A Successful Upstream Integration in the Heavy Mineral Sands Industry JM FOURCADE CEO, TIZIR LIMITED
|
|
- Steven Pitts
- 5 years ago
- Views:
Transcription
1 A Successful Upstream Integration in the Heavy Mineral Sands Industry JM FOURCADE CEO, TIZIR LIMITED 1
2 Agenda 1. Creating a Joint Venture Between MDL, Australia and Eramet, France 2. Developing a Huge TiO2 and Zr Mining Project in Senegal 3. Starting up a New Global Actor in the Heavy Mineral Sands Industry 2
3 Creating a Joint Venture Between MDL and Eramet History ERAMET SA Mining and Metallurgy Group People, 22 Countries Nickel, Manganese, Super Alloys 2008 Tinfos Acquisition (incl. TTI) Strategic Analysis TTI Upstream Integration Project MINERAL DEPOSITS LTD Extensive Experience in H M S Successful Gold Project in Senegal Concession of Grand Cote in 2007 DFS of the GCO Project 2010 Downstream Integration & Partnership CREATION OF TIZIR LIMITED OCTOBER 2011 JV 50/50 3
4 Creating a Joint Venture Between MDL and Eramet 4
5 Creating a Joint Venture Between MDL and Eramet TiZir Titanium and Iron (TTI) Tyssedal Ilmenite Upgrading Plant 5
6 Creating a Joint Venture Between MDL and Eramet Tyssedal What does it do? Smelts ilmenite to produce a titanium-rich slag and pig iron co-product Input Pre-reduction Smelting Outputs Customers Ilmenite Rotary Kiln Electric Furnace Titanium Slag High Purity Pig Iron Pigment Producers (Sulphate process) Foundries ~345ktpa mostly sourced ~200ktpa containing ~80% TiO 2 ~110ktpa 6
7 Senegal Ownership: TiZir 90%, Senegal Govt. 10% Concession: 25 years extendable 7
8 Grande Côte What makes it a quality project? Simple Ore Body Assemblage Water Scale Quality Project No overburden Minor vegetation Free flowing sands Minimal slimes Uniform grain size 10.7% zircon 74.5% ilmenite 2.5% rutile 3.2% leucoxene 90.9% VHM Shallow water table + Deep aquifer Allows dredge mining 100km x 4 km ore body 7,000 t/hr dredge 36MW power station Own railway and port facilities 85ktpa zircon + 575ktpa ilmenite Long mine life 8
9 55 Mt/y Mining Process Flow Sheet 55 Mt/ y Dredge 7000 t/h 7000 t/h 1.7 % HM 1 Mt / y Wet Concentration Plant (WCP) Spirals Tailings 1.7% HM Processing Magnetic Stockpiles 100 t/ h 1 M t/y Truck Stockpile of Heavy Mineral Concentrate (HMC) Wet High-Intensity Magnetic Separation (WHIMS) Plant Non- Magnetic Tailings Wet Tables Mineral Separation Plant (HMC to MSP) 140 t/h Non-Magnetic Zircon/Rutile/Leucoxene/Kyanite/Quartz Tailings Tailings Ilmenite Dry Mill MSP Dry Mill 30 t / h Tailings Ilmenite Zircon Rutile Leucoxene Products NB All Tailings return to Dredge Pond 9
10 10
11 TiZir Products Zircon Avgannual production 85 Kt Production description / target markets Premium quality low in key impurities Suitable for full spectrum of zircon consumers Container shipments provides logistics benefits for customers Ilmenite 400 Kt 54% TiO 2 Feedstock for Tyssedal plant or market 175 Kt 59% TiO 2 Feedstock for chloride pigment production Rutile 6 Kt Premium grade and fine grain size ideal for welding sector Leucoxene 10 Kt Suitable for welding sector Titanium slag 200 Kt Premium quality slag suitable for Sulphate process Pig Iron 110 Kt Premium quality for high quality iron castings 11
12 Safety is our Culture During the Construction Phase over 11 million hours reached with only 3 lost time injuries (FR = 0.27) 400,000 hours of safety training delivered Peak construction workforce of 2,400, inclusive of 240 expats on site Expected long term workforce of 660 total incl. 65 expats initially Emergency Response Team & Clinic operational from start of construction Fire, injury & critical emergency drills carried out weekly Transition to Operations Zero Harm Policy Adaption of the philosophy 12
13 Community & Social Responsibility Creating employment and investing in education, health & infrastructure Substantial positive impact on the local economy Local kindergarten built and supported Successful relationship with local village elders Land compensation rates inline with World Bank standards Assistance with infrastructure ongoing water bores, water towers, roads, etc Refurbishment of local schools program underway 13
