1 W AT E R R E S O U R C E MANAGEMENT PLAN Prepared by June 2017 WT GNV

2 This page left intentionally blank.

3 Contents Acronyms and Abbreviations... VII 1 Introduction Metropolitan North Georgia Water Planning District Overview Integrated Regional Water Resource Planning Plan Update Focus Key Changes in the Plan Developing the Plan Policy Goals Planning Context Plan Coordination Implementing the Plan and Measuring Progress Planning Principles and Management Challenges Planning Principles for the 2017 Plan Update Continuing and Emerging Management Challenges Existing Facilities and Conditions Population Water Supply and Treatment Surface Water Supplies Groundwater Supplies Existing Water Treatment Facilities Non-municipal Permitted Withdrawals Water Conservation Existing Interconnections Wastewater Generation and Treatment Existing Public Wastewater Treatment Facilities Non-Municipal Permitted Wastewater Facilities Existing Septic System Use Basin Return Flow Conditions Assumptions Regarding Septic and LAS returns Reclaimed Water Reuse Existing Interbasin Transfers Watershed Development Drinking Water Supply Watersheds Instream Conditions Surface Water Quality Protected Aquatic Species Future Conditions Population and Employment Projections PAGE I

4 CONTENTS PAGE II 4.2 Water Demand Forecasts Methods Water Demand Forecasts with Enhanced Efficiency Standards and Uncertainty Analysis Wastewater Forecasts Methods Septic System Use Forecasts Wastewater Flows Forecasts Septic System Impact to Wastewater Treatment Facilities Watershed Land Uses Changes Action Items Integrated Water Resource Management Action Items INTEGRATED-1: Coordinated Actions INTEGRATED-2: Local Water Master Plans INTEGRATED-3: Update Local Emergency Water Plans INTEGRATED-4: Local Wastewater Master Plans INTEGRATED-5: Connections To Public Sewer INTEGRATED-6: Source Water Assessment And Protection Program INTEGRATED-7: Water Supply Watershed Protection INTEGRATED-8: Septic System Planning INTEGRATED-9: Septic System Critical Area Management INTEGRATED-10: Septic System Septage Disposal INTEGRATED-11: Septic System Maintenance Education INTEGRATED-12: Private Decentralized Wastewater Systems Ordinance INTEGRATED-13: Corps Reservoirs - Storage, Withdrawals And Returns INTEGRATED-14: Encouraging the Return of Highly Treated Wastewater to the Chattahoochee and Flint Water Supply Planning and Water Conservation Action Items Expanded and New Water Conservation Measures Surface Water Supply Sources by River Basin: 2014 to Planned Planned Reservoirs New and Expanded Water Treatment Facilities WSWC-1: Water Conservation Program WSWC-2: Conservation Pricing WSWC-3: Billing Cycles and Billing System Functionality WSWC-4: Private Fire Lines Metering Requirement WSWC-5: AMI Benefit and Feasibility Studies WSWC-6: Toilet Replacement Program WSWC-7: High-efficiency Toilets and Urinals in Government Buildings WSWC-8: Commercial Water Use Assessments WSWC-9: Pre-rinse Spray Valve Replacement Program WSWC-10: Outdoor Water Requirements for Large Landscapes WSWC-11: State Water Conservation and Drought Response Requirements.5-75 WSWC-12: Require New Car Washes to Recycle Water WSWC-13: Water Waste Policy WSWC-14: Water System Asset Management WSWC-15: Water Loss Control and Reduction WSWC-16: Local Public Education Program Wastewater Action Items

5 5.3.1 Wastewater Infrastructure Plan Wastewater Collection System Inspection and Maintenance Wastewater Treatment Standards WW-1: Enhanced Reliability of Wastewater Pumping Stations WW-2: Sewer System Inventory and Mapping WW-3: Sewer System Maintenance Management WW-4: Sewer System Inspection Program WW-5: Sewer System Rehabilitation Program WW-6: Capacity Certification Program WW-7: Grease Management Program WW-8: Sewer System Overflow Emergency Response Program WW-9: Sewer System Inspection and Maintenance Training WW-10: Local Public Education Program Watershed Management Action Items WATERSHED-1: Post-development Stormwater Management WATERSHED-2: Construction Erosion and Sedimentation Control WATERSHED-3: Floodplain Management WATERSHED-4: Stream Buffer Protection WATERSHED-5: Illicit Discharge Detection and Elimination (IDDE) Program WATERSHED-6: Litter Control WATERSHED-7: Promoting a Green Infrastructure Approach WATERSHED-8: Watershed Improvement Projects WATERSHED-9: Ongoing Stormwater System Management WATERSHED-10: Long-term Ambient Trend Monitoring WATERSHED-11: Macroinvertebrate Bioassessment WATERSHED-12: Local Public Education Program Public Education Public Education Approach Regional Public Education Program Local Public Education Programs Key Public Education Messages and Target Audiences PUBLIC EDUCATION-1: Local Public Education Programs Plan Implementation and Future Plan Evaluation Implementation Actors and Roles Implementation Schedule Technical Assistance Program Implementation Funding Fundamentals of Paying for Capital Projects Options to Pay for Projects Relevant Loan and Grant Program Descriptions Considerations on Which Option to Choose More Implementation Funding Information Future Plan Evaluation Plan Reviews and Updates Plan Accountability and Measuring Progress Conclusions CONTENTS PAGE III

6 CONTENTS Tables 1-1 Local Jurisdictions of the Metropolitan North Georgia Water Planning District 2-1 Continuing and Emerging Management Challenges 3-1 Existing Permitted Surface Water Supply Withdrawals in the District 3-2 Existing Permitted Groundwater Withdrawals (Non-Farm) for Public Water Supply in the District 3-3 Existing Surface Water Treatment Plants in the District 3-4 Non-municipal Surface Water Permitted Withdrawals in the District Excluding Power Generation Sector 3-5 Water Conservation Measures Implemented in the District, Based on Requirements in the 2003 Plan, 2009 Plan Update and 2010 Plan Amendments 3-6 Municipal Permitted Wastewater Treatment Capacity in the District by River Basin 3-7 Municipal Permitted Wastewater Treatment Capacity in the District by County 3-8 Existing Permitted Wastewater Treatment Facilities in the District 3-9 Total Non-Municipal Permitted Wastewater Treatment Capacity in the District by River Basin 3-10 Estimated Number of Existing Septic Systems in the District by County (2013) 3-11 Examples of Non-potable and Planned Indirect Potable Reuse in the District 3-12 Summary of Interbasin Water Transfers for Land Use in the District: Impaired Stream Miles in the District (2014) 3-15 Impaired Streams in the District by Water Quality Parameter (2014) 4-1 Population Projections by County 4-2 Employment Projections by County 4-3 Municipal Water Demand Baseline per County (AAD-MGD) 4-4 Baseline Water Use Profile by County (GPCPD) 4-5 National Average Single Family Indoor Water End Uses Water Research Foundation 4-6 Current Plumbing and Appliance Standards and Estimates of Natural Rate of Plumbing Fixture and Appliance Conversion 4-7 Water Demand Forecasts for the District with Enhanced Efficiency Standards and Uncertainty through Forecasted Septic System Flows by County (AAD-MGD) 4-9 Wastewater Flow Forecasts for Centralized Wastewater Treatment Facilities (AAD) 4-10 Wastewater Flow Forecasts for Centralized Wastewater Treatment Facilities (MMF-MGD) 5-1 Management Options for Septic System Critical Areas 5-2 Surface Water Supply Sources Through Example Sanitary Sewer System Inspection Methods 5-4 Minimum Number of Permanent Stations for Long-Term Trend Monitoring 5-5 Local Public Education Requirements Water Supply and Water Conservation 5-6 Local Public Education Requirements Wastewater Management 5-7 Local Public Education Requirements Watershed Management and Integrated 6-1 Relevant Loan and Grant Programs PAGE IV

7 Figures CONTENTS 1-1 Metropolitan North Georgia Water Planning District 1-2 Metropolitan North Georgia Water Planning District: Major River Basins 1-3 Water Resource Management Integration 1-4 Policy Goals for the Plan Update 1-5 Georgia Water Planning Regions 1-6 Plan Development and Implementation 3-1 District Population: District Per Capita Water Use Trend Non-Municipal Wastewater Facilities in the District - Permitted Capacity Distribution by Sector 3-4 Estimated Percent of Single Family Residences with Septic Systems and Baseline Septic Flows in the District 3-5 Permitted Capacity Distribution of Treated Wastewater Flows in the District (2015) 3-6 Changes in Runoff and Hydrology Due to Development 3-7 Land Cover in the District, 1974 and Land Use in the District: Source Water Supply Watersheds for the District 4-1 DSS Model Overview 4-2 Water System Diagram 4-3 Water Use Profile, District Baseline 4-4 County-Level Water Use Profiles, District Baseline 4-5 Single Family End Uses, District Baseline 4-6 Toilet Fixture Estimates by County, District Baseline 4-7 Comparison of Water Demand Forecasts for the District 4-8 Wastewater Flow Calculation 4-9 Unified Growth Policy Map, The Atlanta Region s Plan 5-1 Planned Water Supply Sources to Meet 2050 Water Demands Metro Water District 5-2 Public Education Approach Appendixes A River Basin Profiles B County-Level Summaries C Local Public Education Programs: Activities, Key Education Focus Areas and Target Audiences PAGE V

8 CONTENTS This page left intentionally blank. PAGE VI

9 Acronyms and Abbreviations AAD AMI ARC ATS AWRF AWWA BAC BFE CCR CDBG CH2M CID CLUP CMMS CMOM CRS CWSRF District DSS DWSRF EPA EPC FEMA FIRM FMA FOG GADNR annual average day Advanced Metering Infrastructure Atlanta Regional Commission advanced treatment system Advanced Water Reclamation Facility American Water Works Association Basin Advisory Council base flood elevation Consumer Confidence Report Community Development Block Grant CH2M HILL Engineers, Inc. Community Improvement District Comprehensive Land Use Plan Computerized Maintenance Management System Capacity Management Operations and Maintenance Community Rating System Clean Water State Revolving Fund Metropolitan North Georgia Water Planning District Decision Support System Drinking Water State Revolving Fund U.S. Environmental Protection Agency energy performance contracting Federal Emergency Management Agency Flood Insurance Rate Map Flood Mitigation Assistance fats, oils and grease Georgia Department of Natural Resources PAGE VII

10 ACRONYMS AND ABBREVIATIONS GADPH GAWP GEFA GEMA Georgia DCA Georgia EPD Georgia SWCC GESA GIS GLCP GPCPD gpf gpm GSMM I/I IDDE IPaC IRT IWA LAS LCI LIA MaP mg/l MGD MMF MPO MS4 NA NFIP NPDES NRW O.C.G.A. OPB PAGE VIII Georgia Department of Public Health Georgia Association of Water Professionals Georgia Environmental Finance Authority Georgia Emergency Management Agency Georgia Department of Community Affairs Georgia Environmental Protection Division Georgia Soil and Water Conservation Commission Georgia Erosion and Sedimentation Act Geographical Information System Georgia Land Conservation Program gallons per capita per day gallon(s) per flush gallon(s) per minute Georgia Stormwater Management Manual infiltration/inflow Illicit Discharge Detection and Elimination Information for Planning and Conservation interconnection reliability target International Water Association land application system Livable Centers Initiative Local Issuing Authority Maximum Performance milligrams per liter million gallon(s) per day maximum month flow Metropolitan Planning Organization Municipal Separate Stormwater Sewer not available National Flood Insurance Program National Pollutant Discharge Elimination System non-revenue water Official Code of Georgia Annotated Office of Planning and Budget

11 ACRONYMS AND ABBREVIATIONS P3 PDM PEP Plan RAD REMI SOP SPOLST SQAP SRF SSO SWAP TAD TCC TECP TMDL USDA USEDA USHUD UV WIFIA WIP WPCP WRC WRF WTP WWTP public private partnership Pre-Disaster Mitigation Population Estimates Program Water Resource Management Plan Research and Analytics Division Regional Econometric Models Inc. standard operating procedure Special Purpose Local Option Sales Tax Sampling Quality Assurance Plan state revolving fund sanitary sewer overflow Source Water Assessment Plan tax allocation district Technical Coordinating Committee tax-exempt commercial paper total maximum daily load U.S. Department of Agriculture U.S. Economic Development Administration U.S. Department of Housing and Urban Development ultraviolet Water Infrastructure Finance and Innovation Act watershed improvement project Water Pollution Control Plant Water Reclamation Center Water Reclamation Facility water treatment plant wastewater treatment plant PAGE IX

12 ACRONYMS AND ABBREVIATIONS This page left intentionally blank. PAGE X

13 SECTION 1 Introduction This Water Resource Management Plan (Plan) presents an integrated approach to water resource management for the 15-county Metropolitan North Georgia Water Planning District (the District). The Plan brings together in one document the plans for Water Supply and Conservation, Wastewater Management and Watershed Management for the region. It describes existing conditions and projects future conditions of the region s water resources and its water, wastewater and watershed management infrastructure. This Plan is driven by science, data and good stewardship, and it promotes the protection of water resources for the purposes of supply, quality and recreation in the region and downstream. The Plan prescribes water resource management strategies that support the region s economic, environmental and social well-being. 1.1 Metropolitan North Georgia Water Planning District Overview The District was created by the Georgia General Assembly in 2001 (Official Code of Georgia Annotated [O.C.G.A.] ) in order to preserve and protect water resources in the 15-county metropolitan Atlanta area. The District is charged with developing comprehensive regional and watershedspecific water resource management plans to be implemented by local governments. The District s purpose is to establish policy, create plans and promote inter-governmental coordination of water issues from a regional perspective. The District s planning efforts provide local jurisdictions and state officials with recommended actions, policies and investments for water supply and water conservation, wastewater management and watershed management activities. The District includes 15 counties (Bartow, Cherokee, Clayton, Cobb, Coweta, DeKalb, Douglas, Fayette, Forsyth, Fulton, Gwinnett, Hall, Henry, Paulding and Rockdale) as well as 93 municipalities partially or fully within these counties (Figure 1-1). The District also has seven authorities that currently provide water, wastewater and/or stormwater services. Table 1-1 provides a list of the local jurisdictions that make up the District. The District s plans and policies work to protect water resources in the Chattahoochee, Coosa/Etowah, Flint, Ocmulgee, Oconee and Tallapoosa River Basins (Figure 1-2). The District started in 2001 as the first regional water planning organization in the state. With the adoption of the Georgia State-wide Water Management Plan by the Georgia General Assembly in 2008, the District became one of eleven regional Water Planning Councils in the state and conducts its planning within the framework of the state s regional water planning process. The District follows the guidance of Georgia Environmental Protection Division (Georgia EPD) for the regional water planning process and also, more specific guidance from Georgia EPD for planning in the District. The District also considers the most recent water resource assessment information developed in the regional water planning process. The District issued its first water resource management plan documents in At that time, the District issued three separate plans: Water Supply and Water Conservation, Wastewater Management and Watershed Management. These plans were updated by the District in This updated Plan combines the three separate plan documents into one comprehensive plan to highlight the interrelationships between approaches to water, wastewater and watershed management. PAGE 1-1

14 SECTION 1 INTRODUCTION Figure 1-1. Metropolitan North Georgia Water Planning District PAGE 1-2

15 SECTION 1 INTRODUCTION Table 1-1. Local Jurisdictions of the Metropolitan North Georgia Water Planning District Counties Bartow County Coweta County Forsyth County Henry County Cherokee County DeKalb County Fulton County Paulding County Clayton County Douglas County Gwinnett County Rockdale County Cobb County Fayette County Hall County Municipalities Acworth Dallas Kennesaw Rest Haven Adairsville Decatur Kingston Riverdale Alpharetta Doraville Lake City Roswell Atlanta Douglasville Lawrenceville Sandy Springs Auburn Duluth Lilburn Senoia Austell Dunwoody Lithonia Sharpsburg Avondale Estates East Point Locust Grove Smyrna Ball Ground Emerson Lovejoy Snellville Berkeley Lake Euharlee Lula Stockbridge Braswell Fairburn Marietta Stone Mountain Brookhaven Fayetteville McDonough Sugar Hill Brooks Flowery Branch Milton Suwanee Buford Forest Park Moreland Taylorsville Canton Gainesville Morrow Tucker Cartersville Gillsville Mountain Park Turin Chamblee Grantville Nelson Tyrone Chattahoochee Hills Grayson Newnan Union City Clarkston Hampton Norcross Villa Rica Clermont Hapeville Oakwood Waleska College Park Haralson Palmetto White Conyers Hiram Peachtree City Woodstock Cumming Holly Springs Peachtree Corners Woolsey Dacula Johns Creek Pine Lake Jonesboro Powder Springs Authorities Cherokee County Water and Sewerage Authority Clayton County Water Authority Cobb County-Marietta Water Authority Coweta County Water and Sewerage Authority Douglasville-Douglas County Water and Sewer Authority Henry County Water Authority Peachtree City Water and Sewerage Authority PAGE 1-3

16 SECTION 1 INTRODUCTION Figure 1-2. Metropolitan North Georgia Water Planning District: Major River Basins PAGE 1-4

17 1.2 Integrated Regional Water Resource Planning SECTION 1 INTRODUCTION The District recognizes that water resource planning management is most effective when it addresses the interrelationships among water resource management strategies. Planning must address current and future needs while considering implications for water supply, treatment, reuse, watershed health, water quality, instream flows, community well-being and fiscal conditions. Integrated planning and management decisions consider the entire system and long-term impacts, because decisions based on only a single point or component in the water management cycle can have unexpected consequences elsewhere (Patwardhan et al., 2007). Integrated water resource planning supports sustainable management that facilitates long-term planning, promotes consistency and efficiency, optimizes uses of the water system, encourages and facilitates regional planning, provides flexible solutions and enhances communication and community support (Freas et al., 2008). In 2014, the District s Technical Coordinating Committee (TCC) created an Integrated Water Planning Working Group to assess how to advance the integration of the District s water resource planning in this Plan Update. This working group developed the following guidance on integrated water resource planning for the District: The District s approach to water resource plan integration seeks to understand the range of needs, requirements and other policy drivers concerning the management of the water resources systems that we rely on. When appropriate, integrated water resource planning uses adaptive management and technical analyses to encourage actions designed to achieve multiple benefits or outcomes. The working group noted that water resource systems include water supply, water quality, and water resource facilities and infrastructure. Figure 1-3 illustrates the complexity and scope of water resource management. Through an integrated approach, the District seeks to develop a plan that recognizes and addresses the inter-relationships among water resources related goals, strategies, and outcomes. In doing so, the District seeks to attain the following benefits of integrated water resource planning delineated by the working group: Identify a clear path to multiple benefits Recognize water resource system interrelationships, including cross-jurisdictional connections Create opportunities to optimize expenditures and resources Drive cost-effective implementation Highlight potential unintended consequences Avoid redundancies To integrate water resource planning in the District, this Plan Update includes and combines the District s plans for Water Supply and Water Conservation, Wastewater Management and Watershed Management. It emphasizes the connections in management approaches and reduces redundancy. It considers the interrelationships among its strategies and their impacts, and it supports collaborative implementation that broadens traditional organizational roles. With the integrated Plan, the District can also comprehensively implement shared strategies for public education, technical assistance for member jurisdictions and plan evaluation. PAGE 1-5

18 SECTION 1 INTRODUCTION 1.3 Plan Update Focus Figure 1-3. Water Resource Management Integration While the primary focus of the 2017 Plan Update is the integration of the previous plans into one comprehensive document, other major areas of focus include the following: Updated water demand and wastewater flow forecasts based on current usage patterns, revised population and employment projections, changes in state requirements and building codes that affect water use and implementation of the region s water conservation and efficiency program Enhanced strategies that maintain the region as a national leader in water conservation and efficiency, with specific consideration of the potential role of commercial water users in water supply and water conservation programs Improved efforts to promote management of septic systems across the District to protect water quality and public health PAGE 1-6

19 SECTION 1 INTRODUCTION Better alignment of the watershed management Action Items with existing federal stormwater management programs (that is, National Pollutant Discharge Elimination System [NPDES] Municipal Separate Stormwater Sewer [MS4]) to reduce duplication of effort and simplify implementation Improved design of public education requirements to better match the range of community sizes in the District Identification of new information on sources of financing for implementation Coordination of planning with the State Water Plan and the Regional Water Plans of neighboring regional Water Planning Councils 1.4 Key Changes in the Plan The shift to an integrated plan significantly changes the organization of the previous plans of the District. The most obvious change is the consolidation of three documents into one. In this consolidation, several sections from the three 2009 Plans are now presented as integrated sections in this Plan, including: Existing Facilities and Conditions Future Conditions Public Education Plan Implementation and Evaluation Other major changes to the Plan include the following: A new section that combines multiple sections from the 2009 Plan documents to describe planning principles as well as continuing and emerging water resource management challenges A new set of Integrated Water Resource Management Action Items that supports multiple planning areas, in addition to the individual and distinct Action Items for Water Supply and Water Conservation, Wastewater Management, Watershed Management and Public Education Integrated county level summaries with information on water and wastewater infrastructure (Appendix B, formerly Appendix B in the 2009 Water Supply and Water Conservation and Wastewater Management Plans) This Plan has been streamlined to simplify the document. Some material included in the previous plans is now available in separate documents, available by hyperlink in the electronic version ( including: Model ordinances Policy recommendations Additional information on financing options for implementation 1.5 Developing the Plan The Plan was developed through a stakeholder approach envisioned by the District s enabling legislation. The primary participants include: Governing Board: The 26-member Governing Board is the decision making body for the District. The Board includes 16 elected representatives from member jurisdictions and 10 citizen members. Basin Advisory Councils (BACs): The BACs are composed of basin stakeholders including water professionals, business leaders, environmental advocates and other interested individuals and groups. Six BACs represent the Chattahoochee, Coosa/Etowah, Flint, Ocmulgee and Oconee River Basins and the Lake PAGE 1-7

20 SECTION 1 INTRODUCTION Lanier Basin. The BACs advise in the development and implementation of policy related to basin-specific issues and provide input on plan content to the Governing Board, TCC and District staff. TCC: The TCC members are primarily local government officials and staff from counties, cities and authorities in the District. The TCC provides planning and policy support to the Governing Board and staff in the areas of water supply and conservation, wastewater management, stormwater and watershed management, septic systems and public education. The planning process relies on local jurisdictions, the Governing Board, the BACs and the TCC for direction and input. The process also receives support and guidance from Georgia EPD, planning staff for the District and technical consulting firms. This document is the second update of the initial plans of the District. The District s enabling legislation requires the update of its plans for Water Supply and Water Conservation, Wastewater Management and Watershed Management no less frequently than every five years after finalization of the initial plan (O.C.G.A to 584). The timing of this update was delayed slightly, with approval from Georgia EPD, to improve coordination with the planning cycle for neighboring regional Water Planning Councils. The update process included a full review of the 2009 plans and consideration of changes in regional conditions and applicable law and regulations since that time. New forecasts for population and employment, water demands and wastewater flows and updated projections for regional land use informed the update process. The process provided for public involvement at the BAC meetings and through a formal public review period for the draft plan Policy Goals The District planning process is driven by policy goals that were initially developed and adopted in As a part of the update process, the goals were revisited in a series of structured discussions in 2014 with the TCC, BACs and Governing Board, and the goals were refined based on their input. The revised policy goals guided decision making and helped to ensure consistency of purpose for the Plan Update (Figure 1-4). More discussion of the policy goals and planning principles can be found in Section 2. PAGE 1-8

21 SECTION 1 INTRODUCTION Planning Context Figure 1-4. Policy Goals for the Plan Update Local governments in the District are required to comply with many federal and state laws and regulations related to water resource management. These laws and regulations generally concern water supply, water treatment, water conservation, wastewater treatment, wastewater discharge and stormwater management. Other related regulatory requirements address water quality, endangered and threatened species protection, wetlands protection, dam safety and flood insurance. This Plan is coordinated and consistent with the regulatory programs that affect its member jurisdictions. The Action Items are designed to facilitate their compliance with federal and state regulatory programs. Moreover, this Plan fulfills the requirements of the state laws, regulations, and implementation guidance that govern the District. The District maintains a record of its compliance with these requirements, and Georgia EPD confirms the District s compliance through its review of the Plan and its involvement in the planning process Plan Coordination The District coordinates its planning with other regional and water resource planning efforts to ensure that plans are complementary and that shared goals can be realized effectively. For this update, the District coordinated with two other planning efforts: the Atlanta Region s Plan, developed by Atlanta Regional Commission (ARC), and the regional water plans developed by regional Water Planning Councils that share water resources with the District. PAGE 1-9

22 SECTION 1 INTRODUCTION Developed by ARC, the Atlanta Region s Plan is directed toward ensuring growth, prosperity and a high quality of life in the metropolitan region for the next 25 years. It focuses on a vision for the region that features world-class infrastructure, a competitive economy and healthy, livable communities. The plan addresses a broad range of regional resources and needs including transportation, land use, water quality, workforce development, aging and health resources, and arts and culture. The District has coordinated closely with ARC to ensure that their regional plans share goals and strategies. For example, both plans highlight stormwater management and green infrastructure principles as important strategies. Coordination of these planning processes resulted in collaboration between the District s watershed management strategy and the Atlanta Region s Plan updates on land use, regional resources and transportation. Both plans promote watershed improvement as a part of transportation and economic development projects to support sustainable outcomes. Development of this Plan was also coordinated with regional water planning conducted outside of the District. The adoption of the Georgia State-wide Water Management Plan by the Georgia General Assembly in 2008 led to the creation of new regional Water Planning Councils around the state, and the District is now one of eleven regional Water Planning Councils in Georgia. Figure 1-5 shows the state s water planning regions and shows that the District is in the headwaters of six river basins. The District conducts its planning within the framework of Georgia s regional water planning process. Georgia EPD has established criteria for regional water plans, and the District ensures compliance with these criteria. The District uses the surface water availability, groundwater availability and water quality resource assessments that are conducted by Georgia EPD for the regional water planning process. The District has also reviewed the plans of regional Water Planning Councils with which it shares water resources, including the Upper Flint, Lower Flint-Ochlockonee, Middle Chattahoochee, Coosa-North Georgia, Middle Ocmulgee, Upper Oconee, Coastal and Altamaha Regional Water Councils. Moreover, the District invited those Councils to review this Plan. As of the development of this Plan, the regional Water Planning Councils outside of the District are updating their regional water plans with a targeted adoption of the updated plans in June PAGE 1-10

23 SECTION 1 INTRODUCTION Figure 1-5. Georgia Water Planning Regions PAGE 1-11

24 SECTION 1 INTRODUCTION 1.6 Implementing the Plan and Measuring Progress The District, Georgia EPD and local governments all play important roles in implementing this Plan, as illustrated on Figure 1-6. The District develops the Plan. It is implemented by local jurisdictions, which are required to comply with it. Georgia EPD enforces the Plan s provisions through an auditing and permitting process. For example, local jurisdictions must demonstrate compliance with the Plan in order to obtain permits for new or expanded water withdrawals or wastewater discharges and renewal of NPDES MS4 permits. Furthermore, consistency with Plan requirements is necessary to obtain Georgia Environmental Finance Authority (GEFA) grant or loan funding for water projects. Implementation progress is tracked in two ways. First, local jurisdictions are audited on a recurring basis by Georgia EPD to ensure local compliance with the Plan. Second, the District periodically surveys implementation progress by local jurisdictions. These implementation surveys are typically conducted on an annual basis. Figure 1-6. Plan Development and Implementation Through its implementation surveys, the District has documented the following achievements in the region: The Toilet Rebate program has supported the replacement of over 120,000 toilets with high-efficiency toilets. Water savings from this program are estimated to be over 860,000,000 gallons per year. 100 percent of water providers in the District have multi-tiered conservation rate structures that encourage water conservation by their residential customers. Local utilities have distributed over 200,000 door hangers since 2010 to educate residents on the negative impacts of fats, oils and grease (FOG) in sewer pipes. Grease-related sewer overflows have decreased by 55 percent since Most local jurisdictions have adopted one or more of the following model ordinances (or equivalent regulations) that protect the region s watersheds: Post-Development Stormwater Management, Stream Buffer Protection, Illicit Discharge and Illegal Connection, Floodplain Management and Litter Control. The most recent implementation survey was conducted by the District in early 2015 to evaluate 2014 implementation progress. Details about implementation to date can be found on the District website. The next survey of implementation will be conducted in early 2017 to assess 2016 implementation progress. With regular efforts to measure implementation, the District is able to evaluate whether its goals for the region s water resources are being attained. Tracking implementation also provides the documentation needed to support timely and effective updates of this Plan. More discussion of the measurement of implementation progress can be found in Section 6 of this document. PAGE 1-12

25 SECTION 2 Planning Principles and Management Challenges This purpose of this section is to describe the factors that guided decision making in the Plan Update process. It describes the planning principles that directed the process generally and in specific areas of the Plan, and it describes existing and emerging challenges for the region s water resource managers. The Plan seeks to provide an approach that is consistent with the planning principles and addresses the management challenges. 2.1 Planning Principles for the 2017 Plan Update In preparation for the 2017 Plan Update, the TCC, BACs and Governing Board discussed the District s goals and objectives for the planning process in a series of structured discussions in Through these discussions, the stakeholders and District leaders provided valuable input from a broad range of perspectives. This input was used to identify planning principles and areas of focus for the Plan Update process, and it also helped to refine the over-arching policy goals. As discussed in Section 1, the Plan Update process was driven by the District s policy goals, which were initially developed and adopted in 2002 and refined for the plan update process based on input from stakeholders. The following policy goals guide decision making for the District and help ensure consistency of purpose for the Plan (see Figure 1-3): Protect Water Quality and Public Water Supplies Support Conservation and/or Demand Management Support Economic Growth and Development Equitably Distribute Benefits and Costs Promote Public Education and Awareness Facilitate Implementation Improve Resiliency In addition to the policy goals, a key area of focus in the Plan Update process was integration of the water, wastewater and watershed management plans in this update. An integrated planning approach was adopted to support consideration of the inter-relationships among management strategies and their impacts. More discussion of Plan integration can be found in Section 1.2. While the policy goals and the focus on integration drove decision making overall, more specific principles helped to guide the design and selection of Action Items. Some of these planning principles apply broadly, while others are specific to particular sections of the Plan, as noted below: Maximize the use of existing sources and facilities: Water supply sources and water and wastewater treatment facilities are major investments for local jurisdictions. Using existing sources and facilities is cost-effective and generally has the least adverse environmental impact. Increase water conservation and efficiency: The need for additional future water supply and treatment capacity can be reduced by increasing efficiency and reducing waste and loss. Demand management and supply efficiency are often more cost-effective than developing new water supplies. PAGE 2-1

26 SECTION 2 PLANNING PRINCIPLES AND MANAGEMENT CHALLENGES Best Practices for non-potable reuse: The District discourages non-potable reuse when its application increases net water use. However, the District recognizes a number of best practices for non-potable reuse that can help extend the life of water supplies (see box at right). Consider return flows: Local wastewater providers should consider the need for returns of highly treated wastewater to local water bodies within the basin of origin as well as opportunities to enhance available water supplies through indirect potable reuse and the generation of made inflows to federal reservoirs (see box at right). GAEPD s planning guidance for this Plan further states that returning highly treated wastewater to Lake Lanier and Allatoona Lake (and their watersheds) and to the Upper Flint River Basin shall be encouraged, where feasible, to support long-term sustainable water use from these basins. Make appropriate use of reclaimed water: The use of highly treated wastewater for indirect potable reuse and non-potable reuse plays an important role in sustaining the District s potable water supplies. Maximizing return flows to local water supply sources is encouraged when feasible. This Plan has a strong focus on indirect potable reuse returns to the river basins and lakes that provide the District's water supplies. The District s policy on the use of reclaimed water is explained in more detail in the box on the right. Continue to protect water quality: Water quality protection is essential to ensuring the quality and availability of existing and future drinking water supplies, in-stream aquatic health, recreational opportunities and availability of wastewater assimilative capacity. Support adoption of advanced treatment technologies: New technologies will advance our abilities to augment water Non-Potable Reuse Policy: With respect to non-potable reuse, this Plan generally sets a preference for return flows to local water supply sources where assimilative capacities are available. While other areas of the country seek to maximize non-potable reuse for a variety of uses, including irrigation, the District must balance its own needs with the needs of instream water quality and downstream uses. While non-potable reuse water is currently offered by a small number of utilities in the District, usually for irrigation, the District discourages these and other uses when they increase net water use. However, some non-potable reuse may reduce demand and extend the life of surface water supplies. Therefore, the District recognizes the following forms of non-potable reuse as best practices: Flushing toilets and urinals Irrigation, when offsetting an existing potable water supply source and combined with a conservation pricing strategy Industrial reuse opportunities (cooling towers, boilers, noncontact cooling water) Commercial reuse opportunities (car washes, construction) Greywater, another form of reuse, may also provide additional opportunities. In accordance with current state plumbing code, greywater may be used only for flushing toilets and urinals and for subsurface irrigation. Return Flows, Indirect Potable Reuse and Water Supply Augmentation in Allatoona Lake and Lake Lanier: Return flows play a critical role in maintaining stream flows and in augmenting available water supplies through indirect potable reuse. In the District, indirect potable reuse occurs when water is returned to a river above a downstream water supply intake and when water is returned to a storage reservoir for later withdrawal. Certain return flows to federal storage reservoirs (e.g., Allatoona Lake and Lake Lanier) may qualify as made inflows to a reservoir, which are defined by the Georgia Department of Natural Resources (GADNR) to include both wastewater effluent return flows discharged to increase flows to the reservoir and water that flows into a reservoir after being released from another storage project upstream. A GADNR rule authorizes the GAEPD Director to allocate made inflows to the federal reservoirs to specific users that have contracted for storage in the federal project. Indirect potable reuse and made inflows to federal reservoirs are an important part of Metro Atlanta s long-term water supply plan. The degree to which such flows can be used for indirect potable reuse to increase the total available water supply for Metro Atlanta, however, depends to a significant degree on the U.S. Army Corps of Engineers crediting made inflows in a manner consistent with Georgia law. Assuming the U.S. Army Corps of Engineers takes steps to do so in the future, then for many users the best alternative to increase supply will be to increase returns. Because substantial investments are needed to return water to federal storage projects, however, this alternative will rarely make sense for any jurisdiction that is not permitted to store and use the water it returns. PAGE 2-2

27 SECTION 2 PLANNING PRINCIPLES AND MANAGEMENT CHALLENGES supplies, ensure safe drinking water and reduce pollutant loadings to our waterbodies. Promote maintenance of decentralized wastewater systems: Recognizing the need to promote return flows and reuse, land application systems (LASs) can offer a viable wastewater treatment method in certain local jurisdictions in the District. Septic systems are also viable wastewater treatment methods across the District. In both instances, however, long-term maintenance of these facilities must be adequate to ensure protection of water quality. Reduce wastewater treatment facility influent variability: Dramatic changes in wastewater influent can cause difficulties for treatment facilities, especially smaller facilities. Practices that reduce variability, such as pre-treatment, septage disposal planning and fats, rags, oils and grease control programs help to protect wastewater treatment facility operations and water quality. Enhance reliability of wastewater pumping stations: Consistent and uninterrupted performance of wastewater pumping stations is critical to protecting water quality. Appropriate measures should be taken to ensure reliability and redundancy, in order to avoid and minimize overflows and discharges of untreated and partially treated wastewater. Promote green infrastructure approaches: Green infrastructure approaches use networks of vegetated, open lands and engineered structures to promote infiltration of rainfall and runoff. The benefits of a green infrastructure approach can include water quality, air quality, flood risk reduction, property value improvement, economic growth, public health, recreation, community revitalization, quality of life, urban heat island reduction and urban agriculture opportunities. Ensure consistency with existing regulatory programs: To facilitate implementation, the Action Items should be designed to promote consistency of this Plan with the requirements of existing regulatory programs. 2.2 Continuing and Emerging Management Challenges The District serves the metropolitan Atlanta region, which is the largest population center in the southeast United States. Water resources are critically important to the region s economic vitality and quality of life. The region lies in the headwaters of six major river basins, where natural surface water sources are small relative to other major metropolitan areas and in need of a high level of protection. Population growth in the region creates demand on the available water supplies while increasing the volume of treated wastewater discharged to the region s rivers, lakes and streams. At the same time, development associated with this growth has impacted watersheds by changing the peak rates, volume, velocity, timing and quality of stormwater runoff. The District faces a number of water resource management challenges as it seeks to balance the needs of its communities with the needs of downstream users and instream aquatic health. Continuing and emerging management challenges are summarized in Table 2-1. The table briefly describes the challenges, discusses integrated management considerations and indicates provisions of this Plan that address each challenge. These management challenges influenced priorities for the Plan Update. Some challenges are not new to the region, and this Plan seeks to continue to improve efforts to overcome them. Other challenges are new and require new areas of focus in planning and management. Many of these challenges are long-term concerns that will require continued and concerted efforts to address and ensure that they are managed for sustainable outcomes for the region s economic, environmental and social wellbeing. This Plan and its Action Items have been developed to help address these key water resource management challenges for the region. PAGE 2-3

28 SECTION 2 PLANNING PRINCIPLES AND MANAGEMENT CHALLENGES Table 2-1. Continuing and Emerging Management Challenges Management Challenge Integrated Management Considerations Action Items that Address this Challenge Consumptive Use: Water use is consumptive when it decreases the amount of water that is returned to surface waters. The District seeks to minimize consumptive uses to the extent possible, while also balancing other goals and considerations. In-stream Flows: Water withdrawals affect downstream flows, and without management of withdrawal quantities, detrimental impacts to natural aquatic habitats and downstream users can occur. PAGE 2-4 Management of consumptive use must consider demands on the water source, returns of treated wastewater to that source, demand management, distribution and collection system infrastructure, and septic system and LAS use. In-stream flows affect both water availability and water quality, and management must consider the impacts of development and withdrawals on watershed hydrology and returns of treated wastewater. INTEGRATED-2: Local Water Master Plans INTEGRATED-4 Local Wastewater Master Plans INTEGRATED-5 Connections to Public Sewer INTEGRATED-8 Septic System Planning INTEGRATED-12 Private Decentralized Wastewater Systems Ordinance WSWC-1 Water Conservation Program WSWC-2 Conservation Pricing WSWC-3 Billing Cycles and Billing System Functionality WSWC-4 Private Fire Lines Metering Requirement WSWC-5 AMI Benefit and Feasibility Studies WSWC-6 Toilet Replacement Program WSWC-7 High-Efficiency Toilets and Urinals in Government Buildings WSWC-8 Commercial Water Use Assessments WSWC-9 Pre-Rinse Spray Valve Replacement Program WSWC-11 State Water Conservation and Drought Response Requirements (rain sensor requirements) WSWC-14 Water System Asset Management WSWC-16 Local Public Education Program WSWC-1 Water Conservation Program WSWC-2 Conservation Pricing WSWC-3 Billing Cycles and Billing System Functionality WSWC-4 Private Fire Lines Metering Requirement WSWC-5 AMI Benefit and Feasibility Studies WSWC-6 Toilet Replacement Program WSWC-7 High-Efficiency Toilets and Urinals in Government Buildings WSWC-8 Commercial Water Use Assessments WSWC-11 State Water Conservation and Drought Response Requirements WSWC-14 Water System Asset Management WSWC-16 Local Public Education Program WATERSHED-7 Promoting a Green Infrastructure Approach WATERSHED-8 Watershed Improvement Projects

29 SECTION 2 PLANNING PRINCIPLES AND MANAGEMENT CHALLENGES Table 2-1. Continuing and Emerging Management Challenges Management Challenge Integrated Management Considerations Action Items that Address this Challenge Septic Systems: To a varying degree, septic systems are used by single-family housing units in every county in the District. While septic systems can provide a workable alternative for wastewater management in areas without sewer, they require coordinated planning and education to ensure maintenance and prevent failure. Septage Disposal: Illegal or improper septage disposal can negatively impact local water quality and disrupt operations at wastewater treatment facilities. Local planning is needed to provide for the capacity and procedures for proper disposal. Emergency Water Supplies: Sound planning is important to reduce the vulnerability of local water infrastructure to unplanned events. Drought Response: Recent droughts have constrained water availability, and some communities have experienced low reservoir levels. Drought preparedness and response planning are important to mitigating adverse impacts and ensuring reliable water supplies. Climate variability projections indicate that drought may become more frequent and severe in the region in the future. Water Treatment Standards: Recent and anticipated future regulatory changes are resulting in more stringent water treatment standards that require new capital investments and compliance activities by local water systems. Chemicals of Concern: The U.S. Environmental Protection Agency (EPA) tracks a wide range of chemicals and microorganisms that are not presently regulated, but that might pose a risk to drinking water and public health (that is, pharmaceuticals, personal care products, endocrine disrupting compounds). If these chemicals are regulated in the future, adoption of advanced treatment techniques, such as ultraviolet (UV) disinfection, Septic systems must be managed to address potential water quality concerns. Septic system management requires coordination and cooperation across multiple entities to address integrated issues. Septage disposal needs to be considered in wastewater master planning to ensure adequate capacity for proper disposal. Coordination and cooperation across multiple entities will be needed to develop effective local septage management plans. The impacts of unexpected events on water supplies and water quality can be mitigated through planning and preparation. Droughts affect water supplies, instream flows and water quality. During droughts, wastewater facility influent can be adversely affected by reduced levels of water entering the collection system as a result of decreased water use. Instream assimilative capacity may be limited by low flows. Water treatment needs depend, in part, on the water quality of the supply source, and therefore, drinking water supply protection and watershed management are closely related to water treatment needs. Management of chemicals of concern requires consideration of treatment issues in both water and wastewater systems, as well as prevention of disposal in the wastewater collection system where possible. INTEGRATED-5 Sewer System Rehabilitation Program INTEGRATED-8 Septic System Planning INTEGRATED-9 Septic System Critical Area Management INTEGRATED-10 Septic System Septage Disposal INTEGRATED-11 Septic System Maintenance Education INTEGRATED-12 Private Decentralized Wastewater Systems Ordinance INTEGRATED-10 Septic System Septage Disposal INTEGRATED-3 Update Local Emergency Water Plans WSWC-11 State Water Conservation and Drought Response Requirements INTEGRATED-2 Local Water Master Plans The Public Education Section addresses public awareness about proper disposal of pharmaceuticals and household chemicals in order to reduce their disposal to the sanitary sewer waste stream and, ultimately, source water supplies. PAGE 2-5

30 SECTION 2 PLANNING PRINCIPLES AND MANAGEMENT CHALLENGES Table 2-1. Continuing and Emerging Management Challenges Management Challenge Integrated Management Considerations Action Items that Address this Challenge nanofiltration or reverse osmosis membranes, may be necessary. Sedimentation of Stream and River Intakes: Sediment entrainment at pump intakes is caused by erosion and high sediment loads within the contributing watershed. It can cause water supply interruptions and higher operating costs. Wastewater Treatment Standards and Performance: Treating a growing volume of wastewater under conditions of limited available assimilative capacity and meeting future requirements for the removal of ammonia, total nitrogen and phosphorus will require adoption of advanced treatment technologies and high levels of treatment plant reliability. Biological Loading: Wastewater treatment plants (WWTPs) in the region have experienced higher influent concentrations of biological components (that is, biochemical oxygen demand, volatile suspended solids, ammonia). Increased biological loading has required many local wastewater providers to plan for and implement upgrades and expansions at their treatment facilities. Wastewater Collection System Maintenance: Potential problems with sewer systems can be caused by inflow and infiltration and improper disposal of fats, oils, grease and rags. In some areas, capacity can be strained by new development. Proactive planning, design, inspections and maintenance are needed to minimize potential problems, including sanitary sewer overflows (SSOs). Private Wastewater Facilities: Of the 155 wastewater treatment facilities in the District, 96 are privately owned. The protection of water supplies and intakes from excess sediment relies upon effective implementation of watershed management and stormwater programs. Wastewater treatment performance and reliability are important for water quality protection and source water supply protection, and therefore, its management requires consideration of water and wastewater treatment needs. Wastewater facility planning must consider a number of integrated factors related to the above trends, including: the impacts of water conservation and septage disposal on the biological loading of incoming wastewater. Leaking or overflowing collection systems contribute to water quality issues impacting downstream water supplies and assimilative capacity. Although the total volume of water treated by private wastewater facilities is very small relative WATERSHED-1 Post-development Stormwater Management WATERSHED-2 Construction Erosion and Sedimentation Control WATERSHED-4 Stream Buffer Protection WATERSHED-7 Promoting a Green Infrastructure Approach WATERSHED-12 Local Public Education Program The Public Education Section targets increased awareness of sedimentation and erosion control requirements among citizens, elected officials and developers. WW-1 Enhanced Reliability of Wastewater Pumping Stations INTEGRATED-4 Local Wastewater Master Plans INTEGRATED-10 Septic System Septage Disposal WW-2 Sewer System Inventory and Mapping WW-3 Sewer System Maintenance Management WW-4 Sewer System Inspection Program WW-5 Sewer System Rehabilitation Program WW-6 Capacity Certification Program WW-7 Grease Management Program WW-8 Sewer System Overflow Emergency Response Program WW-9 Sewer System Inspection and Maintenance Training The Public Education Section emphasizes the need for public awareness of proper fats, oils, grease and rags disposal. INTEGRATED-5 Connections to Public Sewer PAGE 2-6

31 SECTION 2 PLANNING PRINCIPLES AND MANAGEMENT CHALLENGES Table 2-1. Continuing and Emerging Management Challenges Management Challenge Integrated Management Considerations Action Items that Address this Challenge Most of these private systems treat small volumes of wastewater. They are subject to high unit costs, lack of staffing and concerns about performance reliability. to other wastewater facilities in the District, many small private wastewater systems are LAS, and therefore contribute to consumptive use of water. INTEGRATED-12 Private Decentralized Wastewater Systems Ordinance Residuals Disposal: Transport and disposal of wastewater biosolids residuals is a costly management concern as requirements are tightened and options for disposal are often limited. Additionally, advanced treatment of nutrients is resulting in increased volumes of biosolids. Limited Assimilative Capacity: In some parts of the region, the assimilative capacity of surface waters to receive treated wastewater without exceeding water quality standards is limited. A lack of assimilative capacity can require high levels of wastewater treatment and drive treatment toward land application and septic systems. Total Maximum Daily Loads (TMDLs): Georgia EPD is required to establish TMDLs for certain water bodies that do not meet state water quality standards (i.e., those listed as Category 5 on the State s 303(d) list). TMDLs set the maximum loading levels for specific pollutants of concern and identify potential pollutant sources. Nonpoint source pollution is the major cause of water quality impairment in the District (Georgia EPD's (b) / 303(d) List of Water). Planning and management of biosolids requires consideration of septage disposal at wastewater facilities. In some areas, limited assimilative capacity may point toward land application or septic systems for treatment of wastewater, but these options must be evaluated in light of the regional objective of returning treated wastewater to specific water bodies. Assimilative capacity is reduced by nonpoint as well as point sources, and therefore, watershed management is important to addressing this challenge. Meeting the requirements of TMDLs and addressing impairments requires integrated consideration of point source discharges and watershed management to address nonpoint sources. Instream flows and returns of treated wastewater can also affect pollutant concentrations. INTEGRATED-4 Local Wastewater Master Plans INTEGRATED-10 Septic System Septage Disposal INTEGRATED-4 Local Wastewater Master Plans WATERSHED-1 Post-development Stormwater Management WATERSHED-2 Construction Erosion and Sedimentation Control WATERSHED-3 Floodplain Management WATERSHED-4 Stream Buffer Protection WATERSHED-5 Illicit Discharge Detection and Elimination Program WATERSHED-7 Promoting a Green Infrastructure Approach WATERSHED-8 Watershed Improvement Projects WATERSHED-9 Ongoing Stormwater System Management WATERSHED-12 Local Public Education Program INTEGRATED-4 Local Wastewater Master Plans WATERSHED-1 Post-development Stormwater Management WATERSHED-2 Construction Erosion and Sedimentation Control WATERSHED-3 Floodplain Management WATERSHED-4 Stream Buffer Protection WATERSHED-5 Illicit Discharge Detection and Elimination Program WATERSHED-6 Litter Control WATERSHED-7 Promoting a Green Infrastructure Approach WATERSHED-8 Watershed Improvement Projects WATERSHED-9 Ongoing Stormwater System Management WATERSHED-10 Long term Ambient Trend Monitoring WATERSHED-11 Macroinvertebrate Bioassessment WATERSHED-12 Local Public Education Program PAGE 2-7

32 SECTION 2 PLANNING PRINCIPLES AND MANAGEMENT CHALLENGES Table 2-1. Continuing and Emerging Management Challenges Management Challenge Integrated Management Considerations Action Items that Address this Challenge Nutrient Standards: Allatoona Lake has a TMDL for chlorophyll a concentrations associated with nutrient loading. Lake Lanier has a pending TMDL for chlorophyll a. Other lakes in the District and downstream water planning regions may also be affected by nutrient loading. Upper Chattahoochee Trout Fishery: The release of cold waters from Buford Dam supports a trout fishery for portions of the river below the dam that are designated secondary trout waters. This designation affects temperature requirements for wastewater discharges in this area. Reclaimed Water Reuse: Various types of water reuse occur in the District. Indirect potable reuse of highly treated wastewater is an important strategy to supplement available water supplies. Non-potable reuse is employed in some areas to provide water for irrigation and commercial and industrial processes. Return Flows ( Made Inflows ) to Lake Lanier and Allatoona Lake: Returning highly treated wastewater to Lake Lanier and Allatoona Lake and their tributaries will maximize the use of existing infrastructure, enhance available water supplies and support the long-term sustainability of water use from these basins. Proximity of Wastewater Discharges to Water Supply Intakes: Heavy reliance on surface waters for both water supply and wastewater discharge puts these uses in close proximity and requires careful planning and management to ensure high quality and reliability in treatment. Point sources in the District are subject to high treatment standards to address nutrient loads, but because nonpoint sources are the major source of nutrient loading, watershed management is critical to meeting lake nutrient standards. The temperature requirements limit the potential to return reclaimed water to the river; however, returns to the basin provide important flows for downstream users and are critical for indirect potable reuse for water supply. Reuse strategies must consider the need for returns of treated wastewater to surface waters for other uses. Evaluation criteria for non-potable reuse applications in the District are listed in Section 2.1. Management of return flows requires integrated consideration of water supply needs, wastewater treatment infrastructure and watershed management. Water and wastewater planning, operations and management must consider the multiple uses of the region s surface waters and ensure that reliability and treatment protect waters for these uses. Watershed management is also directly WATERSHED-1 Post-development Stormwater Management WATERSHED-2 Construction Erosion and Sedimentation Control WATERSHED-4 Stream Buffer Protection WATERSHED-5 Illicit Discharge Detection and Elimination Program WATERSHED-6 Litter Control WATERSHED-7 Promoting a Green Infrastructure Approach WATERSHED-8 Watershed Improvement Projects WATERSHED-9 Ongoing Stormwater System Management WATERSHED-12 Local Public Education Program INTEGRATED-4 Local Wastewater Master Plans WATERSHED-1 Post-development Stormwater Management WATERSHED-2 Construction Erosion and Sedimentation Control WATERSHED-4 Stream Buffer Protection WATERSHED-5 Illicit Discharge Detection and Elimination Program WATERSHED-7 Promoting a Green Infrastructure Approach WATERSHED-8 Watershed Improvement Projects WATERSHED-9 Ongoing Stormwater System Management See policy call-out box in Section 2.1 INTEGRATED-13 Reclaim Water for Lake Lanier and Allatoona Lake INTEGRATED-2 Local Water Master Plans INTEGRATED-3 Update Local Emergency Water Plans INTEGRATED-4 Local Wastewater Master Plans PAGE 2-8

33 SECTION 2 PLANNING PRINCIPLES AND MANAGEMENT CHALLENGES Table 2-1. Continuing and Emerging Management Challenges Management Challenge Integrated Management Considerations Action Items that Address this Challenge related to ensuring that water quality can meet these multiple needs, and protect human health. INTEGRATED-6 Source Water Assessment and Protection Program INTEGRATED-7 Water Supply Watershed Protection WW-1 Enhanced Reliability of Wastewater Pumping Stations WW-2 Sewer System Inventory and Mapping WW-3 Sewer System Maintenance Management WW-4 Sewer System Inspection Program WW-5 Sewer System Rehabilitation Program WW-6 Capacity Certification Program WW-7 Grease Management Program WW-8 Sewer System Overflow Emergency Response Program WW-9 Sewer System Inspection and Maintenance Training WW-10 Local Public Education Program WATERSHED-1 Post-development Stormwater Management WATERSHED-2 Construction Erosion and Sedimentation Control WATERSHED-4 Stream Buffer Protection WATERSHED-5 Illicit Discharge Detection and Elimination Program WATERSHED-6 Litter Control WATERSHED-7 Promoting a Green Infrastructure Approach WATERSHED-8 Watershed Improvement Projects WATERSHED-9 Ongoing Stormwater System Management WATERSHED-12 Local Public Education Program Climate Change: Climate variability adds uncertainty to water resources planning and management. In the District, climate change impacts could include increased frequency of heat waves, increased evaporation, increased annual precipitation and increased variability of precipitation, including more severe and extended droughts and increased frequency and intensity of rain events. Climate variability has the potential to adversely affect water availability, water quality and watershed hydrology in a manner that will require enhanced implementation of water supply, water conservation, wastewater and watershed management elements of this Plan. INTEGRATED-2 Local Water Master Plans INTEGRATED-3 Update Local Emergency Water Plans INTEGRATED-4 Local Wastewater Master Plans The District recently published a Utility Climate Resiliency Study, which addresses this challenge. PAGE 2-9

34 SECTION 2 PLANNING PRINCIPLES AND MANAGEMENT CHALLENGES This page left intentionally blank. PAGE 2-10

35 SECTION 3 Existing Facilities and Conditions An understanding of current conditions is a prerequisite for updating the Plan. In the short time since the last Plan Update, regional conditions and infrastructure have changed. This section documents current conditions in the region, its water resources, and its water resource management infrastructure. This section supports an integrated approach to water resource planning; while some parts focus specifically on water and wastewater infrastructure, other parts describe conditions that reflect the interconnected nature of water resources management, including regional population information, basin return flow conditions, watershed development and instream conditions. 3.1 Population The 15 counties within the District have experienced continued growth and currently have a population of over five million people. The region saw population increase by 208 percent from 1970 to 2014, or 4.6 percent per year, and in recent years, by seven percent from 2009 to 2014, or 1.2 percent per year. Figure 3-1 shows regional population growth between 1970 and Since the 2009 Plan Update, population grew fastest in the following counties: Forsyth (16 percent), Fulton (ten percent), Gwinnett (nine percent) and Coweta (nine percent). During this same period, growth was slowest in the following counties: Fayette (two percent), Clayton (three percent), DeKalb (four percent) and Rockdale (four percent). Population forecasts for the region are described in Section Water Supply and Treatment Various local public water providers treat and distribute water in the 15 member counties of the District. While most providers are publicly operated by a local government or water authority, some are third-party providers that serve public entities. For example, the Cobb County-Marietta Water Authority is a regional wholesaler of water that was created by the Georgia Legislature. The Authority treats and distributes potable water for wholesale purchase by municipalities in Cobb County and neighboring counties. The District water providers obtain water supply from the headwaters of six river basins: Chattahoochee, Coosa/Etowah, Flint, Ocmulgee, Oconee, and Tallapoosa. A small portion (less than one percent) of the public water supply is from groundwater sources. Water withdrawals for water supply are measured in terms of annual average day (AAD) and million gallons per day (MGD) volumes. This section describes the District s water supply sources and water treatment facilities. It also documents water conservation efforts, water system interconnections and non-municipal water withdrawals in the region. This section is intended to provide an understanding of the current water supply infrastructure of the District. PAGE 3-1

