Whitewater Unit Oil Exploration and Development Project EA

Size: px
Start display at page:

Download "Whitewater Unit Oil Exploration and Development Project EA"

Transcription

1 Whitewater Unit Oil Exploration and Development Project EA

2 Whitewater Unit General Location Mesa and Delta Counties, Colorado The Whitewater Unit is located approximately 15 miles south of the City of Grand Junction

3 NEPA process Present purpose and need BLM must respond to operator s plan to develop lease Put initial project plan out for scoping up to discretion of field office GJFO decided: Public meeting Letters to interested parties (people who commented on first project Local municipalities, CPW, etc

4 Whitewater Project Area Surface/Mineral Ownership Fed/Fed 72.38% Pri/Pri 12.63% GJ/GJ 7.96% Pri/Fed 6.62% Fed/Pri 0.41%

5 Existing Oil and Gas Development 20 Existing well pads* 6 on federal lands 14 on private lands Fram drilled wells* 2 wells in wells in wells in 2011 Current production* Approximately 30 barrels of oil per day *Source: Fram Americas MDP and Personal Communication

6 Proposed Action Year 1 4 Proposed Well Pads All federal/federal Year 2 8 Proposed Well Pads 7 on federal/federal 1 on private/federal Up to 108 Wells

7 Proposed Action Well Pad Disturbance Dimension: 300 ft x 300 ft Area: 3.5 acres each (drilling) 0.8 acre each (production) Total temporary disturbance 42.0 acres Total long-term disturbance 9.6 acres

8 Proposed Action Roads and Pipelines Greater than 92 percent of proposed roads are existing Use of County Road (collector) Upgrade existing two-track roads (local and resource roads) Oil/Water gathering lines adjacent to roads

9 Fram MDP Design Features Closed Loop Drilling Systems Water Gathering System Remote Telemetry Stormwater BMPs Gold Book Standards Green Completions Combustion Unit

10 Water Resources Grand Junction Watershed 54,548 total acres Watershed/Whitewater Unit 3,259 acres 6 percent of Watershed in Whitewater Unit One existing well pad No proposed well pads

11 T&E and Sensitive Species Surveys Identified and Mapped Species Located Raptor Nests and Habitat Documented Invasive and Non-native Plant Species Identified Waters of the U.S. and Wetlands Documented Birds of Conservation Concern Characterized Vegetation/Habitat Potential T&E Species Canada Lynx Endangered Colorado River Fish Greenback Cutthroat Trout Colorado Hookless Cactus* DeBeque Phacelia BLM Sensitive Species Kit Fox and White-tailed Prairie Dog Overall Ranges Prairie Dog Colonies* Burrowing Owl Nest* Golden Eagle Active Nest Sites * Documented within the Project Area

12 Wildlife Big Game Ranges * Mule Deer Critical Winter Range 8,511 acres 9 existing pads/1 proposed pad Elk Winter Concentration Area 10,667 acres 0 existing pads/1 proposed pad Pronghorn Winter Concentration Area 2,231 acres 0 existing pads/0 proposed pad All ranges combined 19,745 acres 9 existing pads/2 new pads * COGCC rules

13 Visual Resources VRM Class II 1,761 acres No existing well pads No proposed well pads VRM Class III 18,962 acres 6 proposed well pads (6 federal surface) 12 existing well pads (6 federal/6 private)

14 Special Management Areas SMAs Near Whitewater Unit Adobe Badlands WSA Dominguez-Escalante Natural Conservation Area Dominguez Canyon Wilderness

15 Received over 300 pages of comments EA is in the analysis stage Substantive comments will be addressed or incorporated into the proposed action Examples of issues raised which will be incorporated into the proposed action: listed cactus all disturbance will be outside of 20m buffer CPW concerns watershed

16 Colorado Parks and Wildlife comments regarding big game winter range

17 City of Grand Junction Comprehensive comments received from Grand Junction regarding watershed issues FRAM has committed to incorporating BMPs identified developed through collaborative effort by stakeholders Watershed Plan for the town of Palisade and the City of Grand Junction August 2007

18 back to NEPA The residual effects to various resources will be analyzed in the EA (Effects remaining after mitigation is included)

19 Fram Whitewater Unit Tank Battery with Combustion Unit Drill Cuttings Lined Containment Tank Battery with Lined Containment Pumping Unit

COLORADO PARKS AND WILDLIFE ACTIONS TO MINIMIZE ADVERSE IMPACTS TO WILDLIFE RESOURCES (2 nd Revision October 17, 2016)

COLORADO PARKS AND WILDLIFE ACTIONS TO MINIMIZE ADVERSE IMPACTS TO WILDLIFE RESOURCES (2 nd Revision October 17, 2016) COLORADO PARKS AND WILDLIFE ACTIONS TO MINIMIZE ADVERSE IMPACTS TO WILDLIFE RESOURCES (2 nd Revision October 17, 2016) The purpose of this document is to enumerate best management practices that minimize

More information

The Wyoming Wildlife Advocates also value the Caribou-Targhee National

The Wyoming Wildlife Advocates also value the Caribou-Targhee National May 20, 2016 Jay Pence District Ranger USDA Forest Service Caribou-Targhee National Forest P.O. Box 777 Driggs, ID 83422 Re: Comments on the proposed Southern Valley Recreation Project, submitted to the

More information

It s Cool to Be Safe

It s Cool to Be Safe USDA Forest Service San Juan National Forest http://www.fs.fed.us/r2/sanjuan San Juan Public Lands Center 15 Burnett Court Durango, CO 81301 Ph (970) 247-4874 Fax (970) 385-1243 USDI Bureau of Land Management

More information

Notice of Availability of the Final Environmental Impact Statement for the Monument

Notice of Availability of the Final Environmental Impact Statement for the Monument This document is scheduled to be published in the Federal Register on 06/24/2016 and available online at http://federalregister.gov/a/2016-15023, and on FDsys.gov 4310-DQ-P DEPARTMENT OF THE INTERIOR Bureau

More information

ECOLOGICAL DEAL BREAKERS

ECOLOGICAL DEAL BREAKERS ECOLOGICAL DEAL BREAKERS Aaron Maier, Senior Ecologist Wyoming Oil and Gas Fair Jackson, WY September 19, 2014 Presentation Outline: 1. Current status and future challenges a. Vegetation Management b.

