of Grain Received in Years Enter the total amount of grain received by the facility during each of the past five (5) years, in tons, with year 5 being last year. 4f) Highest of numbers in 4a) - 4e) -- Choose the highest of the five numbers. 4g) Country Grain Elevator Capacity (C CE) -- Under a U.S. Environmental Protection Agency (EPA) guidance document dated November 14, 1995, the capacity of a country grain elevator is the amount of grain handled during the highest of the last five years, increased by a factor of 20 percent to account for unusual circumstances. This is considered to be the maximum amount of grain your country grain elevator is likely to have available for processing in a given year. C CE = [item 4f] x 1.2 5) Throughput (C A) -- Enter the actual amount of grain (in tons) handled at this facility during the last year. 6) Operating Limitations -- [Skip this item if using this form for Registration Permit Option D.] Describe any permit limits you plan to take to restrict your potential-to-emit (quantity of grain processed, hours of operation, etc.). Attach additional sheets, if needed. Describe the limiting factors and cite any rules that apply (e.g., Standards of Performance for Stationary Sources (NSPS, 40 CFR part pt. 60), or Minnesota Rules). The associated limit must be used to calculate your limited controlled emissions. If you used vendor certification or stack test data to limit your potential-to-emit, the factor you used will become your permit limit. Include all proposed limits on Form CD-01. 7) Unit and Equipment Identification Number -- Fill in the identification number of the emission units (EU) and control equipment (CE) covered by this calculation worksheet. Obtain these numbers from Forms GI-05A and GI-05B. [Note: You may skip this question if you are applying for a Registration Permit.] 7A) For each receiving area for which emissions will be calculated on this form, identify the EU number and the associated CE number, if applicable. Indicate whether the grain is received by truck, railcar, barge, or ship. 7B) For each grain (not feed) loading area for which emissions will be calculated on this form, identify the EU number and the associated CE number, if applicable. Indicate whether the grain is loaded into trucks, railcars, barges, or ships. 7C) For each grain cleaner for which emissions will be calculated on this form, identify the EU number and the associated CE number, if applicable. Describe the type of equipment (i.e., scalper). 7D) Identify the EU numbers all of the units comprising internal handling (e.g., garner and scale bins, elevator legs, and transfer points such as the distributor and gallery and tunnel belts) for which emissions will be calculated on this form. Also identify the associated CE number, if applicable. 7E) For each grain dryer for which emissions will be calculated on this form, identify the EU number and the associated CE number, if applicable. Indicate whether the dryer is a column dryer or a rack dryer. If the dryer is fuel-fired, use Form EC-08 to calculate the emissions from fuel combustion. 7F) For each bin vent for which emissions will be calculated on this form, identify the EU number and the associated CE number, if applicable. 7G) For each piece of grain milling equipment for which emissions will be calculated on this form, identify the EU number and the CE number, if applicable. Indicate whether it is a hammermill, a flaker, or a cracker. 7H) For each pellet cooler for which emissions will be calculated on this form, identify the EU number and the CE number, if applicable. 7I) For each animal feed (not grain) loadout area for which emissions will be calculated on this form, identify the EU number and the associated CE number, if applicable. aq-f1-ec16 2/25/10 Page 10 of 12

11 8) Potential from a Country Grain Elevator - [If using this form for Registration Permit Option D, skip to Item 10.] 8a) PM -- Enter the appropriate total particulate matter (PM) emission factor for each type of operation. Remember to cite the source of any emission factors you use, in item 11. 8b) PM (lb/year) -- Calculate the uncontrolled PM emissions for each type of operation, using the following equation: (lb/yr) = factor (lb/ton) x C CE (tons/year) = [item 8a] x [item 4g] 8c) PM (tons/year) -- Calculate the uncontrolled PM emissions for each type of operation, using the following equation: PM (tons/year) = Max. (lb/yr) x 1 (ton) 2000 (lb/ton) = [item 8b] x d) -- The pollution control efficiency is the product of the capture efficiency and the destruction/collection efficiency indicated on Form GI-05A. Enter this number here and remember to include on Form CD-01 a plan to demonstrate and maintain the destruction/collection efficiency. If there is no control equipment for the particular operation, then indicate zero as the control efficiency. 8e) led PM (tons/year) -- Fill in the led in tons/yr. Use this method for the calculation: led (ton/year) = Max. (tons/year) x (100 control efficiency) 100 = [item 8c] x (100 [item 8d]) 100 8f) Limited led PM -- The Limited led are calculated by taking into account all operating limitations with which you are proposing to comply. These limitations include limits on hours of operation, on the amount of material mined, handled, crushed, screened, etc. You start the calculation of Limited led by repeating the calculation of PM [item 8b] but taking into account the limits you propose. If an emission unit is subject to an emission limitation specified in 40 CFR pt. 60, 40 CFR pt. 61, 40 CFR pt. 63 or Minn. R. ch. 7011, you must show this requirement in the calculation of Limited led and take this into account in calculating the Limited led. If you choose to propose to comply with more a stringent limit, you should state this clearly and show the resulting allowed emissions in this calculation. Be sure you included all of your proposed limits in Item 6, and on Form CD-01. 8g) PM Enter the appropriate emission factor for particulate matter smaller than 10 microns (PM 10) for each type of operation. Remember to cite the source of any emission factors you use, in item 11. 8h) - 8l) Calculate PM 10 emissions following the same procedures items 8b 8f. 8m) PM Enter the appropriate emission factor for particulate matter smaller than 2.5 microns (PM 2.5) for each type of operation. Remember to cite the source of any emission factors you use, in item 11. 8n) - 8r) Calculate PM 2.5 emissions following the same procedures items 8b 8f. 9) Potential from a Terminal Elevator or a Feed Mill -- [If using this form for Registration Permit Option D, or if you do not operate a terminal elevator or a feed mill, skip to Item 10.] 9a) PM -- Enter the appropriate total particulate matter (PM) emission factor for each type of operation. Remember to cite the source of any emission factors you use, in item 11. 9b) Equipment Capacity (ton/hour)-- Enter the equipment capacity in tons per hour. 9c) PM (lb/hour) -- Calculate the uncontrolled PM emissions for each operation, using the following equation: (lb/hr) = (lb/ton) x Equipment Capacity (ton/hr) = [item 9a] x [item 9b] 9d) PM (tons/year) -- Calculate the uncontrolled PM emissions for each type of operation, using the following equation: (ton/year) = Max. (lb/hr) x 8760 (hr/year) x 1 (ton) 2000 (lb) = [item 9c] x e) -- The pollution control efficiency is the product of the capture efficiency and the destruction/collection efficiency indicated on Form GI-05A. Enter this number here and remember to include on Form CD-01 a plan to demonstrate and maintain the destruction/collection efficiency. If there is no control equipment for the particular operation, then indicate zero as the control efficiency. aq-f1-ec16 2/25/10 Page 11 of 12

