1 Twelfth Internatonal Water Technology Conference, IWTC Alexandra, Egypt 1 RELIABILITY-BASED OPTIMAL DESIGN FOR WATER DISTRIBUTION NETWORKS OF EL-MOSTAKBAL CITY, EGYPT (CASE STUDY) Rham Ezzeldn *, Hossam A. A. Abdel-Gawad *, and Magdy Abou Rayan ** * Irrgaton and Hydraulcs Department, Faculty of Engneerng, Mansoura Unversty, El-Mansoura, Egypt E-mal: Rham_ezzeldn@hotmal.com ** Mechancal Power Engneerng Department, Faculty of Engneerng, Mansoura Unversty, El-Mansoura, Egypt E-mal: mrayan@mans.edu.eg ABSTRACT An approach to the Relablty-based optmzaton of water dstrbuton systems s presented and appled to a case study. The approach lnks a genetc algorthm (GA) as the optmzaton tool, the Newton method as the hydraulc smulaton solver wth the chance constrant combned wth the Monte Carlo smulaton to estmate network capacty relablty. The source of uncertanty analyzed s the future nodal external demands whch are assumed to be random normally dstrbuted varables wth gven mean and standard devatons. The performance of the proposed approach s tested on an exstng network. The case study s for El-Mostakbal Cty network, an extenson to an exstng dstrbuton network of Ismala Cty, Egypt. The applcaton of the method on the network shows ts capablty to solve such actual Relablty based-optmzaton problems. INTRODUCTION The complexty of (WDS) makes t dffcult to obtan least-cost desgn systems consderng other constrants such as relablty. A completely satsfactory water dstrbuton system (WDS) should supply water n the requred quanttes at desred resdual heads throughout ts desgn perod. How well a WDS can satsfy ths goal can be determned from water supply relablty. However, evoluton of WDS relablty s extremely complex because relablty depends on a large number of parameters, some of whch are qualty and quantty of water avalable at source; falure rates of supply pumps; power outages; flow capacty of transmsson mans; roughness characterstcs nfluencng the flow capacty of the varous lnks of the dstrbuton network; ppe breaks and valve falures; varaton n daly, weekly, and seasonal demands; as well as demand growth over the years.
2 2 Twelfth Internatonal Water Technology Conference, IWTC Alexandra, Egypt There s currently no unversally accepted defnton of relablty of WDS. However, relablty s usually defned as the probablty that a system performs ts msson wthn specfed lmts for a gven perod of tme n a specfed envronment. For a large system, t s dffcult to analytcally compute relablty n a mathematcal form. Accurate calculaton of a mathematcal relablty requres knowledge of the exact relablty of the basc components of WDS and the mpact on system performance caused by possble falures n the components. Relablty models to compute system relablty have been developed snce 1980s. These models allow a modeler to determne the relablty of a system and account for such factors as the probablty and duraton of ppe and pump falure, the uncertanty n demands, and the varablty n the deteroraton of ppes. Some of these relablty models whch have been commonly used n lterature are cut-set method, Monte Carlo smulaton, chance constrants, sgnfcance ndex method, and frequency duraton analyss. Su et al. (1987) developed a relablty based optmzaton model that determned the least-cost desgn of water dstrbuton system subect to contnuty, conservaton of energy, nodal head bounds, and relablty constrants. The steady-state smulaton model (KYPIPE) by Wood (1980), was used to mplctly solve the contnuty and energy constrants and was used n the relablty model to defne mnmum cut sets. The relablty model, whch was based on a mnmum cut-set method, determned the values of system and nodal relablty. The optmzaton model was based on a generalzed reduced-gradent method (GRG2) by Lasdon and Waren (1979, 1984) whch solved an optmzaton problem wth a nonlnear obectve functon and nonlnear constrants. Lansey et al. (1989) were among the frst to present a chance constrant model for the least-cost desgn of water dstrbuton systems. The uncertanty n the requred demand, pressure heads, and ppe roughness coeffcent were explctly accounted for n the model. The generalzed reduced gradent (GRG2) technque was used to solve the nonlnear programmng sngle-obectve chance constraned mnmzaton model. The methodology assumed nodal heads to be random, normally dstrbuted varables wth gven mean and standard devaton. Snce head values are functons of many parameters, some of whch could be uncertan, they should be treated as a response functon rather than ndependent stochastc varables. Also, the generalzed reduced gradent method (GRG2) s a local search method whch could be easly trapped n the local mnmum (Savc and Walters, (1997)). Bao et al. (1990) presented a Monte Carlo smulaton model that estmated the nodal and system hydraulc relabltes of water dstrbuton systems that accounted for uncertantes. The model conssted of three maor components; random number generaton, hydraulc network smulaton, and computaton of relablty. The model could be appled n the analyss of exstng water dstrbuton systems or n the desgn of new or expandng systems.
3 Twelfth Internatonal Water Technology Conference, IWTC Alexandra, Egypt 3 Goulter et al. (1990) ncorporated relablty concept nto optmal desgn models for ppe network systems. The measure of the system relablty was used as a crteron to mprove the system dstrbuton. The chance constrants were the probablty of ppe falure for each lnk and the probablty of demand exceedng desgn values at each node n the network. Xu and Goulter (1998) developed an approach n whch a probablstc hydraulc model was used for the frst tme n the WDS desgn optmzaton. In the hydraulc model uncertantes were quantfed usng the analytcal technque known as the frst order second moment (FOSM) relablty method. Ths method assumes that a relatonshp between uncertan and response varables s very close to lnear, whch s often not the case for water dstrbuton systems. Xu and Goulter (1999) used the frst order relablty-method-based (FORM) algorthm that computed the capacty relablty of water dstrbuton networks. The senstvtyanalyss-based technque was used to derve the frst order dervatves. The (FORM) algorthm requred repettve calculaton of the frst order dervatves and matrx nverson whch was very computatonally demandng even n small networks and may lead to a number of numercal problems. Rayan et al. (2003) used the sequental unconstraned mnmzaton technque (SUMT) to solve the optmal desgn of El-Mostkbal cty whch s an extenson of Ismala cty (Egypt) combned wth the Newton-Raphson method for the hydraulc analyss of the network. Xu et al. (2003) ntroduced two algorthms for determnng the capacty relablty of ageng water dstrbuton systems consderng uncertantes n nodal demands and ppe capacty. The mean value frst order second moment (MVFOSM) method and the frst order relablty model (FORM) were used as a probablstc hydraulc models for relablty assessment. Both models provded reasonably accurate estmates of capacty relablty n cases that the uncertanty n the random varables was small. In cases nvolvng large varablty n the nodal demands and ppe roughness, FORM performed much better. Savc (2005) through the applcaton of varous approaches for optmal desgn and rehabltaton of urban water systems under the condton of nherent uncertanty; namely, the use of standard safety margns (redundant desgn methodology) and the stochastc robustness/rsk evaluaton models wth both sngle-obectve and multobectve optmzaton methods on the New York water supply tunnels problem and the Anytown network clearly demonstrated that neglectng uncertanty n the desgn process mght lead to serous under-desgn of water dstrbuton networks. Tolson et al. (2004) used GAs to solve the optmal water dstrbuton system desgn problems along wth the frst order relablty method (FORM) method to quantfy uncertantes. They demonstrated that the Monte Carlo Smulaton crtcal node capacty relablty approxmaton can sgnfcantly underestmate the true Monte
4 4 Twelfth Internatonal Water Technology Conference, IWTC Alexandra, Egypt Carlo Smulaton network capacty relablty. Therefore, they developed a more accurate FORM approxmaton to network capacty relablty that consders falure events at the two most crtcal nodes n the network. Abdel-Gawad (2005) presented an approach for water network optmzaton under a specfc level of uncertanty n demand, pressure heads, and ppe roughness coeffcent. The approach depends on usng the chance constraned model to convert uncertantes n the desgn parameters to form a determnstc formulaton of the problem. The GA method was adopted to solve the nonlnear optmzaton problem settled n a determnstc form. A hypothetcal example was solved and compared wth prevous soluton from the gradent approach [3]. From the results t can be found that the constructon cost of the ppe system ncreases, wth an ncreasng rate, as the relablty requrement ncreases. Uncertantes n demand nodes or roughness coeffcents have a more pronounced effect on fnal constructon cost, than the effect of the requred mnmum pressure heads. Babayan et al. (2005) presented a methodology for the least cost desgn of water dstrbuton networks consderng uncertanty n node demand. The uncertan demand was assumed to follow both truncated Gaussan (normal) probablty densty functon (PDF) and unform probablty densty functon. The genetc algorthm was used to solve the equvalent determnstc model for the orgnal stochastc one to fnd relable and economc desgn for the network and the system relablty was then determned usng full Mont Carlo smulaton wth 100,000 samplng ponts. The model was tested on the New York tunnels and Anytown problems and then compared to avalable determnstc solutons. The results demonstrated the mportance of applyng the uncertanty concept n desgnng water dstrbuton systems. Babayan et al. (2006) developed two new methods to solve an optmzaton problem under uncertanty. Uncertanty sources used were both future water consumpton and ppe roughness. The stochastc formulaton after beng replaced by a determnstc one usng numercal ntegraton method, whle the optmzaton model was solved usng a standard genetc algorthm. The samplng method solved the stochastc problem drectly by usng the newly developed robust chance constrant genetc algorthm both methods had there own benefts and drawbacks. Nodal and System Relablty Bao and Mays (1990) defned nodal relablty R n as the probablty that a gven node receves suffcent flow rate at the requred pressure head. Theoretcally, therefore, the nodal relablty s a ont probablty of flow rate and pressure head beng satsfed at the gven nodes. They also stated that system relablty s such an ndex dffcult to defne because of the dependence of the computed nodal relabltes. Three heurstc defntons of the system relablty are therefore proposed:
5 Twelfth Internatonal Water Technology Conference, IWTC Alexandra, Egypt 5 (1) The system relablty R sm could be defned as the mnmum nodal relablty n the system R mn ( R ) = 1,2,, I (4.4) sm n where R n s the nodal relablty at node ; and I s the number of demand nodes of nterest. (2) The system relablty could be the arthmetc mean R sa, whch s the mean of all nodal relabltes. I Rn Rsa 1 (4.5) I (3) The system relablty s defned as a weghted average R sw, whch s a weghted mean of all nodal relabltes weghted by the water supply at the node. where R sw I R n 1 I 1 Q Q s s Q s the mean value of water supply at node. s Approaches for Assessment of Network Relablty (4.6) Two man approaches are avalable for assessment of relablty, (Goulter et al., 2000): Analytcal approach. A closed form of soluton for the relablty s derved drectly from the parameters whch defne the network demands and the ablty of network to meet these demands. Smulaton approach. The network s evaluated usng dfferent user defned scenaros or durng extended perod smulatons (Goulter et al., 2000) Advantages and Dsadvantages of the Analytcal Approach (a) Advantages: 1. Consders the complete network rather than samples. 2. Less computatonal tme. (b) Dsadvantages: 1. Requres a smplfed descrpton of the water system. 2. Smplstc nterpretaton of relablty, e.g., connectvty versus hydraulc performance Advantages and Dsadvantages of the Smulaton Approach
6 6 Twelfth Internatonal Water Technology Conference, IWTC Alexandra, Egypt (a) Advantages: 1. A number of relablty measures can be calculated. 2. Allows the analyss of a system wth complcated nteractons. 3. Allows the detaled modelng of the behavor of the system. (b) Dsadvantages: 1. Tme consumng n both terms of computer per tme per analyss and n terms of tme to set up and use such a program. 2. Its runs are hard to optmze and can be hard to generalze beyond a very specfc system. Thus perhaps the best approach to performng a relablty assessment s to use both smulaton and analytcal methods. The prevous lterature revew demonstrates that both analytcal and smulaton methods should be used together. Ths can be acheved by applyng the chance constrant method to take the uncertanty of dfferent ppe network parameters nto account, and a Monte Carlo smulaton to determne ts nodal and system relabltes more accurately. The present study of uncertanty-based optmzaton of water dstrbuton systems and for a specfed level of uncertanty ams to search the optmal dameters whch mnmze the cost and fulfll the pressure constrants at nodes. The uncertanty-based optmzaton was acheved by the chance constrant formulaton whch s dscussed later. The Monte Carlo smulaton s used to fnd the node and network relabltes for the optmal dameters of the network. In the present nvestgaton, (GACCnet)s used to solve the uncertanty based-optmal desgn of the network The optmzaton tool s the Genetc Algorthm (GA) whch s lnked n the present work wth the uncertanty formulaton. Expressed by the chance constrant method, and Monte Carlo Smulaton to estmate the nodal and network relabltes. The case study s a real network. It s an extenson to an exstng dstrbuton network of Ismala Cty named El-Mostkbal Cty. OPTIMIZATION MODEL FORMULATION The water dstrbuton network optmzaton ams to fnd the optmal ppe dameters n the network for a gven layout and demand requrements. The optmal ppe szes are selected n the fnal network satsfyng the conservatons of mass and energy, and the constrants (e.g. hydraulc and desgn constrants). 1- Determnstc Model The formulaton of the optmzaton model for water dstrbuton system desgn can be generally wrtten n the followng form:[3]
7 Twelfth Internatonal Water Technology Conference, IWTC Alexandra, Egypt 7 Obectve functon: Mn. Cost = mn. C T = f D, M, (1) Model Constrants: q, Q 1,..., J h fn, n H (nodes) (2) 0 n 1,..., N (loops) (3) H 1,..., J (nodes) (4), mn D mn D, D max (5) The man obectve of the model, Eq. (1), s to mnmze the constructon cost of the water dstrbuton network as a functon of the ppe dameter, for the set of possble lnks, M, connectng nodes, n the system. connectng nodes,. Wllams formula: f D, q, s the flow rate n the ppe h s the head loss n the ppe and expressed by the Hazen- h f K L, q, C, D, H H (6) where K s a converson factor whch accounts for the system of unts used, (K = for q, n m 3 /s and D, and L, n m), C, s the Hazen-Wllams roughness coeffcent for the ppe connectng nodes,, L, s the length of the ppe connectng nodes,, and H, rate n the ppe s calculated as: H are the pressure heads at nodes,. Then, the flow q H H , K C, D, L, (7) Eq. (2) represents the law of conservaton of mass (contnuty equaton) whch states that the summaton of the flow rates n the ppes at node must be equal to the external demand, Q, at that node. It has to be notced that the contnuty constrant must be satsfed for each node,, n the network. Eq. (3) n the model constrants smply states that the algebrac summaton of the head loss, h f n, around each loop n = 1,, N must be equal to zero. The lower lmt, H, mn, of the pressure head, H, at each node,, s accounted for n the model by Eq. (4).
8 8 Twelfth Internatonal Water Technology Conference, IWTC Alexandra, Egypt Fnally, Eq. (5) defnes the constrant on the ppes dameters n the network where D mn and D max are the mnmum and maxmum dameters, respectvely. Substtuton of the Hazen-Wllams formula, Eq. (7) back nto Eq. (2) automatcally satsfes Eq. (3), and whch n turn reduces the determnstc model constrants to equatons (4), (5), and (7) n combnaton wth (2). 2- Stochastc (Chance Constrant) Model The determnstc optmzaton model descrbed above s transformed nto a stochastc (chance constrant) formulaton by consderng that the future demand, Q, s uncertan because of the unknown future condtons of the system and can be consdered as an ndependent random varable. The chance constrant formulaton can now be expressed as Lansey et al. (1989): Obectve functon: Mnmum Cost = mn. f D Subect to the constrants:, M, (8) P. Q (9) 0.54 H H K 0.54 C D L 2,. 63,, H H, mn (10) D mn D, D max (11) Eq. (9) s the probablty, P ( ), that the node demands are equaled or exceeded wth probablty level,, The probablty level, s defned as the constrant performance relablty whch accounts for the effect of uncertanty of the future demand. 3- Determnstc Chance Constrant Model The chance constrant model s now transformed from a stochastc form nto a determnstc one through applyng the cumulatve probablty dstrbuton concept by consderng the future demand, to be represented by normal random varables wth mean, µ, and standard devaton, σ, as: Q~ N, ) ( Q Q
9 Twelfth Internatonal Water Technology Conference, IWTC Alexandra, Egypt 9 Smlarly, Eq. (9) s transformed nto a determnstc form as follows: W P Q D L H H C K P , 0.54,, 0.54 (12) Where W s a normal random varable wth mean: Q W D L H H C K 63 2,. 0.54,, 0.54 (13) and standard devaton: 2 1/ , 0.54,, Q W D L H H C K (14) Eq. (12) can be rewrtten as: W W W W W P 1 0 (15) or n a smplfed form: W W 1 (16) where s the cumulatve dstrbuton functon and s the standard normal dstrbuton functon. The fnal determnstc form of the constrant Eq. (12) s now wrtten as: W W 1 1 (17) where W and W are determned usng Eqs. (13) and (14).
10 10 Twelfth Internatonal Water Technology Conference, IWTC Alexandra, Egypt The fnal determnstc chance constrant model for water dstrbuton networks s gven by the obectve functon Eq. (8) subect to the constrants Eqs. (17) and (11). The model s nonlnear because of the nonlnear obectve functon Eq. (8) and the non lnear constrant Eq. (17) for every node. The other constrant gven by Eq. (11) for every ppe s consdered to be smple bound. The genetc algorthm (GA) wll be used as a technque to solve the determnstc chance constraned model for water dstrbuton networks. GACCnet PROGRAM: GACCnet program, t s conssted of: Ezzeldn (2007) 1. Genetc algorthm technque to produce the optmal dameters. The GA source code used s smlar to that used n Abdel-Gawad (2001). 2. Newton method to analyze the network usng The H-equatons soluton method. 3. Chance Constrant for the uncertantes. 4. Monte Carlo technque to compute the relablty of the optmal set of ppe dameters. CASE STUDY An actual water network has been selected to apply the developed program for the uncertanty-based optmzaton to evaluate the desgn of the network, also, to test the capabltes of the developed model n a real and large network. The network selected here as a case study s bult to serve a new resdental cty called El-Mostakbal. It s a new extenson to Cty of Ismala. The network was desgned as an extenson to the orgnal network of Ismala Cty. The data of ths network are taken from Herrck (2001) and Rayan et al. (2003). The layout of the network and the ndex numbers of the nodes and ppes are shown n Fgure 1. As the orgnal ndex numbers are great, the correspondng modfed ndex numbers are shown n Fgure 1(b). Smlarly, n Table 1, these modfed ndces are gven. The data for the studed network s shown n Table 2. It ncludes the new ndex (ID) for each node and ppe. The extenson network has 31 nodes (excludng node 32 whch s taken as the supplyng node, Fg. 1(b)) and 43 ppes. For the nodes, the elevaton and specfed demands are gven, whle for the ppes ther lengths and dameters are represented.
