Seizing Opportunity and Building Value

Size: px
Start display at page:

Download "Seizing Opportunity and Building Value"

Transcription

1 Hanson Lake District Seizing Opportunity and Building Value November

2 Origins of Success Inspiration Relationships Foresight Action TSX-V FOM 2

3 Opportunity is meaningless unless one takes action. TSX-V FOM 3

4 Seizing Opportunity Orphaned Asset Next door to 100 year old mining complex Team Leaders with history of success Potential Underexplored ground Global zinc deficit Commitment Skin in the game TSX-V FOM 4

5 Building Value Production Zinc Copper Thunder Zone McIlvenna Bay Target A Community Relations Tenacity Optionality Innovation Asset Location Team Access to Capital Potential TSX-V FOM 5

6 Metals Market Metals prices are projected to rise by 16% in 2017 amid tightening markets for most metals. The largest gains are expected in zinc (32%) and lead (18%) due to mine supply constraints brought on by permanent closures due to resource exhaustion, as well as discretionary closures (Glencore). Copper is also expected to increase by 18% on mine disruptions World Bank Forecast, April 2017 TSX-V FOM 6

7 Global Zinc Market Applications 8% 3% Galvinizing 14% 15% 60% Zinc base alloys Brass and bronze Compounds Other alloys 7% Sectors 23% 45% Construction Transportation Consumer Goods 25% Industrial Machinery From International Zinc Association TSX-V FOM 7

8 Global Copper Market 18% 13% 6% 63% Regions Asia Europe Americas ROW 15% 12% 12% 31% Sectors Equipment Construction Industrial Infrastructure Transportation 30% From International Copper Study Group World Factbook 2016 TSX-V FOM 8

9 World Class Mining Belt N Deschambault Lake HANSON LAKE DISTRICT FLIN FLON DISTRICT LALOR Snow Lake MCILVENNA BAY TARGET A Denare Beach/ Amisk Lake 777 Flin Flon SNOW LAKE DISTRICT BIGSTONE THUNDER ZONE REED LAKE 200 km Foran is not treating historic (non NI compliant) resource estimates as current; Additional work is required bring historic resource to current TSX-V FOM 9

10 Hanson Lake VMS District N MCILVENNA BAY TARGET A THUNDER ZONE BIGSTONE UTM Zone 13 NAD83 NTS 63L/10 TSX-V FOM 10

11 Hanson Lake VMS District Cluster of VMS deposits Poly-metallic Zinc, Copper, Gold, Silver Prolific mining belt Neighbouring Hudbay/Flin Flon/Lalor Long history of mining 30,000+ drill holes Current management Acquired project in 2011 Underexplored (~800 drill holes) Advanced project Upgraded deposits, new discovery Relationship with First Nations Peter Ballantyne Cree Nation McIlvenna Bay Camp TSX-V FOM 11

12 McIlvenna Bay Deposit N Flagship asset 100% ownership Center of gravity for the district MCILVENNA BAY TARGET A THUNDER ZONE BIGSTONE UTM Zone 13 NAD83 NTS 63L/10 TSX-V FOM 12

13 Access Road & Power Line Hanson Lake Foran Camp Silica Sand Mine McIlvenna Bay Deposit (projection to surface-approximate) Access Road & Power Line m McIlvenna Bay deposit (projected), exploration camp and Silica Sand Mine (under reclamation); looking Northwest April 2012 TSX-V FOM 13

14 McIlvenna Bay Mineral Resources Indicated Mineral Resource Estimate (US$60t/ NSR cut-off) Zone Tonnes (kt) Cu (%) Zn (%) Au (g/t) Ag (g/t) CuEq (%) ZnEq (%) Main Lens Upper West Zone 2, Main Lens Zone 2 3, Lens Copper Stockwork Zone 7, TOTAL INDICATED 13, Inferred Mineral Resource Estimate (US$60t/ NSR cut-off) Zone Tonnes (kt) Cu (%) Zn (%) Au (g/t) Ag (g/t) CuEq (%) ZnEq (%) Main Lens Upper West Zone 2, Main Lens Zone 2 2, Lens Copper Stockwork Zone 5, TOTAL INFERRED 11, Effective date Jan. 1, 2013; Metal prices for 2013 Resource are US$3.25/lb. Cu, US$1.10/lb. Zn, US$1,400/oz. Au & US$25/oz. Ag; The base case uses a US$60/t NSR cut-off using provisions for metallurgical recoveries, smelter payables, refining costs, freight, and applicable royalties; see appendices for full footnotes; for additional information see the Foran news release dated March 27, 2013 at TSX-V FOM 14

15 McIlvenna Bay Deposit PEA tpd, ramp and shaft access, on-site concentrator and tailings facilities; batch processing multiple ore zones Summary Mine Life Plant Throughput Pre-Tax NPV 7% Pre-Tax IRR Post-Tax NPV 7% Post-Tax IRR Payback 13.7 years 4,761 tpd $381.7M 21.9% $262.6M 18.9% 4.1 years Metal Production Metal Per annum LOM lbs. tonnes lbs. tonnes Zinc 58.9M 26, M 365,101 Copper 37.6M 17, M 233,013 Lead 1.2M M 7,167 oz. oz. Gold 16, ,000 Silver 398,000 5,437,000 1 The PEA is considered preliminary in nature and includes mineral resources, including inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves. Mineral resources that are not mineral reserves have not yet demonstrated economic viability. Due to the uncertainty that may be attached to mineral resources, it cannot be assumed that all or any part of a mineral resource will be upgraded to mineral reserves. Therefore, there is no certainty that the results concluded in the PEA will be realized. 2 Includes 20% contingency. 3 Comprised of $33.54/t mining, $13.39/t processing & $4.10/t G&A. 4 Net of by-product, includes all TC/RC, operating costs & royalties. All figures are quoted in CDN$ unless otherwise noted; base case metal prices of US$3.08/lb. Cu, US$1.06/lb., Zn, US$0.93/lb. Pb, US$1,238/oz. Au and US$17/oz. Ag and exchange rate of 0.89 based on spot as at Oct. 15, See the Foran news releases dated November 12, 2014 and January 21, 2015 at TSX-V FOM 15

16 McIlvenna Bay Deposit PEA tpd, ramp and shaft access, on-site concentrator and tailings facilities; batch processing multiple ore zones Capital Costs Operating Costs Base Contingency (20%) Total Avg. OpEx Per tonne milled LOM Pre-Prod. CapEx Sustaining Capital $207.3M $41.5M $248.8M $125.2M $25.0M $150.3M Mining $33.54 $796.2M Processing $13.39 $317.7M LOM $332.5M $66.5M $399.1M G&A $4.10 $97.4M Total $51.03 $1,211.3M 1 The PEA is considered preliminary in nature and includes mineral resources, including inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves. Mineral resources that are not mineral reserves have not yet demonstrated economic viability. Due to the uncertainty that may be attached to mineral resources, it cannot be assumed that all or any part of a mineral resource will be upgraded to mineral reserves. Therefore, there is no certainty that the results concluded in the PEA will be realized. 2 Includes 20% contingency. 3 Comprised of $33.54/t mining, $13.39/t processing & $4.10/t G&A. 4 Net of by-product, includes all TC/RC, operating costs & royalties. All figures are quoted in CDN$ unless otherwise noted; base case metal prices of US$3.08/lb. Cu, US$1.06/lb., Zn, US$0.93/lb. Pb, US$1,238/oz. Au and US$17/oz. Ag and exchange rate of 0.89 based on spot as at Oct. 15, See the Foran news releases dated November 12, 2014 and January 21, 2015 at TSX-V FOM 16

