Audit report (Stage 1) Organisation: OIL INDIA LIMITED, CALCUTTA BRANCH Audits (ZA): Issue:

Size: px
Start display at page:

Download "Audit report (Stage 1) Organisation: OIL INDIA LIMITED, CALCUTTA BRANCH Audits (ZA): Issue:"

Transcription

1 Master Data of Organisation Name of Organisation Name of corporate group (in case of group certification) Street Postcode / Town / Country Contact Phone/Fax Language Scope Description Oil India Limited, Calcutta Branch Not Applicable 4 India Exchange Place, 4th. Floor / Kolkata / India Mr. Apurba Das, Management Representative apu@oilindia.in English Provision of Services of Purchase, Inspection and Logistics for Field Operations of Oil India Limited, and other Support Services in connection with the above Industry / Scope (EA) 31.1, 34.2 more description regarding scope in annex Audit profile Standards under contract / Audit type : 2008 Certification audit, Stage 1 : Manual: Revision / Issue Quality Manual, Issue No. 01, Rev No. 00, dated Surveillance mode Audit team leader / responsible Audit team Yearly surveillance B. B. Majumdar : : Technical expert - Trainee Subhrajit Nandy Group certification / Matrix Yes No Remarks: Shift operation no shift operation Normal.dotm Page 1 of 5 Rev

2 Details for Stage 1 Audit Stage 1 -Audit on site visit. Duration Stage 1 2,50 person-day(s) Date Stage 1 audit on site Audit Result System documentation The system documentation was reviewed with the following result: q.v. enclosed checklist(s) for system documentation, number: Quality Manual, Issue No. 01, Rev No. 00, dated Readiness Relevant areas of the organisation were visited during a tour of the site and individual employees were asked about their activities and the management system on a random sample basis in order to gain an impression of employee awareness. Internal audits and assessments of the management system Planning and implementation of the internal audit and the management system reviews were checked using the available documents and records. Checked Internal Audits plan, scheduled in Jul 12, and reports of audits conducted on & Management Review Meeting planned and conducted on If individual requirements have been assessed as "not ", the nonconformities are described in more detail in the "detailed results" section. Notes: The following exclusions are sought from the scope of certification. 1. Clause 7.3: The organisation does not carry out any design & development for its product/ service realisation. Services are provided as per guidelines, statutes and regulations designed and developed by Oil India Limited s corporate office. So, the clause is. 2. Clause 7.5.2: Output of service realisation processes is immediately verifiable, in-process and finally, before delivery of a service. Hence, validation of processes for production/service provision is not required, and the clause is. 3. Clause 7.6: No monitoring and measuring equipment, requiring calibration/verification, is provided by the organisation for the service realisation processes. For inspection of goods purchased for its customer, the respective suppliers provide such equipment. The organisation ensures that these are calibrated and the calibration is valid. Hence, the clause is. The verbal scope of certification, given above, has been verified and found to be accurate, adequately representing the present activities of the organisation. Normal.dotm Page 2 of 5 Rev

3 Organisational Profile Oil India Limited (OIL), a wholly owned Govt of India oil company under the Ministry of Petroleum & Natural Gas, is engaged in exploration, production and transportation of crude oil and natural gas, and production of LPG. Its major and oldest oil fields are in North-East India, though it has a pan Indian and overseas presence. Calcutta Branch of Oil India Limited was set up in 1950 to cater to the requirements for the above operations because of the city s strategic location (Gateway to N-E India, nearness to industrial units the potential suppliers of the requirements, sea-port and international airport). Oil India Ltd., Calcutta Branch, is providing critical support services in procurement (including inspection) of indigenous materials and logistics management for imported materials required for field operations of Oil India Ltd. s N-E Indian operations. To support the core service realisation processes of OIL, Calcutta Branch, other necessary functions have been established that are responsible for processes such as HRD/training, facility maintenance, payments, etc. The organisation is going for :2008 certification with the objective of improving quality of its services, and has adopted an integrated approach in imlplementing the QMS involving all its personnel, including all support functions, with focus on satisfaction of their respective customers. Recommendation of audit team: Result The audit team is convinced that the Stage 2 audit can be performed as planned without limitations. The audit team is convinced that the Stage 2 audit can be performed as planned - the organisation must ensure, however, that the nonconformities which have been identified have been effectively corrected at the planned date. The audit team is convinced that effective correction of the nonconformities which have been identified must be verified before the Stage 2 audit (repeat stage 1 audit) Recommendation of audit team: Plan for stage 2 (duration, team, sites etc..) The comments regarding the Stage 2 Audit and the surveillance program were drawn up based on the results of the above audit activities The audit team is convinced that the comments on the Stage 2 audit are correct (no aapproval required by the FL) The audit team is of the opinion that the comments made to date on the Stage 2 audit are not correct and proposes the following changes: The stage 2 audit may be conducted on and from 06/09/2012. Review and approval by Specialist Manager(s): / / / Further comments in annex Date: Name: B. B. Majumdar Signature Normal.dotm Page 3 of 5 Rev

4 Statement of the Certification Body (Specialist Manager) Statement regarding the proposals of audit team for the Stage 2 Audit The recommendations of audit team are accepted Continued in an annex Date: Name: Signature Normal.dotm Page 4 of 5 Rev

5 Detailed results The evaluation of the audit results basically follows the scheme shown below: Stage Classification Meaning NC A Nonconformity A 1. Non-fulfillment of one or several requirements of the management system standard or 2. A situation which gives rise to considerable doubt as to the capability of the customer's management system to achieve the desired results NC B Nonconformity B All other nonconformities PI Potential for improvement Items which would allow optimisation of the management system in relation to the requirements of the relevant standard. It is recommended that the company implements these items. GP Positive aspects/ Good Practice Positive aspects of the management system worthy of special mention (see also point 4.3 if applicable) CM Comments Special situation and information to be traced in next audit Follow-up action(*): after-audit, audit documents, action plan, or Next audit No. NC A Area / Process Standard:clause Follow-up action * Set date No. NC B Area / Process Standard:clause Follow-up action * Set date No. PI Area / Process Standard:clause 1. Obsolete reference books, and other documents & Service realisation - : 4.2.3/4 records may marked thus, and suitably dealt with. Purchase 2. Record of goods receipt & despatch may be Service realisation - :4.2.4 computerised for easy retrieval & stock verification. Godown 3. Housekeeping in godown may be improved by Service realisation - :6.3, 6.4 faster disposal of scrap material & better upkeep. Godown 4. Corrections may be made in the Quality Manual, Management :4.2.2 as discussed during the audit. Representative 5. All relevant clauses may be covered in the Internal Audits, and record of the same may be maintained. Management Representative :8.2.2 No. GP Area / Process Standard:clause 1. Procedures for all core & support processes have Management : been established for better compliance. 2. Functional level quality objectives have been deployed for all processes incl support processes. Management : 5.4, 8.2.3, 8.4 No. CM Area / Process Standard:clause Normal.dotm Page 5 of 5 Rev

