2 TABLE OF CONTENTS EXECUTIVE SUMMARY... 1 INTRODUCTION... 3 Background... 3 Purpose of Document... 3 MATERIALS... 4 Types of Materials... 4 Material Attributes... 6 Retroreflectivity... 9 Durability RETROREFLECTIVITY Retroreflectivity Standards Wet Retroreflectivity and Recovery PAVEMENT MARKING REMOVAL Methods Ghost Markings SEQUENTIAL LIGHTING FOR TAPER OR LANE TRANSITIONS SUMMARY RESOURCES Cover Photo Credits (from left to right) 1. Resurfacing on Missouri Interstate 70 source: Matt Myers, Leidos 2. Resurfacing on Oklahoma Interstate 44 source: Matt Myers, Leidos 3. Resurfacing on Missouri Interstate 70 source: Matt Myers, Leidos 4. Lane shift on Missouri Interstate 70 source: Matt Myers, Leidos Guidance for the Use of Temporary Pavement Markings in Work Zones Page i

3 LIST OF FIGURES Figure 1. Temporary Plastic Tab... 4 Figure 2. Temporary Buttons... Figure 3. Use of Temporary Raised Pavement Markers on Centerline and Shoulder on I-70 in Missouri Figure 4. Use of Temporary Raised Pavement Markers on Lane Shift on I-44 in Oklahoma Figure. Use of Paint on Lane Shift on I-44 in Oklahoma Figure 6. Pavement Marking Damage in a Work Zone Figure 7. All-weather Pavement Marking (left) and Standard Pavement Marking (right) Work Zones on US- 32/33/0 Eastbound in Ohio (Daytime) Figure 8. All-weather Pavement Marking (left) and Standard Pavement Marking (right) Work Zones on US- 32/33/0 Eastbound in Ohio (Nighttime) Figure 9. Use of Tabs on Barrier and Paint Wear on Edge Line on I-44 in Oklahoma Figure 10. Oklahoma Work Zone in Wet Weather Conditions... 1 Figure 11. Wet-reflective Markings under Wet Conditions Figure 12. Example of Water-Blasting to Remove Striping in Florida Figure 13. Removed Markings ( Ghost Markings ) Compared to Existing Pavement Markings Figure 14. Contrast striping, Oklahoma Figure 1. Example of Disallowed Black Paint Covering Temporary Pavement Markings Figure 16. Sequential Work Zone Taper Warning on US Route 4 in Missouri Figure 17. Impact on Speed Through Work Zones with Sequential Lighting... 2 LIST OF TABLES Table 1. Results of 20 State Survey on Pavement Markings by the Nebraska Department of Transportation... Table 2. Characteristics of Pavement Markings for Work Zones... 7 Table 3. CTRE Iowa State University Study on Roadway Safety and Maintained Pavement Markings Table 4. Initial Retroreflectivity Readings of Roadway Marking (Dry Conditions)... 1 Table. Pavement Marking Removal Techniques Table 6. Stripe Removal Techniques, Nebraska Transportation Center Table 7. Cost Data for Pavement Marking Removal Techniques Guidance for the Use of Temporary Pavement Markings in Work Zones Page ii

4 Executive Summary Temporary pavement markings are an important element of a Traffic Control Plan (TCP) and provide drivers with clear and defined travel paths through work zones. The Manual on Uniform Traffic Control Devices (MUTCD), Section 6F.77: Pavement Markings emphasizes the need for adequate markings throughout work zones for any travel conditions. According to the MUTCD, temporary pavement markings for long-term work zones should perform as effectively as permanent pavement markings. Temporary pavement markings and raised pavement markers can be installed using a variety of materials including paint, thermoplastic, epoxy, temporary tape, and raised pavement markers such as tabs and buttons. One of the most widely used materials for work zone pavement marking is traffic paint. Painted markings can be installed efficiently over long distances. Buttons, traffic paint, and temporary raised pavement markers can be useful for short-term work zones while pavement markings for long-term work zones could range from traffic paint to more durable products such as thermoplastic or epoxy. When choosing a pavement marking product for work zones, transportation agencies consider several factors including: Durability. Practitioners need to ensure the pavement marking chosen is durable enough to last during the life of the work zone. Premature degradation of the marking can be caused by excessive wearing by vehicles traveling directly on the pavement marking. Other factors such as weather, pavement surface, quality of the material used, practitioners experience in applying material, or pavement and air temperature at the time of installation can also impact durability. Ease of Removal. Because the marking is to be temporary and is typically not placed at the same location as the subsequent permanent marking, it is important that the material can be removed from the pavement without leaving a significant ghost marking. For example, temporary tape is relatively easy to remove when compared to other commonly used temporary pavement marking materials. For other materials, (e.g., traffic paint), practitioners use various removal methods, such as grinding, water blasting, or shot blasting. Each method varies according to the amount of pavement scarring, time to remove, and cost. Grinding, water blasting, and shot blasting are three commonly used removal methods. Grinding is one of the fastest and cheapest methods used, but leaves a high degree of pavement scarring and may not completely remove the markings. Water blasting ranks high in degree of removal with little scarring, particularly on concrete pavement, but water blasting is much slower than grinding. Shot blasting scores slightly better than grinding in rate of removal, having slightly less cost, and less pavement scarring. Cost. Highway agencies must account for the cost of the temporary pavement marking and include it in overall project costs. The different products used can vary in cost. Traffic paint can range from $0.0 to Guidance for the Use of Temporary Pavement Markings in Work Zones Page 1

5 $0.1 per foot installed. Durable markings such as epoxy or thermoplastic can range from $0.10 to $0.3 per foot installed. Retroreflectivity. Retroreflectivity is necessary to delineate the correct path for road users, especially at night and during inclement weather. Recent innovations in temporary pavement marking in work zones include wet reflective pavement marking elements and sequential lighting devices. Wet-reflective and Wet-recovery Pavement Marking. The use of improved wet-weather visibility and wet-weather recovery pavement marking can provide road users improved visibility in inclement weather conditions. Some products can provide retroreflectivity even under a layer of water, and others quickly regain their retroreflectivity after a wet-weather event ends. Through FHWA s Highway for Life program, an All-weather paint (AWP) was recently evaluated under both a closed circuit test and at an active work zone. Researchers found AWP markings retained 0 to 70% of their dry-weather retroreflectivity values compared to standard markings, which retained 17% of their dry-weather retroreflectivity values. Sequential Lighting. Sequential lighting added to temporary traffic control devices such as channelizers along a work zone taper provide additional information to drivers as they approach and travel through the work zone. Using sequential lighting can also lead to a reduction of speeds in the work zone. Another potential benefit from using sequential lighting is a reduction in the number of drivers merging over into the other lane at the last possible moment prior to a shifting taper. This type of treatment can be useful for night work zones which last throughout the evening, but will have minimal impact to the permanent pavement marking. Sequential lighting can reduce the need for temporary marking through the work zone taper, allowing quicker removal of the temporary traffic control when restoring the roadway to normal operation during the day. Given the variety of temporary pavement markings and the factors that influence their use by transportation agencies, the goal of this document is to provide information on the advantages and disadvantages of temporary pavement marking. Guidance for the Use of Temporary Pavement Markings in Work Zones Page 2

6 Introduction Background Temporary pavement marking in work zones provide guidance to the driver on the safest and best path through a work zone. Temporary pavement markings identify changes in lanes and alignment. These markings help maintain a smooth flow of traffic through shifting and merging tapers. Temporary markings must also be easily removed as conditions dictate. Agencies and practitioners chose pavement marking materials to best address the conditions dictated by the work zone. Purpose of Document The MUTCD contains guidance to practitioners and agencies on temporary markings for short-, intermediate-, and long-term work zones. This document will cover the typical pavement marking materials used by agencies in work zones. Practitioners will also find information related to the importance of maintaining adequate pavement markings under heavy traffic or extreme weather conditions. Information related to methods on removing markings is referenced as well. Because agencies are increasingly setting up work zones at night, guidance on sequential lighting in the work zone is provided for practitioners consideration. Guidance for the Use of Temporary Pavement Markings in Work Zones Page 3

7 Materials Different pavement materials may be needed for various reasons. This section will provide general information on the types of materials, durability, and maintenance. The section will highlight different uses for these materials: paint, thermoplastic, epoxy, and temporary raised pavement markers such as tabs and buttons. Types of Materials A number of materials can be used to provide temporary pavement markings in work zones, including traffic paint, temporary tape, raised pavement markers, buttons, and tabs. The following bullets provide a brief overview of each material: - Traffic Paint. Quick-drying paint with glass beads added to create retroreflectivity is a low-cost material for temporary work zones. This material is best applied at temperatures of 70 degrees F and above with little humidity, but can be applied when ambient temperatures are above 0 degrees F. Traffic paint is one the least durable liquid materials used. - Temporary Tape. Preformed tapes are strips of plastic with an adhesive backing. Temporary tape can be removed by pulling the material up and does not require heat or other mechanical methods, although using these methods can result in faster removal. This material may only be used for short-term work zones up to 6 months to prevent the resin from strongly adhering to the pavement. Temporary tape used in work zones is produced with retroreflective material incorporated into it. - Temporary Raised Pavement Markers (TRPM). TRPMs are commonly used in construction zones. Either an adhesive or a peel and stick backing are used to attach the TRPM to the pavement. o Tabs. These markers are strips of plastic which have a reflective strip built into the marker such as Figure 1. Tabs are constructed with enough flexibility to resist an impact. However, practitioners should regularly inspect and replace damaged devices as soon as possible. These Figure 1. Temporary Plastic devices are deployed to simulate a continuous or dashed Tab line and can supplement flat line markings for conditions such as rain. o Buttons. These are rounded domes such as are shown in Figure 2 and are similar to Tabs. These can be glued to the pavement and could be used to simulate dashed lines. These devices are manufactured from plastic or ceramic materials. They are not as impact resistant as tabs and are not usually used where snow-plowing may be a possibility. Guidance for the Use of Temporary Pavement Markings in Work Zones Page 4

