Submissions to Consultation No. 11/32 Reference: ComReg 12/03a Version: Final Date: 09/02/2012

Size: px
Start display at page:

Download "Submissions to Consultation No. 11/32 Reference: ComReg 12/03a Version: Final Date: 09/02/2012"

Transcription

1 Response to Consultation and Final Decision Response to Consultation Document No. 10/70 and 11/32. A final decision further specifying the price control obligation in the market for wholesale terminating segment of leased lines. Submissions to Consultation No. 11/32 Reference: ComReg 12/03a Version: Final Date: 09/02/2012 An Coimisiún um Rialáil Cumarsáide Commission for Communications Regulation Abbey Court Irish Life Centre Lower Abbey Street Dublin 1 Ireland Telephone Fax info@comreg.ie Web

2 Submissions Received from Respondents Document No: 12/03a Date: 9 February 2012 Consultation: 11/32 Response to Consultation: 12/03

3 Content Section 1 Eircom 2 BT Communications Ireland Limited 3 Alternative Operators in the Communications Market ("ALTO") 4 Magnet Networks Limited

4 Submissions to Consultation 11/32 ComReg 12/03a 1 Eircom

5 eircom Ltd. Response to ComReg Doc. 11/32: Further Response to Consultation Doc. No. 10/70 and a Further Consultation and Draft Decision on the Price Control Obligation in the Market for Wholesale Terminating Segments of Leased Lines 3 rd June 2011

6 eircom Ltd. Response to 11/32: Leased Lines Response Non-Confidential DOCUMENT CONTROL Document Name eircom Ltd. Response on the Further Response to Consultation Doc. No. 10/70 and a Further Consultation and Draft Decision on the Price Control Obligation in the Market for Wholesale Terminating Segments of leased lines Document Owner eircom Last Updated 03/06/2011 Status Non-Confidential. Page 2 of 21

7 eircom Ltd. Response to 11/32: Leased Lines Response Non-Confidential TABLE OF CONTENTS OVERVIEW... 4 RESPONSE TO CONSULTATION QUESTIONS... 5 Q. 1. DO YOU AGREE WITH COMREG S PROPOSED APPROACH TO DETERMINING PPC FIBRE ACCESS PRICES? PLEASE PROVIDE REASONS FOR YOUR RESPONSE Q. 2. DO YOU AGREE WITH COMREG S APPROACH ON THE APPLICATION OF THE PRICING GRADIENT TO WSEA LOGICAL PRICES? PLEASE PROVIDE REASONS FOR YOUR RESPONSE Q. 3. DO YOU AGREE WITH COMREG S APPROACH AND THE DRAFT MAXIMUM PRICES, ABOVE AND AS REFERRED TO IN APPENDIX A, FOR WLLS, PPCS AND NGN ETHERNET? PLEASE PROVIDE REASONS TO SUPPORT YOUR ANSWER Q. 4. DO YOU AGREE WITH COMREG S APPROACH, AS SET OUT ABOVE, FOR SETTING THE MINIMUM PRICE FLOORS FOR WLL AND OTHER EQUIVALENTS? PLEASE PROVIDE REASONS FOR YOUR RESPONSE... 6 IN PREPARING TENDERS FOR HIGH CAPACITY LEASED LINE NETWORKS IN URBAN AREAS, EIRCOM MUST ASSESS THE RANGE AND LIKELY MIX OF COMPETING ACCESS SERVICES AVAILABLE TO OAOS BIDDING FOR THAT NETWORK. THIS IS NECESSARY TO ENSURE THAT ANY PRICE WE MIGHT OFFER IS COMPETITIVE Q. 5. DO YOU BELIEVE THAT THE DRAFT TEXT OF THE PROPOSED DECISION IS FROM A LEGAL, TECHNICAL AND PRACTICAL PERSPECTIVE, SUFFICIENTLY DETAILED, CLEAR AND PRECISE WITH REGARDS TO THE SPECIFICS PROPOSED? PLEASE EXPLAIN YOUR RESPONSE AND PROVIDE DETAILS OF ANY SPECIFIC AMENDMENTS YOU BELIEVE ARE REQUIRED Q. 6. DO YOU HAVE ANY VIEWS ON THIS REGULATORY IMPACT ASSESSMENT WITH REGARD TO THE DRAFT MAXIMUM CHARGES DETERMINED FOR WLLS, PPCS AND NGN ETHERNET AND ALSO WITH REGARD TO THE MARGIN SQUEEZE TEST AND ARE THERE ANY OTHER FACTORS THAT COMREG SHOULD CONSIDER IN COMPLETING ITS REGULATORY IMPACT ASSESSMENT ON THESE POINTS? PLEASE EXPLAIN YOUR RESPONSE AND PROVIDE DETAILS OF ANY ADDITIONAL FACTORS THAT SHOULD BE CONSIDERED BY COMREG Page 3 of 21

8 eircom Ltd. Response to 11/32: Leased Lines Response Non-Confidential OVERVIEW The market analysis justifying the imposition of an obligation on eircom to provide Wholesale Leased Lines (WLLs) and price controls on eircom in relation to Partial Private Circuits (PPCs) and WLLs is now over three years old. Since then, there have been very significant market developments, such that the market definition used for distinguishing between trunk and terminating segments, eircom's market power and the remedies to address it, urgently need to be reviewed. Failing this, the current level of regulation will only serve to distort competition. Market developments that need to be reviewed include the increased availability of access infrastructure, the impact of data hosting centres on the provision of new leased line tails, and the effect on end-to-end pricing of over-capacity in the highly competitive trunk segment market. eircom believes that the price control proposed by ComReg in Doc. 11/32, in particular the margin squeeze set out in section 7, cannot be justified in the context of the market analysis underlying ComReg Decision D06/08. In particular, eircom believes that the obligation to provide WLLs cannot be understood in the manner suggested by ComReg and, in particular, it does not imply that eircom uses WLLs for its own supply. In addition, the objective pursued by this test - to set an appropriate margin between PPCs and WLLs - does not relate to the competition problems identified by ComReg in its market analysis. As such this test is unjustifiable and unlawful. In addition, even if it were possible for ComReg to lawfully impose such a test on eircom, the margin squeeze test is inadequate and singularly fails to account for the realities of the current market. As such, the proposed price control, in particular the margin squeeze test set out in section 7, will cause significant damage to eircom s retail and wholesale data network businesses, since it would effectively prevent eircom from competing for leased lines and related managed services. This is because the test proposed by ComReg in the Draft Decision would set price floors for eircom s self supply at a level that is above the maximum costs faced by a competitor. Markets for high bandwidth wholesale and retail leased lines are extremely competitive (especially around the urban portions of markets) and eircom s current obligations already work to prevent eircom from effectively competing within these markets. Any further tightening of the regulatory constraints on eircom, such as would be represented by the current Draft Decision, would be likely to effectively remove eircom as a player in these markets. eircom has taken the opportunity afforded in this Consultation to propose practicable amendments to the margin test to reflect market realities and to allow the test to achieve the stated regulatory objectives. ComReg should undertake a new market analysis with an updated price control (if such a control is found to be necessary), based on the current competitive conditions in the market. Section 8 of 11/32 sets out ComReg s view in relation to a margin squeeze test on the retail market under the competition rules. eircom notes ComReg's position. eircom however does not agree with the approach proposed by ComReg and notes that enforcement under the competition rules will need to reflect competitive conditions on the retail market, defined on an ex post basis. eircom does not believe that ComReg pre-determines that the assessment will necessarily be conducted on a product-byproduct basis. eircom, in this regard, reserves all of its rights in relation to any such action. Page 4 of 21

9 eircom Ltd. Response to 11/32: Leased Lines Response Non-Confidential RESPONSE TO CONSULTATION QUESTIONS Q. 1. Do you agree with ComReg s proposed approach to determining PPC fibre access prices? Please provide reasons for your response. eircom agrees with ComReg s proposed approach to determining PPC fibre access prices, as outlined in Draft Decision 11/32. The proposals in Draft Decision 11/32 reflect the reasonable level of agreement reached between eircom and ComReg and ComReg s consultants TERA following extensive engagement over recent months in relation to the methodology, and the development of appropriate costing models, to support PPC local access rental charges. eircom notes that the approach followed to determine cost-oriented levels is consistent with other recent pricing and cost modelling work for related services, including in particular the following: Copper network cost modelling for LLU price setting: eircom used the outputs in cost per line per month from the LLU model to calculate the average cost per annum for a copper loop used to deliver a leased line. Fibre access cost modelling for NG Wholesale Ethernet Access pricing. SDH cost modelling in the context of the legacy core model built to inform PPC and leased line prices: eircom modelled the costs for SDH equipments used in the delivery of STM1 and 34/45 Mbps PPC EUL services using cost inputs and treatments from recent modelling of the eircom legacy core network for leased line pricing purposes. HDSL modem costs modelled as part of the same exercise. Accordingly, eircom agrees that the approach to determining PPC fibre access prices proposed by ComReg in 11/32 is appropriate and should be used as the basis for setting the prices going forward. Q. 2. Do you agree with ComReg s approach on the application of the pricing gradient to WSEA logical prices? Please provide reasons for your response. eircom agrees with ComReg s approach on the application of the pricing gradient to WSEA logical prices. As stated in our response to ComReg s Consultation document No. 10/70, the use of value gradients in access pricing is a very important tool in arriving at the optimal demand, by recognising that the value of any one product may vary according to circumstances, including, for example, according to uses and users, and by guiding the allocation of joint and common costs to different products on this basis. Value gradients are one way of approaching the maximisation of consumer welfare pursued by Ramsey pricing. In a price setting context, they facilitate the derivation of a set of different prices from a single set of costs. eircom is in no doubt that the use of value gradients is both necessary and desirable for the purpose of pricing leased lines services, including terminating segments of leased lines, and the use of gradients allows for the optimal apportionment of costs between various services so as to recover all of those costs. Page 5 of 21

10 eircom Ltd. Response to 11/32: Leased Lines Response Non-Confidential eircom, in co-operation with ComReg, is best placed to understand the likely profile of demands that will inform an appropriate gradient to demonstrate cost recovery across the portfolio. Q. 3. Do you agree with ComReg s approach and the draft maximum prices, above and as referred to in Appendix A, for WLLs, PPCs and NGN Ethernet? Please provide reasons to support your answer. eircom worked closely with ComReg and its consultants, Tera, in developing cost models to determine maximum charges for WLLs, PPCs and NGN Ethernet, namely the legacy core model and the NGN core model. eircom agrees that the prices derived from the models are cost-oriented. In terms of the price levels, eircom also agrees with ComReg s proposal not to mandate any further changes to the prices in the existing network price list and notes that PPC prices have reduced by about 16% over the past eighteen months. eircom agrees with setting the maximum price for WLLs at the current charges. Q. 4. Do you agree with ComReg s approach, as set out above, for setting the minimum price floors for WLL and other equivalents? Please provide reasons for your response. eircom does not agree with ComReg s proposal to set a price floor for WLLs. Setting price floors for WLLs is not a proportionate and adequate measure. In addition, eircom does not agree with the method proposed by ComReg and is of the view that each of the 9 steps proposed by ComReg is flawed by at least one fundamental error. Each of these flaws is expanded upon below, but, in summary they are I. Regulatory objectives - The RIA analysis shows that the test proposed is not consistent with ComReg stated objectives. II. III. IV. OAO Investment - the test does not recognise the two most relevant characteristics for efficient OAO investment (identified in separate bullets below). OAO Network Configuration - the configuration proposed by ComReg ignores those cases where an OAO builds to reach the customer premises. Input Costs for Margin Squeeze Test - The costs of alternative access mechanisms are not included for circuits delivered into those parts of the market where such alternative mechanisms are available. V. OAO Network Coverage ComReg takes no account of the impact of large hosting centres to the test. VI. VII. VIII. IX. OAOs other Network costs - ComReg should have used EEO rather than SEO. Calculating the Network Cost per Mbps - cost should not be applied to individual circuits, individual speeds, and individual contracts in the margin test. Use of a Price Gradient - price gradient should only be tested against the totality of WLL services and not on a circuit-by-circuit, or on a contract-by-contract, basis. Applying Costs Calculated to Determine the Price Floor - The set of costs included in the test to set an eircom price floor are always greater than the set faced by an efficient OAO. Page 6 of 21