17 McIlvenna Bay PEA Sensitivity Analyses 1 Metal Price -10% Base Case +10% Zinc (US$/lb.) Copper (US$/lb.) Lead (US$/lb.) Gold (US$/oz.) 1,114 1,238 1,362 Silver (US$/oz.) Pre-tax NPV 7% $200.6M $381.7M $562.9M IRR 15.4% 21.9% 27.6% Payback 5.4 years 4.1 years 3.4 years Post-tax NPV 7% $129.4M $262.6M $394.5M IRR 13.3% 18.9% 24.0% Payback 5.4 years 4.1 years 3.5 years Exchange Rate -10% Base Case +10% CDN$:US$ Pre-tax NPV 7% $251.3M $381.7M $541.1M IRR 17.2% 21.9% 26.9% Payback 4.9 years 4.1 years 3.5 years Post-tax NPV 7% $166.9M $262.6M $378.7M IRR 14.9% 18.9% 23.4% Payback 4.9 years 4.1 years 3.5 years 1 The PEA is considered preliminary in nature and includes mineral resources, including inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves. Mineral resources that are not mineral reserves have not yet demonstrated economic viability. Due to the uncertainty that may be attached to mineral resources, it cannot be assumed that all or any part of a mineral resource will be upgraded to mineral reserves. Therefore, there is no certainty that the results concluded in the PEA will be realized. 2 Includes 20% contingency. 3 Comprised of $33.54/t mining, $13.39/t processing & $4.10/t G&A. 4 Net of by-product, includes all TC/RC, operating costs & royalties. All figures are quoted in CDN$ unless otherwise noted; base case metal prices of US$3.08/lb. Cu, US$1.06/lb., Zn, US$0.93/lb. Pb, US$1,238/oz. Au and US$17/oz. Ag and exchange rate of 0.89 based on spot as at Oct. 15, See the Foran news releases dated November 12, 2014 and January 21, 2015 at TSX-V FOM 17

18 Bigstone Cu-Zn Deposit BIGSTONE Upgrade historic resource to NI Specific gravity underestimated 2015 infill drilling 2 All six holes hit high-grade Cu+/-Zn 18.4% Zn over 12m incl. 27.0% Zn over 7.6m, plus 1.4% Cu over 10.6m & 1.3% Cu over 8.5m (BS ) 2.0% Cu over 105m incl. 4.1% Cu over 20m & 3.4% Cu over 19.0m (BS ) Historic mineral resource 1 : Zone Tonnage (t) Cu (%) Au (g/t) Zn (%) Ag (g/t) Copper (1% cutoff) Zinc (5% cutoff) N UTM Zone 13 NAD83 NTS 63L/10 1 Foran is not treating historic (non NI compliant) resource estimates as current; additional work is required bring historic resource to current 2 See Foran news releases dated April 1, 17 and 30, 2015 for additional information; true thickness approx % of downhole distance. TSX-V FOM 18

19 Thunder Zone Cu-Zn Deposit Cu & Zn-rich VMS mineralization 2013 discovery hole First new discovery in 30 years Intersected high-grade massive sulphides 2015 follow-up drilling Confirmed & expanded discovery 1 Higher grades than McIlvenna Bay Open along strike Thickening down-plunge MCILVENNA BAY TARGET A THUNDER ZONE N UTM Zone 13 NAD83 NTS 63L/10 1 See Foran news release dated March 25, 2015 for additional information; true thickness approx. 85% of downhole distance. TSX-V FOM 19

20 Target A Exploration High priority target Identified using updated geophysics Potential game changer Planned drilling for 2017 Prior drilling stopped short of target Wedge off existing hole MCILVENNA BAY TARGET A THUNDER ZONE BIGSTONE N UTM Zone 13 NAD83 NTS 63L/10 TSX-V FOM 20

21 Regional Exploration McIlvenna Bay Deposit Target A 1.2 to 1.6 km long high-priority DEEP-EM conductor; not previously drill tested McIlvenna Bay Grid m 0 5 km UTM Zone 13 NAD83 NTS 63L/10 N TSX-V FOM 21

22 Regional Exploration Thunder Zone Balsam Balsam Grid m 0 5 km UTM Zone 13 NAD83 NTS 63L/10 N TSX-V FOM 22

23 Regional Exploration 10 km Thunder Zone First new discovery in 30 years Target A High priority McIlvenna Bay Flagship deposit Discovery Hole 3.7 Cu and 0.43 g/t Au MR m MR m Conductor Target Resource Grade Shell 13.9 Mt@ 13.19%ZnEq (Ind) ZnEq (Inf) TSX-V FOM 23

24 Community Engagement CanNorth Environmental Services 100% aboriginal-owned, multi-disciplinary environmental consulting firm Conducted environmental baseline studies ASKI PBCN environmental consultancy Managed McIlvenna Bay environmental program Mining Matters Earth Sciences Camps Students are sponsored to attend Educating local students is a priority Using local consulting firms and companies is mutually beneficial TSX-V FOM 24

25 Community Engagement Strong sense of history Foran team is committed to local communities Contractors & employees hired from local Peter Ballantyne Cree Nation (PBCN) communities Positive relationships with First Nations & other stakeholders in the area is critical TSX-V FOM 25

26 Building Value Project Location Large resource base Long mine life Clean, marketable concentrate Growth potential Optionality Safe, stable pro-mining jurisdiction Transparent mining laws Tax incentives 65 km to Flin Flon Available skilled workforce Infrastructure Investment Year-round road access Nearby railhead Low-cost hydro-electric power Water Reasonable capital costs Short timeline to production Community engagement TSX-V FOM 26

27 Capital Structure Issued & Outstanding 99.0 M Options 6.4 M Share Price & Capitalization Recent: $ $ Week High/Low: $0.47/$0.17 Market Cap: ~$26M Ownership Warrants* 0.8 M Fully Diluted M 23% 17% Management & Directors High Net Worth (incl. 11% Pierre Lassonde) 2% Institutional *Price: $0.25 expiring December 2017 ~28% ~30% Corporate Retail As at July 2017; Options Avg.: $0.31; Market Cap based on I&O Shares; All figures in CDN$; Institutional & Corporate Shareholders include CQS, CIBC, City Natural Resources, Gold 2000 & Teck TSX-V FOM 27

28 Leadership Team Directors Darren Morcombe Patrick Soares Sharon Dowdall Maurice Tagami David M. Petroff Executive Chairman President & CEO Former CLO Franco Nevada VP Mining Operations Wheaton Precious Metals Former President, CEO & Director Breakwater Resources Management Darren Morcombe Patrick Soares Tim Thiessen Roger March David Fleming Connie Norman Executive Chairman President & CEO CFO VP Project Exploration VP Exploration Corporate Secretary TSX-V FOM 28

29 Building Value Production Zinc Copper Thunder Zone McIlvenna Bay Target A Community Relations Tenacity Optionality Innovation Asset Location Team Access to Capital Potential TSX-V FOM 29

30 Foran Advantage ASSETS TEAM McIlvenna Bay PEA Thunder Zone New discovery Target A High potential Directors Executive & Staff Consultants & Advisors Proximity to water, roads, power First Nations Top global mining jurisdiction Optimize PEA Continue de-risking project Bigstone resource LOCATION FUTURE TSX-V FOM 30

