1 NMA Supplier Manual Edition 2 July 2010

2 Revision History Contents Management Message 1 Introduction Purpose Scope Responsibility Language Supplier panel requirements Selection rules and status ISO/TS 16949:2002 Registration DUNS Registration EVAL Supplier Validation Audit Government Regulatory Compliance Environment Protection End-of Life Vehicle (ELV) / International Material Data System (IMDS) Quality Assurance Agreement Purchasing terms AIAG standards e-business Capabilities Project management Advanced Product Quality Planning (APQP) Phase 1: Supplier selection (internal) Phase 2: Supplier Design Validation Phase 3: Supplier Process Design and Development Phase 4: Supplier Product and Process Validation Phase 5: PQA Management (Product Quality Assurance) Packaging and Labelling / Logistics Process Flow Process Failure Modes & Effects Analysis (PFMEA) Control Plan Production Part Approval Process (PPAP) Early Production Containment Special Characteristics Safety / Regulation Characteristic Significant Characteristic Functional Characteristics Capability requirements Measurement capability requirements Traceability Carry-over Production transfer...23 Page 2/33

3 4 Serial Production Requirements Introduction Change Management Deviation Authorization Supplier Audits Sub-Supplier Management Annual Revalidation Supplier Facility Access Contingency Plan Document and Product Sample Retention NMA Property - Tools Continuous Improvement Product End Life Measurements, Analysis and Corrective Actions Supplier Performance Reporting Productivity Claim Management Problem resolution methodology and document Claim category Claim management PPM rules Supplier Performance Review Controlled Shipping New Business on Hold Cost Recovery...32 Glossary Page 3/33

4 Revision Record and Approvals Edition Date Edition Level Changes May First release July Update ISO 9001: Update panel status. 2.4 Update EVAL validity 3.14 Define minimum quantity for run@rate. 3.6 New document Request for provisional authorization of deviations before PPAP sampling submission introduced. 3.5 Annual revalidation criteria added. 4.2 New document Change Notification Label added. 5.1 Update of indicators for supplier performance report. 5.1 Update supplier classification Update deadlines for plan-do and check act. 5.7 Update Overall: Site SQA added as responsible with Commodity Engineer. Revised by the Purchasing Team Date Signature Designed by: Tilo Pröhmer Senior Commodity Engineer Marc Lajarige Commodity Engineer Mario Lhotzky Supplier Development & Quality Manager Released by: Mario Lhotzky Supplier Development & Quality Manager Mathilde Gitton Purchasing Director Page 4/33

5 Chairman Message The aim of NIDEC is to contribute to the development of our society and welfare of the general public all over the world by supplying them with the highest quality products with our sincere and enthusiastic dedication to the trinity of technology, skilfulness and modern science and thus to promote the prosperity of our society, our company and all our employees. Page 5/33

6 1 Introduction 1.1 Purpose The purpose of this NMA Supplier Manual is to specify Nidec Motors & Actuators (in the following named Nidec) requirements for our suppliers. These requirements extend from supplier qualification, to new product development, to production and continuous improvement. 1.2 Scope This manual applies to all material/service suppliers of Nidec. 1.3 Responsibility Suppliers are responsible for meeting the NMA Supplier Manual requirements. Failure to meet these requirements may result in the loss of existing and/or future Nidec business, in addition to reimbursement of the cost to Nidec resulting from those failures. Suppliers shall ensure that their production material/service suppliers comply with the requirements of ISO/TS 16949:2002. Suppliers shall adopt the standards of Zero Defects and 100% On Time Delivery to Nidec. Suppliers shall understand that any established PPM target is not an accepted quality level, but represents an intermediate continuous improvement step toward shipment of components/materials meeting the Zero Defects requirement. 1.4 Language Nidec s official language is English. All documents linked with the NMA Supplier Manual are in English. Documents may display the native language. In case of concerns, the English version is the only valid version. Page 6/33

7 2 Supplier panel requirements 2.1 Selection rules and status A new supplier is a company that has never done business with Nidec or a past supplier who has not supplied product to Nidec within the last three years. This applies also to a new supplier location. All new suppliers must be qualified prior to the awarding of new business. The complete list of current / approved suppliers is kept up-to-date by the Supplier Quality & Development Manager. Suppliers are attributed a status according to the following list: Core supplier: its permitted to place without any restriction business at the supplier insofar the commodity (core competence) is respected. Phase out: supplier will be phased out / date is already defined / no new business can be placed. Imposed: supplier is imposed by the customer. NBOH/New Business On Hold: supplier is on probation, Improvement plan is defined and agreed, no new business can be placed before the NBOH is lifted by the management. EOL: supplier will die after end of life of the current production; no new business can be placed. New: Supplier will be introduced, RFQ s can be done, business placed after passing the full introduction procedure / signature of the supplier in must be done. New suppliers, who wish to be added in the Nidec panel, shall: demonstrate compliance to ISO/TS16949:2002 New suppliers, who are only certified according to ISO 9001:2008, may be awarded business on the condition, that they develop their Quality Management System towards to ISO/TS 16949:2002 within 1 year after nomination. maintain a valid DIN ISO certificate choose a Registar certified by the IAOB (International Automotive Oversight Board) for third party audit and certification to ISO/TS 16949/2002 meet all commercial and financial requirements complete and successfully pass the New Supplier Questionnaire EVAL successfully pass a Supplier Validation Audit. NOTE: suppliers directed for use by Nidec s customers shall also meet these criteria. 2.2 ISO/TS 16949:2002 Registration Nidec goal for all suppliers of materials and services affecting production material is to demonstrate compliance to ISO/TS 16949:2002. This is consistent with the expectations of Nidec s customers and our business system that complies to ISO/TS 16949:2002 requirements. Nidec policy is that ALL suppliers must meet the minimum requirement of registration to ISO 9001:2008by an accredited third-party certification body. Any exception to this standard needs to be approved in writing by the Nidec Supplier Quality & Development Manager. It is a further requirement that all suppliers conform to the requirements of ISO/TS 16949:2002 as well as additional requirements outlined in this Supplier Manual. Suppliers shall notify Nidec within 10 day in case their certificate of registration has been suspended or expired. The Supplier shall forward a copy of it s new certificate(s) to all Nidec plants concerned. In case the supplier violates the respective afore-stated norms (ISO/TS or ISO 9001:2008), Nidec is entitled to inform the respective certification body of such violation. Page 7/33

8 2.3 DUNS Registration Suppliers shall register with Dunn & Bradstreet to obtain a DUNS Number. This registration is free of charge and must be done by each supplier s site shipping to Nidec. The Dunn & Bradstreet registration site is located at: EVAL All of Nidec s potential suppliers must receive a positive evaluation when compared with the panel of suppliers in the same business field. Criteria for comparison are as follows: strategy and management general details: financial stability, minimum size, product/market position, etc. R&D (for designers) production quality logistics competitiveness the supplier s capacity to communicate EVAL is a questionnaire defined by Nidec to pre-select suppliers and follow-up their improvement regarding the company s main concerns. At the end of the evaluation, the score determines if the supplier can be pre-selected: EVAL <70%: supplier does not pass pre-selection EVAL 70%: Nidec can take a first order with the supplier, which has 12 months to get an EVAL 80% EVAL 80%: supplier can be selected. The final score is the average of the 8 chapters. 3 conditions have to be fulfilled to be selected: no negative nor more than 3 "insufficient" answers for chapter 1 the average note for each chapter is not below 50% and the final note is not below 70% The EVAL is valid until ending the business relationship between NMA and the supplier. But can be renewed at anytime. Page 8/33

9 2.5 Supplier Validation Audit The purpose of this audit is to verify that a supplier can meet Nidec requirements and expectations. This audit is divided in 11 chapters: 1. Management Responsibility 2. Document and Change Management 3. Project Management 4. Purchasing 5. Material Flow and Traceability 6. Manufacturing and Production Control 7. Non Conformance Management 8. Measurement and Testing 9. Maintenance 10. Personal, Security and Environment 11. Continuous Improvements The supplier validation audit is valid for a period of 24 months maximum. It has to be renewed before the end of its validity. Page 9/33

10 2.6 Government Regulatory Compliance Suppliers shall comply with all applicable governmental regulations. These regulations relate to the health and safety of the workers, environment protection, toxic and hazardous materials, and free trade. Suppliers should recognize that the applicable government regulations might include those in the country of manufacture, as well the country of sale. Suppliers must provide Nidec copies of any data, materials or information provided to a government entity relating to the products supplied to Nidec, including any test, manufacturing, field performance or warranty data. The supplier must provide the information within 10 working days from the date of submission to the government entity. 2.7 Environment Protection Nidec is convinced that the future and permanent protection of our environment, land, water and air can only be achieved through the joint efforts of Industry, Government and Society. Top priority will be to strive for continuous improvement in our environmental performance. We will strive through the development of new products, processes and working methods to further enhance our environmental performance. In doing this, we strive for economical use of raw materials, energy, water and other goods; and will fully consider the life cycle of our products through production, use and disposal. The environmental impact of our products during manufacturing covers both the manufacturing at Nidec and those of our suppliers. This means that both, we and our suppliers, have to perform our activities such that the impact of those activities on the environment is reduced to a minimum. We therefore expect from our suppliers an active engagement in environmental concerns and the establishment, and adherence to, an environmental management as per ISO 14001, or other equivalent standard. This does not release the supplier from complying with all relevant national and international regulations. Nidec recommends all suppliers to be certified ISO or to have planed the certification. The techniques and methods below are those that we believe to constitute the prerequisite to reach the above-mentioned environmental targets: Written guidelines regarding the environmental performance, Regular review of production, maintenance, supply and disposal processes and products to determine their environmental impact, An emergency plan, Definition of targets to improve environmental protection and documentation of their fulfilment. This includes: safeguarding of resources (raw materials, energy, water), prevention and reduction of environmental pollution, minimization of waste and rejects, reduction of expendable packaging, Compliance with all automotive regulations regarding materials and substances, Have a recycling concept/program. The use and consumption of energy and raw materials shall be managed effectively and with a minimum of logistics and transport over the entire vehicle/component life cycle. For a quantitative assessment of resource efficiency by way of life cycle analysis, the requisite data shall be provided upon request (material consumption, water consumption, total energy consumption, transport (raw materials), and emissions. Page 10/33

