Volume II Recommendations January 2006 City of Madison Comprehensive Plan

Size: px
Start display at page:

Download "Volume II Recommendations January 2006 City of Madison Comprehensive Plan"

Transcription

1 10 UTILITIES THE PLAN: GOALS, OBJECTIVES, POLICIES AND IMPLEMENTATION RECOMMENDATIONS Volume II Recommendations January 2006

2 TABLE OF CONTENTS Utilities Overview Summary of Utilities Issues Regional Wastewater Service and Treatment Storm Water Drainage Water Supply On Site Wastewater Treatment Technology Solid Waste Disposal Telecommunications Facilities Power Plants/Transmission Lines Sustainability Utilities Goals, Objectives, and Policies Sanitary Sewer Service Storm Water Management Water Supply On Site Wastewater Treatment Technology Solid Waste Disposal Recycling Facilities Telecommunications Facilities Electric Power Utilities Implementation Recommendations Volume II Recommendations January 2006

3 UTILITIES OVERVIEW This chapter of the was prepared pursuant to Section (2)(d) of the Wisconsin Statutes and includes goals, objectives, policies and implementation recommendations for water supply, sanitary sewer service and treatment, storm water management, solid waste disposal, recycling facilities, telecommunications facilities, and power plants/transmission lines. The Utilities Existing Conditions chapter (Volume I, Chapter 10) includes a description of existing and future public utility facilities, and assesses the future needs for government services related to such utilities. In many cases, the content of the Utilities goals, objectives, policies and implementation recommendations will overlap with the content in other Comprehensive Plan chapters, such as Land Use and Transportation. The overlapping chapters will be integrated and made consistent with each other as required by Wisconsin s Smart Growth Law. Flushing water distribution system pipes. The City will implement the Utilities chapter goals, objectives, policies and implementation recommendations through careful and strategic use of various planning tools such as the Madison General Ordinances, official map, annexation policy, and capital improvements program. This will require a sustained effort by the public and private sectors to use the section as an essential guide for making utilities related decisions over the next 20 year period. Volume II Recommendations 10 1 January 2006

4 SUMMARY OF UTILITIES ISSUES The utilities issues addressed in the are summarized below. The key issues are intended to provide the basis for the goals, objectives and policies that will guide the utilities in their daily operation and long term planning. REGIONAL WASTEWATER SERVICE AND TREATMENT The Madison Metropolitan Sewerage District (MMSD) manages the regional wastewater service and treatment for the Madison area. The condition and capacity of MMSD s collection system and treatment plant facilities are reviewed by MMSD on an ongoing basis. Repair and maintenance projects are undertaken annually to keep the facilities in proper working order. Major expansions and capital improvements are guided by MMSD Facilities Plan studies. Individual projects are incorporated into MMSD s annual capital budgeting process. Madison Sewer Utility manages the local wastewater services for the Madison area. Key issues with regard to the local wastewater system have been identified by operations and design staff, through the preparation of neighborhood development plans and communication with customers of the Madison Sewer Utility. STORM WATER DRAINAGE The Madison Storm Water Utility manages storm water drainage for the Madison area. Key issues have been identified by operations and design staff, through the preparation of neighborhood development plans, and through regulations and cooperation with other governmental agencies. The City of Madison goal for storm water management is to meet or exceed the requirements of existing laws and regulations. Specifically, the City needs to comply with NR 151 and NR 216 of the Wisconsin Administrative Code, as well as the Dane County Water Quality Plan (adopted in 1979 with certain sections updated periodically) and the more restrictive requirements of Dane County Ordinances. WATER SUPPLY The Madison Water Utility works closely with the Wisconsin Department of Natural Resources (WDNR) to ensure that the system meets all current regulations and is positioned to comply with future regulations that become law. Volume II Recommendations 10 2 January 2006

5 ON SITE WASTEWATER TREATMENT TECHNOLOGY There are approximately 200 parcels of land served by on site wastewater treatment facilities in the City. These parcels have been annexed to the City and are often farmhouses or suburban homes on larger parcels of land. The Dane County Department of Public Health inspects these facilities every three years. If the on site treatment facility needs to be replaced, the Dane County Health Department contacts the City to determine if sewer is available. Each year a number of these parcels are connected to the public sewerage system. (Madison General Ordinances provides that structures are to connect to the public sewerage system when a sewer main is within 100 feet of the parcel.) With the annexation of existing parcels and the connection of parcels of land to the public sewerage system, the number of on site wastewater treatment facilities remains at about 200. SOLID WASTE DISPOSAL The City of Madison Streets Division manages the collection of household refuse and yard waste for the Madison area. The City s goal is to maintain an efficient, convenient, and costeffective solid waste collection service. The City strives to reduce the amount of yard and household refuse through its efforts at recycling and waste reduction. The City currently diverts 51 percent or about 50,000 tons of its waste stream from the landfill through recycling and composting. In September 2005, the City began a new automated single stream recycling program where all households received a bin where they can place a broader range of materials for recycling. A key component of Madison s solid waste diversion program is home composting. The Streets Division has sold over 12,000 compost bins to City residents since Because home composting is the most cost effective way to divert organic material from the landfill, the Comprehensive Plan recommends that well managed home composting be allowed in all subdivisions and condominium developments. TELECOMMUNICATIONS FACILITIES Private and public telecommunications companies must coordinate with the communities they serve to evaluate the need for modifications or expansion to their current network. As the City expands and develops, extensions of the telecommunication lines are required. Private land owners/developers are required to coordinate the extension of the new lines to serve their development. Volume II Recommendations 10 3 January 2006

6 POWER PLANTS/TRANSMISSION LINES The Madison Gas & Electric Company and the Alliant Energy Company provide power to the City. In addition, the American Transmission Company was recently created to manage the electrical transmission lines. SUSTAINABILITY The City seeks to provide all needed services and utilities to City residents and businesses in a sustainable manner, by protecting resources for long term use, promoting efficient use of these resources and finding methods to reduce demand by encouraging conservation and reuse techniques. Producing their own food at Quann Community Gardens, gardeners are doing their part to live in a more sustainable way. The Madison Area Community Land Trust is constructing co housing that utilizes green building principles at the Troy Gardens site on the Northside. The Madison Metropolitan Sewerage District provides wastewater treatment to villages, towns, and cities surrounding the Madison area lakes. The District s MetroGro Program recycles the resulting biosolids to agricultural land as a fertilizer and soil conditioner. Volume II Recommendations 10 4 January 2006

7 UTILITIES GOALS, OBJECTIVES, AND POLICIES The following goals, objectives and policies provide the basic framework for all utilities decisions. A goal is a statement that describes in general terms a desired future condition. An objective is a statement that describes a specific future condition to be attained. A policy is a course of action or rule of conduct to achieve the goals and objectives of the Plan. The goals, objectives and policies reflect previously adopted plans and policy documents, as well as the ideas, comments, and concerns expressed by numerous groups and individuals at community open houses, small group meetings and through a community survey. Goal: The City will provide and maintain a high quality, cost effective, energy and resource efficient public water supply, public wastewater service and treatment, storm water management, and household refuse and recyclables collection for the community; and serve as a warden for the installation of telecommunication facilities and power transmission lines. Objectives and Policies for Sanitary Sewer Service Objective 1: Protect the public health and environment by providing exceptional wastewater collection, treatment, and related services to metropolitan Madison and surrounding areas in a well planned and cost effective manner. Policy 1: Provide and maintain regional wastewater collection and treatment services for the Madison metropolitan area. Note: The Madison Metropolitan Sewerage District (MMSD) is a municipal corporation created to carry out the provisions of Sections to of the State Statutes. Objective 2: Maintain the wastewater systems at acceptable and legally required service levels providing comparable service to all citizens; expand the public facilities necessary to accommodate the growth of the City minimizing the cost to current City residents; and, accomplish this objective safely and with an efficient use of resources. Policy 1: Continue to direct the planning, design, construction and repair of public sanitary sewer facilities. Policy 2: Continue to assume ownership and responsibility for maintenance of sanitary sewers upon acceptance of the improvements by the City s Common Council. Volume II Recommendations 10 5 January 2006

