Cautionary Statements

Size: px
Start display at page:

Download "Cautionary Statements"

Transcription

1 Eagle Mine Site Visit November 3-4, 2014

2 Cautionary Statements Caution Regarding Forward Looking Statements This presentation contains forward-looking statements. These forward-looking statements are not based on historical facts, but rather on current expectations and projections about future events. These forward-looking statements are subject to risks and uncertainties. These risks and uncertainties could cause actual results to differ materially from the future results expressed or implied by the forward-looking statements. Such risks may include, without limitation: risks and uncertainties relating to foreign currency fluctuations; risks inherent in mining including environmental hazards, unusual or unexpected geological formations, ground control problems and flooding; risks associated with the estimation of mineral resources and reserves and the geology, grade and continuity of mineral deposits; the possibility that future exploration, development or mining results will not be consistent with the Company s expectations; the potential for and effects of labor disputes or other unanticipated difficulties with or shortages of labor or interruptions in production; actual ore mined varying from estimates of grade, tonnage, dilution and metallurgical and other characteristics; the inherent uncertainty of production and cost estimates and the potential for unexpected costs and expenses; and commodity price fluctuations. For further details of other risks and uncertainties see Risk Factors Relating to the Company s Business in the Company s Annual Information Form and in each management discussion and analysis. Note: All dollar amounts are in US dollars unless otherwise denoted. 2

3 Table of Contents Introduction Safety, Environment & Social Responsibility Project Overview Exploration Corporate Update 3

4 INTRODUCTION (Mike Welch) 4

5 Location Excellent Mining Jurisdiction Project located in Upper Peninsula of Michigan, US Eagle Mine is 28 mi (45 km) northwest of City of Marquette and 12 mi (20 km) from Lake Superior Humboldt Mill is 25 mi (40 km) west of City of Marquette Mine and Mill are approximately 65 mi (105 km) apart via county roads Eagle Mine Marquette Twsp Marquette City Truck Route Train Route Humboldt Mill 5

6 Overview High Grade Nickel and Copper Producer High grade, low cost nickel and copper concentrate producer Start-up commenced in Q Operations commenced on time and on budget Good government and community support 6

7 Health & Safety Eagle Project Lifetime (end of project) Hours worked = 4,549,364 LTI injuries = 14 Total recordable injuries = 22 Project LTIF = 0.62 Project TRIF = 0.97 Injuries prevented = 62 Based on construction industry rates Eagle Project Post LMC (end of project) Hours worked = 1,887,367 LTI injuries = 1 Total recordable injuries = 7 Project LTIF = 0.11 Project TRIF =.074 Performance YTD 2014 (Sept month-end) >1.4 million hours since last LTI LTI injuries = 1 Total recordable injuries = 4 YTD LTIF = 0.14 YTD TRIF =

8 Eagle Mine On Time and On Budget On Sept. 23, Eagle officially entered operation ahead of schedule and on budget First shipment of saleable nickel and copper concentrates took place in October Capital costs expected to be below initial $400m budget Total capital spend ytdof $321m of which $96m was spent in Q3. Residual capex expected through end of year Location Production Guidance Michigan, USA ~23,000t Ni ~20,000t Cu C1 Costs ~$2.00/lb Ni Mine Life 8 years 8

9 Human Resources - Workforce Effective 1 Oct 2014 Employees Contractors Total Mine Operations Humboldt Mill TOTAL Local hires constitute 71% of our workforce NOTE: Contractor numbers include remaining construction contractors Operational contractors forecasted to be ~160 9

10 Environment and Social Responsibility (Kristen Mariuzza & Matt Johnson) 10

11 Environmental & Permitting: Mine Site Eagle Mine has obtained all environmental permits required to begin operations Renewals/reissuances will occur throughout the life of the mine per the regulations Best in class environmental performance Comprehensive internal environmental monitoring program Community Environmental Monitoring Program Water management key driver in mine site design 11

12 Environmental & Permitting: Mill Site Tailings management key driver in the mill site permitting and design Subaqueous disposal in historical open pit iron ore mine Existing tailings from previous operation Grout curtain/cutoff wall approved for operations Water Treatment Facility 12

13 Community Approval Rating (Scorecard) Public Tours Scorecard Data June - September % 90% 33% 80% 70% 54% 62% 49% 49% 60% 50% Exceeds expectations 40% 55% 30% 39% 46% 43% Meets expectations 20% 34% Below expectations 10% 0% 8% Environmental Performance 2% 3% Health & Safety Local Hire Transparency & Communication 5% 8% 2% 4% 1% 6% Community Development Need more information Sample size

14 Community Approval Rating (Scorecard) 100% Community engagement is Eagle s social responsibility 80% 60% 40% 20% 0% Fall 2012 Spring 2013 Fall 2013 Spring 2014 Summer 2014 Environment Safety Local Hire Transparency Community Development 14

15 Project Overview (Mike Welch) 15

16 Key Dates 16

17 Mine Operations Mine Operations 17

18 Metallurgy Eagle is an ultramafic-intrusive-hosted high grade Ni-Cu deposit, with associated cobalt, platinum, palladium & gold Two Predominate Ore Types: I. Massive Unit (MU) Pyrrhotite, pentlandite,chalcopyrite Soft, high grade II. Semi-Massive Unit (SMU) Serpentine, talc, chlorites and other silicates Harder, lower grade 18

19 Mine Plan & Design - Underground Mine: 2000 tpd longhole open stope mine with backfill Access: 2.8 mi (4,500 m) of lateral development Lower internal ramp:1000m to lowest level -145L. Switchback design to provide diamond drill access along strike Surfaces raises: Twin 560 ft. (170 m) raisebores for intake/egress and exhaust 19

20 Mining 20

21 Mine Production Tonnes Cumulative Tonnes and Grade Mined Jun-14 Jul-14 Aug-14 Sep-14 Ore Grades (%) Budget Actual Forecast- Ni (%) Actual- Ni (%) Forecast- Cu (%) Actual- Cu (%) 21

22 Ore Transportation 22

23 Humboldt Mill Mill Operations 23

24 Metallurgy High Level Design Criteria 2,000 tpd operation at 95% availability 3-stage crushing plant (8 hr/day, 7-day/week operation) Concentrator (24 hr/day, 7-day/week operation) Concentrate Load-out (8 hr/day, 7 days/week depending on production) Straight Forward Processing Circuit Conventional flotation to produce separate Ni and Cu concentrates Expected life of mine recovery is 82% nickel and 93% copper Flotation tailings thickened and deposited subaqueouslyin the existing Humboldt tailings disposal facility 24

25 Milling Process

26 Metal Concentrates Nickel concentrate grade is estimated at 11% -14% and copper concentrate at 31% By-product credits include: Copper, cobalt, platinum, palladium, gold and silver Storage capacity at site approximately 3,000 wmtfor nickel concentrates and 1,000 wmtfor copper Concentrates will be railed directly to either Canadian smelters or to the ports on the St. Lawrence, east or west coasts for overseas shipping 26