Vendor Qualification Survey

Vendor Qualification Survey 1200 West 96 th St Minneapolis, MN 55431 Ph: 952-888-7900 Fax: 952-888-2719 Vendor Qualification Survey Vendor Information Company Name: Date: Address: City: Phone Number: email address: Product or Service

More information

QMS Team: MR and all HODs (Internal Auditors) MR March 10. Quality policy Define quality policy The Steering committee Objectives and targets

QMS Team: MR and all HODs (Internal Auditors) MR March 10. Quality policy Define quality policy The Steering committee Objectives and targets QMS Roles, Responsibility and Authority Process Clause Activities Records Required Responsibility Authority Deadline Clause 4: Process Development 4.1 Develop processes and sequence, operation controls

More information

Quality Manual. Ingenuity at its best WEST INDUSTRIES LLC Silverton, Suite 924 San Diego, CA USA

Quality Manual. Ingenuity at its best WEST INDUSTRIES LLC Silverton, Suite 924 San Diego, CA USA 7949 Silverton, Suite 924 San Diego, CA 92126 USA This document is approved for use Copy Holder Copy Holder: President Copy Number: 1 Scope: This Covers the activities and functions performed by operating

More information

QMS CO-ORDINATOR & GENERAL PROCEDURES:-

QMS CO-ORDINATOR & GENERAL PROCEDURES:- 1. QMS CO-ORDINATOR & GENERAL PROCEDURES:- (1) How do you measure effectiveness of system for working of your company? How do you collect necessary information for the same? Are you getting information

More information

ISOQAR CLIENT COMPANY DETAILS FOR ISO 9001: 2008 STAGE 1 IN OFFICE VISITS at RPH Manufacturing Ltd

ISOQAR CLIENT COMPANY DETAILS FOR ISO 9001: 2008 STAGE 1 IN OFFICE VISITS at RPH Manufacturing Ltd ISOQAR CLIENT COMPANY DETAILS FOR ISO 9001: 2008 STAGE 1 IN OFFICE VISITS at RPH Manufacturing Ltd Certificate No: 9493 Expiry date: Visit No/Follow up: Accredited: Yes Guidelines Ref: EAC Code(s): 17m

More information

Correlation Matrix & Change Summary

Correlation Matrix & Change Summary The correlation matrix compares the new requirements of ISO 9001:2015 to the requirements of ISO 9001:2008, and provides a summary of the changes. Correlation Matrix & Change Summary Introduction Correlation

More information

AESOP 15604; ISSUE 2; STATUS PENDING APPROVAL; AUTHORITY CARL BLAZIK This document is the property of NSF ISR. Page 1 of 9

AESOP 15604; ISSUE 2; STATUS PENDING APPROVAL; AUTHORITY CARL BLAZIK This document is the property of NSF ISR. Page 1 of 9 This document is the property of NSF ISR. Page 1 of 9 ISO 9001 Quality Management Systems registration provides a set of uniform requirements for a quality management system. A number of quality management

More information

IPD Quality Management System Supplier Questionnaire Instructions

IPD Quality Management System Supplier Questionnaire Instructions IPD Quality Management System Supplier Questionnaire Instructions 1. The following Supplier Questionnaire was developed by Industrial Parts Depot (IPD) to assess and document the capability of its supplier

More information

YOU RE CLOSER THAN YOU THINK

YOU RE CLOSER THAN YOU THINK YOU RE CLOSER THAN YOU THINK ISO 13485:2016 READINESS CHECKLIST We understand that some of our customers would like to be able to check how close they are to meeting the requirements of ISO 13485:2016.

More information

Questionnaire for preparation for an audit according to automotive standards

Questionnaire for preparation for an audit according to automotive standards Dear Client, As a certification body (CB) performing certifications of QM systems, we require some information regarding your company in order to plan and prepare certification / surveillance / transfer

More information

BS EN ISO 9001 QUALITY ASSURANCE MANUAL

BS EN ISO 9001 QUALITY ASSURANCE MANUAL PAC PRICE ARTHUR CONSULTANCY BS EN ISO 9001 QUALITY ASSURANCE MANUAL COPY NO: 025 ISSUE: 4 QUALITY ASSURANCE MANUAL BS EN ISO 9001 CONTENTS PAC Price Arthur Consultancy - Building Services Consulting Engineers

More information

NABH-PA (BB) PRE-ASSESSMENT GUIDELINES AND FORMS FOR BLOOD BANKS/ BLOOD CENTRES. Issue No. 1 Issue Date: 04/ 08 Page 1 of 10

NABH-PA (BB) PRE-ASSESSMENT GUIDELINES AND FORMS FOR BLOOD BANKS/ BLOOD CENTRES. Issue No. 1 Issue Date: 04/ 08 Page 1 of 10 NABH-PA (BB) PRE-ASSESSMENT GUIDELINES AND FORMS FOR BLOOD BANKS/ BLOOD CENTRES Issue No. 1 Issue Date: 04/ 08 Page 1 of 10 CONTENTS Sl. Title Page Nos. Content 2 1. Guide to use Pre-Assessment Forms &

More information

Enclosed is the report which documents the findings of the recent assessment that was carried out at your company on the 1 st of December 2010.

