Modelling of Logistic System by Petri Nets

Size: px
Start display at page:

Download "Modelling of Logistic System by Petri Nets"

Transcription

1 Strojarstvo 52 (2) (2010) S. CVETKOVIĆ et. al., Modelling of Logistic System by Petri Nets 169 CODEN STJSAO ISSN ZX470/1441 UDK :658.5 Modelling of Logistic System by Petri Nets Slavica CVETKOVIĆ 1), Goran ŠIMUNOVIĆ 2) and Leon MAGLIĆ 2) 1) Mašinski fakultet Univerziteta u Nišu (Mechanical Engineering Faculty University of Niš), Aleksandra Medvedeva 14, Niš Republic of Serbia 2) Strojarski fakultet u Slavonskom Brodu, Sveučilište J. J. Strossmayera u Osijeku (Mechanical Engineering Faculty in Slavonski Brod, J. J. Strossmayer University of Osijek), Trg Ivane Brlić Mažuranić 2, HR Slavonski Brod, Republic of Croatia smijoc@yahoo.com Keywords Modelling Petri nets Simulation Ključne riječi Modeliranje Petrijeve mreže Simulacija Received (primljeno): Accepted (prihvaćeno): Preliminary note In this paper an application of Petri nets (Petri Nets PN) is shown in the modeling and simulation of the production process. Petri nets are graphically mathematical tools that are suitable for modeling and projecting different system types. The very approach to a system modeling by means of Petri nets faithfully reflects the way events develop in the real world so that, for Petri nets, it can be said that they have almost universal application. Computer (PC) simulation is possible by means of the application of the extended Petri nets both in model building and in designing the simulation program routine. The program firstly checks the execution of preconditions for one of the cycles to take place. This routine is cyclical and each cycle corresponds to one time unit. After initiating any cycle, the state space does not allow allocation of a new assignment on this entity until the time interval anticipated for the cycle duration that is in progress has passed. Modeliranje logističkog sustava Petrijevim mrežama Prethodno priopćenje U radu je prikazana primjena Petrijevih mreža (Petri Nets PN) kod modeliranja i simulacije procesa proizvodnje. Petrijeve mreže su grafičkomatematički alat pogodan za modeliranje i oblikovanje različitih vrsta dinamičkih sustava. Pristup modeliranju sustava pomoću Petrijevih mreža vjerno odražava način odvijanja događaja u realnom okruženju, i stoga se za Petrijeve mreže može reći da imaju gotovo univerzalnu primjenu. Računalna simulacija je moguća zahvaljujući primjeni proširenih Petrijevih mreža, kako u izgradnji modela tako i pri oblikovanju rutina simulacijskog programa. Program prvo provjerava stanje preduvjeta za izvršenje nekog ciklusa. Ova rutina je ciklična i svaki ciklus odgovara jednoj vremenskoj jedinici. Po iniciranju bilo kojeg ciklusa, prostor stanja ne dopušta dodjeljivanje novog zadatka ovom entitetu sve dok ne prođe vremenski interval predviđen za trajanje ciklusa aktivnosti koja je u tijeku. 1. Introduction Nowadays changing of industry dynamics have influenced the design, process planning, operation of supply chain systems, production planning and scheduling. The level of knowledge and organisation in production preparation sectors has a considerable impact upon the final characteristics of a product and an indirect effect on production costs and the times of delivery. The fulfilment of the basic requirements modern enterprises are faced with, such as a product optimal quality, low production costs, holding to the agreed times of delivery cannot be imagined without new scientific approaches [1]. Petri nets are graphically mathematical tools that are suitable for modelling and projecting different system types. The very approach to a system modelling by means of Petri nets faithfully reflects the way events develop in the real world so that, for Petri nets, it can be said that they have almost universal application. A classical approach to projecting and analyzing the way a system behaves by means of Petri nets is shown in Figure 1. In order for us to define the structure of a system, we want to project or influence the way it behaves, one of the conventional analytical techniques is applied. According to the received information, we model the system by Petri nets, and then we move on to the model analysis by which we gain insight into the characteristics of the model, that is to say, the system itself. The possible, noticed results of the model point to suitable defects of the modelled system and the necessity for correction of both the original and the model. After putting the correction into action, the mentioned cycle repeats itself until the satisfactory results are obtained.

2 170 S. CVETKOVIĆ et. al., Modelling of Logistic System by Petri Nets Strojarstvo 52 (2) (2010) Symbols/Oznake P = p 1, p 2,...p n - the final set of locations - konačni skup mjesta T = t 1, t 2,...t n I (t) O (t) - the final set of transitions - konačni skup prijelaza - the set of transition input functions - skup ulaznih funkcija prijelaza - the set of various transition functions - skup izlaznih funkcija prijelaza # (x, B) - function which defines a number of x element appearance in B family - funkcija koja definira broj pojavljivanja elemenata x u familiji B D D + Is i SM(T N ) MS(Sm j ) SM(T N ) CS(P d ) PS(PP k ) Pd SPl Kpm LG s M - input matrix - matrica ulaza - output matrix - matrica izlaza - raw material source - izvor polaznog materijala - supply market - sustav tržišta materijala - material storage - skladište materijala - the set of transition input functions - skup ulaznih funkcija prijelaza - company system - sustav poduzeća - production section - proizvodni pogon - internal company element - unutarnji element poduzeća - final products storage - skladište gotovih proizvoda - the buyers of final products - kupci gotovih proizvoda - logistic system - logistički sustav - number of actions - broj aktivnosti N t ij r i d i F i J i t i = Σ t ij W i = Σ W ij L i F SPT EDD FCFS COVERT - number of machines - broj strojeva - processing time necessary for performing O ij operation of J i order, min - vrijeme obrade potrebno za izvođenje operacije O ij naloga J i - appearance time of J i order in the system - vrijeme pojavljivanja naloga J i u sustavu - delivery deadline of J i order - rok isporuke naloga J i - time interval, min - vremenski interval - flow time order through the system, min - vrijeme protoka naloga - total time of the order processing J i, min - ukupno vrijeme obrade naloga J i - total time of waiting for the order J i, min - ukupno vrijeme čekanja naloga J i - time clearance, min - vremenski zazor - the average flow time through the system, min - srednje vrijeme protoka dijelova kroz sustav - Shortest Processing Time rule - pravilo po kojem se prvo raspoređuju nalozi s najkraćim vremenom obrade - Earliest Due Date rule - pravilo po kojem se prvo raspoređuju nalozi s najranijim rokom isporuke - First-come, first served - pravilo po kojem se nalozi raspoređuju prema vremenu pristizanja - Cost-Over Time rule - pravilo po kojem se prvo raspoređuju nalozi s najvećim omjerom troškova kašnjenja i vremena obrade

3 Strojarstvo 52 (2) (2010) S. CVETKOVIĆ et. al., Modelling of Logistic System by Petri Nets 171 C = ( P, T, I, O ); P{ p i } i = 1, 6; T{ t j } j = 1, 6; (4) I(t 1 ) = { p i }; O(t 1 ) = { p 2, p 3 }; I(t 2 ) = { p 3 } (5) O(t 1 ) = { p 3, p 5, p 5 } (6) I(t 3 ) = { p 2, p 3 }; O(t 3 ) = { p 2, p 4 }; (t 4 ) = { p 4, p 5, p 5, p 5 } (7) Figure 1. Classical approach to a system modelling by means of Petri nets Slika 1. Klasični pristup modeliranju sustava Petrijevim mrežama O(t 4 ) = { p 4 } (8) I(t 5 ) = { p 3 }; O(t 5 ) = { p 6 } (9) Mathematical model of the Petri nets is given by its structure C = C (P, T, I, O) that consists of four sets and those are: P = p 1, p 2, p n the final set of locations T = t 1, t 2, t m the final set of transitions I (t) - the set of transition input functions O (t) - the set of various transition functions I(t 5 ) = ; O(t 5 ) = (1) Input and output Functions are families of locations. The family notion is the generalization of the set notion and it allows multiple appearance of the same element in the family. Function #(x, B) defines a number of x element appearance in B family. Introducing the family notion it is provided that a certain location is input or output location of a transition. Another way of presenting Petri nets structure is the representation by means of input matrixes D and output matrix D + where the following applies: D I i,j = # i D I i,j = # (2) The net structure conveyed by means of matrixes would be: (3) The Petri nets structure is defined when the set of locations, set of transition as well as the input and output transition functions have been defined. Analogously to its structure, Petri nets graph consists of two types of knots- the circles that stand for the locations and lines which stand for transitions. Directed arches that link these two types of knots define input and output functions of particular transitions, which defines Petri nets as a directed multigraph, a bipartite one, since it contains two types of knots. Petri nets graph is equivalent to its structure that is illustrated by the next example on Figure 2. Figure 2. Petri nets graph Slika 2. Graf Petrijeve mreže One of the major advantages of using Petri nets is that the same methodology can be used for the modelling, simulation and qualitative and quantitative analysis [2-3]. Petri net methodology and it applications in manufacturing systems have been thoroughly explored. Many authors present application of Petri nets for modelling of manufacturing supply chain [4-7]. The authors [8-12] are dealing with modelling of logistic system and scheduling. 2. Production System Description In order to define all the elements inside and outside the observed industrial company, it is necessary to start from the logistic definition by which the following is implied- the study of material flow starting from the raw material sources and ending with the deliverance of the finished products to their final consumers. The first element is raw material sources (Is i ) and they belong to the supply market-sm (T N ). The other element is material storages-ms (Sm j ), which belong to the company system-cs (P d ). The third element consists of production section-ps (PP k ) and internal