11 2.8 End-of Life Vehicle (ELV) / International Material Data System (IMDS) The End-of-Life Vehicle (ELV) Directive, 2000/53/EC, was enacted by the European Commission "to minimize the impact of end-of-life vehicles on the environment." The use of lead, mercury, cadmium, and hexavalent chromium are prohibited in vehicles and their components, except for certain exemptions published in Annex II of the Directive. This is a mandated requirement for European Union (EU) Member States and also required by North American, and some Japanese, vehicle manufacturers. Additionally, other legal requirements, such as EU Directives 2002/95/EC, 2002/96/EC, and 2003/11/EC restrict the use of certain flame retardant substances: polybrominated biphenyls (PBBs) and polybrominated diphenyl ethers (PBDEs). PBBs or PBDEs shall not be present in components or materials supplied to Nidec. Suppliers in all regions shall ensure that all components and materials supplied to any Nidec facility comply with the above-mentioned legal requirements. The supplier must consider every aspect of the component or assembly or material delivered to Nidec; and must investigate all sub-supplier components, processes, raw materials, lubricants, coatings, paint and chemical constituents, etc. To ensure compliance with the various legal and customer requirements, Nidec requires its suppliers to report information on materials within their respective components. The International Material Data System (IMDS) has been developed by vehicle manufacturers to collect and manage this data. Suppliers shall submit the required ELV/IMDS data to Nidec as soon as possible upon award of new business, but in any case prior to the PPAP submission. The supplier as part of the PPAP submission shall provide confirmation to Nidec s acceptance of the ELV/IMDS data. Refer to section 3.4 Production Part Approval Process (PPAP) for further explanation of the submission requirements. Nidec requires suppliers to submit ELV data by direct entry into IMDS via the Internet ( 2.9 Quality Assurance Agreement Nidec shall request this agreement from its suppliers. It controls suppliers and Nidec s responsibilities and tasks for the key quality processes in respect to the NMA Supplier Manual. The supplier shall review and sign the Quality Assurance Agreement within 15 days after business attribution Purchasing terms Unless otherwise agreed upon with Nidec, the General Terms of Purchase of the buying site shall apply to all purchases made by NMA whether they are for tools, machines or equipment, parts, raw materials, other materials, or services AIAG standards Suppliers are to be familiar with and strive to comply with the requirements contained in the following documents as these provide the core of Nidec expectations and practices: Advanced Product Quality Planning and Control Plan (APQP) Potential Failure Mode and Effects Analysis (FMEA) Measurement System Analysis (MSA) Production Part Approval Process (PPAP) Statistical Process Control (SPC) Page 11/33

12 Suppliers that subcontract heat treatment, plating, and coating operations will be required to prove these subcontractors are ISO9001:2000 registered and must pass the audit CQI-9 Special process Heat Treat System Assessment, the CQI-11 Plating System Assessment and the CQI-12 Coating System Assessment. For these publications, visit e-business Capabilities Suppliers shall have , Internet access and Internet browser as a minimum for e-business capability. This is required to participate in Nidec s web based applications and communications such as: Supplier Relationship Management System, Web EDI, Bidding on Line, Drawing exchange (CATIA native, CATEXP, STEP AP 214, VDAFS 2.0, IGES 5.1, DXF) Page 12/33

13 3 Project management 3.1 Advanced Product Quality Planning (APQP) Suppliers must use an advanced product quality process that follows the APQP project plan and ensures production readiness with parts that meet 100% of the products specifications. Suppliers shall provide the APQP file for a new product with regard to meeting the project s objectives of quality, cost, performance and timing. Suppliers shall use the Nidec forms and should complete those forms in English (when not specified). Suppliers who wish to use an alternative format shall contact their Commodity Engineer/Site SQA and demonstrate equivalency between the forms before any submission is made. Suppliers are responsible for managing their new product introduction process to the guidelines provided in this document. Nidec s APQP process consists of five phases as shown below. Tasks and deliverables of each phase are written in bold Phase 1: Supplier selection (internal) Potential suppliers are given a set of functional specifications (supplier-designers) or technical specifications (supplier-manufacturers). At this stage, requirements concerning: product specifications target costs quality and logistics are defined or restated. Requirements must be updated for existing components or components that are carried over to another project. The supplier that best matches these requirements will be awarded the contract. Drawings & product specifications Suppliers shall review drawing, part specifications and controls. Validation of a non-panel supplier See chapter 2.1 The supplier can not be selected prior to positive results of selection process. Request for Quotation When responding to the Request for Quotation (RFQ), the supplier must submit the signed RFQ with a detailed cost breakdown. Pre Award Meeting Prior to award of new business and upon Nidec request, suppliers shall meet with Nidec dedicated team members to discuss design, quality expectations, drawings and part specifications. This meeting will be held to insure that supplier representatives and Nidec team members can share experience and resolve manufacturing/design issues prior to PPAP. Supplier selection sheet (internal) Nidec is responsible to fill in and sign the supplier selection sheet. Page 13/33

14 3.1.2 Phase 2: Supplier Design Validation The requirements are drawn up and discussed by Nidec and the supplier during this stage. The end of this stage ends with the approval of the APQP File from the supplier. Kick-off APQP File Nidec initialize the APQP File and sends it to the supplier for approval. Technical review Nidec suppliers will meet with Nidec dedicated team members to review the design and quality expectations. It is especially important that measurement methods are reviewed and agreed between Nidec and the supplier. This technical review shall at minimum be documented in meeting minutes. Targets & risks See page 3 of the APQP file It is an assessment about the project s key dates, risk and quality commitment Feasibility study & commitment (5) See page 5 of the APQP file (parts 5.1 and 5.2) This completes the feasibility confirmation of the RFQ Capacity analysis See page 6 of the APQP file The supplier fills in the part 6.1 Working standards and 6.2 Supplier Capacity Study to verify the planned capacity Prototype build & Prototype validation For the fabrication of prototypes or pre-production parts, suppliers shall imitate the planned production process as closely as feasible. If the suppliers for prototypes and serial parts are different, the prototype supplier shall share with the serial production supplier the process knowledge gathered in prototype fabrication. Proprietary information may be withheld by prior agreement with Nidec Nidec will inform the supplier on the quantity to be delivered. Supplier shall identify all prototypes deliveries Once a supplier starts providing parts, as part of the process development and validation stage, any changes to the process require notification to Nidec. These changes may include outside or sub-tier suppliers, addition/deletion of capital equipment, tooling and/or gauges, manufacturing methodology. Suppliers of prototype parts, when required, shall respond to material concerns Prototypes shall be accompanied with a full inspection report (material certificate, metrological, electrical ) Contract & agreement review Supply Agreement Quality Assurance Agreement Tooling contract consignment contract and/or logistics protocol Design freeze The pre-serial drawings are converted into serial drawings with the SAP part numbers. Acceptance of APQP File (1.6) The supplier signs the coversheet of the APQP to approve the content required and the deliverables of phase 2 (Targets & risks, feasibility study & commitment, capacity analysis). Page 14/33

15 3.1.3 Phase 3: Supplier Process Design and Development This phase represents the time during which the supplier completes designs for their tooling, assembly lines/cells, gauging and identifies additional capital equipment required to manufacture the component/material. This phase starts with the supplier s direction to their manufacturers of the tooling, capital equipment, assembly cells and/or gauging to proceed and ends with the approval to ship the completed items. The supplier shall collect data required to assure that the manufactured items meet drawing, specification and capacity requirements before approval to ship is given. During this phase the supplier shall: notify all risks that could affect the product integrity or the project plan implement when possible error-proofing / poka-yoke to achieve Zero Defects identify changes needed for product or process specifications Review gauge/tooling/equipment The supplier shall review the readiness of gauges, toolings and equipments and inform Nidec about any issues that could affect the timing, the quality of the part or R&R studies Build first off-tool parts For the production of first off-tool parts, suppliers shall imitate the planned production process as closely as feasible. The suppliers shall provide material, dimensional, performance, or process data Nidec will inform the supplier on the quantity to be delivered. The supplier shall identify all deliveries Once a supplier starts providing parts, any changes to the process require notification to Nidec. These changes may include outside or sub-tier suppliers, addition/deletion of capital equipment, tooling and/or gauges, manufacturing methodology Define packaging Packaging shall be defined by the supplier in the part 9 of the APQP file and validated by Nidec Packaging must be defined in accordance with the last edition of the Logistic Manual for Suppliers Release series equipment This phase ends when the supplier releases serial equipment i.e. the tooling, capital equipment, assembly equipment and/or gauging is delivered to the supplier s facility Phase 4: Supplier Product and Process Validation This phase starts with the delivery production of off-process parts (In debugging run of the serial process ) of the tooling, capital equipment, assembly equipment and/or gauging to the supplier s facility. It ends with the release of the component (PPAP approval). During this period that the supplier completes and submits a Production Product Approval Process (PPAP) package. The APQP File is completed and submitted at the same time (p6 capacity, p8 Characteristics, p.10 Phase Report, p11, Concern & Action Report). Every supplier is expected to conduct and execute an APQP process. Suppliers who wish to use other reporting formats than defined in this document shall have written approval from their Commodity Engineer/Site SQA. Determination of manufacturing feasibility and/or capacity study may be required for every new or modified product design or manufacturing process based on engineering changes. Build first off-process parts The supplier shall perform an internal validation of the product and the process, through a mass production representative batch Complete Nidec validation test Page 15/33

