1 DOCUMENT INFORMATION / RECORDS CONTROL 7.5 P-4.2, rev 1 WHAT INFORMATION DO YOU USE TO DO YOUR JOB? Make a copy of the master list to check off as you go or save them up to check at one time or your documents may be readily available online and therefore no list is used, ie. Controlled information. WI 7.5 (line 28 and 61) Inspection p/n 439, form 1, rev 1 not online, obsolete after you verify (line 29) Current Lead Time sheet (line 16) P-4.2, NOTE: THIS COULD BE DOCUMENT CONTROL OR 8.1 PRODUCTION PLANNING OR 8.2 CONTRACT REVIEW, BUT YOU ARE AUDITING PRODUCTION. I WOULD TEND TO PUT IT UNDER DOCUMENT CONTROL, IE. ELECTRONIC CONTROL ON THE SERVER. ASSESS IF ALL THE INFORMATION NEEDED TO DO JOB IS AVAILABLE. CONSIDER HOW FORMAL ON-THE-JOB TRAINING IS VERSUS TRAINING FROM DOCUMENTED WORK INSTRUCTIONS. ARE THEIR ANY NEGATIVE TRENDS THAT WOULD INDICATE CURRENT METHODS NEED IMPROVEMENT? Production work instruction does exist and appears to be adequate. ASSESS HOW THIS IS CONTROLLED, HOW OFTEN DOES IT CHANGE AND IS THERE A CHANCE THAT IT WOULD BE CHANGED NOT GET UPDATED? Operators do not use the Lead Time Sheet but Production provides the information to be distributed. Los like it has been updated at least 3-4 times so far this year. Information to be controlled. IDENTIFY RECORDS THAT ARE AN OUTPUT FROM THIS PROCESS. HOW LONG ARE THEY TO BE KEPT (RECORD RETENTION SCHEDULE)? Make a copy of the list to check off as you go or save them up to check at one time or records may be completely electronic and then it is managed by Information Technology. Inspection records current year plus 1 Calibration records 3 years ASSESS IF THERE WERE ANY PROCESS CHANGES THAT WOULD HAVE CHANGED THE RECORDS. ANY NEW RECORDS OR OBSOLETE RECORDS? None at this time. 1 -see above
2 LEADERSHIP AND COMMITMENT 5.2/7.3 P-5.1, HOW HAS THE QUALITY POLICY BEEN COMMUNICATED? Sam was aware of policy and training records observed. (line 28). IF CONTRACTORS ARE WORKING ON-SITE IS IT AVAILABLE TO THEM? Maintenance uses contractors for planned outages. (line 84) ASSESS THE EVIDENCE OF TRAINING RECORDS. CONSIDER THE FEASIBIITY AND CONSEQUENCES OF CONTRACTORS TRAINING RECORDS. These contractors will need some training such as safety and environmental training if bringing any chemicals on-site. You can do the training onsite and maintain records, or contractually require the subcontractor to perform the training and they maintain the records. Records would be available upon request. They are performing maintenance activities so wouldn t require any quality policy and objectives training. 5.1/6.2/7.3 P-5.1, WHAT ARE THE RELEVANT QUALITY OBJECTIVES FOR THIS PROCESS? On-time delivery Claims < 1% sales Downtime 5% 5.1/7.3 ASSESS THE EVIDENCE THAT INDIVIDUALS HAVE BEEN MADE AWARE OF THESE OBJECTIVES AND THEIR PERFORMANCE. ARE THEY AVAILABLE TO CONTRACTORS? Operator said objectives were posted in lunch room (line 59) COMPARE THE GOAL VERSUS CURRENT PERFORMANCE. IF GOAL IS NOT BEING MET, HAS A DOCUMENTED ACTION PLAN BEEN INITIATED? On-time delivery - no Claims < 1% c/a issued (line 23) Downtime - yes WHAT KIND OF PROGRESS HAS BEEN MADE TOWARDS ACHIEVING THIS PLAN? On-time delivery action plan was not documented (line 9) 2
3 5.1.2 P-5.1, EVIDENCE OF CUSTOMER FOCUS? Customer requirements are well known by employees. ASSESS COMMUNICATION OF CUSTOMER PERFORMANCE, INCLUDING ANY COMPLAINTS. The Operator you spe to was aware of the 439 p/n complaint. Check the lunch room which was said to have the Quality Policy posted. It may have management objectives posted and customer feedback regularly posted. Make more inquiries to other employees if they ever lo at the board. 5.3 P-5.1, HOW HAVE RESPONSIBILITES AND AUTHORITIES ASSIGNED? Work instruction WI 7.5 denotes responsibilities. ARE THERE ANY CHANGES, IF SO HAVE THEY BEEN REFLECTED IN DOCUMENTATION? None observed RESOURCES 7.2 P-6.2, HOW DO YOU QUALIFY PERSONNEL (DIRECT OR CONTRACT EMPLOYEES)? 7.2 d) A training matrix is used to train on the required work instructions. (line 73) Nonconformities are tracked by employee for competency. (line 75) Quality performs monthly process audits but Mike does not receive results. (line 76) ASSESS TRAINING RECORDS AND VERIFY ANY NEW EMPLOYEES OR EMPLOYEES THAT HAVE CHANGED POSITION Mike Spencer Sam Lesniak (you loed it up) (line 52) Jim Anderson / obs 3