11 eircom Ltd. Response to 11/32: Leased Lines Response Non-Confidential As a result, ComReg s proposals for price floors for WLLs will not foster competition and efficient investment in infrastructure, but, in fact, will result in a reduction of competition in the retail markets. eircom s position is further explained below. 1. ComReg's reasons for setting minimum price floors for WLLs In order to devise a proportionate price control for WLLs, it is necessary to consider the competition problems which the imposition of a remedy in the form of WLLs was designed to address in the first place. There are a number of relevant considerations. First, WLLs are not part of the market for terminating segments of leased lines. As explained by ComReg, "the provision of Wholesale Leased Lines (WLLs) involves purchasing a full end-to-end leased line from the incumbent operator The WLL product is essentially the same product that Eircom sells at the retail level, albeit currently priced using a "Retail Minus" mechanism. ComReg expressed the view that competition would be best served by encouraging OAOs to use PPCs rather than WLLs, which may involve infrastructure that is used to provide other services that do not fall into the terminating segment market". In this context, the rationale for requiring eircom to provide end-to-end leased lines to other operators at a discount was to avoid giving eircom an undue advantage in the retail market where other operators had not made sufficient investments so as to be able to rely on PPCs rather than end-to-end leased lines. ComReg also noted that where there is a competitive trunk market..., it is likely that an OAO would use PPCs to connect to the trunk segment". However, because there were "large parts of the country where there is not a competitive trunk market", OAOs were still reliant on their ability to purchase WLLs. 1 In other words, the obligation to provide end-to-end circuits to OAOs at a discount was imposed as a stop-gap measure, so to speak, so as to permit OAOs investing in infrastructure (in particular transmission infrastructure) to compete with eircom although they had not reached a coverage of the country sufficient for them to rely principally on PPCs (or indeed their own infrastructure). Having regard to the rationale for the imposition of WLLs, the appropriate form of price control is clearly a maximum price. Crucially, there is no concern on the part of ComReg in the market analysis in relation to WLLs that they may provide a disincentive to operators to purchase PPCs. In the light of this, the market analysis supporting Decision D06/08 does not support the floor price control for WLLs that ComReg is proposing. In particular, ComReg is not entitled to design a price remedy which is concerned with setting the appropriate economic space between PPCs and WLLs. eircom understands that by "appropriate", ComReg means to ensure that the incentives of an OAO to avail of PPCs is not undermined by the availability from eircom of WLLs (in fact, the obligation of eircom is to provide WLLs upon request) at too low a price. eircom notes in this regard that the decisions of the French Regulator ARCEP, which ComReg cites in the Introduction to 11/32 in support of its approach, are in fact of no assistance to ComReg. In particular, France Telecom is not subject to an obligation to provide operators with WLLs. The principle of non-eviction, as invoked by ARCEP, is considered for the purpose of setting an appropriate price control for PPCs so as to ensure a competitive retail market. The French solution includes cost-oriented prices for terminating segments below 2 Mb/s and a margin squeeze test for terminating segments above 2 Mb/s, reflecting the differences in the intensity of France Telecom s market power 1 See in particular ComReg Consultation Document 08/63. Page 7 of 21

12 eircom Ltd. Response to 11/32: Leased Lines Response Non-Confidential below and above 2 Mb/s. This system bears little, if any, resemblance with the price control proposed by ComReg. It appears to eircom that a price control in the form imposed in France would better reflect current competitive conditions in the Irish leased lines markets. In this regard, eircom also notes that the market analysis supporting D06/08 was undertaken more than three years ago. The Better Regulation Directive imposes an obligation on NRAs to conduct market analysis at least every three years and that no remedy can be in place for more than three years, save in exceptional circumstances, and with the approval of the European Commission. Having regard to the fundamental changes in competition in capacity markets in Ireland in the past three years, there could be no justification for the extension of the remedies set in D06/08, and clearly none for the imposition of a new remedy in the form of the price control proposed by ComReg. These fundamental changes include the following: In urban areas the demand for leased line services is now for high speed circuits to deliver connectivity to business headquarter sites and it is economic for OAOs to extend their own fibre networks to complete these connections; In provincial cities and towns, e-net, whose infrastructure is funded by State monies, provides fibre access to business premises at subsidised prices below the rates that the OAO could self-supply or purchase from eircom; Government and enterprise customers are increasingly making use of data hosting centres, where the networks of all providers meet to deliver data services in large capacity at price levels that are clearly the most efficient for the customer, thereby challenging the notion of a terminating segment ; Where there is rural demand for high speed leased lines, radio solutions such as those wholesaled by Airspeed are more economic than fixed deployments in many cases. The Irish capacity markets are clearly no longer at the stage reflected by D06/08 where OAOs' investments were generally limited to building a core network, and they now extend into the access networks especially in high density areas. The economics of leased lines investments have also been fundamentally affected by E-net's offerings. In these circumstances, consistent with the requirements of the regulatory framework, no change in the price control for WLLs should be made without first undertaking a new market analysis and reviewing the appropriateness of a WLL remedy. Second, it should be borne in mind that the "space" between "retail leased lines" and WLLs is, for the reasons explained above, entirely artificial. It follows that the economic space between PPCs and WLLs is, by definition, that between a wholesale access service and an end-to-end retail product. If ComReg is concerned that WLLs act as a disincentive to PPC investments, it would appear that the simplest solution would be to remove the obligation on eircom to offer wholesale leased lines. OAOs would have all the incentives to invest in PPCs and, where this is not efficient, they could avail of end-to-end circuits from eircom on the non-regulated downstream retail markets (possibly availing of volume discounts). Instead, ComReg appears to choose to treat WLLs as an input to eircom's retail offerings and require that all end-to-end products of eircom recover at least a floor price for WLLs, regardless of whether the product concerned was offered to an operator as WLLs or in a retail form. Such an approach does not address the issue of the economic space between WLLs and PPCs. Rather it works to impose a price floor on eircom in relation to end-to-end circuits, in circumstances where eircom s market power in terminating segments has already been addressed by the obligation of cost-orientation of PPCs and Ethernet access products, and the obligation of non-discrimination. eircom does not believe that ComReg s Page 8 of 21

13 eircom Ltd. Response to 11/32: Leased Lines Response Non-Confidential proposal for a price floor, and the manner in which it proposes to apply it, are appropriate in these circumstances. Finally, eircom notes that, as pointed out before, D06/08 cannot be construed to require eircom to provide wholesale Ethernet end-to-end leased lines at a discount. Any maximum or minimum wholesale price that ComReg were to impose in relation to WLLs would not apply to Ethernet end-to-end products provided to OAOs. Were eircom to accede to a request for an OAO to provide it with such a product, such a product will be provided as a retail end-to-end product which is not directly regulated by D06/08. In the light of the above, eircom is of the view that there is no need, nor any justification, for the form of margin squeeze test proposed by ComReg. Having regard to the competition problem that WLLs are meant to address, a maximum price is entirely sufficient for WLLs. The publication of cost-oriented prices for PPCs is sufficient to ensure that ComReg is in the position to monitor prices in downstream markets. In addition, in any event, no change in the price control can lawfully be imposed without reviewing market conditions and accounting for the significant changes in competitive conditions. 2. The Test as Specified by ComReg is Inadequate and Flawed Even if the test proposed by ComReg was justified (which it is not), the approach taken by ComReg in relation to each of the steps it identifies to arrive at a price floor for WLLs is such that it will not allow the test to deliver the objectives that ComReg has said were being pursued, including ensuring that eircom can deliver appropriate discounts in the most competitive portions of the market and protecting OAOs investments. OAO Investment If the objective of the test is to protect OAOs investments, then regard should be had to the economic characteristics of efficient investments made by OAOs in leased line infrastructure. OAOs can build networks to provide services into a number of communications markets to business and residential customers. For all markets for fixed communications services in Ireland, OAOs can Build or Buy, or they can resell. Build or Buy means, building their own network purchasing wholesale inputs from eircom, and this can be done in varying proportions. In general, wholesale inputs are priced at the eircom nationally averaged cost. This is the case of eircom s Partial Private Circuits (PPCs) - the regulated access variant of a leased line. Pricing wholesale services in this way means that an efficient OAO will only build its own network where it can profitably use it to provide services at a cost below the eircom national average cost because the alternative of buying wholesale access services priced at the eircom averaged cost is available everywhere. The second relevant economic characteristic of any OAO investment in network build is that the investment, once made, becomes a sunk cost. Viewed from the point of an OAO making a decision on pricing leased line services that utilise this investment, each service should make a contribution to the cost of that investment. However the OAO concerned will not seek to recover the average cost of that investment from the price charged to each and every customer. To do this would have the effect of failing to sell services to the more price sensitive customers who are not prepared to purchase at the average cost; and it would fail to achieve the efficient level of return from those less price sensitive customers prepared to pay more than the average cost. Clearly, pricing both above and below average costs maximises the volume of services sold, thus reducing the unit cost per service of the investment and so is the rational and efficient pricing policy for the investing OAO. So the two most relevant characteristics for efficient OAO investment in leased line network build are: Page 9 of 21

14 eircom Ltd. Response to 11/32: Leased Lines Response Non-Confidential The efficient OAO will only build its own network where a lower unit cost than the eircom national average can be achieved; and Once OAOs have built their own network, they will compete efficiently in the leased line market by pricing both above and below the average unit cost for that investment. Neither of these key characteristics has been recognised in the test proposed by ComReg. OAO Network Configuration ComReg has presented, in schematic diagrams, three options for the configuration of the OAO network to be used in constructing the test. For all the leased line services depicted, both customer premises are connected to the OAO network using an eircom PPC. This means that these diagrams provide only a partial view of the nature of competition in the leased line market in Ireland. Increasingly, OAOs networks already reach many customer premises and where that is the case eircom s network is only required to deliver one end of a leased line service. The reasons for this have been explained above. These changes are so significant that they require that a new market analysis to be undertaken. In the meantime, and without prejudice to eircom s position in relation to this, at the very least, configurations should be used in any test that show a proportion of circuits at higher speeds delivered to the customer using the OAO s own or third party network. By contrast, the configuration proposed by ComReg entirely ignores those more and more frequent and widespread cases where an OAO builds to reach the customer premises (or buys an access service from a third party provider) at lower cost than the equivalent eircom PPC. In those cases, it is clear that the obligation to provide end-to-end circuits to OAOs is of little relevance. But if the margin test proposed by ComReg is to apply to eircom s selfsupply (which it cannot and should not), it will entirely exclude eircom from competing, to the detriment of the customers concerned. The clear implication for the use of the configuration proposed is that, where an OAO builds network to reach the customer premises or buys an access service from a third party provider that serves the customer at a cost lower than the eircom regulated access price, the margin test proposed is explicitly designed to exclude eircom from competing to sell leased line services to that customer. A very current example as to how the test proposed for high capacity leased lines is at odds with the reality of the market is the HSE National Wide Area Network (WAN). This primary contract was recently awarded to Complete Telecom and the HSE is currently seeking tenders for diverse access to the same sites through a public tender. As part of that tender, they have described in detail the site locations and the local access connectivity at each site, in the tender documentation. This information is in the public domain and is attached as the spreadsheet _LL Response_11_32_HSE WAN Access Connectivity.pdf. This WAN connects 36 national HSE sites (including 6 with diverse access) in cities and provincial towns at speeds of 10 Mbps and above. Even though eircom Wholesale Ethernet Access services are available at all these sites, priced at eircom averaged cost, Complete Telecom did not use a single eircom access service. The Complete Telecom solution used 27 enet services, 7 Airspeed radio services, 4 cases of own-build fibre, and 4 cases where the HSE was already present in a data centre where Complete Telecom has access. Page 10 of 21