8 - Epoxy and Thermoplastic. Long-term work zones and high traffic volumes may warrant the use of these materials. These are highly durable materials that are appropriate for those areas where a visible line is needed for many months or years and subject to extreme abuse from traffic or other situationspecific conditions. Agencies considering these markings will typically apply them in the locations Figure 2. Temporary Buttons where permanent markings will be when the project is complete. Traffic paint is the material most commonly used for temporary pavement markings in work zones, as shown in Table 1. The advantages of traffic paint are that it s versatile, relatively inexpensive, and quickly installed. Traffic paint is formulated to dry within minutes after application, and can be applied either by hand using paint brushes or truck mounted marking system. Temporary tape is also a commonly used pavement marking in work zones due to its ease of installation and removal. Temporary buttons and raised pavement markers can be used to simulate solid lines or supplement existing flat-line pavement marking. Buttons are normally used where snow removal is not expected. Epoxy or thermoplastics materials create highly durable markings and may not be considered as temporary as the other markings discussed in this document are. However, high-traffic volumes or lengthy project duration may make it necessary to apply these markings to ensure that the markings are visible and adequate for traffic guidance and control. Because the characteristics of these materials vary, agencies may use several different types of temporary marking materials on a project based on project duration, traffic characteristics, and weather conditions. Table 1. Results of 20 State Survey on Pavement Markings by the Nebraska Department of Transportation Most Frequently Used Temporary Pavement Markings Number of Participating States Percentage of Participating States Traffic Paint Only 17 8% Traffic Paint and Temporary Tape 4 20% Temporary Tape Only 2 10% Raised Pavement Markers, Buttons, Tabs 1 % Tabs, raised pavement markings or temporary tape 1 % Y. Cho, K. Kabassi, Jae-Ho Pyeon, Effectiveness Study on Temporary Pavement Marking Removals Methods, The Charles W. Durham School of Architectural Engineering & Construction, June Table 1 shows the results of a Nebraska Department of Transportation study to identify the most frequently used method of applying temporary pavement markings. The purpose of the study was to evaluate different pavement marking removal techniques for various materials. As the survey indicates, while paint is the most used temporary marking, other materials may be chosen in combination or as standalone applications to satisfy specific situations related to visibility, discernment of travel path, worker protection, and traffic flow. Guidance for the Use of Temporary Pavement Markings in Work Zones Page

9 Material Attributes Agencies should consider the characteristics and attributes of various temporary pavement marking material. Pavement marking materials are available with a variety of attributes. Pertinent criteria for choosing a pavement marking material include the following: Material and Installation Cost. Agencies must identify the cost of applying a treatment at a specific location. For example, traffic paint is widely used by agencies because it is readily available and relatively low cost. In other situations (e.g., low traffic volumes or short-term work zones), TRPMs are acceptable and can be installed at a lower price and in a shorter period of time than traffic paint. Material Performance. There are situations where one material will perform more effectively than others. For example, TRPMs or buttons can address situations not conducive for flat-line applications such as resurfacing projects with multiple pavement lifts. TRPMs can also be used for chip seals or other roadway surface treatments that are difficult for traffic paint to adhere to. On the other hand, agencies may choose to use traffic paint in situations with longer work zones, higher traffic volumes, and maintenance issues (e.g., snow plowing). In addition, traffic paint provides a continuous pavement marking to road users to help them navigate the work zone, especially in lane shifts and other horizontal alignment changes. Maintenance. Even in a temporary traffic control situation, the initial installation of a pavement marking material may not last the duration of the project s needs. Because of this, it is necessary to consider maintenance efforts when choosing materials. For example, the downside of traffic paint is that even though the initial cost is low restriping will likely be required for a long-term or high-volume work zone. The reapplication process is relatively simple, but it does increase the overall cost of the treatment. Indiana DOT requires restriping of traffic paint for active work zones expected to be in place from December through March. 1 More durable markings (e.g., epoxy, thermoplastic) are more costly up front, but they also last longer, which can be helpful if a long-term work zone has a single phase requiring the same pavement marking pattern for many months. TRPMs require regular field inspections to replace damaged units. Because TRPMs and buttons are not continuous, it is critical to replace missing or damaged TRPMs in a timely manner so road users can see and maneuver through the work zone. Preparation Time. The majority of pavement marking materials require a dry and relatively clean pavement surface for proper adhesion. Some materials require time between the time they are applied and when the roadway can be open to traffic. Traffic paint dries tack-free in two minutes when applied in temperatures between 0 and 7 degrees F. Traffic paint can also be applied when the surface temperatures are lower than 0 degrees, but drying time is extended. In some situations this may not 1 Indiana DOT. (2012) Standard Specifications; Section 800. Retrieved May 28, 2013, from Indiana Department of Transportation: Guidance for the Use of Temporary Pavement Markings in Work Zones Page 6

10 be an acceptable preparation time, so other options (e.g., TRPMs) may be used instead. Some TRPMs are used with certain applications such as asphaltic chip seals; because other liquid traffic markings would not adequately adhere to the roadway. The following situations may impact the decision to use a certain material for work zone pavement marking. Short-term Work Zones In some cases, the roadway project requires daily or weekly adjustments, so pavement markings must be easily removed and reapplied. For example, a resurfacing project may require daily remarking of the roadway. The mobilization of stripers, truck mounted attenuators, brooms, and other equipment would be cost-prohibitive for traffic paint in this situation, so TRPMs or temporary tape could be better options. Weather In inclement weather conditions, TRPMs are often the most appropriate option because moisture during application is not as significant an issue as it is with traffic paint. In addition, paint does not provide enough retroreflectivity during wet weather conditions unless wet reflective beads are added; TRPMs can provide better visibility during inclement weather. High Traffic Volume High traffic volume will cause significant wearing of pavement marking and should be monitored closely. Traffic paint is likely to wear quickly under these conditions, especially if traffic is driving directly on the stripe. Other pavement marking types such as epoxy or thermoplastic may be used to provide a more durable pavement marking for high-volume work zones, reducing the need to re-mark during the project. TRPMs also are not highly-durable devices and should be monitored closely. Special Situations One application being used is sequential lighting on channelizers. A typical example for this application is nighttime road repairs such as a concrete joint repair on a divided roadway. Using this approach, the impact to the permanent striping will likely be minimal. The sequential lighting provides a strong visual cue to the driver, guiding them to the correct path through the work zone without applying other temporary marking materials. The roadway is opened to normal traffic flow in the morning by simply moving the traffic control devices off the roadway. Table 2 shows a sample of the temporary pavement marking commonly used in work zones. Paint is often a preferred material used in work zones, but other materials can be beneficial for specific situations. Figures 3, 4, and provide examples of temporary pavement marking. Table 2. Characteristics of Pavement Markings for Work Zones Materials Application Durability Pros Cons Paint Machine 1 year or less Low cost $ /foot; wet-reflective elements can be added Low durability under heavy traffic, low quality under wet weather. Thermoplastic Machine 3 to years High durability High cost $ /foot, medium wet Guidance for the Use of Temporary Pavement Markings in Work Zones Page 7

11 Materials Application Durability Pros Cons weather recovery; difficult to remove. Epoxy Machine 3 to years High Durability High cost $ /foot, medium wet weather recovery, and contrast hard to see on new concrete. TRPM: Tabs Installed by hand Less than 1 year; less than 1 month under heavy traffic TRPM: Buttons Installed by hand or by machine Low cost, high visibility under wet weather, flexible installation 1 year Low cost, audible and tactile clue to driver Possible littering, vandalism, best in warm weather application. Not conducive for snow plows, small target value. Figure 3. Use of Temporary Raised Pavement Markers on Centerline and Shoulder on I-70 in Missouri. (Source: Leidos) Guidance for the Use of Temporary Pavement Markings in Work Zones Page 8

12 Figure 4. Use of Temporary Raised Pavement Markers on Lane Shift on I-44 in Oklahoma. (Source: Leidos) Figure. Use of Paint on Lane Shift on I-44 in Oklahoma. (Source: Leidos) Retroreflectivity Guidance from the Manual on Uniform Traffic Control Devices MUTCD indicates temporary pavement markings should perform during the day and at night. The pavement marking must provide adequate visibility through the work zone. The pavement marking must also be easily removable, so that it leaves no residual line when the marking is no longer needed. Guidance for the Use of Temporary Pavement Markings in Work Zones Page 9

13 Durability Factors such as the initial quality of the implementation, traffic volume and percentage of heavy vehicles, and weather have an impact on the durability of markings. Most basic markings used for permanent installations have a minimum life of one year, and other more durable (and more expensive) products can last three to five years. These durable markings such as thermoplastic can be used for work zones where the level of wear of the stripe is a concern, but removal of these markings during various stages of construction can often leave ghost markings. Ghost markings are remnants of the pavement marking due to scarring or discoloration of the pavement, and can be as prominent as a permanent pavement marking. A study performed under the Smart Work Zone Deployment Initiative (SWZDI) evaluated temporary pavement marking products: three temporary tapes and one temporary marking paint. The objective of the research project was to measure presence, retroreflectivity, and removability of these temporary markings. The marking material was installed in an active work zone using a typical crossover for a divided highway. The research team took readings at 1 days and 46 days from The Indiana Department of Transportation reapplies temporary road markings on long-term work zones on Interstate routes prior to winter to ensure markings are adequate throughout the year. installation. The research team discovered that the locations of heavy wear from vehicles driving directly on the pavement marking caused significant damage (see Figure 6). 2 The tape on the right allows the previous white edge line to become visible. For some sections, this wearing worsened until reapplication of the marking became necessary. Figure 6. Pavement Marking Damage in a Work Zone (Source: CTRE, Evaluating the Effectiveness of Temporary Work-Zone Pavement Marking Products, 2012) 2 Center for Transportation Research and Education (CTRE ), Evaluating the Effectiveness of Temporary Work-Zone Pavement Marking Products, Smart Work Zone Deployment Initiative, July 2012 Guidance for the Use of Temporary Pavement Markings in Work Zones Page 10

14 While the MUTCD does not have specific performance measures for temporary pavement markings, many transportation agencies use industry established guidelines or specifications for permanent markings to govern temporary pavement marking applications. Practitioners should also inspect these lines to be sure the markings are in good condition. Any condition causing a loss of reflectivity such as debris or loss of pavement marking material should be evaluated for possible repairs. For example, Figure 7 shows a well maintained line during the day. Figure 8 is showing the same work zone, but water is covering the line and reduces the retroreflectivity in the photo on the right. The line on the left in figure 8 is an all-weather paint which still shines through the water. Figure 7. All-weather Pavement Marking (left) and Standard Pavement Marking (right) Work Zones on US- 32/33/0 Eastbound in Ohio (Daytime). (Source: FHWA, May 2013) Figure 8. All-weather Pavement Marking (left) and Standard Pavement Marking (right) Work Zones on US- 32/33/0 Eastbound in Ohio (Nighttime). (Source: FHWA, May 2013) Guidance for the Use of Temporary Pavement Markings in Work Zones Page 11