36 SECTION 3 EXISTING FACILITIES AND CONDITIONS 6,000,000 5,000,000 4,000,000 Population 3,000,000 2,000,000 1,000, Figure 3-1. District Population: a a Population data for the District obtained from U.S. Census Bureau, Population Estimates Program (PEP) Surface Water Supplies The District relies primarily on surface water from rivers and storage reservoirs as its main source of water supply. The most significant water supply source for the region is the Chattahoochee River system, which includes Lake Lanier. Table 3-1 summarizes the District s permitted surface water supply sources. Current water supply sources in the District were identified through existing permits issued by Georgia EPD. These permits make up the equivalent of almost 924 AAD-MGD of water supply withdrawals in the District. PAGE 3-2

37 SECTION 3 EXISTING FACILITIES AND CONDITIONS Table 3-1. Existing Permitted Surface Water Supply Withdrawals in the District Water Supply Source Chattahoochee River Basin Owner/Operator Utilizing Source Permitted Monthly Average Daily Withdrawal (MGD)* Supplemental Source a Primary Source a 2014 Actual Annual Average Withdrawals (MGD) Lake Lanier Chattahoochee River City of Cumming NA Forsyth County Board of Commissioners NA Gwinnett County NA City of Buford NA City of Gainesville NA Atlanta - Fulton County Water Resources Commission DeKalb County Public Works Cobb County- Marietta Water Authority City of Atlanta Watershed Management NA NA NA NA Bear Creek Reservoir b Douglasville-Douglas County Water and 23 Dog River Reservoir b Sewer Authority NA 9.3 Big Creek City of Roswell NA Sweetwater Creek c Sweetwater State Park (George Sparks Reservoir) c City of East Point NA Cedar Creek Reservoirs City of Palmetto NA Cedar Creek (B.T. Brown) Reservoir Coweta County Water and Sewerage Authority NA J.T. Haynes Reservoir d NA Newnan Utilities Sandy/Browns Creek d Monthly Average Day Withdrawal in Chattahoochee River Basin PAGE 3-3

38 SECTION 3 EXISTING FACILITIES AND CONDITIONS Table 3-1. Existing Permitted Surface Water Supply Withdrawals in the District Water Supply Source Coosa/Etowah River Basin Etowah River Hollis Q. Lathem (Yellow Creek) Reservoir/Etowah River Allatoona Lake Owner/Operator Utilizing Source Permitted Monthly Average Daily Withdrawal (MGD)* Supplemental Source a Primary Source a 2014 Actual Annual Average Withdrawals (MGD) City of Canton City of Cartersville e NA 23 NA Cherokee County Water and Sewerage Authority NA City of Cartersville e NA Cobb County- Marietta Water Authority NA Lewis Spring City of Adairsville NA Bolivar Springs Bartow County Water System NA Moss Springs City of Emerson NA Hickory Log Creek Reservoir f City of Canton 11 NA 0.1 Cobb County- Marietta Water Authority 33 NA NA Monthly Average Day Withdrawal in Coosa/Etowah River Basin Flint River Basin Flint River J.W. Smith Reservoir (Shoal Creek) g Clayton County Water Authority g 40 NA 4.2 Fayette County Water System h 16 NA 1.2 Clayton County Water Authority g NA White Oak Creek d 7 NA 1.1 Newnan Utilities Line Creek d 12 NA 1.7 Hutchins Lake City of Senoia NA Whitewater Creek City of Fayetteville NA Lake Kedron h Lake Peachtree (Flat Creek) h Horton Creek Reservoir i Fayette County Water System Whitewater Creek i 2 Lake McIntosh Still Branch Creek Reservoir j Fayette County Water System City of Griffin (provides water to Pike, Spalding and Coweta Counties) NA NA NA NA Monthly Average Day Withdrawal in Flint River Basin PAGE 3-4

39 SECTION 3 EXISTING FACILITIES AND CONDITIONS Table 3-1. Existing Permitted Surface Water Supply Withdrawals in the District Water Supply Source Ocmulgee River Basin Owner/Operator Utilizing Source Permitted Monthly Average Daily Withdrawal (MGD)* Supplemental Source a Primary Source a 2014 Actual Annual Average Withdrawals (MGD) W.J. Hooper Reservoir (Little Cotton Indian Creek) Clayton County Water Authority NA Edgar Blalock Jr. Reservoir (Pates Creek) g NA John Fargason (Walnut Creek) Reservoir S. Howell Gardner (Indian Creek) Reservoir k City of McDonough NA NA Rowland (Long Branch) Reservoir k Henry County Water Authority NA Towaliga River Reservoir NA Tussahaw Creek Reservoir NA Big Haynes Creek (Randy Poynter Lake) Rockdale County NA Brown Branch City of Locust Grove NA Monthly Average Day Withdrawal in Ocmulgee River Basin Oconee River Basin Cedar Creek Reservoir l NA 2 0 City of Gainesville North Oconee River l 20 NA 0 Monthly Average Day Withdrawal in Oconee River Basin Tallapoosa River Basin Lake Paradise (Little Tallapoosa River) h City of Villa Rica NA Cowens Lake (Astin Creek) h Monthly Average Day Withdrawal in Tallapoosa River Basin Total Permitted Withdrawal in District m Monthly Average Day 1,108.7 NA AAD-MGD * Permitted Monthly Average Daily Withdrawal (MGD) is a not-to-exceed monthly withdrawal limit, calculated as a daily average across the month. a The primary source of water is where the intake is located. The supplemental source may be utilized to pump and store water in the primary source or as a substitute for the primary source when it is not available, based on the conditions specified in their individual permit. b The Bear Creek Reservoir withdrawal serves as a supplemental supply to the primary Dog River Reservoir Source (Permit No ). The withdrawals stated for the Dog River and Bear Creek Reservoirs cannot be added; the total permitted withdrawal from both sources is 23 MGD. The Dog River Reservoir releases are augmented with reuse water from the Douglasville-Douglas County Water and Sewer Authority s South Central WWTP, which is piped to a point below the foot of the dam. c The City of East Point has one surface water withdrawal permit for withdrawal from Sweetwater Creek. The City may supplement the withdrawals from Sweetwater Creek with water from the George Sparks Reservoir. Amounts are not to exceed quantities shown PAGE 3-5

40 SECTION 3 EXISTING FACILITIES AND CONDITIONS on the permit. d The J.T. Haynes Reservoir is a pump-storage facility that receives water from three different sources, Sandy/Browns Creek, White Oak Creek, and Line Creek. e The City of Cartersville has two intakes covered by one permit. The combined total withdrawal for the Etowah River and the Allatoona Lake intakes shall not exceed the permitted monthly average day withdrawal of 23 MGD. Of that permitted amount, up to 18 MGD may be withdrawn from Allatoona Lake on a monthly average day basis. f Construction of the Hickory Log Creek Reservoir was completed in Cobb County-Marietta Water Authority is entitled to 75% (33 MGD) of the water from the project and the City of Canton to the remaining 25 percent (11 MGD). The withdrawal intakes for Cobb County-Marietta Water Authority and City of Canton are not located in the reservoir, but in the Etowah River and Allatoona Lake, respectively. g Clayton County Water Authority can withdraw any combination of flow from J.W. Smith Reservoir and Edgar Blalock Jr. Reservoir not to exceed a combined total withdrawal of 10 MGD. J.W. Smith Reservoir on Shoal Creek is a pump-storage facility that receives water from the Flint River. h These two sources share a combined permit limit. i Lake Horton is a pump-storage facility only that receives water from the Flint River and Whitewater Creek. j The permitted monthly average day withdrawal is 42 MGD for the entire reservoir. This reservoir is located outside of the District and is owned by the City of Griffin. The reservoir serves Pike and Spalding Counties, as well Coweta County. Coweta County currently has a purchase contract for 3.00 MGD of finished water from the City of Griffin through June 30, The amount increases to 5.00 MGD on July 1, 2022 through the duration of the contract ending in k Henry County Water Authority may withdraw the combined permitted monthly average day withdrawal of 24 MGD from these three intakes without exceeding each individual limit. l Cedar Creek Reservoir is a pump-storage facility that receives water from the North Oconee River. This reservoir was built in 2000 and may be used as a future potential water supply source. m Monthly average day is 1.2 times AAD Groundwater Supplies Groundwater sources account for less than one percent of the total permitted public water supply in the District. Self-supplied wells are also used in the region, but are not required to obtain a permit if their usage is below 100,000 gallons per day. Generally, the bedrock geology of the region does not support costeffective groundwater use in the District. Groundwater is used by some small towns in the region, and it is also used as a supplemental source. Table 3-2 lists groundwater withdrawal permits for public water supply in the District. Table 3-2. Existing Permitted Groundwater Withdrawals (Non-Farm) for Public Water Supply in the District Owner/Operator Utilizing Source County Permitted Monthly Average Day Withdrawal (MGD) 2014 Actual Monthly Average Withdrawals (MGD) City of Emerson Bartow 1.0 NA City of Kingston Bartow 0.15 NA City of White Bartow 0.2 NA City of Ball Ground Cherokee 0.25 NA Clayton County Water Authority Clayton Coweta County Water & Sewer Department Coweta NA City of Senoia Coweta City of Villa Rica a Carroll NA City of Fayetteville Fayette Board of Commissioners of Fayette County Fayette City of College Park Fulton NA City of Roswell Fulton City of Lawrenceville Gwinnett City of Flowery Branch Hall 0.7 NA PAGE 3-6

41 SECTION 3 EXISTING FACILITIES AND CONDITIONS Table 3-2. Existing Permitted Groundwater Withdrawals (Non-Farm) for Public Water Supply in the District Owner/Operator Utilizing Source County Permitted Monthly Average Day Withdrawal (MGD) 2014 Actual Monthly Average Withdrawals (MGD) City of Lula Hall 0.5 NA City of Hampton Henry City of Locust Grove Henry 1.0 NA City of McDonough Henry City of Stockbridge Henry City of Dallas Paulding Total Groundwater Supply b a For planning purposes, Villa Rica s groundwater well is in this list because it affects the water needed by the city, even though it is located in Carroll County. b The total permitted groundwater supply amount is expressed in terms of monthly average day; groundwater withdrawal permit limits are not set in terms of AAD, as they are for surface water. NA = not available Existing Water Treatment Facilities The District currently has 38 publicly owned surface water treatment plants (WTPs), ranging in permitted capacity from less than 1 MGD to 150 MGD (peak day limit). The combined permitted treatment capacity of surface WTPs in the District is 1,175.7 MGD (peak day limit). Table 3-3 lists the existing surface WTPs in the District, including treatment capacities. Treatment capacity volumes are reported in different units than those for withdrawals because, in the state of Georgia, WTP permits are based on a peak day limits, while withdrawal permits are generally based on monthly average day limits. Some withdrawals are also subject to peak day limits. The District s surface WTPs range in age and condition. The water quality of the source water for these treatment plants also varies widely and dictates treatment technologies. The vast majority of the WTPs use conventional treatment with chemical coagulation, flocculation, sedimentation, filtration and disinfection. Some WTPs in the District currently use or are investigating advanced treatment technologies such as ozonation, UV disinfection and membrane filtration. The regulatory standards for WTPs are subject to change and tend to become more stringent over time; therefore, treatment operations must continually assess and optimize water treatment facilities and processes to ensure compliance. As noted above, groundwater sources provide less than one percent of the public water supply in the District. Typically, groundwater only requires disinfection prior to distribution to customers. The City of Lawrenceville owns and operates the only groundwater treatment plant in the District that applies additional treatment for removal of radon, iron and manganese to a groundwater-only source. Table 3-3. Existing Surface Water Treatment Plants in the District County WTP Entity Source Stream/Reservoir Permitted WTP Capacity (Peak Day, MGD) a Lewis Spring City of Adairsville Lewis Spring b 4 Bartow Clarence B. Walker City of Cartersville Allatoona Lake 27 Emerson City of Emerson Moss Spring b 0.63 Bartow County Bartow County Bolivar Springs 0.8 PAGE 3-7

42 SECTION 3 EXISTING FACILITIES AND CONDITIONS Table 3-3. Existing Surface Water Treatment Plants in the District County WTP Entity Source Stream/Reservoir Permitted WTP Capacity (Peak Day, MGD) a Canton City of Canton Etowah River 5.45 Cherokee Etowah River Cherokee County Water and Sewer Authority Etowah River with Augmentation from Lathem Reservoir 38 Clayton Cobb Coweta Terry R. Hicks Blalock Reservoir 10 W.J. Hooper Clayton County Water Authority W.J. Hooper Reservoir 20 J.W. Smith J.W. Smith Reservoir 12 James E. Quarles Cobb County-Marietta Water Chattahoochee River 86 Hugh A. Wyckoff Authority Allatoona Lake 72 B.T. Brown Coweta County Cedar Creek (B.T. Brown) Reservoir Hershall Norred City of Newnan J.T. Haynes Reservoir Senoia City of Senoia Hutchins Lake 0.45 DeKalb Scott Candler DeKalb County Chattahoochee River 128 Douglas Bear Creek Douglasville-Douglas County Water and Sewer Authority Bear Creek Reservoir Dog River Reservoir Franklin Smith City of Villa Rica Lake Fashion, Cowan Lake 1.5 Fayette Crosstown Lake Horton, Lake Kedron, Lake 13.5 Fayette County South Fayette Peachtree, Groundwater 9.3 Fayetteville City of Fayetteville Whitewater Creek 4 Forsyth Cumming City of Cumming Lake Lanier 24 Forsyth County Forsyth County Lake Lanier Atlanta-Fulton County Atlanta-Fulton County Water Resources Commission Chattahoochee River 90 Fulton Hemphill City of Atlanta Chattahoochee River Chattahoochee 65 Roswell Cecil Wood City of Roswell Big Creek 3.3 East Point City of East Point Sweetwater Creek, Sparks Reservoir 13.9 Palmetto City of Palmetto Cedar Creek Gwinnett Lake Lanier 150 Gwinnett County Lake Lanier Shoal Creek 98 Buford City of Buford Lake Lanier 2 PAGE 3-8

43 SECTION 3 EXISTING FACILITIES AND CONDITIONS Table 3-3. Existing Surface Water Treatment Plants in the District County WTP Entity Source Stream/Reservoir Permitted WTP Capacity (Peak Day, MGD) a Hall Henry Lakeside 10 City of Gainesville Lake Lanier Riverside 25 Towaliga River S. Howell Gardner (Indian Henry County Water Authority Creek) and Rowland Reservoirs 24.4 Tussahaw Tussahaw Creek Reservoir 16.1 McDonough City of McDonough John Fargason (Walnut Creek) Reservoir 2.4 Locust Grove City of Locust Grove Brown Branch 0.45 Rockdale Big Haynes Creek Rockdale County Big Haynes Creek (Randy Poynter Lake) 22.1 Total District Treatment Capacity (Peak Day MGD) 1,175.7 a WTP capacity provided is permitted peak day basis. b Lewis Spring and Moss Spring are groundwater sources under the influence of surface water; they are classified by Georgia EPD as surface water WTPs Non-municipal Permitted Withdrawals While this Plan focuses on public water supply, the region s water resources are also used by private, nonmunicipal water users. It is important to recognize and account for these other water users in the region. Table 3-4 lists the permitted non-municipal withdrawals in the region on a monthly average day basis excluding those for the power generation sector. Water withdrawals by the power generation sector are primarily for cooling water and are regulated by Georgia EPD. These withdrawals are largely nonconsumptive and are not addressed in this Plan. The primary uses for the withdrawals listed in Table 3-4 are industrial applications and golf course irrigation. Returns of treated wastewater by public and private users are addressed in Section 3.4. Table 3-4. Non-municipal Surface Water Permitted Withdrawals in the District Excluding Power Generation Sector Basin Monthly Average Day Permitted Withdrawal (MGD) Peak Day Limit: Permitted 24-Hour Withdrawal (MGD) a Chattahoochee Coosa/Etowah Flint Ocmulgee - - Oconee - - Tallapoosa - - Total a Some withdrawals are also subject to peak day limits that exceed the monthly average day limits. PAGE 3-9

44 SECTION 3 EXISTING FACILITIES AND CONDITIONS Water Conservation Since the creation of the District in 2001, water conservation and efficiency have been at the foundation of water supply planning. The District has made water conservation a region-wide priority and is the only major metropolitan area in the country that has more than 100 jurisdictions implementing a comprehensive water conservation program. The 2003 plan introduced many innovative water conservation strategies that have been expanded upon with the 2009 plan and 2010 amendments. Table 3-5 lists the water conservation programs implemented by the District since its creation in These programs were selected based on their cost-effectiveness and applicability to the District water users, as well as their potential ability to decrease water demands across the region. Through each revision, the programs were strengthened to build on the success already achieved and continue to move the District forward as a national leader in water conservation and efficiency. Table 3-5. Water Conservation Measures Implemented in the District, Based on Requirements in the 2003 Plan, 2009 Plan Update and 2010 Plan Amendments # Conservation Measure a,b 2003 Plan 2009 Plan 2010 Amendments 1 Conservation pricing 2 Replace older, inefficient plumbing fixtures (toilet rebate program) 3 Require pre-rinse spray valve retrofit education program 4 Rain sensor shut-off switches on new irrigation systems 5 Require sub-meters in new multi-family residential buildings 6 Assess and reduce water system leakage 7 Conduct residential water audits 8 Distribute low-flow retrofit kits to residential users 9 Conduct commercial water audits 10 Implement public education and awareness plan 11 Install high efficiency toilets and high efficiency urinals in government buildings 12 Require new car washes to recycle water 13 Expedited water loss reduction (Chattahoochee and Lanier) c 14 Multi-family HET rebates (Chattahoochee and Lanier) c 15 Meters with point of use leak detection (Chattahoochee and Lanier) c 16 Require private fire lines to be metered (Chattahoochee and Lanier) c 17 Maintain a water conservation program (Chattahoochee and Lanier) c 18 Water waste policy 19 Require high efficiency plumbing fixtures consistent with state legislation a Conservation practices listed in the 2003 and 2009 District Plans were developed prior to the enactment of the Georgia Water Stewardship Act (2010). b In 2010, items 13 through 19 were added by a Plan amendment. c Water conservation measures adopted in 2010 were recommended for the Chattahoochee River Basin utilities only. NRW = non-revenue water The District s water conservation program is robust and comprehensive, and it has contributed to a marked decline in the region s water use. Some highlights of these programs include the following: Water conservation pricing that includes higher residential water rates as customers use more water Toilet rebate program that has replaced over 110,000 inefficient toilets, saving more than 2.5 million gallons per day PAGE 3-10

45 SECTION 3 EXISTING FACILITIES AND CONDITIONS Requirement for rain sensors to be installed on new irrigation systems in the District since 2005 Water loss assessment and leak detection programs that have pre-dated the state s award-winning program by a half-decade Award-winning public education and outreach efforts. The District received the 2015 WaterSense Excellence Award for Outreach and Education from the EPA s WaterSense program. The District received this national recognition for making a difference through water efficiency innovation and WaterSense promotion. Since 2001, the District has implemented activities and policies that have helped per capita water use in the region drop by more than 30 percent, as shown on Figure 3-2 below. Figure 3-2. District Per Capita Water Use Trend Existing Interconnections All of the counties within the District maintain interconnections with at least one other county for either routine or emergency water supply. Interconnections with other water systems provide a valuable means of increasing water system reliability. If water systems are interconnected, finished water supply can readily be available in the event of a major water system failure. These connections can function on an emergencyonly basis, as additional supply during peak demand periods, or as major or sole sources of water supply for some water systems. Some of the region s interconnections originally served as a primary water supply source before the water system in the receiving county was developed. These connections are now kept for emergency or peak supply uses. In 2011, the Georgia General Assembly required that GEFA complete a Water System Interconnection Redundancy and Reliability Study (CH2M HILL Engineers, Inc. [CH2M], Jacobs and Lowe Engineers, September 2011). This study documented water system interconnections for 33 systems in the District and quantified the ability of these systems to meet interconnection reliability targets (IRTs), both short-term and long-term. In addition, the report made recommendations for systems to ensure their ability to meet these targets. PAGE 3-11

46 SECTION 3 EXISTING FACILITIES AND CONDITIONS 3.3 Wastewater Generation and Treatment The following sections describe the wastewater infrastructure of the District and the use of septic systems in the region Existing Public Wastewater Treatment Facilities In 2016, the District had 87 publicly owned (municipal) wastewater treatment facilities in operation. The total permitted capacity of these facilities was 700 MGD (Table 3-6). At least 91 percent of the permitted capacity of the publicly owned wastewater treatment facilities in the District is advanced treatment that reduces biochemical oxygen demand to below 20 milligrams per liter (mg/l). Tables 3-6 and 3-7 list the existing permitted wastewater treatment capacity of public facilities by basin and by county in the District. Wastewater treatment facilities are permitted by maximum month flow (MMF) on an average daily basis. This limit is a statistical measure of the average daily flow for the maximum month occurring during a calendar year. The permitted wastewater treatment capacity for municipal facilities has increased six percent since 2006, the year for which data were provided in the 2009 Plan Update. The District met increased demand for municipal wastewater treatment primarily by expanding treatment facilities. The total number of publicly owned wastewater treatment facilities has stayed approximately the same since 2006, and the permitted capacity for these facilities has increased from 660 MGD of wastewater to 700 MGD. Table 3-6 shows that 66 percent of the total existing municipal permitted capacity in the District is located in the Chattahoochee Basin. Table 3-7 shows that three counties, Cobb, Fulton, and Gwinnett, have 67 percent of the treatment capacity of the District. Table 3-8 presents a detailed summary of permitted treatment capacity by facility for each county. Publicly owned facilities decommissioned during the last planning period ( ) and facilities that are not currently in operation include the following: Douglas County: Southside Water Pollution Control Plant (WPCP), South Central Urban Water Reuse Facility (permit remains active), Beaver Estates WPCP and St. Andrew s LAS Fulton County: Cauley Creek Water Reclamation Facility (WRF) This facility remains permitted but is not currently in operation Gwinnett County: Gwinnett Jack s Creek WRF and Jackson Creek WRF Hall County: Lula Facultative Pond Henry County: Springdale Road WPCP, Springdale LAS and Springdale Walnut Creek WPCP Paulding County: Dallas North WPCP and Dallas West WPCP Most treated wastewater from municipal facilities in the District is returned via discharge to surface waters. A small portion is discharged in LASs or directed to reuse applications. The discharge of treated wastewater is discussed further in Section 3.4. Table 3-6. Municipal Permitted Wastewater Treatment Capacity in the District by River Basin 2016 River Basin Permitted Capacity of Municipal Facilities (MMF-MGD) a Number of Municipal Wastewater Treatment Facilities Coosa/Etowah Chattahoochee Flint 27 8 PAGE 3-12

47 SECTION 3 EXISTING FACILITIES AND CONDITIONS Table 3-6. Municipal Permitted Wastewater Treatment Capacity in the District by River Basin 2016 River Basin Permitted Capacity of Municipal Facilities (MMF-MGD) a Number of Municipal Wastewater Treatment Facilities Ocmulgee Tallapoosa 2 1 Oconee 1 1 Total a The current permitted capacity as obtained from 2015 data requests, data provided by Georgia EPD, and meetings with individual utilities. Table 3-7. Municipal Permitted Wastewater Treatment Capacity in the District by County 2016 County Permitted Capacity of Municipal Facilities a (MMF-MGD) Bartow 17.2 Cherokee 18.5 Clayton 38.4 Cobb Coweta 6.9 DeKalb 56.0 Douglas 12.3 Fayette 11.0 Forsyth Fulton Gwinnett Hall 18.5 Henry 17.5 Paulding 7.7 Rockdale 10.2 District Total 697 a The current permitted capacity as obtained from 2015 data requests, data provided by Georgia EPD, and meetings with individual utilities. PAGE 3-13

48 SECTION 3 EXISTING FACILITIES AND CONDITIONS Table 3-8. Existing Permitted Wastewater Treatment Facilities in the District County Bartow Cherokee Clayton Cobb Coweta Wastewater Treatment Facilities Basin Receiving Water Body 2016 Permitted Treatment Capacity (MMF-MGD) Cartersville WPCP Coosa/Etowah Etowah River 15 Emerson Henry Jordan WWTP Adairsville North WPCP Adairsville South WPCP Bartow Southeast WPCP Bartow Two Run WPCP CCWSA Rose Creek WPCP CCWSA Fitzgerald Creek WPCP Woodstock Rubes Creek WPCP Coosa/Etowah Pumpkinvine Creek 0.45 Coosa/Etowah Oothkalooga Creek 1 Coosa/Etowah Oothkalooga Creek 0.5 Coosa/Etowah Etowah River 0.1 Coosa/Etowah Two Run Creek 0.1 Coosa/Etowah Coosa/Etowah Coosa/Etowah Etowah River Arm of Allatoona Lake Little River to Allatoona Lake Rubes Creek, Tributary to Little River Canton WPCP Coosa/Etowah Etowah River 4 Fulton Little River WRF Coosa/Etowah Coosa River 1 Clayton W.B. Casey WRF Clayton W.B. Casey WRF Clayton Northeast WRF Clayton Shoal Creek WRF Cobb Noonday Creek WRF Ocmulgee Huie Constructed Wetlands to Shamrock Lake Flint Flint River 6.6 Ocmulgee Panther Creek 6 Flint Shoal Creek Reservoir, Tributary to Flint River Coosa/Etowah Noonday Creek Tributary 20 Cobb Northwest WRF Coosa/Etowah Allatoona Lake 12 Cobb RL Sutton WRF Chattahoochee Chattahoochee River 40 Cobb South Cobb WRF Chattahoochee Chattahoochee River 40 Coweta Crossroads LAS Flint Land Application Coweta Shenandoah WPCP Flint White Oak Creek, Tributary to Flint River Coweta Arnco WPCP Chattahoochee Wahoo Creek 0.1 Coweta Arnall/Sargent WPCP Chattahoochee Wahoo Creek 0.06 Newnan Wahoo Creek Chattahoochee Wahoo Creek Tributary PAGE 3-14

49 SECTION 3 EXISTING FACILITIES AND CONDITIONS Table 3-8. Existing Permitted Wastewater Treatment Facilities in the District County DeKalb Douglas Fayette Forsyth Wastewater Treatment Facilities Newnan Mineral Springs Chattahoochee Basin Receiving Water Body Mineral Springs Branch/Mountain Creek 2016 Permitted Treatment Capacity (MMF-MGD) Senoia LAS Flint Land Application 0.49 Grantville Colley Street LAS Chattahoochee Land Application 0.15 Grantville Ponds Chattahoochee Various 0.12 Pole Bridge Creek Ocmulgee South River Tributary 20 Snapfinger Creek Ocmulgee South River 36 Douglas South Central WPCP Douglas Sweetwater Creek WPCP Douglas Northside WPCP Douglas Rebel Trails WPCP Douglas South Central Urban Water Reuse Facility Chattahoochee Chattahoochee River 6 Chattahoochee Chattahoochee River 3 Chattahoochee Chattahoochee Gothards Creek to Sweetwater Creek Anneewakee Creek Tributary Chattahoochee Reuse 0.5 Villa Rica North Chattahoochee Town Branch to Sweetwater Creek 0.52 Villa Rica West Tallapoosa NA 2.15 Fayetteville Whitewater Creek Flint Whitewater Creek 5 WPCP Peachtree City Rockaway WPCP Flint Line Creek Tributary 4 Peachtree City Line Creek/Larry B. Turner WPCP Flint Line Creek 2 Forsyth Fowler WRF Chattahoochee Reuse 1.75 Forsyth Shakerag WRF Chattahoochee Chattahoochee River 1.25 Forsyth James Creek Chattahoochee Chattahoochee River 1 Forsyth Dick Creek Chattahoochee Dick Creek 0.76 Forsyth Windermere WRF Chattahoochee Reuse 0.55 Forsyth Parkstone LAS Coosa/Etowah Land Application 0.1 Forsyth Manor Water Reuse Facility Coosa/Etowah Reuse 0.5 Cumming Habersham WPCP Coosa/Etowah Lake Lanier 0.11 Cumming Bethelview Rd AWRF Chattahoochee Big Creek PAGE 3-15

50 SECTION 3 EXISTING FACILITIES AND CONDITIONS Table 3-8. Existing Permitted Wastewater Treatment Facilities in the District County Fulton Gwinnett Hall Henry Wastewater Treatment Facilities Basin Receiving Water Body 2016 Permitted Treatment Capacity (MMF-MGD) Fulton Big Creek WRF Chattahoochee Chattahoochee River 24 Fulton Johns Creek Environmental Campus Fulton Camp Creek WRF Fulton Little Bear WRF Fulton Cauley Creek WRF Atlanta RM Clayton WRC Atlanta South River WRC Atlanta Utoy Creek WRC Gwinnett F. Wayne Hill WRC Gwinnett F. Wayne Hill WRC Gwinnett Yellow River WRF Gwinnett Crooked Creek WRF Buford Southside WPCP Buford Westside WPCP Chattahoochee Chattahoochee River 15 Chattahoochee Chattahoochee River 24 Chattahoochee Chattahoochee Little Bear Creek, tributary to Bear Creek Cauley Creek to Chattahoochee Chattahoochee Chattahoochee River 100 Chattahoochee Chattahoochee River 48 Chattahoochee Chattahoochee River 40 Chattahoochee Lake Lanier 40 Chattahoochee Chattahoochee River 20 Ocmulgee Yellow River 22 Chattahoochee Chattahoochee River 16 Chattahoochee Little Suwanee Creek 2 Chattahoochee Richland Creek 0.25 Flowery Branch WPCP Chattahoochee Lake Lanier 0.4 Gainesville Flat Creek WRF Chattahoochee Flat Creek 12 Gainesville Linwood WRF Chattahoochee Lake Lanier 5 Hall Spout Springs Oconee Lollis Creek 0.75 Lula WRF Chattahoochee Hagen Creek Henry Indian Creek LAS Ocmulgee Land Application 1.5 Henry Walnut Creek WRF Ocmulgee Land Application 8 Henry Bear Creek LAS Flint Land Application 1.25 Hampton WPCP Flint Bear Creek Tributary 1.75 Locust Grove Indian Creek WPCP Ocmulgee Indian Creek to Towaliga River PAGE 3-16

51 SECTION 3 EXISTING FACILITIES AND CONDITIONS Table 3-8. Existing Permitted Wastewater Treatment Facilities in the District County Paulding Rockdale Wastewater Treatment Facilities McDonough Walnut Creek WPCP Basin Receiving Water Body 2016 Permitted Treatment Capacity (MMF-MGD) Ocmulgee Walnut Creek 2 Stockbridge WPCP Ocmulgee Bush Creek Tributary 1.5 Paulding Coppermine WRF Paulding Coppermine LAS Paulding Pumpkinvine WRF Paulding Pumpkinvine LAS Paulding Upper Sweetwater WRF Dallas Pumpkinvine Creek WPCP Rockdale Almand Branch WPCP Rockdale Quigg Branch WRF Rockdale Honey Creek WPCP Rockdale Snapping Shoals WPCP Rockdale Scott Creek WPCP Chattahoochee Mill Creek 1 Chattahoochee Land Application Coosa/Etowah Pumpkinvine Creek 1.5 Coosa/Etowah Reuse 1 Chattahoochee Reuse 0.3 Coosa/Etowah Pumpkinvine Creek 1.5 Ocmulgee Almand Creek to South River Ocmulgee Yellow River 8 Ocmulgee McClains Branch Ocmulgee Snapping Shoals Creek 0.45 Ocmulgee Scott Creek to South River 0.22 AWRF = Advanced Water Reclamation Facility WRC = Water Reclamation Center The acronyms listed above to describe the wastewater treatment facilities (WPCP, WRF, WPCP, WRC) was based on name listed in the NPDES permit for each facility Non-Municipal Permitted Wastewater Facilities In 2016, the District had 96 non-municipal (privately owned) wastewater treatment facilities in operation. The total permitted capacity of these facilities was 12 MGD. Table 3-9 lists the existing permitted nonmunicipal wastewater treatment by basin in the District. Some non-municipal facilities are LASs or decentralized systems and do not have permitted flow limits. The non-municipal wastewater permitted facilities located in the District include those owned by public school systems, industries, campgrounds, mobile home parks and residential developments. For the 96 non-municipal wastewater facilities located in the District, permitted capacity is distributed across several types of industrial and other users, as indicated on Figure 3-3. Table 3-9 lists permitted non-municipal wastewater facilities that are permitted to discharge nutrients or oxygen demanding substances. Other non-municipal wastewater facilities operate in the District, but do not discharge these substances. PAGE 3-17

52 SECTION 3 EXISTING FACILITIES AND CONDITIONS Table 3-9. Total Non-Municipal Permitted Wastewater Treatment Capacity in the District by River Basin 2016 River Basin Permitted Capacity of Non-Municipal Facilities (MMF-MGD) a Number of Non-Municipal Facilities Coosa/Etowah Chattahoochee Flint Ocmulgee Tallapoosa 0 0 Oconee Total Note: This table lists permitted non-municipal wastewater facilities that are permitted to discharge nutrients or oxygen demanding substances. Other non-municipal wastewater facilities operate in the District, but do not discharge these substances. a The current permitted capacity as obtained from 2015 data requests and data provided by Georgia EPD. Schools/Community Centers 19% Campgrounds/Hotels 2% Other 8% Industries 49% Neighborhoods and Mobile Home Parks 22% Figure 3-3. Non-Municipal Wastewater Facilities in the District - Permitted Capacity Distribution by Sector Existing Septic System Use Septic systems are designed and used to dispose of domestic sewage from individual households and small businesses in areas where public sewage collection and disposal may not be available. Septic systems are regulated by rules set by the Georgia Department of Public Health (GADPH) and administered by County Boards of Health (O.C.G.A. 31-2A-11, Ga. Comp. R. & Regs ). In general, sewer is available within cities, or just outside city limit boundaries, and septic systems are typically used for less dense development located outside these areas. Septic systems sometimes are located within sewered areas where development has outpaced sewer extensions. According to GADPH, the longevity of a typical septic system depends on the following: Soil conditions on the site Installation and maintenance practices Volume and pattern of use Size of the system PAGE 3-18

53 SECTION 3 EXISTING FACILITIES AND CONDITIONS Since the previous Plan Update in 2009, GADPH has provided more detailed information on septic system use in the region. This information improves upon the septic system data previously available to the District. Table 3-10 lists 2013 estimates of the number of septic systems for each county in the District. The estimated septic flows were calculated using the baseline flows to septic systems from the wastewater forecasts. The baseline wastewater flows were calculated based on indoor water use data from 2010 to 2014, and the septic system use percentages obtained from 2013 data were applied to the 2015 baseline single-family residential indoor water use to obtain the current flow estimate on Figure 3-4. More information on the calculation of the baseline flows can be found in Section 4. Total baseline flows to septic systems in the District are estimated to be 65 AAD-MGD. Thirty-four percent of the single-family residences in the District are served by septic systems. The estimated percentage of total single-family housing units served by septic systems (2013) is shown on Figure 3-4. This figure also shows estimated flows to septic systems in the region. Table Estimated Number of Existing Septic Systems in the District by County (2013) County Estimated Number of Septic Systems (2013) a Bartow 22,992 Cherokee 39,056 Clayton 14,230 Cobb 34,241 Coweta 28,345 b DeKalb 22,638 Douglas 19,116 b Fayette 21,044 Forsyth 33,032 Fulton 28,133 Gwinnett 65,265 Hall 38,717 b Henry 38,587 Paulding 34,172 b Rockdale 15,314 District Total 454,882 a Data provided by GADPH for The total number of septic systems derives from a baseline 2007 estimate generated by Georgia EPD. The number of septic systems added per year after 2007 is calculated using GADPH inspection records for new systems. b The number of septic systems is estimated based on available water and sewer account data provided by individual utilities. PAGE 3-19

54 SECTION 3 EXISTING FACILITIES AND CONDITIONS Residential Septic % 100% 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% Baseline Septic Flow (AAD-MGD) Residential Septic % Baseline Septic Flow Figure 3-4. Estimated Percent of Single Family Residences with Septic Systems and Baseline Septic Flows in the District a a The total number of single-family residences estimated for 2013 is derived from the U.S. Census Bureau, Five- Year American Community Survey. 3.4 Basin Return Flow Conditions Reclaimed wastewater can be reused or discharged, and when discharged, it may be returned to the river basin from which it was withdrawn or it may be discharged to a different basin. Figure 3-5 shows the distribution of permitted flows of treated wastewater in the District to point source discharges, LASs, and general subsurface return. This figure includes treated wastewater flows from municipal and non-municipal treatment facilities, but does not include flows from power generation facilities. In the District, most treated wastewater is returned to surface waters. This section further characterizes current reuse, return and interbasin transfer of water within the District Assumptions Regarding Septic and LAS returns In evaluating existing water uses, the District has historically adopted a conservative planning approach that assumes 100 percent of the water treated by LASs or septic systems is consumed through evaporation and transpiration. As a result, the District has assumed for planning purposes that no water treated by LASs and septic systems is returned to the environment or contributes to streamflows. Available research in Georgia suggests that substantial quantities of water treated by LASs and septic systems may contribute to groundwater and surface water flows. For example, research in Georgia found that 91 percent of the water discharged into the soil by septic systems went to groundwater, explaining that only a small percentage of the water used by onsite systems is lost to evaporation and transpiration (Radcliffe, D.E. et al. 2006). The same study in Georgia also found that 70 percent or more of wastewater applied through onsite systems and LAS should return to the stream, noting that the percentage of wastewater returns to the stream from [septic systems] may be greater than that from a LAS since the PAGE 3-20

55 SECTION 3 EXISTING FACILITIES AND CONDITIONS [septic system] wastewater is discharged in the subsoil where root abundance is less than that near the soil surface. For purposes of this 2017 Plan Update, the District has continued its highly conservative assumptions regarding the consumptive nature of wastewater flows treated by septic systems and LASs. Whether to continue these assumptions in the future plan updates will be addressed during the relevant planning processes. Municipal LAS and Reuse Permits a 2.6% Non-Municipal LAS Permits 0.5% Non-Municipal NPDES Permits 0.7% Municipal NPDES Permits 95.7% Non-Municipal General Subsurface Permits 0.4% Figure 3-5. Permitted Capacity Distribution of Treated Wastewater Flows in the District (2015) a Includes facilities solely permitted for LAS or reuse; does not include flow from facilities that are permitted for point source discharge that have a portion of flow dedicated for reuse Reclaimed Water Reuse Two types of reuse of reclaimed water are currently employed in the District: non-potable reuse and indirect potable reuse. The use of highly treated effluent for non-potable reuse and indirect potable reuse plays an important role in sustaining the District s potable water supplies. The District s policy on the use of reclaimed water is explained further in Section 2.1. Selected water reuse applications in the District are described in Table Non-potable reuse is currently practiced in the District through irrigation with high quality treated effluent in unrestricted areas such as golf courses and parks. It can also be used as industrial process water. Indirect potable reuse occurs on a large scale within the District, as returned water plays an important role in expanding available water supplies. For example, facilities in Fulton and Gwinnett Counties discharge upstream of water supply intakes operated by other jurisdictions. Planned indirect potable reuse, which returns reclaimed water to lakes or water bodies used for water supply, has also been instituted by a number of local wastewater providers. Planned indirect potable reuse is an industry recognized term meaning a purposeful or intentional strategy to sustain and expand water supply. PAGE 3-21

56 SECTION 3 EXISTING FACILITIES AND CONDITIONS Table Examples of Non-potable and Planned Indirect Potable Reuse in the District Facility Non-potable Reuse Cherokee Rose Creek WPCP Johns Creek Environmental Campus Description The Cherokee County Water and Sewerage Authority owns this facility that is permitted to discharge 6 MGD to either the Towne Lake Golf Course or Allatoona Lake. This Fulton County Department of Public Works facility is situated on 43 acres off Holcomb Bridge Road in the City of Roswell adjacent to the Chattahoochee River. It replaced the Johns Creek WRF and has a total capacity of 15 MGD with an outfall to the adjacent Chattahoochee River. The county is currently building a distribution system that will provide reuse water to multiple golf courses in northern Fulton County. Fowler WRF This Forsyth County Water and Sewer Department facility has a current capacity of 2.5 MGD. Through a 12-mile reuse pipeline, the WRF currently provides reuse water to multiple schools, Sharon Springs Park and St. Marlo Country Club. Northwest Cobb WRF The Northwest Cobb WRF conducts non-potable reuse. It is permitted to discharge 12 MGD to Allatoona Lake or direct a non-potable reuse side stream effluent to Cobblestone Golf Course, Acworth Sports Complex and Kenworth Park for reuse as irrigation water (31.6 MG used for reuse for 2014). The treatment facility provides advanced nitrogen and phosphorus removal, filtration and UV disinfection before discharge to Allatoona Lake. Planned Indirect Potable Reuse F. Wayne Hill WRC This Gwinnett County facility is a 60 MGD indirect potable reuse facility. The facility treats wastewater to extremely stringent levels and returns up to 40 MGD of flow to Lake Lanier, a primary source of drinking water for the District. This facility also has the capability to return 20 MGD to the Chattahoochee River via a 20-mile pipeline to a shared discharge with the Gwinnett Crooked Creek WRF, upstream of several drinking water intakes. Noonday Creek WRF Cobb County has two facilities that provide for indirect potable reuse through returns of highly treated wastewater to Allatoona Lake. The lake is a major water supply for portions of Cobb, Bartow, Paulding and Cherokee Counties. The Noonday Creek WRF has a capacity of 20 MGD and it performs biological phosphorus removal, filtration and UV disinfection before discharging to Noonday Creek, a tributary of Allatoona Lake. The Northwest Cobb WRF has a capacity of 12 MGD and provides advanced nitrogen and phosphorus removal, filtration and UV disinfection before discharge to Allatoona Lake. Cobb County-Marietta Water Authority has contracted with the U.S. Army Corps of Engineers for water supply storage in Allatoona Lake. Georgia EPD has exercised its authority to allocate the made inflows from both treatment facilities to Cobb County-Marietta Water Authority W.B. Casey and Shoal Creek WRFs The Clayton County Water Authority practices indirect potable reuse at two water reclamation facilities. Both facilities discharge high quality effluent into constructed treatment wetlands for natural treatment prior to discharge into Clayton County Water Authority drinking water supply watersheds. During the 2007 drought, these two systems contributed to Clayton County Water Authority water reserves, which were maintained at or above 77 percent of full capacity. The W.B. Casey WRF provides advanced secondary level treatment for 24 MGD, of which 17.4 MGD can be pumped to the E.L. Huie Jr. constructed treatment wetlands. The Huie wetlands discharge to the Pates Creek watershed, which contains the Shamrock and Blalock reservoirs, which are drinking water supply sources for the county. The Shoal Creek WRF provides advanced secondary treatment with UV disinfection for 4.4 MGD with an average of 1.4 MGD of treated effluent pumped to the Panhandle constructed treatment wetlands. The Panhandle wetlands discharge to the Shoal Creek watershed, which contains both the Shoal Creek and the J.W. Smith reservoirs, additional drinking water supply sources for Clayton County. In addition to the examples in Table 3-11, many other facilities in the District contribute to reclaimed water reuse, including: PAGE 3-22

57 Canton WPCP Coweta County Shenandoah WPCP Douglas County Sweetwater Creek Sidestream Reuse Facility Fayette County Larry B. Turner WRF and Rockaway WWTP Forsyth County Dick Creek WRF and Manor Water Reuse Facility Fulton County Little River WRF Paulding County Pumpkinvine and Upper Sweetwater WRFs SECTION 3 EXISTING FACILITIES AND CONDITIONS For future expansions of non-potable and planned indirect potable reuse facilities and discharge locations, see Appendix B Existing Interbasin Transfers The water and wastewater systems of the District operate as an interconnected service network. Interbasin transfer is commonly described as a withdrawal of water from one river basin, followed by use and/or return of some or all of that water to a second river basin. Transfers among basins are particularly common within counties that straddle the ridges between two or more basins. This situation applies in 11 of the District s 15 counties. Transfers of water and wastewater occur among municipalities, counties and basins. While interbasin transfers are an important tool for water resource management in the District, the law that created the District prohibits it from studying or including it in its plan any interbasin transfers from outside of the District area (O.C.G.A ). Table 3-12 presents the net estimated interbasin transfers in the District based on 2013 data. The information provided in Table 3-12 was submitted to Georgia EPD by utilities as part of their water withdrawal permit compliance and compiled by the Georgia EPD Water Withdrawal Permitting Program. Accordingly, this methodology differs from the methodology used in prior plans. Table Summary of Interbasin Water Transfers for 2013 a River Basin Water Gained (MGD) Water Lost (MGD) Net (+/- MGD) b Chattahoochee Coosa Flint Ocmulgee Oconee a Source: Memo from Ade Oke to Judson Turner, 2013 Annual Accounting of Interbasin Transfers in Georgia, June 13, 2014 b +/- indicates cumulative gain and indicates cumulative loss 3.5 Watershed Development Land development affects the physical, chemical and biological conditions of the District s watersheds, waterways and water resources. As land use changes from forested and rural to suburban and urban uses, the natural cycle of water (hydrology) is disrupted and altered. Clearing removes the vegetation that intercepts, slows and returns rainfall to the air through evaporation and transpiration. Grading flattens hilly terrain and fills in natural depressions that slow and provide temporary storage for rainfall. The topsoil and sponge-like layers of humus are scraped and removed and the remaining subsoil is compacted. Rainfall that once seeped into the ground now runs off the surface. The addition of buildings, roadways, parking lots and other surfaces that are impervious to rainfall further reduces infiltration and increases runoff. Stormwater drainage systems such as ditches, curb and gutter and PAGE 3-23

58 SECTION 3 EXISTING FACILITIES AND CONDITIONS storm drainage inlets and pipes further modify the natural hydrology that speeds stormwater runoff to local streams and concentrates pollutants from human activities in the watershed. Figure 3-6 illustrates how the water balance changes when natural forest cover is cleared and replaced by residential and urban development. Figure 3-6. Changes in Runoff and Hydrology Due to Development Notes: Changes in runoff and hydrology can occur based on the intensity of development. Percentages given in this figure represent a generalized scenario and are not specific to the Metro Water District. Population growth and redevelopment in the District have resulted in land use and land cover changes over the past few decades. Generally, land use has shifted from forest and agricultural lands to residential, commercial, industrial and other urbanized land uses. Figure 3-7 illustrates the change in land cover between 1978 and Based on a different dataset, Table 3-13 summarizes the percent change in land use between 1999 and Figure 3-8 illustrates the existing (2012) land use and cover in the District. More detailed information on land use in the region can be found in the River Basin Profiles in Appendix A of this Plan. The changes in watershed hydrology from land use changes can have impacts on stream conditions including: Changes in Stream Flow Increased runoff volumes, increased peak discharges, greater runoff velocities, increased flooding and lower dry weather stream flows Changes in Stream Geometry Stream erosion (widening and down-cutting), loss of riparian tree cover, sedimentation in the channel and increased flood elevations Degradation of Aquatic Habitat Degradation of habitat structure, loss of pool-riffle structure, reduced stream base flows, increased temperatures and reduced abundance and diversity of aquatic biota Water Quality Impacts Reduced dissolved oxygen and increased suspended solids, nutrients (phosphorus and nitrogen compounds), hydrocarbons (oils and grease), organic contaminants, heavy metals, toxic chemicals, trash, debris and microbial contamination (bacteria, viruses and other pathogens) PAGE 3-24

59 SECTION 3 EXISTING FACILITIES AND CONDITIONS These stream and watershed impacts can have physical, economic and aesthetic consequences to communities in the District, including the following: Losses and damages to private and public property and infrastructure due to flooding and erosion Impairment of drinking water supplies Increased cost of water supply treatment and watershed protection Loss of recreational opportunities Declining value of waterfront property Increased litigation between property owners regarding nuisance flooding Reduction in quality of life A key focus of this plan is to provide strategies to help local communities protect their watersheds from future impacts and effectively mitigate existing problems to the extent practicable. PAGE 3-25

60 SECTION 3 EXISTING FACILITIES AND CONDITIONS Figure 3-7. Land Cover in the District, 1974 and 2011 PAGE 3-26

61 SECTION 3 EXISTING FACILITIES AND CONDITIONS Table Land Use in the District: 2012 Coosa/Etowah Chattahoochee Oconee Ocmulgee Flint Tallapoosa Districtwide Total Agricultural Lands 16% 16% 12% 10% 32% 36% 14% 13% 20% 24% 28% 28% 20% 13% Commercial 2% 3% 6% 7% 1% 4% 6% 8% 5% 5% 0% 0% 3% 6% Forest/Open Space 56% 47% 38% 30% 53% 43% 36% 29% 35% 40% 53% 52% 45% 32% High Density Residential 0% 2% 3% 5% 0% 0% 2% 4% 1% 2% 0% 0% 1% 4% Industrial/Institutional 1% 1% 2% 3% 1% 0% 1% 1% 1% 4% 15% 0% 4% 2% Low Density Residential 11% 15% 11% 14% 9% 7% 10% 8% 10% 10% 0% 16% 9% 15% Medium Density Residential 9% 11% 20% 21% 3% 5% 24% 31% 17% 7% 1% 3% 12% 18% Transitional/Extractive Lands 2% 2% 2% 2% 1% 2% 3% 2% 2% 1% 3% 0% 2% 3% Transportation and Utilities 1% 2% 1% 2% 1% 2% 1% 1% 2% 0% 0% 0% 1% 2% Water/Wetlands 2% 2% 5% 6% 0% 1% 3% 3% 7% 8% 0% 0% 3% 4% Undeveloped 74% 65% 55% 45% 85% 80% 53% 45% 62% 71% 81% 81% 68% 49% Developed 26% 35% 45% 55% 16% 20% 47% 55% 38% 29% 19% 19% 32% 51% Total Impervious 6% 10% 14% 17% 4% 11% 14% 18% 12% 15% 12% 2% 11% 12% Effective Impervious 3% 6% 8% 10% 2% 6% 8% 11% 7% 9% 6% 1% 6% 7% Notes: Undeveloped = Agricultural, Forest/Open Space and Water/Wetlands Data Source: Aggregated Land Cover categories from ARC's 1999 and 2012 LandPro GIS PAGE 3-27

62 SECTION 3 EXISTING FACILITIES AND CONDITIONS Figure 3-8. Land Use in the District: 2012 Source: Atlanta Regional Commission, 2012 PAGE 3-28

63 3.6 Drinking Water Supply Watersheds SECTION 3 EXISTING FACILITIES AND CONDITIONS Most of the District s public drinking water supplies come from surface water sources, including streams, rivers and reservoirs, and therefore, protection of source water (drinking water supply) watersheds is vitally important to the region. Degradation of source water can potentially pose human health threats and increase water treatment costs for local communities. Protecting existing water supply watersheds, as well as future potential water supply watersheds, is an important element of this Plan. Figure 3-9 shows the water supply watersheds for the District. Source water watersheds are classified by drainage area size in the state of Georgia: small water supply watersheds have less than 100 square miles of land within the drainage basin upstream of the water intake, and large water supply watersheds are 100 square miles or greater in size. Small watersheds are more vulnerable than large watersheds to contamination by land use development and spills, and therefore, more intensive watershed protection is needed. This Plan provides key protections for water supply watersheds through several Action Items in Section 5 of this Plan. PAGE 3-29

64 SECTION 3 EXISTING FACILITIES AND CONDITIONS Figure 3-9. Source Water Supply Watersheds for the District NOTE: New map is currently in development. PAGE 3-30

65 3.7 Instream Conditions SECTION 3 EXISTING FACILITIES AND CONDITIONS The lakes, ponds, streams and wetlands in the District are critical resources that provide multiple benefits including drinking water, wastewater assimilation, recreation, aesthetic benefits and wildlife habitat. Use and enjoyment of these resources is dependent upon protection of water quality and aquatic habitat. This section is an overview of water quality and habitat conditions in the region Surface Water Quality The Georgia EPD establishes water quality standards for the state s surface waters. Section 303(d) of the federal Clean Water Act requires that all states list waterbodies that do not meet water quality standards. The Georgia EPD publishes a biennial list of streams that do not meet State water quality standards, referred to as the 303(d)/305(b) list. If a water body does not support its designated use (drinking, recreation, fishing, wild/scenic rivers or coastal fishing) because conditions violate water quality standards, it is considered an impaired stream or water body. Tables 3-14 and 3-15 summarize findings of the (b)/303(d) list for streams in the District. The 2014 list was finalized May These tables indicate the number of stream miles with water quality that support/do not support their designated uses and the number of stream miles impaired by each parameter for which stream miles are listed in the region. Some stream segments are listed for multiple parameters, and therefore, the sum of the stream miles in Table 3-14 is not equal to the sum of the stream miles listed in Table The River Basin Profiles in Appendix A provide additional information on surface water impairments in the District. Despite progress since 2003, roughly 1,500 miles of stream and almost 34,000 acres of lake within the District do not meet state water quality standards according to the 2014 final list of impaired waters. More information about impaired streams in the region can be found in the Georgia 305(b)/303(d) List documents. Over the past 15 years, the total number of stream miles listed as impaired in the District has decreased slightly. Stream miles and water bodies remain on the 305(b)/303(d) list until an active delisting procedure is undertaken. Over 50 percent of the listed streams are impaired due to fecal coliform levels. Fecal coliform is a parameter that may not meet state water quality standards in some waterbodies due to natural background sources. The primary source of fecal coliform is nonpoint source runoff, such as wildlife and pet waste, failing septic systems, SSOs and runoff from agricultural properties. Discharges from wastewater treatment facilities are considered to impair only a small number of stream miles, according to the inventory compiled by the Georgia EPD. The agency is currently evaluating alternative indicators that may be more specific to human health concerns. Microbial Source Tracking programs are becoming more common to characterize bacteria sources based on molecular analysis of genetic material. Microbial Source Tracking programs can help determine human or animal sources, and sometimes the species (that is, horse, dog and deer). This knowledge can then be used to select more targeted management measures. After fecal coliform impairment, impaired fish biota, then impaired benthic macroinvertebrate biota, are the most common impairments in the District. Impaired biota (for fish and benthic macroinvertebrates) is often associated with excessive in-stream sediment. Sediment enters waterbodies either from stormwater runoff leaving upland areas, as well as from stream and shoreline erosion and sedimentation. Increased impervious cover without sufficient stormwater controls can lead to increases in stormwater flows and velocities that can cause further sediment impairments that degrade in-stream habitat for biota including fish and benthic macroinvertebrate communities. Many of the Action Items in Section 5 of this Plan are designed to address water quality impairments and provide future protection for water quality. The River Basin Profiles in Appendix A provide more detail on watershed conditions and management strategies. PAGE 3-31