Enclosed is the report which documents the findings of the recent assessment that was carried out at your company on the 1 st of December 2010. 1 December 2010 Mr Andy Glover General Manager Farrell Bearings Ltd P O Box 10403 Te Rapa Hamilton 2035 New Zealand Dear Andy Re: Revalidation Assessment Report Enclosed is the report which documents the

More information

P. 1. Identify the Differences between ISO9001:2000 與 ISO9001:2008 ISO9001:2008 ISO9001:2000 版本的異同. 5 January 2009 ISO 9000 SERIES

P. 1. Identify the Differences between ISO9001:2000 與 ISO9001:2008 ISO9001:2008 ISO9001:2000 版本的異同. 5 January 2009 ISO 9000 SERIES Identify the Differences between ISO9001:2000 and ISO 9001:2008 審視 ISO9001:2000 與 ISO9001:2008 版本的異同 ISO 9000 SERIES ISO 19011 ISO9000 5 January 2009 ISO9001 ISO9004 2 ISO 9000 SERIES ISO 9001 ISO 9000

More information

Procedures on Management System Certification

Procedures on Management System Certification 1. Purpose Procedure PR-005 describes the roles, responsibilities and processes in a certification body according to ISO 17021 involved in the certification of management systems (MS). The certification

More information

OIL INDIA LIMITED Calcutta Branch

OIL INDIA LIMITED Calcutta Branch SECTION TITLE: CONTENTS ISSUE DATE 01/06/2012 REVISION DATE CONTENTS ISO 9001:2008 Clause Title Page No 1 Scope 03-09 2 Normative Reference 10-18 Annexure A (Amendment Record Sheet) 11 Annexure B (List

More information

PURCHASING & RECEIVING INTERNAL AUDIT CHECKLIST

PURCHASING & RECEIVING INTERNAL AUDIT CHECKLIST Audit Date: Auditor Team Members: Audit Preparation: The following tools can be referenced when planning and conducting the audit: Eight Quality Principles ISO 9001:2008 Quality Management System Requirements

More information

Quality Assurance Manual

Quality Assurance Manual McGarvin Engineering Inc. 35 Maple St. Lowell Ma. 01852 ph. 978-454-2741 fx. 978-459-7999 Quality Assurance Manual 1 Table of Contents Section Element 1.0 Scope and Policy 2.0 Organization 3.0 Quality

More information

ANCHOR ISO9001:2008 RPR-007 MARINE SERVICES ADDITIONAL PROCEDURE PRODUCT REALISATION

ANCHOR ISO9001:2008 RPR-007 MARINE SERVICES ADDITIONAL PROCEDURE PRODUCT REALISATION PRODUCT REALISATION Document Control Revision History PAGE REASON FOR CHANGE REV. REVIEWER / AUTHORISED BY: RELEASE DATE: ALL NEW DOCUMENT A J.BENTINK 5/08/2016 Revision Approval: J.BENTINK Signature:

More information

Osprey Technologies, LLC. Quality Manual ISO9001:2008 Rev -

Osprey Technologies, LLC. Quality Manual ISO9001:2008 Rev - February 8, 2015 1 Osprey Technologies, LLC Quality Manual ISO9001:2008 Rev - February 8, 2015 Released by Dave Crockett President 6100 S. Maple Avenue, Suite 117 Tempe, AZ 85283 www.osprey-tech.com February

More information

Master Air Parts, Inc Skyway Drive, Suite 303 Santa Maria, CA (805) Phone (805) Fax

Master Air Parts, Inc Skyway Drive, Suite 303 Santa Maria, CA (805) Phone (805) Fax (Please type or print) Supplier: Address: City: State: Zip: Telephone: Fax: Email: Website: Brief list of Parts, material, or services to be provided to Master Air Parts, Inc. Are you an FAA Certified

More information

1050 Day Hill Road Windsor, Connecticut Telephone (860) Fax (860) SUPPLIER SURVEY DATE OF SURVEY TYPE OF SURVEY

1050 Day Hill Road Windsor, Connecticut Telephone (860) Fax (860) SUPPLIER SURVEY DATE OF SURVEY TYPE OF SURVEY 1050 Day Hill Road Windsor, Connecticut 06095-4728 Telephone (860) 688-0888 Fax (860) 285-8514 SUPPLIER SURVEY DATE OF SURVEY TYPE OF SURVEY POTENTIAL SUPPLIER INITIAL SURVEY ON-SITE EXISTING SUPPLIER

More information

Report No: SARA-CA Assessment Type: Re-Certification & Upgrade. Assessment Dates: 09/19/ /21/2016. Page 1

Report No: SARA-CA Assessment Type: Re-Certification & Upgrade. Assessment Dates: 09/19/ /21/2016. Page 1 Lead Auditor: Thomas Morris Company Name: Kokusai Soko America, Inc. Address: 1521 Francisco Street, Unit A Torrance, CA 90501 Phone: 310-672-6176 Fax: 310-215-3724 Email: jerry@kskla.com Management Rep:

More information

AGSI Certification Pvt. Ltd. 208, Kartik Complex, New Link Road, Andheri (West), Mumbai

AGSI Certification Pvt. Ltd. 208, Kartik Complex, New Link Road, Andheri (West), Mumbai (Note: Quality policy awareness, Quality objectives, Control of documented information, Communication, Continual improvement, Responsibility and authority, Competency may be audited at each of the following

More information

CORPORATE QUALITY MANUAL

CORPORATE QUALITY MANUAL Corporate Quality Manual Preface The following Corporate Quality Manual is written within the framework of the ISO 9001:2008 Quality System by the employees of CyberOptics. CyberOptics recognizes the importance

More information

Quality System Manual - Section 00

Quality System Manual - Section 00 Quality System Manual - Section 00 INDEX AND REVISION STATUS Issued by: Quality Assurance Eff. Date: 06/10/2014 Rev.: A Pg. 1 of 4 QUALITY SYSTEM MANUAL SECTION 0 - INDEX AND REVISION STATUS SECTION 1

More information

Energy Efficiency System:2014 (EES + )

Energy Efficiency System:2014 (EES + ) Energy Efficiency System:2014 (EES + ) Updated 24.3.2015 Energy Efficiency System:2014 (EES + ) Copyright Motiva Oy, Helsinki, tammikuu 2015 2 Table of contents 1 Introduction 5 1.1 Energy efficiency system

