1 SECTION 7.0 Other CEQA Considerations

2 7.0 OTHER CEQA CONSIDERATIONS 7.1 LONG-TERM IMPLICATIONS OF THE PROPOSED PROJECT If the proposed Perris DTSP is approved and constructed, a variety of short-term and long-term impacts would occur on a local level. During project grading and construction, portions of surrounding uses may be temporarily impacted by dust and noise. Short-term soil erosion may also occur during grading. There may also be an increase in vehicle pollutant emissions caused by grading and construction activities. However, these disruptions would be temporary and may be avoided or lessened to a large degree through mitigation cited in this EIR and through compliance with the Perris Municipal Code; refer to Section 5.0, Environmental Analysis. Ultimate development of the project area would create long-term environmental consequences associated with a transition in land use. Development of the proposed Perris DTSP and the subsequent long-term effects may impact the physical, aesthetic and human environments. Long-term physical consequences of development include increased traffic volumes, increased noise from project-related mobile (traffic) and stationary (mechanical and landscaping) sources, incremental increased demands for public services and utilities, and increased energy and natural resource consumption. Long-term visual impacts would occur with the alteration of views within the area. Incremental degradation of local and regional air quality would also occur as a result of mobile source emissions generated from project-related traffic and stationary source emissions generated from the consumption of propane and electricity. 7.2 IRREVERSIBLE ENVIRONMENTAL CHANGES THAT WOULD BE INVOLVED WITH THE PROPOSED ACTION SHOULD IT BE IMPLEMENTED Approval of the proposed Perris DTSP would cause irreversible environmental changes, resulting in the following: Commitment of land, which would be physically altered; Soil erosion due to grading and construction activities; Vegetation removal for grading and construction activities; Alteration of the human environment as a consequence of the development process and the project s commitment to new development of residential, retail, office, and public facilities, which intensifies land uses in the project area; Utilization of various new raw materials, such as lumber, sand and gravel for construction; June

3 Consumption of energy to develop and maintain the project, which may be considered a permanent investment; and Incremental increases in vehicular activity in the surrounding circulation system, due to the nature of the development, resulting in associated increases in air pollutant emissions and noise levels. 7.3 GROWTH-INDUCING IMPACTS As required by the CEQA Guidelines, an (EIR) must include a discussion of the ways in which a project could directly or indirectly foster economic development or population growth, or the construction of additional housing and how that growth would, in turn, affect the surrounding environment (CEQA Guidelines Section (d)). Growth can be induced in a number of ways, including the elimination of obstacles to growth, or through the stimulation of economic activity within the region. The discussion of removal of obstacles to growth relates directly to the removal of infrastructure limitations or regulatory constraints that could result in growth unforeseen at the time of project approval. Under CEQA, induced growth is not considered necessarily beneficial, detrimental, or of little significance to the environment. In general, a project may foster spatial, economic, or population growth in a geographic area if it results in any of the following: Removal of an impediment to growth (e.g., establishment of an essential public service and provision of new access to an area); Fostering of economic expansion or growth (e.g., changes in revenue base and employment expansion); Fostering of population growth (e.g., construction of additional housing), either directly or indirectly; Establishment of a precedent-setting action (e.g., an innovation, a change in zoning and general plan amendment approval); or Development of or encroachment on an isolated or adjacent area of open space (being distinct from an infill project). If a project meets any one of these criteria, it may be considered growth inducing. Generally, growth-inducing projects are either located in isolated, undeveloped, or underdeveloped areas, necessitating the extension of major infrastructure such as sewer and water facilities or roadways, or encourage premature or unplanned growth. IMPEDIMENT TO GROWTH Implementation of the proposed Specific Plan would not remove an existing impediment to growth. Regional access to the Perris Downtown is provided via Interstate 215 and the recently June

4 completed Perris MetroLink Station, which is located at the Old Perris Depot, approximately one quarter-mile from the Perris Civic Center in Downtown Perris. Local access is generally provided by an existing network of roadways, and more specifically provided by 4 th Street (State Route 74 (SR-74)) and D Street. Nearly three-fourths of the Downtown is built-out and consists of urbanized areas, which are already served by an extensive network of electricity, water, wastewater, storm drains, communications, roadways, and other infrastructure necessary to accommodate or allow the existing conditions and planned growth. The existing facilities can be readily upgraded and/or extended onto the future development sites. The increased demands for utility and service systems would not reduce or impair any existing or future levels of utility services, either locally or regionally, as costs for increases in utility and service systems would be provided through cooperative agreements between future developments and servicing agencies. The Specific Plan s proposed mobility network for Downtown Perris would consist of a combination of highways, streets, transit, bicycle, and the pedestrian realm, in order to promote a variety of travel choices. The Specific Plan s proposed Circulation Plan provides the extension of the Main Street environment along D Street. Specific traffic improvements are proposed at roadways and intersections, in order to achieve acceptable levels of service; refer to Section 5.2, Traffic and Circulation. Additionally, the Specific Plan includes a Water and Sewer Systems Plan, based on a Water and Sewer Utilities Study that identifies the upgrades necessary to meet the future demands of the Specific Plan area; refer also to Section 5.13, Water, and Section 5.14, Wastewater. Furthermore, future development would be reviewed a project-by-project basis, at the time of proposed construction, in order to determine the utility systems necessary to serve the proposed land uses. Buildout of the proposed Specific Plan would not require substantial development of unplanned or unforeseen support uses and services. Therefore, the proposed project would not remove an impediment to growth and is not considered growth-inducing in this regard. ECONOMIC GROWTH As indicated in Table 7-1, Proposed Specific Plan Downtown Housing and Population Projections, the proposed Specific Plan would increase the Downtown s existing housing stock and population by approximately 213 percent (3,364 du and 12,924 persons). Table 7-1 Proposed Specific Plan Downtown Housing and Population Projections Year Dwelling Units Population 1 Existing Downtown ,582 6,078 Specific Plan Buildout ,946 19, Change +3, , % Change +213% +213% 1. Population projections are based on persons per household. State of California, Department of Finance, E-5 Population and Housing Estimates for Cities, Counties, and the State, , With 2000 Benchmark. Sacramento, California, May June

5 The Downtown s projected population growth is anticipated to increase sales, with resultant increases in the City s revenue base. Additionally, buildout of the proposed Specific Plan would increase the Downtown s existing non-residential uses by approximately 1,836,066 sf and employment by approximately 4,163 jobs; refer to Table 7-2, Proposed Specific Plan Employment Projections. Implementation of the proposed Specific Plan would foster economic expansion through changes in the revenue base and employment expansion. Therefore, the proposed project is considered growth inducing with respect to economic expansion. Land Use Category Table 7-2 Proposed Specific Plan Employment Projections Square Feet Employees Per Square Foot 1 Projected Employment EXISTING CONDITIONS DOWNTOWN Commercial Retail 550, Commercial Office Industrial 344,485 1, Public Facilities 450, ,167 Total 1,345,356 3,264 BUILDOUT OF PROPOSED SPECIFIC PLAN Commercial Retail 852, ,355 Commercial Office 1,878, ,906 Industrial 0 1, Public Facilities ,167 Total 1,836,068 7,427 CHANGE Commercial Retail +301, Commercial Office +1,878,642 +3,906 Industrial -344, Public Facilities 0 0 Total +1,836,067 +4, The Natelson Company, Inc., Employment Density Study Summary Report Table II-B, Derivation of Square Feet Per Employee Based on Average Employees Per Acre and Average FAR (County of Riverside), October 31, 2001, available at Accessed June 22, Based on the Other Retail/Service land use category. 3. Based on the Low-Rise Office land use category. 4. Based on the Light Manufacturing land use category. POPULATION GROWTH As indicated in Table 7-3, Proposed Specific Plan Housing and Population Projections, the City s existing housing stock involves an estimated 15,625 du, with a resultant population of approximately 55,133 persons. 1 1 State of California, Department of Finance, E-5 Population and Housing Estimates for Cities, Counties, and the State, , With 2000 Benchmark. Sacramento, California, May June