66 SECTION 3 EXISTING FACILITIES AND CONDITIONS Table Impaired Stream Miles in the District (2014) Category Total Stream Miles Supporting Uses 765 Not Supporting Uses 1,476 Assessment Pending 7 Total 2,248 Source: Georgia EPD (d)/305(b) Final List Table Impaired Streams in the District by Water Quality Parameter (2014) Criterion Violated Total Stream Miles a Fecal Coliform 1,108 Impaired Biota - Fish 506 Impaired Biota - Macroinvertebrates 211 Fish Consumption Guidance (polychlorinated biphenyls, toxaphene-like chlorinated camphenes, dieldrin) 176 Commercial Fishing Ban 44 Dissolved Oxygen 19 Copper 16 Lead 12 Zinc 9 ph 3 Other b 12 a Total Stream Miles may include impaired stream segments which extend across County boundaries outside of the District b Other = Alpha-Hexachlorocyclohexane, Beta-Hexachlorocyclohexane, Toxicity, Trichloroethane and Tetrachloroethene Source: Georgia EPD (d)/305(b) Final List Protected Aquatic Species The District is home to a number of native species that are considered threatened or endangered and receive federal or state protection based on their rare status. These species include a number of protected animal species that spend all or part of their life cycle in rivers and streams, or depend on streams for a portion of their life history. They also include protected plants that are either aquatic or semi-aquatic and grow within or along the margins of rivers and streams. At present, the Etowah sub-basin of the Coosa Basin, which is partially located in the District, is habitat for several federally protected fish species. In addition, a portion of the Tallapoosa basin in Paulding County is officially designated as critical habitat for federally-protected freshwater mussels. This area in Paulding County is a part of Designated Critical Habitat Unit 16. The mainstem Oostanaula and Coosawatee Rivers are also designated critical habitat for federally protected freshwater mussels, but the designated parts of these basins are not located in the District. The Georgia Division of Wildlife Resources has set forth a plan to protect the state s biodiversity, including its rare species, in A Comprehensive Wildlife Conservation Strategy for Georgia. PAGE 3-32

67 SECTION 4 Future Conditions Developing a long-term water resource management plan requires projecting forward from baseline conditions to envision the region s future water resource management needs. This section describes the water demand and wastewater flow forecasts for the District. These forecasts are based on population and employment projections for the region. This section also projects future watershed development conditions that will affect watershed management needs and concerns. 4.1 Population and Employment Projections For the 2017 Plan Update, the District used two sets of population and employment projections, presented in Tables 4-1 and 4-2, to forecast future water and wastewater demands: Scenario 1: ARC Population and Employment Projections (2020 to 2050) Scenario 2: Georgia Office of Planning and Budget (OPB) Population Projections and OPB-Based Employment Projections (2020 to 2050) ARC population and employment projections were prepared by ARC s Research and Analytics Division (RAD) for use by the District for the purpose of water demand forecasting as part of the 2017 Plan Update. ARC provided county-level population and employment projections that were calculated using a Regional Econometric Models Inc. (REMI) econometric model. County level projections were reviewed by Metro Water District jurisdictions and adjusted to account for factors driving future growth that are not captured by the REMI model. OPB population projections were prepared in 2015 by the University of Georgia s Carl Vinson Institute of Government using a traditional population cohort-component model. OPB and ARC used different methodologies for their projections, and OPB did not provide future employment forecasts. Therefore, corresponding future employment forecasts for the OPB population projections were developed by ARC s RAD using a simple share allocation method. A ratio of population to employment for each year by county was calculated using the standard REMI projection per county. This ratio was then applied to the OPB population number to create an annual employment projection for each county. The ARC and OPB forecasts are separate and independent projections of future population for each county in the District. These independent projections were derived using different methodologies, and the District developed projected water demand and wastewater flows using both projection scenarios to improve forecast reliability. The water demand and wastewater flow forecasts are described in Sections 4.2 and 4.3. PAGE 4-1

68 SECTION 4 FUTURE CONDITIONS Table 4-1. Population Projections by County ARC Population Projections (Scenario 1) OPB Population Projections (Scenario 2) County Bartow 130, , , , , , , ,085 Cherokee 270, , , , , , , ,713 Clayton 283, , , , , , , ,509 Cobb 726, , , , , , , ,089 Coweta 165, , , , , , , ,779 DeKalb 725, , , , , , , ,063 Douglas 148, , , , , , , ,930 Fayette 109, , , , , , , ,033 Forsyth 255, , , , , , , ,255 Fulton 1,050,286 1,143,594 1,235,645 1,310,110 1,104,788 1,278,928 1,453,507 1,631,265 Gwinnett 927,056 1,073,102 1,239,115 1,392, ,396 1,176,845 1,375,267 1,581,299 Hall 234, , , , , , , ,828 Henry 256, , , , , , , ,121 Paulding 169, , , , , , , ,621 Rockdale 96, , , ,344 95, , , ,086 Total 5,551,674 6,392,420 7,221,360 7,874,632 5,670,468 6,547,495 7,429,586 8,345,677 PAGE 4-2

69 SECTION 4 FUTURE CONDITIONS Table 4-2. Employment Projections by County ARC Employment Projections (Scenario 1) OPB-based Employment Projections (Scenario 2) County Bartow 62,524 69,819 76,352 82,193 56,867 60,238 64,315 67,420 Cherokee 95, , , ,021 93, , , ,806 Clayton 187, , , , , , , ,433 Cobb 526, , , , , , , ,297 Coweta 64,037 71,972 79,668 86,453 59,100 64,128 72,319 83,664 DeKalb 524, , , , , , , ,463 Douglas 71,786 81,812 91, ,510 75,234 86,585 98, ,990 Fayette 84,908 93, , ,192 88,750 92,465 92,761 96,461 Forsyth 85, , , ,805 82,447 94, , ,952 Fulton 1,098,358 1,182,107 1,268,878 1,360,794 1,155,354 1,321,998 1,492,600 1,694,373 Gwinnett 488, , , , , , , ,803 Hall 118, , , , , , , ,118 Henry 96, , , ,670 90, , , ,754 Paulding 54,898 63,544 72,732 80,089 55,205 62,337 71,178 81,900 Rockdale 54,289 61,027 67,890 74,363 53,379 57,593 61,037 64,510 Total 3,613,688 3,981,444 4,359,867 4,728,759 3,735,312 4,174,014 4,587,799 5,076,944 PAGE 4-3

70 SECTION 4 FUTURE CONDITIONS 4.2 Water Demand Forecasts Methods Water demand forecasts for the Plan Update were generated with the same approach used for prior versions of the Plan. The water demand forecasts are mainly a function of two variables: (1) future projections of population and employment, and (2) future water use by residents and employees. The latter category includes assessment of specific projections of future per capita water use, future per employee water use and water conservation impacts and adjustment of the total demand to account for potential uncertainty in projecting the future. The methodology is discussed below. The District employed the Demand Side Management Least Cost Planning Decision Support System (DSS) Model computer model tool developed by Maddaus Water Management to develop the water demand forecasts. This model, which was developed in 1999 and is continually updated, was also used for the 2003 Plan and 2009 Plan Update. The projections developed for the 2017 Plan Update include an additional element of analysis that was not used in previous projection calculations. To account for the variability of key forecast determinants, an uncertainty factor, which progressively increases to 13 percent in 2050, was applied to the base water demand forecasts for each county. The key forecast determinants used in this uncertainty analysis included population growth rate, employment-to-population ratio, per capita residential water use and per employee commercial water use. The DSS Model was used to forecast water demand for the 15 District counties for 2015 through The DSS Model includes a conservation component that quantifies savings from existing efficiency standards (for example, plumbing codes and appliance standards) and active conservation programs over time. Only conservation impacts from existing efficiency standards were assessed for the 2017 Plan Update. Conservation from existing efficiency standards refers to water savings resulting from customer actions and activities that do not depend on direct involvement with utility conservation programs. These activities are required by the current plumbing codes and appliance standards: (1) natural replacement of existing plumbing fixtures and appliances with water-efficient models, and (2) installation of water-efficient fixtures in new buildings and retrofits in existing buildings. The forecasts in this Plan consider potential water savings from existing efficiency standards that are implemented over time. The steps in the DSS Model process are illustrated on Figure 4-1. Using two distinct approaches, top-down and bottom-up, the DSS Model calculates anticipated indoor and outdoor water demands for each customer category: single-family residential, multifamily residential, commercial, industrial, institutional and other categories, as established by the local water provider. The top-down approach breaks overall water usage by total consumed/billed, by customer category and by indoor and outdoor use. The bottom-up approach examines the specific end uses of water (for example, toilets, showers, faucets and irrigation) and the frequency of those end uses. The model aggregates the specific end uses to calculate total water use for each customer category. Each county s specific conditions were calibrated using this approach. The following sections describe the water demand forecasts methods in more detail. PAGE 4-4

71 SECTION 4 FUTURE CONDITIONS Figure 4-1. DSS Model Overview PAGE 4-5

72 SECTION 4 FUTURE CONDITIONS Data Collection Water demand forecasts for the District were based on three main data inputs: 1. Population and employment forecasts (presented in Section 4.1) 2. Water billing, production and withdrawal data 3. Plumbing fixture and appliance stock (by county) The second input enables the model to build a water use profile by customer category for existing conditions. The first input is used to project current unit-based demands forward through the planning horizon. The third input is used to quantify the expected reduction in current water use trends based on the conversion of inefficient plumbing fixtures and appliances as a result of the current requirements of the plumbing code and appliance standards (existing efficiency standards). Other demographic data used for the model were obtained from the 2010 decennial U.S. Census and 2013 U.S. Census estimates. Water Billing, Production and Withdrawal Data Water use data were obtained from local water providers in the District. These data included customer billing (water use data) by customer category, water withdrawals, water production, water loss audits, maximum day demands, records of abnormal years and planning documents, if available. Figure 4-2 shows the process by which water is conveyed from its source to its end use and how the provided billing data were separated into various components for further analysis. Water utility data were collected to take into account water sold between counties. In cases where more than one water utility exists in a county, the billing data from those utilities were combined to support county-level calculations. Figure 4-2. Water System Diagram These data were used to develop estimates of water demand per account for each customer category and to calculate a forecast baseline for county-level water use totals. The forecast baseline of water use for each county in the District is shown in Table 4-3 in AAD-MGD. The baseline use estimates were based on data from 2010, 2011, 2012 and 2014, as available. Rainfall totals in 2013 were much higher than normal, and water demands that summer were lower than normal. In order to create a representative baseline demand, demand data for 2013 were removed from the baseline calculations. Baseline water use in the District incorporates the District s historical and ongoing water conservation program and existing plumbing codes and appliance standards. In order to reflect the enhanced efficiency and conservation effects, only the most recent several years of data were included in the baseline calculation. PAGE 4-6

73 SECTION 4 FUTURE CONDITIONS Table 4-3. Municipal Water Demand Baseline per County (AAD-MGD) County Baseline Water Demand (AAD-MGD) Bartow Cherokee Clayton Cobb Coweta DeKalb Douglas Fayette Forsyth Fulton Gwinnett Hall Henry Paulding Rockdale Total Note: These baseline demands account for all people and jobs in each county, not reflective of water source location, or WTP production. They account for self-supplied, as well as publicly supplied, and include losses due to production and distribution, if applicable. Non-revenue Water The forecast baseline water demands include NRW. Estimates of NRW were compiled using water loss audits from each water provider and compiled withdrawal/production and consumption data. NRW and water loss are indicators of the efficiency of a water distribution system. NRW is defined by the International Water Association (IWA)/American Water Works Association (AWWA) as the total water in the system (including water produced and imported) minus the total billed consumption. It is the water that does not provide revenue to the local water provider. NRW can be subdivided into three categories: unbilled authorized, apparent losses and real losses. Unbilled authorized uses include fire-fighting, hydrant flushing, street cleaning and public fountains. Apparent losses include meter inaccuracies, data errors and unauthorized consumption (theft or illegal connections). Real losses include physical losses from any type of leakage, breakage or overflow. For this Plan Update, NRW and water loss were determined using the withdrawal/production and consumption data and verified using the system-specific water audits. The IWA/ AWWA methodology that defines NRW and water loss is a new national standard, and as it becomes more widely understood and used by water systems, more complete local data should become available. Although the NRW and water loss information has limitations, it is important to highlight that the integrity and quality of the data provided by the local water providers were more robust and complete compared to that used for previous versions of the Plan. The forecast baseline PAGE 4-7

74 SECTION 4 FUTURE CONDITIONS for water demands also accounts for production losses during the water treatment process. These losses were accounted as part of the NRW. Consumption by Customer Service Category The local water provider production data is broken out by customer category (such as single-family residential, commercial and industrial) and used along with NRW and water loss data to create a District water use profile (Figure 4-3). With the demand per account estimate for each customer category, the number of accounts was used to calculate the total baseline demand in each county. In cases where all the major water suppliers within each county provided their complete billing data, the number of accounts was taken directly from the data. In cases where part or all of the billing data were unavailable, the number of accounts was estimated using 2010 and 2013 U.S. Census data or extrapolated from the water demand modeling conducted for previous versions of the Plan, relative to any population or employment increase. A self-supplied customer category was included for counties with a historically significant population using private wells. Self-supplied populations were calculated from the 2003 Plan water demand modeling efforts and data from the U.S. Census for 2010 and Residential water use, including single-family and multifamily residential use, accounts for 54 percent of the District s total water use. Figure 4-4 shows the water use profile for each county in the District. Table 4-4 shows the resulting baseline per capita and per employee uses for residential single-and multi-family, as well as other non-residential uses, including indoor and outdoor use. Baseline per capita water use was calculated using the years 2010, 2011, 2012 and As such, and because of the declining per capita trend, this number may be higher than the current per capita use. The use of conservative baseline per capita estimates allows for reasonably conservative planning and takes into account the interannual variability in water use. Figure 4-5 summarizes the District s Single Family End Uses, which were applied to calibrate the model as described in the Modeling and Analysis section. PAGE 4-8

75 SECTION 4 FUTURE CONDITIONS Real Losses 14% Apparent Losses 3% Unbilled Authorized 2% Self Supplied 2% Other (irrigation, agriculture) 3% Public (government, institutions) 2% Single Family 42% Industrial 4% Commercial 16% Multifamily 12% Figure 4-3. Water Use Profile, District Baseline PAGE 4-9

76 SECTION 4 FUTURE CONDITIONS 100% 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% Bartow Cherokee Clayton Cobb Coweta DeKalb Douglas Fayette Forsyth Fulton Gwinnett Hall Henry Paulding Rockdale Single Family Multifamily Commercial Industrial Public Other Self Supplied Figure 4-4. County-Level Water Use Profiles, District Baseline PAGE 4-10

77 SECTION 4 FUTURE CONDITIONS Table 4-4. Baseline Water Use Profile by County (GPCPD) County Baseline Total System Use (gpcpd) a Baseline Indoor Baseline without NRW (GPCPD) b Baseline Outdoor e Baseline % Outdoor Baseline Total Use Baseline Indoor Single-family Residential (GPCPD) c Baseline Outdoor e Baseline % Outdoor Baseline Total Use Baseline Indoor Multifamily Residential (GPCPD) c Baseline Outdoor e Baseline % Outdoor Baseline Total Use Non-Residential (gallons per day per employee) c Baseline Indoor Baseline Outdoor e Baseline % Outdoor Baseline Total Use Bartow % % % % 215 Cherokee % % % % 33 Clayton % % % % 36 Cobb % % % % 40 Coweta % % % % 69 DeKalb % % % % 33 Douglas % % % % 36 Fayette % % % % 28 Forsyth d % % 60 NA NA NA NA % 62 Fulton % % % % 40 Gwinnett % % % % 37 Hall % % % % 69 Henry % % % % 37 Paulding % % % % 36 Rockdale % % % % 58 Weighted Average f % % % % 44 a The baseline total per capita use was calculated using the baseline water demand estimates and the average population estimates. This column includes NRW. b Includes self-supplied, does not include NRW. c Publically supplied water and population only d Billing data for Forsyth County include multifamily in single-family category. e Outdoor use is defined as all use above the winter minimum level. f Weighted average is based on population. GPCPD = gallons per capita per day PAGE 4-11

78 SECTION 4 FUTURE CONDITIONS Other 13% Outdoor 19% Baths 2% Clothes Washers 14% Toilets 16% Dishwashers 1% Showers 20% Faucets 15% Plumbing Fixture Stock Outdoor Toilets Faucets Showers Dishwashers Clothes Washers Baths Other Figure 4-5. Single Family End Uses, District Baseline Plumbing fixture stock was estimated from housing age data provided by the 2010 decennial U.S. Census, 2013 U.S. Census estimates and the implementation status reports developed by the District with input from its member jurisdictions. It was adjusted based on a projected replacement rate that estimated the rate of installation of more efficient fixtures, as described below. The types of plumbing fixtures installed in houses and other buildings play a large role in current and forecasted indoor water use. Toilets are historically the largest indoor water use, and therefore, the analysis of plumbing stock is focused on toilet replacement. Counties with more recent development, such as Forsyth and Paulding, are estimated to have low levels of inefficient toilets. Alternatively, counties that developed more heavily in past decades, such as Fulton and DeKalb, have a higher percentage of inefficient toilets. Therefore, counties with large percentages of high flush toilets have a higher water savings potential in the future from the natural replacement of fixtures due to plumbing code. Estimates for existing types of toilet fixtures by county are shown on Figure 4-6. A decrease in use can be attributed to the conservation and efficiency programs implemented across the District. One such example is retrofits on reconnection as implemented by DeKalb County. The housing stock also allows for estimates of other water using fixtures and appliances to be determined. In addition to toilets, these estimates were developed for urinals, faucets, and washing machines. PAGE 4-12

79 SECTION 4 FUTURE CONDITIONS 100% 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% 1.28 gpf HET 1.6 gpf ULFT High Use Toilet gpf = gallons per flush HET = high-efficiency toilet ULFT = ultra low-flow toilet Figure 4-6. Toilet Fixture Estimates by County, District Baseline Analysis The total demand for each county was estimated based on gallons-per-day per-account unit-based demands for each customer category and the number of customer accounts. In most cases, the numbers of accounts were taken directly from the data provided by the water utilities. Since there is no standard billing category system in place in the District, common categories were used across the District for comparative purposes. The main categories were: Single-Family Residential Multifamily Residential Commercial Industrial Institutional Other categories were included based on the billing data submitted by the water utilities. These included categories for separately metered irrigation use and individual industries (for example, food processing and beverage production). These categories were aggregated under the non-residential category in Table 4-4. To forecast self-supplied, a one percent annual conversion from self-supplied water to water utility service was assumed through the forecasting horizon. In some cases, this annual conversion rate was lowered to 0.5 percent based on feedback from the water utilities. The bottom-up analysis considered end uses of water and was conducted to confirm and adjust the topdown water use estimates. For this analysis, the initial estimates for fixture use (frequency and volume) were obtained from the Water Research Foundation study, Residential End Uses of Water (Version 2, 2016, #4309). Table 4-5 lists end uses, share of total use, frequency of use factors and average volume per PAGE 4-13

80 SECTION 4 FUTURE CONDITIONS use for a single-family account, based on the Water Resources Foundation study. These initial end use estimates were compared to the existing stock of plumbing fixtures in each of the counties from the topdown analysis. For instance, counties with a larger percentage of older homes have a larger portion of indoor use attributed to toilet flushing than counties with a higher percentage of new development. Table 4-5. National Average Single Family Indoor Water End Uses Water Research Foundation End Use Share of Total Indoor Water Use a GPCPD Average Number of Uses per Capita per Day a Toilets 24% flushes Washing Machines 16% loads Shower 19% showers and baths Faucet 19% minutes Leaks 13% Other Domestic 4% Bath 3% Dishwasher 1% loads Indoor Total 100% a Data Source: Water Research Foundation, 2016 Forecasted demands for the planning period (2015 to 2050) account for the effects of the existing state and federal plumbing codes and appliance standards. These include the National Energy Policy Act of 1992, Georgia Water Stewardship Act of 2010 and the EPA ENERGY STAR program. These codes and standards apply to a broad range of plumbing fixtures and appliances, but those considered in the DSS Model analysis for the 2017 Plan Update were toilets, urinals, showerheads and washing machines. The bottom-up end use analysis supports adjustment of water demand forecasts to account for the effect of existing efficiency standards due to the implementation of the Georgia Water Stewardship Act and the plumbing and building codes. Over time, the code and standards gradually have and will continue to reduce indoor per capita water use because they will result in a growing percentage of homes and buildings with high-efficiency fixtures. The forecast demands that include water savings due to existing efficiency standards are referred to as the with enhanced efficiency demand. The savings from enhanced efficiency standards reduce the baseline water demand forecast for each county through The savings per county vary between 9 and 11 percent depending on the existing age of housing stock and population growth. Overall, the District-wide savings from enhanced efficiency standards amount to a 10 percent reduction over baseline by The estimated rates for natural replacement due to enhanced efficiency standards (that is, plumbing codes and appliance standards) that were used in the demand forecast model are presented in Table 4-6. Specific water savings resulting from enhanced efficiency standards vary by county depending upon the demographics of each county and its current share of various flow fixtures in existing dwellings and businesses. The calibration of the top-down and bottom-up analyses in the model generated estimates of typical single-family residential end uses. PAGE 4-14

81 SECTION 4 FUTURE CONDITIONS Table 4-6. Current Plumbing and Appliance Standards and Estimates of Natural Rate of Plumbing Fixture and Appliance Conversion End Use Current Plumbing Code Natural Replacement Rate a Toilets 1.28 gpf b 2% per year Urinals 0.5 gpf b 2% per year Showerheads 2.5 gpm c 4% per year Washing Machines 19 gallons per load or less 10% per year d a Source: Water Research Foundation, 2015 b Georgia Water Stewardship Act of 2010 applies to toilets and urinal standards of 1.28 and 0.5 gallons per flush (gpf) c National Energy Policy Act of 1992 applies to showerhead standard of 2.5 gallons per minute (gpm). d EPA, 2012 Uncertainty Analysis Water demand forecasts that will be used for water resource planning purposes must be reasonably conservative, because it takes many years to plan, develop, and construct the infrastructure necessary to meet future water needs. Any projection of future water demand, however, is subject to some uncertainty because the drivers of water use vary over time. For the 2017 Plan Update, the DSS Model provided forecasts of future water demands by county for each of the population scenarios analyzed. Actual future water use over the long-term (35-year) planning horizon could be lower or higher than these forecasts as a result of variability in the key drivers of water demand, including population growth, employment growth and water use rates. For example, two key water demand drivers include potential shifts in employment sectors and job growth across the region. Because the District needs to provide reasonably conservative projections of water demands, an "uncertainty factor" was used to adjust water demand projections to account for potential variability. This uncertainty factor was derived by analyzing historical variability relative to four water demand drivers: 1. Population growth rate 2. Employment/population ratio 3. Per capita residential water use 4. Per employee commercial water use Probability distributions based on historical data were created for each demand driver and truncated to remove unrealistic extremes. Then, a Monte Carlo analysis (50,000 simulations) was conducted to determine future water demand probabilities based on the observed historical variability in demand drivers. The results of this Monte Carlo analysis were used to estimate the range of probabilities around the median water demand forecasts. It is industry best practice to select a level of uncertainty above the median probability for water demand and supply planning. Many large local and regional planning entities, such as Seattle, Tacoma and Tampa Bay, use somewhere between the 60th and 75th percentile for water demand forecasting. The 65th percentile of the water demand forecast was used to calculate the uncertainty factor that was applied to each individual county. For each county, this resulted in an increase in water demands of approximately three percent at the start of the projections that grew to approximately 13 percent for the 2050 projections. PAGE 4-15

82 SECTION 4 FUTURE CONDITIONS Water Demand Forecasts with Enhanced Efficiency Standards and Uncertainty Analysis Using the methods described above, the model generated water demand forecasts for the District for the baseline through Table 4-7 presents the county-level water demand forecasts. As noted above, the baseline was calculated based on data from 2010, 2011, 2012 and The forecasts are adjusted to reflect the effects of efficiency standards and the uncertainty factor. The forecasts are reported in terms of AAD- MGD basis. Figure 4-7 summarizes the District population projections and water demand forecasts. It demonstrates how the water demand forecasts have decreased from the previous versions of the Plan. The availability of better data for the 2017 Plan Update produced a more reliable set of water demand forecasts. As discussed in Section 4.1, the water demand forecast scenarios are based on two different population projections by ARC (Scenario 1) and Georgia OPB (Scenario 2). Figure 4-7 shows the effect of enhanced efficiency standards by providing two lines for each 2017 Plan Update Scenario: one with the effect of the enhanced efficiency standards (lower line) and one without this effect (upper line). Table 4-7. Water Demand Forecasts for the District with Enhanced Efficiency Standards and Uncertainty through 2050 County Baseline Water Demand (AAD-MGD) 2025 Water Demand (AAD-MGD) 2050 Water Demand (AAD-MGD) Scenario 1 Scenario 2 Scenario 1 Scenario 2 Bartow Cherokee Clayton Cobb Coweta DeKalb Douglas Fayette Forsyth Fulton Gwinnett Hall Henry Paulding Rockdale District Total Note: The Metro Water District provided information comparing water use projections in the Plan with the State of Georgia s 2015 Water Supply Request in a memorandum to the Georgia EPD Director dated May 2, There is no substantive difference between the projections. PAGE 4-16

83 SECTION 4 FUTURE CONDITIONS 2,000 9,000,000 Water Demand AAD-MGD 1,800 1,600 1,400 1,200 1, ,000,000 7,000,000 6,000,000 5,000,000 4,000,000 3,000,000 2,000,000 1,000,000 Population Plan Water Demand Forecast Baseline 2003 Plan Water Demand Forecast With Conservation 2009 Plan Water Demand Forecast Baseline 2009 Plan Water Demand Forecast With Conservation 2017 Plan Update Scenario 1 Baseline 2017 Plan Update Scenario 1 Baseline with Enhanced Efficiency 2017 Plan Update Scenario 2 Baseline 2017 Plan Update Scenario 2 Baseline with Enhanced Efficiency Water Withdrawals Historic Population Scenario 1 Population Scenario 2 Population Figure 4-7. Comparison of Water Demand Forecasts for the District PAGE 4-17

84 SECTION 4 FUTURE CONDITIONS 4.3 Wastewater Forecasts This section explains the methods used to develop the wastewater demand forecasts for the District, and it provides the wastewater demand forecasts for the region through In summary, in 2050, the District will generate 631 to 667 MGD that will be treated in centralized wastewater systems and 76 to 79 MGD that will be treated by septic systems on an AAD basis. The AAD volume for centralized systems is equivalent to a maximum monthly flow of 788 to 833 MGD. Many counties have current wastewater treatment capacities that exceed the MMF projections for Data from 2014 show actual discharge flows totaling 390 MGD (AAD) for centralized systems in the District Methods The wastewater flow calculation methods used for this Plan are illustrated on Figure 4-8. Each of the components on the figure is described in the following subsections. These methods were used to project flow to central wastewater collection and treatment systems and septic systems. In general, the wastewater flow forecasts were calculated based on the water use forecasts. Figure 4-8. Wastewater Flow Calculation Wastewater Generated Because outdoor water use does not influence wastewater flows, the starting point for the wastewater forecasts are the indoor water use forecasts (residential and non-residential) calculated by the DSS Model and described in Section 4.2. Two sets of water use projections were developed for this Plan Update, and these scenarios are described in Section 4.1. The same uncertainty factors that were applied to the overall water use projections were applied to the indoor water use projections for each planning year. The estimates of wastewater flow generated are projected as AAD flows, which are adjusted for peak flows as described below. Septic Systems Wastewater is discharged to either septic systems or wastewater collection systems. Septic system flows were calculated, as outlined below, and subtracted to determine the flow into wastewater collection systems. The District s 2009 Wastewater Management Plan estimated future septic flows based on an equation that projected the conversion of septic tanks to sewer over time. As a part of this plan update, however, utilities within the District report this has not occurred at the rate previously forecasted. Therefore, for the 2017 Plan Update, future septic system flows were forecasted using a county-by-county approach that accounts for variation among counties in the amount and type of growth. PAGE 4-18

85 SECTION 4 FUTURE CONDITIONS To estimate the future septic system flows in each county, the current percentage of single-family residences using septic systems was calculated by dividing the total estimated number of septic systems by the total number of single-family residences in the county. The estimated number of septic systems was based on data from the GADPH, and current estimates of septic system use are provided in Section The number of single-family residences was based on U.S. Census data from 2010 to Next, one of three types of projection estimates was performed for each county: 1. Urban Counties (Cobb, Cherokee, Clayton, DeKalb, Forsyth, Fulton and Gwinnett): For these counties, it was assumed that the number of new septic systems will be offset by those transitioning to sewer. Thus, the initial number of septic systems was estimated to remain constant for the 2015 to 2050 planning period for these counties. 2. Suburban Counties (Bartow, Fayette, Henry and Rockdale): For these counties, the historical percentage of single-family residences on septic systems was retained through the forecast period (2015 to 2050), reflecting the expectation of new septic systems in the future. 3. Modified Suburban Counties (Coweta, Douglas, Hall and Paulding): For these counties, the estimated baseline number of septic systems was modified based on utility input. It was assumed that all residences that have self-supplied water also use septic systems. The remainder of single-family residences on septic systems was calculated based on available water and sewer connection data to reflect the number of water utility customers that are not sewer customers. The future percentage of septic versus centralized sewer was based on utility input regarding expected county development trends. The septic system projections were modified on a county-by-county basis as necessary to address specific feedback received from individual utilities. Additionally, a confirmation check was performed using data on the number of water accounts and sewer accounts, when available, to assist in validating the septic system estimates. Infiltration and Inflow Once the total flow entering the wastewater collection system was estimated, an infiltration and inflow factor was added to that flow to account for water entering the collection system from sources other than wastewater flows generated from indoor water use. For the District s 2009 Wastewater Management Plan, a standard industry estimate of 20 percent infiltration and inflow was used for each of the counties; however, based on feedback from District utilities, county-specific infiltration and inflow factors are thought to provide more accurate estimates. County input was reviewed, and initial forecasts were aligned with the trend line of historical flow data from 2006 to 2014 to estimate county-specific infiltration and inflow factors, which were then applied to the county level wastewater forecasts. Interjurisdictional Flow Next, the centralized system wastewater flow was adjusted to account for incoming and outgoing interjurisdictional flow. Data on interjurisdictional flow were obtained from District utilities. Historical flows across county lines were gathered for 2006 to The average of the historical flow data was used as the starting point for each 2015 county-to-county interconnection projection. Each county-to-county interconnection was then forecasted through the planning period based on the growth rate of total county flow in the originating county. Flows were added to each county s initial wastewater projections to account for flow entering from other counties, and flows were subtracted to account for flows leaving the county to be treated at another county s facility. In instances where county-to-county agreements include a maximum capacity limit, interjurisdictional flows were capped at that maximum value. PAGE 4-19

86 SECTION 4 FUTURE CONDITIONS Peaking Factor Because wastewater treatment facilities are permitted on an average daily MMF basis, it is necessary to add a peaking factor to the AAD flow that was calculated to account for situations in which flow into facilities is greater than normal. The District s 2009 Wastewater Management Plan added a standard 25 percent peaking factor to calculate maximum month average daily flow entering the county s wastewater treatment facilities. For the 2017 Plan Update, to verify this number, maximum month peaking factors were calculated for each publicly owned wastewater treatment facility using data provided by the individual utilities. Expected trends were generally demonstrated district-wide, with smaller plants having higher peaking factors and larger plants having lower peaking factors. A review of the calculated results indicated that 25 percent is reasonably representative as a districtwide peaking factor estimate, and therefore, this factor was used for all wastewater flow forecasts for the District Septic System Use Forecasts The resulting forecasts for wastewater flows to septic systems in the District are provided in Table 4-8. There are two sets of projections based on two different population scenarios, ARC (Scenario 1) and Georgia OPB (Scenario 2), described in Section 4.1. As noted above, the 2009 Plan Update projected that a substantial number of single-family residences on septic systems would convert over time to sewer, but for the 2017 Plan Update, the rate of future conversion was adjusted on a county-by-county basis. Table 4-8. Forecasted Septic System Flows by County (AAD-MGD) County Baseline Septic System Flows (AAD-MGD) 2025 Septic System Flows (AAD-MGD) 2050 Septic System Flows (AAD-MGD) Scenario 1 Scenario 2 Scenario 1 Scenario 2 Bartow Cherokee Clayton Cobb Coweta DeKalb Douglas Fayette Forsyth Fulton Gwinnett Hall Henry Paulding Rockdale District Total Note: The two scenarios are based on different population projections, as described in Section Wastewater Flows Forecasts The resulting wastewater flow forecasts for centralized wastewater systems in the District are provided in Tables 4-9 and Table 4-9 provides county level projections of AAD flows in MGD for centralized wastewater systems in 2025 and Table 4-10 provides county level projections of MMFs in MGD for centralized wastewater systems in 2025 and In both tables, there are two sets of forecasts based on the two PAGE 4-20

87 SECTION 4 FUTURE CONDITIONS population projection scenarios, ARC (Scenario 1) and Georgia OPB (Scenario 2), described in Section 4.1. The facilities that will treat this wastewater in the future are described in more detail in the county level summaries in Appendix B of this Plan. The wastewater forecasts for the 2017 Plan Update were compared to the forecasts for the 2009 Plan Update. The total centralized wastewater flow projections for 2050 are 16 to 20 percent lower than 2035 projections from the 2009 Plan Update. The decrease in the forecast is primarily due to decreased water demand projections, as well as changes in the assumptions used for septic system conversion to central sewer. Table 4-9. Wastewater Flow Forecasts for Centralized Wastewater Treatment Facilities (AAD) County Baseline Centralized Wastewater Treatment System Flows (AAD-MGD) 2025 Centralized Wastewater Treatment System Flows (AAD-MGD) 2050 Centralized Wastewater Treatment System Flows (AAD-MGD) Scenario 1 Scenario 2 Scenario 1 Scenario 2 Bartow Cherokee Clayton Cobb Coweta DeKalb Douglas Fayette Forsyth Fulton Gwinnett Hall Henry Paulding Rockdale District Total Note: The two scenarios are based on different population projections, as described in Section 4.1. PAGE 4-21

88 SECTION 4 FUTURE CONDITIONS Table Wastewater Flow Forecasts for Centralized Wastewater Treatment Facilities (MMF-MGD) County Baseline Centralized Wastewater Treatment System Flows (MMF-MGD) 2025 Centralized Wastewater Treatment System Flows (MMF-MGD) 2050 Centralized Wastewater Treatment System Flows (MMF-MGD) Scenario 1 Scenario 2 Scenario 1 Scenario 2 Bartow Cherokee Clayton Cobb Coweta DeKalb Douglas Fayette Forsyth Fulton Gwinnett Hall Henry Paulding Rockdale District Total Note: The two scenarios are based on different population projections, as described in Section Septic System Impact to Wastewater Treatment Facilities While septic system flows are not directly treated by the local wastewater treatment facilities, the septage that is pumped from septic systems should be considered in future treatment facility sizing. Septage is stronger than traditional wastewater influent; specifically, it has a higher total suspended solid and biological oxygen demand load on receiving wastewater treatment facilities. If septage is illegally disposed of in storm sewers, sanitary sewers or water bodies, it negatively impacts local water quality and can disrupt operations at wastewater treatment facilities. To minimize illegal dumping, it is essential that communities and wastewater providers maintain a plan for proper septage disposal when determining future areas to be served by septic (INTEGRATED-10). 4.4 Watershed Land Uses Changes As regional population and employment continue to grow, land development will also continue to increase. A trend of continued development is expected in the District through 2050 with the larger land use transitions occurring outside of the urban core areas. Within the urban core areas, increases in density and land use intensity are anticipated due to infill and redevelopment, which is expected to continue and accelerate in future years throughout the region. PAGE 4-22

89 SECTION 4 FUTURE CONDITIONS Continued land development will be accompanied by consequent increases in impervious surfaces. Impervious surfaces, both natural and manmade, do not allow rainfall to soak or infiltrate into the soil, and rainfall that falls on impervious surfaces runs off to pervious areas or surface waters. Concurrent with the development of this Plan, ARC developed the Atlanta Region s Plan, described in Section For that planning process, a Unified Growth Policy Map was developed. While this map does not project where future development and growth will occur, it does inform ARC and other regional commission on where policies may be used to direct future growth. Figure 4-9 is a map for the development and growth types for a 20-county area of Metropolitan Atlanta. This map includes five counties that are not in the 15-county District: Spalding (to the southeast), Barrow, Newton and Walton (to the east) and Carroll (to the west). Additional information on regional land-use and growth policies can be found in The Atlanta Region's Plan. Detailed information on current and potential future land-use can be obtained using local comprehensive development plans and zoning maps. Overall, historic land cover changes in the future suggest that undeveloped lands, including water/wetlands, forests and agricultural lands, will transition to more developed, urbanized lands with residential and urban land uses. The most significant transitions in land cover are expected to occur outside of the central, urbanized areas of the District, with the largest changes projected in areas that currently have more agricultural and undeveloped lands, including Cherokee, Bartow, Paulding, Coweta, Hall and Rockdale Counties. As land uses change to accommodate growth, actions such as post-construction stormwater management, design standards, and comprehensive land use planning will be critical to manage stormwater runoff and prevent nonpoint source pollution. More detailed land use characterizations are described in the River Basin Profiles in Appendix A for each HUC-8 watershed. PAGE 4-23

90 SECTION 4 FUTURE CONDITIONS Figure 4-9. Unified Growth Policy Map, The Atlanta Region s Plan Source: ARC, 2016 PAGE 4-24

91 SECTION 5 Action Items Section 5 includes the required Action Items of this Plan. The Metro Water District, Georgia EPD, local governments and local water and sewer providers within the District all play important roles in implementing the Action Items described in this section. Local governments and local water and sewer providers are required to comply with the actions as described within this section. Georgia EPD enforces this Plan s provisions through an auditing and permitting process. For example, local jurisdictions must demonstrate compliance with this Plan in order to obtain permits for new or expanded water withdrawals or wastewater discharges and renewal of NPDES MS4 permits. Furthermore, consistency with Plan requirements is necessary to obtain GEFA grant or loan funding for water resource projects. The Action Items are organized by planning area in the following sub-sections: 5.1: Integrated Water Resource Management Action Items 5.2: Water Supply and Water Conservation Action Items 5.3: Wastewater Management Action Items 5.4: Watershed Management Action Items 5.5: Public Education Action Items Each of the sections above begins with an introduction of each planning area followed by specific Action Items. Each Action Item may include the following elements: Intent: Describes the purpose of the Action Item. Points of Integration: Describes the relationship of the Action Item with other planning areas. Responsible parties are encouraged to coordinate with other partners who may see benefits or implications through the implementation of the action items. Responsible Parties: Lists who is responsible for implementation and with whom implementation should be coordinated. Action Item: Provides a specific action to be taken or a broad overview (when combined with sub-tasks) of the Action Item. If there are no sub-tasks, then the activities listed in the Action Item are the basis for the Georgia EPD audit checklist. Sub-Tasks (where appropriate): Lists the activities to be performed for an Action Item. These specific activities listed in the sub-tasks are the basis for the Georgia EPD audit checklist. Description: Discusses the rationale for the Action Item. Implementation Guidance: Provides specific guidance on how the Action Item can be performed by the responsible parties. Considerations for Enhanced Implementation: Describes additional, optional actions that a responsible party may take to increase implementation effectiveness. These considerations are optional and, PAGE 5-1

92 SECTION 5 ACTION ITEMS therefore, are not a component of the Georgia EPD audit process for compliance with this Plan. Nonetheless, local governments and utilities in the Metro Water District are encouraged to consider enhanced implementation. For Action Items related to water conservation and drought management and in jurisdictions where water supply reliability and low flows are a concern, special consideration should be given to the enhanced implementation options. Opportunities for Technical Assistance: Describes how the Metro Water District may support implementation through special programs, projects, guidance documents and research developed as needed and based on funding availability. Resources: Lists information sources to support implementation, including hyperlinks where available. All Action Items in this Plan are required, unless otherwise indicated. Many Action Items include detailed requirements that must be implemented in order to be found in good faith compliance, while other Action Items provide the flexibility on implementation to meet the needs of local governments and utilities. 5.1 Integrated Water Resource Management Action Items The Metro Water District has long recognized that water resource management is most effective when strategies are integrated in approach and implementation (see Section 1.2). This section of the Plan presents an integrated approach to planning for comprehensive water resources management and includes those Action Items that overlap multiple planning areas. Some Action Items have multiple responsible parties, and some are included in this section to encourage the responsible parties to implement their individual actions in parallel. For instance, it is recommended that local water and wastewater master planning be performed at the same time, even though the responsible parties may be separate jurisdictions, so that local wastewater planning forecasts will build on the output from the local water planning forecasts. The integrated approach can also be seen throughout this Plan in the Points of Integration descriptions in the Action Items, which discuss how implementation of an Action Item may affect related water resource management outcomes. The integrated Water Resource Management Action Items address the following topics: Coordinated Actions (Action Item INTEGRATED-1): This Action Item ensures a consistent and cooperative approach to engage multiple entities in the planning and implementation process. Infrastructure Planning (Action Items INTEGRATED-2 through INTEGRATED-5): These Action Items help communities support continued economic, environmental and social well-being, ensure that local water and wastewater infrastructure development is consistent with this Plan and prepare for emergencies. While these Action Items each have identified responsible parties, using an integrated approach across planning areas and jurisdictions may reduce redundancies, eliminate inconsistent base data used for local forecasting and improve communication. Source Water Supply Protection (Action Items INTEGRATED-6 and INTEGRATED-7): The Action Items require careful coordination of water supply planning and management with watershed management activities and development regulations. Septic and Private Decentralized Treatment Systems (Action Items INTEGRATED-8 through INTEGRATED-12): These Action Items require coordination across multiple entities and consideration of many factors including water use, water conservation, wastewater infrastructure planning, wastewater treatment capacity and drinking water source protection, as well as watershed and public health. PAGE 5-2

93 SECTION 5 ACTION ITEMS Corps Reservoirs Storage, Withdrawals and Returns (Action Item INTEGRATED-13): This Action Item emphasizes an integrated, regional approach for the efficient and sustainable use of Allatoona Lake and Lake Lanier. Encouraging the Return of Highly Treated Wastewater to the Chattahoochee and Flint River Basins (Action Item INTEGRATED-14): This Action Item outlines the requirements for amendments to this plan by local wastewater providers relating to the treatment of water sourced from the Chattahoochee River Basin below Buford Dam or Upper Flint River Basin. PAGE 5-3

94 SECTION 5 ACTION ITEMS This page left intentionally blank. PAGE 5-4

95 SECTION 5 ACTION ITEMS ACTION ITEM INTEGRATED-1: COORDINATED ACTIONS Intent To develop and administer a process to regularly coordinate across watershed, water supply, and wastewater actions. Points of Integration Coordination across entities involved in water resource management will support attainment of the benefits of integrated management by providing for information sharing and collaboration. Responsible Parties Local Government Local Water Provider Local Wastewater Provider In Coordination With Elected Officials/Governing Board Stormwater and Watershed Management Staff Site Plan Review Planning and Zoning Legal Counsel Inspection/Code Enforcement/Maintenance Staff County Board of Health Emergency Services Action Item: Establish annual coordination meetings among entities within the same or in neighboring jurisdictions to support integrated water resource management. Sub-Tasks: Each local government shall: 1. Conduct an annual meeting with local watershed management staff and land use planning and zoning staff on issues related to watershed management, as they are linked to land use planning and decisions. Consider holding this meeting more frequently, particularly during updates to the local Comprehensive Land Use Plan. Each local government and local water provider shall: 2. Identify source water watersheds within the jurisdiction as well as priority issues and areas for watershed protection actions. Conduct an annual meeting of local government staff and water supply providers to discuss local issues and priorities. 3. Conduct an annual meeting with local governments, water providers, planning and zoning staff, and County Board of Health staff on water supply and conservation action items. Each local government and local wastewater provider shall: 4. Conduct an annual meeting with local governments, wastewater providers, watershed management/stormwater staff and County Board of Health staff on watershed issues related to sanitary sewer and septic system management to address bacteria and other water quality concerns (see Action Items INTEGRATED-8 through INTEGRATED-11). Description: Integrated planning requires coordination among many different entities, and these Sub-Tasks establish coordination requirements to foster communication, information sharing and joint planning by responsible parties. Implementation Guidance: It is recommended that the local governments (i.e. the county and all cities within such county), any authorities that are local water or wastewater providers and the county board of health all meet together in a single meeting when possible and as appropriate based on the subject matter. If a local government cannot attend these group meetings, then it should meet with the local water and wastewater providers independently. If a local government, water provider or wastewater provider have PAGE 5-5

96 SECTION 5 ACTION ITEMS jurisdiction in more than one county, then they should attend the integrated meetings for each county in which they have jurisdiction. The Metro Water District may develop and provide meeting materials, such as suggested meeting topics and agendas to support coordination efforts. For the purposes of documenting compliance with this Action Item, it is recommended that the responsible party maintain appropriate documentation, including but not limited to: , phone summary, meeting agenda, meeting summary or fax transmittal. In-person meetings are recommended because they encourage dialogue and help build relationships. A community may choose to include all parties for the same meeting where multiple elements are discussed (e.g., land use and nonpoint source pollution, source water supply watershed protection, sewer lines and septic system management, grease management and containment and stormwater management/green infrastructure). Some communities may choose to meet more frequently, depending on their local watershed challenges. It is understood that even with proper notice and scheduling, invitees may not actually attend coordination meeting. If invitees do not attend the meeting, the local jurisdiction may provide documentation of the meeting announcement, RSVPs, related coordination and meeting materials to demonstrate compliance with this Action Item. Land Use Coordination: It is recommended that responsible parties discuss how local land use and associated growth management decisions and policies impact water supply, water conservation efforts, wastewater management and other infrastructure considerations. Because of these interconnections, strategic land use planning is critical to effective watershed management. The development of Comprehensive Land Use Plans is an important tool for communities to manage future growth and development and the associated impacts on water resource management. Source Water Watershed Management: It is recommended that the responsible parties discuss how the Part V Environmental Planning Criteria, established by the Georgia Department of Community Affairs (Georgia DCA) and enforced by Georgia EPD, are implemented locally through riparian buffer and lake management requirements to protect drinking water supplies. Local governments must adopt riparian buffers and other measures in compliance with the Part V Environmental Planning Criteria. Source Water Assessment Plans (SWAPs): It is recommended that the responsible parties discuss risks identified in SWAPs that have been completed for public water systems, as required by the Safe Drinking Water Act. SWAPs include an assessment of the susceptibility of each drinking water supply watershed to sources of potential contamination and provide each supply watershed with a risk-based score. SWAPs may be starting points for identification of potential parameters of concern. Emergency Response Maps may be created for communities with source water supply watersheds, and jurisdictions along major transportation corridors may choose to provide emergency response personnel with maps outlining the source water supply watersheds. First responders to accidents, especially those with spills of hazardous materials, would be able to alert the appropriate water plant(s) of spills so that the intake(s) can be shut down until the threat of pollution has passed. The maps may show the emergency contact information for the water plant(s) associated with each source water supply watershed and may be laminated for field use by emergency responders. Sewer Lines and Septic System Management: It is recommended that local governments, local wastewater providers and County Boards of Health discuss watershed management challenges that may include water quality problems potentially caused by septic and/or sanitary sewer systems, as well as proactive wastewater system and septic service area planning to support watershed protection. Coordination can address critical areas planning required by Action Item INTEGRATED-9 to identify septic system critical areas and additional management requirements for septic systems in those areas. Prevention of SSOs is also a potential topic for these coordination meetings. PAGE 5-6

97 SECTION 5 ACTION ITEMS Currently, the location and condition of septic systems is not consistently tracked and managed throughout the state. Some local governments have taken steps to locate and inventory the septic systems in their jurisdiction. It is recommended that local governments encourage County Boards of Health to provide realtime (or up to date) information on septic system permit approvals, failures and repairs to the State Digital Health Department Database or an equivalent system. The information provided should be based on an address or parcel ID. Local wastewater providers should support this effort by providing septage manifests, and local governments should support this effort by providing available local data to the County Board of Health (see Action Item INTEGRATED-10). Considerations for Enhanced Implementation: The optional considerations for enhanced implementation are: Organize coordination meetings more frequently than once per year to maintain effective awareness and collaboration across entities that may not otherwise share information. Prioritize communications with other jurisdictions that occur upstream or downstream within shared watersheds or river basins. Consider developing or adding to existing intergovernmental Memorandums of Agreement or Memorandums of Understanding coordination activities under other Action Items, such as long-term ambient or macroinvertebrate bioassessment monitoring (Action Items WATERSHED-10 and WATERSHED-11). Periodic interjurisdictional meetings may allow coordination and discussion on current actions, projects and issues. Conduct an annual meeting and more frequent coordination activities related to outdoor grease storage and reporting among FOG inspectors and stormwater managers. This type of coordination may help to identify potential pollutant sources and ensure proper preventative actions. Identify, on an annual basis, opportunities for incorporating watershed improvement projects (WIPs) (Action Item INTEGRATED-8) in other maintenance and capital improvement projects to ensure that they can be properly addressed during design. This type of coordination will also support annual reporting associated with MS4 permit requirements and Watershed Protection Plans. Engage additional stakeholders for routine coordination on key issues. These stakeholders may include the following: Neighborhood or community service groups Developers Other jurisdictions Partnering corporations and businesses Environmental groups Federal or state agencies Opportunities for Technical Assistance: The Metro Water District s Technical Assistance Program may provide support for implementation of this Action Item through the following types of activities: Assisting communities in developing draft meeting materials. District staff may also be available to attend coordination meetings. Facilitating discussions between required and optional parties, if requested. Resources: Georgia Water Toolkit, PAGE 5-7

98 SECTION 5 ACTION ITEMS U.S. Fish and Wildlife Service Information for Planning and Conservation (IPaC), Georgia Department of Natural Resources, Wildlife Resources Division, Georgia Rare Species and Natural Community Data, Georgia Department of Natural Resources, Environmental Protection Division, Chapter , Rules for Environmental Planning Criteria, Georgia EPD Source Water Assessment and Protection Implementation Plan, March 28, 2000, PAGE 5-8

99 SECTION 5 ACTION ITEMS ACTION ITEM INTEGRATED-2: LOCAL WATER MASTER PLANS Intent To plan for future water supply, treatment and distribution needs in a manner consistent with this Plan. Points of Integration Coordination of local water and wastewater master planning supports integrated water resource management through alignment of water and wastewater forecasts and consideration of connections between water and wastewater management decisions. Responsible Party Local Water Provider In Coordination With Planning and Zoning Local Wastewater Provider County Board of Health Neighboring Jurisdictions Action Item: Develop and maintain local water master plans that reflect available water sources, water source development and water treatment facility and/or water distribution improvement needs based on future water demands. Sub-Tasks: Each local water provider shall: 1. Develop and maintain a local water master plan with a planning horizon consistent with this Plan (through 2050). 2. Update the local water master plan every five years and as otherwise needed to support projects and remain consistent with regional and state requirements. 3. Include a section in the next update of the water master plan entitled Climate Resiliency. This section shall discuss infrastructure potentially vulnerable to extreme weather events and identify adaptive strategies for mitigating impacts. Description: The local water master plan (also called a water management plan) will identify future demands, supply sources, water service areas, treatment facility and distribution system needs in order to support proposed infrastructure improvements to the local water system. Implementation Guidance: Typically, local water master plans include the following elements: Introduction Describes the planning period, program objectives, regulatory framework and key stakeholders involved in the planning process. City/County Characteristics & Demographics Describes the population, land use, physical and biological characteristics of the area including water quality, topography, wetlands, water resources and protected species. Inventory and Evaluation of Existing Water System Identifies the existing water sources and service areas and analyzes the local water distribution system, including hydraulic capacity, as well as water treatment capabilities. May include optional analyses of water treatment processes and identification of problems with treatment processes. Future Water Demand Projections Forecasts future water demands based on demographic projections, water conservation, anticipated reuse, future land use and the projected water service area boundary. The projections should reference the District s population projections as a foundation or starting point for the population projections in local water master plans. PAGE 5-9

100 SECTION 5 ACTION ITEMS Future Water Source, Distribution and Treatment Alternatives Analyzes alternatives for future extensions and demands for the water system, with a recommended solution for new or expanded supply sources, treatment alternatives, system interconnections, distribution system maintenance and capital needs. Discuss existing interbasin transfers and considerations to minimize, where feasible, net losses from interbasin transfers. Implementation of Recommended Alternative Describes the recommended alternative, including a high level overview of the potential environmental impacts, required permits, institutional impacts and estimated costs and provides a capital improvements phasing plan for the recommended alternative. Climate Resiliency Identifies infrastructure vulnerable to extreme weather events and adaptive strategies for mitigating impacts. Additional elements that may be considered during the development of local water master plans include the following: Source water supply watershed or wellhead protection areas Water reuse management Targets for water withdrawals and/or consumptive use Interconnections facilities Cross-connection program Drought and emergency plans The local water master plan shall outline future system expansions and capital projects for water supply, treatment and distribution, as well as system optimization and regulatory compliance. The local water master plan shall also coordinate with and include projects related to Water System Asset Maintenance (Action Item WSWC-14) and source water protection (Action Items INTEGRATED-6 and INTEGRATED-7) as required in this Plan. Local water master plans shall also be consistent with the Georgia Comprehensive State-wide Water Management Plan, which encourages integrated and sustainable water resources management. Local water providers have flexibility in the development of their local water master plan; a large system will likely have a more detailed local water master plan than a smaller system. Local water providers should consult local water master plans when making critical infrastructure decisions. They should also recognize that local water master plans are living documents and update these plans as necessary to address changing local conditions. At times, local water master plans will also need to be amended to address proposed inter-jurisdictional projects. It is recommended that local water master plan amendments be developed in cooperation with all affected jurisdictions. These jurisdictions include the county, cities within the county, neighboring counties and local water providers. All inter-jurisdictional projects should be in compliance with the Georgia Service Delivery Act (O.C.G.A ). Local water master plans will refine the WTP expansion details outlined in Section 5.2 and Appendix B of this Plan. Local water providers will develop water treatment expansion master plans that define the number, location and capacities of water treatment facilities, and their implementation schedule. A life cycle cost analysis can be used to compare different expansion scenarios. Water treatment technologies, residuals handling and management issues also will be included as part of this master planning. Considerations for Enhanced Implementation: The optional considerations for enhanced implementation are: PAGE 5-10