More information

AND GENERAL REQUIREMENTS

AND GENERAL REQUIREMENTS DESIGN MANUAL FOR ROADS AND BRIDGES VOLUME 0 SECTION 2 INTRODUCTION AND GENERAL REQUIREMENTS GENERAL GUIDANCE PART 1 GD 2/16 QUALITY MANAGEMENT SYSTEMS FOR HIGHWAY DESIGN ACTIVITIES SUMMARY This document

More information

Project Procedure 1.0 PURPOSE 2.0 SCOPE 3.0 REFERENCES 4.0 DEFINITIONS. No.: P /21/2012 PAGE 1 OF 8 INTERNAL QUALITY AUDITS

Project Procedure 1.0 PURPOSE 2.0 SCOPE 3.0 REFERENCES 4.0 DEFINITIONS. No.: P /21/2012 PAGE 1 OF 8 INTERNAL QUALITY AUDITS Project Procedure INTERNAL QUALITY AUDITS 09/21/2012 PAGE 1 OF 8 1.0 PURPOSE The purpose of this procedure is to establish the requirements for a comprehensive system of planned and documented internal

More information

Self-Evaluation/Audit Checklist for Food Supplement Manufacturers

Self-Evaluation/Audit Checklist for Food Supplement Manufacturers Self-Evaluation/Audit Checklist for Food Supplement Manufacturers This checklist has been developed by the EHPM quality working group. It combines work carried out by EHPM various national associations

More information

Correlation Matrix. ISO 9001:2008 and ISO 9001: INTRODUCTION CORRELATION MATRIX ISO 9001:2008 AND ISO 9001:2015

Correlation Matrix. ISO 9001:2008 and ISO 9001: INTRODUCTION CORRELATION MATRIX ISO 9001:2008 AND ISO 9001:2015 Correlation Matrix ISO 9001:2008 and ISO 9001:2015 INTRODUCTION This document provides a correlation between the requirements of ISO 9001:2008 and the ISO 9001:2015 standard. The document will provide

More information

ISO 9001: 2015 Quality Management System Certification. Awareness Training

ISO 9001: 2015 Quality Management System Certification. Awareness Training ISO 9001: 2015 Quality Management System Certification Awareness Training ISO 9001: 2015 STRUCTURE The new standard is modeled around the ISO Directive Annex SL, a high level structure (HSL) based on the

More information

NMT Specialized Machining Inc & NMT General Machining Inc AS 9100 Rev C Quality Systems Manual

NMT Specialized Machining Inc & NMT General Machining Inc AS 9100 Rev C Quality Systems Manual NMT Specialized Machining Inc & NMT General Machining Inc AS 9100 Rev C Quality Systems Manual 290 Shoemaker Street Kitchener, Ontario Canada N2E 3E1 Table of Contents Introduction 5 Documentation Scheme..

More information

SUPPLIER SURVEY FORM Instructions

SUPPLIER SURVEY FORM Instructions SUPPLIER SURVEY FORM Instructions 1. The following Supplier Survey was developed by Vishay Measurements Group, Inc. to assess and document the capability of its supplier base. 2. The Supplier Survey is

More information

SAE AS9100 Revision C Requirements beyond ISO 9001:2008 UPDATING YOUR MANAGEMENT SYSTEM

SAE AS9100 Revision C Requirements beyond ISO 9001:2008 UPDATING YOUR MANAGEMENT SYSTEM 3 Terms and Definitions Ensure awareness and understanding of: Risk Special Requirements Critical Items Key Characteristic 4.1 Include process(es) that deploy(s) requirements from: Customers Applicable

More information

EN39 TUBE ASSESSMENT REPORT. Assessment Summary

EN39 TUBE ASSESSMENT REPORT. Assessment Summary EN39 TUBE ASSESSMENT REPORT : Category: Manufacturer Manufacturer Manufacturer Manufacturer Location: Name: Location Location Location Location Previous Assessment Category: N/A Meeting With: Assessment

More information

QUALITY ASSURANCE MANUAL

QUALITY ASSURANCE MANUAL Chettisham Business Park Chettisham, Ely, Cambs Cb6 1RY Tel. 01353 666399 Managing Director: Mr G. R. Hartwig QUALITY ASSURANCE MANUAL NOTE: This is a CONTROLLED Document. 1 ST Jan 2004 1.0 INTRODUCTION

More information

Quality Manual ISO 9001:2008 ISO 9001:2015

Quality Manual ISO 9001:2008 ISO 9001:2015 Quality Manual ISO 9001:2008 ISO 9001:2015 SAE CIRCUITS, INC. 4820 63 rd Street Suite 100 Boulder, CO 80301 USA www.saecircuits.com Table of Contents 1. Company Information 3 2. QMS Scope and Exclusions

More information

Quality Manual Revision: C Effective: 03/01/10

Quality Manual Revision: C Effective: 03/01/10 TABLE OF CONTENTS DESCRIPTION SECTION PAGE INTRODUCTION 1.0 1 APPROVAL SIGNATURE PAGE 1.1 1 AMENDMENT RECORD 1.2 2 SCOPE 2.0 3 EXCLUSIONS 2.1 3 CORPORATE POLICY 3.0 3 QUALITY MANAGEMENT SYSTEM 4.0 4 GENERAL

More information

IMPLEMENTATION OF ISO 9001:2008 PARTICULAR ASPECTS

IMPLEMENTATION OF ISO 9001:2008 PARTICULAR ASPECTS RINA IMPLEMENTATION OF ISO 9001:2008 PARTICULAR ASPECTS 1 SCOPE AND PURPOSE This document defines the RINA criteria for the verification of implementation of ISO 9001:2008 in relation to some particular

More information

QUALITY MANUAL. Number: M-001 Revision: C Page 1 of 18 THIS DOCUMENT IS CONSIDERED UNCONTROLLED UNLESS ISSUED IDENTIFIED AS CONTROLLED