11 (a) (b) Fgure 1. El-Mostakbal Cty water dstrbuton network (a) Orgnal ID for nodes and ppes, Herrck (2001) (b) Modfed ID for nodes and ppes used n ths study Twelfth Internatonal Water Technology Conference, IWTC Alexandra, Egypt 11
12 12 Twelfth Internatonal Water Technology Conference, IWTC Alexandra, Egypt Table 1. El-Mostakbal Cty network Orgnal Node ID New Node ID Orgnal Ppe ID Start Node End Node New Ppe ID Start Node End Node
13 Twelfth Internatonal Water Technology Conference, IWTC Alexandra, Egypt 13 Table 2. El-Mostakbal Cty network data (Orgnal desgn) (a) Nodes )b)ppes Node ID Elevaton (m) Demand (LPS) Ppe ID Length (m) Dameter (mm) Total Demand = LPS
14 14 Twelfth Internatonal Water Technology Conference, IWTC Alexandra, Egypt The cost values used n the optmzaton problem are the real costs that are used n the Suez Canal Authorty water sector, Herrck (2001). There are 10 commercally avalable dameters for ductle ppes, Table 3. All ppes are selected from ductle although Rayan et al. (2003) gave other optons for ppes less than 6 nches whch s unpractcal n water dstrbuton networks. Table 3. Commercally avalable ppe szes and cost per meter Dameter (nches) Dameter (mm) Unt Cost (L.E./m) Ppe Type Ductle Ductle Ductle Ductle Ductle Ductle Ductle Ductle Ductle Ductle As mentoned n Rayan et al. (2003), the desgner of ths network chose node number 481 from the orgnal network of Ismala Cty to connect t wth the new extenson network. The average pressure head at ths node before connecton equals 25.5 meters (calculated from the hydraulc model analyss). The connecton ppe (Ppe 7000, Fg. 1(a)) between the two networks s 600 mm dameter wth meter long. To solve ths drawback, the node chosen to connect the old network wth the extenson s a dfferent node than that chosen n the orgnal desgn. The node chosen to connect the two networks by the optmzaton program s node number 456. Its average pressure head s meters (calculated from the hydraulc model). The connecton ppe s 800 mm dameter wth length about 2463 meters long. Accordng to ths, ther study showed a decreasng n the total cost of ths ppe of LE 5,990,565. It s worth to menton that the orgnal exstng desgn of the extended network costs LE 11,868,999. On the other hand, the total cost of ppes for the exstng network wthout ncludng ppe 7000 s LE 2,220,879. The resulted new network under nvestgaton has node 32 as a source wth a total head of m and the total demand for the network s LPS. The mnmum acceptable pressure head requrements for all nodes of the network are set as 22 meters. Dfferences wth Prevous Studes The man dfferences between the present study and the study of Herrck (2001) and
15 Twelfth Internatonal Water Technology Conference, IWTC Alexandra, Egypt 15 Rayan et al. (2003) are: 1. The present study s uncertanty-based optmzaton whle the study of Herrck (2001) and Rayan et al. (2003) s optmzaton only. 2. In Herrck (2001) and Rayan et al. (2003), the Sequental Unconstraned Mnmzaton Technque (SUMT) was appled to solve the optmal desgn of network for the ppe network optmzaton. The SUMT was frst suggested by Carroll (1961) and thoroughly nvestgated by Facco and McCormck (1964). The explanaton of the optmzaton model formulaton s gven by Debedan et al. (2000). In the present study, the genetc algorthms are used for the ppe network optmzaton. 3. In Herrck (2001) and Rayan et al. (2003), the head loss h f n the ppe was expressed by the Darcy-Wesbach formula and the frcton factor f was calculated by the expresson proposed by Swamee and Jan (1975). In the present study, the Hazen-Wllams formula s used. Numercal tests for the frctonal losses calculated by Darcy-Wesbach and Hazen-Wllams formulae for El-Mostakbal network were done usng EPANET 2 and the correspondng approxmate Hazen-Wllams coeffcent was found to be 130 (.e. smooth ppe). As ths value decreases wth ppes ageng, the Hazen-Wllams roughness coeffcent s taken as 100 for all ppes throughout ths case study. Computatonal Results of Optmzaton The frst part of the present study s dedcated to fnd the optmal dameters and the correspondng total cost. For the studed network, t should be mentoned that for 43 ppes and a set of 10 commercal ppes, the total number of desgns s Therefore, t s very dffcult for any mathematcal model to test all these possble combnatons of desgn and a very small percentage of combnatons can be reached. The optmal dameters found by GACCnet program are lsted n Table 4. The optmal cost s LE 2,234,046 compared to LE 2,220,879 for the orgnal desgn.
16 16 Twelfth Internatonal Water Technology Conference, IWTC Alexandra, Egypt Table 4. Optmal ppe dameters for El-Mostakbal Cty network ( = 0.5) Ppe ID Dameter (mm) Ppe ID Dameter (mm) Although the optmal cost s not less than the orgnal network cost, but the nodal pressure heads requrements are fulflled. The genetc algorthm parameters used for solvng ths case study are mentoned n Appendx D. The hydraulc analyss results of the case study network before and after optmzaton are shown n Table 5 and Fg. 2. For the network before optmzaton and as seen from Table 5 and Fg. 2, there are some nodes (22 and 24 to 29) wth pressure head values less than 22 m, whch s the mnmum pressure crteron. As expected, the nodal pressure heads n the extended network after optmzaton s hgher than that of the orgnal desgn. The pressure heads at all nodes of the optmzed network are greater than 22 meters whch s the mnmum acceptable pressure head requrements. Also, the average nodal pressure head n the optmzed network s greater than that of the orgnal desgn due to the well-known fact that decreasng the dameter of a ppe ncreases the frcton losses and consequently decreases the pressure head at the downstream node. It can be concluded that the optmzaton of the water dstrbuton system of El-Mostakbal Cty overcomes the drawback of low nodal pressure heads of the orgnal network. For the optmzed network, the utlzaton of optmzaton technque perhaps results n not mnmzng the cost but ncreasng the pressure heads at all nodes of the network to be greater than
17 Twelfth Internatonal Water Technology Conference, IWTC Alexandra, Egypt 17 the mnmum acceptable pressure head. Table 5. Results of hydraulc analyss of El-Mostakbal Cty network before and after optmzaton optmzed network Node ID Nodal Pressure Head (m) Before Optmzaton** After Optmzaton** Average Pressure (m) Mnmum Pressure (m) Maxmum Pressure (m) * Orgnal desgn (Table 9.2), ** Optmal desgn (Table 9.4)
18 Pressure Head (m) 18 Twelfth Internatonal Water Technology Conference, IWTC Alexandra, Egypt 40 After Optmzaton Before Optmzaton Node ID Fgure 2. Comparson of nodal pressure heads between El-Mostakbal Cty orgnal desgn and optmzed network Computatonal Results of Uncertanty-Based Optmzaton The second part of the present study s dedcated to fnd the optmal dameters and the correspondng total cost for specfed levels of uncertanty. Table 6 lsts the optmum desgn of El-Mostakbal Cty network under sx levels of uncertanty for a coeffcent of varaton n nodal demands COV Q = 10%. The nodal pressure heads for these optmal networks are gven n Table 7. The results of nodal and system relabltes from the Monte Carlo smulaton assocated wth these sx dfferent levels of uncertanty are gven n Table 8.
19 Twelfth Internatonal Water Technology Conference, IWTC Alexandra, Egypt 19 Table 6. Optmal ppe dameters for El-Mostakbal Cty network for dfferent network uncertantes at COV Q = 10% Ppe Dameter (mm) ID = 0.5 = 0.6 = 0.7 = 0.8 = 0.9 = Cost (LE) 2,234,046 2,240,746 2,330,245 2,380,332 2,517,901 2,584,412
20 20 Twelfth Internatonal Water Technology Conference, IWTC Alexandra, Egypt Table 7. Nodal pressure heads of best solutons of El-Mostakbal Cty network for dfferent network uncertantes at COV Q = 10% Node Pressure Head (m) ID = 0.5 = 0.6 = 0.7 = 0.8 = 0.9 = Average Pressure (m) Mnmum Pressure (m) Maxmum Pressure (m)
21 Twelfth Internatonal Water Technology Conference, IWTC Alexandra, Egypt 21 Table 8. Node and network relabltes of best solutons of El-Mostakbal Cty network for dfferent network uncertantes at COV Q = 10% Node Node Relablty, R n (%) ID = 0.5 = 0.6 = 0.7 = 0.8 = 0.9 = Network Relablty, R sm (%) Network Relablty, R sa (%) Network Relablty, R sw (%) For maor values of uncertanty, Table 7 show that nodes 24, 25, 27 and 29 are the crtcal nodes n the network, whch have nodal pressure heads not far from the requred mnmum pressure head. Therefore, ther node relabltes and manly that of node 24 are affectng the network relablty, Table 8. It s worth to menton that the Monte Carlo smulaton wth 10,000 samples was performed to calculate the nodal and network relabltes of El-Mostakbal Cty network. Also, from Table 8 the weghted system relablty came out to be hgher than arthmetc system relablty results and the latter s greater than the mnmum nodal system relablty.
