PARTICIPANT BUILD PACK 1 PROCESS FLOW DIAGRAMS VER 3.3 TABLE OF TRANSACTIONS VER 3.2 DOCUMENT REF: VERSION: 3.4 DATE: 01 JULY 2014 FINAL :

Size: px
Start display at page:

Download "PARTICIPANT BUILD PACK 1 PROCESS FLOW DIAGRAMS VER 3.3 TABLE OF TRANSACTIONS VER 3.2 DOCUMENT REF: VERSION: 3.4 DATE: 01 JULY 2014 FINAL :"

Transcription

1 PARTICIPANT BUILD PACK 1 PROCESS FLOW DIAGRAMS VER 3.3 TABLE OF TRANSACTIONS VER 3.2 PREPARED BY: DOCUMENT REF: VERSION: 3.4 MARKET DEVELOPMENT DATE: 01 JULY 2014 FINAL :

2 Document Approval and Acceptance AEMO Approval This document has been prepared by: NAME: Position: Signature: DANNY MCGOWAN Principal Regulatory Analyst Date: This document has been reviewed and conforms with the authorised changes to the Gas Interface Protocol: NAME: Position: Signature: PETER ALBERTS Senior Manager, Gas Retail Market Development Date: This document has been reviewed and conforms to AEMO s regulatory obligations: NAME: Position: Signature: TERRY GRIMWADE Executive General Manager, Market Development Date: Doc Ref: ver JULY 2014 Page 2 of 51

3 Version History VERSION. DATE AUTHOR(S) CHANGES AND COMMENTS /07/10 S. Monaco Ensure document complies with AEMO standard. Replace references to MSOR with relevant NGR & RMP references. Update terminology to correspond with current usage and definitions. Update acronyms to the current vernacular. Update images Add References to Predecessors Diagram 2.0 Remove process flows 2.18, 2.19 and 2.21 which related to an asexml transaction interface between RB and DB for confirming current FRO. This asexml transaction does not exist. Diagram 2.0 Process flow 2.12 to 2.27 which relates to an asexml transaction called Meterdatahistory, which is not operational in asexml. It is however operational as an . Diagram 4.0 Remove the information bubble that made reference to reviewing Meter Route schedule being considered as an asexml. This transaction continues to be made available via . Diagram 5.4 Remove the information bubble that made reference to reviewing Meter Time Expired notice being considered as an asexml. This transaction continues to be made available via . Diagram 13.1, 13.2A, 13.3 and 13.7 yellow change marks as agreed in IN003/09 (CR96 Minor RoLR Documentation Changes) have been included. A copy of the IN003/09 GMI is available from grcf@aemo.com.au /07/12 S. Macri IN011/12 (NECF Changes) Changes for Customer Classification /02/13 J. Luu IN029/12 Pilot Program BAU Process /01/14 D. McGowan IN004/12 Redundant Provision and minor GIP and Spec Pack changes /07/14 D. McGowan IN017/13 Gas Road Map. Service Orders Review. Remove diagrams 5.1 to 5.5, 99.3 and 99.4 and add new Process Flows diagrams 100 to 107 Doc Ref: ver JULY 2014 Page 3 of 51

4 Executive Summary The Table of Transactions version 3.0 contains: Table of Transactions, Table of Elements, List of Job Enquiry Codes, Address Elements and MIRN and Meter states. Note: The Table of Transactions is a separate document and is not included in the electronic version of this document. References to Predecessors To reflect the governance changes implemented on 1 July 2009, this document has been amended to remove references to the Victorian Energy Networks Corporation (VENCorp) and replace such references with Australian Energy Market Operator (AEMO). Where any content inadvertently refers to VENCorp it should be read as referring to AEMO. It should be noted that participant ID VENCORP remains as the participant ID for AEMO as the gas market operator in Victoria and Queensland. Doc Ref: ver JULY 2014 Page 4 of 51

5 Contents 1 Process Flow Diagrams DIAGRAM 1.0 SPECIAL METER READS DIAGRAM 1.1 SPECIAL METER READS CANCELLATION DIAGRAM 2.0 BM DATA COLLECTION AND DELIVERY (PAGE 1) DIAGRAM 2.0 BM DATA COLLECTION AND DELIVERY (PAGE 2) DIAGRAM 2.7 BASIC METER CUSTOMISATION BILL ESTIMATION DIAGRAM 4.0 BASIC METER ROUTE AND SITE INFORMATION DIAGRAM 4.1 BASIC METER ROUTE AND SITE INFORMATION DIAGRAM 6.0 CUSTOMER TRANSFER (PAGE 1) DIAGRAM 6.0 CUSTOMER TRANSFER (PAGE 2) DIAGRAM 6.0 CUSTOMER TRANSFER (PAGE 3) DIAGRAM 6.0 CUSTOMER TRANSFER (PAGE 4) DIAGRAM 6.0 CUSTOMER TRANSFER (PAGE 5) DIAGRAM 6.0 CUSTOMER TRANSFER (PAGE 6) DIAGRAM 9.1 BM DAILY CONSUMPTION ESTIMATION DIAGRAM 10.0 DATA CHANGE DIAGRAM 11.0 BASIC METER PROFILER (BMP) DIAGRAM 12.0 MIRN REQUEST DIAGRAM 13.0 CUSTOMER REQUEST TO RETAILER RETAILER OF LAST RESORT PROCESS FLOWS DIAGRAM 13.1 PRE-ROLR EVENT MONTHLY TRANSFER OF CUSTOMER DATA TO AEMO DIAGRAM 13.2 CATS PROCESSING CANCELLED AND ACCELERATED CUSTOMER TRANSFERS DIAGRAM 13.2A CATS PROCESSING ACCELERATED CUSTOMER TRANSFERS ( MOVE INS ) DIAGRAM 13.3 NON-CATS / CUSTOMER DATA EXCHANGE AND DATA GENERATION DIAGRAM 13.4 FRB GENERATED CUSTOMER LISTS FOR ROLR DIAGRAM 13.5 WHOLESALE PROCESS DIAGRAM 13.6 ROLR COMMUNICATIONS DIAGRAM 13.7 PROVISION OF ESTIMATE TRANSFER READS AND SUBSEQUENT ADJUSTMENT DIAGRAM 13.8 SERVICE ORDERS IN FLIGHT PROCESS FLOW DIAGRAMS DIAGRAM 99.1 MAINS RENEWAL Doc Ref: ver JULY 2014 Page 5 of 51

6 3.2 DIAGRAM 99.2 NETWORK BILLING DIAGRAM 99.4 MIRN STANDING DATA UPDATE DIAGRAM 99.5 METERED SUPPLY POINT COUNT UPDATE CUSTOMER CLASSIFICATION DIAGRAM 99.6 METER FIX DIAGRAM 99.7 TRANSFER (IN SITU / MOVE IN) DIAGRAM 99.8 MOVE IN (NO CHANGE IN RETAILER) DIAGRAM 99.9 CUSTOMER REQUEST TO RETAILER SERVICE ORDER PROCESS FLOWS The drawing conventions used for these diagrams: Diagram 100: Service Orders General (Simplified) Diagram 101: Retailer Initiated Service Orders Cancellation Diagram 102: Distributor Initiated Service Orders Diagram 103: Shipper Process Diagram 104: Meter Fix Request Diagram 105: Upgrade from Basic to Interval Meter Diagram 106 : Downgrade from Interval to Basic Meter For tariff D Diagram 107: Service Order Transaction Table Doc Ref: ver JULY 2014 Page 6 of 51

7 1 Process Flow Diagrams 1. These flow charts were developed as a working aid to development of the Retail Market Procedures (Victoria) and the Participant Build Packs for the purpose of identifying the necessary transactions between Retailers, Distributors and AEMO. Whilst reasonable effort has been made to ensure that these flow charts are updated and consistent with the Retail Market Procedures (Victoria) and the Participant Build Packs, there may be differences between the flow charts and the Retail Market Procedures (Victoria) and the Participant Build Packs. Where there is a difference, the Retail Market Procedures (Victoria) and the Participant Build Packs take precedence. 2. The process steps within individual business are indicative only and do not necessarily identify all required process steps nor do they mandate the use of a particular process. 3. The drawing conventions used for these diagrams are as follows: a. Multiple flow arrows exiting from a process step indicate two or more independent process flows that occur following the step. If a flow is conditional, that condition will be noted on the flow arrow. b. Alternative flows are indicated by a decision box containing a question. Conditions based on answers to the question on the flows exiting these boxes will be noted on the flow arrows. c. A fork synch bar indicates two unconditional parallel processes that will rejoin at some point with a join synch bar. A join indicates that all processes must be completed before moving on. 4. Flow arrows that cross swim lanes to connect to a start or end identifier are used to ease diagram production and do not indicate a B2B transaction. Doc Ref: ver JULY 2014 Page 7 of 51

8 1.1 DIAGRAM 1.0 SPECIAL METER READS Customer 1.1 Requests special read Retail Business (New or Existing FRO) 1.2 Requires special read 1.3 Nominate date and generate special read request 1.17 Willl Retailer carry out special read? [Yes] 1.8 Issues request to contractor for debt collection or disconnection 1.9 If debt un paid disconnect and read meter. Forward meter read and disconnection flag to DB 6.0 Customer Transfer Log Work Order Number [No] 1.13 Update New FRO CIS AEMO SpecialReadResponse SpecialReadResponse SpecialReadRequest MeterReadInputNotification 6.0 Customer Transfer Page CATSNotification AccountCreationNotification Distribution Business 1.11 Close Special Read Request and advise RB 1.20 Return Work Order Number 1.4 Log request and forward to Meter Reading Contractor 10.0 Data Change [Yes] Update MIRN and Meter Data database with disconnection status 1.16 Receive Transfer Completion Notification 1.14 Send New FRO Meter index, date and site data [Yes] BMDM 1.19 Was meter disconnected? [No] 2.0 Basic Meter Data Collection and Delivery Transfer Request? MBMR 1.10 Record reason for no access and advise DB [No] 1.20 Was it Special Final Read? [No] 1.18 Attend site: Access available [Yes] 1.5 Record reading and if requested disconnect 1.6 Perform basic high/low validation 1.7 Send read data to BMDM [Yes] 1.21 Perform Estimation Doc Ref: ver JULY 2014 Page 2 of 51