QUALITY MANUAL. Number: M-001 Revision: C Page 1 of 18 THIS DOCUMENT IS CONSIDERED UNCONTROLLED UNLESS ISSUED IDENTIFIED AS CONTROLLED Page 1 of 18 THIS DOCUMENT IS CONSIDERED UNCONTROLLED UNLESS ISSUED IDENTIFIED AS CONTROLLED Page 2 of 18 REVISION HISTORY DATE CHANGE DESCRIPTION 10/11/06 Original release 10/21/09 Revised to ISO9001:2008

More information

Comparison ISO/TS (1999) to QS 9000, 3 rd edition (1998)

Comparison ISO/TS (1999) to QS 9000, 3 rd edition (1998) 1 SCOPE QS 9000: new: Introduction, applicability In addition to the applicability for supplier sites for production and services and their subcontractors for: - parts or materials, or - services like

More information

STANDARD OPERATING PROCEDURE TEAM INSPECTIONS

STANDARD OPERATING PROCEDURE TEAM INSPECTIONS PHARMACEUTICAL INSPECTION CONVENTION PHARMACEUTICAL INSPECTION CO-OPERATION SCHEME PI 031-1 Annex 29 July 2009 STANDARD OPERATING PROCEDURE TEAM INSPECTIONS PIC/S July 2009 Reproduction prohibited for

More information

Association of American Railroads Quality Assurance System Evaluation (QASE) Checklist Rev. 1/12/2017

Association of American Railroads Quality Assurance System Evaluation (QASE) Checklist Rev. 1/12/2017 Company: Prepared By: Date: Changes from previous version highlighted in yellow. Paragraph Element Objective Evidence 2.1 Objective of Quality Assurance Program 2.2 Applicability and Scope 2.3 QA Program

More information

VERIFICATION & VALIDATION. Co-X/FBO/SOP02

VERIFICATION & VALIDATION. Co-X/FBO/SOP02 CONVENTION & EXHIBITION (PUTRAJAYA) SDN. BHD. Co-X/FBO/SOP02 Revision No.: 02 Effective Date: 1 st November 2017 ` PREPARED BY REVIEWED BY APPROVED BY Name: Name: Name: Position: Position: Position: DEPARTMENT

More information

Installation Qualification Equipment (Reference SOP: )

Installation Qualification Equipment (Reference SOP: ) Installation Qualification Equipment (Reference SOP: ) Project: Equipment Description: Project No: Serial No: Manufacturer: Model No: Equipment No: Location: Protocol: PROGRAM INDEX 1. OBJECTIVE...3 2.

More information

ISO 9001: Understanding the changes

ISO 9001: Understanding the changes ISO 9001: 2015 Understanding the changes Tel: 01952 288325 Email: info@interface-nrm.co.uk Why has ISO 9001 been Revised? ISO 9001, the world's leading Quality Management System has been revised to a new

More information

Auditing Policy and Procedures

Auditing Policy and Procedures Auditing Policy and Procedures Purpose: This procedure details the audits that Childers Cove Dairy Products carries out on the documented Quality System to ensure conformance to Standard ISO9002. Internal

More information

ISO 13485: :2015 CLIENT TRANSITION CHECKLIST

ISO 13485: :2015 CLIENT TRANSITION CHECKLIST - 9001:2015 CLIENT TRANSITION CHECKLIST Audit Conclusions: All requirements have been addressed. The organization is recommended for ISO 13485:2016 certification. Recommendation for registration is dependent

More information

Quality Management System Manual

Quality Management System Manual This Page 1 of 47 of the Quality Management System Manual If issued as a controlled copy, the serial number of this copy is Quality Management System Manual Certified to AS9100 Revision C Printed copies

More information

A02 Assessment Rating Guide Revision 2.9 August 21, 2016

A02 Assessment Rating Guide Revision 2.9 August 21, 2016 Revision 2.9 August 21, 2016 Laboratory Name: Assessment Date: (Lead) Assessor: Signature: ! TABLE OF CONTENTS 1.0! INTRODUCTION... 1 2.0! ASSESSOR NOTES ON THE USE OF CALA A02 ASSESSMENT RATING GUIDE...

More information

BAITY SCREW MACHINE PRODUCTS QUALITY MANUAL

BAITY SCREW MACHINE PRODUCTS QUALITY MANUAL BAITY SCREW MACHINE PRODUCTS QUALITY MANUAL Page 1 of 33 TABLE OF CONTENTS SECTION TITLE PAGE 0 Company Introduction... 4 0 Organizational Chart.. 5 1 Scope.. 6 2 Related Documents... 6 3 Terminology...

More information

Perry Johnson Registrars, Inc. Licensed Copy #2 RECYCLING INDUSTRY OPERATING STANDARD. Prepared for ISRI Services Corporation

Perry Johnson Registrars, Inc. Licensed Copy #2 RECYCLING INDUSTRY OPERATING STANDARD. Prepared for ISRI Services Corporation RECYCLING INDUSTRY OPERATING STANDARD Prepared for ISRI Services Corporation NOT FOR DISTRIBUTION FOR PERRY JOHNSON REGISTRARS, INC. ONLY: LICENSED COPY #2REVISED MARCH 2006 CONTENTS RIOS GLOSSARY... I

More information

QUALITY MANUAL. ISO 9001:2015, ISO and ATEX/IECEX Directive 2014/34/EU

QUALITY MANUAL. ISO 9001:2015, ISO and ATEX/IECEX Directive 2014/34/EU ISO 9001:2015, ISO 80079-34 and ATEX/IECEX Directive 2014/34/EU Reason for Revisions and Sections Affected: INITIAL RELEASE Rev. A Revision B / 6.24.2014 Added: PR-02-0005 to Procedure Table Section: 2.0,

More information

ANCHOR ISO9001:2008 RPR-002 MARINE SERVICES REQUIRED PROCEDURE RECORDS CONTROL

ANCHOR ISO9001:2008 RPR-002 MARINE SERVICES REQUIRED PROCEDURE RECORDS CONTROL RECORD CONTROL (4.2.4) Document Control Revision History PAGE REASON FOR CHANGE REV. REVIEWER / AUTHORISED BY: ALL ALL RELEASE DATE: Revision Approval: J.BENTINK Signature: Date: 20/02/17 Revision: B UNCONTROLLED