More information

DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT PINEDALE ANTICLINE OIL AND GAS EXPLORATION AND DEVELOPMENT PROJECT SUBLETTE COUNTY, WYOMING

DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT PINEDALE ANTICLINE OIL AND GAS EXPLORATION AND DEVELOPMENT PROJECT SUBLETTE COUNTY, WYOMING DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT PINEDALE ANTICLINE OIL AND GAS EXPLORATION AND DEVELOPMENT PROJECT SUBLETTE COUNTY, WYOMING (Volume 1 of 2) Bureau of Land Management Wyoming State Office

More information

Kobe Pumping Plant and Pipeline Project Narrative UPDATED 6/28/13

Kobe Pumping Plant and Pipeline Project Narrative UPDATED 6/28/13 Kobe Pumping Plant and Pipeline Project Narrative UPDATED 6/28/13 Introduction/Background The Kobe Pumping Plant and Pipeline (the Project ) is located in Mesa and Garfield Counties near DeBeque, Colorado.

More information

FACT SHEET: BLM, USFS Greater Sage-Grouse Conservation Effort

FACT SHEET: BLM, USFS Greater Sage-Grouse Conservation Effort EMBARGOED UNTIL SEPTEMBER 22, 2015 @ 12:00PM ET FACT SHEET: BLM, USFS Greater Sage-Grouse Conservation Effort Overview Effective conservation of the greater sage-grouse and its habitat requires a collaborative,

More information

Master Development Plans (MDPs) / Geographic Area Plans (GAPS)

Master Development Plans (MDPs) / Geographic Area Plans (GAPS) Master Development Plans (MDPs) / Geographic Area Plans (GAPS) COMPREHENSIVE PLANNING TOOLS FOR OIL AND GAS PROJECTS BUREAU OF LAND MANAGEMENT COLORADO RIVER VALLEY FIELD OFFICE (CRVFO) SILT, COLORADO

More information

FINDING OF NO SIGNIFICANT IMPACT OWL CREEK GRAVEL PIT EXPANSION U.S. FOREST SERVICE

FINDING OF NO SIGNIFICANT IMPACT OWL CREEK GRAVEL PIT EXPANSION U.S. FOREST SERVICE FINDING OF NO SIGNIFICANT IMPACT OWL CREEK GRAVEL PIT EXPANSION U.S. FOREST SERVICE OURAY RANGER DISTRICT OURAY COUNTY, COLORADO BACKGROUND The Owl Creek Gravel Pit, also known as the Spruce Ridge Pit,

More information

Cause No. 1R, Docket No RM-01. Updates to Restricted Surface Occupancy Area and Sensitive Wildlife Habitat maps

Cause No. 1R, Docket No RM-01. Updates to Restricted Surface Occupancy Area and Sensitive Wildlife Habitat maps Final Statement of Basis, Specific Statutory Authority, and Purpose New Rules and Amendments to Current Rules of the Colorado Oil and Gas Conservation Commission, 2 CCR 404-1 Cause No. 1R, Docket No. 1307-RM-01

More information

Comparison of Oil and Gas Regulations for Wildlife in the Intermountain West

Comparison of Oil and Gas Regulations for Wildlife in the Intermountain West Overarching Principles Applicable to all Processes Definitions Conditions of Approval: In selecting conditions of approval from such Best Management Practices or other sources, the Director shall consider

More information

Environmental Considerations: Renewable and Conventional Power Plant Siting

Environmental Considerations: Renewable and Conventional Power Plant Siting Environmental Considerations: Renewable and Conventional Power Plant Siting 2 Environmental Considerations Acronym Glossary BLM Bureau of Land Management CatEx Categorical Exclusion CAA Clean Air Act CEQ

More information

PROPOSED ACTION Cooperative Horse Removal with Fort McDermitt Paiute-Shoshone Tribe

PROPOSED ACTION Cooperative Horse Removal with Fort McDermitt Paiute-Shoshone Tribe PROPOSED ACTION Cooperative Horse Removal with Fort McDermitt Paiute-Shoshone Tribe Proposed Action The Santa Rosa Ranger District of the Humboldt-Toiyabe National Forest is proposing to remove all unauthorized

More information

XTO Energy Inc. Maranon #H1 and Orinoco #B1 Gas Well

XTO Energy Inc. Maranon #H1 and Orinoco #B1 Gas Well DECISION MEMO XTO Energy Inc. Maranon #H1 and Orinoco #B1 Gas Well National Forest & Grasslands in Texas Sabine National Forest Angelina/Sabine Ranger District Shelby County, Texas DECISION I have decided