6 Table 7-3 Proposed Specific Plan Housing and Population Projections Year Dwelling Units Population Existing City ,625 55,133 Proposed Specific Plan Increment 2 3,364 12,924 Total 18,989 68,057 % Change +122% +123% 1. State of California, Department of Finance, E-5 Population and Housing Estimates for Cities, Counties, and the State, , With 2000 Benchmark. Sacramento, California, May Population projection is based on persons per household (State of California, Department of Finance, E-5 Population and Housing Estimates for Cities, Counties, and the State, , With 2000 Benchmark. Sacramento, California, May 2010). A project could induce population growth in an area, either directly (for example, by proposing new homes and businesses) or indirectly (for example, through extension of roads or other infrastructure). Although existing roads and infrastructure would be improved/modified, the proposed Specific Plan does not involve the extension of roads or other infrastructure into undeveloped areas; refer to the Impediment to Growth discussion above. The residential development anticipated by the proposed Specific Plan would induce direct growth in the City s population. As indicated in Table 7-3, the population growth associated with the new residential development (3,364 du) would be approximately 12,924 persons, representing an increase of approximately 123 percent over the City s existing 2010 population of approximately 55,133 persons. Therefore, the residential development anticipated by the proposed Specific Plan would induce direct growth in the City s population. Additionally, the Specific Plan would increase the City s employment by approximately 4,163 jobs. Employment growth could result in direct growth in the City s population, because future employees (and their families) may relocate to the City. Estimating the number of these future employees who would relocate to the City would be highly speculative, because many factors influence personal housing location decisions (i.e., family income levels and the cost and availability of suitable housing in the local area). Thus, the number of new employees who may relocate to the City to fill the newly created positions is unknown. Overall, the Project is considered growth inducing inasmuch as it would foster population growth in the City through development of both new housing and employment-generating land uses. Potential growth inducing impacts are also assessed based on a project's consistency with adopted plans that have addressed growth management from a local and regional standpoint. Table 7-4, Specific Plan Buildout Projections Compared to SCAG, analyzes the Specific Plan s anticipated growth, as compared to SCAG s 2035 growth projections for the City. As indicated in Table 7-4, SCAG forecasts the City s total housing stock in 2035 would be 26,050 du, with a resultant population of approximately 90,951 persons. With implementation of the proposed Specific Plan, the City s housing stock would total 18,989 du, with a resultant population of approximately 68,057 persons. Comparatively, the City anticipates approximately 37 percent less residential development (7,061 fewer du) than SCAG S 2035 housing growth projections for June

7 the City. Similarly, the City anticipates approximately 34 percent less population growth (22,894 fewer persons) than SCAG S 2035 population growth projections for the City. Therefore, the City would not exceed SCAG s housing and population growth forecasts and a less than significant impact would occur in this regard. Table 7-4 Proposed Specific Plan Buildout Projections Compared to SCAG Year Dwelling Units Population 1 City 2035 (incl. proposed Specific Plan) 1 18,989 68,057 SCAG 2035 City Projections 2 26,050 90,951 City & Specific Plan : 2035 SCAG Difference -7,061-22,894 City & Specific Plan : 2035 SCAG % Difference % % 1. Refer to Table 7-3, Proposed Specific Plan Housing and Population Projections, above. 2. Dwelling unit forecast is based on 23,825 households and 8.54% vacancy rate (State of California, Department of Finance, E-5 Population and Housing Estimates for Cities, Counties, and the State, , With 2000 Benchmark. Sacramento, California, May 2010). At the regional level, the emphasis regarding growth has been placed primarily on achieving a balance of employment and housing opportunities within the subregions. This regional concept, referred to as jobs/housing balance, encourages the designation and zoning of sufficient vacant land for residential uses with appropriate standards to ensure adequate housing is available to serve the needs derived from the local employment base. The jobs/housing ratio can be used as the general measure of balance between a community s employment opportunities and the housing needs of its residents. A rate of 1.0 or greater generally indicates that a City provides adequate employment opportunities, potentially allowing its residents to work within the City. A desirable jobs/housing balance improves regional mobility (traffic), reduces vehicle miles traveled, and improves air quality. Conversely, imbalance between a City s jobs and housing increases commutes, with resultant increases in traffic volumes and air emissions, and overall reduces the quality of life. Under existing conditions, the Downtown s jobs/housing ratio is approximately 2.06, which indicates that the City is currently providing adequate employment opportunities for its Downtown residents. With implementation of the proposed Specific Plan, the Downtown s jobs/housing ratio would be approximately 1.50, which indicates that the City would continue to provide adequate employment opportunities for its Downtown residents. The Downtown s job/housing ratio at buildout of the proposed Specific Plan is considered an improvement over existing conditions, given that the Specific Plan would provide greater balance between the Downtown s employment opportunities and the housing needs of its residents. Therefore, less than significant impacts would occur in this regard. PRECEDENT-SETTING ACTION The proposed project would not result in the establishment of a precedent-setting action; thus, would not be considered growth inducing in this regard. The new development facilitated by the June

8 proposed Specific Plan would be compatible, as to location and scale. Additionally, the new development would be considered an extension of the existing land use pattern. DEVELOPMENT OR ENCROACHMENT OF OPEN SPACE The proposed project would not be growth-inducing with respect to development or encroachment into an isolated or adjacent area of open space. The Specific Plan would involve urban infill development, since the Downtown is approximately three-fourths built-out. Additionally, the Cities of Moreno Valley, Menifee, and Canyon Lake, which are similarly urbanized, border Perris. The Specific Plan would focus on preserving residential neighborhoods, guiding the remaining development and redevelopment opportunities, and revitalizing the Downtown. SUMMARY Overall, implementation of the proposed Specific Plan would foster economic expansion and population growth. However, it would not be growth inducing, inasmuch as it would not remove an impediment to growth, would not establish a precedent-setting action, and would not develop or encroach into an isolated or adjacent area of open space. The residential, population, and employment growth projected at buildout of the proposed Specific Plan would not exceed SCAG s projections for the City. Thus, development within the Downtown would be responding to growth that was previously planned, rather than creating growth that would require substantial development of unplanned and unforeseen support uses and services. Therefore, the proposed Specific Plan would result in less than significant growth inducing impacts. 7.4 ENERGY CONSERVATION Public Resources Code Section 21100(b)(3) and Appendix F of the CEQA Guidelines requires a description (where relevant) of the wasteful, inefficient, and unnecessary consumption of energy caused by a project. In 1975, the California State Legislature adopted Assembly Bill 1575 (AB 1575) in response to the oil crisis of the 1970s. PROJECT ENERGY CONSUMPTION Short-Term Construction In 1994, the United States Environmental Protection Agency (EPA) adopted the first set of emission standards (Tier 1) for all new off-road diesel engines greater than 37 kilowatts (kw). The Tier 1 standards were phased in for different engine sizes between 1996 and 2000, reducing NO X emissions from these engines by 30 percent. The EPA Tier 2 and Tier 3 standards for off-road diesel engines are projected to further reduce emissions by 60 percent for NO X and 40 percent for particulate matter from Tier 1 emission levels. In 2004, the EPA issued the Clean Air Nonroad Diesel Rule. This rule will cut emissions from off-road diesel engines by more than 90 percent, and will be fully phased in by June