4 WORKING ENVIRONMENT observe ASSESS THE WORK AREA AND ITS CONDITION FOR BEING CONDUCIVE TO PRODUCING/CONDUCTING CONFORMING PRODUCT OR SERVICE, ie. Physical factors - Lighting, hygiene, noise Housekeeping was good. Lighting was adequate for inspection. Equipment guards were in place and Operators wearing PPE. IMPROVEMENT/CORRECTIVE ACTIONS 9.2.2/10.2 P-8.5, P-8.5, P-8.5, 10.3 P-8.5, WI 7.5 VERIFY PREVIOUS INTERNAL AUDIT NONCONFORMANCES. ASSESS ACTIONS TAKEN AND THEIR EFFECTIVENESS. None at this time, first audit. VERIFY ANY OPEN AND/OR CLOSED CUSTOMER COMPLAINTS. ASSESS ACTIONS TAKEN AND THEIR EFFECTIVENESS. 439 corrective action verified at production line and operators are aware of complaint. (line 38) New tooling work order for 439 (line 26) VERIFY ANY INTERNAL CORRECTIVE ACTIONS, IF ANY? ASSESS ACTIONS TAKEN AND THEIR EFFECTIVENESS. Could review the corrective action log and sample implementation, but only verified for on-time delivery but no internal corrective action issued. VERIFY ANY CONTINUAL IMPROVEMENT PROJECTS. ASSESS THEIR PROGRESS. Did not audit Production WORK INSTRUCTION BEING FOLLOWED? You can create more detailed questions or use a copy of the work instruction as your checklist and to take notes. Paperwork completed as required See dna f) WI 7.5 DOES THIS PROCESS INVOLVE ANY PRODUCT CHARACTERISTICS THAT CANNOT BE VERIFIED, SUCH AS WELDING OR HEAT TREATING? Typically this has already been established but wanted to provide meaning. None at this time. N/A 4
5 8.5.2 WI 7.5 PRODUCT IDENTITY MAINTAINED AT THE WORKSTATION? You can create more detailed questions or use a copy of the work instruction as your checklist and to take notes. Yes, router is signed off and parts identified. RAW MATERIAL/COMPONENT LOT NUMBERS MAINTAINED AT THE WORKSTATION, IF REQUIRED? Not required as per the work instruction. N/A WI 7.5 DOES THIS PROCESS INVOLVE ANY CUSTOMER SUPPLIED PRODUCT, IE. CONTAINERS, COMPONENTS? IF SO HOW IS IT CONTROLLED? Typically this has already been established but wanted to provide meaning. None at this time. N/A DOES THIS PROCESS INVOLVE ANY EXTERNAL PROVIDER S PRODUCT, IE. CONSIGNMENT COMPONENTS? IF SO HOW IS IT CONTROLLED? None at this time WI 7.5 ARE THERE ANY PACKAGING REQUIREMENTS AT THIS WORK STATION AND ARE THEY BEING FOLLOWED? You can create more detailed questions or use a copy of the work instruction as your checklist and to take notes. Observed operator placing parts into in-process basket as required by the work instruction. No other special requirements. 8.6 WI-7.5, Form 1 PARTS INSPECTED ACCORDING TO CUSTOMER REQUIREMENTS? You can create more detailed questions or use a copy of the work instruction as your checklist and to take notes. Yes, p/n 439, 100% at this time (line 36) 8.7 WI 7.5 WHAT DO YOU DO WHEN NONCONFORMING PRODUCT IS FOUND? Sam said he would stop the press and notify his Supervisor. He would put a red tag on completed product baskets. (line 49) 5
6 Calibration / WI 7.6, Rev 7 INSPECTION EQUIPMENT CALIBRATED? Micrometer #101 calibration sticker (line 38) # finding 7.1.6/ 7.5 WI-7.1, Rev 3 A 3-decimal place micrometer would not be capable of measuring a tolerance of.001. You can verify with a capability study. Also, equipment should be calibrated to 1/10 of its tightest tolerance, therefore a 4-decimal place micrometer is needed. extra credit!! ARE QUALITY PLANNING DOCUMENTS (OUTPUT) DONE ACCORDING TO CUSTOMER REQUIREMENTS? You can create more detailed questions or use a copy of the work instruction as your checklist and to take notes. Yes, p/n 545 rev WI-7.1, Rev 3 ARE PART CHANGES ADEQUATELY REVIEWED ACCORDING TO PROCEDURES? Material Spec change reviewed, or could note here from 7.5 6
Key Process Audit Checklist Record answers and notes on blank turtle diagrams or audit checklist or note page
What machines, equipment, software, and materials are used to do this process? Are there adequate resources? Is the equipment maintained and supported? Are there gauges that require calibration? What Inputs
More informationSUPPLIER QUALITY SYSTEM SURVEY
SUPPLIER QUALITY SYSTEM SURVEY DATE (M/d/yy): 55 Dragon Court Woburn, MA 01801 Tel: (781) 933-7300 Fax: (781) 935-4529 GENERAL INFORMATION Supplier Name: Physical Address: City: State: Zip: Sr. Company
More informationDesk Audit of. Based on Federal Transit Administration (FTA) Quality Assurance and Quality Control Guidelines FTA-IT
Desk Audit of Based on Federal Transit Administration (FTA) Quality Assurance and Quality Control Guidelines FTA-IT-90-5001-02.1 Reviewed by: Element Requirements Applicable 1. Is a quality policy defined
More informationPRECISION SENSORS QUALITY ASSURANCE MANUAL THIS DOCUMENT IS CONTROLLED ONLY IF COPY IS STAMPED CONTROLLED IN RED INK