14 Operating to world-class environmental standards Sound Environmental Management Potential risk identification Develop & Implement an environment management system based on ISO Follow IFS standards and Equator Principles Rehabilitation plan proven, tested & approved (Re-vegetation to use native plant species seed collection started) Monitoring program in place Partnerships with local service providers (farmers, waste management) 14
15 15
16 Starting up a New Global Actor in the Heavy Mineral Sands Industry From a SP TiO2 Feedstocks HP Pig Iron Player, to a CP + SP TiO2 Feedstocks HP Pig Iron High TiO2 products Zrfor ceramics, refractory + other applications Player Within very versatile and cyclical markets, our size (circa 8% of the world MS) and our process allow us the flexibility and the ability to adapt to the changing conditions. 16
17 Starting up a New Global Actor in the Heavy Mineral Sands Industry TTI optionality creates market flexibility Ilmenite 18% Pigment production feedstock source (Outside China) Ilmenite 61% Slag 39% Slag 46% Syn Rutile +UGS 18% Rutile 18% 17
Titanium mining and processing. INVESTOR PRESENTATION September 2013
Titanium mining and processing INVESTOR PRESENTATION September 2013 1 Statements Forward Looking Statements Certain information contained in this presentation, including any information on MDL s plans
More information1Q 2018 OPERATIONS REVIEW
19 April 2018 1Q 2018 OPERATIONS REVIEW TiZir Limited ( TiZir or the Company ) owns 90% of the Grande Côte mineral sands operation ( GCO ) in Senegal, West Africa and 100% of the TiZir Titanium & Iron
More information3Q 2017 OPERATIONS REVIEW
3Q OPERATIONS REVIEW TiZir Limited owns 90% of the Grande Côte Mineral Sands Project in Senegal, West Africa and 100% of the ilmenite upgrading facility TiZir Titanium & Iron, in Tyssedal, Norway. KEY
More informationCOMBINED GENERAL SHAREHOLDERS' MEETING. 27 May 2016
COMBINED GENERAL SHAREHOLDERS' MEETING 27 May 2016 CONTENTS COMBINED GENERAL SHAREHOLDERS' MEETING 27 MAI 2016 Introduction 2015 financial results Strengthening of cash preservation measures Operational
More informationOUTSTANDING RESULTS FROM ILMENITE UPGRADE TESTWORK
ASX and Media Release 9 September, 2015 KEY POINTS OUTSTANDING RESULTS FROM ILMENITE UPGRADE TESTWORK Breakthrough result for Thunderbird, with testwork confirming that the primary ilmenite can be substantially
More informationFor personal use only. Amazon Bay Ironsands Project
Amazon Bay Ironsands Project April 2013 Overview Nearly 200 km stretch of coast line, 150 km south east of Port Moresby, PNG Focus on 30 km long Threadfin area, which has exploration target of 630 million
More information2011 RESULTS. SFAF meeting, Paris February 16 th, 2012 ALLOYS, ORES & PEOPLE.
2011 RESULTS SFAF meeting, Paris February 16 th, 2012 ALLOYS, ORES & PEOPLE. CONTENTS TARGETED STRATEGIC POSITIONING 3 2011 RESULTS 6 DIVISIONS ACTIVITY 14 ERAMET GROUP S STRATEGIC PROJECT 35 ORGANIC DEVELOPMENTS
More informationWIM150 Mineral Sands Project 15 th Anniversary Mineral Sands Conference
WIM150 Mineral Sands Project 15 th Anniversary Mineral Sands Conference 24-25 March 2015 Legal statements Disclaimer This presentation does not comprise a prospectus, disclosure document or other offering
More informationERAMET. RESULTS 1 st half SFAF meeting, Paris July 28 th, 2011 ALLOYS, ORES AND PEOPLE
ERAMET RESULTS 1 st half 2011 SFAF meeting, Paris July 28 th, 2011 ALLOYS, ORES AND PEOPLE GROUPE CONTENTS TARGETED STRATEGIC POSITIONING 4 1 st HALF 2011 RESULTS 5 ACTIVITY BY DIVISION 11 OTHER METALS:
More informationSouthern Ionics Mining to Support the American Zirconium OxyChloride (ZOC) Business
Southern Ionics Mining to Support the American Zirconium OxyChloride (ZOC) Business Southern Ionics Business Overview Privately held chemical manufacturer Founded in 1980 by owner - Milton Sundbeck 285
More informationSales in third-quarter 2017 at 877 million, up by 23% compared with third-quarter 2016.