9 The proposed project would not directly result in the construction of any new development projects. However, implementation of the Perris DTSP could facilitate development of various commercial, retail, office, residential, public, and open space uses. There are no unusual project characteristics that would necessitate the use of construction equipment that would be less energy-efficient than at comparable construction sites in the region or State. Therefore, it is expected that construction fuel consumption associated with the proposed project would not be any more inefficient, wasteful, or unnecessary than other similar development projects of this nature. Long-Term Operations TRANSPORTATION ENERGY DEMAND Pursuant to the Federal Energy Policy and Conservation Act of 1975, the National Highway Traffic and Safety Administration (NTSA) is responsible for establishing additional vehicle standards and for revising existing standards. Since 1990, the fuel economy standard for new passenger cars has been 27.5 miles per gallon (mpg). Since 1996, the fuel economy standard for new light trucks (gross vehicle weight of 8,500 pounds or less) has been 20.7 mpg. Heavyduty vehicles (i.e., vehicles and trucks over 8,500 pounds gross vehicle weight) are not currently subject to fuel economy standards. Compliance with Federal fuel economy standards is not determined for each individual vehicle model. Rather, compliance is determined based on each manufacturer s average fuel economy for the portion of their vehicles produced for sale in the United States. Based on the City of Perris Downtown Specific Plan Traffic Impact Analysis, prepared by RBF Consulting (June 2010), the proposed project would generate 35,079 net daily trips above existing conditions. The Perris DTSP would create a pedestrian-friendly downtown that includes transit-oriented development and mixed use and is intended to reduce daily vehicle trips and vehicle miles traveled (VMT). The Perris DTSP is not anticipated to result in any unusual characteristics that would result in excessive long-term operational fuel consumption. The Perris DTSP involves typical downtown commercial and mixed-use use type trips which would include internal trip capture rates. The Perris DTSP includes standards for the roadway network to address a more pedestrianfriendly environment and enhanced opportunities to linkages with the Metrolink Station, the proposed park within the Mercado, and the civic center community park. Funding sources to provide incentives for infill and transit-oriented development are also identified in the Perris DTSP. For example, the Infill Infrastructure Grant Program (IIF) assists in the construction and rehabilitation of infrastructure that supports higher-density affordable and mixed-income housing. Also, the Transit-Oriented Development (TOD) Housing Program is intended to stimulate the production of housing developments near transit stations. The Perris DTSP provides a Park Once Strategy that promote shared parking arrangements at existing private lots, including the future Metrolink Perris Valley Line parking facilities. These standards and incentives for mixed-use, infill, and TOD projects in Downtown Perris would encourage alternate forms of transportation and reduce transportation energy demand. Fuel consumption associated with vehicle trips generated by future development within the Perris DTSP would not be considered inefficient, wasteful, or unnecessary in comparison to other resort type uses in the region. June

10 PUBLIC TRANSPORTATION OPTIONS The Riverside Transit Agency (RTA) provides fixed-route bus service along 4 th Street (SR-74), A Street, D Street, Perris Boulevard, San Jacinto Avenue, Wilkerson Avenue, 11 th Street, and Goetz Road. Additionally, the DTSP provides strategies to improve transit service and overall mobility within Downtown Perris that would result in a decrease in auto dependency. The Perris DTSP would also take advantage of the development of the Metrolink Station through expanding retail opportunities and allowing for more mixed use and housing opportunities. The development in Downtown Perris would increase density and promote a jobs/housing balance, which would increase public transportation patronage. Additionally, the incorporation the Metrolink station provides regional access to and from Downtown Perris. The availability of public transit for the project s residents and visitors would ensure that the project would not result in the inefficient, wasteful, or unnecessary consumption of transportation energy. BUILDING ENERGY DEMAND The project would not result in any unusual characteristics that would result in excessive longterm operational building energy demand. The project would require electricity and natural gas for typical lighting, climate control, and day-to-day activities. The Perris DTSP provides design standards and guidelines that would ensure energy and water efficiency throughout Downtown Perris. The Perris DTSP also provides an Implementation Matrix that includes actions to provide incentives for incorporating Leadership in Energy and Environmental Design (LEED) standards for new construction and building renovations. Mitigation Measure GHG-1 includes renewable energy measures, such as the installation of solar panels on carports and over parking areas, and the use of combined heat and power. Therefore, the project would not be considered inefficient, wasteful, or unnecessary in comparison to other similar developments in the region. ENERGY EFFICIENCY MEASURES California Code of Regulations, Title 24, Part 6, is California s Energy Efficiency Standards for Residential and Non-residential Buildings. Title 24 was established by the California Energy Commission (CEC) in 1978 in response to a legislative mandate to create uniform building codes to reduce California s energy consumption, and provide energy efficiency standards for residential and non-residential buildings. In 2010, the CEC updated Title 24 standards with more stringent requirements. The 2010 Standards are expected to substantially reduce the growth in electricity and natural gas use. Additional savings result from the application of the Standards on building alterations, such as those within Section V (Site Lighting) including Subpart E (Windows), F (Roofs), and S (Mechanical Equipment). These savings are cumulative, increasing as years go by. The project would adhere to, and exceed, all Federal, State, and local requirements for energy efficiency, including Title 24 standards. The proposed project would not result in the inefficient, wasteful, or unnecessary consumption of building energy. The Perris DTSP promotes energy conservation with requirements for energy-efficient, Energy Star-certified lamps for all pedestrian realm lighting, and with limitation of the hours of operation. Additionally, Mitigation Measure GHG-1 requires the following energy efficiency measures to be incorporated into the proposed project: June

11 Design buildings to be energy efficient, above Title 24 requirements. Install efficient lighting and lighting control systems. Site and design building to take advantage of daylight. Use trees, landscaping, and sun screens on west and south exterior building walls to reduce energy use. Install light colored cool roofs and cool pavements. Provide information on energy management services for large energy users. Install energy efficient heating and cooling systems, appliances, and equipment, and control systems. Install light emitting diodes for traffic, street, and other outdoor lighting. Limit the hours of operation of outdoor lighting. As discussed above, project implementation would result in less than significant impacts on energy resources. There would not be any inefficient, wasteful, or unnecessary energy usage in comparison to similar development projects of this nature regarding construction-related fuel consumption. The availability of public transit (RTA bus lines and Metrolink rail lines) would ensure that the project would not result in the inefficient, wasteful, or unnecessary consumption of transportation energy. The project would adhere to, and exceed, all Federal, State, and local requirements for energy efficiency, including Title 24 of the California Code of Regulations regarding building energy efficiency standards. The proposed project would not result in the inefficient, wasteful, or unnecessary consumption of building energy. Therefore, the project would not be considered inefficient, wasteful, or unnecessary in comparison to other similar developments in the region. June

SECTION 7.0 Other CEQA Considerations

SECTION 7.0 Other CEQA Considerations SECTION 7.0 Other CEQA Considerations 7.0 OTHER CEQA CONSIDERATIONS 7.1 SIGNIFICANT IRREVERSIBLE ENVIRONMENTAL CHANGES WHICH WOULD BE INVOLVED IN THE PROPOSED ACTIONS SHOULD THEY BE IMPLEMENTED Approval

