MULTIPLE FACILITY LOCATION ANALYSIS PROBLEM WITH WEIGHTED EUCLIDEAN DISTANCE. Dileep R. Sule and Anuj A. Davalbhakta Louisiana Tech University

Size: px
Start display at page:

Download "MULTIPLE FACILITY LOCATION ANALYSIS PROBLEM WITH WEIGHTED EUCLIDEAN DISTANCE. Dileep R. Sule and Anuj A. Davalbhakta Louisiana Tech University"

Transcription

1 MULTIPLE FACILITY LOCATION ANALYSIS PROBLEM WITH WEIGHTED EUCLIDEAN DISTANCE Dleep R. Sule and Anuj A. Davalbhakta Lousana Tech Unversty ABSTRACT Ths paper presents a new graphcal technque for cluster formaton n multple facltes locaton analyss problem wth weghted Eucldean dstance norm. There are two facets of the problem; locaton of facltes and allocaton of customers. The objectve s to mnmze the maxmum weghted dstance traveled wthn clusters. Known parameters are Cartesan coordnates of customer locatons, ther demand weghts, and a number of facltes to be placed. The new procedure ensures the optmum soluton. INTRODUCTION Multple facltes locaton analyss begns wth formaton of clusters of customers so that servces can be rendered effcently and cost effectvely from faclty to all customers n that set of customers. In ths paper, we present new graphcal technque developed to form the clusters of customers. Locaton of each faclty can then be determned usng Vector Method (Davalbhakta and Sule, 2003) developed earler. Multple facltes locaton analyss s a long-standng topc of research and lterature search n ths area results n several methods and heurstcs to solve dfferent types of the problem. Brmberg et al. (2000) have presented extensve emprcal study of mprovements and comparsons of varous old and recent heurstcs and algorthms, whch nclude alternatve locaton-allocaton, projecton, Tabu search, p-medan, genetc search and varous versons of varable neghborhood search. Ths paper underlnes the fact that the problem has been studed for long tme and yet contnues to attract the attenton of researchers because of ts ubqutous nature. The problem consdered n ths paper s to determne the locatons of n facltes and to allocate the customers to them so that demands of all the customers are fulflled through the mnmum possble travel. Same problem has been addressed by Cooper (1961) where he has presented a heurstc for as many as 10 customer locatons. For more customer locatons, however, he has solved the mathematcal equatons to come up wth exact solutons. Sule (2000) n hs book on logstcs of facltes locaton and allocaton has also addressed the same problem and author has specfed analytcal method to solve the problem. However, qute often the problem consdered the travel between the new facltes n addton to that of between customers and facltes. Several examples of ths type are also found durng the bblographcal search (Love, Wesolowsky and Kraemer 1973), (Elznga, Hearn, Randolph 1976), (Charalambous 1981) (Brandy, Rosenthal and Young 1983). Mathematcally, the equatons n ths case also consder the demand weghts of facltes and Eucldean dstance between them n addton to the parameters presented n equaton (1) later n ths paper. Other dfferent aspects of ths problem have also been studed such as mnmum coverng ellpse problem where a mnmum certan dstance has to be mantaned

2 between two facltes. Douglas and Papayanopoulos (1991) have employed nteractve graphcal method whch produces near-optmal solutons. A decson analyss approach adopted by Current, Ratck, ReVelle (1998) demonstrates analyss of varous decson makng parameters that affect the total number of facltes to be placed n dynamc faclty locaton analyss. We have however, coned our research to the statc faclty locaton and have consdered that the demands of customers n a cluster can be fulflled by the faclty located n respectve cluster. Durng our research, we also compared our method wth the work done by Levn and Ben-Israel (2002), who have surveyed and compared varous technques avalable to determne the facltes locaton and then assgnng the customers to the facltes. Remanng layout of ths paper ncludes the problem statement and mathematcal formulaton followed by the llustratve example along wth summary and concluson. PROBLEM STATEMENT Consder m facltes are to be placed wthn n customers. Locaton of each customer s expressed as ( X a, Ya ),( X b, Yb ) K( X n, Yn ). Customers are assgned weghts based on ther demands. Let W be the demand weght of customer (where = a, b, c n) In case of weghted mnmax faclty locaton analyss problem, total cost s the functon of demand weghts of customers and dstances traveled between customer locatons and the faclty. It s expressed as: 2 2 Mn W [( X X ) + ( Y Y ) (1) Where X Y = X CoOrdnateOfNewFaclty = Y CoOrdnateOfNewFaclty METHOD Ths new graphcal method of cluster formaton begns wth plottng all the customer locatons on graph followed by connectng all the customer locatons on the perphery n such a way that all the customer locatons le ether on the boundary or wthn t. The permeter of thus formed fgure s calculated and s then dvded nto as many fractons as the number of facltes to be placed (m), startng from the customer locaton closest to the orgn (0,0) of the Cartesan coordnate system. Customer locatons at the fractons are then treated as the orgn for the clusters. It s lkely not to have a customer locaton stuated exactly at the poston specfed by the fracton value. In that case, locaton on the boundary closest to the fracton value s selected as the orgn. Once the orgns are determned, weghted Eucldean dstances of rest of the customers from orgns are calculated and then based on mnmum weghted Eucldean dstance crteron, the clusters are formed. The formulaton developed durng ths research work takes nto account the average weghted dstance of every customer locaton enterng the cluster from every other member of the cluster. The customer locatons selected n the cluster are dscarded from further analyss n order to avod any duplcaton.

3 Steps to be followed are summarzed as follows: 1. Plot all the customer locatons on graph 2. Connect the customers on perphery makng sure that all the locatons are ether on boundary or wthn t. 3. Startng from the pont closest to the orgn of coordnate system (0, 0); dvde the permeter nto m equal fractons. 4. Exstng locatons at these fractonal values (dvson ponts) are termed as orgns. If a dvson pont does not concde exactly wth the locaton of an exstng customer then the locaton of an exstng customer closest to t on the perphery s selected as an orgn. These form the ntal members of the assocated clusters. 5. Check each locaton to determne n whch cluster t should be assgned. Ths s done by checkng ts average weghted Eucldean dstance assocated wth the customers that are presently assgned to each cluster. The dstance s calculated as follows: W j W d j d = W + W j Where, (2) = AlreadyExstngCustomerLocatonsInTheCluster j = EnterngLocaton 6. Jon the customer wth mnmum weghted dstance amongst all the clusters to the assocated clusters. Delete the customer from further evaluatons at ths stage. 7. Repeat steps 5 and 6 tll all the customers are assgned to an approprate cluster. 8. The optmum faclty locaton n each cluster s determned by applyng Vector method [6]. ILLUSTRATIVE EXAMPLE Consder two facltes to be placed to serve 12 customers. Customer locatons and ther demand weghts are gven n Table 1. Table 1: Customer Locatons and ther weghts Customer X Coordnate Y Coordnate Weght A B C D E F G H I J K L