15 Other methods to ensure adequate marking are the use of TRPM s or buttons such as in Figure 9. This depicts a work zone with a concrete barrier along a rural interstate in Oklahoma. The white edge line is showing excessive wear from traffic driving directly on the marking. An inspection of this line should include night inspection to be sure the marking guides drivers adequately. Ongoing inspection and maintenance of temporary markings should be conducted on longterm work zones. Inspection can be either visual or conducted using a retroreflectometer. Temporary markings should perform similarly to permanent markings for night and day operations. Figure 9 highlights why both a night and day inspection Figure 9. Use of Tabs on Barrier and Paint Wear on Edge Line on I-44 in Oklahoma (Source: Leidos) should be made. Although the loss of material is evident, the retroreflectivity of the line may have diminished sooner than the loss of marking material. The significance of the loss of marking is important; but there are other indications being used at this location to show the travel way to the driver. If excessive wearing of the marking is a concern, practitioners may use other supplemental devices to guide drivers through the work zone, such as reflective tabs on a barrier, reflective strips on a glare screen, a rumble strip in the shoulder, and delineation on the guardrail itself, as Figure 9 illustrates. These traffic control devices all supplement and support the driver traveling through this work zone and ensure adequate guidance until restriping can be completed. As part of the inspection, all of these devices should be reviewed to be sure the drivers path is delineated through the work zone. While ensuring the temporary marking is adequately maintained, weather is another concern agencies should consider when choosing materials. Water over flat line marking can significantly reduce the retroreflectivity of even the best maintained line. Some agencies use TRPMs as in Figure 9 to supplement flat-line marking as the reflective panels shed water better and still reflect during a rain storm. All-weather paint is another option now available and is covered later in the section under retroreflectivity. TRPMs are typically not made to sustain heavy traffic over extended periods. In addition, these devices are not able to withstand the rigor of snowplows. TRPMs are commonly used between asphalt courses on resurfacing projects where using traffic paint or other markings is not practical. The color of TRPMs should match the line they are trying to simulate and should be the same color at night. Damaged or missing TRPMs should be replaced as soon as possible. Minnesota DOT uses the following guidelines when TRPM s are used to simulate a line: Guidance for the Use of Temporary Pavement Markings in Work Zones Page 12

16 Broken line - install four TRPMs at 3-1/3 feet centers and leave a 40 foot gap to the next set of four TRPMs. Single line place TRPMs on 10 foot center to center on tangents; foot center to center spacing on curves over 6 degrees. 3 3 Temporary Raised Pavement Markers (TRPMs), Minnesota DOT, March 2006, Guidance for the Use of Temporary Pavement Markings in Work Zones Page 13

17 Retroreflectivity Retroreflectivity Standards Under MUTCD Section 6F.77, pavement markings in work zones are to be seen during the day, at night, and during twilight periods. For most agencies, traffic paint is the pavement marking method used in work zones, particularly for long-term stationary work. TRPM, temporary tape, and buttons may be required for other situations not suitable for paint, such as chip sealed surfaces or short- and intermediate-term work zones. In the MUTCD Section 6G.02 Work Duration, all temporary markings in long-term work zones are required to be retroreflective. Missing or defective devices such as TRPMs can be replaced to regain lost retroreflectivity. However, traffic paint, epoxy, and thermoplastic are in place for longer time periods, and retroreflectivity can diminish due to exposure to weather, debris, dirt, and traffic. Driving at night is very dependent on the quality of the retroreflectivity of the marking. Retroreflectivity is also usually associated with nighttime driving, but practitioners should consider impacts during the day as well. Factors to be considered when determining the type of pavement markings to use include: Degradation of reflectivity; Glare on roadway surface causing markings to become difficult to see; Other pavement treatments competing for the driver s attention; Missing or damaged temporary marking devices such as tabs, tape, or TRPM; and Wearing of traffic paint. The Center for Transportation Research Excellence (CTRE) at Iowa State University recently conducted research on the connection of pavement marking retroreflectivity to roadway safety. The focus of the study was to evaluate differing segments of retroreflective markings and their impacts to roadway safety. The results are presented in Table 3. The study did not validate specific retroreflectivity levels, but rather it compared crash data on roadway segments with various retroreflectivity levels to gauge impact. The researchers discovered that pavement marking on freeways provided a significant safety benefit to drivers. For freeways, yellow edge lines reduced nighttime crashes, and white edge lines helped reduce singlevehicle crashes. For two-lane highways, increasing retroreflectivity led to a decrease in crash frequency. Table 3. CTRE Iowa State University Study on Roadway Safety and Maintained Pavement Markings Facility Retroreflectivity Marking Location Safety Impacts Freeway Yellow Edge Lines Decrease in all nighttime crashes correlated to increases in retroreflectivity White Edge Lines Decrease in SV nighttime crashes correlated to increases in retroreflectivity. Guidance for the Use of Temporary Pavement Markings in Work Zones Page 14

18 Facility Retroreflectivity Marking Location Safety Impacts Lane Lines Decrease in night time and SV Crashes when retroreflectivity increased. Two-Lane Highways Yellow Centerline Decrease in all nighttime crashes correlated to increases in retroreflectivity White Edge Line Decrease in crash frequency as retroreflectivity increased. SV = Single Vehicle Source: Center for Transportation Research and Education (CTRE), Evaluating the Effectiveness of Temporary Work-Zone Pavement Marking Products, Smart Work Zone Deployment Initiative, July Measuring Retroreflectivity. A number of agencies have recognized the need to measure the performance of pavement marking. Although there are not minimum retroreflectivity levels for work zones, some agencies are using retroreflectivity to ensure installed pavement marking is adequate for the driving public. Table 4 lists a few states that have incorporated minimum retro-reflectivity values into their operations. Combining retroreflectivity with physical condition information (e.g. pavement type and condition, horizontal alignment, weather) can ensure an adequate marking throughout the work zone for most physical conditions and for the wide range of drivers. Figure 10. Oklahoma Work Zone in Wet Weather Conditions (Source: Leidos) Iowa* Maryland Agency Table 4. Initial Retroreflectivity Readings of Roadway Marking (Dry Conditions) Initial Retroreflectivity Readings (mcd/lux/m 2 ) Yellow 10 White 100 Additional Notes Initial retroreflectivity readings for temporary marking for dry, wet, and night conditions. Initial retroreflectivity readings for temporary marking for dry, wet, and night conditions. Yellow 10 Maintain above 100 mcd/lux/m 2 White 20 Maintain above 10 mcd/lux/m 2 Minnesota Yellow 80 Minimum readings * N. Hawkins, O. Smadi, B. Aldemir-Bektas, Evaluating the Effectiveness of Temporary Work-Zone Pavement Marking Products, Center for Transportation Research and Education, Final Report InTrans Project , June 2012, Smart Work Zone Deployment Initiative (SWZDI) Guidance for the Use of Temporary Pavement Markings in Work Zones Page 1

19 Wet Retroreflectivity and Recovery Retroreflectivity of beads on most pavement marking is greatly diminished during active rainstorms or water over the traffic paint. A research study by the Texas A&M Transportation Institute measured a 17 percent retained dry-pavement visibility of conventional pavement marking when the markings were covered with moisture. 4 Water covered pavement marking can hamper a driver s ability to safely maneuver through a work zone as shown in Figure 11. Today, agencies can utilize wet-reflective or wet-recoverable marking materials. Wet-recoverable pavement markings consist of preformed tape or paint which recover retroreflectivity very quickly once an active rainstorm has stopped. These materials are not retroreflective while covered by water; but simply allow for the retroreflective elements to recover faster than typical pavement marking with standard bead elements. Figure 11. Wet-reflective Markings under Wet Conditions (Source: 3M, 2012) Wet-reflective elements allow a pavement marking to retain its retroreflectivity when covered by water, even during an active rain event. These elements are specifically designed to use the angularity of light through water to help the marking reflect back to the light source. Agencies may combine typical bead elements with wet-reflective beads to provide a costeffective retroreflectivity for both dry and wet pavement conditions. Under the Highways for Life technology partnerships program, researchers evaluated all-weather paint (AWP) as shown in Figure 12. The evaluation was split between two phases over the years 2007 to The marking was evaluated at a closed circuit test site, where it was found to have higher retro-reflectivity than other materials under the same active wet conditions. A second phase of evaluation was conducted at five active work zones in North Carolina and Ohio. Figures 7 and 8 were day and night comparison of these work zones with AWP. The evaluation was conducted by assessing the following measures of effectiveness (MOE): pavement marking retroreflectivity, 4 Higgins, L., J. D, Miles, P. J. Carlson, D. M. Burns, F. Aktan, M. Zender, and J. M. Kaczmarczik. The Nighttime Visibility of Prototype Work Zone Markings Under Dry, Wet, and Raining Conditions. Transportation Research Board, 88th Annual Meeting Washington, DC. Federal Highway Administration, All-Weather Pavement Marking for Work Zones: Field Evaluation in North Carolina and Ohio, May Retrieved September 17, 2013, from FHWA Accelerating Innovation: Guidance for the Use of Temporary Pavement Markings in Work Zones Page 16

20 rate of lane encroachments, linear lane displacement, and vehicle travel speed (as a surrogate MOE due to increased speed potentially increasing the opportunity for crashes). The results of the study from the second phase of the AWP study found the AWP retroreflectivity values were confirmed to be higher than standard pavement markings. Motorists typically maintained safer lane placements when traveling along the AWP delineated lanes than in lanes with standard pavement marking within the same work zones. Figure 12. Example of Water-Blasting to Remove Striping in Florida (Source: FHWA, 2013) Guidance for the Use of Temporary Pavement Markings in Work Zones Page 17

