BUSINESS RULES III. Cost Allocation and Determination of the Reference Price

Size: px
Start display at page:

Download "BUSINESS RULES III. Cost Allocation and Determination of the Reference Price"

Transcription

1 Cost Allocation & RP TAR /04/1414 DRAFT BUSINESS RULES III Cost Allocation and Determination of the Reference Price ENTSOG AISBL; Av. de Cortenbergh 100, 1000-Brussels; Tel: ; Fax: ; info@entsog.eu VAT No. BE

2 1. General 1.1 The choice of cost allocation methodology shall reflect system characteristics in order to best achieve the objectives of non-discrimination, competition and promotion of crossborder trade. 1.2 At least every 4 years, the relevant authority shall assess all assumptions regarding the stability and evolution of the input parameters to the tariff methodologies against relevant available technical and market data and outlooks. 2. Cost allocation methodology selection 2.1 At the entry into force of the Network Code on Tariffs, NRAs, or where appropriate TSOs, shall launch a public consultation on the proposed methodology for determining reference prices. 2.2 The choice of a cost allocation methodology is limited to postage stamp, capacity weighted distance, distance to the virtual point approach and matrix. 2.3 The choice of methodology will be determined by the circumstances criteria, a cost allocation test and a methodology counterfactual. The NRA will consider each of these to assess the appropriateness of the methodology before deciding on the cost allocation methodology to be implemented. 3. Circumstances influencing the choice of a cost-allocation methodology 3.1 The use of a postage stamp methodology should be limited to networks where one of the following two criteria is met: a) Where at least two thirds of the transmission capacity is dedicated either to the domestic market or to cross border gas flows; or b) The difference between the average distance travelled by cross border flows and the average distance travelled by domestic flows does not exceed a maximum threshold of fifty percent. 3.2 In a network with a unique geographical node where all the flows converge can be identified, the virtual point based methodology may be used. Page 2 of 18

3 3.3 The choice for or against the matrix methodology, or the virtual point methodology, relative to the capacity weighted distance methodologies, shall consider both the drawback of necessary network representation simplifications and the benefit in cost reflectivity, as compared to the capacity-weighted distance approach. 3.4 [Further specification of circumstances] 4. Methodology counterfactual 4.1 A methodology counterfactual shall be developed which consists of comparing the chosen cost allocation methodology with at least one other cost allocation methodology from the limited number of methodologies allowed. 4.2 All of the relevant input data necessary to determine the tariffs for the counterfactual methodology shall be provided. 4.3 The postage stamp methodology may be used for counterfactual purposes, even where it cannot be applied as the cost allocation methodology due to the restrictions specified in the circumstances requirements. 4.4 Where the proposed cost allocation methodology is the postage stamp methodology, it is not necessary to provide a counterfactual. 4.5 If the NRA considers that the methodology counterfactual better meets the objectives of the TAR NC, and if it better satisfies the circumstances requirements and meets the cost allocation test, then it may be approved and implemented instead of the original chosen methodology. 4.6 In establishing the counterfactual, the primary data inputs and assumptions shall be applied consistently with the chosen methodology. 5. Cost allocation test 5.1 A cost allocation test shall be carried out comparing expected revenues and cost drivers of domestic and cross border points to provide an indication of the cost reflectivity of the cost allocation methodology being used. Page 3 of 18

4 5.2 The NRA, or the relevant TSO, shall be responsible for correctly calculating and publishing the results of the test in the official language(s) of the Member States and in English. 5.3 The test should be carried out after the application of the chosen cost allocation methodology and after the application of secondary adjustments, if any. The test should also be carried out on the counterfactual cost allocation methodology, if any. 5.4 The test shall be based on physical cost drivers such as distance and capacity, where these cost drivers are taken into account. If multiple cost drivers are identified, the relative importance of the cost drivers shall be explained. 5.5 The assumptions used in connection to the cost drivers and the cost allocation shall be explained. 5.6 The test shall consist of two ratios, as set out below: In determining the revenue for domestic and cross border customer and also the capacity (if used as a cost driver), the amount of cross-border exit capacity shall be used as a proxy for the amount of entry capacity dedicated to cross-border use on networks where such information is not readily identifiable. The rest of the entry capacity shall be considered as dedicated to domestic use. 5.8 If distance is used as a cost driver then the average distance used for both cross-border and domestic entry and exit points shall be determined by using a weighted average formulation. The weighting used could either be technical capacity, booked capacity or flows depending on what is used in the cost allocation methodology being assessed. 5.9 The NRAs shall justify the reasons for any deviation between the two ratios by more than 10%, where the first ratio is compared to the second. Page 4 of 18

5 5.10 If a deviation exceeding 10% results from the use of alternative charges e.g. commodity charges to collect revenues and/or reconcile the regulatory account on points not under the scope of CAM, the NRA shall ensure the revision of the alternative charges so that the deviation between the two ratios does not exceed the 10% limit. 6. Cost Allocation Methodology Consultation 6.1 The public consultation on the proposed methodology for determining reference prices shall be launched by the NRA or, where appropriate, by the TSO once the Tariff NC enters into force. 6.2 This documentation shall be published in the official language(s) of the Member State and in English. 6.3 This documentation shall consist of: i. the assessment of the proposed cost allocation methodology against the specified circumstances influencing its choice; ii. the relevant input data necessary for the calculation of tariffs pursuant to the proposed methodology; iii. the results of the application of the cost allocation test, including, in case of the deviation between the two cost allocation ratios of >10%, an explanation and justification for the extent of the deviation; iv. at least one methodology counterfactual accompanied by the same information as foreseen for the chosen cost allocation methodology, except in the case where postage stamp is used as the primary methodology. 6.4 After the close of the public consultation the NRA shall fix or approve the proposed cost allocation methodology or, unless the NRA has decided to adopt the counterfactual methodology. 6.5 The decision of the NRA shall be accompanied by a detailed explanation and reasoned justification for the choice of cost allocation methodology to be used. 6.6 Such detailed explanation and reasoned justification shall take account of the information in relation to: i. circumstances criteria, ii. the results of the cost allocation test, iii. the methodology counterfactual, Page 5 of 18

6 iv. responses to the public consultation 6.7 The NRA shall review and update the detailed explanation and the reasoned justification for the choice of the cost allocation methodology at least every 4 years. 6.8 The NRA shall conduct a public consultation following each review on any changes proposed as a result of such review. 6.9 The NRA shall approve the proposed changes after the close of the public consultation. 7. Transmission Services 7.1 Transmission services shall be defined at any service necessary to transport natural gas through a transmission system, excluding those activities which may be linked to local requirements, depending on national circumstances (e.g. regional and local transmission activities, flexibility services, metering, depressurisation, ballasting, quality conversion, biogas related services, odorisation, system operation services for third parties and any other dedicated services or infrastructures). 7.2 All of the revenue from the transmission services as defined in 7.1 shall be an input to the cost allocation methodology unless the following charge is in place A specific charge related to the volume actually flowed may be established if approved by the NRA. 7.3 All of the revenue from the transmission services as defined in 7.1 shall be an input to the cost allocation test even if some of that revenue is earned from the charge as set out in The revenue from the excluded activities as set out in 7.1 may be excluded from the cost allocation methodology and charged separately. 8. Other Charges/Non-capacity based charges 8.1 The collection of revenue shall be based on capacity charges except in specific cases where the NRA may approve or determine a specific non-capacity based charge. Page 6 of 18

