1 Hawke s Bay Snow Event 6 August National Lifelines Forum 2 November 2016 Brendan Olsen, Regional Service Manager Lower North Island

2 Weather forecast

3 Map

4 Normal grid configuration before event Core grid Wairakei 70MW 70MW G Whirinaki Redclyffe 220kV Whakatu Fernhill X Waipawa Redclyffe 110kV Tuai 40MW G

5 Saturday 6 th August First Tripping at 2:30am (RDF_WRK_1), several reclosed attempts but remained out. Loss to Hawkes Bay at 2:45am 209MW all restored at 4:48am (133 minutes) Service Providers called to patrol line Second loss at 9:59am 207MW all restored at 11:34am (95 minutes) Remaining 220kV circuit restored 12:13pm

6 Customers affected by event

7 Genesis Energy s assets affected by event

8 Contact Energy s assets affected by event

9 Pan Pac s assets in affected by event

10 Event Management Both National Grid Operating Centres (Auckland & Christchurch) managed with National Co-ordinations Centres Hamilton & Wellington). Event rooms stood up (Operations, Maintenance, Engineering) with Skype for those contributing from home on Saturday at 8am. HB Civil Defence contacted during both losses of supply, Teleconference 3pm with s updates subsequent days. Media kept update along with social media (facebook) Continued during the day with handovers until 8pm then stood down. Reviewed 10am Sunday then stood down

11 Faults locations

12 Aerial patrol

13 Patrol findings

14 Phase-to-phase faults Distance to Fault Towers Distance to Fault Towers Faults Found from Patrols Span Yellow Phase rolled over Faults Found from Patrols Span Red Phase Twist Span Red Phase Twist Span Red & Blue Phase rolled over Span Blue Phase rolled over Distance between phases 5.5m

15 Recovery Further Helicopter Patrol and ground visits to access site access. WRK_WHI_1 outage September to flip conductors, check spacers while reinsulation being undertaken. RDF_WRK_1 outage October to flip conductors, check spacers while reinsulation being undertaken.

16 Post Event 19 of 20 Actions identified 8 August completed Hawkes Bay 220kV Contingency plan updated Equipment issues (4 separate) Loss of Metservice Weather Station Operations visit to Unison and Pan Pac

17 Longer term Investigations Electrical Islanding for Hawkes Bay Upgrade 220kV Protection (reduce the potential for lines tripping) Conduct further review on 110kV Contingency Plan Following Transpower protection analysis, direct-connect and lines customers review their protection Hawkes Bay restoration automation design Investigate whether a case to install interphase spacers is feasible Determine if Transpower should procure black start capability for the region (at Tuai)

18 Learnings Weather events are becoming more frequent and severe 1 every 3-4 years for Hawkes Bay. All parties have a particular role to play in providing resilience for the Hawkes Bay. Be aware of each others resilience-related capabilities and abilities. Contingency plans are important ensure you review and share them. Risk Analysis Preventative Controls pre-event, Impact Minimisation Controls during the event.

19

20 Impact on Unison Network Power lost at 6:40am. 200 connections lost off Hawkes Bay Network. 190 connections lost off Taupo Network suffered significant damage multiple generators including network generators deployed. HB Restoration: 100 within 3-4 days, 7 days remaining 100. Taupo Restoration: 80 within 10 days, 25 days, remaining 20 at 4 weeks final connections 2/3 September. 70 staff in the field working to restore the network.

21 Taupo Network

22 Unison Key Learnings Lifelines relationships and processes important Inter-agency co-ordination was important Availability of power closely linked to welfare Animal welfare important Proactive public communication Overall effective response and co-ordination working closely with Lifelines and Civil Defence

BELLS POND-WAITAKI TRANSMISSION CONSTRAINT - PROPOSED APPROACH INFORMATION DOCUMENT

BELLS POND-WAITAKI TRANSMISSION CONSTRAINT - PROPOSED APPROACH INFORMATION DOCUMENT BELLS POND-WAITAKI TRANSMISSION CONSTRAINT - PROPOSED APPROACH INFORMATION DOCUMENT CONTINGENCY PLANS NET BENEFIT ANALYSIS Transpower New Zealand Limited October 2016 i Table of Contents Proposal Summary...

More information

WELLINGTON EARTHQUAKE NATIONAL INITIAL RESPONSE PLAN (WENIRP)

WELLINGTON EARTHQUAKE NATIONAL INITIAL RESPONSE PLAN (WENIRP) WELLINGTON EARTHQUAKE NATIONAL INITIAL RESPONSE PLAN (WENIRP) T.H. Woodley Ministry of Civil Defence and Emergency Management 2010 NZSEE Conference ABSTRACT The objective of this paper is to describe the

More information

A SUPPORTING DOCUMENT TO OUR 2015 INTEGRATED TRANSMISSION PLAN SERVICES REPORT 2015

A SUPPORTING DOCUMENT TO OUR 2015 INTEGRATED TRANSMISSION PLAN SERVICES REPORT 2015 A SUPPORTING DOCUMENT TO OUR 2015 INTEGRATED TRANSMISSION PLAN SERVICES REPORT 2015 Services Report September 2015 ii TABLE OF CONTENTS 1. INTRODUCTION... 1 1.1. Purpose... 1 1.2. Services covered by this