16 Nidec defines which tests are required The supplier will deliver parts according to Nidec demand which are representative of the serial process with a complete measurement report of 5 parts minimum (per cavity) Approve sub-suppliers PPAP The supplier is responsible to review and approve the PPAP packages of his suppliers A copy of these documents maybe required for Nidec PPAP Perform Run@Rate audit Nidec will lead on supplier s site a Run@Rate. The scope is to valid process flow, quality and capacity requirements. If the Run@Rate is not qualified first time, the expenses of the second run will be charged to the supplier. During the Run@Rate, parts for initial sample presentation will be sampled during the run. Sorting is not authorized The Run@Rate study is completed on page 6 Capacity of the APQP file. It is a formalized production capacity study that verifies proper cycle times, quality expectations and yields. This significant production run shall be from one to eight hours of production, and with the specific production quantity to total a minimum of 300 consecutive parts, unless otherwise specified by the authorized SQA representative. The score of the audit assesses the state of readiness of the supplier s process. See chart below Submit PPAP The supplier will submit the PAPP package. See chapter 3.6. Nidec line trial Nidec may require a line trial at his facility The supplier must always identify the packaging with a special label to avoid part mixed with serial production PPAP approval The Commodity Engineer/Site SQA is responsible for the approval of the PPAP Page 16/33

17 3.1.5 Phase 5: PQA Management (Product Quality Assurance) Once the initial samples have been accepted, deliveries are subjected to incoming inspection for a defined probationary period. Nidec checks that the product manufactured in line with the APQP documents does not present any nonconformance, whatever the cause, during this period. If an incident occurs, the part will be subjected to a new probationary period after an appropriate action plan, approved by Nidec, has been effectively implemented. Plan Incoming inspection The Commodity Engineer/Site SQA defines with the receiving plant the incoming inspection plan Send weekly report When requested, the supplier must communicate during 3 months a weekly report measuring internal quality performance at supplier location. The weekly report can be found in the APQP file, page12 See chapter 3.7. Open orders released The buyer releases open orders Close APQP file The APQP file is closed and signed by the Commodity Engineer/Site SQA Release PQA status A PQA part is a part that is not subject to Nidec incoming inspection (except for product audits which are carried out periodically as defined by Nidec) and whose conformance is guaranteed by the supplier. If required, initial samples will be re-qualified in line with the periodicity specified. See chapter 4.6. Before PQA deliveries can begin, no incidents involving the part in question must have occurred during the probationary period and the quality objectives must have been achieved. If a part belongs to a technology family, no non-conformance must have been identified in the common production process during the probationary period If all the above conditions have been met, the Commodity Engineer/Site SQA gives the supplier the date on which PQA deliveries can start for the part All PQA deliveries must be identified by a PQA label on all boxes, containers, etc The supplier must be in a position to inform Nidec of the results of inspections carried out for each batch delivered in line with the requirements of the supplier control plan Suspension of PQA Any incident will result in the immediate suspension of PQA deliveries. After analysis of the causes, suspension of PQA is confirmed for: the technology family of part, if it is the generic process that is at fault the part involved if a specific process is found to be at fault In all cases, Nidec will give the supplier written notification of the date for resumption of PQA deliveries after the problem has been solved and a new probationary period completed. If a product or process is modified or production transferred, PQA deliveries are suspended. It may be decided by the Commodity Engineer/Site SQA that the supplier must go through APQP phase 2 to 5 again. Page 17/33

18 3.2 Packaging and Labelling / Logistics Serial Production Requirements Nidec and suppliers shall agree upon the packaging plan during APQP, including the following requirements. There shall be only one part number in a box or packaging unit. All packaging units shall be labelled and the label shall include: Nidec part number with engineering level and part description. Quantity. Supplier name and Nidec supplier code. Lot traceability number and date -- this number shall have a direct relationship with Delivery Note supplied. Starting with the Delivery Note, the supplier shall be able to trace all the documents and record. Nidec, at its discretion, may specify additional traceability requirements. Raw material Heat number, if requested. A Bar Coded label applied to each packaging unit. Nidec facilities may specify their own bar coding formats. Suppliers shall meet the bar code requirements of the Nidec location they are shipping to. Suppliers, regardless of the manufacturing location, shipping to Nidec s North American facilities shall meet the requirements found in the North American Labelling Requirements. Suppliers shall meet the requirements of Nidec with regard to the use, control and supply of returnable packaging. Suppliers are required to utilize and ship material on a first in - first out basis. Sequence of batches must be identified on the packaging label by either a date code or batch/lot number. Safety related identification criteria shall conform to all government regulatory and Nidec requirements. Suppliers providing product to multiple operating units, on a global scale, shall work with each of the locations to assure that the packaging is sufficiently robust to withstand shipment by sea and arrive on time, without damage. Suppliers shall maintain documentation detailing proper packaging, cleanliness level, storage and shipping instructions of its products. These instructions must conform to the Nidec receiving site requirements. Nidec expects their suppliers to conduct, periodically, dock audits on packaged materials. Evidence of these audits shall be retained with other lot inspection documentation. For more information, refer to the Logistic Manual for suppliers. Pre-Production and Sample Part Requirements Suppliers are expected to clearly identify pre-production or sample parts to ensure that the Nidec receiving site does not mix such parts with regular production parts. Labelling must be done per Nidec receiving site requirements and shall be differentiated from regular production shipping labels. In particular, the Supplier Identification, Part Number, Engineering Level, and Quantity must be clearly displayed on the part-packaging label to ensure easy, visible segregation of containers/parts. In addition, a brightly colored sheet of paper, at least 20 cm by 14 cm, must be attached to at least 2 sides of the container or material, stating one of the following: Pre-Production Materials Pre-Production Parts Sample Materials Sample Parts Page 18/33

19 3.3 Process Flow The Process Flow Chart shall define the entire process flow starting with receiving inspection and finishing with packaging and shipping. It shall include any sub-tier, or outside, suppliers, along with the names of those suppliers and the controls done at these additional locations. It shall include machine numbers or unique identifiers that reflect what has been approved as part of the process. Suppliers shall identify those operations linked to the manufacturing of features identified by special characteristics. 3.4 Process Failure Modes & Effects Analysis (PFMEA) Unless otherwise specified, suppliers shall use the AIAG Potential Failure Mode & Effects Analysis (PFMEA) manual as the basis for creating this document. The PFMEA shall follow the flow established in the Process Flow Chart. The PFMEA shall be prepared with multi-disciplinary team. Failure modes shall include designated characteristics from the Nidec drawings in addition to the process and tooling based items. Suppliers shall have a process in place to report on their highest Risk Priority Numbers (RPN). This report may be in the form of a Pareto chart, displaying the RPN from highest to lowest. This system shall include documentation of recommended actions and verification of their implementation. The PFMEA shall be used as a continuous improvement tool. Suppliers shall be able to document continuous improvement efforts derived from RPN rankings below their target value for improvement actions. Suppliers can prioritize their activities based on number of RPN vs. current performance. 3.5 Control Plan Unless otherwise specified, suppliers shall use the AIAG APQP as the basis for creating this document. The Control Plan shall appropriately reflect the same steps and flow established by the Process Flow diagram and PFMEA. It shall include all special characteristics and product audits. It shall include annual revalidation criteria (see chapter 4.6). 3.6 Production Part Approval Process (PPAP) Suppliers shall ensure that the PPAP document and sample submissions are in accordance with the requirements of the Automotive Industry Action Group (AIAG) PPAP Manual. Suppliers shall only submit PPAP packages for production-released drawings, and a copy of this drawing ( ballooned drawing) shall be included in the submission package. Each supplier is responsible for meeting all these requirements before submission to Nidec, including obtaining Nidec approvals for any change requests. Suppliers may be requested to submit the PPAP package in an electronic way. In these instances, suppliers must be prepared to comply with these requests. Nidec has established a global PPAP validation requirement that further defines submission levels, including what the supplier submits and/or retains. Nidec will determine the level of PPAP submission, and any special requirements if applicable. Page 19/33

20 Figure PPAP Submission Levels The order that the package is to be organized is indicated in the Part Submission Warrant. Suppliers shall use the Nidec PSW and reports. Suppliers may use their forms only if they are equivalent to the AIAG forms and if they have the written approval of the Commodity Engineer/Site SQA. Nidec may require their suppliers to submit a validation package that contains additional documents and forms beyond those required by AIAG (see Nidec additional requirements). In addition, the supplier is responsible for all sub-tier PPAP submissions and approvals, including those suppliers Nidec has directed for use. Figure Submission content For all new components and materials, suppliers shall submit with the validation package a copy of ELV/IMDS Reporting Form C. This form verifies the submission of End-of-Life Vehicle component content. Based on the absence of this document, Nidec will not approve the PPAP submission. Supplier submission of a non-conforming PPAP package may be recorded as a supplier performance failure and could affect the supplier's performance rating. All non conformity shall be notified in the request for provisional authorization of deviations before PPAP sampling submission form. Supplier shall obtain Nidec approval prior to submission or shipment. For standard catalogue purchased components, i.e., diodes, resistors, etc., that do not go through the PPAP process, based on a product line decision, are to be considered as approved components. 3.7 Early Production Containment The purpose is to: document the supplier's efforts to verify control of its processes during start-up and acceleration, ensure that any quality issues that may arise are quickly identified, contained, and corrected at the supplier's location and not at the customer s receiving location, Page 20/33