27 Mill Throughput EAGLE CONCENTRATOR Cumulative Milled Tonnes Thousands Aug 25-Aug 1-Sep 8-Sep 15-Sep 22-Sep 29-Sep 6-Oct Original Budget Actual 27

28 Eagle Production Stats (Sep. 23 Oct. 22) Performance to date is ahead of expectations and remains on track to meet or exceed 2014 production guidance Operating stats during the first month have already achieved design rates in some cases 28

29 Transport and Marketing Rail spur was built connecting mill site to Canadian National Railroad network Concentrateswill be loaded to covered rails cars for shipping to smelters or ports All concentrate off take agreements have been finalized: Nickel: Three off take agreements in place for 2+ years Copper: One off take agreement for copper to a smelter five year agreement at annual market terms 29

30 LOM Production & Cost Profile Average Life of Mine (LOM) production of 17 ktpaniand 17 ktpacuat cash costs (excl. royalties) of ~$2.50/lb Ni Average production in first three full years of 23 ktpaniand 20 ktpacuat cash costs (excl. royalties) of approximately $2.00/lb Ni Approximately 8 year mine life (late ) with upside potential Ore Tonnes (kt) Total ,184 Ni(%) Cu (%)

31 Annual Production Profile Average Life of Mine revenue percentage breakdown is as follows 1: 71% Nickel; 23% Copper; 3% Platinum, 2% Cobalt, 1% Palladium, 1% Gold 1 Based on price assumptions used in the July Tech Report., which assume long-term prices of: $9.25/lb Ni, $3.00/lb Cu, $1820/oz Pt, $12.75/lb Co, $790/oz Pd and $1405/oz Au 31

32 Expected Operating Costs Average $/t % of Total Cost Mining Total: $67 51% Transport& Processing: Transportation (ore to mill) $14 10% Processing $26 21% Transport & Processing Total: $40 31% G&A Total: $24 18% Total Operating Cost $131/t 100% Average LOM Net Smelter Return is $456/t 32

33 Eagle Mine: Low-Cost Nickel Producer We estimate Eagle LOM C1 cash cost at $2.50/lb, which is in the lowest cost quartile Eagle (est.) 33

34 Project Capital Cost 30 September 2014 Table below represents spend since time of acquisition of Eagle Mine by Lundin (17 July 2013) $Millions Actual to 30 September 2014 Forecast at time of Acquisition Mine surface Mill Product transport Ore transport Underground mine EPCM Owners Subtotal Contingency - 27 Total All costs are on a cash basis Eagle project payables at 30 September 2014 are $38 million 34

35 Exploration (Mike Welch) 35

36 Eagle Reserves and Resources Reserves 000's Tonnes Ni% Cu% Ni T (000's) Cu T (000's) Proven 1, Probable 3, Total 5, Resources Measured 1, Indicated 2, Inferred As of June 30,

37 Eagle Reserves in Perspective 10 Ni deposits and districts - Total resources (past production+current resources) Eagle Grade (weight % Ni) 1 Raglan Ovoid Kabanga Kambalda Thompson Agnew Voisey's Bay Noril'sk Goro La Sampala Punta Gorda Pechenga Jinchuan Sudbury Murrin-Murrin Serovskoe Mt Keith Platreef Great Dyke Duluth Merensky million tonnes Laterite Deposits Sedimentary Deposits Sulphide Deposits Sulphide Districts 37

38 Near Mine Exploration Eagle near mine exploration: targeting for massive sulphide sill extensions. A little massive sulfide goes a long way. NS Section NS Section New MSU Drill Intercepts 2012 New MSU Model Extensions Previous MSU model 38

39 Eagle East Feeder PR July 16,

40 Eagle East Feeder: PR July 16, 2014 BHID From (m) To (m) 08EA222C EA222C Interv al (m) * ROCK Mineralized peridotite/intrusive breccia Intrusive breccia/ Semi-massive sulphide Ni % Cu % Au pp m Pt pp m Pd pp m Co % EA222D Mineralized peridotite Includes Mineralized peridotite Includes Intrusive breccia EA222D Semi-massive sulphide, net texture

41 Eagle D Seismic Survey 41

42 Massive Sulphide Seismic Reflectors 42

43 Program Continued (model driven) drilling on Eagle East feeder conduit 3D seismic results and interpretation Ongoing borehole geophysics Integration with airborne and ground geophysics (GOCAD) Target generation Drilling Eagle East Looking North Basement contact 43

44 Corporate Update (Paul Conibear) 44

45 Lundin Well Diversified Base Metals Producer Copper dominant with excellent base metals and geographic diversification Zinkgruvan (100%) (Sweden) Freeport Cobalt (24%) (Finland) Eagle (100%) (USA) Zinc-Lead-Copper Neves-Corvo (100%) (Portugal) Cobalt Refinery Aguablanca(100%) (Spain) Nickel-Copper Copper-Zinc Nickel-Copper Candelaria (80%) (Chile) Tenke Fungurume (24%) (DRC) 2014 Guidance Production (k tonnes) Copper Zinc Copper-Gold-Silver Lead Copper-Cobalt Nickel guidance includes attributable share of Tenke and full-year for Candelaria

46 Candelaria A Cornerstone Asset On Oct. 6, announced the acquisition of an 80% stake in the Candelariamining complex for upfront payment of $1.8 billion. Funding consists of: $1.0 billion in senior secured notes, $600m in equity and $648m from the sale of a gold and silver stream Transaction remains on track to close in Q4 Candelaria Overview: Cu-Au-Ag mine located in northern Chile Reserve life through 2028 (14 years). Mine life expected to be extended by exploration Operations include a large open pit, three underground mines and two process plants Significant infrastructure including a large port and new desalination plant 46

47 Candelaria Large-Scale, Long-Life Asset Average LoM production 100% 80% 126 ktpa Cu 101ktpa Cu 77koz Au 1.4Moz Ag 62koz Au 1.1Moz Ag Average Cu production over next 5 years of 139ktpa (100% basis) Total Copper Production (ktpa) 100% basis year remaining life based on 2P reserves High grade (30% Cu) quality copper concentrates with low impurities Au: 101 koz Au: 83 koz Au: 101 koz Au: 97 koz Ag: 1.9 Moz Au: 106 koz Ag: 2.0 Moz Au: 73 koz Ag: 1.5 Moz Au: 77 koz Ag: 1.4 Moz Sumitomo will remain a strategic 20% partner with concentrate off-take agreements at market terms 2011A (1) 2012A (1) 2013A (1) 2014E 2015E 2016E Remaining LOM Avg. Note: (1) Production figures sourced from Freeport s historical year-end results 47