12 9f) led PM (tons/year) -- Fill in the led in tons/yr. Use this method for the calculation: led (ton/year) = Max. (tons/year) x (100 control efficiency) 100 = [item 9d] x (100 [item 9e]) 100 9g) Limited led PM -- The Limited led are calculated by taking into account all limitations on operation of the source you are proposing to comply with in this application. These limitations include limits on hours of operation, on the amount of material mined, handled, crushed, screened, etc. You start the calculation of Limited led by repeating the calculation of PM (item 9c) but taking into account the limits you propose. If an emission unit is subject to an emission limitation specified in 40 CFR pt. 60, 40 CFR pt. 61, 40 CFR pt. 63 or Minn. R. ch. 7011, you must show this requirement in the calculation of Limited led and take this into account in calculating the Limited led. If you choose to propose to comply with more a stringent limit, you should state this clearly and show the resulting allowed emissions in this calculation. 9h) PM Enter the appropriate PM 10 emission factor for each type of operation. Remember to cite the source of any emission factors you use, in item 11. 9i) - 9n) Calculate PM 10 emissions following the same procedures items 9b 9g. 9o) PM Enter the appropriate PM 2.5 emission factor for each type of operation. Remember to cite the source of any emission factors you use, in item 11. 9p) - 9u) Calculate PM 2.5 emissions following the same procedures items 9b 9g. 10) 10a) PM -- Enter the appropriate total particulate matter (PM) emission factor for each type of operation. Remember to cite the source of any emission factors you use, in item b) Equipment Throughput (ton/year) -- Enter the amount of grain, in tons, that was processed through each operation listed. [Note: the total amount of grain for each type of operation [i.e., receiving or grain dryers ) should not execeed the quantity listed in Item 5.] 10c) PM (lb/year) -- Calculate the uncontrolled PM emissions for each operation, using the following equation: (lb/year) = (lb/ton) x Throughput (ton/year) = [item 10] x [item 10b] 10d) PM (tons/year) -- Calculate the uncontrolled PM emissions for each type of operation, using the following equation: (ton/year) = (lb/year) x 1 (ton) 2000 (lb) = [item 10c] x e) -- The pollution control efficiency is the product of the capture efficiency and the destruction/collection efficiency indicated on Form GI-05A or Form RP-D2. Enter this number here and remember to include on Form CD-01 a plan to demonstrate and maintain the destruction/collection efficiency. If there is no control equipment for the particular operation, then indicate zero as the control efficiency. 10f) led PM (tons/year) -- Fill in the led in tons/yr. Use this method for the calculation: led (ton/year) = (ton/year) x (100 control efficiency) 100 = [item 10d] x (100 [item 10e]) g) PM Enter the appropriate PM 10 emission factor for each type of operation. Remember to cite the source of any emission factors you use, in item h) - 10l) Calculate actual PM 10 emissions following the same procedures items 10b 10f. 10m) PM Enter the appropriate PM 2.5 emission factor for each type of operation. Remember to cite the source of any emission factors you use, in item n) - 10r) Calculate actual PM 2.5 emissions following the same procedures items 10b 10f. 11) List the sources used to obtain emission factors. Include information on why you chose a specific source over another, if you found more than one source of data. aq-f1-ec16 2/25/10 Page 12 of 12

EC-04 Degreasing Operations Calculation Form

EC-04 Degreasing Operations Calculation Form EC-04 Degreasing Operations Calculation Form Air Quality Permit Program Instructions on Page 3 Fill out this form completely for each degreaser, or attach sheets with equivalent information. If the degreaser

More information

EC-09 Printing Operations Calculation Form

EC-09 Printing Operations Calculation Form Fill out this form for each printing operation, or attach sheets with equivalent information. EC-09 Printing Operations Calculation Form Air Quality Permit Program If the printing operation emits Hazardous

More information

AIR EMISSION PERMIT NO IS ISSUED TO. ConAgra Flour Milling Company P.O. Box 3500 Omaha, NE For

AIR EMISSION PERMIT NO IS ISSUED TO. ConAgra Flour Milling Company P.O. Box 3500 Omaha, NE For AIR EMISSION PERMIT NO. 03700020-002 IS ISSUED TO ConAgra Flour Milling Company P.O. Box 3500 Omaha, NE 68103-0500 For CONAGRA FLOUR MILLING COMPANY HASTINGS 2005 South Vermilion Street Hastings, Dakota

More information

AIR EMISSION PERMIT NO IS ISSUED TO. ConAgra Flour Milling Company P.O. Box 3500 Omaha, NE For

AIR EMISSION PERMIT NO IS ISSUED TO. ConAgra Flour Milling Company P.O. Box 3500 Omaha, NE For AIR EMISSION PERMIT NO. 03700020-001 IS ISSUED TO ConAgra Flour Milling Company P.O. Box 3500 Omaha, NE 68103-0500 For CONAGRA FLOUR MILLING COMPANY - HASTINGS 2005 South Vermillion Street Hastings, Dakota

More information

AIR EMISSION PERMIT NO Administrative Amendment IS ISSUED TO. ConAgra Food Ingredients Co

AIR EMISSION PERMIT NO Administrative Amendment IS ISSUED TO. ConAgra Food Ingredients Co AIR EMISSION PERMIT NO. 03700020-003 Administrative Amendment IS ISSUED TO ConAgra Food Ingredients Co CONAGRA FLOUR MILL - HASTINGS 2005 South Vermillion Street Hastings, Dakota County, MN 55033 The emission

More information

DRAFT AIR EMISSION PERMIT NO Major Amendment IS ISSUED TO. Miller Milling Co LLC

DRAFT AIR EMISSION PERMIT NO Major Amendment IS ISSUED TO. Miller Milling Co LLC DRAFT AIR EMISSION PERMIT NO. 07900006 004 Major Amendment IS ISSUED TO Miller Milling Co LLC Miller Milling Co LLC 100 2nd Avenue Southwest New Prague, Le Sueur County, MN 56071 The emission units, control

More information

Technical Support Document for Draft Air Emission Permit No

Technical Support Document for Draft Air Emission Permit No Technical Support Document for Draft Air Emission Permit No. 12100021-101 This technical support document (TSD) is intended for all parties interested in the draft permit and to meet the requirements that

More information

NM-EQ Equipment Description and Notification Form Nonmetallic Mineral Processing General Permit

NM-EQ Equipment Description and Notification Form Nonmetallic Mineral Processing General Permit NM-EQ Equipment Description and Notification Form Nonmetallic Mineral Processing General Permit Air Quality Permit Program Instructions on Page 3 1a) AQ Facility ID (permit) No.: 1b) AQD File No.: 2) Facility

More information

AIR EMISSION PERMIT NO IS ISSUED TO. Busch Agricultural Resources, Inc.

