PrePayPower Limited Paramount Court Corrig Road Sandyford Dublin 18 FreePhone:

Size: px
Start display at page:

Download "PrePayPower Limited Paramount Court Corrig Road Sandyford Dublin 18 FreePhone:"

Transcription

1 Smart Metering Programme Office Commission for Energy Regulation, The Exchange Belgard Square North Tallaght Dublin 24 Dear Smart Metering Programme Office, PrePayPower, as Ireland s largest prepay electricity provider, welcomes the opportunity to respond to the CER s National Smart Metering Programme (NSMP) Managing the Transition to Time-of-Use Tariffs consultation paper (CER/15/054). In summary our views are: The case for mandating time of use tariffs on a prepayment population remain unproven, and in our view has not been adequately considered by the CER: o Unproven benefits: We note that on average PrePayPower Lifestyle pay as you go (PAYG) customers already demonstrate significant energy savings far in excess of the results demonstrated in the NSMP trials, comparing the change in their consumption after having a budget controller installed. The efficacy of time-of-use tariffs to deliver the peak-shifting also demonstrated in the trials from such a population is unproven. o Unassessed impact on financial hardship customers: Secondly, many PAYG customers may be in financial hardship. The prohibition for such customers to return to a flat rate tariff must be evaluated from a customer hardship perspective. While promises are made to take account of such customers in the paper, no analysis is yet provided. We therefore request the CER to reaffirm, with rationale and evidence, whether mandated ToU for prepayment customers is still an appropriate for the programme. With the growing numbers of PAYG meters in Ireland, it is no longer sufficient or prudent to assume that ToU benefits will accrue from PAYG customers. Some of the examples in the paper stress the importance of customer choice in timing their transition into a time-of-use tariff. The paper, however, is light on the commercial implications for suppliers arising from an uncontrolled migration of customers to a new ToU product offering. PrePayPower stresses that should PAYG customers be required to take on a time-of-use tariff, it is done within the context of a wider wholesale market framework that supports prudent risk management around the new tariff structure. This includes a liquid forwards market and wholesale market reform to half-hourly settlement.

2 We believe that any regulation by the CER which mandates suppliers to enter into inherently risky contracts, at an unknown rate, without access to appropriate risk mitigations would be contrary to the CER s obligations under the 1999 Act to ensure Authorised Persons are able to fund their activities. We have responded in more detail on the specific questions, and our response is not confidential and may be published in full. If you wish to have further communication in relation to our submission, please don t hesitate to contact me. Yours faithfully, Cathal Fay

3 Transition to Time-of-Use Tariffs: example approaches Q1. The different examples provided focus on flexibility in timing and what can be offered. A. Early Standardised B. Window C. Backstop Trigger? When market technically ready When market technically ready When market technically ready How long after trigger? Next billing cycle Within a year Next billing cycle To what? Standard Tariff Standard Tariff Standard Tariff Any choice? Forced migration to Standard Forced migration to Standard or other tariff, uncertain on who chooses timing Customer choice on when to migrate to what Tariff until backstop, at that time forced migration Move back to flat rate? No No Yes, for a period of time until back-stop When is other choice available? At a later time From first offering From first offering Wholesale HH settlement Before migrating ToU Middle of year window Before migrating ToU We have two high level comments on how these options are presented, before discussing the detail of the various options.

4 The trigger to commence transition (either mandated or by customer choice) seems to be the technical capability to offer the new ToU tariffs. This is aligned in most cases with wholesale market reform to half-hourly data settlement. This does not take into account the other preconditions that should constitute the trigger: o Are there suitable forwards hedging arrangements for suppliers to hedge their retail position? It would create undue risk for suppliers if the CER mandated a time-of-use tariff when suppliers had no mechanisms to manage that imposed risk arising from the time-ofuse time-bands. o What are the pre-requirements for customer engagement before transitioning to the new tariff arrangements? Will it be subject to a political or regulatory go/no-go? o Customer readiness in general does not seem to be considered within the paper. For example, what commercial information (if any) should be given to customers regarding the impact of the ToU transition, and is that possible during the transition periods suggested in the examples? o Is there any interaction with the provision of the mandatory IHD? None of the options explicitly include the possibility of the supplier deciding when customers transition. This would be the most normal way of doing business where a new regulation is required by a particular time. The supplier would have the choice, based on its own commercial readiness, to transition customers to time-of-use in prudent stages, noting at all times regulatoryrequired deadlines.

5 Example A early, standardised transition Q2. This question seeks comment against the six relevant criteria given in section 3.3 for Example A. These criteria are: A. Easy to understand for consumers B. Engaging for consumers C. Providing choice and protection for consumers D. Flexible in promoting choice and innovation E. Operational at low cost for all parties, and over time F. Providing tariffs that accurately reflect supply chain costs Example A performs poorly under criteria B through D. As per our previous statement, it is not only important to reflect supply chain costs (criteria F), but also to manage risk around those supply chain costs suddenly changing. This risk management for suppliers does not need to be a criterion. It simply needs to be a precondition before moving to the new tariffs. In general, we concur with the assessment regarding consumer costs in the paper. Example A, therefore, would not be PrePayPower s favoured approach. It assumes all suppliers reach a level of commercial readiness at the same time. This will place stress if there is any liquidity issue with hedging arrangements, with all parties seeking to enter into hedging arrangements at the same time for their pre-deployment population of smart meters. It is also highly confusing for customers not to be able to choose another supplier s published flat-rate on the basis of whether they have been transitioned onto a smart tariff with another supplier. How that communication occurs between suppliers during a change of supply process appears in the first instance, unworkable.

6 Example B a transition window Q3. This question seeks comment against the same six relevant criteria given in section 3.3 for Example B. Example B performs better under most criteria, with the potential exception of it being simpler to understand for consumers. The paper draws out the correct mitigating action appropriate approved comparison tools being available to customers, increasing the ability of customers to choose their appropriate tariff. We stress our previous comments regarding appropriate triggers to commence the transition. It is clear that to mitigate the issues of confusion, it is required that customers will need access to several months of their interval data, and that appropriate price comparison tools from third-party accredited sites should be available. The option is unclear whether it is the supplier s decision or the customer s decision as to when the customer migrates to the ToU tariff. While better than Example A, and with the welcome addition of a window of time in which to transition, the restriction on customer choice moving to a flat rate when transitioned (while the flat rate tariff from another supplier remains available to other customers) is a complex message. Indeed, the message becomes more complex and difficult to manage where a customer on a smart tariff moves to a smartenabled home that is currently on a flat rate tariff. Again, Example B would not be PrePayPower s preferred option for the reasons given above.

