1 South American Ferro Metals Limited Expanding, Profitable Iron Ore Producer. Alan Doyle Director ASX:SFZ 2 nd Annual LatAm International Mining Conference March 2013 Rio de Janeiro
2 Investment Highlights Expanding to 8Mtpa then to 16Mtpa Only non-brazilian listed pure play iron ore producer in South America Located in prolific Iron Ore Quadrilateral (Neighbouring property Vale) Near customers and infrastructure JORC resource of 277.9Mt at 41.3% Fe (5 th richest Fe grade in Brazil) Phase III program underway to expand resource (target between Mt) DFS for Stage I expansion from 1.5 to 8Mtpa underway Stage II expansion to 16Mtpa targeted for end 2016 Growing Profitability - Newly commissioned Stage I concentrator Stage II Concentrator in final stages of completion (April 2013 production) Highly experienced and successful Brazilian Leadership Team 2
3 Company History: Accelerated Growth Nov Mining commenc ed Feb Mtpa plant refurbished and upgraded Sept 2011 Attained full 1.5Mtpa licensed capacity Feb 2012 Approved the Definitive Feasibility Study June 2012 Commissioned First Concentrator 3
4 Why Brazil? Large Resource Base 2nd largest global iron ore producer 1 & 2 nd largest reserves. 2 30% remains unexplored with high potential. Salvador 480Mt produced in 2011 increase ~92% over 10 years. 2 Vale World s largest iron ore producer SAFM s neighbour. Ranked 8 th best country for resources investment & operation. 3 Extensive logistics and existing infrastructure in project area iron and steel plants, mills, rail, ports and roads. Sao Paulo Rio de Janeiro 1 hour flight / 4 hour drive north of Rio de Janeiro 1 RBC Capital Markets, June 15, US Geological Survey 3 Resource Stocks 2011 World Risk Survey 4
5 Infrastructure in Place Over 100 iron ore mining and infrastructure facilities within 150 km Rail Ports Mines Pelletizing plants Pig iron plants Smelters Steel plants Rail Lines Available rail lines and port capacity. 5
6 Commercial and Technical Overview Technical Overview Shared deposit with Vale - SAFM s JORC Resource is currently 41.3% Fe. Updated JORC Resource in November th Highest grade resource in Brazil. 1 Lowest tercile on the Brazilian cost curve. 1 Total cost of beneficiation production $19 per tonne. Total cost of beneficiation production drop with the commissioning of the Second Concentrator. 1 RBC Prospector - 15 Jun
7 Strong Geology & Resource Base SAFM VALE Setting Ore body runs NE to SW Deposit split with Vale Herculano & Vale s Pico mines to the north of SAFM s site Ore body open to the north, west and south west Geology Hematite-rich itabirite ore Resource % Fe 1 Exploration Target between 300Mt and 350Mt@ 40-44% Fe 2 Located in the heart of Brazil s prolific and historic Iron Ore Quadrilateral (1) The JORC Resource of 277.9Mt is comprised of Measured Resources of 70.4 Mt at 41.64% Fe, an Indicated Resource of Mt at 40.97% Fe, and an Inferred Resource of Mt at 41.39% Fe. (2) The Exploration Target is based on the geological model associated with the defined JORC Resource as stated, and has been determined by a JORC Competent Person Mr Philip Hopkins. It is uncertain if further exploration of the Exploration Target will result in the determination of Mineral Resources
8 Ponto Verde Fly Over Video 8
9 Product Range Commercial Optimisation Current 1.5 Mtpa ROM Feed 15% or 225 ktpa Lump 27% or 405 ktpa Sinter Feed v 16% or 240 ktpa Stage I Concentrate v 21% or 315 ktpa Stage II Concentrate Start up April % Mass Recovery or 1,185 ktpa 9
10 Growth Stages I & II 10
11 Growth: Stage I Operations Expansion From 1.5 to 8Mtpa ROM by end 2015 Stage I Definitive Feasibility Study (DFS) Underway Off-the-Shelf approach - Reduced time and cost risk Will include Footprint and Tie-ins for Stage II Expansion to 16Mtpa Accessing export markets +30 year mine life Will commission by late
12 Growth Plan: Stage II Operations Expansion From 8 to 16Mtpa ROM by 2016 Stage II DFS to begin upon Stage I Study Completion Mirror image of Stage I Plant Foot print and tie in established during 8Mtpa Expansion design +17 year mine life Expected commissioning late
13 SAFM and Brazil SAFM has a strong focus on its local reputation and relationships. SAFM is seen as one of the region s best employer: Excellent relationship with workers union. Low staff turnover rate. No accidents recorded since inception (759 days without any safety or environmental incident at 11 March 2013). 13
14 SAFM and Brazil SAFM works closely with the State Public Ministry and municipal authorities to ensure sustainable mining: Every environmental commitment has been completed ahead of time. SAFM has invited the public ministry to establish their regional rural environment office and facility on its mine site. Public Minister has given high praises to SAFM s environmental efforts on all his visits to the mine-site. SAFM has received a number of environmental awards, including the Empresa Verde Green Award. 14