Paris, 24 October 2017, 8:30 am PRESS RELEASE ERAMET group: sales up in third-quarter 2017 Sales in third-quarter 2017 at 877 million, up by 23% compared with third-quarter 2016. Stability in manganese
More informationIlmenite Pellet Production and use at TiZir
Ilmenite Pellet Production and use at TiZir Arne Hildal and Stian Seim www.tizir.co.uk Tyssedal ilmenite upgrading facility - History 1908 Start production of hydro electrical power in Tyssedal 1916-81
More informationDEVELOPING A HIGH GRADE ILMENITE DEPOSIT TIO 2 WORLD SUMMIT 3-5 OCTOBER 2017 ALICANTE, SPAIN
DEVELOPING A HIGH GRADE ILMENITE DEPOSIT TIO 2 WORLD SUMMIT 3-5 OCTOBER 2017 ALICANTE, SPAIN GREENLAND: THE MISUNDERSTOOD ISLAND TOO COLD?????? TOO HARD? TOO ISOLATED???? 1 MAYBE IT S TIME TO TO THINK
More informationThird-quarter sales in 2016 at 714 million euros, steadily increasing since the start of 2016.
Paris, 09 November 2016 PRESS RELEASE ERAMET Group: 3 rd quarter 2016 sales Third-quarter sales in 2016 at 714 million euros, steadily increasing since the start of 2016. Significant rise in manganese
More informationTZMI CONGRESS 2014, SHANGHAI CHINA NOVEMBER 2014
TZMI CONGRESS 2014, SHANGHAI CHINA NOVEMBER 2014 Summary by Dr Robert Porter, General Manager, Investor Relations OVERVIEW The following provides some notes and observations of part of the proceedings
More informationSHEFFIELD ORE RESERVE FOR DAMPIER PROJECT AT 01 OCTOBER 2018 (in-situ assemblage) HiTi Leuc (%) Zircon (%)
Sheffield s inventory of and Ore Reserve comprises; Thunderbird Ore Reserve of 680.5 million tonnes @ 11.3% HM (Proved and Probable) (refer to ASX announcement 16 March 2017). Thunderbird of 3.23 billion
More informationAustpac Resources N.L (APG)
Austpac Resources N.L (APG) APG achieves technological breakthrough in the treatment of ilmenites Austpac Resources (APG) is set to commercialise its technological breakthrough in the mineral sands market.
More informationCHAPTER 1 INTRODUCTION
INTRODUCTION The purpose of this first chapter is to introduce the reader to the work conducted during this project. It also aims to provide the reader with some perspective by describing the industry
More informationWhat Bob Becher s developments meant to the world pigment industry and WA in particular
What Bob Becher s developments meant to the world pigment industry and WA in particular Nick Bernard 26 November 2013 The Bob Becher Centenary Symposium World Pigment Production 1910 s to 1950 s all TiO
More informationCHINA S ECONOMIC GROWTH AND ITS IMPACT ON MINERALS MARKET. Pierre Alla CEO Goro Nickel New-Caledonia
CHINA S ECONOMIC GROWTH AND ITS IMPACT ON MINERALS MARKET Pierre Alla CEO Goro Nickel New-Caledonia Standing committee Beijing April 2004 CHINA Growing Role in Mineral Market Raw material prices particularly
More informationTrimex Beach Sand Beneficiation Plant
Trimex Beach Sand Beneficiation Plant Walchandnagar industries Ltd (WIL) received a contract from M/s Trimex Sands Pvt Ltd putting up the complete 2.1 MTPA Beach Sand Beneficiation Plant at Srikurmam,
More informationERAMET TOKYO PRESS CONFERENCE. July 6 th, 2017
ERAMET TOKYO PRESS CONFERENCE July 6 th, 2017 CONTENTS ERAMET TOKYO PRESS CONFERENCE Key Figures 2016 financial results / improving performance Operating performance ERAMET Nickel ERAMET Alloys ERAMET
More informationFor personal use only
SUITE H4.6, LEVEL 4, 172 NORTH TERRACE ADELAIDE SA PO BOX 8242 STATION ARCADE SA 5000 Telephone 08 7325 6500 Facsimile 08 8212 6818 Quarterly Report to ASX for the period 1 April to 30 June 2014 Highlights
More information1.1 TiO2 pigment feedstock
1 Introduction 15 1.1 TiO2 pigment feedstock Titanium dioxide (TiO 2 ) is used as pigment in amongst others paints, coatings, plastics, paper, inks, foods, toothpaste and cosmetics due to its brightness,
More informationBauxite Mine & Metals Facility Manjimup BMMF - Project COMMUNICATION RELEASE DRAFT. Minerals & Energy 1
Bauxite Mine & Metals Facility Manjimup BMMF - Project COMMUNICATION RELEASE DRAFT 1 Overview Table of Contents 1. Prima Resources Business Profile 2. Project Proposal Executive Summary Opportunities for
More informationIluka Resources Limited
Iluka Resources Limited CEDA WA Trustee Luncheon David Robb, Managing Director and CEO 19 March 2015 Disclaimer Forward Looking Statements Forward Looking Statements This presentation contains certain