4 All the customer locatons are plotted on graph and then customers on perphery are joned together to form a boundary as shown n Fgure 1. Fgure 1: Customer Locatons Permeter of the boundary s unts. As m = 2, the fracton at whch the orgns should be located s unts. Frst orgn of the cluster s L (1, 2), whle the other orgn s D (50, 20), closest customer to the dvson pont. Weghted dstances are calculated usng formula (2) and are shown n Table 2. Table 2: Cluster Formaton Cycle 1: Cluster 1 Contents: L and cluster 2 contents: D From L (1, 2): Cycle 1 Customers: A B C D E F G H I J K L Weghted Dstance: From D (50, 20): Cycle 1 Customers: A B C D E F G H I J K L Weghted Dstance: Customer locaton F s selected as the locaton enterng the cluster orgnated from L. Cycle 2: Cluster 1 Contents: L & F and cluster 2 contents: D Cluster 1 calculatons: Customers: A B C E G H I J K Weghted Dstance: Cluster 2 calculatons: Customers: A B C D E G H I J K Weghted Dstance: Customer locaton E s selected as a locaton enterng cluster orgnated from D. Cycle 3: Cluster 1 Contents: L & F and cluster 2 contents: D & E

5 Contnung the calculatons n the smlar manner the fnal cluster formaton s obtaned as follows: Table 4: Resultng Clusters Cluster 1 Customers X Coordnate Y Coordnate Weght B F G H I J K L Cluster 2 A C D E Cluster formaton s shown n the Fgure 2. Fgure 2: Cluster Formaton Facltes locaton analyss n each cluster s performed usng the method suggested earler whch s based on vector algebra (Davalbhakta and Sule, 2003). Subsequently, faclty locaton for cluster 1 s at (7.68, 10.96) wth the optmum cost of $ Whle for cluster 2, the optmum faclty locaton s at (32.81, 31.29) wth the cost of $ CONCLUSION New graphcal method has been devsed to form the clusters of customer locatons n a multple faclty locaton analyss problem wth weghted mnmax Eucldean dstance. When we compared our method wth the work done by Levn and Ben-Israel, t occurred that both the methods present the same results for the problem llustrated n ther paper. However, Levn and Ben-Israel have consdered that all the customers have equal

6 demands and hence have not consdered the demand weghts n ther heurstc. On the other hand, method proposed n ths paper takes nto account dfferent demand weghts of customers as vtal factor n cluster formaton as not only the dstance between the faclty and customer but the demand of customer also contrbutes to the total cost. REFERENCES 1. Brady, S.D., Rosenthal, R.E., and Young, D. (1983). Interactve Graphcal Mnmax Locaton of Multple Facltes wth General Constrants. AIIE Transactons 15: Brmberg, J.; Hansen, P.; Mladenovc, N. and Tallard, E.D. (2000). Improvements and comparson of heurstcs for solvng the uncapactated multsource Weber problem. Operatons research 48: Charalambous, C. (1981). An teratve algorthm for the multfaclty mnmax locaton problem wth Euc1dean dstances. Naval Research Logstcs 28: Cooper, L. (1963). Locaton-Allocaton Problems. Operatons Research 11: Current, J.; Ratck, S. and ReVelle, C. (1998). Dynamc faclty locaton when the total number of facltes s uncertan: A decson analyss approach. European Journal of Operatonal research 110: Davalbhakta, A.D. and Sule D. R. (2003). Internatonal Journal of Industral Engneerng. Accepted and In Prnt. 7. Douglas, M. I. and Papayanopoulos, Lee (1991). Mnmax locaton of two facltes wth mnmum separaton. Interactve graphcal solutons. Journal of the Operatonal Research Socety 42: Elznga, J.; Hearn, D. and Randolph, W.D. (1976). Mnmax multfaclty locaton wth Eucldean dstance. Transportaton Scence 10: Levn, Y. and Ben-Israel, A. (2002). Computers and Operatons Research. Accepted and n Prnt. 10. Love, R.F.; Wesolowsky, G. O. and Kraemer, S.A. (1973). Internatonal Journal of Producton research 11: Sule, D. R. (2001). Logstcs of Faclty Locaton and Allocaton. Marcel Dekker Inc., NY.

Planning of work schedules for toll booth collectors

Planning of work schedules for toll booth collectors Lecture Notes n Management Scence (0) Vol 4: 6 4 4 th Internatonal Conference on Appled Operatonal Research, Proceedngs Tadbr Operatonal Research Group Ltd All rghts reserved wwwtadbrca ISSN 00-0050 (Prnt),

More information

Emission Reduction Technique from Thermal Power Plant By Load Dispatch

Emission Reduction Technique from Thermal Power Plant By Load Dispatch Emsson Reducton Technque from Thermal Power Plant By Load Dspatch S. R. Vyas 1, Dr. Rajeev Gupta 2 1 Research Scholar, Mewar Unversty, Chhtorgrah. Inda 2 Dean EC Dept., Unversty College of Engg. RTU, Kota.

More information

Development of Decision Support System for Optimal Site Selection of Desalination Plants

Development of Decision Support System for Optimal Site Selection of Desalination Plants IOSR Journal of Mechancal and Cvl Engneerng (IOSR-JMCE) e-issn: 78-184,p-ISSN: 30-334X, Volume 11, Issue Ver. III (Nov- Dec. 014), PP 84-90 Development of Decson Support System for Optmal Ste Selecton

More information

A Two-Echelon Inventory Model for Single-Vender and Multi-Buyer System Through Common Replenishment Epochs

A Two-Echelon Inventory Model for Single-Vender and Multi-Buyer System Through Common Replenishment Epochs A Two-Echelon Inventory Model for Sngle-Vender and Mult-Buyer System Through Common Replenshment Epochs Wen-Jen Chang and Chh-Hung Tsa Instructor Assocate Professor Department of Industral Engneerng and

More information

A Scenario-Based Objective Function for an M/M/K Queuing Model with Priority (A Case Study in the Gear Box Production Factory)

A Scenario-Based Objective Function for an M/M/K Queuing Model with Priority (A Case Study in the Gear Box Production Factory) Proceedngs of the World Congress on Engneerng 20 Vol I WCE 20, July 6-8, 20, London, U.K. A Scenaro-Based Objectve Functon for an M/M/K Queung Model wth Prorty (A Case Study n the Gear Box Producton Factory)

More information

A Group Decision Making Method for Determining the Importance of Customer Needs Based on Customer- Oriented Approach

A Group Decision Making Method for Determining the Importance of Customer Needs Based on Customer- Oriented Approach Proceedngs of the 010 Internatonal Conference on Industral Engneerng and Operatons Management Dhaka, Bangladesh, January 9 10, 010 A Group Decson Makng Method for Determnng the Importance of Customer Needs

More information

Consumption capability analysis for Micro-blog users based on data mining

Consumption capability analysis for Micro-blog users based on data mining Consumpton capablty analyss for Mcro-blog users based on data mnng ABSTRACT Yue Sun Bejng Unversty of Posts and Telecommuncaton Bejng, Chna Emal: sunmoon5723@gmal.com Data mnng s an effectve method of

More information

Evaluating Clustering Methods for Multi-Echelon (r,q) Policy Setting

Evaluating Clustering Methods for Multi-Echelon (r,q) Policy Setting Proceedngs of the 2007 Industral Engneerng Research Conference G. Bayraksan W. Ln Y. Son and R. Wysk eds. Evaluatng Clusterng Methods for Mult-Echelon (r) Polcy Settng Vkram L. Desa M.S.; Manuel D. Rossett