101 Coordinate local water master planning with local wastewater master planning (Action Item INTEGRATED-4), as well as with the development of local watershed studies and plans, such as watershed assessments and watershed protection plans. SECTION 5 ACTION ITEMS Coordinate ongoing monitoring for this Action Item, with the monitoring for Action Items WATERSHED-10 and WATERSHED-11 and other local monitoring efforts to maximize the benefit of the local investment. Opportunities for Technical Assistance: The Metro Water District s Technical Assistance Program may provide support for implementation of this Action Item through the following types of activities: Facilitating discussions between water and wastewater providers, if requested. Developing a workshop on the preemptive adaptation measures recommended in the Metro Water District 2015 Utility Climate Resiliency Study (or the most recent update). Establishing climate tracking protocols and identifying potential trigger levels for adaptive measures in coordination with stakeholders. Resources: Georgia Association of Water Professionals (GAWP) Best Practice Master Planning Guidelines & Resource Document, December 2015, er_planning_guideli.pdf GAWP Water Master Planning Sample Table of Contents, December 2015, r_planning_water_o.pdf Metro Water District, Utility Climate Resiliency Study, December 2015, Study.pdf Georgia Comprehensive State-wide Water Management Plan, 2008, PAGE 5-11

102 SECTION 5 ACTION ITEMS This page left intentionally blank. PAGE 5-12

103 SECTION 5 ACTION ITEMS ACTION ITEM INTEGRATED-3: UPDATE LOCAL EMERGENCY WATER PLANS Intent To ensure all local water providers are prepared for potential water emergencies by having an up-to-date emergency water supply plan. Points of Integration Strong local emergency water plans will consider not only emergency water supplies, but also integrated concerns such as impacts to potential wastewater infrastructure during emergencies. Responsible Party Local Water Provider In Coordination With Neighboring Local Water Providers Elected Officials/Governing Board Local Wastewater Provider Action Item: Develop or update local emergency water plans to include sufficient emergency water supply sources and detailed steps to modify system operations in order to accept or share water with adjacent local water providers. Review interconnection reliability targets to estimate minimum water supplies for reliability, efficiency and emergencies. Sub-Tasks: Each local water provider shall: 1. Adopt a written local emergency water plan that defines specific steps required to accept or share water in an emergency. 2. Assess the need for the establishment and maintenance of service connections and share existing regional water supplies, where practicable. 3. Meet interconnection reliability targets and ensure that such interconnections provide needed reliability, efficiency and emergency water supplies. Description: A detailed local emergency water plan is an essential component of compliance with the federal Public Health Security and Bioterrorism Preparedness and Response Act of A local emergency water plan is also crucial during droughts when systems may be forced to rely on neighboring local water providers for additional water supply. Implementation Guidance: A local emergency water plan that addresses the needs of the community and the local water provider should include the following components: Procedure to conduct a damage assessment following an emergency and respond to restore full water service A system-specific IRT for emergencies Clearly identified alternate emergency water supplies Coordination with neighboring local water providers and partners to plan to accept or share water as practicable in an emergency Procedures for exercise and maintenance of emergency connections The system-specific IRT should be the estimated annual average daily demand (AAD) that is needed for meeting emergency water needs, including eating, drinking, toilet flushing, firefighting and hospital use. Each local water provider will need to define its own IRT and evaluate other factors affecting water system PAGE 5-13

104 SECTION 5 ACTION ITEMS reliability, including raw and finished water storage, infrastructure conditions, equipment redundancy and existing interconnection capability. The pipe sizes, approximate locations and lengths for potential interconnections should be refined by hydraulic evaluations. The actual location, pipe size, length and alignment of future interconnections, pumping or pressure reducing arrangements should be determined as part of detailed design. Each local water provider should evaluate the feasibility and cost-effectiveness of providing multi-directional flows at existing and future interconnections with a pipe diameter greater than or equal to 12 inches. Each local water provider should improve and continuously update its inventory of distribution system components, including location and size of pipes, valves and storage facilities. An updated inventory, including detailed system maps, will be beneficial in locating future interconnection locations and addressing other system maintenance problems, such as pipe breaks and leaks. Distribution system maps can be incorporated into a Geographical Information System (GIS), as is currently done by many water systems in the Metro Water District. The local emergency water plan should include steps that must be taken to receive water from adjacent water providers or to provide water to another water provider. For example: For a receiving local water provider, the local emergency water plan may include: (1) identification of sub-areas within the water system that can be served by other water providers; (2) valving, piping and pumping changes for flow reversal in the identified sub-areas during the water sharing period; (3) procedures for public notice and media announcement of additional water conservation initiatives and potential water quality changes in supplied water; and (4) a process to coordinate with Georgia EPD. If necessary, the plan should also address the need to request variances from the Drought Management Rules, as may be needed for outdoor water use restrictions. For the supplying local water provider, the local emergency water plan may include pumping and piping changes to supply the local water provider in need. It is recommended for local emergency water plans to consider and address wastewater infrastructure, because it is an integral to local water quality and quantity. Local emergency water plans should also be coordinated and consistent with the local water provider s drought contingency plan (see Action Item WSWC-10 ). Local water providers should take care in preparing their local water emergency plans to protect information relating to their critical water infrastructure against sabotage or criminal or terrorist acts, including protecting records of the type that are not required to be disclosed pursuant to O.C.G.A (a)(25). Considerations for Enhanced Implementation: The optional considerations for enhanced implementation are: Consider and implement, as practicable, recommendations from the GEFA Water System Interconnection Redundancy and Reliability Plan (2011) for the 33 systems that were included. Resources: GEFA Water System Interconnection Redundancy and Reliability Plan, September 2011, EPA, State-Level Water Sector Emergency Response Exercises : Lessons Learned, PAGE 5-14

105 ACTION ITEM INTEGRATED-4: LOCAL WASTEWATER MASTER PLANS SECTION 5 ACTION ITEMS Intent To continue master planning to address wastewater collection, treatment, and effluent and biosolids management. Points of Integration Coordination of local water and wastewater master planning supports integrated water resource management through alignment of water and wastewater forecasts and consideration of connections between water and wastewater management decisions. Responsible Party Local Wastewater Provider In Coordination With Stormwater Management Staff Elected Officials/Governing Board Site Plan Review Planning and Zoning Legal Counsel Inspection/Code Enforcement Maintenance Staff Local Water Provider County Board of Health Neighboring Jurisdictions Action Item: Develop and maintain a local wastewater master plan that addresses wastewater collection, treatment, and effluent and biosolids management. Sub-Tasks: Each local wastewater provider shall: 1. Develop and maintain a local wastewater master plan that addresses wastewater collection, wastewater treatment, and effluent and biosolids management. The plan should have a planning horizon consistent with this Plan (through 2050). 2. Update the local wastewater master plan every five years, at a minimum, and as otherwise needed to support projects and to remain consistent with regional and State policy. 3. Include a section in the next update of the wastewater master plan entitled Climate Resiliency. This section shall discuss infrastructure potentially vulnerable to extreme weather events and identify adaptive strategies for mitigating impacts. Description: Local wastewater providers shall maintain a local wastewater master plan (also called a wastewater management plan) that identifies future sewer service areas, projects future wastewater flows and identifies treatment capacity needs and collection system extensions and expansions in order to support proposed infrastructure improvements to the wastewater management system. Implementation Guidance: Local wastewater master plans typically address local and site specific issues related to wastewater collection, wastewater treatment, reuse (both indirect potable and non-potable) and effluent and biosolids management. Local wastewater master plans will refine the WWTP expansion details outlined in Section 5.3 and Appendix B of this Plan. Local wastewater providers have flexibility in the development of their local wastewater master plan, as a large system will likely have a more detailed local wastewater master plan than a smaller system. Typically, local wastewater master plans include the following elements: Introduction Describes the planning period, program objectives, regulatory framework and key stakeholders involved in the planning process. Inventory and Evaluation of Existing Wastewater System Identifies the existing sewer service area and analyzes the local wastewater collection system, with a focus on hydraulic capacity and wastewater PAGE 5-15

106 SECTION 5 ACTION ITEMS treatment capabilities, including optional analyses of wastewater treatment processes, identification of problems with treatment processes and identification of rehabilitation and reuse opportunities. Future Wastewater Flow Forecasts Projects future wastewater flows based on demographic forecasts, indoor water use forecasts and the projected sewer service area boundary. Future Wastewater Conveyance and Treatment Alternatives Analyzes system alternatives for future expanded areas and flows with a recommended solution for conveyance and treatment capacity needs, treatment technology considerations based on available assimilative capacity, as well as effluent and biosolids management. Communities with septic systems need to consider septage disposal needs when upgrading or designing new wastewater treatment facilities. If reuse applications are considered, a summary of treatment technology, quantities, quality and permitting requirements should be included. The consumptive use implications of these alternatives should be identified and factored into the decision making process. The local wastewater master plans should also address the following key issues: Consumptive use (septic and reuse) Water reuse Local system expansions Biosolids handling and management Septage disposal Private wastewater systems Future Sewered and Unsewered Area Planning Addresses plans for the near-term. Long-term planning is expected to be general in nature and evolve through the local wastewater master plan updates. It is recommended that the County Board of Health be involved in septic system area planning (see Action Item INTERGRATED-1). This section will address the following: 1. Areas to be sewered in the near-term (approximately five years). 2. Areas that are in transition and will not be sewered in the near-term, but are expected to be sewered in the next 30 years, with consideration of the requirements in Action Items INTEGRATED-5 and INTEGRATED-8 through INTEGRATED-12 regarding septic and decentralized systems. Consideration should be given to the relationship between septic system use, stream baseflow, and pollutant loading in areas where more immediate return flows are critical to water supply reliability or protecting water quality standards. Local governments need to determine if development that will rely on private decentralized facilities will be permitted. If private decentralized systems will be used, local wastewater master plans should account for these private systems and create a plan to connect the areas served by these facilities into the larger collection system after the private facilities are decommissioned. The need for any easements to make these connections should also be addressed. 3. Areas that are not intended to be served by sewer in the future. The plan should address appropriate zoning for these areas that can accommodate long-term septic system use (see Action Item INTEGRATED-8). For most parts of the Metro Water District, one-acre or more minimum lot sizes should be considered for these areas. Implementation of Recommended Alternative Describes the recommended alternative, including a high level overview of the potential environmental impacts, required permits, institutional impacts and estimated costs and providing a capital improvements phasing plan associated with the recommended PAGE 5-16

107 SECTION 5 ACTION ITEMS alternative. Environmental justice analyses should be conducted as appropriate as part of the local wastewater master planning process. Climate Resiliency Identifies infrastructure vulnerable to extreme weather events and adaptive strategies for mitigating impacts. Resiliency may be included as a stand-alone section in the local wastewater master plans or included as an element of other sections as may be appropriate. Local wastewater providers will develop wastewater treatment expansion master plans that define the number, location and capacities of wastewater treatment facilities and their implementation schedule. A life cycle cost analysis can be used to compare different expansion scenarios. Wastewater treatment technologies, biosolids handling and management issues also will be included as part of this master planning. Recognizing that local wastewater master plans are living documents, local wastewater providers should consult local wastewater master plans when making critical infrastructure decisions and update these plans as necessary to address changing local conditions. Local wastewater master plans should be consistent with the Georgia Comprehensive State-wide Water Management Plan, which encourages integrated and sustainable water resources management. The local master plan shall coordinate on source water protection issues as required in Action Item INTEGRATED-6. At times, local wastewater master plans will need to be amended to address proposed inter-jurisdictional projects. These local wastewater master plan amendments should be developed in cooperation with all affected jurisdictions. These jurisdictions include the county, cities within the county, neighboring counties and local wastewater providers. All inter-jurisdictional projects should be in compliance with the Georgia Service Delivery Act (O.C.G.A ). Considerations for Enhanced Implementation: The optional considerations for enhanced implementation are: Coordinate with local water master planning (Action Item INTEGRATED-2), as well as with the development of local watershed studies and plans, such as watershed assessments and watershed protection plans. Coordinate ongoing monitoring requirements with the requirements of other local plans to maximize the benefit for the local investment. Opportunities for Technical Assistance: The Metro Water District s Technical Assistance Program may provide support for implementation of this Action Item through the following types of activities: Facilitating discussions between local water and wastewater providers, if requested. Developing a workshop on the preemptive adaptation measures recommended in the 2015 Metro Water District Utility Climate Resiliency Study. Establishing climate tracking protocols and identifying potential trigger levels for adaptive measures in coordination with stakeholders. Resources: GAWP Best Practice Master Planning Guidelines & Resource Document, December 2015, er_planning_guideli.pdf PAGE 5-17

108 SECTION 5 ACTION ITEMS GAWP Water Master Planning Sample Table of Contents, December 2015, r_planning_water_o.pdf Metro Water District, Utility Climate Resiliency Study, December 2015, Study.pdf Georgia Comprehensive State-wide Water Management Plan, 2008, PAGE 5-18

109 ACTION ITEM INTEGRATED-5: CONNECTIONS TO PUBLIC SEWER SECTION 5 ACTION ITEMS Intent To allow for transition of areas from septic systems to public sewer service. Points of Integration Septic system management and transition to public sewer is connected with water quality and return flows management. Responsible Party Local Government In Coordination With Local Wastewater Provider Site Plan Review Legal Counsel Local Planning and Zoning County Board of Health Neighboring Wastewater Providers (where appropriate) Action Item: Each local government shall coordinate with the local wastewater provider and develop and maintain sewer connection policies, including policies addressing redevelopment and conversion of septic systems to sewer service. Description: Local governments shall establish a policy on connections to public sewer consistent with the local wastewater master plan. The focus of the connections policy should be areas that are currently not served by sanitary sewer, but proposed for future sewer service. Implementation Guidance: Local sewer connection policies should address the following: Connections to new developments If the new development is within the planned area for future sewer service and a new sewer will not be extended for the development, the policy needs to address whether or not dry sewers are to be installed at the time of development. Connections to existing developments Where connections will be made to existing developments, the policy should explain how sewer connections will be made within the development, which is likely covered in the sewer specifications. It will also need to address which properties will connect to municipal sewer systems at a later time and how these connection costs will be handled. Connections to isolated properties Where sewers are extended to new developments or pass within reach of properties on septic systems, the policy needs to address whether or not these properties will be required to connect to the sewer: immediately, as redevelopment occurs, if a septic system fails, or not at all. Funding methods It is recommended that the policy address the costs of connecting to the sewer system and who will pay them. The sewer connection policy must be a written policy that includes a clear indication of the date of adoption, whether within the policy or through accompanying documentation (e.g., letters, s, memoranda). Considerations for Enhanced Implementation: The optional considerations for enhanced implementation are: Consider whether to require developers to install dry sewers for future connection to the public sewer in locations where the local wastewater master plan designates an area that will be served by sewer in the future, but where septic systems are currently allowed as an interim treatment solution. Consider whether to require developers to extend the public sewer rather than install septic systems in areas within one mile (or other specified distance) of an existing sewer and where the wastewater master plan calls for future sewer. PAGE 5-19

110 SECTION 5 ACTION ITEMS This page left intentionally blank. PAGE 5-20

111 ACTION ITEM INTEGRATED-6: SOURCE WATER ASSESSMENT AND PROTECTION PROGRAM SECTION 5 ACTION ITEMS Intent Gather basic information about the source(s) of the drinking water and their potential threats. Points of Integration Source water assessments are closely linked to and complimentary with watershed and stormwater management requirements. Responsible Party Local Water Provider In Coordination With Local Government/Elected Officials Governing Board Local Wastewater Provider Planning and Zoning Action Item: Develop a Source Water Protection Plan that delineates raw water sources and identifies the potential sources of contamination to the drinking water supply. Sub-Tasks: Each local water provider shall: 1. Delineate the source water assessment area. 2. Conduct an inventory of potential sources of contamination. 3. Determine the susceptibility of the water supply to contamination. 4. Publish the results of the source water assessment in the Consumer Confidence Report (CCR). 5. Integrate this information into the Local Emergency Water Plan (Action Item INTEGRATED-3). 6. Update the SWAP by January 1, 2020 and every 10 years thereafter. Description: The SWAP will support communities in determining how susceptible the local water system is to contamination. Implementation Guidance: Development of a SWAP will typically require the following activities: 1. Delineate the source water assessment area. Map the land area that contributes to the surface water or groundwater supply source. For groundwater supplies, use information about the flow to delineate source water assessment boundaries and the potential of surface spills reaching the source. For surface water sources, delineate a watershed boundary using a topographic map. 2. Conduct an inventory of potential sources of contamination. This inventory will usually result in a list and a map of facilities and activities within the delineated area that might release contaminants. Some examples of potential pollutant sources are landfills, underground or aboveground fuel storage tanks, residential or commercial septic systems, stormwater runoff from streets and lawns, farms that apply pesticides and fertilizers and sludge disposal sites. Local inventories might provide information on abandoned dump sites, businesses with septic tanks or floor drains (such as dry cleaners or car repair shops), pesticide mixing and storage areas, golf courses and other land uses that might release pollutants to ground water or surface water. 3. Determine the susceptibility of the water supply to contamination. Determine how likely a water supply is to be contaminated by identified potential sources of contamination. This critical step makes the assessments useful for communities because it provides information that local decision makers can use to prioritize their approaches for protecting the drinking water supply. PAGE 5-21

112 SECTION 5 ACTION ITEMS 4. Publish the results of the source water assessment in the CCR. After an assessment is finalized, summarize the information for the public. These summaries help communities understand the potential threats to their water supplies and identify priority needs for protecting the water from contamination. The report and its information can be distributed to the public via a variety of methods, such as workshops and the internet. Source Water Assessment Plan project results may be found on the District website [ Jurisdictions may post the results to a website and include a reference in the CCR or attach the summary of results to the CCR itself. 5. Integrate this information into the Local Emergency Water Plan (Action Item INTEGRATED-3). Communities can and should use the information gathered through the assessment process to broaden their source water protection programs and implement emergency plans. Opportunities for Technical Assistance: The Metro Water District s Technical Assistance Program may provide support for implementation of this Action Item through the following types of activities: Performing Sub-Tasks on behalf of local water providers depending on available funding and approval of intergovernmental agreements Providing template CCR for local water providers to be tailored with system specific information Resources: EPA, Conducting Source Water Assessments guidance, Georgia EPD, Hazardous Site Inventory, PAGE 5-22

113 SECTION 5 ACTION ITEMS ACTION ITEM INTEGRATED-7: WATER SUPPLY WATERSHED PROTECTION Intent Protect the water quality and viability of drinking water supplies from nonpoint source pollution and spills of hazardous materials that could compromise drinking water quality. Points of Integration Water supply watershed protection requires the coordination of water supply, watershed management, and wastewater management planning and implementation and the outcomes provide not only for safe drinking water but also for water quality in general. Responsible Party Local Government In Coordination With Local Water Provider Elected Officials/Governing Board Site Plan Review Planning and Zoning Inspection/Code Enforcement Staff Local Wastewater Provider Action Item: Adopt water supply watershed buffers as required by the Part V Environmental Planning Criteria established by Georgia DCA and enforced by Georgia EPD. Develop and implement interjurisdictional agreements as necessary. Sub-Tasks: Each local government with source water supply watersheds within its jurisdiction shall: 1. Identify source water supply watersheds within its jurisdiction, as well as priority issues and areas for watershed protection, in coordination with local water provider. 2. Adopt the Part V Environmental Planning Criteria, including adoption of drinking water supply watershed buffers in local ordinances. Description: Water supply watershed protection programs serve to protect water resources from contaminants, thereby effectively preserving the amount of water supply available. By limiting the amount of pollution that enters the water supply, local water providers can reduce the costs of treatment and protect public health. Action Item INTEGRATED-6 outlines requirements for the protection of water supply watersheds, and Action Item INTEGRATED-1 requires coordination among local water providers and local water suppliers to address water quality challenges in drinking water supply watersheds. Implementation Guidance: The Criteria for Water Supply Watersheds, Rule , establishes a set of protections to assure that surface sources of drinking water are of a quality so they may be treated to meet all State and Federal drinking water standards. One of the ways the rule accomplishes these ends is through the establishment of buffers. This rule is jointly administered by the DCA and Georgia EPD. This is accomplished via the rule s requirement that Local Governments adopt, and Georgia EPD approves, water supply watersheds protection plans (or in the County s case, an ordinance) as part of their comprehensive planning process. Experience with the administration of the rule, particularly the buffer requirements, led to the rule s 2005 amendments which provide local governments a set of options. SWAPs may be a starting point for identification of potential parameters of concern for water supply watershed protection. SWAPs are completed for public water systems as required by the Safe Drinking Water Act and Action Item INTEGRATED-6 in this Plan. SWAPs include an assessment of the susceptibility of each drinking water supply watershed to sources of potential contamination and provide each water supply watershed with a risk-based score. PAGE 5-23

114 SECTION 5 ACTION ITEMS Local governments and water providers must also adhere to Wellhead Protection Requirements, as stated in the 1986 amendments to the federal Safe Drinking Water Act. Wellhead protection areas are intended to help protect wells and springs that are used as sources of water supply for community public water systems. Considerations for Enhanced Implementation: The optional considerations for enhanced implementation are: Prioritize projects, such as TMDL implementation programs and WIPs (see Action Item WATERSHED-8), in water supply watersheds over other areas, where practical. Provide emergency response personnel with maps outlining water supply watersheds. First responders to accidents, especially when there are spills of hazardous materials, would be able to alert the appropriate water treatment facilities so that the intake(s) can be shut down if necessary until the threat of pollution had passed. It is recommended that local governments coordinate with local water providers to implement this activity (see Action Item INTEGRATED-1). It is also recommended that the maps show emergency contact information for the water treatment facilities associated with each water supply watershed and that maps be laminated for field use by emergency responders. Resources: EPA, Protect Sources of Drinking Water, PAGE 5-24

115 SECTION 5 ACTION ITEMS ACTION ITEM INTEGRATED-8: SEPTIC SYSTEM PLANNING Intent To protect human and environmental health by requiring the proper planning and tracking of septic systems. Points of Integration Septic systems planning addresses water quality and wastewater return flows, as well as wastewater management. Responsible Party Local Government In Coordination With Elected Officials/Governing Board Local Wastewater Provider County Board of Health Stormwater Management Staff Planning and Zoning Site Plan Review Local Water Provider State Department of Public Health Action Item: Develop a plan that identifies where and under what conditions septic systems are appropriate given long-term water quality and quantity concerns. Sub-Tasks: Each local government shall: 1. Determine future septic system areas and local requirements related to septic system planning. 2. Develop near-term and long-term written policies for transitioning unsewered areas to sewered areas. Description: Local governments shall identify areas planned for future sanitary sewer service and areas intended for long-term septic usage. Local governments shall develop policies to address (1) the conversion of septic systems to sewer as the sewer system is extended, and (2) requirements for connection to the sewer system in those areas (see also Action Item INTEGRATED-5). Implementation Guidance: Each local government shall identify appropriate locations and conditions for septic system usage and plan for future sewered and unsewered areas as part of their Comprehensive Land Use Plan (CLUP) and local wastewater master plan (Action Item INTEGRATED-4). This planning should address the management of wastewater generated in transitional areas that are currently served by septic but targeted for sewer connection in the future. Septic system planning should be incorporated into the local wastewater system master plan (see Action Item INTEGRATED-4), the local water supply master plan (see Action Item INTEGRATED-2), and the CLUP. It should also be coordinated with the County Board of Health. It is recommended that local governments begin the septic system planning process by identifying the general location of existing septic systems as well as existing sewer lines. The next step is to determine the areas planned for future septic systems as well as the number of anticipated septic systems based on local zoning within the community. Areas that are not intended to be served by sewer in the future should be zoned appropriately for long-term septic system use. For most areas in the Metro Water District, minimum lot sizes of one-acre or greater should be considered to ensure enough suitable soil for the initial septic system as well as a full size replacement drainfield. It is recommended that local governments consider the following in planning for septic systems: Available WWTP capacity for handling septage from routine septic system maintenance Useful life of drainfield systems PAGE 5-25

116 SECTION 5 ACTION ITEMS Relationship between septic system use, stream baseflow, and pollutant loading in areas where more immediate return flows are critical to water supply reliability or protecting water quality standards Areas with failing septic systems Local soil types Water quality impacts if existing system failures are not addressed Cost-effective and sound solutions to refurbish existing systems General strategies and criteria that can be used to determine when to provide sewer service (see Action Item INTEGRATED-5) Local governments need to identify transitional areas that are currently undeveloped or served by septic systems, but planned for sewer service in the future. After these transitional areas have been identified, the local government will need to determine if development that will rely on private decentralized facilities will be permitted. If private decentralized systems will be used, local wastewater master plans should account for these private systems and create a plan to connect the areas served by these facilities into the larger collection system after the private facilities are decommissioned. The need for any easements to make these connections should also be addressed. Planning for future wastewater service, septic systems and decentralized systems should be consistent with the plan for future land use in the CLUP. Septic system planning must include necessary policies to address connection to sewer in the near-term (within the next five years) and long-term. This topic is further discussed in Action Item INTEGRATED-5. All policies developed to implement this Action Item must be written policies that either include their date of adoption or are accompanied by other documents (e.g., letters, s, memoranda) that establish when the written policy was adopted. PAGE 5-26

117 SECTION 5 ACTION ITEMS ACTION ITEM INTEGRATED-9: SEPTIC SYSTEM CRITICAL AREA MANAGEMENT Intent To increase protection from failure risks of septic for critical watershed areas. Points of Integration Management directed at septic system critical areas has potential benefits for water quality, water supply protection, and return flows management. Responsible Party Local Government In Coordination With Stormwater Management Staff Planning and Zoning Elected Officials Site Plan Review Local Water Provider Local Wastewater Provider County Board of Health State Department of Public Health Action Item: Identify septic system critical areas, including existing and potential problem areas, and assign additional management requirements for septic systems in those areas. Sub-Tasks: Each local government shall: 1. Identify critical areas including assessment of risk of and potential impacts on water quality from septic system failures. 2. Provide enhanced management for septic systems in identified critical areas. Description: Critical areas are those areas where the risks and/or potential impacts of septic system failures are high and areas where failure could readily impact a drinking water supply source. Each local government must identify critical areas that have experienced problems or could possibly experience failures in the future. Through this planning, local communities can minimize the risks and impacts of septic system failures. Implementation Guidance: In determining critical areas for septic systems, the following areas should be considered: Septic systems in small drinking water supply watersheds Septic systems concentrated around lakes or other water features Areas with high septic system failure rates Areas with limited soil conditions, rock, steep slopes or high groundwater levels Areas adjacent to streams listed on the Georgia EPD 303(d) list for water quality standard violations for fecal coliform Areas adjacent to water bodies listed on the Georgia EPD 303(d) list for water quality standard violations for chlorophyll a Other problem areas as defined by the County Board of Health or local jurisdictions Local governments and wastewater providers shall coordinate with the County Board of Health to identify critical areas for septic systems (see Action Item INTEGRATED-1). Local wastewater providers may choose to extend sanitary sewer service to some identified critical areas that are adjacent to current or planned PAGE 5-27

118 SECTION 5 ACTION ITEMS service areas. Local water providers are also encouraged to participate in the identification of critical areas, especially if there is a potential impact to drinking water supplies. Following the identification of the critical areas, local governments shall identify and implement at least one management option for new septic systems and one management option for existing septic systems in the critical areas. Management options that may be implemented are outlined in Table 5-1. Table 5-1. Management Options for Septic System Critical Areas Management Option New Septic Systems Existing Septic Systems Require connection to sanitary sewer (if available) when system fails If sanitary sewer is not available when system fails, require repairs to be made using current regulations, including a soils test to determine the best type of system for the site Require County Board of Health to be involved in the building permit review process for modifications to existing structures Offer inspection and/or pump out incentive program X X Require inspection and/or maintenance at five year intervals X X Conduct special homeowner education program within critical areas X X Make critical areas a priority for sewer service connections in local wastewater master plan Institute or enhance water quality monitoring in critical areas with a focus on pollutant source identification Require larger minimum lot size (based on site criteria) in critical areas Increase tank size requirement by 50 percent and increase drain field length in critical areas Require new systems to install risers at grade in critical areas Require the County Board of Health to be involved in initial site plan review for new developments (before roads and lots are cut) X X X X X X X X X X X Management options may vary within a jurisdiction based on the critical area being protected. For example, critical areas with bedrock or poor soils may require larger minimum lot sizes for septic systems, but critical areas associated with a drinking water supply watershed may require inspections and maintenance of septic systems every five years. County Boards of Health are prohibited from implementing mandatory maintenance for non-mechanical septic systems. However, local governments and utilities have passed local ordinances to regulate the maintenance of septic tanks. Considerations for Enhanced Implementation: The optional considerations for enhanced implementation are: Provide direct outreach to owners of advanced treatment systems (ATSs) in critical areas to notify them of the need to perform annual inspections and routine maintenance. Implement any of the Management Options listed in Table 5-1 across the entire jurisdiction (not only in critical areas). Opportunities for Technical Assistance: The Metro Water District s Technical Assistance Program may provide support for implementation of this Action Item through the following types of activities: PAGE 5-28

119 SECTION 5 ACTION ITEMS Developing GIS maps to support critical areas planning by local governments and local wastewater providers Developing and administering a regional incentive program to promote the inspection and/or maintenance of septic tanks PAGE 5-29

120 SECTION 5 ACTION ITEMS This page left intentionally blank. PAGE 5-30

121 ACTION ITEM INTEGRATED-10: SEPTIC SYSTEM SEPTAGE DISPOSAL SECTION 5 ACTION ITEMS Intent To minimize illegal dumping of septage by providing for proper disposal. Points of Integration Septage disposal management is linked to water quality, source water protection, watershed management, and wastewater management. Responsible Party Local Government Local Wastewater Provider In Coordination With Planning and Zoning County Board of Health Neighboring Wastewater Providers (where appropriate) State Department of Public Health Action Item: Develop a plan for the disposal of septage generated within a local jurisdiction at local WWTPs or alternative disposal locations. Sub-Tasks: Each local government shall develop a plan for septage disposal when determining future areas served by septic and developing wastewater master plans. Each local wastewater provider who accepts septage shall: 1. Determine acceptable parameters for septage disposal at local wastewater treatment facilities. 2. Collect septage hauling manifests and provide them to the County Board of Health at least once per year. 3. Plan for future septage disposal needs when upgrading or designing new wastewater treatment facilities. 4. Report septage quantity received, rate structure for disposal, and septage receiving policies each year to the Metro Water District by treatment facility. This information will be used for District tracking as well as shared with the GADPH for coordination with certified haulers. Description: Illegal septage disposal can negatively impact local water quality and disrupt operations at wastewater treatment facilities. To minimize illegal dumping, it is essential that local governments and wastewater providers maintain a plan for proper septage disposal when determining future areas to be served by septic systems. Illegal dumping of septage into local waterways presents a water quality problem, and illegal dumping into manholes can disrupt operations at the wastewater treatment facilities. Further, septage manifests and greater collaboration with the County Board of Health are necessary to provide documentation and accountability regarding local septage haulers. Implementation Guidance: Local wastewater providers should plan for future septage disposal demands based on local wastewater master plans (Action Item INTEGRATED-4), anticipated zoning density and average disposal frequency. Local wastewater providers should plan for future septage demands when developing wastewater master plans and designing WWTP expansions and/or new wastewater facilities. The septage disposal plan should address, at a minimum: days/times of the week when septage is accepted, volume of septage allowed per day and quality of septage accepted. Septic systems should not be permitted in a location where sufficient capacity for septage disposal has not been identified. Septage haulers are required to submit copies of their hauling manifests to the wastewater facilities. Wastewater providers must forward these manifests to the County Board of Health as a record of proper septic tank maintenance. At a minimum, these manifests should be forwarded annually, but monthly is PAGE 5-31

122 SECTION 5 ACTION ITEMS recommended. Local monitoring of hauling manifests will help to track whether septage is being properly disposed and minimize public health and environmental problems associated with illegal septage disposal. Local wastewater providers shall report septage quantity received, receiving policies and rates for septage received at each wastewater treatment facility annually to Metro Water District. The District shall publish this information each year and provide it to the GADPH for coordination with local County Boards of Health and certified haulers. Considerations for Enhanced Implementation: The optional considerations for enhanced implementation are: Evaluate the need to modify septage receiving fees and protocols to encourage proper disposal of septage waste by haulers within the wastewater provider s jurisdiction. Based on a 2015 survey of receiving facilities, there may be a correlation between receiving fees and the amount of septage received. Wastewater providers should consider implications for improper disposal associated with higher fee structures, while balancing this potential concern with actual costs of treating septage. Accept septage during the common business hours of septage haulers. Recommended hours for acceptance are Monday through Saturday between 8:00 a.m. and at least 5:00 p.m. Currently, the operating hours and practices of facilities that accept septage vary widely across Metro Water District. Haulers may not have a local wastewater facility that can accept septage if they need to dispose of waste after normal business hours or on weekends. Develop procedures for coordination with wastewater treatment facilities in neighboring jurisdictions to provide service to haulers when a local wastewater facility cannot accept septage for disposal. These procedures could outline nearby facilities that accept out-of-county septage or facilities that will accept septage from haulers displaced by the facility closure. The provision of this information to local haulers would support proper disposal. Opportunities for Technical Assistance: The Metro Water District s Technical Assistance Program may provide support for implementation of this Action Item through the following types of activities: Providing information to local wastewater facilities on the operating hours, days of the week and septage fees charged by plants across the Metro Water District, as well assistance with developing emergency aid procedures Developing a standard manifest template for waste haulers to improve consistency across jurisdictions PAGE 5-32

123 SECTION 5 ACTION ITEMS ACTION ITEM INTEGRATED-11: SEPTIC SYSTEM MAINTENANCE EDUCATION Intent To encourage proper maintenance resulting in longer septic system life and lower numbers of system failures. Points of Integration By providing increased educational outreach to promote proper maintenance of septic systems, future system failures can be reduced, which may reduce environmental impacts to watersheds, limit impacts to assimilative capacity in streams and help protect water supply sources. Responsible Party Local Government In Coordination With Elected Officials/Governing Boards Site Plan Review Planning and Zoning Local Wastewater Provider County Board of Health Stormwater Management Staff State Department of Public Health Local Community Groups Action Item: Each local government shall offer ongoing septic system maintenance education as part of a local government s watershed management education programs. Description: In Georgia, each septic system owner is responsible for proper operation and maintenance of their septic system. New homebuyers and even existing homeowners may be unsure whether their new home has a septic system, and they often do not have information on how to properly maintain a septic system. Georgia DPH estimates that one percent of the state s septic systems is failing and over half of those failures are due to lack of maintenance. Routine maintenance of these systems may extend their life and reduce the number of failures. GADPH estimates that pumping a septic tank at least once will double the life expectancy of a drainfield. Public education is needed to promote and support proper septic tank maintenance. Implementation Guidance: Action Item PUBLIC EDUCATION-1 provides detailed implementation guidance for this Action Item. It requires that all local governments implement local public education activities, and it specifies that at least one watershed management public education activity shall address septic system maintenance. GADPH, Metro Water District and others provide resources to educate the septic system owners about the need for proper maintenance. GADPH s Manual for On-site Sewage Management Systems provides general guidance for operation and maintenance. Additionally, the Metro Water District has developed education tools for homeowners, and these resources available on the District s website. Considerations for Enhanced Implementation: The optional considerations for enhanced implementation are: Expand public education programs about septic system maintenance to include a larger audience that reaches beyond homeowners to also include septage pumpers and haulers and real estate agents. Develop partnerships with other utilities, GADPH, local County Boards of Health, local realtor associations and businesses and the local septage pumper/hauler industry to support public education on septic system maintenance. PAGE 5-33

124 SECTION 5 ACTION ITEMS Target public education programs on homeowner maintenance of existing septic systems in critical areas. Opportunities for Technical Assistance: The Metro Water District s Technical Assistance Program may provide support for implementation of this Action Item through the following types of activities: Providing public education resources for local governments and utilities to use in their local public education programs. A list of available resources is provided on the Resources pages of the Metro Water District website, and it includes links and downloadable documents Assisting members in the development of their local education programs and facilitate dialogue with industries, such as real estate, septage pumpers and haulers and other stakeholders Resources: Metro Water District, Public Education and Awareness Resources List, Georgia DPH, Manual for On-site Sewage Management Systems, January 2016, PAGE 5-34

125 SECTION 5 ACTION ITEMS ACTION ITEM INTEGRATED-12: PRIVATE DECENTRALIZED WASTEWATER SYSTEMS ORDINANCE Intent To encourage proper design, operation and maintenance of private decentralized wastewater systems to protect human and environmental health. Points of Integration Adopting private wastewater system ordinances helps protect watershed health and increase source water protection. Private wastewater systems management should consider impacts on return flows. Responsible Party Local Government In Coordination With Elected Officials/Governing Board Planning and Zoning Local Wastewater Provider Legal Counsel Stormwater Management Staff Site Plan Review Inspection/Code Enforcement Maintenance Staff Local Water Provider County Board of Health Neighboring Wastewater Providers, as necessary Action Item: Adopt and maintain local ordinances regarding decentralized wastewater systems and provide technical support when ordinance changes are proposed. Sub-Tasks: Each local government shall: 1. Adopt a private wastewater system ordinance that either prohibits private decentralized wastewater treatment systems or provides technical specifications for these systems. 2. Provide a copy of the ordinance to Georgia EPD and Georgia DCA and incorporate into local wastewater master plans. Description: A private decentralized wastewater system is defined as any privately owned wastewater collection, treatment or disposal system that: (1) serves more than one residential lot or business, (2) has a daily flow in excess of 2,000 gallons or (3) flows between more than one parcel or tract of land. Most of the jurisdictions in Metro Water District have at one time relied upon small private decentralized wastewater treatment systems to establish sewer services. Some communities may view private decentralized systems as building blocks toward the long-term expansion of the wastewater collection system without the need for initial public funding. Alternatively, a community can choose to incorporate decentralized wastewater systems into its permanent portfolio of wastewater collection, treatment and disposal alternatives. Implementation Guidance: Local governments in coordination with local wastewater providers should determine the long-term community impact of decentralized wastewater systems and adjust long-term wastewater master plans accordingly (Action Item INTEGRATED-4). Local governments must either: Enact a local ordinance prohibiting private decentralized wastewater systems, or Enact a local ordinance establishing specific conditions for private decentralized wastewater systems. In selecting from these two options, each local government should consider the long-term impacts of private decentralized wastewater systems on water quality, existing and planned wastewater operations, assimilative capacity and consumptive use. Private decentralized systems create potential adverse water PAGE 5-35

126 SECTION 5 ACTION ITEMS quality impacts similar to those of septic systems if not properly operated and maintained. Private decentralized systems are often required by state regulation to use land application or subsurface disposal methods for treated effluent. While research is ongoing, it is uncertain whether and to what extent these disposal methods contribute to return wastewater flows and this impact should also be factored into the local ordinance decision. Typically, wastewater modeling assumes that these methods are 100 percent consumptive as a conservative modeling assumption. PAGE 5-36

127 SECTION 5 ACTION ITEMS ACTION ITEM INTEGRATED-13: CORPS RESERVOIRS - STORAGE, WITHDRAWALS AND RETURNS Intent: To develop an integrated, regional approach for the efficient and sustainable use of water supply storage in Allatoona Lake and Lake Lanier, considering both the availability of water and storage, the return of highly treated wastewater to these reservoirs, and the potential to expand future water supplies through indirect potable reuse. Points of Integration: The feasibility of returning highly treated wastewater to these reservoirs for indirect potable reuse depends to a significant degree on policies ensuring that returned water is stored and accounted for so that water supply benefits are realized and that compliance with water quality requirements, including any applicable TMDLs, are met. Responsible Parties: Local Water Provider (Allatoona and Lanier) Local Wastewater Provider (Allatoona and Lanier) In Coordination With: Local governments (Allatoona and Lanier) Elected Officials Neighboring local governments, local water providers and local wastewater providers Relevant regulatory agencies Action Item: Coordinate integrated water supply uses and the return of highly treated wastewater to Lake Lanier and Allatoona Lake to support the long-term, sustainable use of water from these reservoirs and their watersheds. Sub-Tasks: Each local water provider that withdraws or plans to withdraw water from Allatoona Lake or Lake Lanier shall, after the date of this plan, coordinate with the State of Georgia through its designated implementing agency(ies) in any requests for water supply storage from the Corps in either Allatoona Lake or Lake Lanier. Each local wastewater provider that returns or may in the future return highly treated wastewater to Allatoona Lake, Lake Lanier, or any tributary to these reservoirs shall: 1. Ensure that treatment capacity developed by the local wastewater provider and permitted wastewater discharges are consistent with the projected wastewater treatment capacities and wastewater discharges included in this Plan (as it may be amended from time to time). 2. If due to changed circumstances or an increase in projected wastewater flows compared to what is included in this Plan a local wastewater provider plans to (a) increase its wastewater treatment capacity by building a new or expanded wastewater treatment plant, (b) change the location of a currently permitted wastewater discharge to a new location outside of the river basin from which the water was sourced or (c) enter into a new or expanded intergovernmental agreement to send wastewater flows to another local wastewater provider - then the local wastewater provider shall request an amendment to this Plan reflecting such changes. Any requested amendment must be approved by the District prior to Georgia EPD issuing the requested permit. 3. Any local wastewater provider seeking an amendment to this Plan as described above in Subtask 2 shall meet with staff for the District and provide any information necessary to support an amendment to this Plan. Such information may include, but is not limited to, current wastewater discharge information, PAGE 5-37

128 SECTION 5 ACTION ITEMS projected future wastewater flows, and capital improvement plans. In reviewing the requested amendment, the District s governing board shall consider, among other factors, whether the local wastewater provider s requested amendment includes returning, where feasible, highly treated wastewater to Allatoona Lake, Lake Lanier and their tributaries. Description: Returning highly treated wastewater to Lake Lanier, Allatoona Lake, and the tributaries to these reservoirs, where feasible, is a priority within the District and necessary to support the long-term sustainable use of these water supply sources. The return of highly treated wastewater to Lake Lanier and Allatoona Lake is a critical component of the District s water supply planning, which relies on indirect potable reuse to enhance and extend the region s water supplies to meet the region s long-term water needs. Indirect potable reuse is a water supply strategy in which highly treated wastewater is returned to a water supply source, so that the returned water can be withdrawn and reused. Within the District, indirect potable reuse occurs on a significant scale at Lake Lanier and Allatoona Lake, the region s primary water supply sources. Indirect potable reuse is an environmentally sound water supply strategy that maximizes the use of existing infrastructure and that avoids unnecessary environmental impacts and, in many cases, economic costs from making investments in additional water supply infrastructure. However, the continued development and reliance on indirect potable reuse at Allatoona Lake and Lake Lanier depends to a significant degree on the adoption of appropriate policies by the Corps that ensure returned water is available to meet water supply needs. Extensive infrastructure investments will be required to continue and expand indirect potable reuse at Lake Lanier and Allatoona Lake. Further, returning highly treated wastewater to these sources for indirect potable reuse will increase treatment and pumping costs relative to other wastewater treatment options. The extent of these cost increases will vary based on factors such as the available assimilative capacities of the receiving waters, treatment costs, the degree to which pumping is needed and the length of any new conveyance that may be required and will be considered as part of the feasibility analysis of specific indirect potable reuse projects. In many instances, these investments and added costs would only be justified if the full additional water supply benefits are realized. Thus, in the absence of appropriate Corps policies that recognize and honor the State of Georgia s permitting decisions and allocation of water rights, water providers and wastewater providers may pursue other alternatives that ensure returned water is available to meet water supply needs in the District. Securing needed water supplies and managing water supply withdrawals from Lake Lanier and Allatoona Lake present unique challenges owing to the reservoirs ownership and operation by the Corps. The State of Georgia and local water providers have been working for many years to secure needed water supply storage in these reservoirs. In support of these efforts, detailed projections of water supply needs from these sources, and wastewater returns to these sources, have been prepared by the District and Georgia EPD. These projections, which are based upon and reflect information included in the development of this Plan, have been submitted to the Corps by the State of Georgia. This information has been utilized by the Corps in lengthy administrative processes to reallocate storage in these reservoirs to water supply. Consistent with its authority to regulate the impoundment and use of surface water in Georgia, the State of Georgia has promulgated rules under which the Director of Georgia EPD may grant users the right to impound or withdraw made inflows to Lake Lanier and Allatoona Lake, among other waters. The State of Georgia, through Georgia EPD, has exercised this authority at Allatoona Lake to allocate certain made inflows to the Cobb County-Marietta Water Authority. Additional allocations of made inflows at Lake Lanier will be addressed by Georgia EPD in the future, as warranted by conditions at the time. However, the return of highly treated wastewater to Lake Lanier and Allatoona Lake and the investment by local water and wastewater providers in developing the infrastructure necessary to return large volumes of water to these PAGE 5-38

129 SECTION 5 ACTION ITEMS sources will be incentivized if the Corps recognizes the State of Georgia s allocation decisions and accounts for made inflows in a manner consistent with Georgia law. Implementation Guidance: Successful implementation of large-scale indirect potable reuse at Lake Lanier and Allatoona Lake requires close coordination among local water providers, wastewater providers, District staff, and relevant regulatory agencies. The amount of water supply available to local water providers, depends, in part, on the volume of water that is returned to the water supply source. At the same time, the return of highly treated wastewater to water supply reservoirs implicates complex wastewater discharge permitting considerations, including applicable water quality requirements for the receiving waterbodies, available assimilative capacity, and compliance with any applicable Total Maximum Daily Limits, wasteload allocations, and permit limits. Furthermore, due to the geography of the region and the applicable treatment requirements, there are special considerations and potential additional costs associated with planning for, developing, and operating wastewater treatment infrastructure necessary to return water to these sources. For example, increasing wastewater returns to Allatoona Lake and Lake Lanier may mean lower permit limits or reductions in nonpoint source loads. Meeting water supply demands from Lake Lanier or Allatoona Lake, or changing the location or amount of wastewater discharges to Lake Lanier, Allatoona Lake or their tributaries, requires careful coordination and planning. The requirements included in the Sub-Tasks above are intended to facilitate that effort. They will ensure that necessary information is provided to the relevant entities in a timely manner, and that the region s water and wastewater infrastructure is developed in a careful and balanced manner that ensures adequate water supplies and wastewater capacity will be available throughout the planning horizon and beyond. A local wastewater provider seeking an amendment to this Plan should provide supporting information showing its decision-making-process and its evaluation of the feasibility of returning highly treated wastewater to Allatoona Lake, Lake Lanier and their respective watersheds. The District may make reasonable requests for additional supporting information. It is recommended that a local wastewater provider seek an amendment as early as possible in its local wastewater planning process. Determining what is feasible involves a variety of factors that will vary among local wastewater providers based on the specific facts and circumstances presented. The District will provide notice of amendment requests pursuant to this Action Item to Georgia EPD prior to the District s governing board acting on such amendment requests. References to the Plan in this Action Item and elsewhere include Appendix B. Resources: Georgia 2015 Water Supply Request USACE ACF Final EIS and WCM USACE ACT Final EIS and WCM TMDL Information PAGE 5-39

130 SECTION 5 ACTION ITEMS This page left intentionally blank. PAGE 5-40

131 SECTION 5 ACTION ITEMS ACTION ITEM INTEGRATED-14: Encouraging the Return of Highly Treated Wastewater to the Chattahoochee and Flint Intent: Support the long-term sustainability of water use from the Chattahoochee River Basin below Buford Dam and the Upper Flint River Basin by encouraging, where feasible, returns of highly treated wastewater to these basins. Returns above Buford Dam are addressed in Integrated-13 above. Points of Integration: Decisions made by local wastewater providers affect the future potential for indirect potable reuse and watershed management in these basins. Responsible Parties: Local Wastewater Provider (Chattahoochee and Flint Only) In Coordination With: Local Water Provider Action Item: Consider, where feasible, returning any water sourced from the Chattahoochee River Basin below Buford Dam or Upper Flint River Basin as highly treated wastewater to these basins when making future decisions regarding wastewater treatment plants and related sewer lines, pump stations and other conveyance infrastructure. Sub-Tasks: Each local wastewater provider that is treating water sourced from the Chattahoochee River Basin below Buford Dam or Upper Flint River Basin shall: 1. Ensure that treatment capacity developed by the local wastewater provider and permitted wastewater discharges are consistent with the projected wastewater treatment capacities and wastewater discharges included in this Plan (as it may be amended from time to time). 2. If due to changed circumstances or an increase in projected wastewater flows compared to what is included in this Plan a local wastewater provider plans to (a) increase its wastewater treatment capacity by building a new or expanded wastewater treatment plant, (b) change the location of a currently permitted wastewater discharge to a new location outside of the river basin from which the water was sourced or (c) enter into a new or expanded intergovernmental agreement to send wastewater flows to another local wastewater provider - then the local wastewater provider shall request an amendment to this Plan reflecting such changes. Any requested amendment must be approved by the District prior to Georgia EPD issuing the requested permit. 3. Any local wastewater provider seeking an amendment to this Plan as described above in Subtask 2 shall meet with staff for the District and provide any information necessary to support an amendment to this Plan. Such information may include, but is not limited to, current wastewater discharge information, projected future wastewater flows, and capital improvement plans. In reviewing the requested amendment, the District s governing board shall consider, among other factors, whether the local wastewater provider s requested amendment includes returning, where feasible, highly treated wastewater to the Chattahoochee River Basin below Buford Dam and Upper Flint River Basin. Description: Returning highly treated wastewater to the Chattahoochee River Basin and Upper Flint River Basin can affect the future potential for indirect potable reuse, increase base flows and improve overall watershed management in these basins. To support the sustainable use of these river basins, the return of highly treated wastewater, where feasible, is an important planning principle to be considered by local PAGE 5-41

132 SECTION 5 ACTION ITEMS wastewater providers when preparing and implementing local wastewater master plans and by the District s governing board when it considers future amendments to this Plan. Implementation Guidance: A local wastewater provider seeking an amendment should provide supporting information showing its decision-making-process and its evaluation of the feasibility of returning water sourced from the Chattahoochee River Basin below Buford Dam or Upper Flint River Basin as highly treated wastewater to these basins. The District may make reasonable requests for additional supporting information. It is recommended that a local water provider seek an amendment as early as possible in its local wastewater planning process. Determining what is feasible involves a variety of factors that will vary among local wastewater providers based on the specific facts and circumstances presented. As described in item 5 of the general section of EPD s Water Planning Guidance issued on February 11, 2015, EPD directs the District to include measures that, where feasible, minimize net losses from interbasin transfers from each of the six river basins in the District. Additionally, item 4 of the wastewater section of EPD s Water Planning Guidance directs the District to encourage the return of water to the Upper Flint Basin, where feasible, to support long-term sustainability of water use from this basin. The historical development of wastewater systems has resulted in a net interbasin transfer out of the Upper Flint River Basin. Due to the unique flow characteristics of the Upper Flint River Basin, local wastewater providers should prioritize future return of water withdrawn from the Upper Flint River Basin back to this basin, where feasible, in accordance with this Action Item. Though not a requirement under this Plan, future planning may include the return of water withdrawn from other sources, where feasible and taking into account impacts on the source watershed, where such returns could offset existing net interbasin transfers out of the Upper Flint River Basin. For local wastewater providers that currently return highly treated wastewater to both Lake Lanier and the Chattahoochee River Basin below Buford Dam, they may continue doing so in accordance with prior arrangements as reflected in this Plan. If an amendment to this Plan is needed as outlined in Subtask 2, then the local wastewater provider shall as a first priority consider returning, where feasible, to Lake Lanier, as outlined in INTEGRATED-13 and then as a second priority returning, where feasible, to the Chattahoochee River Basin below Buford Dam as outlined in this INTEGRATED-14. The District will provide notice of amendment requests pursuant to this Action Item to Georgia EPD prior to the District s governing board acting on such amendment requests. References to the Plan in this Action Item and elsewhere include Appendix B. PAGE 5-42

133 SECTION 5 ACTION ITEMS 5.2 Water Supply Planning and Water Conservation Action Items The water demand forecasts developed for this Plan project that demands in the Metro Water District will be to 899 AAD-MGD in See Section for details on these water demand forecasts. To meet the 2050 water demands, this Plan includes the following water supply sources: (1) water saved from water conservation measures, including the enhanced efficiency standards in place prior to the date of this Plan, (2) surface water withdrawals, including but not limited surface water withdrawals from existing reservoirs and streams, (3) groundwater withdrawals and (4) new water supply reservoirs. In the development of this Plan, each of these water supply sources was evaluated and considered in conjunction with local plans, priorities and preferences. The Metro Water District focused on the water conservation measures that will apply throughout the District, and local water providers submitted information on their planned surface water withdrawals, groundwater withdrawals and planned new reservoirs. This information from the local water providers is included in the county level summaries in Appendix B, and this information serves as the basis for the analysis of water supply sources in this Plan. On an average annual basis, the anticipated 2050 permitted surface water supply will be [1,023.2] AAD- MGD, and the groundwater supply will be [10.6] AAD-MGD (approximately 1% of overall supply in 2050), based on the information submitted by local water providers. Groundwater used for self-supplied domestic use is projected to be [9.1] AAD-MGD in 2050, which are not permitted by Georgia EPD, because the individual withdrawals are less than 100,000 gallons per day. See Appendix B for the county-level breakdown of planned water supply sources. Based on these planned water supply sources, the supply available is projected to meet demand in As a whole, the anticipated 2050 permitted surface water and groundwater supply for the Metro Water District is greater than 2050 forecasted water demands for two primary reasons: 1. As 2050 approaches, local water providers will be planning and seeking permits for water supply sources to meet projected demands beyond the 2050 planning horizon. Advanced planning is required due to the significant lead times needed to permit, design and construct new or upgraded water treatment capacity (and as may be needed, new water supply reservoirs). 2. Although supply is adequate to meet demand based on aggregate supply and demand projections (Table 5-2) for the Metro Water District as a whole, individual local water providers may need additional water supply sources to meet localized demands in areas of the District where localized supply is not sufficient. Figure 5-1 shows that a substantial portion of the 2050 demands will be offset by the enhanced efficiency standards. These measures act to reduce the demand that needs to be satisfied from other water supply sources. PAGE 5-43

134 SECTION 5 ACTION ITEMS New Water Supply Reservoirs 2% Enhanced Efficiency Standards 8% Groundwater Withdrawals 1% Surface Water Withdrawals (including existing reservoirs) 89% Figure 5-1. Planned Water Supply Sources to Meet 2050 Water Demands Metro Water District NOTE: This chart illustrates water supply based on the water demand forecasts calculated for population projection Scenario 1. Population projection scenarios are described in Section Expanded and New Water Conservation Measures Water conservation is a critical strategy in ensuring that the region can meet its future water supply needs. The Metro Water District has become a national leader in water conservation through the implementation of numerous conservation measures in the 2003 Plan, the 2009 Plan and the 2010 amendments (see Table 3-5 for the 19 existing conservation measures). The State has also enacted a number of laws related to water conservation, including but not limited to the Water Stewardship Act of These efforts have resulted in a 30 percent reduction in per capita water use in the District since Total water withdrawn in the Metro Water District has decreased more than 10%, while population has increased by approximately one million people since The supply and demand forecasts in this Plan are based on these enhanced efficiency standards in place prior to the date of this Plan. The water planning guidance from Georgia EPD for the Metro Water District states that the District should continue existing water conservation measures, at a minimum, and preferably include new and expanded water conservation measures. Consistent with the Metro Water District s mission, and in order to promote continued progress toward greater water conservation and ensure future reductions in per capita use, the District has expanded some of the existing conservation measures and added new conservation measures in this Plan. This Plan also clarifies and provides additional implementation guidance on existing water conservation measures and describes optional enhanced implementation measures. The conservation measures that were added by a Plan amendment in 2010 that applied to only the Chattahoochee/Lanier basin have been expanded in this Plan to apply to the entire Metro Water District. Additionally, many of the Action Items in this Plan have been updated to address how existing ordinances and state water conservation and drought response requirements relate to this Plan, and other Action Items have been clarified to ensure more consistent implementation. Notable expanded water conservation measures in the Action Items of this Plan include the following: Private Fire Lines Metering Requirement (Action Item WSWC-4) PAGE 5-44