48 Enhances Lundin's Copper Exposure Impact to Copper Production (kt) Impact to Copper 2P Reserves (Mt) Candelaria (80%) Lundin Standalone Candelaria (80%) Lundin Standalone 350 Percentage Increase over 2013: +103% +129% Actual 2014E Guidance 2014E Pro-Forma (1) 2015E Pro-Forma -- Lundin Candelaria Pro-Forma Source: Company filings. Notes: Lundin production profile based on mid-point of 3-yr guidance provided in December Copper profile does not include any future expansions at Tenke. Includes attributable production from Tenke Fungurume and Candelaria(where applicable). (1) Reflects full year production from Candelaria for illustrative purposes. 48

49 Pro Forma Geographic Diversification 2015E Attributable Cu Eq. Production by Country (1)(2)(3) Current Pro Forma Sweden 15% Spain 6% USA 28% DRC 15% Sweden 10% Spain 4% Chile 33% DRC 23% Portugal 28% Portugal 19% USA 19% Chile becomes Lundin s largest producing region (1) Based on midpoint of 2015E production guidance provided by Lundin. Only includes commodities for which Lundin provides public guidance. Excludes gold and silver. Based on 80% interest in Candelaria. (2) Equivalency calculated according to the following prices: $3.00/lb Cu, $1.00/lb Zn, $8.00/lb Ni, $12.00/lb Co and $1.05/lb Pb. (3) Cobalt guidance for 2015E assumed equal to 2014E guidance. 49

50 Pro Forma Base Metals Exposure 2015E Attributable Cu Eq. Production by Commodity (1)(2)(3) Current Pro Forma Zinc 19% Lead Cobalt 4% 5% Copper 46% Nickel 17% Zinc 13% CobaltLead 3% 3% Copper 64% Nickel 26% Enhanced copper exposure and strong leverage to nickel and zinc maintained (1) Based on midpoint of 2015E production guidance provided by Lundin. Only includes commodities for which Lundin provides public guidance. Excludes gold and silver. Based on 80% interest in Candelaria. (2) Equivalency calculated according to the following prices: $3.00/lb Cu, $1.00/lb Zn, $8.00/lb Ni, $12.00/lb Co and $1.05/lb Pb. (3) Cobalt guidance for 2015E assumed equal to 2014E guidance. 50

51 Lundin Mining with Candelaria Enhanced earnings and cash flow per share with the addition of an established, large scale, high quality operation Diverse geographic and base metals portfolio - copper, zinc and nickel Further strengthens asset base of long-life mines with strong growth potential Maintains a conservative balance sheet going forward Secures Lundin sposition as a leading intermediate base metals producer with competitive costs 51

52 Questions and Answers

TSX: LUN OMX: LUMI Handelsbanken Handelsbank Conf Con er f ence Stockholm

TSX: LUN OMX: LUMI Handelsbanken Handelsbank Conf Con er f ence Stockholm TSX: LUN OMX: LUMI Handelsbanken Conference Stockholm June 2013 Cautionary Statements Caution Regarding Forward Looking Statements This presentation contains forward looking statements. These forward looking

More information

NEWS RELEASE LUNDIN MINING ANNOUNCES 2015 PRODUCTION RESULTS AND PROVIDES OPERATING AND CAPITAL GUIDANCE

NEWS RELEASE LUNDIN MINING ANNOUNCES 2015 PRODUCTION RESULTS AND PROVIDES OPERATING AND CAPITAL GUIDANCE NEWS RELEASE LUNDIN MINING ANNOUNCES PRODUCTION RESULTS AND PROVIDES OPERATING AND CAPITAL GUIDANCE Toronto, January 2, 206 (TSX: LUN; OMX: LUMI) Lundin Mining Corporation ( Lundin Mining or the Company

More information

LUNDIN MINING PROVIDES CORPORATE UPDATE AND REVISED OUTLOOK

LUNDIN MINING PROVIDES CORPORATE UPDATE AND REVISED OUTLOOK NEWS RELEASE LUNDIN MINING PROVIDES CORPORATE UPDATE AND REVISED OUTLOOK Toronto, July 21, 2011 (TSX: LUN; OMX: LUMI) Lundin Mining Corporation ( Lundin Mining or the Company ) provides the following corporate

More information

Forward Looking Statement

Forward Looking Statement Olympias Forward Looking Statement Certain of the statements made in this Presentation may contain forward-looking statements or information within the meaning of the United States Private Securities Litigation

More information

Olympias: Highlights Q Phase 1 Retreatment. Acquired from European Goldfields in February. EIA approved. Phase 1 Retreatment began

Olympias: Highlights Q Phase 1 Retreatment. Acquired from European Goldfields in February. EIA approved. Phase 1 Retreatment began Olympias Olympias: Highlights 2011 2012 2013 2016 Q3 2017 EIA approved Acquired from European Goldfields in February Phase 1 Retreatment began Phase 1 Retreatment complete Planned Phase 2 Commercial Production

More information

Boliden to acquire Kevitsa Finnish nickel-copper-gold-pgm mine from First Quantum. 10 March 2016

Boliden to acquire Kevitsa Finnish nickel-copper-gold-pgm mine from First Quantum. 10 March 2016 Finnish nickel-copper-gold-pgm mine from First Quantum 10 March 2016 1 2016-03-10 Kevitsa strengthens Boliden s position in nickel and copper Excellent operational and geographical fit Consistent with

More information

LUNDIN MINING ANNOUNCES UPDATED MINERAL RESERVES AND RESOURCES

LUNDIN MINING ANNOUNCES UPDATED MINERAL RESERVES AND RESOURCES 2101-885 West Georgia Street Hovslagargatan 5 Vancouver, B.C. Canada V6C 3E8 SE-111 48 Stockholm, Sweden Tel: +1 604 689 78 42 Tel: +46 8 545 074 70 Fax: +1 604 689 42 50 Fax: +46 8 545 074 71 NEWS RELEASE

More information

The New Leader in Global Copper

The New Leader in Global Copper The New Leader in Global Copper November 2013 TSX: FM; LSE: FQM Cautionary Note Regarding Forward-Looking Statement Some of the statements contained in the following material are forward looking statements

More information

The New Leader in Global Copper

The New Leader in Global Copper The New Leader in Global Copper September 2013 TSX: FM; LSE: FQM Cautionary Note Regarding Forward-Looking Statement Some of the statements contained in the following material are forward looking statements

More information

For personal use only

For personal use only 7 August 2012 ASX: PAN Gidgee Gold Project Scoping Study Key Highlights Gold Production estimated at 606,000oz of gold over an initial seven years, average annual production of 87,000oz Operating Cash