4 172 S. CVETKOVIĆ et. al., Modelling of Logistic System by Petri Nets Strojarstvo 52 (2) (2010) company element (P d ). The forth element is final products storage (SPl). The fifth element is the buyers of final products (Kpm). Thus, logistic system (LGs) can be conveyed in form of the following set: LG s = ( I si, SM j, PP k, SPl, K pm ) (10) Logistic system represented in this way provides the integral approach with solving problems related to the material flow and its optimization, which is impossible with partial solutions. The logistic system schematically presented on Figure 3 or by means of mathematical set (2.1) applied on the business of a particular company has certain operative limitations that are manifested as internal or external. Being extremely important internal limitations, what is pointed out in the first place are the already built sections and storages. The second internal limitation is the already existing company capability to ensure the level of services that will satisfy consumers needs. Sales conditions may be considered as the third internal limitations. When it comes to external limitations, firstly it should be emphasized that the company cannot keep them under control. From the aspect of logistics, the most important ones among them are: strategy and competition, state regulations and the way of transportation Figure 3. Schematic approach of the logistic system Slika 3. Shematski pristup logističkog sustava The modeled system that refers to the functioning of the logistic system is shown on the Figure 4 in form of component Petri nets. 3. System Behaviour Analysis The process of production courses simulation is displayed on a concrete example of technological system. By analyzing the structure of the observed system that is presented by means of Figure 5, its permanent and temporary entities are perceived. Temporary entities are often referred to as a master entity or client, and permanent entities are known as slave entities or a server. As the main system entity, we perceive a working object. The permanent entities of the modelled system are: crane, production line, machines for lamella welding, the machines for connection welding, control tub, radiator control tub, means of transport, semi-manufactured products, final parts storage, locations for storing inbetween-phase stocks, palettes, and a worker. On noticing these entities we move on to their operational analysis as it is stated hereafter Crane Operations performed by a crane can be enclosed with three activity cycles. In the first place, it transports the sheet metal spools to the lines 1, 2 and 3. Preconditions for performing each of these activity cycles are: crane is free, the line is ready for sheet metal reception and there is sheet metal in the storage house. The state of the system at the time of system taking place is: the crane is free, the line is busy and ready to be processed. The diagram of the activity cycle is displayed on Figure 6-graph event as well as the component network of the crane activity cycle received based on the data of their own operational analysis. Figure 4. A Concrete logistic system modeled by means of Petri nets Slika 4. Logistički sustav modeliran Petrijevim mrežama

5 Strojarstvo 52 (2) (2010) S. CVETKOVIĆ et. al., Modelling of Logistic System by Petri Nets 173 Figure 5. The Business system structure Slika 5. Struktura proizvodnog sustava it lays away the radiator plates onto the exit line buffer. The preconditions for this process development are: the line is free and fitted to the processing of the demanded product type, the corresponding metal sheet spool is located onto its entrance buffer. The system state at the time of cycle execution is changed by the fact that the line is busy and the continual change of the product number is taking place on the exit line buffer. The consequences of the cycles ending are that the line is free and that a certain number of products are present in the system. The part of the modelled system that refers to the line functioning and its supply with a metal sheet spool and with Figure 6. Graph event and component network of the crane activity Slika 6. Graf događaja i komponentna mreža aktivnosti dizalice 3.2. Lines 1, 2 and 3 A line in its activity cycle performs the following activities: it accepts a metal sheet spool from the buffer entrance location, it processes the metal sheet by transforming it into radiator plates and the delay and reception of a product from its exit bufferand they are shown in Figure 7 in form of the component Petri nets. In this way all the entities of the observed system are described by means of Petri nets system.

6 174 S. CVETKOVIĆ et. al., Modelling of Logistic System by Petri Nets Strojarstvo 52 (2) (2010) Figure 7. Component network of the line activity Slika 7. Komponentna mreža aktivnosti linije 4. Scheduling Problem Description Production system performances largely depend on the way material is organized through the system, that is to say, defining priorities or rules when and where the appropriate operation will be performed. The same rules are used when working objects enter the system, and they have influence on the technological manufacturing procedure, as well as when allocating the system resources by means of suitable working objects. The quality level of the term plan is estimated by means of different, often conflicting criteria like the criteria based on the duration of the production cycle, supply size in the very production process, exploiting the system resources, deadline of the final product delivery or the criteria based on the expanses. Since it is impossible to make a term plan that meets all the criteria, depending on the current production goals, most often one or two criteria upon the term plan production. With technological systems the term problems are becoming even more complex, but there are also new possibilities for devising an optimal, current, that is to say dynamically adjusted term plan. The term problems are nowadays solved by means of expert systems by combining simulation techniques with the knowledge and techniques built into the very expert system. Simulation model is used for the execution of complex term algorithms by which we procure data about the system performance for different term criteria, whereas the expert system performs the estimation of the given strategies, it suggest the most suitable strategy or it points to the necessity of correcting the term plan with the purpose of achieving satisfactory performances. Scheduling can be defined as the allocation of the system resources in a certain time interval for the purpose of satisfying the allocated tasks. In bibliography, it is most often used as the characteristic pointing to the complexity of the problem of scheduling, which is implied by the combinatory explosive nature of the very problem. Simply put, the number of the potential term plans grows exponentially with every new problem dimension like operations, tool machines, staff, orders, etc. Upon choosing the optimal term plan in case of processing M actions on N machines, the terminer has at its disposal (M!) N alternative solutions among which for the clearly defined there certainly is the optimal solution that is possible to be found in the final number of iterations. However, the number of possible combinations for each non-trivial problem is such that a simple search of the possible solutions in search for the optimal is not practical even with the most modern computer technology. For the same reason in practice with the purpose of limiting the space condition of the attainable term plans theorems, rules and algorithms of the models developed after the analysis of the observed systems are used. On Figure 8, a complete logistic chain that binds the observed business system with suppliers and buyers is shown.

7 Strojarstvo 52 (2) (2010) S. CVETKOVIĆ et. al., Modelling of Logistic System by Petri Nets 175 Figure 8. Model of logistic chain for the concrete system Slika 8. Model logističkog lanca za konkretan sustav In that way by global modelling of the basic process of the business system a possibility is opened for integration of certain processes and activities as well as the functioning of the business system on a whole. Information necessary for devising scheduling plan in case of processing M businesses, J i (i = 1, 2 M) in a workshop with a set of machines M k ( k = 1, 2, 3 N) is: t ij processing time necessary for performing O ij operation of J i order r i appearance time of J i order in the system d i delivery deadline of J i order The basic task of scheduling the operations is achieving the optimal scheduling plan that implies the existence of certain criteria, that is to say, indicators of the system performance. Most frequently used criteria are production cycle duration, stock size in the very production process, exploitation of the system resources, the delivery date of the final product or criteria based on expenses. Waiting time W ij of the operation O ij is the time interval starting from the end of the previous operation for performing that operation. Time interval - F i from the appearance of J i order in the system till the ending of his last operation is called the flow time J i order through the system, production interval or the time of the given order ending. That time is presented as the sum of the processing time of all the operations and waiting time of every operation to be processed. F i = W i1 + t i1 + W i2 + t i2 + + W ij + t ij = W i + t i (11) where: t i = Σt ij is time total of the order processing J i W i = W ij = time total of waiting for the order J i (the indicator of the scheduling plan quality). The difference between the finishing time or a order and its deadline and its delivery deadline is called time clearance (L i ): L i = F i d i (12) In our case, this equation is comprised of the time of transport to the buyer and it is as it follows: L i = d i (F i + T di ) (13) If F i > d i, a positive time slack or delay, takes place (d i ): d i = max (0, L i ) (14) Maximum flow time or the time of production cycle duration, which represents time interval from the beginning of the first operation of the first order that is processed till the ending of the last operation of the last order that is processed in the system as follows: F max = max F i (i = 1, 2,3, M ) (15) The average flow time through the system is the average interval of detaining every order in the system: (16)