135 Advanced Metering Infrastructure (AMI) Benefit and Feasibility Studies (Action Item WSWC-5) Toilet Replacement Program (Action Item WSWC-6) Ultra-High-Efficiency Toilets and Urinals in Government Buildings (Action Item WSWC-7) Commercial Water Use Assessments (Action Item WSCW-8) Pre-Rinse Spray Valve Replacement Program (Action Item WSWC-9) Water Loss Control and Reduction (Action Item WSWC-15) SECTION 5 ACTION ITEMS This Plan adds the following new water conservation measures to build upon the success of the enhanced efficiency standards and more comprehensively address residential and commercial sectors, indoor and outdoor uses and new and existing customers: Billing Cycles and Billing System Functionality (Action Item WSWC-3) Outdoor Water Requirements for Large Landscapes (See Action Item WSWC-10) Surface Water Supply Sources by River Basin: 2014 to Planned 2050 For the purpose of water supply planning at the Metro Water District level, information from the countylevel summaries in Appendix B regarding anticipated surface water supply sources is presented below in Table 5-2, which is organized by river basin. This table shows the 2014 permitted withdrawals and 2050 planned permitted withdrawals, as anticipated by local water providers. Table 5-2. Surface Water Supply Sources Through 2050 Water Supply Source Owner/Operator Utilizing Source 2014 Permitted Monthly Average Day Withdrawal (MGD) a 2050 Planned Monthly Average Day Withdrawal (MGD) Chattahoochee River Basin Lake Lanier Chattahoochee River Bear Creek Reservoir b Dog River Reservoir b City of Cumming Forsyth County Board of Commissioners Gwinnett County City of Buford City of Gainesville Atlanta - Fulton County Water Resources Commission DeKalb County Public Works Cobb County-Marietta Water Authority City of Atlanta Watershed Management Douglasville-Douglas County Water and Sewer Authority Big Creek City of Roswell PAGE 5-45

136 SECTION 5 ACTION ITEMS Table 5-2. Surface Water Supply Sources Through 2050 Water Supply Source Owner/Operator Utilizing Source 2014 Permitted Monthly Average Day Withdrawal (MGD) a 2050 Planned Monthly Average Day Withdrawal (MGD) Sweetwater Creek c Sweetwater State Park (George Sparks Reservoir) c City of East Point Cedar Creek Reservoirs City of Palmetto Cedar Creek (B.T. Brown) Reservoir J.T. Haynes Reservoir d Sandy/Browns Creek d Coweta County Water and Sewerage Authority Newnan Utilities Monthly Average Day Withdrawal in Chattahoochee River Basin Coosa/Etowah River Basin Etowah River City of Canton City of Cartersville e Hollis Q. Lathem (Yellow Creek) Reservoir/Etowah River Cherokee County Water and Sewerage Authority Allatoona Lake City of Cartersville e Cobb County-Marietta Water Authority Lewis Spring City of Adairsville Bolivar Springs Bartow County Water System Moss Springs City of Emerson Hickory Log Creek Reservoir f City of Canton NA NA Cobb County-Marietta Water Authority NA NA Richland Creek Reservoir g Paulding County NA 30 Monthly Average Day Withdrawal in Coosa/Etowah River Basin Flint River Basin Flint River Clayton County Water Authority h NA NA Fayette County Water System i NA NA J.W. Smith Reservoir (Shoal Creek) h Clayton County Water Authority h White Oak Creek d Line Creek d Newnan Utilities NA NA Hutchins Lake City of Senoia Whitewater Creek City of Fayetteville 3 0 PAGE 5-46

137 SECTION 5 ACTION ITEMS Table 5-2. Surface Water Supply Sources Through 2050 Water Supply Source Owner/Operator Utilizing Source 2014 Permitted Monthly Average Day Withdrawal (MGD) a 2050 Planned Monthly Average Day Withdrawal (MGD) Lake Kedron j Lake Peachtree (Flat Creek) j Horton Creek Reservoir i Whitewater Creek i Fayette County Water System Lake McIntosh Fayette County Water System 12.5 Still Branch Creek Reservoir k City of Griffin (provides water to Pike, Spalding and Coweta Counties) Monthly Average Day Withdrawal in Flint River Basin Ocmulgee River Basin W.J. Hooper Reservoir (Little Cotton Indian Creek) Clayton County Water Authority Edgar Blalock Jr. Reservoir (Pates Creek) h John Fargason (Walnut Creek) Reservoir City of McDonough S. Howell Gardner (Indian Creek) Reservoir l Rowland (Long Branch) Reservoir l Henry County Water Authority 10 Towaliga River Reservoir Tussahaw Creek Reservoir Big Haynes Creek (Randy Poynter Lake) Rockdale County Brown Branch City of Locust Grove Monthly Average Day Withdrawal in Ocmulgee River Basin Oconee River Basin Cedar Creek Reservoir m City of Gainesville 2 0 North Oconee River m Monthly Average Day Withdrawal in Oconee River Basin Tallapoosa River Basin Lake Paradise (Little Tallapoosa River) j City of Villa Rica Cowens Lake (Astin Creek) j Monthly Average Day Withdrawal in Tallapoosa River Basin Total Permitted Withdrawal in Monthly Average Day 1, ,182.3 District n AAD-MGD a Only the primary sources of water are shown because that is where the intake is located. The supplemental source may be utilized to pump and store water in the primary source or as a substitute for the primary source when it is not available, based on the PAGE 5-47

138 SECTION 5 ACTION ITEMS conditions specified in their individual permit. b The Bear Creek Reservoir withdrawal serves as a supplemental supply to the primary Dog River Reservoir Source (Permit No ). The withdrawals stated for the Dog River and Bear Creek Reservoirs cannot be added; the total permitted withdrawal from both sources is 23 MGD. The Dog River Reservoir releases are augmented with reuse water from the Douglasville-Douglas County Water and Sewer Authority s South Central WWTP, which is piped to a point below the foot of the dam. c The City of East Point has one surface water withdrawal permit for withdrawal from Sweetwater Creek. The City may supplement the withdrawals from Sweetwater Creek with water from the George Sparks Reservoir. Amounts are not to exceed quantities shown on the permit. d The J.T. Haynes Reservoir is a pump-storage facility that receives water from three different sources, Sandy/Browns Creek, White Oak Creek, and Line Creek. e The City of Cartersville has two intakes covered by one permit. The combined total withdrawal for the Etowah River and the Allatoona Lake intakes shall not exceed the permitted monthly average day withdrawal of 23 MGD. Of that permitted amount, up to 18 MGD may be withdrawn from Allatoona Lake on a monthly average day basis. f Construction of the Hickory Log Creek Reservoir was completed in Cobb County-Marietta Water Authority is entitled to 75% (33 MGD) of the water from the project and the City of Canton to the remaining 25 percent (11 MGD). The withdrawal intakes for Cobb County-Marietta Water Authority and City of Canton are not located in the reservoir, but in the Etowah River and Allatoona Lake, respectively. g In October 2015, the U.S. Army Corps of Engineers granted a 404 Permit allowing the construction of the Richland Creek Reservoir Water Supply Program ( h Clayton County Water Authority can withdraw any combination of flow from J.W. Smith Reservoir and Edgar Blalock Jr. Reservoir not to exceed a combined total withdrawal of 10 MGD. J.W. Smith Reservoir on Shoal Creek is a pump-storage facility that receives water from the Flint River. i These two sources share a combined permit limit. j Lake Horton is a pump-storage facility only that receives water from the Flint River and Whitewater Creek. k The permitted monthly average day withdrawal is 42 MGD for the entire reservoir. This reservoir is located outside of the District and is owned by the City of Griffin. The reservoir serves Pike and Spalding Counties, as well Coweta County. Coweta County currently has a purchase contract for 3.00 MGD of finished water from the City of Griffin through June 30, The amount increases to 5.00 MGD on July 1, 2022 through the duration of the contract ending in l Henry County Water Authority may withdraw the combined permitted monthly average day withdrawal of 24 MGD from these three intakes without exceeding each individual limit. m Cedar Creek Reservoir is a pump-storage facility that receives water from the North Oconee River. This reservoir was built in 2000 and may be used as a future potential water supply source. n Monthly average day is 1.2 times AAD Planned Reservoirs As of the date of this Plan, the Richland Creek Reservoir is the only reservoir that is permitted and under construction in the Metro Water District. The Richland Creek Reservoir is a pumped-storage reservoir which receives supply from the Etowah River. Paulding County is developing the Richland Creek Reservoir, located in Paulding County and in the Coosa River Basin. This includes the raw water intake infrastructure, a new water treatment facility and related water transmission and distribution infrastructure to provide potable water supply in the county. The Glades Reservoir in Hall County is not currently planned as a water supply reservoir. Therefore, it is not included as a component of this Plan for water supply purposes. The Bear Creek Reservoir, in South Fulton County, is currently under local consideration, but it is not permitted (as of June 2017). If it is permitted and constructed, it would be the main water supply source for the Palmetto, Union City and Fairburn communities in South Fulton County. Union City and Fairburn are currently supplied with water from the City of Atlanta and Palmetto has its own limited supply. Both the reservoir and the City of Atlanta water supply source are within the Chattahoochee River basin. If the reservoir and supporting WTP are constructed, this new reservoir will decrease the need for water supplied from the Chattahoochee River by the City of Atlanta, but will increase pumping water from the Chattahoochee River south of Peachtree Creek for storage in the Bear Creek Reservoir. PAGE 5-48

139 5.2.4 New and Expanded Water Treatment Facilities SECTION 5 ACTION ITEMS To meet 2050 demands, many existing water treatment facilities will require capacity expansions and upgrades, and some additional facilities will need to be built. The capital improvements phasing plans for these expansions are listed in Appendix B on a county-by-county basis. Because treatment process upgrades may be triggered by future regulatory requirements, the date and scope of process upgrades are not provided in Appendix B. Treatment facility expansions include many tasks such as financing, interjurisdictional agreements and State permitting, which also affect timing and scope. It is important to note that treatment capacity may not be expanded without the issuance of a new or amended water withdrawal permit from Georgia EPD if the proposed expansion will exceed currently permitted water withdrawal limits. PAGE 5-49

140 SECTION 5 ACTION ITEMS This page left intentionally blank. PAGE 5-50

141 SECTION 5 ACTION ITEMS ACTION ITEM WSWC-1: WATER CONSERVATION PROGRAM Intent To maintain and sustain a water conservation program meeting national standards. Points of Integration This measure should result in decreased water demands, which will have implications for wastewater management and planning, such as reduction in the volume of flows entering the wastewater collection system. Responsible Parties Local Water Provider Local Government In Coordination With Elected Officials/Governing Board Action Item: Provide sufficient funding and staffing to implement the required water conservation measures in this Plan. Sub-Tasks: Each local government and local water provider shall: 1. Provide for sufficient funding to implement the required water conservation measures in this Plan; funding levels will vary from jurisdiction to jurisdiction 2. Provide for dedicated, conservation-focused staffing to implement the required water conservation measures in this Plan; staffing levels will vary from jurisdiction to jurisdiction. Description: The water conservation measures in this Plan require coordinated planning and action by local water providers and local governments. Many water conservation measures involve interdepartmental coordination for effective implementation and enforcement. Implementation Guidance: Funding and staffing needs for water conservation implementation will vary from jurisdiction to jurisdiction. Implementation may require existing staff to assume new responsibilities or additional staff to be hired. Each jurisdiction should determine, in its judgment, what staffing and funding levels are sufficient to meaningfully implement and enforce the conservation measures in this Plan. Considerations for Enhanced Implementation: The optional considerations for enhanced implementation are: Become an EPA WaterSense promotional partner to educate the community about the value of water, water efficiency and the WaterSense brand. Partners are asked to commit to goals and make pledges on the activities they will undertake to meet their goals. Meet the ANSI/AWWA G480 Water Conservation Program Operation and Management Standard. The G480 standard is a voluntary, utility management standard that lists appropriate practices, procedures and behaviors for effective and efficient utility operations. A checklist of the elements of the standard is available through the Alliance for Water Efficiency. The G480 Standard itself must be purchased through AWWA s bookstore. Perform a feasibility study and, as appropriate, adopt a commercial water efficiency fee to provide funding for the various commercial water conservation measures in this Plan. PAGE 5-51

142 SECTION 5 ACTION ITEMS Resources: AWWA G Water Conservation Program Operation and Management, 2013, Alliance for Water Efficiency, Resource Library, Alliance for Water Efficiency, Checklist for G480 Standard, EPA WaterSense Partnership Program, San Antonio Water System, Commercial Water Efficiency Fee, PAGE 5-52

143 SECTION 5 ACTION ITEMS ACTION ITEM WSWC-2: CONSERVATION PRICING Intent To reduce discretionary water use by increasing the cost of water as the volume of use increases. Points of Integration This measure should result in decreased water demands. Wastewater planning implications include reducing the volume of flows entering the wastewater collection system. Responsible Party Local Water Provider In Coordination With Legal Counsel Action Item: Implement water conservation pricing rate structures as a means to reduce discretionary water use. Sub-Tasks: Each local water provider shall: 1. Institute a minimum three-tiered water conservation pricing schedule for single-family residential customers. 2. Determine appropriate rates for commercial, multi-family, industrial and institutional categories that encourage conservation by reducing discretionary water use. 3. If irrigation meters are allowed, develop an irrigation meter pricing schedule that recognizes the impact on peak demand from irrigation. The irrigation rate should be significantly higher than the rate for indoor use. At a minimum, the rate for irrigation use by all customer classes should be equal to or greater than 200 percent of the first tier rate for single-family residential customers. 4. Review and adjust pricing schedule to respond to changes in demand and ensure sufficient operation and maintenance funds are available on an as needed basis. Description: In general, tiered rate structures that charge higher rates for higher levels of water use encourage conservation. A rate and revenue analysis can help determine the rates to assign each tier, evaluate the effect on the revenue stream and maintain equitable billing rates. By meeting the requirements of this Action Item, each local water provider satisfies its obligation under Georgia EPD s Drought Management Rule ( ) to develop a drought surcharge plan. Implementation Guidance: Water providers shall perform the necessary analysis to select the most appropriate pricing scenarios. The Metro Water District has developed guidance to help local water providers determine appropriate rate structures for various customer classes. Local water providers should perform a rate and revenue analysis to determine what percent of customers will typically fall into each tier to produce an estimated revenue stream over time, including fixed charges. It is important to note that local water providers may elect to create more than three tiers to further enhance water conservation and revenue needs. Each local water provider should establish rate structures based on a local rate study and an understanding of the local customer base. It is recommended that local water providers periodically review rates to determine the effectiveness of the conservation pricing schedule and adjust conservation pricing to respond to changes in demand. PAGE 5-53

144 SECTION 5 ACTION ITEMS In some communities, water conservation by commercial, multi-family, institutional and industrial customers may be encouraged by adopting a tiered rate structure for these customers. In other communities, commercial, multi-family, institutional and industrial customers may have water use patterns that are more appropriate for uniform rates. While the rate structure for these customer categories is left to the discretion of the local water provider, declining block rate structures are not allowed within the Metro Water District. The Metro Water District recognizes as a best practice using non-potable reuse water for irrigation for existing outdoor landscapes when offsetting an existing potable water supply source and combined with a conservation pricing strategy consistent with this Action Item. See Section 2.1 for more on the Metro Water District s reclaimed water policy. The Metro Water District must balance its own needs with the needs of instream water quality and downstream uses. While non-potable reuse water is currently offered by a handful of utilities in the Metro Water District, usually for irrigation, the Metro Water District discourages these and other uses when they increase net consumption. Resources: AWWA M1 Principles of Water Rates, Fees and Charges, 6 th Edition, 2012, GEFA and Environmental Finance Center, Georgia Water and Wastewater Rates, Rate Structures and Connection Fees Project, PAGE 5-54

145 SECTION 5 ACTION ITEMS ACTION ITEM WSWC-3: BILLING CYCLES AND BILLING SYSTEM FUNCTIONALITY Intent To facilitate water conservation through improved billing system functionality. Points of Integration This measure should result in decreased water demands. Wastewater planning implications include reducing the volume of flows entering the wastewater collection system. Responsible Party Local Water Provider Action Item: Implement billing systems that communicate usage with customers, bill on a monthly basis and provide regionally consistent water consumption data. Sub-Tasks: As billing software is replaced or upgraded, each local water provider shall: 1. Sub-divide customers into the following minimum principal customer categories where appropriate: single family residential, multi-family residential, commercial, industrial and institutional. 2. Bill monthly to allow customers to track water use more effectively. 3. Provide historical and current data on bills and when customers pay online. 4. Clearly identify the billing units, with preference given towards gallon-based units. Most customers are familiar with gallons as a unit of measure and less familiar with other units. 5. Include explanation of conservation pricing to customers on their bills or a link on their bills to such information on the website. Description: Billing systems that are capable of providing frequent and current information about usage allows customers and water providers to identify sudden changes that might be attributed to leaks or changes in use patterns. Systems that have monthly billing allow customers, especially those on fixed incomes, to manage their monthly budget more effectively. Additionally, systems that incorporate customer billing categories can provide information on customer equity, cost of serving the customer class, average consumption volume by customer class and impact of rate changes on affected customers. Regionally consistent customer classes would also allow for more accurate analyses and assessments of future water demands and needs. In addition to the minimum principal categories, utilities may include additional principal categories and further expand them into subcategories as recommended in Table 5.1 of Water Research Foundation Project 4527, if they help meet local utility needs for water use or rate analysis. Implementation Guidance: It is important to note that water providers are not required to update existing billing software. However, as software is replaced or upgraded, local water providers shall include the functionality described in the sub-tasks and monthly billing cycles to facilitate conservation. Local water providers shall assess the feasibility, time and cost to implement a monthly billing program. Water bills, in both paper and electronic formats, should show the amount and cost of water used separately from wastewater and other charges and also provide monthly consumption history. PAGE 5-55

146 SECTION 5 ACTION ITEMS Resources GAWP, Georgia Water Use and Efficiency Reporting Guidance for Public Water Systems, October iciency_rep.pdf Metro Water District, Resources, Water Research Foundation, Evaluation of Customer Information and Data Processing Needs for Water Demand Analysis, Planning, and Management, Project 4527, 2016, PAGE 5-56

147 SECTION 5 ACTION ITEMS ACTION ITEM WSWC-4: PRIVATE FIRE LINES METERING REQUIREMENT Intent Identify and reduce unmetered water losses by metering private fire lines in commercial buildings. Responsible Party Local Water Provider In Coordination With Local Government Legal Counsel Site Plan Review Planning and Zoning Inspection/Code Enforcement Staff Action Item: Adopt an ordinance or policy to meter private fire lines supplying commercial buildings to identify avoidable system leakage and non-fire related water consumption. Sub-Tasks: Each local water provider shall: 1. Adopt an ordinance or policy by January 1, 2019 to require private fire lines supplying all new commercial buildings to have full flow meters or double detector checks. 2. Adopt an ordinance or policy by January 1, 2019 to require private fire lines supplying any commercial building that is undergoing a substantial renovation to have full flow meters or double detector checks. 3. Incorporate these private fire line metering requirements by January 1, 2019 into the development review process. Description: Metering all possible water uses, including private fire lines, reduces the inaccuracies when identifying the potential sources of water system losses. Implementation Guidance: A private fire line is a commercial customer connection supplying water to a fire sprinkler system or private fire hydrant. Once connected, private fire lines are not used very often, but they need to be tested and maintained. As a best practice, fire lines should be kept in good repair and not interconnected with other service pipes. Water drawn from fire lines is for fire protection purposes and should not be used for other non-fire related purposes. The purpose of this Action Item is to meter private fire lines. Although meters that measure flow are preferred, meters can be simple detector check valves that indicate the presence of flow. An option would be to adopt a policy to require a meter for any private fire line that shows use on a detector check for some specified period of time (for example, over three consecutive months). Annual flushing maintains water quality in a private fire line between the public water main and the backflow prevention assembly. The private fire line is flushed through the system main drain or private fire hydrant. During this period, the private fire line is fully opened, and the amount of water to be discharged (from the tap on the public water main to the backflow prevention assembly) through the flushing apparatus is equivalent to five times the volume of water in the private fire line. Metering these maintenance events would provide the property owner and the local water provider with an accurate measure of the amount of water used during maintenance and testing. If private fire service lines are not metered, the water used in testing is not measured and can be improperly categorized. Each local government shall determine what constitutes substantial renovation thereby triggering the requirement that meters or double detectors checks be installed on existing commercial buildings. However, PAGE 5-57

148 SECTION 5 ACTION ITEMS the threshold for substantial renovation should be at such a level that it will be reasonable to expect that new meters or double detector checks will be installed in at least some existing commercial buildings each year. All policies must be written policies that either include their date of adoption or are accompanied by other documents (letters, s, memoranda, etc.) that establish when the written policy was adopted. Considerations for Enhanced Implementation: The optional consideration for enhanced implementation is to consider installing full flow metering or double detector checks as practicable on existing fire lines, not just those in buildings that meet the renovation criteria. Opportunities for Technical Assistance: The Metro Water District s Technical Assistance Program may provide support for implementation of this Action Item by developing guidance or model language for policies and ordinances that require metering private fire lines. Resources: City of Atlanta, Code of Ordinances, Chapter 154 Utilities, Article III Water, Division 2 Fire Hydrants, Section , Installation of detector meter or fire line meter on private unmetered fire service systems having fire hydrants, 154UT_ARTIIIWA_DIV2FIHY Cobb County, Code of Ordinances, Chapter 54 Fire Prevention and Protection, Article III Fire Safety Standards, Section 54.57, Installation mutual fire line meter on unmetered fire service systems, OGE_CH54FIPRPR_ARTIIIFISAST_S54-57INMUFILIMEUNFISESY AWWA, Opflow, Reduce Apparent Water Loss, September 2008, PAGE 5-58

149 SECTION 5 ACTION ITEMS ACTION ITEM WSWC-5: AMI BENEFIT AND FEASIBILITY STUDIES Intent To facilitate accurate customer metering and water conservation through better and more timely information about customer water use. Responsible Party Local Water Provider Action Item: Evaluate the improvement of customer metering technologies to improve accuracy, notify customers of suspected leaks, enhance customer service and provide other benefits. This includes metering technology with the capability to store hourly readings (or more frequently) and transmit these readings daily to the local water provider, which is known as AMI. Sub-Tasks: Each local water provider shall: 1. Except for those local water providers that have already completed or are currently installing AMI system-wide or that have completed an AMI pilot program pursuant to Action Item 5.15 of the 2009 Plan (as amended), all other local water providers shall conduct a system-specific study by December 31, 2018 on the benefits and feasibility of the system-wide installation of AMI. 2. If a local water provider determines that such system-specific study has shown that system-wide implementation is feasible and yields sufficient benefits, then develop a plan, schedule and budget to implement AMI system-wide. 3. If a local water provider has already completed or is installing AMI system-wide whether based on a pilot program or benefits and feasibility study, then implement a program to identify, notify and track customers with continuous usage, if not already completed. Description: Metering technology has advanced greatly over the last five years in terms of the accuracy of the measuring devices and the ability to acquire readings. Installation of AMI systems can improve the accuracy of information used to support water management and conservation. Implementation Guidance: AMI is the complete automation of the metering process which includes meter reading, distribution and monitoring. AMI is the next evolution of what many utilities have implemented over the last several decades: Automated Meter Reading (AMR). AMI has many advantages over AMR, such as the ability to obtain hourly interval meter reads on a daily basis, flag a customer-side leak when it occurs (rather than only at the monthly reading) and support proactive customer service capabilities. The method of transmitting the readings to the local water provider can vary depending on the AMI provider and is often proprietary. Some use base stations or towers to collect readings, others use a mesh-network and others use cellular networks. Additionally, some AMI systems feature two-way technologies for remote disconnect or distribution sensing technologies, such as leak detection, pressure sensors and other operational data. New metering technology includes solid state technology using ultrasonic or magnetic flow measuring elements for improved low-flow accuracy, as opposed to the moving parts of traditional metering technologies. Some water providers that use direct meter reading are considering AMR, and this Action Item strongly recommends moving directly to AMI implementation. The cost difference may be insignificant, and the PAGE 5-59

150 SECTION 5 ACTION ITEMS benefits of AMI may far exceed those of AMR. Installing AMI system-wide can be done in stages over time, and phasing may include installation of AMI in certain areas of the system first and/or installation of meters with encoder registers first, with remaining communications infrastructure coming later. The AMI technology to be adopted in the Metro Water District should have encoder registers that can be equipped with a Meter Interface Unit in the future without changing the register. AMI benefits and feasibility studies should consider the cost-effectiveness and costs and benefits of implementing AMI technology and should consider costs and benefits that are both quantifiable and nonquantifiable. The studies shall conclude with a recommendation regarding AMI implementation: begin, continue, or delay AMI implementation system-wide or begin or implement a pilot program for compliance with EPD audits. Local water providers should prepare and maintain in its records a written feasibility study report. Some financial benefits of AMI to consider include the following: Increased low-flow meter accuracy (through new metering technology) Improved registration (through replacement of older meters) Eliminating estimates and rereads Reducing potential theft of service, meter tampering issues and bad debt Reducing operating expenses associated with reading meters and vehicles Some non-financial benefits to consider include the following: Operational benefits from reducing call center costs, improving staff morale, reducing tampering by using alarms and improving backflow detection Other benefits from improved customer usage data for hydraulic modeling, water loss assessment calculations, water rate studies, meter degradation, etc. Customer service improvements including: More prompt responses to customer inquiries Elimination of long and short reading periods Ability to address billing and usage concerns more accurately Fewer home and yard intrusions On-demand access to consumption information High usage and demand response notice Leak detection notification Budget tracking/setting Resources: AWWA, M6: Water Meters - Selection, Installation, Testing, and Maintenance, Fifth Edition, 2012, AWWA, M22: Sizing Water Service Lines and Meters, Third Edition, 2014, PAGE 5-60

151 SECTION 5 ACTION ITEMS Water Research Foundation, AMR/AMI Standardization for Water Utilities, Report #4467, April 2016, Alliance for Water Efficiency, AMI-ABLE Committee, resources to support AMI/AMR implementation, PAGE 5-61

152 SECTION 5 ACTION ITEMS This page left intentionally blank. PAGE 5-62

153 SECTION 5 ACTION ITEMS ACTION ITEM WSWC-6: TOILET REPLACEMENT PROGRAM Intent To reduce indoor water use and speed the conversion of older, inefficient toilets toward WaterSense labeled highefficiency toilets in single- and multifamily homes. Points of Integration This measure should result in decreased water demands, as well as decreased wastewater flows. Responsible Party Local Water Provider In Coordination With Local Government Local Wastewater Provider Action Item: Implement a program to replace older, inefficient toilets with WaterSense labeled highefficiency toilets in single- and multi-family homes. Sub-Tasks: Each local water provider shall: 1. Establish a program to replace 3.5 gpf or greater toilets in single- and multi-family homes constructed prior to 1994 with high-efficiency WaterSense labeled toilets. 2. Provide information on opportunities to recycle any toilet being discarded pursuant to the toilet replacement program by linking to the Metro Water District website or other local resources. Description: Single- and multi-family homes built prior to 1994 may contain inefficient toilets. While new toilets meet high efficiency standards, the replacement of older, inefficient toilets is needed to address existing stock and reduce indoor water use. Implementation Guidance: Before the 1950s, new toilets typically used 7 gpf. By the end of the 1960s, new toilets typically used 5.5 gpf; in the 1980s, new toilets typically used 3.5 gpf. The federal Energy Policy Act of 1992 required all new toilets use no more than 1.6 gpf by In 2010 the Georgia Water Stewardship Act required that local governments adopt or amend local ordinances to require, among other things, that all new construction, on or after July 1, 2012, use WaterSense labeled toilets. WaterSense is a voluntary program of the EPA designed to identify and promote water efficient products and practices. WaterSense labeled toilets are independently certified to meet rigorous criteria for both performance and efficiency. This Action Item calls for a program to replace toilets in single and multifamily homes constructed prior to 1994 with WaterSense labeled toilets. As of the date of this Plan, the WaterSense efficiency criteria is 1.28 gpf or less for toilets, and in the future, the WaterSense label may become more stringent. If a more stringent criterion is adopted, it will apply as of the date of its adoption for the purposes of this Plan. The toilet replacement program must specifically address toilet replacement rather than provide toilet retrofit devices. Examples of acceptable toilet replacement programs include the following: Rebate incentive program: Customer receives a water bill credit, cash or voucher to offset the cost of a new WaterSense labeled toilet to be installed in a pre-1994 single- or multi-family home. Direct install program: Customer exchanges a toilet from pre-1994 single- or multi-family homes for a WaterSense labeled toilet with discounted installation through the local water provider. Other: Local water providers may create their own programs as long as the program actually results in the replacement of toilets in pre-1994 single- and multi-family homes. These programs may take a PAGE 5-63

154 SECTION 5 ACTION ITEMS variety of forms, including but not limited to on-bill financing programs for toilet replacements and programs requiring that toilets using 3.5 gpf or more be replaced as a condition of a customer establishing water service. If a local water provider chooses to have a single replacement program covering both single and multi-family homes, funds may be made available on a first come, first served basis. Due to the high value of rebate programs for multi-family homes, it is recommended that the local water provider include an inspection element in any multi-family rebate program to prevent possible fraud. This can be done through a physical inspection or by reviewing billing data post-installation. The local water provider should provide information on available toilet recycling opportunities. There are recycling facilities in the region that will recycle crushed porcelain for various uses, such as a concrete aggregate or bathroom tile. Many homeowners may not be aware of recycling options when replacing a toilet. Considerations for Enhanced Implementation: The optional considerations for enhanced implementation include the following: Add an additional requirement that program participants provide documentation or other proof that the replaced toilet uses 3.5 gpf or more, such as requiring a section on the rebate application form for the customer to record the gallons per flush of the old toilet or including a customer self-certification. Encourage customers to purchase WaterSense labeled ultra-high-efficiency toilets that use 1.1 gpf or less through a tiered rebate incentive with a higher rebate tier for toilets meeting these standards. Limit rebates to only WaterSense labeled ultra-high-efficiency toilets that use 1.1 gpf and discontinue rebates on 1.28 gpf toilets. Low-income and disadvantaged customers often live in pre-1994 single- and multi-family homes and spend a greater percentage of their income on utility bills. These customers may experience financial difficulties participating in a rebate incentive program if they cannot afford to purchase the new plumbing fixture before the rebate money is received. A voucher or direct install program for customers with a lower household income would encourage indoor water efficiency in in pre-1994 single- and multi-family homes. As an example, the City of Atlanta s Care and Conserve program provides payment assistance to qualified customers. Local water providers may also consider placing toilet recycling containers at other local government buildings. The City of Atlanta provides free toilet recycling to its residential water customers at the Center for Hard to Recycle Materials. Gwinnett County Water Resources offers free toilet recycling to its residential customers by providing a recycling container for old toilets at its building. Gwinnett County Water Resources covers the cost of transporting the container to a local recycler. This free service is promoted to customers participating in the toilet replacement program and has kept hundreds of tons of porcelain from the landfill. Require recycling for all toilets replaced through the multi-family toilet replacement program. Some local water providers require the customer to agree to transport the used porcelain toilets to an approved recycler within the Metro Water District area. The customer must provide documentation from the recycler that the toilets were disposed properly before the rebate credit will be issued to the account. PAGE 5-64

155 SECTION 5 ACTION ITEMS Opportunities for Technical Assistance: The Metro Water District s Technical Assistance Program may provide support for implementation of this Action Item through the following types of activities: Administering a regional rebate program for single-family homes Creating and administering a regional rebate program for multi-family homes Offering a regional program for low-income and disadvantaged customers using grant funding Developing a regional list of toilet recycling facilities Resources: EPA, WaterSense Toilets, information page, Cobb County, toilet recycling information (see Item No. 16), MaP Testing Premium Ultra-High-Efficiency Toilet page, PAGE 5-65

156 SECTION 5 ACTION ITEMS This page left intentionally blank. PAGE 5-66

157 ACTION ITEM WSWC-7: HIGH-EFFICIENCY TOILETS AND URINALS IN GOVERNMENT BUILDINGS SECTION 5 ACTION ITEMS Intent To speed the conversion of older toilets and urinals in existing government buildings. Points of Integration This measure should result in decreased water demands, as well as decreased wastewater flows. Responsible Party Local Water Provider Local Government In Coordination With Elected Officials/Governing Board Maintenance Staff Legal Counsel Action Item: Replace toilets using 3.5 gpf or more and urinals using more than 1.0 gpf with WaterSense labeled high-efficiency toilets and urinals in local government buildings. Sub-Tasks: Each local government and local water provider shall: 1. Develop a written list for all remaining buildings owned by the local water provider and local government (excluding buildings owned by the local public school system, sheriff s office or tax commissioner s office) that still have toilets using 3.5 gpf or more and urinals using more than 1.0 gpf by January 1, Develop a retrofit schedule and funding mechanism to replace all the inefficient toilets and urinals in the buildings on the retrofit list by January 1, 2020 with high-efficiency WaterSense labeled toilets and urinals. 3. Replace all the inefficient toilets and urinals in the buildings on the retrofit list by January 1, 2020; based on the 2009 Plan, local government and local water providers should be able to show that this retrofitting is underway. 4. For all buildings owned by the local public school system, sheriff s office or tax commissioner s office, the local water provider serving these buildings shall coordinate regarding these buildings with the appropriate elected officials and staff to perform each of the subtasks above with a target start date for retrofits of January 1, 2019 and completion date of January 1, Description: This Action Item will improve the efficiency of toilets and urinals in all government buildings in an effort to conserve water and demonstrate leadership in conservation. Implementation Guidance: As described in Action Item WSWC-6, toilet efficiencies have improved substantially in the past several decades. Urinal efficiencies have also improved. In 2010 the Georgia Water Stewardship Act required that local governments adopt or amend local ordinances to require, among other things, that all new construction on or after July 1, 2012 use WaterSense labeled toilets and urinals. However, older, less efficient fixtures are still commonly in use in existing buildings. WaterSense is a voluntary program of the EPA designed to identify and promote water efficient products and practices. WaterSense labeled toilets and urinals are independently certified to meet rigorous criteria for both performance and efficiency. This Action Item calls for a program to replace older, inefficient toilets and urinals in local government buildings with WaterSense labeled toilets and urinals. As of the date of this Plan, the WaterSense efficiency PAGE 5-67

158 SECTION 5 ACTION ITEMS criteria is 1.28 gpf or less for toilets and 0.5 gpf or less for urinals, and in the future, the WaterSense label standards may become more stringent. If more stringent criteria are adopted, they will apply as of the date of adoption for the purposes of this Plan. Non-flushing (or waterless) urinals are not EPA WaterSensecertified and not recommended for this measure due to maintenance and existing plumbing concerns. It is recommended that local water providers begin replacement programs with their own administration buildings to demonstrate leadership and then proceed to work with the local governments it serves to develop a retrofit list, schedule and funding for replacements in other local government buildings. Options for implementation of this Action Item include: direct replacement programs, rebates for government building retrofits or establishment of a new toilet replacement line item in department. Coordination with the local public school system, sheriff s office or tax commissioner s office shall be initiated by the local water provider serving their buildings. Coordination shall include inviting appropriate elected officials and staff to meetings on at least an annual basis and explaining to them the role of the Metro Water District, the requirements of this Action Item and the financial and water supply benefits of implementation. In the meeting, the local water provider should share lessons learned and best practices based on the local water provider s experience retrofitting its old buildings. If a local water provider can show reasonable and persistent efforts to coordinate with these parties, it is not the local water provider s responsibility if the local public school system, sheriff s office or tax commissioner s do not complete Subtask 4. Opportunities for Technical Assistance: The Metro Water District s Technical Assistance Program may provide support for implementation of this Action Item through the following types of activities: Assisting communities in developing draft meeting materials. District staff may also be available to attend coordination meetings. Facilitating discussions between responsible parties and the local public school system, the sheriff s office and the tax commissioner s office. Resources: Metro Water District, Local Community Choices Implementation Assistance, EPA, WaterSense Toilets, information page, EPA WaterSense Water-Efficient Urinals, information page, MaP Testing Premium Ultra-High-Efficiency Toilet page, PAGE 5-68

159 ACTION ITEM WSWC-8: COMMERCIAL WATER USE ASSESSMENTS SECTION 5 ACTION ITEMS Intent To reduce water use from commercial water users, by sitespecific assessments of use and identification of potential for improved efficiency. Points of Integration This Action Item should result in decreased water demands. Wastewater planning implications include reducing the volume of flows entering the wastewater collection system. Responsible Party Local Water Provider Action Item: Develop or participate in a commercial water use assessment program that targets highest commercial customers or other groups of commercial customers that may have significant water savings potential. Sub-Tasks: Each local water provider shall: 1. Target highest commercial customers, or other groups of commercial customers identified by the local water provider that may have significant water savings potential, and advertise water use assessment program. 2. Establish a program or participate in the District s regional program to conduct water use assessments with interested commercial customers and report results with recommendations to these customers with cost-beneficial water conservation measures. Description: A commercial water use assessment program includes on-site water assessments at commercial facilities, characterization of existing water uses and recommended changes to process and operations to reduce water usage. Commercial customers will typically provide basic water use information about the facility prior to an onsite assessment. Local water providers may want to ask commercial facilities to make an early commitment to reduce water consumption. Commercial water uses are variable and complex. Examples of types of facilities may include, but are not limited to, commercial and retail centers, office buildings, hotels and motels, coin and card operated laundries, auto service and repair shops, restaurants and fast food, bakery and pastry shops, commercial printers, fuel service stations and convenience stores, vehicle washes, schools, grocers, hospitals, bakers, laundries and dry cleaners, water features and pools and landscapes. A facility s water use is related to the type and number of commercial customers that they service. Different types of facilities will have different water use characteristics and potential efficiencies; however, efficiency may also vary within the same type of facility. Therefore, an on-site water use assessment provides a more accurate assessment than estimating efficiencies based on type of facility. Implementation Guidance: Local water providers may develop their own program that they offer to their interested commercial customers with some, all or none of the costs being paid for by the local water provider. The level of funding, the use of staff or contractors and the program scope may vary from local water provider to local water provider based on local desires, needs and expressed interest from customers. Alternatively, local water providers may participate in and assist in promoting the Metro Water District s commercial water use assessment program. Local water providers shall identify their highest commercial water customers, or other groups of commercial customers that may have significant water savings PAGE 5-69

160 SECTION 5 ACTION ITEMS potential, document the methodology used for selecting the customers, and advertise the availability of a water use assessment program. All commercial water use assessments on buildings with cooling towers shall evaluate and, where feasible based on the equipment and local conditions, make recommendations to improve their efficiency, including by increasing the cycles of concentration from two to six or more. All commercial water use assessments on buildings with pre-rinse spray valves shall consider their replacement. If a local water provider has expressed an interest in participating in the District s regional program (pending its review of the final program structure and costs), then such local water provider is not required to create a local program until the District establishes its regional program and the local water provider has made a timely decision about its participation in the regional program. All commercial water use assessments involving irrigation shall evaluate the replacement of simple clock timers with WaterSense labeled irrigation controllers. Replacing standard clock timers with WaterSense labeled irrigation controllers can provide an average annual water savings of 15 percent. These controllers use prevailing weather conditions, current and historic evapotranspiration, soil moisture levels and other relevant factors to adapt water applications to meet the actual needs of plants. Additionally, water efficient landscapes can help reduce irrigation runoff, reduce pollution of waterways and limit property damage. The EPA WaterSense program has developed WaterSense at Work, a compilation of commercial waterefficiency best management practices. This program helps commercial customers understand and better manage their water use, establish an effective water management program and identify projects and practices that can reduce water use. Opportunities for Technical Assistance: The Metro Water District s Technical Assistance Program will provide support for implementation of this Action Item by offering to administer the commercial water assessments, either through District staff or contractors. The costs of this regional program will be paid for by the local water providers choosing to use the regional program to conduct commercial water use assessments. Resources: EPA, WaterSense Commercial, information page, EPA, WaterSense Commercial, Best Management Practices page, Energy.gov, Federal Energy Management Program Water Efficiency, Best Management Practice #10: Cooling Tower Management, PAGE 5-70

161 ACTION ITEM WSWC-9: PRE-RINSE SPRAY VALVE REPLACEMENT PROGRAM SECTION 5 ACTION ITEMS Intent To reduce water use in facilities with commercial and institutional kitchens by replacing older pre-rinse spray valves. Points of Integration This measure should result in decreased water demands, as well as decreased wastewater flows. Responsible Party Local Water Provider In Coordination With County Board of Health Action Item: Implement a replacement program for pre-rinse spray valves in food preparation facilities. Sub-Tasks: Each local water provider shall: 1. Develop a program to replace older pre-rinse spray valves with EPA WaterSense certified models. 2. Use the Metro Water District s outreach material or other media in a targeted effort to recruit food preparation facilities for this program. 3. Track the number of pre-rinse spray valve replacements made annually. Description: The use of efficient pre-rinse spray valves can reduce water use in commercial kitchens by a substantial amount. Because commercial kitchens use hot water to rinse dishes, another benefit is energy savings. Implementation Guidance: In 2006 the federal standard was reduced from 3.5 gpm to the current federal standard for pre-rinse spray valves of 1.6 gpm. The EPA WaterSense criterion is 1.28 gpm. Local water providers may consider focusing their replacement program on food preparation facilities that are older than 2006, which are more likely to contain pre-rinse spray valves using 3.5 gpm or less. The WaterSense certification also requires performance standards to ensure efficient cleaning while using less water. EPA estimates that replacing one pre-rinse spray valve with a WaterSense certified model compared to a 1.6 gpm model can save a typical commercial kitchen more than 7,000 gallons of water per year. Because commercial kitchens use hot water to rinse dishes, energy savings can be attained with efficient pre-rinse spray valves as well. EPA estimates that total financial savings for a commercial kitchen could be as much as $240 per year in water, sewer and energy costs. The price of a WaterSense pre-rinse spray valve typically is between $30 and $50 each, and bulk purchase discounts may be available. Examples of pre-rinse spray valve replacement programs include the following: Rebate incentive program: Customer receives a water bill credit, cash or voucher to offset the cost of a new WaterSense labeled pre-rinse spray valve. Exchange program: Customer exchanges an existing non-watersense pre-rinse spray valve for a WaterSense labeled pre-rinse spay valve through the local water provider. Bulk ordering program: Local water provider collects orders on behalf of interested customers, or makes the orders itself, in order to obtain a discounted price per unit to be paid for or provided at no charge to interested customers. PAGE 5-71

162 SECTION 5 ACTION ITEMS Other: Local water providers may create their own programs as long as the program goes beyond education and actually results in pre-rinse spray valve replacements. It is recommended that the local water provider also track the impact on water usage through meter reading and billing with an attempt to normalize results based on customers or meals served. Targeted outreach efforts should be used to recruit program participants. The Metro Water District has created a pre-rinse spray valve brochure, available on the Metro Water District website, and local water providers may distribute this brochure as a part of their outreach efforts. Local water providers may choose to partner with the County Board of Health to identify food preparation facilities and coordinate in the execution of this action item. In many food preparation facilities, service companies sanitize and maintain kitchen equipment. The local water provider may coordinate with these providers to implement the replacement program. Considerations for Enhanced Implementation: The optional consideration for enhanced implementation is to adopt local ordinances or policies that require all new pre-rinse spray valves available for purchase to be EPA WaterSense labeled. Opportunities for Technical Assistance: The Metro Water District s Technical Assistance Program may provide support for implementation of this Action Item through the following types of activities: Centrally acquiring pre-rinse spray valves or identifying affordable, quality-tested models for local water providers Providing outreach materials to support local program implementation Resources: EPA, WaterSense Labeled Pre-Rinse Spray Valve, information page, Athens-Clarke County Public Utilities Department, Certified Blue Restaurant Conservation Program, PAGE 5-72

163 SECTION 5 ACTION ITEMS ACTION ITEM WSWC-10: OUTDOOR WATER REQUIREMENTS FOR LARGE LANDSCAPES Intent To reduce discretionary water use by requiring water efficient irrigation systems on large landscapes. Points of Integration Reducing irrigation water use on large landscapes can also provide potential watershed management benefits by reducing irrigation runoff and pollution that enters waterways. Responsible Party Local Water Providers In Coordination With Local Government Inspection/Code Enforcement Staff Legal Counsel Site Plan Review Action Item: Each local water provider shall adopt an ordinance or policy by January 1, 2019 requiring all new irrigation systems for large landscapes (greater than one acre or 43,560 square feet and excluding single-family homes) to include: Pressure regulators and master shut-off valves Flow sensors that detect and report high flow conditions due to broken pipes and/or popped sprinkler heads Description: Outdoor water efficiency on large landscapes can be improved by maintaining optimum pressure with regulators and monitoring the system for high flow conditions. Implementation Guidance: This Action Item does not apply to irrigation systems for single-family homes, however the policy or ordinance adopted should cover large landscapes (greater than one acre or 43,560 square feet) irrigated on property owned by homeowner associations. This Action Item does not apply to irrigation systems that use water withdrawn from private wells or surface water by an owner or operator of a property if such well or surface water is solely on the owner/operator s property (i.e., the irrigated property). To calculate the area of irrigated landscapes, all irrigated areas included in a development should be added together. When implementing this action item, it is recommended that: The enacted ordinance or policy requires a post-installation inspection. The local water provider coordinates with the local government to educate staff on enacted ordinances or policies. The local water provider should develop outreach materials regarding smart irrigation controllers and target distribution to owners and managers of properties with large landscapes. All policies must be written policies that either include their date of adoption or are accompanied by other documents (letters, s, memoranda, etc.) that establish when the written policy was adopted. The local water providers should confirm compliance with this Action Item when it reviews site plans and as part of providing meters. Considerations for Enhanced Implementation: The optional considerations for enhanced implementation include the following: PAGE 5-73

164 SECTION 5 ACTION ITEMS Include single-family residential components in implementation of this Action Item where irrigated single-family residential turfgrass area is exceptionally large. Create a requirement that large landscape irrigation systems submit a certification statement at least every other year that an audit of their irrigation system was performed by a Certified Landscape Irrigation Auditor. Require dedicated sub-meters for new irrigation systems in large landscapes. Opportunities for Technical Assistance: The Metro Water District s Technical Assistance Program may provide support for implementation of this Action Item through the following types of activities: Developing a model ordinance for water efficient irrigation systems Administering a regional incentive program for smart irrigation controllers for local water providers interested in participating in a regional program, rather than creating an independent local program Resources: EPA, WaterSense Labeled Irrigation Controllers, information page, California Department of Water Resources, Water Efficient Landscape Ordinance, Technical Assistance, Alliance for Water Efficiency, Resource Library, Landscape, Irrigation and Outdoor Water Use, PAGE 5-74

165 SECTION 5 ACTION ITEMS ACTION ITEM WSWC-11: STATE WATER CONSERVATION AND DROUGHT RESPONSE REQUIREMENTS Intent To ensure local water providers, local governments and citizens are aware of the existing state laws related to water conservation and drought response. Responsible Party Local Water Provider Legal Counsel Local Government In Coordination With Elected Officials/Governing Board Site Plan Review Planning and Zoning Inspection/Code Enforcement/Maintenance Staff Local Wastewater Provider County Board of Health Action Item: Continue adopting, implementing and complying with existing state laws related to water conservation and drought response. Sub-Tasks: Each local government shall: 1. Adopt and implement the Georgia State Minimum Standard Plumbing Code that requires high-efficiency plumbing fixtures in all new construction. 2. Implement existing Georgia state law requiring that new irrigation systems in the Metro Water District be installed with a rain shutoff sensor. 3. Coordinate with and provide support to the local water provider as necessary to implement all responsibilities pursuant to the Drought Management Rule, and if any inconsistencies are identified, then update such plans to ensure they are consistent with the Drought Management Rule. Each local water provider shall: 4. Adopt and implement an ordinance or policy to measure the use of each unit in new multi-unit residential, retail and light industrial buildings based on the measured quantity of water used by each unit, as required by and subject to the exceptions in O.C.G.A Comply with water conservation plan and drought contingency plan prepared in connection with any application for a new or modified surface or ground water withdrawal permit. See Georgia Rules and Regulations, Chapter (4)(b)(8) and (9) and (11). 6. Review the water conservation plan and drought contingency plan for consistency with the Drought Management Rule, and if any inconsistencies are identified, then update such plans to ensure they are consistent with the Drought Management Rule. 7. Coordinate with and request support from local government(s) as necessary to implement all responsibilities under the drought management rule, including applicable drought response strategies under drought response level 1, 2, 3 or 3 plus pursuant to the Drought Management Rule (Georgia Rules and Regulations, Chapter ). Description: This Action Item consists of existing state laws related to water conservation. These measures help improve water system efficiency, encourage water conservation and promote consistent and uniform responses to droughts. PAGE 5-75

166 SECTION 5 ACTION ITEMS Implementation Guidance: Each local government and local water provider retains an independent obligation to identify, understand and comply with state laws. The laws listed in this action item may be amended, replaced or repealed from time to time, and the list in this Action Item may not be a complete list of laws related to water conservation and drought response. For Sub-Task 4, sub-metering is now covered by state law instead of a stand-alone Action Item in this Plan. The terms new multi-unit residential, retail and light industrial buildings likely refer to zoning classifications as opposed to customer classifications that a local water provider uses for billing. Much of the public information available on this sub-metering requirement focuses on its applicability to new multi-unit residential buildings, but local water providers should consider how to apply this requirement to retail and light industrial buildings, in accordance with and subject to the exceptions in O.C.G.A All policies adopted for this Action Item must be written policies that either include their date of adoption or are accompanied by other documents (letters, s, memoranda, etc.) that establish when the written policy was adopted. Resources: Georgia EPD, Existing Rules and Corresponding Laws, Georgia State Minimum Standard Plumbing Code, PAGE 5-76

167 ACTION ITEM WSWC-12: REQUIRE NEW CAR WASHES TO RECYCLE WATER SECTION 5 ACTION ITEMS Intent Reduce water use by conveyor car wash facilities. Points of Integration This measure should result in decreased water demands, as well as decreased wastewater flows. Responsible Party Local Government In Coordination With Elected Officials/Governing Board Legal Counsel Site Plan Review Planning and Zoning Inspection/Code Enforcement/Maintenance Staff Local Wastewater Provider County Board of Health Action Item: Each local government shall adopt an ordinance that requires all new conveyor car washes to install operational recycled water systems. A minimum of 50 percent of water used must be recycled. Description: Substantial water savings can be realized by improving the efficiency of commercial car wash water use through the adoption of water recycling systems. Implementation Guidance: There are three main types of car washes: self-service, roll-over/in-bay and conveyor. Self-service car washes are typically coin-operated with spray wands and brushes operated by the customer. Roll-over/in-bay automatic car washes are characterized by a wash bay in which the customer stays in the car as the carwash equipment uses either spray nozzles or brushes, or a combination of both, to process the individual cycles. A conveyor car wash is usually installed in a tunnel and includes a series of cloth brushes or curtains and arches from which water is sprayed while the car is pulled through the tunnel on a conveyor chain. Self-service car washes typically use 15 gallons per wash, while the in-bay and conveyor washes typically use 50 and 35 gallons per wash, respectively. The adopted ordinance should set a minimum standard that 50 percent of water used by conveyor car washes should be recycled. The Metro Water District has developed a model ordinance on new car wash water recycling as a resource for local governments. All policies must be written policies that either include their date of adoption or are accompanied by other documents (letters, s, memoranda, etc.) that establish when the written policy was adopted. Local governments should take appropriate steps to ensure all car wash wastewater is connected to the sanitary sewer system and not the stormwater system. Resources: Metro Water District, Model Ordinance to Require New Car Washes to Recycle Water, September 2, 2010, Georgia EPD, Water Conservation Best Management Practices and Certification, Chapter , PAGE 5-77

168 SECTION 5 ACTION ITEMS This page left intentionally blank. PAGE 5-78

169 SECTION 5 ACTION ITEMS ACTION ITEM WSWC-13: WATER WASTE POLICY Intent To reduce water waste such as outdoor leaks and improper irrigation. Points of Integration This Action Item should result in decreased water demands. Watershed planning implications include reducing the volume of flows entering the stormwater collection system. Responsible Party Local Government In Coordination With Elected Officials/Governing Board Legal Counsel Site Plan Review Planning and Zoning Inspection/Code Enforcement/Maintenance Staff Local Water Provider County Board of Health Action Item: Each local government shall adopt a water waste ordinance or policy to reduce outdoor water waste. Description: Water waste means the excessive application of water that results in water flowing down any curb and gutter, street or storm drain or onto an adjacent property. Implementation Guidance: Water waste policies and ordinances can range from simple statements that prohibit the waste of outdoor water to more detailed policies and ordinances that specify types of outdoor water waste. Non-compliance with such provisions may be treated as a municipal code violation. Violators should be warned and could potentially be subject to monetary penalties or termination of water service. Action Item WSWC-11 addresses water waste and conservation, and coordinated implementation of these two Action Items is advised. All policies and ordinances must be written policies that either include their date of adoption or are accompanied by other documents (letters, s, memoranda, etc.) that establish when the written policy was adopted. Resources: Metro Water District, Water Waste Policy or Ordinance, March 1, 2012, PAGE 5-79