8 Objectives and Policies for Storm Water Management Objective 3: Maintain the storm water drainage systems to meet or exceed legally required service levels providing comparable service to all citizens; expand the public facilities necessary to accommodate the growth of the City minimizing the cost to current residents; and, accomplish this mission safely and with an efficient use of resources. Policy 1: Provide and maintain a public storm water system capable of conveying storm water from public lands and rights of way and discharging it in a manner that protects the public health, safety and welfare. Policy 2: Provide City residents with access to professional review of drainage problems that occur on or adjacent to their property, and act as a mediator for multiple party problems and provide possible solutions. Note: The City of Madison Engineering Division enforces ordinances that control and prevent soil erosion and minimize increases in peak storm water runoff in order to preserve the natural resources, control floods, prevent impairment of dams and reservoirs, and protect public waters and wildlife. Policy 3: Work with State and County regulatory agencies and neighboring communities to develop Best Management Practices that make measurable improvements to water quality in the City s lakes and streams. Policy 4: Develop a benchmark system for Madison lakes that measures lake water quality and determines the types of improvements that should be made to improve lake water quality. Policy 5: Encourage reduction of storm water runoff and low impact development techniques for storm water management wherever such practices are feasible. Rain Garden Pervious Paving Terraced Landscaping Examples of storm water management techniques that help reduce runoff. Volume II Recommendations 10 6 January 2006

9 Policy 6: Meet or exceed the requirements of Wisconsin Administrative Code statutes NR151 and NR216. Note: All new developments have stringent requirements for peak runoff, the infiltration of storm water into the ground, and an 80 percent reduction in sediment. New developments provide opportunities for storm water detention and treatment. In existing areas, the City needs to have a 20 percent reduction of the suspended solids of runoff by 2008, and a 40 percent reduction of suspended solids by Objectives and Policies for Water Supply Objective 4: Provide and maintain an adequate supply of safe water for drinking and fire protection, with quality service at a reasonable price. Policy 1: Extend new water service connections only to areas that have been annexed by the City, unless consistent with an adopted intergovernmental agreement. Policy 2: Meet all of the requirements of the Safe Drinking Water Act as administered by the United States Environmental Protection Agency (USEPA). Note: The Wisconsin Department of Natural Resources (WDNR) regulates the Madison Water Utility. In addition to monitoring water quality and sampling, WDNR also reviews construction plans, location of new wells, wellhead protection plans, engineering reports, and any proposed improvements to the system. Policy 3: Encourage all water users to practice water conservation techniques to reduce demand for water wherever such practices are feasible. Policy 4: Provide sufficient water system redundancy to assure adequate service under stressed conditions (such as drought, well contamination, etc.). Madison Water Utility Office and fountain completed in Fountain design and photo by Gail Simpson Volume II Recommendations 10 7 January 2006

10 Objectives and Policies for On site Wastewater Treatment Technology Objective 5: Prevent premature development in unincorporated areas identified as potential locations for long term urban development and City of Madison expansion, and maintain the land in agricultural and other open space uses until it is needed for planned City development. Policy 1: Prohibit unincorporated development on the City s periphery that would block future City growth options or make orderly and efficient City expansion and extension of urban services more difficult. Policy 2: Seek agreements with adjacent municipalities, the County and regional planning bodies that would help to preserve long term options for planned, orderly City expansion. Policy 3: Use the City s extraterritorial plat approval jurisdiction to implement land use and development staging recommendations contained in adopted City plans. Policy 4: The City of Madison should reject all land divisions without public sewerage service (subdivision plats and certified survey maps) within its extraterritorial plat approval jurisdiction if such land divisions will in any way impair the ability of the City to expand its physical boundaries as recommended in the City of Madison s Comprehensive Plan and in City adopted neighborhood development plans and other special area plans. The exception to this policy is where intergovernmental agreements between the City of Madison and its neighboring municipalities may allow such development. Utility pipe replacement along State Street. Sanitary sewer pipe maintenance. Policy 5: Parcels with on site treatment facilities shall be connected to the public sewerage system in accordance with the Madison General Ordinances when sewerage facilities are made available. Volume II Recommendations 10 8 January 2006

11 Objectives and Policies for Solid Waste Disposal Objective 6: Maintain household refuse and yard waste collection to meet or exceed legally required service levels providing comparable service to all citizens. Policy 1: Continue household refuse and yard waste collection at currently acceptable and legally required levels. Policy 2: Require that well managed home composting be allowed and encouraged in subdivisions and condominium plats. Objective 7: Expand the collection network to accommodate the growth of the City, minimizing the cost to current citizens, and accomplishing this mission safely and with an efficient use of resources. Policy 1: Expand the City s recycling program as the markets for the material develop. Policy 2: Commence the search for a successor landfill in Objectives and Policies for Recycling Facilities Objective 8: Collect household recyclables to meet and exceed legally required service levels, providing comparable service to all citizens; expand the collection network to accommodate the growth of the City, minimizing the cost to current citizens; and, accomplish this mission safely and with an efficient use of resources. Policy 1: Implement the Single Stream Recycling Program for household recyclables collection. Policy 2: Identify sites for the storage of salvaged building materials. Single stream recycling truck. Volume II Recommendations 10 9 January 2006

12 Objectives and Policies for Telecommunications Facilities Objective 9: Ensure that telecommunications services are provided throughout the City in rights of way and other appropriate locations. Policy 1: Ensure equitable access for all service providers that use the distribution network in reaching their customers. Policy 2: Ensure universal access to telecommunications service for citizens, businesses and institutions within the City of Madison. Policy 3: Ensure that telecommunications lines are extended as the City grows and require that underground installation of telecommunications lines be explored. Policy 4: Maintain uninterrupted telecommunications service by developing an assertive and funded program to explore the feasibility of installing underground telecommunications lines in established neighborhoods (at the time of exploring installation of underground electric lines; see Objective 10, Policy 5 on Page 10 10). Objectives and Policies for Electric Power Objective 10: Ensure that all City residents receive energy services with facilities located in City rights of ways. Policy 1: Support reliability improvements to the electrical transmission system and balance the needs of citizens who reside adjacent to those facilities. Policy 2: Support the addition of renewable energy to the current energy portfolio, the continued purchase of renewable energy, and the sustainable design of City structures. Volume II Recommendations January 2006