8 176 S. CVETKOVIĆ et. al., Modelling of Logistic System by Petri Nets Strojarstvo 52 (2) (2010) There are a number of variations of terming problem and the so-called job-shop problem in which the part paths through the system are different for each part separately, differently from the flow-shop problem where all the paths follow the same path though the system. The general job-shop problem is by far more complicated and the complete solution for the problem is still being searched for. During system functioning very often it comes to the situation that a few orders are waiting in line to be processed in front of a machine. Then it is necessary to choose such a priority rule to launch work orders that are going to satisfy the set criteria of the optimum system performances. Typical priority rules that are most often used in the practice are: SPT (Shortest Processing Time rule) the rule according to which the orders with the least processing time are arranged first, The rule by which the orders with the least remained time for processing (Least-Work-remaining rule), are arranged first, EDD (Earliest Due Date rule), the rule by which the orders with the earliest delivery deadline are arranged first, FCFS ( First-come, first served) the rule by which the orders that came first in the processing line are arranged first, The rule of the minimum-slack-time rule (Minimumslack-time rule) by which the orders with a minimum time slack are arranged first, where the time slack stands for the difference between the time left for the time interval processing between the instantaneous time and the delivery deadline, The rule of maximum number of operations by which the orders with the greatest number of left operations are arranged first, The rule of the minimum number of operations by which the orders with the fewest number of operations left are arranged first, The rule by which the orders that cause the greatest expenses in case of delay are arranged first (Penalty rule) COVERT (Cost-over-time rule) by which the orders with the greatest ratio between the expanses caused by delay and the processing time are arranged first. It is important to point out that there is not a unique solution for the scheduling problem. It is important to point out that there is no unique solution to the scheduling problem. Which technique is suitable for a concrete domain depends on the complexity of that domain, structure and nature of decision points, limitation nature, optimum measures, system performances and many other factors. That is why it is emphasized at the end that there is not, nor it is recommended to attempt to project universal simulation tools that will cover all the cases in practice. As the simulation package universality is growing larger, its efficiency in use is growing smaller for each case individually. 5. Simulation Software Description The program performs a workshop functioning simulation. The received simulation program has the task to register all the data on the space state change in the course of the simulation experiment after the model execution. Specific features of this simulation program result from the approach of model build-up that integrates within itself the objectively oriented and hierarchical approach when analyzing the system and synthesis, as well as the widened Petri nets for describing the process within the system itself. The result of this approach is getting a model that completely copies the attributes and potential activities of the modelled system elements as well as the processes within the system. The very process of model execution follows the path of activity of the appropriate objects, which is identical to the realization, very often competitive, processes that are taking place in the real system. Simulation on (PC) computer is possible by means of the application of the widened Petri nets both in the model build-up and in designing the routines of the simulation program. On Figure 9 there is a display of Petri nets used in designing the simulation program routine that describes the process in the system itself. In the picture, there are cycle diagrams of the activity of all the active system resources shown by means of the suitable subnets that are modelling the suitable subprograms. The program firstly checks the executions of the preconditions for one of the cycles to take place. This routine is cyclical and each cycle corresponds to one unit of time. Initiating any cycle, the space state does not allow the allocation of a new task for this entity, until the time interval anticipated for the cycle duration of the activity in process has passed. The operations of the corresponding activities in course of the model execution change their status and the location in the system. In course of the simulation experiment at any moment the status and location of each operation is defined. For the criteria defined in advance for the optimization of the way the system behaves, corresponding prototype rules can be installed into the very software and in that way, in a very short time of the program executions, the same can be tested and the optimal rule can be chosen.

9 Strojarstvo 52 (2) (2010) S. CVETKOVIĆ et. al., Modelling of Logistic System by Petri Nets 177 Figure 9. A program routine Petri model Slika 9. Petrijev model jedne programske rutine One of the aims of the stimulation programme is to predict the condition in the storage of half fabricants for a particular period of time. The first exit from the programme is the number of working pieces per type and for a particular period scale in a finished-products storage. For each working piece there is a defined amount of the prepared material which is implemented as well as all the positions which are implemented into the composition, so that the storage condition of all finished products is directly reflected to the condition in the storage of half fabricants. The performances of this programme are reflected through the fact that the whole situation is from the real world (the workshop and its surrounding), which is relocated into a computer and in that way the possibilities of modern information technologies are fully used for dealing with these problems. The simulation model behaves in the same way as the real system, although in the real system there are 20 working mandates realized for about three months, and in the computer for about 2 seconds. In that way, the manager has the possibility to finish a whole set of simulation experiments for a very short time and to choose a scheduling plan which would satisfy the current management criteria. The execution is managed by the priority of working mandates which are defined by the time of the appearance of a working mandate in the exit storage, the time of transport to the buyer and the term of delivery. The programme generates the data at the moment of appearance of every working mandate in the system, about the time of the realization of every working mandate, and also automatically calculates the priorities for every working mandate. After finishing every simulation experiment, according to the time of appearance of a working mandate and the time of the supplier s answer, the programme automatically calculates the longest time of the ordering of the material for each working mandate. In that way, the logic chain which supports the basic criteria of the JIT concept is completely closed, and connects the supplier with the buyer and simultaneously uses the performances of given software. The user gets, by an established connection, the condition in the storage of half fabricants which provides a good production process and optimal level of supplies. Furthermore, the programme finds the optimal scheduling production plan depending on the priority of a certain type of products. The next optimization of the system behaviour takes into account the specific characteristics of the modelling system. The finishing time of the production lines is 180 minutes and that s the time which is spent for their setup during the change of the type of the product which is being dealt with. If more working mandates are waiting to be dealt with, the programme checks whether that group contains a working mandate for the realization of which the production line is currently set and chooses it. Before the description of the simulation experiments and reached results, we should emphasize the performances of the realized software which mark it off from the classic software tools which are on the market. The usage of this programme during the creation of the scheduling plan doesn t change the usual way of thinking in the solution of this problem, which is very close to the programme. Thus, during the designing of these types of applications, among else, we should be careful about this: the creator of the scheduling plan has the most knowledge in the domain of the problem of scheduling the concrete work shop, because it is being faced every day and for a long period of time.

10 178 S. CVETKOVIĆ et. al., Modelling of Logistic System by Petri Nets Strojarstvo 52 (2) (2010) the software should provide the realization of that knowledge in the optimal management decision and the software should make the user able to expand that knowledge by providing them with the needed information. These facts are impossible to fulfil completely in the classical approach to the designing of these types of application which have a common purpose and which deal with these problems. The reason for that is the fact that a certain set of more real systems isn t possible to model at this level of abstraction which is needed for making optimal management decisions at the tactical and operational level. The common purpose software isn t able to model the identity of every individual system, that is, the particularities which have to do with its structure and behaviour because they are on a lower level of abstraction. Thus, only the experimental knowledge in the domain of designing of these applications, together with the knowledge in the domain of the industrial engineering and specific knowledge and requests of the users give the software solutions of high performances. The next very important characteristic which marks this approach to the designing of this type of software is contained in the fact that its execution needs only the data about the starting space of the system condition. All other data which describe the dynamics of the change of that space this software realises automatically. With the common purpose software s, except with trivial problems, that s not the case, but for the start of the simulation experiment it is necessary to define a whole set of additional data. Here we again face the complexity which results in a considerably lower quality of models with all the negative consequences: the management decisions which are far from optimal, a low level of usage of the performances of the system, and the loses which are impossible to avoid. Having in mind the characteristics of the modelled system, we come to the conclusion that the change of the scheduling plan is mostly affected by the data which directly affect the priority of a working mandate, and that is: the term of delivery of finished products to a buyer, the size of a working mandate, and the transport time to the buyer The change of the value of these three elements in the range from % at the following diagrams, we enclose the appropriate changes of the following performances of the system: the average number of working mandates in the system, the average time of waiting for the analysis, the average time of the working mandates flow through the system, the average time reserve, the average delay etc. Figure 10 shows the change of the average number of working mandates in the system depending on the time change of the transport of finished products from %. The value of these periods of time is in line with the index 100% (that is, the values 1 in the diagram). The average number of working mandates for that data is 5, 28 and the highest decline from that value is for the rise in the basic values for 150% when the average number of working mandates is 4, 83. It is clear that the rise of the transport time shorts the time reserves, that is, the priorities of a working mandate so, during the experiment, the programme will change the priorities on the side of those working mandates with longer transport time of finished products to the buyer. Figure 10. The change of the average number of working mandates in the system depending on the time change of transport of finished products to the buyer Slika 10. Promjena prosječnog broja radnih naloga u sustavu u ovisnosti o promjeni vremena transporta završnog proizvoda kupcu 6. Conclusion In the paper, a complete logistic chain is shown, modelled by Petri nets, which connects the observed business system with suppliers and buyers. In that way, by means of global modelling of the basic process of the business system, a possibility is opened for integrating certain processes and activities as well as the functioning of the business system on the whole. The widened Petri nets applied for designing the model ensure its faultless execution by means of simulating program that is coded in the object-oriented language C++. The simulation effects in domestic production conditions supports the suggestion about a significant effect of the application of PPC system in reaching