22 22 Twelfth Internatonal Water Technology Conference, IWTC Alexandra, Egypt Smlar to the prevous study, the optmum desgns of El-Mostakbal Cty network under the same prevous levels of uncertanty for a coeffcent of varaton n nodal demands COV Q = 20% are gven n Table 9. The nodal pressure heads for these optmal networks are gven n Table 10. The calculated nodal capacty and system relabltes from the Monte Carlo smulaton assocated wth these sx dfferent levels of uncertanty are summarzed n Table 11. For ths COV Q, t s observed that the mnmum nodal pressure heads are at nodes 24, 25 and 27 dependng on the specfed level of uncertanty and that node 24 has very low nodal relablty compared to that for other nodes for = 0.5 and 0.6. Smlar to COV Q = 10%, the obtaned weghted system relablty s hgher than the arthmetc system relablty and the mnmum nodal system relablty.
23 Twelfth Internatonal Water Technology Conference, IWTC Alexandra, Egypt 23 Table 9. Optmal ppe dameters for El-Mostakbal Cty network for dfferent network uncertantes at COV Q = 20% Ppe Dameter (mm) ID = 0.5 = 0.6 = 0.7 = 0.8 = 0.9 = Cost (LE) 2,234,046 2,251,260 2,386,508 2,490,224 2,586,316 2,755,927
24 24 Twelfth Internatonal Water Technology Conference, IWTC Alexandra, Egypt Table 10. Nodal pressure heads of best solutons of El-Mostakbal Cty network for dfferent network uncertantes at COV Q = 20% Node Pressure Head (m) ID = 0.5 = 0.6 = 0.7 = 0.8 = 0.9 = Average Pressure (m) Mnmum Pressure (m) Maxmum Pressure (m)
25 Twelfth Internatonal Water Technology Conference, IWTC Alexandra, Egypt 25 Table 11. Node and network relabltes of best solutons of El-Mostakbal Cty network for dfferent network uncertantes at COV Q = 20% Node Node Relablty, R n (%) ID = 0.5 = 0.6 = 0.7 = 0.8 = 0.9 = Network Relablty, R sm (%) Network Relablty, R sa (%) Network Relablty, R sw (%) The nformaton on the trade-off between cost and uncertanty s shown n Fg. 3, whch gves the relatonshp or trade-off between cost and uncertanty requrements for a range of uncertanty requrements on the degraded network confguratons. It s evdent from Fgure 3 that, for a gven level of uncertanty, the cost of the desgn ncreases wth the ncrease n the coeffcent of demand varaton. As mentoned prevously, usng a Monte Carlo smulaton, the nodal relablty at every node s calculated and the network relablty s derved from them. The results
26 Cost (LE*10 6 ) Cost (LE*10 6 ) 26 Twelfth Internatonal Water Technology Conference, IWTC Alexandra, Egypt of the network relablty gven n Tables 8 and 11 are plotted n Fg. 4. It s clear that the network relablty s 100% for = 0.99 whch means very relable network under uncertanty n nodal demands up to COV Q = 20% COV Q = 20%, COV C = COV H = 0% COV Q = 10%, COV C = COV H = 0% Fgure 3. Total cost of network versus uncertanty for El-Mostakbal Cty network for COV Q = 10% and 20% COV Q = 20%, COV C = COV H = 0% COV Q = 10%, COV C = COV H = 0% Network Relablty, R sm (%) Fgure 4. Total cost of network versus network relablty for El-Mostakbal Cty network for COV Q = 10% and 20%
27 Twelfth Internatonal Water Technology Conference, IWTC Alexandra, Egypt 27 CONCLUSIONS The Relablty-based optmzaton of water dstrbuton networks s presented and appled to a case study. The approach lnks a genetc algorthm (GA) as the optmzaton tool, the Newton method as the hydraulc smulaton solver wth the chance constrant combned wth the Monte Carlo smulaton to estmate network capacty relablty. The source of uncertanty analyzed s the future nodal external demands. The results at two values of coeffcent of varaton reveal the well known relaton between the total cost and network relablty, that the hgher the relablty requrement, the greater the desgn cost. The hgh relablty of network ncreases the performance of the network at normal condtons. NOMENCLATURE C, Hazen-Wllams roughness coeffcent for ppe connectng nodes, C T total cost D, dameter of ppe connectng nodes, n the system (m) D max maxmum dameter, (m) D mn mnmum dameter, (m) H pressure head at node, (m) H mnmum requred pressure head at node, (m) h f,mn head loss due to frcton n a ppe, (m) K converson factor whch accounts for the system of unts used. L, length of ppe connectng nodes,, (m) M total number of nodes n the network N total number of ppes N s total number of Monte Carlo smulatons P ( ) probablty Q dscharges nto or out of the node, (m 3 /s) Q s mean value of water supply at node, (m 3 /s) q, flow n ppe connectng nodes,, (m 3 /s) R s R x Z N system relablty nodal capacty relablty Independent varable obectve functon Greek Symbols probablty level for the node demands
28 28 Twelfth Internatonal Water Technology Conference, IWTC Alexandra, Egypt cumulatve dstrbuton functon mean of random varable Q, (m 3 /s) Q standard devaton of random varable Q, (m 3 /s) Q REFERENCES 1. Abdel-Gawad, H.A.A., "Optmal Desgn of Ppe Networks by an Improved Genetc Algorthm," Proceedngs of the Sxth Internatonal Water Technology Conference IWTC 2001, Alexandra, Egypt, March 23-25, 2001, pp Abdel-Gawad, H.A.A., "Optmal Desgn of Water Dstrbuton Networks under a Specfc Level of Relablty," Proceedngs of the Nnth Internatonal Water Technology Conference, IWTC9 2005, Sharm El-Shekh, Egypt, March 17-20, 2005, pp Babayan, A.V, Kapelan, Z., Savć, D.A., and Walters, G.A., "Least Cost Desgn of Robust Water Dstrbuton Networks under Demand Uncertanty". Journal of Water Resources Plannng and Management, ASCE, 2005, Vol. 131, No. 5, pp Babayan, A.V, Kapelan, Z., Savć, D.A., and Walters, G.A., "Comparson of two methods for the stochastc least cost desgn of water dstrbuton systems," Engneerng Optmzaton, Vol. 38, No. 03, Aprl 2006, pp Bao, Y., and Mays, L.W., "Model for Water Dstrbuton System Relablty," Journal of Hydraulc Engneerng, ASCE, Vol. 116, No. 9, 1990, pp Carroll, C.W., "The Created Response Surface Technque for Optmzng Nonlnear Restraned Systems," Operatons Research, Vol. 9, 1961, pp Debedan, B., Herrck, A.M., and Rayan, M.M., 2000, "Modellng and Optmzaton of Potable Water Network," Internatonal Ppelne Conference (IPC 2000) October 1-5, Calgary, Canada. 8. Ezzeldn, R.M, ''Relablty-Based Optmal desgn model for Water Dstrbuton Networks '' M. Sc. Thess, Mansoura Unversty, El-Mansoura, Egypt, (2007). 9. Facco, A.V., and McCormck, G.P., 1964, "Computatonal Algorthm for the Sequental Unconstraned Mnmzaton Technque for Nonlnear Programmng," Vol. 10, pp Goulter, C., and Bouchart, F., "Relablty-Constraned Ppe Network Model," Journal of Hydraulc Engneerng, ASCE, Vol. 116, No. 2, 1990, pp Goulter, I., Thomas, M., Mays, L.W., Sakarya, B., Bouchart, F., and Tung, Y.K., "Relablty Analyss for Desgn," n Water Dstrbuton Systems Handbook, (Larry W. Mays, Edtor n Chef), McGraw-Hll, 2000, pp Herrck, A.M., 2001, "Optmum Computer Aded Hydraulc Desgn and Control of Water Purfcaton and Dstrbuton Systems," M. Sc. Thess, Mansoura Unversty, Egypt. 13. Lansey, K., and Mays, L., 1989, "Optmzaton Model for Water Dstrbuton System Desgn," Journal of Hydraulc Engneerng, ASCE, Vol. 115, No. 10, pp