7 Example C transition as a back-stop Q4. This question seeks comment against the same six relevant criteria given in section 3.3 for Example C. Example C, in terms of mechanics, comes closest to an appropriate transition mechanism. There are two triggers associated with Example C: When migration to ToU must commence; and When migration to ToU must complete. The flexibility in moving between smart and flat rate tariffs between these two points is entirely appropriate, and simple for the customer to understand. We, however, would add to the description of Example C, with further criteria for when both triggers would occur. We would also establish principles regarding supplier control of the rate of take up of the tariff. As a prerequisite for offering ToU, the following would be prudent to occur: Regulatory and political buy-in for the transition to commence, informed in liaison with the Customer Engagement workstream; Customers should have at least [x] months of interval data available to them to make an appropriate choice of ToU tariff, from the choices made available by supplier; The new ISEM arrangements should be demonstrably and stably delivering pricing consistent with supply and demand for a year before ToU is offered; o There is no point offering a ToU tariff based on market prices if they are not reflective of the underlying physical operation (and cost of generation) in the wholesale production of energy. Some financial hedging aligned with the ToU decision for the standard tariff should be made available. During the window, it should be established that: Suppliers may restrict the level of sign-up to the new tariffs, in line with their commercial readiness and hedging strategy. To reach the back-stop trigger, final regulatory criteria that should be considered are: The hedging market should have developed a reasonably liquid suite of hedging products, allowing suppliers and generators to adequately manage the risk of at least the standard criteria for ToU, and ideally allow new innovations to occur in a prudent manner. Public acceptance of no more flat rate tariffs should be high. Example C is therefore our preferred option, along with the addition of entry and exit criteria through the transition phase.

8 We believe that any regulation by the CER which mandates suppliers to enter into inherently risky contracts, at an unknown rate, without access to appropriate risk mitigations would be contrary to the CER s obligations under the 1999 Act for authorised persons to be able to fund their activities.

9 Standard Smart Tariffs Q5. This question covers the level of regulation prescribing the standard smart tariff. To begin, PrePayPower is completely against any price promise in relation to the standard tariff. Outside of the obvious commercial risk to the supplier, this cost would have to be recovered from customers. All things being equal, this will raise the average retail price in the market, which will reduce the savings from those customers who have superior load shapes, or who have adjusted their consumption in line with the ToU tariff shape. The introductory smart tariffs would necessarily be more expensive than their concurrent non-smart tariffs in the market. This is not an appropriate message for early transition to the programme. Secondly, Regulation of detail cannot be performed until there is a stable reference market in ISEM on which to base the detail of parameters. Assuming one year s operation is prudent (the intraday market might not be in place for go-live) this work could only commence in late This will create a delay in defining these parameters for suppliers through a standard regulatory consultation process. It will also be a difficult and controversial process to ensure that this does not favour one supplier s trading strategy over another. Following that definition work, there will be a period while suppliers seek opportunities to hedge against the prescribed form before offering the tariff to customers. Overall, therefore, prescription is difficult, prone to accusations of favouritism and will delay the process in commencing the release of time-of-use tariffs. This is not PrePayPower s preferred option. The final option, Regulation through guiding principles makes the most sense to allow for normal commercial decisions to take effect, within the required regulatory framework. It will remove the CER from the ex ante decisions required to regulate the allowed tariffs, speeding up implementation. In line with previous comments, it is important that independent price comparison sites are capable of comparing the different tariffs proposed by suppliers as a criterion to commence transition.

10 Permitted Alternative Tariffs Q6. This question seeks opinion on the level of appropriate regulation for alternative tariffs. We believe that the most important criterion for permitted alternative tariffs is that they are readily comparable with standard tariffs, through access to historical data. The Narrow structure seems unduly restrictive, and it appears difficult to see how this might differentiate against simple discounts on the standard tariff. The Broad Structure is better, offering more flexibility. Nevertheless, the Unconstrained if static approach with a criteria that the tariff is readily comparable to others using a harmonised download file of meter data appears to be all the regulation that is required. Indeed, the same set of guiding principles used for the standard tariff appears to be the remaining necessary and sufficient principle to regulate such tariffing activity.

11 Test Bed Tariffs Q7. The comments made in our submission to the test bed concept in January 2014 remain germaine, and are quoted here: We understand the rationale for the implementation of a test bed environment for new tariffs. Effectively it allows suppliers to implement non-mass marketed tariffs which have characteristics outside the CER s regulated prescribed form of tariffs. Subject to certain as-yet undefined criteria being met, these tariffs can be subsequently massmarketed. For this to be meaningful, it is important that innovative tariffs can progress through this testing phase in a timely manner. On initial inspection, from conception of a new tariff through to its development, CER approval to implement the tariff in the confines of the test bed (implicit or explicit), direct recruitment of customers, running the tariff, analysing and surveying outcomes, and seeking CER approval for a relaxation of the prescribed form, along with any consultations that entails, a supplier may experience a delay of two or more years before mass-marketing a new tariff. Furthermore, as the change to the CER s prescribed form would need consultation, all other suppliers would be notified of the tariff s form and of the intent to potentially mass-market it. Any first mover advantage would be undermined for the innovative supplier. While we welcome the principle of being allowed to innovate outside of CER s prescribed form with limitations, the CER should consider whether the inherent time and required openness in relaxing the prescribed form will erode the benefits to the innovating supplier to such an extent that the innovation offers no commercial advantage. We believe an alternative system whereby customers can opt-out on an informed basis of the prescribed form to a less prescribed form that allows for greater innovation and the potential for greater risk/reward in the customer experience would be a better mechanism. There would be no limits on the numbers of customers that could opt-out, these tariffs could be mass marketed, and participation in such tariffs could be accompanied with a standardised regulatory rider providing customers with information on the risk/reward to what they are signing up. For these reasons, we support none of the presented options. We support a loosened set of principles to develop further tariffs dynamic or static along with a requirement by the supplier to report on the outcome of the tariff against agreed metrics to the CER. The CER could, if the outcome of those metrics were negative, request that the tariff is no longer offered to new customers.