21 Pavement Marking Removal Methods A common issue for every work zone is the removal of permanent or temporary pavement marking as adjustments are needed for the work zone. Section 6F.77 of the MUTCD states that agencies should minimize pavement scarring and not paint over existing marking with black paint or asphalt. Preventing pavement scarring while completely removing the marking can be a difficult challenge. A number of methods can be used to remove pavement marking. Removing pavement marking with a grinder is one of the prominent methods of removal, though others are allowed by most agencies. Table provides a list of available removal methods and a general description of each method. Table. Pavement Marking Removal Techniques Technique of Removal Description Performance Water blasting Grinding Shot Blasting Sand Blasting Hydro-blasting Hot Compressed Air Burning (HCAB) Excess oxygen burning Water shot at 10,000 psi; relatively high cost; relatively long time for removal; standard practice by agencies. Relatively fast method; most common treatment used; scars pavement. Uses small steel balls shot at high speed to remove markings. Similar to sand blasting; very fine materials are propelled at high speed to remove markings Combination of water and sand; can leave scars but effective; water and sand can be recycled Mix of propane and air to vaporize material, found effective with temporary tape, Similar to HCAB; slow removal for thicker materials Rated best for removal especially on concrete; slower than most other treatments; very effective for tape Grinding leaves 1/8 to 1/4 inch groove for thermoplastic; concrete pavement is bright to look like permanent marking Dry pavement only; effective for thinner lines; recycle shot; slower process Slow and can scar pavement; performance is highly tied to operator. Effective due to the ability to recycle sand and water, but can leave scars Relatively slow rate Scarring may fade quickly Dry Ice Blasting Application of solid carbon dioxide; Effective but costly Chemical Environmentally friendly does not contain Methylene Chloride (MeCl); Still needs to be power washed at 400 psi Best at removing stripe without scarring on concrete and asphalt Source: Y. Cho, K. Kabassi, Jae-Ho Pyeon, Effectiveness Study on Temporary Pavement Marking Removals Methods, The Charles W. Durham School of Architectural Engineering & Construction, June 2011 Guidance for the Use of Temporary Pavement Markings in Work Zones Page 18

22 The following information lists three examples from Indiana, Arizona and Maryland on what these states do to remove temporary markings. Arizona remove temporary pavement marking by abrasive blasting, high-pressure water jet, or grinding. Maryland remove adhesive from temporary tape by water blasting. Indiana remove temporary pavement marking by sandblasting, steel shot blasting, water blasting, or grinding. These agencies guidelines highlight accepted removal methods, but the choice of method is left to the discretion of the contactor. The type and thickness of the material has impact on the performance of these removal techniques. The most important aspect of choosing the appropriate removal is minimizing damage to the pavement, leaving what is otherwise known as ghost markings. Ghost Markings Pavement marking removal can sometimes leave behind ghosts or the impressions of past markings left from scarring as shown in Figure 14. These past markings can be seen during rainstorms or reflected Figure 13. Removed Markings ( Ghost Markings ) Compared to Existing Pavement Markings (Source: Texas Transportation Institute, 2008) from sun glare. At times, these past markings can be easier to see than the existing pavement marking. Nebraska DOT initiated a study 6 to evaluate the effectiveness of the removal methods. The project evaluated each method according to speed of removal, amount of scarring, and cost. This information can help agencies and contractors determine what method of removal would best meet driver and agency expectations. The results of the study are shown in Tables 6 and 7. One of the highest rated methods was a chemical process. The chemical process is environmentally friendly and completely removes marking with no pavement scarring. 6 FHWA, All-Weather Pavement Marking, Guidance for the Use of Temporary Pavement Markings in Work Zones Page 19

23 Table 6. Stripe Removal Techniques, Nebraska Transportation Center Marking Rate Completeness Removal Method Type Marking Size (Ft/min) of Removal mils Chemicals 20 mils Water Blasting Dry Ice Blasting Shot Blasting Scarifier Grinding Heat Torch Grinding PCD Scarifier Tape Tape Tape Tape Tape 20 mils 20 mils 4 inch 20 mils 4 inch 20 mils 20 mils 20 mils 4 inch 20 mils 4 inch 20 mills 4 inch Degree of Scarring Note: to 1 Range from complete to no removal of paint; to 1 Range high degree of to no scarring. Source: Y. Cho, K. Kabassi, Jae-Ho Pyeon, Effectiveness Study on Temporary Pavement Marking Removals Methods, The Charles W. Durham School of Architectural Engineering & Construction, June Guidance for the Use of Temporary Pavement Markings in Work Zones Page 20

24 Chemicals Water Blasting Dry Ice Blasting Shot Blasting Table 7. Cost Data for Pavement Marking Removal Techniques Removal Type Marking Marking Size Tape Tape Tape 20 mils 20 mils 20 mils 20 mils 4 inch 20 mils 4 inch 20 mils 20 mils 20 mils 4 inch Cost per Linear Foot $0.33 $0.41 $0.83 $0.48 $2.14 $4.39 $0.8 $.86 $0.09 $3.37 $26.00 $0.06 $0.22 $0.73 $0.12 $1.9 $3.47 $0. $0.02 Scarifier Grinding Heat Torch Grinding PCD Scarifier Tape Tape 20 mils 4 inch 20 mills 4 inch $0.19 $0.1 $0.11 $0.8 $0.80 $3.2 Source: Y. Cho, K. Kabassi, Jae-Ho Pyeon, Effectiveness Study on Temporary Pavement Marking Removals Methods, The Charles W. Durham School of Architectural Engineering & Construction, June Guidance for the Use of Temporary Pavement Markings in Work Zones Page 21

25 Choosing the appropriate method of removal can minimize visible scarring of the pavement, but adding contrast striping can help to increase pavement markings conspicuity. Contrast striping involves adding another material (often black paint) to a stripe. It can be used to offset ghosting impacts by differentiating the markings. Figure 14 shows a location where contrast striping is used to provide users guidance in a complex situation. First, pavement marking removal ghosts are very visible on the right side of the roadway. In addition, the crack sealant on this route is more prominent than the pavement marking, which can be confusing for Figure 1. Example of Disallowed Black Paint Covering Temporary Pavement Markings (Source: Leidos) Sequential Lighting for Taper or Lane Transitions Figure 14. Contrast Striping, Oklahoma (Source: Leidos) road users and cause them to use this as their lane line. The contrast stripe a black stripe added at the end of the typical white stripe provides additional information to drivers about the correct lane line so they can see the appropriate path to travel. Black paint or asphalt has been used to cover up temporary markings. The MUTCD specifically prohibits the use of black paint or asphalt to cover up markings given that the paint can wear out over time revealing the old marking underneath. Figure 1 shows a project where black paint was used as a cover up, and it is as visible as the white shoulder line, which could cause a distraction. This distraction is not limited to daytime; black markings can be visible at night and during rain storms. As part of traffic management plan efforts in work zones, more agencies are conducting construction activities during nighttime hours to avoid the highest traffic volumes. Working at night reduces work zone impacts on the traveling public. However, traffic control plans for night-time work zones must provide additional visual cues for drivers, in particular the higher percentage of high-risk drivers at night (e.g., impaired, drowsy). To fully capitalize on nighttime construction activities, the permanent marking needs to remain in place when the work zone is moved off the roadway and all of the lanes are opened to traffic for normal operations. In most cases, temporary marking is not a viable option for these work zones. One option with similar benefits to temporary pavement marking is the use of sequential lighting at the taper and along the work zone. Guidance for the Use of Temporary Pavement Markings in Work Zones Page 22

26 In addition to temporary lighting, enhanced retroreflective sheeting, and additional traffic control devices, sequential warning work zone lighting can improve visibility and provide improved visual cues for drivers on merging tapers and lane shifts. Sequential warning work zone lights direct the driver through the merging taper and work zone. The devices are self-calibrating once installed at the work zone. For example, if one of the lights stops functioning, the devices will self-adjust the sequence to account for any outages. Additionally, if workers move the devices in a different order, the devices will adjust to the proper sequence based on their proximity to each other in the work zone. Section 6F.63 of the MUTCD allows sequential lighting in place of steady-burn lights on channelizing devices used in a series, such as merging tapers. Specifically, paragraph 12 of Section 6F.63 of the MUTCD states, A series of sequential flashing warning lights may be placed on channelizing devices that form a merging taper in order to increase driver detection and recognition of the merging taper. Figure 16 is an example of an installation in Missouri. Sequential lighting systems are easy to install, and they are effective for both short-duration and long-term work zones. Sequential lighting helps improve the safety of the work zone without adjusting the striping, allowing a quick removal of the temporary traffic control to restore normal operations during the day. The sequential lights accomplish the following goals: Provide positive guidance of the appropriate path at the taper and throughout the work zone. Provide information to motorists that they are entering an active work zone. Confirm that motorists are following the correct path. The University of Missouri performed an evaluation of the effectiveness of sequential lighting deployed on Interstate 70 for the Smart Work Zone Initiative (SWZI). 7 Below are results from the evaluation based on speed and merged vehicles. The study concluded that sequential lighting devices provide a benefit-to-cost ratio ranging from :1 to 10:1, meaning road users receive from to 10 times the benefit from these devices compared to the cost to deploy. Figure 17 shows results from the Missouri evaluation based on speed of approaching vehicles. The study also evaluated when drivers would merge into one lane. The researchers concluded more drivers merged sooner and the number of drivers waiting until the last moment before merging was also reduced when compared to similar work zones without sequential lighting installed. 7 Sun, C., Edara, P., Hou, Y., & Robertson, A. (2011). Cost-Benefit Analysis of Sequential Warning Lights in Nighttime Work Zone Tapers. Columbia: Smart Work Zone Deployment Initiative. Guidance for the Use of Temporary Pavement Markings in Work Zones Page 23

27 Figure 16. Sequential Work Zone Taper Warning on US Route 4 in Missouri. (Source: Leidos) Missouri DOT uses sequential lighting for concrete repairs of divided U.S. highways. These operations involve joint and roadway repair on concrete pavement. Missouri DOT normally conducts these repairs at night during low-traffic volume periods, and these repairs can take most of the night-time hours. The agency may close one lane for a sufficient length to repair multiple areas. The operation requires most of the nighttime hours for the crews to prepare the roadway, pour the concrete, and wait for the concrete to gain enough strength prior to opening to traffic. The agency has the lane opened to the morning peak. This operation does not impact the existing striping on the highway. Sequential lighting has proven itself to reduces speeds through the work zone, and reduced late-merging traffic without adding temporary marking throughout the work zone eliminating removal. Guidance for the Use of Temporary Pavement Markings in Work Zones Page 24

28 Figure 17. Impact on Speed through Work Zones with Sequential Lighting (Source: Sun, Edara, et al., 2011.) Guidance for the Use of Temporary Pavement Markings in Work Zones Page 2