SAE AS9100 DOCUMENT PRECISION SENSORS QUALITY ASSURANCE MANUAL THIS DOCUMENT IS CONTROLLED ONLY IF COPY IS STAMPED CONTROLLED IN RED INK REV. 005 10/27/10 Page 2 Page 4 Page 5 Page 6 Page 7 Page 8 Page
More informationVendor Qualification Survey
1200 West 96 th St Minneapolis, MN 55431 Ph: 952-888-7900 Fax: 952-888-2719 Vendor Qualification Survey Vendor Information Company Name: Date: Address: City: Phone Number: email address: Product or Service
More informationPOLICY MANUAL FOR ISO 9001:2008. Document: PM-9001:2008 Date: April 7, Uncontrolled Copy
POLICY MANUAL FOR ISO 9001:2008 Document: PM-9001:2008 Date: April 7, 2015 REVIEWED BY: Tim Powers DATE: 4-7-2015 APPROVED BY: C._Bickford Uncontrolled Copy DATE: 4-7-2015 1.0 GENERAL ISS: 1 REV: E Page:
More informationANCHOR ISO9001:2008 RPR-004 MARINE SERVICES REQUIRED PROCEDURE NON-CONFORMING PRODUCTS
CONTROL OF NON-CONFORMING PRODUCTS (8.3) Document Control Revision History PAGE REASON FOR CHANGE REV. REVIEWER / AUTHORISED BY: ALL ALL RELEASE DATE: Revision Approval: J.BENTINK Signature: Date: 20/02/17
More informationPikes Peak Test Labs, Inc Edison Avenue Colorado Springs, Colorado QUALITY ASSURANCE MANUAL
, Inc. 4750 Edison Avenue Colorado Springs, Colorado 80915 QUALITY ASSURANCE MANUAL , Inc. QUALITY ASSURANCE MANUAL QAM Revision Q March 9, 2016 Originated By: L. Blondin Approved By: Title: Date: Red
More informationBS EN ISO 9001 QUALITY ASSURANCE MANUAL
PAC PRICE ARTHUR CONSULTANCY BS EN ISO 9001 QUALITY ASSURANCE MANUAL COPY NO: 025 ISSUE: 4 QUALITY ASSURANCE MANUAL BS EN ISO 9001 CONTENTS PAC Price Arthur Consultancy - Building Services Consulting Engineers
More informationHACCP audit checklist
Requirement HACCP audit checklist Prerequisite Program Management Commitment 1. Senior management ensures that the responsibilities and authorities are defined and communicated within the company Internal
More informationMachined Integrations, LLC
QUALITY MANUAL Machined Integrations, LLC ISO9001: 2008 Electronically Controlled by Quality Representative, Rev2, January 2014 Page 2 of 25 TABLE OF CONTENTS SECTION ELEMENT PAGE No A Revision and Approval
More information9001:2015. Quality Manual 9001:2015. Engineering Value through Quality and Innovation.
Quality Manual 9001:2015 9001:2015 Suburban Manufacturing, Inc. encourages comments from customers, suppliers, employees and friends in order to improve our business and its performance. Information contained
More informationSUPPLIER QUALITY ASSESSMENT
Supplier Organization Name: Supplier Number: Street Address: Date of This Audit: City, State, Zip Code: Date of Last Audit: Country: of Employees: Main Phone Number: of Buildings/Size: Fax Number: Principal
More informationQuality Management System Manual
This Page 1 of 47 of the Quality Management System Manual If issued as a controlled copy, the serial number of this copy is Quality Management System Manual Certified to AS9100 Revision C Printed copies
More informationWebster - Hoff Corporation. Quality Manual
Registered to ISO 9001:2008 ANSI/ISO/ASQ Q9001-2008 QM-1 Page 2 of 35 TABLE OF CONTENTS Section Name Page Management Approval Of / List of Exclusions 3 Corporate Quality Policy 4 Webster-Hoff Corporation,
More informationQuality Systems Basics
Quality Systems Basics This presentation was developed by Allison Transmission Global Purchasing. All rights reserved. No part of this material may be reproduced in any form, or by any method, for any
More informationFDA 21 CFR Part 820 vs. ISO 13485:2016 Comparison Table created by greenlight.guru
FDA 21 CFR Part 820 vs. ISO 13485:2016 Comparison Table created by greenlight.guru FDA QSR (21 CFR Part 820) ISO 13485:2016 820.1 Scope 1 Scope 2 Normative References 820.3 Definitions 3 Terms and Definitions
More informationQuality Assurance Manual, Revision F Page 1 of 20
Quality Assurance Manual, Revision F Page 1 of 20 AUTOMATION TECHNOLOGY QUALITY ASSURANCE MANUAL Prepared By: Joseph Pollard Date: 7/6/2015 Quality Assurance Manager Quality Management System Representative
More informationCertification program "Quality Mark TMT" Checklist initial surveillance inspection
Certification program "Quality Mark TMT" Checklist initial surveillance inspection Name and site of factory Date of inspection Inspection performed by (name, company) present factory representatives Person
More informationStanley Industries, Inc. ISO 9001:2008 Quality Policy Manual
Stanley ISO 9001:2008 Table of Contents and STANLEY Document Reference Related STANLEY Section Page Procedure(s) 1. Introduction 1 None 2. Scope 1 None 3. Organizational Structure & 1 STANLEY Company History