AIR EMISSION PERMIT NO IS ISSUED TO. Busch Agricultural Resources, Inc. AIR EMISSION PERMIT NO. 02700022-002 IS ISSUED TO Busch Agricultural Resources, Inc. BUSCH AGRICULTURAL RESOURCES - MOORHEAD 2101 26th Street South Moorhead, Clay County, MN 56560 The emission units, control

More information

ADVICE FOR OBTAINING PERMIT EXEMPT APPLICABILITY DETERMINATIONS

ADVICE FOR OBTAINING PERMIT EXEMPT APPLICABILITY DETERMINATIONS ADVICE FOR OBTAINING PERMIT EXEMPT APPLICABILITY DETERMINATIONS It is the intent of this document to guide applicants into preparing Applicability Determination requests which include only the information

More information

CH-13 Applicability Of State Rules Air Quality Permit Program

CH-13 Applicability Of State Rules Air Quality Permit Program CH-13 Applicability Of State Rules Air Quality Permit Program Doc Type: Permit Application 1a) AQ Facility ID No.: 1b) Agency Interest ID No.: 2) Facility Name: Some businesses and activities in Minnesota

More information

TECHNICAL SUPPORT DOCUMENT For DRAFT/PROPOSED AIR EMISSION PERMIT NO

TECHNICAL SUPPORT DOCUMENT For DRAFT/PROPOSED AIR EMISSION PERMIT NO TECHNICAL SUPPORT DOCUMENT For DRAFT/PROPOSED AIR EMISSION PERMIT NO. 16900013-005 This technical support document (TSD) is intended for all parties interested in the draft/proposed permit and to meet

More information

TECHNICAL SUPPORT DOCUMENT For DRAFT/PROPOSED AIR EMISSION PERMIT NO

TECHNICAL SUPPORT DOCUMENT For DRAFT/PROPOSED AIR EMISSION PERMIT NO TECHNICAL SUPPORT DOCUMENT For DRAFT/PROPOSED AIR EMISSION PERMIT NO. 10900011 005 This technical support document (TSD) is intended for all parties interested in the draft/proposed permit and to meet

More information

DRAFT Air Individual Permit Part 70 Permit

DRAFT Air Individual Permit Part 70 Permit DRAFT Air Individual Permit Part 70 Permit 09100061 004 Permittee: Facility name: Cargill AgHorizons Fairmont Cargill AgHorizons Fairmont 1005 Bix Road North Fairmont, MN 56031 Martin County Operating

More information

AIR EMISSION PERMIT NO IS ISSUED TO. Van Hoven Company, Inc.

AIR EMISSION PERMIT NO IS ISSUED TO. Van Hoven Company, Inc. AIR EMISSION PERMIT NO. 03700070-001 IS ISSUED TO Van Hoven Company, Inc. VAN HOVEN COMPANY, INC. 505 Hardman Avenue South South Saint Paul, Dakota County, Minnesota 55075-2413 The emission units, control

More information

AIR EMISSION PERMIT NO IS ISSUED TO. Malt-O-Meal Company

AIR EMISSION PERMIT NO IS ISSUED TO. Malt-O-Meal Company AIR EMISSION PERMIT NO. 13100022-004 IS ISSUED TO Malt-O-Meal Company Malt-O-Meal Company - Plant 2 - Northfield 701 West 5th Street Northfield, Rice County, MN 55057 The emission units, control equipment

More information

ATTACHMENT A CERTIFICATION OF TRUTH, ACCURACY, AND COMPLETENESS

ATTACHMENT A CERTIFICATION OF TRUTH, ACCURACY, AND COMPLETENESS ATTACHMENT A CERTIFICATION OF TRUTH, ACCURACY, AND COMPLETENESS ATTACHMENT B REQUESTED ADDITIONAL INFORMATION 1. INTRODUCTION In a letter dated May 12, 2011, the Pima Department of Environmental Quality

More information

STATEMENT OF BASIS. Cheney Lime & Cement Company Landmark Plant Alabaster, Alabama Shelby County Facility No

STATEMENT OF BASIS. Cheney Lime & Cement Company Landmark Plant Alabaster, Alabama Shelby County Facility No STATEMENT OF BASIS Cheney Lime & Cement Company Landmark Plant Alabaster, Alabama Shelby County Facility No. 411-0019 This proposed Title V Major Source Operating Permit (MSOP) renewal is issued under

More information

Pollution Control Agency

Pollution Control Agency Minnesota Pollution Control Agency 52LafayetteRoadNorth I SLPaul, Minnesota 55155-4194 I 651.296-63 8-657-38641 651-282-5332 m I M'oW.pca.state.mn.us I EqualOpportunityEmployer September 12, 212 Mr. Mick

More information

SWCAA Emission Inventory Instructions

SWCAA Emission Inventory Instructions SWCAA Emission Inventory Instructions Why is an emission inventory required? Most of the emission inventory reporting requirements originated in Title 0 of the Code of Federal Regulations (0 CFR) Part

More information

AIR EMISSION PERMIT NO IS ISSUED TO ISPAT INLAND STEEL MINING CO

AIR EMISSION PERMIT NO IS ISSUED TO ISPAT INLAND STEEL MINING CO AIR EMISSION PERMIT NO. 13700062-001 IS ISSUED TO ISPAT INLAND STEEL MINING CO Ispat Inland Steel Mining Co U.S. Highway 53 North Virginia, St. Louis County, Minnesota 55792 The emission units, control

More information

EMISSIONS ACTIVITY CATEGORY FORM AGGREGATE PROCESSING PLANTS

EMISSIONS ACTIVITY CATEGORY FORM AGGREGATE PROCESSING PLANTS FOR OHIO EPA USE FACILITY ID: EMISSIONS ACTIVITY CATEGORY FORM AGGREGATE PROCESSING PLANTS This form is to be completed for each crushing operation, screening operation, and product loading operation.

