1 IJSTE - International Journal of Science Technology & Engineering Volume 3 Issue 01 July 2016 ISSN (online): X Methodology of Evaluating the overall Equipment Effectiveness in Machine Shop Manufacturing Industry through Total Productive Maintenance Meghraj Scholar Department of Mechanical Engineering Chhatrapati Shivaji Institute of Technology, Durg, Chhattisgarh, India Dr. Sridhar K Professor Department of Mechanical Engineering Chhatrapati Shivaji Institute of Technology, Durg, Chhattisgarh, India Abstract To implement the TPM tools and techniques a particular unit of machine shop in the Manufacturing Industry is considered in order to evaluate the contributions of total productive maintenance (TPM) initiatives to improve manufacturing performance in machine shop. Due to frequent failures and breakdowns occurred in machine shop, it requires more effort on maintenance due to which increased in maintenance cost and this results into different losses at work place which cause low availability, poor performance and low quality of the output ultimately cause low overall equipment effectiveness (OEE) of the machine. The correlations between various TPM implementation dimensions and manufacturing performance improvements have been evaluated and validated by employing OEE in machine shop. The purpose of this paper is to evaluate the contributions of TPM initiatives through Work sampling to achieve the World class OEE which raise the Quality excellence. Hence in sampling study has been conducted to compute the downtime and utilization of the machines and to improve OEE. The study establishes that focused TPM implementation over a reasonable time period can strategically contribute towards utilization of significant manufacturing performance enhancements. Keywords: Total Productive Maintenance, Overall Equipment Effectiveness, Work Sampling and Utilization I. INTRO DUCTIO N Total Productive Maintenance play an important role due to it control over the various factors Overall equipment effectiveness such as performance, quality, and availability of the machine in the industries. In today s situation, the importance of the keeping good condition of equipment has its own importance since the condition and performance of the equipment have large role in the quality and availability of the products. Many developing countries have liberalized their economies by adopting the TPM and its pillars to remain in the competition but due to the complexity and rapid demand make the organization difficult to follow the TPM. If we focuses of the present status of Indian industries through the literature survey no one industries has OEE equal to the world class OEE, it just about average of 50%-70% of OEE which is comparatively low as world class OEE. Some of the industries trying to achieve the OEE to make the plant in good condition or it also take the place in the market as a leader or competitor. Continuous analysis of the plant by the help of TPM pillar can reduce the trouble up to some extent. II. CO NTRIBUTIO NS TOWARDS TPM PRACTICES IMPROVING MANUFACTURING PERFO RMANCE The advancement in technology had lead to the industrial revolution and higher level competition for survival. PDCA approach is one of the TPM tool which help to plan the activity within the organization [1]. The author (Abhishek Jain et al. [2]) explained that by adopting many improvement strategies to enhance their performance as TPM, Kaizen or Continuous improveme nt (CI), and pillar of TPM model, is a good concept for small continuous improvements. S.Nakajima (Author) has described about challenging limits for TPM, method for calculation of OEE & its comparison with world class manufacturing, possible areas of wastage of resources which may occur losses [3]. The objective of TPM is maximizing of equipment effectiveness by maximization of machine utilization and machine availability. As one of the pillars of TPM activities, Kaizen pursues efficie nt equipment, operator and material and energy utilization that is extremes of productivity and aims at achieving substantial effects. Kaizen activities try to thoroughly eliminate losses in which six major losses that were identified [4]. Frequent machine breakdowns, low plant availability, increased rejection are a great threat to increase operating cost and lower productivity. The company has to suffer due to lower availability of machines and performance rate also decreases as a result of breakdowns which may leads to possess extra cost during the production [5]. The author (Paropate and Sambhe [6]) explained that world-class manufacturing which has been recognized as one of the significant operation strategy to regain the production losses due to equipment inefficiency. Fishbone diagram is one of the seven basic Quality Control tools used for All rights reserved by 231
2 identifying the root causes of problems. Fishbone diagrams have been constructed mostly based on the categories of man, machine, method and material. If root causes are eliminated, breakdowns of equipment would reduce which would reduce the downtime of machine and ultimately increase the OEE [7]. The sequencing of jobs plays an important role in saving time and raise the per unit production. The sequencing of jobs depends not only on the assembly line of the industry but also on the customers [8]. The author (Barelwala and Varotaria [9]) state that Total Productive Maintenance (TPM) has recognized as one o f the significant operation strategy to regain the production losses due to equipmen t inefficiency. Many organizations have implemented TPM to improve their equipment efficiency and to obtain the competitive advantage in the global market in terms of cost and quality. III. OVERALL EQ UIPMENT EFFECTIVENESS The OEE measure is central dimension for the formulation and execution of a TPM improvement strategy. In which TPM has the standards of 90 percent availability, 95 percent performance efficiency and with 99.9 percent rate of quality. An overall 85 percent benchmark OEE is considered as world-class performance for the organizations 10. Overall equipment effectiveness (OEE) methodology incorporates metrics from all equipment manufacturing states guidelines into a measurement system that helps manufacturing and operations teams improve equipment performance and, therefore, reducing equipment cost of ownership (COO) [11]. OEE = Availability X Performance Rate X Quality Rate IV. MO DEL FO R THE TPM IMPLEMENTATIO N Fig. 1: Proposed Model of TPM Implementation for the enhancement of the Machine Shop of manufacturing industry All rights reserved by 232