13 Policy 3: Encourage conservation techniques for power use to reduce energy demands, wherever such practices are feasible. Policy 4: Strive for no net increase in City contributions to greenhouse gas emissions in meeting the City s demand for electric power by relying first on energy efficiency, second on renewable resources, and when fossil fuel use is necessary, taking actions that offset the release of greenhouse gases such as planting trees or using alternative fuel vehicles. Policy 5: Encourage electric power providers to develop an assertive and funded program to bury wires in established neighborhoods to help prevent power loss during storms and other events. The City sponsored EnAct program has helped volunteers in the Vilas neighborhood (above) and other groups learn how to take actions in their daily lives to reduce their impact on the environment. Note: The City Attorney has advised that the City cannot require that power providers bury wires in established neighborhoods. Further, such a project could prove very disrupting to established neighborhoods with mature landscaping and outbuildings. Solar Parking Canopy Generates clean energy from the sun Produces enough energy to power 1.2 homes Protects the environment Offsets 9 tons of carbon dioxide emissions per year Saves nonrenewable energy resources Avoids burning 12,850 pounds of coal per year The solar parking canopy in the City of Madison Municipal Building parking lot is pictured above. The corresponding informational sign located in the front of the canopy is shown to the right. Brought to our community by: your energy company Volume II Recommendations January 2006

14 UTILITIES IMPLEMENTATION RECOMMENDATIONS This section describes the major actions involved in implementing the Utilities Element. Table 1 is intended to guide City staff and the Common Council in setting priorities for capital budgeting and staff allocation. It is expected that this table will be reviewed annually and revised, as necessary, to establish new priorities. Priority 1 actions should be implemented immediately; Priority 2 are those actions that are mid term and should be implemented within five years of adoption of the Comprehensive Plan; and Priority 3 actions will be implemented over a longer period of time 10 years and beyond. As conditions change over time, these actions may be reprioritized to better meet the community s needs. Table 1 Utilities Implementation Actions Priority Action 1 Use the City s extraterritorial plat approval jurisdiction to implement land use and development staging recommendations contained in adopted City plans. 1 Extend new water service connections only to areas that have been annexed by the City, unless consistent with an adopted intergovernmental agreement. Lead & Coordinating Agencies Planning Unit Water Utility Manager City Attorney Water Board Common Council 1 Develop and implement programs that protect the area water supply for long term use, promoting efficient use of water and finding methods to reduce water demand by encouraging city residents, businesses, and institutions to reduce (per capita) water usage. Water Utility Manager Water Board Commission on the Environment Volume II Recommendations January 2006

15 Table 1 Utilities Implementation Actions Priority Action 1 Provide sufficient water system redundancy to assure adequate service under stressed conditions (such as drought, well contamination, etc.) Lead & Coordinating Agencies Water Utility Manager Water Board Common Council 2 Provide and maintain regional wastewater collection and treatment services for the Madison metropolitan area. Madison Metropolitan Sewerage District Planning Unit 1 Continue to direct the planning, design, construction and repair of public sanitary sewer facilities. 1 Provide and maintain a public storm water system capable of conveying storm water from public lands and rights of way and discharging it in a manner that protects the public health, safety and welfare. 2 Work with state and county regulatory agencies and neighboring communities to develop Best Management Practices that make measurable improvements to water quality in the City s lakes and streams. 2 Encourage reduction of storm water runoff and lowimpact development techniques for storm water management wherever such practices are feasible. Board of Public Works Board of Public Works Board of Public Works Commission on Environment Board of Public Works Plan Commission Volume II Recommendations January 2006

16 Table 1 Utilities Implementation Actions Priority Action 1 Meet or exceed the requirements of Wisconsin Administrative Code statutes NR151 and NR216. Lead & Coordinating Agencies Board of Public Works 2 Require that well managed home composting be allowed and encouraged in subdivisions and condominium plats. Street Division Solid Waste Advisory Board Board of Public Works 1 Commence the search for a successor landfill in Street Division Solid Waste Advisory Board Board of Public Works 2 Ensure universal access to telecommunications service for citizens, businesses and institutions within the City of Madison. Telecommunication providers Public Service Commission Information Services City Attorney Volume II Recommendations January 2006

17 Table 1 Utilities Implementation Actions Priority Action 2 Maintain uninterrupted telecommunications service by developing an assertive, and funded, program to explore the feasibility of installing underground telecommunications lines in established neighborhoods (at the time of exploring installation of underground electric lines. Lead & Coordinating Agencies Telecommunication Providers City Attorney 2 Support reliability improvements to the electrical transmission system and balance the needs of citizens who reside adjacent to those facilities. Electrical Providers Public Service Commission City Attorney Sustainable Design and Energy Committee 2 Strive for no net increase in City contributions to greenhouse gas emissions in meeting the City s demand for electric power by relying first on energy efficiency, second on renewable resources, and when fossil fuel use is necessary, taking actions that offset the release of greenhouse gases such as planting trees or using alternative fuel vehicles. Engineering Division Department of Planning and Development Sustainable Design and Energy Committee Volume II Recommendations January 2006

Volume II Recommendations January 2006 City of Madison Comprehensive Plan

Volume II Recommendations January 2006 City of Madison Comprehensive Plan 11 INTERGOVERNMENTAL COOPERATION THE PLAN: GOALS, OBJECTIVES, POLICIES AND IMPLEMENTATION RECOMMENDATIONS Volume II Recommendations January 2006 TABLE OF CONTENTS Intergovernmental Overview...11 1 Summary

More information

Goals, Objectives, and Policies Infrastructure Element Introduction

Goals, Objectives, and Policies Infrastructure Element Introduction Goals, Objectives, and Policies Infrastructure Element Introduction Pursuant to Section 163.3177 (6) (c), FS and Sections 9J-5.011 (2)(b) and (c), FAC, the following represents the Potable Water, Sanitary

More information

INFRASTRUCTURE ELEMENT Goal, Objectives and Policies

INFRASTRUCTURE ELEMENT Goal, Objectives and Policies INFRASTRUCTURE ELEMENT Goal, Objectives and Policies City of Bartow Comprehensive Plan Adopted August 5, 1991 Amended August 2, 1993, Amended 1996 & 1999 Adopted Changes January 16, 2001, Amended April

More information

1006 UTILITIES, STREET LIGHTS, WATER SUPPLY, SEWAGE DISPOSAL, SURFACE WATER MANAGEMENT, AND EROSION CONTROL

1006 UTILITIES, STREET LIGHTS, WATER SUPPLY, SEWAGE DISPOSAL, SURFACE WATER MANAGEMENT, AND EROSION CONTROL 1006 UTILITIES, STREET LIGHTS, WATER SUPPLY, SEWAGE DISPOSAL, SURFACE WATER MANAGEMENT, AND EROSION CONTROL 1006.01 GENERAL STANDARDS A. The location, design, installation, and maintenance of all utility

More information

M E M O R A N D U M. Workshop Discussion: Review of Results Neutral Crosswalk Methodology for Reforming the Comprehensive Plan Utility Elements

M E M O R A N D U M. Workshop Discussion: Review of Results Neutral Crosswalk Methodology for Reforming the Comprehensive Plan Utility Elements M E M O R A N D U M DATE: April 14, 2015 TO: FROM: RE: Planning and Zoning Board Alaina Ray, Director Planning, Zoning and Building Department Workshop Discussion: Review of Results Neutral Crosswalk Methodology

More information

PUTNAM COUNTY COMPREHENSIVE PLAN EXHIBIT DD INFRASTRUCTURE ELEMENT

PUTNAM COUNTY COMPREHENSIVE PLAN EXHIBIT DD INFRASTRUCTURE ELEMENT COMPREHENSIVE PLAN EXHIBIT DD D. Infrastructure Element (Sanitary Sewer, Potable Water, Solid Waste, Drainage and Natural Groundwater Aquifer Recharge) Goals, Objectives and Policies GOAL D.1: Putnam County

More information

Metropolitan St. Louis Sewer District Statement of Policy for Maintenance of Stormwater Sewer Systems