31 Contact Us Foran Mining Corporation Granville Street Vancouver, BC, Canada V6C 1T2 P: E: TSX-V FOM TSX-V FOM 31

32 McIlvenna Bay Resource Footnotes 1 Effective date January 1, 2013; CIM definitions were followed for Mineral Resources; CuEq = copper equivalent; ZnEq = zinc equivalent; NSR = Net Smelter Return. 2 The base case mineral resource is estimated based on 178 diamond drill holes and a NSR cut-off grade of US$60/t. NSR grades were calculated and high grade caps were applied as per the discussion in Estimation Methodology and Parameters below and include provisions for metallurgical recovery and estimates of current shipping terms and smelter rates for similar concentrates. Metal prices used are US$3.25/lb. Cu, US$1.10/lb. Zn, US$1,400/oz. Au, and US$25/oz. Ag. Specific gravity was interpolated for each block based on measurements taken from core specimens. 3 Mr. David Rennie, P.Eng., of RPA, prepared this mineral resource estimate. Mr. Rennie is independent of Foran and is a Qualified Person within the meaning of NI Mineral resources which are not mineral reserves do not have demonstrated economic viability. The estimate of mineral resources may be materially affected by environmental, permitting, legal, marketing or other issues. 5 CuEq and ZnEq values were estimated based on $53.94 per % Cu, $8.11 per % Zn, $31.16 per g/t Au and $0.03 per g/t Ag. 6 For additional information see the Foran news release dated March 27, 2013 at & TSX-V FOM 32

33 McIlvenna Bay Conceptual Mine Design Decline 35m of Dolomite & Sand Cover 200m L Shaft 0m L -200m L Resource Shell -400m L -600m L -800m L Ramp 5,000 tpd underground mine Ramp & shaft to optimize resource extraction Broad thicknesses & steep dip of mineralization amenable to longhole stoping Structural backfill provided by cemented fill and ROM waste 200m Longitudinal Section, Looking Southeast TSX-V FOM 33

34 Flin Flon-Glennie Complex Paleoproterozoic Juvenile Arc Assemblages Deschambault Lake Snow Lake BG Hanson Lake District BA Birch Lake Belt Flin Flon 29 present and past producing mines ~170MT of production >30,000 drill holes Western Assemblages are poorly explored under Phanerozoic Cover - ~1,000 drill holes TSX-V FOM 34

35 McIlvenna Bay Payable Metal Production Metal Per annum LOM lbs. tonnes lbs. tonnes 50% Cu Zinc 59M 26, M 365,101 Copper 38M 17, M 233,013 Lead 1.2M M 7,167 oz. oz. 36% Zn Gold 16, ,000 Silver 398,000 5,437,000 10% Au TSX-V FOM 35

36 Flin Flon-Glennie Complex Deposits Geometry Comparisons 777/Callinan McIlvenna Bay Lalor MB massive sulphide resource geometry has a similar plunge and down-dip extent to large FFGC deposits Only a single body modeled at MB Suggests potential for discovery of additional lenses TSX-V FOM 3

Seizing Opportunity and Building Value

Seizing Opportunity and Building Value Hanson Lake District Seizing Opportunity and Building Value December 2017 www.foranmining.com Opportunity is meaningless unless one takes action. TSX-V FOM 2 The Parties Committed to value creation 100%

More information

Seizing Opportunity and Building Value

Seizing Opportunity and Building Value Hanson Lake District Seizing Opportunity and Building Value January 2018 www.foranmining.com Opportunity is meaningless unless one takes action. TSX-V FOM 2 The Opportunity McIlvenna Bay Location Largest

More information

Seizing Opportunity and Building Value. Cu Zn. February Hanson Lake District

Seizing Opportunity and Building Value. Cu Zn. February Hanson Lake District Hanson Lake District Seizing Opportunity and Building Value February 2018 Cu Zn www.foranmining.com Opportunity is meaningless unless one takes action. TSX-V FOM 2 The Opportunity McIlvenna Bay Location

More information

Patrick Soares President & CEO Canada s Next Base Metal Mining Camp

Patrick Soares President & CEO Canada s Next Base Metal Mining Camp Patrick Soares President & CEO Canada s Next Base Metal Mining Camp TakeStock! AB Nov. 6, 2015 www.foranmining.com Forward Looking Statements This presentation contains "forward-looking information" (also

More information

FORWARD LOOKING STATEMENT

FORWARD LOOKING STATEMENT CORPORATE PRESENTATION MAY2018 FORWARD LOOKING STATEMENT This presentation contains "forward-looking information" (also referred to as "forward looking statements") which may include, but are not limited

More information

FORWARD LOOKING STATEMENT

FORWARD LOOKING STATEMENT CORPORATE PRESENTATION AUGUST2018 FORWARD LOOKING STATEMENT This presentation contains "forward-looking information" (also referred to as "forward looking statements") which may include, but are not limited

More information

FORWARD LOOKING STATEMENT

FORWARD LOOKING STATEMENT CORPORATE PRESENTATION SEPTEMBER2018 FORWARD LOOKING STATEMENT This presentation contains "forward-looking information" (also referred to as "forward looking statements") which may include, but are not

More information

NEWS RELEASE. Foran Finds Elevated Precious Metal Values at Depth

NEWS RELEASE. Foran Finds Elevated Precious Metal Values at Depth NEWS RELEASE Foran Finds Elevated Precious Metal Values at Depth Exceptional thicknesses and base metal grades also encountered at McIlvenna Bay Vancouver, BC (April 25, 2018) - Foran Mining Corporation

More information

DIVERSIFIED METAL EXPLORATION & DEVELOPMENT COMPANY

DIVERSIFIED METAL EXPLORATION & DEVELOPMENT COMPANY 1 DIVERSIFIED METAL EXPLORATION & DEVELOPMENT COMPANY INVESTOR PRESENTATION Winter 2018 #101, 2148 West 38 th Avenue Vancouver, B.C. V6M 1R9 Tel: 604-685-1870 TF: 1-800- 667-1870 Email: Info@elninoventures.com

More information

Copper Mountain Announces Robust Preliminary Economic Assessment Results for New Ingerbelle

Copper Mountain Announces Robust Preliminary Economic Assessment Results for New Ingerbelle Mountain Announces Robust Preliminary Economic Assessment Results for New Ingerbelle Vancouver, B.C., September 27, 2018 Mountain Mining Corporation ( Mountain or the Company) is pleased to announce that

More information

Nevada Copper Hits with 19 Mineralized Holes: Enhances Potential of Open Pit Economics

Nevada Copper Hits with 19 Mineralized Holes: Enhances Potential of Open Pit Economics NEWS RELEASE TSX: NCU Nevada Copper Hits with 19 Mineralized Holes: Enhances Potential of Open Pit Economics September 24, 2018 - Nevada Copper Corp. (TSX: NCU) ("Nevada Copper" or the Company ) is pleased

More information

SUITE WEST HASTINGS STREET VANCOUVER, BC V6C 2W2 CANADA TEL: FAX:

SUITE WEST HASTINGS STREET VANCOUVER, BC V6C 2W2 CANADA TEL: FAX: SUITE 900-999 WEST HASTINGS STREET VANCOUVER, BC V6C 2W2 CANADA TEL: 604.684.8894 FAX: 604.688.2180 March 14, 2011 #11-06 Capstone Completes Prefeasibility Study on Phase V Expansion of Minto Copper-Gold

