1 VERY SHORT DURATION OPERATIONS Terry A. Paholek, P.E. Director of Mnt Ops (BRY)

2 Very Short Duration Work Zone Operations Research Project CTR research team: Randy Machemehl Li Wang Sami Kolahdoozan Dan Seedah Fernanda Leite TxDOT Project Director: Paul Montgomery, P.E.

3 Very Short Duration Work Zone Operation (VSDOs) A planned or unplanned activity that can be executed in 15 minutes or less. This includes potholes patching debris removal, dead animal removal, sign placement for TCP, etc.

4 Very Short Duration Work Zone Operation (VSDOs) Main Fact: VSDOs still interrupt the flow of traffic and create safety risks for workers and the traveling public. Underlying Concern: There is no real guidance on VSDOs. We rely on the judgment of individual workers to determine if they should proceed with a VSDOs or call in full TCP.

5 Very Short Duration Work Zone Operation (VSDOs) Assumption that VSDOs is based on: It takes at least 15 minutes to set-up/remove a simple TCP. Setting up signs, cones, etc. and involves getting on pavement, in no shoulder are present. Thought is if you can perform your task in less time than setting up signs, then VSDOs provide less exposure to safety risks by the driving public and workers.

6 This project identified risk factors that should be considered in order to make a good decision on if a VSDO is appropriate. If we train employees on these risk factors, then we will get better decisions in the field about using VSDOs. This is important due to the turnover of employees and the continuous loss of experience in the field. New employees need to hear this info clearly and quickly.

7 Risk Factors that the project considered for type of TCP: Traffic Volume Traffic Speed Time of Day Distracted Drivers Can drivers understand TCP/devices and flaggers Visibility TCP setup time Work vehicle location Potential for erratic vehicles Roadway geometry Weather

8 In terms of guidance the MUTCD requires the following for working on roadways Have a plan (TCP) for the safety of all users (workers, pedestrians, cars, bikes, etc) Road users should be interrupted as little as possible Road user should be clearly guided in work zone All workers should be trained on TCP procedures Public relations should be considered Roadside safety should be considered (clear zones) VSDOs meets the intent of MUTCD, if we train our workers on TCP operations and have them consider the big picture.

9 Original plan for Research Project: Create a decision tree for workers to consider when arriving at a work location that could be a VSDOs. Upon investigation, it was determined that there were 11,664 options on the decision tree. Thus, the decision tree was abandoned and a Risk Management process was considered.

10 Risk Management process: Risk Identification What are risks? Risk Assessment Prioritize the risks. Risk Analysis What are the root causes of the most prevalent risks? Mitigation Strategies What can be done to eliminate the most prevalent risks? Evaluation Is the final answer applicable to the initial need.

11 Researchers shadowed TxDOT and saw: 93% of jobs were less than 5 minutes Most jobs had 1 truck and 1 operator Light bar was most common TCP Parking area varied (lane/shoulder/grass/parking lot)

12 Factors that workers should consider: Traffic volume Traffic speed Time of day Type of roadway Weather Severity of hazard (can it wait or is it imminent hazard) Visibility Location of work (lane or shoulder) Roadway geometry Type of work Surface condition Safety response

13 Future Options/Improvements: Make trucks more visible Make workers more visible Innovative devices to warn workers of approaching cars EDUCATE workers on making good decisions

14 Questions? Worker Safety in Very Short Work Zone Operations: State of Practice and Risk Management Process TxDOT/CTR Research project

Very Short Duration Operations Safety Guidebook

Very Short Duration Operations Safety Guidebook 2012 Very Short Duration Operations Safety Guidebook Center of Transportation Research The University of Texas at Austin Page 1 1. Introduction Texas has the most roadway mileage of any state in the nation,

More information

Field Guide on. Safe Maintenance and. Work Zone Operations

Field Guide on. Safe Maintenance and. Work Zone Operations Field Guide on Installation and Removal of Temporary Traffic Control for Safe Maintenance and Work Zone Operations August 2008 Introduction This field guide provides field personnel with introductory guidance

More information

Overview of Changes from Previous Documents

Overview of Changes from Previous Documents Overview of Changes from Previous Documents Updated: February 17, 2016 Section Summary Sources for Content Material Changes from Current Documents Foreword General introduction to the new manual including

More information

Mobile Work Zones. Traffic Control in Short Duration / Guidelines for M0WING ZONE AHEAD WORK ROAD SHOULDER WORK RIGHT LANE CLOSED AHEAD SIGNAL AHEAD

Mobile Work Zones. Traffic Control in Short Duration / Guidelines for M0WING ZONE AHEAD WORK ROAD SHOULDER WORK RIGHT LANE CLOSED AHEAD SIGNAL AHEAD M0WING ZONE ROAD WORK AHEAD SHOULDER WORK RIGHT LANE CLOSED AHEAD SIGNAL WORK AHEAD Guidelines for Traffic Control in Short Duration / Mobile Work Zones Guidelines for Traffic Control in Short Duration

More information

Traffic Management Guide to Concrete Overlay Solutions. Dale S. Harrington P.E. Representing CP Tech Center

Traffic Management Guide to Concrete Overlay Solutions. Dale S. Harrington P.E. Representing CP Tech Center Traffic Management Guide to Concrete Overlay Solutions December 5, 2014 ACPA Annual Meeting Dale S. Harrington P.E. Representing CP Tech Center Traffic Management- Concrete Overlays Traffic Management