Metropolitan St. Louis Sewer District Statement of Policy for Maintenance of Stormwater Sewer Systems Metropolitan St. Louis Sewer District Statement of Policy for Maintenance of Stormwater Sewer Systems 1.0 Introduction Adequate drainage in the Metropolitan St. Louis area is necessary to preserve and

More information

RURAL CENTER COMMUNITY ROLE COUNCIL ROLE RURAL CENTER ALL COMMUNITIES

RURAL CENTER COMMUNITY ROLE COUNCIL ROLE RURAL CENTER ALL COMMUNITIES Orderly and Efficient Land Use Align land use, development patterns, and infrastructure to make the best use of public and private investment. Plan for forecasted population and household growth at overall

More information

Chapter 21 Stormwater Management Bylaw

Chapter 21 Stormwater Management Bylaw Chapter 21 Stormwater Management Bylaw SECTION 1. PURPOSE The purpose of this Bylaw is to: implement the requirements of the National Pollutant Discharge Elimination System (NPDES) General Permit for Storm

More information

Public Facilities Element (WAT) (SEW) (SOL) (STM)

Public Facilities Element (WAT) (SEW) (SOL) (STM) Public Facilities Element (WAT) (SEW) (SOL) (STM) Potable Water Sub-Element (WAT) Goal Provide public potable water supply facilities in a manner, which ensures the health, welfare and safety of the residents

More information

Chapter 1: Introduction

Chapter 1: Introduction Chapter 1: Introduction 1.1 Purpose The purpose of this chapter is to describe the contents of the Conveyance Report, which is a component of the Milwaukee Metropolitan Sewerage District (MMSD) 2020 Facilities

More information

OTHER APPROACHES TO MANAGING POLLUTANT SOURCES

OTHER APPROACHES TO MANAGING POLLUTANT SOURCES OTHER APPROACHES TO MANAGING POLLUTANT SOURCES Laws, Land Use, and Laypersons' Participation [Chapter 10] Rules of Thumb Rule 1 One management measure alone rarely achieves the desired result. Rule 2 Both

More information

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: July 11, 2013

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: July 11, 2013 PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: July 11, 2013 SUBDIVISION NAME DEVELOPMENT NAME LOCATION Northside LTD/Joint Venture Subdivision, Resubdivision of and Addition to Lot 3A Northside

More information

SECTION 7. Public Infrastructure, Facilities and Services. 8Chapter 8 INFRASTRUCTURE ELEMENT

SECTION 7. Public Infrastructure, Facilities and Services. 8Chapter 8 INFRASTRUCTURE ELEMENT SECTION 7 Public Infrastructure, Facilities and Services 8Chapter 8 INFRASTRUCTURE ELEMENT INF-2 CHAPTER 8 Infrastructure Element INTRODUCTION Cupertino s public infrastructure works in tandem with the

More information

Capital Facilities Element

Capital Facilities Element Capital Facilities Element Purpose The Growth Management Act requires cities to prepare a capital facilities element consisting of: 1. An inventory of current capital facilities owned by public entities,

More information

MANDATORY COMMERCIAL RECYCLING DIVISION 7. CALIFORNIA INTEGRATED WASTE MANAGEMENT BOARD

MANDATORY COMMERCIAL RECYCLING DIVISION 7. CALIFORNIA INTEGRATED WASTE MANAGEMENT BOARD 1 MANDATORY COMMERCIAL RECYCLING 2 3 TITLE 14. NATURAL RESOURCES 4 5 DIVISION 7. CALIFORNIA INTEGRATED WASTE MANAGEMENT BOARD CHAPTER 9.1. MANDATORY COMMERCIAL RECYCLING 6 7 8 9 10 11 12 13 14 18835. Purpose.

More information

Village of Cross Plains

Village of Cross Plains Memorandum To: Capital Area Regional Planning Commission (CARPC) From: Matthew G. Schuenke, Village Administrator/Clerk-Treasurer CC: Department of Natural Resources (DNR) Date: February 1, 2016 Re: Cross

More information

Post-Development Stormwater Runoff Performance Standards

Post-Development Stormwater Runoff Performance Standards Post-Development Stormwater Runoff Performance Standards December 9, 2014 Topics Why performance standards? What practices/requirements are in effect in other States? The Workgroup s preliminary and final

More information

Pennsylvania Stormwater Best Management Practices Manual. Chapter 3. Stormwater Management Principles and Recommended Control Guidelines

Pennsylvania Stormwater Best Management Practices Manual. Chapter 3. Stormwater Management Principles and Recommended Control Guidelines Pennsylvania Stormwater Best Management Practices Manual Chapter 3 Stormwater Management Principles and Recommended Control Guidelines 363-0300-002 / December 30, 2006 Chapter 3 Stormwater Management Principles

More information

RURAL RESIDENTIAL COMMUNITY ROLE COUNCIL ROLE RURAL RESIDENTIAL ALL COMMUNITIES

RURAL RESIDENTIAL COMMUNITY ROLE COUNCIL ROLE RURAL RESIDENTIAL ALL COMMUNITIES Orderly and Efficient Land Use Align land use, development patterns, and infrastructure to make the best use of public and private investment. Discourage future development of rural residential patterns

More information

ENVIRONMENT LONG-TERM GOAL: INTRODUCTION: Environment 117

ENVIRONMENT LONG-TERM GOAL: INTRODUCTION: Environment 117 ENVIRONMENT LONG-TERM GOAL: There is a complex relationship between physical geography and human life. Humans continually have a significant impact upon the environment through actions such as construction,

More information

MARCH 2009 TO MARCH 2010 (YEAR 7) REPORTING PERIOD VILLAGE OF PLAINFIELD, ILLINOIS

MARCH 2009 TO MARCH 2010 (YEAR 7) REPORTING PERIOD VILLAGE OF PLAINFIELD, ILLINOIS ILLINOIS ENVIRONMENTAL PROTECTION AGENCY ANNUAL FACILITY INSPECTION REPORT NPDES PERMIT FOR STORM WATER DISCHARGES FROM MUNICIPAL SEPARATE STORM SEWER SYSTEMS (MS4) MARCH 2009 TO MARCH 2010 (YEAR 7) REPORTING

More information

CHAPTER 12: SANITARY SEWER SYSTEM

CHAPTER 12: SANITARY SEWER SYSTEM CHAPTER 12: SANITARY SEWER SYSTEM Chapter 12 includes the following information: 1. System Overview 2. On Site Sewage Treatment 3. Inter Community Services 4. Future Demand Forecast 5. Infiltration and

More information

CHAPTER 12: SANITARY SEWER SYSTEM

CHAPTER 12: SANITARY SEWER SYSTEM CHAPTER 12: SANITARY SEWER SYSTEM Chapter 12 includes the following information: 1. System Overview 2. On-Site Sewage Treatment 3. Inter-Community Services 4. Future Demand Forecast 5. Infiltration and

More information

INFRASTRUCTURE ELEMENT

INFRASTRUCTURE ELEMENT Goals, Objectives and Policies INFRASTRUCTURE ELEMENT SANITARY SEWER GOAL 4.A.1.: PROVIDE ADEQUATE CENTRAL SANITARY SEWAGE FACILITIES FOR RESIDENTIAL AND NON-RESIDENTIAL DEVELOPMENT AND REDEVELOPMENT IN

More information

DIVERSIFIED RURAL COMMUNITY ROLE COUNCIL ROLE DIVERSIFIED RURAL ALL COMMUNITIES

DIVERSIFIED RURAL COMMUNITY ROLE COUNCIL ROLE DIVERSIFIED RURAL ALL COMMUNITIES Orderly and Efficient Land Use Align land use, development patterns, and infrastructure to make the best use of public and private investment. Plan for growth not to exceed forecasts and in patterns that

More information

Wisconsin. Wisconsin Land Council. Land Information. Board. Office of. Municipal Boundary Review. Plat Review. Services.