More information

Blanche Park Reservoir Decision Notice and Finding of No Significant Impact

Blanche Park Reservoir Decision Notice and Finding of No Significant Impact Blanche Park Reservoir Decision Notice and Finding of No Significant Impact U.S. Forest Service Grand Mesa, Uncompahgre, and Gunnison National Forests Delta County, Colorado INTRODUCTION The Grand Mesa

More information

RECORD OF PLAN CONFORMANCE AND CATEGORICAL EXCLUSION (CX) DETERMINATION

RECORD OF PLAN CONFORMANCE AND CATEGORICAL EXCLUSION (CX) DETERMINATION RECORD OF PLAN CONFORMANCE AND CATEGORICAL EXCLUSION (CX) DETERMINATION CX Log #: OR-014-CX-04-24 Lease or Serial #: N/A Project Name: Surveyor Salvage CX Location: T.38S., R.5E., Sections 25,26,35,36;

More information

CRUCIAL WINTER MULE DEER AND ELK HABITAT

CRUCIAL WINTER MULE DEER AND ELK HABITAT UTAH'S LEASE NOTICES CRUCIAL WINTER MULE DEER AND ELK HABITAT The lessee/operator is given notice that this lease has been identified as containing crucial winter UT-LN-01 mule deer and elk habitat. No

More information

DECISION MEMO OREGON DEPARTMENT OF TRANSPORTATION (ODOT) SAND SHED CINDER PIT EXPLORATION PROJECT

DECISION MEMO OREGON DEPARTMENT OF TRANSPORTATION (ODOT) SAND SHED CINDER PIT EXPLORATION PROJECT DECISION MEMO OREGON DEPARTMENT OF TRANSPORTATION (ODOT) SAND SHED CINDER PIT EXPLORATION PROJECT USDA Forest Service Bend/Fort Rock Ranger District, Deschutes National Forest Deschutes County, Oregon

More information

DECISION MEMO. Vipond Water Development

DECISION MEMO. Vipond Water Development Page 1 of 5 DECISION MEMO USDA Forest Service Wise River Ranger District Beaverhead County T2S, R10W, Sections 12, 13, 14, &18 Background This project is located in the Pioneer Landscape, East Face Management

More information

RGNF / 3 rd Party Consultant Meeting June 23, 2011

RGNF / 3 rd Party Consultant Meeting June 23, 2011 Village at Wolf Creek Land Exchange RGNF / 3 rd Party Consultant Meeting June 23, 2011 Agenda Summary of Scoping Comments Preview Individuals, Agencies, Environmental Groups, Wolf Creek Ski Area Alternatives

More information

DECISION MEMO. Missoula Electric Cooperative Point 118. MEC - Buried Electric Powerline (Along West Fork Butte Access Road #37 to Point 118)

DECISION MEMO. Missoula Electric Cooperative Point 118. MEC - Buried Electric Powerline (Along West Fork Butte Access Road #37 to Point 118) DECISION MEMO Missoula Electric Cooperative Point 118 MEC - Buried Electric Powerline (Along West Fork Butte Access Road #37 to Point 118) USDA Forest Service - Lolo National Forest Missoula Ranger District

More information

Wind Energy Development Specialist Report

Wind Energy Development Specialist Report United States Department of Agriculture Forest Service Southwestern Region Cibola National Forest and National Grasslands Wind Energy Development Specialist Report Kiowa, Rita Blanca, Black Kettle and

More information

Please sign in at the front desk and provide your contact information if you would like to receive project updates.

Please sign in at the front desk and provide your contact information if you would like to receive project updates. Community Meeting Please sign in at the front desk and provide your contact information if you would like to receive project updates. We invite you to walk around and look at the displays. If you have

More information

Moab/Monticello Ranger District

Moab/Monticello Ranger District PROJECT NAME: Bill Barrett Drilling Pine Ridge #2 and #3 DATE: February 24, 2010 PROJECT LOCATION: T28S, R25E, section 22-23 RANGER DISTRICT: Moab/Monticello Ranger District PROJECT DESCRIPTION: The Manti-La

More information

Quartz to La Grande 230 kv S 39E. ESA-listed or Sensitive Plant Species. Seasonal Restrictions. Raptor nests (not shown) - see Appendix B1

Quartz to La Grande 230 kv S 39E. ESA-listed or Sensitive Plant Species. Seasonal Restrictions. Raptor nests (not shown) - see Appendix B1 9 15 Quartz to La Grande 230 kv 3.6 3.7 3.8 3.9 4 4.1 4.2 4.3 4.4 F 400 Boise ( Tenth-mile Marker Link Node # Link Number Roads Z:\UtilServ\Boardman_emingway\Reports\001_Federal_Applications\POD\NEPA POD_20161205\s\

More information

Decision Memo. Delta A Septic Repair (#33)

Decision Memo. Delta A Septic Repair (#33) Decision Memo Delta A Septic Repair (#33) USDA Forest Service Willamette National Forest McKenzie River Ranger District T16S, R5E, Section 16 Lane County, OR Proposed Action The McKenzie River Ranger District

More information

SAN LUIS VALLEY PUBLIC LANDS CENTER

SAN LUIS VALLEY PUBLIC LANDS CENTER Decision Notice And Finding of No Significant Impact Watershed and Fisheries Conservation Treatments SAN LUIS VALLEY PUBLIC LANDS CENTER USDA Forest Service Rocky Mountain Region Public Lands Center Rio

More information

U.S. Department of the Interior Bureau of Land Management. Updated: January Wildlife Management

U.S. Department of the Interior Bureau of Land Management. Updated: January Wildlife Management U.S. Department of the Interior Bureau of Land Management Updated: January 2013 Wildlife Management BMPs Minimize Wildlife Mortality and Habitat Fragmentation Typical BMPs May Include: Reducing the Initial