More information

EMISSIONS ACTIVITY CATEGORY FORM CEMENT MANUFACTURING PLANTS

EMISSIONS ACTIVITY CATEGORY FORM CEMENT MANUFACTURING PLANTS FOR OHIO EPA USE FACILITY ID: EMISSIONS ACTIVITY CATEGORY FORM CEMENT MANUFACTURING PLANTS This form is to be completed for each cement manufacturing plant. State/Federal regulations which may apply to

More information

AIR EMISSION PERMIT NO IS ISSUED TO GERDAU AMERISTEEL US INC

AIR EMISSION PERMIT NO IS ISSUED TO GERDAU AMERISTEEL US INC AIR EMISSION PERMIT NO. 12300055-002 IS ISSUED TO GERDAU AMERISTEEL US INC 1678 Red Rock Road St. Paul, Ramsey County, MN 55119 The emission units, control equipment and emission stacks at the stationary

More information

EMISSIONS ACTIVITY CATEGORY FORM FERTILIZER MIXING/BLENDING PLANTS

EMISSIONS ACTIVITY CATEGORY FORM FERTILIZER MIXING/BLENDING PLANTS FOR OHIO EPA USE FACILITY ID: EMISSIONS ACTIVITY CATEGORY FORM FERTILIZER MIXING/BLENDING PLANTS This form is to be completed for each fertilizer mixing & blending facility. State/Federal regulations which

More information

AIR EMISSION PERMIT NO IS ISSUED TO. Granite Falls Community Ethanol Plant LLC

AIR EMISSION PERMIT NO IS ISSUED TO. Granite Falls Community Ethanol Plant LLC AIR EMISSION PERMIT NO. 17300038-001 IS ISSUED TO Granite Falls Community Ethanol Plant LLC Granite Falls Community Ethanol Plant LLC 150 th Street Southeast & Highway 23 North Granite Falls, Chippewa

More information

Permit No AIR EMISSION PERMIT NO IS ISSUED TO. Lafarge Corporation - US Cement Group

Permit No AIR EMISSION PERMIT NO IS ISSUED TO. Lafarge Corporation - US Cement Group Permit No. 12300353-002 AIR EMISSION PERMIT NO. 12300353-002 IS ISSUED TO Lafarge Corporation - US Cement Group Lafarge Corporation - Red Rock Terminal 1363 Red Rock Road St Paul, Ramsey County, MN 551196012

More information

AIR EMISSION PERMIT NO Minor Amendment IS ISSUED TO. Unimin Corp

AIR EMISSION PERMIT NO Minor Amendment IS ISSUED TO. Unimin Corp AIR EMISSION PERMIT NO. 07900009-002 Minor Amendment IS ISSUED TO Unimin Corp UNIMIN MINNESOTA CORP - KASOTA PLANT 35496 468th Street Kasota, Le Sueur County, MN 56050 The emission units, control equipment

More information

AIR EMISSION PERMIT NO IS ISSUED TO. Lafarge Corporation - US Cement Group

AIR EMISSION PERMIT NO IS ISSUED TO. Lafarge Corporation - US Cement Group AIR EMISSION PERMIT NO. 12300353-001 IS ISSUED TO Lafarge Corporation - US Cement Group LAFARGE CORPORATION - RED ROCK TERMINAL 1363 Red Rock Road St. Paul, Ramsey County, Minnesota 551196012 The emission

More information

AIR EMISSION PERMIT NO IS ISSUED TO. Mittal Steel USA Inc

AIR EMISSION PERMIT NO IS ISSUED TO. Mittal Steel USA Inc AIR EMISSION PERMIT NO. 13700062-002 IS ISSUED TO Mittal Steel USA Inc MITTAL STEEL USA - MINORCA MINE INC 5950 Old Highway 53 North Virginia, St. Louis County, MN 55792 The emission units, control equipment

More information

ADEQ MINOR SOURCE AIR PERMIT

ADEQ MINOR SOURCE AIR PERMIT ADEQ MINOR SOURCE AIR PERMIT IS ISSUED TO: Peterson Farms, Inc. Feed Mill 2565 North Highway 59 Decatur, AR 72722 Benton County THIS PERMIT IS YOUR AUTHORITY TO CONSTRUCT, MODIFY, OPERATE, AND/OR MAINTAIN

More information

ASA Bloomingburg, LLC. Air permit-to-install (PTI) number Public Hearing Date April 18, 2006 Comment Period End Date April 25, 2006

ASA Bloomingburg, LLC. Air permit-to-install (PTI) number Public Hearing Date April 18, 2006 Comment Period End Date April 25, 2006 ASA Bloomingburg, LLC Air permit-to-install (PTI) number 01-01306 Public Hearing Date April 18, 2006 Comment Period End Date April 25, 2006 Summary of Comments and Ohio EPA Responses August 2006 Introduction

More information

ADEQ MINOR SOURCE AIR PERMIT

ADEQ MINOR SOURCE AIR PERMIT ADEQ MINOR SOURCE AIR PERMIT Permit No. : 1986-AR-4 IS ISSUED TO: Tyson Foods, Inc. Cobb Feed Mill 2125 Country Club Road Siloam Springs, AR 72761 Benton County THIS PERMIT IS THE ABOVE REFERENCED PERMITTEE

More information

EMISSIONS ACTIVITY CATEGORY FORM IRON PRODUCTION

EMISSIONS ACTIVITY CATEGORY FORM IRON PRODUCTION FOR OHIO EPA USE FACILITY ID: EMISSIONS ACTIVITY CATEGORY FORM IRON PRODUCTION This form is to be completed for each operation which is part of an iron production facility. State/Federal regulations which

More information

ROCK CRUSHING PLANT APPLICATIONS ADVICE

ROCK CRUSHING PLANT APPLICATIONS ADVICE ROCK CRUSHING PLANT APPLICATIONS ADVICE This guidance is intended to help applicants prepare applications and certifications with a reduced amount of effort, yielding clearer and more accurate applications.

More information

IA-01 Insignificant Activities Required to be Listed

IA-01 Insignificant Activities Required to be Listed IA-01 Insignificant Activities Required to be Listed Air Quality Permit Program Doc Type: Permit Application Instructions on Page 2 1a) AQ Facility ID No.: 1b) AQ File No.: 2) Facility Name: 3) Check and

More information

Naughton Power Plant. Chapter 6, Section 2 Construction Permit Application. Submitted to the Wyoming Air Quality Division And Prepared by

Naughton Power Plant. Chapter 6, Section 2 Construction Permit Application. Submitted to the Wyoming Air Quality Division And Prepared by Naughton Power Plant Chapter 6, Section 2 Construction Permit Application Submitted to the Wyoming Air Quality Division And Prepared by 1407 West North Temple Salt Lake City, Utah 84116 March 2008 1.0

More information

DRAFT. AIR EMISSION PERMIT NO Total Facility Operating Permit IS ISSUED TO. Magnetation LLC

DRAFT. AIR EMISSION PERMIT NO Total Facility Operating Permit IS ISSUED TO. Magnetation LLC DRAFT AIR EMISSION PERMIT NO. 06100078 001 Total Facility Operating Permit IS ISSUED TO Magnetation LLC MAGNETATION LLC PLANT 2 27692 County Road 10 Bovey, Itasca County, Minnesota 55709 The emission units,

More information

AIR EMISSION PERMIT NO IS ISSUED TO. COLD SPRING GRANITE COMPANY 202 South 3rd Avenue Cold Spring, Stearns County, MN 56320