Wisconsin. Wisconsin Land Council. Land Information. Board. Office of. Municipal Boundary Review. Plat Review. Services. Wisconsin Land Council Wisconsin Land Information Board Municipal Boundary Review Office of Land Information Services Plat Review GIS Services Contents of a Comprehensive Plan FROM s. 66.0295 (2) Wis.

More information

UTILITIES: SOLID WASTE GOALS, OBJECTIVES AND POLICIES. Goal 1: [SW] (EFF. 7/16/90; REV. EFF. 12/24/10)

UTILITIES: SOLID WASTE GOALS, OBJECTIVES AND POLICIES. Goal 1: [SW] (EFF. 7/16/90; REV. EFF. 12/24/10) UTILITIES: SOLID WASTE GOALS, OBJECTIVES AND POLICIES Goal 1: [SW] (EFF. 7/16/90; REV. EFF. 12/24/10) Provide an environmentally sound, sustainable, and cost effective integrated solid waste materials

More information

Potable Water Supply, Wastewater & Reuse Element

Potable Water Supply, Wastewater & Reuse Element Potable Water Supply, Wastewater & Reuse Element GOAL ONE: HIGH QUALITY AND AFFORDABLE POTABLE WATER WILL BE AVAILABLE TO MEET THE EXISTING AND PROJECTED DEMANDS OF PINELLAS COUNTY UTILITY CUSTOMERS. 1.1.

More information

EASTERN GOLETA VALLEY COMMUNITY PLAN D. WATER, WASTEWATER, AND SOLID WASTE MANAGEMENT. Land Use and Development Policies and Implementation Strategies

EASTERN GOLETA VALLEY COMMUNITY PLAN D. WATER, WASTEWATER, AND SOLID WASTE MANAGEMENT. Land Use and Development Policies and Implementation Strategies D. WATER, WASTEWATER, AND SOLID WASTE MANAGEMENT A significant consideration for sustainable land use and development is the rate of use and disposal of resources. Demand for potable water and consumable

More information

COMMUNITY FACILITIES ELEMENT

COMMUNITY FACILITIES ELEMENT [COMPREHENSIVE PLAN] 2025 EXHIBIT C COMMUNITY FACILITIES ELEMENT INTRODUCTION Chapter 163 of the Florida Statutes (F.S.) and Rule 9J-5 of the Florida Administrative Code (F.A.C.) provide the statutory

More information

CHAPTER 6 SANITARY SEWER SUB-ELEMENT

CHAPTER 6 SANITARY SEWER SUB-ELEMENT CHAPTER 6 SANITARY SEWER SUB-ELEMENT Page 1 of 10 CHAPTER 6 SANITARY SEWER SUB-ELEMENT A. OVERVIEW The following Future Land Use categories are considered to be urban and require the provision of sanitary

More information

PLANNED UNIT DEVELOPMENT, PLANNING APPROVAL & SUBDIVISION STAFF REPORT Date: June 4, 2015

PLANNED UNIT DEVELOPMENT, PLANNING APPROVAL & SUBDIVISION STAFF REPORT Date: June 4, 2015 PLANNED UNIT DEVELOPMENT, PLANNING APPROVAL & SUBDIVISION STAFF REPORT Date: June 4, 2015 NAME SUBDIVISION NAME CC Williams Plant Subdivision CC Williams Plant Subdivision LOCATION CITY COUNCIL DISTRICT

More information

Infrastructure Element

Infrastructure Element Infrastructure Element 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 INFRASTRUCTURE ELEMENT GOAL 1: To provide for environmentally

More information

PUBLIC INFRASTRUCTURE AND UTILTIES

PUBLIC INFRASTRUCTURE AND UTILTIES PUBLIC INFRASTRUCTURE AND UTILTIES Des Moines works to keep our built environment functional and safe for all residents and businesses. The City provides basic infrastructure and public services to all

More information

Water Supply and Delivery

Water Supply and Delivery Utilities Water Supply and Delivery Goal U-1 Availability of an adequate, safe, and sustainable water supply and maintenance of an efficient water system for residents and visitors. (Modified Goal 4.B)

More information

SUBURBAN EDGE COMMUNITY ROLE COUNCIL ROLE ALL COMMUNITIES SUBURBAN EDGE

SUBURBAN EDGE COMMUNITY ROLE COUNCIL ROLE ALL COMMUNITIES SUBURBAN EDGE Orderly and Efficient Land Use Align land use, development patterns, and infrastructure to make the best use of public and private investment. Plan and stage development for forecasted growth through 2040

More information

Title 26 DEPARTMENT OF THE ENVIRONMENT Subtitle 04 REGULATION OF WATER SUPPLY, SEWAGE DISPOSAL, AND SOLID WASTE

Title 26 DEPARTMENT OF THE ENVIRONMENT Subtitle 04 REGULATION OF WATER SUPPLY, SEWAGE DISPOSAL, AND SOLID WASTE Title 26 DEPARTMENT OF THE ENVIRONMENT Subtitle 04 REGULATION OF WATER SUPPLY, SEWAGE DISPOSAL, AND SOLID WASTE Chapter 03 Water Supply and Sewerage Systems in the Sub division of Land in Maryland Authority:

More information

6.13 Utilities and Service Systems

6.13 Utilities and Service Systems 6.13 6.13.1 Introduction This section describes impacts for utilities and service systems that would result from construction and operation of the CEQA Alternatives. 6.13.2 Regulatory Setting There are

More information

What is a stormwater utility fee?

What is a stormwater utility fee? What is a stormwater utility fee? A stormwater utility fee is similar to a water or sewer utility fee. In essence, customers pay a fee to convey stormwater from their properties. The City of Goodlettsville

More information

ADDITIONS & DELETIONS TO THE COMPREHENSIVE PLAN

ADDITIONS & DELETIONS TO THE COMPREHENSIVE PLAN LGCP/EAR-2008 Section One: Summary of Solid Waste SubElement Comprehensive Plan Amendments. The following table summarizes additions and deletions made to the Comprehensive Plan as a result of processing

More information

CHAPTER 10: SURFACE WATER MANAGEMENT

CHAPTER 10: SURFACE WATER MANAGEMENT CHAPTER 10: SURFACE WATER MANAGEMENT Chapter 10 includes the following information: 1. Introduction 2. Purpose of the Plan 3. Plan Development 4. Sustainability 5. Stormwater Management System 6. Water

More information

FLORIDA STATE UNIVERSITY MASTER PLAN 9 General Infrastructure

FLORIDA STATE UNIVERSITY MASTER PLAN 9 General Infrastructure GENERAL INFRASTRUCTURE ELEMENT NOTE: Unless otherwise noted, the goals, objectives and policies contained in this element shall guide development of the Main Campus and Southwest Campus in Tallahassee

More information

CHAPTER 10: SURFACE WATER MANAGEMENT

CHAPTER 10: SURFACE WATER MANAGEMENT CHAPTER 10: SURFACE WATER MANAGEMENT Chapter 10 includes the following information: 1. Introduction 2. Purpose of the Plan 3. Plan Development 4. Sustainability 5. Stormwater Management System 6. Water

More information

CITY OF HAPEVILLE STORMWATER UTILITY IMPLEMENTATION. Presented by: Michael J. Moffitt, P.E. (Keck & Wood, Inc.) City Engineer.