More information

IECEE OPERATIONAL DOCUMENT

IECEE OPERATIONAL DOCUMENT IECEE OD-4001 Edition 1.3 IECEE OPERATIONAL DOCUMENT IEC System of Conformity Assessment Schemes for Electrotechnical Equipment and Components (IECEE System) IECEE OD-4001:2013(E) Factory Surveillance

More information

Quality System Manual - Section 00

Quality System Manual - Section 00 Quality System Manual - Section 00 INDEX AND REVISION STATUS Issued by: Quality Assurance Eff. Date: 00/00/00 Rev.: A Pg. 1 of 4 Organization of this manual is the same as the sectional organization of

More information

IECEE OPERATIONAL DOCUMENT

IECEE OPERATIONAL DOCUMENT IECEE OD-4001 Edition 1.34 20138-06xx06-05 IECEE OPERATIONAL DOCUMENT IEC System of Conformity Assessment Schemes for Electrotechnical Equipment and Components (IECEE System) Factory Surveillance Report

More information

(More than 130 document files) GMP+ B3 Editable Document kit

(More than 130 document files) GMP+ B3 Editable Document kit Chapter-1.0CONTENTS OF GMP+ B3 DOCUMENT KIT Good Manufacturing Practices for Trade, collection, storage and transshipment for feed safety (More than 130 document files) The Total Editable Document kit

More information

IECEx OPERATIONAL DOCUMENT

IECEx OPERATIONAL DOCUMENT IECEx OD 314-3 Edition 2.0 2018-10 IECEx OPERATIONAL DOCUMENT IEC System for Certification to Standards relating to Equipment for use in Explosive Atmospheres (IECEx System) IECEx Certified Service Facilities

More information

J. McCann & Co (Nottm) Ltd McCann House 110 Nottingham Road Chilwell Nottingham NG9 6DQ. Quality Manual

J. McCann & Co (Nottm) Ltd McCann House 110 Nottingham Road Chilwell Nottingham NG9 6DQ. Quality Manual McCann House 110 Nottingham Road Chilwell Nottingham NG9 6DQ Quality Manual Quality Manual Issue I Dated 8 th October 2012 Contents Page Section 1 - Introduction 2 Section 2 - Company Details 2 Section

More information

Quality Manual. Print Name Title Date Prepared by L Naughton QA Consultant 9 th April 09. Reviewed by Bernard Lennon Fire and Safety Officer

Quality Manual. Print Name Title Date Prepared by L Naughton QA Consultant 9 th April 09. Reviewed by Bernard Lennon Fire and Safety Officer Quality Manual Print Name Title Date Prepared by L Naughton QA Consultant 9 th April 09 Reviewed by Bernard Lennon Fire and Safety Officer 9 th April 09 Corporate Authorisation Joe Hoare Estates Officer

More information

QUALITY MANUAL 1.0 INTRODUCTION POLICY AND OBJECTIVES DEFINITIONS SCOPE QUALITY SYSTEM... 3

QUALITY MANUAL 1.0 INTRODUCTION POLICY AND OBJECTIVES DEFINITIONS SCOPE QUALITY SYSTEM... 3 CONTENTS QUALITY MANUAL 1.0 INTRODUCTION... 2 2.0 POLICY AND OBJECTIVES... 2 3.0 DEFINITIONS... 2 4.0 SCOPE... 3 5.0 QUALITY SYSTEM... 3 6.0 ORGANISATIONAL CHARTS... 4 6.0 BRISBANE HEAD OFFICE... 4 6.1

More information

Product Realization. Ameritube LLC 1000 N. Hwy 77, Hillsboro TX Revision Level: Procedure No. A

Product Realization. Ameritube LLC 1000 N. Hwy 77, Hillsboro TX Revision Level: Procedure No. A 5/8/2012 Page No. 1 of 32 Date Description Of Change Signature Rev. Level 5/8/2012 New Document Jeremy Wilson Procedure pproval: Company Title: Date: Quality Manager 5/8/2012 5/8/2012 Page No. 2 of 32

More information

Clause Map IATF 16949:2016 to ISO/TS 16949:2009

Clause Map IATF 16949:2016 to ISO/TS 16949:2009 Table of Contents Table of Contents Foreword Foreword + Foreword Automotive QMS Standard + History + Goal + 0.5 Goal of this Technical Specification + Remarks for Certification + Remarks for Certification

More information

I. Development, Submittal, and Acceptance of a Quality Management System

I. Development, Submittal, and Acceptance of a Quality Management System I. Development, Submittal, and Acceptance of a Quality Management System 1. Scope Under the Contract, quality assurance and quality control management are the responsibility of the Contractor. The Contractor

More information

SUPPLIER QUALITY SYSTEM SURVEY

SUPPLIER QUALITY SYSTEM SURVEY AERO BENDING USE ONLY APPROVED DISAPPROVED CONDITIONAL APPROVAL (SEE NOTES AND COMMENTS) BY: DATE: Assigned Vendor # Supplier : Facility Address: Phone: Email: Fax: Please check all that apply: Manufacturer

More information

Supplier Quality Assurance Requirements

Supplier Quality Assurance Requirements 1 Scope No. 1.1 This document details the requirements to be satisfied by suppliers to Tekdata Interconnections Ltd (TIL). TIL requires each supplier and their sub-tier suppliers to comply with the quality

More information

IN2CONNECT UK LTD QUALITY ASSURANCE MANUAL

IN2CONNECT UK LTD QUALITY ASSURANCE MANUAL E L E C T R O N I C C O N N E C T O R S IN2CONNECT UK LTD QUALITY ASSURANCE MANUAL CONTENTS Section Title Related Procedure 1. Introduction & Company Profile 2. Policy & Objectives 3. Definitions 4. Quality

More information

Quality Manual This copy printed on 30 August 2016

Quality Manual This copy printed on 30 August 2016 Quality Manual This copy printed on 30 August 2016 Table of Contents 1. INTRODUCTION... 1 2. THE ISSUE STATUS... 2 3. THE QUALITY POLICY... 3 4. THE QUALITY MANAGEMENT SYSTEM... 4 5. OVERVIEW OF ELECTRICAL

More information

Quality Assurance Audit Checklist

Quality Assurance Audit Checklist Quality Assurance Audit Checklist Form: ASQF-406 Rev. 5 Date: 01-22-2018 Page: 1 of 14 The following is a checklist for process approach internal auditing conducted by Analytic Stress Relieving Inc. based

More information

ISO 9001:2000 Revision G

ISO 9001:2000 Revision G ISO 9001:2000 Revision G 1531 W. 17 th Street, Tempe AZ 85281 Table of contents Section Title Page Index 1 Revision History and Distribution 2 Introduction 3 Quality Policy / Mission Statement 4 Organizational

More information

Additional Information

Additional Information To Our Valued Customer: Supliaereos USA LLC DBA Aero Supply USA has generated this form in an effort to standardize response and reduce valuable time and labor involved with manual response to multiple

More information

BSA International Certification Co. Private Limited.