9 1.2 DIAGRAM 1.1 SPECIAL METER READS CANCELLATION Retailer 1.22 Special Read no longer required Nominate date and generate Special Read Request 1.23 Raise Special Read Cancellation request Distributor SpecialReadRequest 1.24 Log Special Read Cancellation Close Special Read Request and adv ise RB Doc Ref: ver JULY 2014 Page 3 of 51

10 1.3 DIAGRAM 2.0 BM DATA COLLECTION AND DELIVERY (PAGE 1) Customer Page Card Read Retail Business «Phone» 2.16 Call Centre Read AEMO «Mail» MeterReadInputNotification Distribution Business 2.1a Calculate validation parameters 5.1 Basic Meter Fix Basic Meter Removal & Service Orders Basic Meter Change Basic Meter Upgrade to Interval BMDM 2.1 Download reading route schedule and vlidation parameters to meter reading contractor 4.0 Basic Meter Route and Site Information Store and validate data 2.7 Obtain estimated index data as required via process 2.7 Basic Meter Customer Bill Estimation 2.8 Subtract prev ious index read from current index read A (to page 2) 1.0 Special Meter Reads MBMR 2.2 Load reading route schedules into PDEs 2.3 Follow route schedule and key reads into PDEs 1.0 Special Meter Reads , 1.19 & Upload read data 2.31 Leave card [No] 2.30 Able to read meter? [Yes] 2.4 Perform basic high/low validation, update site info as required Doc Ref: ver JULY 2014 Page 4 of 51

11 1.4 DIAGRAM 2.0 BM DATA COLLECTION AND DELIVERY (PAGE 2) Customer Page 2 Retail Business 2.13 Bill end customers 2.28 Identify any missing energy data 2.24 Process energy data 2.29 Request missing energy data 2.26 Request Energy History 2.25 Return Meter Data Response 2.23 Save energy data 2.27 Save Energy History data AEMO 11.0 Basic Meter Profiler (BMP) Basic Meter Profiler (BMP) Distribution Business MeterDataMissingNotification MeterDataNotification (2nd tier) «asexml (CSV)» MeterDataResponse MeterDataResponse MeterDataMissingNotification Request Gas History Data «asexml (CSV)» «fax or » MeterDataNotification MeterDataHistoryResponse «asexml (CSV)» « (CSV)» 2.15 Calculate bill/duos BMDM 2.22 Process Energy Data Response Metric Data? [Yes] 2.10 Apply PCF A (from page 1) [No] 2.9 Conv ert imp to metric 2.11 Apply average heating v alue 2.12 Provide Energy and/or flow data and or index readings MBMR 9.1 BM Daily Consumption Estimation 10.0 Data Change Doc Ref: ver JULY 2014 Page 5 of 51

12 1.5 DIAGRAM 2.7 BASIC METER CUSTOMISATION BILL ESTIMATION Customer Retail Business Provide Customer Characterisation AEMO Provide EDD Provide ave. daily flow. weighted Heating Values Distribution Business AmendMeterRouteDetails «asexml (CSV)» «MIBB» «MIBB» BMDM 2.0 Basic Meter Data Collection and Delivery consumption history >1yr? [No] Determine ave BL & av e TSF from Customer Characterisation [Yes] Estimate Daily Consumed Energy using BL & TSF Conv ert Estimated Consumed Energy to flow 2.0 Basic Meter Data Collection and Delivery MBMR Doc Ref: ver JULY 2014 Page 6 of 51

13 1.6 DIAGRAM 4.0 BASIC METER ROUTE AND SITE INFORMATION Customer 3.1(a) Customer Requests changes to address information (eg - Lot number to Hse Number) 3.1(b) Customer Requests changes to site Information (eg - Access to Meter) Retail Business 4.3 Consultation on Route/Route Changes 4.5 Record annual meter read schedule 4.4 Record route changes 3.2(a) Retailer records and issues request to update address information 3.2(b) Retailer records and issues request to update Site Information AEMO AmendMeterRouteDetails « (CSV)» AmendMeterRouteDetails AmendMeterRouteDetails Annual meter read schedule «Phone, fax, » « (CSV), web» Distribution Business 5.3 Basic Meter Upgrade to Interval Update Meter Data Database 3.3 Receives and acknowledges change to Site Information BMDM 5.1 Basic Meter Fix Analyse and optimise routes 4.2 Update/Create route schedules based on outputs 2.0 Basic Meter Data Collection and Delivery MBMR 3.5 Meter Reading Service Provider requests changes to site Information (eg - Access to Meter, Address details) Doc Ref: ver JULY 2014 Page 7 of 51

14 1.7 DIAGRAM 4.1 BASIC METER ROUTE AND SITE INFORMATION Customer 3.1c Customer request change to contact details 3.1d Customer request mov e in and prov ides contact Details Retail Business 3.2c Retailer records details and issues request to update contact details Distribution Business AmendCustomerDetails «<asexmlcsv>» 3.6 Update Customer contact Database 3.3 Reciev es and acknow ledges change to customer contact details Doc Ref: ver JULY 2014 Page 8 of 51

15 1.8 DIAGRAM 6.0 CUSTOMER TRANSFER (PAGE 1) Customer Provide Implicit Informed Consent Further processing as per problem notice handling, refer to Page 6 Page 1 New FRO 12.0 MIRN Request Submit Transfer Request to CATS Process Response to Transfer Request [If Special Read is required] 1.0 Special Meter Reads Receive Problem Notice AEMO CATSChangeRequest Initiate Transfer Transaction CATSChangeResponse Notify New Retailer Request Standing Data Receive Standing Data I (to page 4) Notify Affected Parties CATSNotification Is it move-in transfer? [No] [Yes] D (to page 4) B (to page 3) CATSChangeAlert Generate Problem Notice Current FRO CATSChangeRequest «manual process» Receive Notice of Transfer A (to page 2) TPO CATSDataRequest CATSChangeResponse Receive Notice of Transfer NACK CATSNotification End Process NACK [Yes] Distributor Deliver Standing Data Process Response to Standing Data Is it re Retrospective Transfer & no reading for that date? [No] Put on Notice to Deliver Energy for This Site in the Allowable Period End Process Doc Ref: ver JULY 2014 Page 9 of 51

16 1.9 DIAGRAM 6.0 CUSTOMER TRANSFER (PAGE 2) Customer Page 2 New FRO Consider Valid Objection CATSNotification AEMO B (to page 3) Validate Objection Register Objection Notify Objecting Party Notify Affected Participants C (to page 3) [No] CATSObjectionRequest CATSObjectionResponse Current FRO Object? [Yes] Enter Objection in CATS Process Objection Response G (to page 3) A (from page 1) CATSNotification TPO Distributor Receive Notice of Objection Doc Ref: ver JULY 2014 Page 10 of 51

17 1.10 DIAGRAM 6.0 CUSTOMER TRANSFER (PAGE 3) Customer Page 3 New FRO B (from page 2) Receive Notice of Objection Withdrawal H (from page 5) Receive Cancelled Txf Notice Liase/Notify with Customer CATSNotification CATSNotification AEMO Current FRO C (from page 2) G (from page 2) Resolve Objection Monitor Objection Period Clear Objection CATSObjectionWithdrawal CATSNotification [objection period expired] Send Notice of Objection Withdrawal CATSNotification Receive Notice of Objection Withdrawal Any Objections? [Yes] [No] D (to page 4) Cancel Transfer Request Send Cancelled Txf Notice CATSNotification CATSNotification Receive Cancelled Txf Notice End Process TPO Receive Notice of Objection Withdrawal Receive Cancelled Txf Notice End Process Distributor Receive Notice of Objection Withdrawal Receive Cancelled Txf Notice Remove from the Transfer Queue to Deliver Energy Doc Ref: ver JULY 2014 Page 11 of 51

18 1.11 DIAGRAM 6.0 CUSTOMER TRANSFER (PAGE 4) Customer 1.12 Page 4 New FRO Receive Status Update Update CIS E (from page 5) End Process AEMO D (from page 3) Set Transfer Status to Pending CATSNotification Send Status Change Notice Wait For Final Read Data Load Actual Meter Read Data Is Read an Actual [Yes] Read? Is Read Date OK for Transfer? I (from page 1) [Yes] [Yes] Has Standing Data been provided? [Yes] Update Status to Completed CATSNotification Notify Affected Participants Update Meter Register End Process D (from page 1 and 3) Current FRO CATSNotification Receive Status Update 11.0 Basic Meter Profiler (BMP) [No] [No] [No] [No] F (to page 5) CATSNotification Issue Final Bill End Process TPO CATSNotification CATSNotification Update DUoS/TUoS Billing End Process Distributor Receive Status Update Update Data Access Controls 1.0 Special Meter Reads End Process Doc Ref: ver JULY 2014 Page 12 of 51

19 Customer DIAGRAM 6.0 CUSTOMER TRANSFER (PAGE 5) AEMOwill automatically cancel the Transfer Request if a New Transfer Date or a Cancellation is not received within 10 business days. Page 5 New FRO AEMO F (from page 4) Current FRO Is it re Retrospective Transfer [Yes] H (to page 3) [No] [Yes] Has read fail notice been issued? H (to page 3) [No] Notify Late Meter Read CATSDataRequest Receive Notice of Read Failure Exception Processing CATSDataRequest Notify New Retailer Of final Read Failure New Transfer Date or Cancel? [Cancel] CATSChangeWithdrawal Set Transfer Status to Cancelled Receive Transfer Cancellation Notice CATSNotification Notify Affected Participants CATSNotification Receive Transfer Cancellation Notice End Process CATSChangeRequest [New transfer date] Update Status with new Transfer Date End Process Process Response CATSChangeResponse Receive Notice Notify Affected Participants CATSNotification E (to page 4) TPO CATSDataRequest CATSNotification CATSNotification Distributor Receive Notice of Read Failure Receive Transfer Cancellation Notice End Process Receive Notice Doc Ref: ver JULY 2014 Page 13 of 51

20 1.13 DIAGRAM 6.0 CUSTOMER TRANSFER (PAGE 6) Customer Page 6 New FRO Receiv e Problem Notice AEMO CATSChangeAlert Pass Problem CATSChangeAlert Notice to New Retailer CATSChangeAlert Current FRO «manual process» Generate Problem Notice TPO Generate Problem Notice Distributor Generate Problem Notice Doc Ref: ver JULY 2014 Page 14 of 51