More information

A TABU SEARCH FOR MULTIPLE MULTI-LEVEL REDUNDANCY ALLOCATION PROBLEM IN SERIES-PARALLEL SYSTEMS

A TABU SEARCH FOR MULTIPLE MULTI-LEVEL REDUNDANCY ALLOCATION PROBLEM IN SERIES-PARALLEL SYSTEMS Internatonal Journal of Industral Engneerng, 18(3), 120-129, 2011. A TABU SEACH FO MULTIPLE MULTI-LEVEL EDUNDANCY ALLOCATION POBLEM IN SEIES-PAALLEL SYSTEMS Kl-Woong Jang and Jae-Hwan Km Department of

More information

INCORPORATING WAITING TIME IN COMPETITIVE LOCATION MODELS: FORMULATIONS AND HEURISTICS 1

INCORPORATING WAITING TIME IN COMPETITIVE LOCATION MODELS: FORMULATIONS AND HEURISTICS 1 INCORPORATING WAITING TIME IN COMPETITIVE LOCATION MODELS: FORMULATIONS AND HEURISTICS 1 Francsco Slva a, Danel Serra b a GREL, IET, Unverstat Pompeu Fabra, Ramon Tras Fargas, 25-27, 08005 Barcelona, Span.

More information

An Analytical Model for Atmospheric Distribution. and Transport of Pollutants from Area Source

An Analytical Model for Atmospheric Distribution. and Transport of Pollutants from Area Source nt. J. Contemp. Math. Scences, Vol. 6, 0, no. 6, 97-30 An Analytcal Model for Atmospherc Dstrbuton and Transport of Pollutants from Area Source D.V.S. Kushwah, V. S. Dhakad and 3 Vandana Kushwah Department

More information

A SIMULATION STUDY OF QUALITY INDEX IN MACHINE-COMPONF~T GROUPING

A SIMULATION STUDY OF QUALITY INDEX IN MACHINE-COMPONF~T GROUPING A SMULATON STUDY OF QUALTY NDEX N MACHNE-COMPONF~T GROUPNG By Hamd Sefoddn Assocate Professor ndustral and Manufacturng Engneerng Department Unversty of Wsconsn-Mlwaukee Manocher Djassem Assstant Professor

More information

1991), a development of the BLAST program which integrates the building zone energy balance with the system and central plant simulation.

1991), a development of the BLAST program which integrates the building zone energy balance with the system and central plant simulation. OPTIMISATION OF MECHANICAL SYSTEMS IN AN INTEGRATED BUILDING ENERGY ANALYSIS PROGRAM: PART I: CONVENTIONAL CENTRAL PLANT EQUIPMENT Russell D. Taylor and Curts O. Pedersen Unversty of Illnos at Urbana-

More information

CONFLICT RESOLUTION IN WATER RESOURCES ALLOCATION

CONFLICT RESOLUTION IN WATER RESOURCES ALLOCATION 7 th Internatonal Conference on Hydronformatcs HIC 2006, Nce, FRANCE CONFLICT RESOLUTION IN WATER RESOURCES ALLOCATION MASOUD ASADZADEH ESFAHANI Graduate Research Assstant, School of Cvl and Envronmental

More information

Construction of Control Chart Based on Six Sigma Initiatives for Regression

Construction of Control Chart Based on Six Sigma Initiatives for Regression 2018 IJSRST Volume 4 Issue 2 Prnt ISSN: 2395-6011 Onlne ISSN: 2395-602X Themed Secton: Scence and Technology Constructon of Control Chart Based on Sx Sgma Intatves for Regresson ABSTRACT R. Radhakrshnan

More information

CHAPTER 2 OBJECTIVES AND METHODOLOGY

CHAPTER 2 OBJECTIVES AND METHODOLOGY 28 CHAPTER 2 OBJECTIVES AND METHODOLOGY The objectve of ths research s to mprove shop floor performance through proper allocaton of jobs n the machnes by consderng due tme, whch reduces the overall penalty

More information

Optimal Issuing Policies for Substitutable Fresh Agricultural Products under Equal Ordering Policy

Optimal Issuing Policies for Substitutable Fresh Agricultural Products under Equal Ordering Policy 06 Internatonal Academc Conference on Human Socety and Culture (HSC 06) ISBN: 978--60595-38-6 Optmal Issung Polces for Substtutable Fresh Agrcultural Products under Eual Orderng Polcy Qao- TENG,a, and

More information

Study on Productive Process Model Basic Oxygen Furnace Steelmaking Based on RBF Neural Network

Study on Productive Process Model Basic Oxygen Furnace Steelmaking Based on RBF Neural Network IJCSI Internatonal Journal of Computer Scence Issues, Vol., Issue 3, No 2, May 24 ISSN (Prnt): 694-84 ISSN (Onlne): 694-784 www.ijcsi.org 7 Study on Productve Process Model Basc Oxygen Furnace Steelmakng

More information

COST OPTIMIZATION OF WATER DISTRIBUTION SYSTEMS SUBJECTED TO WATER HAMMER

COST OPTIMIZATION OF WATER DISTRIBUTION SYSTEMS SUBJECTED TO WATER HAMMER Thrteenth Internatonal Water Technology Conference, IWTC13 29, Hurghada, Egypt COST OPTIMIZATION OF WATER DISTRIBUTION SYSTEMS SUBJECTED TO WATER HAMMER Berge Djebedjan *, Mohamed S. Mohamed *, Abdel-Gawad

More information

AN ITERATIVE ALGORITHM FOR PROFIT MAXIMIZATION BY MARKET EQUILIBRIUM CONSTRAINTS

AN ITERATIVE ALGORITHM FOR PROFIT MAXIMIZATION BY MARKET EQUILIBRIUM CONSTRAINTS AN ITERATIVE ALGORITHM FOR PROFIT MAXIMIZATION BY MARKET EQUILIBRIUM CONSTRAINTS Andrés Ramos Marano Ventosa Mchel Rver Abel Santamaría Unversdad Pontfca Comllas IBERDROLA DISTRIBUCIÓN S.A.U. Alberto Agulera

More information

Research on chaos PSO with associated logistics transportation scheduling under hard time windows

Research on chaos PSO with associated logistics transportation scheduling under hard time windows Advanced Scence and Technology Letters Vol76 (CA 014), pp75-83 http://dxdoorg/101457/astl0147618 Research on chaos PSO wth assocated logstcs transportaton schedulng under hard tme wndows Yuqang Chen 1,

More information

Models - Repositories of Knowledge (Proceedings ModelCARE2011 held at Leipzig, Germany, in September 2011) (IAHS Publ. 3XX, 201X).