15 Environmental Stewardship SAFM s environmental programs focus on achieving the requirements outlined by the Public Minister in association with the mining license. The Public Ministry and other environmental authorities have praised SAFM s environmental activities, including: Rehabilitating erosion areas. Backfilling and revegetation of mining areas that are no longer in use. Installing a 26km fence surrounding the adjacent environmental park. Repairing the structural foundations of a public bridge. Restoring historical building ruins (on going). 15
16 SAFM and Brazil SAFM has a strong focused on its local reputation and relationships. During its 2 years of production SAFM has successfully established good strategic relationship with: Vale Cristal Mining NAMISA LGA MRS MMX, 16
17 The Future SAFM believes in the Brazilian story, and is well placed within the region to share on its future economic growth. SAFM has strong management with the proven ability to successfully operate between Australia and Brazil. SAFM will expand its production to 8Mtpa (2014) and 16Mtpa (2016) with its continuous focus on mining sustainability. 17
18 Disclaimer South American Ferro Metals Limited and each of its respective directors, officers and agents believe that the information contained in this presentation is correct and that any estimates, opinions or conclusions contained in this presentation are reasonably held or made as at the time of compilation. However, no warranty is made as to the accuracy or reliability of any estimates, opinions, conclusions or other information contained in this document. South American Ferro Metals and its directors, officers and agents disclaims all liability and responsibility for any direct or indirect loss or damage which may be suffered by any recipient through relying on anything contained in or omitted from this presentation. This presentation is for the intended recipient. No part of this document may be reproduced without the permission of South American Ferro Metals Limited. Forward Looking Statements This announcement contains certain forward looking statements which by nature, contain risk and uncertainty because they relate to future events and depend on circumstances that occur in the future. There are a number of factors that could cause actual results or developments to differ materially from those expressed or implied by these forward looking statements. Competent Person s Statement Information in this statement that relates to the JORC resource at Ponto Verde is based on information compiled by Mr Bernardo Hurta de C Viana (Phase I) and Mr Porfirio Cabaleiro (Phase II) both of Coffey Mining (Brazil). Both are Members of the Australasian Institute of Mining and Metallurgy. Mr Viana and Mr Cabaleiro have sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he has undertaken to qualify as a Competent Person as defined in the 2004 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore reserves (the JORC Code). Mr Viana and Mr Cabaleiro have consented to the inclusion in this announcement of the statements based on his information in the form and context in which they appear. 18
19 Thank You Alan Doyle Director 19
For personal use only
South American Ferro Metals Limited Successful First Year of Production Philip Hopkins Chief Executive Officer ASX:SFZ Annual General Meeting 16 November 2011 - Sydney, Australia www.safml.com Presentation
More informationGrange Resources. Diggers & Dealers 4 August Russell Clark Managing Director & CEO
Grange Resources Australia s leading magnetite producer Grange Resources Limited (GRR) Level 11, 200 St Georges Terrace Perth, WA 6000, Australia Phone + 61 8 9321 1118 Fax + 61 8 9321 1523 www.grangeresources.com.au
More informationGrange Resources Australia s leading magnetite producer
Grange Resources Australia s leading magnetite producer Grange Resources Limited (GRR) Level 11, 200 St Georges Terrace Perth, WA 6000, Australia Phone + 61 8 9321 1118 Fax + 61 8 9321 1523 www.grangeresources.com.au
More informationCentral Eyre Iron Project On the Road to Production. Larry Ingle, General Manager - 8 th SA Exploration & Mining Conference - 2 December 2011
Central Eyre Iron Project On the Road to Production Larry Ingle, General Manager - 8 th SA Exploration & Mining Conference - 2 December 2011 Disclaimer Forward-Looking Statements This presentation contains
More informationBuilding South Australia s Largest Iron Ore Project