21 1.14 DIAGRAM 9.1 BM DAILY CONSUMPTION ESTIMATION Customer This diagram is for AEMO internal use only. Not to be used for participant design Retail Business AEMO [Yes] 11.0 Basic Meter Profiler (BMP) 11.0 Basic Meter Profiler (BMP) Consumed Energy Available? [No] Estimate Daily Consumed Energy using BL & TSF NMIStandingDataUpdateNotification Distribution Business See also diagram 11.0 BMP ( > 11.17) Prov ide BL & TSF BMDM MBMR Doc Ref: ver JULY 2014 Page 15 of 51

22 1.15 DIAGRAM 10.0 DATA CHANGE Customer 10.1 Customer complaint re bill Retail Business [Yes] 10.2 Consider complaint - data problem? [No] 10.3 Request data quality confirmation and provide clarifiying Information (where applicable) 10.6 Manage customer / complaint AEMO Distribution Business MeterDataVerifyRequest MeterDataVerifyResponse BMDM [Special Read] 10.4 Initiate Special Read 10.8 Alternative re-estimate or special read required? [Alternative re-estimate] 10.7 Carry out alternativ e re-estimation 10.5 Inform RB of re-estimation or special read result [If new energy data is to be supplied] 2.0 Basic Meter Data Collection and Delivery MBMR 1.0 Special Meter Reads Doc Ref: ver JULY 2014 Page 16 of 51

23 1.16 DIAGRAM 11.0 BASIC METER PROFILER (BMP) Customer Retail Business AEMO Generate values/site without reading Meter Data Store 11.4 Apply UAFG Benchmark 11.9 MIBB Calculate EDD Values Monitor Energy Data 6.0 Customer Transfer Aggregate Energy Readings by RB by DB 11.8 Settlements Process [Yes] Update Meter Register with BL and TSF Send Response to BL and TSF by Site Update 11.2 Are all MIRNs present? 11.6 Apply Profile to Aggregated Energy Meter Data Store NMIStandingDataUpdateNotification NMIStandingDataUpdateResponse Request Missing Energy Data [No] 11.1 Validate Data 11.7 Profile Preparation (PPS) Distribution Business Deliver BL and TSF by Site Process Response to BL and TSF by Site Update MeterDataResponse MeterDataNotification (2nd tier) BMDM MeterDataMissingNotification 2.0 Basic Meter Data Collection and Delivery Basic Meter Data Collection and Delivery MBMR Doc Ref: ver JULY 2014 Page 17 of 51

24 1.17 DIAGRAM 12.0 MIRN REQUEST Customer 12.2 Provide Explicit Informed Consent, MIRN or Address Retail Business 12.3 Initiate MIRN Discov ery Transaction 12.8 Use Data Contact DB for Details [No] 12.9 Can RB resolve? [Yes] AEMO NMIDiscoveryResponse/ NMIStandingDataResponse NMIDiscoveryRequest/ NMIStandingDataRequest NMIDiscoveryResponse/ NMIStandingDataResponse MIDiscoveryResponse/ NMIStandingDataResponse «Phone, fax, » Distribution Business Manage Query on Failed Searches Return error [No] 12.5 Single match on Address/MIRN? [Yes] 12.6 Prov ide MIRN Data [If additional data to be supplied] 12.7 Provide Additional MIRN Data BMDM MBMR Doc Ref: ver JULY 2014 Page 18 of 51

25 1.18 DIAGRAM 13.0 CUSTOMER REQUEST TO RETAILER Identifying a Gas Customer s Current Retailer (Meter and/or up stand removed) Business Day 1 Day 3 Day 8 Retailer Retailer Distributor Distributor FRO FRO AEMO AEMO (Not (Not FRO) FRO) Customer Customer 1. Customer calls a RB who is not the FRO to arrange SO. 2. Receives call from customer. Advises customer they are not the RB for that address. Take customer's details. No SO details are taken. 3. RB B2B Contact (Primary/Secondary) send AEMO Helpdesk for Identify FRO. 4. Helpdesk logs call and searches meter register for current FRO. 5. AEMO Pass customer details to FRO and closes call. 7. Customer happy. End. 6. FRO contact customer and collects SO details. 8. Organise Service Order (if required). 9. Receive Service order request and complete. Doc Ref: ver JULY 2014 Page 19 of 51

26 2 RETAILER OF LAST RESORT PROCESS FLOWS 2.1 DIAGRAM 13.1 PRE-ROLR EVENT MONTHLY TRANSFER OF CUSTOMER DATA TO AEMO Doc Ref: ver JULY 2014 Page 20 of 51

27 2.2 DIAGRAM 13.2 CATS PROCESSING CANCELLED AND ACCELERATED CUSTOMER TRANSFERS Doc Ref: ver JULY 2014 Page 21 of 51

28 2.3 DIAGRAM 13.2A CATS PROCESSING ACCELERATED CUSTOMER TRANSFERS ( MOVE INS ) Doc Ref: ver JULY 2014 Page 22 of 51

29 2.4 DIAGRAM 13.3 NON-CATS / CUSTOMER DATA EXCHANGE AND DATA GENERATION Doc Ref: ver JULY 2014 Page 23 of 51

30 2.5 DIAGRAM 13.4 FRB GENERATED CUSTOMER LISTS FOR ROLR Doc Ref: ver JULY 2014 Page 24 of 51

31 2.6 DIAGRAM 13.5 WHOLESALE PROCESS Doc Ref: ver JULY 2014 Page 25 of 51

32 2.7 DIAGRAM 13.6 ROLR COMMUNICATIONS Doc Ref: ver JULY 2014 Page 26 of 51

33 2.8 DIAGRAM 13.7 PROVISION OF ESTIMATE TRANSFER READS AND SUBSEQUENT ADJUSTMENT Doc Ref: ver JULY 2014 Page 27 of 51

34 2.9 DIAGRAM 13.8 SERVICE ORDERS IN FLIGHT Doc Ref: ver JULY 2014 Page 28 of 51

35 3 PROCESS FLOW DIAGRAMS 3.1 DIAGRAM 99.1 MAINS RENEWAL Retailer Record impacted MIRNs FieldWorkNotification « (CSV)» Distributor Notify Retailer of impacted MIRNs Identify maintenance w ork requirement Identify impacted MIRNs Notify impacted customers as required Doc Ref: ver JULY 2014 Page 29 of 51

36 3.2 DIAGRAM 99.2 NETWORK BILLING Retailer Record Network DUoS Billing Details data NetworkDUoSBillingNotification «asexml (CSV)» Distributor Collate Network DUoS Billng Details data [disagreement with billing details] Issue a Dispute NetworkDUoSBillingNotification «asexml (CSV)» Rev iew Network DUoS Billing Details and Propose a Resolution Rev iew Proposed Dispute Resolution NetworkDUoSBillingNotification «asexml (CSV)» NetworkDUoSBillingNotification «asexml (CSV)» Record Payment Details Doc Ref: ver JULY 2014 Page 30 of 51

37 3.3 DIAGRAM 99.4 MIRN STANDING DATA UPDATE Retailer Update MIRN Standing Data Distributor « » Update MIRN Standing Data Notify Retailer of change Doc Ref: ver JULY 2014 Page 31 of 51

38 3.4 DIAGRAM 99.5 METERED SUPPLY POINT COUNT UPDATE AEMO Update Metered Supply Points Count Distributor MeteredSupplyPointsCountUpdate Prov iding Metered Supply Points Count Doc Ref: ver JULY 2014 Page 32 of 51

39 4 CUSTOMER CLASSIFICATION 4.1 DIAGRAM 99.6 METER FIX Customer Classification AGREED - Transfer (Insitu/MoveIn) AEMO Distributor Retailer Request MIRN Discovery/Standing Data Validate request and send MIRN Discovery Response Receive MIRN Discovery Responsse and update system(s) Raise Transfer Request Receive transfer and Issue market notifications Receive Completion and ACN and update system(s) Generate Account Creation Notification Receive Completion and update system Send Notifiction transfer Complete Has the primary use of the property changed? No End Yes Generate Amend Route/Site Address Details Transaction Receive transaction with Customer Classification Code Where CCC is BUS Update Customer Threshold Code ( LOW, MED, HIGH Send update Receive Amend Route/Site Address Details transaction and update system(s) Generate Amend Route/ Site Address Details Transaction Doc Ref: ver JULY 2014 Page 33 of 51

40 4.2 DIAGRAM 99.7 TRANSFER (IN SITU / MOVE IN) Customer Classification AGREED - Transfer (Insitu/MoveIn) AEMO Distributor Retailer Request MIRN Discovery/Standing Data Validate request and send MIRN Discovery Response Receive MIRN Discovery Responsse and update system(s) Raise Transfer Request Receive transfer and Issue market notifications Receive Completion and ACN and update system(s) Generate Account Creation Notification Receive Completion and update system Send Notifiction transfer Complete Has the primary use of the property changed? No End Yes Generate Amend Route/Site Address Details Transaction Receive transaction with Customer Classification Code Where CCC is BUS Update Customer Threshold Code ( LOW, MED, HIGH Send update Receive Amend Route/Site Address Details transaction and update system(s) Generate Amend Route/ Site Address Details Transaction Doc Ref: ver JULY 2014 Page 34 of 51

41 4.3 DIAGRAM 99.8 MOVE IN (NO CHANGE IN RETAILER) Customer Classification AGREED - Move In (Same Retailer) Retailer Receive Customer request for Move-in on property already with the Retailer Has the primary use of the property changed? No Yes Generate Amend Route/Site Address Details Transaction Receive Amend Route/Site Address Details transaction and update system(s) End Receive transaction with updated Customer Classification Code Distributor Where CCC is BUS Update Customer Threshold Code ( LOW, MED, HIGH Send update Generate Amend Route/Site Address Details Transaction Doc Ref: ver JULY 2014 Page 35 of 51

42 4.4 DIAGRAM 99.9 CUSTOMER REQUEST TO RETAILER Customer Classification AGREED - Request from Customer to RB Retailer Receive Customer request Has the primary use of the property changed? No Yes Generate Amend Route/Site Address Details Transaction Receive Amend Route/Site Address Details transaction and update system(s) End Receive transaction with updated Customer Classification Code Distributor Where CCC is BUS Update Customer Threshold Code ( LOW, MED, HIGH Send update Generate Amend Route/Site Address Details Transaction Doc Ref: ver JULY 2014 Page 36 of 51

