CORPORATE QUALITY SYSTEM PROCEDURE
|
|
- Virginia Washington
- 6 years ago
- Views:
Transcription
1 Number: JVICQC-1.0 Revision: 6 11/29/2011 Page 1 of 10 Approvals Author Quality System Manager Name: Randy Bennett Doyle Cassity Signature: Date: 11/29/ /29/2011 Electronic versions of this procedure are considered the latest revision and a Controlled Copy when viewed from the JVIC Corporate site. When printed, this procedure is considered an uncontrolled copy unless signed by the Corporate Quality System Manager or his Designee. Doyle Cassity Corporate Quality System Manager TABLE OF CONTENTS BULLET POINT AND FLOW CHART 1.0 SCOPE/FIELD OF APPLICATION 2.0 REFERENCES 3.0 RESPONSIBILITIES 4.0 DEFINITIONS REPORTS/RECORDKEEPING 7.0 FORMS AND ATTACHMENTS 8.0 RECORD OF REVISION
2 Number: JVICQC-1.0 Revision: 6 11/29/2011 Page 2 of 10 BULLET POINT AND FLOW CHART Important Questions Is an NCR Required? Assign a unique number and notes in an NCR Log Recommended a disposition, review with the Client, AI, and JVIC Has the client accepted the disposition and plan? Was the Item corrected, Scrapped or Returned to Vendor Place the NCR in the project file and send copies to the Area QC Manager and Corporate Office
3 Number: JVICQC-1.0 Revision: 6 11/29/2011 Page 3 of 10 Flow Chart
4 Number: JVICQC-1.0 Revision: 6 11/29/2011 Page 4 of SCOPE/FIELD OF APPLICATION 1.1 Scope This procedure applies to all quality activities performed by JV Industrial Companies, Ltd. (Corporate) in support of all projects. Non-conformances identified as a result of quality activities. 1.2 Field of Application This procedure applies to all quality activities performed by JV Industrial Companies, Ltd.(Corporate) in support of all projects when required, unless directed otherwise by client specifications, contract obligations or the JVIC Quality Department. 2.0 REFERENCES JVIC Quality Manual JVIC Quality Control Manual (Code Work) 3.0 RESPONSIBILITIES This procedure is approved by the JVIC Quality System Manager. All Quality personnel shall follow this procedure. 4.0 DEFINITIONS 4.1 Non-conformance A condition or action in which specified requirements for quality have not been met. A deficiency in characteristic, procedure or documentation that renders the quality of an item, service or process to be unacceptable or indeterminate. 4.2 Repair The process of restoring a non-conforming characteristic to a condition such that the capability of an item to function reliably and safely is unimpaired, although that item still may not conform to the original specified requirements. 4.3 Rework The process of restoring a non-conforming characteristic to a condition such that the item conforms, without exception, to the originally specified requirements. 4.4 Use-as-is A disposition which may be imposed for a non-conformance when it can be established that the
5 Number: JVICQC-1.0 Revision: 6 11/29/2011 Page 5 of 10 discrepancy will result in no adverse conditions and that the item under consideration will continue to meet all engineering functional requirements including performance, maintainability, fit and safety. 4.5 Scrap/Return to Vendor A condition which may be imposed on a non-conformance when the item cannot be made to meet all engineering functional requirements, such as performance, maintainability, fit and safety or it is not feasible The JVIC Supervising Inspector or his/her designee will be expected to document all nonconformances detected by QC or other project groups. 5.2 The Non-conforming item shall be tagged with a Do Not Use tag and placed in a Hold Area until a final disposition can be carried out. 5.3 The Supervising Inspector will assign a unique NCR number and record it in a project NCR log (Exhibit # 2) the unique NCR number should be the job number plus NCR 001, 002, etc. Example: NCR The JVIC Supervising Inspector or his/her designee will be expected to fill out the Nonconformance Report (Exhibit 1). 5.5 All data blanks/fields are to be completed or marked N/A, if not applicable. Ex: NCR The recommended disposition should be approved by the Client and/or AI (if required). Their approval is documented by signature on the Non-conformance Report. 5.7 Disagreements with regard to the applicability or suitability of proposed dispositions will be referred to the JVIC Area Quality Manager. 5.8 Once the final disposition is carried out, the JVIC Supervising Inspector or designee will verify that the disposition has been completed and then fill in the NCR Closure Date on the Nonconformance Report. 5.9 A signature from the client and AI (if required) should be obtained indicating approval of NCR Closure A copy of the completed form will be sent to the Client representative and a copy will be sent to the JVIC Area QC Manager. The original will be put in the project QC file as applicable.