CITY OF HAPEVILLE STORMWATER UTILITY IMPLEMENTATION. Presented by: Michael J. Moffitt, P.E. (Keck & Wood, Inc.) City Engineer. CITY OF HAPEVILLE STORMWATER UTILITY IMPLEMENTATION Presented by: Michael J Moffitt, PE (Keck & Wood, Inc) City Engineer May, 2016 What is Stormwater? Stormwater is rain or snowmelt that falls on streets,

More information

Design and Construction of Local Public and Private Sewers and Ancillary Facilities

Design and Construction of Local Public and Private Sewers and Ancillary Facilities Chapter 2 Design and Construction of Local Public and Private Sewers and Ancillary Facilities Subchapter I - General 2.101 Purpose...1 2.102 Applicability...1 2.103 Electronic data...1 2.104 Effect of

More information

Mobility Management STAFF SUMMARY REPORT

Mobility Management STAFF SUMMARY REPORT Mobility Management STAFF SUMMARY REPORT COMPREHENSIVE PLAN AMENDMENTS Transportation Element Capital Improvement Element LAND DEVLOPMENT REGULATIONS Mobility Update Treasure Island PAGE INTENTIONALLY

More information

SOP 15: Private Drainage Connections SOP 15: PRIVATE DRAINAGE CONNECTIONS. Introduction

SOP 15: Private Drainage Connections SOP 15: PRIVATE DRAINAGE CONNECTIONS. Introduction Standard Operating Procedures SOP 15: Private Drainage Connections SOP 15: PRIVATE DRAINAGE CONNECTIONS Introduction The 2003 Massachusetts MS4 Permit described a number of non-stormwater discharges to

More information

PLANNED UNIT DEVELOPMENT & PLANNING APPROVAL STAFF REPORT Date: February 7, 2013

PLANNED UNIT DEVELOPMENT & PLANNING APPROVAL STAFF REPORT Date: February 7, 2013 PLANNED UNIT DEVELOPMENT & PLANNING APPROVAL STAFF REPORT Date: February 7, 2013 NAME LOCATION MAWSS Shelton Beach Road East side of Shelton Beach Road Extension, 2/10± mile North of Moffett Road CITY

More information

CHAPTER 8: INTERGOVERNMENTAL COOPERATION

CHAPTER 8: INTERGOVERNMENTAL COOPERATION CHAPTER 8: INTERGOVERNMENTAL COOPERATION Photos above by Randy Uhl 8.1 Introduction Intergovernmental cooperation involves working with neighboring communities, school districts and agencies to understand

More information

Wakulla County Comprehensive Plan July 2013 GOALS, OBJECTIVES AND POLICIES

Wakulla County Comprehensive Plan July 2013 GOALS, OBJECTIVES AND POLICIES GOALS, OBJECTIVES AND POLICIES INFRASTRUCTURE ELEMENT Goal 1: To provide needed public facilities in a manner that protects investments in existing facilities and supports orderly, efficient growth while

More information

POTABLE WATER GOALS, OBJECTIVES, AND POLICIES

POTABLE WATER GOALS, OBJECTIVES, AND POLICIES POTABLE WATER GOALS, OBJECTIVES, AND POLICIES GOAL 1: To develop, operate, and maintain an environmentally sound, economically efficient, potable water treatment, and distribution, system meeting all applicable

More information

SANITARY SEWER ELEMENT

SANITARY SEWER ELEMENT Goal 5.0. The Environmental Protection and Growth Management Department (EPGMD) and Water and Wastewater Services (WWS) shall identify the needs of and provide the unincorporated areas, large users, and

More information

BEE BRANCH WATERSHED GREEN INFRASTRUCTURE SUMMARY

BEE BRANCH WATERSHED GREEN INFRASTRUCTURE SUMMARY BEE BRANCH WATERSHED GREEN INFRASTRUCTURE SUMMARY purpose & background PURPOSE & BACKGROUND Through the Bee Branch Watershed Green Infrastructure Project, the City proposes to install permeable interlocking

More information

Glossary. September 11,

Glossary. September 11, Adequate public facilities: Facilities which have the capacity to serve development without decreasing levels of service below locally established minimums. (WAC 365- Adopt a comprehensive land use plan:

More information

1) ENERGY CONSERVATION

1) ENERGY CONSERVATION Sustainable development... "meets the needs of the present without compromising the ability of future generations to meet their own needs." - United Nations Brundtland Commission Report, 1987 During the

More information

K. UTILITIES AND SERVICE SYSTEMS SETTING SEWER AND WASTEWATER TREATMENT PLANT CAPACITY WATER. IV. Environmental Setting, Impacts, and Mitigation

K. UTILITIES AND SERVICE SYSTEMS SETTING SEWER AND WASTEWATER TREATMENT PLANT CAPACITY WATER. IV. Environmental Setting, Impacts, and Mitigation K. UTILITIES AND SERVICE SYSTEMS This section describes the major utilities serving the project site and evaluates the effects of the proposed project on utilities and service systems. SETTING The project

More information

DRAINAGE AND NATURAL AQUIFER GROUNDWATER RECHARGE ELEMENT

DRAINAGE AND NATURAL AQUIFER GROUNDWATER RECHARGE ELEMENT Goal 7.0. To optimize integrated stormwater management in order to reduce damage and impacts from sea level rise and flooding, promotes recharge to the Surficial Aquifer System (SAS), improve and protect

More information

Headwaters Underground Water Conservation. District Hill Country Priority Groundwater Management Area

Headwaters Underground Water Conservation. District Hill Country Priority Groundwater Management Area GW Special Designations Comparison of Water Availability Rules, Hill Country Counties Southeast Trinity Groundwater Conservation Hill Country Priority Groundwater Management Area Hill Country Underground

More information

2413 (6) Authorize random audits by the director of documentation developed or submitted by certified water quality professionals to ensure

2413 (6) Authorize random audits by the director of documentation developed or submitted by certified water quality professionals to ensure 2413 (6) Authorize random audits by the director of documentation developed or submitted by certified water quality professionals to ensure compliance with requirements established in rules adopted under

More information

IOWA ADMINISTRATIVE CODE SUMMARY

IOWA ADMINISTRATIVE CODE SUMMARY IOWA ADMINISTRATIVE CODE SUMMARY To explain and define details of legislation, departments in the executive branch of Iowa government adopt and publish rules. After prescribed public review and comments,

More information

Comprehensive Plan for Unincorporated Hillsborough County Solid Waste Element - DRAFT

Comprehensive Plan for Unincorporated Hillsborough County Solid Waste Element - DRAFT Results Neutral Revision Critical Findings Hillsborough County manages the collection and disposal of solid waste for unincorporated Hillsborough County and for designated service areas within municipal

More information

CITY OF BOYNTON BEACH COMPREHENSIVE PLAN UTILITIES ELEMENT

CITY OF BOYNTON BEACH COMPREHENSIVE PLAN UTILITIES ELEMENT EXHIBIT B CITY OF BOYNTON BEACH COMPREHENSIVE PLAN UTILITIES ELEMENT PROPOSED AMENDMENTS Table of Contents Objective Page Sanitary Sewer Sub-Element 3A.1 Secure reserve capacity at the South Central Regional

More information

SURFACE WATER MANAGEMENT ELEMENT

SURFACE WATER MANAGEMENT ELEMENT SURFACE WATER MANAGEMENT ELEMENT of the PINELLAS COUNTY COMPREHENSIVE PLAN Prepared By: The Pinellas County Planning Department as staff to the LOCAL PLANNING AGENCY for THE BOARD OF COUNTY COMMISSIONERS