43 5 SERVICE ORDER PROCESS FLOWS 5.1 The drawing conventions used for these diagrams: The drawing conventions used for these diagrams are as follows: N.N Activity Decision Decision/Data Transfer Description Process Terminator/ Inter-process Link On Page Ref Process Close Process Start Wait Parallel Mode asexml Message Description Association Notes Doc Ref: ver JULY 2014 Page 37 of 51

44 5.2 Diagram 100: Service Orders General (Simplified) Diagram 100: Service Orders General (Simplified) SA Process Ref: PF (B2B) REQ5B/MIRN 1 AEMO Distributor Retailer Customer From or or as applicable 1a. Request a Service 3. Receive Service Order Request & Validate 1. Request a Service ServiceOrderRequest [actiontype= New ] <<asexml>> #1 No 4. Valid Service Order Request? Go To Yes Where rejected, Retailer takes appropriate action e.g. Initiate new service order request and current process ends. 2. Send Service Order (SO) C-K 5. Send Validation Outcome Yes Transaction Acknowledgment <<asexml>> 9. Log Service Order & Send Response 12. Was Additional or Alternative Work Completed? 6. Receive Acceptance/ Rejection From No 10. Action Service Order 7. Was Service Order Accepted? No This process wasn t reviewed as part of IN017/13. IN027/13 has been created to raise awareness that when Meter Data Delivery process is reviewed revisit this process flow diagram Yes If required by service requested ServiceOrderResponse [responsetype= Initial ] <<asexml>> #2 Go To or as applicable 11. Has SO been Completed? Yes Go To 2.0 Meter Data Delivery 8. Receive Service Order Response (Initial) No Yes Wait for service order response Closure Up to 5 BD From Expected Completion of Step Send Service Order Response Up to 5 BD from Expected Completion of Step Does SO Type Require Delivery of Meter Data? ServiceOrderResponse [responsetype= Closure ] <<asexml>> Go To or #3 Yes as applicable No 14. Upgrade or Downgrade? 17. Does SO Require Notification to AEMO? No 15. Receive Service Order Response (Closure) No Yes 18. Send Notification to AEMO <<asexml>> #4 19. Action Notification #1, 2, 3 & 4 Refer to Diagram 107 for the transactions involved Doc Ref: ver JULY 2014 Page 38 of 51

45 5.3 Diagram 101: Retailer Initiated Service Orders Cancellation Diagram 101: Retailer Initiated Service Orders Cancellation SA Process Ref: PF (B2B) REQ 7 Distributor Retailer Customer 3. Receive Service Order Cancellation & Validate 1. Request a Service order to be Cancelled 1a. Request a Service order to be Cancelled ServiceOrderRequest [actiontype= Cancel ] <<asexml>> #1 No 4. Valid Service Order Cancel Request? 5. Send Validation Outcome 2. Send Service Order (SO) Cancellation C-K Yes Transaction Acknowledgment <<asexml>> Same day cancellations must also be phoned through 10. Attempt to Cancel Initial SO Request 6. Receive Acceptance/ Rejection No 7. Was SO Cancellation Accepted? 11. Can Initial SO be Cancelled? No Yes Yes Where cancellation is rejected the original SO will continue to be actioned Retailer takes appropriate action 8. Receive Service Order Response ServiceOrderResponse [responsetype=closure] <<asexml>> #3 12. Send Service Order Response 9. Update System Data Up to 5 BD from Expected Completion of Step 10 Where cancellation is rejected the original SO will continue to be actioned #1 & 3 Refer to Diagram 107 Table for the transactions involved Doc Ref: ver JULY 2014 Page 39 of 51

46 5.4 Diagram 102: Distributor Initiated Service Orders Diagram 102: Distributor Initiated Service Orders SA Process Ref: PF (B2B) REQ 6 AEMO Distributor Retailer Distributor initiated work at the site requires update to retailer/aemo This includes Time Expired Meters From Complete Field Work 3. Receive & Validate Service Order Response (C-K) ServiceOrderResponse [responsetype=closure] <<asexml>> #3 2. Send Service Order Response (C-K) This process wasn t reviewed as part of IN017/13. IN027/13 has been created to raise awareness that when Meter Data Delivery process is reviewed revisit this process flow diagram Go To 2.0 Meter Data Delivery 4. Update System Data Yes 5. Does SO Require Notification to AEMO? 6. Does SO Type Require Delivery of Meter Data? No No Yes 7. Send Notification to AEMO <<asexml>> #4 8. Action Notification #3 & 4 Refer to Diagram 107 Table for the transactions involved Doc Ref: ver JULY 2014 Page 40 of 51

47 5.5 Diagram 103: Shipper Process Diagram 103: Shipper Process SA Process Ref: MIRN1.1 Part 2 Distributor Retailer Customer From or or as applicable 1a. Request a Service From or as applicable 1. Request a Service Phone 2. Prepare Shipper Form 1b. Request a Shipper From or as applicable The request for work Form is different for each DB 6. Receive Validation Outcome 3. Receive & Validate Shipper Form If rejected, resolve issues with customer and resend Shipper Form (potentially amended) Phone/Fax/ 11. Advise Customer of Costs / Conditions & Send Offer 10. Receive Shipper Response 5. Send Validation Outcome No 4. Valid Shipper Request? No Yes 12. Accept Cost / Conditions? Yes /Fax 13. Receive Signed Agreement 8. Does the Site Match Shipper Form? 7. Review Field Requirements and/or Visit Site No Yes 15.Is SO Required for the Service by the Applicable DB? No Tariff V requires response within 10 business days from request received otherwise date agreed by the customer Yes /Fax 9. Complete Shipper Evaluation Form & Send Response Go To 100.1a 14. Receive Signed Shipper Acceptance Go To or or or as applicable Notes: Service Order Enquiry Code MAP, MFX, MRT, RSR, SCR, UMS, USR Doc Ref: ver JULY 2014 Page 41 of 51

48 5.6 Diagram 104: Meter Fix Request Diagram 104: Meter Fix Request SA Process Ref: NA Retailer Customer 1. Request Meter Fix as Service & Fitting Lines Completed 2.Simple Meter Type Installation? No Yes 3.Is a Shipper form required? 5. Customer Quotes CoC & PLN 4. Request Customer to Provide CoC & PLN No No 6. Valid CoC & PLN? Yes Go To 100.1a 7. Request Customer to Provide Start Work Notice No & PLN 8. Customer Quotes Start Work Notice No & PLN Yes Go To From Doc Ref: ver JULY 2014 Page 42 of 51

49 5.7 Diagram 105: Upgrade from Basic to Interval Meter Diagram 105: Upgrade from Basic to Interval Meter SA Process Ref: PF (B2B) MR12 AEMO Distributor Retailer Customer Go To 103.1b 3. Distributor identifies need for Basic to Interval Meter Upgrade 1. Request Upgrade to Interval Meter 2. Retailer identifies need for Basic to Interval Meter Upgrade 4.Confirm Receipt of Service Order 6. Install Data Logger and/or Comms GIP 126 Go To Go To 103.1a 9. Receive & Validate MR Application 7. Prepare & Send Meter Registration (MR) Application GIP 126 From Confirm Receipt of Signed Acceptance 10. MR Application Valid? If required by service requested From Amend & Resubmit MR Application No Yes 13. Commission Interval Meter in Association with MDP 12. Receive Notated MR Application GIP Update Meter Register to Pending Interval Metering & Send Notated MR Application From Complete & Send Meter Installation Parameter (MIP) Notice 18. Receive Completion Advice or ServiceOrderResponse 17. Update System Send Completion Advice to Retailer 16. Receive Notated MIP Notice 15. Update Meter Register to Active Interval Metering & Send Notated MIP Notice Doc Ref: ver JULY 2014 Page 43 of 51

50 5.8 Diagram 106 : Downgrade from Interval to Basic Meter For tariff D Diagram 106 : Downgrade from Interval to Basic Meter For tariff D SA Process Ref: PF (B2B) MR14 AEMO Distributor Retailer Customer Go To 103.1b 3. Distributor identifies need for Interval to Basic Meter Downgrade 1. Request Downgrade to a Basic Meter 2. Retailer identifies need for Interval to Basic Meter Downgrade 4. Confirm Receipt of Service Order 6. Prepare & Send Meter Installation Parameter change Notice (MIP) GIP 134 Go To Go To 103.1a GIP Receive & Validate MIP 5. Confirm Receipt of Signed Acceptance From Amend & Resubmit MIP No 9. MIP Valid? From Yes From Update System and set Meter to Basic 11. Receive Notated MIP 10. Update Meter Register to Basic Metering & Send Notated MIP 14. Receive SO Completion Advice ServiceOrderResponse 13. Remove Data Logger and/or Comms Doc Ref: ver JULY 2014 Page 44 of 51

51 5.9 Diagram 107: Service Order Transaction Table Diagram 107: Service Order Transaction Table #1 Service Orders Request C-K #2 Service Order Response C-K (Initial) #3 Service Order Response C-K (Final) #4 Status Change Response GIP 87 - Meter Fix Request (JEC = MFX) GIP Meter Change Request (JEC = MCH) GIP 87A - Meter Fix Request Response GIP 92 - Meter Fix Completed GIP 94 - Meter Fix Notification GIP 101A - Meter Change Request Response GIP 93 - No Access to Complete Meter Fix GIP No Access to Complete Meter Change GIP Meter Change Completed GIP Meter Upgrade Completed GIP Meter Removal Request (JEC = MRM) GIP 151A - Meter Removal Request Response GIP No Access to Complete Meter Removal GIP MIRN Status Update Notification GIP Meter Removal Completed GIP Service Connection Request (JEC = SCR) GIP Service Disconnection Request (JEC = SDR) GIP Service Orders for Priority C-K (JEC = All JEC's) GIP Relocate Service Request (JEC = RSR) GIP Upgrade Service Size Request (JEC = USR) GIP Upgrade Meter Size Request (JEC = UMS) GIP 310A - Service Connection Request Response GIP 312A - Service Disconnection Request Response GIP 314A - Service Orders for Priority C-K Response GIP 316A - Relocate Service Request Response GIP 318A - Upgrade Service Size Request Response GIP 320A - Upgrade Meter Size Request Response GIP Service Connection Complete GIP Service Disconnection Complete GIP Service Orders Completed for Priority A-K GIP Relocate Service Complete GIP Upgrade Service Size Complete GIP Upgrade Meter Size Complete GIP MIRN Status Update Notification JEC = Job Enquiry Doc Ref: ver JULY 2014 Page 45 of 51