Models - Repositories of Knowledge (Proceedings ModelCARE2011 held at Leipzig, Germany, in September 2011) (IAHS Publ. 3XX, 201X). Models - Repostores of Knowledge (Proceedngs ModelCARE20 held at Lepzg, Germany, n September 20) (IAHS Publ. 3XX, 20X). Smultaneous estmaton of groundwater recharge rates, assocated zone structures, and

More information

A Two-layer Time Window Assignment Vehicle Routing Problem

A Two-layer Time Window Assignment Vehicle Routing Problem Proceedngs of the Internatonal Conference on Industral Engneerng and Operatons Management Washngton DC, USA, September 27-29, 218 A Two-layer Tme Wndow Assgnment Vehcle Routng Problem Mahd Jallvand Department

More information

Extended Abstract for WISE 2005: Workshop on Information Systems and Economics

Extended Abstract for WISE 2005: Workshop on Information Systems and Economics Extended Abstract for WISE 5: Workshop on Informaton Systems and Economcs How Many Bundles?:An Analyss on Customzed Bundlng of Informaton Goods wth Multple Consumer Types Wendy HUI Ph.D. Canddate Department

More information

Aalborg Universitet. Positioning empty containers under dependent demand process. Dang, Vinh Quang; Yun, Won-Young; Kopfer, Herbert

Aalborg Universitet. Positioning empty containers under dependent demand process. Dang, Vinh Quang; Yun, Won-Young; Kopfer, Herbert Downloaded from vbn.aau.dk on: marts 20, 2019 Aalborg Unverstet Postonng empty contaners under dependent demand process Dang, Vnh Quang; Yun, Won-Young; Kopfer, Herbert Publshed n: Computers & Industral

More information

RELIABILITY-BASED OPTIMAL DESIGN FOR WATER DISTRIBUTION NETWORKS OF EL-MOSTAKBAL CITY, EGYPT (CASE STUDY)

RELIABILITY-BASED OPTIMAL DESIGN FOR WATER DISTRIBUTION NETWORKS OF EL-MOSTAKBAL CITY, EGYPT (CASE STUDY) Twelfth Internatonal Water Technology Conference, IWTC12 2008 Alexandra, Egypt 1 RELIABILITY-BASED OPTIMAL DESIGN FOR WATER DISTRIBUTION NETWORKS OF EL-MOSTAKBAL CITY, EGYPT (CASE STUDY) Rham Ezzeldn *,

More information

Experiments with Protocols for Service Negotiation

Experiments with Protocols for Service Negotiation PROCEEDINGS OF THE WORKSHOP ON APPLICATIONS OF SOFTWARE AGENTS ISBN 978-86-7031-188-6, pp. 25-31, 2011 Experments wth Protocols for Servce Negotaton Costn Bădcă and Mhnea Scafeş Unversty of Craova, Software

More information

A Novel Gravitational Search Algorithm for Combined Economic and Emission Dispatch

A Novel Gravitational Search Algorithm for Combined Economic and Emission Dispatch A Novel Gravtatonal Search Algorthm for Combned Economc and Emsson Dspatch 1 Muhammad Yaseen Malk, 2 Hmanshu Gupta 1 Student, 2 Assstant Professor 1 Electrcal Engneerng 1 E-Max Group of Insttutons, Haryana,

More information

The Spatial Equilibrium Monopoly Models of the Steamcoal Market

The Spatial Equilibrium Monopoly Models of the Steamcoal Market Advances n Management & Appled Economcs, vol.2, no.3, 2012, 125-132 ISSN: 1792-7544 (prnt verson), 1792-7552 (onlne) Scenpress Ltd, 2012 The Spatal Equlbrum Monopoly Models of the Steamcoal Maret Hu Wen

More information

PSO Approach for Dynamic Economic Load Dispatch Problem

PSO Approach for Dynamic Economic Load Dispatch Problem Internatonal Journal of Innovatve Research n Scence, Engneerng and Technology (An ISO 3297: 2007 Certfed Organzaton Vol. 3, Issue 4, Aprl 2014 PSO Approach for Dynamc Economc Load Dspatch Problem P.Svaraman

More information

DEVELOPMENT OF DECISION SUPPORT SYSTEM FOR SELECTING QUALITY MANAGEMENT SYSTEMS AND MANAGEMENT TOOLS

DEVELOPMENT OF DECISION SUPPORT SYSTEM FOR SELECTING QUALITY MANAGEMENT SYSTEMS AND MANAGEMENT TOOLS Proceedng 7 th Internatonal Semnar on Industral Engneerng and Management DEVELOPMENT OF DECISION SUPPORT SYSTEM FOR SELECTING QUALITY MANAGEMENT SYSTEMS AND MANAGEMENT TOOLS Saranya Sukkarn 1, Natcha Thawesaengskultha

More information

Fast Algorithm for Prediction of Airfoil Anti-icing Heat Load *

Fast Algorithm for Prediction of Airfoil Anti-icing Heat Load * Energy and Power Engneerng, 13,, 493-497 do:.4236/epe.13.4b09 Publshed Onlne July 13 (http://www.scrp.org/ournal/epe) Fast Algorthm for Predcton of Arfol Ant-cng Heat * Xueqn Bu, Ru Yang, Ja Yu, Xaobn

More information

1 Basic concepts for quantitative policy analysis

1 Basic concepts for quantitative policy analysis 1 Basc concepts for quanttatve polcy analyss 1.1. Introducton The purpose of ths Chapter s the ntroducton of basc concepts of quanttatve polcy analyss. They represent the components of the framework adopted

More information

Steady State Load Shedding to Prevent Blackout in the Power System using Artificial Bee Colony Algorithm

Steady State Load Shedding to Prevent Blackout in the Power System using Artificial Bee Colony Algorithm Jurnal Teknolog Full paper Steady State Load Sheddng to Prevent Blackout n the Power System usng Artfcal Bee Colony Algorthm R. Mageshvaran a*, T. Jayabarath b a School of Electrcal Engneerng. VIT Unversty.

More information

Production Scheduling for Parallel Machines Using Genetic Algorithms

Production Scheduling for Parallel Machines Using Genetic Algorithms Producton Schedulng for Parallel Machnes Usng Genetc Algorthms Chchang Jou 1), Hsn-Chang Huang 2) 1) Tamkang Unversty, Department of Informaton Management (cjou@mal.m.tku.edut.tw) 2) Tamkang Unversty,

More information

Dynamic Economic Dispatch for Combined Heat and Power Units using Particle Swarm Algorithms

Dynamic Economic Dispatch for Combined Heat and Power Units using Particle Swarm Algorithms Internatonal Journal of Energy and Power Engneerng 2015; 4(2): 84-93 Publshed onlne March 19, 2015 (http://www.scencepublshnggroup.com/j/jepe) do: 10.11648/j.jepe.20150402.19 ISSN: 2326-957X (Prnt); ISSN:

More information

A Batch Splitting Job Shop Scheduling Problem with bounded batch sizes under Multiple-resource Constraints using Genetic Algorithm

A Batch Splitting Job Shop Scheduling Problem with bounded batch sizes under Multiple-resource Constraints using Genetic Algorithm A Batch Splttng Job Shop Schedulng Problem wth bounded batch szes under ultple-resource Constrants usng Genetc Algorthm WANG Ha-yan,ZHAO Yan-we* Key Laboratory of echancal manufacture and Automaton of

More information

Application of Ant colony Algorithm in Cloud Resource Scheduling Based on Three Constraint Conditions

Application of Ant colony Algorithm in Cloud Resource Scheduling Based on Three Constraint Conditions , pp.215-219 http://dx.do.org/10.14257/astl.2016.123.40 Applcaton of Ant colony Algorthm n Cloud Resource Schedulng Based on Three Constrant Condtons Yang Zhaofeng, Fan Awan Computer School, Pngdngshan