More informationASA-100 QUALITY MANUAL
ASA-100 QUALITY MANUAL Origination Date: XXXX Document Identifier: Date: Document Revision: Latest Revision Date Abstract: This quality manual describes (your Company's) quality management system policies
More informationISO 9001 QUALITY MANUAL
ISO 9001 QUALITY MANUAL Origination Date: 10/01/14 Document Identifier: AIF quality control manual Date: 10/01/14 Project: Customer review Document Status: Released Document Link: www.aeroindfast.com Abstract:
More informationQUALITY MANUAL DISTRIBUTION. Your Logo Here. Page 1 1 of 57. Rev.: A
Page 1 1 of 57 President Design Engineering Production Production Engineering Materials Control Purchasing Service Marketing Sales Contracts Human Resources Quality Assurance Quality Control Production
More informationQuality Manual ISO Cedarburg, Wisconsin Revision: L
Quality Manual ISO 9001-2015 Cedarburg, Wisconsin Revision: L Section: 1 Revision: L Title: Table of Contents Management Rep. Chris Andersen President/CEO Jerry Edquist Effective Date: 10/9/2017 (CHANGES
More informationANCHOR ISO9001:2008 RPR-002 MARINE SERVICES REQUIRED PROCEDURE RECORDS CONTROL
RECORD CONTROL (4.2.4) Document Control Revision History PAGE REASON FOR CHANGE REV. REVIEWER / AUTHORISED BY: ALL ALL RELEASE DATE: Revision Approval: J.BENTINK Signature: Date: 20/02/17 Revision: B UNCONTROLLED
More informationPRINTED COPY IS NOT CONTROLLED
Quality Manual We Deliver Quality on Time Form 1217 (01.16.2018) Rev. 12 SOR Inc. sorinc.com SOR QUALITY MANUAL Page 1 of 18 Table of Contents Quality Manual 8701-001 Revision 12 Introduction....4 1.0
More informationQuality System Manual - Section 00
Quality System Manual - Section 00 INDEX AND REVISION STATUS Issued by: Quality Assurance Eff. Date: 00/00/00 Rev.: A Pg. 1 of 4 Organization of this manual is the same as the sectional organization of
More informationBeaver Machine. Quality Manual
Beaver Machine Quality Manual This manual has been written to the ISO 9001:2000 International Quality Standard Beaver Machine Inc. 5273 Hanson Court Minneapolis, MN 55429 763-535-2204 www.beavermachine.com
More informationQuality Manual. This manual has been written to the ISO 9001:2000 International Quality Standard
Sceptre CNC Machining Inc. Quality Manual This manual has been written to the ISO 9001:2000 International Quality Standard Sceptre CNC Machining Inc. Unit 401 1485 Coast Meridian Road Port Coquitlam, B.C.
More informationRevision. Quality Manual. Multilayer Prototypes. Compliant to ISO / AS9100 Rev C
1 of 29 Quality Manual Multilayer Prototypes Compliant to ISO 9001-2008 / AS9100 Rev C This Quality Manual sets forth the quality system policies and Defines compliance with the ISO 9001-2008 SAE AS 9100
More informationISO 9001:2008 Quality Management System QMS Manual
2501 Kutztown Road Reading, PA, 19605 Tel. 610-929-3330 Fax 610-921-6861 ISO 9001:2008 Quality Management System QMS Manual The information contained in this document is Fidelity Technologies Corporation
More informationQUALITY MANUAL RED CHECK DENOTES THIS IS A CONTROLLED COPY. APPROVED BY: (President) APPROVED BY: (Production Manager) APPROVED BY: (Quality Manager)
PNC, Inc. QUALITY MANUAL, Rev. 6 Date: 11-10-08 Page 1 of 17 QUALITY MANUAL RED CHECK DENOTES THIS IS A CONTROLLED COPY APPROVED BY: (President) APPROVED BY: (Production Manager) APPROVED BY: (Quality
More informationISO 9001: 2000 (December 13, 2000) QUALITY MANAGEMENT SYSTEM DOCUMENTATION OVERVIEW MATRIX
In completing your Documented Quality Management System Review, it is important that the following matrix be completed and returned to us as soon as possible. This will save time during the review and
More informationReliance Aerospace Solutions
Reliance Aerospace Solutions Quality Manual The information contained in this document is the property of Reliance Aerospace Solutions, a division of Reliance Steel & Aluminum Company This manual is a
More informationSAMPLE THIS IS NOT A COMPLETE MANUAL All References have been Updated to Comply with ISO 9001:2008
THE QUALITY MANAGEMENT SYSTEM Insert Your Logo Image Here See Template Revision Instructions SAMPLE THIS IS NOT A COMPLETE MANUAL All References have been Updated to Comply with ISO 9001:2008 Random text
More informationQuality Management System
Quality Management System ZYQ Testing Laboratory 11111 Testing Avenue Testing Town, Alaska 22222 (555) 555-5555 Date Prepared: January 19, 2009 1 Please note that this Quality Management System (QM) was
More informationCQR-1. CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES Revision Date: 6/8/2015