PARTICIPANT BUILD PACK 1 PROCESS FLOW DIAGRAMS VER 3.6 TABLE OF TRANSACTIONS VER 3.5

PARTICIPANT BUILD PACK 1 PROCESS FLOW DIAGRAMS VER 3.6 TABLE OF TRANSACTIONS VER 3.5 PARTICIPANT BUILD PACK 1 PROCESS FLOW DIAGRAMS VER 3.6 TABLE OF TRANSACTIONS VER 3.5 PREPARED BY: DOCUMENT REF: 305196 VERSION: 3.6 MARKET DEVELOPMENT DATE: 29 September 2017 FINAL : Document Approval

More information

GAS INTERFACE PROTOCOL. PREPARED BY: AEMO DOCUMENT REF: VERSION NO: 21.0 DATE: 29 September 2017 FINAL :

GAS INTERFACE PROTOCOL. PREPARED BY: AEMO DOCUMENT REF: VERSION NO: 21.0 DATE: 29 September 2017 FINAL : PREPARED BY: AEMO DOCUMENT REF: 296630 VERSION NO: 21.0 DATE: 29 September 2017 FINAL : Version History VERSION DATE AUTHOR(S) CHANGES AND COMMENTS 8.0 01/07/2010 S. Monaco Ensure document complies with

More information

PARTICIPANT BUILD PACK 2 - GLOSSARY

PARTICIPANT BUILD PACK 2 - GLOSSARY PARTICIPANT BUILD PACK 2 - GLOSSARY PREPARED BY: MARKET DEVELOPMENT DOCUMENT REF: 305188 VERSION: 3.1 DATE: 1 JANUARY 2014 FINAL Document Approval and Acceptance AEMO Approval This document has been prepared

More information

RETAIL MARKET PROCEDURES (VICTORIA)

RETAIL MARKET PROCEDURES (VICTORIA) RETAIL MARKET PROCEDURES (VICTORIA) DOCUMENT NO: PROJECT-57-30 VERSION NO: 12.0 PROJECT-57-30 Retail Market Procedures (Victoria) Page i of 77 VERSION CONTROL VERSION NUMBER EFFECTIVE DATE PROCEDURES AFFECTED

More information

INTERVAL METER REGISTRATION PROCESS WHOLESALE GAS MARKET

INTERVAL METER REGISTRATION PROCESS WHOLESALE GAS MARKET INTERVAL METER REGISTRATION PROCESS WHOLESALE GAS MARKET PREPARED BY: Responsible Department DOCUMENT NO: 129749 VERSION NO: 5 FINAL Auslra!ion Eretgy' 111'.arket Ope

More information

MIRN STRUCTURE (VICTORIA)

MIRN STRUCTURE (VICTORIA) PREPARED BY: MARKET DEVELOPMENT DOCUMENT REF: 297179 VERSION: 2.0 DATE: 24 MAY 2010 FINAL Australian Energy Market Operator Ltd ABN 94 072 010 327 www.aemo.com.au info@aemo.com.au NEW SOUTH WALES QUEENSLAND

More information

GUIDE TO MSATS AND B2B TERMS DEFINES THE MSATS AND B2B TERMS USED IN THE ELECTRICITY RETAIL MARKET

GUIDE TO MSATS AND B2B TERMS DEFINES THE MSATS AND B2B TERMS USED IN THE ELECTRICITY RETAIL MARKET GUIDE TO MSATS AND B2B TERMS DEFINES THE MSATS AND B2B TERMS USED IN THE ELECTRICITY RETAIL MARKET Version: 1.01 Published: Friday, 16 March 2018 IMPORTANT NOTICE Purpose This Guide to MSATS and B2B Terms,

More information

IMPACT IMPLEMENTATION REPORT (IIR)

IMPACT IMPLEMENTATION REPORT (IIR) IMPACT IMPLEMENTATION REPORT (IIR) Summary Section For AEMO to complete and administer. Issue Number Impacted Jurisdiction(s) Proponent Affected Gas Market(s) Industry Consultative forum(s) used Short

More information

RETAIL MARKET PROCEDURES (NSW AND ACT)

RETAIL MARKET PROCEDURES (NSW AND ACT) RETAIL MARKET PROCEDURES (NSW AND ACT) DOCUMENT REF: RETAILMARKET-14-4705 VERSION: 18.0 EFFECTIVE DATE: STATUS: FINAL Approved for distribution and use: APPROVED BY: Peter Geers TITLE: Executive General

More information

B2B PROCEDURE SERVICE ORDER PROCESS

B2B PROCEDURE SERVICE ORDER PROCESS B2B PROCEDURE SERVICE ORDER PROCESS ENERGY TYPE: Electricity PREPARED BY: Retail Markets and Metering DOCUMENT NO: Not Applicable VERSION NO: 2.2 EFFECTIVE DATE: 13 May 2015 FINAL DETERMINATION Australian

More information

RETAIL MARKET PROCEDURES (NSW AND ACT)

RETAIL MARKET PROCEDURES (NSW AND ACT) RETAIL MARKET PROCEDURES (NSW AND ACT) DOCUMENT REF: RETAILMARKET-14-4705 VERSION: 15.0 EFFECTIVE DATE: STATUS: FINAL Approved for distribution and use: APPROVED BY: Matt Zema TITLE: Managing Director

More information

GUIDE TO RETAIL ELECTRICITY MARKET PROCEDURES PROVIDES AN EXPLANATION OF RETAIL ELECTRICITY MARKET PROCEDURES AND SUPPORTING DOCUMENTS AS REQUIRED BY

GUIDE TO RETAIL ELECTRICITY MARKET PROCEDURES PROVIDES AN EXPLANATION OF RETAIL ELECTRICITY MARKET PROCEDURES AND SUPPORTING DOCUMENTS AS REQUIRED BY GUIDE TO RETAIL ELECTRICITY MARKET PROCEDURES PROVIDES AN EXPLANATION OF RETAIL ELECTRICITY MARKET PROCEDURES AND SUPPORTING DOCUMENTS AS REQUIRED BY CHAPTER 7 OF THE NATIONAL ELECTRICITY RULES Version:

More information

MKT IBO Training. Updated: 29 November 2016

MKT IBO Training. Updated: 29 November 2016 MKT-3193 IBO Training Updated: 29 November 2016 v About EnergyAustralia ACN has a partnership with EnergyAustralia to market competitive electricity and gas offers to residential and small business customers.

More information

Blue Telecom is compliant with the Telecommunications Consumer Protection Code (C628:2012), which applies if you meet one of the criteria below.

Blue Telecom is compliant with the Telecommunications Consumer Protection Code (C628:2012), which applies if you meet one of the criteria below. Blue Telecom Regulatory Compliance Statement Blue Telecom is compliant with the Telecommunications Consumer Protection Code (C628:2012), which applies if you meet one of the criteria below. You are an

More information

METERING COMPETITION EMBEDDED NETWORKS METER REPLACEMENT PROCESSES PROCEDURE CONSULTATION PARTICIPANT RESPONSE PACK. Participant: United Energy

METERING COMPETITION EMBEDDED NETWORKS METER REPLACEMENT PROCESSES PROCEDURE CONSULTATION PARTICIPANT RESPONSE PACK. Participant: United Energy UNITED ENERGY METERING COMPETITION EMBEDDED NETWORKS METER REPLACEMENT PROCESSES PROCEDURE CONSULTATION PARTICIPANT RESPONSE PACK Participant: United Energy Completion Date: 31 May 2016 3. Metrology Procedure:

More information

Electricity Distribution Network Code. made under the Electricity Act 1994

Electricity Distribution Network Code. made under the Electricity Act 1994 Electricity Distribution Network Code made under the Electricity Act 1994 CHAPTER 1: THIS CODE 4 1.1 Introduction 4 1.1.1 Code objective 4 1.1.2 Scope of the Code 4 1.1.3 Authority 4 1.1.4 Date of effect

More information

GUIDE TO B2B E-HUB SELFACCREDITATION EXPLAINS HOW TO OBTAIN ACCREDITATION TO BECOME A B2B E-HUB PARTICIPANT

GUIDE TO B2B E-HUB SELFACCREDITATION EXPLAINS HOW TO OBTAIN ACCREDITATION TO BECOME A B2B E-HUB PARTICIPANT GUIDE TO B2B E-HUB SELFACCREDITATION EXPLAINS HOW TO OBTAIN ACCREDITATION TO BECOME A B2B E-HUB PARTICIPANT Version: 1.01 Published: Thursday, 7 December 2017 IMPORTANT NOTICE AEMO has prepared this Guide

More information

NSW AND ACT GAS INTERFACE PROTOCOL. PREPARED BY: REGULATORY CHANGE VERSION NO: 6.0 DATE: 29 September 2017 FINAL

NSW AND ACT GAS INTERFACE PROTOCOL. PREPARED BY: REGULATORY CHANGE VERSION NO: 6.0 DATE: 29 September 2017 FINAL NSW AND ACT GAS INTERFACE PROTOCOL PREPARED BY: REGULATORY CHANGE VERSION NO: 6.0 DATE: 29 September 2017 FINAL Version History VERSION DATE AUTHOR(S) CHANGES AND COMMENTS 1.0 01/07/2014 D.McGowan IN003/14

More information

Customer Charter. Small Customer Charter. Version June Tango Energy Pty Ltd ABN

Customer Charter. Small Customer Charter. Version June Tango Energy Pty Ltd ABN Customer Charter Small Customer Charter Version 3.2 14 June 2017 Tango Energy Pty Ltd ABN 43 155 908 839 tangoenergy.com Table of Contents 1. Our commitment to you... 3 2. What s the difference between

More information

MIRN STRUCTURE DOCUMENT REF: VERSION: 1.0 DATE: 8 DEC 2017 FINAL RETAILMARKET

MIRN STRUCTURE DOCUMENT REF: VERSION: 1.0 DATE: 8 DEC 2017 FINAL RETAILMARKET PREPARED BY: DOCUMENT REF: MARKETS RETAILMARKET-12-38915 VERSION: 1.0 DATE: 8 DEC 2017 FINAL Executive Summary This document describes the MIRN Structure that is used in the Victoria, Queensland, New South