More information

Outage Protocol: Explanatory note

Outage Protocol: Explanatory note Outage Protocol: Explanatory note This is the version of the outage protocol (previously in section VII of part F of the Electricity Governance Rules 2003) that the Authority is required to publish by

More information

Plan and manage helicopter overhead lines operation

Plan and manage helicopter overhead lines operation Page 1 of 5 Plan and manage helicopter overhead lines operation Level 5 Credits 10 Purpose People credited with this unit standard are able, for helicopter overhead lines operations, to: plan; organise

More information

BR04 SERVICE PERFORMANCE MEASURES

BR04 SERVICE PERFORMANCE MEASURES SERVICE PERFORMANCE MEASURES 1 October 2013 C O P Y R I G H T 2013 T R A N S P O W E R N E W Z E A L A N D L I M I T E D. A L L R I G H T S R E S E R V E D This document is protected by copyright vested

More information

Black Start Strategy

Black Start Strategy Issue 1 Revision Black Start Strategy Produced in accordance with Standard Condition C16 of the NGET Transmission Licence Effective from 1 st April 2017 to 31 st March 2018 DOCUMENT HISTORY Version 1.0

More information

Plan. Security of Supply Participant Rolling Outage. Plan

Plan. Security of Supply Participant Rolling Outage. Plan Plan Security of Supply Participant Rolling Outage Security of Supply - Participant Rolling Outage Plan 31 March 2017 Table of Contents 1 PURPOSE OF THIS DOCUMENT... 1 2 DEFINITIONS... 1 2.1 Associated

More information

Busbar Classification Review

Busbar Classification Review Busbar Classification Review Updated Credible Methodology and Trial Results Transpower New Zealand Limited February 2017 Version Date Change 1 01/02/2017 Pubilshed for feedback IMPORTANT Disclaimer The

More information

13. Lifeline utilities

13. Lifeline utilities 13. Lifeline utilities Summary Lifeline utilities are entities that provide infrastructure services to the community such as water, wastewater, transport, energy, and telecommunications. Lifeline utilities

More information

Lifelines and Earthquakes: A Review of New Zealand's Key Vulnerabilities

Lifelines and Earthquakes: A Review of New Zealand's Key Vulnerabilities Lifelines and Earthquakes: A Review of New Zealand's Key Vulnerabilities D. R. Brunsdon National Lifelines Co-ordinator, New Zealand. M. C. Daly Executive Project Manager, Auckland Regional Council. A.

More information

PPL Electric Utilities Summer Readiness Overview June 2018

PPL Electric Utilities Summer Readiness Overview June 2018 SUMMARY PPL Electric Utilities Summer Readiness Overview June 2018 For PPL Electric Utilities (PPL Electric), summer readiness means the company must respond effectively to summer storms as well as provide

More information

Electricity Planning in the Parry Sound-Muskoka area

Electricity Planning in the Parry Sound-Muskoka area Electricity Planning in the Parry Sound-Muskoka area Local Advisory Committee Meeting #2 September 26, 2016 Parry Sound-Muskoka Regional Planning Process and Timeline 2 Purpose of today s meeting Review

More information

Business Process Framework R8.0

Business Process Framework R8.0 R8.0 Certification Report NetCracker TOMS Suite Release 8.2 May 2011 TM Forum 2011 Table of Contents Table of Contents... 2 List of Tables... 3 List of Figures... 4 1 Introduction... 5 1.1 Executive Summary...

More information

JULY 2015 INITIATIVES PLAN FOR REGULATED TRANSMISSION SERVICES

JULY 2015 INITIATIVES PLAN FOR REGULATED TRANSMISSION SERVICES JULY 2015 INITIATIVES PLAN FOR REGULATED TRANSMISSION SERVICES TABLE OF CONTENTS 1. INTRODUCTION... 3 1.1 Services Covered by the Initiatives Plan... 3 1.2 Activities Covered by the Initiatives Plan...

More information

Jamaica Investment Forum 2018 June 12 th -14 th, 2018 Montego Bay. Presentation by Emanuel DaRosa JPS President & CEO

Jamaica Investment Forum 2018 June 12 th -14 th, 2018 Montego Bay. Presentation by Emanuel DaRosa JPS President & CEO Jamaica Investment Forum 2018 June 12 th -14 th, 2018 Montego Bay Presentation by Emanuel DaRosa JPS President & CEO Energy: Integral to National Development Goals Jamaica s National Energy Policy JPS

More information

4 September 2010 and 22 February 2011 Christchurch Earthquakes from a Transmission Grid Infrastructure Perspective

4 September 2010 and 22 February 2011 Christchurch Earthquakes from a Transmission Grid Infrastructure Perspective 4 September 2010 and 22 February 2011 Christchurch Earthquakes from a Transmission Grid Infrastructure Perspective Asset Structural Performance and Lessons Learned By Craig McGhie and Christophe Tudo-Bornarel

More information

Connecting New Generation in New Zealand. Len Gould Customer Services Manager Transpower New Zealand Ltd

Connecting New Generation in New Zealand. Len Gould Customer Services Manager Transpower New Zealand Ltd Connecting New Generation in New Zealand Len Gould Customer Services Manager Transpower New Zealand Ltd Outline New Zealand s power system & Transpower s roles The planning process for new generation The

More information

PERFORMANCE MEASURES SUMMARY OF CUSTOMER FEEDBACK ON JULY 2013 CONSULTATION. Transpower New Zealand Limited September 2013

PERFORMANCE MEASURES SUMMARY OF CUSTOMER FEEDBACK ON JULY 2013 CONSULTATION. Transpower New Zealand Limited September 2013 PERFORMANCE MEASURES SUMMARY OF CUSTOMER FEEDBACK ON JULY 2013 CONSULTATION Transpower New Zealand Limited September 2013 Performance Measures Transpower New Zealand Limited 2007. All rights reserved.