21 increase involvement and visibility of top management. Containment of early production parts starts with Pre-Production builds and continues through the first 90 days of production after PPAP approval. At least 5000 pieces must be put through new production containment even if this means extending containment over the 90 days. The supplier shall develop this Control Plan consisting of additional controls, inspection audits, and testing to identify non-conformances during the production process. Depending on the dominant factor of the production process (set-up, machinery, fixture, tooling, operator, material/components, preventative maintenance, climate), additional controls shall include: off-line, separate and independent check from the normal production process whenever possible increased frequency/sample size of receiving, process and or shipping inspections sub-supplier containment and/or sub-supplier audits addition of inspection/control items increased verification of label accuracy enhanced process controls such as error proofing error proofing validation through introduction of known defects Additional controls shall be highlighted in yellow in the Control Plan. Early Production Containment requirements will be documented by the supplier in their Production Control Plan and must be reviewed by the responsible Commodity Engineer/Site SQA for concurrence prior to any Pre-Production builds. Concurrence from Nidec does not relieve the supplier of any responsibility or accountability to deliver 100% conforming product to Nidec. Suppliers are required to submit weekly report to the receiving Nidec plant. According these results, suppliers shall develop action plans to address missed failure modes or capability improvement needs and update FMEA and Control Pan. Suppliers may exit early production containment if they have achieved zero defects or implemented corrective action plan approved by Nidec Commodity Engineer/Site SQA. 3.8 Special Characteristics Special Characteristics are any product or process characteristics that affect safety or compliance with regulations, fit, function, performance or subsequent processing of product. In accordance with the requirements of ISO/TS 16949, Special Characteristics shall be identified and specifically addressed in the Design-FMEA, Process-FMEA, Control Plans, Process Flows, Work Instructions and other associated documents. Nidec designated Special Characteristics are identified on drawings/specifications. Suppliers are responsible to fully understand the usage of their product and also identify Special Characteristics, as appropriate. Suppliers are also responsible for ensuring that relevant Special Characteristics are explained, understood and controlled by their sub-suppliers. 3 levels of Special Characteristics are defined: Safety / Regulation Characteristic It is a product characteristic or process parameter which excessive variation could affect compliance with government regulation or safety or could create loss of function. Page 21/33

22 3.8.2 Significant Characteristic It is a product characteristic or process parameter whose variability could significantly: Affect system level performance and customer satisfaction. Impact the interface between any part of the system and any other vehicle components or between 2 components of our system assembled by the customer Functional Characteristics It is a product characteristic or process parameter whose variability could significantly impact the interface between 2 components assembled in Nidec line Capability requirements Cmk: machine capability. This capability can be conducted with both variable and attribute data. The minimum acceptable sample size for variable data is 50 pieces, and for attribute is 150 pieces. Ppk: performance index of a process, used for a new product / process and measured during the Run@Rate. The sample size is at the minimum 100 parts coming from at least 25 different periods of time of the run at rate. These pickings have to be representative of different batches and different operating conditions. A capability study is done for each cavity / die. Cpk: capability index of a serial stable process, used for an existing product / process At a minimum, suppliers shall implement process controls for Special Characteristics as designated on Nidec drawings. Additional characteristics deemed germane to be predictors of process stability and feedback should also be identified in the supplier s Control Plan. These relate to product safety, government regulation, product performance, and the ability to assemble product or customer satisfaction features. These are identified by various symbols, requiring specific levels of special controls and process capability. Special Characteristics Machine Capability Cmk Performance Capability Ppk Serial Capability Cpk Safety / Regulation 2 2 1,67 Significant Characteristics F Functional Characteristics 2 2 1,67 1,67 1,67 1,33 Critical 2 2 1,67 Major 1,67 1,67 1, ,67 Customer Requirements (OEM) See customer specification (OEM). Figure Capability requirements Page 22/33

23 Unless otherwise specified, for characteristics/features designated as significant, critical or functional, the supplier must calculate and report the process capability as Ppk. For those characteristics/features showing a Ppk of less than required, the supplier must create an action plan that both defines containment and process improvements. Containment must effectively separate non-conforming material from the population. Containment, generally either 100% sort or some form of mistake proofing, must continue until such time that the process Cpk demonstrates capability greater than, or equal to required value Measurement capability requirements Measurement System Analysis Studies (Gauge R&R) must be submitted with ALL Initial Process Studies (capability report) concerning all special characteristics. They must also be submitted if the gage is modified for any reason. Attribute Studies will be at minimum performed on 30 parts, with 3 operators and 3 trials. Other requirements have to be discussed with Commodity Engineer/Site SQA prior to PPAP submission. Gauge R&R <10 is acceptable, 10 to 20 may be acceptable based on importance and R&R >20 is rejectable. Corrective action is necessary for all rejectable items. 3.9 Traceability Suppliers shall install an identification system and lot traceability that allow Nidec to effectively execute lot control, e.g. in the event that a contaminated population is identified. Unique requirements will be identified and documented by Nidec at the APQP Kick-Off Meeting or other formal communication. Identification shall at least permit traceability back to the specific supplier raw materials lot numbers, as well as the manufacturing, inspection and test records. The supplier should also be able to trace where products made under similar conditions (same raw material lot, same manufacturing line/batch, etc.) were shipped Carry-over In case of carry-over references from one project to another, the supplier will: Formally validate the production capacities including supplied parts and materials Present a copy of validated PPAP Use from previous incidents the Lessons Learned Cards (LLC) Update quality targets Update process FMEA and control plan 3.11 Production transfer A production transfer shall be managed by the supplier like a project with a dedicated team (project leader, quality project, process engineer ). The supplier shall always issue a Request for Change. The supplier shall follow the APQP procedure describe in this manual and should agree with the Commodity Engineer/Site SQA the content of the required files and submission level. Proposal and Nidec agreement shall be in written forms. Page 23/33

24 4 Serial Production Requirements 4.1 Introduction Once the manufacturing process for producing a component is successfully validated, the next phase encountered is that of serial production. During this stage there are a number of requirements each supplier should be fully aware of and follow. Key areas include change management, concern management, sub-tier supplier management and annual revalidation. Additional expectations are also detailed in the following sections. 4.2 Change Management Suppliers shall submit a written request for product or process change and obtain Nidec approval prior to implementing the change. This includes also changes at sub-suppliers throughout the supply chain. Additionally, suppliers shall submit a written request for all items listed in Table I.3.3 of the AIAG PPAP Manual. Suppliers are also required to submit all supporting validation data including necessary dimensional reports, performance testing, before/after process parameters, updated APQP documentation (PFMEA/Control Plan) and a detailed timeline demonstrating proper change control that identifies necessary safety stock requirements including timing for Nidec/Customer validation timing and designated resources to manage the change. Nidec must act in accordance with all customer requirements for change notification and as such, Nidec expects the supply base to comply correspondingly. Change approval may take an extended period when Nidec customer approval is required. Notification should be at least with 90 days in advance. Changes shall not be implemented prior to the receipt of written approval from Nidec. Verbal request will not be accepted. Consequences of non-communicated or unauthorized process changes at the supplier manufacturing facility or any sub-supplier facility could result in any or all of following actions: Written notification from Nidec to supplier requesting the supplier to contact their registrar of the nonconformance, Supplier commercial status change to New Business Hold (NBH) for a period of 3 6 months, depending on root cause of non-conformance, Issuance of a C1 claim and immediate third party containment of affected component/product, Potential request for independent, third party audit of affected supply chain, including ALL affected sub-tier suppliers involved. Reinstatement of supplier to good standing will depend on suppliers ability to develop effective preventative actions and verification by Nidec accordingly. Authorization to ship production material after the change is communicated through a signed Part Submission Warrant after Nidec has approved the PPAP for the requested change, and that change is coordinated through the using Nidec facility or facilities. First shipments must be properly identified using the Change Notfication Label. Off-Line rework, not included in the original Control Plan, is considered a process change and suppliers shall obtain Nidec approval for it as specified above. Rework shall be supported by operating and inspection instructions. The inspection instructions shall be consistent with an updated production process control plan. Nidec will require special identification and segregation of the reworked product. Page 24/33