More information

CUSTOMER CHARTER RETAIL

CUSTOMER CHARTER RETAIL CUSTOMER CHARTER 2017 RETAIL Intoducing Tas Gas Retail Inside the Charter Welcome to Tas Gas Retail 2 About Tas Gas Retail 3 Account services 4 Sample Account 6 Service Charges 8 Disconnection & Reconnection

More information

POWER OF CHOICE IMPLEMENTATION PROGRAM MARKET TRIAL TEST PLAN (VERSION 1.2)

POWER OF CHOICE IMPLEMENTATION PROGRAM MARKET TRIAL TEST PLAN (VERSION 1.2) POWER OF CHOICE IMPLEMENTATION PROGRAM MARKET TRIAL TEST PLAN (VERSION 1.2) Published: July 2017 VERSION RELEASE HISTORY Version Date Summary of Changes 0.1 25/05/2017 First draft issued for discussion

More information

OVERVIEW GUIDE TO THE WESTERN AUSTRALIAN GAS RETAIL MARKET

OVERVIEW GUIDE TO THE WESTERN AUSTRALIAN GAS RETAIL MARKET OVERVIEW GUIDE TO THE WESTERN AUSTRALIAN GAS RETAIL MARKET PREPARED BY: AEMO / Markets / Market Management VERSION: 2.0 EFFECTIVE DATE: 30 April 2018 STATUS: FINAL Australian Energy Market Operator Ltd

More information

METERING COMPETITION EMBEDDED NETWORKS METER REPLACEMENT PROCESSES PROCEDURE CONSULTATION PARTICIPANT RESPONSE PACK. Participant: Pacific Hydro

METERING COMPETITION EMBEDDED NETWORKS METER REPLACEMENT PROCESSES PROCEDURE CONSULTATION PARTICIPANT RESPONSE PACK. Participant: Pacific Hydro METERING COMPETITION EMBEDDED NETWORKS METER REPLACEMENT PROCESSES PROCEDURE CONSULTATION PARTICIPANT RESPONSE PACK Participant: Pacific Hydro Completion Date: 31 May 2016 Table of Contents 1. Glossary

More information

STARHUB'S DATA PROTECTION POLICY PLEASE READ THESE TERMS CAREFULLY AS THEY MAY HAVE IMPORTANT CONSEQUENCES FOR YOU.

STARHUB'S DATA PROTECTION POLICY PLEASE READ THESE TERMS CAREFULLY AS THEY MAY HAVE IMPORTANT CONSEQUENCES FOR YOU. STARHUB'S DATA PROTECTION POLICY PLEASE READ THESE TERMS CAREFULLY AS THEY MAY HAVE IMPORTANT CONSEQUENCES FOR YOU. ABOUT THESE TERMS & CONDITIONS This is StarHub's data protection policy for all our customers

More information

ENERGY RETAIL CODE. Version 10

ENERGY RETAIL CODE. Version 10 Version 10 May 2012 Page 2 Enquiries concerning the currency of these Guideline should be addressed to - Essential Services Commission Level 2, 35 Spring Street Melbourne Vic 3000 Telephone (03) 9651 0222

More information

Power of Choice Reforms

Power of Choice Reforms Power of Choice Reforms Energex Limited October 2017 Contents 1 Gentle introduction to PoC speak 2 Brief refresher on PoC reforms 2.1 PoC reforms and their meaning 2.2 What additional changes will electrical

More information

QUALIFICATION PROCEDURE

QUALIFICATION PROCEDURE METERING PROVIDERS, METERING DATA PROVIDERS & EMBEDDED NETWORK MANAGERS PREPARED BY: AEMO MARKETS VERSION: 1.2 EFFECTIVE DATE: 02 SEPTEMBER 2017 STATUS: FINAL Approved for distribution and use by: APPROVED

More information

Lycamobile Pty Ltd Customer Complaints Handling Policy Table of Contents

Lycamobile Pty Ltd Customer Complaints Handling Policy Table of Contents Lycamobile Pty Ltd Customer Complaints Handling Policy Table of Contents Introduction 1 Definition of complaint 2 Purpose of this policy 3 Our commitment to handling complaints 4 Complaints handling stages

More information

SERVICE LEVEL PROCEDURE

SERVICE LEVEL PROCEDURE SERVICE LEVEL PROCEDURE METERING PROVIDER SERVICES PREPARED BY: AEMO MARKETS VERSION: 1.3 EFFECTIVE DATE: 01 DECEMBER 2017 STATUS: FINAL Approved for distribution and use by: APPROVED BY: PETER GEERS TITLE:

More information

ENERGEX Inverter Energy Systems

ENERGEX Inverter Energy Systems ENERGEX Inverter Energy Systems Connecting Your Inverter Energy System to the ENERGEX Network 8181 13.08.2010 ENERGEX Limited trading as ENERGEX ABN: 40 078 849 055 http://www.energex.com.au Requests and

More information

Your contract with us

Your contract with us Customer charter ERM Business Energy Customer Charter This Customer Charter outlines what you need to know about your rights, entitlements and obligations under your contract with ERM Power Retail Pty

More information

IMPACT & IMPLEMENTATION REPORT SUMMARY SECTION (For AEMO to complete and administer) IN029/16 VIC, QLD, SA and NSW/ACT

IMPACT & IMPLEMENTATION REPORT SUMMARY SECTION (For AEMO to complete and administer) IN029/16 VIC, QLD, SA and NSW/ACT IMPACT & IMPLEMENTATION REPORT SUMMARY SECTION (For AEMO to complete and administer) Issue Number Impacted Jurisdiction (s) IN029/16 VIC, QLD, SA and NSW/ACT Proponent Danny McGowan Company AEMO Affected

More information

Code Subsidiary Document No. 0202: Meter Read Submission: Process

Code Subsidiary Document No. 0202: Meter Read Submission: Process Code Subsidiary Document No. 0202: Table of Contents 1. Purpose and scope... 4 1.1 Purpose... 4 1.2 Scope... 4 2. Meter Read Types and Meter Read Methods... 5 2.1 Overview... 5 2.2 Meter Read Types...

More information

WA B2B Procedure. Customer and Site Details Notification Process. STOP - You have not printed the document with "Document and Markeups".

WA B2B Procedure. Customer and Site Details Notification Process. STOP - You have not printed the document with Document and Markeups. National Electricity Market Management Company Limited ABN 94 072 010 327 WA B2B Procedure Customer and Site Details Notification Process STOP - You have not printed the document with "Document and Markeups".

More information

Nexus Requirements Clarification Log - Open Requirements

Nexus Requirements Clarification Log - Open Requirements Nexus Requirements Clarification Log - Open Requirements ID Date Raised Raised By Status Heading BRD / Topic Area Options Actions/Resolution Date Closed Section BRD Updated REQ32 19/12/2014 PN UNC Open

More information

B2B PROCEDURE CUSTOMER AND SITE DETAILS NOTIFICATION PROCESS

B2B PROCEDURE CUSTOMER AND SITE DETAILS NOTIFICATION PROCESS B2B PROCEDURE CUSTOMER AND SITE DETAILS NOTIFICATION PROCESS ENERGY TYPE: Electricity PREPARED BY: Retail Markets and Metering DOCUMENT NO: Not Applicable VERSION NO: 2.2 EFFECTIVE DATE: 13 May 2015 FINAL

More information

PURCHASING AND OUTGOING PAYMENTS PROCEDURES

PURCHASING AND OUTGOING PAYMENTS PROCEDURES PURCHASING AND OUTGOING PAYMENTS PROCEDURES PREAMBLE DEFINITIONS PART 1. DECISION TO PURCHASE 1. Application of Purchasing and Outgoing Payment Procedures 1.1. Goods and services 1.2. Payments that are

More information

Ordering and Assure Guide

Ordering and Assure Guide Ordering and Assure Guide Access Products ORDERING AND ASSURE GUIDE ACCESS PRODUCTS / V7.1 / 19 APR 2012 / PAGE 1 ORDERING AND ASSURE GUIDE ACCESS PRODUCTS / V7.1 / 19 APR 2012 / PAGE 2 Document Control

More information

Business processes for the Danish electricity market. (EDI guide BRS)

Business processes for the Danish electricity market. (EDI guide BRS) * Business processes for the Danish electricity market (EDI guide BRS) Wholesale model version Version 3.7 1 June 2016 'The business processes are available in Danish and English. In the event of discrepancies

More information

FRC B2M Process Flows Sequence Diagrams

FRC B2M Process Flows Sequence Diagrams FRC B2M Flows Sequence Diagrams For the SA and WA Gas Retail Markets. Version: 3.4 Last Update : 15 August 2011 1 Disclaimer/Preamble: This document has been modified to comply as closely as possible with

More information

Billing as a service helps provide a seamless experience from invoice to payment collection.

Billing as a service helps provide a seamless experience from invoice to payment collection. UNCLASSIFIED 26/05/2016 v1.3 Cobweb Partner Service Description Billing-as-a-Service (BaaS) provides channel partners with an out-of-the-box, automated solution for effectively managing the customers billing

More information

RETAILER FEED-IN TARIFF SCHEME TERMS

RETAILER FEED-IN TARIFF SCHEME TERMS RETAILER FEED-IN TARIFF SCHEME TERMS PREAMBLE Under the Electricity Act, all electricity retailers with more than 5,000 Customers must offer to purchase electricity fed back into the grid by Qualifying

More information

RECOMMENDATION TO NAESB RGQ EXECUTIVE COMMITTEE

RECOMMENDATION TO NAESB RGQ EXECUTIVE COMMITTEE 1. Recommended Action: Effect of EC Vote to Accept Recommended Action: x Accept as requested x Change to Existing Practice Accept as modified below Status Quo Decline 2. TYPE OF MAINTENANCE Per Request:

More information

NATIONAL ELECTRICITY RULES ELECTRICITY CONNECTION FOR RETAIL CUSTOMERS CHAPTER 5A. Page 615

NATIONAL ELECTRICITY RULES ELECTRICITY CONNECTION FOR RETAIL CUSTOMERS CHAPTER 5A. Page 615 ELECTRIC ITY CONN ECTION FOR RET AIL CU STOM ERS NATIONAL ELECTRICITY RULES Page 615 Chapter 5A Electricity connection for retail customers Part A 5A.A.1 Preliminary Definitions In this Chapter: basic

More information

MIRN STRUCTURE (NSW-ACT)

MIRN STRUCTURE (NSW-ACT) PREPARED BY: RETAIL DEVELOPMENT AND CHANGE IMPLEMENTATION DOCUMENT REF: 297358 VERSION: 1.0 DATE: FINAL Executive Summary This document describes the MIRN Structure that is used in the NSW-ACT Gas

More information

WA B2B Procedure. Service Order Process. STOP - You have not printed the document with "Document and Markeups".