7 8.2 A specific non-capacity based charge, which may be expressed in monetary terms or in kind, and is related to the volume actually flowed, may be established to cover costs that are mainly driven by the volume actually flowed, if approved or determined by the NRA. 8.3 Where a specific charge related to volume is applied, it shall be levied equally for all entry points and equally for all exit points, based on the actual flows of individual network users. 8.4 For points not under the scope of CAM, alternative charges, e.g. commodity charges, may be used to recover revenue resulting from a gap between the allowed revenue and the actual revenue earned. 8.5 In applying such alternative charges for revenue recovery, the concerned NRA shall demonstrate that they are cost reflective and do not result in cross subsidies between domestic and cross border points. Before such alternative charges are applied, the concerned NRA should submit the result of the assessment to the Agency. 9. The entry-exit split 9.1 An entry-exit split is the split between the revenue to be recovered from entry points of an entry-exit-zone in a Member State and the revenue to be recovered from its exit points. 9.2 In order to avoid barriers to cross-border trade and cross-subsidies between types of network users, especially between cross-border and domestic network users, in setting or approving the cost allocation methodology, the NRA may apply a split based on cost drivers, such as capacity and distance. Otherwise, the NRA shall adopt a 50:50 split as a general principle. 9.3 The split can be either a result of or an input to the applied cost allocation methodology. 9.4 [For cross border entry-exit zones the split shall be determined or approved by all involved NRAs.] 10. Distance, Average Distance and Network Representation 10.1 The point-to-point distance between an entry point (specific entry point or clustered entry point) and an exit point (specific exit point or clustered exit point), which is needed Page 7 of 18

8 to calculate average distances in the network, shall be calculated using an approach such as the:: i. Euclidean approach (airline): this is the shortest straight line distance between two points in a transmission system based on their coordinates, or ii. Path approach (pipeline): the measured distance of a pipeline route connecting an entry point to an exit point based either on the shortest or average measured distance where more than one pipeline route could apply Average distances in the network (used for the cost-allocation test and the criteria for applying the postage stamp methodology) can be calculated based on the distance matrix from each (clustered) entry point to each (clustered) exit point Average weighted distance can be calculated for a certain entry point, a certain exit point or a group of points: Average Weighted Distance for a certain Exit Point: =( (We gh f en ry p n ) (d s nce be ween en ry p n nd ex p n j) ) / ( (We gh f en ry p n ) Average Weighted Distance for a certain Entry Point: =( j (We gh f ex p n j ) (d s nce be ween en ry p nt nd ex p n j) ) / ( jij(we gh f ex p n j ) Average Weighted Distance for a group of Points: =( j(we gh f cer n p ntj ) (Aver ge d s nce f cer n p ntj ) ) / ( j(we gh f cer n p n j ) 10.4 A weighted average approach may be used for calculating the average distance with the weights based on e.g. capacity (technical or booked) or flows Network representations may be complicated and detailed; therefore it is not always appropriate or practical to use the TSO s detailed network model when applied to a particular cost allocation methodology. Page 8 of 18

9 10.6 A simplification of the network representation, for the purpose of calculation of average distances may be carried out Simplification of the network representation can be carried out by e.g. clustering points. The entry or exit points can be clustered, for example, on the basis of geography or the type of point The level of simplification shall be considered with regards to the relevant cost allocation methodology and shall be approved by the NRA. 11. Inputs for Cost Allocation Methodologies 11.1 The inputs for cost allocation methodologies listed here below shall reflect the expected situation of the system for the relevant tariff period. This means that, for example, the capacity data used (technical or booked) shall reflect the expected future technical or booked capacity for the tariff period on which the allocation methodology is applied. COSTS/FINANCIAL INPUTS 11.2 In line with its definition, the cost allocation methodology determines how the regulated transmission revenue is allocated to the different transmissions services. Therefore, the main input required for the cost allocation methodology is the regulated transmission services revenue For some cost allocation methodologies, specific costs of parts of the network components (pipelines, compressors, etc.) are used as cost drivers. These specific costs, used as cost drivers, can be two types of cost concepts: observed costs or incremental costs Inputs such as the indexes of inflation, realised inflation and depreciation should be taken into account to their full extent where used in the cost allocation methodology Observed costs reflect the costs of the existing system and can be represented by historical costs or replacement costs The observed costs shall be recorded in the audited financial statements or shall be approved by the NRA if the regulatory accounting rules are different from the commercial accounting rules. Page 9 of 18

10 11.7 Incremental costs reflect the costs of expanding the system and can be represented as either long run average incremental costs, standardised costs of expansion of the system and investment plan based costs Incremental costs may be the appropriate costs to use in expanding systems, either resulting from an increase in demand, or triggered by a change in the general system sourcing (including a change in the proportion of domestic/ cross-border flows) Observed costs may be the appropriate costs to use in systems with constant or decreasing consumptions and that have limited or stable supply sources. CAPACITY/FLOWS/SYSTEM CHARACTERISTIC INPUTS The relevant capacity data, (technical or booked), which relates to all network points to which the tariff methodology applies, should be specified. This would allow the total entry and the total exit capacity to be identified The capacity data used can be the technical capacity, the booked capacity or the flow resulting from a given demand/supply scenario. When capacity is based on flows as a proxy the reference conditions of the demand/supply scenario flows should be specified. These reference conditions may be peak conditions associated with measured values or average values considered for contractual values When the cost allocation methodology requires the flow direction as an input, it should be specified. Flows, for the network points to which the tariff methodology applies, should be specified. This would allow the total flows from entry points and exit points to be identified Some networks are capable of different physical flow directions and have several peak scenarios. In such systems, using flows based on supply/demand scenarios as a proxy for capacity could create inappropriate locational signals due to unstable flow patterns, in which case technical or booked capacity approaches might be better alternatives When forecasting capacities where technical capacity is used for the tariff calculation, reference may be made to the relevant National Development Plan (NDP) or to ENTSOG s TYNDP. Any deviations between these development plans and capacities used shall be justified. Page 10 of 18

11 11.15 When forecasting capacities where booked capacity is used for the tariff calculation, the forecasted bookings are based on a commercial estimation by the TSO created on the basis of actual bookings and forecasted bookings. The input data depends on the TSO estimation When forecasting capacities where flows are used for the tariff calculation, the flow approach takes both supply and demand into account (the demand estimation could be a peak estimation or based on a national demand forecast). This approach considers the capacity in the system in certain flow situations. The input data depends on the system optimisation and does not consider bi-directional points and storages in both configurations The network representation used as an input to the methodology should be detailed or simplified depending on what is necessary for the chosen allocation methodology. Segments and nodes may be used to simplify the network representation Technical network information such as pipeline sizes, lengths and diameters and compressor stations power may be provided as an input, if relevant The capacity assumption used in the cost allocation methodology shall be consistent with the economic signals expected from the chosen methodology. 12. Main cost allocation methodologies 12.1 [One and the same primary cost allocation methodology shall apply to all entry and exit points on an entry-exit system. This rule shall equally apply to entry exit zones including several TSO networks.] 12.2 [Nothing in the Network Code on Tariffs shall prevent NRAs from establishing and/or approving for each entry-exit zone comprising several TSOs networks an inter-tso compensation mechanism, as this may be required to reconcile collected revenues with allowed revenues.] 13. Postage stamp 13.1 The outputs from the postage stamp methodology are a single reference price at all entries and a separate single reference price at all exits. Page 11 of 18

12 13.2 The inputs for the methodology are the allowed revenue, the assumptions on capacity bookings and the split between entry and exit revenues where this is used as an input The reference price for each category of points is calculated by taking the target revenue for entry/exit and dividing it by the total booked capacity (or a relevant proxy) assumed for entry/exit points. 14. Capacity-Weighted Distance approach 14.1 The inputs for the capacity weighted distance approach are the technical capacities, forecasted booked capacities, transmission services revenue, the split of revenue between the entry and exit points on the system (where this is used as an input), a (simplified) representation of the network with the distances between entry points and exit points 14.2 Where the calculation is based on only the relevant combinations of entries and exits, an additional input is needed: the supply/demand scenarios for identification of the combinations of entries and exits The first step of the methodology is to calculate the weighted average distance of each entry (respectively exit) point through following steps: Step A: Identify the distance from the entry (respectively exit) point to each exit (respectively entry) point. In case not all combinations of entry and exit points are relevant, limit the calculations in this step to all relevant combinations only Step B: Calculate the weighted average of distances for each entry and exit point based on the relevant combinations in Step A above, the weight used is the capacity (booked or technical) of the exit (respectively entry) points. We gh ed Aver ge d s nce f n ry (( s nce be ween n ry nd x ) ( p c y f x )) ( p c y f x ) Where j stands for all relevant Exit points Page 12 of 18