25 4.3 Deviation Authorization It is the policy of Nidec to not accept products that do not meet the requirements of the applicable drawings and specifications. Suppliers shall request, in writing, a Deviation Authorization before shipping non-conforming material to Nidec. A plan to return to normal production and the time required to do so shall be submitted at same time as the written request. Material shipped under an approved deviation shall be labelled with the deviation number and its expiration date. A deviation request should be accompanied by an 8D report. This report shall include the identification of a clean point and the manner in which products will be identified, including how traceability will be maintained. 4.4 Supplier Audits Nidec employs three audit tools in its Supplier Development Process: Supplier Validation Audit Supplier Run@Rate Audit Supplier 8D Audit When notified of a future scheduled audit, the supplier, to be prepared, should conduct an internal audit before the Nidec audit team arrives. Nidec may, at its discretion, utilize independent auditors. These individuals represent Nidec and will audit the supplier's processes to establish conformance to validated quality systems. 4.5 Sub-Supplier Management Suppliers of Nidec shall have capabilities to manage their respective suppliers (regardless of how directed) including APQP disciplines and periodic auditing. Nidec, when necessary, will audit the critical processes of the sub-suppliers to assure that proper controls are in place throughout the entire supply stream. Suppliers of Nidec shall ensure they audit and manage critical processes such as heat-treating and plating and, when directed, use a designated format. Sub-suppliers have a significant impact on the quality of the final component. Whether they provide raw materials, services or sub-components their influence is so critical that it is necessary for each of Nidec s suppliers to have a supplier management system in place. This system shall include a function that tracks and reports on their supply base quality and delivery performance. Supplier shall be able to demonstrate that they manage their suppliers issues through documented corrective actions and verification activities. 4.6 Annual Revalidation Unless otherwise specified, a complete annual layout inspection, including all sub-components, is required for all parts. All suppliers shall annually revalidate their respective production components, and be able to provide the results to Nidec within 48 hours of the request. Revalidation submission requirements are a criteria based on supplier performance and PPAP process flow. Suppliers shall compile revalidations and document this requirement in the Production Control Plan for all parts supplied. Those features/characteristics/notes that will Page 25/33

Global Supplier Quality Process Manual. Quality Processes for Suppliers to Merkle-Korff Industries. Abstract

Global Supplier Quality Process Manual. Quality Processes for Suppliers to Merkle-Korff Industries. Abstract Global Supplier Quality Process Manual Quality Processes for Suppliers to Merkle-Korff Industries Abstract This document contains quality requirements for suppliers to Merkle-Korff Industries and provides

More information

Supplier Quality Systems Requirements Manual

Supplier Quality Systems Requirements Manual Supplier Quality Systems Requirements Manual Brink Towing Systems Version: 2.4 Date: 23-07-2018 Changed text in blue Page 1 / 9 Table of Contents 1. Introduction 3 1.1 Scope 3 1.2 Purpose 3 1.3 Background

More information

Supplier Quality Manual

Supplier Quality Manual QP #: 8.4.1.2 Rev. #:0 Date Issued: 12/19/17 Date Revised: Page 1 of 8 Supplier Quality Manual Approved by: Mike Cornwell ( VP of Materials) Date: 12/19/17 1.0 Purpose: To provide Suppliers of BRC Rubber

More information

Supplier Quality Manual

Supplier Quality Manual Supplier Quality Manual Table of Contents Challenge Quality Policy... 4 Challenge Objectives... 4 Expectations & Philosophy... 5 SECTION 1- Introduction... 6 A. Policy and Vision... 6 B. Purpose... 6 C.

More information

Supplier Quality Manual

Supplier Quality Manual Supplier Quality Manual SC-002 Revision: 09/24/2018 Table of Contents Challenge Quality Policy. 3 Challenge Quality Objectives..3 Expectations and Philosophy...4 Section 1- Introduction.... 5-6 A. Policy

More information

Supplier Quality Manual (QQS )

Supplier Quality Manual (QQS ) Monticello Spring Corporation Quality Management System Supplier Quality Manual (QQS 100.00) 1.0 Introduction 1.1 Scope The details stipulated in this manual are the minimum mandatory requirements for

More information

Edition: Revision 09, February 19, This document is controlled by: Mayco International, LLC. Edited by

Edition: Revision 09, February 19, This document is controlled by: Mayco International, LLC. Edited by Working together as a team QUALITY AT THE SOURCE Page: 2 of 24 Supplier Quality Standard Edition: Revision 09, February 19, 2018 This document is controlled by: Mayco International, LLC Edited by Mayco

More information

SUPPLIER GUIDELINES MANUAL

SUPPLIER GUIDELINES MANUAL 1.0 INTRODUCTION 1.1 This guidelines manual defines the minimum requirements for Supreme Machined Products Co.; Inc. LTD (to be referenced as Supreme throughout the document) Supplier s and does not supersede

More information

MERIT Customer Specific Requirements

MERIT Customer Specific Requirements MERIT Customer Specific Requirements For Use with ISO 9001:2015 And IATF16949:2016 Effective March 31, 2018 1 Table of Contents INTRODUCTION /BUSINESS PHILOSOPHY... 6 1. SCOPE... 7 1.1 Scope General...

More information

Supplier Requirements Manual

Supplier Requirements Manual Supplier Requirements Manual 1.0 Control Responsibility TABLE OF CONTENTS 1.1 Proprietary Information Sharing 1.2 Purpose & Approval 1.2.1 Scope 1.3 Quality Systems Management & Evaluation 1.3.1 QMS 1.3.2

More information

Supplier Quality Standard

Supplier Quality Standard Supplier Quality Standard Sherex Industries & Sherex Fastening Solutions "First Time Quality at the Source" Through Teamwork Supplier Quality Standard Edition: Rel. September 6, 2007 This document is controlled

More information

Supplier Requirement Manual. Preface

Supplier Requirement Manual. Preface 1 Preface This manual has been created to assist our suppliers in understanding the purchasing expectations and quality requirements for products supplied to RCO Engineering. The manual is also a tool

More information

Supplier Quality Manual CHASSIX Inc.

Supplier Quality Manual CHASSIX Inc. Supplier Quality Manual CHASSIX Inc. SQM-001 rev 6/26/17 Page 1 TABLE OF CONTENTS 1.0 INTRODUCTION 1.1 CHASSIX QUALITY POLICY 1.2 CHASSIX SUPPLIER QUALITY MANAGEMENT SYSTEM REQUIREMENTS 1.3 CHASSIX SUPPLIER

More information

Visteon Corporation. Customer Specific Requirements Fifth Edition. For Use with ISO/TS 16949:2009

Visteon Corporation. Customer Specific Requirements Fifth Edition. For Use with ISO/TS 16949:2009 Visteon Corporation Customer Specific Requirements Fifth Edition For Use with ISO/TS 16949:2009 SP-WW-SG-1007 Page 1 of 9 Printed Copies of this I. Introduction Quality professionals from Visteon collaboratively

More information

Materion AMTS Supplier Quality Manual

Materion AMTS Supplier Quality Manual Advanced Materials Technologies and Services Inc. Materion AMTS Supplier Quality Manual Supplier Name: Supplier Address: Suppliers shall review the attached Supplier Quality Manual and acknowledge receipt

More information

Supplier Quality Manual CHASSIX Inc.

Supplier Quality Manual CHASSIX Inc. Supplier Quality Manual CHASSIX Inc. SQM-001 rev 8/2/17 Page 1 TABLE OF CONTENTS 1.0 INTRODUCTION 1.1 CHASSIX QUALITY POLICY 1.2 CHASSIX SUPPLIER QUALITY MANAGEMENT SYSTEM REQUIREMENTS 1.3 CHASSIX SUPPLIER

More information

Supplier Quality Requirements Manual

Supplier Quality Requirements Manual Supplier Quality Requirements Manual 1 TABLE OF CONTENTS Page Number 1.0 Forward 3 2.0 Introduction 4 3.0 Supplier Selection Requirements 5 4.0 Supplier Development 5 5.0 Supplier Quality Rating System

More information

STANDARD. S P-O Svedlund UTDH Markku Backholm. SDT Eva Ivrell Hedensjö UTDH Iréne Klingberg

STANDARD. S P-O Svedlund UTDH Markku Backholm. SDT Eva Ivrell Hedensjö UTDH Iréne Klingberg 1(13) SCANIA CUSTOMER SPECIFIC REQUIREMENTS Contents Changes from previous issue... 1 General... 1 1 General requirements... 2 2 Human rights... 2 3 REACH legislation... 3 4 Environmental protection...

More information

SUPPLIER QUALITY REQUIRMENTS MANUAL (SQRM)

SUPPLIER QUALITY REQUIRMENTS MANUAL (SQRM) SUPPLIER QUALITY REQUIRMENTS MANUAL (SQRM) 11/3/2008 Page 1 of 12 PURPOSE The purpose of this manual is to provide Suppliers with the DeltaTech Control (DTC) requirements for various items related to the

More information

This manual supersedes all previous revisions of the Pontiac Coil, Inc. Supplier Quality Manual

This manual supersedes all previous revisions of the Pontiac Coil, Inc. Supplier Quality Manual Controlled only when viewed at Pontiac Coil's Website REVISION L - DECEMBER 20, 2017 This manual supersedes all previous revisions of the Supplier Quality Manual Supplier Quality Manual Preface This manual

More information

DaimlerChrysler (Chrysler Group) Customer-Specific Requirements

DaimlerChrysler (Chrysler Group) Customer-Specific Requirements DaimlerChrysler (Chrysler Group) Customer-Specific Requirements For Use With ISO/TS 16949 Second Edition September, 2005 1. Scope ISO/TS 16949 and this document define fundamental quality system requirements

More information

GENERAL QUALITY REQUIREMENTS

GENERAL QUALITY REQUIREMENTS SUPPLIER QUALITY MANUAL Ref.: 05.04 LIR Ind. : 3 Date : 07.11.2012 Page : 1 / 10 Modified by : Dumitrita DALEA Validated by : Gelu MATEESCU Verified by : Adina Halinga GENERAL QUALITY REQUIREMENTS This