Building South Australia s Largest Iron Ore Project Briefing to the Regional Communities Consultative Council (RCCC) Wudinna, South Australia, 28 September 2012 Disclaimer Forward-Looking Statements This
More informationMARILLANA MAIDEN HEMATITE ORE RESERVE OF 1.05 BILLION TONNES
ASX Release: 9 September 2010 MARILLANA MAIDEN HEMATITE ORE RESERVE OF 1.05 BILLION TONNES Definitive Mining Studies confirm continuity, quality and quantum of Ore body at MARILLANA Detrital Ore Reserves
More informationGum Flat Iron Ore. Potential to Export from Port Lincoln in 2 years. Dr A. John Parker. Managing Director. Port Lincoln Council 17 January 2011
Gum Flat Iron Ore Potential to Export from Port Lincoln in 2 years Dr A. John Parker Managing Director Port Lincoln Council 17 January 2011 Disclaimer & Competent Person s Statement This presentation has
More informationOn The Road To Production. South Australian Resources and Energy Investment Conference 1 May 2012
On The Road To Production South Australian Resources and Energy Investment Conference 1 May 2012 Disclaimer Forward-Looking Statements This presentation contains forward looking statements concerning the
More informationPit to Port Infrastructure in SA
Pit to Port Infrastructure in SA An Explorer s Perspective Dr A. John Parker Managing Director SA Mining and Energy Infrastructure Conference 2011 12-13 April 2011 Disclaimer & Competent Person s Statement
More informationFIRST GOLD ORE DISPATCHED FROM ULYSSES
Genesis Minerals Limited (ASX: GMD) ASX Announcement 14 November 2016 FIRST GOLD ORE DISPATCHED FROM ULYSSES Genesis poised for first cash-flow as first parcel of ore departs for Paddington gold plant
More informationDEVELOPING FERTILISER PROJECTS TO MEET THE GROWING DEMAND IN BRAZIL AND THE WORLD
EST MINE HARVEST MINERALS Developing Fertiliser Projects DEVELOPING FERTILISER PROJECTS TO MEET THE GROWING DEMAND IN BRAZIL AND THE WORLD Corporate advisor: Investor Presentation July 2015 ASX: HMI www.harvestminerals.net
More informationBald Hill Delivers Excellent Metallurgical Test Work Results
6 September 2017 Bald Hill Delivers Excellent Metallurgical Test Work Results Tawana Resources NL (TAW:ASX) (Tawana) and Alliance Mineral Assets Limited (SGX:AMA) (AMAL) are pleased to announce encouraging
More informationFor personal use only. Mining the Territory. Korab Resources Limited NT RESOURCES WEEK ASX: KOR. Andrej K. Karpinski Executive Chairman
Korab Resources Limited Mining the Territory NT WEEK Andrej K. Karpinski Executive Chairman Diversified International Minerals Company Precious metals, agricultural and industrial commodities Magnesium
More informationFor personal use only
ASX Release and Media Announcement 3 December 2012 IRON ROAD ANNOUNCES PROPOSED EXPORT SOLUTION New Port Option to Open South Australia to Capesize Bulk Carriers Iron Road Limited (Iron Road, ASX: IRD)
More informationDECEMBER 2010 QUARTERLY ACTIVITIES REPORT
21 January 2011 DECEMBER 2010 QUARTERLY ACTIVITIES REPORT HIGHLIGHTS Company s total JORC compliant resource inventory in south-east Brazil increased to 126.1 million tonnes at an average grade of 30.5%
More informationFirst mover advantage in Africa s new world-class iron ore region Developing the Mbalam-Nabeba Iron Ore Project
First mover advantage in Africa s new world-class iron ore region Developing the Mbalam-Nabeba Iron Ore Project Giulio Casello, CEO & Managing Director ASX Small to Mid Caps Spotlight in Asia May 14 th
More informationDeveloping a Brazilian Iron Ore Business. Mark Papendieck, Chief Commercial Officer
Developing a Brazilian Iron Ore Business Mark Papendieck, Chief Commercial Officer February, 2011 Disclaimer This presentation does not constitute investment advice. Neither this presentation nor the information
More information13 th South Australian Exploration & Mining Conference 2 nd December Central Eyre Iron Project - Building Partnerships to our Future
13 th South Australian Exploration & Mining Conference 2 nd December 2016 - Central Eyre Iron Project - Building Partnerships to our Future Disclaimer Forward Looking Statements This announcement contains
More informationFor personal use only
ASX Announcement July 2014 WILGERUP HEMATITE IRON ORE PROJECT General Manager 24 th July 2014 The Company Announcements Office Australian Securities Exchange Electronic Lodgement System Dear Sir/Madam
More informationAGM Operations Overview. Mr Robin Longley General Manager Geology. Sundance Resources AGM 30 November ASX Code: SDL ABN
AGM 2012 Operations Overview Mr Robin Longley General Manager Geology ASX Code: SDL ABN 19 055 719 394 Sundance Resources AGM 30 November 2012 Disclaimer Certain statements made during or in connection
More informationThe Right Project at The Right Time Giulio Casello, Managing Director & CEO Sundance Resources Ltd.