29 Summary Temporary pavement markings are essential for motorists to guide them through work zones. Temporary markings are to be visible day or night through any type of weather. Durability, cost, ease of removal, maintenance, and implementation are all factors that contribute to the decision as to what type of temporary marking to use. Temporary marking can be created with traffic paint, temporary tape, or temporary raised pavement markers (TRPM) such as tabs or buttons. Work zones with high traffic volumes may require highly durable markings such as thermoplastic or epoxy to ensure markings last through the life of a project. TRPMs are used to supplement other temporary marking or simulate flat-line marking on surfaces not conducive to the successful application of other materials (e.g., chip seals) or for resurfacing or certain other complex projects. For example, a bridge replacement may require a combination of long-line traffic paint and TRPMs for many months. As with permanent markings, temporary pavement marking should be retroreflective to provide the necessary guidance to drivers especially for nighttime work zones. Agencies and practitioners should have an inspection program to ensure pavement marking is kept in good condition. Even with regular inspection, weather events such as rain can reduce retroreflectivity of temporary markings. Water covering flat-line marking can significantly reduce retroreflectivity by more than 80 percent. TRPMs can supplement flat-line markings during these events, and all-weather paint, which is made with wet-reflective bead elements, is retroreflective even if covered by water and provides another option to deal with wet weather. More durable markings such as thermoplastic or epoxy may be needed to ensure the markings will last through the winter months of northern states or high-traffic volumes roadways. Some states restripe traffic paint prior to these winter months to ensure the marking can withstand damage by snowplows. Removal of temporary markings when no longer needed is another important consideration when choosing the appropriate material. Pavement type and marking material impact the effectiveness of each method of marking removal. Temporary tape can be removed by hand or machine. TRPMs may be removed by hand or machinery. Removing traffic paint, thermoplastic, or epoxy may require special equipment such as shotwater-blasting or grinders. Other non-typical methods of removal include chemical, dry ice, or heat torch. Grinding is commonly used because of a high rate of removal and is one of the cheapest methods compared to the other methods; however, grinding is very likely to scar the pavement in order to completely remove the pavement techniques. One study found chemical removal ranks best in removal with no visible scarring of the pavement, but shot blasting had one of the highest rates of removal for all pavement surface types. Besides AWP, sequential lighting is an innovation which leads the driver through the work zone taper and the work zone by using a number of lights that turn on and off in a successive manner, guiding the driver through the work zone. This sequence has been shown to reduce vehicular speeds through the work zone. Another benefit found was a reduction in the number of drivers waiting until the last moment to merge into Guidance for the Use of Temporary Pavement Markings in Work Zones Page 26

30 the open lane. Sequential lighting accommodates night-time work zones where additional temporary marking may not be practical. Temporary pavement marking provides the necessary guidance to drivers and other users to navigate safely through work zones. Agencies and practitioners utilizing the information from this guide will enhance the safety of both the traveling public and construction workers while providing a smooth transition to and from the work zone. Guidance for the Use of Temporary Pavement Markings in Work Zones Page 27

31 Resources 3M. (2012, April 19). Highways for Life. Retrieved June 11, 2013, from Federal Highway Administration: Association, A. T. (n.d.). Quality Guidelines for Work Zone Traffic Control Devices. Retrieved May 28, 2013, from Workzonesafety: Clearinghouse, N. W. (2000). Safety Products. Retrieved May 23, 2013, from The National Work Zone Safety Information Clearinghouse: Federal Highway Administration. (2013, May). All-Weather Pavement Marking for Work Zones: Field Evaluation in North Carolina and Ohio. Retrieved September 17, 2013, from FHWA Accelerating Innovation: Hawkins, N., Smadi, O., & Aldemir-Bektas, B. (2012). Smart Work Zone Deployment Initiative; Evaluating the Effectivenss of Temporary Work-Zone Pavement Marking Products. Ames, Iowa: Iowa Department of Transportation; FHWA. Indiana DOT. (2012) Standard Specifications; Section 800. Retrieved May 28, 2013, from Indiana Department of Transportation: Sun, C., Edara, P., Hou, Y., & Robertson, A. (2011). Cost-Benefit Analysis of Sequential Warning Lights in Nighttime Work Zone Tapers. Columbia: Smart Work Zone Deployment Initiative. Texas Department of Transportation. (2012, December 6). Retrieved September 16, 2013, from Texas Department of Transportation Manual on Uniform Traffic Control Devices: Transportation, I. D. (2010, December 21). Retrieved September 12, 2013, from Transportation, I. D. (2012). Idaho DOT Traffic Manual. Retrieved June 10, 2013, from Idaho Department of Transportation: Transportation, M. D. (2008, July). Standard Specifiations for Construction and Materials. Retrieved May 21, 2013, from Y. Cho, K. K.-H. (2011). Effectiveness Study on Temporary Pavement Marking Removals Methods. Lincoln, NE: Nebraska Department of Roads. Guidance for the Use of Temporary Pavement Markings in Work Zones Page 28

32

Evaluating the Effectiveness of Temporary Work-Zone Pavement Marking Products

Evaluating the Effectiveness of Temporary Work-Zone Pavement Marking Products Evaluating the Effectiveness of Temporary Work-Zone Pavement Marking Products Final Report July 2012 Sponsored by Smart Work Zone Deployment Initiative (TPF-5(081)) Federal Highway Administration (InTrans

More information

Section 811. PERMANENT PAVEMENT MARKINGS

Section 811. PERMANENT PAVEMENT MARKINGS 811.01 Section 811. PERMANENT PAVEMENT MARKINGS 811.01. Description. This work consists of providing and applying retroreflective permanent pavement markings in accordance with the Michigan Manual on Uniform

More information

PAVEMENT MARKINGS. F. Grooves Cut for Pavement Markings, Symbols, and Legends

PAVEMENT MARKINGS. F. Grooves Cut for Pavement Markings, Symbols, and Legends PAVEMENT MARKINGS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Permanent Pavement Markings, Symbols, and Legends B. Removable Pavement Markings, Symbols, and Legends C. Temporary Delineators D. Raised Pavement

More information

Field Guide on. Safe Maintenance and. Work Zone Operations

Field Guide on. Safe Maintenance and. Work Zone Operations Field Guide on Installation and Removal of Temporary Traffic Control for Safe Maintenance and Work Zone Operations August 2008 Introduction This field guide provides field personnel with introductory guidance

More information

CHAPTER 16: TRAFFIC. In either situation, the plan must contain the detail for the interim pavement markings.

CHAPTER 16: TRAFFIC. In either situation, the plan must contain the detail for the interim pavement markings. CHAPTER 16: TRAFFIC ADVANCE WARNING SIGN SPACING The Advance Warning Sign Spacing for 0-30 mph has been reduced from 300 feet to 100 feet. This is more in line with the Federal MUTCD and accounts for more

More information

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION Sheet 1 of 7 KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION SECTION TRAFFIC CONTROL Page 628, subsection.01. Delete the following bid items: Advance

More information

TXDOT SIGNING AND MARKINGS REVIEW OF MATERIALS & PRACTICES

TXDOT SIGNING AND MARKINGS REVIEW OF MATERIALS & PRACTICES TXDOT SIGNING AND MARKINGS REVIEW OF MATERIALS & PRACTICES Table of Contents 1 2 3 4 5 6 7 Introduction Traffic Marking Specifications Traffic Marking Practices Signing Specifications Retroreflective Sheeting

More information

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION Sheet 1 of 6 KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION SECTION TRAFFIC CONTROL Page 628, subsection.01. Delete the following bid items: Advance

More information

SECTION 905 TRAFFIC SIGNS, STRIPING AND RAISED MARKERS

SECTION 905 TRAFFIC SIGNS, STRIPING AND RAISED MARKERS SECTION 905 TRAFFIC SIGNS, STRIPING AND RAISED MARKERS Delete this Section in its entirety and replace with the following: SECTION 905 TRAFFIC SIGNS, STRIPING AND RAISED MARKERS 905-1 DESCRIPTION: This

More information

MINNESOTA DEPARTMENT OF TRANSPORTATION Engineering Services Division Technical Memorandum No T-02 October 30, 2014

MINNESOTA DEPARTMENT OF TRANSPORTATION Engineering Services Division Technical Memorandum No T-02 October 30, 2014 MINNESOTA DEPARTMENT OF TRANSPORTATION Engineering Services Division Technical Memorandum No. 14-11-T-02 To: From: Subject: Electronic Distribution Recipients Jon M. Chiglo, P.E. Division Director, Engineering

More information

Road Markings for Machine Vision NCHRP Project (6) Update to AASHTO SCOTE June 2016

Road Markings for Machine Vision NCHRP Project (6) Update to AASHTO SCOTE June 2016 Road Markings for Machine Vision NCHRP Project 20-102(6) Update to AASHTO SCOTE June 2016 NCHRP Project 20-102 Impacts of Connected Vehicles and Automated Vehicles on State and Local Transportation Agencies

More information

2011 Regional Asphalt Meetings. Frequently Asked Questions

2011 Regional Asphalt Meetings. Frequently Asked Questions 2011 Regional Asphalt Meetings Frequently Asked Questions Quiet Pavement Questions 1. Based on the data from the SR 234 site, the decibel difference between the dense graded and PFC was only 1 dba. Is

More information

TECHNICAL SPECIFICATIONS

TECHNICAL SPECIFICATIONS TECHNICAL SPECIFICATIONS ITEM 00663 TRAFFIC BUTTONS & PAVEMENT MARKERS 663.1 Description. This item shall consist of furnishing and installing traffic buttons and reflectorized pavement markers and jiggle

More information

805 - WORK ZONE TRAFFIC CONTROL & SAFETY SECTION 805 WORK ZONE TRAFFIC CONTROL AND SAFETY

805 - WORK ZONE TRAFFIC CONTROL & SAFETY SECTION 805 WORK ZONE TRAFFIC CONTROL AND SAFETY SECTION 805 WORK ZONE TRAFFIC CONTROL AND SAFETY 805.1 DESCRIPTION Provide, erect, maintain and remove traffic control devices as shown in the Contract Documents. On roadways that carry traffic through

More information

GENERAL NOTES FOR WORK ZONE SAFETY SET UP GUIDE

GENERAL NOTES FOR WORK ZONE SAFETY SET UP GUIDE FORWARD It shall be the responsibility of the person in charge to institute the placing of all appropriate cautionary devices and controls as may be required for the particular job. Traffic protection

More information

Field Evaluation Of Pavement Marking Materials

Field Evaluation Of Pavement Marking Materials NTPEP Committee Work Plan for Field Evaluation Of Pavement Marking Materials NTPEP Designation: PMM-17-01 National Transportation Product Evaluation Program 444 North Capitol Street N. W., Suite 249 Washington,

More information

OKLAHOMA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISIONS FOR TRAFFIC STRIPE (MULTI-POLYMER)

OKLAHOMA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISIONS FOR TRAFFIC STRIPE (MULTI-POLYMER) 856-1(a-g) 09 OKLAHOMA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISIONS FOR TRAFFIC STRIPE (MULTI-POLYMER) These Special Provisions revise, amend, and where in conflict, supersede applicable sections of

More information

State Freeways/Expressways State Highways Roundabouts Special Markings Notes

State Freeways/Expressways State Highways Roundabouts Special Markings Notes State Freeways/Expressways State Highways Roundabouts Special Markings Notes Alabama (Tape on concrete surfaces) (Tape on concrete surfaces) We have none at this time but would be same as left (Tape on

More information

Section 505. CHIP SEALS

Section 505. CHIP SEALS Section 505. CHIP SEALS 505.01. Description. This work consists of preparing the pavement surface and providing and placing a single chip seal, double chip seal, or shoulder chip seal. 505.02. Materials.