More information

SLIDES: Collaborative Planning and Lessons Learned

SLIDES: Collaborative Planning and Lessons Learned University of Colorado Law School Colorado Law Scholarly Commons Best Management Practices (BMPs): What? How? And Why? (May 26) Getches-Wilkinson Center Conferences, Workshops, and Hot Topics 5-26-2011

More information

MAWG "Middle Ground" Proposal Jackson Hole Conservation Area Prescriptions

MAWG Middle Ground Proposal Jackson Hole Conservation Area Prescriptions MAWG "Middle Ground" Proposal Jackson Hole Conservation Area Prescriptions We recommend the designation of several Jackson Hole Conservation Areas (JHCA) totaling approximately 214,000 acres to be comprised

More information

Oil & Gas Development Potential for Conservation Easements. Determining the Potential (Lynn Connaughton) Impacts to Conservation Values (Steve Boyle)

Oil & Gas Development Potential for Conservation Easements. Determining the Potential (Lynn Connaughton) Impacts to Conservation Values (Steve Boyle) Oil & Gas Development Potential for Conservation Easements Determining the Potential (Lynn Connaughton) Impacts to Conservation Values (Steve Boyle) Silt Web Site (www.townofsilt.org) Minerals Assessment

More information

ENVIRONMENTAL ASSESSMENT

ENVIRONMENTAL ASSESSMENT ENVIRONMENTAL ASSESSMENT, FINDING OF NO SIGNIFICANT IMPACT, and DECISION RECORD 1 ENVIRONMENTAL ASSESSMENT EA Number: OR-080-05-10 BLM Office: Marys Peak Resource Area, Salem District Office 1717 Fabry

More information

General Description WOLF CREEK PASS LINKAGE LANDSCAPE ZOOLOGICAL AREA. Proposed Designated Area Rio Grande National Forest Divide Ranger District

General Description WOLF CREEK PASS LINKAGE LANDSCAPE ZOOLOGICAL AREA. Proposed Designated Area Rio Grande National Forest Divide Ranger District WOLF CREEK PASS LINKAGE LANDSCAPE ZOOLOGICAL AREA Proposed Designated Area Rio Grande National Forest Divide Ranger District 22,300 acres General Description The Wolf Creek Pass Linkage Zoological Area

More information

Federal Coal Lease Modification 1 COC-70615, Tract 2 Consent to Lease

Federal Coal Lease Modification 1 COC-70615, Tract 2 Consent to Lease Forest Service Grand Mesa, Uncompahgre and Gunnison National Forests 2250 Highway 50 Delta, CO 81416 Voice: 970-874-6600 TDD: 970-874-6660 File Code: 2820 Date: February 26, 2014 Route To: Subject: To:

More information

Acronyms and Abbreviations... vii

Acronyms and Abbreviations... vii CONTENTS Acronyms and Abbreviations... vii Chapter 1 Purpose and Need for Action...1-1 1.1 Background...1-1 1.2 Proposed Action...1-5 1.3 Scope of this Analysis...1-6 1.4 Purpose and Need...1-7 1.4.1 Providing

More information

USDA FOREST SERVICE DAKOTA PRAIRIE GRASSLANDS LITTLE MISSOURI NATIONAL GRASSLAND MEDORA RANGER DISTRICT BILLINGS COUNTY, NORTH DAKOTA

USDA FOREST SERVICE DAKOTA PRAIRIE GRASSLANDS LITTLE MISSOURI NATIONAL GRASSLAND MEDORA RANGER DISTRICT BILLINGS COUNTY, NORTH DAKOTA GMX RESOURCES INC. LITTLE MISSOURI FEDERAL 24-10-1H OIL AND GAS WELL AND ACCESS ROAD #734-22 LOCATED WITHIN SW¼ of SE¼, SECTION 10, T141N, R100W BILLINGS COUNTY, NORTH DAKOTA USDA FOREST SERVICE DAKOTA

More information

COMBINED PUBLIC WORKSHOP/ PUBLIC HEARING

COMBINED PUBLIC WORKSHOP/ PUBLIC HEARING COMBINED PUBLIC WORKSHOP/ PUBLIC HEARING Draft Environmental Assessment Five-Year Capital Improvement Program Punta Gorda Airport, Charlotte County, Florida March 2019 Project Overview The Charlotte County

More information

Burns Paiute Tribe s s Wildlife Acquisitions

Burns Paiute Tribe s s Wildlife Acquisitions Burns Paiute Tribe s s Wildlife Acquisitions Logan Valley 2000-009 009-00 Purchased: April 2000 Malheur River 2000-027 027-0000 Purchased: November 2000 Location of Properties Malheur Malheur River Subbasin

More information

Avian and Bat Studies Summary Presentation

Avian and Bat Studies Summary Presentation PLEASANT RIDGE EXHIBIT 113 Avian and Bat Studies Summary Presentation Pleasant Ridge Energy LLC Livingston County, Illinois Personal Qualifications Terry VanDeWalle BS in Animal Ecology; MA in Biology

More information

Grand Traverse Bay Watershed Protection Plan:

Grand Traverse Bay Watershed Protection Plan: Grand Traverse Bay Watershed Protection Plan: An Overview Sarah U Ren Program Director The Watershed Center 231-935-1514, suren@gtbay.org What is a Watershed? A watershed is an area of land that captures

More information

Environmental Intelligence, LLC. Development.