More information

Drilling, metallurgical test work and a new resource model add 21% to oxide gold reserves

Drilling, metallurgical test work and a new resource model add 21% to oxide gold reserves LA ARENA GOLD OXIDE RESERVES INCREASED TO 1.28MM OZ AT AU PRICE OF $1,200 COMPLETION OF THE PRE-FEASIBILITY STUDY FOR THE PHASE II SULPHIDE Cu-Au PROJECT Drilling, metallurgical test work and a new resource

More information

Positive Preliminary Economic Assessment for Murray Brook Zn Cu Pb Ag Deposit, Bathurst Mining Camp, New Brunswick

Positive Preliminary Economic Assessment for Murray Brook Zn Cu Pb Ag Deposit, Bathurst Mining Camp, New Brunswick NEWS RELEASE Positive Preliminary Economic Assessment for Murray Brook Zn Cu Pb Ag Deposit, Bathurst Mining Camp, New Brunswick Overview Pre production capital requirements $261 million Mill throughput

More information

TINKA RESOURCES LIMITED

TINKA RESOURCES LIMITED TINKA RESOURCES LIMITED #1305 1090 WEST GEORGIA STREET VANCOUVER, B.C. V6E 3V7 Tel: (604) 685 9316 Fax (604) 683 1585 Website: www.tinkaresources.com TSXV & BVL: TK OTCPK: TKRFF NEWS RELEASE November 8,

More information

POSITIVE SCOPING STUDY FOR THUNDER BAY NORTH PROJECT

POSITIVE SCOPING STUDY FOR THUNDER BAY NORTH PROJECT Magma Metals Limited ABN 72 114 581 047 Lvl 3, 18 Richardson St, West Perth WA 6005 Australia PO Box 1221, West Perth WA 6872 Australia Tel +61 (0)8 9324 1500 Fax +61 (0)8 9324 1700 Email: magma@magmametals.com.au

More information

For personal use only

For personal use only Magma Metals Limited ABN 72 114 581 047 Lvl 3, 18 Richardson St, West Perth WA 6005 Australia PO Box 1221, West Perth WA 6872 Australia Tel +61 (0)8 9324 1500 Fax +61 (0)8 9324 1700 Email: magma@magmametals.com.au

More information

PEGMONT PEA HIGHLIGHTS

PEGMONT PEA HIGHLIGHTS Advanced Lead-Zinc Resource Development PEGMONT PEA HIGHLIGHTS January 2019 Pegmont Deposit Queensland, Australia IMPORTANT INFORMATION Cautionary Statement on Forward Looking Information This presentation

More information

Harte Gold Announces Positive PEA For the Sugar Zone Project

Harte Gold Announces Positive PEA For the Sugar Zone Project HARTE GOLD CORP. 8 King Street East, Suite 1700 Toronto, Ontario, M5C 1B5 Tel: 416-368-0999 Fax: 416-368-5146 Harte Gold Announces Positive PEA For the Sugar Zone Project Toronto May 3, 2018 - HARTE GOLD

More information

INV METALS ANNOUNCES ROBUST PRELIMINARY FEASIBILITY STUDY AT LOMA LARGA

INV METALS ANNOUNCES ROBUST PRELIMINARY FEASIBILITY STUDY AT LOMA LARGA INV METALS ANNOUNCES ROBUST PRELIMINARY FEASIBILITY STUDY AT LOMA LARGA TORONTO, ON July 14, 2016 INV Metals Inc. ( INV Metals or the Company ) (TSX:INV) is pleased to announce the positive results of

More information

Pine Point MRE Overview TSXV: OM

Pine Point MRE Overview TSXV: OM Pine Point MRE Overview TSXV: OM Forward-Looking Statements & Cautionary Notes Regarding TechnicalInformation This presentation (the "Presentation") contains "forward-looking information" and "forward-looking

More information

Nymagee Scoping Study

Nymagee Scoping Study 2 May 2017 Nymagee Scoping Study Aurelia Metals Limited ( AMI or the Company ) is pleased to announce the results of the Nymagee Scoping Study ( Study ) were positive and justify the Company committing

More information

IDM MINING S RED MOUNTAIN PRELIMINARY ECONOMIC ASSESSMENT DEMONSTRATES ROBUST ECONOMICS

IDM MINING S RED MOUNTAIN PRELIMINARY ECONOMIC ASSESSMENT DEMONSTRATES ROBUST ECONOMICS IDM MINING S RED MOUNTAIN PRELIMINARY ECONOMIC ASSESSMENT DEMONSTRATES ROBUST ECONOMICS July 23, 2014, Vancouver, BC IDM Mining Ltd. (TSX:IDM) ( IDM or the Company ) is pleased to announce the results

More information

A Leading Zinc exploration and Development company TSX-V: CNX I OTCQX: CLLXF

A Leading Zinc exploration and Development company TSX-V: CNX I OTCQX: CLLXF A Leading Zinc exploration and Development company 2 FORWARD LOOKING INFORMATION This presentation contains certain forward-looking information and statements. Such forward-looking information and statements

More information

Strength to Build the Future

Strength to Build the Future Strength to Build the Future Dundee Base Metals & Iron Ore Conference October 2010 David Garofalo, president and chief executive officer John Vincic, vice president of investor relations and corporate

More information

Forward Looking Statement

Forward Looking Statement Olympias Forward Looking Statement Certain of the statements made in this Presentation may contain forward-looking statements or information within the meaning of the United States Private Securities Litigation

More information

Sierra Metals Exploration Update Call

Sierra Metals Exploration Update Call Sierra Metals Exploration Update Call October 5, 2017 TSX SMT NYSE AMERICAN: SMTS BVL SMT Forward Looking Statements Disclaimer Certain statements in this presentation constitute forward-looking information

More information

TEPAL PROJECT MEXICO Corporate update

TEPAL PROJECT MEXICO Corporate update Corporate update September, 2018 Cautionary Statement on Forward-Looking Information & Statements This presentation may contain statements which constitute 'forward-looking statements, including statements

More information

VALUE THROUGH GOLD BRUCEJACK PROJECT PREMIER S NATURAL RESOURCE CONFERENCE

VALUE THROUGH GOLD BRUCEJACK PROJECT PREMIER S NATURAL RESOURCE CONFERENCE VALUE THROUGH GOLD BRUCEJACK PROJECT PREMIER S NATURAL RESOURCE CONFERENCE January 2016 CAUTIONARY STATEMENT Forward Looking Information This Presentation contains forward-looking information and forward

More information

Sierra Metals Updates Mineral Resource and Reserve Estimate for Bolivar Mine, Mexico

Sierra Metals Updates Mineral Resource and Reserve Estimate for Bolivar Mine, Mexico NEWS RELEASE Sierra Metals Updates Mineral Resource and Reserve Estimate for Bolivar Mine, Mexico 4/11/2017 TORONTO, April 11, 2017 /PRNewswire/ - Sierra Metals Inc. (TSX: SMT) (BVL: SMT) ("Sierra Metals"

More information

Copper Silver Gold. TSX-V, Nasdaq First North: FIL filo-mining.com. Corporate Presentation July, 2017

Copper Silver Gold. TSX-V, Nasdaq First North: FIL filo-mining.com. Corporate Presentation July, 2017 Copper Silver Gold TSX-V, Nasdaq First North: FIL filo-mining.com Corporate Presentation July, 2017 CAUTIONARY STATEMENT All information included in this presentation, including any information as to the