13 We gh ed Aver ge d s nce f x j (( s nce be ween x nd n ry ) ( p c y f n ry )) ( p c y f n ry ) Where i stands for all relevant Entry points 14.4 The second step is to calculate the cost weight of each entry (respectively exit) point: the cost weight of each entry (respectively exit) point is determined as the ratio between the product of its forecasted booked capacity with its average distance and the sums of such products for all entry (respectively exit) points The third step is to allocate a share of the transmission services revenue to each entry (respectively exit) point by multiplying the total share of the transmission services revenue to be collected from entry points (respectively exit points) by the cost weight of each entry point (respectively exit point) Finally, determine the tariffs by dividing the share of the transmission services revenue to be collected from each point by its forecasted booked capacity. 15. Virtual point based approach 15.1 The principle of the virtual point based approach is to determine entry and exit tariffs for each point to which the tariff applies by weighting capacity at these points according to their distance to a virtual point The virtual point is a theoretical location which can be determined mathematically for Variant A or determined geographically for Variant B. Variant A 15.3 The inputs needed for the virtual point based approach (Variant A) are an accurate representation of the physical network, the transmission services revenue, entry/exit split, an appropriate peak day gas flow scenario, a network cost expansion factor ( /GWh/km), an annuitisation factor and where necessary to meet allowed revenues, an additive constant The flow distance values for the pipeline segments on the network must be calculated. The value for each segment is the product of the distance and network flows at peak between each point and its nearest node The flow distance values between each point and a selected single node on the network (known as the reference node) are summed and allocated to each entry and exit point. Page 13 of 18

14 Where more than one path is available between entry and exit points, the path which minimises the flow distance is selected Flow Distance values are recorded as positive for a given pipeline segment when transporting gas between the reference node and the given entry or exit point (or between nodes) would be consistent with the direction of flows at peak. In an unmeshed network, this path is unique; in a meshed network, it is obtained from computer modelling Flow Distance values are recorded as negative for a given pipeline segment when transporting gas between the reference node and the given entry or exit point (or between nodes) would be contrary to the direction of gas flows at peak The flow distance values for each entry and exit point are adjusted to derive a constant consistent with a given entry/exit split. Having established the constant, it is then added to the flow distance values for all entry points, and subtracted from the flow distance values for all exit points To determine the reference prices for each entry and exit point, the adjusted flow distance values are multiplied by the expansion constant, and then the annuitisation factor Variant B A number of inputs are needed for the virtual point based approach (Variant B) such as the technical capacities and forecasted booked capacities for all the entry and exit points on the system The geographical location of the virtual trading point must be identified and this can be determined by selecting a dominant node in the network where most flows occur. It can be also determined geographically based on the capacity weighted average of the geographical location of all entry and exit points The proportion of entry (or exit) capacity at each point is calculated relative to the total entry and exit capacity. The geographical location (longitude and latitude) of each entry (and exit) point is multiplied by its proportion factor. The location of the virtual point is determined by summing the capacity weighted geographic locations The distance between each entry point and the virtual point is calculated as well as the distance between each exit point and the virtual point. Page 14 of 18

15 15.14 The revenue to be collected from all entry points and all exit points is calculated from the capacity-weighted distance to the virtual point The capacity-weighted distance to the virtual point for entry and exit points is calculated separately. The sum of capacity-weighted distances for entry points and the sum of capacity-weighted distances for exit points is used to determine the entry-exit split The revenue collected from all entry points (and revenue collected from all exit points) is calculated by multiplying the total revenue by the entry share (and exit share for revenue collected from all exit points) The tariffs are determined by minimising the difference between the calculated revenue from entries and exits, and the revenue to be obtained by multiplying tariffs by booked capacities. 16. Matrix approach 16.1 The following inputs are needed for the matrix approach: A unitary transmission cost index, e.g. depending on pipe diameter and its theoretical physical capacity, and a description of the physical network where each portion of the grid (segment), has an associated length, diameter and prevailing flow direction. A representation of all entry/exit paths (and the segments they are composed of) is also needed The unit cost of each segment, determined for prevailing flow and backhaul, is calculated using the unitary transmission cost index multiplied by its length. Backhaul valorisation is determined by the NRA or TSO in the range between zero (no cost associated) and one (cost associated equal to prevailing flow) To calculate the unit cost for each possible path, the unit costs of all the segments included in the path are summed up In case of meshed networks, where multiple paths are possible to link the same couple of entry-exit points, the cost associated to the path can be derived as the minimum or, alternatively, as the average of all paths costs Once the costs of all paths have been determined and a matrix composed by all unit cost combinations between entry and exit points has been created, entry and exit charges shall be calculated by an optimisation algorithm: for every path, the difference between Page 15 of 18

16 the unit cost and the sum of the corresponding entry and exit charges is calculated and squared. The sum of the squared differences for the entire matrix is then minimised A constraint shall be put in place, to avoid negative entry or exit tariffs In case of multiple solutions, their number can be reduced by introducing additional restrictions, such as fixing the split between entry and exit or applying a further derivation to arrive at a unique solution such as fixing one tariff which acts as a constraint on the optimisation. 17. Secondary adjustments 17.1 NRAs may decide to adjust a primary cost allocation methodology and the associated initial tariffs derived from it at a national level by applying secondary adjustments Where secondary adjustments are used, only Rescaling, Equalisation and Benchmarking shall be allowed The secondary adjustments shall be applied in a fully transparent manner and shall not undermine the basis for using a given primary methodology Secondary adjustments can be applied at the end of the application of a primary methodology. For rescaling and equalisation, it is possible for the secondary adjustment to be embedded in the primary methodology by creating one or more homogenous sets of points at the beginning of the calculation. 18. Rescaling 18.1 The application of rescaling consists of increasing or decreasing the initial tariffs for entry and/or exit points Rescaling shall be applied either to adjust the initial tariffs that result from the primary cost allocation methodology in order to recover the allowed revenue and/or to avoid negative capacity charges Rescaling shall be performed either by topping up the initial tariffs with an additive constant or by multiplying them by a constant multiplier. The corresponding multiplier or additive constant for entry and for exit points shall uniformly apply to all entry points the system and/or all exit points in the system respectively. Page 16 of 18

17 18.4 If alternative charges are used at non-cam points then the use of rescaling to adjust the tariff to recover the allowed revenues should not apply uniformly to all entry and/or exit points as described in in Rescaling may be limited to those points that do not have an alternative charge to reconcile revenues Where rescaling is used to close the gap between initial tariffs and the revenue to be recovered, the assessment shall cover the consistency of this rescaling with the economic signals and locational signals expected from the chosen primary cost allocation methodology An assessment of the effect of rescaling on the entry/exit split which was achieved from the application of the primary methodology should be produced. 19. Equalisation 19.1 Equalisation results in the same tariff for each homogenous set of points in the system. Subject to 19.2, equalisation can be applied to one or more set of homogenous entry or exit points at any one time Each homogenous set of points subject to equalisation can only include either domestic points, or cross-border points, in order to avoid cross - subsidisation between crossborder and domestic customers An exhaustive list of the points that could be considered in an homogenous set of points are as follows: Entry interconnection points, Exit interconnection points, Domestic entries, Domestic Exits, Entries from Storage, Exits to Storage, Entries from LNG regasification terminals, Exits to LNG liquefaction terminals, Entries from production points, taking 19.2 into account Equalisation can only be applied for reasons of security of supply or price stability or fostering competition in the retail market and/ or in the renewable energy sector If an NRA decides to equalise the tariffs for each homogenous set of points then justification for this decision shall be provided at a national level, taking account of tradeoffs between the loss of locational signals and the improved tariff stability anticipated by applying equalisation. Page 17 of 18