3 The above proposed model as shown in Figure 1 is useful for the implementation of TPM pillars in the industry in which they have to follows certain result and analysis. Ultimately improve the result of OEE of the machine shop of manufacturing industry. A. Case Study Data collected and analyzed using quantitative methods. Data collected from various resources likes observation of machines, historical data recorded register, interview and discussion session. The findings and way forward will be discussed in the following section. Overall Equipment Effectiveness (OEE) is a total measure of performance that relates the availability of t he process to the performance and quality. Due to the continuous running or working at from large period machine requires planned maintenance or necessary maintenance which make the good health condition of the machine so that it can produce maximum as per machine capacity and reduced the unplanned breakdown time. To justifying the research, the results of OEE calculation of different rating factors were observed for Vertical boring machine, Horizontal boring machine, Gear cutting machine and Horizontal lathe machine as shown in the below sections. B. Work Sampling According to L.H.C. Tippett Work sampling is defined as: A technique in which a statistically number of instantaneous observations are taken, over a period of time, of a group of machines, processes or workers. Each observation recorded for a particular activity or delay is a measure of the percentage of time observed by the occurrence. Work sampling technique will obtain a maximum of information in a minimum of time, which is important, both from the standpoint of the more efficient utilization of the time-study man's time and the cost to the plant [12]. Work sampling is a technique of industrial engineering used to measure the productivity potential of men, machines or workplaces through random observations and also used t o calculate the standard time [13]. Procedure for Conducting a Work sampling Study: 1) Decide on the objective of the study. 2) Obtain the approval of the supervisor of the department in which work study is to be conducted. 3) Decide upon work and delay elements. 4) Decide upon the duration of the study. 5) Determine the desired accuracy of results. 6) Make a preliminary estimate of the percentage occurrence of the activity or delay to be measured. 7) Design the study 8) Make the observation according to the plan, analyze and summarize the data. 9) Check the accuracy of the data at the end of the study 10) Prepare the report. Table 1 Work sampling observations for Vertical boring machine Dept.-Machine Shop Machine name: M1045 Operation: Boring Date: S. No. Time Observation Remarks am W Setting am W Setting am W Setting am I Idle am W Setting am W Inspecting the dimensions am W Setting am W Setting am W Machining am W Machining am W Machining am W Machining am I Idle am I Idle am W Machining am W Machining Date: am W Machining am W Machining am W Machining am I Went to supervisor room am I Idle am W Machining am W Machining All rights reserved by 233
4 am W Machining am W Setting am W Setting am W Inspecting the dimensions am W Inspecting the dimensions am W Machining am W Machining am W Machining am W Machining Date: am W Machining am W Machining am W Machining am W Setting am W Machining am W Setting am I Idle am W Setting am W Setting am W Machining am W Machining am W Machining setup am W Machining am W Machining am W Machining am W Inspecting the dimensions Date: am W Setting am I Went to supervisor room am W Setting am I Idle am W Setting am W Machining am W Machining am W Machining am W Machining am W Machining am W Machining am W Inspecting the dimensions am I Idle am I Went to supervisor room am I Idle am W Setting Date: am W Setting am W Idle am W Setting am W Machining am W Machining am W Machining am W Inspecting the dimensions am W Machining am W Machining am W Machining am W Setting am W Machining am W Machining am W Machining am W Machining am W Machining To find no. of observations required we had taken 80 observation in the preliminary study. To get a confidence level of 95% and accuracy limit ± 10% the total observation required is completed from the preliminary study as follows: P=11/80 = All rights reserved by 234
5 Idle observations = 11 Working observations =69 To get no. of observations required we used the formula P(1 P) S P = n Where P = 11/80 = N = no. of observations required = 2500 Many operations or activities which are impractical or costly to measure by time study can be measured by Work sampling. It usually requires lesser man-hours and costs less to make a Work sampling instead of making a continuous time study. Work sampling is performed to measure the activities and delays of workers or machine as shown in Table 1. Utilization of Vertical Boring machine and the operator observed through work sampling as shown in Figure 2. Table - 2 Results through Work Sampling after Implementation of TPM (March 2015) Machine Scheduled Run Time(hrs) Unplanned Stoppage(hrs) Actual Run Time(hrs) Targeted no. of items No. of item yield Reject/Defect items Items Allow Availability Performance Rate Quality Rate OEE Machine 1: Vertical Boring Machine, Machine 2: Horizontal Boring Machine, Machine 3: Gear cutting Machine, Machine 4: Horizontal Lathe Machine Table - 3 Results through Work Sampling after Implementation of TPM (June 2015) Machine Scheduled Run Time(hrs) Unplanned Stoppage(hrs) Actual Run Time(hrs) Targeted no. of items No. of item yield Reject/Defect items Items Allow Availability Performance Rate Quality Rate OEE Fig. 2: Utilization of Vertical Boring machine and the operator observed through work sampling To evaluate effectiveness of TPM implementation steps, OEE value was calculated (as shown in table 2). It is observed that work sampling is giving results on par with continuous observation. TPM has been implemented in the firm in stages and All rights reserved by 235