More information

Copper Silver Gold. TSX-V, Nasdaq First North: FIL filo-mining.com. Corporate Presentation October, 2017

Copper Silver Gold. TSX-V, Nasdaq First North: FIL filo-mining.com. Corporate Presentation October, 2017 Copper Silver Gold TSX-V, Nasdaq First North: FIL filo-mining.com Corporate Presentation October, 2017 CAUTIONARY STATEMENT All information included in this presentation, including any information as to

More information

Olympias: Highlights Q Phase 1 Retreatment. Acquired from European Goldfields in February. EIA approved. Phase 1 Retreatment began

Olympias: Highlights Q Phase 1 Retreatment. Acquired from European Goldfields in February. EIA approved. Phase 1 Retreatment began Olympias Olympias: Highlights 2011 2012 2013 2016 Q3 2017 EIA approved Acquired from European Goldfields in February Phase 1 Retreatment began Phase 1 Retreatment complete Planned Phase 2 Commercial Production

More information

Advancing Palmer: A High-Grade Polymetallic Project, Southeast Alaska

Advancing Palmer: A High-Grade Polymetallic Project, Southeast Alaska TSX.V : CEM OTCQB: CNSNF Advancing Palmer: A High-Grade Polymetallic Project, Southeast Alaska TSX.V : CEM Forward Looking Statements Forward looking statements: This presentation contains certain forward-looking

More information

For personal use only

For personal use only Heron Resources Limited 2015 Euroz Conference Rapidly Advancing the High Grade Woodlawn Zinc-Copper Project From PEA to Production Wayne Taylor, Managing Director 11 March 2015 ASX: HRR TSX: HER Forward

More information

21 st Annual BMO Capital Markets Global Metals & Mining Conference February 26 29, 2012

21 st Annual BMO Capital Markets Global Metals & Mining Conference February 26 29, 2012 HBM 21 st Annual BMO Capital Markets Global Metals & Mining Conference February 26 29, 2012 Creating Sustainable Value through High Quality Long Life Deposits Forward Looking Information This presentation

More information

SIERRA METALS REPORTS A 53.5% INCREASE IN NI COMPLIANT MINERAL RESERVES AT ITS YAURICOCHA MINE, PERU

SIERRA METALS REPORTS A 53.5% INCREASE IN NI COMPLIANT MINERAL RESERVES AT ITS YAURICOCHA MINE, PERU No. 41-2013 SIERRA METALS REPORTS A 53.5% INCREASE IN NI 43-101 COMPLIANT MINERAL RESERVES AT ITS YAURICOCHA MINE, PERU Vancouver, BC November 19, 2013 Sierra Metals Inc. (TSX:SMT)(BVL:SMT) ( Sierra Metals

More information

A New Direction. Developing Copper Assets in Canada s North TSX.V:COL. 1 May 2018

A New Direction. Developing Copper Assets in Canada s North TSX.V:COL. 1 May 2018 A New Direction Developing Copper Assets in Canada s North 1 May 2018 TSX.V:COL FORWARD LOOKING STATEMENTS This presentation includes certain forward-looking information or forward-looking statements for

More information

A Preliminary Economic Assessment of the Hackett River Project features the following highlights:

A Preliminary Economic Assessment of the Hackett River Project features the following highlights: Thunder Bay, ON: March 5, 2007 Shares Issued: 55,517,567 SABINA S HACKETT RIVER PRELIMINARY ECONOMIC ASSESSMENT POSITIVE ON PRODUCTION OF 12 MILLION OZ SILVER, 324 MILLION LBS ZINC PER YEAR; MOVING TO

More information

A New Direction. Developing Copper Assets in Canada s North TSX.V:COL. 27 Feb 2018 CPNVF:US, FRA:79M1

A New Direction. Developing Copper Assets in Canada s North TSX.V:COL. 27 Feb 2018 CPNVF:US, FRA:79M1 A New Direction Developing Copper Assets in Canada s North 27 Feb 2018 TSX.V:COL CPNVF:US, FRA:79M1 FORWARD LOOKING STATEMENTS This presentation includes certain forward-looking information or forward-looking

More information

INNOVATIVE ENERGY EFFICIENT SOTKAMO SILVER

INNOVATIVE ENERGY EFFICIENT SOTKAMO SILVER INNOVATIVE ENERGY EFFICIENT SOTKAMO SILVER Industry Summit, 5th October 2017, Oulu Timo Lindborg CEO, Dr. Tech., Adjunct professor Sotkamo Silver AB SOTKAMO SILVER AB Sotkamo Silver AB is listed in NGM

More information

T S X : R M X N Y S E. M K T : R B Y

T S X : R M X N Y S E. M K T : R B Y T S X : R M X N Y S E. M K T : R B Y News Release A p r i l 1 4, 2015 Rubicon s Phoenix Gold Project Commences Mill Commissioning and Remains on Schedule for Mid-2015 Projected Initial Production TORONTO,

More information

N E W S R E L E A S E

N E W S R E L E A S E ASM: TSX/NYSE American Avino Silver & Gold Mines Ltd. T (604) 682 3701 Suite 900-570 Granville Street F (604) 682 3600 Vancouver, BC V6C 3P1 www.avino.com February 21, 2018 N E W S R E L E A S E AVINO

More information

Skeena Announces Preliminary Economic Assessment for Spectrum-GJ Copper-Gold Project

Skeena Announces Preliminary Economic Assessment for Spectrum-GJ Copper-Gold Project NR: 17-05 April 20, 2017 Skeena Announces Preliminary Economic Assessment for Spectrum-GJ - Project Vancouver, BC (April 20, 2017) Skeena Resources Limited (TSX.V: SKE) ( Skeena or the Company ) is pleased

More information

N E W S R E L E A S E

N E W S R E L E A S E ASM: TSX/NYSE American Avino Silver & Gold Mines Ltd. T (604) 682 3701 Suite 900-570 Granville Street F (604) 682 3600 Vancouver, BC V6C 3P1 www.avino.com February 21, 2018 N E W S R E L E A S E AVINO

More information

ASCOT INCREASES TOTAL GOLD RESOURCES AT THE PREMIER-DILWORTH PROPERTIES IN BRITISH COLUMBIA

ASCOT INCREASES TOTAL GOLD RESOURCES AT THE PREMIER-DILWORTH PROPERTIES IN BRITISH COLUMBIA Ascot Resources Ltd. Suite 1550-505 Burrard St. Vancouver, B.C., V7X 1M5 T: 778-725-1060 F: 778-725-1070 TF: 855-593-2951 www.ascotgold.com For Immediate Release ASCOT INCREASES TOTAL GOLD RESOURCES AT

More information

NEW MINERAL RESOURCE ESTIMATE ADDS 281 MILLION TONNES OF HIGH-GRADE INFERRED RESOURCES TO THE HUGO NORTH COPPER-GOLD DEPOSIT IN MONGOLIA

NEW MINERAL RESOURCE ESTIMATE ADDS 281 MILLION TONNES OF HIGH-GRADE INFERRED RESOURCES TO THE HUGO NORTH COPPER-GOLD DEPOSIT IN MONGOLIA February 1, 2006 NEW MINERAL RESOURCE ESTIMATE ADDS 281 MILLION TONNES OF HIGH-GRADE INFERRED RESOURCES TO THE HUGO NORTH COPPER-GOLD DEPOSIT IN MONGOLIA ULAANBAATAR, MONGOLIA John Macken, President of