More information

Distribution System Operating Code

Distribution System Operating Code Distribution System Operating Code Draft Rev 5 Approved September 2007 Comments to this document can be forwarded to: RSA Grid Code Secretariat Attention: Mr. Bernard Magoro Eskom, Transmission System

More information

CIVIL DEFENCE AND EMERGENCY MANAGEMENT SECTION TITLE CHAPTER THREE 162

CIVIL DEFENCE AND EMERGENCY MANAGEMENT SECTION TITLE CHAPTER THREE 162 CIVIL DEFENCE AND EMERGENCY MANAGEMENT SECTION TITLE CHAPTER THREE 162 CIVIL DEFENCE AND EMERGENCY MANAGEMENT OVERVIEW Global natural disasters such as the Christchurch earthquakes and tsunami in Japan,

More information

Manage electricity generation dispatch

Manage electricity generation dispatch Page 1 of 6 Manage electricity generation dispatch Level 6 Credits 10 Purpose People credited with this unit standard are able to: demonstrate knowledge of principles of power system operation; identify

More information

BC HYDRO REAL TIME OPERATIONS OPERATING ORDER 1T 11D. POWER SYSTEM OPERATION FORCED OUTAGES Supercedes 1T-11D issued 03 June 2009

BC HYDRO REAL TIME OPERATIONS OPERATING ORDER 1T 11D. POWER SYSTEM OPERATION FORCED OUTAGES Supercedes 1T-11D issued 03 June 2009 BC HYDRO REAL TIME OPERATIONS OPERATING ORDER 1T 11D POWER SYSTEM OPERATION FORCED OUTAGES Supercedes 1T-11D issued 03 June 2009 Effective Date: 26 August 2011 Expiry Year: 2015 Original signed by: APPROVED

More information

CUSTOMER-FACING GRID PERFORMANCE MEASURES

CUSTOMER-FACING GRID PERFORMANCE MEASURES CUSTOMER-FACING GRID PERFORMANCE MEASURES CONSULTATION PAPER Transpower New Zealand Limited October 2012 CUSTOMER-FACING GRID PERFORMANCE MEASURES Transpower New Zealand Limited 2007. All rights reserved.

More information

AsetManagementPlan.

AsetManagementPlan. 2012 AsetManagementPlan www.topenergy.co.nz Introduction It gives me great pleasure to present Top Energy s 2012-2022 Network Asset Management Plan (AMP). The 2012 plan follows on from the 2011 plan,

More information

RCP2 Project Overview Document

RCP2 Project Overview Document RCP2 Project Overview Document Project: Expenditure Class: Base Capex Expenditure Category: Grid - Enhancement & Development As at date: 15 November 2013 Expenditure Forecast Real 2012/13 NZ$ (m) 2015-2016

More information

SRRTEP Meeting 2019 Annual Assumptions for Pepco

SRRTEP Meeting 2019 Annual Assumptions for Pepco SRRTEP Meeting 2019 Annual Assumptions for Pepco December 7, 2019 1 Agenda Base Case Power Flow Model PJM Baseline Analysis FERC 715 Analysis Supplemental Project Drivers Asset Management Drivers Retirement

More information

Pole 3 Commissioning

Pole 3 Commissioning Pole 3 Commissioning Test Programme & Commercial Contracting Industry Briefing 21 June 2012 1 Introduction Mike Carter General Manager Grid Projects Welcome 2 Key points A robust bi-pole HVDC enables a

More information

Procurement & Supply Chain Integration

Procurement & Supply Chain Integration Construction Clients Group Sourcing, Supply & Contracts Procurement & Supply Chain Integration Wednesday 24th November 2010 1 Construction Clients Group today s agenda Background Challenges and what we

More information

Waikato and Upper North Island (WUNI) Voltage Management Investigation

Waikato and Upper North Island (WUNI) Voltage Management Investigation Waikato and Upper North Island (WUNI) Voltage Management Investigation Transpower, Development Group Anna Li 1 Presentation Outline Needs Investigation (phase 1) UNI thermal decommissionings, identified

More information

HAWKE S BAY REGIONAL COUNCIL Job Description Position Title: Project Leader Hikurangi Response Plan (Fixed Term) Responsible to:

HAWKE S BAY REGIONAL COUNCIL Job Description Position Title: Project Leader Hikurangi Response Plan (Fixed Term) Responsible to: HAWKE S BAY REGIONAL COUNCIL Job Description Position Title: Project Leader Hikurangi Response Plan (Fixed Term) Responsible to: Team Leader Hazard Reduction Responsible for: Nil Salary Range: Progress