18 20. Benchmarking 20.1 Benchmarking implies reducing the tariff at one point in order to attract greater gas flows. Higher capacity sales at this point would be expected to offset the need for increased tariffs at other points in order to collect allowed revenues Benchmarking shall be limited to the point, where the TSO faces effective competition from other TSOs point or route. The tariff reduction shall be limited to what is strictly necessary to adjust to the competitive tariff level The application of benchmarking shall be decided by NRAs on a case by case basis Benchmarking may be applied where there is proof that effective pipeline-to-pipeline competition exists and the effect of the benchmarking on the entry/exit split obtained from the strict application of the main methodology is minimised Benchmarking may be applied where it is possible to demonstrate that the outcome of any methodology would not allow to meet the competitive tariff level and that the outcome of benchmarking leads to better meeting the objectives of the Gas Regulation In the application of benchmarking, neighbouring NRAs shall cooperate with each other in order to ensure a consistent and compatible approach across the Member States concerned The proposal for reducing a tariff based on benchmarking, as well as the corresponding tariff increases and the NRA s reasoning, shall be publicly consulted before the tariffs are set. 21. Storage 21.1 In setting or approving tariffs for entry and exit points from and to gas storage facilities, NRAs shall consider the benefits which storage facilities may provide to the transmission system and the need to promote efficient investments in networks NRAs shall also minimise any adverse effect on cross-border flows. Page 18 of 18

We appreciate your feedback

We appreciate your feedback Publishing date: 03/12/2013 Document title: We appreciate your feedback Please click on the icon to take a 5 online survey and provide your feedback about this document Framework Guidelines on rules regarding

More information

Opening. Today s agenda. 1. Introduction. 2. Stakeholders visions and impact on tariffs. 3. In-depth explanation of NC TAR. 4.

Opening. Today s agenda. 1. Introduction. 2. Stakeholders visions and impact on tariffs. 3. In-depth explanation of NC TAR. 4. Opening 1. Introduction 2. Stakeholders visions and impact on tariffs Today s agenda 3. In-depth explanation of NC TAR 4. Next steps 1. Introduction 2. Stakeholders visions and impact on tariffs Today

More information

Implementation Workshop

Implementation Workshop Brussels 5 October 2017 Implementation Workshop Tariff Network Code Welcome Brussels 5 October 2017 Introduction TAR NC Implementation Workshop Irina Oshchepkova Tariff Subject Manager, ENTSOG Agenda 1.

More information

Comments on Implementation Document for the Network Code on Harmonised Transmission Tariff Structures for Gas by ENTSOG

Comments on Implementation Document for the Network Code on Harmonised Transmission Tariff Structures for Gas by ENTSOG 21 June 2017 Comments on Implementation Document for the Network Code on Harmonised Transmission Tariff Structures for Gas by ENTSOG 1. Comments on ENTSOG s interpretation of Article 2 of TAR NC (cf. page

More information

Future of Gas Entry Tariff Regime Initial Modelling Evidence. Consultation Paper CER/14/ nd September th October 2014

Future of Gas Entry Tariff Regime Initial Modelling Evidence. Consultation Paper CER/14/ nd September th October 2014 Future of Gas Entry Tariff Regime Initial Modelling Evidence DOCUMENT TYPE: REFERENCE: Consultation Paper CER/14/455 DATE PUBLISHED: 02 nd September 2014 CLOSING DATE: 14 th October 2014 RESPONSES TO:

More information

... Art. 30 (1)(b)(i) Information on the allowed and/or target revenue

... Art. 30 (1)(b)(i) Information on the allowed and/or target revenue Art. 30 (1)(a) Information on parameters used in the applied reference price methodology related to the technical characteristics of the transmission system Capacity prognosis for calendar year 2018 Weighted

More information

Implementation of the Balancing Network Code: an overview of TSOs main challenges

Implementation of the Balancing Network Code: an overview of TSOs main challenges Implementation of Balancing Network Code 20 November 2013 Rev 1 Implementation of the Balancing Network Code: an overview of TSOs main challenges ENTSOG AISBL; Av. de Cortenbergh 100, 1000-Brussels; Tel:

More information

The present ACER Guidance to ENTSOG provides a framework for the development of a

The present ACER Guidance to ENTSOG provides a framework for the development of a ACER guidance to ENTSOG on the development of amendment proposals to the Network Code on Capacity Allocation Mechanisms on the matter of incremental and new capacity 1. Introduction a) The Network Code

More information

A study on the implementation status of TAR NC in six northwest European countries

A study on the implementation status of TAR NC in six northwest European countries A study on the implementation status of TAR NC in six northwest European countries A study for Gasunie Transport Services 1 SAFER, SMARTER, GREENER Presentation outline 1 Introduction DNV GL 2 Introduction

More information

Framework Guidelines on Capacity Allocation Mechanisms for the European Gas Transmission Network FG-2011-G August 2011

Framework Guidelines on Capacity Allocation Mechanisms for the European Gas Transmission Network FG-2011-G August 2011 Framework Guidelines on Capacity Allocation Mechanisms for the European Gas Transmission Network FG-2011-G-001 3 August 2011 Agency for the Cooperation of Energy Regulators Trg Republike 3 1000 Ljubljana

More information

Transit via Ukraine after 2019

Transit via Ukraine after 2019 12 th Gas Forum 20 September 2017 Transit via Ukraine after 2019 Sergiy Makogon Director of Business Development Ukrtransgaz Naftogaz of Ukraine Group Present day what have been done Gas Law aligned with

More information

Quo vadis EU gas market regulatory framework Study on a Gas Market Design for Europe

Quo vadis EU gas market regulatory framework Study on a Gas Market Design for Europe Quo vadis EU gas market regulatory framework Study on a Gas Market Design for Europe Overview presentation 19 October 2017 Content I. Introduction II. Methodology III. Modelling IV. Sensitivities V. Stakeholder

More information

COMMISSION STAFF WORKING PAPER INTERPRETATIVE NOTE ON DIRECTIVE 2009/73/EC CONCERNING COMMON RULES FOR THE INTERNAL MARKET IN NATURAL GAS

COMMISSION STAFF WORKING PAPER INTERPRETATIVE NOTE ON DIRECTIVE 2009/73/EC CONCERNING COMMON RULES FOR THE INTERNAL MARKET IN NATURAL GAS EN EN EN EUROPEAN COMMISSION Brussels, 22 January 2010 COMMISSION STAFF WORKING PAPER INTERPRETATIVE NOTE ON DIRECTIVE 2009/73/EC CONCERNING COMMON RULES FOR THE INTERNAL MARKET IN NATURAL GAS THIRD-PARTY

More information

Energy Identification Coding Scheme (EIC): ENTSOG Local Issuing Office Procedures

Energy Identification Coding Scheme (EIC): ENTSOG Local Issuing Office Procedures 27 Feb 2013 Rev.0 DRAFT Energy Identification Coding Scheme (EIC): ENTSOG Local Issuing Office Procedures INTRODUCTION The Energy Identification Coding scheme (EIC), standardized and maintained by ENTSO-E,

More information

Official Journal of the European Union. (Non-legislative acts) REGULATIONS

Official Journal of the European Union. (Non-legislative acts) REGULATIONS 17.3.2017 L 72/1 II (Non-legislative acts) REGULATIONS COMMISSION REGULATION (EU) 2017/459 of 16 March 2017 establishing a network code on capacity allocation mechanisms in gas transmission systems and

More information

All NEMOs proposal for the price coupling algorithm and for the continuous trading matching algorithm, also incorporating TSO and NEMO proposals for

All NEMOs proposal for the price coupling algorithm and for the continuous trading matching algorithm, also incorporating TSO and NEMO proposals for All NEMOs proposal for the price coupling algorithm and for the continuous trading matching algorithm, also incorporating TSO and NEMO proposals for a common set of requirements, in accordance with Article

More information

SIKKERHEDSGUIDE NØDUDGANGE HJERTESTARTER SAMLINGSSTED

SIKKERHEDSGUIDE NØDUDGANGE HJERTESTARTER SAMLINGSSTED SIKKERHEDSGUIDE NØDUDGANGE HJERTESTARTER SAMLINGSSTED USER GROUP ON TARIFFS 4 October 2017 Nina Synnest Sinvani Dok. nr. 17/03101-27 2 AGENDA This is the second User Group in the process of implementing