More information

ASX Release ASX Code: YTC

ASX Release ASX Code: YTC HERA DEFINITIVE FEASIBILITY STUDY TO BE EXPANDED Hera DFS scope to be expanded to include the assessment of mining and treatment of high grade copper ores from the Nymagee Copper Mine together with additional

More information

T S X : R M X N Y S E. M K T : R B Y. Rubicon Begins Stockpiling Mill Feed for Projected Production Commencing Mid-2015

T S X : R M X N Y S E. M K T : R B Y. Rubicon Begins Stockpiling Mill Feed for Projected Production Commencing Mid-2015 T S X : R M X N Y S E. M K T : R B Y News Release D e c e m b e r 1 8, 2014 Rubicon Begins Stockpiling Mill Feed for Projected Production Commencing Mid-2015 TORONTO, Ontario Rubicon Minerals Corporation

More information

121 MINING INVESTMENT CONFERENCE HONG KONG

121 MINING INVESTMENT CONFERENCE HONG KONG ASX / MEDIA RELEASE 23 April 2018 121 MINING INVESTMENT CONFERENCE HONG KONG St George Mining Limited (ASX: SGQ) ( St George or the Company ) is participating at the 121 Mining Investment Conference in

More information

Azure Minerals Ltd ASX Code:

Azure Minerals Ltd ASX Code: Azure Minerals Ltd ASX Code: AZS @AzureMinerals www.azureminerals.com.au Tony Rovira Managing Director Azure Minerals Ltd Objective To be a low cost, high margin copper producer Strategy Developing our

More information

AQM Copper Releases Positive Preliminary Economic Assessment for the Zafranal Copper Gold Project

AQM Copper Releases Positive Preliminary Economic Assessment for the Zafranal Copper Gold Project AQM Copper Releases Positive Preliminary Economic Assessment for the Zafranal Copper Gold Project Vancouver, British Columbia, AQM Copper Inc. (TSX.V: AQM; BVL: AQM) ( AQM or the "Company") is pleased

More information

Thalanga Project Ore Reserve and Mineral Resource Statement (as at 1 December 2017)

Thalanga Project Ore Reserve and Mineral Resource Statement (as at 1 December 2017) Thalanga Project Ore Reserve and Mineral Resource Statement (as at 1 December 2017) Thalanga Project Ore Reserves Ore Reserves Classification Tonnage (Kt) Cu (%) Pb (%) Zn (%) Au (g/t) Ag (g/t) Zn Eq.

More information

Confidence in Carrapateena project grows

Confidence in Carrapateena project grows 7 NOVEMBER 2016 Confidence in Carrapateena project grows Carrapateena Pre-Feasibility Study released - project competitive with, or better than comparable long-life copper assets globally Project metrics

More information

Great Western Scoping Study Update & Onsite Gold Processing

Great Western Scoping Study Update & Onsite Gold Processing ASX RELEASE 10 August 2017 ABN: 45 116 153 514 ASX: TMX Great Western Scoping Study Update & Onsite Gold Processing Terrain Minerals Limited (ASX: TMX) is pleased to provide the following update on its

More information

Thalanga Operations Ore Reserve and Mineral Resource Statement

Thalanga Operations Ore Reserve and Mineral Resource Statement Thalanga Operations Ore Reserve and Mineral Resource Statement Ore Reserves Classification Tonnage (Kt) Cu (%) Pb (%) Zn (%) Au (g/t) Ag (g/t) Zn Eq. (%) West 45 (1) Proved 101 0.3 2.0 4.6 0.3 38 8.4 Probable

More information

EXCO S PROJECT PIPELINE

EXCO S PROJECT PIPELINE EXCO S PROJECT PIPELINE INVESTOR UPDATE EXCO RESOURCES N.L. MAY 2010 Presented by Michael Anderson Managing Director DISCLAIMER This presentation contains forward looking statements that are subject to

More information

Orezone Announces Updated Feasibility Study to Incorporate a Phase II High-Grade Sulphide Expansion

Orezone Announces Updated Feasibility Study to Incorporate a Phase II High-Grade Sulphide Expansion Orezone Announces Updated Feasibility Study to Incorporate a Phase II High-Grade Sulphide Expansion November 19, 2018, Orezone Gold Corporation (TSXV: ORE) ( Orezone or the Company ) is pleased to provide

More information

FOR IMMEDIATE RELEASE 30 August 2018 TSX-V: AZR

FOR IMMEDIATE RELEASE 30 August 2018 TSX-V: AZR FOR IMMEDIATE RELEASE 30 August 2018 TSX-V: AZR AZARGA METALS ANNOUNCES POSITIVE, INDEPENDENT, PRELIMINARY ECONOMIC ASSESSMENT ( PEA ) ON UNKUR COPPER-SILVER PROJECT HIGHLIGHTS: Positive PEA result achieved

More information

9 July 2018 Atalaya Mining Plc ( Atalaya or the Company ) Proyecto Riotinto 29% Increase in Open Pit Mineral Reserves Updated Technical Report

9 July 2018 Atalaya Mining Plc ( Atalaya or the Company ) Proyecto Riotinto 29% Increase in Open Pit Mineral Reserves Updated Technical Report 9 July 2018 Atalaya Mining Plc ( Atalaya or the Company ) Proyecto Riotinto 29% Increase in Open Pit Mineral Reserves Updated 43-101 Technical Report Atalaya Mining Plc (AIM:ATYM, TSX:AYM) is pleased to

More information

Vendetta Announces Positive Preliminary Economic Assessment with Pre-Tax IRR of 32% and NPV (8%) of $201M on Pegmont Lead-Zinc Project

Vendetta Announces Positive Preliminary Economic Assessment with Pre-Tax IRR of 32% and NPV (8%) of $201M on Pegmont Lead-Zinc Project FOR IMMEDIATE RELEASE January 28, 2019 (VTT2019 NR #1) Vendetta Announces Positive Preliminary Economic Assessment with Pre-Tax IRR of 32% and NPV (8%) of $201M on Pegmont Lead-Zinc Project Vancouver,

More information

HIGH-GRADE EXPANDING COPPER-GOLD PRODUCER CANADA RAB TSXV RMM AIM

HIGH-GRADE EXPANDING COPPER-GOLD PRODUCER CANADA RAB TSXV RMM AIM HIGH-GRADE EXPANDING COPPER-GOLD PRODUCER CANADA RAB TSXV RMM AIM NOVEMBER 2017 FORWARD LOOKING STATEMENTS Caution Regarding Forward Looking Statements: Certain information included in this presentation,

More information

NEWS RELEASE. Highlights of the Copperwood Project Feasibility Study

NEWS RELEASE. Highlights of the Copperwood Project Feasibility Study NEWS RELEASE Highland Copper Announces Positive Feasibility Study Results for its Copperwood Project in Michigan - IRR of 18% After Tax, Capital Cost of $275 M and an Average Payable Copper Production

More information

Transitioning from Explorer to Miner

Transitioning from Explorer to Miner Transitioning from Explorer to Miner ASX: AZS @AzureMinerals www.azureminerals.com.au RIU Resources Investor Roadshow Sydney & Melbourne 25-27 September 2018 Tony Rovira Managing Director Azure Minerals

More information

For personal use only

For personal use only RDM ASX Announcement 23 October 2013 ACN 103 367 684 ASX ANNOUNCEMENT 8 MARCH 2016 ASX Code: RDM Red Metal Limited is a minerals exploration company focused on the exploration, evaluation and development

More information

For personal use only

For personal use only Heron Resources Limited Rapidly Advancing the High Grade Woodlawn Zinc-Copper Project From PEA to Production Wayne Taylor, Managing Director 16 April 2015 ASX: HRR TSX: HER Forward Looking & Compliance

More information

CORPORATE PRESENTATION JULY 2017

CORPORATE PRESENTATION JULY 2017 CMX GOLD & SILVER CORP. CORPORATE PRESENTATION JULY 2017 www.cmxgoldandsilver.com 1 2 This presentation includes certain forward-looking statements within the meaning of Canadian securities legislation.