The Right Project at The Right Time Giulio Casello, Managing Director & CEO Sundance Resources Ltd. Diggers & Dealers Conference Kalgoorlie WA 6 August 2013 2 The Start - Not the End - of the Cycle Iron
More informationArrium Mining. Continued Mining Success in the Face of Lower Iron Ore Prices. 11 th SAEMC 5 December 2014
Arrium Mining Continued Mining Success in the Face of Lower Iron Ore Prices 11 th SAEMC 5 December 2014 Disclaimer The information in this presentation that relates to Mineral Resources or Ore Reserves
More informationAVALON SIGNS HOA WITH HANNANS TO ACQUIRE DISCOVERY ZONE COPPER-IRON DEPOSIT FOR A$4M
6 May 2013 AVALON SIGNS HOA WITH HANNANS TO ACQUIRE DISCOVERY ZONE COPPER-IRON DEPOSIT FOR A$4M Highlights Following continued negotiations Avalon and Hannans have signed a Heads of Agreement for Avalon
More informationAustralia s New Nickel
Australia s New Nickel Proactive Investors Forum, Sydney David Singleton, MD & CEO 9 July 2014 Agenda The Windarra Nickel Mine Black Swan Processing Plant & Mine Nickel Market Boom developing 2 2 Windarra
More informationInvestor Presentation Jogjakarta Iron Sands Project
Investor Presentation Jogjakarta Iron Sands Project Overview of Iron Sands Project Large & well tested (to JORC Standard) Iron Sands Mineral Resource in Java, Indonesia, equivalent 65 Mt of Iron Project
More informationASX ANNOUNCEMENT. Maiden Reserve for Catho Well Channel Iron Deposit, West Pilbara WA. Mt Stuart Joint Venture MAIDEN ORE RESERVE STATEMENT
ABN 46 006 045 790 14 th December 2010 ASX ANNOUNCEMENT Maiden Reserve for Catho Well Channel Iron Deposit, West Pilbara WA Cullen Resources Limited (ASX:CUL) (Cullen) is pleased to report the maiden JORC
More informationPanda Hill Niobium Project. January 2014
Panda Hill Niobium Project January 2014 ASX Capital Structure Issued Shares* 128,675,017 Unlisted options (May 2016 at 26.7c) 7,687,500 Listed options (January 2015 at 26.7c) 17,962,506 Total Options 25,650,006
More informationShaw River Completes Acquisition of 75.5% Interest in Namibian Manganese Project
` ASX ANNOUNCEMENT 11 FEBRUARY 2011 Shaw River Completes Acquisition of 75.5% Interest in Namibian Manganese Project Highlights Acquisition of a 75.5% interest in the Otjozondu Manganese Project in Namibia
More informationMozambique Real Opportunity. Benchmark World Tour Sydney 21 st September
Mozambique Real Opportunity Benchmark World Tour Sydney 21 st September 1 Project 1 Montepuez Montepuez Graphite Project 2 Annual graphite production Capex (pre-production) Opex (concentrate/t) 7 Grade
More informationCarbon Energy Low cost, low emission energy has arrived
Carbon Energy Low cost, low emission energy has arrived Investor Presentation Andrew Dash Managing Director Australian Securities Exchange Spotlight Conference London 10th March 2011 Important Statements
More informationFor personal use only
AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT 22 June 2011 CENTAURUS DELIVERS INTERIM JORC RESOURCE UPGRADE FOR JAMBREIRO IRON ORE PROJECT DRILLING OF SOUTH EAST EXTENSION ZONE CONTINUES DRILLING & SCOPING
More informationFor personal use only
Pre-Feasibility Study Highlights World Class Potential of Mt Lindsay Tin/Tungsten Project ASX Announcement Tuesday, 1 March 2011 Ref: /VMS/606/VMS/0249 Highlights: Project generates substantial revenue
More informationFor personal use only
ASX Announcement Arafura Extends Nolans Mine Life To Beyond Thirty Years 2 September 217 Two-thirds of Measured and Indicated Resources inventory identified as NdPr-bearing phosphate-rich material types
More informationFor personal use only
The Right Time, the Right Project in the Right Place George Jones, Chairman Sundance Resources Ltd. Resources Rising Stars Conference 2 October 2013 Competent Persons Statement The information in this
More informationCentral Eyre Iron Project - Progress Towards Development -
Click to edit Master title style Delivering Iron Ore Opportunities Central Eyre Iron Project - Progress Towards Development - Larry Ingle, General Manager 7 th SA Explorers Conference 26 November 2010
More information5 th Asian Bauxite & Alumina Conference
5 th Asian Bauxite & Alumina Conference October 2015 Bauxite Hills Project Deliberate Focus ASX : MMI CORPORATE SNAPSHOT Shareholders 0.140 0.120 MMI Share Price (A$) Other 47% NetWealth Investments 5%
More informationOPTION TO PURCHASE BUENA VISTA IRON ORE DEPOSIT
ASX Release 19 February 2010 OPTION TO PURCHASE BUENA VISTA IRON ORE DEPOSIT HIGHLIGHTS Option to purchase 100% of USA based Buena Vista Iron ore deposit for total consideration of $US8 million over approximately
More informationValence Industries Australia s Only Graphite Producer