170 SECTION 5 ACTION ITEMS This page left intentionally blank. PAGE 5-80

171 ACTION ITEM WSWC-14: WATER SYSTEM ASSET MANAGEMENT SECTION 5 ACTION ITEMS Intent To facilitate effective operation and maintenance of the system to minimize water system leakage and to ensure proper functioning. Points of Integration This Action Item improves the management and efficiency of the water system. Watershed, wastewater and water distribution personnel can work together, with cross-training, to identify infrastructure problems in the field. Responsible Party Local Water Provider Action Item: Develop an asset management program that ensures proper management of the water system. Sub-Tasks: Each local water provider shall: 1. Develop a map of the water distribution system and assets. All local water providers shall develop digital GIS water system mapping by January 1, Develop a written asset management program to prioritize and implement activities to inspect, maintain and rehabilitate the local water system components. Description: The condition of water infrastructure in the Metro Water District varies greatly from new systems in outlying counties to systems over 100 years old. Aging water system infrastructure affects the safety, efficiency and reliability of the water systems. Aging infrastructure can also cause financial challenges, including putting operational funds at risk of being diverted to cover emergency repair costs. Asset management is a framework that can support sustainable infrastructure through planned and prioritized maintenance to minimize life-cycle costs, prevent water loss and ensure proper system functioning. Implementation Guidance: Asset management approaches to the maintenance of water infrastructure involve managing and maintaining the water system in a way that minimizes the life-cycle costs. Asset management for local water providers includes regular inspections and maintenance from the source to the water treatment facility through the water distribution system up to customer meters. Regular maintenance can extend the lifespan of water system assets as well as prevent customer service interruptions. Asset management plans are developed to maintain an optimal level of service at best appropriate cost for rehabilitating, repairing or replacing assets. Asset management is a framework being widely adopted as a means to pursue and achieve sustainable infrastructure. A well-developed asset management program incorporates detailed asset inventories, operation and maintenance tasks and long-range financial planning to build water system capacity, and it puts water systems on the road to sustainability. The GAWP Asset Management Committee has developed a guidance document on Asset Management for Small Systems that may be used as a reference by Metro Water District water providers. The water system map, at a minimum, should include survey and inventory of the water distribution system and horizontal and vertical locations of critical components. Comprehensive maps can help to determine which parts of the system need inspection, track ongoing, mostly unscheduled, maintenance work, and help determine appropriate resources for annual inspection and maintenance. Ongoing map maintenance is also critical to ensuring information is up-to-date and incorporates data on new lines and connections. PAGE 5-81

172 SECTION 5 ACTION ITEMS Information collected as a part of water system mapping will vary based on the local water system and may include: Pipe information: size, material, age, condition, direction of flow and slope Valve information: location, diameter, depth, age and condition Pump station information: location, capacity, number of pumps, condition, method of alarm indication and method of backup power Elevated tanks: location, capacity, condition, normal level and method of alarm indication In addition, water providers should identify critical infrastructure based on risk and consequence of failure. Risk can be defined as the combination of the likelihood of failure and the consequence of failure. The likelihood of failure can be determined or estimated by assessing the condition of the asset or by evaluating historic performance. The consequence of failure can be determined or evaluated on a case by case basis, depending on the type of asset. If the condition of assets is not known, such as for buried assets like pipes, the consequence of failure determination can be used to prioritize condition assessment activities. Most local water providers, especially those in communities with a significant level of new development, already use a GIS-based water distribution system map. Water distribution system maps should be kept current and any water system changes should be made to the system map in a timely manner. It is recommended that local water providers coordinate the asset management program with the local water master plan (Action Item WSWC-2) and water loss control program (Action Item WSWC-15). Resources: GAWP, Asset Management Committee, A Guide to Asset Management for Small Water Systems, July AAC465A2DB88/Small_Water_Systems_Guide_2015.docx GAWP, 2015 Pamphlet, 10 Questions A Small System Should be Asking About Asset Management Planning, AAC465A2DB88/2015_Pamphlet_for_Small_Water_Systems.pdf PAGE 5-82

173 ACTION ITEM WSWC-15: WATER LOSS CONTROL AND REDUCTION SECTION 5 ACTION ITEMS Intent To control and reduce local water provider s real losses. Points of Integration This Action Item improves the management and efficiency of the water system. Watershed, wastewater, and water distribution personnel can work together, with crosstraining, to identify infrastructure problems in the field. Responsible Party Local Water Provider Action Item: Develop and implement program to identify and reduce real water losses. Sub-Tasks: Each local water provider serving at least 3,300 individuals shall: 1. Comply with Georgia EPD s Water Supply Efficiency Rule (see Georgia Rules and Regulations, Chapter ) and any related guidance that may be issued from time to time [the Water Supply Efficiency Rule ], including but not limited to the requirements for water loss audits, reporting and demonstration of progress. 2. Track key metrics from the AWWA water audit annually as required by the Georgia Water Stewardship Act and the Water Supply Efficiency Rule. 3. For each local water provider with density greater than 32 connections per mile of main and real losses above 60 gallons per day per connection (based on 2013 water loss audit results), adopt a 2025 goal to reduce real losses to less than 60 gallons per day per connection and demonstrate progress in the interim years toward meeting this goal. Systems that achieve this goal prior to 2025 should continue cost-effective water loss controls and initiate progress toward 35 gallons per day per connection. 4. For each local water provider with density greater than 32 connections per mile of main and real losses are between 35 and 60 gallons per day per connection (based on 2013 water loss audit results), adopt a 2025 goal to reduce real losses to less than 35 gallons per day per connection and demonstrate progress in the interim years towards meeting this goal. Systems that achieve this goal prior to 2025 should continue cost-effective water loss controls by setting new individualized goals and demonstrating progress as required by the Water Supply Efficiency Rule. 5. If a local water provider required to adopt a target pursuant to Sub-Tasks (3) and (4) above reasonably believes after detailed analysis that the applicable 2025 goal exceeds its system-specific economic level of leakage, then the local water provider may send a notice to the District Chairperson by no later than July 1, 2018 establishing a new 2025 goal. See implementation guidance below for details on this notice. Description: Audits of real water losses provide information that can be used to set goals to improve water system management and reduce water losses. Implementation Guidance: The Georgia Water Stewardship Act requires that all local water providers serving at least 3,300 individuals complete an annual local water provider audit using the AWWA Free Water Audit Software and submit the audit results to Georgia EPD by March 1 of each year. Additionally, the Metro Water District has required local water providers to assess leakage by performing water loss audits since the adoption of the 2003 Plan. In June 2015, the Georgia DNR board passed the Water Supply Efficiency Rule (Georgia Rules and Regulations, Chapter ) as prescribed by the Georgia Water Stewardship Act of The rule states that audits must be annually reviewed and certified by a Qualified PAGE 5-83

174 SECTION 5 ACTION ITEMS Water Loss Auditor prior to submitting to Georgia EPD. Another provision is that all local water providers must have a water loss control program by July 1, The rule also states that local water providers shall establish individual goals to set and improve water supply efficiency and demonstrate progress toward those goals. The AWWA Free Water Audit Software uses the IWA/AWWA methodology which is applied in an Excel spreadsheet. Within IWA/AWWA methodology, no water is considered unaccounted for, as it is allocated as either a consumption or loss. Water loss programs can then target the categories of losses, which will vary for every local water provider. The water audit software calculates the following local water provider performance metrics for water loss that can be tracked annually: Apparent Losses per connection per day (gallons per day) Real Losses per connection per day (gallons per day) Real Losses per mile of main per day (gallons per day) These metrics are identified in the AWWA M36 Manual and in the Georgia Water Loss Manual as recommendations for tracking progress and setting goals. The use of percentage indicators is not recommended to track progress over time, due to the unrelated factors that can skew such numbers from year-to-year. Using volumes that are normalized for local water provider-specific factors is more applicable for individual local water providers tracking of water losses. The 2025 goals in the Sub-Tasks (3) and (4) are based on an analysis of the latest published water audit results (2013 calendar year) for local water providers in the Metro Water District. In 2013, the median real water losses for local water providers with densities of greater than 32 connections per mile of main was 34.5 gallons per day per connection. Progress towards meeting the 2025 goals can be reviewed and demonstrated by tracking the key metrics from consecutive audit years using the AWWA Water Audit Compiler tool. This tracking tool is freely available from the AWWA website, and can be used to create graphics showing the trends of these metrics over several years. The trend can be used to demonstrate progress, and for purpose of Sub-Tasks (3) and (4), demonstrating progress will be based on gallons per day per connection. The water audit software also calculates the water audit data validity to provide a level of reliability of the water audit results for the purposes of implementing water loss control activities. The water audit software requires the application of data grades to each input based on very specific data quality and operational criteria. These data grades are compiled into an overall data validity score, which provides the overall reliability of the results. Target and goal setting is not recommended in the software or by AWWA until the data validity score is between 50 and 70. The inputs are not weighted equally, and as a result, those water systems with data validity scores below 50 should consider activities to improve their data grades on key inputs. Key inputs include Volume From Own Sources (or Water Imported), Master Meter Error Adjustments, Billed Metered and Customer Metering Inaccuracies. Specific activities that can be performed to improve the data grades are listed in the water audit software. The 2025 goals in Sub-Tasks (3) and (4) apply regardless of a local water provider s data validity score, but a local water provider with a data validity score below 50 may prioritize taking action to improve its score before other activities necessary to meet the 2025 goals as demonstration of progress. Local water providers should consider the costs and benefits of their water loss activities in order to implement the most cost-effective programs to reduce water losses and meet the 2025 goals. For example, local water providers should compare the cost of implementing a water loss reduction activity to the value of the water losses recovered. The value of recovered real and apparent losses can be represented by the variable production cost and customer retail unit cost, respectively, found in the water audit. PAGE 5-84

175 SECTION 5 ACTION ITEMS For any local water provider sending notice of a new 2025 goal under Sub-Task (5), the new 2025 goal and the form and substance of the related notice to the Metro Water District must be approved by the local water provider s governing body. The notice must include a detailed summary of their analysis and attach detailed data supporting their determination of their system-specific economic level of leakage. If a local water provider does not send a notice changing its 2025 goal by the deadline of July 1, 2018, then the 2025 goal shall apply. Resources: AWWA, M36: Water Audits and Loss Control Programs, Fourth Edition, 2016, Water Research Foundation, Water Audits and Real Loss Component Analysis, 2015, AWWA, Water Loss Control Resource Community, Free Water Audit Software v5.0 and Water Audit Software and Compiler v5.0, 2014, GAWP, Water Loss Auditing and Efficiency Reporting Guidance, Georgia Water Loss Control Manual, Version 2.0, March 2016, PAGE 5-85

176 SECTION 5 ACTION ITEMS This page left intentionally blank. PAGE 5-86

177 ACTION ITEM WSWC-16: LOCAL PUBLIC EDUCATION PROGRAM SECTION 5 ACTION ITEMS Intent To increase knowledge and awareness of the importance of water efficiency and conservation with the goal of building public support for local actions and activities as well as long term behavior change. Points of Integration The development and implementation of an integrated education program is encouraged. Water conservation education can be integrated with education regarding watershed management, septic systems, and wastewater to emphasize the interconnected nature of water resources and their management. Local Responsibility Local Water Provider In Coordination With Stormwater Management Staff Local Wastewater Provider Action Item: Develop and implement a local water efficiency and conservation education program. Sub-Tasks: Each local water provider shall: 1. Implement education activities as outlined in Action Item PUBLIC EDUCATION Distribute high-efficiency retrofit kits to residential water customers. 3. Provide residential water assessment information to residential water customers. 4. Promote the EPA WaterSense New Homes program. 5. Provide information on water efficient landscape practices to residential water customers. Description: Public education and outreach is crucial for fostering broad public support for water conservation and efficiency. Involving the public is crucial to developing an ethic of stewardship, and it enables to the public to make informed choices about water resources management. Additionally, education and outreach can encourage changes in basic behavior and practices that are necessary to achieve maximum and long-term objectives to protect our shared water resources. At the local level, water providers must implement education and public awareness programs that help individual citizens, businesses and organizations to become aware of their role in how water is used and what they can do to support sustainable use and drought mitigation. Implementation Guidance: Section 5.5 provides more detail on public education programs and Action Item PUBLIC EDUCATION-1 provides more detail on local public education program requirements. Specific guidance for Sub-Tasks lists above includes: Local water providers should identify and purchase high-efficiency retrofit kits appropriate for the local water service area and target the distribution to customers in pre-1994 properties. It is recommended that the retrofit kit include a WaterSense certified showerhead. Instead of offering standard retrofit kits to customers, one or more water conservation items from the kit may be offered a la carte to customers based on their needs and preferences. PAGE 5-87

178 SECTION 5 ACTION ITEMS Local water providers may use the Do It Yourself Household Water Assessment developed by the Metro Water District to educate customers on their water use through a self-water assessment. Local water providers may distribute information developed through the EPA WaterSense New Homes program to local developers, architects, engineers and builders interested in building higher water efficient homes. Water providers and local governments may use the Water-Wise Landscape Guide for the Georgia Piedmont developed by the Metro Water District and UGA Extension to educate customers on water efficient landscape practices. Opportunities for Technical Assistance: The Metro Water District s Technical Assistance Program may provide support for implementation of this Action Item through the following types of activities: Providing education resources for local governments and utilities to use in their local public education programs. A list of available resources is provided on the Resources pages of the Metro Water District website, and it includes links and downloadable documents. Centrally acquiring high-efficiency retrofit kits or identifying affordable, quality-tested models for local water providers. Assisting members in the development of their local education programs Resources: Metro Water District, Public Education and Awareness Resources List, Metro Water District, Do It Yourself Household Water Assessment, EPA, WaterSense Labeled Homes, information page, UGA Extension, Water-Wise Landscape Guide for the Georgia Piedmont, June 2015, Bulletin 144, PAGE 5-88

179 5.3 Wastewater Action Items SECTION 5 ACTION ITEMS The forecasts developed for this Plan project that wastewater demands in Metro Water District will be 786 to 831 MMF-MGD in Meeting this demand will require the management of the wastewater system infrastructure to reclaim water in a manner that will protect water quality and public health and support the need for returns to the region s lakes and river basins. Appendix B addresses the future wastewater treatment infrastructure needs of the Metro Water District on a county-by-county basis. The Action Items below, along with Appendix B, describe the plan for meeting the Metro Water District s future wastewater needs Wastewater Infrastructure Plan To meet future wastewater needs, Appendix B provides a region-wide overview of where wastewater treatment facilities will be located and an estimate of their capacities. The treatment facilities are owned and operated by local wastewater providers, and these providers will refine this Plan over time in order to optimize it and add innovation. It is important to note that wastewater facilities may not be expanded without the issuance of new or amended permits from Georgia EPD if the proposed expansion will expand the capacity beyond the currently permitted limits for wastewater discharges and land application. The wastewater treatment infrastructure plan was determined based on the wastewater flow forecasts outlined in Section 4 and the planning considerations outlined in Section 2. Appendix B provides detail on wastewater facility needs in each county. The summaries in Appendix B provide the wastewater facility plan for the District through This plan indicates that by 2050 the region will have the following: 13 new wastewater treatment facilities 54 expansions of existing wastewater treatment facilities 24 existing wastewater treatment facilities that will continue to be in use without expansion 9 decommissioned wastewater treatment facilities It is projected that 96 percent of the wastewater volume collected by local wastewater providers in 2050 will be treated by facilities that discharge to surface waters. The remainder will be treated by land application systems or discharged to non-potable reuse end users. Specific projections of non-potable reuse volumes are not available, but volumes are expected to be minimal. See the Metro Water District s Nonpotable Reuse Water Policy in Section 2.1. Expansion of existing facilities will be the primary source of additional treatment capacity in the Metro Water District through Expansion is considered a cost-effective approach, but may present some challenges in watersheds with assimilative capacity limitations where advanced technologies may be needed to protect water quality standards. The facilities scheduled to be decommissioned are mostly smaller with less efficient treatment technologies or decentralized systems that were deeded to the local wastewater provider. The new facilities are primarily located in the growing counties on the perimeter of the District Wastewater Collection System Inspection and Maintenance There are approximately 16,000 miles of sewers and more than 450,000 manholes in the Metro Water District. Sewers and manholes in the District range in age from new to over 100 years old. As the system continues to age, proper inspections and maintenance are necessary to maintain a high level of customer service and protect water quality. Identifying and correcting collection system deficiencies in conjunction with overflow spill response programs may help local water bodies meet State water quality standards. PAGE 5-89

180 SECTION 5 ACTION ITEMS NPDES and LAS permits require permittees to properly manage, operate and maintain at all times all parts of the collection system they control. Some collection system operators in the Metro Water District have found inspection and maintenance programs to be very helpful in meeting their permit obligations, reducing or preventing SSOs, maintaining superior system performance, extending the longevity of sewer system components, maintaining relatively high customer satisfaction, protecting WWTPs and protecting human health and the environment. All local wastewater providers in the District must maintain a wastewater collection system inspection and maintenance program. These programs should consist of the minimum elements identified in the Action Items below, as well as any additional requirements identified in local NPDES and LAS wastewater permits. Many of the programs outlined in the Action Items below are related to the elements of a Capacity Management Operations and Maintenance (CMOM) program. Communities that have an approved CMOM program with Georgia EPD can demonstrate compliance with Action Items WW-2 through WW-9 through certification of their CMOM program based on the most recent CMOM audit Wastewater Treatment Standards Higher levels of treatment with advanced technologies at wastewater treatment facilities will most likely be required during the planning horizon where current limits may not be sufficient to protect water quality standards. Some reasons to anticipate more stringent wastewater treatment standards include: TMDLs: As the causes of impairments of surface water uses are identified in TMDL plans, more restrictive discharge limits may be imposed on some wastewater treatment facilities. These limits will be specific to the cause of the impairment, such as excessive nutrients or inadequate dissolved oxygen. Most of the TMDL challenges in the Metro Water District are related to nonpoint source pollution, which will be mitigated by implementation of the Watershed Management Action Items in Section 5.4. In-stream nutrient standards: Georgia EPD is developing standards and implementation strategies for nutrients (including ammonia) in various water bodies. When these are finalized, nutrients in the flow discharged by wastewater treatment facilities may need to be reduced below current levels with higher levels of treatment. At this time, Lake Lanier and Allatoona Lake have limits on the discharge of phosphorus from wastewater treatment facilities. Increasing volumes of wastewater: Growth in the Metro Water District will lead to increasing volumes of wastewater for treatment and discharge. As the volume of discharges increases, the level of treatment must increase correspondingly in order to provide the same level of protection for surface water quality. While this Plan is designed to protect water quality, the determination of specific facility-level wastewater treatment limits that will protect water quality is the responsibility of Georgia EPD. When this Plan uses the term highly treated wastewater, it means water meeting the facility-level treatment limits as determined by Georgia EPD. The Plan does not presuppose or require any specific level of treatment, including tertiary treatment. Local wastewater providers should not assume that assimilative capacity is available in a receiving body even if a projected plant capacity is listed in the tables of Appendix B. It is the responsibility of each local wastewater provider to coordinate with Georgia EPD to assess the assimilative capacity of receiving waters as a first step when planning for an expansion or new discharge. PAGE 5-90

181 ACTION ITEM WW-1: ENHANCED RELIABILITY OF WASTEWATER PUMPING STATIONS SECTION 5 ACTION ITEMS Intent To enhance the reliability of wastewater pumping stations and provide more clarity for auditing purposes. Points of Integration Enhanced reliability of wastewater pumping stations sustains watershed health and can support source water protection by reducing the risk of SSOs. Responsible Party Local Wastewater Provider Action Item: Enhance reliability of wastewater pumping stations by further clarifying backup power requirements. Sub-Tasks: Each local wastewater provider shall: 1. Maintain a file of the firm capacity of all pump stations within the wastewater master plan (see Action Item INTEGRATED-4). 2. For all newly constructed major (one MGD or greater firm capacity) wastewater pump stations, or those receiving an upgrade to a firm capacity of one MGD or greater, provide a dedicated secondary power supply, emergency generator(s) or dedicated stand-by pumping system to allow continued firm pumping capacity with the primary power supply out of service. 3. For wastewater pump stations with firm capacity less than one MGD without a dedicated secondary power supply or emergency generator, provide, at a minimum, to enhance reliability: a. Backup power connection via an emergency generator receptacle b. Availability of a portable utility-owned or rental generator c. Quick connections for a stand-by pumping system d. Availability of a portable utility owned or rental pumps or an overflow basin sized for at least 24- hour overflow protection under maximum month average daily flow conditions 4. Compliance with this action item shall be achieved by January 1, Description: Reliable wastewater pumping systems are important in the Metro Water District for a number of reasons. Many areas of the Metro Water District are in the headwaters of basins, where there is limited assimilative capacity and where system failures could affect downstream users. In addition, some wastewater systems in the Metro Water District are located upstream from drinking water intakes, where failures must be avoided. As more return flows are expected in the future to support the water resource needs of the Metro Water District, reliable infrastructure will be needed to pump and treat the flow. Implementation Guidance: The reliability of wastewater pumping stations will be addressed in local wastewater master plans (Action Item INTEGRATED-4) to maintain compliance with regulatory requirements. Pumping facilities shall have a firm capacity (i.e., total maximum pumping capacity with the largest pump out of service) such that expected peak flow can be pumped to its desired destination. Wastewater providers shall maintain a file of the firm capacity of all treatment plants and pump stations within their wastewater master plan. Additionally, a dedicated emergency or secondary power supply PAGE 5-91

182 SECTION 5 ACTION ITEMS should be provided that is suitable for meeting total maximum pumping capacity needs with the primary power supply out of service. In areas where an automatic diversion to another gravity sewer or pump station is available, secondary power sources or overflow basins should be evaluated, but are not required to meet the requirements of Sub-Tasks 2 and 3. Local water providers that provide for the connection of a portable generator for operating wastewater pump stations with firm capacity less than one MGD should consider access to the site during extreme flood, snow or icy conditions when backup power is more likely to be needed. Considerations for Enhanced Implementation: An optional consideration for enhanced implementation is for facilities upstream from drinking water intakes or recreational waters to consider providing even greater enhanced reliability, including additional mechanical redundancy and offline storage for wastewater pump stations. Resources: Great Lakes Upper Mississippi River Board of State and Provincial Public Health and Environmental Managers, Recommended Standards for Wastewater Facilities, 2004 Edition, see Section 47 Emergency Operation, PAGE 5-92

183 ACTION ITEM WW-2: SEWER SYSTEM INVENTORY AND MAPPING SECTION 5 ACTION ITEMS Intent To improve documentation of existing infrastructure for improved planning and targeted infrastructure improvements. Points of Integration Wastewater system maps can be used to support watershed health and source water protection by improving the management of the system and reducing the risk of inadvertent spills. Responsible Party Local Wastewater Provider In Coordination With Local Government Site Plan Review Local GIS Department Action Item: For wastewater providers who do not have an approved CMOM with Georgia EPD, develop and maintain a digital sewer system map based on a survey and inventory of the sewer system. Sub-Tasks: Each local wastewater provider shall: 1. Determine a sewer system mapping strategy. Outline a plan, schedule, and budget for sewer system mapping. 2. Collect field data for sewer system database development, possibly in an electronic form. 3. Create a sewer system map based on the database. All wastewater utilities shall develop digital GIS sewer system mapping by January 1, Update sewer system maps periodically to include sewer system extensions and rehabilitation projects. 5. Identify critical infrastructure based on risk and consequence of failure. Description: A comprehensive sewer system map is critical for developing a strong inspections and maintenance program. Without proper mapping of a sewer system, it is difficult to determine which parts of a sewer system need inspection or to track ongoing, mostly unscheduled, maintenance work. Without proper documentation and tracking of inspection and maintenance work, it is difficult and time consuming to determine the amount of resources that should be allocated to sewer system inspection and maintenance on an annual basis. Implementation Guidance: At a minimum, the sewer system map will include surveying, inventorying, and mapping the sewer system and horizontal and vertical locations of critical sewer system components. The sewer system inventorying and mapping is the basis for a broader asset management program. Information collected as a part of sewer system mapping will vary based on the local wastewater system and may include: Pipe information: size, material, age, condition, direction of flow and slope Manhole information: location, diameter, depth, material, age, condition, entering and exit line sizes, direction and elevation Pump station information: location, firm capacity, number of pumps, condition, method of alarm indication and method of backup power Most local wastewater providers, especially in communities with a significant level of new development, already use a GIS-based collection system map. Digital maps have many significant benefits, including safer PAGE 5-93

184 SECTION 5 ACTION ITEMS storage of data, enhanced record-keeping and the ability to more easily share and access data. Collection system maps should be kept current and any system changes should be made to the system map in a timely manner. Although most local wastewater providers have completed initial mapping of the wastewater system, map maintenance will be an ongoing activity. Once the initial surveying, inventorying and mapping are complete, data on new sewers and associated appurtenances can then be added on an on-going basis. In addition, all local wastewater providers shall identify critical infrastructure based on risk and consequence of failure to enable prioritization of maintenance and replacement efforts. Communities that have an approved CMOM program with Georgia EPD can demonstrate compliance through certification of their CMOM program based on the most recent CMOM audit. Considerations for Enhanced Implementation: The optional considerations for enhanced implementation are: Update standards to require new developments to provide digital as-built data suitable for incorporation into GIS maps of the wastewater system Make use of electronic handheld device technology to collect and upload data into the electronic map. Handheld devices reduce the need for cumbersome printing of map books and the liability of having old, inaccurate maps in the field. While not required, these automatic data collection tools may be helpful to larger utilities as a tool for efficient map maintenance. Use of these devices can help operators and maintenance personnel to better understand their system and support relatively easy retrieval of locational and attribute data when needed for operational, maintenance and management purposes. Opportunities for Technical Assistance: The Metro Water District s Technical Assistance Program may provide support for implementation of this Action Item through the following types of activities: Developing GIS base maps for local governments and local wastewater providers Supporting GIS mapping by wastewater utilities by providing datasets, ArcGIS interactive online mapping tools and a GIS user group for information through ARC Resources: ArcGIS Resources, ARC, GIS Data and Maps, PAGE 5-94

185 SECTION 5 ACTION ITEMS ACTION ITEM WW-3: SEWER SYSTEM MAINTENANCE MANAGEMENT Intent To improve sewer system maintenance to address collection system capacity and condition issues, which might result in SSOs. Points of Integration This Action Item improves the management of the wastewater system and reduces the risk of SSOs, which supports watershed health and source water protection. Responsible Party Local Wastewater Provider In Coordination With Site Plan Review Maintenance Staff Local GIS Department Action Item: For wastewater providers who do not have an approved CMOM with Georgia EPD, develop and implement a Computerized Maintenance Management System (CMMS) and standard operating procedures (SOPs) for maintenance management of collection system components, including pump stations and linear assets. Sub-Tasks: Each local wastewater provider shall: 1. Select a CMMS and purchase any necessary hardware. 2. Establish SOPs for maintenance management. 3. Implement a CMMS and SOPs. Description: A CMMS is a tool for the following: Maintaining sewer system data Maintaining information on equipment (inventory and tracking), available maintenance and repair materials and material procurement Tracking and documenting activities Tracking the value of sewer system assets Facilitating adequate overflow emergency response activities Facilitating the development and implementation of a capacity certification program By tracking maintenance data in CMMS, a wastewater provider facilitates easy access and coordination with other sewer system management-related activities. The focus of sewer system maintenance activities is maintaining the hydraulic capacity of the sewer system because the primary function of the sanitary sewer system is conveyance. Additionally, a maintenance program must help ensure continuous operation and reliability of mechanical systems such as pump stations and generators. Typically, two different classes of problems can reduce hydraulic capacity and reliability: structural and operational. Structural defects involve the degradation of the sewer pipe itself. Serious structural defects can lead to pipe collapse and cause SSOs. Sewer repair and rehabilitation activities are focused on restoring the structural integrity of the pipe. Most operational defects affect the hydraulic capacity of the pipe. Roots, rags, sediments and FOG can all reduce the cross-sectional area of the pipe, which in turn reduces its hydraulic capacity. Sewer cleaning and source control activities are directed toward PAGE 5-95

186 SECTION 5 ACTION ITEMS preventing or reducing the impacts of operational defects on the collection system. A CMMS approach can address these concerns by supporting improved system maintenance, which can help to maintain system capacity and prevent SSOs. Implementation Guidance: This plan requires a CMMS be selected and implemented. This system can be sophisticated, as in the case of a database or GIS-based program, or it can be a simpler form, such as a spreadsheet. If a GIS-based program is chosen, system data may be used to map an entire sewer system or portions thereof as needed for inspection and maintenance purposes (see Action Item WW-1). Moreover, a GIS-based program can be used to overlay sewer systems on land use categories or impaired stream segments for determining areas in need of inspection and maintenance. Sewer system maintenance includes the following: SOPs as needed to support maintenance activities Routine inspection and service of all pumps and associated equipment Periodic cleaning of sewers and associated appurtenances Routine inspection and maintenance of the sewer system such as rights-of-way, stream crossings, stream banks adjacent to sewers, and force mains Tracking of maintenance activities Maintenance data should be tracked in CMMS to facilitate easy access and coordination with other sewer system management-related activities. Another component of maintenance management is to establish and maintain standard inspection and condition assessment procedures and cleaning protocols and execute these programs to document condition of existing assets at least once per decade or as recommended by the utility's asset management program based on criticality. Collection system assets require routine care to ensure they function properly. Handheld devices can be used for this inspection documentation. In addition, all wastewater providers should identify critical infrastructure based on risk and consequence of failure. Risk can be defined as the combination of the likelihood of failure and the consequence of failure. The likelihood of failure can be determined or estimated by assessing the condition of the asset, or by evaluating historic performance. The consequence of failure can be determined or evaluated on a case-bycase basis, depending on the type of asset. If the condition of the assets is not known, such as for buried assets like pipes, the consequence of failure determination can be used to prioritize condition assessment activities. Communities that have an approved CMOM program with Georgia EPD can demonstrate compliance through certification of their CMOM program based on the most recent CMOM audit. PAGE 5-96

187 SECTION 5 ACTION ITEMS ACTION ITEM WW-4: SEWER SYSTEM INSPECTION PROGRAM Intent To ensure sewer system assets are inspected and cleaned on a regular basis to reduce SSOs. Points of Integration This Action Item improves the management of the sewer system and reduces the risk of SSOs, which supports watershed health and source water protection. Watershed, wastewater, and water distribution personnel can work together, with cross-training, to identify infrastructure problems in the field. Responsible Party Local Wastewater Provider In Coordination With Inspection/Code Enforcement/Maintenance Staff Action Item: For wastewater providers who do not have an approved CMOM with Georgia EPD, maintain a sanitary sewer system inspection program that determines the condition of the sanitary sewer system and identifies any needed maintenance and rehabilitation activities. Sub-Tasks: Each local wastewater provider shall: 1. Establish standard inspection and condition assessment procedures and cleaning protocols. 2. Execute these programs to document condition of existing assets at least once per decade or as recommended by the utility s asset management program based on criticality. Description: Regular inspection and cleaning of the sanitary sewer system can help to prevent SSOs. A program that schedules inspection and cleaning can help to ensure that these activities occur on a routine basis. Implementation Guidance: A sewer system inspection program sets the timing of scheduled inspections. These may be regularly scheduled inspections of the entire system or follow a criticality-based asset management approach. Older areas of the wastewater system and areas with higher flow volumes and certain pipe materials are more prone to failures. Therefore, local wastewater providers may choose to inspect these areas more regularly due to the greater risk of failure or SSOs in these areas. At a minimum, programs shall document the condition of existing assets at least once per decade or as recommended by the utility s asset management program based on criticality. The wastewater system inspection program must identify the regularity and type of inspections that will occur depending on the type and/or criticality of the assets in the wastewater collection system. The wastewater system inspection program must identify who is responsible for documentation of the inspections, using either handheld devices connected to the inventory database or using paper records. Table 5-3 lists several example inspection techniques and their applicability. Communities that have an approved CMOM program with Georgia EPD can demonstrate compliance through certification of their CMOM program based on the most recent CMOM audit. PAGE 5-97

188 SECTION 5 ACTION ITEMS Table 5-3. Example Sanitary Sewer System Inspection Methods Inspection Method Where it should be used What it will find Physical inspections of manholes and sewer pipes/lines Manholes and above-ground sewer pipes Manholes Frame and cover defects Structural defects Flow surcharging Root intrusion Sewer pipes Signs of leakage and blockages Exterior structural defects Smoke testing Manholes and sewer pipes Sources of infiltration/inflow (I/I) Location of illegal connections Location of broken sewers Location of buried manholes Dye-water testing Sewer pipes Sources of exflow/exfiltration Closed Circuit Television Inspection or other internal pipe evaluation Right-of-way/easement inspection Sewer pipes Proof of building connection to sewer system Location of illegal connections Estimating flow velocity Structural defects Maintenance needs Sources of I/I at joints, breaks, connections Cross connections or illegal connections Missing/unrecorded sewer pipes and manholes Flow surcharging Trees with potential for root intrusion Considerations for Enhanced Implementation: The optional considerations for enhanced implementation are: Inspect portions of the collection system that are adjacent to impaired waterbodies more regularly than other areas of their system. Surface water data revealing high fecal coliform levels, for example, may indicate a sewer line failure. Therefore, increased inspections of these areas may be a priority, depending on local conditions. Use standards for the assessment of gravity pipelines and manholes developed by National Association of Sewer Service Companies or any other method of assessing infrastructure condition. Use handheld devices connected to inventory databases for documentation of inspections. Cross-train sewer inspection personnel with watershed protection and water distribution system personnel to increase opportunities for identifying infrastructure problems in the field. PAGE 5-98

189 ACTION ITEM WW-5: SEWER SYSTEM REHABILITATION PROGRAM SECTION 5 ACTION ITEMS Intent To restore structural integrity of sewer systems and reduce hydraulic loads by reducing I/I. Points of Integration By coordinating with local watershed monitoring efforts (Action Items WATERSHED-10 and 11), rehabilitation projects may be prioritized where local surface waters have been directly impaired due to sewer overflows. Additionally, coordination of wastewater and stormwater programs can help to identify cross connections and eliminate direct stormwater inflow to the sewer system. Responsible Party Local Wastewater Provider In Coordination With Site Plan Review Neighboring Wastewater Providers, as necessary Stormwater Management Staff Elected Official/Governing Board Action Item: For wastewater providers who do not have an approved CMOM with Georgia EPD, prioritize rehabilitation projects based on risk and consequence of failure. Budget and execute capital projects to rehabilitate existing infrastructure and document completed projects and effect on I/I reduction where applicable. Sub-Tasks: Each local wastewater provider shall: 1. Prioritize rehabilitation projects and document the priority list. 2. Develop implementation plan for rehabilitation projects based on budget schedule, and staffing. 3. Implement a program to rehabilitate infrastructure based on schedule and budget for critical infrastructure. 4. Include rehabilitation needs as part of the annual planning and budget process. 5. Document the rehabilitation performed in the asset management program and its beneficial effects of I/I on the sewer system where applicable. Description: Failing sanitary sewer infrastructure presents potential problems for wastewater system operation, watershed health and source water protection. A rehabilitation program that takes a planned and prioritized approach can help to prevent sewer system failures. Priorities can be based on the severity of an infrastructure problem, but also on the potential impacts on watershed health and source water protection. Many local wastewater providers in the Metro Water District maintain ongoing sewer rehabilitation programs and have accomplished substantial projects through these programs. Implementation Guidance: The sewer system rehabilitation program, at a minimum, will include the following: Procedures for prioritizing rehabilitation projects based on severity of defects, cost effectiveness, and hydraulic capacity Schedule for sewer system rehabilitation projects Documentation of completed projects and effect on I/I reduction where applicable. PAGE 5-99

190 SECTION 5 ACTION ITEMS In setting priorities for the rehabilitation program, watershed impairments should be considered. Rehabilitation projects may be prioritized where local surface waters have been directly impaired due to sewer overflows. Action Items WATERSHED-10 and WATERSHED-11 will generate data on watershed health, and state water quality monitoring information can also support this assessment (e.g., Georgia EPD 305(b)/303(d) impaired waters list). There are many different technologies used for rehabilitation programs. For example, trenchless technology is a method of construction for replacing sanitary sewer pipelines without employing the longer-term disruptive aspects of conventional open cut excavation. Benefits of rehabilitation work performed using trenchless technology versus conventional rehabilitation methods include shorter disruption of sewer service during work and lower costs. Common trenchless technologies used in sewer system rehabilitation programs include pipe bursting and slip-lining. Elected Officials/Governing Boards are essential to proper planning and budgeting for the use of these technologies. Many sewer systems have interjurisdictional flows with neighboring wastewater providers. Coordination between neighboring wastewater providers with which there are interjurisdictional flows should be performed as necessary as sewer rehabilitation programs are developed and enhanced. Communities that have an approved CMOM program with Georgia EPD can demonstrate compliance through certification of their CMOM program based on the most recent CMOM audit. PAGE 5-100

191 SECTION 5 ACTION ITEMS ACTION ITEM WW-6: CAPACITY CERTIFICATION PROGRAM Intent To ensure adequate capacity to accept new flows to minimize SSOs Points of Integration A capacity certification program reduces the likelihood of sewer overflows and thereby promotes and sustains watershed health and potential source water protection. Responsible Party Local Wastewater Provider Local Government In Coordination With Site Plan Review Planning and Zoning Action Item: For wastewater providers who do not have an approved CMOM with Georgia EPD, maintain a program and process for certifying wastewater collection system capacity for new development and redevelopment projects. Sub-Tasks: Each local wastewater provider shall: 1. Maintain a flow and rainfall monitoring program to support the hydraulic modeling and capacity certification program. 2. Maintain a hydraulic model to determine available capacity. 3. Determine system capacity. 4. Maintain procedures for certifying available capacity. 5. Certify availability of capacity for proposed developments. Each local government shall: 6. Develop and implement procedures to coordinate with the local wastewater provider at the determined level of the planning/development review process. Description: A capacity certification program can reduce the number of SSOs in the Metro Water District. Capacity certification programs allow local wastewater providers to determine whether adequate wastewater collection and treatment capacities exist or will be available within their sewer systems, before authorizing new flows and sewer service connections. Some portions of the Metro Water District are experiencing a great deal of infill development and redevelopment activity, which is expected to continue. When one home on a large lot is subdivided into multiple lots and residences, the volume of wastewater increases. Similarly, if a sewer system extends beyond its originally planned boundaries, additional flows are added to the system. These additional flows can strain the existing collection system that was initially designed for lower volume flows. Capacity certification programs allow local wastewater providers to determine whether adequate wastewater collection and treatment capacities exist or will exist within their sewer systems before authorizing new flows and sewer service connections. Implementation Guidance: The capacity certification program must be clearly described. It should address at what point in the planning/development process various levels of review are performed (during initial building permit application, requests for zoning/rezoning, sewer connection requests, etc.) and which agencies of the organization will be responsible for certifying capacity availability. Coordination with local government development agencies will be needed to develop and implement appropriate procedures. PAGE 5-101

192 SECTION 5 ACTION ITEMS Building permit applications should include detailed plans, estimated wastewater flows and supporting calculations. The authorizing agency within a jurisdiction will certify that the system has available adequate capacity to collect, transmit and treat additional flows associated with new building construction and occupancy. Alternately, the authorizing agency will certify that ongoing or planned sewer system improvements would provide the capacity needed to handle the additional flows. A capacity certification form will be completed and signed by authorized representatives before a service connection is allowed. Certification of sewer collection capacity alone is not sufficient. In addition to certifying capacity, it is necessary to certify transmission and treatment capacities to ensure reduction in sewer system overflows, while ensuring compliance with the requirements of wastewater permits. Using these guidelines, each local wastewater provider will develop its own unique capacity certification program based on system specific conditions and available information. To implement flow and rainfall monitoring requirements, most wastewater treatment facilities have flow meters as part of their wastewater permit requirements. Additional flow meters may be needed to address capacity certification, depending on the location of existing flow monitoring devices and the extent of the system. If strategically located, flow monitors can track wastewater flow trends and aid in determining the volume of I/I entering the collection system upstream of the flow monitor. The combination of wastewater flow and rainfall monitoring is typically used to estimate the peak flows associated with various rainfall events. It is recommended that flow and rainfall monitoring be performed continuously within older sewer systems. Where possible, flow monitoring should be performed continuously at all major pump stations and wastewater treatment facilities. In lieu of traditional flow monitoring, some systems may be able to determine actual flows using run time data from pump stations within the collection system. Pump station run time calculations are acceptable if they accurately determine the volume of flow through the system. To implement the hydraulic modeling requirements, the conveyance capacity of a sewer system can be estimated through manual calculations or based on data output from a hydraulic model of the collection system. A hydraulic model is a tool that can be used to determine the available sewer system capacity and to estimate the ability of the system to handle additional wastewater flows. A computer-based model may be preferred due to the number of iterations expected with planned system extension. A comprehensive sewer system map (Action Item WW-2) will provide the base data needed to develop an accurate hydraulic model. Flow and rainfall monitoring will be used to calibrate the hydraulic model as well as provide the needed information on anticipated inflow and infiltration volumes. The hydraulic model of each sewer system should be maintained and updated as needed to minimize SSOs, but at a minimum, it should be updated prior to planned future expansions that may stress the collection system. Some local wastewater providers may choose a method of calculation of available capacity in lieu of developing a hydraulic model with specialized software, such as a spreadsheet. Regardless of the tool chosen, the local wastewater provider must have a means for determining available capacity in the system and determining the impact of additional wastewater flows on the collection system. Communities that have an approved CMOM program with Georgia EPD can demonstrate compliance through certification of their CMOM program based on the most recent CMOM audit. Resources: EPA, Guide for Evaluating CMOM Programs at Sanitary Sewer Collection Systems, January 2005, PAGE 5-102

193 SECTION 5 ACTION ITEMS Georgia EPD, Guidelines for Sewage Collection Systems, November 2010, ge%20collection%20systems.pdf Water Environment Federation, Wastewater Collection Systems Management, 6 th Edition, PAGE 5-103

194 SECTION 5 ACTION ITEMS This page left intentionally blank. PAGE 5-104

195 SECTION 5 ACTION ITEMS ACTION ITEM WW-7: GREASE MANAGEMENT PROGRAM Intent To reduce SSOs and plant operational problems related to FOG and Rags. Points of Integration A grease management program reduces the risk of SSOs, and thereby promotes and sustains watershed health and potential source water protection. Responsible Party Local Government Local Wastewater Provider In Coordination With Inspection/Code Enforcement Staff County Board of Health Elected Officials/Governing Board Action Item: For wastewater providers who do not have an approved CMOM with Georgia EPD, implement and maintain a grease management program, including procedures for grease control and enforcement, inspection and tracking of grease traps and permitting and inspection of grease trap hauling trucks. Sub-Tasks: Each local government and local wastewater provider shall: 1. Establish an ordinance or policy regulating the grease traps and discharges from industrial, institutional and commercial facilities. 2. Establish an enforcement program. 3. Develop written methods and procedures for preventing and controlling discharges of grease from industrial, institutional and commercial facilities. 4. Develop an inspection and tracking methodology. 5. Develop an inspection and permitting program for trucks used to pump grease traps or delegate inspection responsibilities to a designee. Description: The discharge of grease into sewer systems contributes to serious clogging problems and presents local wastewater providers with substantial labor and repair costs for unclogging and cleaning the sewer system. Grease is responsible for a significant amount of system blockages in the Metro Water District. Of the 699 reported sewer blockages that occurred in 2014, over 50 percent were due to grease blockages. FOG continues to be the leading cause of sewer spills from year to year. The high frequency of these problems highlights the need for grease management programs and enforcement efforts to address the significant potential impacts on water quality and infrastructure. Many local governments in the Metro Water District have incorporated grease trap requirements for commercial food establishments or processors that discharge a large volume of waste oils or tallow. Although existing ordinances require the installation of grease traps, a lack of routine maintenance of grease traps can lead to sewer line failure. An inspection and tracking program will support routine inspections of grease traps, tracking of sewer system blockages and overflows associated with grease, and investigations to identify sources causing blockages in the sewer system. Implementation Guidance: The implementation of this Action Item will vary from jurisdiction to jurisdiction based on the allocation of legal authority for establishing, implementing and enforcing grease management programs. Local wastewater providers should identify the department responsible for implementing the grease trap inspection program during future Plan Implementation Surveys from the Metro Water District (see Section 6.2). PAGE 5-105

196 SECTION 5 ACTION ITEMS Commercial waste transports must be registered with Georgia EPD, as outlined in the Georgia Water Quality Control Act (O.C.G.A ). This Act also requires that a local governing authority inspect commercial trucks annually. Local governments in the Metro Water District can choose to implement an inspection program or delegate inspection responsibilities to a designee. The Georgia F.O.G. Alliance provides training for local government staff on conducting these inspections. For Sub-Task 1, all policies must be written policies that either include their date of adoption or are accompanied by other documents (letters, s, memoranda, etc.) that establish when the written policy was adopted. Implementation of this Action Item will be supported through implementation of the Action Item PUBLIC EDUCATION-1, which requires that each local wastewater provider implement at least one public education activity to raise awareness of the proper disposal of FOG and rags. Communities that have an approved CMOM program with Georgia EPD can demonstrate compliance through certification of their CMOM program based on the most recent CMOM audit. Considerations for Enhanced Implementation: The optional considerations for enhanced implementation are: Analyze sewer blockage records on a continual basis to provide management feedback on occurrence trends, which could support proactive efforts to further reduce grease blockages and sewer spills. Inspect and track the collection, transport and disposal of grease trap waste using a manifest system. Tracking the disposal of grease trap waste with a manifest system may help communities with challenges related to improper grease disposal or illicit discharges. Provide an incentive program for grease trap or interceptor installation downstream of new multi-family units or other known grease buildup locations. Utility operational experience indicates that SSOs due to grease buildup and blockage is most prevalent downstream from areas of concentrated development. New multi-unit facility owners may consider plans for separating kitchen and sanitary wastewater for each individual unit, with stub-out locations to accommodate a grease interceptor for each unit of the multi-unit facility. Where separate interceptors per unit are not practical due to suitable physical property space and sewer gradient, options for treating flow from multiple units may be explored. Opportunities for Technical Assistance: The Metro Water District s Technical Assistance Program may provide support for implementation of this Action Item through the following types of activities: Providing fact sheets and door hangers (in English and Spanish) for public education about proper disposal of FOG and rags Developing and distributing a model ordinance as a resource for local governments to use to address Sub-Task 1 Resources: Southeastern F.O.G. Alliance, Metro Water District, F.O.G. Fact Sheet, wp-content/uploads/2015/05/final_fog_flyer.pdf PAGE 5-106

197 SECTION 5 ACTION ITEMS ACTION ITEM WW-8: SEWER SYSTEM OVERFLOW EMERGENCY RESPONSE PROGRAM Intent To minimize watershed impacts from SSOs. Points of Integration An SSO emergency response program helps to promote and sustain watershed health and protect drinking water sources. Wastewater providers should notify appropriate staff as soon as possible regarding any SSOs or spills that might affect surface waters or drinking water supplies both within and downstream of the local wastewater provider s jurisdiction. Responsible Party Local Wastewater Provider In Coordination With Local Stormwater Management Staff County Board of Health Georgia EPD Action Item: For wastewater providers who do not have an approved CMOM with Georgia EPD, maintain a sewer system overflow emergency response program, including updating SOPs, as necessary, and executing existing programs to respond and provide notifications. Sub-Tasks: Each local wastewater provider shall: 1. Review SSO emergency response program to ensure local response program complies with Federal and State requirements. 2. Update and add SOPs to ensure proper response to overflow. Description: While the prevention of SSOs is a key component of system management, an emergency response system is also critical to minimize adverse impacts in the event of overflows. While many local wastewater providers already maintain emergency response programs for SSOs, SOPs, training and notification systems should be kept up-to-date to ensure rapid and effective response. Implementation Guidance: The SOPs for emergency response to SSOs must include procedures that will be followed to ensure expedient notification and response to spills, major spills, or overflows impacting or having the potential to impact the public, surface waters, ground surfaces and structures. Common SOP provisions include procedures to: Ensure dispatch of personnel and equipment immediately to correct and repair conditions causing or contributing to overflows. Investigate the causes of overflow events or spills. Estimate spill quantities and areal extents. Notify Georgia EPD immediately in the event a spill or major spill occurs. Notify the public in the event an overflow occurs. Report spill or major spill to the local media (television, radio and print media). Limit public access to areas affected by overflows. PAGE 5-107

198 SECTION 5 ACTION ITEMS Report spill or major spill to local health departments immediately. Notify City/County stormwater staff. Post notice immediately and as close as possible to where the spill or major spill occurred and where the spill or major spill entered State waters. Publish notice of major spill according to the Georgia Rules and Regulations for Water Quality Control (Chapter ). Notify downstream city, county and public agencies as required by the Georgia Rules and Regulations for Water Quality Control (Chapter ). Train personnel adequately regarding the provisions and implementation of the SOP when overflows occur. Minimize the volume of untreated wastewater flowing or transmitted to the portion of the sewer system impacted by overflow events. Monitor and sample major spill-impacted waters immediately and analyze samples from water impacted, or potentially impacted, by overflow events. Reporting the results of the monitoring, sampling and analysis of water samples, impacted or potentially impacted by overflows, to appropriate regulatory authorities. New staff training programs and continuing education for inspection and maintenance personnel is needed to ensure the sewer system inspection and maintenance program is effective to avoid overflows and the need for emergency response. Communities that have an approved CMOM program with Georgia EPD can demonstrate compliance through certification of their CMOM program based on the most recent CMOM audit. Considerations for Enhanced Implementation: The optional considerations for enhanced implementation are: Develop procedures to document spill locations and collect other necessary data into GIS or other appropriate mapping software. Analyze collected spill data to provide management feedback on occurrence trends, potential maintenance prioritization or other proactive efforts which can help reduce the number and volume of SSOs. Resources: Georgia EPD, Rules and Regulations for Water Quality Control, Chapter , PAGE 5-108

199 SECTION 5 ACTION ITEMS ACTION ITEM WW-9: SEWER SYSTEM INSPECTION AND MAINTENANCE TRAINING Intent To ensure effectiveness of sewer system inspection and maintenance program. Points of Integration This Action Item improves the management of the sewer system and reduces the risk of SSOs, which supports watershed health and source water protection. Watershed, wastewater, and water distribution personnel can work together, with cross-training, to identify infrastructure problems in the field. Responsible Party Local Wastewater Provider In Coordination With Site Plan Review Local Water Provider Action Item: For wastewater providers who do not have an approved CMOM with Georgia EPD, maintain a staff training program for sewer system inspection and maintenance. Sub-Tasks: Each local wastewater provider shall: 1. Review status of existing staff certification and continuing training credits to ensure they meet State requirements under the Wastewater Collection System Operator license. 2. Schedule additional training as needed for new or existing personnel. Description: Regular inspection and cleaning of the sanitary sewer system can help to prevent SSOs. Action Item WW-4 requires an inspection program to provide routine checks on the system. The staff that conducts these inspections needs up-to-date training to perform their field work effectively. Cross-training of inspectors with watershed protection and water distribution system personnel could increase opportunities for identifying infrastructure problems in the field. Implementation Guidance: The training program for inspectors should be designed so that wastewater personnel have a strong and up-to-date understanding of all aspects of the sewer system inspection and maintenance program, especially related to their areas of responsibility. The sewer system inspection and maintenance training program should include the following: General training for all employees: This training should cover basic aspects of the sewer system, including the management, operation, inspection and maintenance program Specific employee training programs: These programs should include detailed courses covering specific inspection and maintenance activities Procedures for tracking all training activities Schedules for personnel training, including periodic refresher training Staff training programs and continuing education may be designed to comply with State requirements for operations and maintenance personnel. For example, local wastewater providers must provide State mandated training such as Wastewater Collections System Operator training and Erosion and Sedimentation Control training to appropriate staff. PAGE 5-109

200 SECTION 5 ACTION ITEMS Communities that have an approved CMOM program with Georgia EPD can demonstrate compliance through certification of their CMOM program based on the most recent CMOM audit. Considerations for Enhanced Implementation: The optional considerations for enhanced implementation are: Consider additional training elements that may be needed as the sewer system changes over time. Cross-train sewer inspection personnel with watershed protection and water distribution system personnel to increase opportunities for identifying infrastructure problems in the field. Provide cross training to other staff to increase awareness and supplement the efforts of the traditional inspections staff, including transportation, sheriff/police, code enforcement, bus drivers, etc. PAGE 5-110

201 SECTION 5 ACTION ITEMS ACTION ITEM WW-10: LOCAL PUBLIC EDUCATION PROGRAM Intent To increase knowledge and awareness of water resource protection with the goal of building public support for local actions and activities as well as long term behavior change. Points of Integration The development and implementation of an integrated education program is encouraged. Public education can be integrated to address water conservation, watershed management, septic systems and wastewater in order to emphasize the interconnected nature of water resources and their management. Responsible Party Local Wastewater Provider In Coordination With Stormwater Management Staff County Board of Health Local Water Provider Action Item: Develop and implement a local public education program on wastewater topics. Sub-Tasks: Each local wastewater provider shall: 1. Implement education activities as outlined in Action Item PUBLIC EDUCATION Direct at least one public education activity to address the proper disposal of fats, rags, oil and grease. Description: Public education and outreach at the local level is important to raise awareness of wastewater management with the goal of fostering broad public support for local actions and activities as well as changing behaviors that leads to the long-term protection of our water resources. Involving the public in local wastewater efforts is crucial to developing an ethic of stewardship and community service and enabling the public to make informed choices about water resources management. Changes in basic behavior and practices are necessary to achieve maximum, long-term improvements in water quality. Implementation Guidance: Section 5.5 provides more detail on public education programs and Action Item PUBLIC EDUCATION-1 provides more detail on local public education program requirements. In addition to the general public education requirements for wastewater listed in Table 5-6, there is a specific requirement that at least one public education activity specifically address the proper disposal of rags and FOG. Opportunities for Technical Assistance: The Metro Water District s Technical Assistance Program may provide support for implementation of this Action Item through the following types of activities: Providing education resources for local governments and utilities to use in their local public education programs. A list of available resources is provided on the Resources pages of the Metro Water District website, and it includes links and downloadable documents. Assisting members in the development of their local education programs Resources: Metro Water District, Public Education and Awareness Resources List, PAGE 5-111

202 SECTION 5 ACTION ITEMS Georgia F.O.G. Alliance, Metro Water District, F.O.G. Fact Sheet, City of Atlanta, F.O.G. Fighter Video, Gwinnett County, F.O.G. informational webpage, Home PAGE 5-112

203 5.4 Watershed Management Action Items SECTION 5 ACTION ITEMS Land use development within the Metro Water District is expected to continue through 2050 with the larger land use transitions occurring outside of the urban core areas. Within the urban core areas, density and land use intensity are anticipated to increase due to infill and redevelopment, which is expected to continue and accelerate in future years throughout the region. Land development can have substantial impacts on watershed hydrology as described in more detail in Section 3.5. The Watershed Management Action Items are designed to help mitigate adverse impacts of land development. The Metro Water District s 2003 and 2009 Watershed Management Plans created a strong foundation of strategies and management measures for meeting watershed management goals. Since 2003, local jurisdictions in the Metro Water District have actively implemented these measures in an effort to meet their local permit requirements. From this foundation, this Plan focuses on adapting the 2003 and 2009 Plans management measures to better respond to the most current regulatory requirements, simplifying language to make requirements as concise as possible for local governments and address basin-specific priorities identified in the River Basin Profiles in Appendix A. As a result of this evaluation, the Watershed Management Action Items were updated to: Help manage and mitigate sources of nonpoint source pollution. Support continued implementation of existing stormwater management measures and model ordinances. Facilitate closer coordination of Plan requirements with most recent MS4 permits and wastewater discharge permits (as described in Georgia EPD-approved Watershed Protection Plans). Support the monitoring of watershed health to support future management and planning. Support integrated water resources planning and management. Action Items are management measures to be performed at the local level by the Metro Water District s member local governments. Because these local Action Items are framed at a regional level, their implementation will continue to build a comprehensive program for addressing watershed issues, including the protection of water quality and designated uses as well as improving the health of impacted waterbodies. As listed above, many Action Items coordinate with other permit requirements. However, not all local governments in the Metro Water District are subject to an MS4 or wastewater discharge permit. The Action Items provide details to describe how these local governments without MS4 permits are to comply with the requirements. This description for non-permittees is typically more detailed than for permittees, because permittees are directed to follow their permit requirements to comply with the Action Item. The District encourages GAEPD to work with stakeholders in identifying opportunities to make further use of water quality data collected by local jurisdictions in listing, delisting, and other decisions where appropriate. The District is available to work with GAEPD and work collaboratively to determine the best approach for using this data. Some Action Items that were previously found in the Watershed Management Plan are now a part of the Integrated Water Resources Action Items (Section 5.1). These include the Action Items related to source water assessment and water supply watershed protection, sanitary sewer and septic tank coordination, and land use planning. PAGE 5-113