12 Tariff Comparison Tools Complementary to the form of regulation proposed above around tariff design, it is important that customers can make an informed decision on which tariff and /or supplier is appropriate for them. PrePayPower believe it is ppropriate for the CER to set out the requirement on how tariffs should be compared as they do currently. Given that the CER is also setting the principles/rules to which a tariff must comply, it makes most sense that the CER as an intrinsic part of that design process delivers the comparison metrics at the same time as part of an overall package. PrePayPower therefore supports CER-defined measures and metrics, as part of the wider package of ToU regulation proposed above. We note, however, that if the CER goes with more strict definitions of allowed tariffs, then the necessity for defined measures and metrics no longer holds, as customers will be more readily able to compare with the support of comparison sites their tariff offerings. Strict regulation of all aspects of the ToU environment (form of tariff and their presentation) will stifle competition on form, and lead to a uniformity of offering from suppliers on presentation that will drive that lack of competition home to endusers. Regulation of uniformity of offering during the smart metering roll-out will not be consistent with the NSMP objectives, and raise the reasonable question as to why such an investment has been made if its effect is to restrict choice in an obvious manner to consumers.

Electric Ireland response to CER/15/053 Managing the Transition to Time of Use Tariffs consultation

Electric Ireland response to CER/15/053 Managing the Transition to Time of Use Tariffs consultation Smart Metering Programme Office Commission for Energy Regulation, The Exchange, Belgard Square North, Tallaght, Dublin 24. 1 st May 2015 response to CER/15/053 Managing the Transition to Time of Use Tariffs

More information

EAI Response to CER National Smart Metering Programme, Smart Metering High Level Design proposed decision paper

EAI Response to CER National Smart Metering Programme, Smart Metering High Level Design proposed decision paper EAI Response to CER National Smart Metering Programme, Smart Metering High Level Design proposed decision paper Electricity Association of Ireland Retail Working Group 127 Baggot Street Lower Dublin 2

More information

Electric Ireland response to CER/15/272 Proposed Decisions on Empowering & Protecting Customers

Electric Ireland response to CER/15/272 Proposed Decisions on Empowering & Protecting Customers Smart Metering Programme Office Commission for Energy Regulation, The Exchange, Belgard Square North, Tallaght, Dublin 24. 22 nd January 2016 response to CER/15/272 Proposed Decisions on Empowering & Protecting

More information

CER National Smart Metering Programme Rolling out New Services: Time-of-Use Tariffs

CER National Smart Metering Programme Rolling out New Services: Time-of-Use Tariffs CER National Smart Metering Programme Rolling out New Services: Time-of-Use Tariffs DOCUMENT TYPE: REFERENCE: DATE PUBLISHED: Decision CER/15/270 8 December 2015 The Commission for Energy Regulation, The

More information

CER National Smart Metering Programme Policy Implementation Roadmap

CER National Smart Metering Programme Policy Implementation Roadmap CER National Smart Metering Programme Policy Implementation Roadmap DOCUMENT TYPE: REFERENCE: Information Paper CER/15/055 DATE: 31 March 2015 The Commission for Energy Regulation, The Exchange, Belgard

More information

EAI Response to CER National Smart Metering Programme, Presentation of Energy Usage Information (CSI) and Pay As You Go consultation papers

EAI Response to CER National Smart Metering Programme, Presentation of Energy Usage Information (CSI) and Pay As You Go consultation papers EAI Response to CER National Smart Metering Programme, Presentation of Energy Usage Information (CSI) and Pay As You Go consultation papers Electricity Association of Ireland Retail Working Group 127 Baggot

More information

CER Decision Paper Smart Metering High Level Design Appendix B: Decision on Time of Use Tariffs

CER Decision Paper Smart Metering High Level Design Appendix B: Decision on Time of Use Tariffs CER Decision Paper Smart Metering High Level Design Appendix B: Decision on Time of Use Tariffs DOCUMENT TYPE: REFERENCE: DATE PUBLISHED: Decision Paper CER/14/046B 14 th October 2014 The Commission for

More information

CER National Smart Metering Programme Status Update

CER National Smart Metering Programme Status Update CER National Smart Metering Programme Status Update DOCUMENT TYPE: REFERENCE: Information Paper CER/16/126 DATE PUBLISHED: QUERIES TO: 15 April 2016 smartmetering@cer.ie The Commission for Energy Regulation,

More information

Update on the Smart Meter Upgrade

Update on the Smart Meter Upgrade Update on the Smart Meter Upgrade Information Paper Reference: CER/17/279 Date Published: 21 September 2017 Closing Date: N/A Smart meters are the next generation of electricity and gas meter and are being

More information

ESB NETWORKS - RESPONSE TO CER15137 EMPOWERING AND PROTECTING CUSTOMERS

ESB NETWORKS - RESPONSE TO CER15137 EMPOWERING AND PROTECTING CUSTOMERS ESB NETWORKS - RESPONSE TO CER15137 EMPOWERING AND PROTECTING CUSTOMERS Dear Sir/Madam, ESB Networks welcomes the opportunity to further engage with the National Smart Metering Programme on this important

More information

11 th October The Commission for Energy Regulation The Exchange Belgard Square North Tallaght Dublin 24

11 th October The Commission for Energy Regulation The Exchange Belgard Square North Tallaght Dublin 24 11 th October 2013 The Commission for Energy Regulation The Exchange Belgard Square North Tallaght Dublin 24 Opower Comments on the CER National Smart Metering Programme, Presentation of Energy Usage Information

More information

INTRODUCTION. SSE Airtricity welcomes the opportunity to comment on the CER s paper National Smart Metering Programme - Smart Pay As You Go.

INTRODUCTION. SSE Airtricity welcomes the opportunity to comment on the CER s paper National Smart Metering Programme - Smart Pay As You Go. CONSULTATION ON CER NATIONAL SMART METERING PROGRAMME SMART PAY AS YOU GO SSE AIRTRICITY RESPONSE TO THE COMMISSION FOR ENERGY REGULATION 2015 INTRODUCTION SSE Airtricity welcomes the opportunity to comment

More information

Role of the Public Electricity Supplier and the Supplier of Last Resort in the De-regulated Electricity Market

Role of the Public Electricity Supplier and the Supplier of Last Resort in the De-regulated Electricity Market Role of the Public Electricity Supplier and the Supplier of Last Resort in the De-regulated Electricity Market DOCUMENT Consultation Paper TYPE: REFERENCE: CER 11/039 DATE PUBLISHED: CLOSING DATE: RESPONSES

More information

Review of Typical Domestic Consumption Values for Electricity and Gas Customers CER/17703