More information

Supplier Manual Rev /15

Supplier Manual Rev /15 Supplier Manual Rev. 01-05/15 www.kamax.com Operations Europe KAMAX GmbH & Co. KG Petershütter Allee 29, 37520 Osterode am Harz, Germany Dr.-Rudolf-Kellermann-Str. 2, 35315 Homberg/Ohm, Germany Am Kreuzweg

More information

JSP Supplier Quality Assurance Manual

JSP Supplier Quality Assurance Manual Changes to the Supplier Quality Assurance Manual: The 2011 has been reviewed for updates and revisions needed to keep our forms, policies and procedures current. The updates will be communicated to suppliers

More information

Supplier Quality Assurance Manual

Supplier Quality Assurance Manual Supplier Quality Assurance Manual Revised: 0128 January Jul 2014 2010 1. Introduction The purpose of the Supplier Quality Assurance Manual is to straightforwardly communicate to our current and potential

More information

Blue Chip Engineered Products Supplier Quality Manual

Blue Chip Engineered Products Supplier Quality Manual Blue Chip Engineered Products Supplier Quality Manual Revision Date 07/09/2013 Page 1 Table of Contents A. Goal B. Purpose C. Approach D. Applicability E. Implementation F. Zero Defects Policy Section

More information

Agreement. Between. Cooper Standard. (Hereafter referred to as the CS ) And. (Hereafter referred to as the Supplier )

Agreement. Between. Cooper Standard. (Hereafter referred to as the CS ) And. (Hereafter referred to as the Supplier ) Global Supplier Quality Manual Revision 1 Agreement Between Cooper Standard (Hereafter referred to as the CS ) And (Hereafter referred to as the Supplier ) This agreement is made between the above named

More information

Supplier Quality Manual

Supplier Quality Manual including subsidiaries of Mexico and Canada Supplier Quality Manual Issue date: March 1, 2010 Revised: April 7, 2011 Page 1 of 14 Corporate Quality Statement Quality plays a vital role in SCHOTT Gemtron

More information

Supplier Quality Requirements Manual

Supplier Quality Requirements Manual Supplier Quality Requirements Manual ISO-020-1 Revision G January 20, 2012 ISO-020-1 Rev G 01/20/12 Page 1 of 17 Table of Contents Quality Commitment and Expectations... 3 SECTION 1- Introduction... 4

More information

GENERAL SUPPLIER GUIDELINE DATE: OCTOBER 2013

GENERAL SUPPLIER GUIDELINE DATE: OCTOBER 2013 GENERAL SUPPLIER GUIDELINE DATE: OCTOBER 2013 Introduction With its two business units Engine Systems and Components as well as Filtration and Engine Peripherals, MAHLE ranks among the top three systems

More information

Metric Manufacturing Supplier Manual

Metric Manufacturing Supplier Manual Metric Manufacturing Supplier Manual This Manual applies to all suppliers of Metric Manufacturing Co. Compliance to all requirements within this manual, as well as the general terms and conditions, are

More information

Supplier Quality System Requirements Manual

Supplier Quality System Requirements Manual Supplier Quality System Requirements Manual This manual available ON-LINE at www.axletech.com website Quality Policy "AxleTech International is committed to exceeding our customers expectations by continually

More information

Supplier Containment

Supplier Containment Page 1 of 14 1. PURPOSE The purpose of supplier containment is to protect the customer by preventing nonconforming material from being shipped to Delphi Technologies or subsequently passed to Delphi Technologies

More information

Metal Powder Products Company

Metal Powder Products Company Metal Powder Products Company Supplier Quality Manual Revision 1 Page 1 of 10 Introduction 1. Purpose: This manual has been created for Metal Powder Product s (MPP) Production, Prototype and Service Suppliers.

More information

PPAP Process Checklist \ Sign Off Sheet instructions

PPAP Process Checklist \ Sign Off Sheet instructions PPAP Process Checklist \ Sign Off Sheet instructions In addition to these requirements you must meet all Nexteer Automotive Supplier Requirements noted in the Nexteer Automotive Supplier Website. Nexteer

More information

SUPPLIER QUALITY MANUAL

SUPPLIER QUALITY MANUAL SUPPLIER QUALITY MANUAL 2018 I N D E X Paragraph Subject Page 1.0 Introduction 3 2.0 Quality System Requirements Specific to JVS 3 2.1 ISO 14001:2015 Compliance Requirements 2.2 IATF16949:2016/ISO9001:2015

More information

STANDARD. Date SP Jan F Visscher UTMS Michaela Bundschuh

STANDARD. Date SP Jan F Visscher UTMS Michaela Bundschuh 1(19) Distribution: Scania, Suppliers SCANIA CUSTOMER SPECIFIC REQUIREMENTS Contents Changes from previous issue... 1 1 General... 2 2 Supplier Portal... 2 3 Scania Standards... 2 4 Customer Property...

More information

Delphi Technologies Customer Specific Requirements. For Use with ISO 9001:2015 and IATF16949:2016

Delphi Technologies Customer Specific Requirements. For Use with ISO 9001:2015 and IATF16949:2016 Delphi Technologies Customer Specific Requirements For Use with ISO 9001:2015 and IATF16949:2016 Effective December 5, 2017 1 Introduction Suppliers shall develop a quality management system that meets

More information

SP-Q-SG 002 Supplier Guidelines for the APCB. Production Part Approval Process (PPAP)

SP-Q-SG 002 Supplier Guidelines for the APCB. Production Part Approval Process (PPAP) Supplier Guidelines for the APCB Production Part Approval Process (PPAP) These supplier guidelines complement and clarify the requirements defined in the AIAG PPAP manual and the APCB Customer Specific

More information

Its purpose is to define the approval process of new or revised parts, or parts resulting from new or significantly revised production methods.

Its purpose is to define the approval process of new or revised parts, or parts resulting from new or significantly revised production methods. SUPPLIER PPAP HANDBOOK NORTH AMERICA Revision D May 24, 2018 Table of Contents Table of Contents 1 Foreword.. 2 Production Part approval Process (PPAP) Purpose.. 3 When is a Submission Required?. 3 Significant

More information

SUPPLIER MANUAL. Griffith Rubber Mills - HQ 2625 Northwest Industrial Street Portland, Oregon 97210

SUPPLIER MANUAL. Griffith Rubber Mills - HQ 2625 Northwest Industrial Street Portland, Oregon 97210 SUPPLIER MANUAL Griffith Rubber Mills - HQ 2625 Northwest Industrial Street Portland, Oregon 97210 TABLE OF CONTENTS Page Title 1... Introduction, Purpose, Scope Quality Policy, Certification & Exemptions

More information

Western Diversified Plastics, LLC. Supplier Requirements Manual

Western Diversified Plastics, LLC. Supplier Requirements Manual Western Diversified Plastics, LLC. Supplier Requirements Manual Revision Date: 12/10/2019 TABLE OF CONTENTS 1.0 Introduction.. 3 2.0 WDP Supplier Policy.. 4 3.0 Scope... 4 4.0 Launch Readiness Measures...

More information

SUPPLIER QUALITY MANUAL

SUPPLIER QUALITY MANUAL SUPPLIER QUALITY MANUAL QD-SUPPLIER-QUALITYMANUAL 1 of 13 02.20.15 TABLE OF CONTENTS Page A. Goal 3 B. Purpose 3 C. Approach 3 D. Applicability 3 E. Implementation 3 F. Zero Defects Policy 3 Section 1:

More information

Section Table of Contents Page Number

Section Table of Contents Page Number Derby Fabricating Solutions Section Table of Contents Page Number 1.1 Introduction 2 1.2 Derby Quality Policy 2 1.3 Environmental Policy 2 1.4 Supplier Requirements Manual 2 1.5 Social Accountability 2

More information

INTRODUCTION. New Mather Metal Incorporated specializes in manufacturing quality stabilizer bars for suspension systems for the automotive industry.

INTRODUCTION. New Mather Metal Incorporated specializes in manufacturing quality stabilizer bars for suspension systems for the automotive industry. INTRODUCTION Welcome to, New Mather Metal Inc. (NMMI) New Mather Metal Incorporated specializes in manufacturing quality stabilizer bars for suspension systems for the automotive industry. You can view

More information

ConMet Supplier Quality Manual

ConMet Supplier Quality Manual ConMet Supplier Quality Manual Revision: 11/2/17 Uncontrolled Copy Page 1 Table of Contents Title Page Introduction 3 Supplier Quality Systems Requirements 4 Supplier Social Responsibility 4 Confidentiality

More information

Revision no: 01 Date: Global Supplier Quality Assurance Network

Revision no: 01 Date: Global Supplier Quality Assurance Network Title: H-APQP Template Manual Purpose and Scope This document is aimed at internal and external stakeholders to describe the use of the H-APQP Template. Contents Introduction H-APQP... 2 1. Planning and

More information

Consolidated Metco, Inc. Supplier Quality Manual

Consolidated Metco, Inc. Supplier Quality Manual Consolidated Metco, Inc. Supplier Quality Manual Revision: 12/20/17 Uncontrolled Copy Page 1 Table of Contents Title Page Introduction 3 Supplier Quality Systems Requirements 4 Supplier Social Responsibility

More information

SUPPLIER QUALITY MANUAL

SUPPLIER QUALITY MANUAL SUPPLIER QUALITY MANUAL LM-QU-PA-008 Revision Date:7/13/18 LM-QU-PA-008 Revision Date:7/13/18 Table of Contents 1.0 Purpose 2.0 Scope 3.0 Quality System Requirements 4.0 Approved Supplier List 5.0 Supplier

More information

GLB QM 02. Supplier Quality Manual 05. 3/2/18 Supplier Quality 1 of 19. Issue Date Issuing Department Page

GLB QM 02. Supplier Quality Manual 05. 3/2/18 Supplier Quality 1 of 19. Issue Date Issuing Department Page 3/2/18 Supplier Quality 1 of 19 3/2/18 Supplier Quality 2 of 19 Table of Contents 1.0 Introduction 3 2.0 Manual 4 2.1 Application 4 2.2 Quality Management System of the Supplier 4 2.3 Quality Management

More information

Supplier Quality System Requirements

Supplier Quality System Requirements AUTOMOTIVE AXLES LIMITED Supplier Quality System Requirements Supplier Quality System Requirement, Rev 04, 01 Dec 2018 Page 1 AAL QUALITY POLICY To be a world class organization whereby we are committed

More information

Springdale Site Specific Requirements. Addendum to. DAYCO Global Supplier Policy Manual

Springdale Site Specific Requirements. Addendum to. DAYCO Global Supplier Policy Manual Springdale Site Specific Requirements Addendum to DAYCO Global Supplier Policy Manual Uncontrolled if Printed 1 9/28/2017 TABLE OF CONTENTS 1. Purpose 3 2. Objectives 3 3. Scope 3 4. Supplier Sourcing

More information

Montaplast of North America, Inc.