15 eircom Ltd. Response to 11/32: Leased Lines Response Non-Confidential Input Costs for Margin Squeeze Test ComReg lists ten categories of costs for inclusion in the margin squeeze test. eircom has four main issues with the list: 1. A number of costs are to be recovered twice: this is highly inefficient in circumstances where provision of a WLL does not, in general, require the cost to be incurred twice. 2. The costs of the OAO s own network are incomplete because they do not include any share of the costs of the OAO access network built to serve retail customers directly. 3. The costs of alternative access mechanisms (LLU, enet, Airspeed, etc.) are not included for circuits delivered into those parts of the market where such alternative mechanisms are available. 4. The costs of eircom s PPC End User Links (EUL) have been included at a nationally average circuit length. This has the effect of raising the price floor in urban areas where the EULs used by the OAOs are shorter than the average. Again, if the price control is to be used in relation to eircom s self-supply, this places eircom at a significant competitive disadvantage in geographic areas marked with significant alternative infrastructure. OAO Network Coverage The coverage proposed by ComReg for the OAO network appears to be broadly in line with the networks built out by LLU access seekers. ComReg s proposal in terms of the OAO core network coverage appears reasonable as an input into the margin test with two key exceptions: 1. The coverage modelled makes no allowance for the increasing market requirement for all OAOs to build out their core network to the large hosting centres where customers and suppliers interconnect for the diverse delivery of high capacity business services. 2. A core network built in urban areas will inevitably pass the premises for many customers of leased line services. All network operators use this synergy to deliver access services at low incremental cost. Any treatment of network coverage that reflects the current market reality must recognise the implication this has for reducing the required length of the EUL. OAOs Other Network Costs eircom does not agree that the test should include OAO operating and leased line platform costs as a mark-up on the costs of their transmission network. There is no reason not to use as the benchmark the most efficient core network, and doing otherwise will distort investment incentives and encourage inefficient investments. Page 11 of 21

16 eircom Ltd. Response to 11/32: Leased Lines Response Non-Confidential Calculating the Network Cost per Mbps In addition to disagreeing with the methodology used to calculate the national average total cost per Mbps for crossing the OAO core, eircom considers that it is not a sufficient or appropriate input into a margin squeeze test that applies on a circuit-by-circuit, a speed-byspeed, or a contract-by-contract basis. A large proportion of the total cost that is an input into the average cost per Mbps calculation is fixed or common. These costs are not relevant for pricing decisions in the market for leased line services, as, for example, an OAO will price as low as average variable costs in the case where the contract is offered into the most competitive region of the market. To take a simple example of the approach that an OAO must take to selling a leased line service across Dublin we should consider the OAO network in that city. Some 35 of the 70 sites connected by the OAO transmission network are located in Dublin. If the OAO uses two eircom PPCs and conveys the traffic across its own network from the A-end serving eircom exchange to the B-end serving eircom exchange they cannot hope to win business by pricing the service to recover the national average cost per Mbps of their transmission network. This is because they will be competing with providers using their own local access network for at least one end of the service and with providers prepared to accept a contribution to fixed and common costs below the national averaged level. As a result the competitive level of price will settle close to the level of local variable cost rather that national total cost. The level of cost per Mbps modelled by ComReg is the level that the OAO must recover on average - across all contracts, across all speeds, and across all regions to achieve his target return on the network investment. So a similar approach should be used in a margin test across the full portfolio of eircom WLL services. In other words, to apply this level of cost to individual circuits, individual speeds, and individual contracts in a margin test for all eircom s end-to-end services including self-supply would simply serve to exclude eircom from competing in the urban parts of the national market, to the detriment of end-users Use of a Price Gradient eircom is of the view that the use of a single national average with a gradient applied to test all circuits at a given speed is not correct as it simply does not recognise regional variation in competition. Once again the test of the average OAO cost per Mbps multiplied by the price gradient for the circuit speed should only be tested against the totality of WLL services provided by eircom at that speed and not be applied on a circuit-by-circuit, or an a contract-bycontract, basis. Applying Costs Calculated to Determine the Price Floor The fundamental issues arising with ComReg s proposed test as identified above will be magnified by the manner in which ComReg has proposed to apply the cost inputs into the test that will determine the price floor. The fundamental disagreements that eircom has with the ComReg approach to constructing the proposed test can be summarised into two main issues: The set of costs included in the test to set an eircom price floor are always greater than the set faced by an efficient OAO competing in the national market for retail leased line services Page 12 of 21

17 eircom Ltd. Response to 11/32: Leased Lines Response Non-Confidential The degree of averaging applied to these costs has the effect, when applied to all contracts on a speed-by-speed basis, of excluding eircom from the high-speed urban portions of the market where competition is most intense Eircom Recommendations for an Appropriate Margin Test From the discussion above, it is clear that the test, as currently described in ComReg document 11/32, is entirely unacceptable as a tool to address the competition problems currently evident in Market Six. However, eircom believes that there are a number of ways that the test can be modified to make it appropriate to both protecting efficient OAO investments, and to benefitting end users of leased line services. eircom will now propose how the cost information available to ComReg should be used in appropriate tests. This recommendation is informed by the nature of the cost information now available to ComReg that has the following characteristics: 1. Up to and including 2 Mbps, leased line services are delivered almost exclusively over eircom copper loops. The exceptions are a small number of fixed radio systems that are more economic in certain geographies, and cases where a number of 2 Mbps demands are aggregated onto fibre delivery at a customer hub site. 2. Above 2 Mbps, in rural areas and in smaller provincial towns, the PPC EUL and NGN Wholesale Ethernet fibre access products are nearly always the most economic form of data connectivity. This is in sharp contrast to larger provincial towns and cities served by enet fibre, UPC fibre rolled out to upgrade cable television services, and data centre connectivity between service providers and customers. For these reasons eircom proposes that there should be at least two quite distinct margin tests. Up to and including 2 Mbps leased line services, the inputs that ComReg has deployed are appropriate. However the treatment of these inputs and the application of the test must be adjusted to ensure that the effect is not to exclude eircom from parts of the market and so limit the discounts available to end users. The two main changes necessary are: A Leased lines up to and including 2 Mbps: the test proposed generates a single national price floor based on the sum of a number of average costs the average cost of the OAO network, the average cost of an eircom PPC EUL access circuit, and the cost of an eircom PPC Transport Link (TL) with average fill. For each of these three inputs costs there are fixed and variable elements. In summary, eircom proposes that the appropriate test for leased line services up to an including 2 Mbps should be applied in two stages. 2 (i) (ii) At the first stage the leased line services in each customer contract should pass the test to the average variable cost (AVC) standard. At the second stage the leased line services across all customer contracts at any time should pass the test to the average total cost (ATC) standard This approach allows eircom to compete on the basis of the same structure of costs as the OAO using PPCs as an input to supplement their own core network investment in delivering end-to-end leased line services. The approach also protects the OAO investment by ensuring that the revenue available from the full portfolio is sufficient to fund an efficient investment by an operator. 2 Calculated on the basis of EEO Page 13 of 21

18 eircom Ltd. Response to 11/32: Leased Lines Response Non-Confidential B Leased Lines above 2 Mbps: as discussed at length above the main issue that eircom has with the proposed test for this part of the market is that there is no recognition of the lower access costs available in cities and provincial towns. All key competitors to eircom are pricing their services to reflect the range of access solutions available. Therefore, ComReg s proposal to require eircom to set leased line prices for urban networks based on eircom averaged fibre costs will simply exclude eircom from any new contracts. The margin test must include the real costs faced by the OAO namely: (i) (ii) (iii) The costs of the actual access solution used (a mix of e-net, Airspeed, data centre charges, own fibre build, and eircom regulated access service) A contribution to the costs of interconnection services bought from eircom (for the proportion of eircom access actually used) The cost of the OAO transmission and leased line core network modelled on an EEO basis (i.e. using eircom costs) Basing the price floor test on these three sets of costs adds some complexity for ComReg over and above the simplistic test proposed in this Consultation mainly because the test proposed by ComReg is exclusively based on eircom costs and charges. The first complexity added is that the test must now be populated with third party charges (enet fibre prices, Airspeed radio charges), OAO costs for fibre build and for data centre occupancy. The second level of complexity is that there are rural areas where there will be some demand for high capacity leased line service that have limited alternatives to eircom regulated access (Airspeed wireless can be an economic alternative if the number of radio hops is limited). For this reason eircom proposes two tests above 2 Mbps. For purely rural networks a test identical to the two-stage national test (AVC per contract, ATC over all customers) for leased line services up to 2 Mbps is appropriate. For urban areas (to include all cities and those provincial towns where enet offers access using government funded MANs), the input costs listed above are the only basis for a margin test that will protect efficient OAO investments and benefit customers through vigorous price competition. Again the test should be applied in two stages: (i) (ii) At the first stage the leased line services in each customer contract should pass the test based on the actual (mix of) cost for access mechanisms available to OAOs in urban markets, plus the variable costs of the OAO network At the second stage the leased line services across all customer contracts at any time should pass the test based on the actual (mix of) cost for access mechanisms available to OAOs in urban markets, plus the average total costs of the OAO network Eircom appreciates that these tests need additional information above that collected by ComReg for the test proposed in the current Consultation. However an increasing amount of the necessary information is in the public domain. This includes enet and Airspeed charges (though OAOs may receive unpublished volume discounts), the locations of data centres, and the awards of large contracts for government and enterprise high capacity leased line networks. Page 14 of 21