More information

7.0 GROWTH-INDUCING IMPACTS

7.0 GROWTH-INDUCING IMPACTS 7.0 GROWTH-INDUCING IMPACTS 1. PURPOSE The California Environmental Quality Act (CEQA) requires a discussion of the ways in which a project could foster economic or population growth, or the construction

More information

OTHER CEQA CONSIDERATIONS

OTHER CEQA CONSIDERATIONS Chapter 5 OTHER CEQA CONSIDERATIONS CEQA Guidelines Section 15128 requires that an EIR disclose the reasons why various possible environmental effects of a proposed project are found not to be significant

More information

5.0 LONG-TERM CEQA CONSIDERATIONS

5.0 LONG-TERM CEQA CONSIDERATIONS 5.0 LONG-TERM CEQA CONSIDERATIONS Section 15126 of the CEQA Guidelines requires that all phases of a project must be considered when evaluating its impact on the environment, including planning, acquisition,

More information

TRANSPORTATION AND LAND USE

TRANSPORTATION AND LAND USE TRANSPORTATION AND LAND USE INTRODUCTION The 2020 and 2030 GHG projections estimate that transportation emissions in the unincorporated area will increase considerably in the next two decades. Minimizing

More information

5.1 - Significant Unavoidable Adverse Environmental Impacts

5.1 - Significant Unavoidable Adverse Environmental Impacts SECTION 5: OTHER CEQA CONSIDERATIONS 5.1 - Significant Unavoidable Adverse Environmental Impacts The California Environmental Quality Act (CEQA) Guidelines Section 15126.2(a)(b) requires an Environmental

More information

Draft Environmental Impact City of Daly City General Plan Update. Sacramento, California, May

Draft Environmental Impact City of Daly City General Plan Update. Sacramento, California, May The EIR must examine the potential growth-inducing impacts of the proposed General Plan. More specifically, CEQA Guidelines require that the EIR discuss the ways in which the proposed project could foster

More information

SECTION 6.0 Alternatives to the Proposed Project

SECTION 6.0 Alternatives to the Proposed Project SECTION 6.0 Alternatives to the Proposed Project 6.0 ALTERNATIVES TO THE PROPOSED PROJECT CEQA requires that an EIR include an analysis of a range of project alternatives that could feasibly attain most

More information

LONG-TERM IMPLICATIONS OF THE PROJECT

LONG-TERM IMPLICATIONS OF THE PROJECT LONG-TERM IMPLICATIONS OF THE PROJECT SIGNIFICANT ENVIRONMENTAL EFFECTS THAT CANNOT BE MITIGATED The environmental effects of the Proposed Project and Alternative 1 are addressed in Sections 4.1 through

More information

NOTICE OF PREPARATION OF ENVIRONMENTAL IMPACT REPORT FOR WOODLAND RESEARCH & TECHNOLOGY PARK SPECIFIC PLAN FOCUS OF INPUT NOP RESPONSES

NOTICE OF PREPARATION OF ENVIRONMENTAL IMPACT REPORT FOR WOODLAND RESEARCH & TECHNOLOGY PARK SPECIFIC PLAN FOCUS OF INPUT NOP RESPONSES NOTICE OF PREPARATION OF ENVIRONMENTAL IMPACT REPORT FOR WOODLAND RESEARCH & TECHNOLOGY PARK SPECIFIC PLAN To: Responsible Agencies, Trustee Agencies, Organizations, and Interested Parties From: Erika

More information

Sapphos. February 28, South Alameda Street Project

Sapphos. February 28, South Alameda Street Project Sapphos environmental inc. William Lamborn Major Projects Department of City Planning 200 N. Spring Street, Rm 750 Phone: 213.978.1470 Dear Mr. Lamborn, In preparation for the City Council Hearing on the

More information

ALBION FLATS DEVELOPMENT EXISTING TRAFFIC CONDITIONS AND POTENTIAL IMPACTS

ALBION FLATS DEVELOPMENT EXISTING TRAFFIC CONDITIONS AND POTENTIAL IMPACTS EXISTING TRAFFIC CONDITIONS AND POTENTIAL IMPACTS FINAL REPORT SEPTEMBER 2010 TABLE OF CONTENTS 1.0 INTRODUCTION 1 2.0 EXISTING TRAFFIC CONDITIONS 2 3.0 FUTURE TRAFFIC CONDITIONS 3 4.0 POTENTIAL IMPACTS

More information

SECTION 5: ALTERNATIVES TO THE PROPOSED PROJECT

SECTION 5: ALTERNATIVES TO THE PROPOSED PROJECT SECTION 5: ALTERNATIVES TO THE PROPOSED PROJECT 5.1 - Introduction In accordance with CEQA Guidelines Section 15126.6, this Draft Subsequent Environmental Impact Report (DSEIR) contains a comparative impact

More information

6 ALTERNATIVES 6.1 INTRODUCTION

6 ALTERNATIVES 6.1 INTRODUCTION 6 ALTERNATIVES 6.1 INTRODUCTION Environmental impact reports (EIRs) are required to consider alternatives to the project that are capable of reducing or avoiding significant environmental impacts. Section

More information

REGIONAL PLANNING AND POLICY FRAMEWORK A Preferred Approach for our Regional Growth

REGIONAL PLANNING AND POLICY FRAMEWORK A Preferred Approach for our Regional Growth REGIONAL PLANNING AND POLICY FRAMEWORK A Preferred Approach for our Regional Growth The Regional Comprehensive Plan (RCP) establishes a new approach to planning in the San Diego region. This approach is

More information

Electricity and Natural Gas

Electricity and Natural Gas 4.15.1.1 ENVIRONMENTAL SETTING Electricity Service The Azusa Light and Water Department (Department), a municipal utility, provides electricity to City residents and businesses. The Department maintains

More information

6.0 OTHER ENVIRONMENTAL CONSIDERATIONS 6.1 Significant Unavoidable Impacts

6.0 OTHER ENVIRONMENTAL CONSIDERATIONS 6.1 Significant Unavoidable Impacts 6.0 OTHER ENVIRONMENTAL CONSIDERATIONS 6.1 Significant Unavoidable Impacts Section 15126.2(b) of the California Environmental Quality Act (CEQA) Guidelines requires that an Environmental Impact Report

More information

SECTION 5: OTHER CEQA STATUTORY CONSIDERATIONS

SECTION 5: OTHER CEQA STATUTORY CONSIDERATIONS Sacramento LAFCo - Incorporation of Arden Arcade Other CEQA Statutory Considerations SECTION 5: OTHER CEQA STATUTORY CONSIDERATIONS 5.1 - Growth-Inducing Impacts CEQA Guidelines (Section 15126.2 [d]) require

More information

5. OTHER CEQA CONSIDERATIONS

5. OTHER CEQA CONSIDERATIONS 5. OTHER CEQA CONSIDERATIONS Cumulative Impacts CEQA requires the analysis of impacts due to cumulative development that would occur independent of, but during the same timeframe as, the project under

More information

5 CEQA Required Conclusions

5 CEQA Required Conclusions 5 CEQA Required Conclusions This section presents a summary of the impacts of the proposed Pacifica General Plan on several subject areas specifically required by CEQA, including significant irreversible

More information

SECTION 5: ALTERNATIVES TO THE PROPOSED PROJECT

SECTION 5: ALTERNATIVES TO THE PROPOSED PROJECT City of American Canyon Broadway District Specific Plan Alternatives to the Proposed Project SECTION 5: ALTERNATIVES TO THE PROPOSED PROJECT 5.1 Introduction In accordance with CEQA Guidelines Section