More information

VILLAGE OF SKOKIE, ILLINOIS

VILLAGE OF SKOKIE, ILLINOIS ILLINOIS ENVIRONMENTAL PROTECTION AGENCY ANNUAL FACILITY INSPECTION REPORT NPDES PERMIT FOR STORM WATER DISCHARGES FROM MUNICIPAL SEPARATE STORM SEWER SYSTEMS (MS4) MARCH 2016 TO FEBRUARY 2017 (YEAR 14)

More information

Department of Environmental Conservation. Fiscal Year 2015 Performance Outcomes and Measures

Department of Environmental Conservation. Fiscal Year 2015 Performance Outcomes and Measures Department of Environmental Conservation Fiscal Year 2015 Performance Outcomes and Measures Department of Environmental Conservation Fiscal Year 2015 Performance Outcomes and Measures Department of Environmental

More information

City of Evanston STORMWATER MANAGEMENT PLAN February 2018

City of Evanston STORMWATER MANAGEMENT PLAN February 2018 City of Evanston STORMWATER MANAGEMENT PLAN February 2018 1 1.0 Table of Contents 2.0 INTRODUCTION...3 2.1 SMP STRUCTURE... 3 2.2 AREA SUBJECT TO THE PLAN... 3 2.3 SMP DEVELOPMENT... 3 2.4 ANNUAL REPORTING...

More information

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 3E

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 3E TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M To: Council Members AGENDA ITEM 3E From: Date: Subject: Staff May 19, 2017 Council Meeting Local Government Comprehensive Plan Review Draft

More information

[THIS PAGE INTENTIONALLY LEFT BLANK]

[THIS PAGE INTENTIONALLY LEFT BLANK] 4-35 POTABLE WATER [THIS PAGE INTENTIONALLY LEFT BLANK] TABLE OF CONTENTS 4-4 GOAL: TO PROVIDE A COST EFFECTIVE, ENVIRONMENTALLY SOUND POTABLE WATER SYSTEM THAT WILL SERVE EXISTING AND FUTURE DEVELOPMENT....

More information

7.0 INTERGOVERNMENTAL COOPERATION

7.0 INTERGOVERNMENTAL COOPERATION 7.0 INTERGOVERNMENTAL COOPERATION This element identifies activities in Town of West Point associated with intergovernmental cooperation. Intergovernmental cooperation is generally considered to be any

More information

Chapter IV. Infrastructure Element

Chapter IV. Infrastructure Element Chapter IV Infrastructure Element (Sanitary Sewer, Solid Waste, Drainage, Potable Water and Natural Groundwater Aquifer Recharge) Goal, Objectives and Policies Goal: Objective A: Policy A.1: Policy A.2:

More information

Community Assistance Planning Report No. 330 A RESTORATION PLAN FOR THE OAK CREEK WATERSHED. Chapter 1 INTRODUCTION

Community Assistance Planning Report No. 330 A RESTORATION PLAN FOR THE OAK CREEK WATERSHED. Chapter 1 INTRODUCTION #239219 CAPR-330 (Oak Creek Watershed) Chapter 1 - Text 300-4010 MGH/LKH/JEB/mid 8/28/18, 9/6/18, 9/10/18 Community Assistance Planning Report No. 330 A RESTORATION PLAN FOR THE OAK CREEK WATERSHED Chapter

More information

Volume II Recommendations January 2006 City of Madison Comprehensive Plan

Volume II Recommendations January 2006 City of Madison Comprehensive Plan 6 NATURAL AND AGRICULTURAL RESOURCES THE PLAN: GOALS, OBJECTIVES, POLICIES AND IMPLEMENTATION RECOMMENDATIONS Volume II Recommendations January 2006 TABLE OF CONTENTS Natural and Agricultural Resources

More information

Model Riparian Buffer Ordinance.

Model Riparian Buffer Ordinance. Model Riparian Buffer Ordinance. This is a sample riparian buffer ordinance written as an amendment to an existing zoning ordinance. This ordinance complies with the state minimum standards for river corridor

More information

Introduction. What are Capital Facilities and Why Do We Need to Plan for Them?

Introduction. What are Capital Facilities and Why Do We Need to Plan for Them? Introduction What are Capital Facilities and Why Do We Need to Plan for Them? Capital facilities are all around us. They are the public facilities we all use, and possibly take for granted, on a daily

More information

CHAPTER 10: SURFACE WATER MANAGEMENT

CHAPTER 10: SURFACE WATER MANAGEMENT CHAPTER 10: SURFACE WATER MANAGEMENT Chapter 10 includes the following information: 1. Introduction 2. Purpose of the Plan 3. Plan Development 4. Sustainability 5. Stormwater Management System 6. Water

More information

The City of Lake Forest Stormwater Management Policy Approved by City Council on March 7, 2016

The City of Lake Forest Stormwater Management Policy Approved by City Council on March 7, 2016 The City of Lake Forest Stormwater Management Policy Approved by City Council on March 7, 2016 I. Purpose The purpose of this policy is to address home and property drainage issues relating to stormwater

More information

Chapter 9 UTILITIES ELEMENT

Chapter 9 UTILITIES ELEMENT Chapter 9 UTILITIES ELEMENT Introduction The state of Washington Growth Management requires that local governments developing or updating Comprehensive Plans under the Act to include an element within

More information

Yuba County IRWMP 2015 UPDATE APPENDIX 10-1 General Plan Relation to IRWMP

Yuba County IRWMP 2015 UPDATE APPENDIX 10-1 General Plan Relation to IRWMP APPENDIX 10-1 General Plan Relation to IRWMP 1 of 13 Community Development Element Goal CD11: Quality of Life and Local Advantages Provide a high quality of life and take advantage of the County s economic

More information

WATER SUPPLY POLICIES

WATER SUPPLY POLICIES WATER SUPPLY POLICIES The County will: GOALS AND OBJECTIVES 10.1 Coordinate Planning Coordinate water supply planning with land use and wastewater management planning to assure that the supply and quality

More information

13 Authority cited: Section 40502, Public Resources Code. Reference: Section 42649

13 Authority cited: Section 40502, Public Resources Code. Reference: Section 42649 1 MANDATORY COMMERCIAL RECYCLING 2 3 TITLE 14. NATURAL RESOURCES 4 DIVISION 7. CALIFORNIA INTEGRATED WASTE MANAGEMENT BOARD 5 CHAPTER 9.1. MANDATORY COMMERCIAL RECYCLING 6 7 18835. Purpose. 8 This Chapter

More information

CLEAN WATER PLAN Policies, Assessments and Management Programs

CLEAN WATER PLAN Policies, Assessments and Management Programs METRO VISION 2020 CLEAN WATER PLAN Policies, Assessments and Management Programs June 17, 1998 Incorporating amendments through January, 2006 Denver Regional Council of Governments 4500 Cherry Creek Drive

More information

Memorandum of Understanding for an Adaptive Management Pilot Project in the Yahara Watershed

Memorandum of Understanding for an Adaptive Management Pilot Project in the Yahara Watershed Memorandum of Understanding for an Adaptive Management Pilot Project in the Yahara Watershed 1. Background The Wisconsin Department of Natural Resources (WDNR or the department) has developed numeric water

More information

Comprehensive Plan Update - Sanitary Sewer Section Planning Commission Workshop: November 10, 2014