More information

Selected Economic Aspects of Water Quality Trading

Selected Economic Aspects of Water Quality Trading Selected Economc Aspects of Water Qualty Tradng Rchard N. Bosvert Gregory L. Poe Yukako Sado Cornell Unversty Passac Rver Tradng Project Kckoff Meetng Cook College, Rutgers Unversty, New Brunswck, NJ January

More information

A Multiobjective Programming for Transportation Problem with the Consideration of both Depot to Customer and Customer to Customer Relationships

A Multiobjective Programming for Transportation Problem with the Consideration of both Depot to Customer and Customer to Customer Relationships Proceedngs of the Internatonal ultconference of Engneers and Computer Scentsts 2009 Vol II A ultobectve Programmng for Transportaton Problem wth the Consderaton of both to and to Relatonshps Wuttnan unkaew

More information

CHAPTER 8 DYNAMIC RESOURCE ALLOCATION IN GRID COMPUTING USING FUZZY-GENETIC ALGORITHM

CHAPTER 8 DYNAMIC RESOURCE ALLOCATION IN GRID COMPUTING USING FUZZY-GENETIC ALGORITHM 28 CHAPTER 8 DYNAMIC RESOURCE ALLOCATION IN GRID COMPUTING USING FUZZY-GENETIC ALGORITHM The man aspraton of Grd Computng s to aggregate the maxmum avalable dle computng power of the dstrbuted resources,

More information

A Distance-Based Multi-Criteria Decision Making Approach to Problem of Supplier Involvement in New Product Development

A Distance-Based Multi-Criteria Decision Making Approach to Problem of Supplier Involvement in New Product Development Iowa State Unversty From the SelectedWorks of Gül Okudan-Kremer August, 2010 A Dstance-Based Mult-Crtera Decson Makng Approach to Problem of Suppler Involvement n New Product Development Gulsen Akman,

More information

A New Model for Location and Transportation Problem of Cross-Docks in Distribution Networks

A New Model for Location and Transportation Problem of Cross-Docks in Distribution Networks Internatonal Journal of Modelng and Optmzaton Vol 7 No 6 December 07 A New Model for Locaton and Transportaton of Cross-Docks n Dstrbuton Networks A Hasan Goodarz and H Zegord Abstract Ths paper consders

More information

Dual-Route Distribution Strategy with Supply Chain Disruption

Dual-Route Distribution Strategy with Supply Chain Disruption Dual-Route Dstrbuton Strategy wth Supply Chan Dsrupton Sung Ho Hur, Dong-Kyu Km, Seung-Young Kho, and Chungwon Lee Unexpected dsruptons n the supply chan can drectly and ndrectly cause addtonal logstcs

More information

A Multi-Product Reverse Logistics Model for Third Party Logistics

A Multi-Product Reverse Logistics Model for Third Party Logistics 2011 Internatonal Conference on Modelng, Smulaton and Control IPCSIT vol.10 (2011) (2011) IACSIT Press, Sngapore A Mult-Product Reverse Logstcs Model for Thrd Party Logstcs Tsa-Yun Lao, Agatha Rachmat

More information

Finite Element Analysis and Optimization for the Multi- Stage Deep Drawing of Molybdenum Sheet

Finite Element Analysis and Optimization for the Multi- Stage Deep Drawing of Molybdenum Sheet Fnte Element Analyss and Optmzaton for the Mult- Deep of Molybdenum Sheet Heung-Kyu Km a,*, Seok Kwan Hong a, Jong-Kl Lee b, Byung-Hee Jeon c, Jeong Jn Kang a, and Young-moo Heo a a Precson Molds and Des

More information

Multi-UAV Task Allocation using Team Theory

Multi-UAV Task Allocation using Team Theory Proceedngs of the 44th IEEE Conference on Decson and Control, and the European Control Conference 2005 Sevlle, Span, December 12-15, 2005 MoC03.6 Mult-UAV Task Allocaton usng Team Theory P. B. Sut, A.

More information

Optimal operation scheme for diesel power plant units of PT. PLN-Manokwari Branch using Lagrange Multiplier Method

Optimal operation scheme for diesel power plant units of PT. PLN-Manokwari Branch using Lagrange Multiplier Method Avalable onlne at www.scencedrect.com roceda Envronmental Scences 17 ( 2013 ) 557 565 The 3 rd Internatonal Conference on Sustanable Future for Human Securty SUSTAIN 2012 Optmal operaton scheme for desel

More information

Optimum Generation Scheduling for Thermal Power Plants using Artificial Neural Network

Optimum Generation Scheduling for Thermal Power Plants using Artificial Neural Network Internatonal Journal of Electrcal and Computer Engneerng (IJECE) Vol., o., ecember 0, pp. 35~39 ISS: 088-8708 35 Optmum Generaton Schedulng for Thermal ower lants usng Artfcal eural etwork M. S. agaraja

More information

A Bi-Objective Green Closed Loop Supply Chain Design Problem with Uncertain Demand

A Bi-Objective Green Closed Loop Supply Chain Design Problem with Uncertain Demand sustanablty Artcle A B-Obectve Green Closed Loop Supply Chan Desgn Problem wth Uncertan Demand Mng Lu 1 ID, Rongfan Lu 1, Zhanguo Zhu 2, *, Chengbn Chu 1,3 and Xaoy Man 4 1 School of Economcs and Management,

More information

R. MAGESHVARAN*, T. JAYABARATHI, VAIBHAV SHAH, SHIVAM SOOD

R. MAGESHVARAN*, T. JAYABARATHI, VAIBHAV SHAH, SHIVAM SOOD Journal of Engneerng Scence and Technology Vol. 10, No.10 (2015) 1239-1260 School of Engneerng, Taylor s Unversty OPTIMUM STEADY STATE LOAD SHEDDING USING SHUFFLED FROG LEAPING ALGORITHM TO AVERT BLACKOUT

More information

Journal of Engineering Science and Technology Review 10 (6) (2017) Research Article. Kai Yang 1,3,* and Yuwei Liu 2

Journal of Engineering Science and Technology Review 10 (6) (2017) Research Article. Kai Yang 1,3,* and Yuwei Liu 2 Jestr Journal of Engneerng Scence and Technology Revew 10 (6) (2017) 171-178 Research Artcle Optmzaton of Producton Operaton Scheme n the Transportaton Process of Dfferent Proportons of Commngled Crude

More information

Evaluating The Performance Of Refrigerant Flow Distributors

Evaluating The Performance Of Refrigerant Flow Distributors Purdue Unversty Purdue e-pubs Internatonal Refrgeraton and Ar Condtonng Conference School of Mechancal Engneerng 2002 Evaluatng The Performance Of Refrgerant Flow Dstrbutors G. L Purdue Unversty J. E.