More information

2016 MUTCD CONCEPT TTC COMMENTS. Michael A. Chacon Traffic Operations Division

2016 MUTCD CONCEPT TTC COMMENTS. Michael A. Chacon Traffic Operations Division 2016 MUTCD CONCEPT TTC COMMENTS Michael A. Chacon Traffic Operations Division MUTCD 4 Ballot items were discussed at the June 2014 meeting in TTC, as well as additional topics. TTC No. 1 Pedestrian and

More information

May 2004 Traffic Control 600-i. Table of Contents 601 WORK ZONE TRAFFIC CONTROL DESCRIPTION OF WORK

May 2004 Traffic Control 600-i. Table of Contents 601 WORK ZONE TRAFFIC CONTROL DESCRIPTION OF WORK DIVISION 600 Traffic Control SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION May 2004 May 2004 Traffic Control 600-i Section Table of Contents Page 601 WORK ZONE TRAFFIC CONTROL...601-1 601.1 DESCRIPTION

More information

CEDAR RAPIDS METROPOLITAN AREA STANDARD SPECIFICATIONS FOR PUBLIC IMPROVEMENTS April 2003

CEDAR RAPIDS METROPOLITAN AREA STANDARD SPECIFICATIONS FOR PUBLIC IMPROVEMENTS April 2003 SECTION 02850 PAVEMENT MARKINGS PART 1 GENERAL 1.01 - Section Includes A. Traffic Paint. B. Thermoplastic Reflectorized Pavement Markings. C. Permanent Marking Tape. D. Preformed Polymer Marking Material

More information

QUALITY STANDARDS for Temporary Traffic Control Devices

QUALITY STANDARDS for Temporary Traffic Control Devices QUALITY STANDARDS for Temporary Traffic Control Devices Contents Introduction 1 Quality Requirements 2 Quality Standards 2 General 2 Barricades, Channelizing Devices, and Signs 3 Warning Lights 3 Flashing

More information

SECTION 616 TEMPORARY TRAFFIC CONTROL

SECTION 616 TEMPORARY TRAFFIC CONTROL SECTION 616 TEMPORARY TRAFFIC CONTROL 616.1 Description. This work shall consist of furnishing, installing, operating, maintaining, cleaning, relocating and removing temporary traffic control devices and

More information

Chapter 8 WORK ZONE TRAFFIC CONTROLS

Chapter 8 WORK ZONE TRAFFIC CONTROLS October 31, 2009 Chapter 8 WORK ZONE TRAFFIC CONTROLS TABLE OF CONTENTS Page 8-1.00 INTRODUCTION..........................................................8-3 1.01 Purpose 1.02 Scope 1.03 Relation to Other

More information

Safety. Introduction. Total System

Safety. Introduction. Total System Safety Introduction Ohio is the 35 th largest state in the nation based on geographic size, however it carries the 5 th largest total traffic volume and the 4 th largest truck traffic volume. With such

More information

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS Section Page SECTION 14 RESTORATION OF SURFACES... 14.1 14-1 GENERAL... 14.1 14-2 PRIVATE ROADS... 14.1 14-3 STREETS AND PARKING LOTS... 14.1 14-3.01

More information

HDX TECHNICAL SPECIFICATION

HDX TECHNICAL SPECIFICATION HDX TECHNICAL SPECIFICATION SafeLane surface overlay Pavement Substrate A Cargill Deicing Technology Product Providing customers with deicing solutions that save lives and enhance commerce. Helping to

More information

300 MARKINGS Traffic Engineering Manual

300 MARKINGS Traffic Engineering Manual TABLE OF CONTENTS Part 3 - MARKINGS 300 GENERAL... 3-5 300- Introduction... 3-5 300-2 Construction Projects... 3-5 300-3 Force Account (ODOT Operations) Work... 3-5 30 PAVEMENT & CURB MARKINGS... 3-6 30-

More information

Selecting a Method to Comply with the Requirements for Traffic Sign Retroreflectivity

Selecting a Method to Comply with the Requirements for Traffic Sign Retroreflectivity Selecting a Method to Comply with the Requirements for Traffic Sign Retroreflectivity James W. Ellison, P.E. Consulting Traffic Engineer Federal Way, WA The Complexity of Sign Retroreflectivity Driver

More information

Welcome!! Traffic Control Supervisor. Training Course

Welcome!! Traffic Control Supervisor. Training Course Welcome!! Traffic Control Supervisor Training Course Traffic Control Supervisor Training Course Two-day course Begins promptly at 8:00 AM Ends no later than 5:00 PM Flexible schedule!! 0-2 Course Objectives

More information

Implementation of a Pavement Marking Management Program in Florida

Implementation of a Pavement Marking Management Program in Florida Implementation of a Pavement Marking Management Program in Florida NESMEA 2013 Presentation Outline Pavement Marking Information Current Re-Striping Determinations Mobile Retroreflectivity Unit (MRU) MRU

More information

May 8, 2017 ADDENDUM #1. IFB Resin Floor System For Highway Department Central District Building

May 8, 2017 ADDENDUM #1. IFB Resin Floor System For Highway Department Central District Building May 8, 2017 ADDENDUM #1 IFB 17-082 Resin Floor System For Highway Department Central District Building Addendum #1 is being issued to offer an alternate resin flooring system. 096700 FLUID-APPLIED FLOORING

More information

research report Virginia Transportation Research Council Final Report VTRC 09-R24 MICHAEL D. FONTAINE, Ph.D., P.E. Senior Research Scientist

research report Virginia Transportation Research Council Final Report VTRC 09-R24 MICHAEL D. FONTAINE, Ph.D., P.E. Senior Research Scientist Final Report VTRC 09-R24 Virginia Transportation Research Council research report Synthesis of Benefits and Costs of Alternative Lane Marking Strategies http://www.virginiadot.org/vtrc/main/online_reports/pdf/09-r24.pdf

More information

Asphalt Paving

Asphalt Paving University of New Hampshire University of New Hampshire Scholars' Repository Division 32 Exterior Improvements Chapter 5 Technical Construction and Renovation Standards 1-25-2013 321216 - Asphalt Paving

More information

550 Surface Treatments

550 Surface Treatments Table of Contents 550 Surface Treatments... 550-1 550.1 Introduction... 550-1 551 Crack Sealing... 550-1 551.1 Project Selection... 550-1 551.2 Design Considerations... 550-1 552 Chip Sealing... 550-2

More information

PENNSYLVANIA TURNPIKE COMMISSION Harrisburg, Pennsylvania

PENNSYLVANIA TURNPIKE COMMISSION Harrisburg, Pennsylvania PENNSYLVANIA TURNPIKE COMMISSION Harrisburg, Pennsylvania INSTALLATION OF DURABLE PAVEMENT MARKINGS BETWEEN MILEPOST 000.00 TO MILEPOST 245.75; TOLL I-376, TURNPIKE 66, TURNPIKE 43, AND TURNPIKE 576 IN

More information

Bridge Deck Preservation Treatment Options

Bridge Deck Preservation Treatment Options Western Bridge Preservation Partnership May 17-18, 2016 Salt Lake City, Utah Bridge Deck Preservation Treatment Options Gregg Freeman - Kwikbond Polymers Rob Johnson - Transpo Industries Clay Christiansen

More information

MUTCD Part 6F: Temporary Traffic Control Zone Devices

MUTCD Part 6F: Temporary Traffic Control Zone Devices MUTCD Part 6F: Temporary Traffic Control Zone Devices 6F.01 Types of Devices FHWA policy requires that all roadside appurtenances such as traffic barriers, barrier terminals and crash cushions, bridge

More information

805 - WORK ZONE TRAFFIC CONTROL & SAFETY SECTION 805 WORK ZONE TRAFFIC CONTROL AND SAFETY

805 - WORK ZONE TRAFFIC CONTROL & SAFETY SECTION 805 WORK ZONE TRAFFIC CONTROL AND SAFETY SECTION 805 WORK ZONE TRAFFIC CONTROL AND SAFETY 805.1 DESCRIPTION Provide, erect, maintain and remove traffic control devices as shown in the Contract Documents. BID ITEMS UNITS Work Zone Signs (0 to

More information

SPECIAL SPECIFICATION 7270 High Build Paint

SPECIAL SPECIFICATION 7270 High Build Paint 2004 Specifications CSJ 6147-86-001 SPECIAL SPECIFICATION 7270 High Build Paint 1. Description. A. This work shall consist of furnishing and installing a multiple component, retroreflective traffic marking

More information

53.20 PAINTED ROADWAY LINES

53.20 PAINTED ROADWAY LINES 53.20 PAINTED ROADWAY LINES 53.20.1 GENERAL The Work consists of supplying paint and painting roadway lines on pavement surfaces. The various configurations of roadway lines are shown in the Department

More information

Evaluation of Flexible Delineator Posts

Evaluation of Flexible Delineator Posts Transportation Kentucky Transportation Center Research Report University of Kentucky Year 1990 Evaluation of Flexible Delineator Posts Kenneth R. Agent Jerry G. Pigman University of Kentucky, ken.agent@uky.edu

More information

ARBN PRODUCT INDEX

ARBN PRODUCT INDEX ARBN 26 008 776 243 PRODUCT INDEX TRAFFIC PAINTS 1. Waterbased Road Marking 201 White 2. Waterbased Road Marking 301 HD White 3. Waterbased Road Marking 401 HD White 4. Waterbased Road Marking RF6040 White

More information

Prevention of Transverse Bumps Over Crack Sealant During Asphalt Overlay Construction

Prevention of Transverse Bumps Over Crack Sealant During Asphalt Overlay Construction Prevention of Transverse Bumps Over Crack Sealant During Asphalt Overlay Construction Crack sealants are often utilized as a pavement preservation tool in asphalt pavements. These sealants are placed in

More information

Section 504. MICRO-SURFACING

Section 504. MICRO-SURFACING 504.01 Section 504. MICRO-SURFACING 504.01. Description. This work consists of preparing existing pavement and providing and placing a micro-surfacing mixture. 504.02. Materials. Provide materials in accordance

More information

Night Work Specification

Night Work Specification 1.0 HOURS OF WORK Night Work Specification Night time hours are defined as per the Tender documents. 2.0 TRAFFIC CONTROL PLAN Prior to the start of work the Contractor shall submit 4 bound copies of a

More information

CHAPTER 4 GRADE SEPARATIONS AND INTERCHANGES

CHAPTER 4 GRADE SEPARATIONS AND INTERCHANGES CHAPTER 4 GRADE SEPARATIONS AND INTERCHANGES 4.0 INTRODUCTION The ability to accommodate high volumes of intersecting traffic safely and efficiently through the arrangement of one or more interconnecting

More information

Floor-Mark How Smart are your floors?