AIR EMISSION PERMIT NO IS ISSUED TO. COLD SPRING GRANITE COMPANY 202 South 3rd Avenue Cold Spring, Stearns County, MN 56320 AIR EMISSION PERMIT NO. 14500067-001 IS ISSUED TO COLD SPRING GRANITE COMPANY 202 South 3rd Avenue Cold Spring, Stearns County, MN 56320 The emission units, control equipment and emission stacks at the

More information

DRAFT. AIR EMISSION PERMIT NO Major Amendment IS ISSUED TO

DRAFT. AIR EMISSION PERMIT NO Major Amendment IS ISSUED TO DRAFT AIR EMISSION PERMIT NO. 09900002 012 Major Amendment IS ISSUED TO Hormel Foods Corp Quality Pork Processors HORMEL FOODS CORP/QPP AUSTIN 500 14th Avenue Northeast Austin, Mower County, Minnesota

More information

rai San Joaquin Valley AIR POLLUTION CONTROL DISTRICT

rai San Joaquin Valley AIR POLLUTION CONTROL DISTRICT rai San Joaquin Valley AIR POLLUTION CONTROL DISTRICT HEALTHY JAN 1 5 2014 Mark Ferguson Diamond Pet Food Processors of Ripon 942 South Stockton Ave Ripon, CA 95366 Re: Notice of Preliminary Decision -

More information

Air Individual Permit Part 70 Reissuance Gateway Blvd Arden Hills, Minnesota Ramsey County

Air Individual Permit Part 70 Reissuance Gateway Blvd Arden Hills, Minnesota Ramsey County Air Individual Permit Part 70 Reissuance 12300718-101 Permittee: Facility name: Hood Packaging Corp - Arden Hills Hood Packaging Corp - Arden Hills 1887 Gateway Blvd Arden Hills, Minnesota 55112-2770 Ramsey

More information

AIR EMISSION PERMIT NO Major Amendment IS ISSUED TO. American Crystal Sugar Company

AIR EMISSION PERMIT NO Major Amendment IS ISSUED TO. American Crystal Sugar Company AIR EMISSION PERMIT NO. 02700001-011 Major Amendment IS ISSUED TO American Crystal Sugar Company AMERICAN CRYSTAL SUGAR - MOORHEAD 2500 11th Street North Moorhead, Clay County, MN 56560 The emission units,

More information

ADEQ MINOR SOURCE AIR PERMIT

ADEQ MINOR SOURCE AIR PERMIT ADEQ MINOR SOURCE AIR PERMIT Permit No. : 0422-AR-5 IS ISSUED TO: Riceland Foods, Inc. - Waldenburg Hwy. 49 North and Lake Hogue Road Waldenburg, AR 72475 Poinsett County THIS PERMIT IS THE ABOVE REFERENCED

More information

AIR EMISSION PERMIT NO IS ISSUED TO. Brown Printing Company - Division of Gruner & Jahr

AIR EMISSION PERMIT NO IS ISSUED TO. Brown Printing Company - Division of Gruner & Jahr AIR EMISSION PERMIT NO. 16100013-001 IS ISSUED TO Brown Printing Company - Division of Gruner & Jahr Brown Printing Company - Waseca Division 2300 Brown Avenue Waseca, Waseca County, MN 56093 The emission

More information

TECHNICAL SUPPORT DOCUMENT For DRAFT/PROPOSED AIR EMISSION PERMIT NO

TECHNICAL SUPPORT DOCUMENT For DRAFT/PROPOSED AIR EMISSION PERMIT NO TECHNICAL SUPPORT DOCUMENT For DRAFT/PROPOSED AIR EMISSION PERMIT NO. 06900025 005 This technical support document (TSD) is intended for all parties interested in the draft/proposed permit and to meet

More information

The designed world is the product of a design process, which provides ways to turn resources materials, tools and machines, people, information,

The designed world is the product of a design process, which provides ways to turn resources materials, tools and machines, people, information, The designed world is the product of a design process, which provides ways to turn resources materials, tools and machines, people, information, energy, capital, and time into products and services. Transportation

More information

DRAFT. AIR EMISSION PERMIT NO Major Amendment IS ISSUED TO. Pan O Gold Baking Co

DRAFT. AIR EMISSION PERMIT NO Major Amendment IS ISSUED TO. Pan O Gold Baking Co DRAFT AIR EMISSION PERMIT NO. 14500176 002 Major Amendment IS ISSUED TO Pan O Gold Baking Co Pan O Gold Baking Co 444 St. Germain Street East St. Cloud, Sherburne County, MN 56304 The emission units, control

More information

MPCA Stack Test and Monitoring Program: Asphalt and Aggregate Facilities. MPCA Speakers: Shanda Fisher Sean O Connor

MPCA Stack Test and Monitoring Program: Asphalt and Aggregate Facilities. MPCA Speakers: Shanda Fisher Sean O Connor MPCA Stack Test and Monitoring Program: Asphalt and Aggregate Facilities MPCA Speakers: Shanda Fisher Sean O Connor 1 S.T.A.M.P. Stack Testing And Monitoring Program 2 S.T.A.M.P. Staff Shanda Fisher Metro,

More information

AIR EMISSION PERMIT NO ADMINISTRATIVE AMENDMENT IS ISSUED TO. Northern States Power Company

AIR EMISSION PERMIT NO ADMINISTRATIVE AMENDMENT IS ISSUED TO. Northern States Power Company AIR EMISSION PERMIT NO. 05300015-002 ADMINISTRATIVE AMENDMENT IS ISSUED TO Northern States Power Company NSP - RIVERSIDE 3100 Marshall Street Northeast Minneapolis, Hennepin County, MN 554181826 The emission

More information

ADEQ MINOR SOURCE AIR PERMIT

ADEQ MINOR SOURCE AIR PERMIT ADEQ MINOR SOURCE AIR PERMIT Permit No. : 2121-A IS ISSUED TO: 184 Wilson Mill Road Monticello, AR 71655 Drew County THIS PERMIT IS THE ABOVE REFERENCED PERMITTEE S AUTHORITY TO CONSTRUCT, MODIFY, OPERATE,

More information

AIR EMISSION PERMIT NO IS ISSUED TO. Northern States Power Company

AIR EMISSION PERMIT NO IS ISSUED TO. Northern States Power Company AIR EMISSION PERMIT NO. 14100004-001 IS ISSUED TO Northern States Power Company NSP - Sherburne County 13999 Industrial Boulevard Becker, Sherburne County, Minnesota 55308 The emission units, control equipment

More information

AIR EMISSION PERMIT NO IS ISSUED TO. ST. PAUL BRASS AND ALUMINUM FOUNDRY 954 West Minnehaha Avenue St Paul, Ramsey County, MN 55104