6 Number: JVICQC-1.0 Revision: 6 11/29/2011 Page 6 of REPORTS/RECORDKEEPING 6.1 The JVIC Supervising inspector or designee, files and maintains in suitable files (hard copies or electronically) Non-conformance Reports for turnover to the Project and the JVIC Area QC Manager and Corporate Quality office. 6.2 Record forms may be modified or revised without revision to this procedure. 7.0 FORMS AND ATTACHMENTS 7.1 Exhibit 1 Non-conformance Report 7.2 Exhibit 2 NCR Log
7 Number: JVICQC-1.0 Revision: 6 11/29/2011 Page 7 of 10 EXHIBIT 1
8 Number: JVICQC-1.0 Revision: 6 11/29/2011 Page 8 of 10
9 Number: JVICQC-1.0 Revision: 6 11/29/2011 Page 9 of 10 EXHIBIT 2
10 Number: JVICQC-1.0 Revision: 6 11/29/2011 Page 10 of RECORD OF REVISION Revision Date Description 0 02/24/2005 Initial Issue 1 06/21/2005 Revised NCR Form and Text 2 06/17/2008 Revised NCR Form and Text, Changed Title 3 01/26/2009 Changed Format, added revised form Added Bullet Points, Flow Chart and Changed Responsibilities 4 04/05/ /01/2010 Format Change, and added revised forms JVIC form# and /29/2011 Revised sections 5.3 and 5.5, changed unique NCR number requirements.
NON-CONFORMING MATERIAL
NON-CONFORMING MATERIAL AND NONCONFORMING MATERIAL REPORTS 1.0 SCOPE This document describes the procedure used in determining the disposition of nonconforming items associated with MIT/CSR parts, materials,
More information4. RELATED DOCUMENTS AND FORMS 4.1. AS ISO Cambridge Valley Machining, Inc. QMS procedures, including, but not limited to:
Approved By: Purchasing Manager Candice Lane (signature on file) Date: 5/26/17 Approved By: Process Owner James D. Moore (signature on file) Date: 5/26/17 1. PURPOSE 1.1. To define Cambridge Valley Machining,
More informationJOHN WOOD UNCONTROLLED COPY: THE JOHN WOOD COMPANY PO BOX HIGHLAND AVENUE OAKS, PENNSYLVANIA 19456
JOHN WOOD QUALITY CONTROL SYSTEM MANUAL FOR PRESSURE VESSELS CONSTRUCTED TO ASME BOILER & PRESSURE VESSEL CODE SECTION VIII, DIVISION 1 AND REPAIRS AND ALTERATIONS TO METALLIC PRESSURE RETAINING ITEMS
More informationDesk Audit of. Based on Federal Transit Administration (FTA) Quality Assurance and Quality Control Guidelines FTA-IT
Desk Audit of Based on Federal Transit Administration (FTA) Quality Assurance and Quality Control Guidelines FTA-IT-90-5001-02.1 Reviewed by: Element Requirements Applicable 1. Is a quality policy defined
More informationINS QA Programme Requirements
Specification Date: 20/3/17 INS QA Programme Requirements UNCONTROLLED WHEN PRINTED Author: J Cooch AUTHORISATION Date: 20/3/17 A Brown Owner: J Cooch (Signature) N.B. only required for hard copy If issued
More informationCQR-1. CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES Revision Date: 6/8/2015
CQR-1 CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES Revision Date: 6/8/2015 SCOPE This document establishes the minimum quality program requirements for a contractor providing equipment, material,
More informationAppendix QI. Intra-Lockheed Martin Work Transfer Agreement (IWTA) Quality Requirements for Deliverable Items
Intra-Lockheed Martin Work Transfer Agreement (IWTA) Quality Requirements for Deliverable Items REVISION RECORD The latest issue to this document is the version that is available on the Lockheed Martin
More informationFAA Conformity Inspection Checklist Form N/C 10JAN16
Purpose The purpose of this checklist is to provide a system to assist with the FAA design and installation conformity inspection process. This form is primarily intended to serve applicants for FAA design
More informationNR CHECKLIST Rev. 1. QAM IMP References NBIC Part 3, 1.8 Y N Y N a. Organization. Company Name/Certificate Number: Page 1 of 26
Company Name/Certificate Number: Page 1 of 26 a. Organization a.1. Has the Organizational Structure of the program identified the levels of management responsible for the Quality System Program, including
More informationQuality Assurance Policy and Procedures
650 Montana Ave, Suite A Las Cruces, NM 88001 (575) 522-0430 www.rmgovernmentservices.com Quality Assurance Policy and Procedures PURPOSE. The purpose of this policy is to outline the quality assurance
More informationIn case of of differences or inconsistencies with texts in the Main Contract, the stipulations in this Appendix I will prevail.