Environmental Intelligence, LLC. Development. Environmental Intelligence, LLC Renewable Energy Development www.enviro-intel.com Protecting What Matters EI provides cost efficient solutions for renewable energy development that meet California s environmental

More information

Notice of Availability of the Draft Environmental Impact Statement for the. Converse County Oil and Gas Project, Converse County, Wyoming

Notice of Availability of the Draft Environmental Impact Statement for the. Converse County Oil and Gas Project, Converse County, Wyoming This document is scheduled to be published in the Federal Register on 01/26/2018 and available online at https://federalregister.gov/d/2018-01320, and on FDsys.gov 4310-22 P DEPARTMENT OF THE INTERIOR

More information

Marcellus Shale Gas Development in Maryland: A Natural Resource Analysis

Marcellus Shale Gas Development in Maryland: A Natural Resource Analysis Marcellus Shale Gas Development in Maryland: A Natural Resource Analysis Advisory Commission Meeting February 27, 2012 Garrett County Economic Development map Catherine McCall Balancing Natural Resources

More information

Proposed Action and Alternatives

Proposed Action and Alternatives Chapter Proposed Action and Alternatives Page 15 CHAPTER 2 - PROPOSED ACTION AND ALTERNATIVES INTRODUCTION Chapter 2 describes and compares the Southwest Fence Relocation and Waterline Project s Proposed

More information

BLM Office: Lakeview District, Klamath Falls Resource Area Phone #:

BLM Office: Lakeview District, Klamath Falls Resource Area Phone #: Decision Memorandum on Action and for Application of: Categorical Exclusion 516 DM2, Appendix 1, 1.12 Hazardous Fuel Reduction (PLAN CONFORMANCE AND CATEGORICAL EXCLUSION DETERMINATION) CX Log #: CX-04-17

More information

The Bear River Hydroelectric Project License & Settlement Agreement

The Bear River Hydroelectric Project License & Settlement Agreement The Bear River Hydroelectric Project License & Settlement Agreement 2012 UPDATE PacifiCorp Energy Mark Stenberg License Program Manager Hydro License Background U.S. hydro projects generally need a license

More information

EXECUTIVE SUMMARY. Mountains to Plains Energy by Design Report to the Colorado State Land Board

EXECUTIVE SUMMARY. Mountains to Plains Energy by Design Report to the Colorado State Land Board EXECUTIVE SUMMARY Mountains to Plains Energy by Design Report to the Colorado State Land Board January 10, 2013 Red Mountain Open Space Meegan Flenniken 1 Prepared by: Megan Kram, Energy Projects Director/Natural

More information

Newport/Sullivan Lake Ranger Districts

Newport/Sullivan Lake Ranger Districts United States Department of Agriculture Forest Service Newport/Sullivan Lake Ranger Districts 315 North Warren Newport, WA 99156 509-447-7300 FAX: 509-447-7301 File Code: 1950/2630 Date: October 18, 2012

More information

CARRIZO PLAIN PLANNING UNIT Carrizo Plain

CARRIZO PLAIN PLANNING UNIT Carrizo Plain Existing Conditions & Uses Overview About one square mile of cropland and grassland, much of which until recently supported a solar power generation facility, in a remote and lightly populated agricultural

More information

Director s Protest Resolution Report. Proposed Bishop Resource Management Plan Amendment & Livestock Use Authorizations

Director s Protest Resolution Report. Proposed Bishop Resource Management Plan Amendment & Livestock Use Authorizations Director s Protest Resolution Report Proposed Bishop Resource Management Plan Amendment & Livestock Use Authorizations October 17, 2014 1 Contents Reader s Guide... 3 List of Commonly Used Acronyms...

More information

DECISION MEMO. Bull Bear 1H-18 Oil and Gas Pipeline

DECISION MEMO. Bull Bear 1H-18 Oil and Gas Pipeline DECISION MEMO Bull Bear 1H-18 Oil and Gas Pipeline USDA, Forest Service Cibola National Forest, Black Kettle National Grasslands Roger Mills County, Oklahoma BACKGROUND: Laredo Petroleum, Inc., in order

More information

DECISION RECORD for the Rattlesnake Negotiated Timber Sale (Reference:

DECISION RECORD for the Rattlesnake Negotiated Timber Sale (Reference: DECISION RECORD for the Rattlesnake Negotiated Timber Sale (Reference: Bly Mtn. / Swan Lake / Rattlesnake Reservoir Forest Health and Woodland Treatments Environmental Assessment #OR014-99-6) Introduction

More information

United States Department of the Interior

United States Department of the Interior United States Department of the Interior BUREAU OF LAND MANAGEMENT Baker Resource Area PO Box 947 Baker City, OR 97814 4100 (#3606260) Notice of Field Manager s Final Decision for Renewal of Grazing Permit

More information

DECISION NOTICE AND FINDING OF NO SIGNIFICANT IMPACT

DECISION NOTICE AND FINDING OF NO SIGNIFICANT IMPACT DECISION NOTICE AND FINDING OF NO SIGNIFICANT IMPACT PLAINS EXPLORATION AND PRODUCTION COMPANY HELL S GULCH NORTH, PHASE 2 April 2008 USDA Forest Service Region 2 White River National Forest Rifle Ranger

More information

Natural Resource Management of Pipeline Infrastructure

Natural Resource Management of Pipeline Infrastructure Natural Resource Management of Pipeline Infrastructure Dan Devlin Director, Bureau of Forestry www.dcnr.state.pa.us Connection between Pipelines & DCNR Commonwealth s forests Fragmentation or reduction

More information

Weld County Oil & Gas Update June Active Wells, Drilling Permits, Production, Rig Count, Trends

Weld County Oil & Gas Update June Active Wells, Drilling Permits, Production, Rig Count, Trends Weld County Oil & Gas Update June 2018 Active Wells, Drilling Permits, Production, Rig Count, Trends CRUDE OIL PRODUCTION Weld County #1 Oil Producing County with 91% of Colorado s Oil Production in 2017!