More informationMozambique Real Opportunity. Benchmark World Tour Sydney 21 st September
Mozambique Real Opportunity Benchmark World Tour Sydney 21 st September 1 Project 1 Montepuez Montepuez Graphite Project 2 Annual graphite production Capex (pre-production) Opex (concentrate/t) 7 Grade
More informationTronox Limited: A Brighter Future From the Ground Up. Tennessee Tombigbee Waterway Conference
Tronox Limited: A Brighter Future From the Ground Up Tennessee Tombigbee Waterway Conference Leading Global Pigment and Mineral Sands Platform Botlek, The Netherlands Oklahoma City, OK Stamford, CT Shanghai,
More informationDredging and Land Spirals For Alluvial HM Deposits
Dredging and Land Spirals For Alluvial HM Deposits & Hydraulic Mining for Virgin Soil HM Deposits Hong Kong office address: Suite 915, 9 th Floor, Ocean Centre, 5 Canton Road, Tsim Sha Tsui, Hong Kong
More informationASX ANNOUNCEMENT. Fungoni Heavy Mineral Sands Project DFS HIGHLIGHTS. 6 October 2017
ASX ANNOUNCEMENT Fungoni Heavy Mineral Sands Project DFS 6 October 2017 Fungoni Definitive Feasibility Study delivers outstanding financial returns Fungoni high grades and low costs underpinning a fast
More informationCristal Australia Pty Ltd
ENERGY EFFICIENCY OPPORTUNITIES PUBLIC REPORT 2013 Cristal Australia Pty Ltd is a wholly owned subsidiary of The National Titanium Dioxide Company Limited (Cristal), a private company with headquarters
More informationPRE-FEASIBILITY STUDY UPDATE CONFIRMS THUNDERBIRD AS THE WORLD S BEST UNDEVELOPED MINERAL SANDS PROJECT
ASX AND MEDIA RELEASE 14 October 2015 PRE-FEASIBILITY STUDY UPDATE CONFIRMS THUNDERBIRD AS THE WORLD S BEST UNDEVELOPED MINERAL SANDS PROJECT KEY POINTS Pre-feasibility Study Update confirms low risk,
More informationREVIEWED GROUP INTERIM RESULTS For the twelve months ended 30 June 2004 PRESENTATION 2004
HARNESSING THE POWER OF THE EARTH REVIEWED GROUP INTERIM RESULTS For the twelve months ended 30 June 2004 PRESENTATION 2004 www.kumbaresources.com CHIEF EXECUTIVE HARNESSING THE POWER OF THE EARTH 2 KEY
More informationKenmare Resources Plc Moma Titanium Minerals Mine. January 2013 Update
Kenmare Resources Plc Moma Titanium Minerals Mine January 2013 Update Disclaimer This Confidential Presentation (the Presentation ) has been prepared and issued by Kenmare Resources plc (the Company or
More informationFor personal use only
24 January 2018 BARRAMBIE PROJECT UPDATE HIGHLIGHTS Titanium and vanadium prices at 5 year highs o Prices have rapidly increased since the closure of 89 ore processing companies in China due to environmental
More informationXXV International Mineral Processing Congress (IMPC 2010) Eco-Efficient Gravity Separation Solutions in India
XXV International Mineral Processing Congress (IMPC 2010) Eco-Efficient Gravity Separation Solutions in India Carlos A. Pena Reference Number: 441 Contact Author: Full name Carlos A. Pena Position title
More informationFor personal use only
CROSSLAND URANIUM MINES LTD (ASX: CUX) Featuring Charley Creek, Northern Territory - a rapidly developing strategic Rare Earth Resource The following presentation briefly outlines: The Rare Earth industry,
More informationGrange Resources. Diggers & Dealers 4 August Russell Clark Managing Director & CEO
Grange Resources Australia s leading magnetite producer Grange Resources Limited (GRR) Level 11, 200 St Georges Terrace Perth, WA 6000, Australia Phone + 61 8 9321 1118 Fax + 61 8 9321 1523 www.grangeresources.com.au
More informationMINING TOGETHER BUILDING TOGETHER THE GCO FAMILY PROJECT PARTNERS
MINING TOGETHER BUILDING TOGETHER THE GCO FAMILY PROJECT PARTNERS MINING TOGETHER BUILDING TOGETHER THE GCO FAMILY Grande Côte Operation s new CEO Jozsef Patarica took on the reins at the Senegalese mineral
More informationDECEMBER 2013 QUARTERLY REPORT TO SHAREHOLDERS
DECEMBER 2013 QUARTERLY REPORT TO SHAREHOLDERS The Directors are pleased to provide Shareholders with the December 2013 Quarterly Report. TVI Pacific Inc. (TVI) completes next phase of Placement and funding
More informationERAMET. Investors and Analysts Presentation - December 2015
ERAMET Investors and Analysts Presentation - December 2015 DISCLAIMER This document and the materials appended to it (together, the materials ) may include certain forwardlooking statements, beliefs or
More informationMagnetite potential of the Upper Zone of the Bushveld Complex in the Northern Limb. Limpopo Minerals Conference 12 November 2015.