29 Twelfth Internatonal Water Technology Conference, IWTC Alexandra, Egypt Lasdon, L.S., and Waren, A.D., "Generalzed Reduced Software for Lnearly and Nonlnearly Constraned Problems," Desgn and Implementaton of Optmzaton Software, H. Greenberg, ed., Sgthoff and Noordoff, Netherlands, Lasdon, L.S., and Waren, A.D., "GRG2 User s Gude," Unversty of Texas at Austn, Tex., Rayan, M.A., Debedan, B., El-Hak, N.G., and Herrck, A., "Optmzaton of Potable Water Network (Case Study)," Seventh Internatonal Water Technology Conference, IWTC 2003, Aprl 1-3, 2003, Caro, Egypt, pp Savc, D.A., "Copng wth Rsk and Uncertanty n Urban Water Infrastructure Rehabltaton Plannng," Acqua e Cttà - I Convegno Nazonale d Idraulca Urbana, Sant Agnello (NA), September A-Relazone_Mem_Savc.pdf 18. Savc, D.A., and Walters, G.A., "Genetc Algorthms for Least-Cost Desgn of Water Dstrbuton Networks," Journal of Water Resources Plannng and Management, ASCE, Vol. 123, No. 2, 1997, pp Su, Y.C., Mays, L.W., Duan, N., and Lansey, K.E., "Relablty-Based Optmzaton Model for Water Dstrbuton Systems," Journal of Hydraulc Engneerng, ASCE, Vol. 114, No. 12, 1987, pp Swamee, P. K., and Jan, A. K., 1975, "Explct Equatons for Ppe-Flow Problems," Journal of the Hydraulcs Dvson, ASCE, Vol. 102, No. HY5, May, pp Tolson, B.A., Maer, H.R., Smpson, A.R., and Lence, B.J., "Genetc Algorthms for Relablty-Based Optmzaton of Water Dstrbuton Systems," Journal of Water Resources Plannng and Management, ASCE, Vol. 130, No. 1, 2004, pp Wood, D.J., "Computer Analyss of Flow n Ppe Networks Includng Extended Perod Smulatons: User s Manual" College of Engneerng, Unversty of Kentucky, Lexngton, KY, Xu, C., and Goulter, I.C., "Probablstc Model for Water Dstrbuton Relablty," Journal of Water Resources Plannng and Management, ASCE, Vol. 124, No. 4, 1998, pp Xu, C., and Goulter, I.C., "Relablty-Based Optmal Desgn of Water Dstrbuton Networks," Journal of Water Resources Plannng and Management, ASCE, Vol. 125, No. 6, 1999, pp Xu, C., Goulter, I.C., and Tckle, K.S., "Assessng the Capacty Relablty of Ageng Water Dstrbuton Systems," Cvl Engneerng and Envronmental Systems, Vol. 20, No. 2, 2003, pp
COST OPTIMIZATION OF WATER DISTRIBUTION SYSTEMS SUBJECTED TO WATER HAMMER
Thrteenth Internatonal Water Technology Conference, IWTC13 29, Hurghada, Egypt COST OPTIMIZATION OF WATER DISTRIBUTION SYSTEMS SUBJECTED TO WATER HAMMER Berge Djebedjan *, Mohamed S. Mohamed *, Abdel-Gawad
More information1 Basic concepts for quantitative policy analysis
1 Basc concepts for quanttatve polcy analyss 1.1. Introducton The purpose of ths Chapter s the ntroducton of basc concepts of quanttatve polcy analyss. They represent the components of the framework adopted
More informationFlexible Design of Urban Water Distribution Networks
4225 Flexble Desgn of Urban Water Dstrbuton Networks Danguang Huang 1, Kalanthy Varavamoorthy 1, Seneshaw Tsegaye 1 1 School of Cvl Engneerng, College of Engneerng and Physcal Scences, Unversty of Brmngham
More informationA Two-Echelon Inventory Model for Single-Vender and Multi-Buyer System Through Common Replenishment Epochs
A Two-Echelon Inventory Model for Sngle-Vender and Mult-Buyer System Through Common Replenshment Epochs Wen-Jen Chang and Chh-Hung Tsa Instructor Assocate Professor Department of Industral Engneerng and
More informationMULTIPLE FACILITY LOCATION ANALYSIS PROBLEM WITH WEIGHTED EUCLIDEAN DISTANCE. Dileep R. Sule and Anuj A. Davalbhakta Louisiana Tech University
MULTIPLE FACILITY LOCATION ANALYSIS PROBLEM WITH WEIGHTED EUCLIDEAN DISTANCE Dleep R. Sule and Anuj A. Davalbhakta Lousana Tech Unversty ABSTRACT Ths paper presents a new graphcal technque for cluster
More informationPlanning of work schedules for toll booth collectors
Lecture Notes n Management Scence (0) Vol 4: 6 4 4 th Internatonal Conference on Appled Operatonal Research, Proceedngs Tadbr Operatonal Research Group Ltd All rghts reserved wwwtadbrca ISSN 00-0050 (Prnt),
More informationPractical Application Of Pressure-Dependent EPANET Extension
Cty Unversty of New York (CUNY) CUNY Academc Works Internatonal Conference on Hydronformatcs 8-1-2014 Practcal Applcaton Of Pressure-Dependent EPANET Extenson Alemtsehay G. Seyoum Tku T. Tanymboh Follow
More informationExperiments with Protocols for Service Negotiation
PROCEEDINGS OF THE WORKSHOP ON APPLICATIONS OF SOFTWARE AGENTS ISBN 978-86-7031-188-6, pp. 25-31, 2011 Experments wth Protocols for Servce Negotaton Costn Bădcă and Mhnea Scafeş Unversty of Craova, Software
More informationOptimal Scheduling of Hydro Power Generation Using Deconvolution Technique: A Case Study of Thai Power System
Optmal Schedulng of Hydro Power Generaton Usng Deconvoluton Technque: A Case Study of Tha Power System Keerat Chayakulkheeree Abstract In ths paper, the deconvoluton technque s appled to determne an optmal
More informationFIN DESIGN FOR FIN-AND-TUBE HEAT EXCHANGER WITH MICROGROOVE SMALL DIAMETER TUBES FOR AIR CONDITIONER
FIN DESIGN FOR FIN-AND-TUBE HEAT EXCHANGER WITH MICROGROOVE SMALL DIAMETER TUBES FOR AIR CONDITIONER Yfeng Gao (a), J Song (a), Jngdan Gao (b), Guolang Dng (b)* (a) Internatonal Copper Assocaton Shangha
More informationSimulation of Steady-State and Dynamic Behaviour of a Plate Heat Exchanger
Journal of Energy and Power Engneerng 10 (016) 555-560 do: 10.1765/1934-8975/016.09.006 D DAVID PUBLISHING Smulaton of Steady-State and Dynamc Behavour of a Plate Heat Exchanger Mohammad Aqeel Sarareh
More informationCOMPARISON OF DEMAND DRIVEN AND PRESSURE DEPENDENT HYDRAULIC APPROACHES FOR MODELLING WATER QUALITY IN DISTRIBUTION NETWORKS
11 th Internatonal Conference on Computng and Control for the Water Industry, Exeter UK, 5-7 September 211 COMPARISON OF DEMAND DRIVEN AND PRESSURE DEPENDENT HYDRAULIC APPROACHES FOR MODELLING WATER QUALITY
More informationModeling and Simulation for a Fossil Power Plant
Modelng and Smulaton for a Fossl Power Plant KWANG-HUN JEONG *, WOO-WON JEON, YOUNG-HOON BAE AND KI-HYUN LEE Corporate R&D Insttute Doosan Heavy Industres and Constructon Co., Ltd 555, Gwgo-dong, Changwon,
More informationPSO Approach for Dynamic Economic Load Dispatch Problem
Internatonal Journal of Innovatve Research n Scence, Engneerng and Technology (An ISO 3297: 2007 Certfed Organzaton Vol. 3, Issue 4, Aprl 2014 PSO Approach for Dynamc Economc Load Dspatch Problem P.Svaraman
More informationA Multi-Product Reverse Logistics Model for Third Party Logistics
2011 Internatonal Conference on Modelng, Smulaton and Control IPCSIT vol.10 (2011) (2011) IACSIT Press, Sngapore A Mult-Product Reverse Logstcs Model for Thrd Party Logstcs Tsa-Yun Lao, Agatha Rachmat
More informationRECEIVING WATER HYDRAULICS ASSIGNMENT 2
RECEIVING WATER HYDRAULICS ASSIGNMENT 2 Desgn of wastewater dscharge from the cty of Göteborg. Example of a dffuser n a stratfed coastal sea Example of retenton tme calculatons Ths assgnment conssts of
More informationDevelopment and production of an Aggregated SPPI. Final Technical Implementation Report
Development and producton of an Aggregated SPP Fnal Techncal mplementaton Report Marcus Frdén, Ulf Johansson, Thomas Olsson Servces Producer Prce ndces, Prce Statstcs Unt, Statstcs Sweden 2010 ntroducton
More informationFinite Element Analysis and Optimization for the Multi- Stage Deep Drawing of Molybdenum Sheet
Fnte Element Analyss and Optmzaton for the Mult- Deep of Molybdenum Sheet Heung-Kyu Km a,*, Seok Kwan Hong a, Jong-Kl Lee b, Byung-Hee Jeon c, Jeong Jn Kang a, and Young-moo Heo a a Precson Molds and Des
More informationA Scenario-Based Objective Function for an M/M/K Queuing Model with Priority (A Case Study in the Gear Box Production Factory)
Proceedngs of the World Congress on Engneerng 20 Vol I WCE 20, July 6-8, 20, London, U.K. A Scenaro-Based Objectve Functon for an M/M/K Queung Model wth Prorty (A Case Study n the Gear Box Producton Factory)
More informationEvaluating The Performance Of Refrigerant Flow Distributors
Purdue Unversty Purdue e-pubs Internatonal Refrgeraton and Ar Condtonng Conference School of Mechancal Engneerng 2002 Evaluatng The Performance Of Refrgerant Flow Dstrbutors G. L Purdue Unversty J. E.
More information1991), a development of the BLAST program which integrates the building zone energy balance with the system and central plant simulation.