More information

OPERATIONS IN THE MONO BASIN*

OPERATIONS IN THE MONO BASIN* LOS ANGELES DEPARTMENT OF WATER AND POWER OPERATIONS IN THE MONO BASIN* I APPRECIATE THIS OPPORTUNITY TO COMMENT ON THE DEPARTMENT'S WATER GATHERING OPERATIONS IN THE MONO BASIN AND THE RESULTING IMPACT

More information

5.13 Biological Resources

5.13 Biological Resources I-70 East Supplemental Draft EIS 5.13 Biological Resources 5.13 Biological Resources This section provides a summary of the biological resources in the study area and explains why they are important. The

More information

Further information of project proposals is available on the World Wide Web at:

Further information of project proposals is available on the World Wide Web at: United States Department of Agriculture Forest Service Newport/Sullivan Lake Ranger Districts 315 North Warren Newport, WA 99156 509-447-7300 FAX: 509-447-7301 File Code: 1950 Date: February 7, 2014 Dear

More information

Preliminary Decision Memo 2015 Recreation Residence Projects Odell Lake

Preliminary Decision Memo 2015 Recreation Residence Projects Odell Lake 2015 Recreation Residence Projects Odell Lake USDA Forest Service Crescent Ranger District, Deschutes National Forest Klamath County, Oregon Background The Crescent Ranger District maintains 66 recreation

More information

Exploring the Potential for Ecosystem Services on Colorado State Trust Lands

Exploring the Potential for Ecosystem Services on Colorado State Trust Lands Exploring the Potential for Ecosystem Services on Colorado State Trust Lands Fully realize the vision of Colorado s citizens, as expressed in Amendment 16, for stewardship of the lands we hold in perpetual

More information

APPENDIX J IMPLEMENTATION PLAN

APPENDIX J IMPLEMENTATION PLAN APPENDIX J IMPLEMENTATION PLAN 126 Implementation Plan for Colorado Grassland Species Conservation Plan Objective / Action Status Completion Deadline Objective 1: Meet occupied acreage and distribution

More information

DECISION NOTICE AND FINDING OF NO SIGNIFICANT IMPACT FEDERAL COAL LEASE COC MODIFICATION, TRACT 5

DECISION NOTICE AND FINDING OF NO SIGNIFICANT IMPACT FEDERAL COAL LEASE COC MODIFICATION, TRACT 5 DECISION NOTICE AND FINDING OF NO SIGNIFICANT IMPACT FEDERAL COAL LEASE COC-61357 MODIFICATION, TRACT 5 Paonia Ranger District Grand Mesa, Uncompahgre and Gunnison National Forests Gunnison County, Colorado

More information

HABITAT MEANS HOME. Habitat Means Home. Grade 4 Curriculum Guide. S. DANGERFIELD Interpretive Planning

HABITAT MEANS HOME. Habitat Means Home. Grade 4 Curriculum Guide. S. DANGERFIELD Interpretive Planning HABITAT MEANS HOME Habitat Means Home Grade 4 Curriculum Guide S. DANGERFIELD Interpretive Planning Habitat Means Home Habitat is home for plants and animals Different plants and animals adapt to different

More information

Mount Diablo Baseline and Meridian. T42N, R54E, Section 29 and 30

Mount Diablo Baseline and Meridian. T42N, R54E, Section 29 and 30 DECISION MEMO Walker Ridge Gold Exploration Project Plan of Operations #06-12-05 Mountain City Ranger District, Humboldt-Toiyabe National Forest Elko County, Nevada BACKGROUND On February 21, 2012, Columbia

More information

Variance Request Form

Variance Request Form Variance Request Form Ocotillo Express Wind LLC Variance: 019 Pier 1 Bay 3 Request No.: Rev 0 San Francisco CA 94111 Date Submit: _8/30/2012 415-283-4000 Date Approval Needed: 9/6/2012 Date Agency Received:

More information

EAST MONTANA GRASS RANCH

EAST MONTANA GRASS RANCH EAST MONTANA GRASS RANCH COHAGEN, MONTANA $13,194,558 25,480 ± ACRES LISTING BROKER: FRED SCOTT 3630 VICKERY DRIVE BILLINGS, MONTANA 59102 P: 406 656 5636 M: 406 698 7620 SCOTTWESTERNRLTY@AOL.COM 1 DESCRIPTION

More information

WEST TAVAPUTS PLATEAU NATURAL GAS FULL FIELD DEVELOPMENT PLAN RECORD OF DECISION

WEST TAVAPUTS PLATEAU NATURAL GAS FULL FIELD DEVELOPMENT PLAN RECORD OF DECISION WEST TAVAPUTS PLATEAU NATURAL GAS FULL FIELD DEVELOPMENT PLAN RECORD OF DECISION July 2010 Prepared by: U.S. Department of the Interior Bureau of Land Management Price Field Office Price, Utah Cooperating

More information

KINGS RIVER PLANNING UNIT Kings River Watershed

KINGS RIVER PLANNING UNIT Kings River Watershed Existing Conditions & Uses Overview Remote parcel in rugged canyon with adjoining whitewater rafting base camps 100 acres in Fresno County The Kings River Planning Unit is outside any FERC Project boundary