Review of Typical Domestic Consumption Values for Electricity and Gas Customers CER/17703 Review of Typical Domestic Consumption Values for Electricity and Gas Customers CER/17703 Review of Typical Domestic Consumption Values for Electricity and Gas Customers CER/ 17703 Consultation response

More information

Supplier of Last Resort in Prepayment Electricity. Consultation Paper. An Coimisiún um Rialáil Fóntas Commission for Regulation of Utilities

Supplier of Last Resort in Prepayment Electricity. Consultation Paper. An Coimisiún um Rialáil Fóntas Commission for Regulation of Utilities An Coimisiún um Rialáil Fóntas Commission for Regulation of Utilities Supplier of Last Resort in Prepayment Electricity Consultation Paper Consultation Paper Reference: CRU17333 Date Published: 07/12/2017

More information

UK Case Studies. 4 th July 2013 Steinkjer, Norway. Esther Dudek

UK Case Studies. 4 th July 2013 Steinkjer, Norway. Esther Dudek UK Case Studies 4 th July 2013 Steinkjer, Norway Esther Dudek Presentation Contents Summary of four case studies: The Energy Demand Reduction Trial E.ON Thinking Energy Trial Customer Led Network Revolution

More information

Scottish and Southern Energy plc. Telephone: Our Reference: Facsimile: Your Reference:

Scottish and Southern Energy plc. Telephone: Our Reference: Facsimile: Your Reference: Claudio Pollack Floor 6, Office of Communications Riverside House 2A Southwark Bridge Road London SE1 9HA Head Office Inveralmond House 200 Dunkeld Road Perth PH1 3AQ Telephone: 01738 456400 Our Reference:

More information

Retail and Reducing Energy Costs: a Working Group of the Retail Consultation Forum Submission in response to CER Consultation CER/16/031

Retail and Reducing Energy Costs: a Working Group of the Retail Consultation Forum Submission in response to CER Consultation CER/16/031 Retail and Reducing Energy Costs: a Working Group of the Retail Consultation Forum Submission in response to CER Consultation CER/16/031 Review of the Electricity and Gas Supplier s Handbook 25 April 2016

More information

Consultation on DS3 System Services Contracts for Interim Arrangements. DS3 System Services Implementation Project

Consultation on DS3 System Services Contracts for Interim Arrangements. DS3 System Services Implementation Project Consultation on DS3 System Services Contracts for Interim Arrangements DS3 System Services Implementation Project 21 April 2016 Disclaimer EirGrid as the Transmission System Operator (TSO) for Ireland,

More information

Benchmarking of audit regime against audit best practices

Benchmarking of audit regime against audit best practices Benchmarking of against best practices Introduction 1. In February 2015, the Authority engaged PA Consulting Limited (PA Consulting) to develop a comparison framework to allow the Electricity Authority

More information

The Information Commissioner s response to the Competition and Market Authority s Energy market investigation: notice of possible remedies paper.

The Information Commissioner s response to the Competition and Market Authority s Energy market investigation: notice of possible remedies paper. The Information Commissioner s response to the Competition and Market Authority s Energy market investigation: notice of possible remedies paper. The Information Commissioner s role The Information Commissioner

More information

Regulatory Approach to Maintaining Local Security of Supply in Electricity

Regulatory Approach to Maintaining Local Security of Supply in Electricity An Coimisiún um Rialáil Fóntas Commission for Regulation of Utilities Regulatory Approach to Maintaining Local Security of Supply in Electricity Information Paper Reference: CRU17346 Date Published: 18/12/2017

More information

Energy Supply Costs Information Paper

Energy Supply Costs Information Paper An Coimisiún um Rialáil Fóntas Commission for Regulation of Utilities Energy Supply Costs Information Paper 0 Information Paper Reference: CRU17291 Date Published: 11 th October 2017 www.cru.ie Public/

More information

Smart Metering Implementation Programme

Smart Metering Implementation Programme Smart Metering Implementation Programme Consultation on Smart Metering Rollout Strategy DCC response 19 th May 2015 DCC PUBLIC Page 1 of 14 1 Executive Summary 1.1 Introduction and background 1. DCC provides

More information

CER National Smart Metering Programme Steady State Model BGN Response to CER/13/151 Consultation

CER National Smart Metering Programme Steady State Model BGN Response to CER/13/151 Consultation CER National Smart Metering Programme Steady State Model BGN Response to CER/13/151 Consultation Table of Contents 1. Introduction... 3 2. BGN Responses to Consultation Questions:... 4 BGN Response to

More information

Revised Tariff Structure Statement OVERVIEW PAPER. ActewAGL Distribution Electricity Network. 4 October 2016

Revised Tariff Structure Statement OVERVIEW PAPER. ActewAGL Distribution Electricity Network. 4 October 2016 Revised Tariff Structure Statement OVERVIEW PAPER ActewAGL Distribution Electricity Network 4 October 2016 Contents Introduction 1 The electricity network 2 What makes up your electricity bill? 3 What

More information

COMMISSION STAFF WORKING PAPER

COMMISSION STAFF WORKING PAPER EN EN EN EUROPEAN COMMISSION Brussels, 22 January 2010 COMMISSION STAFF WORKING PAPER INTERPRETATIVE NOTE ON DIRECTIVE 2009/72/EC CONCERNING COMMON RULES FOR THE INTERNAL MARKET IN ELECTRICITY AND DIRECTIVE

More information

Electricity & Gas Retail Markets Annual Report 2012

Electricity & Gas Retail Markets Annual Report 2012 Electricity & Gas Retail Markets Annual Report 2012 DOCUMENT TYPE: REFERENCE: Information Paper CER/13/120 DATE PUBLISHED: 4 June 2013 QUERIES TO: Adrienne Costello acostello@cer.ie The Commission for

More information

European Commission s proposal for a revised Electricity Directive

European Commission s proposal for a revised Electricity Directive European Commission s proposal for a revised Electricity Directive ESMIG proposals for amendments 1 : Article 2 paragraph 18 18. smart metering system means an electronic system that can measure energy

More information

EUROPEAN ASSOCIATION OF CO-OPERATIVE BANKS The Co-operative difference : Sustainability, Profitability, Governance

EUROPEAN ASSOCIATION OF CO-OPERATIVE BANKS The Co-operative difference : Sustainability, Profitability, Governance Brussels, 28 November 2017 EACB s views on the Article 29 Working Party draft Guidelines on Automated individual decision-making and Profiling and on Personal data breach notification under Regulation

More information

Competition and Market Authority's energy market investigation inquiry one off evidence session