Montaplast of North America, Inc. Montaplast of North America, Inc. Supplier Quality Manual Page 1 of 20 Table of Contents 1.0 Purpose pg. 3 2.0 Scope pg. 3 3.0 Quality System Requirements pg. 3 4.0 Approved Supplier List pg. 4 5.0 Supplier

More information

Table of Contents. 1.0 Purpose. 2.0 Scope. 3.0 Quality System Requirements. 4.0 Approved Supplier List. 5.0 Supplier Assessments

Table of Contents. 1.0 Purpose. 2.0 Scope. 3.0 Quality System Requirements. 4.0 Approved Supplier List. 5.0 Supplier Assessments Issued 2/6/2009 Revision: 2/13/2017 Table of Contents 1.0 Purpose 2.0 Scope 3.0 Quality System Requirements 4.0 Approved Supplier List 5.0 Supplier Assessments 6.0 Advance Product Quality Planning (APQP)

More information

SUPPLIER MANUAL Quality Policy

SUPPLIER MANUAL Quality Policy SUPPLIER MANUAL Quality Policy Prettl, Kurz Kasch is committed to providing our Customers with quality products. We will develop, maintain and continually improve our quality systems to ensure Customer

More information

VU Manufacturing Supplier Quality Manual

VU Manufacturing Supplier Quality Manual Supplier Quality Manual Revision 08, February 26, 2018 Table of Contents Section Preface Page 3 A. Quality System Page 4 B. Advanced Quality Planning Page 4 C. Continuous Improvement Page 5 D. Production

More information

SUPPLIER QUALITY MANUAL

SUPPLIER QUALITY MANUAL SUPPLIER QUALITY MANUAL ASYST Technologies, LLC 5811 99TH AVENUE KENOSHA, WI 53144 PHONE (262) 857-2244 FAX (262) 857-3623 Approval Signatures APPROVAL SIGNATURES Name / Title Contact Information Approval

More information

FAIRFIELD GLOBAL SUPPLIER QUALITY PROGRAM

FAIRFIELD GLOBAL SUPPLIER QUALITY PROGRAM FAIRFIELD GLOBAL SUPPLIER QUALITY PROGRAM 1 QA.101 rev. 3-2012 PURPOSE OF THIS STANDARD Fairfield is committed to continuous product quality improvement. Our management team is convinced that only with

More information

SUPPLIER QUALITY MANUAL

SUPPLIER QUALITY MANUAL SUPPLIER QUALITY MANUAL 2 TABLE OF CONTENTS PAGE 1. INTRODUCTION 3 2. SCOPE 4 3. REFERENCE MATERIAL 4 4. SUPPLIER APPROVAL PROCESS 4-6 5. PRODUCT APPROVAL PROCESS 6 6. ON-GOING PRODUCTION 6-7 7. SUPPLIER

More information

Supplier Quality Requirements FSQ01

Supplier Quality Requirements FSQ01 Supplier Quality Requirements FSQ01 1 Change Revision Level Date Introduced 0 25/06/2013 2 1. Scope 2. Code of Conduct 3. Acronyms and Definitions 4. Prohibited and Restricted Materials Policy 5. Quality

More information

Index. BOS Automotive Products Quality guidelines for suppliers. Message from the BOS Management. Section 1 - Introduction

Index. BOS Automotive Products Quality guidelines for suppliers. Message from the BOS Management. Section 1 - Introduction Index Message from the BOS Management Section 1 - Introduction 1A. Policy and Vision 1B. Purpose 1C. Scope 1D. Special Supplier Responsibilities 1E. Language 1F. Government Regulatory Compliance 1G. Code

More information

RFC-SOP-0002 Skyworks RF Ceramics Supplier Quality Manual

RFC-SOP-0002 Skyworks RF Ceramics Supplier Quality Manual Skyworks RF Ceramics Supplier Quality Manual Page 1 of 8 RFC-SOP-0002 Rev. 1 1 Purpose and Scope 1.1 Purpose The purpose of this manual is to define the basic quality systems and business procedures required

More information

Supplier Quality Manual

Supplier Quality Manual Supplier Quality Manual Second Edition Issued: August 25, 2015 Meeting Our Customers Needs Through Business Excellence First Edition All rights reserved under the copyright laws. 1 Marion Body Works Inc.

More information

LOTUS SUPPLIER HANDBOOK rev14 09/05/2018. Supplier Handbook

LOTUS SUPPLIER HANDBOOK rev14 09/05/2018. Supplier Handbook rev14 09/05/2018 Supplier Handbook Issue 14 May 2018 SECTION 0.0 Foreword to Issue 14 The LOTUS Supplier Handbook Issue 14 was issued with revisions to the following: Chapters re-organised Section 2.0

More information

Suppliers Quality Assurance Manual

Suppliers Quality Assurance Manual Suppliers Quality Assurance Manual Revision: 10 Issued Date: 9 July 2018 2016 Marketing Plan Avenida 5 de Febrero 2115 Fracc. Industrial Benito Juárez Santiago de Querétaro, Querétaro C.P. 76120 Tel: +52

More information

Supplier. Quality Manual

Supplier. Quality Manual Supplier Quality Manual Supplier Quality Manual TUBACEX Group 1. INTRODUCTION Vision, Mission and Values 2. New Supplier 3. New Product 4. Serial Production Quality System and/or Qualification Audit Environmental

More information

Supplier Quality Manual

Supplier Quality Manual Supplier Quality Manual 1 1. Introduction Scope Purpose Application Implementation 2. Purchasing Expectations Terms and Conditions Engineering / Technical Support Customer Support Resources Pricing Consistent

More information

Global Supplier Quality Manual. Revision 4

Global Supplier Quality Manual. Revision 4 Global Supplier Quality Manual Revision 4 Introduction 1. Purpose: This manual has been created for Cooper Standard s (CS) Production, Prototype and Service Suppliers. The manual includes all CS locations

More information

Supplier Quality Manual

Supplier Quality Manual Table of Contents 1.0 Introduction 2.0 Quality System Requirements 3.0 Quality Performance 4.0 Code of Ethics 5.0 APQP 6.0 SRG Global Access to Supplier Facility 7.0 Production Part Approval Process 8.0

More information

PURPOSE To establish a quality requirements and guidelines for Suppliers doing business with Orchid Monroe

PURPOSE To establish a quality requirements and guidelines for Suppliers doing business with Orchid Monroe Page 1 of 12 DOCUMENT TITLE Supplier Quality Assurance Manual PURPOSE To establish a quality requirements and guidelines for Suppliers doing business with Orchid Monroe REVISION HISTORY Revision Change

More information

Supplier Quality Manual

Supplier Quality Manual ALLIANCE ELECTRONICS DISTRIBUTOR Supplier Quality Manual 22412 Gilberto Rd. Rancho Santa Margarita, CA 92688 INTRODUCTION Welcome to Alliance Electronics Distributor (AED) Alliance Electronics Distributor

More information

Supplier Quality Specification 3DS Document P14 Rock Hill, South Carolina Revision A

Supplier Quality Specification 3DS Document P14 Rock Hill, South Carolina Revision A Supplier Quality Specification 3DS Document 51000-P14 Rock Hill, South Carolina Revision A Revision History Change Description Revision Date All New Release 6/26/16 A Updated supplier classification section,

More information

Supplier Quality Manual

Supplier Quality Manual d by 1/22 Ref Customer Specific Requirements Haldex AB d by 2/22 Ref Foreword Effective communication is the key to building strong supplier-customer relationships. The continuing support of our suppliers

More information

Supplier Quality Requirements Manual

Supplier Quality Requirements Manual Supplier Quality Requirements TABLE OF CONTENTS Page Number 1.0 Forward 3 2.0 Introduction 4-5 3.0 Supplier Selection Requirements 6 4.0 Supplier Quality Rating System 6 5.0 Corrective and Preventative

More information

Guideline for Suppliers: Initial Sampling

Guideline for Suppliers: Initial Sampling 1. Purpose Regulation of the procedure for production process and product approval (initial sampling) with the goal to provide a documented proof that the requirements outlined and agreed upon in drawings,