OPTIMISATION OF MECHANICAL SYSTEMS IN AN INTEGRATED BUILDING ENERGY ANALYSIS PROGRAM: PART I: CONVENTIONAL CENTRAL PLANT EQUIPMENT Russell D. Taylor and Curts O. Pedersen Unversty of Illnos at Urbana-
More informationEvaluating the statistical power of goodness-of-fit tests for health and medicine survey data
8 th World IMACS / MODSIM Congress, Carns, Australa 3-7 July 29 http://mssanz.org.au/modsm9 Evaluatng the statstcal power of goodness-of-ft tests for health and medcne survey data Steele, M.,2, N. Smart,
More informationExtended Abstract for WISE 2005: Workshop on Information Systems and Economics
Extended Abstract for WISE 5: Workshop on Informaton Systems and Economcs How Many Bundles?:An Analyss on Customzed Bundlng of Informaton Goods wth Multple Consumer Types Wendy HUI Ph.D. Canddate Department
More informationAssignment II Design of Wastewater Discharge from the City of Gothenburg. Design of a Wastewater Discharge from the City of Gothenburg
Assgnment II Desgn of Wastewater Dscharge from the Cty of Gothenburg Envronmental Hydraulcs Desgn of a Wastewater Dscharge from the Cty of Gothenburg The assgnment conssts of two parts. The frst part deals
More informationA SIMULATION STUDY OF QUALITY INDEX IN MACHINE-COMPONF~T GROUPING
A SMULATON STUDY OF QUALTY NDEX N MACHNE-COMPONF~T GROUPNG By Hamd Sefoddn Assocate Professor ndustral and Manufacturng Engneerng Department Unversty of Wsconsn-Mlwaukee Manocher Djassem Assstant Professor
More informationCOMPARISON ANALYSIS AMONG DIFFERENT CALCULATION METHODS FOR THE STATIC STABILITY EVALUATION OF TAILING DAM
Blucher Mechancal Engneerng Proceedngs May 2014, vol. 1, num. 1 www.proceedngs.blucher.com.br/evento/10wccm COMPARISON ANALYSIS AMONG DIFFERENT CALCULATION METHODS FOR THE STATIC STABILITY EVALUATION OF
More informationCONFLICT RESOLUTION IN WATER RESOURCES ALLOCATION
7 th Internatonal Conference on Hydronformatcs HIC 2006, Nce, FRANCE CONFLICT RESOLUTION IN WATER RESOURCES ALLOCATION MASOUD ASADZADEH ESFAHANI Graduate Research Assstant, School of Cvl and Envronmental
More informationHigh impact force attenuation of reinforced concrete systems
Structures Under Shock and Impact XII 273 Hgh mpact force attenuaton of renforced concrete systems Y. Km, T. El-Korch & K. S. Arsava Department of Cvl and Envronmental Engneerng, Worcester Polytechnc Insttute
More informationStudy on trade-off of time-cost-quality in construction project based on BIM XU Yongge 1, a, Wei Ya 1, b
Internatonal Conference on Economcs, Socal Scence, Arts, Educaton and Management Engneerng (ESSAEME 205) Study on trade-off of tme-cost-qualty n constructon project based on BIM XU Yongge, a, We Ya, b
More informationConstruction of Control Chart Based on Six Sigma Initiatives for Regression
2018 IJSRST Volume 4 Issue 2 Prnt ISSN: 2395-6011 Onlne ISSN: 2395-602X Themed Secton: Scence and Technology Constructon of Control Chart Based on Sx Sgma Intatves for Regresson ABSTRACT R. Radhakrshnan
More informationEvaluating Clustering Methods for Multi-Echelon (r,q) Policy Setting
Proceedngs of the 2007 Industral Engneerng Research Conference G. Bayraksan W. Ln Y. Son and R. Wysk eds. Evaluatng Clusterng Methods for Mult-Echelon (r) Polcy Settng Vkram L. Desa M.S.; Manuel D. Rossett
More informationRULEBOOK on the manner of determining environmental flow of surface water
Pursuant to Artcle 54 paragraph 2 of the Law on Waters (Offcal Gazette of the Republc of Montenegro 27/07 and Offcal Gazette of Montenegro 32/11 and 48/15), the Mnstry of Agrculture and Rural Development
More informationOptimal operation scheme for diesel power plant units of PT. PLN-Manokwari Branch using Lagrange Multiplier Method
Avalable onlne at www.scencedrect.com roceda Envronmental Scences 17 ( 2013 ) 557 565 The 3 rd Internatonal Conference on Sustanable Future for Human Securty SUSTAIN 2012 Optmal operaton scheme for desel
More informationReprint from "MPT-Metallurgical P(ant and Technology International" issue No. 2/1990, pages Optimization of. Tempcore installations for
Reprnt from "MPT-Metallurgcal P(ant and Technology nternatonal" ssue No. 2/990, pages 6-69 (Ç 990, Verlag StahlesenmbH, Düsseldorf Optmzaton of. Tempcore nstallatons for rebars Perre Smon, Centre de Recherches
More informationAppendix 6.1 The least-cost theorem and pollution control
Appendx 6.1 The least-cost theorem and polluton control nstruments Ths appendx s structured as follows. In Part 1, we defne the notaton used and set the scene for what follows. Then n Part 2 we derve a
More informationEmission Reduction Technique from Thermal Power Plant By Load Dispatch
Emsson Reducton Technque from Thermal Power Plant By Load Dspatch S. R. Vyas 1, Dr. Rajeev Gupta 2 1 Research Scholar, Mewar Unversty, Chhtorgrah. Inda 2 Dean EC Dept., Unversty College of Engg. RTU, Kota.
More informationThe Spatial Equilibrium Monopoly Models of the Steamcoal Market
Advances n Management & Appled Economcs, vol.2, no.3, 2012, 125-132 ISSN: 1792-7544 (prnt verson), 1792-7552 (onlne) Scenpress Ltd, 2012 The Spatal Equlbrum Monopoly Models of the Steamcoal Maret Hu Wen
More informationApplication of Ant colony Algorithm in Cloud Resource Scheduling Based on Three Constraint Conditions
, pp.215-219 http://dx.do.org/10.14257/astl.2016.123.40 Applcaton of Ant colony Algorthm n Cloud Resource Schedulng Based on Three Constrant Condtons Yang Zhaofeng, Fan Awan Computer School, Pngdngshan
More informationOptimum Generation Scheduling for Thermal Power Plants using Artificial Neural Network
Internatonal Journal of Electrcal and Computer Engneerng (IJECE) Vol., o., ecember 0, pp. 35~39 ISS: 088-8708 35 Optmum Generaton Schedulng for Thermal ower lants usng Artfcal eural etwork M. S. agaraja
More informationMulti-objective Optimization of Combined Sewer Systems Using SWMM 5.0
J. Cvl Eng. Archtect. Res. Vol. 2, No. 10, 2015, pp. 985-993 Receved: Aprl 28, 2015; Publshed: October 25, 2015 Journal of Cvl Engneerng and Archtecture Research Mult-objectve Optmzaton of Combned Sewer
More informationA Novel Gravitational Search Algorithm for Combined Economic and Emission Dispatch
A Novel Gravtatonal Search Algorthm for Combned Economc and Emsson Dspatch 1 Muhammad Yaseen Malk, 2 Hmanshu Gupta 1 Student, 2 Assstant Professor 1 Electrcal Engneerng 1 E-Max Group of Insttutons, Haryana,
More informationReliability Evaluation of Groundwater Contamination Source Characterization under Uncertain Flow Field
Relablty Evaluaton of Groundwater Contamnaton Source Characterzaton under Uncertan Flow Feld Mahsa Amrabdollahan and Bthn Datta Abstract Groundwater contamnaton s one of the serous envronmental problems.