19 eircom Ltd. Response to 11/32: Leased Lines Response Non-Confidential In preparing tenders for high capacity leased line networks in urban areas, eircom must assess the range and likely mix of competing access services available to OAOs bidding for that network. This is necessary to ensure that any price we might offer is competitive. Q. 5. Do you believe that the draft text of the proposed decision is from a legal, technical and practical perspective, sufficiently detailed, clear and precise with regards to the specifics proposed? Please explain your response and provide details of any specific amendments you believe are required. This response deals exclusively with the wording of the Draft Decision instrument, and is without prejudice to eircom s substantive position as expressed in response to the other questions raised in 11/32. eircom s comments are provided below section by section of the Draft Decision. 1. Statutory and Legal Powers eircom is of the view that Decision D06/08 cannot be used as the basis for the price control that ComReg is proposing. In particular, the margin squeeze test between PPCs and WLLs in the form set out by ComReg is not justified by the market analysis that led to D06/08. Any such remedy can only be imposed, if justified and proportionate, following a new market analysis. ComReg s proposed Decision is, accordingly, in breach of the Framework Regulations, which do not permit the imposition or amendment of an SMP obligation without first assessing competition in the relevant markets by way of a market analysis. In this regard, eircom further notes that the market analysis for terminating segments of leased lines was undertaken more than three years ago. This means that the maximum, period for market reviews allowed under the Better Regulation Directive (which ComReg, as a State entity, is bound to comply with, even absent transposition) has been reached. It is accordingly not appropriate for ComReg to impose and/or specify a new price control on eircom. 2. Definitions eircom does not agree that the definition of Margin squeeze, by reference to appropriate economic space, itself undefined, is sufficiently detailed, clear and precise. eircom agrees with the definition of WLLs, which is consistent with the definition of WLLs set out in ComReg Doc. 08/63 and reflects the position expressed by eircom in response to Question 4. Elements of the test proposed by ComReg, in particular Step 9 at para 7.28 and its reference to bids, presumably on the retail market, does not reconcile with this definition. 4. Price Control Section 4.4 is not clear. There appears to be wording missing between "WLL services and (including but not limited to)". Section 4.7 should clarify that for the avoidance of doubt, compliance with this Decision does not require eircom to amend prices for WLLs agreed and applied prior to the entry into force of this Decision. Sections 4.8 and section 4.9 seem to impose contradictory obligations on eircom. This is particularly so as eircom's current prices are not to be amended Page 15 of 21

20 8. Effective Date eircom Ltd. Response to 11/32: Leased Lines Response Non-Confidential The duration of the Decision should be expressed in terms of a maximum duration rather than a finite period. That maximum duration is linked to the market review period and the Decision adopted on the basis of relevant findings, and these (rather than a subsequent Decision on their basis) may not exceed three years. Reference to sections 10.2 in section 8.3 should be to section 8.2. Q. 6. Do you have any views on this Regulatory Impact Assessment with regard to the draft maximum charges determined for WLLs, PPCs and NGN Ethernet and also with regard to the Margin Squeeze test and are there any other factors that ComReg should consider in completing its Regulatory Impact Assessment on these points? Please explain your response and provide details of any additional factors that should be considered by ComReg. Objectives and Policy Issues ComReg articulates 4 objectives as: Avoid distortion or restriction of competition Encourage efficient investment Promote the interests of users Encourage access to the internet eircom agrees that these are appropriate objectives. eircom also believes, however, that more than three years after the analysis of the relevant markets was undertaken, these objectives should be defined, and the means to achieve them defined and provided for, in the context of a new market analysis, in accordance with ComReg s obligations under the regulatory framework. Eircom nonetheless analyses below the two main Draft Decisions in ComReg 11/32 against these objectives. Maximum Prices for PPCs, WLL, and Wholesale NG Ethernet Access eircom agrees that LRAIC plus is the appropriate cost modelling approach for setting cost oriented access prices that send the appropriate build or buy signals to potential investors for access products including, in particular, PPCs and equivalents. WLL services, in contrast, require no OAO investment being simple resale of eircom endto-end services. Current maximum prices reflect this fundamental difference. NRAs are generally of the view that network based competition is more vigorous, and more sustainable, than service based competition. However, any proposal to reduce the current maximum prices for WLL services runs the risk of discouraging OAOs from extending their networks. Such a short term reduction in one set of wholesale prices may well be against the long term interests of users by limiting competition to service-based competition where network-based competition may be more appropriate, given demand levels and potential returns available. In their discussion of the pricing methodology, ComReg contrasts the national average pricing approach for the legacy WLLs and PPCs products with the geographically deaveraged pricing approach for the wholesale NGN Ethernet leased lines products and services. This distinction is more apparent than real. All leased line pricing is de-averaged in several dimensions to recognise two factors: Page 16 of 21

21 eircom Ltd. Response to 11/32: Leased Lines Response Non-Confidential 1. The proportion of network costs used to deliver the leased line service at issue, and 2. The customer s willingness to pay. With no de-averaging of leased line prices all circuits would have the same price regardless of speed, length, or nature of the network used to deliver the service. For traditional leased line speed services, the first form of de-averaging is by circuit speed. Higher prices for higher speeds recognise that the bandwidth delivered between customer site drives network costs and that a customer attaches more value to a 45 Mbps circuit than to a 64 Kbps circuit linking the same site. The second form of de-averaging is by leased line length. Again this recognises that longer lines use more network resources, as well as that customers attach a greater value to a facility that transmits key data accurately and quickly over 200 km than they do to a similar facility that transmits the same data across 2 km. In the move to NGN Ethernet, eircom s pricing has maintained the de-averaging by speed using a similar speed/price gradient applied to the average cost per Mbps as is used for TDM leased lines. The de-averaging by distance has been replaced by a regional analysis of costs that shows higher unit costs in provincial regions, where demand for all services is lower. These provincial regions are generally larger than the low cost urban areas. The result is that higher cost of crossing a provincial region generally conveys the Ethernet traffic a greater distance. So the move to geographic de-averaging for NG Ethernet services still reflects the use of network resources in a similar way to nationally averaged distance based charging. Margin Squeeze Test eircom does not agree that the proposed margin squeeze test is appropriate if it is applied in relation to eircom s self-supply for retail purposes. In addition, in any event, ComReg has made a number of crucial errors, and the form of margin test proposed will not, for that reason, assist ComReg in meeting the objectives it has identified. Eircom agrees that assessment of margin squeeze is properly done on an ex post basis. However eircom finds that the OAO network costs should be only included in this test after modelling on an Equally Efficient Operator (EEO) basis as this is the only basis for efficient investment. The OAO should only invest in their own core network where they can achieve costs below the eircom average otherwise it is more efficient to buy PPC services priced at the eircom average. On this basis, to include the OAO network costs modelled at eircom cost levels (i.e. EEO) is clearly sufficient to avoid stranding an efficient OAO investment. However ComReg has made a number of crucial errors in selecting the form of margin test that is consistent with the first three regulatory objectives. Where these errors are present in the body of the Consultation proposing the structure of the test, they should also have been detected in the Regulatory Impact Assessment (RIA). To the extent that the RIA should test the remedy against the regulatory objectives, eircom finds that the RIA is faulty. Eircom now proposes to test the proposed test against each of the first three objectives. Avoid Distortion or Restriction of Competition ComReg has proposed a test (Figure 12 on page 73 of ComReg 11/32) against a single price floor at each circuit speed for all WLL services offered by eircom at that speed. The single price floor is made up of: (i) (ii) The charge for two PPC EULs at that circuit speed for a set averaged length A share of the costs of two PPC TLs calculated at a single averaged fill. Page 17 of 21

22 (iii) eircom Ltd. Response to 11/32: Leased Lines Response Non-Confidential A single national charge on the OAO transmission network, calculated by applying the speed/price gradient to the average modelled cost per Mbps. The result is the price floor is a single number in per annum that will apply individually to all WLL services at that speed whether delivered 2 kilometres across Dublin, or 200 kilometres from Kerry to Sligo. Because this test is to be applied on a circuit-by-circuit basis, rather than on a portfolio basis, it will have the effect both of distorting competition, and of restricting competition. The proposed test will distort competition because the WLL price floor it sets is above the level of cost faced by an OAO buying eircom PPC services to deliver a service across Dublin. This occurs because: (i) (ii) (iii) Both PPC End User Link (EUL) tails purchased will be below the set averaged length used in the test. The fill in the TLs used by the OAO in Dublin have a higher fill than the national average The OAO uses less of its own network to cross Dublin than the average for all circuits that traverse its network and the OAO will reflect this into the price offered for the WLL particularly as Dublin has more intense competition for leased line services. If the test is to apply to eircom's self-supply, then its application results in excluding eircom from competing for short urban services. Conversely the same test applies a price floor for services offered over long distances in rural parts of Ireland that is well below the cost of the inputs needed by the OAO to provide the service. This will have the effect of excluding OAOs from tenders for provincial leased line networks (that require access inputs from eircom). So the effect of the test is to limit competition for provincial leased lines. As well as restricting competition by excluding eircom from urban networks and OAOs (without access networks) from rural networks the test has further potential to distort competition. In urban areas OAOs generally compete at price levels well below the floor set for eircom by the proposed test. As this floor is at a single rate per speed the results of a number of competitions may indicate to the larger OAOs competing against eircom that there is a clear level below which eircom cannot bid. When this level becomes known to the market it is likely that price competition will centre on a level just below this floor. Even though there will be OAOs facing costs well below the eircom price floor it will be apparent that there are contracts to be won well above cost by bidding at a level just below the eircom price floor. The concentration of OAO bids around this level is, of course, a distortion of real competition where all operators price bids in relation to their own costs in the absence of information around competitors pricing constraints. Encourage Efficient Investment The investment signals that the proposed margin test sends to the OAO considering building out a leased line network are stark and unambiguous. The application of the same price floor per circuit for eircom in urban and rural areas signals that they can face costs below the eircom floor in urban areas with a minimal network investment. The same test sends a very different message to an OAO considering a network investment outside out of urban areas. A provincial investment no matter how extensive is unlikely to deliver unit costs below the eircom nationally averaged rate that is the basis for the WLL price floor in rural areas. These conflicting signals seem very unlikely to encourage efficient investment. Page 18 of 21

23 Promote the Interests of Users eircom Ltd. Response to 11/32: Leased Lines Response Non-Confidential In the markets for WLLs and the downstream markets for retail data networks, the interests of end users are best protected by ensuring that there are a number of credible bidders for each contract. As explained above, the proposed test will have the effect of excluding the provider with the most extensive network from bidding competitively for urban networks. It will also have the effect of excluding OAOs that rely principally on eircom PPC inputs to extend their own network reach to bid for provincial leased lines from the market for such services. To this extent the proposed test has the capacity to damage the interests of end users of both urban and provincial data networks. In summary, eircom finds that the RIA for the margin squeeze test presented in the Consultation document is flawed in that it does not directly examine the clear effects that can be anticipated from the implementation of that test against the stated objectives. Changed Competitive Conditions eircom s experience is that the competitive dynamics in this market have changed significantly since ComReg conducted its last Market Review in It is important to note that the data on which this market review is based is now over three years old and increasingly unrepresentative of current competitive conditions. Some of the changes experienced in that time are Significant growth in competitor capability and market shares have also changed. Growth of ENET, selling state subsidised competitive networks in 93 cities town and villages. This fact alone should invalidate previous market analysis at the fibre level (see map and diagram below). Entry of NTL/UPC into the business market. AIRSPEED and other suppliers now have significant radio infrastructure The recent acquisition by VODAFONE of INTERFUSION The current severe domestic and international recession has caused retraction in the market, and customers are now focusing on price as a major factor in choosing network suppliers. These changes have impacted on the retail market as follows: There has been evidence of the severe competitive pressure on all bids, with multiple competitors, most using alternative access infrastructure. Page 19 of 21

24 eircom Ltd. Response to 11/32: Leased Lines Response Non-Confidential Map Showing Current ENET Network Page 20 of 21

25 eircom Ltd. Response to 11/32: Leased Lines Response Non-Confidential ENET Customers = Page 21 of 21