More information

contents executive summary introduction Future requirements scenarios electricity demand Generation impact on the Grid scenario outcomes

contents executive summary introduction Future requirements scenarios electricity demand Generation impact on the Grid scenario outcomes THE ENDURING GRID contents 01 Executive Summary 02 1 Introduction 03 2 Future requirements 03 3 Scenarios 06 3.1 Electricity demand 09 3.2 Generation 12 3.3 Impact on the Grid 12 3.4 Scenario Outcomes

More information

Post-earthquake response plans for State Highways in the Wellington Region

Post-earthquake response plans for State Highways in the Wellington Region Post-earthquake response plans for State Highways in the Wellington Region P. Brabhaharan & J. Hobman Opus International Consultants, Wellington D. Robertson New Zealand Transport Agency, Wellington 2015

More information

Powerlink Transmission Line Asset Methodology Framework

Powerlink Transmission Line Asset Methodology Framework Powerlink Transmission Line Asset Methodology Framework Current version: 1/06/2018 EXTERNAL USE Page 1 of 24 Table of contents 1. Introduction... 4 1.1 Purpose... 4 1.2 Scope... 4 1.3 References... 5 1.4

More information

Ergon Energy Corporation Limited 4 June 2010

Ergon Energy Corporation Limited 4 June 2010 Ergon Energy Corporation Limited 4 June 2010 Disclaimer While care was taken in preparation of the information in this discussion paper, and it is provided in good faith, Ergon Energy Corporation Limited

More information

INSTITUTIONAL FRAMEWORK FOR EARTHQUAKE RESPONSE OF ENERGY SUPPLY IN NEW ZEALAND

INSTITUTIONAL FRAMEWORK FOR EARTHQUAKE RESPONSE OF ENERGY SUPPLY IN NEW ZEALAND INSTITUTIONAL FRAMEWORK FOR EARTHQUAKE RESPONSE OF ENERGY SUPPLY IN NEW ZEALAND Tan Pham AC Consulting Group limited, P O Box 2934, Level 15, 142 Lambton Quay, Wellington, New Zealand tanp@acconsulting.co.nz

More information

AMI information. for improved outage management

AMI information. for improved outage management Utilities the way we see it AMI information for improved outage management The information contained in this document is proprietary. 2013 Capgemini. All rights reserved. Rightshore is a trademark belonging

More information

BRIEFING: Incoming Minister of Civil Defence

BRIEFING: Incoming Minister of Civil Defence This document has been proactively released. Redactions are consistent with the provisions of the Official Information Act 1982 BRIEFING: Incoming Minister of Civil Defence Date: 24 April 2017 Priority:

More information

Attentis Technology. Submission to the Review of Victoria s Electricity Network Safety Framework. Attention: Dr. Paul Grimes Chair

Attentis Technology. Submission to the Review of Victoria s Electricity Network Safety Framework. Attention: Dr. Paul Grimes Chair Attentis Technology Submission to the Review of Victoria s Electricity Network Safety Framework Attention: Dr. Paul Grimes Chair April 2017 Contents Summary.4 Background.5 REFCL..6 REFCL Capabilities.7

More information

PARTICIPANT OUTAGE PLAN

PARTICIPANT OUTAGE PLAN SECURITY OF SUPPLY PARTICIPANT OUTAGE PLAN ELECTRICITY NETWORK CONTINGENCY PLAN October 2012 Table of Contents 1. INTRODUCTION... 3 2. PURPOSE... 3 3. DEFINITIONS... 3 4. BACKGROUND... 4 4.1 ELECTRICITY

More information

ASSET MANAGEMENT PLAN 2017 SUPPORTING DOCUMENT OF: INTEGRATED MANAGEMENT PLAN

ASSET MANAGEMENT PLAN 2017 SUPPORTING DOCUMENT OF: INTEGRATED MANAGEMENT PLAN ASSET MANAGEMENT PLAN 2017 SUPPORTING DOCUMENT OF: INTEGRATED MANAGEMENT PLAN CONTENTS 1. INTRODUCTION 1 2. PLAN SUMMARY 3 3. 4. POWERING NEW ZEALANDERS: TODAY AND INTO THE FUTURE 9 OUR APPROACH TO ASSET

More information

ASSET MANAGEMENT PLAN 2017 SUPPORTING DOCUMENT OF: INTEGRATED MANAGEMENT PLAN

ASSET MANAGEMENT PLAN 2017 SUPPORTING DOCUMENT OF: INTEGRATED MANAGEMENT PLAN ASSET MANAGEMENT PLAN 2017 SUPPORTING DOCUMENT OF: INTEGRATED MANAGEMENT PLAN CONTENTS 1. INTRODUCTION 1 2. PLAN SUMMARY 3 3. 4. POWERING NEW ZEALANDERS: TODAY AND INTO THE FUTURE 9 OUR APPROACH TO ASSET

More information

PID 276 Feasibility Study Report 4.4MW Distribution Inter-Connection Mermentau Substation