6 significant improvements have been observed. After implementing Statistical Process Control, significant improvement in the quality has been observed and these improvements shown in the Table 3. The pie diagram figure 2 shows significant observations of the Vertical Boring machine through work sampling study. V. CO NCLUSIONS A machine shop of manufacturing industry has been studied and analyzed to identify the TPM implementation issues and related factors to achieve goal from OEE as a result of TPM implementation. The required numbers of observations are collected to perform the Work sampling study to arrive the availability and utilization of the machines. To eliminate the machine idleness due to operator and to increase the productivity, work sampling technique can be used to identify the productive potential of men/machines/workplaces. It can be seen that OEE on machine shop has shown a progressive growth, which is an indication of increase in equipment availability, increase in rate of performance and quality rating. As a result overall productivity of industry also increased. OEE value is encouraging and with the passage of time results will be quite good and may reach a world class OEE value of 85%. Through TPM process focus, the cost and quality were improved significantly by reducing and minimizing equipment losses and failures. Thus, from the study of work sampling the overall effectiveness of equipment also improved significantly. REFERENCES [1] P. K. Suresh, TPM Implementation in a Food Industry-A PDCA Approach, International Journal of Scientific and Research Publicatio ns, Vo lum e 0 2, Issue 11, Pp. 1-9, November 2012, ISSN: [2] Abhishek Jain, Harwinder Singh and Rajbir Bhatti, Performance Improvement of a medium size organization by using Continuous Improvement Strategy through OEE Enhancement: A Case Study, International Journal of Darshan Institute on Engineering Research & Emerging Technologies, Vo lum e 0 4, Issue No. 02, Pp , 2015, ISSN: [3] S. Nakajima, Introduction to Total Productive Maintenance, Productivity press, Cambridge, MA, [4] J. Venkatesh, An Introduction to Total Productive Maintenance, The Plant Maintenance Resource Centre, April 16, 2007, Available at: [5] Binoy Boban and Jenson Joseph E, Enhancing Overall Equipment Effectiveness for a Manufacturing Firm through To tal P roductiv e Mainten an ce, International Journal of Emerging Technology and Advanced Engineering, Volume 03, Issue No. 08, Pp , August 2013, ISSN: [6] Ravikant V. Paropate and Dr. Rajeshkumar U. Sambhe, The Implementation and Evaluation of Total Productive Maintenance A Case Study of midsized Indian Enterprise, International Journal of Application or Innovation in Engineering & Management, Volume 02, Issue No. 10, Pp , Oct ober 2013, ISSN [7] Papari Das and Thuleswar Nath, Root Cause Analysis of the Major Equipment Breakdown Problems of the Tube Section of a FMCG Co m p any as an Approach to Improve OEE, International Journal of Engineering Trends and Technology, Volume 27, Issue No. 04, Pp , September 2015, ISSN: [8] Prof Pradeep Kumar, Dr. K. V. M. Varambally and Dr. Lewlyn L.R. Rodrigues, A Methodology for Implementing Total Product ive M aintenance in Manufacturing Industries A Case Study, International Journal of Engineering Research and Development, Volume 05, Issue No. 02, Pp , December 2012, ISSN: X. [9] Prof. Chintan Barelwala and Jagdish Varotaria, Barriers and Solutions of TPM Implementation In PNG Distribution Company, In ternational Jo urnal o f Science, Engineering and Technology Research, Volume 03, Issue No. 07, Pp , July 2014, ISSN: [10] Albert H.C. Tsang & P.K. Chan, TPM implementation in China: a case study, International Journal of Quality & Reliability Management, Vo lum e 1 7, Issue No. 02, [11] Pradeep Kumar, Raviraj Shetty and Lewlyn L.R. Rodrigues, Overall Equipment Efficiency and Productiv-ity of a News Paper Printing Machine of a Daily News Paper Company - A Case Study, International Journal of Engineering Practical Research Volume 03 Issue No. 01, February [12] M. E. Gregory, W. M. Roberts, and J. Hader, Work-Sampling as a Technique in Determining Labor Utilization of Dairy Plants, Journal of Dairy Science, Pp [13] Suman Balany, Determination of Productive Potential of Bottleneck Machines through Work Sampling, International Journal of Innovative Research in Science, Engineering and Technology, Volume 05, Issue No. 02, February 2016, ISSN: All rights reserved by 236
Barriers and Solutions of TPM Implementation In PNG Distribution Company
Barriers and Solutions of TPM Implementation In PNG Distribution Company Prof. Chintan Barelwala 1, Jagdish Varotaria 2, 1 Asst. Prof., Department of Mechanical Engineering, Gandhinagar Institute of Technology,
More informationOverall Equipment Effectiveness Improvement of Annealing Furnace by Implementation of Total Productive Maintenance (TPM) - A Case Study
IJIRST International Journal for Innovative Research in Science & Technology Volume 3 Issue 07 December 2016 ISSN (online): 2349-6010 Overall Equipment Effectiveness Improvement of Annealing Furnace by
More informationA Review on Employment of TPM to Improve OEE in Manufacturing Industry
A Review on Employment of TPM to Improve OEE in Manufacturing Industry Mayur M Mhamunkar 1, Prof. Arun Kumar 2 Student, Department of Mechanical Engineering, VIVA Institute of technology, Mumbai University,
More informationRoot Cause Analysis of the Major Equipment Breakdown Problems of the Tube Section of a FMCG Company as an Approach to Improve OEE
Root Cause Analysis of the Major Equipment Breakdown of the Tube Section of a FMCG Company as an Approach to Improve OEE Papari Das 1, Thuleswar Nath 2 1 Final year, M.E., 2 Associate Professor, Dept.
More informationJAN VAVRA JAN SUCHY ONDREJ SLEZAK MEASURING PRODUCTION EFFECTIVENESS: INDUSTRIAL CASE FROM ELECTRONIC INDUSTRY
JAN VAVRA Unversity of Pardubice, Czech Republic JAN SUCHY University of Pardubice, Czech Republic ONDREJ SLEZAK Hermetic Pumpen, Czech Republic MEASURING PRODUCTION EFFECTIVENESS: INDUSTRIAL CASE FROM
More informationDEVELOPMENT OF TPM IMPLEMENTATION PLAN IN SWITCHGEAR & ENGINEERING COMPANY
Proceedings of the International Conference on Mechanical Engineering 2003 (ICME2003) 26-28 December 2003, Dhaka, Bangladesh ICME03-AM-32 DEVELOPMENT OF TPM IMPLEMENTATION PLAN IN SWITCHGEAR & ENGINEERING
More informationNational Conference on Advances in Mechanical Engineering Science (NCAMES-2016)
Effect of Total Productive Maintenance (TPM) Implementation in Manufacturing and Service Industries A Review Prashanth Pai M 1, Dr. Ramachandra C G 2, Dr. T R Srinivas 3, Raghavendra M J 4 1 Assistant
More informationContinuous Improvement Toolkit. Flow Process Chart. Continuous Improvement Toolkit.
Continuous Improvement Toolkit Flow Process Chart The Continuous Improvement Map Managing Risk FMEA Understanding Performance Check Sheets Data Collection PDPC RAID Log* Risk Assessment* Fault Tree Analysis
More informationLEAN MANUFACTURING & TPM.