26 Location Transmission Path - Hop 1 Access Type Cork University Hospital Fibre MAN to Cork Co-Lo MAN Aras Slainte, Cork Fibre MAN to Cork Co-Lo MAN HSE North East HQ, Kells Fibre MAN to Kells Co-Lo MAN Limerick Regional Hospital Fibre MAN to Limerick Co-Lo MAN Sligo General Hospital Fibre MAN to Sligo Co-Lo MAN Merlin Park Hospital, Galway Fibre MAN to Galway PoP MAN University College Hospital, Galway Fibre MAN to Galway PoP MAN Tullamore Hospital, Tullamore Fibre MAN to Tullamore Co-Lo MAN Waterford Regional Hospital Fibre MAN to Waterford Co-Lo MAN Dr Steevens' Hospital, Dublin Fibre to DEG (Complete Telecom and Aurora) Own Fibre Kerry General Hospital Tralee to DEG (Primary) Fibre on e net Tralee MAN MAN Kerry General Hospital Tralee to CIX (Secondary) Airspeed Radio to RTE Mast Knockmoyle Airspeed Portlaoise General Hospital Fibre MAN to Portlaoise Co-Lo MAN Letterkenny General Hospital Fibre MAN to Letterkenny Co-Lo MAN Mullingar General Hospital Fibre MAN to Mullingar Co-Lo MAN HSE MW Area Offices, Limerick Fibre MAN to Limerick Co-Lo MAN St Munchin's Regional Maternity Hospital, Limerick Fibre MAN to Limerick Co-Lo MAN Cavan General Hospital Fibre MAN to Cavan Co-Lo MAN Our Lady of Lourdes Hospital, Drogheda Fibre MAN to Drogheda Co-Lo MAN Naas General Hospital Airspeed Radio to ESB High Site in Saggart Airspeed HSE SE Offices, Lackan, Co. Kilkenny Fibre MAN to Kilkenny Co-Lo MAN Mallow General Hospital Airspeed Radio to Towercom Mallow Airspeed Bantry General Hospital (Primary) Fibre to Bantry Co-Lo Data Center Bantry General Hospital (Secondary) Fibre to Bantry Co-Lo Data Center Ennis General Hospital to Limerick (Primary) Fibre/Radio Airspeed Ennis General Hospital to Galway (Secondary) Airspeed Radio to RTE Maheragh Airspeed Nenagh General Hospital to Limerick (Primary) Fibre to Civic Office Data Center Nenagh General Hospital to Galway (Secondary) Fibre to Civic Office Data Center Louth County Hospital, Dundalk Fibre MAN to Dundalk Co-Lo MAN Our Lady's Hospital, Navan Fibre MAN to Navan Co-Lo MAN Monaghan General Hospital Fibre MAN to Monaghan Co-Lo MAN Portiuncula Hospital,Ballinasloe Fibre MAN to Ballinsloe Co-Lo MAN Mayo General Hospital, Castlebar via Ballina (Primary) Airspeed Radio to Cellcom Tower Kiltimagh Airspeed Mayo General Hospital, Castlebar via Galway (Secondary) Airspeed Radio to Cellcom Tower Kiltimagh Airspeed RDO Office, Model Farm Rd, Cork Fibre MAN to Cork Co-Lo MAN Roscommon General Hospital to DEG (Primary) Fibre MAN to Roscommon Co-Lo MAN Roscommon General Hospital via Galway PoP (Secondary) Fibre MAN to Roscommon Co-Lo MAN HSE Offices, Manorhamilton, Co Sligo Fibre MAN to Manorhamilton Co-Lo MAN Ambulance Control, Ballyshannon, Co Donegal Fibre MAN to Ballyshannon Co-Lo MAN Ambulance Control Centre, Tallaght, Dublin Fibre (Complete) Own Fibre Eircom Data Centre, Clonshaugh Fibre to DEG using Complete Telecom, Aurora and Eunetworks (T50) Own Fibre HP Unit 23, Airways Ind Est, Santry, Dublin 9 Fibre (Complete) Own Fibre Page 1 of _LL Response_11_32_HSE WAN Access Connectivity_1.xls

27 Submissions to Consultation 11/32 ComReg 12/03a 2 BT Communications Ireland Limited

28 Reference: Submission re ComReg 11/32 BT Communications Ireland Ltd ( BT ) response to ComReg Consultation Paper entitled: Response to Consultation Document No. 10/70 and a further consultation and draft decision on the price control obligation in the market for wholesale terminating segments of leased lines Issue 1 3rd June Introduction We welcome ComReg s work in this sector of the communications market addressing business products and for the opportunity to further address some of the complex issues of setting the pricing control. This is an important market for BT as we purchase PPCs and Ethernet from eircom and we are investing in our own infrastructure to provide both retail business solutions and wholesale services. The principle of the ladder of investment is important to the regulatory regime to encourage investment however equally important is that such investments are not left stranded or undermined due to margin squeeze or poor pricing behaviour from the incumbent. We fully agree with ComReg in its work to establish workable price control mechanisms to ensure both fair and open competition and regulatory certainty. We agree and support the positions ComReg have concluded in the response to consultation 10/70 and our focus for the remainder of this response addresses our comments to the further consultation and the new questions asked. We have provided our detailed response later however we would specifically like to draw attention to the ComReg proposal for the price gradient and prices for Wholesale Ethernet Logical Circuits. In 1 P a g e

Market Review: Wholesale High Quality Access at a Fixed Location

Market Review: Wholesale High Quality Access at a Fixed Location Market Review: Wholesale High Quality Access at a Fixed Location Consultation and Draft Decision Reference: Date: ComReg16/69 18/08/2016 Legal Disclaimer This Consultation is not a binding legal document

More information

AIIP comments on the

AIIP comments on the AIIP comments on the BEREC Common Position on best practice remedies on the market for wholesale broadband access (including bitstream access) imposed as a consequence of a position of significant market

More information

Case SI/2009/0957: Wholesale (physical) network infrastructure access (including shared or fully unbundled access) at a fixed location

Case SI/2009/0957: Wholesale (physical) network infrastructure access (including shared or fully unbundled access) at a fixed location EUROPEAN COMMISSION Brussels, 11/09/2009 C(2009)7007 SG-Greffe (2009) D/5397 Agencija za pošto in elektronske komunikacije Republike Slovenije (APEK) Stegne 7, p.p. 418 1001 Ljubljana Slovenia For the

More information

REPUBLIC OF IRAQ COMMUNICATIONS AND MEDIA COMMISSION

REPUBLIC OF IRAQ COMMUNICATIONS AND MEDIA COMMISSION REPUBLIC OF IRAQ COMMUNICATIONS AND MEDIA COMMISSION CONSULTATION DOCUMENT MARKET REVIEWS JUNE 2016 INTRODUCTION The Communications and Media Commission should impose ex-ante regulation only on operators

More information

Partial Private Circuits Charge Control

Partial Private Circuits Charge Control Consultation document Date of publication: 24 June 2004 The deadline for comments is 30 July 2004 Contents Section Page Summary 1 1 Introduction 5 2 Rationale for charge control 11 3 Construction of baskets

More information

Principles of implementation and best practice regarding the application of Retail Minus pricing methodologies IRG (05) 39

Principles of implementation and best practice regarding the application of Retail Minus pricing methodologies IRG (05) 39 Principles of implementation and best practice regarding the application of Retail Minus pricing methodologies IRG (05) 39 IRG PUBLIC CONSULTATION DOCUMENT Principles of Implementation and Best Practice

More information

Study prepared for Nkom. Principles for margin squeeze tests for fibre access in Market 4 and 5

Study prepared for Nkom. Principles for margin squeeze tests for fibre access in Market 4 and 5 Study prepared for Nkom Principles for margin squeeze tests for fibre access in Market 4 and 5 Bad Honnef, 9 February 2015 Principles for margin squeeze tests for fibre access in Market 4 and 5 I Contents

More information

REPORT ON PRICING AND METHODOLOGY FOR CURRENT GENERATION ACCESS SERVICES (MARKET 3b)

REPORT ON PRICING AND METHODOLOGY FOR CURRENT GENERATION ACCESS SERVICES (MARKET 3b) REPORT ON PRICING AND METHODOLOGY FOR CURRENT GENERATION ACCESS SERVICES (MARKET 3b) FOR COMREG PUBLIC VERSION February 2017 1 Content CHAPTER 1. INTRODUCTION... 3 Background... 3 Objective of this report...

More information

BoR (15) 143. BEREC Report Regulatory Accounting in Practice 2015

BoR (15) 143. BEREC Report Regulatory Accounting in Practice 2015 BoR () BEREC Report Regulatory Accounting in Practice October BoR () Contents. Executive summary.... Introduction.... Background.... Current report... 7. The data collection process... 7. Outline of the

More information

BEREC Opinion on Phase II investigation pursuant to Article 7 of Directive 2002/21/EC as amended by Directive 2009/140/EC: Case NL/2017/1960

BEREC Opinion on Phase II investigation pursuant to Article 7 of Directive 2002/21/EC as amended by Directive 2009/140/EC: Case NL/2017/1960 BoR (17) 53 BEREC Opinion on Phase II investigation pursuant to Article 7 of Directive 2002/21/EC as amended by Directive 2009/140/EC: Case NL/2017/1960 Wholesale high-quality access provided at a fixed

More information

Price regulation of unbundled broadband services

Price regulation of unbundled broadband services Price regulation of unbundled broadband services ARPCE, Brazzaville 19 February 2014 Pedro Seixas, expert ITU International Telecommunication Union Agenda Outline of regulatory issues Price regulation

More information

BEREC Opinion on. Phase II investigation. pursuant to Article 7a of Directive 2002/21/EC as amended by Directive 2009/140/EC: Case DE/2014/1642

BEREC Opinion on. Phase II investigation. pursuant to Article 7a of Directive 2002/21/EC as amended by Directive 2009/140/EC: Case DE/2014/1642 BEREC Opinion on Phase II investigation pursuant to Article 7a of Directive 2002/21/EC as amended by Directive 2009/140/EC: Case DE/2014/1642 Call termination on individual public telephone networks provided

More information

7 Market power assessment

7 Market power assessment Section 7 7 Market power assessment Introduction 7.1 In the preceding sections we set out our proposed definitions of the relevant markets. In this section we present our Significant Market Power (SMP)

More information

EUROPEAN COMMISSION. Comments pursuant to Article 7(3) of Directive 2002/21/EC

EUROPEAN COMMISSION. Comments pursuant to Article 7(3) of Directive 2002/21/EC EUROPEAN COMMISSION Brussels, 18.9.2014 C(2014) 6809 final Autorité de Régulation des Communications électroniques et des Postes (ARCEP) 7, square Max Hymans F-75730 Paris-Cedex 15 France For the attention

More information

EUROPEAN COMMISSION. Comments pursuant to Article 7(3) of Directive 2002/21/EC

EUROPEAN COMMISSION. Comments pursuant to Article 7(3) of Directive 2002/21/EC EUROPEAN COMMISSION Brussels, 14/12/2012 C(2012) 9778 Γραφείο Επιτρόπου Ρυθµίσεως Ηλεκτρονικών Επικοινωνιών Και Ταχυδροµείων (OCECPR) Helioupoleos 12 1101 Λευκωσία Cyprus For the attention of: Dr Polis

More information

Pricing evolution. Submission to nbn s consultation paper by Vodafone Hutchison Australia