AIR EMISSION PERMIT NO IS ISSUED TO. ST. PAUL BRASS AND ALUMINUM FOUNDRY 954 West Minnehaha Avenue St Paul, Ramsey County, MN 55104 AIR EMISSION PERMIT NO. 12300001-001 IS ISSUED TO ST. PAUL BRASS AND ALUMINUM FOUNDRY 954 West Minnehaha Avenue St Paul, Ramsey County, MN 55104 The emission units, control equipment and emission stacks

More information

AIR EMISSION PERMIT NO IS ISSUED TO. MinnErgy LLC

AIR EMISSION PERMIT NO IS ISSUED TO. MinnErgy LLC AIR EMISSION PERMIT NO. 10901021-001 IS ISSUED TO MinnErgy LLC MINNERGY LLC South East corner of Intersection of 19 th Street and 110 th Avenue Eyota, Olmsted County, MN 55934 The emission units, control

More information

AIR EMISSION PERMIT NO ADMINISTRATIVE AMENDMENT IS ISSUED TO. Northern States Power Company

AIR EMISSION PERMIT NO ADMINISTRATIVE AMENDMENT IS ISSUED TO. Northern States Power Company AIR EMISSION PERMIT NO. 16300005-003 ADMINISTRATIVE AMENDMENT IS ISSUED TO Northern States Power Company NSP - ALLEN S KING GENERATING PLANT 1103 King Plant Road Bayport, Washington County, MN 55003 The

More information

Proposed Amendments to NSPS for Grain Elevators. EPA Region 7 Ag Stakeholders October 30, 2014

Proposed Amendments to NSPS for Grain Elevators. EPA Region 7 Ag Stakeholders October 30, 2014 Proposed Amendments to NSPS for Grain Elevators EPA Region 7 Ag Stakeholders October 30, 2014 Outline Background NSPS Review Proposal Schedule 2 Background Approximately 900 grain elevators subject to

More information

CONSTRUCTION PERMIT. PERMIT NO: 09LP0202F Final Approval

CONSTRUCTION PERMIT. PERMIT NO: 09LP0202F Final Approval COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT AIR POLLUTION CONTROL DIVISION TELEPHONE: (303) 692-3150 CONSTRUCTION PERMIT PERMIT NO: 09LP0202F Final Approval DATE ISSUED: September 3, 2013 Modification

More information

AIR EMISSION PERMIT NO (Part 70 Reissuance) IS ISSUED TO. Gerdau Ameristeel US Inc

AIR EMISSION PERMIT NO (Part 70 Reissuance) IS ISSUED TO. Gerdau Ameristeel US Inc AIR EMISSION PERMIT NO. 12300055-004 (Part 70 Reissuance) IS ISSUED TO Gerdau Ameristeel US Inc GERDAU AMERISTEEL US INC - ST PAUL MILL 1678 Red Rock Road St. Paul, Ramsey County, MN 55119 The emission

More information

Industrial Accessories Company 4800 Lamar Ave Mission, Kansas ETHANOL MARKET. PP007

Industrial Accessories Company 4800 Lamar Ave Mission, Kansas ETHANOL MARKET.   PP007 Industrial Accessories Company 4800 Lamar Ave Mission, Kansas 66202 ETHANOL MARKET PP007 1 PRODUCTS & SYSTEMS 1. OEM Baghouse Supplier. 2. FGD Technology for SOx & HCL Removal 3. Fly-ash & Material Pneumatic

More information

AIR EMISSION PERMIT NO Administrative Amendment IS ISSUED TO. Cargill Inc & Buffalo lake Energy LLC

AIR EMISSION PERMIT NO Administrative Amendment IS ISSUED TO. Cargill Inc & Buffalo lake Energy LLC AIR EMISSION PERMIT NO. 09100061-003 Administrative Amendment IS ISSUED TO Cargill Inc & Buffalo lake Energy LLC CARGILL AGHORIZONS 1005 Bixby Road Fairmont, Martin County, MN 56031 BUFFALO LAKE ENERGY

More information

SECTION 2.0 PERMIT BY RULE: Asphalt Plants

SECTION 2.0 PERMIT BY RULE: Asphalt Plants FACILITY NAME: DATE NDEQ Facility ID# TE: YOU MUST ALSO FILL OUT SECTION 1.0 IN ITS ENTIRETY TE: If you are already covered by the Asphalt Plant Permit-by-Rule and are applying for a relocation, you need

More information

(SIC Code: 2361) Liberty Paper, Inc Liberty Ln Becker, Sherburne County, MN

(SIC Code: 2361) Liberty Paper, Inc Liberty Ln Becker, Sherburne County, MN TECHNICAL SUPPORT DOCUMENT For DRAFT/PROPSOSED AIR EMISSION PERMIT NO. 14100036-007 This technical support document (TSD) is intended for all parties interested in the permit and to meet the requirements

More information

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM. October 26, 2018

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM. October 26, 2018 ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM October 26, 2018 SUBJECT: Review of Application Operating Permit McConway and Torley LLC 109 48 th Street Pittsburgh, PA 15201-2755 RE: Operating

More information

RELEASE POINT TYPE Enter or select one of the following stack/emission point release orientation: downward

RELEASE POINT TYPE Enter or select one of the following stack/emission point release orientation: downward EMISSION SOURCE (Internal Combustion Engines) Instructions for Form B2-G Form B2-G should be completed for all generators. Make as many copies of the form as necessary. Attach all calculations and assumptions

More information

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM October 5, 2011 SUBJECT: Renewal Title V Operating Permit Application Chambers Development Company, Inc. - Monroeville Landfill 600 Thomas Street

More information

STATEMENT OF BASIS. for the issuance of Draft Air Permit # 1681-AOP-R4

STATEMENT OF BASIS. for the issuance of Draft Air Permit # 1681-AOP-R4 1. PERMITTING AUTHORITY: STATEMENT OF BASIS for the issuance of Draft Air Permit # 1681-AOP-R4 Arkansas Department of Environmental Quality 8001 National Drive Post Office Box 8913 Little Rock, Arkansas

More information

Draft Air Individual Permit State Permit

Draft Air Individual Permit State Permit Draft Air Individual Permit State Permit 13500023-101 Permittee: Facility name: Central Boiler Inc Central Boiler Inc 20502 160th St Greenbush, MN 56726-9251 Roseau County Expiration date: Non-Expiring

More information

Iowa Department of Natural Resources Title V Operating Permit

Iowa Department of Natural Resources Title V Operating Permit Iowa Department of Natural Resources Title V Operating Permit Name of Permitted Facility: Lafarge North America Inc. Facility Location: 301 East Front Street Buffalo, IA 52728 Air Quality Operating Permit