LEAN MANUFACTURING & TPM www.fourprinciples.com BACKGROUND The core area of any manufacturing facility is the shop floor. Manufacturing is most often also the largest function within an organisation. In
More informationImpact of TPM Implementation: Literature Review and Direction
P P P IJISET - International Journal of Innovative Science, Engineering & Technology, Vol. 2 Issue 12, December 2015. Impact of TPM Implementation: Literature Review and Direction 1 2 3 S.VigneshwaranP
More informationContinuous Improvement Toolkit. Traffic Light Assessment. Continuous Improvement Toolkit.
Continuous Improvement Toolkit Traffic Light Assessment The Continuous Improvement Map Managing Risk FMEA Understanding Performance Check Sheets Data Collection PDPC RAID Log* Risk Assessment* Fault Tree
More informationInternational Journal on Emerging Technologies 4(1): 66-74(2013) ISSN No. (Print) : ISSN No. (Online) :
e t International Journal on Emerging Technologies 4(1): 66-74(2013) ISSN No. (Print) : 0975-8364 ISSN No. (Online) : 2249-3255 TPM: A Strategic Tool to Improve the Organizational Efficiency Jitender*,
More informationSMED Implementation in a Press Shop
IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE) e-issn: 2278-1684,p-ISSN: 2320-334X PP. 36-41 www.iosrjournals.org SMED Implementation in a Press Shop T.G.Arul 1, A.Manimaran 2, P.Ranjith
More informationContinuous Improvement Toolkit
Continuous Improvement Toolkit Lean Measures Managing Risk PDPC Pros and Cons Importance-Urgency Mapping RACI Matrix Stakeholders Analysis FMEA RAID Logs Break-even Analysis Cost -Benefit Analysis PEST
More informationLine Balancing through Cycle Time Reduction
International Journal of Advance Industrial Engineering E-ISSN 2320 5539 2016 INPRESSCO, All Rights Reserved Available at http://inpressco.com/category/ijaie/ Research Article Kanagaraj A #, Vivek C #,
More informationEnhancement of Overall Equipment Effectiveness using Total Productive Maintenance in a Manufacturing Industry
International Journal of Performability Engineering, Vol. 13, No. 2, March 2017, pp.173-188 Totem Publisher, Inc., 4625 Stargazer Dr., Plano, Texas 75024, U.S.A Enhancement of Overall Equipment Effectiveness
More informationGoal of TPM BEKC 4883 ADVANCED MANUFACTURING SYSTEM. What is Total Productive Maintenance (TPM)? Founder/Pioneer of TPM
BEKC 4883 ADVANCED MANUFACTURING SYSTEM CHAPTER 8: INTRODUCTION TO TOTAL PRODUCTIVE MAINTENANCE (TPM) What is Total Productive Maintenance (TPM)? TPM - a production management method/philosophy, which
More informationImplementing Total Productive Maintenance (TPM) in Malaysian Manufacturing Organisation: (One Yoon Seng, Muhamad Jantan, dan T.
Implementing Total Productive Maintenance (TPM) in Malaysian Manufacturing Organisation: (One Yoon Seng, Muhamad Jantan, dan T. Ramayah) IMPLEMENTING TOTAL PRODUCTIVE MAINTENANCE (TPM) IN MALAYSIAN MANUFACTURING
More informationLean Gold Certification Blueprint
The Lean Certification Blueprint provides additional useful information beyond the Body of Knowledge. The Body of Knowledge specifies the competencies, topics, and subtopics required by different types
More informationDEVELOPMENT OF A TOTAL PRODUCTIVE MAINTENANCE REPORT CARD FOR CRITICAL MACHINES
DEVELOPMENT OF A TOTAL PRODUCTIVE MAINTENANCE REPORT CARD FOR CRITICAL MACHINES J. Naran 1*, F.W. Kienhöfer 2, T.S. Hattingh 3, and P.R.Taggart 4 1 School of Mechanical, Industrial and Aeronautical Engineering
More informationContinuous Improvement Toolkit. Value Analysis
Continuous Improvement Toolkit Value Analysis VA NVA The Continuous Improvement Map Managing Risk FMEA Understanding Performance** Check Sheets Data Collection PDPC RAID Log* Risk Analysis* Benchmarking***
More informationOperational Analysis of Mining Equipment in Opencast Mine using Overall Equipment Effectiveness (OEE)
PP 27-31 Operational Analysis of Mining Equipment in Opencast Mine using Overall Equipment Effectiveness (OEE) V.M Kalra 1, Tilak Thakur 2, B.S Pabla 3 1 (Department of Electronics and Communication Engineering,
More informationContinuous Improvement Toolkit. Risk Analysis. Continuous Improvement Toolkit.
Continuous Improvement Toolkit Risk Analysis The Continuous Improvement Map Managing Risk FMEA Understanding Performance Check Sheets Data Collection PDPC RAID Log* Risk Analysis* Fault Tree Analysis Traffic
More informationContinuous Improvement Toolkit. QFD (Quality Function Deployment) Continuous Improvement Toolkit.