More information

Woodlake General Plan Draft Environmental Impact Report

Woodlake General Plan Draft Environmental Impact Report 5.0 UNAVOIDABLE ADVERSE ENVIRONMENTAL EFFECTS The following potential adverse environmental effects appear to be unavoidable if the Woodlake General Plan is implemented, even if certain mitigation measures

More information

5.0 ALTERNATIVES 5.1 INTRODUCTION

5.0 ALTERNATIVES 5.1 INTRODUCTION 5.1 INTRODUCTION The California Environmental Quality Act (CEQA) Guidelines state that an EIR shall describe a range of reasonable alternatives to the Project, or to the location of the Project, which

More information

SECTION 4.5 Energy Demand and Conservation

SECTION 4.5 Energy Demand and Conservation SECTION 4.5 Energy Demand and Conservation This section addresses Appendix F of the CEQA Guidelines. Appendix F notes that an EIR requires an evaluation of a proposed project s potential energy implications

More information

- FACT SHEET - THE GUIDING PRINCIPLES

- FACT SHEET - THE GUIDING PRINCIPLES THE GUIDING PRINCIPLES The General Plan begins with seven ideas that together create a vision for the City s future. When the City approved the General Plan in 1994, these idea were dubbed the Seven Guiding

More information

PROPOSED CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA) TRANSPORTATION SECTION UPDATE

PROPOSED CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA) TRANSPORTATION SECTION UPDATE DRAFT DOCUMENT CITY OF LOS ANGELES PROPOSED CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA) TRANSPORTATION SECTION UPDATE Prepared by: Departments of City Planning (DCP) and (LADOT) 3.xx 1 DRAFT 2018 LOS ANGELES

More information

APPENDIX A: NOTICE OF PREPARATION AND COMMENTS RECEIVED

APPENDIX A: NOTICE OF PREPARATION AND COMMENTS RECEIVED APPENDIX A: NOTICE OF PREPARATION AND COMMENTS RECEIVED Date: September 19, 2017 NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT To: Agencies and Interested Parties Lead Agency: Sacramento Municipal

More information

NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT

NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT Date: September 19, 2017 NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT To: Agencies and Interested Parties Lead Agency: Sacramento Municipal Utility District 6201 S Street, MS B203 Sacramento,

More information

MEMORANDUM 1 PROJECT LOCATION AND SETTING 2 PROJECT DESCRIPTION

MEMORANDUM 1 PROJECT LOCATION AND SETTING 2 PROJECT DESCRIPTION MEMORANDUM To: From: Subject: Date: January 5, 2017 Attachment(s): Figures 1 2 Laura Shinn, San Diego State University Sarah Lozano, Katie Laybourn, Nicholas Lorenzen, Dudek SDSU Tula Pavilion and Tenochca

More information

Transportation Category. New Location and. Green Vehicles. Reduced Parking Footprint. Bicycle Facilities. Access to Quality Transit

Transportation Category. New Location and. Green Vehicles. Reduced Parking Footprint. Bicycle Facilities. Access to Quality Transit New Location and Transportation Category LEED ND Location Sensitive Land Protection High Priority Site Surrounding Density Diverse Uses Access to Quality Transit Bicycle Facilities Reduced Parking Footprint

More information

Mitigation Monitoring Program Campus Master Plan 2015

Mitigation Monitoring Program Campus Master Plan 2015 Mitigation Program Campus Master Plan 2015 California State University, Sacramento May 2015 Environmental Mitigation Program Sacramento Campus Master Plan 2015 Project Section 1: Authority This Environmental

More information

White Paper: Implementing the Climate Action Plan in the Zoning Regulations

White Paper: Implementing the Climate Action Plan in the Zoning Regulations White Paper: Implementing the Climate Action Plan in the Zoning Regulations APRIL 2018 Introduction California is a global leader in addressing climate change. The State adopted the Global Warming Solutions

More information

First and foremost, alternatives in an EIR must be potentially feasible. In the context of CEQA, feasible is defined as:

First and foremost, alternatives in an EIR must be potentially feasible. In the context of CEQA, feasible is defined as: ALTERNATIVES TO THE PROPOSED PROJECT 5.0 5.1 CEQA REQUIREMENTS CEQA requires that an EIR analyze a reasonable range of feasible alternatives that meet most or all project objectives while reducing or avoiding

More information

6. Cumulative Impacts

6. Cumulative Impacts 6.1 OVERVIEW Section 15355 of the California Environmental Quality Act (CEQA) Guidelines defines cumulative impacts as: "...two or more individual effects which when considered together, are considerable

More information

CONSERVATION/ OPEN SPACE ELEMENT

CONSERVATION/ OPEN SPACE ELEMENT CONSERVATION/ OPEN SPACE ELEMENT E l C e n t r o G e n e r a l P l a n This Implementation Program provides actions to implement the adopted policies and plans identified in the Conservation/Open Space

More information

METROPOLITAN BAKERSFIELD GENERAL PLAN UPDATE GREATER BAKERSFIELD CHAMBER OF COMMERCE

METROPOLITAN BAKERSFIELD GENERAL PLAN UPDATE GREATER BAKERSFIELD CHAMBER OF COMMERCE METROPOLITAN BAKERSFIELD GENERAL PLAN UPDATE GREATER BAKERSFIELD CHAMBER OF COMMERCE JUNE 12, 2009 PURPOSE OF WORKSHOP MAJOR INFLUENCES PUBLIC OUTREACH REPORT EXISTING CONDITIONS REPORT SB 375/AB 32/AB

More information

6.13 Utilities and Service Systems

6.13 Utilities and Service Systems 6.13 6.13.1 Introduction This section describes impacts for utilities and service systems that would result from construction and operation of the CEQA Alternatives. 6.13.2 Regulatory Setting There are

More information

Cumulative and Secondary Impacts

Cumulative and Secondary Impacts Chapter 14: Cumulative and Secondary Impacts A. INTRODUCTION SEQRA regulations require the consideration of the Proposed Project s potential to result in cumulative impacts (6 NYCRR 617.9(b)(5)(a)) and

More information

5 ALTERNATIVES TO THE PROPOSED PROJECT

5 ALTERNATIVES TO THE PROPOSED PROJECT 5 ALTERNATIVES TO THE PROPOSED PROJECT 5.1 INTRODUCTION In accordance with Section 15126.6(a) of the State California Environmental Quality Act (CEQA) Guidelines, an environmental impact report (EIR) must

More information

SECTION 9.0 Effects Found Not To Be Significant

SECTION 9.0 Effects Found Not To Be Significant SECTION 9.0 Effects Found Not To Be Significant 9.0 EFFECTS FOUND NOT TO BE SIGNIFICANT The City of Santa Clarita conducted an Initial Study in April 2006 to determine significant effects of the proposed

More information

1) ENERGY CONSERVATION

1) ENERGY CONSERVATION Sustainable development... "meets the needs of the present without compromising the ability of future generations to meet their own needs." - United Nations Brundtland Commission Report, 1987 During the

More information

Appendix G Analysis of Project Impacts Compared to Existing Conditions

Appendix G Analysis of Project Impacts Compared to Existing Conditions Appendix G Analysis of Project Impacts Compared to Existing Conditions This page intentionally left blank. Analysis of Project Impacts Compared to Existing Conditions Introduction The analysis scenarios

More information

5.0 ALTERNATIVE VARIATIONS

5.0 ALTERNATIVE VARIATIONS 5.0 ALTERNATIVE VARIATIONS 5.1 INTRODUCTION The Draft EIR for the Beverly Hilton Revitalization Plan evaluated five alternatives to the project, pursuant to Section 15126.6 of the California Environmental