More information

MODULE 10 Road Ranger Work Zones

MODULE 10 Road Ranger Work Zones MODULE 10 Road Ranger Work Zones Module 10 1 Purpose of the Course To train personnel who may be required to assist motorists and emergency personnel within the highway right-of-way, as part of their Road

More information

GENERAL NOTES FOR WORK ZONE SAFETY SET UP GUIDE

GENERAL NOTES FOR WORK ZONE SAFETY SET UP GUIDE FORWARD It shall be the responsibility of the person in charge to institute the placing of all appropriate cautionary devices and controls as may be required for the particular job. Traffic protection

More information

A Guide to Short Term Stationary, Short Duration, and Mobile Work Zone Traffic Control

A Guide to Short Term Stationary, Short Duration, and Mobile Work Zone Traffic Control A Guide to Short Term Stationary, Short Duration, and Mobile Work Zone Traffic Control Page i 1. Report No. 2. Government Accession No. 3. Recipient Catalog No. 4 Title and Subtitle A Guide to Short-Term

More information

The Basics of Temporary Traffic Control What Every Contractor Should Know

The Basics of Temporary Traffic Control What Every Contractor Should Know The Basics of Temporary Traffic Control What Every Contractor Should Know James E. Bryden, PE jbryden@nycap.rr.com Federal Highway Administration, USDOT Work Zone Safety and Mobility Final Rule Updates

More information

Welcome!! Temporary Traffic Control During Maintenance and Short Duration Activities. Training Course 1-1

Welcome!! Temporary Traffic Control During Maintenance and Short Duration Activities. Training Course 1-1 Welcome!! Temporary Traffic Control During Maintenance and Short Duration Activities Training Course 1-1 About This Course This material is based upon work supported by the Federal Highway Administration

More information

Actively Managing Your Work Zones: The 6B Solution

Actively Managing Your Work Zones: The 6B Solution Actively Managing Your Work Zones: The 6B Solution Steven C. Strength, PE, PTOE steve.strength@la.gov Louisiana Local Technical Assistance Program (LTAP) Louisiana Transportation Conference Session 29

More information

Monroe Fire Department

Monroe Fire Department Monroe Fire Department Standard Operating Guidelines Highway Safety Policy Purpose: This procedure identifies parking practices for Fire Department apparatus and vehicles that will provide maximum protection

More information

SECTION TRAFFIC CONTROL. A. The following is a list of standards which may be referenced in this section:

SECTION TRAFFIC CONTROL. A. The following is a list of standards which may be referenced in this section: SECTION 01 55 26 TRAFFIC CONTROL PART 1 GENERAL 1.01 SECTION INCLUDES A. Section covers requirements for traffic control during construction of the PROJECT. 1.02 REFERENCES A. The following is a list of

More information

Peterborough County Road Safety Audit Guideline Pilot

Peterborough County Road Safety Audit Guideline Pilot Peterborough County Pilot Table of Contents 1.0 Purpose... 3 2.0 Road Safety Audit Objectives... 3 3.0 Legal Issues... 3 4.0 Road Safety Audit Procedures... 4 4.1 Project Selection Criteria... 5 4.2 Scope...

More information

Texas Transportation Institute The Texas A&M University System College Station, Texas

Texas Transportation Institute The Texas A&M University System College Station, Texas 1. Report No. FHWA/TX-04/4174-1 4. Title and Subtitle IDENTIFICATION OF HAZARDS ASSOCIATED WITH MOBILE AND SHORT DURATION WORK ZONES 7. Author(s) Brooke R. Ullman, Melisa D. Finley, and Nada D. Trout 9.

More information

"TOTAL QUALITY MANAGEMENT M E A S U R I N G QUALITY FROM THE CUSTOMER'S VIEWPOINT"

TOTAL QUALITY MANAGEMENT M E A S U R I N G QUALITY FROM THE CUSTOMER'S VIEWPOINT 32 "TOTAL QUALITY MANAGEMENT M E A S U R I N G QUALITY FROM THE CUSTOMER'S VIEWPOINT" Jerry Miller Assistant District Engineer Minnesota Department of Transportation - Total quality management must start

More information

TEXAS CONNECTED FREIGHT CORRIDORS

TEXAS CONNECTED FREIGHT CORRIDORS TEXAS CONNECTED FREIGHT CORRIDORS 2017 USDOT ATCMTD Program Award 17 October 2018 Table of Contents 1 Texas Triangle Challenge 3 2 Texas Connected Vehicle Vision 4 3 4 5 6 7 8 Texas Connected Freight Corridors

More information

NOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 4/08/2003

NOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 4/08/2003 NOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 4/08/2003 Control 6096-61-001 Project RMC - 609661001 Highway FM0004 County HOOD Ladies/Gentlemen: Attached please find an addendum on the above captioned

More information

BEST PRACTICES FOR WORK ZONE TRAFFIC CONTROL ON HIGHWAYS, STREETS AND BRIDGES

BEST PRACTICES FOR WORK ZONE TRAFFIC CONTROL ON HIGHWAYS, STREETS AND BRIDGES BEST PRACTICES FOR WORK ZONE TRAFFIC CONTROL ON HIGHWAYS, STREETS AND BRIDGES Developed by: The Dallas Area Road Construction Work Zone Task Force WORK ZONE TRAFFIC CONTROL BEST PRACTICES I Management