11 Strojarstvo 52 (2) (2010) S. CVETKOVIĆ et. al., Modelling of Logistic System by Petri Nets 179 a better strategic position of a tested system and a significant rise of the level of flexibility and shortage of supplies. The simulation software provides a global view of the functioning of the business system by modelling a complete logistic chain from supplies of half fabricants to the delivery of the products to the buyer. This global view is a necessary condition for the internal and external integration of the business system as well as the optimization of its behaviour, which is one of the basic sub-aims which are necessary for the realisation of the production concept. The scheduling plan which generates this simulation software completely supports the PULL system of the material flow through the system paying attention to: the time of the supplier s answer, the fast and confident delivery of finished products, the time needed for the realization of working mandates, the finishing time at the process level, the elimination of narrow throats in the production, the optimization of the size of working mandates and the full usage of the capacities. The suggested concept in the management model which uses the performances of the simulation model as an integral part of the information system provides the management of the behaviour of the part of the business system which they wish to manage. In this way, the knowledge which gives the information technologies, industrial engineering and strategic management can focus in the simulation model which in that way becomes a powerful tool for the management support. References [1] SIMUNOVIC, G.; SARIC, T.; LUJIC, R.: Application of neural networks in evaluation of technological time, Strojniški vestnik - Journal of Mechanical Engineering 54 (2008) 3, [2] GU, T.; BAHRI, P.A.: A survey of Petri net applications in batch processes, Computers in Industry 47 (2002) [3] DONG, M.; CHEN, F.F.: Process modelling and analysis of manufacturing supply chain networks using object-oriented Petri nets, Robotics and Computer Integrated Manufacturing 17 (2001) [4] MAN-ZHIA, L.; MEI-HUAA, Z.; XUE-QINGA, L.; JI-XIANB, Y.: The research on modelling of coal supply chain based on object oriented Petri net and optimization, Procedia Earth and Planetary Science 1 (2009) [5] GIUA, A.; PILLONI, M.T.; SEATZU, C.: Modelling and simulation of a bottling plant using hybrid Petri nets, International Journal of Production Research, 43 (2001) [6] BLACKHURST, J.; WU TONG T.; CRAIGHEAD C.W.: A systematic approach for supply chain conflict detection with a hierarchical Petri Net extension, Omega 36 (2008) [7] LIU, R.; KUMAR A.; van der AALST, W.: A formal modelling approach for supply chain event management, Decision Support Systems 43 (2007) [8] WADHWA, S.; MADAAN J.; CHAN F.T.S.: Flexible decision modelling of reverse logistics system: A value adding MCDM approach for alternative selection, Robotics and Computer- Integrated Manufacturing 25 (2009) [9] CVETKOVIĆ, S.: Razvoj savremenih proizvodnih strategija u industriji, Monografija, Zadužbina Andrejević, Beograd 2002., ISBN [10] LEE, Y.F.; JIANG Z.B.; LIU H.R.: Multipleobjective scheduling and real-time dispatching for the semiconductor manufacturing system, Computers & Operations Research 36 (2009) [11] van der AALST, W.M.P.; REIJERS, H.A.; WEIJTERS, A.J.M.M.; van DONGEN, B.F.; ALVES de MEDEIROS, A.K.; SONG, M.; VERBEEK H.M.W.: Business process mining: An industrial application, Information Systems 32 (2007) [12] GNANAVELBABU, A.; JERALD, J.; NOORUL HAQ, A.; ASOKAN, P.: Multi objective scheduling of jobs AGVs and AS/RS in FMS using artificial immune system, Advances in Production Engineering and Management, 4 (2009) 3,

Performance Improvement of the Flexible Manufacturing System (FMS) with a Proper Dispatching Rules Planning

Performance Improvement of the Flexible Manufacturing System (FMS) with a Proper Dispatching Rules Planning Proceedings of the 2014 International Conference on Industrial Engineering and Operations Management Bali, Indonesia, January 7 9, 2014 Performance Improvement of the Flexible Manufacturing System (FMS)

More information

Determination of Routing and Sequencing in a Flexible Manufacturing System Based on Fuzzy Logic

Determination of Routing and Sequencing in a Flexible Manufacturing System Based on Fuzzy Logic Determination of Routing and Sequencing in a Flexible Manufacturing System Based on Fuzzy Logic Pramot Srinoi 1* and Somkiat Thermsuk 2 Abstract This paper is concerned with scheduling in Flexible Manufacturing

More information

APPLYING OF AHP METHODOLOGY AND WEIGHTED PROPERTIES METHOD TO THE SELECTION OF OPTIMUM ALTERNATIVE OF STOCK MATERIAL

APPLYING OF AHP METHODOLOGY AND WEIGHTED PROPERTIES METHOD TO THE SELECTION OF OPTIMUM ALTERNATIVE OF STOCK MATERIAL 1. KATICA ŠIMUNOVIĆ, 2. MARIO GALOVIĆ, 3. GORAN ŠIMUNOVIĆ, 4. ILIJA SVALINA APPLYING OF AHP METHODOLOGY AND WEIGHTED PROPERTIES METHOD TO THE SELECTION OF OPTIMUM ALTERNATIVE OF STOCK MATERIAL Abstract:

More information

Sujin Woottichaiwat. Received September 9, 2014; Accepted February 9, 2015

Sujin Woottichaiwat. Received September 9, 2014; Accepted February 9, 2015 Research Article Efficiency Improvement of Truck Queuing System in the Freight Unloading Process Case Study of a Private Port in Songkhla Province Sujin Woottichaiwat Department of Industrial Engineering

More information

Analysis of the job shop system with transport and setup times in deadlock-free operating conditions

Analysis of the job shop system with transport and setup times in deadlock-free operating conditions Archives of Control Sciences Volume 22(LVIII), 2012 No. 4, pages 417 425 Analysis of the job shop system with transport and setup times in deadlock-free operating conditions JOLANTA KRYSTEK and MAREK KOZIK

More information

There seems to be a universal agreement on what a supply chain is. Jayashankar et al. [25] defines a supply chain to be

There seems to be a universal agreement on what a supply chain is. Jayashankar et al. [25] defines a supply chain to be ne previo conten Next: Intelligent Agents Up: No Title Previous: Introduction Supply Chain Management Introduction This chapter aims to give the supply chain management side of the theoretical background

More information

LOADING AND SEQUENCING JOBS WITH A FASTEST MACHINE AMONG OTHERS

LOADING AND SEQUENCING JOBS WITH A FASTEST MACHINE AMONG OTHERS Advances in Production Engineering & Management 4 (2009) 3, 127-138 ISSN 1854-6250 Scientific paper LOADING AND SEQUENCING JOBS WITH A FASTEST MACHINE AMONG OTHERS Ahmad, I. * & Al-aney, K.I.M. ** *Department

More information

SCHEDULING AND CONTROLLING PRODUCTION ACTIVITIES

SCHEDULING AND CONTROLLING PRODUCTION ACTIVITIES SCHEDULING AND CONTROLLING PRODUCTION ACTIVITIES Al-Naimi Assistant Professor Industrial Engineering Branch Department of Production Engineering and Metallurgy University of Technology Baghdad - Iraq dr.mahmoudalnaimi@uotechnology.edu.iq

More information

1. For s, a, initialize Q ( s,

1. For s, a, initialize Q ( s, Proceedings of the 2006 Winter Simulation Conference L. F. Perrone, F. P. Wieland, J. Liu, B. G. Lawson, D. M. Nicol, and R. M. Fujimoto, eds. A REINFORCEMENT LEARNING ALGORITHM TO MINIMIZE THE MEAN TARDINESS

More information

SEQUENCING & SCHEDULING

SEQUENCING & SCHEDULING SEQUENCING & SCHEDULING November 14, 2010 1 Introduction Sequencing is the process of scheduling jobs on machines in such a way so as to minimize the overall time, cost and resource usage thereby maximizing

More information

Integration of Process Planning and Scheduling Functions for Batch Manufacturing

Integration of Process Planning and Scheduling Functions for Batch Manufacturing Integration of Process Planning and Scheduling Functions for Batch Manufacturing A.N. Saravanan, Y.F. Zhang and J.Y.H. Fuh Department of Mechanical & Production Engineering, National University of Singapore,

More information

PRODUCTION SCHEDULING PART-A

PRODUCTION SCHEDULING PART-A PRODUCTION SCHEDULING PART-A 1. List out any five priority sequencing rules. (Nov-2017) First come, first served (FCFS) Last come, first served (LCFS) Earliest due date (EDD) Shortest processing time (SPT)