More information

Appendix C: Greenhouse Gas Reduction Calculations

Appendix C: Greenhouse Gas Reduction Calculations San Rafael Climate Change Action Plan C-1 Appendix C: Greenhouse Gas Reduction Calculations This document provides a summary of the calculations of potential greenhouse gas emission reductions resulting

More information

OTHER CEQA-MANDATED SECTIONS

OTHER CEQA-MANDATED SECTIONS GROWTH INDUCEMENT OTHER CEQA-MANDATED SECTIONS California Environmental Quality Act (CEQA) Section 21100(b)(5) specifies that the growth-inducing impacts of a project must be addressed in an environmental

More information

5 CEQA CONSIDERATIONS

5 CEQA CONSIDERATIONS 5 CEQA CONSIDERATIONS 5.1 UNAVOIDABLE ADVERSE IMPACTS For the purposes of this section, unavoidable significant adverse impacts are those effects of the project that would significantly affect either natural

More information

4.0 Other CEQA Considerations

4.0 Other CEQA Considerations 4.0 Other CEQA Considerations This chapter discusses additional topics statutorily required by the California Environmental Quality Act (CEQA). The topics considered include energy conservation, significant

More information

11.0 NOISE ELEMENT NOISE ELEMENT THE CITY OF AMERICAN CANYON GENERAL PLAN 11-1

11.0 NOISE ELEMENT NOISE ELEMENT THE CITY OF AMERICAN CANYON GENERAL PLAN 11-1 NOISE ELEMENT 11-1 STATUTORY REQUIREMENTS Government Code Section 65302(f) states the following: The General Plan shall include a noise element which shall identify and appraise noise problems in the community.

More information

Purpose and Organization PROGRAM ENVIRONMENTAL IMPACT REPORT. Native American Consultation Workshop

Purpose and Organization PROGRAM ENVIRONMENTAL IMPACT REPORT. Native American Consultation Workshop PROGRAM ENVIRONMENTAL IMPACT REPORT Native American Consultation Workshop A Presentation by the Southern California Association of Governments October, 2015 Purpose and Organization Introduction Draft

More information

From: City of Santa Cruz, Planning Dept., 809 Center Street, Room 206, Santa Cruz, CA 95060

From: City of Santa Cruz, Planning Dept., 809 Center Street, Room 206, Santa Cruz, CA 95060 CITY OF SANTA CRUZ Notice of Exemption To: Clerk of the Board Office of Planning and Research County of Santa Cruz 1400 Tenth Street, Room 121 Governmental Center Sacramento, CA 95814 701 Ocean Street

More information

OTHER ENVIRONMENTAL CONSIDERATIONS

OTHER ENVIRONMENTAL CONSIDERATIONS IV. OTHER ENVIRONMENTAL CONSIDERATIONS A. SUMMARY OF SIGNIFICANT UNAVOIDABLE IMPACTS CEQA Guidelines Section 15126.2(b) requires that any significant impacts, including those that can be mitigated but

More information

6.1 SIGNIFICANT IMPACTS OF THE PROJECT

6.1 SIGNIFICANT IMPACTS OF THE PROJECT SECTION 6.0 ALTERNATIVES CEQA requires that an EIR identify alternatives to a project as it is proposed. The CEQA Guidelines specify that the EIR should identify alternatives which would feasibly attain

More information

David Balducci, Align Real Estate Doug Flaming, Doug Flaming Construction Management, Inc. Shari Libicki, Sarah Manzano, Kevin Warner

David Balducci, Align Real Estate Doug Flaming, Doug Flaming Construction Management, Inc. Shari Libicki, Sarah Manzano, Kevin Warner MEMO Date: 1/13/17 To From CC David Balducci, Align Real Estate Doug Flaming, Doug Flaming Construction Management, Inc. Shari Libicki, Sarah Manzano, Kevin Warner Amara Morrison, Wendel Rosen Black &

More information

H. LAND USE City of Los Angeles L.A. CEQA Thresholds Guide 2006

H. LAND USE City of Los Angeles L.A. CEQA Thresholds Guide 2006 H. LAND USE 2006 H.1. LAND USE CONSISTENCY 1. INITIAL STUDY SCREENING PROCESS A. Initial Study Checklist Questions IX.b): IX.c): Would the project conflict with any applicable land use plan, policy, or

More information

PUBLIC INFRASTRUCTURE AND UTILTIES

PUBLIC INFRASTRUCTURE AND UTILTIES PUBLIC INFRASTRUCTURE AND UTILTIES Des Moines works to keep our built environment functional and safe for all residents and businesses. The City provides basic infrastructure and public services to all

More information

Chapter II. Community Growth Strategy A. COMMUNITY GROWTH STRATEGY DIAGRAM AND DESIGNATIONS. 1. Adoption of Growth Strategy Diagram

Chapter II. Community Growth Strategy A. COMMUNITY GROWTH STRATEGY DIAGRAM AND DESIGNATIONS. 1. Adoption of Growth Strategy Diagram Chapter II Community Growth Strategy This chapter contains policies and a diagram to help define the quality, quantity, and direction of future urban growth for the (City). Since 1974, the City has maintained

More information

Memorandum. FROM: Jim Ortbal Rosalynn Hughey Barry Ng TO: HONORABLE MAYOR, CITY COUNCIL. DATE: June 16, 2017

Memorandum. FROM: Jim Ortbal Rosalynn Hughey Barry Ng TO: HONORABLE MAYOR, CITY COUNCIL. DATE: June 16, 2017 CITY OF SANjOSE CAPITAL OF SILICON VALLEY TO: HONORABLE MAYOR, CITY COUNCIL SUBJECT: TRANSPORTATION POLICY UPDATE REQUIRED BY STATE LAW - LOS TO VMT Memorandum FROM: Jim Ortbal Rosalynn Hughey Barry Ng

More information

Section 3.9 Land Use and Planning ENVIRONMENTAL SETTING

Section 3.9 Land Use and Planning ENVIRONMENTAL SETTING Section 3.9 Land Use and Planning This section evaluates the existing land use setting and potential land use and planning impacts that may result from construction and/or operation of the proposed project.

More information

SCS Scenario Planning

SCS Scenario Planning E SCS Scenario Planning Introduction As part of the 2035 MTP/SCS process, AMBAG developed a series of land use and transportation alternative scenarios for evaluation and testing to demonstrate how the

More information

Sacramento Municipal Utility District Headquarters Building and Site Rehabilitation Project

Sacramento Municipal Utility District Headquarters Building and Site Rehabilitation Project Sacramento Municipal Utility District Headquarters Building Final Initial Study and Mitigated Negative Declaration March 2015 Sacramento Municipal Utility District Headquarters Building Final Initial Study

More information

Climate Action Plan For Western Riverside County

Climate Action Plan For Western Riverside County Climate Action Plan For Western Riverside County Western Riverside Council of Governments 4080 Lemon Street, 3rd Floor MS 1032 Riverside, CA 92501 (951) 955-7985 www.wrcog.cog.ca.us Why Prepare a Climate

More information

6.0 OTHER CEQA CONSIDERATIONS

6.0 OTHER CEQA CONSIDERATIONS 6.0 OTHER CEQA CONSIDERATIONS 6.1 INTRODUCTION Sections 15126 and 15128 of the 2008 California Environmental Quality Act (CEQA) Statutes and Guidelines states that an EIR must include a discussion of the