More information

Developing High Grade Projects in Mexico

Developing High Grade Projects in Mexico Developing High Grade Projects in Mexico ASX: AZS @AzureMinerals www.azureminerals.com.au Tony Rovira Managing Director Azure Minerals Ltd 20 February 2018 Exciting High Quality Projects Sara Alicia: 100%

More information

TSX : LUN OMX : LUMI. Total 2016 Estimated Production. Production Assets

TSX : LUN OMX : LUMI. Total 2016 Estimated Production. Production Assets SX : LUN OMX : LUMI 2016 Eagle Mine Humboldt Mill Lundin Mining Corporation is a diversified Canadian base metals mining company with operations in Chile, the USA, Portugal, and Sweden, primarily producing

More information

Aeon Metals Limited HIGHLIGHTS

Aeon Metals Limited HIGHLIGHTS ASX Announcement 15 February 2017 WALFORD CREEK PRELIMINARY ECONOMIC ASSESSMENT Early start up Copper-Zinc-Cobalt project indicated for Vardy Zone 2017 drill program focused on significant mine life extension

More information

Seizing Opportunity and Building Value

Seizing Opportunity and Building Value Hanson Lake District Seizing Opportunity and Building Value December 2017 www.foranmining.com Opportunity is meaningless unless one takes action. TSX-V FOM 2 The Parties Committed to value creation 100%

More information

MINERAL RESERVES AND MINERAL RESOURCES. As of December 31, 2017 unless otherwise noted

MINERAL RESERVES AND MINERAL RESOURCES. As of December 31, 2017 unless otherwise noted MINERAL RESERVES AND MINERAL RESOURCES As of December 31, 2017 unless otherwise noted As of December 31, 2017 unless otherwise noted (6) SILVER Peñasquito (25%) (10) Proven & Probable Reserves Attributable

More information

Nkomati: An Open Ended Opportunity

Nkomati: An Open Ended Opportunity Nkomati: An Open Ended Opportunity Disclaimer Certain oral and written statements contained or incorporated by reference in this presentation, including information as to the future financial or operating

More information

T S X : R M X N Y S E. M K T : R B Y. Rubicon Begins Stockpiling Mill Feed for Projected Production Commencing Mid-2015

T S X : R M X N Y S E. M K T : R B Y. Rubicon Begins Stockpiling Mill Feed for Projected Production Commencing Mid-2015 T S X : R M X N Y S E. M K T : R B Y News Release D e c e m b e r 1 8, 2014 Rubicon Begins Stockpiling Mill Feed for Projected Production Commencing Mid-2015 TORONTO, Ontario Rubicon Minerals Corporation

More information

Iván Arriagada, CEO Antofagasta Minerals. Producer Challenges

Iván Arriagada, CEO Antofagasta Minerals. Producer Challenges Iván Arriagada, CEO Antofagasta Minerals Producer Challenges Cautionary statement This presentation has been prepared by Antofagasta plc. By reviewing and/or attending this presentation, you agree to the

More information

Sulphide Nickel Production and Supply: Market Implications

Sulphide Nickel Production and Supply: Market Implications Sulphide Nickel Production and Supply: Market Implications Metal Bulletin 3 rd Asian Nickel Conference Mark Selby, President & CEO Royal Nickel Corporation September 23, 2015 Disclaimer Cautionary Statements

More information

The Los Bronces Development Project Brian Beamish CEO Anglo Base Metals 28th November 2007

The Los Bronces Development Project Brian Beamish CEO Anglo Base Metals 28th November 2007 The Los Bronces Development Project Brian Beamish CEO Anglo Base Metals 28th November 2007 This presentation is being made only to and is directed only at (a) persons who have professional experience in

More information

For personal use only

For personal use only NEWS RELEASE DECEMBER 20, 2013 NEW HIGH-GRADE COPPER PROSPECT SECURED IN CHILE Guayacán copper-gold prospect returns surface channel samples grading up to 4.13% Cu Key Points: Option secured over prospective

More information

PEGMONT PEA HIGHLIGHTS

PEGMONT PEA HIGHLIGHTS Advanced Lead-Zinc Resource Development PEGMONT PEA HIGHLIGHTS January 2019 Pegmont Deposit Queensland, Australia IMPORTANT INFORMATION Cautionary Statement on Forward Looking Information This presentation

More information

METATES UPDATED PEA INDICATES EXCELLENT PROJECT ECONOMICS 26,000 METRE DRILL PROGRAM UNDERWAY

METATES UPDATED PEA INDICATES EXCELLENT PROJECT ECONOMICS 26,000 METRE DRILL PROGRAM UNDERWAY March 7, 2011 Symbol: TSX V-CKG NR1-2011 METATES UPDATED PEA INDICATES EXCELLENT PROJECT ECONOMICS 26,000 METRE DRILL PROGRAM UNDERWAY Chesapeake Gold Corp. ( Chesapeake ) is pleased to announce the results

More information

T S X : R M X N Y S E. M K T : R B Y

T S X : R M X N Y S E. M K T : R B Y T S X : R M X N Y S E. M K T : R B Y News Release A p r i l 1 4, 2015 Rubicon s Phoenix Gold Project Commences Mill Commissioning and Remains on Schedule for Mid-2015 Projected Initial Production TORONTO,

More information

Economic Geology ( )

Economic Geology ( ) Hashemite University Faculty of Natural Resources and Environment Department of earth and environmental sciences Economic Geology (111201491) Part5: Ore deposits Exploration Dr. Faten Al-Slaty First Semester

More information

Precious Metals Summit Sept Page 1

Precious Metals Summit Sept Page 1 Precious Metals Summit Sept. 2016 Page 1 Disclaimer and Competent Persons Statement Cautionary Note Whilst this document and presentation is based on information from sources which are considered reliable,

More information

Twin Metals Minnesota LLC Overview Minnesota SME. April 23, 2014

Twin Metals Minnesota LLC Overview Minnesota SME. April 23, 2014 Twin Metals Minnesota LLC Overview Minnesota SME April 23, 2014 Who is Twin Metals Minnesota (TMM)? Twin Metals Minnesota (TMM) is pursuing the development and operation of an underground copper, nickel,

More information

Zinc Business. September 19, 2017 Dale Andres, Senior Vice President, Base Metals

Zinc Business. September 19, 2017 Dale Andres, Senior Vice President, Base Metals September 19, 2017 Dale Andres, Senior Vice President, Base Metals Forward Looking Information Both these slides and the accompanying oral presentations contain certain forward-looking statements within

More information

Drilling, metallurgical test work and a new resource model add 21% to oxide gold reserves

Drilling, metallurgical test work and a new resource model add 21% to oxide gold reserves LA ARENA GOLD OXIDE RESERVES INCREASED TO 1.28MM OZ AT AU PRICE OF $1,200 COMPLETION OF THE PRE-FEASIBILITY STUDY FOR THE PHASE II SULPHIDE Cu-Au PROJECT Drilling, metallurgical test work and a new resource