More information

Cu-eq references throughout this press release.

Cu-eq references throughout this press release. NEWS RELEASE TSX: NCU NEVADA COPPER ANNOUNCES POSITIVE PEA RESULTS FOR PUMPKIN HOLLOW OPEN PIT COPPER PROJECT September 10, 2018 Nevada Copper Corp. (TSX: NCU) ( Nevada Copper or the Company ) is pleased

More information

RE: REVIEW OF THE PRAIRIE CREEK MINE SCOPING STUDY

RE: REVIEW OF THE PRAIRIE CREEK MINE SCOPING STUDY January 29, 2001 Mr. Malcolm Swallow President & CEO Canadian Zinc Corporation Suite 1202-700 Pender Street Vancouver Canada V6C 1G8 By Fax: 604-688-2043 Total Number of Pages: 8 Dear Mr. Swallow: RE:

More information

930 West 1 st Street, Suite 202, North Vancouver, BC V7P 3N4. Tel: (604) Tel:

930 West 1 st Street, Suite 202, North Vancouver, BC V7P 3N4. Tel: (604) Tel: 930 West 1 st Street, Suite 202, North Vancouver, BC V7P 3N4 Tel: (604) 998-4175 Tel: 1888 648-4218 www.sabinagoldsilver.com April 22, 2014 SBB NR 14-05 SBB TSX SABINA GOLD & SILVER REPORTS SIGNIFICANT

More information

TECHNICAL REPORT PRELIMINARY ECONOMIC ASSESSMENT OF THE KENO HILL SILVER DISTRICT PROJECT, YUKON TERRITORY, CANADA

TECHNICAL REPORT PRELIMINARY ECONOMIC ASSESSMENT OF THE KENO HILL SILVER DISTRICT PROJECT, YUKON TERRITORY, CANADA ALEXCO RESOURCE CORP. TECHNICAL REPORT PRELIMINARY ECONOMIC ASSESSMENT OF THE KENO HILL SILVER DISTRICT PROJECT, YUKON TERRITORY, CANADA NI 43-101 Report Qualified Persons: Torben Jensen, P.Eng. Gilles

More information

TECHNICAL REPORT PRELIMINARY ECONOMIC ASSESSMENT OF THE KENO HILL SILVER DISTRICT PROJECT, YUKON TERRITORY, CANADA

TECHNICAL REPORT PRELIMINARY ECONOMIC ASSESSMENT OF THE KENO HILL SILVER DISTRICT PROJECT, YUKON TERRITORY, CANADA ALEXCO RESOURCE CORP. TECHNICAL REPORT PRELIMINARY ECONOMIC ASSESSMENT OF THE KENO HILL SILVER DISTRICT PROJECT, YUKON TERRITORY, CANADA NI 43-101 Report Qualified Persons: Torben Jensen, P.Eng. Gilles

More information

(TSX: AUQ) (NYSE: AUQ)

(TSX: AUQ) (NYSE: AUQ) AuRico Gold Announces a New Gold-Copper Porphyry Discovery at the Kemess Project; Initial Resource Estimate Expected in Early 2015 Hole KH-14-04 intersects 768 metres of 0.442 g/t Au and 0.392% Cu Toronto:

More information

Richmont Mines Provides a Status Update on an Expansion Case Preliminary Economic Assessment for the Island Gold Mine

Richmont Mines Provides a Status Update on an Expansion Case Preliminary Economic Assessment for the Island Gold Mine NEWS RELEASE Richmont Mines Provides a Status Update on an Expansion Case Preliminary Economic Assessment for the Island Gold Mine 11/1/2016 Potential for Increased Production to 1,100 Tonnes per Day with

More information

A New Direction. Developing Copper Assets in Canada s North TSX.V:COL. June 1, May 2013

A New Direction. Developing Copper Assets in Canada s North TSX.V:COL. June 1, May 2013 A New Direction Developing Copper Assets in Canada s North June 1, 2017 May 2013 TSX.V:COL FORWARD LOOKING STATEMENTS This presentation includes certain forward-looking information or forward-looking statements

More information

For personal use only

For personal use only The Manager Company s Announcements Australian Securities Exchange Highlights Corazon Exploration Up-date Drilling continues at the nickel-copper sulphide EL Deposit at the Lynn Lake Project, Canada ASX

More information

Niblack Project Poised For Development

Niblack Project Poised For Development Niblack Project Poised For Development AIDEA Board of Directors Meeting 38% 30% 22% 9% July 31, 2014 Forward-Looking Statements Except for statements of historical fact, this presentation contains certain

More information

Rambler Updates the Reserve and Resource Estimates At its Ming Copper Gold Mine

Rambler Updates the Reserve and Resource Estimates At its Ming Copper Gold Mine 27 January 2014 Rambler Updates the Reserve and Resource Estimates At its Ming Copper Gold Mine London, England & Baie Verte, Newfoundland and Labrador Rambler Metals and Mining plc, a Newfoundland copper

More information

AN EXCITING PLAYER IN AUSTRALIAN BASE METALS. Annual General Meeting 21 st October 2016

AN EXCITING PLAYER IN AUSTRALIAN BASE METALS. Annual General Meeting 21 st October 2016 AN EXCITING PLAYER IN AUSTRALIAN BASE METALS Annual General Meeting 21 st October 2016 2 IMPORTANT INFORMATION This document has been prepared by Aeon Metals Limited (Aeon) for the purpose of providing

More information

A G M P R E S E N T A T I O N O c t o b e r 2018

A G M P R E S E N T A T I O N O c t o b e r 2018 A G M P R E S E N T A T I O N O c t o b e r 2018 D I S C L A I M E R & C O M P L I A N C E S TAT E M E N T S The information contained in this presentation should be read in conjunction with and subject

More information

Developing High Grade Projects in Mexico

Developing High Grade Projects in Mexico Developing High Grade Projects in Mexico ASX: AZS @AzureMinerals www.azureminerals.com.au Tony Rovira Managing Director Azure Minerals Ltd 20 February 2018 Exciting High Quality Projects Sara Alicia: 100%

More information

Quality, Diverse Group of Mining Assets. February 2018

Quality, Diverse Group of Mining Assets. February 2018 Quality, Diverse Group of Mining Assets February 2018 1 Forward Looking Statements Some of the statements contained in the following material are "forward looking statements". All statements in this release,

More information

555 Burrard Street, Suite 1800, Vancouver, B.C. V7X 1M June 5, 2018 SBB NR SBB TSX

555 Burrard Street, Suite 1800, Vancouver, B.C. V7X 1M June 5, 2018 SBB NR SBB TSX 555 Burrard Street, Suite 1800, Vancouver, B.C. V7X 1M7 604.998.4175 June 5, 2018 SBB NR-18-15 SBB TSX SABINA GOLD & SILVER REPORTS FINAL RESULTS FROM SPRING DRILL PROGRAM Includes 8.38g/t Au over 11.45m