More information

NATURAL GAS TRANSMISSION AND LNG RE-GASIFICATION TARIFF

NATURAL GAS TRANSMISSION AND LNG RE-GASIFICATION TARIFF NATURAL GAS TRANSMISSION AND LNG RE-GASIFICATION TARIFF Unofficial Translation 1 of 23 IMPORTANT NOTE: The English translation is not binding. In the event of discrepancies between the Greek and English

More information

Comments to ENTSO-E Electricity Balancing Network Code

Comments to ENTSO-E Electricity Balancing Network Code Comments to ENTSO-E Electricity Balancing Network Code Contacts: EURELECTRIC: Pavla MANDATOVA Advisor Networks Unit pmandatova@eurelectric.org Olga MIKHAILOVA Advisor Markets Unit omikhailova@eurelectric.org

More information

Decision. on 1 st April Decision of 30 October 2014 forming a ruling on the changes to the ATRT5 tariff concerning the interim measures

Decision. on 1 st April Decision of 30 October 2014 forming a ruling on the changes to the ATRT5 tariff concerning the interim measures Decision Deliberation of the French Regulatory Commission of Energy of 19 March 2015 deciding on the evolution of the tariffs for the use of natural gas transmission networks as of 1 April 2015 Present

More information

Council of the European Union Brussels, 13 December 2017 (OR. en)

Council of the European Union Brussels, 13 December 2017 (OR. en) Council of the European Union Brussels, 13 December 2017 (OR. en) Interinstitutional File: 2016/0379 (COD) 15237/17 ADD 1 NOTE ENER 487 ENV 1016 CLIMA 336 COMPET 841 CONSOM 384 FISC 322 CODEC 1970 From:

More information

Target Model for the European Natural Gas Market

Target Model for the European Natural Gas Market Target Model for the European Natural Gas Market A REPORT PREPARED FOR GDF SUEZ BRANCHE INFRASTRUCTURES June 2011 Frontier Economics Ltd, London. June 2011 Frontier Economics & Stratorg-Ylios i Target

More information

Energie-Control Austria Executive Board Ordinance on Provisions for the Gas Market Model (Gas Market Model Ordinance 2012) Title 1 Principles

Energie-Control Austria Executive Board Ordinance on Provisions for the Gas Market Model (Gas Market Model Ordinance 2012) Title 1 Principles Energie-Control Austria Executive Board Ordinance on Provisions for the Gas Market Model (Gas Market Model Ordinance 2012) In exercise of section 41 Gaswirtschaftsgesetz (Natural Gas Act) 2011, BGBl. (Federal

More information

Consultation on the integration of gas markets of Czech Republic and Austria

Consultation on the integration of gas markets of Czech Republic and Austria Consultation on the integration of gas markets of Czech Republic and Austria TABLE OF CONTENTS A. INTRODUCTION... 3 B. OBJECTIVE OF THE CONSULTATION... 5 C. RULES OF THE PUBLIC CONSULTATION... 5 D. THE

More information

Black Start Procurement Methodology

Black Start Procurement Methodology Issue 1 Revision Black Start Procurement Methodology Produced in accordance with Standard Condition C16 of the National Grid Transmission Licence Effective from 1 st April 2017 to 31 st March 2018 DOCUMENT

More information

Kontakt DW Unser Zeichen Ihr Zeichen Datum Alexandra Gruber 211 AG/Ha 15/

Kontakt DW Unser Zeichen Ihr Zeichen Datum Alexandra Gruber 211 AG/Ha 15/ ENTSO-E Task Force Avenue de Cortenbergh 100 1000 Brussels Belgium Mailto:oliver.john@amprion.net Marta.Mendoza-Villamayor@entsoe.eu Kontakt DW Unser Zeichen Ihr Zeichen Datum Alexandra Gruber 211 AG/Ha

More information

Virtual Reverse Flow: at Interconnection Points. Implementing EU Regulations. Code Modification No. A064. Business Rules. Version 2.

Virtual Reverse Flow: at Interconnection Points. Implementing EU Regulations. Code Modification No. A064. Business Rules. Version 2. Virtual Reverse Flow: at Interconnection Points Implementing EU Regulations Code Modification No. A064 Business Rules 16 th January 2015 Version 2.0 i VERSION CONTROL Version Date Description 1.0 19 th

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents California Independent System Operator Corporation 8. Ancillary Services... 3 8.1 Scope... 3 8.2 Ancillary Services Standards... 4 8.2.1 Determination Of Ancillary Service Standards...

More information

CRE consultation on the creation of a single gas market area

CRE consultation on the creation of a single gas market area CRE consultation on the creation of a single gas market area n EFET response 15 September 2017 The European Federation of Energy Traders (EFET) thanks CRE for the opportunity to react to its proposals

More information

CODE OPERATIONNEL DE RESEAU ACHEMINEMENT

CODE OPERATIONNEL DE RESEAU ACHEMINEMENT CODE OPERATIONNEL DE RESEAU ACHEMINEMENT PART B1.1 METHOD FOR DETERMINING UPSTREAM CAPACITY Disclaimer The present translation is not binding and proposed by GRTgaz exclusively for information purposes.

More information

Clean Energy for all Europeans

Clean Energy for all Europeans Clean Energy for all Europeans EC s Winter Package - 30 November 2016 Users Group Plenary meeting 30 March 2017 Towards an European Energy Union Jean-Claude Juncker President of the European Commission

More information

Consultation document. Redesigning the Austrian gas balancing system

Consultation document. Redesigning the Austrian gas balancing system Consultation document Redesigning the Austrian gas balancing system Energie-Control Austria für die Regulierung der Elektrizitäts- und Erdgaswirtschaft (E-Control) E-Control Rudolfsplatz 13a, A-1010 Vienna

More information

Demand based network tariffs offering a new choice

Demand based network tariffs offering a new choice Version 1.1 30 September 2015 Demand based network tariffs offering a new choice Consultation paper September 2015 Table of Contents 1 Overview... 5 2 Background... 7 3 Purpose... 8 4 Network tariff strategy...

More information

15 January FCR Cooperation Draft Proposal

15 January FCR Cooperation Draft Proposal Proposal for the establishment of common and harmonised rules and processes for the exchange and procurement of Frequency Containment Reserve (FCR) in accordance with Art. 33 of COMMISSION REGULATION (EU)

More information

THE HARMONISED ELECTRICITY MARKET ROLE MODEL

THE HARMONISED ELECTRICITY MARKET ROLE MODEL 1 THE HARMONISED ELECTRICITY MARKET ROLE MODEL ASSOCIATED ORGANISATIONS: APPROVED 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 TABLE OF CONTENTS 1 INTRODUCTION...