CQR-1 CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES Revision Date: 6/8/2015 SCOPE This document establishes the minimum quality program requirements for a contractor providing equipment, material,
More informationApplication to the Virginia BEST
Application to the Virginia BEST LEVEL I Applicants Submitted to: Associated General Contractors of Virginia Virginia BEST Program 11950 Nuckols Rd. Glen Allen, VA 23059 Attn: Mr. Gordon Dixon Company
More information4-OF AS9102 FAIR Forms and Instructions (SC)
A FAIR package consists of the following required documents: a) Completed AS9102 Forms 1, 2, and 3; or equivalent, b) Material/process certs, c) Performance test results, and d) A design record or balloon
More informationThe Skyworks Quality Management System strives to:
Skyworks has embraced a workplace where Quality is the number one differentiator to achieve Customer Loyalty. Skyworks has adopted a single Quality Management System which drives efficiency, consistency
More informationQMS CO-ORDINATOR & GENERAL PROCEDURES:-
1. QMS CO-ORDINATOR & GENERAL PROCEDURES:- (1) How do you measure effectiveness of system for working of your company? How do you collect necessary information for the same? Are you getting information
More information14620 Henry Road Houston, Texas PH: FX: WEB: QUALITY MANUAL
14620 Henry Road Houston, Texas 77060 PH: 281-447-3980 FX: 281-447-3988 WEB: www.texasinternational.com QUALITY MANUAL ISO 9001:2008 API Spec Q1, 9th Edition API Spec 8C 5 Th Edition MANUAL NUMBER: Electronic
More informationHumantech Environmental Management System Manual
Humantech Management System Version 1.0 March 2014 Humantech, Inc. Humantech Management System Revision No.: 1 Date : 03-10-14 Prepared by: Approved by: (EMR) President Revision History Revision Date Description
More informationISO 9001:2008 and AS9100 Rev. C. Supplier Quality Manual
ISO 9001:2008 and AS9100 Rev. C Supplier Quality Manual ffective Date: Section I Supplier (same as xternal Provider) xpectations 1.0 Introduction 2 of 7 This Supplier Quality Manual (SQM) has been created
More informationPERICOM QUALITY SYSTEM POLICY MANUAL
REV. DCN NO. DATE REVISION HISTORY APPROVED BY DATE -- 0125 11/01/96 Initiate Specification. Ed Mello 01/20/94 A 0294 07/11/94 Completely revise specification, add criteria of ISO-9001. Ed Mello 08/12/94
More informationQuality Assurance Policy and Procedures
650 Montana Ave, Suite A Las Cruces, NM 88001 (575) 522-0430 www.rmgovernmentservices.com Quality Assurance Policy and Procedures PURPOSE. The purpose of this policy is to outline the quality assurance
More informationHACCPEUROPA PUBLICATIONS ISO 22000:2005 FOOD SAFETY QUALITY MANUAL. ISO 22000:2005 Quality Manual
HACCPEUROPA PUBLICATIONS ISO 22000:2005 FOOD SAFETY QUALITY MANUAL ISO 22000:2005 Quality Manual QUALITY MANUAL ISO 22000:2005 Food Safety Management HACCPEuropa Publications 2012 Table of Contents Introduction...
More informationQUALITY MANAGEMENT SYSTEM POLICIES AND PROCEDURES
Your Company Name QUALITY MANAGEMENT SYSTEM POLICIES AND PROCEDURES Origination Date: XXXX Document Identifier: Date: Document Revision: QMS-00 QMS Policies and Procedures Latest Revision Date Abstract:
More informationACCREDITATION OF FITTING MANUFACTURERS
ACCREDITATION OF FITTING MANUFACTURERS TSSA GUIDE FOR REVIEW TEAMS The Technical Standards and Safety Authority Boilers and Pressure Vessels Safety Division 3300 Bloor Street West 14th Floor, Centre Tower
More informationTOOL ENGINEERING OLD GROVE RD. SAN DIEGO, CA
Page 1 of 42 VERTECHS ENTERPRISES, INC. Dba LUCHNER TOOL ENGINEERING 10051 OLD GROVE RD. SAN DIEGO, CA 92131 Ph No. 1-858-578-3900. Fax No. 1-858-578-2910 Reviewed and Approved By: Geosef (Joey) Straza
More informationMANUAL QUALITY CONTROL & QUALITY ASSURANCE
MANUAL QUALITY CONTROL & QUALITY ASSURANCE METROTEC ENGINEERING LLC P.O. BOX: 26045, DUBAI U.A.E TEL : 043889771 FAX:043889772 E Mail: metrotecengg@yahoo.com info@metrotec.ae Web: www.metrotec.ae 2 TABLE
More informationAssociation of American Railroads Quality Assurance System Evaluation (QASE) Checklist Rev. 1/12/2017
Company: Prepared By: Date: Changes from previous version highlighted in yellow. Paragraph Element Objective Evidence 2.1 Objective of Quality Assurance Program 2.2 Applicability and Scope 2.3 QA Program
More informationQUALITY MANAGEMENT SYSTEM Guidelines & Checklist
QUALITY MANAGEMENT SYSTEM Guidelines & Checklist 4 th Edition 2017 DISCLAIMER The information provided in this document is intended as guidance only and should not be taken as definitive or exhaustive.