More information

Mt Carlton. May Arlene Rofe General Manager

Mt Carlton. May Arlene Rofe General Manager Mt Carlton May 2014 Arlene Rofe General Manager Disclaimer This presentation has been prepared by Evolution Mining Limited ( Evolution Mining ) and consists of slides for a presentation concerning the

More information

Investor Update. June 2016

Investor Update. June 2016 Investor Update June 2016 Next Steps: 2015 Work Programme Is this the time?! 500%? Introducing Impact Minerals (ASX:IPT) Capital Structure Listed on ASX November 2006 Shares on Issue Options/Warrants Convertible

More information

VALUE THROUGH GOLD BRUCEJACK PROJECT PREMIER S NATURAL RESOURCE CONFERENCE

VALUE THROUGH GOLD BRUCEJACK PROJECT PREMIER S NATURAL RESOURCE CONFERENCE VALUE THROUGH GOLD BRUCEJACK PROJECT PREMIER S NATURAL RESOURCE CONFERENCE January 2016 CAUTIONARY STATEMENT Forward Looking Information This Presentation contains forward-looking information and forward

More information

Our Record Speaks For Itself

Our Record Speaks For Itself Our Record Speaks For Itself December 2012 ecem TSX: FM; LSE: FQM Cautionary Note Concerning Forward-Looking Statements Some of the statements contained in the following material are forward looking statements

More information

Transitioning from Explorer to Miner

Transitioning from Explorer to Miner Transitioning from Explorer to Miner ASX: AZS @AzureMinerals www.azureminerals.com.au RIU Resources Investor Roadshow Sydney & Melbourne 25-27 September 2018 Tony Rovira Managing Director Azure Minerals

More information

Savannah poised for restart. Euroz Institutional Conference 14 March 2018

Savannah poised for restart. Euroz Institutional Conference 14 March 2018 Savannah poised for restart Euroz Institutional Conference 14 March 2018 Disclaimer No New Information or Data This presentation contains references to exploration results, and Mineral Resource and Ore

More information

Corporate Presentation London December, 2011

Corporate Presentation London December, 2011 Corporate Presentation London December, 2011 FORWARD-LOOKING STATEMENTS Certain information regarding Erdene ("the Company") contained herein may constitute forward-looking statements within the meaning

More information

Nymagee Scoping Study

Nymagee Scoping Study 2 May 2017 Nymagee Scoping Study Aurelia Metals Limited ( AMI or the Company ) is pleased to announce the results of the Nymagee Scoping Study ( Study ) were positive and justify the Company committing

More information

SECOND QUARTER REPORT 15 JULY 2014

SECOND QUARTER REPORT 15 JULY 2014 SECOND QUARTER REPORT 15 JULY 2014 DISCLAIMER This presentation has been prepared by OZ Minerals Limited ( OZ Minerals ) and consists of written materials/slides for a presentation concerning OZ Minerals.

More information

Investing in African Mining Indaba Cape Town

Investing in African Mining Indaba Cape Town PATRICE MOTSEPE, EXECUTIVE CHAIRMAN ANDRÉ WILKENS, CEO Investing in African Mining Indaba Cape Town - 2005 GROWTH, GROWTH and MORE GROWTH Introduction It is our dream to grow ARM into a low-cost, globally

More information

INV METALS ANNOUNCES ROBUST PRELIMINARY FEASIBILITY STUDY AT LOMA LARGA

INV METALS ANNOUNCES ROBUST PRELIMINARY FEASIBILITY STUDY AT LOMA LARGA INV METALS ANNOUNCES ROBUST PRELIMINARY FEASIBILITY STUDY AT LOMA LARGA TORONTO, ON July 14, 2016 INV Metals Inc. ( INV Metals or the Company ) (TSX:INV) is pleased to announce the positive results of

More information

Voisey s Bay Project Update

Voisey s Bay Project Update Voisey s Bay Project Update Presentation to the Newfoundland and Labrador Branch of the CIM November 5, 2004 This presentation will include projections and other forward-looking statements. While these

More information

September 2018 Quarterly Report Presentation and Webcast 25 October 2018

September 2018 Quarterly Report Presentation and Webcast 25 October 2018 September 2018 Quarterly Report Presentation and Webcast 25 October 2018 Access this presentation at: http://webcasting.brrmedia.com/broadcast/5bb2ad1abfd72969440cb5a0 or http://www.sandfire.com.au 1 Important

More information

CERRO LINDO SILVER STREAM CORNERSTONE ASSET December 2016

CERRO LINDO SILVER STREAM CORNERSTONE ASSET December 2016 CERRO LINDO SILVER STREAM CORNERSTONE ASSET December 2016 Largest Underground Polymetallic Mine in Peru Cerro Lindo is a Zn/Cu/Pb/Ag VMS deposit, wholly-owned and operated by Milpo, a subsidiary of Votorantim

More information

(TSX: AUQ) (NYSE: AUQ)

(TSX: AUQ) (NYSE: AUQ) AuRico Gold Announces a New Gold-Copper Porphyry Discovery at the Kemess Project; Initial Resource Estimate Expected in Early 2015 Hole KH-14-04 intersects 768 metres of 0.442 g/t Au and 0.392% Cu Toronto:

More information

NEWS RELEASE Trading Symbol: TSX: SVM

NEWS RELEASE Trading Symbol: TSX: SVM NEWS RELEASE Trading Symbol: TSX: SVM SILVERCORP REPORTS Q3 FISCAL 2016 FINANCIAL AND OPERATING RESULTS AND FISCAL 2017 GUIDANCE ISSUED VANCOUVER, British Columbia February 5, 2016 Silvercorp Metals Inc.

More information

SILVERCORP REPORTS Q3 FISCAL 2016 FINANCIAL AND OPERATING RESULTS AND FISCAL 2017 GUIDANCE ISSUED

SILVERCORP REPORTS Q3 FISCAL 2016 FINANCIAL AND OPERATING RESULTS AND FISCAL 2017 GUIDANCE ISSUED NEWS RELEASE Trading Symbol: TSX: SVM SILVERCORP REPORTS Q3 FISCAL 2016 FINANCIAL AND OPERATING RESULTS AND FISCAL 2017 GUIDANCE ISSUED VANCOUVER, British Columbia February 5, 2016 Silvercorp Metals Inc.