Valence Industries Australia s Only Graphite Producer Asia Pacific I Europe I North America December 2014 Christopher S. Darby MD & CEO SAEM Conference Adelaide Manufacturing Our Carbon Future TM Valence
More informationSouth Australia s Largest Iron Ore Project. SACOME Breakfast Briefing, 21 June 2012
South Australia s Largest Iron Ore Project SACOME Breakfast Briefing, 21 June 2012 Disclaimer Forward-Looking Statements This presentation contains forward looking statements concerning the projects owned
More informationIRON-NICKEL SCOPING STUDY COMMENCES ON KALGOORLIE NICKEL PROJECT
ASX Release 26 October 2011 IRON-NICKEL SCOPING STUDY COMMENCES ON KALGOORLIE NICKEL PROJECT INITIAL RESOURCE ESTIMATE COMPLETED AT THE GOONGARRIE SOUTH DEPOSIT AND BENCH-SCALE TESTING COMMENCED SUMMARY
More informationMINING COMMENCES AT KONONGO GOLD PROJECT
ASX Release Monday 28 th March 2011 MINING COMMENCES AT KONONGO GOLD PROJECT Signature Metals Limited is pleased to announce that it has commenced mining at the Konongo Gold Project. SIGNATURE METALS LIMITED
More informationFor personal use only
For personal use only 1 February 2013 Company Announcements ASX Limited Level 8, Exchange Plaza PERTH WA 6000 COMPANY UPDATE First phase metallurgical test work program now complete with encouraging results
More informationValence Industries. Australia s Only Graphite Producer. Asia Pacific I Europe I North America. Manufacturing Our Carbon Future TM.
Valence Industries Australia s Only Graphite Producer Asia Pacific I Europe I North America December 2014 Manufacturing Our Carbon Future TM Valence (noun). the combining power of an element, especially
More informationPATRICK SCOTT - DIRECTOR TIN CONFERENCE BEER & CO - SECOND ANNUAL WEDNESDAY, 5 NOVEMBER, 2014
BEER & CO - SECOND ANNUAL TIN CONFERENCE WEDNESDAY, 5 NOVEMBER, 2014 PATRICK SCOTT - DIRECTOR SCOTT@AUSTRALIA.ROHSTOFF.DE Disclaimer This presentation has been prepared by and issued by Tin International
More informationAustralia s leading magnetite producer. Southdown Magnetite Project
Australia s leading magnetite producer Southdown Magnetite Project Pre-feasibility Study May 2011 Disclaimer The material in this presentation ( material ) is not and does not constitute an offer, invitation
More informationAustralia s leading magnetite producer
Australia s leading magnetite producer Russell Clark Managing Director and CEO CCI Resource Conference 28 June 2012 Disclaimer The material in this presentation ( material ) is not and does not constitute
More information209 million 36.1% Fe
ASX ANNOUNCEMENT 29 August 2011 ASX Code: BDR MAIDEN IRON ORE RESOURCE ON BEADELL S MINING CONCESSION - BRAZIL 209 million tonnes @ 36.1 Fe Beadell Resources Limited ( Beadell ) is pleased to announce
More informationTOP 5 REASONS WHY MBALAM IS POSITIONED TO BE THE WORLD S NEXT GREAT IRON ORE OPERATION Developing the Mbalam Iron Ore Project in central west Africa
TOP 5 REASONS WHY MBALAM IS POSITIONED TO BE THE WORLD S NEXT GREAT IRON ORE OPERATION Developing the Mbalam Iron Ore Project in central west Africa Africa Down Under Conference 1 September 2011 ASX Code:
More informationFor personal use only
HIGHLIGHTS EQUATORIAL SIGNS RAILWAY FUNDING AGREEMENT UPON COMPLETION OF RAIL STUDY Equatorial Resources Limited has signed an agreement (Protocole d Accord) with the Republic of Congo state owned railway
More informationMine Infrastructure Construction begins at Nullagine JV First iron ore shipment by December 2010
ASX RELEASE 18 AUGUST 2010 Mine Infrastructure Construction begins at Nullagine JV First iron ore shipment by December 2010 Key Points: Mining approvals granted for Stage 1 of the Nullagine Iron Ore JV
More informationGROW WITH US INVESTOR PRESENTATION MARCH 2019
GROW WITH US INVESTOR PRESENTATION MARCH 2019 - Emerging SOP Province located in WA Goldfields Very accessible infrastructure options Scaleable volume growth across multiple lakes EMERGING GLOBAL FERTILISER
More informationCENTRAL EYRE IRON PROJECT HAMBIDGE
ASX Release and Media Announcement 29 November 2011 CENTRAL EYRE IRON PROJECT HAMBIDGE Completion of Stage IV Drilling Programme and Estimation of Exploration Target Iron Road Limited (Iron Road, ASX:IRD)
More informationFor personal use only
REPUBLIC OF CONGO IRON ORE EXPLORATION UPDATE Drilling to commence in coming weeks targeting high grade direct shipping ore HIGHLIGHTS Drilling to commence shortly at Youkou high grade direct shipping
More informationBuilding a new supplier of raw materials for the steel industry
Jupiter Mines Limited (JML) Building a new supplier of raw materials for the steel industry Shareholder update and conference call 14 October 2010 Not a Jupiter Mines Limited asset Who is Pallinghurst?