More informationQuality Manual Revision: C Effective: 03/01/10
TABLE OF CONTENTS DESCRIPTION SECTION PAGE INTRODUCTION 1.0 1 APPROVAL SIGNATURE PAGE 1.1 1 AMENDMENT RECORD 1.2 2 SCOPE 2.0 3 EXCLUSIONS 2.1 3 CORPORATE POLICY 3.0 3 QUALITY MANAGEMENT SYSTEM 4.0 4 GENERAL
More informationA Division of Research Products Corporation
A Division of Research Products Corporation Quality Manual ISO 9001:2008 Table of Contents Page Number Approvals 2 Table of Contents 3 Revision History 4 Distribution List - Controlled Copies 5 Introduction,
More informationAVNET Logistics & EM Americas. Quality Manual
AVNET Logistics & EM Americas Quality Manual Avnet is committed to ensuring customer satisfaction while meeting all customer and applicable legal, statutory and regulatory requirements. This is accomplished
More informationUPGRADE ASSESSMENT CHECKLIST
Checklist Instructions : Prior to auditing each element, the auditor shall review the documentation and mark a 0 in each box where functions /departments are referenced. As each function/department is
More informationBAITY SCREW MACHINE PRODUCTS QUALITY MANUAL
BAITY SCREW MACHINE PRODUCTS QUALITY MANUAL Page 1 of 33 TABLE OF CONTENTS SECTION TITLE PAGE 0 Company Introduction... 4 0 Organizational Chart.. 5 1 Scope.. 6 2 Related Documents... 6 3 Terminology...
More informationSections of the Standard. Evidence / Comments. (Y) / Nonconforming (NC)
Date: Sections of the Standard 4 Context of the Organization 4.1 Understanding the organization and its context 4.2 Understanding the needs and expectations of interested parties 4.3 Determining the scope
More informationQuality System Manual
Quality System Manual IATF VERSION Joe Coatter 12/7/17 President - Joe Coatter Date Bill Gareis ISO/IATF Management Representative - Bill Gareis 12/7/17 Date Revision Status: Revision # 10 (12-7-17) QUA-0003
More informationDocument ID: Revision: Date. Approved:
Document ID: Q&EMSM Standard: ISO 9001 / ISO 14001 Title: Quality and Environmental Management System Manual Approved By: Revision: ED170616 Date Approved: 6/26/17 Quality and Environmental Management
More informationQuality Manual DRAFT. Quality Management Plan Version A1 Date: <22/01/11> Page 1 of 17
Quality Manual DRAFT Page 1 of 17 Document Acceptance and Release Notice This is Revision A1 of the East Coast Designer Builders Quality Manual. The Manual is a managed document. For identification of
More informationSafety Management System (SMS) Guidance Document. Safety Resources
Safety Management System (SMS) Guidance Document 2017 Safety Resources 1 Contents 1. Leadership... 3 2. Hazard Assessment and Management... 4 Introduction... 4 Processes and Procedures... 4 2.1 Review...
More informationQuality Manual. AARD Spring & Stamping Quality Manual
Quality Manual Page 1 of 25 AARD Spring & Stamping QM/5.0 Title: QM 5.0 AARD Spring & Stamping Quality Manual Copy Approval Date: 1/27/2011 Reviewer(s): Sign / Print Title Date Dan Wheeler Document Originator
More information1 General Information Supplier:
1 General Information Supplier: Company Address Street Postal code and City Country Phone Fax Contact Person Function Department E-Mail Quality Management Quality Manager Phone Fax E-Mail The information
More informationFO-5 PR-1, FO-1,2 PR-1 EM-6 PR-1, FE-1, NA-1 FO-10 FO-7, EM-2 EM-2. ISO Environmental Management Systems - Specification Yes.