More information

ROADLESS AREA CONSERVATION: NATIONAL FOREST SYSTEM LANDS IN COLORADO, Proposed rule Regulatory Impact Analysis And Cost-Benefit Analysis

ROADLESS AREA CONSERVATION: NATIONAL FOREST SYSTEM LANDS IN COLORADO, Proposed rule Regulatory Impact Analysis And Cost-Benefit Analysis ROADLESS AREA CONSERVATION: NATIONAL FOREST SYSTEM LANDS IN COLORADO, Proposed rule Regulatory Impact Analysis And Cost-Benefit Analysis USDA Forest Service February 3, 2011 TABLE OF CONTENTS EXECUTIVE

More information

Environmental Information Worksheet

Environmental Information Worksheet Environmental Information Worksheet Water System Owner (Attach additional sheets if necessary) Needs and Alternatives Provide a brief narrative that describes: Current drinking water system needs. Project

More information

UNITED STATES OF AMERICA 132 FERC 62,179 FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA 132 FERC 62,179 FEDERAL ENERGY REGULATORY COMMISSION UNITED STATES OF AMERICA 132 FERC 62,179 FEDERAL ENERGY REGULATORY COMMISSION Public Utility District No. 1 of Chelan County, Project No. 2145-107 Washington ORDER APPROVING WILDLIFE HABITAT MANAGEMENT

More information

Plan of Development. Energy Gateway South Transmission Project. Volume I PREPARED BY:

Plan of Development. Energy Gateway South Transmission Project. Volume I PREPARED BY: Energy Gateway South Transmission Project Plan of Development Volume I Wyoming Colorado Utah PREPARED BY: U.S. Department of Interior Bureau of Land Management Wyoming State Office NOVEMBER 2016 THIS PAGE

More information

The Los Vaqueros Reservoir Expansion Project

The Los Vaqueros Reservoir Expansion Project The Los Vaqueros Reservoir Expansion Project Marguerite Patil Special Assistant to the General Manager Contra Costa Water District SCVWD/CCWD Joint Meeting July 14, 2016 Today s Itinerary 11:00 11:50 Presentation

More information

land more than 20 years ago and continues to expand these efforts.

land more than 20 years ago and continues to expand these efforts. 3 ecological health INTRODUCTION More than 100,000 acres of open space have been protected by Boulder County to preserve natural, cultural, and agricultural resources and provide public uses that reflect

More information

Katahdin Forest Management 2016 SFI Summary Audit Report

Katahdin Forest Management 2016 SFI Summary Audit Report Katahdin Forest Management 2016 SFI Summary Audit Report Introduction The SFI Program of Katahdin Forest Management of Millinocket, Maine has demonstrated continued conformance with the SFI 2015-2019 Standard

More information

Statement of Qualifications. environmental archaeology regulatory air & water quality reclamation.

Statement of Qualifications. environmental archaeology regulatory air & water quality reclamation. Statement of Qualifications 2Dot Consulting environmental archaeology regulatory air & water quality reclamation www.2dotconsulting.com Office Phone Email 2810 North Speer Blvd. 720.556.7781 info@2dot-consulting.com

More information

Upper Green River Area Rangeland Project Draft Environmental Impact Statement Table of Contents. Table of Contents

Upper Green River Area Rangeland Project Draft Environmental Impact Statement Table of Contents. Table of Contents Chapter 1. Purpose of and Need for Action... 1 Introduction and Document Structure... 1 Background... 1 Purpose and Need for Action... 3 Purposes of the Upper Green River Rangeland Area Project are to:...

More information

USDA Forest Service Decision Memo. Mattie V Creek Minesite Rehabilitation Project

USDA Forest Service Decision Memo. Mattie V Creek Minesite Rehabilitation Project USDA Forest Service Decision Memo Mattie V Creek Minesite Rehabilitation Project Ninemile Ranger District Lolo National Forest Mineral County, Montana I. DECISION TO BE IMPLEMENTED A. Decision Description:

More information

RECORD OF PLAN CONFORMANCE AND CATEGORICAL EXCLUSION (CX) DETERMINATION

RECORD OF PLAN CONFORMANCE AND CATEGORICAL EXCLUSION (CX) DETERMINATION RECORD OF PLAN CONFORMANCE AND CATEGORICAL EXCLUSION (CX) DETERMINATION CX Log #: OR-014-CX-03-02 Lease or Serial #: OR 58195 Project Name: Peetsch Mineral Material Sale Applicant: Doug Peetsch Location:

More information

Lake Fork of the Gunnison Watershed: Status and Stewardship. Camille Richard, Project Director

Lake Fork of the Gunnison Watershed: Status and Stewardship. Camille Richard, Project Director Lake Fork of the Gunnison Watershed: Status and Stewardship Camille Richard, Project Director Upper Gunnison Basin Lake Fork Watershed 7,500 14,309 ft Sagebrush to alpine 432 square miles Population 900

More information

APPENDIX H - RESOURCE MANAGEMENT STIPULATIONS FOR NEW OIL AND GAS LEASES

APPENDIX H - RESOURCE MANAGEMENT STIPULATIONS FOR NEW OIL AND GAS LEASES APPENDIX H - RESOURCE MANAGEMENT STIPULATIONS FOR NEW OIL AND GAS LEASES INTRODUCTION Oil and gas leases issued pursuant to approval and implementation of the San Juan Plan Revision (SJPR) grant the lessee

More information

Dear Ms. Bose, Thank you for the opportunity to comment on the application by Juneau Hydropower Inc. for a