This Appendix I with the Supplier Quality Assurance Requirements for the Hondajet HA-420 program defines Fokker Aerostructures (Buyer) additional Program Specific Quality Requirements and forms an integral
More informationQUALITY MANUAL DISTRIBUTION. Your Logo Here. Page 1 1 of 57. Rev.: A
Page 1 1 of 57 President Design Engineering Production Production Engineering Materials Control Purchasing Service Marketing Sales Contracts Human Resources Quality Assurance Quality Control Production
More informationExternal Provider Quality Requirements QCS-001 Processing Sources
Page 1 of 11 The latest issue to this document is the version that is available on the Lockheed Martin Logistics Services Supplier Quality Management website: http://www.lockheedmartin.com/us/suppliers/bu-info/aeronautics/sustainment-services.html
More informationFlooring Contractor QA/QC Plan Sample Selected pages (not a complete plan)
Flooring Contractor QA/QC Plan Sample Selected pages (not a complete plan) Part 1: Project Specific Quality Plan Part 2: Quality Manual Part 3: Submittal Forms Part 4: Inspection Checklist Forms Contact:
More informationQuality Manual ISO 9001:2000
Quality Manual ISO 9001:2000 Page 2 of 23 TABLE OF CONTENTS COVER PAGE...1 TABLE OF CONTENTS...2 SIGNATURES...3 QUALITY POLICY...4 INTRODUCTION...5 CORPORATE PROFILE...9 4.O QUALITY MANAGEMENT SYSTEM...10
More informationAssociation of American Railroads Quality Assurance System Evaluation (QASE) Checklist Rev. 1/12/2017
Company: Prepared By: Date: Changes from previous version highlighted in yellow. Paragraph Element Objective Evidence 2.1 Objective of Quality Assurance Program 2.2 Applicability and Scope 2.3 QA Program
More informationROTEK. IIInnInstI Instrument Corp. ISO 9001 Quality System Manual
ROTEK IIInnInstI Instrument Corp. ISO 9001 Quality System Manual QSM900100-01 REV O MANUAL NO: 10 ISSUED TO: Rotek Web Site DATE OF ISSUE: 17 July 2002 APPROVALS: ORIGINATOR: Lawrence E. Weissbach Lawrence
More informationHow to Set Up a Quality Assurance System A Step by Step Guide to Quality Control Management System
How to Set Up a Quality Assurance System A Step by Step Guide to Quality Control Management System By BizMove Management Training Institute Other free books by BizMove that may interest you: Free starting
More informationR-1 The Contractor's TMP Implementation Manager (if identified below) is responsible for keeping the portion of the project being used by public traffic in a condition that (1) safely and adequately accommodates
More informationNonconforming Material System Procedure
Page: 1 of 13 Nonconforming Material System Procedure Page: 2 of 13 1.0 PURPOSE AND SCOPE 1.1 Purpose a. To define the system for identifying, segregating and controlling, and disposing of material, identified
More informationEPICOR, INCORPORATED QUALITY ASSURANCE MANUAL
EPICOR, INCORPORATED QUALITY ASSURANCE MANUAL Revision: 6 Date 05/18/09 EPICOR, INCORPORATED 1414 E. Linden Avenue P.O. Box 1608 Linden, NJ. 07036-0006 Tel. 1-908-925-0800 Fax 1-908-925-7795 Table of Contents:
More informationDEC STD ISO Quality Systems - Model for Quality Assurance in Final Inspection and Test
Digital Internal Use Only DEC STD 017-3 - ISO 9003 - Quality Systems - Model for Quality Assurance in Final Inspection and Test DOCUMENT IDENTIFIER: A-DS-EL00017-03-0000 Rev A, ABSTRACT: This standard
More informationInstructions for Supplier Survey
Instructions for Supplier Survey In order to be become a vendor and/or a repair station for Aero Precision, you are required to complete a Quality Systems Survey. Once you have completed the survey, please
More informationZODIAC INTERCONNECT US ZODIAC AEROSYSTEMS SEGMENT ZODIAC INTERCONNECT DIVISION
Document Number: PWI-003 Document Title: Supplier Detailed Inspection Revision: A Released Date: 11-14-2017 Approved By: Harold Julander Signature Approval: See Electronic Approval Table of Contents: Section
More informationQUALITY MANAGEMENT SYSTEM MANUAL ISO 9001:2008
QUALITY MANAGEMENT SYSTEM MANUAL ISO 9001:2008 Revision: 9 Issue Date: 28 April 2014 CONTROLLED COPY Number: Issued to: UNCONTROLLED COPY A.M.S. Electronics, Inc. 113 Pillow Street, Butler, PA 16001 (724)