ISO 14001 Environmental Management Systems - Specification Yes Minor No Comments/Questions 4.1 GENERAL The organization shall establish and maintain an environmental management system, the requirements
More information0. 0 TABLE OF CONTENTS
QUALITY MANUAL Conforming to ISO 9001:2008 0. 0 TABLE OF CONTENTS Section Description ISO 9001 Clause Page 0 TABLE OF CONTENTS n/a 2 1 PIMA VALVE, INC. DESCRIPTION n/a 3 2 QUALITY MANUAL DESCRIPTION 4.2.2
More informationGMP On Site Series. GMP Essentials
GMP On Site Series GMP Essentials GMP Basics Objectives 1. State the critical definitions of the pharmaceutical industry. 2. Describe the law as it applies to various critical functions. 3. State the history
More informationPolywrapper Instruction
Page 1 of 7 1. Purpose and Scope To provide instruction to Machine Operators regarding the proper operation of the inserter machines 2. Definitions Proof Approval Slip (TG 164 rev 5/09 Count Report Job
More informationFEC QUALITY MANUAL. Federal Equipment Company River Rd. Cincinnati, Ohio
QMS-20 2016 FEC QUALITY MANUAL Federal Equipment Company 5298 River Rd Cincinnati, Ohio 45233 www.federalequipment.com www.fecheliports.com www.usdrillhead.com www.orionseals.com www.tkf.com REVISION:
More informationQMS Team: MR and all HODs (Internal Auditors) MR March 10. Quality policy Define quality policy The Steering committee Objectives and targets
QMS Roles, Responsibility and Authority Process Clause Activities Records Required Responsibility Authority Deadline Clause 4: Process Development 4.1 Develop processes and sequence, operation controls
More informationCORPORATE QUALITY MANUAL
Corporate Quality Manual Preface The following Corporate Quality Manual is written within the framework of the ISO 9001:2008 Quality System by the employees of CyberOptics. CyberOptics recognizes the importance
More informationSelf-Evaluation/Audit Checklist for Food Supplement Manufacturers
Self-Evaluation/Audit Checklist for Food Supplement Manufacturers This checklist has been developed by the EHPM quality working group. It combines work carried out by EHPM various national associations
More informationAttachment C Management of the Installation
Table of Contents Attachment C Management of the Installation C1.1 Organisational Chart C1.2 Quality, Safety and Environmental (QSE) Policy Statement C1.3 Roles & Responsibilities of Key Environmental
More informationEVANS CAPACITOR COMPANY
DISTRIBUTION LIST: Location Book # Quality Manager 0001 President 0002 CEO 0003 Engineering Manager 0004 Production Manager 0005 Office Manager 0006 Page 1 of 33 REV A 11/18/03 TABLE OF CONTENTS Page Distribution
More informationversion 1 / 96 R Green Stars Hotel Environmental Management System
Environmental Management Manual for Hotels in Hong Kong version 1 / 96 R Green Stars Hotel Environmental Management System 2002 Acknowledgements: This document is a revised version of the manual published
More informationVosky Precision Machining Corp. 70-B Air Park Drive, Ronkonkoma, NY Tel: (631) Fax: (631)
Vosky Precision Machining Corp. 70-B Air Park Drive, Ronkonkoma, NY 11779 Tel: (631) 737-3200 Fax: (631) 737-3240 Quality Control Manual ISSUED: January 21, 2005 Revision. G (12/3/2003) Vosky Precision
More informationSOLAR KEYMARK SPECIFIC SCHEME RULES ANNEX E: FACTORY PRODUCTION CONTROL INFORMATIVE BASED ON ISO 9001 STANDARD COVERING THE PRODUCTION LINE
SOLAR KEYMARK SPECIFIC SCHEME RULES ANNEX E: FACTORY PRODUCTION CONTROL INFORMATIVE BASED ON ISO 9001 STANDARD COVERING THE PRODUCTION LINE 1. General This annex specifies the requirements for the Factory
More informationa. Are the foundry s employees trained and familiar with portions of the system applicable to their position?
NAV 29 FOUNDRY OPERATIONS 1. Does the foundry have a documented quality system? a. Are the foundry s employees trained and familiar with portions of the system applicable to their position? b. What recognized
More informationNUMBER OF EMPLOYEES TOTAL ENGINEERING MANUFACTURING QUALITY SUPPLIER IN-HOUSE SPECIAL PROCESS CAPABILITIES
Kearfott/ACA SUPPLIER QUALITY SYSTEM SURVEY SUPPLIER NAME SUPPLIER CODE DATE ADDRESS & ZIP CODE AREA CODE & PHONE QUALITY MANAGEMENT (NAME & TITLE) PRODUCT LINE (DESCRIBE) NUMBER OF EMPLOYEES TOTAL ENGINEERING
More informationQUALITY MANAGEMENT SYSTEM MANUAL ISO 9001:2008
QUALITY MANAGEMENT SYSTEM MANUAL ISO 9001:2008 Revision: 9 Issue Date: 28 April 2014 CONTROLLED COPY Number: Issued to: UNCONTROLLED COPY A.M.S. Electronics, Inc. 113 Pillow Street, Butler, PA 16001 (724)
More informationISO 14001: 2004 Standard Review. Review of the ISO 14001:2004 Standard
Review of the ISO 14001:2004 Standard Achieving Continual Improvement with ISO 14001: 2004 Continual Improvement Management Review Environmental Policy Checking Implementation & Operation Planning Sections
More informationDRAWING NUMBER REVISION TITLE REV DATE PAGE