Competition and Market Authority's energy market investigation inquiry one off evidence session Angus Brendan MacNeil MP Chair, Energy and Climate Change Committee House of Commons London SW1H 9NB 29th June 2016 Competition and Market Authority's energy market investigation inquiry one off evidence

More information

Alberta Energy Capacity Market Framework Engagement December 2017

Alberta Energy Capacity Market Framework Engagement December 2017 Capacity Market Cost Allocation - Response Template The engagement is seeking stakeholder feedback on the questions below. Please submit your responses to these questions, and any additional input on this

More information

Retail Bundling in Hull. KCOM Bundling of SMP and non-smp Products

Retail Bundling in Hull. KCOM Bundling of SMP and non-smp Products KCOM Bundling of SMP and non-smp Products Statement Publication date: 8 October 2010 Contents Section Page 1 Summary 2 2 Background to the Consultation 3 3 Responses to the consultation and Ofcom s determination

More information

Alberta Energy - Capacity Market Framework Engagement December 2017

Alberta Energy - Capacity Market Framework Engagement December 2017 Capacity Market Cost Allocation - Response Template The engagement is seeking stakeholder feedback on the questions below. Please submit your responses to these questions, and any additional input on this

More information

Response to: CER/15/284 - Review of Connection and Grid Access Policy: Initial Thinking & Proposed Transitional Arrangements

Response to: CER/15/284 - Review of Connection and Grid Access Policy: Initial Thinking & Proposed Transitional Arrangements Response to: CER/15/284 - Review of Connection and Grid Access Policy: Initial Thinking & Proposed Transitional Arrangements ESB Generation and Wholesale Markets (GWM) welcome the opportunity to respond

More information

Residential demand response the dynamic Time-of-Use tariff

Residential demand response the dynamic Time-of-Use tariff Residential demand response the dynamic Time-of-Use tariff Session 2 Adriana Laguna & Kerry Morgan UK Power Networks & EDF Energy In Partnership with: 1 Agenda Before Low Carbon London LCL: dynamic Time

More information

Tariff Reform Working Group Meeting #2. 28 January 2015

Tariff Reform Working Group Meeting #2. 28 January 2015 Tariff Reform Working Group Meeting #2 28 January 2015 Agenda Meeting objectives Inform and seek feedback Recap Tariff reform principles Network pricing arrangements - rule change Revenue cap What makes

More information

Review of Typical Domestic Consumption. Values for Electricity and Gas Customers. Consultation Paper

Review of Typical Domestic Consumption. Values for Electricity and Gas Customers. Consultation Paper Review of Typical Domestic Consumption Values for Electricity and Gas Customers Consultation Paper Reference: CER/17003 Date Published: 11/01/2017 Closing Date: 13/02/2017 Executive Summary The CER currently

More information

Submission in response to the NSW Dept of Planning & Environment Discussion Paper on Consumer Protections

Submission in response to the NSW Dept of Planning & Environment Discussion Paper on Consumer Protections Submission in response to the NSW Dept of Planning & Environment Discussion Paper on Consumer Protections Mike B Roberts*, Associate Professor Iain MacGill and Dr Rob Passey Centre for Energy and Environmental

More information

Ofwat: Draft price control determination for Affinity Water

Ofwat: Draft price control determination for Affinity Water Ofwat: Draft 2015-20 price control determination for Affinity Water Consumer Council for Water Representation May 2014 1. Introduction 1.1 The Consumer Council for Water is the statutory consumer organisation

More information

Smart-metering rollout scenarios & CBA BGN Response to CER/10/197 Consultation

Smart-metering rollout scenarios & CBA BGN Response to CER/10/197 Consultation Smart-metering rollout scenarios & CBA BGN Response to CER/10/197 Consultation Table of Contents 1. Introduction... 3 2. Objectives... 4 3. Ownership, display and provision of data... 4 3.1 Gas data granularity...

More information

Demand based network tariffs offering a new choice

Demand based network tariffs offering a new choice Version 1.1 30 September 2015 Demand based network tariffs offering a new choice Consultation paper September 2015 Table of Contents 1 Overview... 5 2 Background... 7 3 Purpose... 8 4 Network tariff strategy...

More information

Unleashing Demand Response with Effective Supplier Compensation

Unleashing Demand Response with Effective Supplier Compensation 1 UNLEASHING DEMAND RESPONSE THE REGULATORY ASSISTANCE PROJECT (RAP) June 2017 Unleashing Demand Response with Effective Supplier Compensation Phillip Baker Explicit demand response, where aggregators

More information

May 31st, Introduction:

May 31st, Introduction: May 31st, 2010 FBF S ANSWER TO THE CESR CONSULTATION ON ITS TECHNICAL ADVICE TO THE EUROPEAN COMMISSION IN THE CONTEXT OF THE MIFID REVIEW INVESTOR PROTECTION AND INTERMEDIARIES Introduction: The French

More information

MARKET OPENING PROGRAMME

MARKET OPENING PROGRAMME CER/03/285 Proposal for co-ordination of ongoing reform programmes in the Irish gas market Version 1.0 27 November 2003 Market Opening Programme Interim market opening options - Version 1.0 Document Control

More information

New technologies + old tariffs = Problem!

New technologies + old tariffs = Problem! New technologies + old tariffs = Problem! Simon Coates Concept Consulting 8 March 2017 www.concept.co.nz The same technologies have dominated electricity for decades Centralised, economies of scale generation

More information

Submission on the Issues Paper on Proposed Revisions to the Western Power Network Access Arrangement AA4

Submission on the Issues Paper on Proposed Revisions to the Western Power Network Access Arrangement AA4 11 December 2017 Economic Regulation Authority Level 4, 469 Wellington Street Perth WA 6000 VECTOR LIMITED 101 CARLTON GORE ROAD PO BOX 99882 AUCKLAND 1149 NEW ZEALAND +64 9 978 7788 / VECTOR.CO.NZ Lodged

More information

Consultation on the UK Corporate Governance Code and Guidance on Board Effectiveness

Consultation on the UK Corporate Governance Code and Guidance on Board Effectiveness Rolls-Royce Holdings plc 62 Buckingham Gate, London SW1E 6AT Telephone: +44 (0) 20 7222 9020 Consultation on the UK Corporate Governance Code and Guidance on Board Effectiveness Rolls-Royce welcomes the

More information

Questions concerning the sale of new motor vehicles

Questions concerning the sale of new motor vehicles Frequently Asked Questions During the transition period 1 provided for in Article 10 of Regulation 1400/2002, the Commission received a number of questions relating to the application of the Regulation.