PID 276 Feasibility Study Report 4.4MW Distribution Inter-Connection Mermentau Substation PID 276 Feasibility Study Report 4.4MW Distribution Inter-Connection Mermentau Substation Prepared by: Entergy Services, Inc. T & D Planning 639 Loyola Avenue New Orleans, LA 70113 Rev Issue Date Description

More information

Participant Outage Plan

Participant Outage Plan EA NETWORKS (ELECTRICITY ASHBURTON LTD) 20150324_Proposed_Participant_Outage_Plan Participant Outage Plan SYSTEM OPERATOR IMPOSED LOAD REDUCTION Reviewed March 2015 Contents Documentation Control... 2

More information

Water Supply Resilience Strategic Case August 2015

Water Supply Resilience Strategic Case August 2015 Water Supply Resilience Strategic Case August 2015 1 Title of report Table of Contents 1. Introduction... 1 1.1 Purpose and Scope... 1 1.2 Strategic Context... 1 2. Strategic Assessment The need to Invest...

More information

THE DISTRIBUTION SYSTEM SECURITY AND PLANNING STANDARDS. Asset Management & Regulation, ESB Networks

THE DISTRIBUTION SYSTEM SECURITY AND PLANNING STANDARDS. Asset Management & Regulation, ESB Networks THE DISTRIBUTION SYSTEM SECURITY AND PLANNING STANDARDS. Issued by: Review Cycle: Asset Management & Regulation, ESB Networks Three years Contents 1.0 Introduction....3 1.1 Definitions...3 1.2 Aim of Planning...5

More information

Christchurch Stakeholder Forum. Christchurch 11 th July 2011

Christchurch Stakeholder Forum. Christchurch 11 th July 2011 Christchurch Stakeholder Forum Christchurch 11 th July 2011 Transpower = The National Grid We Plan, Build, and Maintain your grid, and, Operate your electricity system in real time. Your National Grid

More information

One System for Grid Operations Management

One System for Grid Operations Management One System for Grid Operations Management Spectrum Power ADMS Siemens AG 2014 All Right Reserved. usa.siemens.com/smartgrid Evolving grid challenges Increasing grid complexity including integration of

More information

Metrics for Addressing Smart Grid Issues, Including the Importance and Necessity of Protocols

Metrics for Addressing Smart Grid Issues, Including the Importance and Necessity of Protocols Metrics for Addressing Smart Grid Issues, Including the Importance and Necessity of Protocols Presentation to the U.S. Department of Energy by the IEEE Joint Task Force on QER U.S. DOE Requested Insights

More information

Power and Energy Systems Engineering

Power and Energy Systems Engineering Engineering Planning Project Management Operations Support Provided By J. J. Bergeron & Company, Inc. 1900 Veterans Memorial Blvd. Suite 205 Metairie, La. 70005 Power and Energy Systems Engineering Services

More information

POWER SYSTEM DYNAMICS AND CONTROL

POWER SYSTEM DYNAMICS AND CONTROL POWER SYSTEM DYNAMICS AND CONTROL 1 POWER SYSTEM DYNAMICS AND CONTROL INTRODUCTION Electric power system comprises components and systems like Generators, transformers, transmission lines and distribution

More information

SERVICE ENGAGEMENT PAPER 2

SERVICE ENGAGEMENT PAPER 2 SERVICE ENGAGEMENT PAPER 2 April 2017 Contents Introduction... 2 Request for feedback... 2 Part A... 3 Engagement Process... 3 Feedback to date... 4 Part B... 6 Refresh and evolution of the performance

More information

System Management Standard. System Restart Services. (System Restart Standard)

System Management Standard. System Restart Services. (System Restart Standard) System Management System Management Standard System Restart Services (System Restart Standard) This Standard is a guide to the acquisition of System Restart Services. 1 October 2014 Table of contents 1.

More information

Pepco s Reliability Enhancement Model Using Predictive Reliability to Plan Investment in Electrical Infrastructure

Pepco s Reliability Enhancement Model Using Predictive Reliability to Plan Investment in Electrical Infrastructure 1 Pepco s Reliability Enhancement Model Using Predictive Reliability to Plan Investment in Electrical Infrastructure General Meeting of the IEEE Power Engineering Society Panel Discussion Predictive Reliability

More information

Supporting Document 03. Information to support our proposed base capital expenditure programme

Supporting Document 03. Information to support our proposed base capital expenditure programme Supporting Document 03 Information to support our proposed base capital expenditure programme Information to support our proposed base capital expenditure programme Summary This document sets out Scottish

More information

PARTICIPANT ROLLING OUTAGE PLAN

PARTICIPANT ROLLING OUTAGE PLAN SECURITY OF SUPPLY PARTICIPANT ROLLING OUTAGE PLAN ELECTRICITY NETWORK CONTINGENCY PLAN May 2015 Table of Contents 1. INTRODUCTION... 3 2. PURPOSE... 3 3. DEFINITIONS... 3 4. BACKGROUND... 4 4.1 ELECTRICITY

More information

ITIL Intermediate Lifecycle Stream:

ITIL Intermediate Lifecycle Stream: ITIL Intermediate Lifecycle Stream: SERVICE TRANSITION CERTIFICATE Sample Paper 2, version 6.1 Gradient Style, Complex Multiple Choice QUESTION BOOKLET Gradient Style Multiple Choice 90 minute paper Eight

More information

Quick tip... DEVELOPMENT WHAT ARE THE ISSUES?