RESOURCES LTD Magnetite potential of the Upper Zone of the Bushveld Complex in the Northern Limb Limpopo Minerals Conference 12 November 2015 Dr Luke Longridge The Upper Zone on the Northern Limb The Upper
More informationFor personal use only
ASX AND MEDIA RELEASE 22 January 2016 MAIDEN ORE RESERVE THUNDERBIRD PROJECT HIGHLIGHTS Maiden Ore Reserve of 683 million tonnes @ 11.3% heavy mineral (HM) Supports Thunderbird Pre-feasibility Study outcomes
More informationRoger Bell, CFA. Hannam & Partners (Advisory) LLP 2 Park Street Mayfair London W1K 2HX
Oct-16 Nov-16 Dec-16 Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17 Jul-17 Aug-17 Sep-17 Oct-17 Equity Research 16 October 2017 KENMARE RESOURCES BACK FROM BRINK, BUT RECOVERY STILL UNDERAPPRECIATED After years
More informationWindimurra Vanadium Plant Project Update. Investor Presentation August 2011
Windimurra Vanadium Plant Project Update Investor Presentation August 2011 Disclaimer The material in this presentation ( material ) is not and does not constitute an offer, invitation or recommendation
More informationFEASIBILITY STUDY COMPLETED CONFIRMING ROBUST CASH MARGINS FOR JOGJAKARTA IRON PROJECT
ANNOUNCEMENT TO THE AUSTRALIAN SECURITIES EXCHANGE: 29 AUGUST 2011 FEASIBILITY STUDY COMPLETED CONFIRMING ROBUST CASH MARGINS FOR JOGJAKARTA IRON PROJECT Highlights: Feasibility Study completed on a 2
More informationAustralia s leading magnetite producer. Southdown Magnetite Project
Australia s leading magnetite producer Southdown Magnetite Project Pre-feasibility Study May 2011 Disclaimer The material in this presentation ( material ) is not and does not constitute an offer, invitation
More informationBauxite Residue Reclamation Projects Investor Presentation
s Investor Presentation (WA Alumina Refineries) RECLAIM METALS FROM BAUXITE RESIDUE PREPARED BY: MICHAEL SHENTON JUNE 2015 Email: mshenton@primaresources.com.au Mob No : +61 407 919 077 www.primaresources.com.au
More informationH Results Presentation 20 th August 2018
H1 2018 Results Presentation 20 th August 2018 Disclaimer This Presentation (the Presentation ) has been prepared and issued by Kenmare Resources plc (the Company or Kenmare ). While this Presentation
More informationGum Flat Iron Ore. Potential to Export from Port Lincoln in 2 years. Dr A. John Parker. Managing Director. Port Lincoln Council 17 January 2011
Gum Flat Iron Ore Potential to Export from Port Lincoln in 2 years Dr A. John Parker Managing Director Port Lincoln Council 17 January 2011 Disclaimer & Competent Person s Statement This presentation has
More informationFUTURE PRODUCER OF IRON, VANADIUM AND TITANIUM. COMEX - Environmental and Social Impact Review Committee Ouje-Bougoumou - December 4 th, 2018
FUTURE PRODUCER OF IRON, VANADIUM AND TITANIUM COMEX - Environmental and Social Impact Review Committee Ouje-Bougoumou - December 4 th, 2018 Forward-Looking Statements: This presentation contains "forward-looking
More informationAndromeda Metals A New Direction in Industrial Minerals
SA Explorers Conference 2018 Andromeda Metals A New Direction in Industrial Minerals 2018 ANNUAL GENERAL MEETING Managing Directors Address ASX:ADN Disclaimer The information in this presentation is published
More informationHIGHLIGHTS. Mining movements lift in fourth quarter with successful remediation, and development of North Pit west wall.