More information

Advanced Metering Policy

Advanced Metering Policy May 2008 500446-7 Glossary of abbreviations and terms AMI Advanced Meter Infrastructure Board Electricity Commission Board Commission Electricity Commission CPE Customer Premise Equipment EIEP Electricity

More information

Q. 1: Should the PRIPs initiative focus on packaged investments? Please justify or explain your answer.

Q. 1: Should the PRIPs initiative focus on packaged investments? Please justify or explain your answer. Submission by the Central Bank of Ireland to the EU Commission Consultation on legislative steps for the Packaged Retail Investment Products initiative 2. Scope of the PRIPs Regime Q. 1: Should the PRIPs

More information

Revised Proposal Attachment Tariff Structure Statement. January 2019

Revised Proposal Attachment Tariff Structure Statement. January 2019 Revised Proposal Attachment 10.01 Tariff Structure Statement January 2019 Content 1 ABOUT THIS TARIFF STRUCTURE STATEMENT... 3 1.1 Introduction... 3 1.2 Structure of this Tariff Structure Statement...

More information

Statement regarding a European single market for electronic communications

Statement regarding a European single market for electronic communications KKV1007, v1.3, 2012-09-10 STATEMENT 06/11/2013 593/2013 1 (7) The Ministry of Enterprise, Energy and Communications 103 33 Stockholm Statement regarding a European single market for electronic communications

More information

Gas Networks Ireland Connections Policy Proposals

Gas Networks Ireland Connections Policy Proposals An Coimisiún um Rialáil Fóntas Commission for Regulation of Utilities Gas Networks Ireland Connections Policy Proposals Commission for Regulation of Utilities Consultation Consultation Paper Reference:

More information

Response by Energia to Commission for Energy Regulation Decisions & Further Consultation CER/16/287

Response by Energia to Commission for Energy Regulation Decisions & Further Consultation CER/16/287 Response by Energia to Commission for Energy Regulation Decisions & Further Consultation CER/16/287 REVIEW OF THE SUPPLIER S HANDBOOK DECISION AND FURTHER CONSULTATION 25 th 1. Introduction Energia welcomes

More information

BEREC views on the European Parliament first reading legislative resolution on the European Commission s proposal for a Connected Continent Regulation

BEREC views on the European Parliament first reading legislative resolution on the European Commission s proposal for a Connected Continent Regulation BEREC views on the European Parliament first reading legislative resolution on the European Commission s proposal for a Connected Continent Regulation General remarks In line with its statutory duty of

More information

IMPLEMENTATION OF A SECURITY- CONSTRAINED MARKET MODEL

IMPLEMENTATION OF A SECURITY- CONSTRAINED MARKET MODEL IMPLEMENTATION OF A SECURITY- CONSTRAINED MARKET MODEL November 2017 PRESENTED BY AEMO AND PUBLIC UTILITIES OFFICE SLIDE 1 PLANNING FOR FUTURE MARKET REFORMS - AEMO AEMO is working closely with the Public

More information

GEODE Amendments Proposals to the European Commission Directive on the internal market for electricity

GEODE Amendments Proposals to the European Commission Directive on the internal market for electricity GEODE Amendments Proposals to the European Commission Directive on the internal market for electricity AMENDMENT 1 Article 2, 20 Definitions near-real time means, in the context of smart metering, the

More information

CP1464 Requiring HH consumption data to be processed to appropriate precision

CP1464 Requiring HH consumption data to be processed to appropriate precision Requiring HH consumption data to be processed to appropriate precision This CP Consultation was issued on 6 June 2016 as part of CPC00767, with responses invited by 1 July 2016. Consultation Respondents

More information

South Australian Power Networks Tariff Structure Statement. Submission to the Australian Energy Regulator

South Australian Power Networks Tariff Structure Statement. Submission to the Australian Energy Regulator South Australian Power Networks Tariff Structure Statement Submission to the Australian Energy Regulator Submission to Australian Energy Regulator. 1 Summary... 3 Background... 3 The long term interest

More information

NSW Tariff Structure Statements. Submission to the Australian Energy Regulator

NSW Tariff Structure Statements. Submission to the Australian Energy Regulator NSW Tariff Structure Statements Submission to the Australian Energy Regulator Submission to the Australian Energy Regulator... 1 Summary... 3 Background... 3 The long term interests of consumers... 4 Ausgrid,

More information

Economic Regulation Authority

Economic Regulation Authority Economic Regulation Authority 4th Floor Albert Facey House 469 Wellington Street, Perth Mail to: Perth BC, PO Box 8469 PERTH WA 6849 T: 08 6557 7900 F: 08 6557 7999 E: records@erawa.com.au W: www.erawa.com.au

More information

Time-Varying and Dynamic Rate Design A RAP Global Series Report

Time-Varying and Dynamic Rate Design A RAP Global Series Report Time-Varying and Dynamic Rate Design A RAP Global Series Report Massachusetts Grid Modernization Workgroup Boston, 26 February 2013 The Regulatory Assistance Project Global China European Union United

More information

Power Markets and Renewables Deployment in Developing Countries

Power Markets and Renewables Deployment in Developing Countries Power Markets and Renewables Deployment in Developing Countries Goran Strbac Imperial College London g.strbac@imperial.ac.uk and Frank A. Wolak Stanford University wolak@zia.stanford.edu Outline of Presentation

More information

BT s response to Ofcom consultation document. Price Rises in Fixed Term Contracts

BT s response to Ofcom consultation document. Price Rises in Fixed Term Contracts BT s response to Ofcom consultation document Price Rises in Fixed Term Contracts 14 March 2013 1 Executive Summary We welcome the opportunity to comment on this consultation on Price Rises in Fixed Term

More information

Part I PRELIMINARY. Part II MARKET DEFINITION ASSESSING SIGNIFICANT MARKET POWER. Part IV IMPOSITION OF OBLIGATIONS UNDER THE REGULATORY FRAMEWORK

Part I PRELIMINARY. Part II MARKET DEFINITION ASSESSING SIGNIFICANT MARKET POWER. Part IV IMPOSITION OF OBLIGATIONS UNDER THE REGULATORY FRAMEWORK 201[ ] ELECTRONIC COMMUNICATIONS (GUIDELINES ON MARKET ANALYSIS AND THE ASSESSMENT OF SIGNIFICANT MARKET POWER FOR NETWORKS AND SERVICES) (ARRANGEMENT OF GUIDELINES) Table of Contents 1. [Short Title]