204 SECTION 5 ACTION ITEMS This page left intentionally blank. PAGE 5-114

205 ACTION ITEM WATERSHED-1: POST-DEVELOPMENT STORMWATER MANAGEMENT SECTION 5 ACTION ITEMS Intent To protect long-term water quality by effectively managing runoff from developed areas. Points of Integration Plan reviews conducted by other departments, particularly water and wastewater providers related to new development should be coordinated with the stormwater review procedure. Development review process and design standards and criteria are included in this Action Item to demonstrate the dependency of these actions. Responsible Party Local Government In Coordination With Stormwater Management Staff Site Plan Review Inspection/Code Enforcement Staff Elected Officials/Governing Board Planning and Zoning Legal Counsel Maintenance Staff Action Item: Adopt a post-development stormwater management ordinance, a local design manual and a site plan development plan review and inspection process to address post-development stormwater management. Sub-Tasks: Each local government shall: 1. Adopt the Metro Water District Model Post-Development Stormwater Management Ordinance for New Development and Redevelopment Ordinance or an equivalent ordinance at least as effective, based on the guidance in the latest Georgia Stormwater Management Manual (GSMM) and MS4 permit as applicable. 2. Adopt and implement site plan reviews for development plans based on the GSMM or equivalent local design manual. 3. Require maintenance agreements on all new post-construction stormwater facilities, including local inspections. 4. Develop a site development plan review and inspection process and checklist(s) that lists stormwater and watershed management related requirements. Description: Post-construction stormwater management includes program elements that provide legal authority, design standards and review process, maintenance agreements and other related activities in order to provide for long-term management of runoff from developed areas and protection for water quality. Implementation Guidance: The Metro Water District Model Post-Development Stormwater Management Ordinance for New Development and Redevelopment Ordinance establishes development regulations for mitigating the long-term water quality and quantity impacts from stormwater runoff that result from land cover changes and land use activities. Local governments are to adopt the model ordinance, or an equivalent ordinance or regulations, that: PAGE 5-115

206 SECTION 5 ACTION ITEMS Requires a post-development stormwater management plan for all development and redevelopment that adds 5,000 square feet of impervious cover or more than one acre of disturbance. This plan must specify how the development will mitigate the stormwater runoff quality and quantity impacts. Adopts the GSMM or develops a local stormwater manual. The GSMM includes minimum requirements for water quantity and quality performance. A local stormwater manual used in lieu of the GSMM must provide an equivalent level of stormwater control and treatment. The GSMM can be adopted as-is by a local government, or with a local addendum, which may supplement or provide additional technical criteria, details or guidance. Includes provisions for ongoing long-term inspections and maintenance of stormwater control facilities. Privately maintained structural stormwater controls approved under this ordinance must have a maintenance agreement that outlines the inspection responsibilities and routine maintenance activities that must be performed. The local jurisdiction is required, at a minimum, to track stormwater facilities covered by maintenance agreements. Includes a method for enforcement of the ordinance provisions, including appropriate violations and penalties which are consistent with other local regulations. During the construction phase, enforcement methods for failure to comply with the approved stormwater management plan might include stop work orders, withholding the certificate of occupancy and/or suspension, revocation, or modification of the permit. Long-term maintenance violations may result in civil or criminal penalties and enforcement actions. This Action Item consolidates multiple actions that were previously described separately in the 2009 Plan, including 5.A.1 Post-Development Stormwater Management Ordinance, 5.C.1 Integrated Development Review Process, 5.C.2 Stormwater Management Design Review Criteria and Standards. Post-development stormwater management requirements may be adopted either as an ordinance or as part of the local development regulations. If the requirements are located in the local development regulations, the development regulations must provide the necessary enforcement mechanisms. Considerations for Enhanced Implementation: The optional considerations for enhanced implementation are: Implement a Runoff Reduction-based Ordinance: EPA provides examples of more protective ordinances on its website. As an added incentive toward green infrastructure practices, runoff reduction ordinances can require a runoff reduction volume of the first one inch of rain in lieu of treatment of the first 1.2 inches of rain for new development and redevelopment. The City of Atlanta Department of Watershed Management revised its Post Development Stormwater Management Ordinance to be more protective by including runoff reduction requirements for smaller more frequent storm events. This approach is also being used in other parts of the country where there is a critical need to improve infiltration and reduce the amount of stormwater runoff. Incentivize Redevelopment Projects: From a watershed perspective, redevelopment activities are often preferred over new (greenfield) development as they often involve less land disturbance and fewer construction phase impacts, but also provide an opportunity to address previous stormwater quality and quantity impacts. Retrofitting existing detention facilities and regional stormwater facilities are two common strategies for managing stormwater on redeveloped sites. Some communities may choose to incentivize redevelopment activities. The Water Environment Research Federation provides guidance on possible incentives on its website. Implement Alternative Arrangements for Residential Stormwater Maintenance: The post-development model ordinance requires that structural stormwater controls for new residential subdivisions are located on an individual lot of record. Typically, these structural facilities will be the responsibility of a PAGE 5-116

207 SECTION 5 ACTION ITEMS homeowners association. Due to issues with the nature of homeowner associations, local governments may consider alternate arrangements for ensuring long-term inspection and maintenance including accepting maintenance responsibility. Require Electronic As-Built Submission: To ensure that stormwater infrastructure inventories remain upto-date, communities may choose to require electronic as-built submissions in either an AutoCAD or GIS format. Staff will need to check the detail and accuracy of the electronic submissions, including use of correct reference locations. Implement Stream Crossing and Culvert Design Policy: To minimize the negative habitat impacts of traditional stream crossings, local governments may consider implementing a stream crossing and culvert design policy for stream crossings, including clear span bridges, bottomless culverts (arched culverts) and embedded culverts. The U.S. Forest Service provides guidance and an interactive tool related to aquatic organism passage on its website. Additionally, in Georgia, the U.S. Fish and Wildlife Service provides a handbook detailing regulations and ecological considerations for stream crossings. Opportunities for Technical Assistance: The Metro Water District s Technical Assistance Program may provide support for implementation of this Action Item through the following types of activities: Providing support to communities, as requested, with runoff reduction ordinance implementation through information on lessons learned and key success elements. Resources: GSMM, 2016 Edition, EPA, Urban Runoff: Model Ordinances for Post Construction Controls, City of Atlanta, Post-Development Stormwater Management Ordinance, 2013, AEBB38FC264C3DF6&showMeta=2&ext=.pdf EPA, guidance on redevelopment activities, Water Environment Research Federation, Using Incentive Programs to Promote Stormwater Best Management Practices, Metro Water District, Model Post-Development Stormwater Management Ordinance for New Development and Redevelopment Ordinance U.S. Forest Service, Aquatic Organism Passage Interactive Tool, U.S. Fish and Wildlife Service, Georgia s Stream Crossing Handbook, PAGE 5-117

208 SECTION 5 ACTION ITEMS This page left intentionally blank. PAGE 5-118

209 SECTION 5 ACTION ITEMS ACTION ITEM WATERSHED-2: CONSTRUCTION EROSION AND SEDIMENTATION CONTROL Intent To reduce soil erosion from active development sites and enforce applicable erosion and sedimentation control provisions in order to reduce adverse impacts to watershed health. Points of Integration Proper compliance with the action reduces siltation and habitat impacts in local streams and downstream reservoirs, improving water supply and water quality. Responsible Party Local Government In Coordination With Stormwater Management Staff Site Plan Review Inspection/Code Enforcement Staff Action Item: Comply with the requirements of the Georgia Erosion and Sedimentation Act (GESA). Sub-Tasks: Each local government shall comply with one of the following: 1. Communities that do not have Local Issuing Authority (LIA) status through Georgia EPD must ensure that local public projects are properly permitted with Georgia EPD. Efforts will be employed to ensure that locally funded projects comply with all erosion and sedimentation control requirements. or 2. Communities that have LIA status are to review, inspect and enforce erosion and sedimentation control requirements at the local level, including: a. Educate applicants of the Notice of Intent requirement under the NPDES Construction Permit and ensure the mandatory fee per disturbed acre is collected as described in the Notice of Intent. Plans must be submitted to the local Soil and Water Conservation District for review and approval prior to issuing a land disturbance permit, unless a memorandum of understanding has been signed by the LIA, the local Soil and Water Conservation District, and the Georgia SWCC which allows the LIA to conduct in-house reviews. b. Ensure that erosion and sedimentation control measures are properly designed, installed and maintained. c. Verify that site personnel involved with the project are certified to perform land disturbance activities; verification can be checked on the Georgia SWCC website. d. Identify deficiencies and take enforcement actions where necessary. Description: GESA protects Georgia s waters from soil and erosion and sediment deposition. Local governments with implementing authority (LIAs) administer the requirements of the Act locally. All local governments should ensure that local projects comply with the requirements of the Act in order to reduce erosion and protect watershed health. Implementation Guidance: GESA requires permits for land-disturbing activities on sites one acre or larger, as well as an approved erosion and sedimentation control plan for the activity. In addition, sedimentation and erosion control regulations require undisturbed buffers that, for all projects, prohibit most development PAGE 5-119

210 SECTION 5 ACTION ITEMS activity within 25 feet of most streams and 50 feet for streams classified as trout streams (Georgia Rules and Regulations, Chapter ). LIAs are audited periodically for compliance by the Georgia SWCC. Communities that pass their LIA audits are considered in compliance with this Action Item. The most recent letter of compliance received from the Georgia SWCC is adequate to document compliance. The Manual for Erosion and Sedimentation Control in Georgia (Green Book) provides details on the proper design of erosion and sedimentation control methods. The Georgia SWCC also publishes a plan review checklist related to erosion and sedimentation control requirements. Additionally, several organizations and groups offer the state-mandated training and certifications courses on erosion and sedimentation control to professionals involved with land disturbance. Considerations for Enhanced Implementation: An optional consideration for enhanced implementation is to identify opportunities for off-stream regional stormwater control structures, green infrastructure and other watershed improvements as part of erosion and sedimentation control plan reviews and inspections. These projects are typically more feasible and cost-effective if conducted in conjunction with other land disturbance activities. Resources: Manual for Erosion and Sediment Control in Georgia, _in_georgia_sixth_edition_2014.pdf GSMM, 2016 Edition, Georgia SWCC, verification portal land disturbance activities certification, PAGE 5-120

211 SECTION 5 ACTION ITEMS ACTION ITEM WATERSHED-3: FLOODPLAIN MANAGEMENT Intent To minimize future flooding impacts and integrate floodplain management with stormwater management during the land development process. Points of Integration Local governments may incorporate the adoption of floodplain management/flood damage prevention ordinances with a larger program to promote green infrastructure approaches to stormwater management. Responsible Party Local Government In Coordination With Local Floodplain Administrator Stormwater Management Staff Site Plan Review Planning and Zoning Legal Counsel Inspection/Code Enforcement Staff Maintenance Staff Action Item: Adopt a floodplain management and flood damage prevention ordinance, develop and maintain floodplain maps, and incorporate ordinance review and enforcement procedures into development plan reviews. Sub-Tasks: Each local government shall: 1. Adopt the Model Floodplain Management/Flood Damage Prevention Ordinance, or an equivalent ordinance at least as effective. 2. Make revisions to local plan review processes and procedures to incorporate the model ordinance or other regulations. 3. For all streams with drainage areas greater than 100 acres, delineate and map the 100-year futureconditions floodplain and update floodplain maps as needed. For streams that drain 100 to 640 acres (one square mile), communities may choose to delineate future condition maps or require developers to delineate future conditions on a site by site basis. Delineating future floodplain boundaries for streams that drain greater than 640 acres are always the responsibility of the local government. Georgia EPD provides additional guidance regarding Floodplain Management on their website. 4. Incorporate future floodplain mapping into development review procedures and regulate development based on the future-conditions floodplain maps, as available. Description: Floodplain management involves the designation of flood-prone areas and the management of their uses. It is also intended to minimize modifications to streams, reduce flood hazards and protect the beneficial uses and functions of floodplains, including water quality protection. Floodplain regulations can greatly reduce future flooding impacts and protect their function to safely convey floodwaters and protect water quality. Implementation Guidance: The floodplain management/flood damage prevention requirements may be adopted either as an ordinance or as part of the local development regulations. If the requirements are located in the local development regulations, these regulations must provide enforcement mechanisms. The Metro Water District Model Floodplain Management/Flood Damage Prevention Ordinance is intended to help communities integrate floodplain management with stormwater management during the land development process. This ordinance promotes a No Adverse Impact approach to floodplain encroachments, establishes planning requirements to map and regulate land development based on futureconditions hydrology and promulgates higher freeboard and building standards than the National Flood PAGE 5-121

212 SECTION 5 ACTION ITEMS Insurance Program (NFIP) minimums. Local governments are to adopt the model ordinance, or an equivalent ordinance or regulations, that: Regulates floodplains based on expected future land use conditions Requires a floodplain management plan for land development activities within areas of special flood hazard Includes a requirement that any land development within a floodplain be required to provide an engineering study to demonstrate that it will cause no adverse impact downstream or upstream Specifies building requirements and provisions to minimize flood damages for both residential and nonresidential structures within the floodplain Provides appropriate variance and enforcement procedures Future-conditions floodplain delineation is required for all streams with drainage areas greater than 100 acres as described in the Sub-Tasks. Local governments are expected to develop and follow a prioritized schedule to complete future-conditions floodplain delineation of these streams. Future-conditions floodplain delineation should be coordinated with all local comprehensive plans and their unified growth policy maps. The future-conditions floodplain maps developed for this Action Item are for local use only in administering their floodplain management/flood damage prevention ordinance. These maps are not a FEMA requirement, nor will FEMA use a community s future-conditions flood maps for flood insurance purposes. However, a local government may elect to use a FEMA-approved modeling process to update current base flood elevations (BFEs) for their local Flood Insurance Rate Maps (FIRMs). In addition, a local jurisdiction may also request that future-conditions floodplains to be added to FIRMs as a Zone X floodplain. Hydraulic modeling, based on future conditions hydrology, is used to establish future-conditions BFEs. The BFEs will be mapped using the best available topographic data to create future condition floodplain maps. Future-conditions hydrology must be based on the best available estimate of future land use conditions within a watershed as determined by the local government and may include a local government s adopted future land use map, future-conditions zoning map or watershed study projections. For watersheds or sub-basins that are currently at full build-out, communities may use the existing 100-year floodplain boundaries as long as they prove that: (1) the current 100-year floodplains are accurate and effective, (2) the future land use is not expected to change significantly due to new development or redevelopment, and (3) hydraulic and hydrologic modeling is performed to show that the floodplain will not increase in the future. Engineering analysis based on FEMA approved methodology must show that BFEs and floodplain delineations are accurate given existing and future buildout conditions. Both the Chattahoochee River and Etowah River are highly regulated below the federally-operated Buford and Allatoona Dams, respectively. Therefore, these two main stem river segments are exempt from the mapping requirements under this measure. Even though these rivers are highly regulated, they still have the potential to flood. Considerations for Enhanced Implementation: The optional considerations for enhanced implementation are: Prohibit development in the floodplain to the maximum extent practicable. Flood damage and risk to properties can be minimized through prohibiting development within the existing or future conditions floodplain. Additionally, establishing a buy-out program for repetitive loss properties may be beneficial to reducing or eliminating existing properties within the floodplain. PAGE 5-122

213 SECTION 5 ACTION ITEMS Identify Critical Facilities: For some activities and facilities, the consequences of the facility being flooded are so severe that additional flood protection may be needed. Typical critical facilities include hospitals, fire stations, police stations, water and wastewater facilities, critical records storage facilities and similar facilities. These facilities may be given special consideration when formulating regulatory alternatives and floodplain management plans. A critical facility should not be located in a floodplain if at all possible. If a critical facility must be located in a floodplain, it should be provided a higher level of protection so that it can continue to function and provide services after a flood. Communities may develop emergency plans to continue to provide these services in the event of a flood. Under Executive Order regarding floodplain management, facilities subject to federal agency funding and/or permitting are required to avoid the 0.2 percent (500-year) floodplain or protect the facilities to the 0.2 percent chance flood level. Participate in the FEMA Community Rating System (CRS): The NFIP s CRS is a voluntary incentive program that recognizes and encourages community floodplain management activities that exceed the minimum NFIP requirements. By participating in the CRS program, flood insurance premium rates are discounted for residents of a local jurisdiction to reflect the reduced flood risk resulting from the community actions in meeting the three goals of the CRS: reducing flood losses, facilitating accurate insurance ratings and promoting the awareness of flood insurance. Adopting and enforcing the Metro Water District s higher regulatory floodplain management standards will help a local jurisdiction to receive CRS credit points and premium reductions for its citizens. Metro Water District communities that are in compliance with this Action Item should be able to receive CRS credits under Activity 400 (Mapping and Regulations) and Activity 500 (Flood Damage Prevention) sections of the CRS program. Adopt Flood Study Approaches: There are currently four flood study approaches used to develop FEMA flood maps, all of which can be considered for developing local future-conditions floodplain maps. The major difference between these engineering approaches is the quantity of data available. The following methods should be considered additional enhancements to the future floodplain mapping requirement. These modeling approaches should be considered enhancements because they are above the minimum level of effort for future floodplain mapping and would be more consistent with FEMA methods. A brief description of each is provided below: Detailed Study: A detailed study results in the delineation of floodplain boundaries for the one percent (base flood) and 0.2 percent annual chance storms. The one percent annual chance floodplain is mapped as Zone AE and the 0.2 percent annual chance floodplain is mapped as shaded Zone X. BFEs are established and shown on the FIRMs. A regulatory floodway is established and mapped on the FIRMs. This study method entails using the digital elevation data, supplementing the data with field surveys for channel bathymetry, detailed structure geometry and channel and floodplain characteristics in order to conduct fully detailed hydrologic and hydraulic analyses and floodplain mapping. Limited Detail Study: A limited detail study results in the delineation of floodplain boundaries for the one percent annual chance storm. It may be mapped on the FIRMs as Zone AE (with BFEs) or Zone A, depending on the preference of the State or local jurisdiction. However, the one percent annual chance flood profile may not be contained in the FIS report and the regulatory floodway may not be shown on the FIRMs. Structures are contained in the hydraulic modeling, but only essential structure geometry is obtained from a field survey. Approximate Study: A flood hazard study that results in the delineation of floodplain boundaries for the one percent annual chance storm, but does not establish BFEs. The floodplain is mapped as Zone A. Structures are not contained in the hydraulic models. PAGE 5-123

214 SECTION 5 ACTION ITEMS Re-delineation: This study method involves no new hydrologic or hydraulic analyses and only applies to detailed studies (Zone AE). Effective detailed flood elevations are used to revise the one percent and 0.2 percent annual chance flood hazard area to fit the best available topography. As the future-conditions floodplain maps are for local use and not for federal flood insurance purposes, local communities have wide latitude in the modeling and mapping approaches that can be utilized. However, the use of FEMA-approved methodologies is encouraged so that future-floodplain information can be added to FIRM maps (as Zone X) as well as subsequent use to update FIRM s based on community and FEMA needs. Participate in the Map Modernization Program: Map Modernization is a nationwide, five-year program to update the nation s FIRMs being undertaken by FEMA. Georgia EPD is the Cooperating Technical Partner to FEMA and administers the Map Modernization program in the State of Georgia. The Map Modernization program is primarily being undertaken to convert existing FIRM maps into a digital (GISready) product for Georgia counties. It may incorporate completed studies into the updated maps, but the Map Modernization program will not be undertaking new studies or restudies of existing floodplains, and therefore this effort is complementary to the Metro Water District mapping requirements. Educate and encourage businesses, homeowners and Home Owner s Associations on floodplain management. Resources: Metro Water District, Model Floodplain Management/Flood Damage Prevention Ordinance FEMA, NFIP CRS, FEMA, Hazard Mitigation Planning Resources, Executive Order 11988: Establishing a Federal Flood Risk Management Standard and a Process for Further Soliciting and Considering Stakeholder Input, office/2015/01/30/executive-order-establishing-federal-flood-risk-management-standard-and- Georgia EPD, PAGE 5-124

215 SECTION 5 ACTION ITEMS ACTION ITEM WATERSHED-4: STREAM BUFFER PROTECTION Intent To protect and stabilize stream banks, protect water quality and preserve aquatic and riparian habitat. Points of Integration Stream buffer protection provides a barrier to pollutants and reduces soil and stream bank erosion and thereby can protect downstream surface water supply sources and assimilative capacity. Responsible Party Local Government In Coordination with Stormwater Management Staff Site Plan Review Planning and Zoning Legal Counsel Action Item: Adopt a stream buffer protection ordinance and incorporate review and enforcement procedures into development plan reviews. Sub-Tasks: Each local government shall: 1. Adopt the Metro Water District Model Stream Buffer Protection Ordinance, or an equivalent ordinance or other regulation at least as effective. 2. Incorporate compliance with this ordinance into development review and inspection procedures. Description: Stream buffers help protect streams and preserve water quality. Stream buffers filter pollutants, reduce erosion and sedimentation, protect and stabilize stream banks, preserve vegetation and provide both aquatic and riparian habitat. Implementation Guidance: Local governments are to adopt the Metro Water District Model Stream Buffer Protection Ordinance, or an equivalent ordinance or other regulations, that: Provides for consistent buffer zones along the streams for the protection of water resources and riparian areas. Outlines appropriate stream determination methods, minimum buffer requirements, as well as restrictions for activities within protected stream buffers. All land disturbing activity permits must include site plans showing topography, location of all known streams and location of all required stream buffers. Protected stream buffers must be shown on all final plats to ensure that property owners understand the restrictions on these areas. Includes appropriate exemptions, variance procedures and enforcement provisions. Note that variances to the state water quality buffers are issued by Georgia EPD. Stream buffer protection requirements may be adopted either as an ordinance or as part of the local development regulations. If the requirements are incorporated in the local development regulations, the development regulations must provide the necessary enforcement mechanisms. Below are the key elements to developing an ordinance that is equivalent to the Metro Water District model ordinance: A local ordinance or regulations must provide for undisturbed 50-foot stream buffers with an additional 25-foot impervious surface setback (i.e., a total 75-foot setback for impervious surfaces from a stream), unless the local government has developed an alternative stream buffer methodology that is as PAGE 5-125

216 SECTION 5 ACTION ITEMS protective and supported by scientific study or analysis. Note that wider stream buffer requirements and/or setbacks may be necessary on certain waters to comply with other State laws or regulations. Local stream buffer protection regulations must provide guidance on how stream determinations are performed. While the mapping of all streams within the local jurisdiction is one option, the Metro Water District s model ordinance provides a rebuttable presumption that a stream is present on any drainage of 25 acres or greater. Note that communities must use the Georgia EPD guidance for state buffers for 25-foot state water quality buffers. Considerations for Enhanced Implementation: An optional consideration for enhanced implementation is that local governments may create maps that clearly identify the appropriate stream buffers within their jurisdiction and incorporate these stream buffer maps into the community s zoning maps and other community planning efforts. Mapping stream buffers for known streams may help ensure that local staff, the development community and private citizens are aware of the stream buffer requirements. Local governments have the responsibility for making stream determinations based on state guidelines for smaller, unmapped streams within their jurisdiction. Educate and encourage Home Owner s Associations to provide buffer protections for streams and ponds that may exist on their common property. Resources: Metro Water District, Model Stream Buffer Protection Ordinance Georgia EPD, technical guidance for erosion and sediment control and state-protected stream buffers, Cobb County, stream buffer maps, PAGE 5-126

217 ACTION ITEM WATERSHED-5: ILLICIT DISCHARGE DETECTION AND ELIMINATION (IDDE) PROGRAM SECTION 5 ACTION ITEMS Intent To prevent water pollution due to unauthorized discharges to the public stormwater system. Points of Integration Addressing illicit discharges to the stormwater management system can reduce the impact of pollutants in surface waters and thereby protect downstream surface water supply sources and assimilative capacity. Responsible Party Local Government In Coordination with Stormwater Management Staff Legal Counsel Inspection/Code Enforcement Staff Local Wastewater Provider Action Item: Adopt an ordinance and develop and implement a local program to address illicit discharges and illegal connections to the stormwater system. Sub-Tasks: Each local government shall: 1. Adopt the Metro Water District Model Illicit Discharge and Illegal Connection Ordinance, or an equivalent ordinance or other regulation at least as effective 2. For MS4 permittees only: Develop an IDDE program with inspection and enforcement procedures consistent with Phase I and II MS4 permits or Communities without an MS4 permit: Follow methods in the Metro Water District Standards and Methodologies for Surface Water Monitoring 3. Incorporate an enforcement process into development review procedures. Note: Each local government is responsible for coordinating their IDDE program with NPDES MS4 permit requirements. Local governments are encouraged to rotate inspections so that all areas of the local stormwater system are inspected, while recognizing that some areas may have greater potential for illicit discharges and therefore will be inspected more regularly. Description: An illicit discharge is defined as any discharge to a stormwater drainage system or surface water (lakes, rivers, creeks and streams) that is not composed entirely of stormwater runoff. An illegal connection is a pipe or conveyance that allows an ongoing illicit discharge to occur. The purpose of the required ordinance or regulation is to provide local governments with the legal authority to address illicit discharges and illegal connections to the public (county or municipal) stormwater system. Implementation Guidance: Local governments should adopt the Metro Water District Model Illicit Discharge and Illegal Connection Ordinance, or an equivalent ordinance or regulations, that: Adequately defines the publicly owned and operated stormwater system (municipal/county separate storm sewer system). Provides the local government with the legal authority to address illicit discharges and illegal connections to the local stormwater system. PAGE 5-127

218 SECTION 5 ACTION ITEMS Establishes enforcement actions for those properties found to be in non-compliance or that refuse to allow access to their facilities. Most MS4 permittees can comply with this Action Item as part of the Stormwater Management Plan, which defines activities that follow the Phase I or II MS4 permit. For these permittees, no additional activities are required outside of compliance with the MS4 permit. In concert with the ordinance, communities are to develop an IDDE program that best addresses their local stormwater infrastructure and watershed conditions, water quality issues and priorities. Local programs may include one or more of the following options: Dry weather stormwater outfall screening Commercial and industrial inspections Asset management inspections Streamwalks Other local IDDE program activities developed by the local government Considerations for Enhanced Implementation: The optional considerations for enhanced implementation are: Include one or more approach in the program that goes beyond the requirements of the MS4 permit. These approaches are further defined in the Metro Water District Standards and Methodologies for Surface Water Monitoring, including commercial and industrial inspections, asset management inspections and stream walks. Cross-train inspections staff to look for illicit discharges and illegal connections as part of their routine system inspections. Inspections of catch basins can look for dry weather flows and staining that might indicate an illicit discharge. Also, consider cross-training sewer inspection personnel with watershed protection and water distribution system personnel to increase opportunities for identifying infrastructure problems in the field. As inspections take place throughout the community, it may be easier to identify and track the source of an illicit discharge. Inspecting ten percent of the stormwater system annually is recommended for local governments that will utilize asset management inspections as the only option for their IDDE program. However, most communities must also conduct dry weather outfall screening for compliance with their MS4 permit. Perform routine stream walks to identify illicit discharges with the added benefit of greater understanding of local water resources. Some local governments may elect to perform stream walks of ten percent of wadeable streams annually for their IDDE program. The survey should specifically look at outfalls under dry weather conditions and similar to outfall screenings investigate any flows during dry conditions. Resources: Metro Water District, Model Illicit Discharge and Illegal Connection Ordinance Metro Water District, Standards and Methodologies for Surface Water Monitoring, 2007, Center for Watershed Protection, Illicit Discharge information page, PAGE 5-128

219 SECTION 5 ACTION ITEMS ACTION ITEM WATERSHED-6: LITTER CONTROL Intent To provide legal authority to prohibit and penalize the littering of public or private waters. Points of Integration Litter control can reduce the impact of pollutants in surface waters and thereby protect downstream surface water supply sources and assimilative capacity. Responsible Party Local Government In Coordination With Stormwater Management Staff Inspection/Code Enforcement Staff Maintenance Staff Action Item: Adopt a litter control ordinance. Sub-Tasks: Each local government shall: 1. Adopt the Metro Water District Model Litter Control Ordinance, or an equivalent ordinance or other regulation that is at least as effective. 2. Develop inspection, violation and enforcement procedures based on the ordinance or equivalent regulation. Description: Litter often is carried by stormwater to streams, rivers and lakes, where it contributes to water quality degradation. A litter control ordinance or regulation provides a mechanism for local governments to have the legal authority to address this source of water quality degradation. Implementation Guidance: Local governments should to adopt the Metro Water District Model Litter Control Ordinance, or an equivalent ordinance or regulation, that: Provides a definition of litter and a prohibition against the littering of public or private property and waters. Includes an enforcement mechanism with appropriate penalties for violations. The Metro Water District s model ordinance is based on the Georgia Litter Control Law (O.C.G.A et. seq.). Adoption of the model ordinance, or other ordinances at least as protective, is specifically authorized by O.C.G.A Considerations for Enhanced Implementation: An optional consideration for enhanced implementation is to authorize local government employees to enforce the ordinance. The local police department may deputize local employees to enforce certain aspects of local code. The model ordinance provides enforcement authority to law enforcement personnel as well as anyone authorized, empowered and directed to enforce compliance with this article. Many communities delegate authority to code enforcement officers, environmental compliance officers, inspections staff, stormwater enforcement personnel and others to issue warnings and citations for littering. Resources: Metro Water District, Model Litter Control Ordinance Keep Georgia Beautiful, Litter and Illegal Dumping in Georgia, information on litter control, PAGE 5-129

220 SECTION 5 ACTION ITEMS Metro Water District, Clean Water Campaign Report a Polluter, PAGE 5-130

221 SECTION 5 ACTION ITEMS ACTION ITEM WATERSHED-7: PROMOTING A GREEN INFRASTRUCTURE APPROACH Intent To ensure an environmentally protective approach is promoted to minimize and prevent stormwater runoff and nonpoint source pollution. Points of Integration A green infrastructure approach can improve stream baseflow and groundwater recharge, thereby protecting downstream source water supplies, flows and water quality. Responsible Party Local Government In Coordination With Stormwater Management Staff Elected Officials/Governing Board Site Plan Review Planning and Zoning Legal Counsel Inspection/Code Enforcement Staff Maintenance Staff Action Item: Implement development and land use policies or practices to encourage the protection of greenspace and/or the use of green infrastructure within the community. Sub-Tasks: Each local government shall select and implement one or more of the following options that go above and beyond current MS4 requirements to address growth management for the protection of water resources by encouraging protection of open space and greenspace and use of green infrastructure: 1. Adopt protective ordinances or other local mechanisms to preserve open space and greenspace for watershed protection while accommodating development. 2. Develop and adopt a formalized Greenspace or Green Infrastructure Plan. 3. Identify impediments and barriers to the use of the green infrastructure and greener approaches to growth consistent with MS4 permit requirements for Phase I and II communities with a population greater than 10,000. Evaluate local building codes, ordinances and other regulations and provisions for potential barriers. Identify opportunities to promote the use of infiltration, reuse and evapotranspiration. or 4. Develop a green infrastructure program that evaluates the feasibility and applicability of different green infrastructure and low impact development practices, develops an inventory of these practices within the community and establishes inspection procedures and responsibility for green infrastructure in a manner consistent with MS4 permit requirements. Description: Green infrastructure is defined broadly as the network of vegetated or open lands and engineered structures that promote infiltration. A green infrastructure approach includes actions that improve the functions of natural ecosystems. This will include a mix of site-specific stormwater management and larger scale greenspace management. Benefits of green infrastructure can include water quality, air quality, flood risk reduction, property value improvement, economic growth, public health benefits, recreation, community revitalization, quality of life improvement, urban heat island reduction and urban agriculture opportunities. As part of an effective watershed management strategy, it is important that green infrastructure is considered in plans, reviews and implementation. PAGE 5-131

222 SECTION 5 ACTION ITEMS Stormwater better site design, sustainable site design, low impact development and green infrastructure are overlapping approaches that are included within a green infrastructure approach. Encouraging these site planning and design techniques can reduce contributions to the stormwater system and have a positive benefit on local watershed health. In addition, many of these greener development approaches can reduce the costs of construction and need for infrastructure while creating more sustainable development and more livable communities. EPA provides multiple tools and analysis techniques that may be used to perform cost analyses, cost-benefit analyses, and to provide additional information on appropriate implementation of green infrastructure. Implementation Guidance: This Action Item includes multiple options for compliance, in recognition of the many ways to promote green infrastructure and the unique watershed characteristics and management challenges and opportunities in each Metro Water District community. In considering what green infrastructure practices may be best suited to each unique watershed, it is recommended that local governments consider surface water base flows, existing impervious surface coverage, geology, soils, other hydrologic features and climate resiliency when selecting practices. Practices should be best suited both to manage runoff during wet years and to withstand drought during dry years. Additionally, jurisdictions should consider the use of native plants, which can adapt to wet and dry years, as per Volume 2, Appendix D of the 2016 Georgia Stormwater Management Manual. By considering these items, local governments will be better equipped to choose when to use green infrastructure practices and which green infrastructure practices may be best suited to their unique watershed. A green infrastructure approach can be integrated with multiple Action Items in this Plan. Local governments should include green infrastructure considerations with land use planning and policy decisions, as well as in managing and promoting growth and development. Action Item WATERSHED-1 requires post-development stormwater management, and a local government may incorporate low impact development and green infrastructure practices into the plan review and inspection process. Reviewing local code evaluation for impediments to green infrastructure can be conducted as a part of the implementation of Action Item INTEGRATED-1 regarding governmental coordination. In considering the use of green infrastructure practices, it is recommended that local governments consider which practices will be best suited both to manage runoff during wet years and to withstand drought during dry years. Considerations for Enhanced Implementation: The optional considerations for enhanced implementation are: Implement green infrastructure approaches as part of implementation of Action Item INTEGRATED-1 regarding government coordination. In addition, coordination with potential partners and stakeholders will also promote green infrastructure and may include outreach to the local development community, potential corporate sustainability partners, other departments such as transportation or planning and other neighboring jurisdictions. Implement more than one (or all) of the options included within the Sub-Tasks. Each of these options builds a stronger level of watershed management, and local governments should consider implementing more than one (or all) of these options for a greater level of watershed management. In its broadest definition, green infrastructure is intrinsically tied to communities and their quality of life, as well as watershed health. These benefits can best be achieved through coordinated, widely distributed and diverse activities and projects to implement green infrastructure. Additional guidance is provided below: Protective ordinances, zoning categories or other local mechanisms may be used to preserve greenspace and critical areas for watershed protection while accommodating development. Adopting a zoning category or planned unit development process are effective options that require close coordination with the local planning departments. The Metro Water District Model PAGE 5-132

223 SECTION 5 ACTION ITEMS Conservation Subdivision/Open Space Development Ordinance is one approach to preserve open space and greenspace for watershed protection and provide for non-structural management of stormwater runoff while accommodating development projects. Conservation subdivisions provide for residential designs that can allow for increased lot density in order to preserve open spaces. This approach can also be successfully applied to other zoning categories such as commercial, industrial and institutional land uses. Communities wishing to increase the open space and greenspace conservation may offer incentives to developers, such as expedited plan review, property tax reductions/elimination in conservation areas, increased density or bonus lots and stormwater utility fee credits. Tree preservation during land development can serve many important stormwater management and watershed protection functions, including stormwater runoff quantity and quality mitigation, decreased soil erosion and sedimentation, increased groundwater recharge, water conservation and riparian habitat shading. Tree protection ordinances are a mechanism that a community can use to preserve trees in land development projects. Opportunities for Technical Assistance: The Metro Water District s Technical Assistance Program may provide support for implementation of this Action Item through the following types of activities: Providing guidance for implementing a green infrastructure/low impact development program that is consistent with MS4 permit requirements Assisting communities in developing other green infrastructure/green space management programs that are tailored to their specific context Resources: GSMM, 2016, Georgia EPD, Phase I MS4 Stormwater Management Program Guidance, July 2014, ce_ doc GSMM, Coastal Stormwater Supplement, Green Infrastructure Practices, _Stormwater_Supplement_2009.pdf EPA, Urban Runoff: Low Impact Development, EPA, Green Infrastructure Cost-Benefit Resources, PAGE 5-133

224 SECTION 5 ACTION ITEMS This page left intentionally blank. PAGE 5-134

225 SECTION 5 ACTION ITEMS ACTION ITEM WATERSHED-8: WATERSHED IMPROVEMENT PROJECTS Intent To address water quality problems and improve streams and waterbodies to meet their designated uses Points of Integration Local governments may consider prioritizing WIPs that benefit water supply watershed protection, address TMDL impairments or reduce pollutant loads in assimilative capacity limited surface waters Responsible Party Local Government In Coordination With Stormwater Management Staff Elected Officials/Governing Board Legal Counsel Local Wastewater Provider Action Item: Identify substantially-impacted watersheds and implement WIPs to address impaired waters. Sub-Tasks: Each local government shall: 1. Identify substantially-impacted watersheds based on local criteria and the Georgia EPD 303(d) list of impaired streams. 2. Prioritize impaired watersheds for retrofit and restoration activities that can be conducted as WIPs as a part of a Watershed Improvement Plan. 3. Incorporate WIPs into the local Capital Improvement Plan list and develop implementation schedule. 4. Design and construct WIPs based on local implementation schedule as budgets and resources allow. Description: WIPs reduce stormwater runoff and restore streams and waterbodies to improve water quality, meet designated use and promote sustainable watershed functioning. WIPs include structural or physical improvements (i.e., structural measures, retrofits and/or restoration efforts) to address specific problems in the watershed including flooding, hydraulic capacity, streambank stability, streambank erosion, degraded aquatic habitat and impaired water quality. WIPs also include nonstructural activities or programs that are developed to improve conditions in a substantially impacted watershed, such as targeted public education efforts, designated areas for more protective stream buffers, watershed investigations, trash removal and other activities. Implementation Guidance: Each local government shall identify substantially-impacted watersheds within its jurisdiction and develop watershed improvement plans to address these impairments. At minimum, the list of substantially impacted watersheds should include areas with water quality impairment including waterbodies on the Georgia EPD 303(d) list and waterbodies that have TMDLs. Local governments may choose to add to the list watersheds with high levels of impervious area, flooding problems, streambank erosion and sedimentation, aging or degraded infrastructure or aquatic habitat degradation. A schedule should be created to prioritize all substantially-impacted watersheds in the community and provide a specific planning horizon for completion of the WIPs. Implementation of the WIPs should occur as budgets and resources allow. WIPs can include a number of different retrofit or restoration strategies based on the problems within a watershed. Retrofit measures can include the modification of existing stormwater structures, such as detention/retention ponds, in order to provide water quality treatment and/or improve hydrologic function. Site-level engineered green infrastructure WIPs can include a suite of available practices such as green roofs, PAGE 5-135

226 SECTION 5 ACTION ITEMS rain cisterns, bioretention ponds, grassed swales, green streets, and porous pavement/pervious asphalt. Restoration measures can include stream restoration, wetland enhancements, re-planting riparian corridors and other projects to restore habitat and improve the hydrologic regime. A WIP may also be focused on protection or conservation of sensitive resources. Additionally, non-structural WIPs can he highly effective with improving watershed conditions in a community. The EPA provides a variety of guidance and information at the following website. The following sources of information may be used to determine and assess the substantially-impacted watersheds in a community: Existing watershed studies prepared by a local government or regional, state or federal agency, including Watershed Protection Plans prepared for NPDES wastewater permits HUC-8 River Basin Profiles included in Appendix A Georgia EPD 305(b)/303(d) list of impaired waters Georgia EPD TMDL designations and local TMDL assessment and implementation plans Local stormwater master plans, management system inventories and infrastructure inventories Results of water quality monitoring activities, biological and habitat assessments, streamwalks and other field work or data collection and analysis, such as GIS and/or computer modeling Calls and complaints to the community related to flooding, streambank erosion and water quality Other information sources including staff knowledge of problems, impervious cover assessments, land use and redevelopment planning, etc. Criteria used by the local government to prioritize watersheds or specific areas of the community for WIPs can be based on locally-developed criteria or priorities. These criteria may include: Number and/or magnitude of existing or future problems in a drainage area or watershed Level of existing or future development or redevelopment, land use activities or population in a drainage area or watershed Feasibility-related issues such as land ownership that may drastically effect the cost-effectiveness or expediency of project implementation Long-term resource availability and budget planning Other programs, activities or funding that would influence the implementation of WIPs Public review of prioritized watersheds, specific target areas or projects by the public, as appropriate Considerations for Enhanced Implementation: The optional considerations for enhanced implementation are: Align watershed improvement plans with the EPA list of nine key elements for a watershed plan for impaired waters in order to enhance effectiveness and maximize available funding through grant programs. The nine key elements are as follows: - Element 1: Causes and Sources - Element 2: Expected Load Reductions - Element 3: Management Measures - Element 4: Technical and Financial Assistance - Element 5: Information/Education Component PAGE 5-136

227 - Element 6: Schedule - Element 7: Measurable Milestones - Element 8: Evaluation of Progress - Element 9: Effectiveness Monitoring SECTION 5 ACTION ITEMS Develop watershed improvement plans for each substantially-impacted watershed to include potential WIPs that are developed at a conceptual level and location within the watershed. The WIPs can be prioritized for implementation based on cost-effectiveness, local needs and objectives and feasibility. Each watershed improvement plan can provide a milestone schedule for further sub-watershed planning, if needed, and WIP design and implementation. Develop a public outreach or communications program to support WIP implementation and success. Depending on the size and watershed issues within each community, WIP implementation has continued to increase since In communities that have requirements for nonpoint source pollution management tied to their NDPES wastewater discharge permits, the level of WIP implementation is typically highest. In the most successful programs, multiple community benefits are evaluated when selecting WIPs for implementation. For example, WIPs tend to be most feasible and accepted by the local citizens when they not only provide water quality or aquatic habitat benefits, but also are associated with neighborhood access, such as walking trails and parks, and aesthetic appeal. Examples are provided in the success stories included in Appendix A River Basin Profiles. Implementation feasibility is dependent on property ownership or easement acquisition, and citizen support is extremely important. Implement a single- or multi-jurisdiction watershed-based approach to strengthen the effectiveness of WIPs toward overall watershed protection. Stormwater and watershed management activities generally take place within political boundaries, not within the overall context of a watershed. Local governments may elect to develop and implement watershed-based detailed investigations and implementation programs, either on their own or in conjunction with neighboring local governments that share a watershed. Opportunities for Technical Assistance: The Metro Water District s Technical Assistance Program may provide support for implementation of this Action Item through the following types of activities: Supporting local governments in identifying goals and developing WIPs Identifying funding opportunities for watershed improvement plans and WIPs Resources: EPA, Nine Minimum Elements to Be Included in a Watershed Plan for Impaired Waters Using Incremental Section 319 Funds, WtrshdPlan-EpaHndbk.pdf EPA, National Menu of Best Management Practices (BMPs) for Stormwater, Georgia EPD 305(b)/303(d) impaired waters list, PAGE 5-137

228 SECTION 5 ACTION ITEMS This page left intentionally blank. PAGE 5-138

229 ACTION ITEM WATERSHED-9: ONGOING STORMWATER SYSTEM MANAGEMENT SECTION 5 ACTION ITEMS Intent To provide ongoing stormwater system management in order to prevent nonpoint source pollution as a result of unmanaged runoff or infrastructure disrepair. Points of Integration Effective stormwater system management can reduce pollutants in downstream surface waters thereby protecting downstream source water supplies, flows and water quality. Additionally, infrastructure inspection and maintenance programs may be coordinated across stormwater, water, and wastewater asset management programs to improve efficiencies and leverage shared resources. Responsible Party Local Government In Coordination With Stormwater Management Staff Inspection/Code Enforcement Staff Maintenance Staff Action Item: Conduct ongoing management of stormwater infrastructure to ensure effective functioning and watershed protection. Sub-Tasks: Each local government shall: 1. Develop a stormwater infrastructure inventory, including: a. Establishment of data objectives and requirements and a data collection schedule b. Development of an inventory and map of the public stormwater system c. Maintenance and updating of inventory data as required 2. Develop an extent and level of service policy 3. Develop a stormwater systems inspections program 4. Develop a stormwater maintenance program 5. Establish pollution prevention /good housekeeping for local operations, including: a. Identification of public facilities and activities with pollution potential b. Development of practices and procedures to prevent pollution Description: This Action Item consolidates several Action Items that were previously described separately in the 2009 Watershed Management Plan, including 5.D.1 Stormwater Infrastructure Inventory, 5.D.2 Extent and Level of Service Policy, 5.D.3 Stormwater System Inspections, 5.D.4 Stormwater Maintenance Program, 5.D.5 Capital Improvement Plan and 5.E.1 Pollution Prevention/Good Housekeeping for Local Operations. These Action Items were consolidated in this Plan because they should be implemented in combination to form a basic stormwater management program. PAGE 5-139

230 SECTION 5 ACTION ITEMS Implementation Guidance: This Action Item is consistent with some MS4 permit requirements. As a result, MS4-permitted local governments shall comply with the same elements of their MS4 permit to demonstrate compliance with this Action Item. MS4 permitted local governments may satisfy this requirement by providing letters from Georgia EPD that document approval of the MS4 annual reports during the audit process. Local governments that do not hold an MS4 permit shall comply with this Action Item by following the implementation guidance regarding the Sub-Tasks below. Asset management principles are encouraged in implementing this Action Item. Local governments should use tools and procedures for a prioritized, proactive approach to stormwater management. A brief description of each Sub-Task is provided below. For Sub-Task 1, a stormwater infrastructure inventory identifies individual structural assets, attributes and locations. The level of sophistication of the local government s stormwater infrastructure inventory will vary depending on the complexity of the system and funding available. However, the basic intent of the inventory is to understand how stormwater runoff enters the conveyance system and where flows ultimately discharge to receiving water bodies. For Sub-Task 2, the extent and level of service policy or other similar mechanism should define responsibilities within the community related to stormwater infrastructure. A local extent of service policy identifies the publicly-maintained and privately-maintained portions of the stormwater system, as defined by the inventory. A local level of service policy may outline services provided in each extent of service for inspection and maintenance activities on public or privately owned property, as well as private property that is subject to an easement. Some communities may choose to be more specific with the frequency of inspections and maintenance and what type of enforcement activities will be provided. The level of service policy may also include a goal-based statement that relates to the functionality of the system, such as reducing flooded properties by ten percent. For Sub-Tasks 3 and 4, stormwater system inspections should be conducted regularly to evaluate the existing stormwater infrastructure and identify areas needing repair, potential future problems and water quality concerns. Stormwater maintenance programs ensure that the stormwater system is functioning properly and can convey or infiltrate storm flows and reduce pollutants. At a minimum, inspections must address publicly-owned structural controls and publicly-maintained infrastructure. Private stormwater structural control facilities with maintenance agreements must be included in the inspection program unless the local jurisdiction allows inspection and certification by a qualified design professional and those provisions and responsibilities are included in the approved maintenance agreements. Standard maintenance agreements can be found in the 2016 Georgia Stormwater Management Manual, Volume 1, Appendix D. In addition, local governments should develop comprehensive maintenance programs that address both reactive and preventative maintenance needs including customer complaints, routine drainage system cleaning, and repair and replacement of aging infrastructure. For Sub-Task 5, pollution prevention and good housekeeping programs for local operations aim to minimize nonpoint source pollution from publicly owned facilities and set a good example to residents, businesses, industry and institutions. The GSMM provides guidance for these programs. As a part of this program, publicly-owned facilities should be inventoried when a facility has activities that can potentially contribute to stormwater pollution and water quality degradation; this includes facilities with an industrial stormwater NPDES permit. Pollution prevention and good housekeeping practices should be listed for each publicly owned facility with the potential to contribute to stormwater pollution. Considerations for Enhanced Implementation: The optional considerations for enhanced implementation are: PAGE 5-140

231 SECTION 5 ACTION ITEMS Develop a Private Dam Inspection Program: The Georgia Safe Dam Program covers dams greater than 25 feet tall or that impound more than 100-acre-feet of water. Dams associated with small retention and neighborhood ponds are therefore not inspected by Georgia EPD. While the threat of loss of life and property damage is lower from these smaller impoundments, the breach of a dam can still have a catastrophic impact on watershed health and the local community. Local governments may choose to inspect these private dams either as part of a calendar-based or criticality-based asset management program. FEMA has published a Technical Manual for Dam Owners on the impacts of plants on earthen dams. This manual may help educate private dam owners on their responsibilities. Develop a CMMS: A CMMS is a type of database-derived software that performs functions in support of asset management and tracking of inspection and maintenance activities. Scheduling routine maintenance and tracking inventory supplies may create more efficient stormwater operations. Communities interested in implementing a CMMS may select from a wide range of both out of the box and customized solutions. The level of sophistication and cost of these systems vary greatly. Many will integrate with an existing GIS platform. In some communities, it may be possible to share a CMMS with the local wastewater provider (see Action Item WW-3). Perform Private Stormwater System Inspections and Maintenance: Most local governments will focus inspections and maintenance efforts on public property and publicly-maintained right-of-way. Some communities with dedicated funding sources or communities with specific private property concerns may choose to perform inspections and/or maintenance for stormwater structures on private property. These structures are beyond the scope of requirements of this Action Item. However, it is important to clarify that to implement the requirements of this Action Item, local governments must inspect private structural stormwater controls constructed since the adoption of their post-development stormwater management ordinance (Action Item WATERSHED-1). These structural controls should have maintenance agreements filed with the local government and must be periodically inspected for compliance with the maintenance agreements. Some local governments in the Metro Water District have agreed to accept maintenance responsibility for private detention ponds that meet certain minimum criteria. This type of program has generally been established in response to poor local maintenance of these structures by homeowners groups. Some communities with dedicated stormwater funding mechanisms may also choose to accept responsibility for certain residential stormwater facilities. Require Electronic As-Built Submission: To ensure that stormwater infrastructure inventories remain upto-date, communities may choose to require electronic as-built submissions in either an AutoCAD or GIS format. The electronic standards can specify the line size, color and style required for each feature in the as-built submission to allow seamless integration with the jurisdiction s local AutoCAD and/or GIS maps. Importing electronic as-built records can result in a significant time savings. If a local government chooses to implement this approach, staff will need to check the detail and accuracy of the electronic as-built submissions, including use of correct reference locations. Develop a Street and Parking Lot Cleaning Program: Local governments may implement a street and parking lot cleaning programs to reduce nonpoint source pollutant loading to local waterways through mechanical sweeping and vacuuming of roadway and parking lot debris using heavy equipment. Many communities in the Metro Water District have street cleaning programs for the aesthetic benefits of litter removal as well as water quality benefits. Update ordinances so that pressure washing or hosing down streets, parking lots or sidewalks without a wash water collection system is treated as an illicit discharge and shall not be performed. Consider Development and Implementation of a Stormwater Utility: Many local governments have implemented stormwater utilities to provide a dedicated funding source to support stormwater PAGE 5-141

232 SECTION 5 ACTION ITEMS management program implementation. Stormwater utility fees may be a desirable funding option depending on local conditions to help achieve the recommendations in this plan and support repair and replacement of aging infrastructure. Resources: Georgia EPD, Stormwater Management, technical guidance page, GSMM, 2016 Edition, EPA, Stormwater Maintenance, technical guidance page, FEMA, Technical Manual for Dam Owners: Impacts of Plants on Earthen Dams, FEMA 534, September 2005, PAGE 5-142

233 SECTION 5 ACTION ITEMS ACTION ITEM WATERSHED-10: LONG-TERM AMBIENT TREND MONITORING Intent To provide comprehensive and consistent watershed-based water quality monitoring from across the Metro Water District and to consolidate data from local monitoring efforts to better assess watershed conditions and effectiveness of watershed protection and management efforts. Points of Integration Long-term ambient trend monitoring can provide valuable information related to source water supply quality and may be implemented in leveraged coordination with monitoring requirements related to NPDES discharge permits. Responsible Party Local Government In Coordination With Stormwater Management Staff Elected Officials/Governing Board Local Wastewater Provider Action Item: Perform long-term trend water quality monitoring program that includes permanent, representative stations, as well as monitoring of 303(d) listed stream segments for the parameters of concern. Sub-Tasks: Each local government shall: 1. Monitor permanent representative stations. Develop and implement a long-term monitoring plan consistent with any one of the following three options: a. Georgia EPD-approved Watershed Protection Plan b. Other plan that is consistent with the Metro Water District Standards and Methodologies for Surface Water Monitoring with the exception of bacteria (which are addressed in Sub-Task #2 below). For local governments without a Georgia EPD-approved Watershed Protection Plan, the sampling of the following precipitation events and frequencies are required: A total of six events annually for wet weather monitoring: minimum of three wet weather samples during each of the summer and winter seasons (May-Oct, Nov-April) A total of two events annually for dry weather monitoring: minimum of one dry weather sample during each of the summer and winter seasons (May-Oct, Nov-April) or c. Establish an MOA or MOU with another jurisdiction that will conduct monitoring on behalf of your community. Local governments that have an established MOA or MOU with another jurisdiction that holds a Georgia EPD-approved Watershed Protection Plan should monitor, at a minimum, per the MOA or MOU. 2. Monitor 303(d) representative stations. Develop and implement a TMDL monitoring plan for 303(d) listed stream segments, with the exception of impaired biota (see Note), using any one of the following four options: PAGE 5-143