More information

MINERAL RESERVES AND MINERAL RESOURCES. As of December 31, 2016 unless otherwise noted

MINERAL RESERVES AND MINERAL RESOURCES. As of December 31, 2016 unless otherwise noted MINERAL RESERVES AND MINERAL RESOURCES As of December 31, 2016 unless otherwise noted As of December 31, 2016 unless otherwise noted (6) SILVER Peñasquito (25%) (10) Proven & Probable Reserves Attributable

More information

POSITIVE SCOPING STUDY FOR THUNDER BAY NORTH PROJECT

POSITIVE SCOPING STUDY FOR THUNDER BAY NORTH PROJECT Magma Metals Limited ABN 72 114 581 047 Lvl 3, 18 Richardson St, West Perth WA 6005 Australia PO Box 1221, West Perth WA 6872 Australia Tel +61 (0)8 9324 1500 Fax +61 (0)8 9324 1700 Email: magma@magmametals.com.au

More information

For personal use only

For personal use only Magma Metals Limited ABN 72 114 581 047 Lvl 3, 18 Richardson St, West Perth WA 6005 Australia PO Box 1221, West Perth WA 6872 Australia Tel +61 (0)8 9324 1500 Fax +61 (0)8 9324 1700 Email: magma@magmametals.com.au

More information

Macquarie Australia Conference 2018 Warrick Ranson Chief Financial Officer. M a y 2018

Macquarie Australia Conference 2018 Warrick Ranson Chief Financial Officer. M a y 2018 Macquarie Australia Conference 2018 Warrick Ranson Chief Financial Officer M a y 2018 Disclaimer Forward looking statements This presentation has been prepared by OZ Minerals Limited (OZ Minerals) and

More information

QUARTERLY REPORT IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII PERIOD ENDING 31 MARCH 2016

QUARTERLY REPORT IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII PERIOD ENDING 31 MARCH 2016 QUARTERLY REPORT IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII PERIOD ENDING 31 MARCH 2016 Hillgrove Resources Limited (ASX: HGO) reports for the quarter ended 31 March 2016 HIGHLIGHTS While conditions remain

More information

Confidence in Carrapateena project grows

Confidence in Carrapateena project grows 7 NOVEMBER 2016 Confidence in Carrapateena project grows Carrapateena Pre-Feasibility Study released - project competitive with, or better than comparable long-life copper assets globally Project metrics

More information

DIVERSIFIED METAL EXPLORATION & DEVELOPMENT COMPANY

DIVERSIFIED METAL EXPLORATION & DEVELOPMENT COMPANY 1 DIVERSIFIED METAL EXPLORATION & DEVELOPMENT COMPANY INVESTOR PRESENTATION Winter 2018 #101, 2148 West 38 th Avenue Vancouver, B.C. V6M 1R9 Tel: 604-685-1870 TF: 1-800- 667-1870 Email: Info@elninoventures.com

More information

Geology and mineral resources of the Kylylahti Mine

Geology and mineral resources of the Kylylahti Mine Geology and mineral resources of the Kylylahti Mine asenteella - tuurilla törmäillen; harkiten harmitta Jari Juurela Altona Mining Ltd Geology Manager - Finland 24.04.2014 Disclaimer and JORC Compliance

More information

AMUR MINERALS CORPORATION (AIM: AMC)

AMUR MINERALS CORPORATION (AIM: AMC) 26 February 2019 AMUR MINERALS CORPORATION (AIM: AMC) Kun-Manie Pre-Feasibility Study Amur Minerals Corporation ( Amur or the Company ), the nickel-copper sulphide exploration and development company focused

More information

Creating Value Through Operational Excellence

Creating Value Through Operational Excellence Creating Value Through Operational Excellence Kemess North Project Minerals North April 2004 Northgate Exploration Limited Overview BRITISH COLUMBIA based gold mining company Principal asset is the Kemess

More information

For personal use only

For personal use only L4 66 Kings Park Road West Perth WA 6005 P: +61 8 6141 3585 F: +61 8 6141 3599 E: info@drakeresources.com.au ASX Code: DRK Shares on Issue: ~104M ASX Announcement 25 March 2013 Granmuren Preliminary Metallurgical

More information

For personal use only

For personal use only ASX Release 20 March 2012 PANTON REVIEW STUDY RESULTS (ASX:PLA) is pleased to advise that the results from the recently completed Panton Review Study ( PRS ) showed that the Project could achieve and Internal

More information

Joe Hamilton CEO January 2008 AIM/TSX: ACU BSE:African Copper

Joe Hamilton CEO January 2008 AIM/TSX: ACU BSE:African Copper Joe Hamilton CEO January 2008 AIM/TSX: ACU BSE:African Copper Forward Looking Statement Except for historical information contained in this presentation relating to African Copper, certain disclosure statements

More information

Deutsche Bank BRICS Metals & Mining Conference Presentation London, November 2006

Deutsche Bank BRICS Metals & Mining Conference Presentation London, November 2006 Deutsche Bank BRICS Metals & Mining Conference Presentation London, 13 14 November 2006 2 Disclaimer Forward looking statements Certain statements in this presentation constitute forward looking statements

More information

Progress Update on the Lower Footwall Zone

Progress Update on the Lower Footwall Zone 9 February 2015 Progress Update on the Lower Footwall Zone London, England & Baie Verte, Newfoundland and Labrador, Canada Rambler Metals and Mining plc (TSXV: RAB, AIM: RMM) ( Rambler or the Company ),

More information

Farellon. January 2018

Farellon. January 2018 Farellon January 2018 Disclaimer Except for the statements of historical fact, the information contained herein is of a forward-looking nature. Such forward-looking information involves known and unknown

More information

Transitioning from Explorer to Miner

Transitioning from Explorer to Miner Transitioning from Explorer to Miner ASX: AZS @AzureMinerals Precious Metals Investment Symposium Perth, Western Australia 3-4 October 2018 Tony Rovira Managing Director Azure Minerals Ltd www.azureminerals.com.au

More information

Thalanga Project Ore Reserve and Mineral Resource Statement (as at 1 December 2017)

Thalanga Project Ore Reserve and Mineral Resource Statement (as at 1 December 2017) Thalanga Project Ore Reserve and Mineral Resource Statement (as at 1 December 2017) Thalanga Project Ore Reserves Ore Reserves Classification Tonnage (Kt) Cu (%) Pb (%) Zn (%) Au (g/t) Ag (g/t) Zn Eq.