Continuous Improvement Toolkit QFD (Quality Function Deployment) The Continuous Improvement Map Managing Risk FMEA Understanding Performance Check Sheets Data Collection PDPC RAID Log* Risk Assessment*
More informationDesign and Development of Automation of Loading and Unloading to DX-100 CNC Turning Center
IJSTE - International Journal of Science Technology & Engineering Volume 1 Issue 11 May 2015 ISSN (online): 2349-784X Design and Development of Automation of Loading and Unloading to DX-100 CNC Turning
More informationSDD: Total Productive Maintenance REV1: 2014 January 31. Page 1 of 21. Step 1
Page 1 of 21 Page 2 of 21 Contents 1. Introduction... 3 2. Planned maintenance benefits... 4 3. Planned maintenance responsibilities... 5 3.1 The role of the production department... 6 3.2 The role of
More informationProject Quality Management
1 Project Quality Management Unit 8 Eng.elsaka09@gmail.com Project Quality Management Includes the processes and activities of the performing organization that determine quality policies, objectives, and
More informationBeyond Lean Manufacturing
PRODUCT CONFIGURATION MANAGEMENT Beyond Lean Manufacturing www.infor.com/solutions/pcm 1 Agenda State of discrete manufacturing productivity Strategies for competitive advantage Suggestions for getting
More informationINVESTIGATIVE REPORT ON WORKSTATION STABILITY AND CONTINUOUS IMPROVEMENT MAPPING TECHNIQUE TO REDUCE MANUFACTURING WASTE
International Journal of Production Technology and Management (IJPTM) Volume 7, Issue 2, July-December, 2016, pp. 01 08, Article ID: IJPTM_07_02_001 Available online at http://www.iaeme.com/ijptm/issues.asp?jtype=ijptm&vtype=7&itype=2
More informationA Total Productive Maintenance (TPM) Approach to Improve Production Efficiency and Development of Loss Structure in a Pharmaceutical Industry
P a g e 186 Vol. 10 Issue 2 (Ver 1.0), April 2010 Global Journal of Management and Business Research A Total Productive Maintenance (TPM) Approach to Improve Production Efficiency and Development of Loss
More informationTOTAL PRODUCTIVE MAINTENANCE, THE SIX BIG LOSSES, AND OVERALL EQUIPMENT EFFECTIVENESS AND THE TPM VISION
TOTAL PRODUCTIVE MAINTENANCE, THE SIX BIG LOSSES, AND OVERALL EQUIPMENT EFFECTIVENESS AND THE TPM VISION TOTAL PRODUCTIVE MAINTENANCE Total productive maintenance (TPM) was first defined in 1971 by the
More informationMODIFICATION OF MIXING BIN FOR PRODUCTIVITY IMPROVEMENT OF CEMENT PLANT
MODIFICATION OF MIXING BIN FOR PRODUCTIVITY IMPROVEMENT OF CEMENT PLANT Sanjay Kumar Pandey 1, Manjit Singh 2 1 M.Tech Scholar, Mechanical Engineering Department, BIST, Bhopal 2 Professor, Mechanical Engineering
More informationIntroducing The Reliable Maintenance Excellence Index
Introducing The Reliable Maintenance Excellence Index The key to profit-and customer-centered maintenance is measuring results and return on investment. If you were a maintenance contractor, your results
More informationEFFECTIVENESS OF EDUCATION AND TRAINING WITH REFERENCE TO TPM
EFFECTIVENESS OF EDUCATION AND TRAINING WITH REFERENCE TO TPM V.K.AJAY 1 1. Assistant Professor & Research Scholar (Anna University Chennai, Department of Management Science, S.A.Engineering College, Poonamallee
More informationConcept Business Excellence Pvt. Ltd. TOTAL PRODUCTIVE MAINTENANCE OVERVIEW
Concept Business Excellence Pvt. Ltd. TOTAL PRODUCTIVE MAINTENANCE OVERVIEW Your partner in creating High Performing World Class Organization of CBEPL 1 TPM Overview What is TPM and Why TPM? TPM is a culture
More informationContinuous Improvement Toolkit. Pareto Analysis. Continuous Improvement Toolkit.
Continuous Improvement Toolkit Pareto Analysis The Continuous Improvement Map Managing Risk FMEA Understanding Performance Check Sheets Data Collection PDPC RAID Log* Risk Assessment* Fault Tree Analysis
More informationLEAN CERTIFICATION BODY OF KNOWLEDGE RUBRIC VERSION 3.0
MODULE 1 LEAN CERTIFICATION BODY OF KNOWLEDGE RUBRIC VERSION 3.0 1. Cultural Enablers 15% 20% 25% 1.1. Principles of Cultural Enablers 3% 4% 5% 1.1.1. Respect for the individual 1.1.2. Humility 1.2. Processes
More informationClose the Productivity Gap with Overall Equipment Effectiveness (OEE)
Close the Productivity Gap with Overall Equipment Effectiveness (OEE) Reduce changeover time, improve supply chain predictability, and enhance quality and throughput The need to act now The imperative
More informationOEE IMPROVEMENT BY TPM IMPLEMENTATION: A CASE STUDY
OEE IMPROVEMENT BY TPM IMPLEMENTATION: A CASE STUDY Jitendra Kumar Department of Mechanical Engineering, Sant Longowal Institute of Engineering and Technology (Deemed University), Punjab (India) ABSTRACT
More informationWHITE PAPER. spencermetrics LLC Three Giffard Way, Melville, NY p:
WHITE PAPER MEASURE ANALYZE W p IMPROVE Operational Equipment Effectiveness spencermetrics CONNECT When you think of printing as the production of printed objects whether those objects are documents, labels,
More informationPlant Layout and Material Handling
Plant Layout and Material Handling IV year-ii semester COURSE CODE A80365 Prepared by G S Vivek, Assistant Professor A.Venu Prasad, Assistant Professor MECHANICAL ENGINEERING INSTITUTE OF AERONAUTICAL
More informationCLASSIFICATION OF LAYOUT ( )
CLASSIFICATION OF LAYOUT (2016-2017) Layouts can be classified into the following five categories: 1. Process layout 2. Product layout 3. Combination layout 4. Fixed position layout 5. Group layout 1-
More informationIncreasing Productivity by Reducing Manufacturing Lead Time through Value Stream Mapping
