1 The Railways Asset Management Maturity Model GianPiero Pavirani
2 Document UIC AM WORKING GROUP UIC AM Guidelines published September 2010 Scope of asset management Eight key steps defining an AM system for railway infrastructure asset Definition of an AM Framework components Cross Reference to PAS 55
3 The needs of a Railway infrastructure AM maturity Self Assessment The members of the AMWG agreed to assess the AM activities of their own organizations within the scope of framework stated on guide lines by means of a self assessment questionnaire. The AMWG has analyzed a number of self assessment approaches but realized that are not sufficiently address the specific needs of rail Infrastructure Managers. Subsequently, it was decided, that a tailor-made questionnaire would best serve the needs. PROJECT OBJECTIVES Enable a self-assessment of the management of rail infrastructure assets in order to identify the level of maturity of the processes applied within the UIC asset management framework. Enable the rail Infrastructure Managers to optimize its processes and activities to deliver the performances requested by its customers, funders and other stakeholders. Facilitate to benchmark against others Improve comparability between the execution of core activities as defined by the asset management framework, and enable Infrastructure Managers to Improve their own approach by learning from other Infrastructure providers
4 The road map for the AM Maturity self assessment questionnaire At the last has been introduced the concept of maturity to evaluate the growth and development of framework components and their activities or actions.
5 1.Definition of framework components Column A in the questionnaire. components of framework are macro elements of analysis. The framework reference is defined on Guide lines publishes by UIC. Framework components have a logical order as numbered in the graphical chart. Asset information Risk management LCC tools Business processes Competencie s Supply chain management ENABLING MECHANISMS 1. Network objectives 2. Route strategies Asset Operational component component 3. Operational 4. Asset strategy strategy 6. Route asset 5. Route operational plans plans 7. Route delivery 8. Timetable and plans access planning 10. Network 9. Execution of work operation Audits KPIs Managem ent reviews Corrective actions REVIEWING MECHANISMS
6 2. Definition of main processes for each component Column B in the questionnaire. The main process characteristics for each component are defined. The specified processes are micro analyzed. The processes addressed applying the following principles: Component definition given on the UIC AM guide line; Based on own organization experience. Based on customization derived from logical order of each component (e.g.) : Fix starting Point; Define referring targets; develop alternative strategic approaches and evaluate them decide on strategic approach to pursue; derive action.
7 3. Description of processes 3 Column C in the questionnaire The process is described trough its relevant characteristics. For that, is useful to compare every single process with of review/enabling mechanism.
8 4. Definition of questions 3 Column E in the questionnaire At this step we formulate the appropriate questions related to the each item.
9 5. Definition of possible answers characteristics, fine tuned on 6 maturity level of Asset management. Columns H-M in the questionnaire For every question are defined 6 different answers for each maturity level most compliant with railways organization. In the Chart a guide to find the right answers are descript the adopted structure for maturity levels.
10 Necessity of develop an advanced excel Tool Was agreed, that to manage a simply file excel with 10 sheet for to fill the complete questionnaire would serve an IT Tool in excel environment but using the capability of "Visual Basic" forms and commands. This tool also enable the following possibility: Allows a comparison of different practices in similar contexts. The model of analysis is set to evaluate maturity not only at a global macro level but also at a detailed micro level. The global evaluation maturity, is measured according to the components as defined in the framework. The detailed evaluation maturity is measured process/activities defined for each framework component. The Network to define the roadmap of improvements in performance through the evolution towards higher levels of maturity needs to refer the Network best pratices, and thus will give a reference value to activities, of a managerial, technical, organizational or global nature, which allow the implementation of these elements.
11 The Excel Tool A form to manage input and output data Input Buttons Output Buttons
12 A form multipage for read the questionnaire and evaluate your answers
13 Why a multipage Tool? The Tool is capable to contain and analysis data of AM maturity of 9 organizations all the data (input output are managed in anonymous This able AM WG to do benchmark and for each process/ activities individualize a best practices organisation
14 Output analysis eg. Network H
15 Network H analysis from macro to micro From macro TO micro
16 Output for macro benchmark
17 Thank you for your kind attention GianPiero Pavirani, Asset Information (AI) System of Rete Ferroviaria Italiana (RFI), 6 October Asset Information (AI) System of Rete Ferroviaria Italiana (RFI), 6 October 2011
Asset Management Developing Implementation Projects (Working sub group) Martina Capogna and Lorenzo Di Pasquale
Asset Management Developing Implementation Projects (Working sub group) Martina Capogna and Lorenzo Di Pasquale Table of contents Asset Management Working Group The sub group: Asset Management Developing
More informationGuidelines for the Application of Asset Management in Railway Infrastructure Organisations
Guidelines for the Application of Asset Management in Railway Infrastructure Organisations INTERNATIONAL UNION OF RAILWAYS (UIC) 16 rue Jean Rey - F-75015 PARIS Tel: +33 (0)1 44 49 20 20 Fax: +33 (0)1
More informationADM The Architecture Development Method
ADM The Development Method P Preliminary Phase Preliminary Phase Determine the Capability desired by the organization: Review the organizational context for conducting enterprise architecture Identify
More informationWhy need railway infrastructure. Management? Dominique Gardin chairman of the UIC Asset Management working group
Why need railway infrastructure managers to introduce Asset Management? Dominique Gardin chairman of the UIC Asset Management working group The world is changing! > New expectations and restrictions appear
More informationAsset Management Maturity Current IAM Thinking and Network Rail Case Study. 3 rd October 2013
Asset Management Maturity Current IAM Thinking and Network Rail Case Study Andrew Sharp 3 rd October 2013 2 Overview 1. What is Asset Management maturity? The latest view from the Institute of Asset Management
More informationThe four steps to Service Management Exellence. White Paper.