More information

South Portland Fire Dept. Standard Operating Guideline. S.O.G. Number: Date: 6/11/2007 Pages: 7. Title: Fire Incident Traffic Control

South Portland Fire Dept. Standard Operating Guideline. S.O.G. Number: Date: 6/11/2007 Pages: 7. Title: Fire Incident Traffic Control South Portland Fire Dept. Standard Operating Guideline S.O.G. Number: 325.1 Date: 6/11/2007 Pages: 7 Category: Highway Safety Title: Fire Incident Traffic Control Approved: Purpose: To establish guidelines

More information

2016 MUTCD CONCEPT TTC COMMENTS. Michael A. Chacon Traffic Operations Division

2016 MUTCD CONCEPT TTC COMMENTS. Michael A. Chacon Traffic Operations Division 2016 MUTCD CONCEPT TTC COMMENTS Michael A. Chacon Traffic Operations Division MUTCD 4 Ballot items were discussed at the June 2014 meeting in TTC, as well as additional topics. TTC No. 1 Pedestrian and

More information

TRAFFIC CONTROL STRATEGIES FOR SHORT- TERM, SHORT-DURATION, AND MOBILE WORK ZONES

TRAFFIC CONTROL STRATEGIES FOR SHORT- TERM, SHORT-DURATION, AND MOBILE WORK ZONES TRAFFIC CONTROL STRATEGIES FOR SHORT- TERM, SHORT-DURATION, AND MOBILE WORK ZONES Training Program FHWA GRANT DTFH61-11-RA-00012 1 DISCLAIMER Opinions, findings, and conclusions expressed in this presentation

More information

Concept of Operations

Concept of Operations Concept of Operations Truck Rollover Warning System (TROWS) Minnesota Department of Transportation Innovative Ideas Program MnDOT Contract No. 02200 SEH No. MNTMD 123391 April 15, 2013 Table of Contents

More information

System Requirements. Truck Rollover Warning System (TROWS) Minnesota Department of Transportation MnDOT Contract No

System Requirements. Truck Rollover Warning System (TROWS) Minnesota Department of Transportation MnDOT Contract No System Requirements (TROWS) Minnesota Department of Transportation MnDOT Contract No. 02200 Short Elliott Hendrickson Inc. IRD, Inc. MNTMD 123391 June 6, 2013 Table of Contents Page 1. Project Description...

More information

FHWA-NJ July 2006

FHWA-NJ July 2006 TURNING PROBLEMS INTO SOLUTIONS Need a solution? Think Jersey DOT Project 2003-27: Identification of Traffic Control Devices for Mobile and Short Duration Work Operations FHWA-NJ-2006-006 July 2006 SUMMARY

More information

SECTION TRAFFIC REGULATIONS

SECTION TRAFFIC REGULATIONS PART 1 GENERAL 1.1 DESCRIPTION A. Traffic Control permits, notifications, mobilization, temporary signs, barriers, lights, flagging personnel, striping, markings, and demobilization and removal. 1.2 RELATED

More information

TEMPORARY TRAFFIC CONTROL PLAN DEVELOPMENT WORKSHOP. Local Sponsor:

TEMPORARY TRAFFIC CONTROL PLAN DEVELOPMENT WORKSHOP. Local Sponsor: TEMPORARY TRAFFIC CONTROL PLAN DEVELOPMENT WORKSHOP Local Sponsor: 1 TEMPORARY TRAFFIC CONTROL PLAN DEVELOPMENT WORKSHOP Instructors Tapan K. Datta, Phd. P.E. Tim Gates, Phd. P.E. Jonathan Kay Introductions

More information

Safe Practices for Traffic Incident Responders

Safe Practices for Traffic Incident Responders Session No. 653 Safe Practices for Traffic Incident Responders Introduction Kim Johnson, CSP, CFPS Traffic responders work in one of the most hazardous environments the highway. All too frequently, responders

More information

Welcome!! Traffic Control Supervisor. Training Course

Welcome!! Traffic Control Supervisor. Training Course Welcome!! Traffic Control Supervisor Training Course Traffic Control Supervisor Training Course Two-day course Begins promptly at 8:00 AM Ends no later than 5:00 PM Flexible schedule!! 0-2 Course Objectives

More information

NOTIFICATION OF ADDENDUM ADDENDUM NO. 2 DATED 9/11/2017

NOTIFICATION OF ADDENDUM ADDENDUM NO. 2 DATED 9/11/2017 NOTIFICATION OF ADDENDUM ADDENDUM NO. 2 DATED 9/11/2017 Control 6287-61-001 Project RMC - 628761001 Highway IH0035 County WEBB Ladies/Gentlemen: Attached please find an addendum on the above captioned

More information

NOTIFICATION OF ADDENDUM ADDENDUM NO. 2 DATED 10/31/2018

NOTIFICATION OF ADDENDUM ADDENDUM NO. 2 DATED 10/31/2018 NOTIFICATION OF ADDENDUM ADDENDUM NO. 2 DATED 10/31/2018 Control 6331-53-001 Project BPM - 633153001 Highway US0067 County TITUS Ladies/Gentlemen: Attached please find an addendum on the above captioned

More information

Advantages of Concrete Parking Lots. Presented by: National Ready Mixed Concrete Association (NRMCA) American Society of Concrete Contractors (ASCC)