Increasing Productivity by Reducing Manufacturing Lead Time through Value Stream Mapping Renu Yadav, Ashish Shastri, Mithlesh Rathore Mechanical Department, MPCT, Gwalior (M.P.) E-mail: renusingh_k5@yahoo.co.in,
More informationLOADING AND SEQUENCING JOBS WITH A FASTEST MACHINE AMONG OTHERS
Advances in Production Engineering & Management 4 (2009) 3, 127-138 ISSN 1854-6250 Scientific paper LOADING AND SEQUENCING JOBS WITH A FASTEST MACHINE AMONG OTHERS Ahmad, I. * & Al-aney, K.I.M. ** *Department
More informationABSTRACT I. INTRODUCTION LITERATURE REVIEW
2017 IJSRST Volume 3 Issue 3 Print ISSN: 2395-6011 Online ISSN: 2395-602X Themed Section: Science Technology Lean Manufacturing Implementation Technique A Review Chetan Patel*, Satayu Travadi, Vikas Panchal
More informationCOMPARATIVE STUDY OF SEISMIC FORCES BASED ON STATIC AND DYNAMIC ANALYSIS AS PER IS:
Int. J. Struct. & Civil Engg. Res. 2015 Ramanujam I V R and Dr H Sudarsana Rao, 2015 Research Paper ISSN 2319 6009 www.ijscer.com Vol. 4, No. 1, February 2015 2015 IJSCER. All Rights Reserved COMPARATIVE
More informationImplementation of TPM for Enhancing OEE of Small Scale Industry
125 Implementation of TPM for Enhancing OEE of Small Scale Industry Abhishek Jain 1, Rajbir Bhatti 2, Harwinder Singh Deep 3, Shiv kumar Sharma 4 1 PhD Research Scholar, PTU, Jalandhar,India 2 Mechanical
More informationLean Manufacturing Implementation in Small and Medium Industry
Advances in Smart Systems Research ISSN 2050-8662 Vol. 5. No. 1 : pp.17-29 : isrp16-004 Lean Manufacturing Implementation in Small and Medium Industry N.H.Zakaria 1, N.M.Z.N.Mohamed 1,2 *, A.N.M.Rose 1,
More informationTotal Productive Maintenance OVERVIEW
Total Productive Maintenance OVERVIEW Aims and Objectives Target Audience : Senior Management Purpose of Module : To understand the need for TPM and the commitment required to achieve an effective system..
More informationSet Up Change Time Optimization Using Single Minute Exchange of Die (SMED) Methodology
International Journal of Research in Electronics ISSN : 2348-9065 (Online) Set Up Change Optimization Using Single Minute Exchange of Die (SMED) Methodology I Pankajkumar. J. Mistry, II Mukesh Desai I
More informationfor higher reliability by lower costs
Service Strategies for higher reliability by lower costs Joerg Recklies Director Engineering Infineon Dresden GmbH Content Todays Challenges Existing Strategies Reliability Centered Optimization / Review
More informationTolu Adesalu Head of Procurement West Africa Cadbury Nigeria PLC Nigeria
Tolu Adesalu Head of Procurement West Africa Cadbury Nigeria PLC Nigeria Manufacturing in Nigeria: Yesterday, Today & Tomorrow Tolu Adesalu Purpose: Spark debate on the benefits of making Nigeria the manufacturing
More informationReducing the Manufacturing Lead Time of Export Pump Components in an Indian Pump Industry
Reducing the Manufacturing Lead Time of Export Pump Components in an Indian Pump Industry 1 Aravinth Kumar A, 2 Dr.D.Rajenthirakumar. 1 PG Scholar, 2 Associate Professor, Department of Mechanical Engineering,
More informationContinuous Improvement Toolkit. RACI Matrix
Continuous Improvement Toolkit RACI Matrix R A C I The Continuous Improvement Map Managing Risk FMEA Understanding Performance** Check Sheets Data Collection PDPC RAID Log* Risk Analysis* Benchmarking***
More informationContinuous Improvement Toolkit. Stakeholder Analysis. Continuous Improvement Toolkit.
Continuous Improvement Toolkit Stakeholder Analysis The Continuous Improvement Map Managing Risk FMEA Understanding Performance Check Sheets Data Collection PDPC RAID Log* Risk Assessment* Fault Tree Analysis
More informationBasics of TPM. Mahesh Mutthusamy
Basics of TPM Mahesh Mutthusamy Session objectives; Background to TMP Learn the basics of TMP Learn the Totality of TPM Enhance the understanding of TPM 5/18/2015 Training @ NPS 2 TPM Supports World Class
More informationDevelopment of autonomous maintenance implementation framework for semiconductor industries
268 Int. J. Industrial and Systems Engineering, Vol. 9, No. 3, 2011 Development of autonomous maintenance implementation framework for semiconductor industries Chen Shin Min, Rosmaini Ahmad*, Shahrul Kamaruddin
More informationOEE IMPROVEMENT THROUGH TOTAL PRODUCTIVE MAINTENANCE
OEE IMPROVEMENT THROUGH TOTAL PRODUCTIVE MAINTENANCE Sachin A. Mehta 1, Mohan S. Futane 2, Nyaneshwar Manjrekar 3 1,2 Assistant Professor, Mechanical Engg Department, Hirasugar Institute of Technology
More informationManaging for Daily Improvement
Managing for Daily Improvement Standard Work and Tools For Management to Drive Continuous Improvement Front Line Leadership Development System Module Part 1 of 12 MDI Workshop Agenda 2 Day Monday Tuesday
More informationContinuous Improvement Toolkit
Continuous Improvement Toolkit Process Redesign Managing Risk PDPC Pros and Cons Importance-Urgency Mapping RACI Matrix Stakeholders Analysis FMEA RAID Logs Break-even Analysis Cost -Benefit Analysis PEST
More informationRELIABILITY CENTERED MAINTENANCE
Page 1 *************************************************************************************** RELIABILITY CENTERED MAINTENANCE BUILDING BLOCKS FOR RELIABILITY. ****************************************************************************************
More informationIntegrating SPC and TPM
Integrating SPC and TPM 1. Introduction An important continuous improvement tool for manufacturing organizations is Total Productive Maintenance (TPM). Although both TPM and SPC are continuous improvement
More informationLEAN PRODUCTION FACILITY LAYOUT.