WA B2B Procedure. Service Order Process. STOP - You have not printed the document with Document and Markeups. National Electricity Market Management Company Limited ABN 94 072 010 327 WA B2B Procedure STOP - You have not printed the document with "Document and Markeups". Version No:0. 1.4 Published: 1 Dec 20 30

More information

GRAMPIANS NET SYSTEM PROFILE METHODOLOGY

GRAMPIANS NET SYSTEM PROFILE METHODOLOGY GRAMPIANS NET SYSTEM PROFILE METHODOLOGY PREPARED BY: Retail Markets and Metering VERSION: 1.0 EFFECTIVE DATE: 1 February 2013 FINAL Version Release History VERSION DATE AUTHOR COMMENTS 0.1 24 Oct 12 Justin

More information

Market Opening IT Programme. Market Opening Programme. Supplier Communications Resulting from DUoS Billing & Invoicing

Market Opening IT Programme. Market Opening Programme. Supplier Communications Resulting from DUoS Billing & Invoicing Market Opening Programme Supplier Communications Resulting from DUoS Billing & Invoicing Version: 1.2 Page 1 of 47 03/12/2015 Document Updates Date Description Version 01.06.2004 Release 1 1.0 19.10.2004

More information

disclosure statement electricity Victoria - Fair Deal 39

disclosure statement electricity Victoria - Fair Deal 39 disclosure statement electricity Victoria - Fair Deal 39 This Fair Deal 39 (Victoria) product is only available to residential customers. Eligibility criteria apply. Benefits Pay on time discount Under

More information

3M Ariba Light Account Network Collaboration for Suppliers

3M Ariba Light Account Network Collaboration for Suppliers SAP Training Source To Pay 3M Ariba Light Account Network Collaboration for Suppliers External User Training Version: 1.0 Last Updated: 31-Aug-2017 3M Business Transformation & Information Technology Progress

More information

This rule was approved by the Alberta Utilities Commission on January 2, 2008.

This rule was approved by the Alberta Utilities Commission on January 2, 2008. Rule 004 Alberta Tariff Billing Code Rules This rule was approved by the Alberta Utilities Commission on January 2, 2008. Contents 1 General and administrative provisions... 6 1.1 Application... 6 1.2

More information

Instructions End a Fixed-Term Contract

Instructions End a Fixed-Term Contract BACKGROUND INFORMATION Team Leaders now have the ability to cease (end) contracts for current fixed-term employees via the Employee Self Service (ESS). The contracts will flow electronically through a

More information

The Procedure for Agreement of Change of Supplier Readings and Resolution of Disputed Change of Supplier Readings

The Procedure for Agreement of Change of Supplier Readings and Resolution of Disputed Change of Supplier Readings The Procedure for Agreement of Change of Supplier Readings and Resolution of Disputed Change of Supplier Readings MAP 08 Version : 3.2 Status : Final Date : 30 th June 2016 Document Reference : MAP08_3.2

More information

METROLOGY PROCEDURE: PART B: METERING DATA VALIDATION, SUBSTITUTION AND ESTIMATION PROCEDURE FOR METERING TYPES 1 7

METROLOGY PROCEDURE: PART B: METERING DATA VALIDATION, SUBSTITUTION AND ESTIMATION PROCEDURE FOR METERING TYPES 1 7 METROLOGY PROCEDURE: PART B: METERING DATA VALIDATION, SUBSTITUTION AND ESTIMATION PROCEDURE FOR METERING TYPES 1 7 PREPARED BY: DOCUMENT NO: Market Development MT_MA80 VERSION NO: 5.30 EFFECTIVE DATE:

More information

What you need to do now In order to get paid in the future, you will need to submit your invoices electronically via Tungsten Network.

What you need to do now In order to get paid in the future, you will need to submit your invoices electronically via Tungsten Network. Maes-Y-Coed Road Cardiff CF14 4TT United Kingdom Dear Valued Supplier, Re: Important - From 4 th May 2015, we are no longer accepting paper invoices We are contacting you as our records indicate that you

More information

PUBLIC SECTOR RESOURCING. Fieldglass Hiring Manager Guide. June 2018 V1.5

PUBLIC SECTOR RESOURCING. Fieldglass Hiring Manager Guide. June 2018 V1.5 Fieldglass Hiring Manager Guide June 2018 V1.5 TABLE OF CONTENTS PURPOSE....4 FIELDGLASS FAQ S...5 LOCATIONS... 5 APPROVERS... 6 COST CENTRES... 7 REQ APPROVALS... 8 FIELDGLASS SYSTEM INSTRUCTIONS...9

More information

ETZ Timesheet Manager Contractor User Guide

ETZ Timesheet Manager Contractor User Guide ETZ Timesheet Manager Contractor User Guide Contents 1. First time log in... 3 2. Forgotten password... 5 3. Home page... 6 4. Completing a timesheet... 7 5. Timesheet submission via ETZ Sign... 9 6. Timesheet

More information

Western Power Retail Customer Charter.

Western Power Retail Customer Charter. Western Power Retail Customer Charter. 1 Contents Our service commitment to you... 1 Who this Charter applies to... 2 How to contact us... 3 Generation, distribution and retail... 4 What we do for you

More information

Westlink Container Park. Carrier Access Arrangements

Westlink Container Park. Carrier Access Arrangements Westlink Container Park Carrier Access Arrangements LAST UPDATED 30 MARCH 2016 1. Overview Westlink Container Park is committed to the highest principles and standards of safety, operational excellence,

More information

NATIONAL E-PROCUREMENT PROJECT GUIDANCE NOTES

NATIONAL E-PROCUREMENT PROJECT GUIDANCE NOTES NATIONAL E-PROCUREMENT PROJECT GUIDANCE NOTES WORKFLOW AND AUTHORISATION Title: Workflow and Authorisation Identification: Outlines some of the basic workflow concepts and the wider business issues that

More information

Service Quality and Reliability Performance Monitoring and Reporting for Owners of Electric Distribution Systems and for Gas Distributors

Service Quality and Reliability Performance Monitoring and Reporting for Owners of Electric Distribution Systems and for Gas Distributors C5-16-1 Rule 002 Service Quality and Reliability Performance Monitoring and Reporting for Owners of Electric Distribution Systems and for Gas Distributors This rule as amended was approved by the Alberta

More information

Ariba Network Supplier Guide. Get Started

Ariba Network Supplier Guide. Get Started Ariba Network Supplier Guide Get Started Using This Guide The purpose of this guide is to help suppliers understand the business processes required by Constellation Brands. This button will take you back

More information

Travel Account Diners Club Reference Manual

Travel Account Diners Club Reference Manual Travel Account Diners Club Reference Manual Contents Introduction 3 How your account works.....4 Account Details... 5 Account Reconciler..6-7 Payment Methods and Guidelines...8-9 Accessing the Travel Account

More information

TABLE OF CONTENTS RETAIL INQUIRY TRACKING SYSTEM (RITS):...

TABLE OF CONTENTS RETAIL INQUIRY TRACKING SYSTEM (RITS):... Updated January 2017 TABLE OF CONTENTS RETAIL INQUIRY TRACKING SYSTEM (RITS):... 1 1. What is a RITS ticket?... 1 2. What is the Service Level Agreement (SLA) for RITS tickets?... 1 3. When and why should

More information

Smart Metering Infrastructure (SMI)

Smart Metering Infrastructure (SMI) Smart Metering Infrastructure (SMI) Cover Page Customer Service Functions Please note: The following methodology has been utilised to analyse the customer service functions nominated below: Function #7.6:

More information

Job Aid Administration of Consultants and Individual Contractors

Job Aid Administration of Consultants and Individual Contractors Administration of Consultants and Individual Contractors Table of Contents Page Overview..3 Objectives...3 Enterprise Roles..3 Search for Business Partner (BP) Record Requisitioner.....4 Search and Request

More information

Level 2 and 3 Award and Certificate in Providing Financial Services ( )

Level 2 and 3 Award and Certificate in Providing Financial Services ( ) Level 2 and 3 Award and Certificate in Providing Financial Services (6774-02-03) Level 3-5 Units September 2014 Version 2.0 UNIT PACK Version and date Change detail Section 2.0 September 2014 Corrected

More information

Market Opening IT Programme. Market Opening Programme. Supplier Communications Resulting from DUoS Billing & Invoicing

Market Opening IT Programme. Market Opening Programme. Supplier Communications Resulting from DUoS Billing & Invoicing Market Opening Programme Supplier Communications Resulting from DUoS Billing & Invoicing Version: 1.1 Page 1 of 51 19/10/2004 Document Updates Date Description Version 01.06.2004 Release 1 1.0 19.10.2004

More information

Electrical Contractor Handbook. SA Power Networks. Effective from 1 December Version

Electrical Contractor Handbook. SA Power Networks. Effective from 1 December Version Electrical Contractor Handbook Effective from 1 December 2017 Version 1.0 SA Power Networks Page 0 of 25 Contents Section 1: Introduction... 2 Documents Purpose... 2 Section 2: Scope... 2 The REX Portal...