More information

Modelling and Prediction of Logistic Chains Dependability Using the Markov s Random Processes

Modelling and Prediction of Logistic Chains Dependability Using the Markov s Random Processes Modelling and Prediction of Logistic Chains Dependability Using the Markov s Random Processes MILAN VROZINA, VILEM SROVNAL, JIRI DAVID, ZORA JANCIKOVA Department of Automation and Computer Application

More information

Workflow Model Representation Concepts

Workflow Model Representation Concepts Workflow Model Representation Concepts József Tick Institute for Software Engineering, John von Neumann Faculty, Budapest Tech tick@bmf.hu Abstract: Workflow management and the possibilities of workflow

More information

CHAPTER 1. Basic Concepts on Planning and Scheduling

CHAPTER 1. Basic Concepts on Planning and Scheduling CHAPTER 1 Basic Concepts on Planning and Scheduling Eugénio Oliveira Scheduling, FEUP/PRODEI /MIEIC 1 Planning and Scheduling: Processes of Decision Making regarding the and ordering of activities as well

More information

Industrial Automation course

Industrial Automation course Industrial Automation course Lesson 11 Petri Nets Modeling Politecnico di Milano Universidad de Monterrey, July 2015, A. L. Cologni 1 Introduction An automated production system is necessary to obtain

More information

CHAPTER 1 INTRODUCTION

CHAPTER 1 INTRODUCTION 1 CHAPTER 1 INTRODUCTION 1.1 MANUFACTURING SYSTEM Manufacturing, a branch of industry, is the application of tools and processes for the transformation of raw materials into finished products. The manufacturing

More information

Chapter 2 The Project Management Life Cycle

Chapter 2 The Project Management Life Cycle Information Systems Project Management: A Process and Team Approach 1 Chapter 2 The Project Management Life Cycle Multiple Choice 1. The phases of managing a project are called: a. systems development

More information

PRODUCTION ACTIVITY CONTROL (PAC)

PRODUCTION ACTIVITY CONTROL (PAC) PRODUCTION ACTIVITY CONTROL (PAC) Concerns execution of material plans Contains shop floor control (SFC), and vendor scheduling and follow-up SFC encompasses detailed scheduling and control of individual

More information

PMP Exam Preparation Course Project Time Management

PMP Exam Preparation Course Project Time Management Project Time Management 1 Project Time Management Processes Define Activities Sequence Activities Estimate Activity Resources Estimate Activity duration Develop Schedule Control Schedule In some projects,

More information

APPENDIX 1 Processing time (pij) Release date (rj) Due date (dj): Weight (wj)

APPENDIX 1 Processing time (pij) Release date (rj) Due date (dj): Weight (wj) 172 APPENDIX 1 In all the scheduling problems considered the number of jobs and the number of machines are assumed to be finite. The number of jobs is denoted by N and the number of machines by M. usually,

More information

The Simulation Optimization of a Flexible Manufacturing System with Arena

The Simulation Optimization of a Flexible Manufacturing System with Arena The Simulation Optimization of a Flexible Manufacturing System with Arena Gaurav Kumar Department of Mechanical Engineering Sagar Institute of Research & Tech. Excellence, Bhopal, India Dr. Trilok Singh

More information

MODELLING AND OPTIMISATION OF PRODUCTION PROCESSES IN OVERHAUL ACTIVITIES

MODELLING AND OPTIMISATION OF PRODUCTION PROCESSES IN OVERHAUL ACTIVITIES IVAN MAVRIC D. Se. Fakultet strojarstva i brodogradnje Ivana Lucica 5, Zagreb Science in Traffic Review U. D. C. 62-7:62-5 Accepted: Apr. 14, 1997 Approved: Jun. 9,1997 MODELLING AND OPTIMISATION OF PRODUCTION

More information

Unit WorkBook 1 Level 5 ENG U48 Manufacturing Systems Engineering UniCourse Ltd. All Rights Reserved. Sample

Unit WorkBook 1 Level 5 ENG U48 Manufacturing Systems Engineering UniCourse Ltd. All Rights Reserved. Sample Pearson BTEC Levels 5 Higher Nationals in Engineering (RQF) Unit 48: Manufacturing Systems Engineering Unit Workbook 1 in a series of 1 for this unit Learning Outcome LO1 to LO4 Manufacturing Systems Engineering

More information

ARCHITECTURE OF FMS. Typical Elements of FMS. Two Kind of Integration. Typical Sequence of Operation

ARCHITECTURE OF FMS. Typical Elements of FMS. Two Kind of Integration. Typical Sequence of Operation Typical Elements of FMS ARCHITECTURE OF FMS Versatile NC machines equipped with automatic tool changing and inprocess gauging, with capability to carry out a variety of operations An automated Material

More information

International Journal of Engineering, Business and Enterprise Applications (IJEBEA)

International Journal of Engineering, Business and Enterprise Applications (IJEBEA) International Association of Scientific Innovation and Research (IASIR) (An Association Unifying the Sciences, Engineering, and Applied Research) International Journal of Engineering, Business and Enterprise

More information

In general, a model is used to understand a system. It is only a representation of a more complicated original system based on mutual

In general, a model is used to understand a system. It is only a representation of a more complicated original system based on mutual In general, a model is used to understand a system. It is only a representation of a more complicated original system based on mutual characteristics, that is used for a specific exercise by a third system.

More information

Scheduling I. Today. Next Time. ! Introduction to scheduling! Classical algorithms. ! Advanced topics on scheduling

Scheduling I. Today. Next Time. ! Introduction to scheduling! Classical algorithms. ! Advanced topics on scheduling Scheduling I Today! Introduction to scheduling! Classical algorithms Next Time! Advanced topics on scheduling Scheduling out there! You are the manager of a supermarket (ok, things don t always turn out

More information

5.3 Supply Management within the MES

5.3 Supply Management within the MES Technical 6x9 / Manufacturing Execution Sytems (MES): Design, Planning, and Deployment / Meyer / 0-07-162383-3 / Chapter 5 Core Function Production Flow-Oriented Planning 85 Customer data (e.g., customer

More information

Developing an Ambient Intelligent-Based Decision Support System for Production and Control Planning

Developing an Ambient Intelligent-Based Decision Support System for Production and Control Planning Developing an Ambient Intelligent-Based Decision Support System for Production and Control Planning Marco Gomes, Fábio Silva, Filipa Ferraz, António Silva, Cesar Analide and Paulo Novais Department of

More information

OPERATIONAL RESEARCH ON PRODUCTION ORGANIZING

OPERATIONAL RESEARCH ON PRODUCTION ORGANIZING 1 2 OPERATIONAL RESEARCH ON PRODUCTION ORGANIZING Steliana CUCU, Traian FLEŞER ISIM TIMIŞOARA ABSTRACT Operational research, a new domain in science, having a complex character, studies and analyses the

More information

World Rural Observations 2017;9(3) Developing a New Mathematical Model for Scheduling Trucks in Cross-Docking Systems

World Rural Observations 2017;9(3)   Developing a New Mathematical Model for Scheduling Trucks in Cross-Docking Systems Developing a New Mathematical Model for Scheduling Trucks in Cross-Docking Systems Rashed Sahraeian, Mohsen Bashardoost Department of Industrial Engineering, Shahed University, Tehran, Iran Sahraeian@shahed.ac.ir,

More information

PETRI NET VERSUS QUEUING THEORY FOR EVALUATION OF FLEXIBLE MANUFACTURING SYSTEMS

PETRI NET VERSUS QUEUING THEORY FOR EVALUATION OF FLEXIBLE MANUFACTURING SYSTEMS Advances in Production Engineering & Management 5 (2010) 2, 93-100 ISSN 1854-6250 Scientific paper PETRI NET VERSUS QUEUING THEORY FOR EVALUATION OF FLEXIBLE MANUFACTURING SYSTEMS Hamid, U. NWFP University

More information

Hybrid Model applied in the Semiconductor Production Planning

Hybrid Model applied in the Semiconductor Production Planning , March 13-15, 2013, Hong Kong Hybrid Model applied in the Semiconductor Production Planning Pengfei Wang, Tomohiro Murata Abstract- One of the most studied issues in production planning or inventory management

More information

Axiomatic Design of Manufacturing Systems

Axiomatic Design of Manufacturing Systems Axiomatic Design of Manufacturing Systems Introduction to Manufacturing System "What is a manufacturing system?" "What is an ideal manufacturing system?" "How should we design a manufacturing system?"

More information

INDIAN INSTITUTE OF MATERIALS MANAGEMENT Post Graduate Diploma in Materials Management PAPER 18 C OPERATIONS RESEARCH.