LEAN PRODUCTION FACILITY LAYOUT www.fourprinciples.com BACKGROUND The production facility layout is as important as the technology it houses and has a significant impact on business performance. The layout
More informationMotion and Time Study
IE 101-Industrial Engineering Orientation Fall 2009 Motion and Time Study Engin Topan Defining Work Systems Work consists of tasks Tasks consist of work elements Work elements consist of basic motion elements
More informationSTUDY ON CONSTRUCTION LABOUR PRODUCTIVITY USING LEAN PRINCIPLES
STUDY ON CONSTRUCTION LABOUR PRODUCTIVITY USING LEAN PRINCIPLES Ramya G 1, R. Vidjeapriya 2 1 M E Student, Department of Civil Engineering, College of Engineering, Anna University, Chennai (India) 2 Associate
More informationINDUSTRIAL ACTIVITY AT CERN
EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH ORGANISATION EUROPÉENE POUR LA RECHERCHE NUCLÉAIRE CERN - ST Division CERN-ST-2000-033 February, 2000 INDUSTRIAL ACTIVITY AT CERN G. Kowalik Abstract The decrease
More informationMAINTENANCE & LOGISTICS T.P.M TOTAL PRODUCTIVE MAINTENANCE
MAINTENANCE & LOGISTICS T.P.M TOTAL PRODUCTIVE MAINTENANCE Duval Pascal, Q.L.I.O Dept IUT of Béthune 1230, rue de l Université 62408 Béthune - France Abstract: After the ISO certification, it seems that
More informationChapter 07 Design of Work Systems
Chapter 07 Design of Work Systems True / False Questions 1. Ergonomics is the use of computers and robots in the workplace. TLO: 2 2. Specialization is one of the sources of disagreement between the efficiency
More informationLesson-19. Law of Variable Proportions
Law of Variable Proportions Lesson-19 Law of Variable Proportions Law of Variable Proportions is also known as the Law of Diminishing Returns. This law is a generalization which the economists make about
More informationImproving maintenance by profit indicators
Improving maintenance by profit indicators H. Rødseth 1, O. Myklebust 2,R.Eleftheradis 1 & P. Schjølberg 1 1 Department of Production and Quality Engineering, Norwegian University of Science and Technology,
More informationIATF transition. Only 1 year to go for over 69,000 ISO/TS16949 certified organizations to transition to ISO9001: 2015 and IATF 16949: 2016.
ISO/TS16949:2009 IATF 16949:2016 Risk or Opportunity? Quality Partner Newsletter September 2017 For More Information Visit www.qualitypartner.co.uk Author: Paul Hardiman Welcome to the ninth edition of
More informationBusiness Process Management system using SOA
Advances in Computational Sciences and Technology ISSN 0973-6107 Volume 10, Number 5 (2017) pp. 1457-1462 Research India Publications http://www.ripublication.com Business Process Management system using
More informationInternational Journal on Textile Engineering and Processes, ISSN: , Vol 1, Issue 2, April 2015
To Reduce Non-Productive Time in Garment Industry Sapna Jain, Pranjali Chandurkar and Harshada Upasani, Centre For Textile Functions, Mukesh Patel School of Technology Management and Engineering, Narsee
More informationCase Study of Electrical Energy Audit in Heat Treatment Industry
International Journal of Control Theory and Applications ISSN : 0974-5572 International Science Press Volume 10 Number 16 2017 Case Study of Electrical Energy Audit in Heat Treatment Industry K. Keerthi
More informationCHAPTER 1 INTRODUCTION
1 CHAPTER 1 INTRODUCTION 1.1 MANUFACTURING SYSTEM Manufacturing, a branch of industry, is the application of tools and processes for the transformation of raw materials into finished products. The manufacturing
More informationOverall Productivity Improvement in Casting Industry by Using Various Industrial Engineering Techniques
Overall Productivity Improvement in Casting Industry by Using Various Industrial Engineering Techniques Mayank Dev Singh 1, Swati Singh 2, Derasari Keyur 3, Soni Saumil 4, Patel Niki 5, Panchal Harshal
More informationDETERMINATION OF STANDARD TIME IN PACKAGING PROCESSING USING STOPWATCH TIME STUDY TO FIND OUTPUT STANDARD
DOI 0.2776 DETERMINATION OF STANDARD TIME IN PACKAGING PROCESSING USING STOPWATCH TIME STUDY TO FIND OUTPUT STANDARD Rio Prasetyo Lukodono ), Siti Kholisotul Ulfa 2) ), 2) Department of Industrial Engineering
More informationIBM C Exam. Volume: 51 Questions
Volume: 51 Questions Question No: 1 A new employee just started working with a company and only received their laptop in week 4. The BPM analyst investigated the cause: -Equipment was not ordered until
More informationEQUIPMENT EVALUATION TOOL BASED ON THE MANUFACTURING SYSTEM DESIGN DECOMPOSITION
EQUIPMENT EVALUATION TOOL BASED ON THE MANUFACTURING SYSTEM DESIGN DECOMPOSITION Deny D. Gomez deny@mit.edu Graduate Research Assistant Daniel C. Dobbs dcdobbs@mit.edu Graduate Research Assistant Massachusetts
More informationIPA Quality Forum Reflections on the Journey so far
IPA Quality Forum Reflections on the Journey so far India Pharmaceutical Forum 2018 23rd Feb 2018 The IPA Quality forum was formed with a vision of helping the Indian pharma industry achieve excellence
More informationInternational Journal of Modern Engineering Research (IJMER) Vol.3, Issue.3, May-June pp ISSN:
Vol.3, Issue.3, May-June. 2013 pp-1268-1272 ISSN: 2249-6645 Job Shop Layout Design Using Group Technology Concept Gyan Tshering Lepcha, 1 Dr. D.C. Roy 2 PG Student, Dept. of Mechanical Engineering, Jalpaiguri
More informationTHE CHALLENGES TO THE IMPLEMENTATION OF LEAN MANUFACTURING
THE CHALLENGES TO THE IMPLEMENTATION OF LEAN MANUFACTURING Akhil Kumar Research Scholar, D.C.R. University of Science and Technology- Murthal, Sonepat (Haryana), India-131039 akm1803@yahoo.co.in, akm.1803@gmail.com
More informationContinuous Improvement Toolkit. Relationship Mapping. Continuous Improvement Toolkit.