Floor-Mark How Smart are your floors? How Smart are your floors? You won t GET LEAN... until you GET VISUAL! 7381 Ardith Ct., Byron Center, MI 49315 616.583.9400 info@ Smart Floors Drive Efficiency & Productivity A Visual Workplace Helps Build

More information

Stanford University Facilities Design Guidelines SECTION SEAL COATS. C. Section : Traffic Striping and Pavement Markings

Stanford University Facilities Design Guidelines SECTION SEAL COATS. C. Section : Traffic Striping and Pavement Markings SECTION 32 12 36 SEAL COATS PART 1 GENERAL 1.1 RELATED WORK A. Section 31 10 00: Site Preparation B. Section 32 12 00: Flexible Paving C. Section 32 17 23 01: Traffic Striping and Pavement Markings 1.2

More information

INVESTIGATE THE ABILITY TO DETERMINE PAVEMENT MARKING RETROREFLECTIVITY

INVESTIGATE THE ABILITY TO DETERMINE PAVEMENT MARKING RETROREFLECTIVITY INVESTIGATE THE ABILITY TO DETERMINE PAVEMENT MARKING RETROREFLECTIVITY Evaluate the Advanced Mobile Asset Collection (AMAC) Mobile Pavement Marking Retroreflectivity Measurement System Report prepared

More information

Advantages: Advantages include:

Advantages: Advantages include: Elgin, Illinois Hi-Tek Polymers Floor Description: Hi-Tek Polymers Floor is a decorative thin-set epoxy system of 1/4" (6,3mm) to 3/8 (MM) which meets all the standards set by the NTMA (National Terrazzo

More information

US 14 EIS (New Ulm to N. Mankato) Interchange and Intersection Type Comparison

US 14 EIS (New Ulm to N. Mankato) Interchange and Intersection Type Comparison T E C H N I C A L M E M O R A N D U M US 14 EIS (New Ulm to N. Mankato) Interchange and Intersection Type Comparison PREPARED FOR: Mn/DOT District 7 PREPARED BY: CH2M HILL DATE: March 27, 2007 This technical

More information

PAINTS AND ENAMELS. Package the paint in new containers marked with the following information:

PAINTS AND ENAMELS. Package the paint in new containers marked with the following information: PAINTS AND ENAMELS 3501 BASIC REQUIREMENTS FOR PAINTS 3501.1 SCOPE Provide paints for construction and maintenance. 3501.2 REQUIREMENTS A Package Stability Ensure the paint does not cake, liver, thicken,

More information

Rust Bullet Home and Farm FAQ s

Rust Bullet Home and Farm FAQ s Rust Bullet Home and Farm FAQ s 1. Will Rust Bullet Protect My Galvanized Metal Roof? Yes. Rust Bullet is the ideal coating for protecting sheet metal buildings and roofs; it not only provides protection

More information

Asphalt Maintenance PRODUCTS INFORMATION AND INSTALLATION GUIDE

Asphalt Maintenance PRODUCTS INFORMATION AND INSTALLATION GUIDE Asphalt Maintenance PRODUCTS INFORMATION AND INSTALLATION GUIDE TABLE OF CONTENT About RESISTO 2 Asphalt Cleaner and Degreaser 3 Oil Spot Primer 3 Liquid Crack Filler 4 Rubberized Crack Filler 4 Levelling

More information

Everything you need to know about Chip Seals and Fog Seals

Everything you need to know about Chip Seals and Fog Seals 1 Everything you need to know about Chip Seals and Fog Seals March 22-24, 2016 Nashville, TN www.worldofasphalt.com Preventive maintenance treatments Time or traffic Rehabilitate 1 The right treatment

More information

KENTUCKY TRANSPORTATION CENTER

KENTUCKY TRANSPORTATION CENTER Research Report KTC-08-20/FR155-06-1F KENTUCKY TRANSPORTATION CENTER EXPERIMENTAL CONCRETE COATING APPLICATION ON THE MEDIAN BARRIER OF I-65 IN LOUISVILLE OUR MISSION We provide services to the transportation

More information

Concept of Operations prepared for Minnesota Department of Transportation (MnDOT) for Rural Intersection Conflict Warning Systems II Deployment

Concept of Operations prepared for Minnesota Department of Transportation (MnDOT) for Rural Intersection Conflict Warning Systems II Deployment Concept of Operations prepared for Minnesota Department of (MnDOT) for Rural Intersection Conflict Warning Systems II Deployment December 22, 2014 Table of Contents 1. Introduction and Concept Overview...1

More information

Attractive, Durable Composite Sound Walls

Attractive, Durable Composite Sound Walls SOUND BARRIER SYSTEM Attractive, Durable Composite Sound Walls AcoustaShield sound barrier systems meet or exceed AASHTO and DOT sound wall guidelines. SOUND BARRIER SYSTEM Carsonite AcoustaShield sound

More information

PREPARATION IS THE KEY TO SUCCESSFUL FLOOR COATINGS By Bob Cusumano

PREPARATION IS THE KEY TO SUCCESSFUL FLOOR COATINGS By Bob Cusumano PREPARATION IS THE KEY TO SUCCESSFUL FLOOR COATINGS By Bob Cusumano Coating new concrete floors can really be tough. Whether you re painting the floor of a large warehouse or the garage in a home, there

More information

Attractive, Durable Composite Sound Walls Sound-mitigation fencing with a lightweight design for easy installation.

Attractive, Durable Composite Sound Walls Sound-mitigation fencing with a lightweight design for easy installation. SOUND BARRIER SYSTEM Attractive, Durable Composite Sound Walls Sound-mitigation fencing with a lightweight design for easy installation. AcoustaShield sound barrier systems meet or exceed AASHTO and DOT

More information

Pavement Maintenance Best Practices. Thomas J. Wood

Pavement Maintenance Best Practices. Thomas J. Wood Pavement Maintenance Best Practices Thomas J. Wood Agenda Why pavement maintenance / preservation is important Dealing with cracks When to apply a surface treatment Fog Sealing Micro Milling UTBWC Thin

More information

CTRE DURABLE, COST-EFFECTIVE PAVEMENT MARKINGS PHASE I: SYNTHESIS OF CURRENT RESEARCH FINAL REPORT

CTRE DURABLE, COST-EFFECTIVE PAVEMENT MARKINGS PHASE I: SYNTHESIS OF CURRENT RESEARCH FINAL REPORT DURABLE, COST-EFFECTIVE PAVEMENT MARKINGS PHASE I: SYNTHESIS OF CURRENT RESEARCH FINAL REPORT Sponsored by the Iowa Department of Transportation and the Iowa Highway Research Board Iowa DOT Project TR-454

More information

610 - DOUBLE ASPHALT SURFACE TREATMENT SECTION 610 DOUBLE ASPHALT SURFACE TREATMENT

610 - DOUBLE ASPHALT SURFACE TREATMENT SECTION 610 DOUBLE ASPHALT SURFACE TREATMENT SECTION 610 DOUBLE ASPHALT SURFACE TREATMENT 610.1 DESCRIPTION Construct a wearing surface composed of an asphalt prime coat followed by the applications of 2 asphalt seal coats and cover material as specified

More information

Washington State Department of Transportation Case Study. Guidelines for the Preservation of High-Traffic-Volume Roadways (R26)

Washington State Department of Transportation Case Study. Guidelines for the Preservation of High-Traffic-Volume Roadways (R26) Washington State Department of Transportation Case Study Guidelines for the Preservation of High-Traffic-Volume Roadways (R26) Background Stretching the time between major rehabilitation projects can save

More information

Maintenance & Rehabilitation. Treatments. Crack Sealing. Sealant Types. Asphalt Pavement Preservation: Identification of Alternative Treatments

Maintenance & Rehabilitation. Treatments. Crack Sealing. Sealant Types. Asphalt Pavement Preservation: Identification of Alternative Treatments Asphalt Pavement Preservation: Evaluation, Maintenance & Rehabilitation Maintenance & Rehabilitation Treatments Identification of Alternative Treatments Before selecting a treatment for a pavement, we

More information

SECTION PAINTED PAVEMENT MARKINGS. A. Section Includes: Painted traffic striping and symbols on pavements and curbs.

SECTION PAINTED PAVEMENT MARKINGS. A. Section Includes: Painted traffic striping and symbols on pavements and curbs. SECTION 02763 PAINTED PAVEMENT MARKINGS PART 1 - GENERA 1.1 SUMMARY A. Section Includes: Painted traffic striping and symbols on pavements and curbs. B. Related Documents: The Conditions of the Contract

More information

WorkZone Safety:Traffic Control Plans and Intrusion Prevention Basic Work Zone Traffic Control Principles External Traffic Control

WorkZone Safety:Traffic Control Plans and Intrusion Prevention Basic Work Zone Traffic Control Principles External Traffic Control WorkZone Safety:Traffic Control Plans and Intrusion Prevention Basic Work Zone Traffic Control Principles External Traffic Control Intrusion of the Traveling Population Employees exposed to traffic Internal

More information

Q: How often should the PaveDrain System be completely cleaned or maintained?