More informationGarden Well Gold Deposit. Reserve Increases to 1.66 Million Ounces
ABN 28 009 174 761 31 March 2011 Manager Announcements Company Announcements Office Australian Securities Exchange Limited Level 4, 20 Bridge Street Sydney NSW 2000 www.regisresources.com Level 1 1 Alvan
More informationWindimurra Vanadium Plant Project Update. Investor Presentation August 2011
Windimurra Vanadium Plant Project Update Investor Presentation August 2011 Disclaimer The material in this presentation ( material ) is not and does not constitute an offer, invitation or recommendation
More informationA Tiger in the Congo. Charles Brown, COO, S.E.K SPRL, Katanga Province, D R Congo
A Tiger in the Congo Charles Brown, COO, S.E.K SPRL, Katanga Province, D R Congo Disclaimer Forward-Looking Statements This presentation contains forward-looking information, which is based on assumptions
More informationFor personal use only
TERRAMIN AUSTRALIA LIMITED Annual General Meeting 30 May 2014 Disclaimer & Competent Person Statement Disclaimer This presentation has been prepared by Terramin Australia Limited (Terramin). It is current
More informationCompany Overview. August 2011
Company Overview August 2011 Capital Structure Market Capitalisation approx $130 million Undervalued against peers ASX Code: IDO 229.8m shares on issue 30.5m unlisted options Up to 35m performance shares
More informationSeptember 2018 Quarterly Report Presentation and Webcast 25 October 2018
September 2018 Quarterly Report Presentation and Webcast 25 October 2018 Access this presentation at: http://webcasting.brrmedia.com/broadcast/5bb2ad1abfd72969440cb5a0 or http://www.sandfire.com.au 1 Important
More informationSecond drill rig to accelerate major drilling program at Productora
DRAFT ASX ANNOUNCEMENT Thursday 11th September 2014 Second drill rig to accelerate major drilling program at Productora Expanded resource-reserve base will underpin completion of Productora Pre-feasibility
More informationASX Announcement 25 November 2010 MT BEVAN IRON ORE PROJECT EXPLORATION UPDATE. About Legacy Iron Ore. The Company Announcements Office ASX Limited
I R O N O R E L I M I T E D About Legacy Iron Ore Legacy Iron Ore Limited ( Legacy or the Company ) is a Western Australian based Exploration Company, focused on iron ore and gold exploration and discovery.