Quick tip... DEVELOPMENT WHAT ARE THE ISSUES? DEVELOPMENT WHAT ARE THE ISSUES? SECTION 02 Inappropriate development can pose a significant risk to the operation of the National Grid. Electrical and physical hazards due to development and land use

More information

Request for Market Performance Review.

Request for Market Performance Review. 1 st August 2013 Attn: Bruce Smith General Manager Market Performance Electricity Authority Level 7 ASB Bank Tower 2 Hunter Street PO Box 10041 Wellington From: Christopher Brown Site Energy Coordinator

More information

FOURTH Quarter REPORT

FOURTH Quarter REPORT 4 1 FOURTH Quarter REPORT FISCAL YEAR 2017 austinenergy.com BENEFITS OF PUBLIC POWER More than just getting the lights back on Hurricane Harvey wreaked havoc on the Gulf Coast when it made landfall, but

More information

TEMPORARY GRID RECONFIGURATIONS NET BENEFIT TEST METHODOLOGY

TEMPORARY GRID RECONFIGURATIONS NET BENEFIT TEST METHODOLOGY TEMPORARY GRID RECONFIGURATIONS NET BENEFIT TEST METHODOLOGY 1 1. Summary When one part of the grid is facing security of supply risk where local generation in one region of the grid is not enough for

More information

Briefing for the Minister of Civil Defence

Briefing for the Minister of Civil Defence Briefing for the Minister of Civil Defence Resilient New Zealand Contents 3 Foreword 5 Sector Overview 6 Strategic and Legislative Framework 7 Minister s Role 9 The ministry s Role 10 Key Issues and Themes

More information

LOWER SOUTH ISLAND RELIABILITY INVESTMENT PROPOSAL. Attachment F Summary of Stakeholder Engagement

LOWER SOUTH ISLAND RELIABILITY INVESTMENT PROPOSAL. Attachment F Summary of Stakeholder Engagement LOWER SOUTH ISLAND RELIABILITY INVESTMENT PROPOSAL Attachment F Summary of Stakeholder Engagement May 2010 Document Revision Control Document Number/Version Description Date 001/Rev A Lower South Island

More information

Amdocs Network Rollout Solution

Amdocs Network Rollout Solution Solutions for Software- Powered Networks Amdocs Network Rollout Solution Project Orchestration for Small Cell Network Rollout March. 2015 Transform the Economics of Small Cell Rollout Complexity Volume

More information

8 MANAGING THE EFFECTS OF NATURAL HAZARDS

8 MANAGING THE EFFECTS OF NATURAL HAZARDS 8 MANAGING THE EFFECTS OF NATURAL HAZARDS 8.1 RESOURCE MANAGEMENT ACT OBLIGATIONS 8.1.1 A natural hazard is defined under Section 2 as being Any atmospheric or earth or water related occurrence (including

More information

Auckland Engineering Lifelines Group

Auckland Engineering Lifelines Group Auckland Engineering Lifelines Group Framework to Implement Lifelines Strategies (To assist lifelines organisations to gain maximum benefit from Lifelines Projects) Project AELG/12 VERSION 1.0 JANUARY

More information

Summary details for SPC TSR # and MH TSR # are shown in Tables ES.1 and ES.2: Service Requested

Summary details for SPC TSR # and MH TSR # are shown in Tables ES.1 and ES.2: Service Requested Executive Summary Firm point to point transmission service has been requested by Transmission Service Request (TSR) #80439788, under the SaskPower Open Access Transmission Tariff (OATT). The purpose of

More information

Summary details for SPC TSR # and MH TSR # are shown in Tables ES.1 and ES.2: IFHS MH MW, firm :00:00 CS

Summary details for SPC TSR # and MH TSR # are shown in Tables ES.1 and ES.2: IFHS MH MW, firm :00:00 CS Executive Summary Firm point to point transmission service has been requested by Transmission Service Request (TSR) #80487374, under the SaskPower Open Access Transmission Tariff (OATT). The purpose of

More information

The Distribution System Security and Planning Standards

The Distribution System Security and Planning Standards The Distribution System Security and Planning Standards (Demand customers only) Date: September 2003 Status: Approved Distribution System Operator ESB Networks Revision 1 September 2003, Page 1 of 26 Contents

More information

Planned Islanding and Energy Storage at BC Hydro

Planned Islanding and Energy Storage at BC Hydro Planned Islanding and Energy Storage at BC Hydro Workshop: International Smartgrid projects review December 10, 2010 Jaime Peralta M.Sc., P.Eng. Distribution Planning T&D Asset Investment Management BC

More information

BC Transmission Corporation:

BC Transmission Corporation: BC Transmission Corporation: Working Towards a Smarter Grid PSERC Smart Grid Meeting August 10, 2009 Janos Toth Program Manager, R&D Working Towards a Smarter Grid BCTC s View of Innovation and Technology

More information

Operating in a climate of change

Operating in a climate of change Group Chief Executive s AGM speech 2018 Operating in a climate of change Thank you, Michael, It s a time of unprecedented change for Vector, for Auckland and for the energy sector in general. As Canadian