More informationASA-100 QUALITY MANUAL
Your Company Name ASA-100 QUALITY MANUAL Origination Date: XXXX Document Identifier: Date: Document Revision: QMS-00 Quality Manual Latest Revision Date Abstract: This quality manual describes (your Company's)
More informationSupplier Quality Manual
Supplier Quality Manual February 2010 Page 1 of 6 Table of Contents 1.0 Purpose 2.0 Scope 3.0 Quality System Requirements 4.0 Supplier Assessments 5.0 Advance Product Quality Planning 6.0 First Article
More informationSUPPLIER QUALITY SYSTEM SURVEY
SUPPLIER QUALITY SYSTEM SURVEY DATE (M/d/yy): 55 Dragon Court Woburn, MA 01801 Tel: (781) 933-7300 Fax: (781) 935-4529 GENERAL INFORMATION Supplier Name: Physical Address: City: State: Zip: Sr. Company
More informationMANUAL QUALITY CONTROL & QUALITY ASSURANCE
MANUAL QUALITY CONTROL & QUALITY ASSURANCE METROTEC ENGINEERING LLC P.O. BOX: 26045, DUBAI U.A.E TEL : 043889771 FAX:043889772 E Mail: metrotecengg@yahoo.com info@metrotec.ae Web: www.metrotec.ae 2 TABLE
More informationVendor Qualification Survey
1200 West 96 th St Minneapolis, MN 55431 Ph: 952-888-7900 Fax: 952-888-2719 Vendor Qualification Survey Vendor Information Company Name: Date: Address: City: Phone Number: email address: Product or Service
More informationVendor Qualification Quality Audit Checklist
In order for your firm to be placed on our Approved Vendor List, it is necessary that the person responsible for the Quality system in your firm fill out this audit form and return it to us via mail, fax,
More informationQuality Management System Manual
This Page 1 of 47 of the Quality Management System Manual If issued as a controlled copy, the serial number of this copy is Quality Management System Manual Certified to AS9100 Revision C Printed copies
More informationINSPECTION SYSTEM REQUIREMENTS
MILITARY SPECIFICATIONS MIL-I-45208A INSPECTION SYSTEM REQUIREMENTS This specification has been approved by the Department of Defense and is mandatory for use by all Agencies. 1. SCOPE 1.1 Scope. This
More informationApproved Supplier Guidance
Approved Supplier Guidance Administrative Office: 2420 W. R. Larson Rd. San Antonio, Texas 78261 (210) 384-3484 FAX (830) 438-2309 D&D Machinery and Sales Inc. Approval by: Original copy retained in D&D
More informationSupplier Quality Manual PREPARED AND MAINTAINED BY FIRESTONE INDUSTRIAL PRODUCTS COMPANY DIVISION OFFICE 250 W. 96 th Street INDIANAPOLIS, IN 46260
Supplier Quality Manual PREPARED AND MAINTAINED BY FIRESTONE INDUSTRIAL PRODUCTS COMPANY DIVISION OFFICE 250 W. 96 th Street INDIANAPOLIS, IN 46260 Firestone Industrial Products Quality Policy We will
More informationC.A.S.E. AIR CARRIER SECTION POLICIES AND PROCEDURES
C.A.S.E. 3-A STANDARD DISTRIBUTORS OF NEW AND SURPLUS PARTS QUALITY PROGRAM REQUIREMENTS Section Subject Page 1. Policy.... 2 2. Quality System and Quality Manual.... 3 3. Quality Organization..... 3 4.
More informationFacilities Planning and Construction (FP&C)
Appendix 8.4a Facilities Planning and Construction (FP&C) UAA FP&C Quality Assessment Checklist (A) Project: PM: Project ID: Updated:
More informationQM-001(Rev. 1) 1.0 INTRODUCTION. 1.1 Scope
SECTION 1 Page 1/1 1.0 INTRODUCTION 1.1 Scope The purpose of the Quality Manual is to provide a documented quality management system for BOLTEX mfg. The manual includes the organization structure, responsibilities,
More informationQuality Management System
Quality Management System 6.1 Quality Q-Codes () 6.1 Quality Q-Codes Quality Clauses The following quality control clauses apply when specifically noted on the Gear Technology purchase order: Q1- Material
More informationObjective Evidence Record (OER)
This material is derived from SAE AS9101D, which is copyrighted intellectual property of SAE international. SAE is not responsible for outcomes resulting from use of this material. APPENDIX A OBJECTIVE
More informationQuality Assurance Program for CDA / Design-Build Projects with a Capital Maintenance Agreement with Three Optional 5-Year Terms.