More informationAfrica Down Under September Vincent Algar - Managing Director
Africa Down Under September 2011 Vincent Algar - Managing Director Disclaimer 2 This presentation has been prepared by Shaw River Manganese Limited ( Shaw River or the Company ). It should not be considered
More informationMaiden Ore Reserve for Camel Creek JV
10 September 2013 Manager Company Announcements Company Announcements Office Australian Securities Exchange Limited Level 4, 20 Bridge Street SYDNEY NSW 2000 ABN 85 003 257 556 Maiden Ore Reserve for Camel
More informationFor personal use only
ASX Announcement 19 December 2014 BOARD OF DIRECTORS Paul Murphy (Non-Executive Chairman) Bryan Dixon (Managing Director) Alan Thom (Executive Director) Greg Miles (Non-Executive Director) ASX CODE BLK
More informationSTUDIES CONFIRM COMBINED WILUNA URANIUM PROJECT IMPROVEMENTS
ASX RELEASE 30th January 2014 STUDIES CONFIRM COMBINED WILUNA URANIUM PROJECT IMPROVEMENTS Uranium developer Toro Energy Limited (ASX: TOE) (Toro) today announced the completion of an independent Mining
More informationOne Billion Tonnes of Opportunity Opening Up SA s Next Generation of Developments
One Billion Tonnes of Opportunity Opening Up SA s Next Generation of Developments South Australia Resources & Energy Investment Conference 30 April 2013 1 Disclaimer Forward-Looking Statements This presentation
More informationFor personal use only
28 February 2013 Another Major Milestone for IOH Iron Valley Transaction with Mineral Resources Limited Highlights Mine Gate Sale Agreement executed with Mineral Resources Limited (MIN) MIN to develop
More informationAndromeda Metals A New Direction in Industrial Minerals
SA Explorers Conference 2018 Andromeda Metals A New Direction in Industrial Minerals 2018 ANNUAL GENERAL MEETING Managing Directors Address ASX:ADN Disclaimer The information in this presentation is published
More informationDALGARANGA PRE-FEASIBILITY UPDATE
January 19th, 2016 Australian Securities Exchange Limited Via Electronic Lodgement 57 139 522 900 DALGARANGA PRE-FEASIBILITY UPDATE PFS Pit optimisations indicate a production target far larger than anticipated
More informationFor personal use only
January 19th, 2016 Australian Securities Exchange Limited Via Electronic Lodgement 57 139 522 900 DALGARANGA PRE-FEASIBILITY UPDATE PFS Pit optimisations indicate a production target far larger than anticipated
More informationHot Chili Commences Scoping Study on Productora Copper Project, Chile
ASX ANNOUNCEMENT Thursday 12th January 2012 Hot Chili Commences Scoping Study on Productora Copper Project, Chile Leading engineering and project development group AUSENCO appointed to undertake study
More informationDALGARANGA GOLD PROJECT OPERATIONAL UPDATE: MILL PERFORMANCE TEST COMPLETED AS RAMP UP CONTINUES
July 25 th 2018 Australian Securities Exchange Limited Via Electronic Lodgement 57 139 522 900 DALGARANGA GOLD PROJECT OPERATIONAL UPDATE: MILL PERFORMANCE TEST COMPLETED AS RAMP UP CONTINUES The Process
More informationElement 25 Limited Investor Update
Element 25 Limited Investor Update Transitioning from a diversified explorer to the developer of a world class high purity manganese project to supply the battery revolution. - August 2018 Disclaimer This
More informationMt Thirsty Cobalt-Nickel Joint Venture Infill Drilling Results
31 January 2007 ASX ANNOUNCEMENT. Mt Thirsty Cobalt-Nickel Joint Venture Infill Drilling Results The Company is pleased to announce results of infill drilling at the Mt Thirsty Cobalt Nickel Project, strategically
More informationMT CATTLIN DRILLING DELIVERS MORE HIGH GRADE INTERCEPTS
8 December 2009 MT CATTLIN DRILLING DELIVERS MORE HIGH GRADE INTERCEPTS Highlights Latest drill results show excellent intercepts for lithium WMC Costean Zone shows near surface mineralisation with the
More informationFerrowest acquires Yalyirimbi Iron Project
16 May, 2013 Ferrowest acquires Yalyirimbi Iron Project Positive due diligence completed Ferrowest to proceed with the Sale and Purchase Agreement to acquire 60% of the Yalyirimbi Iron Project Strategic
More informationFENIX RESOURCES LIMITED
FENIX RESOURCES LIMITED I R O N R I D G E A C Q U I S I T I O N H I G H G R A D E H E M A T I T E I R O N O R E P R O J E C T ASX : FEX DISCLAIMER The material in this presentation has been prepared by
More informationMolybdenum- The New Battery Metal 2018
Molybdenum- The New Battery Metal 2018 Why Hammer Why Molybdenum? 2018 Molybdenum has been one of the best price performing metals traded on the London Metals Exchange (LME) up 62.5% in the first 4 months
More informationBoardroom Radio presents. March Toyota Tsusho. Kasbah Resources Limited
Boardroom Radio presents March 12 2012 Toyota Tsusho Kasbah Resources Limited 1 DISCLAIMER Certain oral and written statements contained or incorporated by reference in this presentation, including information