Comprehensive Plan Update - Sanitary Sewer Section Planning Commission Workshop: November 10, 2014 Comprehensive Plan Update - Sanitary Sewer Section Planning Commission Workshop: November 10, 2014 Application type Agency Review Comments Applicable Plan Sections Staff Planner Staff Recommendation Publicly

More information

MS4 Programs: Quality, the Other Stormwater Q. Dan Bounds, PE, D.WRE IAFSM March 9, 2017

MS4 Programs: Quality, the Other Stormwater Q. Dan Bounds, PE, D.WRE IAFSM March 9, 2017 MS4 Programs: Quality, the Other Stormwater Q Dan Bounds, PE, D.WRE IAFSM March 9, 2017 MS4 Rule and Regulations MS4 Municipal Separate Storm Sewer System A conveyance or system of conveyances (catch basins,

More information

Town of Friday Harbor PO Box 219 / Friday Harbor / WA / (360) / fax (360) /

Town of Friday Harbor PO Box 219 / Friday Harbor / WA / (360) / fax (360) / Town of Friday Harbor PO Box 219 / Friday Harbor / WA / 98250 (360) 378-2810 / fax (360) 378-5339 / www.fridayharbor.org LAND CLEARING, GRADING, OR FILLING PERMIT APPLICATION APPLICATION DATE GRD No. APPLICANT/FRANCHISE

More information

Chapter NONPOTABLE WATER DISTRIBUTION SYSTEM

Chapter NONPOTABLE WATER DISTRIBUTION SYSTEM 13.05.010 Chapter 13.05 NONPOTABLE WATER DISTRIBUTION SYSTEM Sections: 13.05.010 Findings, purpose and intent. 13.05.020 Nonpotable water policy. 13.05.030 Definitions. 13.05.040 Administration. 13.05.050

More information

Chapter 8-Sanitary Sewer

Chapter 8-Sanitary Sewer Chapter -Sanitary Sewer Executive Summary Background The Metropolitan Land Planning Act (amended 1995) requires local governments to prepare comprehensive plans and submit them to the Metropolitan Council

More information

URBAN CENTER COMMUNITY ROLE COUNCIL ROLE ALL COMMUNITIES URBAN CENTER

URBAN CENTER COMMUNITY ROLE COUNCIL ROLE ALL COMMUNITIES URBAN CENTER Orderly and Efficient Land Use Align land use, development patterns, and infrastructure to make the best use of public and private investment. Plan for forecasted population and household growth at average

More information

PENNSYLVANIA STANDARDS FOR RESIDENTIAL SITE DEVELOPMENT: APRIL 2007 CHAPTER 8: OTHER UTILITIES

PENNSYLVANIA STANDARDS FOR RESIDENTIAL SITE DEVELOPMENT: APRIL 2007 CHAPTER 8: OTHER UTILITIES CHAPTER 8: OTHER UTILITIES Sections Page # 8.0 INTRODUCTION 4 8.1 GENERAL 4 8.1.1 Act 287: PA OneCall 4 8.2 LOCATION 4 8.3 TRENCHING AND BACKFILL STANDARDS 4 8.4 EASEMENTS 6 8.5 PETROLEUM AND NATURAL GAS

More information

Sustainability Plan. A City within a Park

Sustainability Plan. A City within a Park Sustainability Plan A City within a Park About the Sustainability Plan... 3 1.1 Vision... 4 1.2 Values... 4 s and Strategies... 5 Greenhouse Gas and Energy Reduction... 5 Building Green Facilities and

More information

PLAN CHECK GUIDELINES MULTI-FAMILY/COMMERCIAL

PLAN CHECK GUIDELINES MULTI-FAMILY/COMMERCIAL o PUBLIC WORKS DEPARTMENT PLAN CHECK GUIDELINES MULTI-FAMILY/COMMERCIAL CIVIL ENGINEERING AND ARCHITECTURE 1. Offsite Improvements - Civil Engineering drawings may be required to show the following: Replacement

More information

SANTA CRUZ LOCAL AGENCY FORMATION COMMISSION SPHERES OF INFLUENCE POLICIES AND GUIDELINES

SANTA CRUZ LOCAL AGENCY FORMATION COMMISSION SPHERES OF INFLUENCE POLICIES AND GUIDELINES SANTA CRUZ LOCAL AGENCY FORMATION COMMISSION SPHERES OF INFLUENCE POLICIES AND GUIDELINES I. Legislative Authority Amended by Resolution No. 2011-1; February 2, 2011 The Knox-Nisbet Act of 1963 (former

More information

OAKLAND COUNTY HEALTH DIVISION SANITARY CODE ARTICLE II - GROUNDWATER PROTECTION

OAKLAND COUNTY HEALTH DIVISION SANITARY CODE ARTICLE II - GROUNDWATER PROTECTION OAKLAND COUNTY HEALTH DIVISION SANITARY CODE ARTICLE II - GROUNDWATER PROTECTION INDEX OF CODE SECTION 1 SECTION 2 SECTION 3 SECTION 4 SECTION 5 SECTION 6 DEFINITIONS RESIDENTIAL BUILDING SITES COMMERCIAL

More information

Section Wastewater Treatment Element

Section Wastewater Treatment Element 3.3.4. Wastewater 4-3-12 Section 3.3.4. Wastewater Treatment Element Pursuant to Section 163.3177(3), Florida Statutes and Chapter 9J-5.011(2) of the Florida Administrative Code. Background Discussion

More information

A. POTABLE WATER SUB-ELEMENT GOAL I-1: STRIVE TO PROVIDE HIGH QUALITY POTABLE WATER TO CURRENT AND FUTURE RESIDENTS AND VISITORS.

A. POTABLE WATER SUB-ELEMENT GOAL I-1: STRIVE TO PROVIDE HIGH QUALITY POTABLE WATER TO CURRENT AND FUTURE RESIDENTS AND VISITORS. A. POTABLE WATER SUB-ELEMENT GOAL I-1: STRIVE TO PROVIDE HIGH QUALITY POTABLE WATER TO CURRENT AND FUTURE RESIDENTS AND VISITORS. Objective I-1.1 Water Supply Planning Walton County shall develop and maintain

More information

Chapter 7: Utilities and Stormwater Management

Chapter 7: Utilities and Stormwater Management Chapter 7: Utilities and Stormwater Management Utilities are essential services that affect future land use and growth areas, stormwater management, and energy use. Chapter 7 of this Comprehensive Plan

More information

Regional Stormwater Program 2013 Stormwater Management Plan

Regional Stormwater Program 2013 Stormwater Management Plan Regional Stormwater Program 2013 Stormwater Management Plan This 2013 SWMP is an attachment to the 2012 Annual Report to the Department of Ecology for its Phase II NPDES Permit Prepared for: Asotin County

More information

Chapter CONSTRUCTION SITE EROSION CONTROL

Chapter CONSTRUCTION SITE EROSION CONTROL Chapter 19.30 CONSTRUCTION SITE EROSION CONTROL Sections: 19.30.010 When required. 19.30.020 Definitions. 19.30.030 Technical Standards 19.30.040 Erosion and sediment control performance standards for

More information

STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION GENERIC PERMIT FOR DISCHARGE OF STORMWATER FROM PHASE II

STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION GENERIC PERMIT FOR DISCHARGE OF STORMWATER FROM PHASE II STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION GENERIC PERMIT FOR DISCHARGE OF STORMWATER FROM PHASE II MUNICIPAL SEPARATE STORM SEWER SYSTEMS May 1, 2003 1 Generic Permit for Discharge of Stormwater

More information