More information

LAND USE POLICIES BY COMMUNITY DESIGNATION

LAND USE POLICIES BY COMMUNITY DESIGNATION 137 2040 138 Land Use Policies by Community Designation As discussed earlier in Thrive MSP 2040, the Council assigns a community designation to each city and township. This designation indicates the overall

More information

The Level of Service Metric and. Alternatives for Multi-Modal Transportation. in Oakland

The Level of Service Metric and. Alternatives for Multi-Modal Transportation. in Oakland The Level of Service Metric and Alternatives for Multi-Modal Transportation in Oakland By Jill Nevins For the City of Oakland, Public Works Agency Mills College Public Policy Program May 2012 Executive

More information

Towards a Greener Southern California: Regional Transportation Plan/ Sustainable Communities Strategy

Towards a Greener Southern California: Regional Transportation Plan/ Sustainable Communities Strategy SOUTHERN CALIFORNIA ASSOCIATION of GOVERNMENTS Towards a Greener Southern California: 2012-2035 Regional Transportation Plan/ Sustainable Communities Strategy Hasan Ikhrata Executive Director 2 SCAG Quick

More information

Appendix H. Millennium Hollywood Project Trip Cap and Mitigation Triggers

Appendix H. Millennium Hollywood Project Trip Cap and Mitigation Triggers Appendix H Millennium Hollywood Project Trip Cap and Mitigation Triggers MILLENNIUM HOLLYWOOD PROJECT TRIP CAP AND MITIGATION TRIGGERS Crain and Associates Introduction The Millennium Hollywood Project

More information

RESOLUTION NO. RD:SSL:JMD 12/03/2015

RESOLUTION NO. RD:SSL:JMD 12/03/2015 RESOLUTION NO. A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN JOSE MAKING CERTAIN FINDINGS CONCERNING SIGNIFICANT IMPACTS, MITIGATION MEASURES AND ALTERNATIVES, AND ADOPTING A STATEMENT OF OVERRIDING

More information

Notice of Preparation For Link Union Station (Link US) Project. Joint Environmental Impact Statement and Environmental Impact Report

Notice of Preparation For Link Union Station (Link US) Project. Joint Environmental Impact Statement and Environmental Impact Report Notice of Preparation For Link Union Station (Link US) Project Joint Environmental Impact Statement and Environmental Impact Report Date: May 27, 2016 To: Subject: Project Title: From: All Interested Agencies,

More information

3.12 LAND USE AND PLANNING

3.12 LAND USE AND PLANNING 3.12 LAND USE AND PLANNING 3.12.1 INTRODUCTION This section describes the existing land uses in the project vicinity that could be affected by implementation of the Proposed Action and the alternatives.

More information

APPENDIX A - PLANS AND POLICY REVIEW FEBRUARY 2017

APPENDIX A - PLANS AND POLICY REVIEW FEBRUARY 2017 APPENDIX A - PLANS AND POLICY REVIEW FEBRUARY 2017 DENVERMOVES Transit Denver Moves: Transit APPENDIX A PLANS AND POLICY REVIEW 2035 Metro Vision Regional Transportation Plan (MVRTP) (2011) 2040 Fiscally

More information

65 East Project (P18-045) Addendum to an Environmental Impact Report

65 East Project (P18-045) Addendum to an Environmental Impact Report 65 East Project (P18-045) Addendum to an Environmental Impact Report File Number/Project Name: 65 East Project (P18-045) Project Location and Surrounding Land Uses: The proposed project site consists of

More information

CORBIN AND NORDHOFF IV. ENVIRONMENTAL IMPACT ANALYSIS ENV EIR G. LAND USE

CORBIN AND NORDHOFF IV. ENVIRONMENTAL IMPACT ANALYSIS ENV EIR G. LAND USE G. LAND USE ENVIRONMENTAL SETTING PROJECT SITE Zoning As shown in Section II, Figure 3: Radius Map, current zoning on the Project Site includes MR2-1 (Restricted Light Industrial, Height District 1), [T][Q]M1-1

More information

FINAL ENVIRONMENTAL IMPACT REPORT Volume 1. NBC Universal Evolution Plan ENV EIR STATE CLEARINGHOUSE NO Council District 4

FINAL ENVIRONMENTAL IMPACT REPORT Volume 1. NBC Universal Evolution Plan ENV EIR STATE CLEARINGHOUSE NO Council District 4 Division of Land / Environmental Review City Hall 200 N. Spring Street, Room 750 Los Angeles, CA 90012 FINAL ENVIRONMENTAL IMPACT REPORT Volume 1 ENV-2007-0254-EIR STATE CLEARINGHOUSE NO. 2007071036 Council

More information

f. Implement a high-quality architectural design that improves the overall aesthetics of the project site and surrounding area.

f. Implement a high-quality architectural design that improves the overall aesthetics of the project site and surrounding area. September 20, 2018 Craig Spencer, Supervising Planner Monterey County Resource Management Agency Planning Department 1441 Schilling Place Salinas, California 93901 Subject: Rio Ranch Market Place Draft

More information

Chapter 4: Transportation and Land Use

Chapter 4: Transportation and Land Use Chapter 4: Transportation and Land Use Transportation and land use together make possible the wide range of destination opportunities in the region. Transportation provides the connections, and, in turn,

More information

TRANSPORTATION RELATIONSHIP TO OTHER ELEMENTS OF THE PLAN AND COUNTY REGULATIONS VISION FOR TRANSPORTATION PLANNING ROAD NETWORK SECTION 7

TRANSPORTATION RELATIONSHIP TO OTHER ELEMENTS OF THE PLAN AND COUNTY REGULATIONS VISION FOR TRANSPORTATION PLANNING ROAD NETWORK SECTION 7 TRANSPORTATION Like many growing western counties, Douglas County focuses on one of the most integral elements in land-use planning: transportation. The primary purpose of a transportation network is to

More information

City of Menifee. Public Works Department. Traffic Impact Analysis Guidelines

City of Menifee. Public Works Department. Traffic Impact Analysis Guidelines Public Works Department Traffic Impact Analysis Guidelines Revised: August 2015 TABLE OF CONTENTS INTRODUCTION... 3 PURPOSE... 3 EXEMPTIONS... 3 SCOPING... 4 METHODOLOGY... 5 STUDY AREA... 6 STUDY SCENARIOS...

More information

3.8 LAND USE AND PLANNING

3.8 LAND USE AND PLANNING 3.8 LAND USE AND PLANNING 3.8.1 INTRODUCTION This section evaluates the potential land use and planning impacts of the proposed project. The section describes the existing and surrounding land uses at

More information

Conditional Uses 815

Conditional Uses 815 Title 33, Planning and Zoning Chapter 33.815 7/9/18 Conditional Uses 33.815 Conditional Uses 815 Sections: General 33.815.010 Purpose 33.815.020 How to Use this Chapter 33.815.030 Automatic Conditional

More information

The alternatives addressed in this EIR were selected based on the following factors:

The alternatives addressed in this EIR were selected based on the following factors: CHAPTER V Alternatives A. Criteria for Selecting Alternatives The California Environmental Quality Act (CEQA) requires that the EIR compare the effects of a reasonable range of alternatives to the effects

More information

PROJECT NUMBER: CGC42761 Town of Amherst Comprehensive Plan Amendments and Zoning Code Revisions DRAFT Project Benefits Metrics Report (PBMR)

PROJECT NUMBER: CGC42761 Town of Amherst Comprehensive Plan Amendments and Zoning Code Revisions DRAFT Project Benefits Metrics Report (PBMR) PROJECT NUMBER: CGC42761 Town of Amherst Comprehensive Plan Amendments and Zoning Code Revisions DRAFT Project Benefits Metrics Report (PBMR) Section 1: Benefits Overview The Town of Amherst is formulating