Quality Assurance Program for CDA / Design-Build Projects with a Capital Maintenance Agreement with Three Optional 5-Year Terms August 29, 2017 2017 by Texas Department of Transportation 512/506-5808 All
More informationTOOL ENGINEERING OLD GROVE RD. SAN DIEGO, CA
Page 1 of 42 VERTECHS ENTERPRISES, INC. Dba LUCHNER TOOL ENGINEERING 10051 OLD GROVE RD. SAN DIEGO, CA 92131 Ph No. 1-858-578-3900. Fax No. 1-858-578-2910 Reviewed and Approved By: Geosef (Joey) Straza
More informationMantor Aviation Company
Mantor Aviation Company QUALITY ASSURANCE MANUAL QA Manual 2013 Revision 8 Uncontrolled Copy Ph: 507-553-5053 Fax: 612-395-5267 Introduction Mantor Aviation Company is a supplier of aircraft parts, components,
More informationFAA REPAIR STATION NO.: OGYR627Y
EASA Supplement To The OTTO Quality/Repair Station Manual OTTO 2 East Main Street Carpentersville, IL 60110 FAA REPAIR STATION NO.: OGYR627Y This supplement does not form part of the FAA FAR-145 Repair
More informationSTATEMENT OF SPECIAL INSPECTION FORM
STATEMENT OF SPECIAL INSPECTION FORM Project Title: Plan Check #: Project Address: This Statement of Special Inspections is submitted in fulfillment of the requirements of the 2013 California Building
More informationQUALITY OPERATIONS STANDARD
QUALITY OPERATIONS STANDARD TITLE: GUIDELINES FOR SUPPLIER PREPARATION AND PROCESSING OF SUPPLIER MATERIAL REVIEW REPORT (SMRR/WT) Standard Number: QOS 0035 Revision Letter: L Effective Date: July 31,
More informationQuality Management System
Quality Management System ZYQ Testing Laboratory 11111 Testing Avenue Testing Town, Alaska 22222 (555) 555-5555 Date Prepared: January 19, 2009 1 Please note that this Quality Management System (QM) was
More information14620 Henry Road Houston, Texas PH: FX: WEB: QUALITY MANUAL
14620 Henry Road Houston, Texas 77060 PH: 281-447-3980 FX: 281-447-3988 WEB: www.texasinternational.com QUALITY MANUAL ISO 9001:2008 API Spec Q1, 9th Edition API Spec 8C 5 Th Edition MANUAL NUMBER: Electronic
More informationI. In-Plant Quality Control Manual Specifics
I. In-Plant Quality Control Manual Specifics AC 10 is the Acceptance Criteria that the ICC Evaluation Service has created to provide a template for what is reasonable to include in a manufactured product
More informationSupplier Quality Manual
including subsidiaries of Mexico and Canada Supplier Quality Manual Issue date: March 1, 2010 Revised: April 7, 2011 Page 1 of 14 Corporate Quality Statement Quality plays a vital role in SCHOTT Gemtron
More informationWest Star Aviation 796 Heritage Way Walker Field Airport Grand Junction, Co 81506
DOMESTIC REPAIR STATION AND QUALITY CONTROL MANUALS West Star Aviation 796 Heritage Way Walker Field Airport Grand Junction, Co 81506 Federal Aviation Administration Repair Station Certificate Number WTXR173J
More informationSHELTON INDUSTRIAL PATTERN INC.
Defintions: Seller : Supplier of materials, parts and or services that support production Supplies : materials, parts that support production FOD : Foreign Object Debri / Damage 1. Quality Management System
More informationQUALITY ADMINISTRATIVE PROCEDURE
NYE COUNTY NUCLEAR WASTE REPOSITORY PROJECT OFFICE QUALITY ADMINISTRATIVE PROCEDURE TITLE: Procurement of Items and Services REVISION: 1 DATE: PAGE: 1 of 8 PROCEDURE NUMBER: QAP-7.1 SUPERSEDES: Revision
More informationELECTRONIC REPAIR STATION MANUAL
UNCONTROLLED WHEN COPIED OR PRINTED CONTROLLED FORMS LOCATED AT: http://www.aero-weld.com/forms.htm AEROWELD, INC 433 Breesport San Antonio, Texas 78216 ELECTRONIC REPAIR STATION MANUAL Including: QUALITY
More informationISO 14001:2015 Gap Analysis Check Sheet
? CONTEXT OF THE ORGANIZATION 4.1 Understanding the organization and its context The organization shall determine external and internal issues that are relevant to its purpose and that affect its ability
More informationQuality Manual Revision: C Effective: 03/01/10
TABLE OF CONTENTS DESCRIPTION SECTION PAGE INTRODUCTION 1.0 1 APPROVAL SIGNATURE PAGE 1.1 1 AMENDMENT RECORD 1.2 2 SCOPE 2.0 3 EXCLUSIONS 2.1 3 CORPORATE POLICY 3.0 3 QUALITY MANAGEMENT SYSTEM 4.0 4 GENERAL
More informationWebster - Hoff Corporation. Quality Manual
Registered to ISO 9001:2008 ANSI/ISO/ASQ Q9001-2008 QM-1 Page 2 of 35 TABLE OF CONTENTS Section Name Page Management Approval Of / List of Exclusions 3 Corporate Quality Policy 4 Webster-Hoff Corporation,