Advantages of Concrete Parking Lots. Presented by: National Ready Mixed Concrete Association (NRMCA) American Society of Concrete Contractors (ASCC) Advantages of Concrete Parking Lots Presented by: National Ready Mixed Concrete Association (NRMCA) American Society of Concrete Contractors (ASCC) Today s Outline Market Trends Benefits of Concrete Parking

More information

WorkZone Safety:Traffic Control Plans and Intrusion Prevention Basic Work Zone Traffic Control Principles External Traffic Control

WorkZone Safety:Traffic Control Plans and Intrusion Prevention Basic Work Zone Traffic Control Principles External Traffic Control WorkZone Safety:Traffic Control Plans and Intrusion Prevention Basic Work Zone Traffic Control Principles External Traffic Control Intrusion of the Traveling Population Employees exposed to traffic Internal

More information

Preventing backing accidents

Preventing backing accidents Risk Control Target Accident Reduction Plan (TARP) Preventing backing accidents Risk Control Reduce Risk. Prevent Loss. Save Lives. Backing a commercial motor vehicle is not an easy task under the best

More information

MEMORANDUM. ~ ~ //. -L/'j L!E.

MEMORANDUM. ~ ~ //. -L/'j L!E. ~e* ~;~:~ent.,o.:-ransportation MEMORANDUM TO: All District Engineers DATE: September 28,2007 ~ ~ //. -L/'j L!E. FROIVI: Carlos A. Lopez, P.E. ~..t::o ce- V '1'~ r. SUBJECT: Revised Barricade and Construction

More information

TEMPORARY TRAFFIC CONTROL PLAN DEVELOPMENT WORKSHOP. Local Sponsor:

TEMPORARY TRAFFIC CONTROL PLAN DEVELOPMENT WORKSHOP. Local Sponsor: TEMPORARY TRAFFIC CONTROL PLAN DEVELOPMENT WORKSHOP Local Sponsor: 1 TEMPORARY TRAFFIC CONTROL PLAN DEVELOPMENT WORKSHOP Instructors Tapan K. Datta, Phd. P.E. Tim Gates, Phd. P.E. Jonathan Kay Introductions

More information

TEMPORARY TRAFFIC CONTROL PLAN DEVELOPMENT WORKSHOP. Local Sponsor:

TEMPORARY TRAFFIC CONTROL PLAN DEVELOPMENT WORKSHOP. Local Sponsor: TEMPORARY TRAFFIC CONTROL PLAN DEVELOPMENT WORKSHOP Local Sponsor: 1 TEMPORARY TRAFFIC CONTROL PLAN DEVELOPMENT WORKSHOP Instructors Tapan K. Datta, Phd. P.E. Tim Gates, Phd. P.E. Jonathan Kay Introductions

More information

COMPANY OFFICER SAFE VEHICLE PRACTICES DURING ON-HIGHWAY INCIDENTS. 3 hours TIME FRAME: LEVEL OF INSTRUCTION: AUTHORITY: BEHAVIORAL OBJECTIVE:

COMPANY OFFICER SAFE VEHICLE PRACTICES DURING ON-HIGHWAY INCIDENTS. 3 hours TIME FRAME: LEVEL OF INSTRUCTION: AUTHORITY: BEHAVIORAL OBJECTIVE: TOPIC: TIME FRAME: LEVEL OF INSTRUCTION: SAFE VEHICLE PRACTICES DURING ON-HIGHWAY INCIDENTS 3 hours II AUTHORITY: BEHAVIORAL OBJECTIVE: Condition: Behavior: Standard: A written quiz The student will confirm

More information

J&C Construction Agency

J&C Construction Agency Traffic Control Inspection conducted for J&C Construction Agency Date and Time of Inspection 04 May 2018 06:57 AM Project Number JCCA-1234 Competent Person Steeve Rogerson Inspected by SafetyCulture Staff

More information

Temporary Traffic Control Design Specialist. Training Course

Temporary Traffic Control Design Specialist. Training Course Temporary Traffic Control Design Specialist Training Course About This Course This material is based upon work supported by the Federal Highway Administration (FHWA) under grant agreement No. DTFH61-06-G-00004

More information

Sign Retroreflectivity Requirements in the MUTCD. Final Rule. MUTCD Changes. Conducting Visual Nighttime Inspections. University of Kentucky

Sign Retroreflectivity Requirements in the MUTCD. Final Rule. MUTCD Changes. Conducting Visual Nighttime Inspections. University of Kentucky Sign Retroreflectivity Requirements in the MUTCD Eric Green, MSCE, PE, GISP Kentucky Transportation Center Final Rule Published on Dec 21, 2007 Vol 72, No. 245 Revision #2 of the 2003 Edition of the MUTCD

More information

Evaluation of Freeway Work Zone Merge Concepts

Evaluation of Freeway Work Zone Merge Concepts Evaluation of Freeway Work Zone Merge Concepts Michael Kurker University of Texas at Austin Research in conjunction with Ruoyu Liu, Shoupeng Tang, Chris Fournier Jen Duthie, Natalia Ruiz Juri, Randy Machemehl,

More information

Date: May 4, Clare M. Look-Jaeger, P.E. Kevin C. Jaeger Linscott, Law & Greenspan, Engineers Weingart Projects Construction Traffic Analysis