Continuous Improvement Toolkit Relationship Mapping The Continuous Improvement Map Managing Risk FMEA Understanding Performance Check Sheets Data Collection PDPC RAID Log* Risk Assessment* Fault Tree Analysis
More informationCreative Thinking in Problem Solving. Application to Professional Consultancy
Creative Thinking in Problem Solving Application to Professional Consultancy Page 1. Company Background 2. Problem faced by the company 3. Fishbone diagram - Mess finding and Problem finding Technique
More informationEXPLORING THE NEED FOR PLANNED MAINTENANCE IN REPONSE TO LOW PRODUCTIVITY AT A HEAVY STEEL MANUFACTURER
EXPLORING THE NEED FOR PLANNED MAINTENANCE IN REPONSE TO LOW PRODUCTIVITY AT A HEAVY STEEL MANUFACTURER D. Hartmann 1*, T.M. Malaba 2 and C. Saasa 3 1-3 School of Mechanical, Industrial and Aeronautical
More informationThe digital design of products and production systems - the so-called Digital Factory - comprises a network of digital models and methods for
The digital design of products and production systems - the so-called Digital Factory - comprises a network of digital models and methods for computer-supported modelling, simulation and visualization.
More informationThe improvement of Overall Equipment Effectiveness of machines using TPM study in a small scale industry
The improvement of Overall Equipment Effectiveness of machines using TPM study in a small scale industry (A case study on Milling Machine and Chasing Machine used in a CTC roller sharpening industry) Subhankur
More informationPROVING THE ROI OF TRAINING. Moving from Expense to Necessity
PROVING THE ROI OF TRAINING Moving from Expense to Necessity DEMONSTRATING RETURN ON INVESTMENT While world-class manufacturers know an investment in human capital is critical for achieving and sustaining
More informationConstruction Project Scheduling of MK Apartment Using MS Project 2013
Construction Project Scheduling of MK Apartment Using MS Project 2013 Monish Kumar K 1, Maheshwar S Maregoudru 2, Sparsha B.P 3 1,2 PG Student, Dept. of Civil Engineering, KVGCE, Sullia, Karnataka, India
More informationManufacturing & Production
The OpsDog Manufacturing & Production Benchmarking Report Manufacturing & Production Benchmarks, KPI Definitions & Measurement Details ABRIDGED CONTENT Purchase to View Full Benchmarking Report! 2017 Edition
More informationJustifying Advanced Finite Capacity Planning and Scheduling
Justifying Advanced Finite Capacity Planning and Scheduling Charles J. Murgiano, CPIM WATERLOO MANUFACTURING SOFTWARE 1. Introduction How well your manufacturing company manages production on the shop
More informationLean and Agile Systems. Rajiv Gupta FORE School of Management October 2013 Session 6
Lean and Agile Systems Rajiv Gupta FORE School of Management October 2013 Session 6 Module 1 Recap of Session 5 Module 2 Pull Production Rules of Kanban Module 3 Small Batch Production Level Production
More informationProcess 1 Process 2 Process 3
Lean is a system approach to eliminating waste (NVA) and creating value through continuous improvement in pursuit of perfection by flowing the product at the pull of the customer Customer supplier supplier
More informationAgenda. 1. Background 2. Lean Path 3. Lean Accounting Role 4. Lessons Learned 5. Next Steps 6. Questions / Answers
Agenda 1. Background 2. Lean Path 3. Lean Accounting Role 4. Lessons Learned 5. Next Steps 6. Questions / Answers 1 Facility Overview 65,000 sq. ft. 35,000 Air-Conditioned Mfg. 25,000 Warehouse 5,000 Office
More informationA Proposed Total Productive Maintenance (TPM) Tool for Lean Dashboard, Statistics and Performance Efficiency in Malaysian Modern Manufacturer
A Proposed Total Productive Maintenance (TPM) Tool for Lean Dashboard, Statistics and Performance Efficiency in Malaysian Modern Manufacturer *1 Nurul Fadly Habidin, 2 Norlaile Salleh Hudin, 3 Wan Salmuni
More informationElectronic document management offers many advantages
Electronic document management offers many advantages Improves engineering productivity Fast Forward: Database-centric electrical computer-aided engineering (E-CAE) enhances productivity. In using E-CAE
More informationGet Insight & Get Optimized
Get Insight & Get Optimized Corrado Giussani GE Digital Imagination at work 1 The vision is clear If you went to bed an industrial company, you re waking up a data & analytics company Jeff Immelt, GE
More informationOptimization of available resources and methods of capitalizing human capital on industrial process lines efficiently
Optimization of available resources and methods of capitalizing human capital on industrial process lines efficiently S. K. SUBRAMANIAM 1, A. H. HAMIDON 2 and R. S. S. SINGH 3 1,3 Faculty of Electronics
More informationSupply Chain Management Alternative Course Outlines
Supply Chain Management Alternative Course Outlines This is a course design for a 24-session course, each session of ninety minutes duration. Course Objectives: The course would help students in: Understanding
More informationBENCHMARKING INTERNAL SUPPLY CHAIN
BENCHMARKING INTERNAL SUPPLY CHAIN Benchmarking Internal Supply Chain Performance: Development of Frame Work, Harjit Singh, Anish PERFORMANCE: Sachdeva, Gurpreet Kaur, DEVELOPMENT Journal Impact Factor
More information