INDIAN INSTITUTE OF MATERIALS MANAGEMENT Post Graduate Diploma in Materials Management PAPER 18 C OPERATIONS RESEARCH. INDIAN INSTITUTE OF MATERIALS MANAGEMENT Post Graduate Diploma in Materials Management PAPER 18 C OPERATIONS RESEARCH. Dec 2014 DATE: 20.12.2014 Max. Marks: 100 TIME: 2.00 p.m to 5.00 p.m. Duration: 03

More information

Genetic Algorithms-Based Model for Multi-Project Human Resource Allocation

Genetic Algorithms-Based Model for Multi-Project Human Resource Allocation Genetic Algorithms-Based Model for Multi-Project Human Resource Allocation Abstract Jing Ai Shijiazhuang University of Applied Technology, Shijiazhuang 050081, China With the constant development of computer

More information

Job Batching and Scheduling for Parallel Non- Identical Machines via MILP and Petri Nets

Job Batching and Scheduling for Parallel Non- Identical Machines via MILP and Petri Nets Proceedings of the 2009 IEEE International Conference on Systems, Man, and Cybernetics San Antonio, TX, USA - October 2009 Job Batching and Scheduling for Parallel Non- Identical Machines via MILP and

More information

Logistic and production Models

Logistic and production Models i) Supply chain optimization Logistic and production Models In a broad sense, a supply chain may be defined as a network of connected and interdependent organizational units that operate in a coordinated

More information

Rules for Construction of Simulation Models for Production Processes Optimization

Rules for Construction of Simulation Models for Production Processes Optimization Rules for Construction of Simulation Models for Production Processes Optimization Konstantin A. Aksyonov 1, Anna S. Antonova 1, Olga P. Aksyonova 1, and Wang Kai 2 1 Ural Federal University, Yekaterinburg,

More information

THE PMP EXAM PREP COURSE

THE PMP EXAM PREP COURSE THE PMP EXAM PREP COURSE Session 2 PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc. www.falconppm.com Agenda 9:00 10:15 Practice the PMP Questions 10:15 10:30 Break 10:30

More information

Research Article Integrated Production-Distribution Scheduling Problem with Multiple Independent Manufacturers

Research Article Integrated Production-Distribution Scheduling Problem with Multiple Independent Manufacturers Mathematical Problems in Engineering Volume 2015, Article ID 579893, 5 pages http://dx.doi.org/10.1155/2015/579893 Research Article Integrated Production-Distribution Scheduling Problem with Multiple Independent

More information

International Journal of Advanced Engineering Technology E-ISSN

International Journal of Advanced Engineering Technology E-ISSN International Journal of Advanced Engineering Technology E-ISSN 976-3945 Research Paper A SIMULATION STUDY AND ANALYSIS OF JOB RELEASE POLICIES IN SCHEDULING A DYNAMIC FLEXIBLE JOB SHOP PRODUCTION SYSTEM

More information

Simulation of Lean Principles Impact in a Multi-Product Supply Chain

Simulation of Lean Principles Impact in a Multi-Product Supply Chain Simulation of Lean Principles Impact in a Multi-Product Supply Chain M. Rossini, A. Portioli Studacher Abstract The market competition is moving from the single firm to the whole supply chain because of

More information

TenStep Project Management Process Summary

TenStep Project Management Process Summary TenStep Project Management Process Summary Project management refers to the definition and planning, and then the subsequent management, control, and conclusion of a project. It is important to recognize

More information

Research on the Service Modeling Method of Information Management Software based on the Petri Net Model

Research on the Service Modeling Method of Information Management Software based on the Petri Net Model Research on the Modeling Method of Information Management Software based on the Petri Net Model Han Tianfeng School of Computer Application, Qingdao Hotel Management College P.R.China hantianfeng@126.com

More information

SINGLE MACHINE SEQUENCING. ISE480 Sequencing and Scheduling Fall semestre

SINGLE MACHINE SEQUENCING. ISE480 Sequencing and Scheduling Fall semestre SINGLE MACHINE SEQUENCING 2011 2012 Fall semestre INTRODUCTION The pure sequencing problem is a specialized scheduling problem in which an ordering of the jobs completely determines a schedule. Moreover,

More information

STRUCTURAL AND QUANTITATIVE PERSPECTIVES ON BUSINESS PROCESS MODELLING AND ANALYSIS

STRUCTURAL AND QUANTITATIVE PERSPECTIVES ON BUSINESS PROCESS MODELLING AND ANALYSIS STRUCTURAL AND QUANTITATIVE PERSPECTIVES ON BUSINESS PROCESS MODELLING AND ANALYSIS Henry M. Franken, Henk Jonkers and Mark K. de Weger* Telematics Research Centre * University of Twente P.O. Box 589 Centre

More information

Analysis and Modelling of Flexible Manufacturing System

Analysis and Modelling of Flexible Manufacturing System Analysis and Modelling of Flexible Manufacturing System Swetapadma Mishra 1, Biswabihari Rath 2, Aravind Tripathy 3 1,2,3Gandhi Institute For Technology,Bhubaneswar, Odisha, India --------------------------------------------------------------------***----------------------------------------------------------------------

More information

PRODUCTION PLANNING AND CONTROL

PRODUCTION PLANNING AND CONTROL 5 PRODUCTION PLANNING AND CONTROL CHAPTER OUTLINE 5.1 Introduction and Meaning 5.2 Need for Production Planning and Control 5.3 Objectives of PP & C 5.4 Phases of PP & C 5.5 Functions of PP & C 5.6 Operations

More information

CHAPTER 1 INTRODUCTION

CHAPTER 1 INTRODUCTION 1 CHAPTER 1 INTRODUCTION 1.1 FACILITY LAYOUT DESIGN Layout design is nothing but the systematic arrangement of physical facilities such as production machines, equipments, tools, furniture etc. A plant

More information

SIMULATION OF PRODUCTION PROCESS REORGANIZED WITH VALUE STREAM MAPPING

SIMULATION OF PRODUCTION PROCESS REORGANIZED WITH VALUE STREAM MAPPING N. Gjeldum, I. Veža, B. Bilić ISSN 1330-3651 UDC/UDK 658.52.011.56:629.5 SIMULATION OF PRODUCTION PROCESS REORGANIZED WITH VALUE STREAM MAPPING Nikola Gjeldum, Ivica Veža, Boženko Bilić Original scientific

More information

A Study of the Production Process Simulation System Based on Workflow Management

A Study of the Production Process Simulation System Based on Workflow Management Association for Information Systems AIS Electronic Library (AISeL) WHICEB 2013 Proceedings Wuhan International Conference on e-business Summer 5-25-2013 A Study of the Production Process Simulation System

More information

OPERATIONAL PLANNING AND SCHEDULING IN MANUFACTURING ORGANIZATIONS

OPERATIONAL PLANNING AND SCHEDULING IN MANUFACTURING ORGANIZATIONS OPERATIONAL PLANNING AND SCHEDULING IN MANUFACTURING ORGANIZATIONS Dragana Vukovic 1 ; Ph.D. Zoran Nesic 2 ; Ph.D. Stojance Nusev 3 1 The College of Applied Technical Science Arandjelovac, SERBIA, dragana.vukovic@vsar.edu.rs

More information

Five Tips to Achieve a Lean Manufacturing Business

Five Tips to Achieve a Lean Manufacturing Business Five Tips to Achieve a Lean Manufacturing Business Executive Overview Introduction The more successful manufacturers today are those with the ability to meet customer delivery schedules while maintaining

More information

Shipyard Production Processes Re-Design Methodology Based on Expert Approach and Simulation Modeling

Shipyard Production Processes Re-Design Methodology Based on Expert Approach and Simulation Modeling ISSN 0554-6397 UDK: 629.5.01.005.418 681.5.017 Original scientific paper (IZVORNI ZNANSTVENI RAD) Received (Primljeno): 07.09.2015. Tin Matulja, Ph.D. E-mail: tin.matulja@riteh.hr Marko Hadjina, Ph.D.