More information

Demand Response Availability Data Systems Definitions

Demand Response Availability Data Systems Definitions Demand Response Availability Data Systems Definitions August 2013 3353 Peachtree Road NE Suite 600, North Tower Atlanta, GA 30326 404-446-2560 www.nerc.com Table of Contents Table of Contents Table of

More information

Walk through the Eligible Customer Regulation. Dr. Seun Amoda

Walk through the Eligible Customer Regulation. Dr. Seun Amoda Walk through the Eligible Customer Regulation Dr. Seun Amoda 1 INTRODUCTION 2 The Nigerian Grid Voltages 330kV 132kV 33KV 11KV 415V 3 The Nigerian Grid 4 Eligibility - EPSRA 2005 Section 100 of EPSR Act

More information

Regulated Retail Electricity Prices for Draft Determination

Regulated Retail Electricity Prices for Draft Determination 20 April 2018 Mr Charles Millsteed Chief Executive Officer Queensland Competition Authority GPO Box 2257 Brisbane QLD 4001 Dear Mr Millsteed Regulated Retail Electricity Prices for 2018-19 Draft Determination

More information

Several matters are pertinent to a discussion of audit quality with respect to external audits of banks.

Several matters are pertinent to a discussion of audit quality with respect to external audits of banks. June 21, 2013 Secretariat of the Basel Committee on Banking Supervision Bank for International Settlements CH-4002 Basel Switzerland By email: baselcommittee@bis.org CONSULTATIVE DOCUMENT: EXTERNAL AUDITS

More information

Re: UNC Modication Proposal Removal of the Zero Auction Reserve Price for Within-day Daily NTS Entry Capacity (WDDSEC)

Re: UNC Modication Proposal Removal of the Zero Auction Reserve Price for Within-day Daily NTS Entry Capacity (WDDSEC) 6 th May 2010 Modification Panel Secretary Joint Office of Gas Transporters E-mail: enquiries@gasgovernance.co.uk Re: UNC Modication Proposal 0284 - Removal of the Zero Auction Reserve Price for Within-day

More information

A Common Evaluation Framework for Comparison of Smart Grid Program Impacts Across Utilities

A Common Evaluation Framework for Comparison of Smart Grid Program Impacts Across Utilities A Common Evaluation Framework for Comparison of Smart Grid Program Impacts Across Utilities Stuart Schare, Navigant Consulting, Boulder, CO Mike Sherman, Navigant Consulting, Burlington, MA ABSTRACT A

More information

The FTTH Council is concerned by a number of specific aspects of this consultation which it would like to set out at the outset.

The FTTH Council is concerned by a number of specific aspects of this consultation which it would like to set out at the outset. Introduction The FTTH Council welcomes the opportunity to reply to these consultations, Review of the wholesale local access market and Review of the wholesale broadband access market. The FTTH Council

More information

NATIONAL ELECTRICITY RULES ELECTRICITY CONNECTION FOR RETAIL CUSTOMERS CHAPTER 5A. Page 615

NATIONAL ELECTRICITY RULES ELECTRICITY CONNECTION FOR RETAIL CUSTOMERS CHAPTER 5A. Page 615 ELECTRIC ITY CONN ECTION FOR RET AIL CU STOM ERS NATIONAL ELECTRICITY RULES Page 615 Chapter 5A Electricity connection for retail customers Part A 5A.A.1 Preliminary Definitions In this Chapter: basic

More information

Review of Regulated Retail Electricity Tariffs and Prices

Review of Regulated Retail Electricity Tariffs and Prices Submission Paper Review of Regulated Retail Electricity Tariffs and Prices Response to the QCA Issues Paper August 2011 ENERGEX Limited GPO Box 1461 Brisbane QLD 4001 ABN 40 078 849 055 Table of Contents

More information

Audit of Compliance with Deposit Requirements in the Electricity & Gas Supplier Handbook 2016

Audit of Compliance with Deposit Requirements in the Electricity & Gas Supplier Handbook 2016 Audit of Compliance with Deposit Requirements in the Electricity & Gas Supplier Handbook 2016 Information Paper Reference: CER17052 Date Published: 21/03/2017 Closing Date: N/A 1 P a g e Executive Summary

More information

RE: ENA Submission on the Electricity Pricing Review

RE: ENA Submission on the Electricity Pricing Review 23 October 2018 Miriam Dean QC Chair Electricity Review Panel C/- Ministry of Business, Innovations and Employment, Wellington By email to:energymarkets@mbie.govt.nz RE: ENA Submission on the Electricity

More information

Implementation of the Balancing Network Code: an overview of TSOs main challenges

Implementation of the Balancing Network Code: an overview of TSOs main challenges Implementation of Balancing Network Code 20 November 2013 Rev 1 Implementation of the Balancing Network Code: an overview of TSOs main challenges ENTSOG AISBL; Av. de Cortenbergh 100, 1000-Brussels; Tel:

More information

Origin has provided specific comments on the cost components of the QCA s Draft Decision below.

Origin has provided specific comments on the cost components of the QCA s Draft Decision below. 20 April 2016 Mr John Hindmarsh Chief Executive Officer Queensland Competition Authority GPO Box 2257 Brisbane 4001 Email: electricity@qca.org.au Dear Mr Hindmarsh REGULATED RETAIL ELECTRICITY PRICES 2016-17

More information

P302 Improving the Change of Supplier Meter read process for smart Meters

P302 Improving the Change of Supplier Meter read process for smart Meters Stage 01: What stage is this document in the process? Improving the Change of Supplier Meter read process for smart Meters This Modification proposal proposes changes to the Code and BSCPs to amend the

More information

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT. Information note

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT. Information note 2013/3 AGENDA ITEM 10.1 EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT Information note Subject: Handling of notifications in the context of the flexibility provisions under Articles

More information

Incentives to make the right decision: Policy measures to enhance consumer decarbonisation

Incentives to make the right decision: Policy measures to enhance consumer decarbonisation Incentives to make the right decision: Policy measures to enhance consumer decarbonisation Lisa Ryan 25 th October 2018 ESIPP Symposium, UCD Future energy systems: how to decarbonise? Policy targets: Renewable

More information

Response to the consultation on the Draft review of the BEREC Common Position on geographical aspects of market analysis (definition and remedies).