More information

Update on the implementation of GR-BG Projects. Angeliki D. Mourtzikou, Head of Oil & Gas Dept. Regulatory Authority for Energy

Update on the implementation of GR-BG Projects. Angeliki D. Mourtzikou, Head of Oil & Gas Dept. Regulatory Authority for Energy Update on the implementation of GR-BG Projects Angeliki D. Mourtzikou, Head of Oil & Gas Dept. Regulatory Authority for Energy Presented at the 30 th Regional Coordination Committee Meeting & 21th Stakeholder

More information

European best practice regarding to the connection to the grid, connection tariffs

European best practice regarding to the connection to the grid, connection tariffs Ad Hoc Expert Facility under the INOGATE project Support to Energy Market Integration and Sustainable Energy in the NIS (SEMISE) European best practice regarding to the connection to the grid, connection

More information

GUIDELINE ON LIBERALIZATION OF ELECTRICITY MARKET IN KOSOVO

GUIDELINE ON LIBERALIZATION OF ELECTRICITY MARKET IN KOSOVO GUIDELINE ON LIBERALIZATION OF ELECTRICITY MARKET IN KOSOVO Pristina, 18 January 2017 Adresa: Rr. Dervish Rozhaja nr. 12, 10000 Prishtinë, Kosovë Tel: 038 247 615 lok.. 101, Fax: 038 247 620, E-mail: info@ero-ks.org,

More information

the Real-Time Market will be based on the system marginal costs produced by the Real-Time

the Real-Time Market will be based on the system marginal costs produced by the Real-Time 17.1 LBMP Calculation The Locational Based Marginal Prices ( LBMPs or prices ) for Suppliers and Loads in the Real-Time Market will be based on the system marginal costs produced by the Real-Time Dispatch

More information

BGE Transmission Tariffs for Gas Year 2003/04

BGE Transmission Tariffs for Gas Year 2003/04 BGE Transmission Tariffs for Gas Year 2003/04 This file details the information used by BGE Transmission in calculating the tariffs for use of the BGE Transmission network from 1st October 2003 to 30th

More information

Proposal for a DIRECTIVE OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL

Proposal for a DIRECTIVE OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL EUROPEAN COMMISSION Brussels, XXX [ ](2017) XXX draft Proposal for a DIRECTIVE OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL amending Directive 2009/73/EC concerning common rules for the internal market

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents 40. Resource Adequacy Demonstration for all SCs in the CAISO BAA... 3 40.1 Applicability... 3 40.1.1 [Not Used]... 3 40.2 Information Requirements for Resource Adequacy Programs... 3

More information

DS3: System Services Review TSO Recommendations

DS3: System Services Review TSO Recommendations DS3: System Services Review TSO Recommendations A Synopsis for the SEM Committee EirGrid and SONI, 2012 Page 1 1. Executive Summary 1.1 Introduction The power system of Ireland and Northern Ireland is

More information

Distribution Code Definitions

Distribution Code Definitions Distribution Code Definitions Version 5 Approved September 2007 Comments to this document can be forwarded to: RSA Grid Code Secretariat Attention: Mr. Bernard Magoro Eskom, Transmission System Operator

More information

Transparency Workshop Brussels, 14 September 2010

Transparency Workshop Brussels, 14 September 2010 Hellenic Natural Gas Transmission System Operator Transparency Workshop Brussels, 14 September 2010 Hellenic Gas Transmission System Operator (DESFA) SA DESFA was established in March 2007 after the completion

More information

REVIEW OF GAZ METRO S COST OF SERVICE AND RATE DESIGN

REVIEW OF GAZ METRO S COST OF SERVICE AND RATE DESIGN Société en commandite Gaz Métro Demande portant sur l'allocation des coûts et la structure tarifaire de Gaz Métro, R-3867-2013 REPORT REVIEW OF GAZ METRO S COST OF SERVICE AND RATE DESIGN BLACK & VEATCH

More information

Demand assessment report for incremental capacity between PEG Nord and ZTPL

Demand assessment report for incremental capacity between PEG Nord and ZTPL Demand assessment report for incremental capacity between PEG Nord and ZTPL 2017-07-27 This report is a joint assessment of the potential for incremental capacity projects conducted by GRTgaz SA 6 rue

More information

Scanpower Limited. Pricing Methodology Disclosure. For Pricing Effective 1 April 2010 to 31 March 2011

Scanpower Limited. Pricing Methodology Disclosure. For Pricing Effective 1 April 2010 to 31 March 2011 Scanpower Limited Pricing Methodology Disclosure For Pricing Effective 1 April 2010 to 31 March 2011 Page 1 of 7 Introduction 1. The purpose of this document is to describe the methodology used by Scanpower

More information

REQUEST FOR AMENDMENT BY ALL REGULATORY AUTHORITIES AGREED AT THE ENERGY REGULATORS FORUM

REQUEST FOR AMENDMENT BY ALL REGULATORY AUTHORITIES AGREED AT THE ENERGY REGULATORS FORUM REQUEST FOR AMENDMENT BY ALL REGULATORY AUTHORITIES AGREED AT THE ENERGY REGULATORS FORUM ON THE ALL TSO PROPOSAL FOR COMMON GRID MODEL METHODOLOGY (CGMM) 13 December 2016 1 I. Introduction and legal context

More information

SCHEDULE 12 Transmission Enhancement Charges. Establishment of Transmission Enhancement Charges.

SCHEDULE 12 Transmission Enhancement Charges. Establishment of Transmission Enhancement Charges. SCHEDULE 12 Transmission Enhancement Charges (a) Establishment of Transmission Enhancement Charges. (i) Establishment of Transmission Enhancement Charges by Transmission Owners and Entities That Will Become

More information

Network codes workshop

Network codes workshop 4 October 2017 ENTSOG capacity model 2017 Network codes workshop Jan Vitovský Subject Manager, Capacity, ENTSOG Capacity according to Art. 21 CAM NC 1. As from 1 January 2018, transmission system operators

More information

COMMISSION STAFF WORKING DOCUMENT

COMMISSION STAFF WORKING DOCUMENT EUROPEAN COMMISSION Brussels, 8.11.2017 SWD(2017) 368 final COMMISSION STAFF WORKING DOCUMENT Assessing the amendments to Directive 2009/73/EC setting out rules for gas pipelines connecting the European

More information

Gas Infrastructure Development in CEE: building basis for a major shift in energy-mix

Gas Infrastructure Development in CEE: building basis for a major shift in energy-mix Gas Infrastructure Development in CEE: building basis for a major shift in energy-mix Brussels, 23 rd of April 2012 Jan CHADAM, President of the Management Board GAZ-SYSTEM S.A. GAZ-SYSTEM Facts&Figures

More information

AB AMBER GRID RULES FOR ACCESS TO THE NATURAL GAS TRANSMISSION SYSTEM

AB AMBER GRID RULES FOR ACCESS TO THE NATURAL GAS TRANSMISSION SYSTEM TRANSMISSION SYSTEM OPERATOR AB AMBER GRID AB AMBER GRID RULES FOR ACCESS TO THE NATURAL GAS TRANSMISSION SYSTEM Version 3.0 Vilnius, 2015 TABLE OF CONTENTS 1. GENERAL PROVISIONS... 3 2. DEFINITIONS AND

More information

Improving the way we price our network services. Consultation paper

Improving the way we price our network services. Consultation paper Improving the way we price our network services Consultation paper October 2015 Table of Contents 1 Overview... 4 2 Background... 6 3 Purpose... 7 4 Network tariff strategy... 7 4.1 Network tariff reform

More information

Part I PRELIMINARY. Part II MARKET DEFINITION ASSESSING SIGNIFICANT MARKET POWER. Part IV IMPOSITION OF OBLIGATIONS UNDER THE REGULATORY FRAMEWORK

Part I PRELIMINARY. Part II MARKET DEFINITION ASSESSING SIGNIFICANT MARKET POWER. Part IV IMPOSITION OF OBLIGATIONS UNDER THE REGULATORY FRAMEWORK 201[ ] ELECTRONIC COMMUNICATIONS (GUIDELINES ON MARKET ANALYSIS AND THE ASSESSMENT OF SIGNIFICANT MARKET POWER FOR NETWORKS AND SERVICES) (ARRANGEMENT OF GUIDELINES) Table of Contents 1. [Short Title]

More information

Object: Re: Centrica Storage Limited s response to National Grid Informal Consultation on Exit Capacity Substitution and Revision

Object: Re: Centrica Storage Limited s response to National Grid Informal Consultation on Exit Capacity Substitution and Revision 04 August 2010 Lesley Ramsey National Grid Transmission Commercial NG House Warwick Technology Park Gallows Hill Warwick CV34 6DA Venture House 42-54 London Road Staines Middlesex TW18 4HF Telephone +44

More information

27 October Allegato A

27 October Allegato A All TSOs proposal for the day-ahead firmness deadline (DAFD) in accordance with Article 69 of the Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and