More information

4.13 POPULATION, EMPLOYMENT, AND HOUSING; GROWTH INDUCEMENT; AND ENVIRONMENTAL JUSTICE

4.13 POPULATION, EMPLOYMENT, AND HOUSING; GROWTH INDUCEMENT; AND ENVIRONMENTAL JUSTICE 4.13 POPULATION, EMPLOYMENT, AND HOUSING; GROWTH INDUCEMENT; AND ENVIRONMENTAL JUSTICE This section describes the existing and projected demographics of the project area and analyzes the LWRP 2020 Plan

More information

LOCAL GOVERNMENT PARTNERSHIP CITY OF BEAUMONT

LOCAL GOVERNMENT PARTNERSHIP CITY OF BEAUMONT LOCAL GOVERNMENT PARTNERSHIP CITY OF BEAUMONT 2009-2011 Program Cycle Abstract DATED: MARCH 10, 2008 PART 1. PARTNER INFORMATION a) City of Beaumont b) New Local Government Partner b) Contact: Kelsey DeForge

More information

Final Land Use and Development Opportunities Report 5.0 Environmental Impact/Environmental Consequences

Final Land Use and Development Opportunities Report 5.0 Environmental Impact/Environmental Consequences Figure 5-6. Century City 1/4-Mile Station Area August 16, 2010 Page 5-14 Figure 5-7. Wilshire/Westwood 1/4-Mile Station Area August 16, 2010 Page 5-15 Alternative 1 would be constructed underneath existing

More information

3.5 Energy, Conservation, and Sustainability

3.5 Energy, Conservation, and Sustainability As a result of the analysis undertaken in the Initial Study for the proposed 2009 Master Plan, the LACCD determined that the proposed project may result in environmental impacts to Energy, Conservation,

More information

ELEMENT M GROWTH MANAGEMENT

ELEMENT M GROWTH MANAGEMENT Growth Management ELEMENT M GROWTH MANAGEMENT GOAL: To ensure that growth and development are integrally planned with, and phased concurrently with, the City of Irvine s ability to provide an adequate

More information

CHAPTER 7.0 OTHER CEQA REQUIRED CONSIDERATIONS

CHAPTER 7.0 OTHER CEQA REQUIRED CONSIDERATIONS CHAPTER 7.0 OTHER CEQA REQUIRED CONSIDERATIONS This section discusses the additional topics statutorily required by the California Environmental Quality Act (CEQA). The topics indicated whether the proposed

More information

Objective A: Transportation facilities and services should be designed to conform with other policies contained herein.

Objective A: Transportation facilities and services should be designed to conform with other policies contained herein. CHAPTER ONE GOALS & OBJECTIVES INTRODUCTION KRS 100.193 mandates that a Planning Commission adopt statements of goals and objectives that will act as guides to the preparation of the plan. The update has

More information

Sacramento Area Flood Control Agency. May State Clearinghouse No Prepared for: Prepared by: Consulting Engineers and Scientists

Sacramento Area Flood Control Agency. May State Clearinghouse No Prepared for: Prepared by: Consulting Engineers and Scientists Addendum No. 3 (North Sacramento Streams) to the Environmental Impact Report on the North Sacramento Streams, Sacramento River East Levee, Lower American River, and Related Flood Improvements Project Prepared

More information

(Image of a moving Muni light rail vehicle in the Geneva Yard at night)

(Image of a moving Muni light rail vehicle in the Geneva Yard at night) (Page 1) Transportation Sustainability Program SFMTA Board of Directors February 2012 Partnership of the San Francisco County Transportation Authority, San Francisco Planning Department, San Francisco

More information

Environmental and Development Services Department Planning Division San Pablo Avenue, El Cerrito, CA (510) FAX: (510)

Environmental and Development Services Department Planning Division San Pablo Avenue, El Cerrito, CA (510) FAX: (510) Environmental and Development Services Department Planning Division 10890 San Pablo Avenue, El Cerrito, CA 94530 (510) 215-4330 - FAX: (510) 233-5401 N O T I C E O F P R E P A R A T I O N DATE: April 4,

More information

Regional GHG Reduction Plan

Regional GHG Reduction Plan Regional GHG Reduction Plan Final Environmental Impact Report March 5, 2014 Michael Hendrix The Project: San Bernardino County Regional Greenhouse Gas (GHG) Emissions Inventory and Reduction Plan Goals:

More information

City of Los Angeles 2010 Bicycle Plan First Year of the First Five-Year Implementation Strategy & Figueroa Streetscape Project Draft EIR

City of Los Angeles 2010 Bicycle Plan First Year of the First Five-Year Implementation Strategy & Figueroa Streetscape Project Draft EIR 5.0 ALTERNATIVES California Environmental Quality Act (CEQA) requires that an EIR describe a range of reasonable alternatives to the project or to the location of the project that could feasibly avoid

More information

2.0 RECOMMENDATIONS AND PROCEDURES

2.0 RECOMMENDATIONS AND PROCEDURES SANTA BARBARA COUNTY PLANNING COMMISSION Staff Report for Isla Vista Master Plan Updates Hearing Date: Staff Report Date: August 25, 2015 Case No.: 14GPA-00000-00007, 15GPA-00000-00004, 15ORD-00000-00011,

More information

Environmental Impact Statement for the Green Line to the Airport Project. ACTION: Notice of Intent to Prepare an Environmental Impact Statement (EIS).

Environmental Impact Statement for the Green Line to the Airport Project. ACTION: Notice of Intent to Prepare an Environmental Impact Statement (EIS). This document is scheduled to be published in the Federal Register on 11/18/2015 and available online at http://federalregister.gov/a/2015-29418, and on FDsys.gov DEPARTMENT OF TRANSPORTATION Federal Transit

More information

Fresno County Measure C Transit Oriented Development (TOD) Program Policies and Guidelines

Fresno County Measure C Transit Oriented Development (TOD) Program Policies and Guidelines Fresno County Measure C Transit Oriented Development (TOD) Program Policies and Guidelines The TOD program was created in the 2006 Measure C Extension Plan. The goals of the Measure C Transit Oriented

More information

2016 MAJOR GENERAL PLAN AMENDMENT

2016 MAJOR GENERAL PLAN AMENDMENT 2016 MAJOR GENERAL PLAN AMENDMENT GROWTH AREAS ELEMENT GROWTH AREAS ELEMENT 4.0 GOALS 1. Encourage orderly development within Growth Areas. 2. Encourage balanced, mixed use and multi-modal development

More information

Summary of transportation-related goals and objectives from existing regional plans

Summary of transportation-related goals and objectives from existing regional plans SMTC 2050 Long Range Transportation Plan Appendix A: Summary of transportation-related goals and objectives from existing regional plans SMTC 2050 Long Range Transportation Plan Summary of transportation-related

More information

Sheriff Protection Services

Sheriff Protection Services 3.11.2 Sheriff Protection Services ENVIRONMENTAL SETTING Existing Conditions Police protection, enforcement, and emergency services in the City of Malibu are provided by the Los Angeles County Sheriff

More information

7.1 Introduction. 7.2 Criteria for Alternatives Analysis

7.1 Introduction. 7.2 Criteria for Alternatives Analysis SECTION 7.0 Alternatives Analysis 7.1 Introduction The identification and analysis of alternatives is a fundamental concept under California Environmental Quality Act (CEQA). The role of alternatives in

More information