Response to the consultation on the Draft review of the BEREC Common Position on geographical aspects of market analysis (definition and remedies). Response to the consultation on the Draft review of the BEREC Common Position on geographical aspects of market analysis (definition and remedies). 7 February 2014 FTTH Council Europe ASBL Rue des Colonies

More information

Counties Power Limited

Counties Power Limited Counties Power Limited Electricity Distribution Business Pricing Methodology Disclosure 1 April 2018 to 31 March 2019 Pursuant to Electricity Information Disclosure Information for compliance with Part

More information

Consultation on extending the existing smart meter framework for data access and privacy to Smart-Type Meters and Advanced Meters

Consultation on extending the existing smart meter framework for data access and privacy to Smart-Type Meters and Advanced Meters Consultation on extending the existing smart meter framework for data access and privacy to Smart-Type Meters and Advanced Meters Consultation Contact: Colin Down, Senior Policy Manager Publication date:

More information

Judith Ward Sustainability First. Enabling domestic demand-side flexibility : what issues still need to be tackled?

Judith Ward Sustainability First. Enabling domestic demand-side flexibility : what issues still need to be tackled? Judith Ward Enabling domestic demand-side flexibility : what issues still need to be tackled? BEIS / Ofgem Smart Systems Forum Victoria Street. London SW1-5 October 2017 www.sustainabilityfirst.org.uk

More information

Official Journal of the European Union. (Non-legislative acts) REGULATIONS

Official Journal of the European Union. (Non-legislative acts) REGULATIONS 17.3.2017 L 72/1 II (Non-legislative acts) REGULATIONS COMMISSION REGULATION (EU) 2017/459 of 16 March 2017 establishing a network code on capacity allocation mechanisms in gas transmission systems and

More information

Undue discrimination by SMP providers How Ofcom will investigate potential contraventions on competition grounds of Requirements not to unduly

Undue discrimination by SMP providers How Ofcom will investigate potential contraventions on competition grounds of Requirements not to unduly Undue discrimination by SMP providers How Ofcom will investigate potential contraventions on competition grounds of Requirements not to unduly discriminate imposed on SMP providers Publication date: 15

More information

Compressed Natural Gas for transport Licensing arrangements

Compressed Natural Gas for transport Licensing arrangements Compressed Natural Gas for transport Licensing arrangements DOCUMENT TYPE: REFERENCE: DATE PUBLISHED: CLOSING DATE: RESPONSES TO: Consultation Paper D/15/051 March 25 th 2015 May 8 th 2015 bhussey@cer.ie

More information

Sunshine Tariff Summary report. Western Power Distribution and Regen SW

Sunshine Tariff Summary report. Western Power Distribution and Regen SW Sunshine Tariff Summary report Western Power Distribution and Regen SW February 2017 1 Contents The trial The challenge The trial...3 The challenge...3 The solution...3 The trial...4 The tariff...5 Feasibility...5

More information

I-SEM Testing Tariff High Level Options Consultation

I-SEM Testing Tariff High Level Options Consultation I-SEM Testing Tariff High Level Options Consultation 02 June 2017 Version 1.0 EXECUTIVE SUMMARY Testing Tariffs are currently applied to Units Under Test (UUT) in the Single Electricity Market (SEM) on

More information

Strategic Direction for Eskom s Retail Tariffs 2011 onwards

Strategic Direction for Eskom s Retail Tariffs 2011 onwards Strategic Direction for Eskom s Retail Tariffs 2011 onwards Author & Presenter: Deon Conradie B Eng (Hons) University of Pretoria, MBL Unisa Senior Manager (Electricity Pricing), Eskom Co-author: S Salvoldi

More information

The influence of existing bidding zones on electricity markets

The influence of existing bidding zones on electricity markets Your reference Our reference Date 30.09.2013 Agency for the cooperation of energy regulators consultation2013e04@acer.europa.eu The influence of existing bidding zones on electricity markets Energy Norway

More information

Comments on the BEREC Work Programme for 2010

Comments on the BEREC Work Programme for 2010 Comments on the BEREC Work Programme for 2010 1. Preliminary Remarks by VON Europe The Voice on the Net Coalition Europe ( VON ) welcomes the opportunity to comment on the Draft BEREC Work Programme for

More information

European Commission DG Energy Unit B2: Wholesale markets, electricity & gas Office: DM24, 6th floor Rue De Mot 24 B 1049 Brussels/Belgium

European Commission DG Energy Unit B2: Wholesale markets, electricity & gas Office: DM24, 6th floor Rue De Mot 24 B 1049 Brussels/Belgium European Commission DG Energy Unit B2: Wholesale markets, electricity & gas Office: DM24, 6th floor Rue De Mot 24 B 1049 Brussels/Belgium 6th February 2013 European Commission public consultation on generation

More information

The use of consumers energy consumption data emanating from smart meters is governed by the Data Access Privacy Framework (DAPF).

The use of consumers energy consumption data emanating from smart meters is governed by the Data Access Privacy Framework (DAPF). The Information Commissioner s Office response to the Department of Business, Energy & Industrial Strategy and Ofgem s Call for Evidence on a Smart, Flexible Energy System. The Information Commissioner

More information

Indirect Land Use Change Impacts of Biofuels

Indirect Land Use Change Impacts of Biofuels FWG-P-11-02 Indirect Land Use Change Impacts of Biofuels Consultation Response from the Low Carbon Vehicle Partnership 1 This paper presents the final submission from LowCVP to the EU iluc consultation.

More information

MCE Decision paper. 13 December A National Minimum Functionality for Smart Meters

MCE Decision paper. 13 December A National Minimum Functionality for Smart Meters MCE Decision paper 13 December 2007 A National Minimum Functionality for Smart Meters In April 2007 COAG committed to a national mandated roll-out of electricity smart meters to areas where benefits outweigh

More information

Profitability measures for regulated network businesses. Response to the AER Discussion Paper December 2017

Profitability measures for regulated network businesses. Response to the AER Discussion Paper December 2017 Contents Introduction 3 Transparency around network profitability is critical 3 Report from Newgrange Consulting 5 Response to questions 7 Conclusion 8 2 Consumer confidence in the economic regulation

More information

CUSC Amendment Proposal Form CAP: 162

CUSC Amendment Proposal Form CAP: 162 CUSC Amendment Proposal Form CAP: 162 Title of Amendment Proposal: Transmission Access - Entry Overrun Description of the Proposed Amendment (mandatory by proposer): Creation of a commercial mechanism

More information