More information

FLORENCE SCHOOL OF REGULATION

FLORENCE SCHOOL OF REGULATION ISSN 1977-3919 FLORENCE SCHOOL OF REGULATION Issue 2013/07 November 2013 The Gas Target Model in Central Europe: a Study of the V4 Region Authors: Sergio Ascari 1 POLICY BRIEF Highlights Due to the small

More information

Pricing Mechanisms Development in the East Asian Gas Market

Pricing Mechanisms Development in the East Asian Gas Market Pricing Mechanisms Development in the East Asian Gas Market Irina Mironova, Energy Research Institute of the Russian Academy of Sciences, Russian Federation Abstract The balance in international politics

More information

COMMISSION STAFF WORKING PAPER

COMMISSION STAFF WORKING PAPER EN EN EN EUROPEAN COMMISSION Brussels, 22 January 2010 COMMISSION STAFF WORKING PAPER INTERPRETATIVE NOTE ON DIRECTIVE 2009/72/EC CONCERNING COMMON RULES FOR THE INTERNAL MARKET IN ELECTRICITY AND DIRECTIVE

More information

Federal Network Agency for Electricity, Gas, Telecommunications, Post and Railway Ruling Chamber 7 Tulpenfeld Bonn

Federal Network Agency for Electricity, Gas, Telecommunications, Post and Railway Ruling Chamber 7 Tulpenfeld Bonn Federal Network Agency for Electricity, Gas, Telecommunications, Post and Railway Ruling Chamber 7 Tulpenfeld 4 53113 Bonn Consultation documents: Application for use of a reservation quotas at the Vierow

More information

Deliverable 2: Procedural guidelines as a recommendation to the national competent authorities

Deliverable 2: Procedural guidelines as a recommendation to the national competent authorities Deliverable 2: Procedural guidelines as a recommendation to the national competent authorities Content Introduction... 2 Procedural Guidelines... 2 1. Scope of recommended procedural guidelines... 3 2.

More information

Delegations will find in Annex the above, as it resulted from the informal trilogue meeting on 27 November 2012.

Delegations will find in Annex the above, as it resulted from the informal trilogue meeting on 27 November 2012. COUNCIL OF THE EUROPEAN UNION Interinstitutional File: 2011/0300 (COD) Brussels, 28 November 2012 DRAFT 14:30 16563/12 LIMITE ENER 485 CADREFIN 478 CODEC 2756 NOTE from: General Secretariat of the Council

More information

Vattenfall response to: ACER pre-consultation Energy Regulation: a bridge to 2025

Vattenfall response to: ACER pre-consultation Energy Regulation: a bridge to 2025 Vattenfall AB Identification number in the EC register: 12955024114-93 Vattenfall European Affairs Rue de la Loi, 223 1040 Brussels Vattenfall response to: ACER pre-consultation Energy Regulation: a bridge

More information

South African Distribution Code

South African Distribution Code South African Distribution Code Tariff Code Version 6.0 July 2014 This document is approved by the National Energy Regulator of South Africa (NERSA) Issued by: RSA Grid Code Secretariat Contact: Mr. Bernard

More information

Methodology for calculating subsidies to renewables

Methodology for calculating subsidies to renewables 1 Introduction Each of the World Energy Outlook scenarios envisages growth in the use of renewable energy sources over the Outlook period. World Energy Outlook 2012 includes estimates of the subsidies

More information

TEMPORARY GRID RECONFIGURATIONS NET BENEFIT TEST METHODOLOGY

TEMPORARY GRID RECONFIGURATIONS NET BENEFIT TEST METHODOLOGY TEMPORARY GRID RECONFIGURATIONS NET BENEFIT TEST METHODOLOGY 1 1. Summary When one part of the grid is facing security of supply risk where local generation in one region of the grid is not enough for

More information

Energy Regulation: A Bridge to 2025 Conclusions Paper September 2014

Energy Regulation: A Bridge to 2025 Conclusions Paper September 2014 Energy Regulation: A Bridge to 2025 Conclusions Paper 1 19 September 2014 Recommendation of the Agency on the regulatory response to the future challenges emerging from developments in the internal energy

More information

3. RELATIONSHIP BETWEEN ISO AND PARTICIPATING TOs. Each Participating TO shall enter into a Transmission Control Agreement with the

3. RELATIONSHIP BETWEEN ISO AND PARTICIPATING TOs. Each Participating TO shall enter into a Transmission Control Agreement with the FERC ELECTRIC TARIFF First Revised Sheet No. 121 ORIGINAL VOLUME NO. I Replacing Original Sheet No. 121 3. RELATIONSHIP BETWEEN ISO AND PARTICIPATING TOs. 3.1 Nature of Relationship. Each Participating

More information

EU energy policy: gas Prepared by Prof. Vidmantas Jankauskas

EU energy policy: gas Prepared by Prof. Vidmantas Jankauskas EU energy policy: gas Prepared by Prof. Vidmantas Jankauskas www. erranet.org Agenda 1. Rationale for restructuring and liberalisation 2. Different market models 3. Gas market liberalisation in the EU

More information

EFET proposed amendments to draft instruments within the Clean Energy Package VARIOUS THEMES

EFET proposed amendments to draft instruments within the Clean Energy Package VARIOUS THEMES EFET proposed amendments to draft instruments within the Clean Energy Package VARIOUS THEMES n DRAFT - 6 June 2017 The amendments below are a compilation of the various themes not tackled in our dedicated

More information

EUGINE CONTRIBUTION TO THE EC PUBLIC CONSULTATION ON ELECTRICITY MARKET DESIGN

EUGINE CONTRIBUTION TO THE EC PUBLIC CONSULTATION ON ELECTRICITY MARKET DESIGN EUGINE Diamant Building, Boulevard A. Reyers 80 1030 Brussels Belgium Contact Phone Fax E-mail Date Gaëtan Claeys (+32 2) 7 06 82 97 (+32 2) 7 06 82 10 gaetan.claeys@eugine.eu 6 October 2015 EUGINE CONTRIBUTION

More information

Market-Based Investment Procedures for Gas Infrastructure: Issues and Approaches

Market-Based Investment Procedures for Gas Infrastructure: Issues and Approaches Market-Based Investment Procedures for Gas Infrastructure: Issues and Approaches Public Consultation Ref: C12-GWG-87-03a 3-December-2012 Council of European Energy Regulators ASBL 28 rue le Titien, 1000

More information

Technical Bulletin Comparison of Lossy versus Lossless Shift Factors in the ISO Market Optimizations

Technical Bulletin Comparison of Lossy versus Lossless Shift Factors in the ISO Market Optimizations Technical Bulletin 2009-06-03 Comparison of Lossy versus Lossless Shift Factors in the ISO Market Optimizations June 15, 2009 Comparison of Lossy versus Lossless Shift Factors in the ISO Market Optimizations

More information

Successful International B2B Pricing for Manufacturers of Consumer Goods

Successful International B2B Pricing for Manufacturers of Consumer Goods Successful International B2B Pricing for Manufacturers of Consumer Goods Cluster criteria: Geographical proximity Legal barriers/free trade agreements Similarity in culture/local preferences Same currency

More information

Proposal for a common set of requirements used for the continuous trading matching algorithm

Proposal for a common set of requirements used for the continuous trading matching algorithm Proposal for a common set of requirements used for the continuous trading matching algorithm 13 November 2017 1. Background 1. This document is a common proposal developed by all Transmission System Operators

More information

LAW AND POLICY OF EU NATURAL GAS MARKETS STATE OF PLAY AND FUTURE TRENDS

LAW AND POLICY OF EU NATURAL GAS MARKETS STATE OF PLAY AND FUTURE TRENDS LAW AND POLICY OF EU NATURAL GAS MARKETS STATE OF PLAY AND FUTURE TRENDS Energy Week, Vaasa, Finland, 16.03.2016 Ioanna Mersinia, Attorney in Law (LL.M.) Contents EU Energy Law / 3 rd Energy Package (2009):