More information

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM. January 28, 2015

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM. January 28, 2015 ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM January 28, 2015 SUBJECT: Review of Application Operating Permit McConway and Torley LLC 109 48 th Street Pittsburgh, PA 15201-2755 RE: Operating

More information

United Taconite Analysis of Best Available Retrofit Technology (BART)

United Taconite Analysis of Best Available Retrofit Technology (BART) United Taconite Analysis of Best Available Retrofit Technology (BART) Table of Contents 1. Executive Summary...iv 2. Introduction...1 2.A BART Eligibility...3 2.B BART Determinations...3 3. Streamlined

More information

Addendum A: Source Applicable Requirements

Addendum A: Source Applicable Requirements Addendum A COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF AIR QUALITY Addendum A: Source Applicable Requirements Describe and cite all applicable requirements pertaining

More information

AIR EMISSION PERMIT NO IS ISSUED TO. UNIMIN MINNESOTA CORP - KASOTA PLANT th Street Kasota, Le Sueur County, MN 56050

AIR EMISSION PERMIT NO IS ISSUED TO. UNIMIN MINNESOTA CORP - KASOTA PLANT th Street Kasota, Le Sueur County, MN 56050 AIR EMISSION PERMIT NO. 07900009-001 IS ISSUED TO UNIMIN MINNESOTA CORP - KASOTA PLANT 35496 468th Street Kasota, Le Sueur County, MN 56050 The emission units, control equipment and emission stacks at

More information

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM March 27, 2002

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM March 27, 2002 ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM SUBJECT: Review of Application Title V Operating Permit Resolite Polyglas 1575 Lebanon School Road West Mifflin, PA 15122-3464 RE: Operating Permit

More information

HOT MIX ASPHALT PLANTS

HOT MIX ASPHALT PLANTS United States Office Of Air Quality EPA-454/R-00-019 Environmental Protection Planning And Standards December 2000 Agency Research Triangle Park, NC 27711 Air HOT MIX ASPHALT PLANTS EMISSION ASSESSMENT

More information

AIR EMISSION PERMIT NO IS ISSUED TO. BLANDIN PAPER COMPANY & Minnesota Power

AIR EMISSION PERMIT NO IS ISSUED TO. BLANDIN PAPER COMPANY & Minnesota Power AIR EMISSION PERMIT NO. 06100001-003 IS ISSUED TO BLANDIN PAPER COMPANY & Minnesota Power Blandin Paper Company 115 Southwest First Street, Grand Rapids, MN 55744-3662 Minnesota Power Blandin Energy Center

More information

TECHNICAL FACT SHEET September 24, 2018

TECHNICAL FACT SHEET September 24, 2018 Copperwood Resources, Inc. Page 1 Purpose and Summary TECHNICAL FACT SHEET September 24, 2018 The Michigan Department of Environmental Quality (MDEQ), Air Quality Division (AQD), is proposing to act on

More information

Commonwealth of Kentucky Division for Air Quality PERMIT STATEMENT OF BASIS

Commonwealth of Kentucky Division for Air Quality PERMIT STATEMENT OF BASIS SOURCE DESCRIPTION: Commonwealth of Kentucky Division for Air Quality PERMIT STATEMENT OF BASIS Conditional Major / Synthetic Minor, Construction / Operating Buffalo Creek Energy, LLC. Tram/Pikeville,

More information

Technical Contact. Conrad Carter, Jr., P.E. President (704) PO Box 1760 Albemarle, NC

Technical Contact. Conrad Carter, Jr., P.E. President (704) PO Box 1760 Albemarle, NC NORTH CAROLINA DIVISION OF AIR QUALITY Application Review Issue Date: XXXX XX, 2017 Facility Data Applicant (Facility s Name): H. W. Culp Lumber Co, Inc. Facility Address: H. W. Culp Lumber Co, Inc. 491

More information

Commonwealth of Kentucky Division for Air Quality PERMIT STATEMENT OF BASIS

Commonwealth of Kentucky Division for Air Quality PERMIT STATEMENT OF BASIS SOURCE DESCRIPTION: Commonwealth of Kentucky Division for Air Quality PERMIT STATEMENT OF BASIS (DRAFT) Conditional Major/Synthetic Minor, Construction / Operating Chisolm Energy, LLC. Phelps, Kentucky

More information

A.4.2 Minn. R. for Fiberglass Operations placed in operation on or after July 9, 1969

A.4.2 Minn. R. for Fiberglass Operations placed in operation on or after July 9, 1969 A.4 Fiberglass Operations The following are Minnesota Standards of Performance for Industrial Process Equipment A.4.1 Minn. R. for Fiberglass Operations placed in operation before July 9, 1969 Total Particulate

More information

NARRATIVE. Manny Patel Ginger Payment DATE: June 15, 2015

NARRATIVE. Manny Patel Ginger Payment DATE: June 15, 2015 Georgia Department of Natural Resources Environmental Protection Division Air Protection Branch 4244 International Parkway Suite 120 Atlanta Georgia 30354 404/363-7000 Fax: 404/363-7100 Judson H. Turner,

More information

AIR EMISSION PERMIT NO IS ISSUED TO. American Color Graphics, Inc.

AIR EMISSION PERMIT NO IS ISSUED TO. American Color Graphics, Inc. AIR EMISSION PERMIT NO. 13900051-001 IS ISSUED TO American Color Graphics, Inc. Shakopee Valley Printing 5101 South Valley Industrial Boulevard Shakopee, Scott County, MN 55379-1821 The emission units,

More information

Air Individual Permit Part 70 Reissuance Ever-Green Energy, Inc. Environmental Wood Supply, LLC

Air Individual Permit Part 70 Reissuance Ever-Green Energy, Inc. Environmental Wood Supply, LLC Air Individual Permit Part 70 Reissuance 12300063-004 Permittee: Co-permittee name: District Energy St Paul Inc-Hans O Nyman St Paul Cogeneration Ever-Green Energy, Inc. Environmental Wood Supply, LLC

More information

DRAFT/PROPOSED AIR EMISSION PERMIT NO IS ISSUED TO. Potlatch Land & Lumber LLC, Bemidji

DRAFT/PROPOSED AIR EMISSION PERMIT NO IS ISSUED TO. Potlatch Land & Lumber LLC, Bemidji DRAFT/PROPOSED AIR EMISSION PERMIT NO. 05700002-006 IS ISSUED TO Potlatch Land & Lumber LLC, Bemidji POTLATCH LAND & LUMBER LLC, BEMIDJI 50518 County Road 45 Bemidji, Hubbard County, Minnesota 56601 The

More information

AIR EMISSION PERMIT NO IS ISSUED TO. Eveleth Mines LLC. EVTAC MINING - PLANT Highway 16 Forbes, St. Louis County, MN 55738