More information

MULTI-OBJECTIVE OPTIMIZATION OF MULTIMODAL PASSENGER TRANSPORTATION NETWORKS: COPING WITH DEMAND UNCERTAINTY

MULTI-OBJECTIVE OPTIMIZATION OF MULTIMODAL PASSENGER TRANSPORTATION NETWORKS: COPING WITH DEMAND UNCERTAINTY OPT- An Internatonal Conference on Engneerng and Appled Scences Optmzaton M. Papadrakaks, M.G. Karlafts, N.D. Lagaros (eds.) Kos Island, Greece, 4-6June 2014 MULTI-OBJECTIVE OPTIMIZATION OF MULTIMODAL

More information

The Order Selection and Lot Sizing Problem in the Make-to-Order Environment

The Order Selection and Lot Sizing Problem in the Make-to-Order Environment Florda Internatonal Unversty FIU Dgtal Commons FIU Electronc Theses and Dssertatons Unversty Graduate School 3-4-2011 The Order Selecton and Lot Szng Problem n the Make-to-Order Envronment Zhongpng Zha

More information

Appendix 6.1 The least-cost theorem and pollution control

Appendix 6.1 The least-cost theorem and pollution control Appendx 6.1 The least-cost theorem and polluton control nstruments Ths appendx s structured as follows. In Part 1, we defne the notaton used and set the scene for what follows. Then n Part 2 we derve a

More information

K vary over their feasible values. This allows

K vary over their feasible values. This allows Proceedngs of the 2007 INFORMS Smulaton Socety Research Workshop. MULTI-PRODUCT CYCLE TIME AND THROUGHPUT EVALUATION VIA SIMULATION ON DEMAND John W. Fowler Gerald T. Mackulak Department of Industral Engneerng

More information

Supplier selection and evaluation using multicriteria decision analysis

Supplier selection and evaluation using multicriteria decision analysis Suppler selecton and evaluaton usng multcrtera decson analyss Stratos Kartsonaks 1, Evangelos Grgorouds 2, Mchals Neofytou 3 1 School of Producton Engneerng and Management, Techncal Unversty of Crete,

More information

INTEGER PROGRAMMING 1.224J/ESD.204J TRANSPORTATION OPERATIONS, PLANNING AND CONTROL: CARRIER SYSTEMS

INTEGER PROGRAMMING 1.224J/ESD.204J TRANSPORTATION OPERATIONS, PLANNING AND CONTROL: CARRIER SYSTEMS INTEGE POGAMMING 1.224J/ESD.204J TANSPOTATION OPEATIONS, PLANNING AND CONTOL: CAIE SYSTEMS Professor Cyntha Barnhart Professor Ngel H.M. Wlson Fall 2003 IP OVEVIEW Sources: -Introducton to lnear optmzaton

More information

Identifying Factors that Affect the Downtime of a Production Process

Identifying Factors that Affect the Downtime of a Production Process Identfyng Factors that Affect the Downtme of a Producton Process W. Nallaperuma 1 *, U. Ekanayake 1, Ruwan Punch-Manage 2 1 Department of Physcal scences, Rajarata Unversty, Sr Lanka 2 Department of Statstcs

More information

EVALUATION METHODOLOGY OF BUS RAPID TRANSIT (BRT) OPERATION

EVALUATION METHODOLOGY OF BUS RAPID TRANSIT (BRT) OPERATION 200-203 JATIT & LL. All rghts reserved. IN: 992-864 www.att.org E-IN: 87-39 EVALUATION METHODOLOGY OF BU RAPID TRANIT (BRT) OPERATION WU HONGYANG A a Chna Urban ustanable Transport Research Center (CUTReC),

More information

Optimization of e-learning Model Using Fuzzy Genetic Algorithm

Optimization of e-learning Model Using Fuzzy Genetic Algorithm Optmzaton of e-learnng Model Usng Fuzzy Genetc Algorthm Receved: 00?????? 2012, Accepted: 00????? 2013 M. A. Afshar Kazem Assocate professor, Informaton Technology Management Department, Electrnc Branch,

More information

Calculation and Prediction of Energy Consumption for Highway Transportation

Calculation and Prediction of Energy Consumption for Highway Transportation Calculaton and Predcton of Energy Consumpton for Hghway Transportaton Feng Qu, Wenquan L *, Qufeng Xe, Peng Zhang, Yueyng Huo School of Transportaton, Southeast Unversty, Nanjng 210096, Chna; *E-mal: wenql@seu.edu.cn

More information

RULEBOOK on the manner of determining environmental flow of surface water

RULEBOOK on the manner of determining environmental flow of surface water Pursuant to Artcle 54 paragraph 2 of the Law on Waters (Offcal Gazette of the Republc of Montenegro 27/07 and Offcal Gazette of Montenegro 32/11 and 48/15), the Mnstry of Agrculture and Rural Development

More information

Study on Multi-objective Optimization Model of Inventory Control and Supplier Selection Problem Under Uncertainty

Study on Multi-objective Optimization Model of Inventory Control and Supplier Selection Problem Under Uncertainty Study on Mult-objectve Optmzaton Model of Inventory Control and Suppler Selecton Problem Under Uncertanty June, 201 3 D O C T OR OF E N G INEERING D c k y F a t r a s T O Y O HASHI U N I VERSITY OF TECHNOLOGY

More information

An Artificial Neural Network Method For Optimal Generation Dispatch With Multiple Fuel Options

An Artificial Neural Network Method For Optimal Generation Dispatch With Multiple Fuel Options An Artfcal Neural Network Method For Optmal Generaton Dspatch Wth Multple Fuel Optons S.K. Dash Department of Electrcal Engneerng, Gandh Insttute for Technologcal Advancement,Badaraghunathpur,Madanpur,

More information

A New Artificial Fish Swarm Algorithm for Dynamic Optimization Problems

A New Artificial Fish Swarm Algorithm for Dynamic Optimization Problems WCCI 2012 IEEE World Congress on Computatonal Intellgence June, 10-15, 2012 - Brsbane, Australa IEEE CEC A New Artfcal Fsh Swarm Algorthm for Dynamc Optmzaton Problems 1 Danal Yazdan Department of Electrcal,

More information

Ê«u U UO mm WF U WO UMB ««œù«re Ë W bmn «r * W??ö)«

Ê«u U UO mm WF U WO UMB ««œù«re Ë W bmn «r * W??ö)« Journal of Engg. Research Vol. 2 No. (4) Dec 2014 pp. 103-118 s ;«œbf *«rok «l EPQ U M*«œbF à u/ WK _«**m u mma mm Ë **uoa d O wo Ê«u ËË m U w Ê«u U UO mm WF U WO UMB ««œù«re Ë W bmn «r * Ê«u U UO u umj

More information

A Hybrid Model for Congestion Management with Real and Reactive Power Transaction

A Hybrid Model for Congestion Management with Real and Reactive Power Transaction A Hybrd Model for Congeston Management wth Real and Reactve Power Transacton Narayana Prasad Padhy Yog Ra Sood Abdel Moamen. M. A. Maruth Kumar H. O. Gupta Abstract-- In ths paper, an effcent and practcal

More information

Best-Order Crossover in an Evolutionary Approach to Multi-Mode Resource-Constrained Project Scheduling

Best-Order Crossover in an Evolutionary Approach to Multi-Mode Resource-Constrained Project Scheduling Internatonal Journal of Computer Informaton Systems and Industral Management Applcatons. ISSN 2150-7988 Volume 6 (2014) pp. 364-372 MIR Labs, www.mrlabs.net/csm/ndex.html Best-Order Crossover n an Evolutonary

More information

A new algorithm for size optimization of the truss structures using finite element method

A new algorithm for size optimization of the truss structures using finite element method IOP Conference Seres: Materals Scence and Engneerng PAPER OPEN ACCESS A new algorthm for sze optmzaton of the truss structures usng fnte element method To cte ths artcle: Vu Th Bch Quyen et al 2018 IOP