234 SECTION 5 ACTION ITEMS a. Georgia EPD-approved Impaired Waters Monitoring and Implementation Plan (IWP) associated with an MS4 permit b. Plan that is consistent with the Metro Water District Standards and Methodologies for Surface Water Monitorings for waterbodies with 303(d) listings in a local community c. Georgia EPD-approved Sampling Quality Assurance Plan (SQAP), which is a requirement for data submitted for 305(b)/303(d) listing or delisting of waterbodies. A local government may have developed a SQAP in association with an IWP or for another purpose. It may be developed for a specific stream segment or broader use. d. Establishment of an MOA or MOU with another local government that will conduct monitoring on your behalf. Note that this option is available to local governments that may not have a Georgia EPD-approved Watershed Protection Plan or provide wastewater services, if these communities are coordinating with another local government that has a Georgia EPD-approved Watershed Protection Plan where the service area includes both jurisdictions. 3. Track data annually to identify changes and conduct a more detailed analysis every three to five years to identify long-term trends, successes and potential WIPs (see Action Item WATERSHED-8). 4. After the Metro Water District establishes a reporting process, submit data annually to the District using the electronic Watershed Assessment Data Reporting Template from Georgia EPD. As of the publication of this Plan, the Metro Water District has not yet established this process. *Note: The Sub-Tasks above states that monitoring for impaired biota (benthic macroinvertebrates and fish) is not included for 303(d) listed stream segments. This is consistent with current Georgia EPD guidance. Habitat and benthic macroinvertebrate assessments are often included in a Georgia EPD-approved Watershed Protection Plan, but IWPs typically do not require biota assessments. Action Item WATERSHED-12 addresses macroinvertebrate bioassessment. Many local governments monitor total suspended sediment or other sedimentation-related parameters to assess potential sediment impacts habitat and biological communities. Description: Monitoring long-term ambient water quality trends provides a means of demonstrating progress toward water quality goals as watershed management efforts are implemented. Local governments that monitor waterbodies with TMDLs can investigate water quality trends for the 303(d)-listed violated criteria, as well as identify and address pollutant sources. TMDL monitoring can be used to track the sources of pollution (monitoring several places along a stream to narrow potential sources) and /or performed with the intent of de-listing the waterbody through a Georgia EPD-approved SQAP. Basic data evaluation will vary for each local government, but can use a combination of data trending over time, comparisons of values from upstream to downstream within a watershed (accounting for land uses or known sources) and basic statistical summaries (i.e., average, median, minimum and maximum) and statistical tests for each parameter. Implementation Guidance: Permanent representative monitoring stations must be selected by local governments (with or without a Georgia EPD-approved Watershed Protection Plan). Local governments with a Georgia EPD-approved Watershed Protection Plan shall follow the number and location of stations included in the Watershed Protection Plan. Local governments with a Georgia EPD-approved Watershed Protection Plan should monitor, at a minimum, the permanent stations included in their Watershed Protection Plan. Only for local governments without a Georgia EPD-approved Watershed Protection Plan, the minimum number of monitoring stations shall be calculated based on the latest census population estimates for the jurisdiction, as listed in Table 5-4. PAGE 5-144

235 SECTION 5 ACTION ITEMS Table 5-4. Minimum Number of Permanent Stations for Long-Term Trend Monitoring Census Population a Number of Monitoring Stations Less than 10, ,001 50, , , , ,000 8 Communities with greater than 250, a Population breakdowns generally follow those found in the MS4 permits Long-term trend monitoring is intended to be conducted by all local governments, which may include cities and counties that share 303(d) listed stream segments. Therefore, local governments in the Metro Water District will need to coordinate on local responsibility, financial obligations and appropriate siting of monitoring stations. In the event that local governments within a watershed or county cannot agree on a monitoring program, each local government will be responsible for the number of stations indicated above. Communities should select stations to represent 303(d) listed waters and areas of changing land uses and should include additional sites to provide good coverage of local conditions. Communities shall compare water quality data with Georgia water quality standards on an annual basis to identify localized problems and impairments. For sampling guidance to delist 303(d) streams using a SQAP, see Georgia EPD s guidance document. While it is not currently a requirement to submit monitoring data to the Metro Water District, the District will continue to evaluate options to support regional monitoring data evaluation and trending. The District may coordinate with Georgia EPD or local governments to collect monitoring data using the same electronic Watershed Assessment Data Reporting Template that Georgia EPD requires for Watershed Protection Plans. The District is considering the development of an online platform to collect monitoring data. Considerations for Enhanced Implementation: The optional considerations for enhanced implementation include the following: Establish an MOA or MOU among neighboring local governments to centralize the collection of monitoring data in a watershed so that data can be more efficiently collected and analyzed. Conduct additional monitoring to further establish the success of Action Items and to monitor specific improvements or impairments within targeted watersheds. In some locations, a more rigorous long- or short-term monitoring program may be used. Many local governments in the Metro Water District have a long-term monitoring program that complies with multiple regulatory requirements. They have maintained robust long-term monitoring programs that include a greater number of monitoring stations that required by this Action Item, more or less frequent sampling events during both dry and wet weather and annual rotations among monitoring stations. An increased level of monitoring data allows these communities to better identify baseline conditions and more effectively evaluate watershed trends over time. Where appropriate, local jurisdictions are encouraged to work with and make use of community groups in carrying out watershed monitoring efforts. This may also provide support for other activities such as Source Water Assessments and Watershed Improvement Programs. PAGE 5-145

236 SECTION 5 ACTION ITEMS Opportunities for Technical Assistance: The Metro Water District s Technical Assistance Program may provide support for implementation of this Action Item through the following types of activities: Developing an online platform for member governments to submit monitoring data Helping jurisdictions prioritize watershed projects based on water quality data Assisting in coordination of monitoring locations among jurisdictions to support collection of data that is useful to multiple jurisdictions Resources: Georgia EPD, Watershed Assessment and Protection Plan Guidance Documents, Water Environment Research Federation, 2008, Protocols for Studying Wet Weather Impacts and Urbanization Patterns, Project Number 03-WSM-3, Project Leader: Danial Woltering, Metro Water District, Standards and Methodologies for Surface Water Monitoring, 2007, Georgia Rules and Regulations, Chapter , Water Use Classifications and Water Quality Standards, _2015.pdf Georgia EPD, Guidance on Submitting Water Quality Data for Use by the Georgia Environmental Protection Division in 305(b)/303(d) Listing Assessments, Georgia EPD, Stormwater Management, technical guidance page, Georgia EPD, Watershed Assessment and Protection Plan Data Reporting Template and Instructions, September 2016, North Carolina State University, Section 319 National Monitoring Program Projects, Georgia EPD, 305(b)/303(d) impaired waters list, PAGE 5-146

237 SECTION 5 ACTION ITEMS ACTION ITEM WATERSHED-11: MACROINVERTEBRATE BIOASSESSMENT Intent To provide additional data to establish ecological health and identify overall long-term trends for pollution and water quality. Points of Integration Habitat and biological monitoring can serve as a useful indicator of overall watershed health, water quality, and success in water resource management implementation. Responsible Party Local Government In Coordination With Stormwater Management Staff Local Wastewater Provider Action Item: Perform benthic macroinvertebrate and habitat monitoring of wadeable streams at permanent representative stations. Sub-Tasks: Each local government shall: 1. Select permanent representative macroinvertebrate bioassessment stations. Develop and implement a long-term monitoring plan that fulfills any of the following three options: a. Georgia EPD-approved Watershed Protection Plan b. Other plan that is consistent with the most recent Georgia EPD Macroinvertebrate Bioassessment Standard Operating Procedures. For local governments without a Georgia EPD-approved Watershed Protection Plan, habitat and biological monitoring shall be conducted at all permanent representative stations that are monitored for Action Item WATERSHED-10. or c. Establishment of an MOA or MOU with another local government that will conduct monitoring on your behalf. Note that this option is available to local governments who may not have a Georgia EPD-approved Watershed Protection Plan or provide wastewater services, if these local governments are coordinating with another local government that has a Georgia EPD-approved Watershed Protection Plan where the service area includes both jurisdictions. 2. Track data during each sampling event to identify changes and conduct a more detailed analysis every three to five years to identify long-term trends, successes and potential WIPs (see Action Item WATERSHED-8) 3. After the Metro Water District establishes a reporting process, submit data annually to the Metro Water District using the electronic Watershed Assessment Data Reporting Template from Georgia EPD. As of the publication of this Plan, the Metro Water District has not yet established this process. Description: Macroinvertebrate bioassessment is important for identifying trends in stream and watershed integrity. It includes both habitat assessments and benthic macroinvertebrates sampling, but not fish sampling (which is required for most Georgia EPD-approved Watershed Protection Plans). Implementation Guidance: Specific guidance on performing biological monitoring is outlined in the Georgia EPD Macroinvertebrate Bioassessment Standard Operating Procedures and Metric Spreadsheets. At this time, Georgia EPD guidance does not address data collection to delist a stream segment for impaired PAGE 5-147

238 SECTION 5 ACTION ITEMS biota. However, by conducting habitat, benthic macroinvertebrate and/or fish assessments in a long-term program, a community can understand the trends and hotspots in their watersheds and focus watershed improvements and watershed management strategies accordingly. Similar to long-term trend monitoring (Action Item WATERSHED-10), habitat and biological monitoring should be conducted by all local governments, which may include cities and counties that share 303(d) listed stream segments. Therefore, local governments in the Metro Water District will need to coordinate on local responsibility, financial obligations and appropriate siting of monitoring stations. In the event that local governments within a watershed or county cannot agree on a monitoring program, each local government will be responsible for the number of stations indicated above in Action Item WATERSHED-10. Local governments should select stations to represent 303(d) listed waters and areas of changing land uses and should include additional sites to provide good coverage of local conditions. While it is not currently a requirement to submit monitoring data to the Metro Water District, the Metro Water District will continue to evaluate options to support regional monitoring data evaluation and trending. The Metro Water District may coordinate with Georgia EPD or communities to collect monitoring data using the same electronic multi-metric index spreadsheets that are required for Watershed Protection Plans. The Metro Water District is considering the development of an online platform to collect monitoring data. Considerations for Enhanced Implementation: The optional considerations for enhanced implementation are: Implement watershed approaches to monitoring. These approaches focus on sediment reduction and stream channel stability for their potential to reduce impacts of sedimentation on the health of instream biological habitats. Bank erosion monitoring, stream walks and other visual stream assessments, such as Near Bank Stress and Bank Erosion Hazard Index, can be cost-effective techniques to incorporate into a long-term monitoring program. Water quality concerns in surface waters are often directly or indirectly linked to concentrations and movement of sediment. As a result, sediment is a commonly used indicator of water quality status. This is particularly important for developed watersheds with altered hydrology where peak stream flows can stage up quickly with high velocities that cause stream bed scour and bank erosion. Communities may choose to monitor stream channel cross sections on an annual basis to measure the rate of change in sediment deposition and erosion. This information can be used to identify targeted areas for watershed improvements or other watershed management strategies. It can also be included in an Impaired Waters Plan in compliance with an MS4 permit or Watershed Protection Plan. Include fish assessments in the biological monitoring program for some or all permanent stations and/or 303(d) listed stream segments. Most Georgia EPD-approved Watershed Protection Plans require fish assessment. Streams in the Metro Water District continue to be 303(d) listed for both impaired benthic macroinvertebrate and fish communities. In addition to the required habitat and benthic macroinvertebrate assessments, fish assessments can add detail to the overall assessment of watershed health. Given the life history differences between a macroinvertebrate and fish community, particularly mobility and habitat needs, different snapshots of the level of watershed degradation and improvements can be monitored and compared from these datasets. Conduct additional monitoring to allow local governments to better identify baseline conditions and more effectively evaluate watershed trends over time. As with long-term ambient trend monitoring (Action Item WATERSHED-10), additional monitoring is encouraged to further establish the success of Action Item implementation and to monitor specific improvements or impairments in targeted watersheds. In some locations, a more rigorous long- or short-term monitoring program may be used. Many local governments in the Metro Water District have a long-term monitoring program that complies with multiple regulatory requirements. PAGE 5-148

239 SECTION 5 ACTION ITEMS Where appropriate, local jurisdictions are encouraged to work with and make use of community groups in carrying out watershed monitoring efforts. This may also provide support for other activities such as Source Water Assessments and Watershed Improvement Programs. Opportunities for Technical Assistance: The Metro Water District s Technical Assistance Program may provide support for implementation of this Action Item through the following types of activities: Developing an online platform for local governments to submit monitoring data Helping local governments prioritize watershed projects based on habitat and biological data Assisting in coordination of monitoring locations among local governments to support collection of data that is useful to multiple local governments Resources: Georgia EPD, Watershed Assessment and Protection Plan Guidance Documents, Georgia EPD, Macroinvertebrate Bioassessment SOPs and Metric Spreadsheets, Georgia EPD, 305(b)/303(d) impaired waters list, Georgia EPD, Watershed Assessment and Protection Plan Data Reporting Template and Instructions, September 2016, PAGE 5-149

240 SECTION 5 ACTION ITEMS This page left intentionally blank. PAGE 5-150

241 SECTION 5 ACTION ITEMS ACTION ITEM WATERSHED-12: LOCAL PUBLIC EDUCATION PROGRAM Intent To increase knowledge and awareness of water resource protection with the goal of building public support for local actions and activities as well as long term behavior change. Points of Integration The development and implementation of an integrated education program is encouraged. Public education can be integrated to address water conservation, watershed management, septic systems and wastewater in order to emphasize the interconnected nature of water resources and their management and to leverage public education resources. Local Responsibility Local Government In Coordination With Stormwater Management Staff Action Item: Each local government shall develop and implement a local public education program that addresses watershed protection, stormwater issues and prevention of nonpoint source pollution in compliance with Action Item PUBLIC EDUCATION-1. Description: Public education and outreach at the local level is important to raise awareness of watershed protection, stormwater issues and prevention of nonpoint source pollution with the goal of fostering broad public support for local actions and activities as well as changing behaviors that leads to the long-term protection of our water resources. Involving the public in local watershed protection efforts is crucial to developing an ethic of stewardship and community service and enabling the public to make informed choices about water resources management. Changes in basic behavior and practices are necessary to achieve maximum, long-term improvements in water quality. Implementation Guidance: Section 5.5 provides more detail on public education programs and Action Item PUBLIC EDUCATION-1 provides more detail on local public education program requirements. The public education program should include at least one activity that addresses septic system maintenance and pollution prevention, as described in Action Items INTEGRATED-11 and PUBLIC EDUCATION-1. Compliance with Action Item PUBLIC EDUCATION-1 fulfills the requirements of this Action Item. Opportunities for Technical Assistance: The Metro Water District s Technical Assistance Program may provide support for implementation of this Action Item through the following types of activities: Providing education resources for local governments and utilities to use in their local public education programs. A list of available resources is provided on the Resources pages of the District website, and it includes links and downloadable documents. Assisting members in the development of their local education programs Resources: Metro Water District, Resources List, PAGE 5-151

242 SECTION 5 ACTION ITEMS This page left intentionally blank. PAGE 5-152

243 5.5 Public Education SECTION 5 ACTION ITEMS The foundation of effective implementation of this Plan is a coordinated public education effort that engages the citizens of this region in protecting our water resources and using them wisely. We have an interdependent relationship with our region s water resources. We each have an impact on water resources, and water resources have an impact on each of us. Therefore, public education seeks to engage each of us in improving water resource management, and it is an essential strategy for effective Plan implementation. The Metro Water District has implemented a public education program since its original 2003 management plans. This program has supported regional water resource managers in attaining achievements including the following: Decrease of 30 percent per capita in water consumption since 2000 Installation of over 110,000 high-efficiency toilets through the Toilet Rebate Program Total reduction of 45 percent SSOs since 2003 and a reduction in grease related sewer clog related overflows by 63 percent during the same period The Metro Water District public education program is specifically designed to: Raise public awareness about our region s water resources and their value in order to foster support for solutions to regional water concerns and for plan implementation Educate the public and other identified target groups in order to increase awareness and encourage behavioral changes Coordinate with other public as well as private entities to maximize the visibility of the Metro Water District and its messages In this Plan, the Public Education and Outreach section integrates the three public education sections from the 2009 plans for Water Supply and Water Conservation, Wastewater Management and Watershed Management. Bringing these sections together provides an opportunity for the integration of public education efforts and messages to address linkages across functional areas of water resources planning and raise public awareness of the interconnected nature of our water resources Public Education Approach The Metro Water District public education program has two elements: a regional program managed by the District staff and local public education programs administered by local governments and utilities. The regional program provides tools and resources that address key themes in this Plan and support coordinated messaging through regional education initiatives. The local governments and utilities in the region carry the regional program into their communities, reach out to specific local groups and address specific local concerns while also reinforcing regional initiatives and messages. Without local implementation of public education and service activities, the full potential of this Plan cannot be realized. Service activities incorporate a field service component targeting neighborhoods and schools to support a learning experience for all levels of the community. The following pages address both the process (delivery) and content (messages) for future public education related to water resources in the region. Figure 5-2 shows the primary components of the approach to public education in this Plan. The first part of this section focuses on the on the delivery of public education. It describes the regional public education program and the local public education activities to support implementation of this Plan. Requirements for local public education are presented in Action Item PUBLIC PAGE 5-153

244 SECTION 5 ACTION ITEMS EDUCATION-1. More details on public education activities to fulfill the requirements of this Action Item are provided in Table C-1 of Appendix C. The second part of this section focuses on the messages for public education programs to support implementation of this Plan. It describes the key public education messages to be delivered and the target audiences for those messages. It references detailed tables that are presented in Appendix C (Tables C-2 through C-5) to further specify the focus areas for public education for specific target audiences. These tables can be used to support the design and execution of local public education programs to support Plan implementation and fulfill the Action Item requirements. MESSAGES Water Supply & Water Conservation Watershed Management Integrated Water Management Wastewater DELIVERY Regional Program Local Programs Regional Public Education Program Figure 5-2. Public Education Approach Since 2003, the Metro Water District has developed and implemented a comprehensive public education program to support implementation of the regional water resource plans. The Metro Water District and its members implement public education programs at both the regional and local levels. The regional public education program provides the benefits of reduced duplication of effort, shared costs and larger scale efforts, such as mass media such as television and radio advertising. Local public education programs complement the regional program with tailored efforts targeted at local communities and concerns. The coordination of the regional and local public education programs supports a broad and multi-layered initiative that can reach farther than these programs could on their own. Planning provides for consistency and efficiency in implementation. The Metro Water District s regional public education program includes the following elements: Regional Public Education Initiatives: The Metro Water District coordinates two initiatives to coordinate regional messaging about water conservation and water quality protection: PAGE 5-154

REGIONAL WATER RESOURCES PLANS

REGIONAL WATER RESOURCES PLANS The Wastewater Management Plan prescribes strategies and recommendations for the effective management of wastewater flows in the rapidly growing Metropolitan North Georgia Water Planning District. Management

More information

THE METRO WATER DISTRICT

THE METRO WATER DISTRICT The Watershed Management Plan provides the framework for regional water resources protection for the 15-county. The Watershed Management Plan prescribes strategies and recommendations for effective stormwater

More information

FEDERAL CLEAN WATER ACT NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) PROGRAM

FEDERAL CLEAN WATER ACT NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) PROGRAM The Act requires that the District-wide Watershed Management Plan shall build upon and be coordinated with existing watershed planning efforts undertaken by local governments. Local governments in the

More information

Water Supply and Water Conservation Management Plan

Water Supply and Water Conservation Management Plan Water Supply and Water Conservation Management Plan May 2009 Prepared By: AECOM Metropolitan North Georgia Water Planning District [This page intentionally left blank] Water Supply and Water Conservation

More information

W A T E R S U P P L Y A N D W A T E R C O N S E R V AT I O N M A N A G E M E N T P L A N M A Y

W A T E R S U P P L Y A N D W A T E R C O N S E R V AT I O N M A N A G E M E N T P L A N M A Y This Section identifies surface water supply sources for the Metro Water District to meet future water demands. The first part of this Section discusses the water supply sources intended to meet water

More information

WASTEWATER FLOW FORECASTS

WASTEWATER FLOW FORECASTS The population of the 15-county Metro Water District is expected to increase by over 3 million people during the planning period: from 4.4 million in 2005 to 7.5 million in 2035. A corresponding increase

More information

Metropolitan North Georgia Water Planning District Activities & Progress Report

Metropolitan North Georgia Water Planning District Activities & Progress Report Metropolitan North Georgia Water Planning District Activities & Progress Report 2009 2009 Board Members Elected Officials City of Atlanta Hon. Shirley Franklin* Bartow County Hon. Matt Santini Cherokee

More information

RE: Plan Amendment Process Documentation and Staff Recommendation

RE: Plan Amendment Process Documentation and Staff Recommendation TO: FROM: Executive Committee Metro Water District Staff DATE: November 12, 2018 RE: Plan Amendment Process Documentation and Staff Recommendation (City of Auburn) The Metropolitan North Georgia Water

More information

Metro Atlanta s Water: Everything You Wanted To Know About Your Water (but were afraid to ask)

Metro Atlanta s Water: Everything You Wanted To Know About Your Water (but were afraid to ask) Metro Atlanta s Water: Everything You Wanted To Know About Your Water (but were afraid to ask) June 2014 Regional Snapshot Atlanta Regional Commission For more information, contact: KZitsch@atlantaregional.com

More information

WATER RESOURCE CONSIDERATIONS

WATER RESOURCE CONSIDERATIONS One layer of the wastewater management planning process is determining where and when treatment capacity should be in place, and where and how treated water should be returned. The needed location and

More information

COUNTY-BY-COUNTY WATER FACILITY CAPACITY AND EXPANSION SCHEDULE

COUNTY-BY-COUNTY WATER FACILITY CAPACITY AND EXPANSION SCHEDULE COUNTY-BY-COUNTY WATER FACILITY CAPACITY AND EXPANSION SCHEDULE This Appendix outlines the schedule for expanding water facility treatment capacities in the Metro Water District. Appendix B details the

More information

INTRODUCTION DATA COLLECTED WATER BILLING AND PRODUCTION DATA

INTRODUCTION DATA COLLECTED WATER BILLING AND PRODUCTION DATA INTRODUCTION This Section documents the methodology used to develop water demand forecasts. The Demand Side Management Least Cost Planning Decision Support System (DSS) computer model developed by Maddaus

More information

FEDERAL OPERATION OF LAKE LANIER AND ALLATOONA LAKE

FEDERAL OPERATION OF LAKE LANIER AND ALLATOONA LAKE As water systems in the Metro Water District continue to collaborate on regional water resources planning, water resources issues are identified. This Section outlines the regional water resource issues

More information

Protecting Water Resources: Elements of Success

Protecting Water Resources: Elements of Success METROPOLITAN NORTH GEORGIA WATER PLANNING DISTRICT Protecting Water Resources: Elements of Success ACTIVITIES & PROGRESS REPORT 2005 MESSAGE FROM THE CHAIRMAN December 2005 Protecting water quality and

More information

GEORGIA DEPARTMENT OF TRANSPORTATION NPDES MS4 COMPLIANCE

GEORGIA DEPARTMENT OF TRANSPORTATION NPDES MS4 COMPLIANCE This Section focuses on state and regional policy recommendations to further implementation of watershed management and water resources protection in the Metro Water District. These recommendations are

More information

Building A State of Conservation

Building A State of Conservation Building A State of Conservation Water Reuse and Conservation in Georgia By Alice Miller Keyes and Ernest Earn Georgia Environmental Protection Division Governor s Environmental Advisory Council July 11,

More information

Statewide Water Management Plan Association County Commissioners of Georgia May 2, 2008

Statewide Water Management Plan Association County Commissioners of Georgia May 2, 2008 Statewide Water Management Plan Association County Commissioners of Georgia May 2, 2008 Introduction Coupled with Georgia s continued economic and population growth, the historicallysevere drought of 2007-08

More information

EXISTING WATER CONSERVATION PROGRAM

EXISTING WATER CONSERVATION PROGRAM This Section presents the water conservation measures evaluated and selected for the 2008 Supply and Conservation Management Plan. The updated water conservation program expands the existing Metro District

More information

Potable Water Supply, Wastewater & Reuse Element

Potable Water Supply, Wastewater & Reuse Element Potable Water Supply, Wastewater & Reuse Element GOAL ONE: HIGH QUALITY AND AFFORDABLE POTABLE WATER WILL BE AVAILABLE TO MEET THE EXISTING AND PROJECTED DEMANDS OF PINELLAS COUNTY UTILITY CUSTOMERS. 1.1.

More information

WATERSHED MANAGEMENT FOR LAKE LANIER: PERSPECTIVES ON INTER-GOVERNMENTAL IMPLEMENTATION

WATERSHED MANAGEMENT FOR LAKE LANIER: PERSPECTIVES ON INTER-GOVERNMENTAL IMPLEMENTATION WATERSHED MANAGEMENT FOR LAKE LANIER: PERSPECTIVES ON INTER-GOVERNMENTAL IMPLEMENTATION Douglas S. Baughman', Mary E. Horton 2, Tim Merritt3 and Robert R. Rivers 4 AUTHORS: Senior Environmental Scientist

More information

INFRASTRUCTURE ELEMENT Goal, Objectives and Policies

INFRASTRUCTURE ELEMENT Goal, Objectives and Policies INFRASTRUCTURE ELEMENT Goal, Objectives and Policies City of Bartow Comprehensive Plan Adopted August 5, 1991 Amended August 2, 1993, Amended 1996 & 1999 Adopted Changes January 16, 2001, Amended April

More information

CITY OF HAPEVILLE STORMWATER UTILITY IMPLEMENTATION. Presented by: Michael J. Moffitt, P.E. (Keck & Wood, Inc.) City Engineer.

CITY OF HAPEVILLE STORMWATER UTILITY IMPLEMENTATION. Presented by: Michael J. Moffitt, P.E. (Keck & Wood, Inc.) City Engineer. CITY OF HAPEVILLE STORMWATER UTILITY IMPLEMENTATION Presented by: Michael J Moffitt, PE (Keck & Wood, Inc) City Engineer May, 2016 What is Stormwater? Stormwater is rain or snowmelt that falls on streets,

More information

CUMULATIVE IMPACT ANALYSIS: A SIMPLE MODEL FOR LOCAL GOVERNMENT RESERVOIRS AND WITHDRAWALS IN GEORGIA

CUMULATIVE IMPACT ANALYSIS: A SIMPLE MODEL FOR LOCAL GOVERNMENT RESERVOIRS AND WITHDRAWALS IN GEORGIA CUMULATIVE IMPACT ANALYSIS: A SIMPLE MODEL FOR LOCAL GOVERNMENT RESERVOIRS AND WITHDRAWALS IN GEORGIA Nolton G. Johnson AUTHOR: Chief, Water Resources Branch, Georgia Environmental Protection Division,

More information

Section 5: Infrastructure and Utilities

Section 5: Infrastructure and Utilities 5.0 Infrastructure and Utilities 5.1 Introduction The Town of Holly Springs rapid growth provides for challenges with respect to funding, environmental permitting, and installation of infrastructure utilities

More information

CHAPTER SEVEN: UTILITIES

CHAPTER SEVEN: UTILITIES CHAPTER SEVEN: UTILITIES 7.0 Introduction T he Water Works Board of the City of Auburn (AWWB) is the primary potable water service provider for the City of Auburn (City) and Auburn University. There are

More information

CHAPTER SEVEN: UTILITIES

CHAPTER SEVEN: UTILITIES CHAPTER SEVEN: UTILITIES 7.1 Introduction The Water Works Board of the City of Auburn (AWWB) is the primary potable water service provider for the City of Auburn (City) and Auburn University. There are

More information

September 7, JOINT PUBLIC NOTICE Savannah District/State of Georgia

September 7, JOINT PUBLIC NOTICE Savannah District/State of Georgia DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS, SAVANNAH DISTRICT 100 WEST OGLETHORPE AVENUE SAVANNAH, GEORGIA 31401-3604 Regulatory Branch SAS-2001-04600 Formerly SAS-2003-00306 September 7, 2018

More information

POTABLE WATER ELEMENT

POTABLE WATER ELEMENT Goal 4.0. Provide current and future residents of the County's utility service areas, and large users of the regional raw water system a cost-effective and equitable potable or raw water supply system

More information

Reclaimed Water. While the number and capacity of reclaimed water facilities is increasing, much of the potential as a resource remains underutilized.

Reclaimed Water. While the number and capacity of reclaimed water facilities is increasing, much of the potential as a resource remains underutilized. Reclaimed Water Issue Definition The Florida Department of Environmental Protection (FDEP) defines reclaimed water as water that has received at least secondary treatment and basic disinfection and is

More information

3. Engage stakeholders as active participants in developing effective, long-term water resource management objectives and strategies.

3. Engage stakeholders as active participants in developing effective, long-term water resource management objectives and strategies. Guidelines for Developing an Integrated Resource Plan Under the Delaware River Basin Commission Southeastern Pennsylvania Ground Water Protected Area Regulations September 25, 2002 A. Introduction Integrated

More information

What are WSSC s conservation objectives? How is conservation linked to WSSC s environmental protection, resource management, sustainability goals?

What are WSSC s conservation objectives? How is conservation linked to WSSC s environmental protection, resource management, sustainability goals? What are WSSC s conservation objectives? How is conservation linked to WSSC s environmental protection, resource management, sustainability goals? What are WSSC customers expectations about water conservation?

More information

CLEAN WATER PLAN Policies, Assessments and Management Programs

CLEAN WATER PLAN Policies, Assessments and Management Programs METRO VISION 2020 CLEAN WATER PLAN Policies, Assessments and Management Programs June 17, 1998 Incorporating amendments through January, 2006 Denver Regional Council of Governments 4500 Cherry Creek Drive

More information

Physical and Natural Features

Physical and Natural Features ATTACHMENT 4 Upper Basin Profile The Upper Basin is located in the southern section of the Metro Water District and encompasses about 556 square miles of the Metro Water District, or 11 percent of its

More information

Jo Ann Macrina, PE, Deputy Director Watershed Protection Division DeKalb County Dept. of Watershed Management and Aylin Lewallen and Jeff Herr, PE

Jo Ann Macrina, PE, Deputy Director Watershed Protection Division DeKalb County Dept. of Watershed Management and Aylin Lewallen and Jeff Herr, PE Jo Ann Macrina, PE, Deputy Director Watershed Protection Division DeKalb County Dept. of Watershed Management and Aylin Lewallen and Jeff Herr, PE Brown and Caldwell Presentation Overview Regulatory context

More information

North Fulton Wastewater Capacity Analysis and Economic Assessment

North Fulton Wastewater Capacity Analysis and Economic Assessment North Fulton Wastewater Capacity Analysis and Economic Assessment Fulton County Department of Water Resources Project No. 84426 07/27/2015 North Fulton Wastewater Capacity Analysis and Economic Assessment

More information

2009 ASCE Georgia Infrastructure Report Card

2009 ASCE Georgia Infrastructure Report Card 2009 ASCE Georgia Infrastructure Report Card To participate in our infrastructure survey, please visit www.ascega.org Contact your legislators to let them know your infrastructure concerns www.legis.state.ga.us

More information

Watershed master planning, City of Griffin, Georgia, USA

Watershed master planning, City of Griffin, Georgia, USA Water Resources Management VII 3 Watershed master planning, City of Griffin, Georgia, USA J. K. Kaplan & B. J. Watson Tetra Tech, Water Resources Group, Atlanta, Georgia, USA Abstract Tetra Tech has assisted

More information

Understanding The ATL and HB 930

Understanding The ATL and HB 930 Understanding The ATL and HB 930 Georgia Municipal Association Annual Conference Savannah, GA June 24, 2018 Scott Haggard Director of Government and External Affairs, ATL/SRTA Todd Long Chief Operating

More information

CHATTAHOOCHEE RIVER. Smyrna Atlanta. Sugar Hill Austell. Suwanee Avondale Estates. Union City Ball Ground. Villa Rica Berkeley Lake.

CHATTAHOOCHEE RIVER. Smyrna Atlanta. Sugar Hill Austell. Suwanee Avondale Estates. Union City Ball Ground. Villa Rica Berkeley Lake. BASIN OVERVIEW The Chattahoochee Basin flows from its headwaters in the Blue Ridge Mountains into Lake Sidney Lanier and through the center of the District and metropolitan Atlanta region from the northeast

More information

O R A N G E C I T Y S INTEGRAT E D W AT E R R E S O U R C E S M A N A G E M E N T & R E S I L I E N C Y P L A N

O R A N G E C I T Y S INTEGRAT E D W AT E R R E S O U R C E S M A N A G E M E N T & R E S I L I E N C Y P L A N O R A N G E C I T Y S INTEGRAT E D W AT E R R E S O U R C E S M A N A G E M E N T & R E S I L I E N C Y P L A N Cooperation is Key Cooperation among Volusia County and Cities is critical to solve our water

More information

National Water Demand Management Policy

National Water Demand Management Policy National Water Demand Management Policy Introduction In 1997, the Ministry of Water and Irrigation developed Jordan s Water Strategy and the following four policies, which include: Water Utility Policy;

More information

ENVIRONMENTAL CONSIDERATIONS FOR EVALUATING INTERBASIN WATER TRANSFERS IN GEORGIA

ENVIRONMENTAL CONSIDERATIONS FOR EVALUATING INTERBASIN WATER TRANSFERS IN GEORGIA ENVIRONMENTAL CONSIDERATIONS FOR EVALUATING INTERBASIN WATER TRANSFERS IN GEORGIA Nolton G. Johnson, Steven R. Layman, and Cristin C. Krachon AUTHORS: Geosyntec Consultants, 1255 Roberts Blvd NW, Suite

More information

Capital Facilities Element

Capital Facilities Element Capital Facilities Element Purpose The Growth Management Act requires cities to prepare a capital facilities element consisting of: 1. An inventory of current capital facilities owned by public entities,

More information

SOURCE WATER ASSESSMENT PROJECT:

SOURCE WATER ASSESSMENT PROJECT: SOURCE WATER ASSESSMENT PROJECT: An Assessment of Potential for Pollution of Surface Drinking Water Supply Sources Prepared by the Atlanta Regional Commission for Cherokee County Water & Sewer Authority

More information

Metropolitan North Georgia Water Planning District. Watershed/Stormwater Subcommittee of the. Technical Coordinating Committee.

Metropolitan North Georgia Water Planning District. Watershed/Stormwater Subcommittee of the. Technical Coordinating Committee. Metropolitan North Georgia Water Planning District Watershed/Stormwater Subcommittee of the Technical Coordinating Committee Meeting Summary October 27, 2015 The Metropolitan North Georgia Water Planning

More information

Unify efforts to address water resources for the Big Sky area and surrounding zone of influence in three co-equal water resources focus areas:

Unify efforts to address water resources for the Big Sky area and surrounding zone of influence in three co-equal water resources focus areas: EXECUTIVE SUMMARY The Big Sky Sustainable Water Solutions Forum (Water Forum) is a community-based, collaborative approach building a unified vision for future Big Sky water resources management to maintain

More information

DEVELOPING A WATERSHED IMPROVEMENT PLAN TO MEET MULTIPLE COMMUNITY OBJECTIVES IN GAINESVILLE AND HALL COUNTY, GEORGIA

DEVELOPING A WATERSHED IMPROVEMENT PLAN TO MEET MULTIPLE COMMUNITY OBJECTIVES IN GAINESVILLE AND HALL COUNTY, GEORGIA DEVELOPING A WATERSHED IMPROVEMENT PLAN TO MEET MULTIPLE COMMUNITY OBJECTIVES IN GAINESVILLE AND HALL COUNTY, GEORGIA Chrissy, Thom 1, David Dockery 2, Kevin McInturff 3, Betsy Massie 1, and Lauren Murphy

More information

2013 ANNUAL REPORT on INTERBASIN TRANSFERS for RTP South and the Towns of Cary, Apex, and Morrisville

2013 ANNUAL REPORT on INTERBASIN TRANSFERS for RTP South and the Towns of Cary, Apex, and Morrisville 2013 ANNUAL REPORT on INTERBASIN TRANSFERS for RTP South and the Towns of Cary, Apex, and Morrisville Prepared for: Town of Apex Town of Cary Town of Morrisville RTP South/Wake County Submitted to: North

More information

Water Use, Conservation, and Efficiency Rome, Georgia A Report by the Coosa River Basin Initiative July 2014

Water Use, Conservation, and Efficiency Rome, Georgia A Report by the Coosa River Basin Initiative July 2014 Water Use, Conservation, and Efficiency Rome, Georgia A Report by the Coosa River Basin Initiative July 2014 408 Broad Street Rome, GA 30161 (706) 232-2724 www.coosa.org Table of Contents About the Coosa

More information

CHAPTER 6 SANITARY SEWER SUB-ELEMENT

CHAPTER 6 SANITARY SEWER SUB-ELEMENT CHAPTER 6 SANITARY SEWER SUB-ELEMENT Page 1 of 10 CHAPTER 6 SANITARY SEWER SUB-ELEMENT A. OVERVIEW The following Future Land Use categories are considered to be urban and require the provision of sanitary

More information

DRAINAGE AND NATURAL AQUIFER GROUNDWATER RECHARGE ELEMENT

DRAINAGE AND NATURAL AQUIFER GROUNDWATER RECHARGE ELEMENT Goal 7.0. To optimize integrated stormwater management in order to reduce damage and impacts from sea level rise and flooding, promotes recharge to the Surficial Aquifer System (SAS), improve and protect

More information

DECENTRALIZED WASTEWATER TREATMENT PLANNING, ALTERNATIVES, MANAGEMENT

DECENTRALIZED WASTEWATER TREATMENT PLANNING, ALTERNATIVES, MANAGEMENT DECENTRALIZED WASTEWATER TREATMENT PLANNING, ALTERNATIVES, MANAGEMENT Linda MacGregor, P.E. AUTHORS: Engineer & President, McKenzie MacGregor Incorporated, 3455 Lawrenceville-Suwanee Road, Suite A, Suwanee,

More information

Santa Ana River Watershed. SAWPA Celeste Cantú April 17, 2012

Santa Ana River Watershed. SAWPA Celeste Cantú April 17, 2012 Santa Ana River Watershed SAWPA Celeste Cantú April 17, 2012 What is SAWPA? SAWPA Member Agencies & Other Stakeholders Other Stakeholders 97 Water-related Agencies 4 Counties 59 Cities State water, environmental,

More information

Goals, Objectives, and Policies Infrastructure Element Introduction

Goals, Objectives, and Policies Infrastructure Element Introduction Goals, Objectives, and Policies Infrastructure Element Introduction Pursuant to Section 163.3177 (6) (c), FS and Sections 9J-5.011 (2)(b) and (c), FAC, the following represents the Potable Water, Sanitary

More information

Chapter 7: Utilities and Stormwater Management

Chapter 7: Utilities and Stormwater Management Chapter 7: Utilities and Stormwater Management Utilities are essential services that affect future land use and growth areas, stormwater management, and energy use. Chapter 7 of this Comprehensive Plan

More information

A resource assessment of the Etowah Watershed

A resource assessment of the Etowah Watershed A resource assessment of the Etowah Watershed The Upper Etowah watershed drains a region dominated by rolling Piedmont topography with interspersed forest cover, agricultural and urban land uses. With

More information

Executive Summary. ES-1 Water Resources Infrastructure for Apex, Cary, Morrisville, and RTP South

Executive Summary. ES-1 Water Resources Infrastructure for Apex, Cary, Morrisville, and RTP South Executive Summary Since the mid-1990s the Towns of Apex, Cary, and Morrisville, and Wake County have worked to develop and manage a flexible portfolio of water resources options. This approach is preferable

More information

PUBLIC MEETINGS SCHEDULED ON SPONSORED PROJECTS

PUBLIC MEETINGS SCHEDULED ON SPONSORED PROJECTS To: Interested Stakeholders From: Patti Cale-Finnegan, SRF Coordinator Iowa Department of Natural Resources Date: November 5, 2012 PUBLIC MEETINGS SCHEDULED ON SPONSORED PROJECTS You are invited to attend

More information

CHAPTER SEVEN: UTILITIES

CHAPTER SEVEN: UTILITIES CHAPTER SEVEN: UTILITIES 7.1 Introduction T he Water Works Board of the City of Auburn (AWWB) is the primary potable water service provider for the City of Auburn (City) and Auburn University. There are

More information

PIMA COUNTY COMPREHENSIVE PLAN CO PIMA COUNTY REGIONAL COMPREHENSIVE PLAN POLICY MAJOR PLAN AMENDMENT

PIMA COUNTY COMPREHENSIVE PLAN CO PIMA COUNTY REGIONAL COMPREHENSIVE PLAN POLICY MAJOR PLAN AMENDMENT PIMA COUNTY COMPREHENSIVE PLAN CO7-07-04 PIMA COUNTY REGIONAL COMPREHENSIVE PLAN POLICY MAJOR PLAN AMENDMENT Arizona law [A.R.S. 11-821(C)(3)] requires: Planning for water resources that addresses: a)

More information

A. POTABLE WATER SUB-ELEMENT GOAL I-1: STRIVE TO PROVIDE HIGH QUALITY POTABLE WATER TO CURRENT AND FUTURE RESIDENTS AND VISITORS.

A. POTABLE WATER SUB-ELEMENT GOAL I-1: STRIVE TO PROVIDE HIGH QUALITY POTABLE WATER TO CURRENT AND FUTURE RESIDENTS AND VISITORS. A. POTABLE WATER SUB-ELEMENT GOAL I-1: STRIVE TO PROVIDE HIGH QUALITY POTABLE WATER TO CURRENT AND FUTURE RESIDENTS AND VISITORS. Objective I-1.1 Water Supply Planning Walton County shall develop and maintain

More information

Watershed Organizations in the. Southeast Handout

Watershed Organizations in the. Southeast Handout Attachment E: Watershed Organizations in the Southeast Handout E Watershed Organizations in the Southeast Handout Lake Lanier Handout - Alternative Nutrient Strategies Brown and Caldwell Alternative Nutrient

More information

What is a stormwater utility fee?

What is a stormwater utility fee? What is a stormwater utility fee? A stormwater utility fee is similar to a water or sewer utility fee. In essence, customers pay a fee to convey stormwater from their properties. The City of Goodlettsville

More information

Cannon River One Watershed, One Plan. POLICY COMMITTEE MEETING January 10, 2018 Rice County Government Center Faribault, MN

Cannon River One Watershed, One Plan. POLICY COMMITTEE MEETING January 10, 2018 Rice County Government Center Faribault, MN Cannon River One, One Plan POLICY COMMITTEE MEETING January 10, 2018 Rice County Government Center Faribault, MN TASK Task 1. Aggregate Existing Physical & Spatial Data 1A. Create project maps 1B. Meeting

More information

CITY OF BOYNTON BEACH COMPREHENSIVE PLAN UTILITIES ELEMENT

CITY OF BOYNTON BEACH COMPREHENSIVE PLAN UTILITIES ELEMENT EXHIBIT B CITY OF BOYNTON BEACH COMPREHENSIVE PLAN UTILITIES ELEMENT PROPOSED AMENDMENTS Table of Contents Objective Page Sanitary Sewer Sub-Element 3A.1 Secure reserve capacity at the South Central Regional

More information

Chapter 1. Introduction

Chapter 1. Introduction Chapter 1 Introduction James P. Heaney, Robert Pitt, and Richard Field Introduction Stormwater has traditionally been considered a nuisance, requiring rapid and complete drainage from areas of habitation.

More information

Promoting your Community on the Web: An Exploratory Analysis of the Web Presence of Cities in Georgia

Promoting your Community on the Web: An Exploratory Analysis of the Web Presence of Cities in Georgia Georgia Journal of Public Policy Volume 3 Issue 1 Article 2 April 2017 Promoting your Community on the Web: An Exploratory Analysis of the Web Presence of Cities in Georgia William Hatcher wihatcher@augusta.edu

More information

CITY OF LAGRANGE, GEORGIA UTILITY DEPARTMENT WATER CONSERVATION AND DROUGHT CONTINGENCY PLANS

CITY OF LAGRANGE, GEORGIA UTILITY DEPARTMENT WATER CONSERVATION AND DROUGHT CONTINGENCY PLANS CITY OF LAGRANGE, GEORGIA UTILITY DEPARTMENT WATER CONSERVATION AND DROUGHT CONTINGENCY PLANS Modified: May 2012 WATER CONSERVATION PLAN SYSTEM MANAGEMENT AND SALES Permit Information. The City of LaGrange

More information

Sewerage and Water Board of New Orleans Strategic Plan

Sewerage and Water Board of New Orleans Strategic Plan Sewerage and Water Board of New Orleans Strategic Plan 2011-2020 Mission, Vision, and Values Our mission is to provide safe drinking water to everyone in New Orleans; to remove waste water for safe return

More information

SECTION 6: MITIGATION STRATEGIES

SECTION 6: MITIGATION STRATEGIES SECTION 6: MITIGATION STRATEGIES This section presents mitigation actions for Onondaga County to reduce potential exposure and losses identified as concerns in the Risk Assessment portion of this plan.

More information

Capacity Assurance, Management, Operation, and Maintenance Program

Capacity Assurance, Management, Operation, and Maintenance Program CITY OF INDIANAPOLIS Capacity Assurance, Management, Operation, and Maintenance Program Table of Contents EXECUTIVE SUMMARY...ES-1 SECTION 1 PURPOSE AND GOALS... 1-1 1.1 Purpose... 1-1 1.2 Goals... 1-2

More information

SUBURBAN EDGE COMMUNITY ROLE COUNCIL ROLE ALL COMMUNITIES SUBURBAN EDGE

SUBURBAN EDGE COMMUNITY ROLE COUNCIL ROLE ALL COMMUNITIES SUBURBAN EDGE Orderly and Efficient Land Use Align land use, development patterns, and infrastructure to make the best use of public and private investment. Plan and stage development for forecasted growth through 2040

More information

PUTNAM COUNTY COMPREHENSIVE PLAN EXHIBIT DD INFRASTRUCTURE ELEMENT

PUTNAM COUNTY COMPREHENSIVE PLAN EXHIBIT DD INFRASTRUCTURE ELEMENT COMPREHENSIVE PLAN EXHIBIT DD D. Infrastructure Element (Sanitary Sewer, Potable Water, Solid Waste, Drainage and Natural Groundwater Aquifer Recharge) Goals, Objectives and Policies GOAL D.1: Putnam County

More information

Infrastructure Element

Infrastructure Element Infrastructure Element 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 INFRASTRUCTURE ELEMENT GOAL 1: To provide for environmentally

More information

DRAFT ANNOTATED OUTLINE 12/4/2006

DRAFT ANNOTATED OUTLINE 12/4/2006 DRAFT ANNOTATED OUTLINE 12/4/2006 INTEGRATED WATER MANAGEMENT PLAN SAN DIEGO REGION A. INTRODUCTION AND REGIONAL WATER MANAGEMENT GROUP Summary This Integrated Regional Water Management Plan (IRWM Plan)

More information

INSTREAM FLOW GUIDELINES AND PROTECTION OF GEORGIA S AQUATIC HABITATS

INSTREAM FLOW GUIDELINES AND PROTECTION OF GEORGIA S AQUATIC HABITATS INSTREAM FLOW GUIDELINES AND PROTECTION OF GEORGIA S AQUATIC HABITATS Mary M. Davis AUTHOR Aquatic Ecologist, The Nature Conservancy, 133 West Peachtree Street, Suite 41, Atlanta, Georgia 339 REFERENCE

More information

Volume II Recommendations January 2006 City of Madison Comprehensive Plan

Volume II Recommendations January 2006 City of Madison Comprehensive Plan 10 UTILITIES THE PLAN: GOALS, OBJECTIVES, POLICIES AND IMPLEMENTATION RECOMMENDATIONS Volume II Recommendations January 2006 TABLE OF CONTENTS Utilities Overview... 10 1 Summary of Utilities Issues...

More information

RURAL RESIDENTIAL COMMUNITY ROLE COUNCIL ROLE RURAL RESIDENTIAL ALL COMMUNITIES

RURAL RESIDENTIAL COMMUNITY ROLE COUNCIL ROLE RURAL RESIDENTIAL ALL COMMUNITIES Orderly and Efficient Land Use Align land use, development patterns, and infrastructure to make the best use of public and private investment. Discourage future development of rural residential patterns

More information

Glades Reservoir Draft Environmental Impact Statement

Glades Reservoir Draft Environmental Impact Statement Glades Reservoir Draft Environmental Impact Statement Chapter 4 Environmental Consequences October 2015 4 ENVIRONMENTAL CONSEQUENCES 4.1 INTRODUCTION 4-1 4.1.1 Types and Definitions of Impacts 4-1 4.1.2

More information

Comprehensive Plan Update - Sanitary Sewer Section Planning Commission Workshop: November 10, 2014

Comprehensive Plan Update - Sanitary Sewer Section Planning Commission Workshop: November 10, 2014 Comprehensive Plan Update - Sanitary Sewer Section Planning Commission Workshop: November 10, 2014 Application type Agency Review Comments Applicable Plan Sections Staff Planner Staff Recommendation Publicly

More information

Priorities & Metrics Workgroup Proposed Vision, Mission, Goals, Objectives, and Targets

Priorities & Metrics Workgroup Proposed Vision, Mission, Goals, Objectives, and Targets Priorities & Workgroup Proposed Vision, Mission, Goals, Objectives, and November 28, 2012 Vision: An integrated, balanced, and consensus-based approach to ensuring the long-term sustainability of the Region

More information

STRATEGIC PLAN FY 2018 FY 2019

STRATEGIC PLAN FY 2018 FY 2019 STRATEGIC PLAN FY 2018 FY 2019 This Strategic Plan is a blueprint for ANRC as we continue to work to manage and protect Arkansas s abundant natural resources. The plan reflects ANRC s commitment to build

More information

Water Supply Water Quality Water Reuse and Conservation Watershed Management Interagency Coordination

Water Supply Water Quality Water Reuse and Conservation Watershed Management Interagency Coordination WATER ELEMENT INTRODUCTION Water is one of the most critical resources for the Merced County economy and for the quality of life of its residents. Both surface water and groundwater supplies are an important

More information

Municipal Stormwater Management Planning

Municipal Stormwater Management Planning Municipal Stormwater Management Planning Christopher C. Obropta, Ph.D., P.E. Water Resources Extension Specialist with Rutgers Cooperative Extension Assistant Professor with Department of Environmental

More information

Strategic Plan. A public, non-profit agency providing water, sewer and reclaimed water services to the Carrboro-Chapel Hill community.

Strategic Plan. A public, non-profit agency providing water, sewer and reclaimed water services to the Carrboro-Chapel Hill community. Strategic Plan Orange Water and Sewer Authority Carrboro, North Carolina A public, non-profit agency providing water, sewer and reclaimed water services to the Carrboro-Chapel Hill community. Adopted June

More information

8-2. Communications and Legislation Committee. Board of Directors. 12/11/2018 Board Meeting. Subject. Executive Summary. Details

8-2. Communications and Legislation Committee. Board of Directors. 12/11/2018 Board Meeting. Subject. Executive Summary. Details Board of Directors Communications and Legislation Committee 12/11/2018 Board Meeting Subject Adopt Federal Legislative Priorities and Principles for 2019; the General Manager has determined that the proposed

More information

RURAL CENTER COMMUNITY ROLE COUNCIL ROLE RURAL CENTER ALL COMMUNITIES

RURAL CENTER COMMUNITY ROLE COUNCIL ROLE RURAL CENTER ALL COMMUNITIES Orderly and Efficient Land Use Align land use, development patterns, and infrastructure to make the best use of public and private investment. Plan for forecasted population and household growth at overall

More information

Objective NAT-1.1. Maintain the best possible air quality, meeting or exceeding state and federal air quality standards.

Objective NAT-1.1. Maintain the best possible air quality, meeting or exceeding state and federal air quality standards. Vision Statement: Maintain and enhance the natural environment in the City of Coral Gables and surrounding areas through the promotion of environmental protection and sustainability. Goals, Objectives

More information

Approved August 12, 1991 Amended June 8, 2009

Approved August 12, 1991 Amended June 8, 2009 Approved August 12, 1991 Amended June 8, 2009 THIS PAGE INTENTIONALLY LEFT BLANK Page WW-0 W A S T E W AT E R G O A L S, O B JECTIVES & POLICIES GOAL 1 To provide efficient and economic wastewater services

More information

Recent Changes in Phase II MS4 Permitting

Recent Changes in Phase II MS4 Permitting Recent Changes in Phase II MS4 Permitting Georgia Association of Flood Management - Spring Conference March 11-14, 2013 Lake Lanier Islands, Georgia GA EPD - Watershed Protection Branch Wastewater Regulatory

More information

PROTECTING THE BIG HAYNES CREEK WATERSHED: A STRATEGY FOR LAND MANAGEMENT AND NONPOINT POLLUTION CONTROL

PROTECTING THE BIG HAYNES CREEK WATERSHED: A STRATEGY FOR LAND MANAGEMENT AND NONPOINT POLLUTION CONTROL PROTECTING THE BIG HAYNES CREEK WATERSHED: A STRATEGY FOR LAND MANAGEMENT AND NONPOINT POLLUTION CONTROL Denise L. Schmidt AUTHOR: Principal Environmental Planner, Atlanta Regional Commission, 3715 Northside

More information

STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION GENERIC PERMIT FOR DISCHARGE OF STORMWATER FROM PHASE II

STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION GENERIC PERMIT FOR DISCHARGE OF STORMWATER FROM PHASE II STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION GENERIC PERMIT FOR DISCHARGE OF STORMWATER FROM PHASE II MUNICIPAL SEPARATE STORM SEWER SYSTEMS May 1, 2003 1 Generic Permit for Discharge of Stormwater

More information

Support legislation that will protect the quantity of water in Lake Erie

Support legislation that will protect the quantity of water in Lake Erie Specific Regional Priorities Each of Pennsylvania s major drainage basins has an array of individual characteristics that distinguish it from other regions of the state. These include diverse geographic

More information

Water Quality in Athens- Clarke County

Water Quality in Athens- Clarke County Water Quality in Athens- Clarke County Mayor and Commission Work Session 1 December 8, 2015 Purpose Provide background on why the Unified Government of Athens-Clarke County (ACCUG) is involved with water

More information

DIVERSIFIED RURAL COMMUNITY ROLE COUNCIL ROLE DIVERSIFIED RURAL ALL COMMUNITIES

DIVERSIFIED RURAL COMMUNITY ROLE COUNCIL ROLE DIVERSIFIED RURAL ALL COMMUNITIES Orderly and Efficient Land Use Align land use, development patterns, and infrastructure to make the best use of public and private investment. Plan for growth not to exceed forecasts and in patterns that

More information

Model Riparian Buffer Ordinance.

Model Riparian Buffer Ordinance. Model Riparian Buffer Ordinance. This is a sample riparian buffer ordinance written as an amendment to an existing zoning ordinance. This ordinance complies with the state minimum standards for river corridor

More information

CONCEPTUAL DEVELOPMENT PLAN Land Use, Governance, Funding & Implementation

CONCEPTUAL DEVELOPMENT PLAN Land Use, Governance, Funding & Implementation M a r y l a n d P a r k L a k e D i s t r i c t Advisory Committee Meeting CONCEPTUAL DEVELOPMENT PLAN Land Use, Governance, Funding & Implementation City of Maryland Heights, Missouri November 07, 2018

More information

4. Present Activities and Roles

4. Present Activities and Roles 4. Present Activities and Roles The present missions, authorities, activities and roles of the various agencies involved with flood protection, floodplain management and flood-damage reduction are identified

More information

PUBLIC INFRASTRUCTURE AND UTILTIES

PUBLIC INFRASTRUCTURE AND UTILTIES PUBLIC INFRASTRUCTURE AND UTILTIES Des Moines works to keep our built environment functional and safe for all residents and businesses. The City provides basic infrastructure and public services to all

More information

DEKALB COUNTY STORMWATER MANAGEMENT PLAN PHASE 2

DEKALB COUNTY STORMWATER MANAGEMENT PLAN PHASE 2 DEKALB COUNTY STORMWATER MANAGEMENT PLAN PHASE 2 Introduction DeKalb County, Illinois, located approximately 50 miles west of Lake Michigan, is rectangular in shape, with a north/south dimension of 36