BSA International Certification Co. Private Limited. BSA International Certification Co. Private Limited. TRANSITION GUIDELINES FOR ISO 9001:2015 As everyone in the quality game is aware, the world now has a new version of ISO 9001. ISO Standards touch almost

More information

c) Have personnel been appointed to supervise the production operations across all shifts in order to ensure the product quality?

c) Have personnel been appointed to supervise the production operations across all shifts in order to ensure the product quality? Factory s Quality Assurance Ability 1 Responsibilities and Resources 1.1 Responsibilities a) Have the responsibilities and interrelation of various personnel involved in quality activities been defined?

More information

Quality Manual TABLE OF CONTENTS APPROVAL SIGNATURE PAGE AMENDMENT RECORD SCOPE EXCLUSIONS 2.1 3

Quality Manual TABLE OF CONTENTS APPROVAL SIGNATURE PAGE AMENDMENT RECORD SCOPE EXCLUSIONS 2.1 3 TABLE OF CONTENTS DESCRIPTION SECTION PAGE INTRODUCTION 1.0 1 APPROVAL SIGNATURE PAGE 1.1 1 AMENDMENT RECORD 1.2 2 SCOPE 2.0 3 EXCLUSIONS 2.1 3 CORPORATE POLICY 3.0 3 QUALITY MANAGEMENT SYSTEM 4.0 4 GENERAL

More information

Supplier Quality Survey. 1. Type of Business: g) Commodities supplied? Supplier Changes/comments: 2. Headcount breakdown by group: Purchasing

Supplier Quality Survey. 1. Type of Business: g) Commodities supplied? Supplier Changes/comments: 2. Headcount breakdown by group: Purchasing Supplier: Phone: Prime Contact/Title: Sales Contact/Title: Address: Fax: e-mail address e-mail address Quality Contact/Title: e-mail address 1. Type of Business: a) Number of years in business? b) Company

More information

Correlation matrices between ISO 9001:2008 and ISO 9001:2015

Correlation matrices between ISO 9001:2008 and ISO 9001:2015 Correlation matrices between ISO 9001:2008 and ISO 9001:2015 ISO 9001:2015 ISO 9001:2008 1 Scope 1 Scope 1.1 General 4 Context of the organization 4 Quality management system 4.1 Understanding the organization

More information

Document Number: QM001 Page 1 of 19. Rev Date: 10/16/2009 Rev Num: 1. Quality Manual. Quality Manual. Controlled Copy

Document Number: QM001 Page 1 of 19. Rev Date: 10/16/2009 Rev Num: 1. Quality Manual. Quality Manual. Controlled Copy QM001 Page 1 of 19 Quality Manual QM001 Page 2 of 19 Table of Contents Page Company Profile 4 Approval 4 Revision History 4 Distribution List 4 1.0 Scope 5 Section 2: Normative Reference 6 2.0 Quality

More information

YOUNG & FRANKLIN / TACTAIR FLUID CONTROLS QUALITY ASSURANCE SURVEY. Company Name: Address: City: State: Zip: Phone: Fax: Response Prepared By:

YOUNG & FRANKLIN / TACTAIR FLUID CONTROLS QUALITY ASSURANCE SURVEY. Company Name: Address: City: State: Zip: Phone: Fax:   Response Prepared By: YOUNG & FRANKLIN / TACTAIR FLUID CONTROLS QUALITY ASSURANCE SURVEY Company Name: Date: Address: City: State: Zip: Phone: Fax: e-mail: Response Prepared By: Title: 1.0 Is your company ISO, QS, AS, or NADCAP

More information

MANAGEMENT SYSTEM CERTIFICATION APPLICATION

MANAGEMENT SYSTEM CERTIFICATION APPLICATION Our ref: (Scheme reference) Enquiries: (Name of the Manager) Date: (Date report completed and reviewed by Manager) Dear XXXXXXXXXXXXX MANAGEMENT SYSTEM CERTIFICATION APPLICATION Thank you for your enquiry

More information

Quality Manual Power Engineering & Manufacturing Inc th Lane NE Blaine Minnesota MN 55449

Quality Manual Power Engineering & Manufacturing Inc th Lane NE Blaine Minnesota MN 55449 Quality Manual Power Engineering & Manufacturing Inc 1463 94th Lane NE Blaine Minnesota MN 55449 COVER PAGE PD 0002 rev. 3 Section QM 01 Page 1 of 17 This document is approved for use Manual Contents Section

More information

Qualification of manufacturers of special materials

Qualification of manufacturers of special materials SERVICE SPECIFICATION DNVGL-SE-0079 Edition June 2016 Qualification of manufacturers of special materials The electronic pdf version of this document found through http://www.dnvgl.com is the officially

More information

HACCP audit checklist

HACCP audit checklist Requirement HACCP audit checklist Prerequisite Program Management Commitment 1. Senior management ensures that the responsibilities and authorities are defined and communicated within the company Internal

More information

SUPPLIER QUESTIONNAIRE FORM

SUPPLIER QUESTIONNAIRE FORM SUPPLIER QUESTIONNAIRE FORM DATE: SECTION 1 COMPANY PROFILE: Company Name Address Tel Nr Fax Nr a) If a division or subsidiary, please list name and address of parent organization: b) INTRODUCTION This

More information

Supplier Quality Requirements SQR-1.0 Rev. 3

Supplier Quality Requirements SQR-1.0 Rev. 3 Supplier Quality Requirements Rev. 3 Approved By: Brian Brown, Quality Manager The current issue of this document is maintained on LSP Technologies, Inc. s Internet Web Site at http://www.lspt.com/resources-supplier_requirements.asp.