31 December 24 January 2018 ASX: GRR REPORT FOR THE QUARTER ENDED 31 December HIGHLIGHTS Mining movements lift in fourth quarter with successful remediation, and development of North Pit west wall. High
More informationConstruction and Сommissioning of ERAMET SiMn + EMM Plant in Gabon
Construction and Сommissioning of ERAMET SiMn + EMM Plant in Gabon ABSTRACT Patrice L HUILLIER, COO, ERAMET-COMILOG In 2009, ERAMET-COMILOG the world leader producer of refined Manganese alloys and one
More informationBuilding South Australia s Largest Iron Ore Project
Building South Australia s Largest Iron Ore Project Briefing to the Regional Communities Consultative Council (RCCC) Wudinna, South Australia, 28 September 2012 Disclaimer Forward-Looking Statements This
More information25 July half-year results
25 July 2018 2018 half-year results Christel BORIES Chairman and CEO CONTENT 1 Safety 2 2018 half-year results 3 Operating performance 4 Strategic orientations 5 Conclusion & outlook DISCLAIMER Group Certain
More informationGrange Resources Australia s leading magnetite producer
Grange Resources Australia s leading magnetite producer Grange Resources Limited (GRR) Level 11, 200 St Georges Terrace Perth, WA 6000, Australia Phone + 61 8 9321 1118 Fax + 61 8 9321 1523 www.grangeresources.com.au
More informationWINDIMURRA SITE VISIT PRESENTATION
6 June 2012 WINDIMURRA SITE VISIT PRESENTATION Please find attached a presentation to be given by the senior management team of Atlantic Ltd during a site visit to Windimurra today. -ends- For further
More informationAustralia s leading magnetite producer
Australia s leading magnetite producer Russell Clark Managing Director and CEO CCI Resource Conference 28 June 2012 Disclaimer The material in this presentation ( material ) is not and does not constitute
More informationFor personal use only
TERRAMIN AUSTRALIA LIMITED Annual General Meeting 30 May 2014 Disclaimer & Competent Person Statement Disclaimer This presentation has been prepared by Terramin Australia Limited (Terramin). It is current
More informationRare Earths WE TOUCH THEM EVERYDAY. Roskill International Rare Earths Conference Presentation. 16 November 2011
Rare Earths WE TOUCH THEM EVERYDAY Roskill International Rare Earths Conference Presentation 16 November 2011 Disclaimer This Presentation has been prepared by Lynas Corporation Limited (ABN 27 009 066
More informationPilot-Scale Demonstration of Ilmenite Processing Technology Project Update
Pilot-Scale Demonstration of Ilmenite Processing Technology Project Update June 7, 2017 Mining & Reclamation Classroom Chisholm, MN M. Mlinar Growing Strong Industries ~ Developing New Ideas ~ Nurturing
More informationAN OVERVIEW OF SOUTH AFRICA S TITANIUM MINERAL CONCENTRATE INDUSTRY
REPORT R71 /2008 AN OVERVIEW OF SOUTH AFRICA S TITANIUM MINERAL CONCENTRATE INDUSTRY DIRECTORATE: MINERAL ECONOMICS REPORT R71 /2008 AN OVERVIEW OF SOUTH AFRICA S TITANIUM MINERAL CONCENTRATE INDUSTRY
More informationQUARTERLY REPORT FOR THE PERIOD ENDING 31 MARCH 2017
QUARTERLY REPORT FOR THE PERIOD ENDING 31 MARCH 2017 SUMMARY RECORD POSITIVE CASHFLOW: Cash flows from Operating and Investing activities increased to $11.6m. In addition to that amount, a further inflow
More informationAustralia s largest Vanadium in magnetite deposit delivering the highest Vanadium grade in concentrate
Australia s largest Vanadium in magnetite deposit delivering the highest Vanadium grade in concentrate VANADIUM CONCEPT STUDY UNDERWAY High Purity Vanadium Pentoxide, Titanium Dioxide and Iron Oxide ASX:
More informationTERRAMIN AUSTRALIA LIMITED. Annual General Meeting
TERRAMIN AUSTRALIA LIMITED Annual General Meeting 27 May 2016 Disclaimer & Competent Person Statement Disclaimer This presentation has been prepared by Terramin Australia Limited (Terramin). It is current
More informationAn overview of the Namakwa Sands Ilmenite Smelting Operations
Southern African Pyrometallurgy 2006, Edited by R.T. Jones, South African Institute of Mining and Metallurgy, Johannesburg, 5-8 March 2006 An overview of the Namakwa Sands Ilmenite Smelting Operations
More informationIndusteel Industeel, the right steel Creusabro at the right place Unique, Best, Proven
Industeel Industeel, Creusabro the right steel at Unique, the right Best, place Proven A complete range to meet any situation Creusabro is a complete range of advanced abrasion resistant steel plates bringing
More informationFor personal use only
ASX RELEASE Sorby Hills Silver Lead Project Major Milestone Achieved with Environmental Approval As announced on 3 April, the WA Minister for Environment has approved the development of the Sorby Hills
More informationFor personal use only
AUSTPAC RESOURCES N.L. ACN 002 264 057 Level 3 62 Pitt Street SYDNEY NSW 2000 GPO Box 5297 SYDNEY NSW 2001 Telephone: (+61 2) 9252 2599 Facsimile: (+61 2) 9252 8299 Email: apgtio2@ozemail.com.au www.austpacresources.com