More information

Energy Management System for Battery/Ultracapacitor Electric Vehicle with Particle Swarm Optimization

Energy Management System for Battery/Ultracapacitor Electric Vehicle with Particle Swarm Optimization Proceedngs of the Internatonal Conference on Recent Advances n Electrcal Systems, Tunsa, 06 Energy Management System for Battery/Ultracapactor Electrc Vehcle wth Partcle Swarm Optmzaton Selm Koroglu Akf

More information

Experimental design methodologies for the identification of Michaelis- Menten type kinetics

Experimental design methodologies for the identification of Michaelis- Menten type kinetics UNIVERIDADE NOVA DE LIBOA Faculdade de Cêncas e Tecnologa Departamento de Químca Expermental desgn methodologes for the dentfcaton of Mchaels- Menten type knetcs Por Flpe Ataíde Dssertação apresentada

More information

SENSITIVITY ANALYSIS AND OPTIMIZATION OF DIFFERENT INVENTORY CONTROL POLICIES ALONG THE SUPPLY CHAIN

SENSITIVITY ANALYSIS AND OPTIMIZATION OF DIFFERENT INVENTORY CONTROL POLICIES ALONG THE SUPPLY CHAIN SENSITIVITY ANALYSIS AND OPTIMIZATION OF DIFFERENT INVENTORY CONTROL POLICIES ALONG THE SUPPLY CHAIN Dulo Curco (a), Francesco Longo (b) (a) (b) Modelng & Smulaton Center - Laboratory of Enterprse Solutons

More information

Improved Music Based Harmony Search Algorithm (IMBHSA) for solving Job Shop Scheduling Problems (JSSPs)

Improved Music Based Harmony Search Algorithm (IMBHSA) for solving Job Shop Scheduling Problems (JSSPs) Improved Musc Based Harmony Search Algorthm (IMBHSA) for solvng Job Shop Schedulng Problems (JSSPs) M.Hymavath 1*, C.S.P.Rao 2 1* Assstant Professor, Department of Mechancal Engneerng, Bengal College of

More information

Maximizing the Validity of a Test as a Function of Subtest Lengths for a Fixed Total Testing Time: A Comparison Between Two Methods

Maximizing the Validity of a Test as a Function of Subtest Lengths for a Fixed Total Testing Time: A Comparison Between Two Methods Maxmzng the Valdty of a Test as a Functon of Subtest Lengths for a Fxed Total Testng Tme: A Comparson Between Two Methods Tam Kennet-Cohen, Shmuel Bronner and Yoav Cohen Paper presented at the annual meetng

More information

Optimal Placement of Solar PV in Distribution System using Particle Swarm Optimization

Optimal Placement of Solar PV in Distribution System using Particle Swarm Optimization ISSN (Prnt) : 2320 3765 ISSN (Onlne): 2278 8875 Internatonal Journal of Advanced Research n Electrcal, Electroncs and Instrumentaton Engneerng (An ISO 3297: 2007 Certfed Organzaton) Vol. 2, Specal Issue

More information

Evaluation Method for Enterprises EPR Project Risks

Evaluation Method for Enterprises EPR Project Risks , pp.350-354 http://dx.do.org/10.14257/astl.2016. Evaluaton Method for Enterprses EPR Project Rsks L-Yongmng 1,2 1 College of Economcs and Management, Nanjng Unversty of Aeronautcs and Astronautcs, Nanjng,

More information

Optimization in Allocating Goods to Shop Shelves Utilizing Genetic Algorithm under the Introduction of Sales Probabilities

Optimization in Allocating Goods to Shop Shelves Utilizing Genetic Algorithm under the Introduction of Sales Probabilities Journal of Communcaton and Computer 2 (205 55-63 do: 0.7265/548-7709/205.04.00 D DAVID PUBLISHING Optmzaton n Allocatng Goods to Shop Shelves Utlzng Genetc Algorthm under the Introducton of Sales Probabltes

More information

MULTIPLE CRITERIA DECISION MAKING USING VIKOR METHOD. APPLICATION IN IRRIGATION NETWORKS IN THE THESSALONIKI PLAIN

MULTIPLE CRITERIA DECISION MAKING USING VIKOR METHOD. APPLICATION IN IRRIGATION NETWORKS IN THE THESSALONIKI PLAIN Proceedngs of the 13 th Internatonal Conference on Envronmental Scence and Technology Athens, Greece, 5-7 September 2013 MULTIPLE CRITERIA DECISION MAKING USING VIKOR METHOD. APPLICATION IN IRRIGATION

More information

Tuneable hydrogels. complete.handy.simple USER GUIDE. Innovative cell culture systems.

Tuneable hydrogels. complete.handy.simple USER GUIDE. Innovative cell culture systems. complete.handy.smple USER GUIDE Innovatve cell culture systems. Innovatve cell culture systems. MATERIAL NEEDED Materal ncluded Lyophlzed peptde gel powder n glass val Materal not ncluded Dstlled water

More information

APPLICATION OF FLEET CREATION PROBLEMS IN AIRCRAFT PRE-DESIGN

APPLICATION OF FLEET CREATION PROBLEMS IN AIRCRAFT PRE-DESIGN APPLICATION OF FLEET CREATION PROBLEMS IN AIRCRAFT PRE-DESIGN Pavel V. Zhuravlev Faculty of Aeronautcal Engneerng, Moscow Avaton Insttute, Moscow, Russa Keywords: Passenger Arplane, Arcraft Fleet, Operatonal

More information

Computational Solution to Economic Operation of Power Plants

Computational Solution to Economic Operation of Power Plants Electrcal and Electronc Engneerng 013, 3(6): 139-148 DOI: 10.593/j.eee.0130306.01 Computatonal Soluton to Economc Operaton of ower lants Temtope Adefarat 1,*, Ayodele Sunday Oluwole 1, Mufutau Adewolu

More information

RIGOROUS MODELING OF A HIGH PRESSURE ETHYLENE-VINYL ACETATE (EVA) COPOLYMERIZATION AUTOCLAVE REACTOR. I-Lung Chien, Tze Wei Kan and Bo-Shuo Chen

RIGOROUS MODELING OF A HIGH PRESSURE ETHYLENE-VINYL ACETATE (EVA) COPOLYMERIZATION AUTOCLAVE REACTOR. I-Lung Chien, Tze Wei Kan and Bo-Shuo Chen RIGOROUS MODELING OF A HIGH PRESSURE ETHYLENE-VINYL ACETATE (EVA) COPOLYMERIZATION AUTOCLAVE REACTOR I-Lung Chen, Tze We an and Bo-Shuo Chen Department of Chemcal Engneerng, Natonal Tawan Unversty of Scence

More information

INTEGRATED ENERGY DISTRIBUTION SYSTEM PLANNING: A MULTI-CRITERIA APPROACH

INTEGRATED ENERGY DISTRIBUTION SYSTEM PLANNING: A MULTI-CRITERIA APPROACH INTEGRATED ENERGY DISTRIBUTION SYSTEM PLANNING: A MULTI-CRITERIA APPROACH Audun Botterud 1,3, Mara Catrnu 1, Ove Wolfgang 2, Arne T. Holen 1 1 Dept. of Electrcal Power Engneerng, Norwegan Unversty of Scence

More information

DESIGNING TWO-ECHELON SUPPLY CHAIN USING SIMULATION AND PRICING STRATEGY

DESIGNING TWO-ECHELON SUPPLY CHAIN USING SIMULATION AND PRICING STRATEGY DESIGIG TWO-ECHELO SUPPLY CHAI USIG SIULATIO AD PRICIG STRATEGY Seyed ohammad ahd Kazem (a), Peyman Tak (b), Seyed ohamad kazem (c) (a) Department of ndustral engneerng, Damavand Branch, Islamc Azad Unvesty,

More information

Do Competing Suppliers Maximize Profits as Theory Suggests? An Empirical Evaluation

Do Competing Suppliers Maximize Profits as Theory Suggests? An Empirical Evaluation Unversty of Massachusetts Boston ScholarWorks at UMass Boston Management Scence and Informaton Systems Faculty Publcaton Seres Management Scence and Informaton Systems January 2015 as Theory Suggests?