DRAWING NUMBER REVISION TITLE REV DATE PAGE 90-2000-7.5.1 C PRODUCT RESOURCES NEWBURYPORT, MA Control of Production and 11/2016 1 of 5 NOTICE: THIS DOCUMENT IS PROPRIETARY AND ITS CONTENTS ARE THE EXCLUSIVE
More informationDALAIR LIMITED QUALITY MANUAL
DALAIR LIMITED QUALITY MANUAL BS EN ISO 001:2015 Issue No.: Issue Date: 5//1 Page 2 of In consideration of BS EN ISO 001:2015 Dalair Limited by way of this document and its management systems seek to demonstrate
More informationSAFETY POLICY AND PROCEDURE MANUAL All Euramax Subsidiaries. Number E-2.0 Safety Audits and Inspection Program
Number E-2.0 Issued: 1/2009 Revised: 12/2015 Page 1 of 2 1.0 PURPOSE: To establish a formal system to routinely self-inspect each Euramax facility in an effort to detect unsafe and/or hazardous conditions,
More informationQUALITY MANUAL. Number: M-001 Revision: C Page 1 of 18 THIS DOCUMENT IS CONSIDERED UNCONTROLLED UNLESS ISSUED IDENTIFIED AS CONTROLLED
Page 1 of 18 THIS DOCUMENT IS CONSIDERED UNCONTROLLED UNLESS ISSUED IDENTIFIED AS CONTROLLED Page 2 of 18 REVISION HISTORY DATE CHANGE DESCRIPTION 10/11/06 Original release 10/21/09 Revised to ISO9001:2008
More informationBRC Storage and Distribution Quality and Safety Management System Implementation Workbook
We have written this workbook to assist in the implementation of your BRC quality & safety management system. The workbook is divided into 8 steps that are designed to assist you in implementing your quality
More informationQuality Manual ISO 9001:2000
Quality Manual ISO 9001:2000 Page 2 of 23 TABLE OF CONTENTS COVER PAGE...1 TABLE OF CONTENTS...2 SIGNATURES...3 QUALITY POLICY...4 INTRODUCTION...5 CORPORATE PROFILE...9 4.O QUALITY MANAGEMENT SYSTEM...10
More informationBROOKHAVEN NATIONAL LABORATORY SBMS Interim Procedure
BROOKHAVEN NATIONAL LABORATORY SBMS Interim Procedure Interim Procedure Number: 2004-18001-005 Revision: 12 on 1-26-07 Title: 18001 Audit Checklist Point of Contact: Pat Williams Management System: Occupational
More informationSupplier Quality Manual
Supplier Quality Manual February 2010 Page 1 of 6 Table of Contents 1.0 Purpose 2.0 Scope 3.0 Quality System Requirements 4.0 Supplier Assessments 5.0 Advance Product Quality Planning 6.0 First Article
More informationAlternator Recall for Installation of Improper Wave Retainer
2900 Selma Highway Montgomery, AL 36108 USA Tel: 334-386-5400 Fax: 334-386-5450 1. Planning Information A. Effectivity (1) Hartzell Engine Technologies LLC (HET), Alternator models: (a) Alternator ALX-9525BR
More informationSatellite Aerospace, Inc. TERMS & CONDITIONS Page 1 of 6
TERMS & CONDITIONS Page 1 of 6 1.0 PURPOSE 1.1 Satellite Aerospace, Inc. Quality Requirements to Subtier Sources. 2.0 SCOPE 2.1 This document applies to all purchasing and sales personnel responsible for
More informationINS QA Programme Requirements
Specification Date: 20/3/17 INS QA Programme Requirements UNCONTROLLED WHEN PRINTED Author: J Cooch AUTHORISATION Date: 20/3/17 A Brown Owner: J Cooch (Signature) N.B. only required for hard copy If issued
More informationHealth and Safety Management Standards
Management Standards Curtin University Sept 2011 PAGE LEFT INTENTIONALLY BLANK Management Standards Page 2 of 15 CONTENTS 1. Introduction... 4 1.1 Hierarchy of Documents... 4 2. Management System Model...
More informationASA-100 QUALITY MANUAL
Your Company Name ASA-100 QUALITY MANUAL Origination Date: XXXX Document Identifier: Date: Document Revision: QMS-00 Quality Manual Latest Revision Date Abstract: This quality manual describes (your Company's)
More informationQuality Assurance in the Amusement Industry CLARK WESTERFIELD
Quality Assurance in the Amusement Industry 1 CLARK WESTERFIELD General Overview Steps to building a successful QA Program Put Someone in Charge with Authority to Act Understand the Basic Requirements
More informationcertificate of recognition
certificate of recognition Small Business Audit Document / Version 1.0 www.bccsa.ca BC Construction Safety Alliance 2010 BC Construction Safety Alliance (BCCSA) The BC Construction Safety Alliance (BCCSA)
More informationQM-001(Rev. 1) 1.0 INTRODUCTION. 1.1 Scope
SECTION 1 Page 1/1 1.0 INTRODUCTION 1.1 Scope The purpose of the Quality Manual is to provide a documented quality management system for BOLTEX mfg. The manual includes the organization structure, responsibilities,
More informationISO 9001:2015. Quality Management Systems Documentation. Quality Manual / Documented Information. Document No. QM-001
ISO 9001:2015 Quality Management Systems Documentation / Documented Information Document No. QM-001 Mailing Address: PO Box 149 Flippin, AR 72634 1-870-453-2261 www.microplastics.com 1 P a g e Table of
More informationQuality Manual ISSUED JANUARY Approved By: January 12, 2004 (President & Chief Executive Officer)
Quality Manual ISSUED JANUARY 2004 Approved By: January 12, 2004 (President & Chief Executive Officer) (Date) Quality Policy To be the industrial control industry's most preferred supplier of sensor integration
More information