Q: How often should the PaveDrain System be completely cleaned or maintained? MAINTENANCE MANUAL The PaveDrain System is a one of a kind paving surface that takes all of the positive attributes of traditional paving surfaces and puts them together into one single permeable paving

More information

1. General Signs shall conform to Section 56, Signs, of the State Specifications, and these Specifications.

1. General Signs shall conform to Section 56, Signs, of the State Specifications, and these Specifications. Section 32 TRAFFIC SIGNS, MARKINGS, AND BARRICADES 32-1 TRAFFIC SIGNS 1. General Signs shall conform to Section 56, Signs, of the State Specifications, and these Specifications. 2. Overhead Sign Structures

More information

Application Instructions for Keystone Kool Deck on Existing Concrete

Application Instructions for Keystone Kool Deck on Existing Concrete Application Instructions for Keystone Kool Deck on Existing Concrete REQUIRED MATERIALS Keystone Kool Deck PTA Bonding Agent Water 20 Mesh Marble Sand White Portland Cement OPTIONAL TOOLS Mortex Pattern

More information

603 - ASPHALT PAVEMENT SMOOTHNESS SECTION 603 ASPHALT PAVEMENT SMOOTHNESS

603 - ASPHALT PAVEMENT SMOOTHNESS SECTION 603 ASPHALT PAVEMENT SMOOTHNESS SECTION 603 ASPHALT PAVEMENT SMOOTHNESS 603.1 DESCRIPTION Determine the smoothness of the pavement surface and correct the deficiencies as specified in the Contract Documents. For the purposes of this

More information

Section 508. CHIP SEALS Description. Prepare the surface and apply the specified single chip seal, double chip seal or shoulder chip seal.

Section 508. CHIP SEALS Description. Prepare the surface and apply the specified single chip seal, double chip seal or shoulder chip seal. 508.01 Section 508. CHIP SEALS 508.01 Description. Prepare the surface and apply the specified single chip seal, double chip seal or shoulder chip seal. 508.02 Materials. Use materials meeting the following.

More information

Maryland Transportation Authority (MDTA)

Maryland Transportation Authority (MDTA) Maryland Transportation Authority (MDTA) I-95 Major Deck and Superstructure Rehabilitation South of the Fort McHenry Tunnel Northeast Bridge Preservation Partnership Conference September 20, 2016 David

More information

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS Section Page 14-1 GENERAL... 14.1 14-2 PRIVATE ROADS... 14.1 14-3 STREETS AND PARKING LOTS... 14.1 14-3.01 Aggregate Base... 14.1 14-3.02 Asphalt

More information

A. This Section includes resinous flooring systems with epoxy body coat(s).

A. This Section includes resinous flooring systems with epoxy body coat(s). SECTION 096723 - RESINOUS FLOORING PART 1 - GENERAL 1.1 SUMMARY A. This Section includes resinous flooring systems with epoxy body coat(s). 1. Application Method: Troweled (Slurry, Seeded or Broadcast

More information

ESTIMATE OF QUANTITIES

ESTIMATE OF QUANTITIES ESTIMATE OF QUANTITIES STATE OF PROJECT SOUTH DAKOTA 083S-351 SHEET TOTAL NO. SHEETS 2 9 ESTIMATED QUANTITIES The below quantities are based on the rates shown in the Rates of Materials. This is only an

More information

SACRAMENTO COUNTY ASPHALT RUBBER HOT MIX-GAP GRADED (ARHM-GG):

SACRAMENTO COUNTY ASPHALT RUBBER HOT MIX-GAP GRADED (ARHM-GG): SACRAMENTO COUNTY ASPHALT RUBBER HOT MIX-GAP GRADED (ARHM-GG): ARHM-GG shall conform to the provisions for Type "A" asphalt concrete in Section 39, "Asphalt Concrete," of the State Standard Specifications

More information

IMPROVING EXIT RAMP VISIBILITY IN WORK ZONES. Proposal submitted by: Cleveland State University and Ohio University. Principal Investigators:

IMPROVING EXIT RAMP VISIBILITY IN WORK ZONES. Proposal submitted by: Cleveland State University and Ohio University. Principal Investigators: IMPROVING EXIT RAMP VISIBILITY IN WORK ZONES Proposal submitted by: Cleveland State University and Ohio University Principal Investigators: Stephen F. Duffy, Ph.D., P.E., F.ASCE for Cleveland State University

More information

SPECIFICATIONS FOR AluSystems Aluminum Composite Panels Series 20 Dry Joint 1.00 GENERAL 1.01 RANGE OF WORK Section includes: Laminated panels and attachment systems for use as exterior cladding. A. Provide

More information

High Friction Surface Treatments Frequently Asked Questions

High Friction Surface Treatments Frequently Asked Questions High Friction Surface Treatments Frequently Asked Questions Frequently Asked Questions about High Friction Surface Treatments (HFST) SAFETY MAINTENANCE AND OPERATIONS COST ENVIRONMENTAL IMPACTS SITE CONDITIONS

More information

Sherman Library Maintenance Handbook for Porous Asphalt

Sherman Library Maintenance Handbook for Porous Asphalt Sherman Library Maintenance Handbook for Porous Asphalt Porous asphalt systems are an effective means of stormwater management. Unlike traditional pavements, rainfall drains through the pavement surface

More information

Chapter URBAN & RURAL FREEWAY DESIGN

Chapter URBAN & RURAL FREEWAY DESIGN Chapter 5 URBAN & RURAL FREEWAY DESIGN 5.1 INTRODUCTION This chapter provides standards and guidance for urban and rural freeways on new construction/reconstruction projects. The chapter also provides

More information

Modeling Merging Behavior at Lane Drops

Modeling Merging Behavior at Lane Drops InTrans Project Reports Institute for Transportation 2-2015 Modeling Merging Behavior at Lane Drops Shauna L. Hallmark Iowa State University, shallmar@iastate.edu Nicole Lynn Oneyear Iowa State University

More information

SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS

SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS Section Page 26-1 GENERAL... 26.1 26-2 PAVEMENT KEYCUTTING... 26.1 26-3 PAVEMENT PLANING... 26.2 26-4 PLANED PAVEMENT CONFORMS... 26.3

More information

MATERIAL SPECIFICATION FOR THERMOPLASTIC PAVEMENT MARKING MATERIALS

MATERIAL SPECIFICATION FOR THERMOPLASTIC PAVEMENT MARKING MATERIALS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 1713 FEBRUARY 1991 MATERIAL SPECIFICATION FOR THERMOPLASTIC PAVEMENT MARKING MATERIALS 1713.01 SCOPE 1713.02 REFERENCES 1713.03 DEFINITIONS 1713.05

More information

A. Manufacturer: A firm that produces primary glass or fabricated glass as defined in referenced glazing publications.

A. Manufacturer: A firm that produces primary glass or fabricated glass as defined in referenced glazing publications. SECTION 08800 - GLAZING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections,

More information

Bridge Preservation: Thin epoxy overlays

Bridge Preservation: Thin epoxy overlays Bridge Preservation: Thin epoxy overlays and anti-skid surfacing Structurally Deficient Bridges Source: US DOT, 2008 Estimate to eliminate all bridge deficiencies: $9.4 billion per year for 20 years Source:

More information

TRAFFIC CONTROL STRATEGIES FOR SHORT- TERM, SHORT-DURATION, AND MOBILE WORK ZONES

TRAFFIC CONTROL STRATEGIES FOR SHORT- TERM, SHORT-DURATION, AND MOBILE WORK ZONES TRAFFIC CONTROL STRATEGIES FOR SHORT- TERM, SHORT-DURATION, AND MOBILE WORK ZONES Training Program FHWA GRANT DTFH61-11-RA-00012 1 DISCLAIMER Opinions, findings, and conclusions expressed in this presentation

More information

Rehabilitation Strategies for Bonded Concrete Overlays of Asphalt Pavements

Rehabilitation Strategies for Bonded Concrete Overlays of Asphalt Pavements University of Pittsburgh Rehabilitation Strategies for Bonded Concrete Overlays of Asphalt Pavements Authors: J. M Vandenbossche S. Sachs August 2013 1. Introduction Bonded concrete overlays of asphalt

More information

Ohio Department of Transportation

Ohio Department of Transportation Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH 43223 Ted Strickland, Governor Jolene M. Molitoris, Director THE DEPARTMENT UTILIZES BID EXPRESS (http://www.bidx.com)

More information

Asphalt Rubber Chip Sealing DRAFT MAINTENANCE SPECIFICATION. March 22, 2007

Asphalt Rubber Chip Sealing DRAFT MAINTENANCE SPECIFICATION. March 22, 2007 Asphalt Rubber Chip Sealing DRAFT MAINTENANCE SPECIFICATION March 22, 2007 Description: This work consists of furnishing and applying asphalt rubber binder followed by an application of treated cover aggregate

More information

MANDATORY SUPPLEMENTAL SPECIFICATIONS FOR CONTRACTOR QUALITY CONTROL Contractor Quality Control - is replaced with the following:

MANDATORY SUPPLEMENTAL SPECIFICATIONS FOR CONTRACTOR QUALITY CONTROL Contractor Quality Control - is replaced with the following: MANDATORY SUPPLEMENTAL SPECIFICATIONS FOR CONTRACTOR QUALITY CONTROL EFFECTIVE DATE: OCTOBER 14, 2011 200.07 Contractor Quality Control - is replaced with the following: (a) (b) (c) Scope: These requirements

More information

Executive Summary Arizona s Use of Asphalt-Rubber

Executive Summary Arizona s Use of Asphalt-Rubber Executive Summary Arizona s Use of Asphalt-Rubber I. Overview Arizona is a leader in the use of asphalt-rubber (A-R). 1 The use of A-R is growing in a number of states, including: California, New Mexico,

More information

SECTION EPOXY FLOORING SYSTEMS

SECTION EPOXY FLOORING SYSTEMS SECTION 09800 EPOXY FLOORING SYSTEMS PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

THE ADVANCES AND BARRIERS IN APPLICATION OF NEW CONCRETE TECHNOLOGY

THE ADVANCES AND BARRIERS IN APPLICATION OF NEW CONCRETE TECHNOLOGY 25 THE ADVANCES AND BARRIERS IN APPLICATION OF NEW CONCRETE TECHNOLOGY Suneel N. Vanikar Federal Highway Administration, U.S. Department of Transportation, Washington, DC, USA Abstract Numerous advances

More information

ITEM 458 WATERPROOFING FOR STRUCTURES

ITEM 458 WATERPROOFING FOR STRUCTURES ITEM 458 WATERPROOFING FOR STRUCTURES 458.1. Description. This Item shall govern for the furnishing and placing of waterproofing on concrete and steel bridge decks of railroad structures and on other structures

More information

Liquid Road Bituminous Surface Treatment for Parking Lots

Liquid Road Bituminous Surface Treatment for Parking Lots BEST PRACTICES FOR SEALCOATING Liquid Road Bituminous Surface Treatment for Parking Lots A Premium Surface Coating for Superior Durability, Protection and Beautification sealmaster.net (800) 395-7325 Copyright

More information

Cold In-Place Recycling

Cold In-Place Recycling Cold In-Place Recycling Dan Schellhammer, P.E. Midstate Reclamation and Trucking In 1991, Midstate brought the first reclaimer into the state of Minnesota Emphasis on asphalt recycling techniques (milling,

More information