More information

Synergies between Gas and Electricity Networks and Markets

Synergies between Gas and Electricity Networks and Markets ENERGY Synergies between Gas and Electricity Networks and Markets Christian Hewicker iiesi European Workshop 2014 Copenhagen, 28 May 2014 1 DNV GL 2014 28 May 2014 SAFER, SMARTER, GREENER Impact of Power

More information

Con Ed/PSEG Wheel Replacement Proposal A joint white paper from the New York Independent System Operator and PJM Interconnection

Con Ed/PSEG Wheel Replacement Proposal A joint white paper from the New York Independent System Operator and PJM Interconnection Con Ed/PSEG Wheel Replacement Proposal A joint white paper from the New York Independent System Operator and PJM Interconnection DRAFT For Discussion Purposes Only V 4.0 December 19, 2016 Table of Contents

More information

EXPERIENCE OF THIRD PARTY ACCESS TO GAS DISTRIBUTION NETWORKS IN FRANCE

EXPERIENCE OF THIRD PARTY ACCESS TO GAS DISTRIBUTION NETWORKS IN FRANCE EXPERIENCE OF THIRD PARTY ACCESS TO GAS DISTRIBUTION NETWORKS IN FRANCE 0 Table of Contents Table of Contents... 1 Background... 2 Aim... 3 Methods... 3 1. Conditions of access to natural gas distribution

More information

Partial Private Circuits Charge Control

Partial Private Circuits Charge Control Consultation document Date of publication: 24 June 2004 The deadline for comments is 30 July 2004 Contents Section Page Summary 1 1 Introduction 5 2 Rationale for charge control 11 3 Construction of baskets

More information

Principles of implementation and best practice regarding the application of Retail Minus pricing methodologies IRG (05) 39

Principles of implementation and best practice regarding the application of Retail Minus pricing methodologies IRG (05) 39 Principles of implementation and best practice regarding the application of Retail Minus pricing methodologies IRG (05) 39 IRG PUBLIC CONSULTATION DOCUMENT Principles of Implementation and Best Practice

More information

Slovenia. Key issues. General overview

Slovenia. Key issues. General overview Slovenia Key issues Further strengthening of the power grid is needed to ensure the reliable and safe operation of the national electricity system. Planned investments in additional cross-border capacity

More information

Objective, transparent and regulated grid access tariffs

Objective, transparent and regulated grid access tariffs Access Objective, transparent and regulated grid access tariffs Elia s grid access package offers operation and development of the grid infrastructure, operation of the electric system, compensation of

More information

Study prepared for Nkom. Principles for margin squeeze tests for fibre access in Market 4 and 5

Study prepared for Nkom. Principles for margin squeeze tests for fibre access in Market 4 and 5 Study prepared for Nkom Principles for margin squeeze tests for fibre access in Market 4 and 5 Bad Honnef, 9 February 2015 Principles for margin squeeze tests for fibre access in Market 4 and 5 I Contents

More information

Two Years of TPA in Italy: Snam Rete Gas experience. Deux années de accés tiers au réseau de transport en Italie: l expérience de Snam Rete Gas

Two Years of TPA in Italy: Snam Rete Gas experience. Deux années de accés tiers au réseau de transport en Italie: l expérience de Snam Rete Gas Two Years of TPA in Italy: Snam Rete Gas experience Deux années de accés tiers au réseau de transport en Italie: l expérience de Snam Rete Gas Carlo Malacarne Managing Director Operations - Snam Rete Gas

More information

ACER/CEER Annual Report on the Results of Monitoring the Internal Electricity and Gas Markets in Summary

ACER/CEER Annual Report on the Results of Monitoring the Internal Electricity and Gas Markets in Summary ACER/CEER Annual Report on the Results of Monitoring the Internal Electricity and Gas Markets in 216 Summary October 217 The support of the Energy Community Secretariat in coordinating the collection and

More information

- An overview - Karsten Bourwieg Federal Network Agency. Bonn

- An overview - Karsten Bourwieg Federal Network Agency. Bonn The Federal Network Agency - An overview - Karsten Bourwieg Federal Network Agency Friday, June 1, 2007 Bonn AGENDA History Organization structure Responsibilities Core activities Cooperation with national

More information

2. Market Operations Overview

2. Market Operations Overview 2. Market Operations Overview 2.5 Market Information This section summarizes and describes the common information that is used by the Day-Ahead and Real-Time processes. 2.5.1 Resource Static Data Static

More information

Section 5: Network Integration Transmission Service Accounting. 5.1 Network Integration Transmission Service Accounting Overview

Section 5: Network Integration Transmission Service Accounting. 5.1 Network Integration Transmission Service Accounting Overview Section 5: Network Integration Transmission Service Accounting Welcome to the Network Integration Transmission Service Accounting section of the PJM Manual for Open Access Transmission Tariff Accounting.

More information

TENP JOINT INFORMATION MEMORANDUM FOR THE DEVELOPMENT OF SOUTH-NORTH GAS TRANSMISSION CAPACITY FROM ITALY TO GERMANY AND BELGIUM THROUGH SWITZERLAND

TENP JOINT INFORMATION MEMORANDUM FOR THE DEVELOPMENT OF SOUTH-NORTH GAS TRANSMISSION CAPACITY FROM ITALY TO GERMANY AND BELGIUM THROUGH SWITZERLAND TENP In association with BE JOINT INFORMATION MEMORANDUM FOR THE DEVELOPMENT OF SOUTH-NORTH GAS TRANSMISSION CAPACITY FROM ITALY TO GERMANY AND BELGIUM THROUGH SWITZERLAND Contents 1. Executive summary

More information

EUROPEAN COMMISSION. Comments pursuant to Article 7(3) of Directive 2002/21/EC

EUROPEAN COMMISSION. Comments pursuant to Article 7(3) of Directive 2002/21/EC EUROPEAN COMMISSION Brussels, 14/12/2012 C(2012) 9778 Γραφείο Επιτρόπου Ρυθµίσεως Ηλεκτρονικών Επικοινωνιών Και Ταχυδροµείων (OCECPR) Helioupoleos 12 1101 Λευκωσία Cyprus For the attention of: Dr Polis

More information

The Internal Energy Market

The Internal Energy Market The Internal Energy Market A Eurogas Position Paper January 2013 Eurogas is the association representing the European gas wholesale, retail and distribution sector. Founded in 1990, its members are some

More information

I-SEM Testing Tariff High Level Options Consultation

I-SEM Testing Tariff High Level Options Consultation I-SEM Testing Tariff High Level Options Consultation 02 June 2017 Version 1.0 EXECUTIVE SUMMARY Testing Tariffs are currently applied to Units Under Test (UUT) in the Single Electricity Market (SEM) on

More information

Rate Design and Resource Planning

Rate Design and Resource Planning Rate Design and Resource Planning Rate Considerations and Resource Planning Decisions El Paso Electric Company New Mexico Public Advisory Group Meeting December 11, 2014 Rates and Resource Planning The

More information

Methodology for deriving delivery prices

Methodology for deriving delivery prices Methodology for deriving delivery prices For prices applying from 1 April 2018 Issued xx February 2018 DRAFT Please note that this document has not yet been certified by Orion s directors A certified version

More information

Local Market Power Mitigation Enhancements

Local Market Power Mitigation Enhancements Local Market Power Mitigation Enhancements Draft Final Proposal May 6, 2011 CAISO/M&ID/CRH May 6, 2011 page 1 Draft Final Proposal Local Market Power Mitigation Enhancements Table of Contents 1. Introduction...

More information

PHYSICAL BALANCING...

PHYSICAL BALANCING... BALANCING 1) INTRODUCTION... 2 1.1) METHODS FOR DETERMINING THE ESTIMATIONS TO BE PUBLISHED... 6 1.1.1) Other information concerning injection and re-delivery flows... 8 1.2) COMMUNICATION OF INFORMATION

More information

CBI Response to BEIS Call for Evidence

CBI Response to BEIS Call for Evidence CBI Response to BEIS Call for Evidence Smart, Flexible Power System The CBI welcomes the opportunity to respond to the BEIS Call for Evidence on A Smart, Flexible Energy System. Across the UK, the CBI

More information