More information

RSC-G-009D-Annex1 (SP) Checklist for evaluation of a Project Safety Plan

RSC-G-009D-Annex1 (SP) Checklist for evaluation of a Project Safety Plan RSC-G-009D-Annex1 (SP) Checklist for evaluation of a Project Safety Plan Prepared by: Maik Wuttke 22.02.2012 Reviewed by: Mary Molloy 22.02.2012 1 Introduction This checklist will be employed by the RSC

More information

DEVDATT INDUSTRIES TITLE: MASTER LIST OF QUALITY MANUAL DOC. NO : QF/01 CL. NO. : -- PG. NO. : 01 of 02 Sr. No.

DEVDATT INDUSTRIES TITLE: MASTER LIST OF QUALITY MANUAL DOC. NO : QF/01 CL. NO. : -- PG. NO. : 01 of 02 Sr. No. TITLE: MASTER LIST OF QUALITY MANUAL DOC. NO : QF/01 CL. NO. : -- PG. NO. : 01 of 02 Sr. No. CONTENTS ID NO. ISO 9001 2008 CLAUSE NO. NO. OF PG REV. NO. 01 RECORD OF REVISION STATUS QF/06 4.2 01 00 02

More information

Definitions contained in the above mentioned Specifications and Industry Standards are applicable herein.

Definitions contained in the above mentioned Specifications and Industry Standards are applicable herein. 1. SCOPE Quality Specification TEC-1019 12 Jul 11 Rev C All Paragraphs Revised Global Quality Management System Supplement for the Aerospace Industry Model, AS 9100 (C) 1.1. Content This specification

More information

FAQ 9101:2014 / 9101E

FAQ 9101:2014 / 9101E Rev. 4.0 20160927 Note 1: These FAQs correspond to 9101:2014 (9101E). Note 2: The item number corresponds with the order of submittal of the questions. This will support traceability. The questions and

More information

PURCHASING QUALITY CLAUSES

PURCHASING QUALITY CLAUSES PURCHASING QUALITY CLAUSES AS9120:2016, Clause 8.4 AvAir, Inc. Chandler, AZ Revision C Approvals Purchasing Quality Clauses Refer to the Documented Information Register. Revision History Listed below are

More information

Quality Management System Plan

Quality Management System Plan Quality Management System Plan Rev. 2 February, 2004 Shaw Environmental & Infrastructure, Inc. 4171 Essen Lane Baton Rouge, LA 70809 Page iii Rev. 2 Table of Contents PAGE Approvals Quality Policy &

More information

Derlin Construction Limited QUALITY POLICY MANUAL ISO 9001:2008

Derlin Construction Limited QUALITY POLICY MANUAL ISO 9001:2008 Derlin Construction Limited QUALITY POLICY MANUAL ISO 9001:2008 Copy Number Issued to CONTROLLED / UNCONTROLLED Uncontrolled manuals are current at time of issue but will not be updated. Document history.

More information

ANCHOR ISO9001:2008 RPR-004 MARINE SERVICES REQUIRED PROCEDURE NON-CONFORMING PRODUCTS

ANCHOR ISO9001:2008 RPR-004 MARINE SERVICES REQUIRED PROCEDURE NON-CONFORMING PRODUCTS CONTROL OF NON-CONFORMING PRODUCTS (8.3) Document Control Revision History PAGE REASON FOR CHANGE REV. REVIEWER / AUTHORISED BY: ALL ALL RELEASE DATE: Revision Approval: J.BENTINK Signature: Date: 20/02/17

More information

25 D.L. Martin Drive Mercersburg, PA (717)

25 D.L. Martin Drive Mercersburg, PA (717) QUALITY MANUAL D. L. MARTIN CO. 25 D.L. Martin Drive Mercersburg, PA 17236 (717) 328-2141 Revision 14 August 2012 Michael A. White Manager, QA & Engineering D.L. Martin Co. Quality Manual UNCONTROLLED

More information

BURN STANDARD COMPANY LIMITED 22B, Raja Santosh Road, Alipore, Kolkata [ A Government of India Undertaking under Ministry of Railways ]

BURN STANDARD COMPANY LIMITED 22B, Raja Santosh Road, Alipore, Kolkata [ A Government of India Undertaking under Ministry of Railways ] BURN STANDARD COMPANY LIMITED 22B, Raja Santosh Road, Alipore, Kolkata 700027 [ A Government of India Undertaking under Ministry of Railways ] VENDOR REGISTRATION FORM (for supplies) Page No. 01 [fill

More information

Machined Integrations, LLC

Machined Integrations, LLC QUALITY MANUAL Machined Integrations, LLC ISO9001: 2008 Electronically Controlled by Quality Representative, Rev2, January 2014 Page 2 of 25 TABLE OF CONTENTS SECTION ELEMENT PAGE No A Revision and Approval

More information

Procedures: QP 4 through QP 8, QP 16, QP 17, and QP 19

Procedures: QP 4 through QP 8, QP 16, QP 17, and QP 19 SRI Quality System Registrar Procedures: QP 4 through QP 8, QP 16, QP 17, and QP 19 Booklet Version 171122 Revision Date QP 4.0 Pre-Audit Registration Procedures 15 11/07/15 QP 5.0 On-Site Audit Procedure

More information

Quality Assurance Manual Sample Company

Quality Assurance Manual Sample Company Document last amended on 4/4/2018 Quality Assurance Manual Sample Company This document was prepared for Sample Client, on behalf of Sample Company TABLE OF CONTENTS - SAMPLE Quality Manual Series Introduction...

More information

ISO 9001:2015 QUALITY MANAGEMENT SYSTEM POLICIES AND PROCEDURES

ISO 9001:2015 QUALITY MANAGEMENT SYSTEM POLICIES AND PROCEDURES ISO 9001:2015 QUALITY MANAGEMENT SYSTEM POLICIES AND PROCEDURES Origination Date: XXXX Document Identifier: Date: Document Revision: QMS-00 Policies and Procedures Latest Revision Date Abstract: This handbook

More information