More information12. Inventory - Receiving & Shipping
1.0 PURPOSE 1.1 To establish a procedure for dealing with Warehouse issues including: i ii iii iv Receiving Shipping Handling and storage including ESD RMA & Quarantine 2.0 RESPONSIBILITY 2.1 The Warehouse
More informationRail Safety Management Procedure General Engineering and Operational Systems - Asset Management of Rolling Stock
1/16 Management of Rolling Stock Revision Date Comments 1 January 2011 Procedure developed to support SMS and legislative requirements. 2 February 2012 Reviewed with RISSB Standards and change of titles
More informationPage 1 / 11. Version 0 June 2014
Page 1 / 11 CORRESPONDENCE MATRIX NQSA NSQ-100 version 0 NUCLEAR SAFETY AND QUALITY MANAGEMENT SYSTEM REQUIREMENTS Model for quality management in design & development, manufacturing, erection, commissioning
More informationProtocol for Third Party Validation of Manufacturer s Certification
Protocol for Third Party Validation of Manufacturer s Certification 1825 Connecticut Ave., NW Suite 680 Washington, DC 20009 P: 202-462-9607 F: 202-462-9779 www.plasticpipe.org Protocol for Third Party
More informationAPPENDIX B. PROJECT CONTRACTOR QUALITY CONTROL PLAN March 6, 2009
Base Realignment and Closure Program Management Office West 1455 Frazee Road, Suite 900 San Diego, California 92108-4310 CONTRACT NO. N62473-07-D-3211 CTO NO. 0009 APPENDIX B DRAFT PROJECT CONTRACTOR QUALITY
More informationPPI/TZ Standard Quality Requirements for Suppliers -SQRS-
PPI/TZ Standard Quality Requirements for Suppliers -SQRS- AS9100, ISO 13485 and ISO 9001 Revision: March 19, 2014 For questions concerning Standard Quality Requirements for Supplier (SQRS), please contact
More informationCopyright 2012 Aeronautical Repair Station Association
THE AERONAUTICAL REPAIR STATION ASSOCIATION S DOMESTIC MODEL FORMS MANUAL Copyright 2012 Aeronautical Repair Station Association 703 739 9543 www.arsa.org 121 North Henry Street Alexandria, VA 22314-2903
More informationSTATE OF SOUTH CAROLINA Employee Performance Management System
STATE OF SOUTH CAROLINA Employee Performance Management System Name Agency South Carolina Forestry Commission Employee ID Number Department Position Classification Assigned to Current Position Performance
More informationSupplier Requirements Retail Information Svcs LLC Fastener Division
Supplier Requirements Retail Information Svcs LLC Fastener Division REVISION : 1 PAGE 1 of 11 TABLE OF CONTENT SECTION PAGE Supplier Evaluation and Selection Process 3 Supplier Performance Evaluation 4
More informationSupplier Quality Agreement
Supplier Quality Agreement Clyde, OH Poplar Bluff, MO Brampton, Ontario Jeffersonville, IN Page 1 of 15 TABLE OF CONTENTS Table of Contents 1. Administrative Elements... 4 1.1. Scope... 4 1.2. Parties
More informationDefinitions contained in the above mentioned document and industry regulations are applicable herein.
Quality Specification TEC-1021 21May12 Rev E Global Quality Management System Supplement for Various International Nuclear Quality Assurance Criteria, Regulations, and Requirements 1. SCOPE 1.1. Content
More informationSupplier Quality Manual
ALLIANCE ELECTRONICS DISTRIBUTOR Supplier Quality Manual 22412 Gilberto Rd. Rancho Santa Margarita, CA 92688 INTRODUCTION Welcome to Alliance Electronics Distributor (AED) Alliance Electronics Distributor
More informationFIRST ARTICLE INSPECTIONS
Page 1 of 17 Quality Assurance Controlling Department 06/13/06 Issue Date 08/04/11 Revision Date FIRST ARTICLE INSPECTIONS Notes: Compliant With AS 9102A:2004 Approvals: Product Engineering And Program
More informationQuality Manual ISO 9001:2015 Quality Management System
Quality management input comprises the standard requirements from ISO 9001:2015 which are deployed by our organization to achieve customer satisfaction through process control. Quality Manual ISO 9001:2015
More informationPlastics and Concepts of Connecticut Inc. Quality Manual
Plastics and Concepts of Connecticut Inc. Quality Manual Nature of Changes For This Issue: 1. Initial Release 8/14/2000 2. Reformatted and grammatical errors corrected 6/11/02 3. Minor grammatical errors
More informationSupplier Quality Manual
Supplier Quality Manual Document No. F-PM010 Rev 3 Owner Supplier Quality Page 1 OF 11 TABLE OF CONTENTS 1.0 Purpose 3 2.0 Scope... 3 3.0 Quality System Requirements... 3 4.0 Approved Supplier List (ASL).