Date: May 4, Clare M. Look-Jaeger, P.E. Kevin C. Jaeger Linscott, Law & Greenspan, Engineers Weingart Projects Construction Traffic Analysis MEMORANDUM To: CAJA Environmental Services, LLC Date: From: Subject: Clare M. Look-Jaeger, P.E. Kevin C. Jaeger Linscott, Law & Greenspan, Engineers Weingart Projects Construction Traffic Analysis LLG

More information

Portable Changeable Message signs have a wide variety of

Portable Changeable Message signs have a wide variety of Part 6F (devices) Minnesota MUTCD 2005 with 2007 09 Revisions Part 6F (devices) Federal MUTCD 2009 Part 6F (devices) MN MUTCD Rearranged Sections 6F.55 Portable Changeable Message Signs Portable Changeable

More information

Manage Lanes, AET & Technology Summit April 23, 2018 Dan Lamers, P.E. Senior Program Manager

Manage Lanes, AET & Technology Summit April 23, 2018 Dan Lamers, P.E. Senior Program Manager Occupancy Verification: To Enforce or Not to Enforce, That is the Question Manage Lanes, AET & Technology Summit April 23, 2018 Dan Lamers, P.E. Senior Program Manager Occupancy Verification: To Enforce

More information

APWA Conference Work Zone Safety Update on Regulations & Requirements for Employee Protection

APWA Conference Work Zone Safety Update on Regulations & Requirements for Employee Protection APWA Conference Work Zone Safety Update on Regulations & Requirements for Employee Protection September 16, 2009 Columbus, Ohio Presenter: John J. Meola, CSP, ARM Safety Manager, Transfield Services Richmond,

More information

ST. MARK S SCHOOL OF TEXAS

ST. MARK S SCHOOL OF TEXAS TRAFFIC MANAGEMENT PLAN FOR ST. MARK S SCHOOL OF TEXAS IN DALLAS, TEXAS DESHAZO PROJECT NO. 15200 Z156-218 (RB) Prepared for: 10600 Preston Road Dallas, Texas 75230 Prepared by: Texas Registered Engineering

More information

KANSAS WORK ZONE SAFETY AND MOBILITY PROCESSES AND PROCEDURES

KANSAS WORK ZONE SAFETY AND MOBILITY PROCESSES AND PROCEDURES KANSAS WORK ZONE SAFETY AND MOBILITY PROCESSES AND PROCEDURES Bureau of Transportation Safety and Technology 700 SW Harrison, Topeka, KS 66603 July 30, 2008 Definitions Significant Project All Federal-aid

More information

SECTION 616 TEMPORARY TRAFFIC CONTROL

SECTION 616 TEMPORARY TRAFFIC CONTROL SECTION 616 TEMPORARY TRAFFIC CONTROL 616.1 Description. This work shall consist of furnishing, installing, operating, maintaining, cleaning, relocating and removing temporary traffic control devices and

More information

Safety Management System for Israel

Safety Management System for Israel Safety Management System for Israel Dr. Simon Lewis and Joe Garvey AgileAssets, Inc. Traffic Records Forum New Orleans July 27, 2010 A nation under pressure * Do things well /smart * Do things right first

More information

Reconstruction Project Update

Reconstruction Project Update I-65/I-70 North Split Interchange Reconstruction Project Update September 18, 2017 Agenda Welcome/introductions Project overview Scope and limits Need Environmental Assessment Maintenance of traffic Financial

More information

Temporary Traffic Control (TTC) Inspection Form

Temporary Traffic Control (TTC) Inspection Form Temporary Traffic Control (TTC) Inspection Form Project Information Rating/Grade of Project District/County Contractor Name Project Location Inspected By: Date/Time of Inspection: Permit/Contract No. Project

More information

Scarborough Fire Department Scarborough, Maine Standard Operating Procedures

Scarborough Fire Department Scarborough, Maine Standard Operating Procedures Scarborough Fire Department Scarborough, Maine Standard Operating Procedures Book: Emergency Operations Chapter: Alarm & Response Procedures Subject: 3020 - Safe Vehicle Positioning Revision Date: 7/31/2007;

More information

ACRP Report 52. Available since late 2011 Download from TRB web site Provide airport operators updated resource on wayfinding and signing guidelines

ACRP Report 52. Available since late 2011 Download from TRB web site Provide airport operators updated resource on wayfinding and signing guidelines Available since late 2011 Download from TRB web site Provide airport operators updated resource on wayfinding and signing guidelines 1 Panel Broward County Aviation Dept. Port of Oakland Massachusetts

More information

CHAPTER 18 TEMPORARY ROADS AND BRIDGES

CHAPTER 18 TEMPORARY ROADS AND BRIDGES Change #1 - Revised 12/12 CHAPTER 18 TEMPORARY ROADS AND BRIDGES 18.0 INTRODUCTION These guidelines are to be used to design temporary roads and bridges where traffic will be maintained at the construction

More information

Road Markings for Machine Vision NCHRP Project (6) Update to AASHTO SCOTE June 2016

Road Markings for Machine Vision NCHRP Project (6) Update to AASHTO SCOTE June 2016 Road Markings for Machine Vision NCHRP Project 20-102(6) Update to AASHTO SCOTE June 2016 NCHRP Project 20-102 Impacts of Connected Vehicles and Automated Vehicles on State and Local Transportation Agencies