More informationAustralia s most experienced magnetite producer. UBS Iron Ore and Coal Conference Sydney, Australia November 2013
Australia s most experienced magnetite producer UBS Iron Ore and Coal Conference Sydney, Australia 27-28 November 2013 Disclaimer The material in this presentation ( material ) is not and does not constitute
More informationFor personal use only. Company Overview. 30 May 2011
Company Overview 30 May 2011 Capital Structure Market Capitalisation approx $145 million Undervalued against peers ASX Code: IDO 211.1m shares on issue (100% tradeable) 29.6m unlisted options (incl 28.6m
More informationMines & Money Sydney October 2011
Mines & Money Sydney October 2011 Disclaimer This material contains certain forecasts and forward-looking information, including regarding possible or assumed future performance, costs, production levels
More informationFor personal use only
ASX Market Update/Media release Monday 22 August 2016 Metals of Africa Reports Further Exceptional Metallurgical Results High grade chemical-free Flotation Testwork at Montepuez Project delivers >98% TGC
More informationFor personal use only
Mt Ruby DSO Project Acquired High Grade DSO Project in Queensland Mining planned to commence in Q4, 2013 Infrastructure accessible and ready ACN 146 455 576 ASX Release 8 February 2013 Suite 2, 12 Parliament
More informationCHINA MINING Conference Tianjin October 2014
CHINA MINING Conference Tianjin October 2014 Forward Looking Statements These materials include forward looking statements. Often, but not always, forward looking statements can generally be identified
More informationFor personal use only
ASX Announcement October 2014 WILGERUP HEMATITE IRON ORE PROJECT General Manager 23 rd October 2014 The Company Announcements Office Australian Securities Exchange Electronic Lodgement System Dear Sir/Madam
More informationCUU. Ansongo Manganese. Our First Development. Callabonna Resources Ltd (CUU:ASX) Investor update February 2015 Jeff Williams Director
Ansongo Manganese Our First Development Callabonna Resources Ltd (:ASX) Investor update February 2015 Jeff Williams Director 1 Disclaimer This document has been prepared by Callabonna Resources Limited
More informationFor personal use only
12 April, 2012 GOLD ASSAYS SUPPORT FURTHER EXPLORATION AT MARVEL LOCH Two gold anomalies identified at Edwards North A gold anomaly at Jaccoletti confirmed with silver and lead association Jaccoletti anomaly
More informationASX : BLK. Australian gold producer with exceptional growth opportunity
ASX : BLK Australian gold producer with exceptional growth opportunity AMEC Conference Perth June 2017 The information contained in the report that relates to ore reserves at the Matilda Gold Project is
More informationFor personal use only
Tuesday, 11 December 2012 ASX release Cape Alumina completes Pre-Feasibility Study for Bauxite Hills Highlights Cape Alumina Limited (ASX Code: CBX) engaged GHD in April 2012 to carry out a pre-feasibility
More informationFIRST GOLD FROM DALGARANGA GOLD PROJECT: AHEAD OF SCHEDULE AND UNDER BUDGET
May 30 th 2018 Australian Securities Exchange Limited Via Electronic Lodgement 57 139 522 900 FIRST GOLD FROM DALGARANGA GOLD PROJECT: AHEAD OF SCHEDULE AND UNDER BUDGET First Gold poured from Dalgaranga
More informationAeon Metals Limited HIGHLIGHTS
ASX Announcement 15 February 2017 WALFORD CREEK PRELIMINARY ECONOMIC ASSESSMENT Early start up Copper-Zinc-Cobalt project indicated for Vardy Zone 2017 drill program focused on significant mine life extension
More informationInvestor Update. January 2014 ASX : ENR
Investor Update January 2014 ASX : ENR INVESTMENT SUMMARY Greenfields Copper Discovery - BM7 Large scale Cu system >14km long and growing $20m farm-in with Antofagasta plc (2 tenements) Key ground position
More information4 th Drilling Rig Mobilised to drill High- Grade Pipes at SPD Vanadium Project
23 November 2018 4 th Drilling Rig Mobilised to drill High- Grade Pipes at SPD Vanadium Project Figure 1. Drilling equipment being slung into place. Tando Resources (ASX: TNO, Tando or the Company) is
More informationGrange Resources European Investors Lunch Amsterdam
Grange Resources European Investors Lunch Amsterdam 2nd December 2009 Russell Clark Managing Director & CEO NOT FOR DISTRIBUTION IN THE US Level 11, 200 St Georges Terrace NOT FOR DISTRIBUTION IN THE US
More informationAustralian Tailings Group Pty Ltd Synergy (SNR) Investor Presentation
Australian Tailings Group Pty Ltd Synergy (SNR) Investor Presentation Disclaimer Forward-Looking Statements This presentation contains forward looking statements concerning the projects owned by Australian
More informationFor personal use only
CONCENTRATES CONFIRMED AS BENCHMARK AND HIGHLY SUITABLE FOR USE IN LITHIUM-ION BATTERIES HIGHLIGHTS Independent test work demonstrates Graphmada graphite concentrates as highly suitable for lithium-ion
More information