More informationConverting Steel Industry Waste into Profits. Presentation by Mike Turbott Managing Director
Converting Steel Industry Waste into Profits Presentation by Mike Turbott Managing Director 1 Disclaimer This presentation is provided to you for information purposes only and should not be construed as
More informationMarket Update Southdown Magnetite Project
MEDIA RELEASE 23 February 2018 Market Update Southdown Magnetite Project Grange Resources Limited (ASX:GRR) (Grange) is pleased to announce that, in conjunction with its joint venture participant, SRT
More informationPit to Port Infrastructure in SA
Pit to Port Infrastructure in SA An Explorer s Perspective Dr A. John Parker Managing Director SA Mining and Energy Infrastructure Conference 2011 12-13 April 2011 Disclaimer & Competent Person s Statement
More informationAustralia s most experienced magnetite producer. UBS Iron Ore and Coal Conference Sydney, Australia November 2013
Australia s most experienced magnetite producer UBS Iron Ore and Coal Conference Sydney, Australia 27-28 November 2013 Disclaimer The material in this presentation ( material ) is not and does not constitute
More informationAustralia s leading magnetite producer Southdown Magnetite Project. Russell Clark Managing Director & CEO February 2012
Australia s leading magnetite producer Southdown Magnetite Project Russell Clark Managing Director & CEO February 2012 Disclaimer The material in this presentation ( material ) is not and does not constitute
More informationAustpac Resources NL Page 2 of 7 EAW
Synthetic Rutile Production from Murray Basin Ilmenite by the Austpac ERMS Process Ernest Alan WALPOLE Austpac Resources N.L. Level 12 Currency House 23 Hunter Street SYDNEY NSW 2000 A paper presented
More informationBy-products recovery via integrated copper operations at Rio Tinto Kennecott. EU Commission - Brussels 12 th Nov 2015
By-products recovery via integrated copper operations at Rio Tinto Kennecott EU Commission - Brussels 12 th Nov 2015 Who we are Rio Tinto is a leading global business delivering value at each stage of
More informationPRODUCER SERVICE PROVIDER INDUSTRY SUPPLIER PROJECT INCUBATOR REDUCTANT SPECIALIST COMMODITY SUPPLY SPECIALIST SOUTHERN AFRICAN AGRI VALUE CHAIN
PRODUCER SERVICE PROVIDER INDUSTRY SUPPLIER PROJECT INCUBATOR REDUCTANT SPECIALIST COMMODITY SUPPLY SPECIALIST SOUTHERN AFRICAN AGRI VALUE CHAIN 5 TH FLOOR, 138 WEST STREET, SANDTON, 2146 Copyright 2017
More informationA Tiger in the Congo. Charles Brown, COO, S.E.K SPRL, Katanga Province, D R Congo
A Tiger in the Congo Charles Brown, COO, S.E.K SPRL, Katanga Province, D R Congo Disclaimer Forward-Looking Statements This presentation contains forward-looking information, which is based on assumptions
More informationAnnual General Meeting Presentation. Shaun Verner, Managing Director and CEO
Annual General Meeting Presentation Shaun Verner, Managing Director and CEO 19 May 2017 Tailings storage facility Truck parking area Fixed plant workshop Administration Building Raw water dam Power station
More information70 019oz 30 % 0.19Moz LTIFR 0.0. $19.1 million 32% $988/oz 11 % $1.14 million. MALARIA IncIDence RATE. 48 Randgold Resources ANNUAL REPORT 2017
MORILA gold mine PRODuceD 70 09oz 30 % ToTAL cash cost $988/oz % LTIFR 0.0 PROFIT FROM MINING ACTIVITY $9. million 3% TOTAL RESERveS 0.9Moz MALARIA IncIDence RATE TO % DIRecT CONTRIBUTION TO COMMunITY
More informationFor personal use only
MEDIA/ASX RELEASE 13 JANUARY 2011 NEW EXPLORATION LICENCE GRANTED WITH JORC KAOLIN RESOURCE OF 65 MT AT AMMG'S MECKERING PROJECT (COMPRISING 16.77MT INDICATED 48.28MT INFERRED) HIGHLIGHTS AMMG granted
More informationILUKA BRIEFING PAPER MODELLING METHODOLOGY June 2016
ILUKA BRIEFING PAPER MODELLING METHODOLOGY June 2016 Key Physical and Financial Parameters Iluka issued guidance on a range of parameters in its Key Physical and Financial Parameters of 19 February 2016).
More informationINVESTOR SITE VISIT WONDERKOP SMELTER
INVESTOR SITE VISIT WONDERKOP SMELTER 6 MAY 2016 Presented by Zanele Matlala (CEO) and Amanda Magro (Wonderkop General Works Manager) Presented by Zanele Matlala (CEO) and Kajal Bissessor (FD) Legal notice/disclaimer
More informationOPTIMISATION OF RADIATION PROTECTION IN NORM INDUSTRIES 3 NOVEMBER 2015 AJ VAN DER WESTHUIZEN
OPTIMISATION OF RADIATION PROTECTION IN NORM INDUSTRIES 3 NOVEMBER 2015 AJ VAN DER WESTHUIZEN GENERAL SAFETY REQUIREMENTS GENERAL SAFETY REQUIREMENTS PART 3 (GSR PART 3) Definition of Optimisation The
More informationSTRONG PRE-FEASABILITY STUDY SUPPORTS 1.5 MTPA URQUHART BAUXITE DEVELOPMENT
ASX RELEASE 30 DECEMBER 2016 STRONG PRE-FEASABILITY STUDY SUPPORTS 1.5 MTPA URQUHART BAUXITE DEVELOPMENT HIGHLIGHTS Independent Pre-Feasibility Study (PFS) supports development of the Urquhart Bauxite
More informationWorld Titanium Resources.