AIR EMISSION PERMIT NO IS ISSUED TO. Eveleth Mines LLC. EVTAC MINING - PLANT Highway 16 Forbes, St. Louis County, MN 55738 AIR EMISSION PERMIT NO. IS ISSUED TO Eveleth Mines LLC EVTAC MINING - PLANT Highway 16 Forbes, St. Louis County, MN 55738 The emission units, control equipment and emission stacks at the stationary source

More information

CHAPTER Committee Substitute for Committee Substitute for Senate Bill No. 1300

CHAPTER Committee Substitute for Committee Substitute for Senate Bill No. 1300 CHAPTER 2003-144 Committee Substitute for Committee Substitute for Senate Bill No. 1300 An act relating to citrus; amending s. 403.08725, F.S.; redefining the terms new sources and existing sources ; amending

More information

AIR EMISSION PERMIT NO IS ISSUED TO. Tennant Co

AIR EMISSION PERMIT NO IS ISSUED TO. Tennant Co AIR EMISSION PERMIT NO. 05300143-003 IS ISSUED TO Tennant Co TENNANT CO - GOLDEN VALLEY 701 Lilac Drive North Golden Valley, Hennepin County, MN 55422 The emission units, control equipment and emission

More information

Original Title V Air Permit Application Submittal: March 2014 Submission Date for corrections: March, 2015

Original Title V Air Permit Application Submittal: March 2014 Submission Date for corrections: March, 2015 REQUEST FOR TITLE V PERMIT CORRECTIONS AND SUBMITTAL OF TITLE V PERMIT AND AIR OPERATION PERMIT APPLICATION CORRECTIONS MARCH 2015 FLORIDA POWER DEVELOPMENT, LLC FACILITY ID: 0530380 TITLE-V AIR PERMIT:

More information

AIR EMISSION PERMIT NO IS ISSUED TO

AIR EMISSION PERMIT NO IS ISSUED TO AIR EMISSION PERMIT NO. 13100005-004 IS ISSUED TO MULTEK FLEXIBLE CIRCUITS INC. SHELDAHL ROAD East and West Buildings 1150 Sheldahl Road and 805 North Highway 3 Northfield, Dakota County, Minnesota 55057-0170

More information

AIR EMISSION PERMIT NO IS ISSUED TO. Minnesota Power & Light The Wisconsin Public Power Inc. System

AIR EMISSION PERMIT NO IS ISSUED TO. Minnesota Power & Light The Wisconsin Public Power Inc. System AIR EMISSION PERMIT NO. 06100004-001 IS ISSUED TO Minnesota Power & Light The Wisconsin Public Power Inc. System MINNESOTA POWER AND LIGHT - BOSWELL ENERGY P.O. Box 128 Cohasset, Itasca County, Minnesota

More information

Emission Control Technology Review for NorthMet Project Processing Plant RS58A

Emission Control Technology Review for NorthMet Project Processing Plant RS58A Emission Control Technology Review for NorthMet Project Processing Plant RS58A PolyMet Mining Inc. October 2007 Emission Control Technology Review for NorthMet Project Processing Plant RS58A PolyMet Mining

More information

MCAQ EMISSIONS WORKBOOK

MCAQ EMISSIONS WORKBOOK MCAQ EMISSIONS WORKBOOK An Approach-Driven Guide to Calculating and Reporting Air Pollutant Emissions Developed by: www.airquality.charmeck.org Rev. 04/2016 Table of Contents (Click on the links below

More information

AIR EMISSION PERMIT NO IS ISSUED TO. Poly Foam, Inc. 116 Pine Street South Lester Prairie, McLeod County, Minnesota 55354

AIR EMISSION PERMIT NO IS ISSUED TO. Poly Foam, Inc. 116 Pine Street South Lester Prairie, McLeod County, Minnesota 55354 AIR EMISSION PERMIT NO. 08500016-001 IS ISSUED TO Poly Foam, Inc. 116 Pine Street South Lester Prairie, McLeod County, Minnesota 55354 The emission units, control equipment and emission stacks at the stationary

More information

AIR EMISSION PERMIT NO IS ISSUED TO. Plymouth Foam Products 1800 Sunset Drive Plymouth, Wisconsin FOR

AIR EMISSION PERMIT NO IS ISSUED TO. Plymouth Foam Products 1800 Sunset Drive Plymouth, Wisconsin FOR AIR EMISSION PERMIT NO. 14100038-001 IS ISSUED TO Plymouth Foam Products 1800 Sunset Drive Plymouth, Wisconsin 53073 FOR Plymouth Foam Products - Becker 13900 Industry Ave Becker, Sherburne County, Minnesota

More information

AIR EMISSION PERMIT NO IS ISSUED TO

AIR EMISSION PERMIT NO IS ISSUED TO AIR EMISSION PERMIT NO. 16300005-004 IS ISSUED TO Northern States Power Company For the NSP - ALLEN S KING GENERATING PLANT 1103 King Plant Road Oak Park Heights, Washington County, MN 55003 The emission

More information

Draft Air Individual Permit Part 70 Reissuance County Road 25 Saint Louis Park, MN55416 Hennepin County

Draft Air Individual Permit Part 70 Reissuance County Road 25 Saint Louis Park, MN55416 Hennepin County Draft Air Individual Permit Part 70 Reissuance 05300138-101 Permittee: Facility name: Northland Aluminum Products Inc Northland Aluminum Products Inc 5005 County Road 25 Saint Louis Park, MN55416 Hennepin

More information

AIR EMISSION PERMIT NO IS ISSUED TO. LSP - Cottage Grove LP

AIR EMISSION PERMIT NO IS ISSUED TO. LSP - Cottage Grove LP AIR EMISSION PERMIT NO. 16300087-003 IS ISSUED TO LSP - Cottage Grove LP LSP COTTAGE GROVE COGENERATION FACILITY 9525 105th Street Court South Cottage Grove, Washington County, MN 55016 The emission units,

More information

Site-Specific PM 10 Ambient Air Monitoring Plan

Site-Specific PM 10 Ambient Air Monitoring Plan Site-Specific PM 10 Ambient Air Monitoring Plan Great Plains Sand Processing Facility Wenck File #2771-01 Prepared for: GREAT PLAINS SAND, LLC 15870 Johnson Memorial Drive Jordan, MN 55352 February 2012

More information

Wyodak Power Plant. Chapter 6, Section 2 Construction Permit Application. Submitted to the Wyoming Air Quality Division And Prepared by

Wyodak Power Plant. Chapter 6, Section 2 Construction Permit Application. Submitted to the Wyoming Air Quality Division And Prepared by Wyodak Power Plant Chapter 6, Section 2 Construction Permit Application Submitted to the Wyoming Air Quality Division And Prepared by 1407 West North Temple Salt Lake City, Utah 84116 March 2008 1.0 Introduction

More information