More informationQuality Clauses F Rev. I West Brooks Avenue North Las Vegas, NV Phone (702) Fax (702)
Quality Code Quality Clause Title Q-001 Flow Down Requirements Q-002 Quality System Q-003 Discrepancies Q-004 FOD Foreign Object Debris/Damage Program Q-005 ESD Electrostatic Discharge Control Program
More informationNumber Control SQRM 1.0 Appendix N/A Date Issued. E-Location DocuShare / Internet Approval Manager Quality Assurance
Title Supplier Quality System Requirements Originator Gary Hosker E-Location DocuShare / Internet Approval Manager Quality Assurance Number Control SQRM 1.0 Appendix N/A Date Issued Rev Level Date Revised
More informationVENDOR EVALUATION REPORT. Supplier Name: Type of Business: Manufacturer Service Distributor Other: Vendor Address:
NOTES 1. Vendor approval applies to the location identified below. All locations that apply to the scope of the business must be identified and included as a part of this survey. 2. Pre-prepared surveys
More information4. SPLITTING QUANITITES OF DEFECTIVE MATERIAL IN CAMSTAR
ZOLL Document Number: 90F1087 Page 3 of 18 1. INTRODUCTION The purpose of this document is to provide instruction for when and how to perform the ERP and MES transactions required to process nonconforming
More informationEVANS CAPACITOR COMPANY
DISTRIBUTION LIST: Location Book # Quality Manager 0001 President 0002 CEO 0003 Engineering Manager 0004 Production Manager 0005 Office Manager 0006 Page 1 of 33 REV A 11/18/03 TABLE OF CONTENTS Page Distribution
More informationRequired Elements of a Quality Management System
Quality Management System Review Procedures IAPMO Evaluation Service (IAPMO UES) No.: ES-010 Title: Review Procedures for Certified Manufacturer s Quality Management System (QMS) Documentation By: B. Berneche
More informationISO 9001 QUALITY MANUAL
ISO 9001 QUALITY MANUAL Origination Date: 10/01/14 Document Identifier: AIF quality control manual Date: 10/01/14 Project: Customer review Document Status: Released Document Link: www.aeroindfast.com Abstract:
More informationBulk Metals Qualified Suppliers List for Distributors (QSLD) Criteria and Provisions
Bulk Metals Qualified Suppliers List for Distributors (QSLD) Criteria and Provisions PREFACE The DLA Troop Support Construction and Equipment Supply Chain (C & E) has instituted a Qualified Suppliers List
More informationPRECISION SENSORS QUALITY ASSURANCE MANUAL THIS DOCUMENT IS CONTROLLED ONLY IF COPY IS STAMPED CONTROLLED IN RED INK
SAE AS9100 DOCUMENT PRECISION SENSORS QUALITY ASSURANCE MANUAL THIS DOCUMENT IS CONTROLLED ONLY IF COPY IS STAMPED CONTROLLED IN RED INK REV. 005 10/27/10 Page 2 Page 4 Page 5 Page 6 Page 7 Page 8 Page
More informationCERTIFICATE OF REGISTRATION
03/31/2017 CERTIFICATE OF REGISTRATION This Certificate bears witness that Great Western Registrar LLC (An ANAB-accredited CB) has assessed the management system of: INTEGRATED IDEAS & TECHNOLOGIES, INC.