World Titanium Resources www.worldtitaniumresources.com 2 AUSTRALIANS AT HOME AND ABROAD World Titanium Resources World Titaniu Madagascar in motion JUNE 2012 The International Resource Journal AUSTRALIANS
More informationINDONESIAN MINING POLICY UPDATE
INDONESIAN MINING POLICY UPDATE bauma FORUM bauma 2013 30th International Trade Fair for Construction Machinery, Building Material Machines, Mining Machines, Construction Vehicles and Construction Equipment
More informationInvestor Presentation
12 September 2018 Investor Presentation Philippe Gundermann Executive VP Strategy & Innovation, Investor Relations Sandrine Nourry-Dabi Investor Relations Manager CONTENT 1 ERAMET at a glance 2 2018 half-year
More informationFor personal use only
Wednesday, 23 March 2016 $6 MLN FUNDING FOR WINCHESTER MAGNESITE PROJECT AND STRATEGIC INVESTOR $6 million funding to be provided for AusMag to develop Winchester project into a raw magnesium carbonate
More informationQUARTERLY REPORT March 2011
QUARTERLY REPORT March 2011 Australian energy company, Blackham Resources Ltd (Blackham) ( ASX: BLK ) continues to advance the development of the Scaddan and Zanthus Coal to Liquids ( CTL ) projects. The
More informationHealth and Safety. Update: No LTI at Prestea Open Pits. 5.65M man hours worked with no LTI
SIMPLE Expanding Production & LEAN and Reducing PRODUCER Costs Health and Safety Update: No LTI at Prestea Open Pits 5.65M man hours worked with no LTI 510 Days as at 31 st Oct without LTI. Last LTI on
More informationCase No COMP/M ERAMET / TINFOS. REGULATION (EC) No 139/2004 MERGER PROCEDURE. Article 6(1)(b) NON-OPPOSITION Date: 03/07/2008
EN Case No COMP/M.5179 - ERAMET / TINFOS Only the English text is available and authentic. REGULATION (EC) No 139/2004 MERGER PROCEDURE Article 6(1)(b) NON-OPPOSITION Date: 03/07/2008 In electronic form
More informationFor personal use only. Company Overview. 30 May 2011
Company Overview 30 May 2011 Capital Structure Market Capitalisation approx $145 million Undervalued against peers ASX Code: IDO 211.1m shares on issue (100% tradeable) 29.6m unlisted options (incl 28.6m
More informationIndian Chrome Ore and Ferro Chrome Industry
Indian Chrome Ore and Ferro Chrome Industry Koushik Bhadra General Manager Tata Steel Asia (Hong Kong) Limited 15 th Asian Ferro Alloy Conference Hong Kong, 3 rd April, 2014 1 DISCLAIMER : The presentation
More informationMetallurgical Innovations and Critical Parts for the Defence & Aerospace Industries
Raw Materials Week November 8 th, 2017, Brussels Metallurgical Innovations and Critical Parts for the Defence & Aerospace Industries Laurent CORBIER Vice-President, Public Affairs, ERAMET CONTENT ERAMET
More informationCHAPTER 26 ORES, SLAG AND ASH
CHAPTER 26 ORES, SLAG AND ASH 1. This chapter does not cover; a) Slag or similar industrial waste prepared as macadam (heading 2517); b) Natural magnesium carbonate (magnesite), whether or not calcined
More informationA Deeper Look 04/ / 187. Lonmin Plc Annual Report and Accounts 2016
Lonmin Plc 188 Consolidated Group Five Year Financial Record 189 195 Mineral Resources and Mineral Reserves 04/ / 187 A Deeper Look Key financial and operational statistics over the past five years and
More informationOre mineral: a mineral from which one or more metals can be extracted.
1 Ore mineral: a mineral from which one or more metals can be extracted. Gangue minerals: minerals that accompany ore minerals but are of little or no worth. Ore: a body of rock containing one or more
More informationFast-tracking Montepuez & Balama Projects. BATTERY MINERALS LIMITED AGM Presentation 30 th May 2018
Fast-tracking Montepuez & Balama Projects BATTERY MINERALS LIMITED AGM Presentation 30 th May 2018 1 Less than 15 mths to first sales and cashflow 1.Market 2.Company 3.Projects 4.Growth 5.Next Steps 2
More information