More information

Night Work Specification

Night Work Specification 1.0 HOURS OF WORK Night Work Specification Night time hours are defined as per the Tender documents. 2.0 TRAFFIC CONTROL PLAN Prior to the start of work the Contractor shall submit 4 bound copies of a

More information

Cooperative Automated Transportation (CAT)

Cooperative Automated Transportation (CAT) Cooperative Automated Transportation (CAT) Perspectives on Organization Alignment and Near-Term Investments John Nisbet, Director, Traffic Operations Washington State Department of Transportation AASHTO

More information

AASHTO S NATIONAL TRANSPORTATION PRODUCT EVALUATION PROGRAM (NTPEP)

AASHTO S NATIONAL TRANSPORTATION PRODUCT EVALUATION PROGRAM (NTPEP) AASHTO S NATIONAL TRANSPORTATION PRODUCT EVALUATION PROGRAM (NTPEP) TEMPORARY TRAFFIC CONTROL DEVICES DATA USAGE GUIDE INRODUCTION The NTPEP program has successfully supplied material performance data

More information

SPECIAL PROVISION Detours, Barricades, Warning Signs, Sequence of Work, etc.

SPECIAL PROVISION Detours, Barricades, Warning Signs, Sequence of Work, etc. 2004 Specifications CSJ 0299-04-049, Etc. SPECIAL PROVISION 000---979 Detours, Barricades, Warning Signs, Sequence of Work, etc. 1. Description of Project. A. General. This project provides for the construction

More information

INTERSTATE CORRIDOR PLANNING

INTERSTATE CORRIDOR PLANNING INTERSTATE CORRIDOR PLANNING Prioritization of Corridor Studies July 29, 2015 Importance of the Interstate System Texas is an integral part of the national interstate system. The interstate system provides

More information

by Melisa D. Finley, P.E. Transportation Short Course October 11, 2017

by Melisa D. Finley, P.E. Transportation Short Course October 11, 2017 by Melisa D. Finley, P.E. Transportation Short Course October 11, 2017 Acknowledgements Texas Department of Transportation (TxDOT) Project 0-6769 Project 0-6867 (Phase I) Project 0-6867-01 (Phase II) Southwest

More information

I-880 ICM Systems Engineering Management Plan TAC Meeting

I-880 ICM Systems Engineering Management Plan TAC Meeting I-880 ICM Systems Engineering Management Plan TAC Meeting Presented by Metropolitan Transportation Commission (MTC) November 16, 2011 1 Agenda Introductions, Agenda Project Status I-880 ICM Strategies

More information

Safety. Introduction. Total System

Safety. Introduction. Total System Safety Introduction Ohio is the 35 th largest state in the nation based on geographic size, however it carries the 5 th largest total traffic volume and the 4 th largest truck traffic volume. With such

More information

Part I. GENERAL PROVISIONS

Part I. GENERAL PROVISIONS Part I. GENERAL PROVISIONS 1A-1 Purpose of Traffic Control Devices The purpose of traffic control devices and warrants for their use is to help insure highway safety by providing for the orderly and predictable

More information

Construction Requirements for Installation of Utilities in the Public Right-of-way of McPherson County, Kansas October 2011

Construction Requirements for Installation of Utilities in the Public Right-of-way of McPherson County, Kansas October 2011 Construction Requirements for Installation of Utilities in the Public Right-of-way of McPherson County, Kansas October 2011 General Provisions and Specifications - These provisions and specifications shall

More information

Local Technical Assistance Program (LTAP) / Tribal Technical Assistance Program (TTAP) Every Day Counts (EDC) Initiatives. Chad Pendley, P.E.

Local Technical Assistance Program (LTAP) / Tribal Technical Assistance Program (TTAP) Every Day Counts (EDC) Initiatives. Chad Pendley, P.E. Local Technical Assistance Program (LTAP) / Tribal Technical Assistance Program (TTAP) Every Day Counts (EDC) Initiatives Chad Pendley, P.E. June 23, 2016 Stillwater, Oklahoma All Work Zones MUST follow

More information

Adaptive Signal Control Technology (ASCT) for Rural Applications Lessons Learned from the Bell Rd ASCT Pilot Project

Adaptive Signal Control Technology (ASCT) for Rural Applications Lessons Learned from the Bell Rd ASCT Pilot Project Adaptive Signal Control Technology (ASCT) for Rural Applications Lessons Learned from the Bell Rd ASCT Pilot Project NRITS & ITS AZ Annual Conference October 2018 Presented by: April Wire, P.E., PTOE ITS

More information

SAFETY FACT SHEETS. Working in or near Traffic Safety Non Negotiable. G-HS-ST Working in or near Traffic. G-HS-FS Version:1

SAFETY FACT SHEETS. Working in or near Traffic Safety Non Negotiable. G-HS-ST Working in or near Traffic. G-HS-FS Version:1 SAFETY FACT SHEETS Working in or near Traffic Safety Non Negotiable G-HS-ST-00737 Working in or near Traffic Safety Non-Negotiables (SNN) Zinfra Group is committed to providing a safe workplace in line

More information

Work Zone Positive Protection Toolbox

Work Zone Positive Protection Toolbox Work Zone Positive Protection Toolbox This booklet serves as a toolbox to describe various types of positive protection devices currently in use and provides guidance on where and how each is typically