More information

METATES UPDATED PEA INDICATES EXCELLENT PROJECT ECONOMICS 26,000 METRE DRILL PROGRAM UNDERWAY

METATES UPDATED PEA INDICATES EXCELLENT PROJECT ECONOMICS 26,000 METRE DRILL PROGRAM UNDERWAY March 7, 2011 Symbol: TSX V-CKG NR1-2011 METATES UPDATED PEA INDICATES EXCELLENT PROJECT ECONOMICS 26,000 METRE DRILL PROGRAM UNDERWAY Chesapeake Gold Corp. ( Chesapeake ) is pleased to announce the results

More information

NEWS RELEASE ROXGOLD ANNOUNCES POSITIVE FEASIBILITY STUDY FOR ITS BAGASSI SOUTH PROJECT

NEWS RELEASE ROXGOLD ANNOUNCES POSITIVE FEASIBILITY STUDY FOR ITS BAGASSI SOUTH PROJECT NEWS RELEASE ROXGOLD ANNOUNCES POSITIVE FEASIBILITY STUDY FOR ITS BAGASSI SOUTH PROJECT Yaramoko annual gold production expected to increase approximately 40% to over 150,000 ounces Toronto, Ontario November

More information

For personal use only

For personal use only 25 May 2012 AMENDED PERKOA JOINT VENTURE PROJECT MINERAL RESOURCE UPGRADE Please find attached an amended version of the Perkoa Joint Venture Project Mineral Resource Upgrade announcement released yesterday.

More information

Development of Sisson Brook Tungsten Molybdenum Deposit in New Brunswick, Canada

Development of Sisson Brook Tungsten Molybdenum Deposit in New Brunswick, Canada Development of Sisson Brook Tungsten Molybdenum Deposit in New Brunswick, Canada DISCLAIMER This presentation by Geodex Minerals Ltd. (the Company ) contains forward-looking statements, including, in particular,

More information

News Release. Highlights of the Cobalt Resource:

News Release. Highlights of the Cobalt Resource: TSX/NYSE American Symbol: TMQ News Release Trilogy Metals Reports Maiden Inferred Cobalt Resource Estimate Containing 77 Million Pounds of Cobalt at the Bornite Project, Alaska, USA June 5, 2018 - Vancouver,

More information

MEDIA RELEASE OCEANAGOLD ANNOUNCES COMMENCEMENT OF CONSTRUCTION AT THE DIDIPIO PROJECT IN THE PHILIPPINES

MEDIA RELEASE OCEANAGOLD ANNOUNCES COMMENCEMENT OF CONSTRUCTION AT THE DIDIPIO PROJECT IN THE PHILIPPINES 15 June 2011 MEDIA RELEASE OCEANAGOLD ANNOUNCES COMMENCEMENT OF CONSTRUCTION AT THE DIDIPIO PROJECT IN THE PHILIPPINES (MELBOURNE) OceanaGold Corporation (ASX: OGC, TSX: OGC, NZX: OGC) ( the Company )

More information

Constantine Metallurgy Program Yields Quality Barite Concentrate and Recoveries of 93% for Zinc and 89% for Copper. Palmer Project, Southeast Alaska

Constantine Metallurgy Program Yields Quality Barite Concentrate and Recoveries of 93% for Zinc and 89% for Copper. Palmer Project, Southeast Alaska August 13, 2018 NR # 152-18 NEWS RELEASE Constantine Metallurgy Program Yields Quality Barite Concentrate and Recoveries of 93% for Zinc and 89% for Copper Palmer Project, Southeast Alaska Vancouver, BC

More information

Bank of America Merrill Lynch 2015 Global Metals, Mining & Steel Conference

Bank of America Merrill Lynch 2015 Global Metals, Mining & Steel Conference Bank of America Merrill Lynch 2015 Global Metals, Mining & Steel Conference May 2015 HBM Cautionary Information This presentation contains "forward-looking statements" and "forward-looking information"

More information

UPDATE TO BROKEN HILL MINERAL RESOURCES AND ORE RESERVES

UPDATE TO BROKEN HILL MINERAL RESOURCES AND ORE RESERVES 7 November 2008 UPDATE TO BROKEN HILL MINERAL RESOURCES AND ORE RESERVES Highlights Broken Hill Ore Reserves increase life of mine to 9 years at conservative price assumptions Substantial Resource base

More information

Investor Presentation

Investor Presentation Investor Presentation January 2016 HBM Cautionary Information This presentation contains "forward-looking statements" and "forward-looking information" (collectively, "forward-looking information") within

More information

CMZ. Advancing The Zafranal Project. Bruce L. Turner Executive Director, Compañía Minera Zafranal 6 March 2017 Peru Day PDAC 2017

CMZ. Advancing The Zafranal Project. Bruce L. Turner Executive Director, Compañía Minera Zafranal 6 March 2017 Peru Day PDAC 2017 Advancing The Zafranal Project Bruce L. Turner Executive Director, Compañía Minera Zafranal 6 March 2017 Peru Day PDAC 2017 Forward-Looking Information These slides contain certain forward-looking statements

More information

TSX-V: CNX I OTCQX: CLLXF. A Leading Zinc Junior in Established Canadian Mining Districts

TSX-V: CNX I OTCQX: CLLXF. A Leading Zinc Junior in Established Canadian Mining Districts TSX-V: CNX I OTCQX: CLLXF A Leading Zinc Junior in Established Canadian Mining Districts FORWARD LOOKING INFORMATION This presentation contains certain forward-looking information and statements. Such

More information

N E W S R E L E A S E

N E W S R E L E A S E ASM: TSX/NYSE American January 17, 2019 AVINO ANNOUNCES AND FULL YEAR PRODUCTION RESULTS Avino Silver & Gold Mines Ltd. (ASM: TSX/NYSE American, GV6: FSE, Avino or the Company ) is pleased to announce

More information

Progress Update on the Lower Footwall Zone

Progress Update on the Lower Footwall Zone 9 February 2015 Progress Update on the Lower Footwall Zone London, England & Baie Verte, Newfoundland and Labrador, Canada Rambler Metals and Mining plc (TSXV: RAB, AIM: RMM) ( Rambler or the Company ),

More information

QUARTERLY REPORT for the period ending 30 September 2017

QUARTERLY REPORT for the period ending 30 September 2017 ASX: AMI September 2017 Quarter 16 October 2017 QUARTERLY REPORT for the period ending 30 September 2017 QUARTER HIGHLIGHTS Gold production of 11,111 oz at a Cash Cost of A$181/oz and an AISC of A$570/oz

More information

Macmillan Pass Zinc Project: The Path Forward from a Robust PEA

Macmillan Pass Zinc Project: The Path Forward from a Robust PEA Macmillan Pass Zinc Project: The Path Forward from a Robust PEA August 2018 Cautionary Statements The following statements are required by Canadian securities legislation: PEA Cautionary Note: Readers

More information

A Near-Term Zinc Producer

A Near-Term Zinc Producer www.canadianzinc.com A Near-Term Zinc Producer July 2014 Some of the statements in this presentation are forward-looking statements and as such are based on an assumed set of the geological and economic

More information