Pricing evolution. Submission to nbn s consultation paper by Vodafone Hutchison Australia Pricing evolution Submission to nbn s consultation paper by Vodafone Hutchison Australia June 2017 Vodafone Hutchison Australia (VHA) welcomes the opportunity to provide input into nbn s access pricing

More information

Contents. Bitstream access: comments on the draft determination PUBLIC. Report for TelstraClear, 19 May Network Strategies Report Number 25013

Contents. Bitstream access: comments on the draft determination PUBLIC. Report for TelstraClear, 19 May Network Strategies Report Number 25013 Bitstream access: comments on the draft determination Report for TelstraClear, 19 May 2005 Network Strategies Report Number 25013 Contents 1 Introduction 1 2 Differential business and residential pricing

More information

Part I PRELIMINARY. Part II MARKET DEFINITION ASSESSING SIGNIFICANT MARKET POWER. Part IV IMPOSITION OF OBLIGATIONS UNDER THE REGULATORY FRAMEWORK

Part I PRELIMINARY. Part II MARKET DEFINITION ASSESSING SIGNIFICANT MARKET POWER. Part IV IMPOSITION OF OBLIGATIONS UNDER THE REGULATORY FRAMEWORK 201[ ] ELECTRONIC COMMUNICATIONS (GUIDELINES ON MARKET ANALYSIS AND THE ASSESSMENT OF SIGNIFICANT MARKET POWER FOR NETWORKS AND SERVICES) (ARRANGEMENT OF GUIDELINES) Table of Contents 1. [Short Title]

More information

Telecommunications Authority of Trinidad and Tobago

Telecommunications Authority of Trinidad and Tobago Telecommunications Authority of Trinidad and Tobago Determination of Market Definitions in the Retail Domestic Fixed Voice Sector of T&T April 14 th 2009 PREFACE This document is divided into five main

More information

EUROPEAN COMMISSION. Commission Decision concerning Case DK/2014/1665: Review of the LRAIC model on the fixed markets in Denmark for the year 2015

EUROPEAN COMMISSION. Commission Decision concerning Case DK/2014/1665: Review of the LRAIC model on the fixed markets in Denmark for the year 2015 EUROPEAN COMMISSION Brussels, 24.11.2014 C(2014) 9090 final Danish Business Authority (DBA) Dahlerups Pakhus Langelinie Allé 17 DK-2100 Copenhagen Denmark For the attention of: Ms. Betina Hagerup Director

More information

The Price of Copper and the Transition to Fibre

The Price of Copper and the Transition to Fibre The Price of Copper and the Transition to Fibre Workshop n 1 : Wholesale charges: setting methodologies for fixed TERA Consultants 32, rue des Jeûneurs 75002 PARIS Tél. + 33 (0) 1 55 04 87 10 Fax. +33

More information

Response to the consultation on the Draft review of the BEREC Common Position on geographical aspects of market analysis (definition and remedies).

Response to the consultation on the Draft review of the BEREC Common Position on geographical aspects of market analysis (definition and remedies). Response to the consultation on the Draft review of the BEREC Common Position on geographical aspects of market analysis (definition and remedies). 7 February 2014 FTTH Council Europe ASBL Rue des Colonies

More information

The opinions expressed in this presentation are the personal views of the author and do not prejudge decisions of the RRT

The opinions expressed in this presentation are the personal views of the author and do not prejudge decisions of the RRT Functional and Structural Separation Models TAIEX Workshop on regulatory framework and further development of electronic communications Belgrade, 8, 9 April 2010 Lina Rainiene, Communications Regulatory

More information

Main conclusions of the broadband and superfast broadband market analyses

Main conclusions of the broadband and superfast broadband market analyses Main conclusions of the broadband and superfast broadband market analyses 1 Market analysis: background In mid-2016, Arcep began the process of reviewing its analyses of fixed broadband and superfast broadband

More information

AUSTRIA INTRODUCTION REGULATORY ENVIRONMENT. Main regulatory developments

AUSTRIA INTRODUCTION REGULATORY ENVIRONMENT. Main regulatory developments AUSTRIA Note: This document is an excerpt from the Staff Working Document attached to the Communication 'Towards a Single European Telecoms Market 13 th Progress Report (COM (2008(153)). The Communication

More information

Draft Call Termination Regulations Explanatory Note. 05 September 2014

Draft Call Termination Regulations Explanatory Note. 05 September 2014 Draft Call Termination Regulations 2014 Explanatory Note 05 September 2014 Page 1 of 27 Contents 1. Introduction... 4 2. An outline of the process followed... 5 Operator Access to the Top-Down and Bottom-Up

More information

Regulation of Broadband access and development of NGA networks in Slovenia

Regulation of Broadband access and development of NGA networks in Slovenia Regulation of Broadband access and development of NGA networks in Slovenia Nataša Vidmar Kraljević, AKOS September 2017, Budva Market development overview Market development Retail market shares by broadband

More information

BoR (14) 73. BEREC Common Position on geographical aspects of market analysis (definition and remedies)

BoR (14) 73. BEREC Common Position on geographical aspects of market analysis (definition and remedies) BEREC Common Position on geographical aspects of market analysis (definition and remedies) 5 June 2014 Contents Executive summary... 3 I. Introduction... 6 II. Basic principles... 7 III. Main cases since

More information

VIRTUAL UNBUNDLED ACCESS TO FIBRE-TO-THE-HOME: Implementing the VULA Remedy

VIRTUAL UNBUNDLED ACCESS TO FIBRE-TO-THE-HOME: Implementing the VULA Remedy VIRTUAL UNBUNDLED ACCESS TO FIBRE-TO-THE-HOME: Implementing the VULA Remedy Published: 15 April 2015 Internal Reference: MCA/C/15-2241 Malta Communications Authority Valletta Waterfront, Pinto Wharf, Floriana,

More information

Mark Naftel Norton Rose

Mark Naftel Norton Rose The International Telecommunication Union Regulatory Implications of Broadband Workshop Market Implications of Technologically Neutral Regulation Mark Naftel naftelm@nortonrose.com Dial up access Flat

More information

POLICY GUIDELINES ON TARIFFS FOR TELECOMMUNICATIONS SERVICES

POLICY GUIDELINES ON TARIFFS FOR TELECOMMUNICATIONS SERVICES SOUTHERN AFRICAN TRANSPORT AND COMMUNICATIONS (SATCC) POLICY GUIDELINES ON TARIFFS FOR TELECOMMUNICATIONS SERVICES (INITIATED BY TRASA AND APPROVED BY THE SATCC COMMITTEE OF MINISTERS) BLANTRYE, NOVEMBER

More information

Routing calls to ported telephone numbers Statement. ( Redacted for publication)

Routing calls to ported telephone numbers Statement. ( Redacted for publication) Routing calls to ported telephone numbers Statement ( Redacted for publication) Statement Publication date: 1 April 2010 Contents Section Annex Page 1 Summary 1 2 Introduction and background 4 3 Ofcom

More information

Official Journal of the European Union. (Non-legislative acts) REGULATIONS

Official Journal of the European Union. (Non-legislative acts) REGULATIONS 17.3.2017 L 72/1 II (Non-legislative acts) REGULATIONS COMMISSION REGULATION (EU) 2017/459 of 16 March 2017 establishing a network code on capacity allocation mechanisms in gas transmission systems and

More information

Commission decision concerning Case EL/2010/1130: wholesale broadband access - further details of price control remedy

Commission decision concerning Case EL/2010/1130: wholesale broadband access - further details of price control remedy EUROPEAN COMMISSION Brussels, 14/10/2010 C(2010)7224 SG-Greffe (2010) D/16116 EΘΝΙΚΗ ΕΠΙΤΡΟΠΗ ΤΗΛΕΠΙΚΟΙΝΩΝΙΩΝ ΚΑΙ ΤΑΧΥ ΡΟΜΕΙΩΝ (EETT) Λ. Κηφισίας 60 GR-151 25 Μαρούσι Greece For the attention of: Mr. Dr.

More information

What makes unilateral conduct abusive? An economic perspective

What makes unilateral conduct abusive? An economic perspective What makes unilateral conduct abusive? An economic perspective 11 th Annual Conference of the GCLC, Brussels, 26 and 27 November 2015 Andrea Lofaro 23 November, 2015 Overview Effects based vs form based

More information

BBC response to Ofcom s consultation: Broadcast Transmission Services: a review of the market

BBC response to Ofcom s consultation: Broadcast Transmission Services: a review of the market BBC response to Ofcom s consultation: Broadcast Transmission Services: a review of the market 9 June 2016 Overview 1. The BBC welcomes the opportunity to respond to Ofcom s consultation Broadcast Transmission

More information

BT Response to Ofcom VULA Margin Consultation ANNEX D MARGIN SQUEEZE TEST IMPLEMENTATION BY OTHER NRAS IN THE EU

BT Response to Ofcom VULA Margin Consultation ANNEX D MARGIN SQUEEZE TEST IMPLEMENTATION BY OTHER NRAS IN THE EU BT Response to Ofcom VULA Margin Consultation ANNEX D MARGIN SQUEEZE TEST IMPLEMENTATION BY OTHER NRAS IN THE EU Introduction and summary 1.1. In this Annex, we review the implementation (or proposed implementation)

More information

The business case for sub-loop unbundling in the Netherlands

The business case for sub-loop unbundling in the Netherlands Final Report for OPTA (public version) The business case for sub-loop unbundling in the Netherlands 26 January 2007 Our ref: 264-483 Analysys Consulting Limited St Giles Court, 24 Castle Street Cambridge,

More information

RESPONSE THE TELECOMMUNICATIONS REGULATORY AUTHORITY OF BAHRAIN (TRA)

RESPONSE THE TELECOMMUNICATIONS REGULATORY AUTHORITY OF BAHRAIN (TRA) RESPONSE TO THE TELECOMMUNICATIONS REGULATORY AUTHORITY OF BAHRAIN (TRA) MARKET AND COMPETITION REVIEW OF THE RETAIL MARKETS FOR ACCESS TO CALL SERVICES INCLUDING DOMESTIC CALLS FROM A FIXED LOCATION DRAFT

More information

Local loop unbundling: setting the fully unbundled rental charge ceiling and minor amendment to SMP conditions FA6 and FB6

Local loop unbundling: setting the fully unbundled rental charge ceiling and minor amendment to SMP conditions FA6 and FB6 Local loop unbundling: setting the fully unbundled rental charge ceiling and minor amendment to SMP conditions FA6 and FB6 Consultation document Publication date: 7 September 2005 Closing Date for Responses:

More information

ERG (09) 21. ERG Report on price consistency in upstream broadband markets

ERG (09) 21. ERG Report on price consistency in upstream broadband markets ERG Report on price consistency in upstream broadband markets June 2009 Contents Executive Summary... 2 1 Introduction... 4 2 Value chain in broadband services and corresponding price regulation across

More information

Comments on ERG Bitstream Access Consultation document

Comments on ERG Bitstream Access Consultation document Comments on ERG Bitstream Access Consultation document This paper provides the European Competitive Telecommunications Association, ECTA, comment on the ERG consultation document. ECTA represents over

More information

Adam Mantzos Brockley Consulting. Review of cost attribution and cost allocation approaches. A report for Network Rail

Adam Mantzos Brockley Consulting. Review of cost attribution and cost allocation approaches. A report for Network Rail Adam Mantzos Brockley Consulting Review of cost attribution and cost allocation approaches A report for Network Rail 18 March 2015 Contents Summary... 3 Introduction... 8 Cost allocation principles...