More informationENVIRONMENTAL LABORATORY APPROVAL PROGRAM CERTIFICATION MANUAL DATE 5/06/08
1 of 69 Preface The New York State Department of Health, Wadsworth Center, Environmental Laboratory Approval Program (ELAP) has adopted as its Standard the current version of the National Environmental
More informationDesign-Builder Quality Control System Paul Moyer, P.E., Gill Engineering. July 17, 2011
Design-Builder Quality Control System Paul Moyer, P.E., Gill Engineering July 17, 2011 Project Quality Assurance Program Quality Assurance All those planned and systematic actions necessary to provide
More informationZOLL Document Number: 90E0004 Page 5 of 15 Maintenance of Quality Records
ZOLL Number: 90E0004 Page 5 of 15 1. INTRODUCTION 1.1 Purpose 1.2 Scope The purpose of this document is to provide guidance regarding the identification of a quality record and the documentation practices
More informationNUMBER STATE OF WASHINGTON DEPARTMENT OF CORRECTIONS PRISON/PRE-RELEASE/ DOC WORK RELEASE/FIELD SIGNATURE DATE EFFECTIVE DATE
( i \ NUMBER STATE OF WASHINGTON DEPARTMENT OF CORRECTIONS PRISON/PRE-RELEASE/ DOC 550.100 WORK RELEASE/FIELD SIGNATURE DATE EFFECTIVE DATE 3/1/05 PAGE NUMBER 181 Offender Manual [8J Spanish JOSEPH D.
More informationBS EN ISO 9001 QUALITY ASSURANCE MANUAL
PAC PRICE ARTHUR CONSULTANCY BS EN ISO 9001 QUALITY ASSURANCE MANUAL COPY NO: 025 ISSUE: 4 QUALITY ASSURANCE MANUAL BS EN ISO 9001 CONTENTS PAC Price Arthur Consultancy - Building Services Consulting Engineers
More informationALCO Plastics, Incorporated SUPPLIER QUALITY SYSTEM REQUIREMENTS MANUAL
INTRODUCTION Revision Level: A 5/3/06 Revision Level: This manual is provided to the Suppliers of ALCO Plastics, Inc. to communicate the Quality System Requirements and Assessment process. Purchased materials
More information2
Quality Control Manual 2008 1 2 Table of Contents Introduction... 5 Major Factors in Quality Control... 6 General Requirements... 7 Plant Quality Control Procedures... 7 Steps to integrating a full quality
More informationSections of the Standard. Evidence / Comments. (Y) / Nonconforming (NC)
Date: Sections of the Standard 4 Context of the Organization 4.1 Understanding the organization and its context 4.2 Understanding the needs and expectations of interested parties 4.3 Determining the scope
More informationQuality Assurance Manual
Quality Assurance Manual Current Electrical is committed to leading the market in satisfying customer needs by providing versatile and innovative electrical and control solutions We take pride in the ability
More informationClause "A" Subcontractor Controls, General Requirements (Applicable when Clause "A" is invoked in the Purchase Order "Remarks")
Clause "A" Subcontractor Controls, General Requirements (Applicable when Clause "A" is invoked in the Purchase Order "Remarks") (1) Any non-destructive testing defined within this Seyer Industries Purchase
More informationDefinitions contained in the above mentioned Specifications and Industry Standards are applicable herein.
1. SCOPE Quality Specification TEC-1019 12 Jul 11 Rev C All Paragraphs Revised Global Quality Management System Supplement for the Aerospace Industry Model, AS 9100 (C) 1.1. Content This specification
More informationQuality Program For Inspection Organizations
Quality Program For Inspection Organizations The National Board of Boiler and Pressure Vessel Inspectors 1055 Crupper Avenue Columbus, Ohio 43229 614.888.8320 Approved by Executive Director on: 11/17/2016
More informationISTA Accreditation Standard for Seed Testing and Seed Sampling
INTERNATIONAL SEED TESTING ASSOCIATION (ISTA) Secretariat, Zürichstrasse 50, 8303 Bassersdorf, CH-Switzerland Phone: +41-44-838 60 00, Fax: +41-44-838 60 01, Email: ista.office@ista.ch, http://www.seedtest.org
More informationDOT-FHWA QA/QC Plan Sample Selected pages (not a complete plan)
DOT-FHWA QA/QC Plan Sample Selected pages (not a complete plan) Part 1: Project Specific Quality Plan Part 2: Quality Manual Part 3: Submittal Forms Contact: FirstTimeQuality 410 451 8006 Pat [Pick the
More informationMaterion AMTS Supplier Quality Manual
Advanced Materials Technologies and Services Inc. Materion AMTS Supplier Quality Manual Supplier Name: Supplier Address: Suppliers shall review the attached Supplier Quality Manual and acknowledge receipt
More informationDocument No.: INS Rev: B Origination Date: 10/30/2013
1.0 Purpose This instruction is to describe the process for Cost of Poor Quality (COPQ) calculation, along with process for Cost Recovery with supplier caused problems. This applies to all purchased materials,
More informationLimited Shelf Material Control Procedure
Page: 1 of 7 Limited Shelf Material Control Procedure Page: 2 of 7 1.0 PURPOSE AND SCOPE 1.1 Purpose 1.1.1 The purpose of this procedure is to define the method for Limited Shelf Material Control used
More information