More information

An Automated Decision Support System to Assist with Project Planning, Program Management and Work Flow Analysis of an Enterprise

An Automated Decision Support System to Assist with Project Planning, Program Management and Work Flow Analysis of an Enterprise An Automated Decision Support System to Assist with Project Planning, Program Management and Work Flow Analysis of an Enterprise NBS Enterprises Competition Sensitive Natasha J. Schebella / CEO & Owner

More information

Flowshop Scheduling Problem for 10-Jobs, 10-Machines By Heuristics Models Using Makespan Criterion

Flowshop Scheduling Problem for 10-Jobs, 10-Machines By Heuristics Models Using Makespan Criterion Flowshop Scheduling Problem for 10-Jobs, 10-Machines By Heuristics Models Using Makespan Criterion Ajay Kumar Agarwal Assistant Professor, Mechanical Engineering Department RIMT, Chidana, Sonipat, Haryana,

More information

Designing an Effective Scheduling Scheme Considering Multi-level BOM in Hybrid Job Shop

Designing an Effective Scheduling Scheme Considering Multi-level BOM in Hybrid Job Shop Proceedings of the 2012 International Conference on Industrial Engineering and Operations Management Istanbul, Turkey, July 3 6, 2012 Designing an Effective Scheduling Scheme Considering Multi-level BOM

More information

Management of purchase process in realization of building investment

Management of purchase process in realization of building investment ARCHIVES of FOUNDRY ENGINEERING Published quarterly as the organ of the Foundry Commission of the Polish Academy of Sciences ISSN (1897-3310) Volume 10 Special Issue 3/2010 225 230 43/3 Management of purchase

More information

Scheduling of Three FMS Layouts Using Four Scheduling Rules

Scheduling of Three FMS Layouts Using Four Scheduling Rules Scheduling of Three FMS Layouts Using Four Scheduling Rules Muhammad Arshad1 m.arshad8@bradford.ac.uk Milana Milana1 m.milana@student.bradford.ac.uk Mohammed Khurshid Khan1 M.K.Khan@bradford.ac.uk 1 School

More information

Storage Allocation and Yard Trucks Scheduling in Container Terminals Using a Genetic Algorithm Approach

Storage Allocation and Yard Trucks Scheduling in Container Terminals Using a Genetic Algorithm Approach Storage Allocation and Yard Trucks Scheduling in Container Terminals Using a Genetic Algorithm Approach Z.X. Wang, Felix T.S. Chan, and S.H. Chung Abstract Storage allocation and yard trucks scheduling

More information

OPERATIONS RESEARCH Code: MB0048. Section-A

OPERATIONS RESEARCH Code: MB0048. Section-A Time: 2 hours OPERATIONS RESEARCH Code: MB0048 Max.Marks:140 Section-A Answer the following 1. Which of the following is an example of a mathematical model? a. Iconic model b. Replacement model c. Analogue

More information

Information Technology Audit & Cyber Security

Information Technology Audit & Cyber Security Information Technology Audit & Cyber Security Managing Information System Projects Systems & Infrastructure Lifecycle Management Introduction Definitions INTRODUCTION Governance Roles and Responsibilities

More information

Keywords: Product Family Design, Production Cost Estimation Framework, Activity Based Costing, Product Family Structure, Resource Sharing Methods

Keywords: Product Family Design, Production Cost Estimation Framework, Activity Based Costing, Product Family Structure, Resource Sharing Methods DEVELOPMENT OF A PRODUCTION COST ESTIMATION FRAMEWORK TO SUPPORT PRODUCT FAMILY DESIGN Jaeil Park 1 and Timothy W. Simpson 2* Department of Industrial & Manufacturing Engineering Penn State University,

More information

Multi-objective Evolutionary Optimization of Cloud Service Provider Selection Problems

Multi-objective Evolutionary Optimization of Cloud Service Provider Selection Problems Multi-objective Evolutionary Optimization of Cloud Service Provider Selection Problems Cheng-Yuan Lin Dept of Computer Science and Information Engineering Chung-Hua University Hsin-Chu, Taiwan m09902021@chu.edu.tw

More information

Application of Stateflow Diagrams in Production Line Modeling

Application of Stateflow Diagrams in Production Line Modeling Application of Stateflow Diagrams in Production Line Modeling Ján Čabala *, Ján Jadlovský ** * Department of Cybernetics and Artificial Intelligence, Faculty of Electrical Engineering and Informatics,

More information

ISE480 Sequencing and Scheduling

ISE480 Sequencing and Scheduling ISE480 Sequencing and Scheduling INTRODUCTION ISE480 Sequencing and Scheduling 2012 2013 Spring term What is Scheduling About? Planning (deciding what to do) and scheduling (setting an order and time for

More information

2017 2nd International Conference on Advances in Management Engineering and Information Technology (AMEIT 2017) ISBN:

2017 2nd International Conference on Advances in Management Engineering and Information Technology (AMEIT 2017) ISBN: 2017 2nd International Conference on Advances in Management Engineering and Information Technology (AMEIT 2017) ISBN: 978-1-60595-457-8 Research on Decision-making of Green Reverse Logistics in Enterprises:

More information

MANAGEMENT SYSTEM FOR STREAMLINING THE INNOVATION PROCESS OF RESEARCH AND DEVELOPMENT WORKPLACE

MANAGEMENT SYSTEM FOR STREAMLINING THE INNOVATION PROCESS OF RESEARCH AND DEVELOPMENT WORKPLACE MANAGEMENT SYSTEM FOR STREAMLINING THE INNOVATION PROCESS OF RESEARCH AND DEVELOPMENT WORKPLACE Ing. Martina Husarova Doc. Ing. Jan Spisak, PhD Development and realization workplace of raw materials extracting

More information

AGENTS MODELING EXPERIENCE APPLIED TO CONTROL OF SEMI-CONTINUOUS PRODUCTION PROCESS

AGENTS MODELING EXPERIENCE APPLIED TO CONTROL OF SEMI-CONTINUOUS PRODUCTION PROCESS Computer Science 15 (4) 2014 http://dx.doi.org/10.7494/csci.2014.15.4.411 Gabriel Rojek AGENTS MODELING EXPERIENCE APPLIED TO CONTROL OF SEMI-CONTINUOUS PRODUCTION PROCESS Abstract The lack of proper analytical

More information

USING THE MIN/MAX METHOD FOR REPLENISHMENT OF PICKING LOCATIONS

USING THE MIN/MAX METHOD FOR REPLENISHMENT OF PICKING LOCATIONS Transport and Telecommunication, 2, volume 8, no., 9 8 Transport and Telecommunication Institute, Lomonosova, Riga, LV-9, Latvia DOI./ttj-2-8 USING THE / METHOD FOR REPLENISHMENT OF PICKING LOCATIONS Raitis

More information

Optimizing Inplant Supply Chain in Steel Plants by Integrating Lean Manufacturing and Theory of Constrains through Dynamic Simulation

Optimizing Inplant Supply Chain in Steel Plants by Integrating Lean Manufacturing and Theory of Constrains through Dynamic Simulation Optimizing Inplant Supply Chain in Steel Plants by Integrating Lean Manufacturing and Theory of Constrains through Dynamic Simulation Atanu Mukherjee, President, Dastur Business and Technology Consulting,

More information

Improving Material Handling Efficiency in a Ginning Machine Manufacturing Company

Improving Material Handling Efficiency in a Ginning Machine Manufacturing Company Improving Material Handling Efficiency in a Ginning Machine Manufacturing Company A. P. Bahale 1, Dr.S.S.Deshmukh 2 P.G. Student, Department of Mechanical engineering, PRMIT&R, Badnera, India 1 Associate

More information

SIMULATION APPROACH TO OPTIMISE STOCKYARD LAYOUT: A CASE STUDY IN PRECAST CONCRETE PRODUCTS INDUSTRY

SIMULATION APPROACH TO OPTIMISE STOCKYARD LAYOUT: A CASE STUDY IN PRECAST CONCRETE PRODUCTS INDUSTRY SIMULATION APPROACH TO OPTIMISE STOCKYARD LAYOUT: A CASE STUDY IN PRECAST CONCRETE PRODUCTS INDUSTRY Ramesh Marasini, Nashwan Dawood School of Science and Technology, Univerisity of Teesside, Middlesbrough

More information

I R TECHNICAL RESEARCH REPORT. Rescheduling Frequency and Supply Chain Performance. by Jeffrey W. Herrmann, Guruprasad Pundoor TR

I R TECHNICAL RESEARCH REPORT. Rescheduling Frequency and Supply Chain Performance. by Jeffrey W. Herrmann, Guruprasad Pundoor TR TECHNICAL RESEARCH REPORT Rescheduling Frequency and Supply Chain Performance by Jeffrey W. Herrmann, Guruprasad Pundoor TR 2002-50 I R INSTITUTE FOR SYSTEMS RESEARCH ISR develops, applies and teaches

More information

Balance Analysis of Many Varieties Small Batch Workshop Production Line

Balance Analysis of Many Varieties Small Batch Workshop Production Line Vol.8, No. 9 (2015), pp.69-74 http://dx.doi.org/10.14257/ijunesst.2015.8.9.08 Balance Analysis of Many Varieties Small Batch Workshop Production Line Meng Ai-ying Zhejiang Industry Polytechnic College

More information

Application of an Improved Neural Network Algorithm in E- commerce Customer Satisfaction Evaluation

Application of an Improved Neural Network Algorithm in E- commerce Customer Satisfaction Evaluation Application of an Improved Neural Network Algorithm in E- commerce Customer Satisfaction Evaluation Lei Yang 1,2 *, Ying Ma 3 1 Science and Technology Key Laboratory of Hebei Province, Baoding 071051,