More information

BEREC Opinion on. Phase II investigation. pursuant to Article 7 of Directive 2002/21/EC as amended by Directive 2009/140/EC: Case NL/2015/1727

BEREC Opinion on. Phase II investigation. pursuant to Article 7 of Directive 2002/21/EC as amended by Directive 2009/140/EC: Case NL/2015/1727 BoR (15) 85 BEREC Opinion on Phase II investigation pursuant to Article 7 of Directive 2002/21/EC as amended by Directive 2009/140/EC: Case NL/2015/1727 Wholesale local access provided at a fixed location

More information

Initial Modification Report No.39. Transfer of Exit Capacity between Northern Ireland Exit Points to permit Secondary Trading of Exit Capacity

Initial Modification Report No.39. Transfer of Exit Capacity between Northern Ireland Exit Points to permit Secondary Trading of Exit Capacity Initial Modification Report No.39 Transfer of Exit Capacity between Northern Ireland Exit Points to permit Secondary Trading of Exit Capacity 30 th September 2016 Please find below Initial Modification

More information

Case AT/2009/0970: Wholesale broadband access in Austria. Opening of Phase II investigation pursuant to Article 7(4) of Directive 2002/21/EC 1

Case AT/2009/0970: Wholesale broadband access in Austria. Opening of Phase II investigation pursuant to Article 7(4) of Directive 2002/21/EC 1 EUROPEAN COMMISSION Brussels, 5/10/2009 C(2009)7720 SG-Greffe (2009) D/6009 Rundfunk und Telekom Regulierungs-GmbH (RTR) Mariahilferstraße 77-79 A-1060 Wien Austria For the attention of: Mr Georg Serentschy

More information

Telecom Order CRTC

Telecom Order CRTC Telecom Order CRTC 2016-394 PDF version Ottawa, 4 October 2016 File number: Tariff Notice 949 Northwestel Inc. Introduction of competitive local exchange carrier digital network access service The Commission

More information

COMMISSION OF THE EUROPEAN COMMUNITIES COMMISSION STAFF WORKING DOCUMENT. accompanying the COMMISSION RECOMMENDATION

COMMISSION OF THE EUROPEAN COMMUNITIES COMMISSION STAFF WORKING DOCUMENT. accompanying the COMMISSION RECOMMENDATION EN EN EN COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, 7.5.2009 SEC(2009) 600 COMMISSION STAFF WORKING DOCUMENT accompanying the COMMISSION RECOMMENDATION on the Regulatory Treatment of Fixed and Mobile

More information

New Zealand Telecommunications Forum. Disconnection Code

New Zealand Telecommunications Forum. Disconnection Code New Zealand Telecommunications Forum Disconnection Code DOCUMENT VERSION: Number and Status: FINAL Date: September 2013 Prepared by: TCF Disconnection Code Working party Code classification Voluntary 2013

More information

experience Principal, International Ofcom April 2008

experience Principal, International Ofcom April 2008 Functional separation: the UK experience Tom Kiedrowski Tom Kiedrowski Principal, International Ofcom April 2008 Agenda Section 1 Background and context Section 2 Approach and rationale Section 3 Taking

More information

BEREC Opinion on. Phase II investigation. pursuant to Article 7a of Directive 2002/21/EC as amended by Directive 2009/140/EC: Case DE/2014/1605

BEREC Opinion on. Phase II investigation. pursuant to Article 7a of Directive 2002/21/EC as amended by Directive 2009/140/EC: Case DE/2014/1605 BEREC Opinion on Phase II investigation pursuant to Article 7a of Directive 2002/21/EC as amended by Directive 2009/140/EC: Case DE/2014/1605 Wholesale voice call termination on individual mobile networks

More information

Position Paper. Cable Europe position paper on the Telecoms Review. Executive Summary. Policy objectives

Position Paper. Cable Europe position paper on the Telecoms Review. Executive Summary. Policy objectives 4 April 2016 Position Paper Cable Europe position paper on the Telecoms Review Executive Summary This Position Paper outlines Cable Europe s response to the Commission s consultation on the revision of

More information

May BT Group response to HMG Review of Business Broadband

May BT Group response to HMG Review of Business Broadband BT Group response to HMG Review of Business Broadband May 2016 1 BT RESPONSE TO HMG REVIEW OF BUSINESS BROADBAND CALL FOR EVIDENCE Introduction: BT welcomes the call for evidence on business broadband.

More information

REGULATION OF GOVERNMENT OF THE REPUBLIC OF INDONESIA NO. 36/2004 ON OIL AND GAS DOWNSTREAM BUSINESS

REGULATION OF GOVERNMENT OF THE REPUBLIC OF INDONESIA NO. 36/2004 ON OIL AND GAS DOWNSTREAM BUSINESS REGULATION OF GOVERNMENT OF THE REPUBLIC OF INDONESIA NO. 36/2004 ON OIL AND GAS DOWNSTREAM BUSINESS PRESIDENT OF THE REPUBLIC OF INDONESIA, Considering: that, to enforce the provisions of Articles 8 paragraph

More information

Review of the fixed narrowband services wholesale markets Statement on the markets, market power determinations and remedies including further

Review of the fixed narrowband services wholesale markets Statement on the markets, market power determinations and remedies including further Review of the fixed narrowband services wholesale markets Statement on the markets, market power determinations and remedies including further consultation Statement and consultation Publication date:

More information

COMMISSION OF THE EUROPEAN COMMUNITIES. Draft COMMISSION STAFF WORKING DOCUMENT EXPLANATORY NOTE. Accompanying document to the

COMMISSION OF THE EUROPEAN COMMUNITIES. Draft COMMISSION STAFF WORKING DOCUMENT EXPLANATORY NOTE. Accompanying document to the EN EN EN COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, (2008) Draft COMMISSION STAFF WORKING DOCUMENT EXPLANATORY NOTE Accompanying document to the COMMISSION RECOMMENDATION of [ ] on regulated access

More information

Energy Supply Costs Information Paper

Energy Supply Costs Information Paper An Coimisiún um Rialáil Fóntas Commission for Regulation of Utilities Energy Supply Costs Information Paper 0 Information Paper Reference: CRU17291 Date Published: 11 th October 2017 www.cru.ie Public/

More information

EUROPEAN COMMISSION. Comments pursuant to Article 7(3) of Directive 2002/21/EC

EUROPEAN COMMISSION. Comments pursuant to Article 7(3) of Directive 2002/21/EC EUROPEAN COMMISSION Brussels, 26.11.2012 C(2012) 8828 Comisión del Mercado de las Telecomunicaciones (CMT) Carrer de la Marina 16-18 E-08005 Barcelona Spain For the attention of: Mr. Bernardo Lorenzo Presidente

More information

The BEREC Opinion on the draft. methodologies. Dr Iris Henseler-Unger, Vice President BNetzA 8th EETT International Conference Athens, 16/17 May 2013

The BEREC Opinion on the draft. methodologies. Dr Iris Henseler-Unger, Vice President BNetzA 8th EETT International Conference Athens, 16/17 May 2013 The BEREC Opinion on the draft Recommendation on consistent nondiscrimination obligations and costing methodologies Dr Iris Henseler-Unger, Vice President BNetzA 8th EETT International Conference Athens,

More information

The Committee of Ministers, under the terms of Article 15.b of the Statute of the Council of Europe,

The Committee of Ministers, under the terms of Article 15.b of the Statute of the Council of Europe, Recommendation CM/Rec(2015)5 of the Committee of Ministers to member States on the processing of personal data in the context of employment (Adopted by the Committee of Ministers on 1 April 2015, at the

More information

Role of the Public Electricity Supplier and the Supplier of Last Resort in the De-regulated Electricity Market

Role of the Public Electricity Supplier and the Supplier of Last Resort in the De-regulated Electricity Market Role of the Public Electricity Supplier and the Supplier of Last Resort in the De-regulated Electricity Market DOCUMENT Consultation Paper TYPE: REFERENCE: CER 11/039 DATE PUBLISHED: CLOSING DATE: RESPONSES

More information

BT s response to Ofcom consultation document. Price Rises in Fixed Term Contracts

BT s response to Ofcom consultation document. Price Rises in Fixed Term Contracts BT s response to Ofcom consultation document Price Rises in Fixed Term Contracts 14 March 2013 1 Executive Summary We welcome the opportunity to comment on this consultation on Price Rises in Fixed Term

More information

RECORD KEEPING RULES ON INITIAL REPORTS RELATING TO ACCOUNTING SEPARATION

RECORD KEEPING RULES ON INITIAL REPORTS RELATING TO ACCOUNTING SEPARATION RECORD KEEPING RULES ON INITIAL REPORTS RELATING TO ACCOUNTING SEPARATION OVERVIEW Accounting Separation of Telstra Record Keeping Rules On 24 September 2002 the Minister for Communications, Information

More information

REPORT ON ERG BEST PRACTICES ON REGULATORY REGIMES IN WHOLESALE UNBUNDLED ACCESS AND BITSTREAM ACCESS

REPORT ON ERG BEST PRACTICES ON REGULATORY REGIMES IN WHOLESALE UNBUNDLED ACCESS AND BITSTREAM ACCESS REPORT ON ERG BEST PRACTICES ON REGULATORY REGIMES IN WHOLESALE UNBUNDLED AND BITSTREAM The ERG, with the valuable contribution by stakeholders within the consultation process, identified Local loop unbundling

More information

Broadband Development

Broadband Development Broadband Development 5 November 2014 Alexandre Verheyden Jones Day 1 Key points for discussion The Commission Recommendation of 11 September 2013 on consistent non-discrimination obligations and costing

More information

Procurement by Utilities

Procurement by Utilities Brief 16 Public Procurement September 2016 Procurement by Utilities CONTENTS Utilities procurement in context When does the Utilities Directive apply? Which entities are subject to the application of the

More information

LOCAL LOOP UNBUNDLING

LOCAL LOOP UNBUNDLING LOCAL LOOP UNBUNDLING A REPORT FOR CLEAR JULY 2000 No part of this document may be used or reproduced without permission. TABLE OF CONTENTS Executive Summary ii 1. Introduction 1 2. The interim findings

More information

CHAPTER ELEVEN TELECOMMUNICATIONS

CHAPTER ELEVEN TELECOMMUNICATIONS CHAPTER ELEVEN TELECOMMUNICATIONS ARTICLE 11.1: SCOPE AND COVERAGE 1. This Chapter shall apply to: measures related to access to and use of public telecommunications transport networks and services; measures

More information

BEREC Opinion. Phase II investigation pursuant to Article 7a of Directive 2002/21/EC as amended by Directive 2009/140/EC:

BEREC Opinion. Phase II investigation pursuant to Article 7a of Directive 2002/21/EC as amended by Directive 2009/140/EC: BEREC Opinion Phase II investigation pursuant to Article 7a of Directive 2002/21/EC as amended by Directive 2009/140/EC: Case PL/2011/1260: Revision of dispute settlement decisions concerning voice call

More information

ITU-D Workshop for the Arab region on Interconnection and Next Generation Networks: Addressing the regulatory challenges Manama, Kingdom of Bahrain

ITU-D Workshop for the Arab region on Interconnection and Next Generation Networks: Addressing the regulatory challenges Manama, Kingdom of Bahrain ITU-D Workshop for the Arab region on Interconnection and Next Generation Networks: Addressing the regulatory challenges Manama, Kingdom of Bahrain Interconnection Charges: Bill & Keep, Peering, Transit

More information

EUROPEAN COMMISSION. Dear Mr Michaelides,

EUROPEAN COMMISSION. Dear Mr Michaelides, EUROPEAN COMMISSION Brussels, 16.12.2014 C(2014) 10121 final Γραφείο Επιτρόπου Ρυθμίσεως Ηλεκτρονικών Επικοινωνιών Και Ταχυδρομείων (OCECPR) Helioupoleos 12 1101 Λευκωσία Cyprus For the attention of: Mr.