More information

Distribution GIS & Grid Model Data Management

Distribution GIS & Grid Model Data Management Distribution GIS & Grid Data Management Pat Brown EPRI OGC Energy & Utilities Summit June 28, 2017 Pat Brown works in EPRI s Information and Communication Technology program. She is currently engaged in

More information

UK Power Networks. Technology Watch (Smart) Networks Context & Innovation. 28 th April, 2015 David Boyer, Smart Networks Policy Lead

UK Power Networks. Technology Watch (Smart) Networks Context & Innovation. 28 th April, 2015 David Boyer, Smart Networks Policy Lead UK Power Networks Technology Watch (Smart) Networks Context & Innovation 28 th April, 2015 David Boyer, Smart Networks Policy Lead UK Power Networks Total % of industry End customers (millions) Service

More information

Open Networks Workstream 3: Product 2

Open Networks Workstream 3: Product 2 The Voice of the Networks Open Networks Workstream 3: Product 2 Functional and System Requirements 15th May 2018 Energy Networks Association Document Ref: ON-WS3-P2 DSO Functional Requirements Restriction:

More information

ENGINEERING RECOMMENDATION P2/6 SECURITY OF SUPPLY JULY Energy Networks Association Engineering Directorate

ENGINEERING RECOMMENDATION P2/6 SECURITY OF SUPPLY JULY Energy Networks Association Engineering Directorate ENGINEERING RECOMMENDATION P2/6 SECURITY OF SUPPLY JULY 2006 Energy Networks Association Engineering Directorate NORTHERN IRELAND ELECTRICITY Ltd AMENDMENT SHEET ISSUE 1 - MAY 2015 SECURITY OF SUPPLY DOCUMENT

More information

Ergon Energy Corporation Limited

Ergon Energy Corporation Limited Ergon Energy Corporation Limited Final Report Emerging Distribution Network Limitations in the Central Toowoomba Area 16 May 2013 Disclaimer While care was taken in preparation of the information in this

More information

SUMMARY Table 1 presents the proposed 2010 Smart Grid costs for Operations and Information Technology. Operations Projects 3,

SUMMARY Table 1 presents the proposed 2010 Smart Grid costs for Operations and Information Technology. Operations Projects 3, EB-00-0 Exhibit G Tab Schedule Page of SMART GRID PLAN SUMMARY Table presents the proposed 00 Smart Grid costs for Operations and Information Technology. Table : 00 Smart Grid Projects Smart Grid Projects

More information

Minnesota State Board Association Converging Communications, IT and OT

Minnesota State Board Association Converging Communications, IT and OT Minnesota State Board Association Converging Communications, Grid Resilience IT and OT Grid Modernization and Resilience How it impacts ADMS deployment Dan Lysaker Senior Joe LaCasse, Grid Modernization

More information

nts Issue: April 18 th, 2018 Date Issued: Summary about 11%) of customers. 1. Prior to the occur? Province. 3) If the public Major Event warning of

nts Issue: April 18 th, 2018 Date Issued: Summary about 11%) of customers. 1. Prior to the occur? Province. 3) If the public Major Event warning of Major Even nts RESPONSE REPORT Issue: April 7 th to 9 th, 2017 2.1. 4.2 Major Events Response Report Date Issued: April 18 th, 2018 Prepared for: Publication and Electronicc Filing with the Ontario Energy

More information

National Policy Statement on Electricity Transmission Further Guidance on Risks of Development near High-voltage Transmission Lines

National Policy Statement on Electricity Transmission Further Guidance on Risks of Development near High-voltage Transmission Lines National Policy Statement on Electricity Transmission Further Guidance on Risks of Development near High-voltage Transmission Lines Prepared by Transpower New Zealand Limited This report may be cited as:

More information

Distribution Line Storm Hardening Presenter: Tim Cashman Cashman Engineering

Distribution Line Storm Hardening Presenter: Tim Cashman Cashman Engineering Distribution Line Storm Hardening Presenter: Tim Cashman Cashman Engineering PLS-CADD Advanced Training and User Group Meeting Madison, WI July 16 18, 2013 Introduction Due to the frequency and severity

More information

ViCiSi - Unleash the Power of Business Activities

ViCiSi - Unleash the Power of Business Activities ViCiSi Unleash the Power of Business Activities Viking City Simulator ViCiSi.eu The scope of ViCiSi is to use a virtual society to test the resilience of critical infrastructures A society is heavily dependent

More information

Support continued transparency for policy and design choices

Support continued transparency for policy and design choices Transpower House 96 The Terrace PO Box 1021, Wellington New Zealand www.transpower.co.nz Catherine.jones@transpower.co.nz 04 590 8624 / 027 5646976 10 October 2017 John Rampton General Manager Market Design

More information

Toward Ensuring Reliability: Reliability Performance Metrics. A NERC Staff White Paper

Toward Ensuring Reliability: Reliability Performance Metrics. A NERC Staff White Paper Toward Ensuring Reliability: Reliability Performance Metrics A NERC Staff White Paper Table of Contents Table of Contents Table of Contents... 2 Executive Summary... 3 Metrics Objective... 5 Metrics Background...