More informationDynamic optimal groundwater management considering fixed and operation costs for an unconfined aquifer
Dynamc optmal groundwater management consderng fxed and operaton costs for an unconfned aqufer MING- SHENG. YEH, YU-WEN. CHEN 2, CHIN-TSAI. HSIAO 3, LIANG-CHENG. CHANG 5. Graduate Student of Department
More informationSporlan Valve Company
F21O-10-12 LMTED: M & W What s a TEV Settng? For years Sporlan and every other manufacturer oftevs has used regulated arflow and controlled temperature baths to establsh a "factory" settng. Typcally the
More informationMODULE - 8 LECTURE NOTES 6 URBAN STORMWATER MANAGEMENT
Water Resources Systems Plannng and Management: Water Resources Systems Modelng Urban MODULE - 8 LECTURE NOTES 6 URBAN STORMWATER MANAGEMENT INTRODUCTION Urban stormwater management systems are meant to
More informationApproach for Online Short-term Hydro-Thermal Economic Scheduling
Approach for Onlne Short-term Hydro-Thermal Economc Schedulng Rav Brahmadev, Tukaram Moger, Member, IEEE and D. Thukaram, Senor Member, IEEE Department of Electrcal Engneerng Indan Insttute of Scence,
More informationModel-based Optimal Control of Variable Air Volume Terminal Box
Purdue Unversty Purdue e-pubs Internatonal Hgh Performance Buldngs Conference School of Mechancal Engneerng 216 Model-based Optmal Control of Varable Ar Volume ermnal Box Fuxn Nu he unversty of alabama,
More informationA TABU SEARCH FOR MULTIPLE MULTI-LEVEL REDUNDANCY ALLOCATION PROBLEM IN SERIES-PARALLEL SYSTEMS
Internatonal Journal of Industral Engneerng, 18(3), 120-129, 2011. A TABU SEACH FO MULTIPLE MULTI-LEVEL EDUNDANCY ALLOCATION POBLEM IN SEIES-PAALLEL SYSTEMS Kl-Woong Jang and Jae-Hwan Km Department of
More informationOptimal Operation of a Wind and Fuel Cell Power Plant Based CHP System for Grid-Parallel Residential Micro-Grid
Optmal Operaton of a Wnd and Fuel Cell Power Plant Based CHP System for Grd-Parallel Resdental Mcro-Grd M. Y. EL-SHARKH, M. TARIOVE, A. RAHMA, M. S. ALAM Department of Electrcal and Computer Engneerng,
More informationGuidelines on Disclosure of CO 2 Emissions from Transportation & Distribution
Gudelnes on Dsclosure of CO 2 Emssons from Transportaton & Dstrbuton Polcy Research Insttute for Land, Infrastructure and Transport June 2012 Contents 1. Introducton...- 3-1.1 Purpose and concept...- 3-1.2
More informationA Group Decision Making Method for Determining the Importance of Customer Needs Based on Customer- Oriented Approach
Proceedngs of the 010 Internatonal Conference on Industral Engneerng and Operatons Management Dhaka, Bangladesh, January 9 10, 010 A Group Decson Makng Method for Determnng the Importance of Customer Needs
More informationExperimental design methodologies for the identification of Michaelis- Menten type kinetics
UNIVERIDADE NOVA DE LIBOA Faculdade de Cêncas e Tecnologa Departamento de Químca Expermental desgn methodologes for the dentfcaton of Mchaels- Menten type knetcs Por Flpe Ataíde Dssertação apresentada
More informationStudy on Productive Process Model Basic Oxygen Furnace Steelmaking Based on RBF Neural Network
IJCSI Internatonal Journal of Computer Scence Issues, Vol., Issue 3, No 2, May 24 ISSN (Prnt): 694-84 ISSN (Onlne): 694-784 www.ijcsi.org 7 Study on Productve Process Model Basc Oxygen Furnace Steelmakng
More informationOptimal Issuing Policies for Substitutable Fresh Agricultural Products under Equal Ordering Policy
06 Internatonal Academc Conference on Human Socety and Culture (HSC 06) ISBN: 978--60595-38-6 Optmal Issung Polces for Substtutable Fresh Agrcultural Products under Eual Orderng Polcy Qao- TENG,a, and
More informationApplication of a PCA based water quality classification method in water. quality assessment in the Tongjiyan Irrigation Area, China
Internatonal Conference on Energy and Envronmental Protecton (ICEEP 06) Applcaton of a PCA based water qualty classfcaton method n water qualty assessment n the Tongyan Irrgaton Area, Chna ue-feng Tao,
More informationK vary over their feasible values. This allows
Proceedngs of the 2007 INFORMS Smulaton Socety Research Workshop. MULTI-PRODUCT CYCLE TIME AND THROUGHPUT EVALUATION VIA SIMULATION ON DEMAND John W. Fowler Gerald T. Mackulak Department of Industral Engneerng
More informationNumerical Analysis about Urban Climate Change by Urbanization in Shanghai
Numercal Analyss about Urban Clmate Change by Urbanzaton n Shangha Hafeng L 1, Wejun Gao 2 and Tosho Ojma 3 1 Research Assocate, School of Scence and Engneerng, Waseda Unversty, Japan 2 Assocate Professor,
More informationOptimization of Groundwater Use in the Goksu Delta at Silifke, Turkey
Frst Internatonal Conference on Saltwater Intruson and Coastal Aqufers Montorng, Modelng, and Management. Essaoura, Morocco, Aprl 23 25, 21 Optmzaton of Groundwater Use n the Goksu Delta at Slfke, Turkey
More informationSupplier selection and evaluation using multicriteria decision analysis
Suppler selecton and evaluaton usng multcrtera decson analyss Stratos Kartsonaks 1, Evangelos Grgorouds 2, Mchals Neofytou 3 1 School of Producton Engneerng and Management, Techncal Unversty of Crete,
More informationOptimization of Technological Water Consumption for an Industrial Enterprise with Self-Supply System
, March 13-15, 2013, Hong Kong Optmzaton of Technologcal Water Consumpton for an Industral Enterprse wth Self-Supply System Ioan Sarbu, Gabrel Ostafe and Emlan Stefan Valea Abstract Modern ndustry uses
More informationemissions in the Indonesian manufacturing sector Rislima F. Sitompul and Anthony D. Owen
Mtgaton optons for energy-related CO 2 emssons n the Indonesan manufacturng sector Rslma F. Stompul and Anthony D. Owen School of Economcs, The Unversty of New South Wales, Sydney, Australa Why mtgaton
More informationSIMULATION RESULTS ON BUFFER ALLOCATION IN A CONTINUOUS FLOW TRANSFER LINE WITH THREE UNRELIABLE MACHINES
Advances n Producton Engneerng & Management 6 (2011) 1, 15-26 ISSN 1854-6250 Scentfc paper SIMULATION RESULTS ON BUFFER ALLOCATION IN A CONTINUOUS FLOW TRANSFER LINE WITH THREE UNRELIABLE MACHINES Sörensen,
More informationMulti-UAV Task Allocation using Team Theory
Proceedngs of the 44th IEEE Conference on Decson and Control, and the European Control Conference 2005 Sevlle, Span, December 12-15, 2005 MoC03.6 Mult-UAV Task Allocaton usng Team Theory P. B. Sut, A.
More informationProduct Innovation Risk Management based on Bayesian Decision Theory
Advances n Management & Appled Economcs, vol., no., 0, - ISS: 79-7 (prnt verson), 79-7 (onlne) Internatonal Scentfc Press, 0 Product Innovaton Rsk Management based on Bayesan Decson Theory Yngchun Guo
More informationExperimental Validation of a Suspension Rig for Analyzing Road-induced Noise
Expermental Valdaton of a Suspenson Rg for Analyzng Road-nduced Nose Dongwoo Mn 1, Jun-Gu Km 2, Davd P Song 3, Yunchang Lee 4, Yeon June Kang 5, Kang Duc Ih 6 1,2,3,4,5 Seoul Natonal Unversty, Republc
More informationFast Algorithm for Prediction of Airfoil Anti-icing Heat Load *
Energy and Power Engneerng, 13,, 493-497 do:.4236/epe.13.4b09 Publshed Onlne July 13 (http://www.scrp.org/ournal/epe) Fast Algorthm for Predcton of Arfol Ant-cng Heat * Xueqn Bu, Ru Yang, Ja Yu, Xaobn
More informationApplied Soft Computing
Appled Soft Computng (2) 4 46 Contents lsts avalable at ScenceDrect Appled Soft Computng journal homepage: wwwelsevercom/locate/asoc Soft computng based optmzaton of combned cycled power plant start-up
More informationMODELING OF RIVER ICE BREAKUP DATE AND THICKNESS IN THE LENA RIVER
Ice n the Envronment: Proceedngs of the 16th IAHR Internatonal Symposum on Ice Dunedn, New Zealand, 2nd 6th December 2002 Internatonal Assocaton of Hydraulc Engneerng and Research MODELING OF RIVER ICE
More informationComputational Solution to Economic Operation of Power Plants
Electrcal and Electronc Engneerng 013, 3(6): 139-148 DOI: 10.593/j.eee.0130306.01 Computatonal Soluton to Economc Operaton of ower lants Temtope Adefarat 1,*, Ayodele Sunday Oluwole 1, Mufutau Adewolu
More informationPrediction algorithm for users Retweet Times
, pp.9-3 http://dx.do.org/0.457/astl.05.83.03 Predcton algorthm for users Retweet Tmes Hahao Yu, Xu Feng Ba,ChengZhe Huang, Haolang Q Helongang Insttute of Technology, Harbn, Chna Abstract. In vew of the
More informationModel Development of a Membrane Gas Permeation Unit for the Separation of Hydrogen and Carbon Dioxide
CHEMICAL ENGINEERING TRANSACTIONS Volume 21, 2010 Edtor.. Klemeš, H. L. Lam, P. S. Varbanov Copyrght 2010, AIDIC Servz S.r.l., ISBN 978-88-95608-05-1 ISSN 1974-9791 DOI: 10.3303/CET1021218 1303 Model Development
More informationCYCLE TIME VARIANCE MINIMIZATION FOR WIP BALANCE APPROACHES IN WAFER FABS. Zhugen Zhou Oliver Rose
Proceedngs of the 013 Wnter Smulaton Conference R. Pasupathy, S.-H. Km, A. Tolk, R. Hll, and M. E. Kuhl, eds CYCLE TIME VARIANCE MINIMIZATION FOR WIP BALANCE APPROACHES IN WAFER FABS Zhugen Zhou Olver
More informationIdentifying Factors that Affect the Downtime of a Production Process
Identfyng Factors that Affect the Downtme of a Producton Process W. Nallaperuma 1 *, U. Ekanayake 1, Ruwan Punch-Manage 2 1 Department of Physcal scences, Rajarata Unversty, Sr Lanka 2 Department of Statstcs
More informationVarunraj Valsaraj, Kara Kockelman, Jennifer Duthie, and Brenda Zhou University of Texas at Austin. Original Version: September 2007.
FORECASTING EMPLOYMENT & POPULATION IN TEXAS: An Investgaton on TELUM Requrements Assumptons and Results ncludng a Study of Zone Sze Effects for the Austn and Waco Regons Varunraj Valsaraj Kara Kockelman
More informationModeling of joint water-supply scheduling with multi-source in Beijing under uncertain conditions
MATEC Web of Conferences 246, 112 (218) https://do.org/1.151/matecconf/218246112 Modelng of ont water-supply schedulng wth mult-source n Beng under uncertan condtons Xaoun Dou 1,2,*, Hea Wang 2 1 Insttute
More informationSteady State Load Shedding to Prevent Blackout in the Power System using Artificial Bee Colony Algorithm
Jurnal Teknolog Full paper Steady State Load Sheddng to Prevent Blackout n the Power System usng Artfcal Bee Colony Algorthm R. Mageshvaran a*, T. Jayabarath b a School of Electrcal Engneerng. VIT Unversty.