More information

North Texas Tollway Authority

North Texas Tollway Authority North Texas Tollway Authority Traffic Safety and Congestion NCTCOG 18 th Annual Public Works Roundup May 10, 2017 Latest Edition NTTA established in 1997; non-budgeted state agency Texas Transportation

More information

Author Justin Jackson Student Center for Transportation Research and Education, Iowa State University

Author Justin Jackson Student Center for Transportation Research and Education, Iowa State University NIGHTTIME ROAD CONSTRUCTION: CURRENT ISSUES Author Justin Jackson Student Center for Transportation Research and Education, Iowa State University Center for Transportation Research and Education Iowa State

More information

SECTION 12 - CONSTRUCTION AREA TRAFFIC CONTROL TABLE OF CONTENTS

SECTION 12 - CONSTRUCTION AREA TRAFFIC CONTROL TABLE OF CONTENTS SECTION 12 - CONSTRUCTION AREA TRAFFIC CONTROL TABLE OF CONTENTS Section Page 12-1 GENERAL... 12.1 12-2 FLAGGING... 12.1 12-2.01 Flaggers... 12.1 12-2.02 Flagging Costs... 12.1 12-3 TRAFFIC-HANDLING EQUIPMENT

More information

NOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 8/02/2006

NOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 8/02/2006 NOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 8/02/2006 Control 6149-17-001 Project RMC - 614917001 Highway IH0030 County FRANKLIN Ladies/Gentlemen: Attached please find an addendum on the above captioned

More information

Project Initiation Form

Project Initiation Form Meeting Date: The Project Initiation Form should be completed in conjunction with the Level 2 Screening Form. Process Leads and/or Planners should complete the Project Initiation Form to document coordination

More information

TRAFFIC MANAGEMENT PLAN REQUIREMENTS FOR COMMERCIAL/LARGE DEVELOPMENT SITES

TRAFFIC MANAGEMENT PLAN REQUIREMENTS FOR COMMERCIAL/LARGE DEVELOPMENT SITES TRAFFIC MANAGEMENT PLAN REQUIREMENTS FOR COMMERCIAL/LARGE DEVELOPMENT SITES The District of West Vancouver requires a Traffic Management Plan (TMP) to be submitted for acceptance by the Land Development

More information

Selecting a Method to Comply with the Requirements for Traffic Sign Retroreflectivity

Selecting a Method to Comply with the Requirements for Traffic Sign Retroreflectivity Selecting a Method to Comply with the Requirements for Traffic Sign Retroreflectivity James W. Ellison, P.E. Consulting Traffic Engineer Federal Way, WA The Complexity of Sign Retroreflectivity Driver

More information

Modeling Traffic Flow under Emergency Evacuation Situations: Current Practice and Future Direction

Modeling Traffic Flow under Emergency Evacuation Situations: Current Practice and Future Direction Modeling Traffic Flow under Emergency Evacuation Situations: Current Practice and Future Direction Kevin D. Moriarty Research Assistant Transportation Engineering November 16, 2006 Overview Introduction

More information

5. Builder/Contractor Guidelines/Work Rules

5. Builder/Contractor Guidelines/Work Rules Last Revised 2018 Architectural Standards Committee Page 25 of 28 5. Builder/Contractor Guidelines/Work Rules 5.1 Builder/Contractor Responsibilities The builder/contractor is responsible for ensuring

More information

Work Zone Inspection Process

Work Zone Inspection Process Work Zone Inspection Process 2013 Louisiana Transportation Conference Barry L. Lacy, P.E. Work Zone/Claims/Audit Engineer Louisiana State Motto Why is Temporary Traffic Control Important? www.workzonesafety.org

More information

Night Lighting Best Practices to Ensure Safety. Fred Beaudry

Night Lighting Best Practices to Ensure Safety. Fred Beaudry Night Lighting Best Practices to Ensure Safety Fred Beaudry Night Work Safety Work Zones Safe work practices for night work consist of much more than just PPE. It s our whole attitude and approach to the

More information

Operations in the 21st Century DOT Meeting Customers Needs and Expectations

Operations in the 21st Century DOT Meeting Customers Needs and Expectations Operations in the 21st Century DOT Meeting Customers Needs and Expectations 1 Purpose of this Meeting: Share Thoughts & Discuss Challenges brought about by the changing transportation environment and public

More information

600 TEMPORARY TRAFFIC CONTROL Traffic Eng. Manual

600 TEMPORARY TRAFFIC CONTROL Traffic Eng. Manual TABLE OF CONTENTS Part 6 - TEMPORARY TRAFFIC CONTROL 600 GENERAL... 6-13 600-1 Introduction... 6-13 600-2 Construction Projects... 6-13 600-3 Force Account (ODOT Operations) Work... 6-13 600-4 Public Communication...