The four steps to Service Management Exellence White Paper Table of Contents Executive Summary Introduction Stage One: The Primary Role of Service Management Stage Two: The Operational Role of Service
More informationAssessment of IT Operations. Frameworks* An Overview
Assessment of IT Operations Leveraging Industry Standard Frameworks* An Overview *COBIT 5, ITIL,CMM,other SPEAKER BIOGRAPHY Sameer Gupta is a director in KPMG's Consulting Practice and has over 25 years
More information20 years of rail liberalisation in Europe: key lessons and future prospects
20 years of rail liberalisation in Europe: key lessons and future prospects Views of SNCF 1 SNCF SNCF 4th European Rail Transport Regulation Forum OVERVIEW Why introduce competition? Pillars of the European
More informationExecutive Director: Annual Evaluation
Please rate the Executive Director on the following attributes. Executive Director: Annual Evaluation 1 1.1 1.2 1.3 Vision, Mission, and Strategies The Executive Director maintains a clear vision for the
More informationRegulatory Framework
[AA31] Supplementary for Chapter 02 Regulatory Framework Chapter 02 AA31 3. Purpose of the Integrated Report The primary purpose of an integrated report is to explain to providers of financial capital
More informationPMO In A Box. Prepared for UBS
PMO In A Box Prepared for UBS Roadmap Why PMO In A Box? Establish PMO Governance Standardize Methodology Create a Stakeholder Partnership Plan 2 PMOs Are In Transition 3 CEB PMO Executive Council pmo in
More informationIntegrated Clause-byclause Guidance
Integrated Clause-byclause Guidance ISO 9001:2015, ISO 14001:2015 & ISO 45001:2018 Table of Contents 1 INTRODUCTION... 4 2 IMPLEMENTATION & DEVELOPMENT... 5 2.1 MANAGING THE CHANGE... 6 2.2 TOP MANAGEMENT
More informationProject Management Institute IMPLEMENTING ORGANIZATIONAL PROJECT MANAGEMENT: A PRACTICE GUIDE
Project Management Institute IMPLEMENTING ORGANIZATIONAL PROJECT MANAGEMENT: A PRACTICE GUIDE PREFACE V 1 INTRODUCTION TO THE PRACTICE GUIDE 1 1.1 Overview of OPM Basics 1 1.2 Intended Audience for this
More informationDoes your organization Establish Career Path for all Organizational Project Management Roles"?
Best Practice ID SAM Question Domain Process Improvement Stage 8640 Does your organizaron Control the Define Roadmap Control 8750 Does your organizaron Improve the Define Roadmap Improve 8760 Does your
More informationAsset Visibility through Data Integrity. Matt Bayne Access Midstream
Asset Visibility through Data Integrity Matt Bayne Access Midstream Company Introduction Access Midstream 2 A short history 1937 2001: Liquids (DOT 195) IM 2000 2004: Gas (DOT 192) IM 2010 T O D A Y Basic
More informationAn initiative of the Food Sector for the protection of the environment
An initiative of the Food Sector for the protection of the environment LIFE+ FOODPRINT LIFE13 ENV/GR/000958 Action B.1: Development of a Carbon Footprint tool for the effective quantification of CO 2 equivalent
More informationEverything you always wanted to know about privacy impact assessments but where afraid to ask
PON Congres 13 Oktober 2016 Everything you always wanted to know about privacy impact assessments but where afraid to ask Albert Holl Introduction Strategy, Governance, & People Digital security assessment
More informationFROM ERP TO COBIT MOVING TOWARD MATURE OF- THE-SHELF INFORMATION SYSTEMS. A Toy Example A Small Detergent Manufacturing Co.