More informationOptimal Configuration for Distributed Generations in Micro-grid System Considering Diesel as the Main Control Source
Journal of Energy and Power Engneerng 9 (2015) 493-499 do: 10.17265/1934-8975/2015.05.009 D DAVID PUBLISHING Optmal Confguraton for Dstrbuted Generatons n Mcro-grd System Consderng Desel as the Man Control
More informationRobustness theoretical framework
Jont Workshop of COST Actons TU0601 and E55 September 21-22 2009, Lublana, Slovena Robustness theoretcal framework John D. Sørensen Aalborg Unversty, Denmark Enrco Rzzuto Unversty of Genoa, Italy Mchael
More information6.4 PASSIVE TRACER DISPERSION OVER A REGULAR ARRAY OF CUBES USING CFD SIMULATIONS
6.4 PASSIVE RACER DISPERSION OVER A REGULAR ARRAY OF CUBES USING CFD SIMULAIONS Jose Lus Santago *, Alberto Martll and Fernando Martn CIEMA (Center for Research on Energy, Envronment and echnology). Madrd,
More informationAnnual Energy Production Maximization for Tidal Power Plants with Evolutionary Algorithms
Internatonal Journal of Flud Machnery and Systems DOI: http://dx.do.org/10.5293/ijfms.2017.10.3.264 Vo 10 o. 3 July-September 2017 ISS (Onlne): 1882-9554 Orgnal Paper Annual Energy Producton Maxmzaton
More informationDerived Willingness-To-Pay For Water: Effects Of Probabilistic Rationing And Price
Derved Wllngness-To-Pay For Water: Effects Of Probablstc Ratonng And Prce Roberto Garca Alcublla Abstract A two stage lnear programmng approach s used to estmate the wllngness to pay WTP of ndvdual households
More informationThe research on modeling of coal supply chain based on objectoriented Petri net and optimization
Proceda Earth and Planetary Scence 1 (2009) 1608 1616 Proceda Earth and Planetary Scence www.elsever.com/locate/proceda The 6 th Internatonal Conference on Mnng Scence & Technology The research on modelng
More informationAn Innovative Design and Cost Optimization of a Trigeneration (Combined Cooling, Heating and Power) System
Int. J. Envron. Res., 8():971-978, Autumn 201 ISSN: 173-686 An Innovatve Desgn and Cost Optmzaton of a Trgeneraton (Combned Coolng, Heatng and Power) System Abbaspour, M. * and Sarae, A.R. School of Mechancal
More informationProgram Phase and Runtime Distribution-Aware Online DVFS for Combined Vdd/Vbb Scaling
Program Phase and Runtme Dstrbuton-Aware Onlne DVFS for Combned Vdd/Vbb Scalng Jungsoo Km, Sungjoo Yoo, and Chong-Mn Kyung Dept. of EECS at KAIST jskm@vslab.kast.ac.kr, kyung@ee.kast.ac.kr Dept. of EE
More informationSENSITIVITY ANALYSIS AND OPTIMIZATION OF DIFFERENT INVENTORY CONTROL POLICIES ALONG THE SUPPLY CHAIN
SENSITIVITY ANALYSIS AND OPTIMIZATION OF DIFFERENT INVENTORY CONTROL POLICIES ALONG THE SUPPLY CHAIN Dulo Curco (a), Francesco Longo (b) (a) (b) Modelng & Smulaton Center - Laboratory of Enterprse Solutons
More informationAn Artificial Neural Network Method For Optimal Generation Dispatch With Multiple Fuel Options
An Artfcal Neural Network Method For Optmal Generaton Dspatch Wth Multple Fuel Optons S.K. Dash Department of Electrcal Engneerng, Gandh Insttute for Technologcal Advancement,Badaraghunathpur,Madanpur,
More informationImpacts of Generation-Cycling Costs on Future Electricity Generation Portfolio Investment
1 mpacts of Generaton-Cyclng Costs on Future Electrcty Generaton Portfolo nvestment P. Vthayasrchareon, Member, EEE, and. F. MacGll, Member, EEE Abstract Ths paper assesses the mpacts of ncorporatng short-term
More informationProduction Scheduling for Parallel Machines Using Genetic Algorithms
Producton Schedulng for Parallel Machnes Usng Genetc Algorthms Chchang Jou 1), Hsn-Chang Huang 2) 1) Tamkang Unversty, Department of Informaton Management (cjou@mal.m.tku.edut.tw) 2) Tamkang Unversty,
More informationPower System Reliability Analysis with Emergency Demand Response Program
231 Internatonal Journal of Smart Electrcal Enneerng, Vol.2, No.4, Fall 2013 ISSN: 2251-96 pp.231:236 ower System Relablty Analyss wth Emergency Demand Response rogram Rahmat Aazam 1, Nosratallah Mohammadbe
More informationBest-Order Crossover in an Evolutionary Approach to Multi-Mode Resource-Constrained Project Scheduling
Internatonal Journal of Computer Informaton Systems and Industral Management Applcatons. ISSN 2150-7988 Volume 6 (2014) pp. 364-372 MIR Labs, www.mrlabs.net/csm/ndex.html Best-Order Crossover n an Evolutonary
More informationOn Advantages of Scheduling using Genetic Fuzzy Systems
On Advantages of Schedulng usng Genetc Fuzzy Systems Carsten Franke, Joachm Leppng, and Uwe Schwegelshohn Computer Engneerng Insttute, Dortmund Unversty, 44221 Dortmund, Germany (emal: {carsten.franke,
More informationEconomic/Emission dispatch including wind power using ABC-Weighted-Sum
Internatonal Journal of Engneerng and Techncal Research (IJETR) ISSN: 2321-0869 (O) 2454-4698 (P), Volume-3, Issue-10, October 2015 Economc/Emsson dspatch ncludng wnd power usng ABC-Weghted-Sum Sebaa Hadd,
More informationA FREILP Approach for Long-Term Planning of MSW Management System in HRM, Canada
A FREILP Approach for Long-Term Plannng of MSW Management System n HRM, Canada by Wenwen Pe Submtted n partal fulfllment of the requrements for the degree of Master of Appled Scence at Dalhouse Unversty
More informationCONGESTION MANAGEMENT USING COORDINATED CONTROL OF FACTS DEVICES AND LOAD SHEDDING
COGESTIO MAAGEMET USIG COORDIATED COTROL OF FACTS DEVICES AD LOAD SHEDDIG avel Etngov, ola Voropa Energy Systems Insttute Iruts, Russa etngov@sem.se.r.ru Aleandre Oudalov ABB Corporate Research Centre
More informationOPTIMAL CONTROL THEORY APPLIED TO HYBRID FUEL CELL POWERED VEHICLE. G. Paganelli 1, T.M. Guerra 2, S. Delprat 2 Y. Guezennec 1, G.
Copyrght IFAC 15th Trennal World Congress, Barcelona, Span OPTIMAL CONTROL THEORY APPLIED TO HYBRID FUEL CELL POWERED VEHICLE G. Paganell 1, T.M. Guerra, S. Delprat Y. Guezennec 1, G. Rzzon 1 1 Center
More informationDerived Operating Rules for Allocating Recharges and Withdrawals among Unconnected Aquifers
Derved Operatng Rules for Allocatng Recharges and Wthdrawals among Unconnected Aqufers Davd E. Rosenberg 1 and Jay R. Lund, M.ASCE 2 Abstract: Sx balancng rules are derved to nform short-term drawdown
More informationFPGA Device and Architecture Evaluation Considering Process Variations
FPGA Devce and Archtecture Evaluaton Consderng Process Varatons Ho-Yan Wong, Lerong Cheng, Yan Ln, Le He Electrcal Engneerng Department Unversty of Calforna, Los Angeles {phoebe, lerong, yln, lhe}@ee.ucla.edu,
More informationIMPACTS OF MINIMUM ACTIVITY LEVEL AND MULTI-SOURCING ON PRODUCT FAMILY AND SUPPLY CHAIN DESIGN
21 st Internatonal Conference on Producton Research IMPACTS OF MINIMUM ACTIVITY LEVEL AND MULTI-SOURCING ON PRODUCT FAMILY AND SUPPLY CHAIN DESIGN Bertrand Baud-Lavgne, Bruno Agard and Bernard Penz Unversté
More informationJournal of Engineering Science and Technology Review 10 (6) (2017) Research Article. Kai Yang 1,3,* and Yuwei Liu 2
Jestr Journal of Engneerng Scence and Technology Revew 10 (6) (2017) 171-178 Research Artcle Optmzaton of Producton Operaton Scheme n the Transportaton Process of Dfferent Proportons of Commngled Crude
More informationMultiobjective Optimization of Low Impact Development Scenarios in an Urbanizing Watershed
Multobectve Optmzaton of Low Impact Development Scenaros n an Urbanzng Watershed Guoshun Zhang Agrcultural and Bologcal Engneerng Dept. Penn State Unversty Unversty Park, PA 16802 Abstract Low Impact Development
More information