More information

CHALLENGES IN ENSURING WORKER SAFETY IN ACTIVE ROADWAY WORK ZONES

CHALLENGES IN ENSURING WORKER SAFETY IN ACTIVE ROADWAY WORK ZONES CHALLENGES IN ENSURING WORKER SAFETY IN ACTIVE ROADWAY WORK ZONES Aleks Kivi, MASc Pavement Specialist akivi@ara.com Chris Olidis, P.Eng Principal Engineer colidis@ara.com Applied Research Associates,

More information

A method to determine roadways with greatest need for intelligent transportation deployments

A method to determine roadways with greatest need for intelligent transportation deployments A method to determine roadways with greatest need for intelligent transportation deployments Jonathan Riehl Wisconsin Traffic Operations and Safety Laboratory October 25, 2016 Outline Overview of TSM&O

More information

The Future of Transportation Technology

The Future of Transportation Technology The Future of Transportation Technology MATT SMITH, P.E., ITS PROGRAM ADMINISTRATOR MICHIGAN DEPARTMENT OF TRANSPORTATION Technology Shifts Transportation transformations have happened before Railroads

More information

SPECIFICATIONS FOR FOG SEAL WITH COVER AGGREGATE

SPECIFICATIONS FOR FOG SEAL WITH COVER AGGREGATE SPECIFICATIONS FOR FOG SEAL WITH COVER AGGREGATE 1.0 DEFINITIONS The term Director [Superintendent, etc.] shall mean the Director of Public Works of the awarding authority. The term Designee shall mean

More information

Internal Audit Follow-Up Report. Compass TxDOT Office of Internal Audit

Internal Audit Follow-Up Report. Compass TxDOT Office of Internal Audit Internal Audit Follow-Up Report Compass TxDOT Office of Internal Audit Objective Assess the status of corrective actions for high risk Management Action Plans (MAPs) previously communicated in the Compass

More information

DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS 441 G STREET, NW WASHINGTON, DC

DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS 441 G STREET, NW WASHINGTON, DC DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS 441 G STREET, NW WASHINGTON, DC 20314-1000 REPLY TO ATTENTION OF S: 30 September 2014 CECW-CO 3 0 December 20 11 MEMORANDUM FOR MSC and District Chiefs,

More information

Cold In-Place Recycling

Cold In-Place Recycling Cold In-Place Recycling Dan Schellhammer, P.E. Midstate Reclamation and Trucking In 1991, Midstate brought the first reclaimer into the state of Minnesota Emphasis on asphalt recycling techniques (milling,

More information

CHITTENDEN COUNTY REGIONAL PLANNING COMMISSION Winooski/Burlington, US RTs 2 & 7 Bridge Scoping Study ADVISORY COMMITTEE MEETING NO.

CHITTENDEN COUNTY REGIONAL PLANNING COMMISSION Winooski/Burlington, US RTs 2 & 7 Bridge Scoping Study ADVISORY COMMITTEE MEETING NO. CHITTENDEN COUNTY REGIONAL PLANNING COMMISSION Winooski/Burlington, US RTs 2 & 7 Bridge Scoping Study ADVISORY COMMITTEE MEETING NO. 5 Agenda: 1. Welcome/Introductions 2. Progress & Updates Since Previous

More information

Flexible Pavement Preservation Treatment Construction Patching and Edge Repair AT-TC3PP T1-JA01. Suggested Field Considerations

Flexible Pavement Preservation Treatment Construction Patching and Edge Repair AT-TC3PP T1-JA01. Suggested Field Considerations Suggested Field Considerations The following field considerations are a guide to the important aspects of patching or edge repair. These issues should be determined as required before, during, and after

More information

Construction and Materials Tips

Construction and Materials Tips Construction and Materials Tips Utilizing Slot Stitching for Longitudinal Joint Separation Repair Background Published by the Construction and Bridge Divisions November 2013 Many miles of Continuously

More information

Portable Positive Protection:

Portable Positive Protection: Portable Positive Protection: A Guide for Short Duration and Short Term Work Zones June 2016 Updated by Mobile Barriers LLC Based on Material Developed by ATSSA for the FHWA Work Zone Safety Grant Program

More information

Developing the Program. Module 5

Developing the Program. Module 5 Developing the Program Module 5 Different aspects of the ITCP will be identified and developed during the various construction phases of a project. Depending on the phase, different people will be involved

More information

OUR MISSION. Council is to educate and influence society to adopt safety, health and. and procedures that prevent and mitigate human suffering and

OUR MISSION. Council is to educate and influence society to adopt safety, health and. and procedures that prevent and mitigate human suffering and SAFETY COUNTERMEASURES IN THE WORK ZONE BY JOHN BOYER, INSTURCTOR, ARIZONA C HAPTER(WWW.ACNSC.ORG) NATIONAL SAFETY COUNCIL the National Safety Council, a non- governmental, not-for-profit, public service

More information

GEOMETRIC DESIGN CRITERIA for Non-freeway Resurfacing, Restoration, and Rehabilitation Projects

GEOMETRIC DESIGN CRITERIA for Non-freeway Resurfacing, Restoration, and Rehabilitation Projects GEOMETRIC DESIGN CRITERIA for Non-freeway Resurfacing, Restoration, and Rehabilitation Projects SEPTEMBER 1989 Arkansas State Highway and Transportation Department GEOMETRIC DESIGN CRITERIA for Non-freeway

More information

2. Guiding Principles, Objectives, and Policies

2. Guiding Principles, Objectives, and Policies 2. Guiding Principles, Objectives, and Policies INTRODUCTION The guiding principles for the 2040 MTP Update establish the vision and key focus areas for this planning effort. They combine the guidance

More information

Section 811. PERMANENT PAVEMENT MARKINGS

Section 811. PERMANENT PAVEMENT MARKINGS 811.01 Section 811. PERMANENT PAVEMENT MARKINGS 811.01. Description. This work consists of providing and applying retroreflective permanent pavement markings in accordance with the Michigan Manual on Uniform

More information