More information

EQUIPMENT MAINTENANCE - PRODUCT SPECIFICATION

EQUIPMENT MAINTENANCE - PRODUCT SPECIFICATION EQUIPMENT MAINTENANCE - PRODUCT SPECIFICATION 1. INTRODUCTION This document contains information on the Equipment Maintenance service. If you require more detailed technical information, please contact

More information

When disaster strikes, will you be ready? An introduction to the Civil Defence Emergency Management Act 2002

When disaster strikes, will you be ready? An introduction to the Civil Defence Emergency Management Act 2002 When disaster strikes, will you be ready? An introduction to the Civil Defence Emergency Management Act 2002 Resilient Communities The awesome effects of nature are a fact of life in New Zealand. Earthquakes,

More information

Understanding the impact of a major earthquake on Wellington Lifelines

Understanding the impact of a major earthquake on Wellington Lifelines Understanding the impact of a major earthquake on Wellington Lifelines Mowll, R.L., Brunsdon, D., Wilde, F., Leslie P.D. Wellington Lifelines Group (Project Manager, previous Project Manager, Chair and

More information

Managing Director Transmission Operations

Managing Director Transmission Operations Managing Director Transmission Operations Responsible for the safe, reliable, cost-effective, and profitable operational management of AEP's transmission assets including: 1) directs and manages AEP's

More information

AEP Guidelines for Transmission Owner Identified Needs

AEP Guidelines for Transmission Owner Identified Needs AEP Guidelines for Transmission Owner January 2017 1 Document Control Document Review and Approval Action Name(s) Title Prepared by: Kevin Killingsworth Principal Engineer, Asset Performance and Renewal

More information

Brunswick Landing Microgrid Development

Brunswick Landing Microgrid Development Brunswick Landing Microgrid Development Background The Concept o Brunswick Renewable Energy Center and Microgrid The Reality o Electrical Distribution System Existing Conditions o Services provided by

More information

Smart Distribution Applications and Technologies - Program 124

Smart Distribution Applications and Technologies - Program 124 Smart Distribution Applications and Technologies - Program 124 Program Description Program Overview New technologies will be critical to future smart grid operation. These technologies will include advanced

More information

Electric Utilities: An Industry in Transition

Electric Utilities: An Industry in Transition 1 Electric Utilities: An Industry in Transition Wanda Reder Chief Strategy Officer, S&C Electric Company IEEE Power & Energy Society Distinguished Lecture Australia August, 2017 2 Overview Trends and Drivers

More information

Standard TPL Transmission System Planning Performance Requirements

Standard TPL Transmission System Planning Performance Requirements A. Introduction 1. Title: Transmission System Planning Performance Requirements 2. Number: TPL-001-4 3. Purpose: Establish Transmission system planning performance requirements within the planning horizon

More information

Smart Grid. Project Types and Technology EnerNex. All Rights Reserved.

Smart Grid. Project Types and Technology EnerNex. All Rights Reserved. Smart Grid Project Types and Technology NIST Smart Grid Model Project Types Substation automation Distribution Automation Control Center Systems Electric Vehicle Charging Infrastructure Automated Metering

More information

ATTACHMENT 13 NORTHEAST-POCONO RELIABILITY PROJECT PPL DESIGN CRITERIA AND SAFETY PRACTICES

ATTACHMENT 13 NORTHEAST-POCONO RELIABILITY PROJECT PPL DESIGN CRITERIA AND SAFETY PRACTICES ATTACHMENT 13 NORTHEAST-POCONO RELIABILITY PROJECT PPL DESIGN CRITERIA AND SAFETY PRACTICES The National Electrical Safety Code (NESC) is a set of rules to safeguard people during the installation, operation,

More information

Detailed Seismic Assessment Report. Islington Substation August 2011

Detailed Seismic Assessment Report. Islington Substation August 2011 Detailed Seismic Assessment Report August 2011 Prepared for: Transpower New Zealand Prepared by: Opus International Consultants Reference: 5-C1929.01 Date: 8 th August 2011 Status: Draft 1 Report prepared

More information

East Kentucky Power Cooperative (EKPC) Transmission System Planning Criteria

East Kentucky Power Cooperative (EKPC) Transmission System Planning Criteria East Kentucky Power Cooperative (EKPC) Transmission System Planning Criteria March 2016 Section 1 Overview and General Discussion The primary purpose of East Kentucky Power Cooperative s (EKPC s) transmission

More information

Ten years on: A Review of the Lifelines Lessons Learnt from the 1994 Northridge and 1995 Kobe Earthquakes

Ten years on: A Review of the Lifelines Lessons Learnt from the 1994 Northridge and 1995 Kobe Earthquakes Ten years on: A Review of the Lifelines Lessons Learnt from the 1994 Northridge and 1995 Kobe Earthquakes Dave Brunsdon & Peter Leslie Wellington Lifelines Group Overview of Presentation The events Earthquake

More information

Overview SFJCCAG3. Respond to emergencies at the operational (bronze) level

Overview SFJCCAG3. Respond to emergencies at the operational (bronze) level Overview This standard is about responding to emergencies at the operational (bronze) level. In this context, `bronze' is the level (below Gold level and Silver level) at which the management of `hands-on'

More information