More information

Quality, Diverse Group of Mining Assets. February 2018

Quality, Diverse Group of Mining Assets. February 2018 Quality, Diverse Group of Mining Assets February 2018 1 Forward Looking Statements Some of the statements contained in the following material are "forward looking statements". All statements in this release,

More information

Our Record Speaks For Itself

Our Record Speaks For Itself Our Record Speaks For Itself June 2012 TSX: FM; LSE: FQM Cautionary Note Concerning Forward-Looking Statements Some of the statements contained in the following material are forward looking statements

More information

SILVERCORP REPORTS SILVER PRODUCTION OF 5.0 MILLION OUNCES, CASH FLOWS FROM OPERATIONS OF $31.9 MILLION, OR $0

SILVERCORP REPORTS SILVER PRODUCTION OF 5.0 MILLION OUNCES, CASH FLOWS FROM OPERATIONS OF $31.9 MILLION, OR $0 NEWS RELEASE Trading Symbol: TSX: SVM SILVERCORP REPORTS SILVER PRODUCTION OF 5.0 MILLION OUNCES, CASH FLOWS FROM OPERATIONS OF $31.9 MILLION, OR $0.19 PER SHARE, FOR FISCAL YEAR ENDED MARCH 31, 2016 VANCOUVER,

More information

MINERAL RESERVES AND MINERAL RESOURCES. As of December 31, 2017 unless otherwise noted

MINERAL RESERVES AND MINERAL RESOURCES. As of December 31, 2017 unless otherwise noted MINERAL RESERVES AND MINERAL RESOURCES As of December 31, 2017 unless otherwise noted As of December 31, 2017 unless otherwise noted (6) SILVER Peñasquito (25%) (10) Proven & Probable Reserves Attributable

More information

Bank of America Merrill Lynch 2017 Global Metals, Mining & Steel Conference. Andrew Cole Managing Director & CEO

Bank of America Merrill Lynch 2017 Global Metals, Mining & Steel Conference. Andrew Cole Managing Director & CEO Bank of America Merrill Lynch 2017 Global Metals, Mining & Steel Conference Andrew Cole Managing Director & CEO Disclaimer Forward looking statements This presentation has been prepared by OZ Minerals

More information

NEWS RELEASE GREAT PANTHER SILVER ACHIEVES SEVERAL PRODUCTION RECORDS IN THIRD QUARTER 2013

NEWS RELEASE GREAT PANTHER SILVER ACHIEVES SEVERAL PRODUCTION RECORDS IN THIRD QUARTER 2013 October 0, 203 For Immediate Release TSX: GPR NYSE MKT: GPL NEWS RELEASE GREAT PANTHER SILVER ACHIEVES SEVERAL PRODUCTION RECORDS IN THIRD QUARTER 203 GREAT PANTHER SILVER LIMITED (TSX: GPR; NYSE MKT:

More information

Morrie Goodz, Managing Director Nimbus Silver-Zinc-Gold Project, Kalgoorlie

Morrie Goodz, Managing Director Nimbus Silver-Zinc-Gold Project, Kalgoorlie MacPhersons Corporate Presentation Mining 2014 Conference 29 th October 2014 Morrie Goodz, Managing Director Nimbus Silver-Zinc-Gold Project, Kalgoorlie Disclaimer The information contained in this presentation

More information

CAPITAL DOWN AT TALA HAMZA

CAPITAL DOWN AT TALA HAMZA CAPITAL DOWN AT TALA HAMZA ASX Shareholder Report 8 April 2009 Enquiries on this Report or the Company Business may be directed to: Dr Kevin Moriarty Executive Chairman + 61 8 8213 1415 + 61 408 173 157

More information

Pine Point MRE Overview TSXV: OM

Pine Point MRE Overview TSXV: OM Pine Point MRE Overview TSXV: OM Forward-Looking Statements & Cautionary Notes Regarding TechnicalInformation This presentation (the "Presentation") contains "forward-looking information" and "forward-looking

More information

Fourth Quarter Production Report. for the three months ended 31 December 2017

Fourth Quarter Production Report. for the three months ended 31 December 2017 Fresnillo plc 21 Upper Brook Street London W1K 7PY United Kingdom www.fresnilloplc.com 24 January 2018 Fourth Quarter Production Report for the three months ended 31 December 2017 Overview Record annual

More information

A Deeper Look 04/ / 187. Lonmin Plc Annual Report and Accounts 2016

A Deeper Look 04/ / 187. Lonmin Plc Annual Report and Accounts 2016 Lonmin Plc 188 Consolidated Group Five Year Financial Record 189 195 Mineral Resources and Mineral Reserves 04/ / 187 A Deeper Look Key financial and operational statistics over the past five years and

More information

TSX: LUN Nasdaq Stockholm: LUMI. Responsible Mining and Management at the Neves-Corvo Mine. ICSG Meetings in Lisbon. Neves-Corvo, Portugal

TSX: LUN Nasdaq Stockholm: LUMI. Responsible Mining and Management at the Neves-Corvo Mine. ICSG Meetings in Lisbon. Neves-Corvo, Portugal TSX: LUN Nasdaq Stockholm: LUMI Responsible Mining and Management at the Neves-Corvo Mine ICSG Meetings in Lisbon October 2 nd, 2018 1 Neves-Corvo, Portugal 2 3 Candelaria Lundin Mining Corporation Zinkgruvan

More information

Azure Minerals Ltd ASX Code:

Azure Minerals Ltd ASX Code: Azure Minerals Ltd ASX Code: AZS @AzureMinerals www.azureminerals.com.au Tony Rovira Managing Director Azure Minerals Ltd Objective To be a low cost, high margin copper producer Strategy Developing our

More information

Aeon Metals Limited. ASX Announcement 18 April 2017 WALFORD CREEK COBALT ROASTING SCOPING STUDY. 18 April 2017

Aeon Metals Limited. ASX Announcement 18 April 2017 WALFORD CREEK COBALT ROASTING SCOPING STUDY. 18 April 2017 ASX Announcement 18 April 2017 WALFORD CREEK COBALT ROASTING SCOPING STUDY Aeon Metals Limited ABN 91 121 964 725 Level 7, 88 Pitt Street, Sydney, NSW 2000, Australia P.O. Box 8155, Gold Coast MC. Qld

More information

Pan American Silver Mineral Reserves Increase to 288 Million Ounces

Pan American Silver Mineral Reserves Increase to 288 Million Ounces Suite 1500-625 Howe St. Vancouver, BC Canada, V6C 2T6 604-684-1175 www.panamericansilver.com Pan American Silver Mineral Reserves Increase to 288 Million Ounces All financial figures are expressed in US$

More information

Current Drilling program at the Cuye Zone reflects high grade Polymetallic and Copper mineralization which continues and remains open to depth

Current Drilling program at the Cuye Zone reflects high grade Polymetallic and Copper mineralization which continues and remains open to depth FOR IMMEDIATE RELEASE TSX: SMT BVL: SMT NYSE AMERICAN: SMTS No. 02-2018 SIERRA METALS INTERSECTS 99 METERS @ 1.48% CU, 12 G/T AG, 0.05% ZN, 0.01% PB AND 0.7 G/T AU. NEW DRILLING AT CUYE CONFIRMS THE EXTENSION

More information

McFaulds Lake ( Ring of Fire ) Mineral Exploration and Development Overview. (MNDMF) May 11, 2010

McFaulds Lake ( Ring of Fire ) Mineral Exploration and Development Overview. (MNDMF) May 11, 2010 McFaulds Lake ( Ring of Fire ) Mineral Exploration and Development Overview (MNDMF) May 11, 2010 Summary Several significant new mineral discoveries have been found in the Far North over the past 8 years