More information

SUPPLIER MANUAL Released 5/16/2012 Revised 11/12/2016

SUPPLIER MANUAL Released 5/16/2012 Revised 11/12/2016 SUPPLIER MANUAL Released 5/16/2012 Revised 11/12/2016 TABLE OF CONTENTS 1.0 Introduction 1.1 Purpose of Supplier Requirements 1.2 Scope 2.0 Quoting 3.0 Advance Product Quality Planning (APQP) 3.1 APQP

More information

Supplier Quality Manual

Supplier Quality Manual Supplier Quality Manual Edition 9 October 9, 2014 Table of Contents Page Forward / Introduction... 1 Standard Requirements... 2 3 1.0 Specific Requirements... 4 1.1 Purpose... 4 1.2 General... 4 1.3 Supporting

More information

TRICO PRODUCTS PUR-C-P106-A

TRICO PRODUCTS PUR-C-P106-A TRICO PRODUCTS PUR-C-P106-A October 9, 2009 Supplier Guide Page 1 of 14 TRICO PRODUCTS PUR-C-P106-A October 9, 2009 Page 2 of 14 NAME: TRICO Supplier Guide PURPOSE: The purpose of this document is to communicate

More information

Progressive Metal Forming, inc Hall Road Hamburg, MI 48139

Progressive Metal Forming, inc Hall Road Hamburg, MI 48139 SUPPLIER QUALITY MANUAL Progressive Metal Forming, inc. 10850 Hall Road Hamburg, MI 48139 www.pmfdraw.com Rev. 1/30/17 Page 1 of 11 TABLE OF CONTENTS 1.0 INTRODUCTION. 3 2.0 SUPPLIER QUALITY GUIDELINES...3

More information

Integrated Supplier Quality Requirements

Integrated Supplier Quality Requirements Integrated Supplier Quality Requirements April 1, 2013 ISQ-001-QM Revision B The controlled and current version of this document is available on www.navistarsupplier.com. Supplier Quality Lifecycle Management

More information

Supplier Quality Requirements Manual

Supplier Quality Requirements Manual Supplier Quality Requirements Manual Revision D 05/31/2017 Page 1 1.0 Purpose The purpose of this manual is to communicate the quality requirements pertaining to the systems, processes, tools and procedures

More information

Danfoss Supplier Quality Manual

Danfoss Supplier Quality Manual Danfoss Supplier Quality Manual Revision 9.3 January 2014 1 Quality Policy... 3 2 Purpose... 3 3 General Requirements... 3 3.1 Quality Targets... 4 3.2 Quality Improvement Plan (QIP)... 4 3.3 Communication...

More information

LG SOURCING VENDOR QUALITY MANAGEMENT SYSTEM REQUIREMENTS

LG SOURCING VENDOR QUALITY MANAGEMENT SYSTEM REQUIREMENTS LG SOURCING VENDOR QUALITY MANAGEMENT SYSTEM REQUIREMENTS LG Sourcing QMS ver01 03.29.2010 Page 1 of 16 PAGE INTENTIONALLY LEFT BLANK Copyright 2010, LF Corporation - All rights reserved No part of this

More information

GENERIC QUALITY ASSURANCE REQUIREMENTS FOR: BUILT TO PRINT ITEMS, ITEMS TO STANDARD AND OFF THE SHELF ITEMS

GENERIC QUALITY ASSURANCE REQUIREMENTS FOR: BUILT TO PRINT ITEMS, ITEMS TO STANDARD AND OFF THE SHELF ITEMS GENERIC QUALITY ASSURANCE REQUIREMENTS FOR: BUILT TO PRINT ITEMS, ITEMS TO STANDARD AND OFF THE SHELF ITEMS APPLICABLE FOR: AIRBUS DEFENCE AND SPACE - SPACE BUSINESS UNIT ORBITAL ISSUE: 02c RELEASE DATE:

More information

Customer Specific Requirements. For Use with ISO/TS16949 And ISO 9001

Customer Specific Requirements. For Use with ISO/TS16949 And ISO 9001 Customer Specific Requirements For Use with ISO/TS16949 And ISO 9001 Effective: October 9, 2015 Introduction This document contains BWI companion requirements to the current revision of ISO/TS16949. Each

More information

SUPPLIER QUALITY MANUAL

SUPPLIER QUALITY MANUAL Global Supplier of Automotive Tire Products & Refrigeration Components SUPPLIER QUALITY MANUAL Air Controls Products, LLC Oxford, NC Air Controls Products maintains sole control rights to the master copy

More information

QAA1, Appendix 2. APQP Elements. Customer order. 1.1 Customer specifications

QAA1, Appendix 2. APQP Elements. Customer order. 1.1 Customer specifications QAA1, Appendix 2 APQP Elements The objectives, expectations and requirements for documenting individual elements of the APQP Status Reports (see QSR-1, Appendix 3) are described as follows: Customer order

More information

SUPPLIER QUALITY MANUAL For ISO/TS16949:2009 (Level 1)

SUPPLIER QUALITY MANUAL For ISO/TS16949:2009 (Level 1) 1 of 8 General Introduction Standard Motor Products, Inc. Greenville Operations (SMP) is a registered TS-16949 facility. SMP has earned a reputation for providing products of consistent quality, competitive

More information

QUALITY MANUAL DISTRIBUTION. Your Logo Here. Page 1 1 of 57. Rev.: A

QUALITY MANUAL DISTRIBUTION. Your Logo Here. Page 1 1 of 57. Rev.: A Page 1 1 of 57 President Design Engineering Production Production Engineering Materials Control Purchasing Service Marketing Sales Contracts Human Resources Quality Assurance Quality Control Production

More information

Comparison ISO/TS (1999) to QS 9000, 3 rd edition (1998)

Comparison ISO/TS (1999) to QS 9000, 3 rd edition (1998) 1 SCOPE QS 9000: new: Introduction, applicability In addition to the applicability for supplier sites for production and services and their subcontractors for: - parts or materials, or - services like

More information

MANUAL SUPPLIER S QUALITY MANUAL

MANUAL SUPPLIER S QUALITY MANUAL MANUAL Raba Automotive Components Ltd Identification 50MR23003 1.8 Page 1/9 Coming into force 10.09.2015 SUPPLIER S QUALITY MANUAL Prepared/ Modified by Checked by Approved by Name Signature Date János

More information

MANUAL SUPPLIER S QUALITY MANUAL

MANUAL SUPPLIER S QUALITY MANUAL MANUAL Rába Automotive Component Manufacturing Ltd Identification 1.3 1/8 Coming into force 28. 01. 2009 SUPPLIER S QUALITY MANUAL Prepared by Checked by Approved by Name Signature Date János KENYERES

More information

SUPPLIER MANUAL SUPPLIER MANUAL

SUPPLIER MANUAL SUPPLIER MANUAL SUPPLIER MANUAL Rev.: 4, 01.11.2013 Page: 1 of 9 IER-QSF 003 TABLE OF CONTENTS PAGE 1. INTRODUCTION 2 2. SCOPE 3 3. REFERENCE MATERIAL 3 4. SUPPLIER APPROVAL PROCESS 3 5. PRODUCT APPROVAL PROCESS 5 6.

More information

Global Supplier Manual. December 20, 2017

Global Supplier Manual. December 20, 2017 Global Supplier Manual December 20, 2017 TABLE OF CONTENTS Contents TABLE OF CONTENTS... 1 Introduction... 3 SMR Quality and Environmental Policy Statement... 3 Purpose... 3 Scope... 3 Responsibility...

More information

Supplier Resource Guide

Supplier Resource Guide Supplier Resource Guide The purpose of this Resource Guide is to strengthen our supplier s knowledge and understanding of General Fasteners Company (GFC) requirements. GFC aligns itself with supply chain

More information

SUPPLIER REQUIREMENTS MANUAL Revision 3. SUPPLIER REQUIREMENTS MANUAL Revision 3 GATES CORPORATION

SUPPLIER REQUIREMENTS MANUAL Revision 3. SUPPLIER REQUIREMENTS MANUAL Revision 3 GATES CORPORATION SUPPLIER REQUIREMENTS MANUAL Revision 3 SUPPLIER REQUIREMENTS MANUAL Revision 3 GATES CORPORATION 1 TABLE OF CONTENTS Introduction 3 Social Accountability 4 Purpose 4 Scope 4 Supplier Responsibilities

More information

Newcor Precision Machining Group Supplier Quality Manual

Newcor Precision Machining Group Supplier Quality Manual Newcor Precision Machining Group Supplier Quality Manual Deco Engineering, Inc. 9900 Main St Clifford, MI 48727 Rochester Gear, Inc. 9900 Main St Clifford, MI 48727 Machine Tool & Gear, Inc. 1021 N. Shiawassee

More information

IATF - International Automotive Task Force IATF 16949:2016 Frequently Asked Question (FAQ)

IATF - International Automotive Task Force IATF 16949:2016 Frequently Asked Question (FAQ) :2016 Frequently Asked Question (FAQ) :2016 1 st Edition was published in October 2016. In response to questions from the IATF recognized certification bodies and stakeholders, the following questions

More information

Supplier. Quality. Manual

Supplier. Quality. Manual DEPARTMENT: Quality Assurance Title: Supplier - Quality Manual ISSUED ON: 29-Jul-09 PAGE 1 of 12 Supplier Quality Manual Distribution to: Electronically controlled. If this document is in hard copy it

More information

Supplier Quality Manual

Supplier Quality Manual Supplier Quality Manual DuraTech Industries Supplier Quality Manual Page 2 of 13 Table of Contents 1.0 Introduction 1.1. Overview 1.2. Scope 1.3. Customer Responsibilities 3 3 3 2.0 Supplier Quality Expectations

More information