More information

Comments pursuant to Article 7(3) of Directive 2002/21/EC 1

Comments pursuant to Article 7(3) of Directive 2002/21/EC 1 EUROPEAN COMMISSION Brussels, 26/03/2008 SG-Greffe (2008) D/201384 Rundfunk und Telekom Regulierungs- GmbH (RTR) Mariahilferstraße 77-79 A-1060 Wien Austria For the attention of: Mr. Georg Serentschy Mr.

More information

Local Loop Unbundling for Cable & Wireless Jamaica

Local Loop Unbundling for Cable & Wireless Jamaica Local Loop Unbundling for Cable & Wireless Jamaica Consultative Document Contents ABSTRACT. 3 Pages COMMENTS FROM INTERESTED PARTIES... 4 CHAPTER 1: REGULATORY FRAMEWORK... 6 CHAPTER 2: POLICY OBJECTIVES

More information

Telecom Decision CRTC

Telecom Decision CRTC Telecom Decision CRTC 2017-299 PDF version Ottawa, 24 August 2017 File number: 8640-N1-201609893 Northwestel Inc. Request for forbearance from the regulation of operation and maintenance services provided

More information

Controlling Abusive Behaviour in the Roll out of Broadband Services

Controlling Abusive Behaviour in the Roll out of Broadband Services Controlling Abusive Behaviour in the Roll out of Broadband Services 0 CONTROLLING ABUSIVE BEHAVIOUR IN THE ROLL OUT OF BROADBAND SERVICES Introduction Access by electronic communications operators to local

More information

COMMUNICATIONS OUTLOOK 1999

COMMUNICATIONS OUTLOOK 1999 OCDE OECD ORGANISATION DE COOPÉRATION ET ORGANISATION FOR ECONOMIC DE DÉVELOPPEMENT ÉCONOMIQUES CO-OPERATION AND DEVELOPMENT COMMUNICATIONS OUTLOOK 1999 TELECOMMUNICATIONS: Regulatory Issues Country: Sweden

More information

Public consultation on the methodology for cost modeling

Public consultation on the methodology for cost modeling Public consultation on the methodology for cost modeling Contents 1. Introduction... 1 1.1. Status of the paper...3 1.2. Comment on consultation document...4 1.3. Structure of the document...5 2. The use

More information

ERGEG Guidelines for Good Practice on Open Season Procedures (GGPOS) Ref: C06-GWG-29-05c 21 May 2007

ERGEG Guidelines for Good Practice on Open Season Procedures (GGPOS) Ref: C06-GWG-29-05c 21 May 2007 ERGEG Guidelines for Good Practice on Open Season Procedures (GGPOS) Ref: C06-GWG-29-05c 21 May 2007 European Regulators Group for Electricity and Gas Contact: Council of European Energy Regulators ASBL

More information

Consultation paper on issues relating to Chorus proposed changes to the UBA service

Consultation paper on issues relating to Chorus proposed changes to the UBA service Consultation paper on issues relating to Chorus proposed changes to the UBA service Submission Commerce Commission 18 September 2014 Contents Executive Summary... 1 Introduction... 3 Our views on the opinion...

More information

International Conference: Regulating the Electronic Communications Market, 26 September 27 September 2016, Budva, Montenegro

International Conference: Regulating the Electronic Communications Market, 26 September 27 September 2016, Budva, Montenegro International Conference: Regulating the Electronic Communications Market, 26 September 27 September 2016, Budva, Montenegro Communications Regulation Commission Redefined Recommendation 2014/710/EU Relevant

More information

Introducing Carrier Selection & Carrier Pre- Selection in Malta

Introducing Carrier Selection & Carrier Pre- Selection in Malta Introducing Carrier Selection & Carrier Pre- Selection in Malta Report on Consultation and Decision May 2004 Malta Communications Authority "Il-Pjazzetta", Suite 43/44, Tower Road, Sliema SLM 16, Malta,

More information

EUROPEAN COMMISSION. The Right Hon Jack STRAW MP Secretary of State for Foreign and Commonwealth Affairs Downing Street London SW1A 2AL United Kingdom

EUROPEAN COMMISSION. The Right Hon Jack STRAW MP Secretary of State for Foreign and Commonwealth Affairs Downing Street London SW1A 2AL United Kingdom EUROPEAN COMMISSION Brussels, 05.X.2005 C(2005)3660 final Subject: State aid N 267/2005 United Kingdom Rural Broadband Access Project Sir, I. PROCEDURE 1. By letter registered on 31 May 2005, pursuant

More information

Porting charges under General Condition 18 Consultation document Redacted for publication

Porting charges under General Condition 18 Consultation document Redacted for publication Porting charges under General Condition 18 Consultation document Redacted for publication Redactions are indicated by [ ] Consultation Publication date: 24 March 2014 Closing Date for Responses: 12 May

More information

Replicability of bundles from the perspective of the availability of wholesale inputs and access to content Convergence PT

Replicability of bundles from the perspective of the availability of wholesale inputs and access to content Convergence PT Replicability of bundles from the perspective of the availability of wholesale inputs and access to content Convergence PT Table of Contents List of Figures... ii List of Tables... ii A. Organisation of

More information

Comments on the ERG Consultation Document on Bitstream Access

Comments on the ERG Consultation Document on Bitstream Access Comments on the ERG Consultation Document on Bitstream Access DT welcomes the opportunity to comment on the questions raised by the ERG to discuss the regulatory approach put forward in the Consultation

More information

FTTH Council Europe Conference Munich, 16 February Intervention by Luigi Gambardella, ETNO Executive Board Chair

FTTH Council Europe Conference Munich, 16 February Intervention by Luigi Gambardella, ETNO Executive Board Chair FTTH Council Europe Conference Munich, 16 February Intervention by Luigi Gambardella, ETNO Executive Board Chair First of all I would like to congratulate the FTTH Council Europe for this very successful

More information

Oklahoma Universal Service Fund (OUSF) Fiscal Year 2017/2018 Remittance Worksheet Instructions

Oklahoma Universal Service Fund (OUSF) Fiscal Year 2017/2018 Remittance Worksheet Instructions I. Filing Requirements and General Instructions A. Introduction The Oklahoma Telecommunications Act of 1997 (House Bill 1815), signed into law on June 13, 1997, established the Oklahoma Universal Service

More information

Clarifying how mobile numbers can be used by Communications Providers. Proposed modification to the National Telephone Numbering Plan

Clarifying how mobile numbers can be used by Communications Providers. Proposed modification to the National Telephone Numbering Plan Clarifying how mobile numbers can be used by Communications Providers Proposed modification to the National Telephone Numbering Plan CONSULTATION: Publication Date: 9 November 2017 Closing Date for Responses:

More information

Improving the way we price our network services. Consultation paper

Improving the way we price our network services. Consultation paper Improving the way we price our network services Consultation paper October 2015 Table of Contents 1 Overview... 4 2 Background... 6 3 Purpose... 7 4 Network tariff strategy... 7 4.1 Network tariff reform

More information

EU Telecoms Sector: Regulatory Developments, Threats and. Opportunities

EU Telecoms Sector: Regulatory Developments, Threats and. Opportunities EU Telecoms Sector: Regulatory Developments, Threats and Opportunities Institute of International and European Affairs Dublin, 11 November 2013 Intervention by Mr Luigi Gambardella Chairman of the Executive

More information

Time to re-consider? Functional Separation in UK telecoms markets

Time to re-consider? Functional Separation in UK telecoms markets Functional Separation in UK telecoms markets Time to re-consider? 1 Pioneered in the UK, functional separation is proving an increasingly fashionable means of tackling competition problems in the telecoms

More information

DISCUSSION PAPER ON ACCESS TO SERVICE FACILITIES AND RAIL RELATED SERVICES

DISCUSSION PAPER ON ACCESS TO SERVICE FACILITIES AND RAIL RELATED SERVICES DISCUSSION PAPER ON ACCESS TO SERVICE FACILITIES AND RAIL RELATED SERVICES Disclaimer: This discussion paper does not prejudge the existing or future positions of the European Commission and its services

More information

14186/17 CB/OTS/ek 1 DGE 2B

14186/17 CB/OTS/ek 1 DGE 2B Council of the European Union Brussels, 9 November 2017 (OR. en) Interinstitutional File: 2016/0288 (COD) 14186/17 NOTE From: To: Presidency Delegations TELECOM 279 COMPET 743 MI 803 CONSOM 345 CODEC 1780

More information

Margin Squeeze Testing in an ex ante Regulatory Environment

Margin Squeeze Testing in an ex ante Regulatory Environment Margin Squeeze Testing in an ex ante Regulatory Environment Prepared for BBNed, Online and Tele2 23 rd March 2011 Strategy and Policy Consultants Network Ltd Chapel House Booton Norwich NR10 4PE United

More information

OFTA. Report on the Effectiveness of Competition in Hong Kong's Telecommunications Market: An International Comparison. June 2003

OFTA. Report on the Effectiveness of Competition in Hong Kong's Telecommunications Market: An International Comparison. June 2003 OFTA Report on the Effectiveness of Competition in Hong Kong's Telecommunications Market: An International Comparison June 2003 Spectrum Strategy Consultants 2003 Contents Preface 1 1 Introduction 2 1.1

More information

Market Monitoring and Market Design

Market Monitoring and Market Design Market Monitoring and Market Design Dan L. Jones Vice President Director, ERCOT IMM Potomac Economics Harvard Electricity Policy Group Dallas, Texas November 30, 2006 Introduction Competitive markets are

More information

DISCUSSION PAPER ON ACCESS TO SERVICE FACILITIES AND RAIL RELATED SERVICES. Article 1. Subject matter

DISCUSSION PAPER ON ACCESS TO SERVICE FACILITIES AND RAIL RELATED SERVICES. Article 1. Subject matter DISCUSSION PAPER ON ACCESS TO SERVICE FACILITIES AND RAIL RELATED SERVICES Disclaimer: This discussion paper does not prejudge the existing or future positions of the European Commission and its services

More information

Preventing discrimination

Preventing discrimination Preventing discrimination Vodafone Group plc April 2017 Executive summary An effective non-discrimination regime is essential to meet the Commission s objective of a European Gigabit Society In September

More information

QUESTIONS AND ANSWERS

QUESTIONS AND ANSWERS QUESTIONS AND ANSWERS REGARDING Invitation to tender MOVE/A3/2013-119 (Contract notice 2013/S 122-208384) concerning "Framework Contract regarding Impact Assessments and Evaluations (ex-ante, intermediate

More information

Public Consultation on a Draft Common Position on Next Generation Networks Future Charging Mechanisms / Long Term Termination Issues

Public Consultation on a Draft Common Position on Next Generation Networks Future Charging Mechanisms / Long Term Termination Issues Public Consultation on a Draft Common Position on Next Generation Networks Future Charging Mechanisms / Long Term Termination Issues Wind Telecomunicazioni comments Question 1 (Section 1): Do you agree

More information