More information

Fast Tracking the Superior Lake Project Re-Start Plan

Fast Tracking the Superior Lake Project Re-Start Plan ASX Announcement ASX: SUP 12 July 2018 superiorlake.com.au Fast Tracking the Superior Lake Project Re-Start Plan Highlights Historical review of mining operations and remaining infrastructure at Superior

More information

Updated Investor Presentation

Updated Investor Presentation Havilah Resources Limited plans to sequentially develop its portfolio of gold, copper, iron, cobalt, tin and other mineral resources in South Australia. Our vision is to become a new mining force, delivering

More information

Thalanga Operations Ore Reserve and Mineral Resource Statement

Thalanga Operations Ore Reserve and Mineral Resource Statement Thalanga Operations Ore Reserve and Mineral Resource Statement Ore Reserves Classification Tonnage (Kt) Cu (%) Pb (%) Zn (%) Au (g/t) Ag (g/t) Zn Eq. (%) West 45 (1) Proved 101 0.3 2.0 4.6 0.3 38 8.4 Probable

More information

The declining discovery rate what is the real story?

The declining discovery rate what is the real story? The declining discovery rate what is the real story? Richard Schodde Managing Director, AMIRA International s 8th Exploration Managers Conference 22-23 March 2010, Yarra Valley, Victoria Overview Review

More information

AMUR MINERALS CORPORATION (AIM: AMC)

AMUR MINERALS CORPORATION (AIM: AMC) 29 June 2015 AMUR MINERALS CORPORATION (AIM: AMC) Operational Blueprint Defined For Kun-Manie Amur Minerals Corporation ( Amur or the Company ) is pleased to present the forward looking Operational Blueprint

More information

Sierra Metals Exploration Update Call

Sierra Metals Exploration Update Call Sierra Metals Exploration Update Call October 5, 2017 TSX SMT NYSE AMERICAN: SMTS BVL SMT Forward Looking Statements Disclaimer Certain statements in this presentation constitute forward-looking information

More information

Hard Creek Nickel. Emerging Giant Turnagain Nickel Project. Ed Beswick P Eng. HNC:TSX

Hard Creek Nickel. Emerging Giant Turnagain Nickel Project. Ed Beswick P Eng. HNC:TSX Hard Creek Nickel Emerging Giant Turnagain Nickel Project Ed Beswick P Eng. HNC:TSX www.hardcreeknickel.com Minerals North Conference April 2010 Cautionary Statement The information contained in this presentation

More information

Hochschild Mining plc. BAML Global Metals, Mining & Steel Conference May 2017

Hochschild Mining plc. BAML Global Metals, Mining & Steel Conference May 2017 Hochschild Mining plc BAML Global Metals, Mining & Steel Conference 16-18 May 2017 DISCLAIMER Some statements contained in this presentation or in documents referred to in it are or may be forward-looking

More information

QUARTERLY REPORT for the period ending 30 September 2017

QUARTERLY REPORT for the period ending 30 September 2017 ASX: AMI September 2017 Quarter 16 October 2017 QUARTERLY REPORT for the period ending 30 September 2017 QUARTER HIGHLIGHTS Gold production of 11,111 oz at a Cash Cost of A$181/oz and an AISC of A$570/oz

More information

MINIMUM ENGINEERING STUDY REQUIREMENT. 128 June 2015

MINIMUM ENGINEERING STUDY REQUIREMENT. 128 June 2015 # 128 June 2015 MINIMUM ENGINEERING STUDY REQUIREMENT UPDATE The evaluation of a mining project from exploration through development and production is a lengthy and complicated process. Mine development

More information

Kibali Mine Development

Kibali Mine Development Kibali Mine Development The Kibali mine development in the Democratic Republic of Congo is the largest project undertaken to date by Randgold. With a reserve base at plus 10 million ounces and still growing,

More information

MEDIA RELEASE OCEANAGOLD ANNOUNCES COMMENCEMENT OF CONSTRUCTION AT THE DIDIPIO PROJECT IN THE PHILIPPINES

MEDIA RELEASE OCEANAGOLD ANNOUNCES COMMENCEMENT OF CONSTRUCTION AT THE DIDIPIO PROJECT IN THE PHILIPPINES 15 June 2011 MEDIA RELEASE OCEANAGOLD ANNOUNCES COMMENCEMENT OF CONSTRUCTION AT THE DIDIPIO PROJECT IN THE PHILIPPINES (MELBOURNE) OceanaGold Corporation (ASX: OGC, TSX: OGC, NZX: OGC) ( the Company )

More information

Forward-looking Statements

Forward-looking Statements Forward-looking Statements The information given in this presentation and during Mandalay Resources Corporation s September 12, 2016 Investor Day contain "forwardlooking statements" within the meaning

More information

Australia s leading explorer in Mexico

Australia s leading explorer in Mexico Australia s leading explorer in Mexico ASX: AZS @AzureMinerals www.azureminerals.com.au Tony Rovira Managing Director Corporate Overview ASX Code Share Price AZS A$0.013 Shares 1,672M Market Cap Cash A$24M

More information

For personal use only

For personal use only 19 April 2018 MARCH 2018 QUARTERLY ACTIVITIES REPORT High grade cobalt mineralisation confirmed at Mulligan with rock chip samples grading up to 9.71% Co and 16.5 g/t Au Two new Primary Cobalt Projects

More information

OZ MINERALS. JP Morgan Melbourne Mining Day. Terry Burgess, Managing Director and CEO. Melbourne 16 October 2009 OZMINERALS.COM

OZ MINERALS. JP Morgan Melbourne Mining Day. Terry Burgess, Managing Director and CEO. Melbourne 16 October 2009 OZMINERALS.COM OZ MINERALS JP Morgan Melbourne Mining Day Terry Burgess, Managing Director and CEO Melbourne 16 October 2009 OZMINERALS.COM OZ MINERALS: CURRENT STATUS 2 Prominent Hill ramping-up to name-plate capacity

More information

For personal use only

For personal use only Heron Resources Limited 2015 Euroz Conference Rapidly Advancing the High Grade Woodlawn Zinc-Copper Project From PEA to Production Wayne Taylor, Managing Director 11 March 2015 ASX: HRR TSX: HER Forward

More information

Update of Amaruq Agnico Eagle s near-term future in Nunavut Nunavut Mining Symposium, Iqaluit, Nunavut

Update of Amaruq Agnico Eagle s near-term future in Nunavut Nunavut Mining Symposium, Iqaluit, Nunavut Update of Amaruq Agnico Eagle s near-term future in Nunavut Nunavut Mining Symposium, Iqaluit, Nunavut April 14, 2016 Denis Vaillancour, PGeo, M.Sc. Exploration Manager Eastern Canada Agnico Eagle Mines

More information