More information

Makespan Algorithms and Heuristic for Internet-Based Collaborative Manufacturing Process Using Bottleneck Approach

Makespan Algorithms and Heuristic for Internet-Based Collaborative Manufacturing Process Using Bottleneck Approach J. Software Engineering & Applications, 2010, : 91-97 doi:10.426/jsea.2010.1011 ublished Online January 2010 (http://www.scir.org/journal/jsea) Makespan Algorithms and Heuristic for Internet-Based Collaborative

More information

Automatic Support for Product Based Workflow Design: Generation of Process Models from a Product Data Model

Automatic Support for Product Based Workflow Design: Generation of Process Models from a Product Data Model Automatic Support for Product Based Workflow Design: Generation of Process Models from a Product Data Model Irene Vanderfeesten, Hajo A. Reijers, Wil M.P. van der Aalst, and Jan Vogelaar Technische Universiteit

More information

TIMETABLING EXPERIMENTS USING GENETIC ALGORITHMS. Liviu Lalescu, Costin Badica

TIMETABLING EXPERIMENTS USING GENETIC ALGORITHMS. Liviu Lalescu, Costin Badica TIMETABLING EXPERIMENTS USING GENETIC ALGORITHMS Liviu Lalescu, Costin Badica University of Craiova, Faculty of Control, Computers and Electronics Software Engineering Department, str.tehnicii, 5, Craiova,

More information

A Simulation Platform for Multiagent Systems in Logistics

A Simulation Platform for Multiagent Systems in Logistics A Simulation Platform for Multiagent Systems in Logistics Heinz Ulrich, Swiss Federal Institute of Technology, Zürich Summary: The challenges in today s global economy are flexibility and fast reactions

More information

Genetic Algorithm for Flexible Job Shop Scheduling Problem - a Case Study

Genetic Algorithm for Flexible Job Shop Scheduling Problem - a Case Study Genetic Algorithm for Flexible Job Shop Scheduling Problem - a Case Study Gabriela Guevara, Ana I. Pereira,, Adriano Ferreira, José Barbosa and Paulo Leitão, Polytechnic Institute of Bragança, Campus Sta

More information

Project Time Management

Project Time Management Project Time Management Prof. Dr. Daning Hu Department of Informatics University of Zurich Adapted from Managing Information Technology Projects, Schwalbe Learning Objectives Define activities as the basis

More information

Available online at ScienceDirect. Procedia Computer Science 47 (2015 )

Available online at   ScienceDirect. Procedia Computer Science 47 (2015 ) Available online at www.sciencedirect.com ScienceDirect Procedia Computer Science 47 (2015 ) 247 254 Analysis for Maximal Optimized penalty for the Scheduling of Jobs with Specific Due Date on a Single

More information

AGV Controlled FMS. The ITB Journal. Fergus G. Maughan. Volume 1 Issue 1 Article 5

AGV Controlled FMS. The ITB Journal. Fergus G. Maughan. Volume 1 Issue 1 Article 5 The ITB Journal Volume 1 Issue 1 Article 5 2000 AGV Controlled FMS Fergus G. Maughan Follow this and additional works at: http://arrow.dit.ie/itbj Part of the Other Operations Research, Systems Engineering

More information

Procedia - Social and Behavioral Sciences 109 ( 2014 )

Procedia - Social and Behavioral Sciences 109 ( 2014 ) Available online at www.sciencedirect.com ScienceDirect Procedia - Social and Behavioral Sciences 109 ( 2014 ) 1059 1063 2 nd World Conference On Business, Economics And Management - WCBEM 2013 * Abstract

More information

Product Scheduling in a Multi-Product Colour Processing Facility - Case Study at TN Textiles (Pvt) Ltd

Product Scheduling in a Multi-Product Colour Processing Facility - Case Study at TN Textiles (Pvt) Ltd Proceedings of the 2012 International Conference on Industrial Engineering and Operations Management Istanbul, Turkey, July 3 6, 2012 Product Scheduling in a Multi-Product Colour Processing Facility -

More information

Operations and Supply Chain Management Prof. G. Srinivasan Department of Management Studies Indian Institute of Technology, Madras

Operations and Supply Chain Management Prof. G. Srinivasan Department of Management Studies Indian Institute of Technology, Madras Operations and Supply Chain Management Prof. G. Srinivasan Department of Management Studies Indian Institute of Technology, Madras Lecture - 24 Sequencing and Scheduling - Assumptions, Objectives and Shop

More information

Logistics Agreement Version 2

Logistics Agreement Version 2 Logistics Agreement Version 2 Introduction Introduction The present recommendation offers operational guidelines for logistics exchanges between parties, in the attempt to clarify traditional rules, to

More information

A Machine Setup Model for TFT-LCD Cell Back-End Process

A Machine Setup Model for TFT-LCD Cell Back-End Process A Machine Setup Model for TFT-LCD Cell Back-End Process Y.-C. Chang 1, P.-S. Chen 2, P.-C. Chen 1 1 Department of Industrial Engineering and Management, National Chiao Tung University, Hsinchu, Taiwan

More information

MTP_Paper 9_Syllabus 2016_June 2018_Set 1

MTP_Paper 9_Syllabus 2016_June 2018_Set 1 Paper - 9 : OPERATIONS MANAGEMENT & STRATEGIC MANAGEMENT Academics Department, The Institute of Cost Accounts of India (Statutory Body under an Act of Parliament) Page 1 Paper 9 : Operation Management

More information

PROJECT PLANNING AND SCHEDULING

PROJECT PLANNING AND SCHEDULING PROJECT PLANNING AND SCHEDULING AFTAB HAMEED MEMON Office: E6-003A, Makmal Kej. Bangunan Jab. Kej. Bangunan & Peminaan, FKAAS Contact No. 014-2527620 E-mail: ah78memon@hotmail.com Introduction to Project

More information

Optimization Problems and Algorithms in Supply-Chain Management

Optimization Problems and Algorithms in Supply-Chain Management Optimization Problems and Algorithms in Supply-Chain Management 1 Botond Bertok, 1 Robert Adonyi, 2 Sandor Bodrogi, and 1 Zoltan Kovacs 1 University of Pannonia, Faculty of Information Technology Department

More information

Vehicle Routing Problems in Supply Chain Management

Vehicle Routing Problems in Supply Chain Management Lecture 12. Vehicle Routing Problems in Supply Chain Management With the emergence of international markets and the growth of globalization, the management of supply chains has gained increased attention.

More information

Application of Graph Theory: a Review

Application of Graph Theory: a Review Application of Graph Theory: a Review Ravi Kalra 1, Sunil Kumar 2, Kamal Jangra 3 1 JCD college of Engineering, Sirsa, Haryana * 2 Yadavindra College of Engineering, Guru Kashi Campus, Talwandi Sabo, Bathinda,

More information

CONFIGURATION OF MODULAR NOISE BARRIERS

CONFIGURATION OF MODULAR NOISE BARRIERS CONFIGURATION OF MODULAR NOISE BARRIERS Milan Kolarević 1, Vladan Grković 1,Miomir Vukićević 1, Mišo Bjelić 1 1 University of Kragujevac, Faculty of Mechanical Engineering Kraljevo, Serbia, kolarevic.m@mfkv.kg.ac.rs

More information

CHAPTER 1. Business Process Management & Information Technology

CHAPTER 1. Business Process Management & Information Technology CHAPTER 1 Business Process Management & Information Technology Q. Process From System Engineering Perspective From Business Perspective In system Engineering Arena Process is defined as - a sequence of

More information

JOB SHOP SCHEDULING TO MINIMIZE WORK-IN-PROCESS, EARLINESS AND TARDINESS COSTS ZHU ZHECHENG A THESIS SUBMITTED FOR THE DEGREE OF DOCTOR OF PHILOSOPHY

JOB SHOP SCHEDULING TO MINIMIZE WORK-IN-PROCESS, EARLINESS AND TARDINESS COSTS ZHU ZHECHENG A THESIS SUBMITTED FOR THE DEGREE OF DOCTOR OF PHILOSOPHY JOB SHOP SCHEDULING TO MINIMIZE WORK-IN-PROCESS, EARLINESS AND TARDINESS COSTS ZHU ZHECHENG A THESIS SUBMITTED FOR THE DEGREE OF DOCTOR OF PHILOSOPHY DEPARTMENT OF INDUSTRIAL AND SYSTEMS ENGINEERING NATIONAL

More information

Development of the Simulation Based Integrative Decision Support Framework for. Flexible Manufacturing System with Real Time Process Plan Selection

Development of the Simulation Based Integrative Decision Support Framework for. Flexible Manufacturing System with Real Time Process Plan Selection Development of the Simulation Based Integrative Decision Support Framework for Flexible Manufacturing System with Real Time Process Plan Selection A thesis presented to the faculty of Russ College of Engineering

More information