Dear Ms. Bose, Thank you for the opportunity to comment on the application by Juneau Hydropower Inc. for a United States Department of Agriculture Forest Service Alaska Region Tongass National Forest 648 Mission Street Ketchikan, AK 99901 Phone: (907) 225-3101 Fax: (907) 228-6215 File Code: 2770-1 Date: November

More information

Wildlife and Habitat Protection

Wildlife and Habitat Protection Under our Avian Protection Plans, 2,700 electric transmission and distribution locations have been retrofitted with equipment to protect birds. BIODIVERSITY Wildlife and Habitat Protection Our Approach

More information

3.4 AQUATIC ECOSYSTEMS AND FISH SPECIES

3.4 AQUATIC ECOSYSTEMS AND FISH SPECIES 3.4 AQUATIC ECOSYSTEMS AND FISH SPECIES The following section supplements the analysis found in Chapter Three, Section 3.4 - Aquatic Ecosystems and Fish Species of the Draft EIS on page 3.59, Impacts Related

More information

Goals of This Orientation

Goals of This Orientation East Contra Costa County Habitat Conservation Plan / Natural Community Conservation Plan (HCP/NCCP) HCP/NCCP Orientation for Project Proponents and Scientific Consultants January 9, 2008 John Kopchik (Contra

More information

Here are the Oregon Dept of Fish & Wildlife DEIS comments. Thank you Nigel

Here are the Oregon Dept of Fish & Wildlife DEIS comments. Thank you Nigel comment@boardmantohemingway.com From: Sent: To: Subject: Attachments: Nigel E Seidel Thursday, March 19, 2015 3:59 PM comment@boardmantohemingway.com ODFW DEIS Comments ODFW

More information

Weld County s Land Use Approach to Oil and Gas Operations. Michelle Martin Planning Manager

Weld County s Land Use Approach to Oil and Gas Operations. Michelle Martin Planning Manager Weld County s Land Use Approach to Oil and Gas Operations Michelle Martin Planning Manager Welcome to Weld County Weld County covers an area of 3,999 square miles Third largest County in Colorado There

More information

Northwest Colorado. Oil & Gas Wildlife Consultations Update

Northwest Colorado. Oil & Gas Wildlife Consultations Update Northwest Colorado Oil & Gas Wildlife Consultations Update Colorado Parks & Wildlife What we do Colorado Parks & Wildlife is the state agency responsible for the management of fishing, hunting, wildlife

More information

VILLAGE OF BELLAIRE WATER QUALITY ACTION PLAN

VILLAGE OF BELLAIRE WATER QUALITY ACTION PLAN VILLAGE OF BELLAIRE WATER QUALITY ACTION PLAN Elk-River-Chain-of-Lakes Gaps Analysis Project The Watershed Center Grand Traverse Bay Tip of the Mitt Watershed Council Michigan Department of Natural Resources

More information

DECISION MEMO. NORTH FORK of NORTH CREEK FISH BARRIER PROJECT

DECISION MEMO. NORTH FORK of NORTH CREEK FISH BARRIER PROJECT DECISION MEMO NORTH FORK of NORTH CREEK FISH BARRIER PROJECT USDA Forest Service Fishlake National Forest, Beaver Ranger District Beaver County, Utah I. DECISION I have decided to allow the Utah Division

More information

Solano Multi-Species Habitat Conservation Plan

Solano Multi-Species Habitat Conservation Plan Solano Multi-Species Habitat Conservation Plan 580,000 Acres 37 Covered Species 4 Natural Communities 12,000 acres of Proposed Development Approximately 23,000 acres will be Preserved Plan Participants

More information

U.S. Department of the Interior Bureau of Land Management. March Introduction to BMPs

U.S. Department of the Interior Bureau of Land Management. March Introduction to BMPs U.S. Department of the Interior Bureau of Land Management March 2014 Introduction to BMPs Outstanding Resources The BLM manages many outstanding resources, including important wildlife habitat, scenic

More information

National Wild Turkey Federation

National Wild Turkey Federation Who am I? National Wild Turkey Federation Our Mission Conservation of the wild turkey and preservation of our hunting heritage Save the Habitat. Save the Hunt. Conserve habitat 4 Million acres Create new

More information

Proposed Action and Alternatives

Proposed Action and Alternatives Chapter Proposed Action and Alternatives Chapter 2 Proposed Action and Alternatives Page 15 CHAPTER 2 - PROPOSED ACTION AND ALTERNATIVES INTRODUCTION Chapter 2 describes and compares the Southwest Fence

More information

PUBLIC NOTICE Section 404 of the Clean Water Act - Permit Review ENVIRONMENTAL IMPACT STATEMENT U.S. ARMY CORPS OF ENGINEERS REGULATORY BRANCH

PUBLIC NOTICE Section 404 of the Clean Water Act - Permit Review ENVIRONMENTAL IMPACT STATEMENT U.S. ARMY CORPS OF ENGINEERS REGULATORY BRANCH US Army Corps of Engineers Omaha District PUBLIC NOTICE Corps ID No: NWO-2007-1337-DEN Project: Regional Watershed Supply Project Applicant: Million Conservation Resource Group Issue Date: May 8, 2009

More information

Notice of Proposed Action & Opportunity to Comment

Notice of Proposed Action & Opportunity to Comment United States Department of Agriculture Notice of Proposed Action & Opportunity to Comment Forest Service Rural Telephone Fiber Optic Line Murphy Hot Springs to Jarbidge Ruby Mountains-Jarbidge Ranger

More information