More information

ONCOR INTERCONNECTION APPLICATION AND PROCESS FOR DISTRIBUTED RESOURCES

ONCOR INTERCONNECTION APPLICATION AND PROCESS FOR DISTRIBUTED RESOURCES ONCOR INTERCONNECTION APPLICATION AND PROCESS FOR DISTRIBUTED RESOURCES 2016 Commercial and Residential Solar Programs Kickoff Meeting November 11-12, 2015 Ken Brunkenhoefer Oncor Asset Planning OVERVIEW

More information

LAST UPDATED 19 January 2018

LAST UPDATED 19 January 2018 LAST UPDATED 19 January 2018 1. Overview Christchurch Carrier Access Arrangement Specialised Container Services Christchurch (SCS Christchurch) is committed to the highest principles and standards of safety,

More information

Annual Software Support Agreement. ( the Customer ) Foresiight Pty Ltd ( Foresight )

Annual Software Support Agreement. ( the Customer ) Foresiight Pty Ltd ( Foresight ) Annual Software Support Agreement between ( the Customer ) and Foresiight Pty Ltd ( Foresight ) V.5 01 February 2017 Foresiight Pty Ltd ABN. 49 010 227 817 31 Navigator Place, Hendra QLD 4011 PO Box 1701,

More information

Customer Charter: Small Customer

Customer Charter: Small Customer 1 Contents 1.Our Customer Charter...4 2. The Electricity Market...4 3. Your Contract with Us...5 4. Billing, Charges and Payment...7 5. Disconnections and Reconnections...10 6. Security Deposits...11 7.

More information

Oracle Utilities Customer Care and Billing Release Utility Reference Model Manage Field Activities and Field Orders

Oracle Utilities Customer Care and Billing Release Utility Reference Model Manage Field Activities and Field Orders Oracle Utilities Customer Care and Billing Release 2.3.1 Utility Reference Model 5.3.2.1 Manage Field Activities and Field Orders July 2012 Oracle Utilities Customer Care and Billing Utility Resource Model

More information

Schedule 2. Compendium of Gas Customer Licence Obligations. (Compendium)

Schedule 2. Compendium of Gas Customer Licence Obligations. (Compendium) Schedule 2 Compendium of Gas Customer Licence Obligations (Compendium) PART 1 PRELIMINARY... 4 1.1 Commencement of Schedule 2... 4 1.2 Interpretation of Schedule 2... 4 1.3 Definitions for Schedule 2...

More information

Schedule 2. Compendium of Gas Customer Licence Obligations. (Compendium)

Schedule 2. Compendium of Gas Customer Licence Obligations. (Compendium) Schedule 2 Compendium of Gas Customer Licence Obligations (Compendium) PART 1 PRELIMINARY... 4 1.1 Commencement of Schedule 2... 4 1.2 Interpretation of Schedule 2... 4 1.3 Definitions for Schedule 2...

More information

ETZ Timesheet Manager Contractor User Guide

ETZ Timesheet Manager Contractor User Guide ETZ Timesheet Manager Contractor User Guide 2 Intoduction Please read the following information carefully before using the ETZ Timesheet Manager system. Technical problems with ETZ Timesheet Manager can

More information

Portland General Electric Company First Revision of Sheet No P.U.C. Oregon No. E-18 Canceling Original Sheet No. 26-1

Portland General Electric Company First Revision of Sheet No P.U.C. Oregon No. E-18 Canceling Original Sheet No. 26-1 First Revision of Sheet No. 26-1 P.U.C. Oregon No. E-18 Canceling Original Sheet No. 26-1 PURPOSE SCHEDULE 26 NONRESIDENTIAL DEMAND RESPONSE PILOT PROGRAM This schedule is an optional supplemental service

More information

PROJECT Elmarknadshubb DATE DRAFT VERSION /1263. Elmarknadshubb. Functionality description, overview

PROJECT Elmarknadshubb DATE DRAFT VERSION /1263. Elmarknadshubb. Functionality description, overview ROJECT Elmarknadshubb DATE 2018-01-11 ENGLISH ÄRENDENUMMER 1. 0 2015/1263 Elmarknadshubb Functionality description, overview Updates Release Change note Date English draft version 1.0 First English version.

More information

6. Will the system be able to provide historical invoice data? Yes, the system will provide an archive of paid invoices.

6. Will the system be able to provide historical invoice data? Yes, the system will provide an archive of paid invoices. CHI Connect Financial Systems and Accounts Payable Q&A 1. How will departments access their financial data each month? Departments will have online access to a variety of useful reports detailing their

More information

Meter access and estimated billing best endeavours April 2015

Meter access and estimated billing best endeavours April 2015 Meter access and estimated billing best endeavours April 2015 Background EWOV receives and investigates complaints about estimated billing resulting from meter access issues, particularly where the estimated

More information

Supply Chain Tracking

Supply Chain Tracking Supply Chain Tracking User Manual Version 2.0 Ananda Kumary 2/10/2016 This document defines the user manual for Supply Chain Tracking portal, which enables system based acceptance/rejection of Purchase

More information

BUSINESS TRAVEL SOLUTION

BUSINESS TRAVEL SOLUTION BUSINESS TRAVEL SOLUTION Nominated Travel Administrator Procedures This Procedure Guide is for Nominated Travel Administrators (NTA s) who are using the Business Travel Solution (BTS), provided by Lloyds

More information

Online Store Application Form

Online Store Application Form Online Store Application Form You need to be a Lincoln Sentry Account holder to place orders using the online store website. Please provide your existing Lincoln Sentry account number. Submit the completed

More information

Unemployment Compensation Project Phase 2

Unemployment Compensation Project Phase 2 State of Florida Agency for Workforce Innovation Unemployment Compensation Project Phase 2 To-Be Business Process Short Time Compensation Document Control Revision History Date Version Author 12/18/09

More information

The expected outcomes known as what must go right will be that: DWGs will be established and / or reviewed within the RMIT organisation structure

The expected outcomes known as what must go right will be that: DWGs will be established and / or reviewed within the RMIT organisation structure 1.0 Objective To set out the requirements for the establishment and maintenance of Health and Safety Committees (s), Designated Work Groups (DWGs) and Health and Safety Representatives (HSRs) at RMIT.

More information

There are some policy aspects which we wish to address as general observations.

There are some policy aspects which we wish to address as general observations. 26 February 2010 Manager, MCE Secretariat, Department of Resources, Energy and Tourism, GPO Box 9839 Canberra ACT 2601 MCEMarketReform@ret.gov.au Thank you for the opportunity to comment on the National

More information

NATURAL GAS SERVICES BULLETIN BOARD PROCEDURES VERSION 7.0

NATURAL GAS SERVICES BULLETIN BOARD PROCEDURES VERSION 7.0 NATURAL GAS SERVICES BULLETIN BOARD PROCEDURES VERSION 7.0 PREPARED BY: Markets VERSION: 7.0 DATE: 6 October 2016 FINAL This document is current to version 30 of the National Gas Rules Approved for distribution

More information

Port Melbourne Containers Pty. Ltd.

Port Melbourne Containers Pty. Ltd. Port Melbourne Containers Pty. Ltd. A.B.N. 62 118 191 183 LAST UPDATED 15 AUGUST 2017 Carrier Access Arrangements The website Terms of Use form part of this document. By accepting those Terms of Use You

More information

Business Practice Energy Imbalance Market (EIM BP) Revision Number: Revision Date: November 30July 29, 2015

Business Practice Energy Imbalance Market (EIM BP) Revision Number: Revision Date: November 30July 29, 2015 Revision Number: 3.02.1 Revision Date: November 30July 29, 2015 Revision Log 0.0 3/31/15 Pre-market initial draft 1.0 5/15/15 Email and phone contacts, Sections 3, 7, 8, 9, 11 and Appendix A for participating

More information

The key features of the Town s municipal aggregation program will include:

The key features of the Town s municipal aggregation program will include: Town of Grafton Municipal Aggregation Plan July 19, 2016 Revised March 23, 2018 The Town of Grafton (the Town ) has developed the Grafton Energy Choice program to bring the benefits of low cost power,

More information

23 December Australian Energy Market Commission PO Box A2449 SYDNEY SOUTH NSW Lodged online at: Project number EPR0038

23 December Australian Energy Market Commission PO Box A2449 SYDNEY SOUTH NSW Lodged online at:  Project number EPR0038 23 December 2013 Australian Energy Market Commission PO Box A2449 SYDNEY SOUTH NSW 1235 Lodged online at: www.aemc.gov.au Project number EPR0038 Dear Sir/Madam Re: AEMC Issues Paper Review of Electricity

More information

MINUTES Gas Retail Consultative Forum (GRCF)

MINUTES Gas Retail Consultative Forum (GRCF) MINUTES Gas Retail Consultative Forum (GRCF) MEETING : 107 DATE: Thursday 30 June 2016 TIME: 9.30 AM 12.30 PM LOCATION: s Melbourne, Sydney, Adelaide, and Teleconference. CONTACT: grcf@aemo.com.au ATTENDEES:

More information

E-CRB System specification

E-CRB System specification On behalf of Bi or Tri Borough CRB Partnerhip Appendix A E-CRB System specification July 2012 Requirement Scope Functional Requirements Validation of Application Data Processing of Applications User Administration

More information

REVISION NO.: 8 EFFECTIVE: 03/26/18

REVISION NO.: 8 EFFECTIVE: 03/26/18 Distributed Generation Interconnection Process for Residential and Small General Service OVERVIEW REVISION NO.: 8 EFFECTIVE: 03/26/18 Required Steps for ED3 s Distributed Generation Interconnection Process

More information

GUIDE PURCHASING NATURAL GAS IN MANITOBA

GUIDE PURCHASING NATURAL GAS IN MANITOBA GUIDE PURCHASING NATURAL GAS IN MANITOBA UNDERSTANDING YOUR NATURAL GAS SUPPLY As a Manitoba natural gas consumer, you have a choice when buying natural gas for your home or business. This guide provides

More information

Billing and Invoices. March 31, 2016 Version 2016 Release 1

Billing and Invoices. March 31, 2016 Version 2016 Release 1 March 31, 2016 Version 2016 Release 1 General Notices Sample Code NetSuite Inc. may provide sample code in SuiteAnswers, the Help Center, User Guides, or elsewhere through help links. All such sample code

More information

Ariba Network Invoice Guide

Ariba Network Invoice Guide Ariba Network Invoice Guide Content Introduction Invoice Practices Before you Begin Invoicing Viewing Customer Invoice Rules Electronic Invoice Routing and notifications Account Configuration and Invoice

More information

I-SEM Programme Project Office Programme Change Control Procedure

I-SEM Programme Project Office Programme Change Control Procedure Project Office Programme Change Control Procedure Version: 1.1 FINAL Date: 8 March 2017 Document Control Production Authors Responsibility Date Jim McAllister I-SEM PMO 01/07/2015 Helen Mounsey I-SEM PMO

More information