More information

IMPACTS OF MINIMUM ACTIVITY LEVEL AND MULTI-SOURCING ON PRODUCT FAMILY AND SUPPLY CHAIN DESIGN

IMPACTS OF MINIMUM ACTIVITY LEVEL AND MULTI-SOURCING ON PRODUCT FAMILY AND SUPPLY CHAIN DESIGN 21 st Internatonal Conference on Producton Research IMPACTS OF MINIMUM ACTIVITY LEVEL AND MULTI-SOURCING ON PRODUCT FAMILY AND SUPPLY CHAIN DESIGN Bertrand Baud-Lavgne, Bruno Agard and Bernard Penz Unversté

More information

Annual Energy Production Maximization for Tidal Power Plants with Evolutionary Algorithms

Annual Energy Production Maximization for Tidal Power Plants with Evolutionary Algorithms Internatonal Journal of Flud Machnery and Systems DOI: http://dx.do.org/10.5293/ijfms.2017.10.3.264 Vo 10 o. 3 July-September 2017 ISS (Onlne): 1882-9554 Orgnal Paper Annual Energy Producton Maxmzaton

More information

Varunraj Valsaraj, Kara Kockelman, Jennifer Duthie, and Brenda Zhou University of Texas at Austin. Original Version: September 2007.

Varunraj Valsaraj, Kara Kockelman, Jennifer Duthie, and Brenda Zhou University of Texas at Austin. Original Version: September 2007. FORECASTING EMPLOYMENT & POPULATION IN TEXAS: An Investgaton on TELUM Requrements Assumptons and Results ncludng a Study of Zone Sze Effects for the Austn and Waco Regons Varunraj Valsaraj Kara Kockelman

More information

Comparison of robust M estimator, S estimator & MM estimator with Wiener based denoising filter for gray level image denoising with Gaussian noise

Comparison of robust M estimator, S estimator & MM estimator with Wiener based denoising filter for gray level image denoising with Gaussian noise Comparson of robust M estmator, S estmator & MM estmator wth Wener based denosng flter for gray level mage denosng wth Gaussan nose Mr. Pratyaksh A Maru Electroncs and Communcaton Department, Dr. Jvraj

More information

Implementation of Supplier Evaluation and. Ranking by Improved TOPSIS

Implementation of Supplier Evaluation and. Ranking by Improved TOPSIS Appled Mathematcal Scences, Vol. 7, 2013, no. 46, 2265 2270 HIKARI Ltd, www.m-hkar.com Implementaton of Suppler Ealuaton and Rankng by Improed TOPSIS C. Katha Department of Mathematcs Sathyabama Unersty,

More information

Development of a Tool Management System for Energy Sector Company

Development of a Tool Management System for Energy Sector Company Development of a Tool Management System for Energy Sector Company Varun Raj C. 1, Sharath Kumar K. M. 2, Danel Berald Boch 3 1- M.Sc. [Engg.] Student, 2-Asst. Professor, Department of Mechancal and Manufacturng

More information

Fuzzy Scheduling of Logistics Production and Distribution under Uncertain Environments using Particle Swarm Optimization

Fuzzy Scheduling of Logistics Production and Distribution under Uncertain Environments using Particle Swarm Optimization XING LIU et al: FUZZY SCHEDULING OF LOGISTICS PRODUCTION AND DISTRIBUTION UNDER Fuzzy Schedulng of Logstcs Producton Dstrbuton under Uncertan Envronments usng Partcle Swarm Otmzaton Xng Lu * Ha Lu School

More information

Simulation-based Decision Support System for Real-time Disaster Response Management

Simulation-based Decision Support System for Real-time Disaster Response Management Proceedngs of the 2008 Industral Engneerng Research Conference J. Fowler and S. Mason, eds. Smulaton-based Decson Support System for Real-tme Dsaster Response Management Shengnan Wu, Larry Shuman, Bopaya

More information

TRAFFIC SIGNAL CONTROL FOR REDUCING VEHICLE CARBON DIOXIDE EMISSIONS ON AN URBAN ROAD NETWORK

TRAFFIC SIGNAL CONTROL FOR REDUCING VEHICLE CARBON DIOXIDE EMISSIONS ON AN URBAN ROAD NETWORK TRAFFIC SIGNAL CONTROL FOR REDUCING VEHICLE CARBON DIOXIDE EMISSIONS ON AN URBAN ROAD NETWORK Toshhko Oda (1), Masao Kuwahara (2) and Satosh Nkura (3) (1) Panasonc System Solutons Company, Matsushta Electrc

More information

Pricing for Resource Allocation in Cloud Computing

Pricing for Resource Allocation in Cloud Computing Internatonal Conference on Logstcs Engneerng, Management and Computer Scence (LEMCS 2015) Prcng for Resource Allocaton n Cloud Computng Zhengce Ca Department of Informaton Servce Anhu Insttute of Internatonal

More information

Özlem Coşgun Fatih University, Department of Industrial Engineering, Istanbul, 34500, Turkey

Özlem Coşgun Fatih University, Department of Industrial Engineering, Istanbul, 34500, Turkey Internatonal Journal of Computatonal Intellgence Systems, Vol. 7, No. 4 (August 204), 636-649 Data Envelopment Analyss Applcaton n Tursh Energy Maret Özlem Coşgun Fath Unversty, Department of Industral

More information

Using the Hybrid GA-TOPSIS Algorithm to Solving the Site Selection Problem in Passive Defense

Using the Hybrid GA-TOPSIS Algorithm to Solving the Site Selection Problem in Passive Defense Internatonal Journal of Industral Engneerng & Producton Research March 1, Volume 3, Number 1 pp. 35-43 ISSN: 8-488 http://ijiepr.ust.ac.r/ Usng the Hybrd GA-TOPSIS Algorthm to Solvng the Ste Selecton Problem

More information

Dynamic Task Assignment and Resource Management in Cloud Services Using Bargaining Solution

Dynamic Task Assignment and Resource Management in Cloud Services Using Bargaining Solution Dynamc ask Assgnment and Resource Management n Cloud Servces Usng Barganng Soluton KwangSup Shn 1, Myung-Ju Park 2 and Jae-Yoon Jung 2 1 Graduate School of Logstcs, Incheon Natonal Unversty 12-1 Songdo-Dong,

More information