FROM ERP TO COBIT MOVING TOWARD MATURE OF- THE-SHELF INFORMATION SYSTEMS Armin Shmilovici and Eli Rohn Department of Information Systems Engineering Ben-Gurion University, Israel {armin, elirohn}@bgu.ac.il
More informationChapter 7: Quality Project Review
Chapter 7: Quality Project Review Focus: This discussion addresses the quality project review, a scheduled, formal review that centers on project performance and quality metrics and which raises broad
More informationAbstract. 1 Introduction
TRACE supervision system for dispatching and passenger information M. Renkema, H. Vas Visser Railverkeerssystemen, Holland Railconsult, Utrecht, The Netherlands Abstract This paper describes the TRACE
More informationUIC Railway Application Guide
UIC ASSET MANAGEMENT WORKING GROUP UIC Railway Application Guide Practical implementation of Asset Management through ISO 55001 November 2016 ISBN 978-2-7461-2521-6 Warning No part of this publication
More informationOrganizational Issues in Asset Management Water System Assets Example
Organizational Issues in Asset Management Water System Assets Example Is Asset Management ning a Technological Challenge Or an Organizational Challenge? February 19, 2001 Darin Thomas Finkbeiner, Pettis
More informationINTERNATIONAL FINANCE CORPORATION TERMS OF REFERENCE
INTERNATIONAL FINANCE CORPORATION TERMS OF REFERENCE Position: Project: Region: Sector: Manager: Dairy Consultant (a firm) Ukraine Dairy Supply Chain Development ECA, Ukraine Animal Protein Regional Lead,
More informationLEADING MARKETING (60 Credits)
LEADING MARKETING (60 Credits) A Route to Chartered Marketer By the end of Stage 2 candidates should be able to: Demonstrate a critical awareness of current and emerging issues in marketing that is informed
More informationDevelopment of a Unified Water Sector Strategy for Gulf Cooperation Council of Arab Member States
Development of a Unified Water Sector Strategy for Gulf Cooperation Council of Arab Member States Regional Workshop on Climate Change Mainstreaming Capacity Building for Water Resources Management Strategies
More informationDigital Transformation with Enterprise Digital Twins
Digital Transformation with Enterprise Digital Twins TRENDS, DIRECTIONS AND ROADMAP Michiel Jorna Director Transformation Solutions Asia, Pacific & Japan INNOVATION TOUR 2018 June 7 Sydney 2018 Software
More informationUsing railml for Exchanging Timetable Data Experiences from the PAIP Project. Alexander Schmidt Paris, May 3, 2017
Using railml for Exchanging Timetable Data Experiences from the PAIP Project Alexander Schmidt Paris, May 3, 2017 Architecture Principles at SBB. Reuse, Rent, Buy or Make for new applications We share
More informationDeveloping the Long Island Rail Road Roadmap to Advance Asset Management Capability
Developing the Long Island Rail Road Roadmap to Advance Asset Management Capability TRB 11 th National Conference on Transportation Asset Management July 12, 2016 Presentation Overview LIRR Context Objectives
More informationTai Calon Board - Development and Training Programme Timetable
Tai Calon Board - Development and Training Programme Timetable Month 1 The Effective Board Member - Delivery by External Consultant Aimed particularly at new Board members but a useful refresher for all
More information3. OBJECTIVES PURSUED BY THIS WORK PROGRAMME AND THE FUNDING PRIORITIES:
3. OBJECTIVES PURSUED BY THIS WORK PROGRAMME AND THE FUNDING PRIORITIES: 3.1.3. Rail interoperability including interoperability of the Rail Freight Corridors Priority open only to the Cohesion Member
More informationAsset Register for Compliance
Asset Register for Compliance Kobie van Rooy Powertech System Integrators Kobie.vanrooy@ptsi.co.za Add Company Logo HERE Asset Management The term asset management is defined by the PAS 55 industry standard
More informationSoa Readiness Assessment, a New Method
ISSN : 8-96, Vol., Issue 8( Version ), August 0, pp.- RESEARCH ARTICLE OPEN ACCESS Soa Readiness Assessment, a New Method Ali Mirarab, Najmeh Ghasemi Fard and Abdol Reza Rasouli Kenari Electrical and Computer
More informationPortfolio Management Professional (PfMP ) Certification preparatory workshop Course Outline
Portfolio Management Professional (PfMP ) Certification preparatory workshop Course Outline Three days 21 PDUs This outline describes the coverage of the Portfolio Management Professional (PfMP ) Certification
More informationGap Analysis Checklist & Transition Guide. OHSAS 18001:2007 to ISO 45001:2018
Gap Analysis Checklist & Transition Guide Introduction Although the introduction of ISO 45001:2018 brings a new standard into effect, most of its basic principles are already formulated in OHSAS. The new
More informationINTERNATIONAL FINANCE CORPORATION TERMS OF REFERENCE
INTERNATIONAL FINANCE CORPORATION TERMS OF REFERENCE Position: Project: Region: Sector: Manager: Dairy Consultant (a firm) Ukraine Dairy Supply Chain Development ECA, Ukraine Animal Protein Regional Lead,
More informationTEMPLATE. Asset Management. Assetivity
TEMPLATE Asset Management Assetivity EXECUTIVE SUMMARY This section provides an overview of the Strategic Asset Management Plan (SAMP) including: Purpose of the document Overall strategy statement List
More informationProvisionally registered with the Department of Higher Education and Training as a private higher education institution under the Higher Education
Provisionally registered with the Department of Higher Education and Training as a private higher education institution under the Higher Education Act, 1997 Provisional Registration Certificate No.: 2014/HE07/007).
More informationEuroMaintenance 2014 CONGRESS PROCEEDINGS May 5 7, Helsinki, Finland. Edition 3 ISBN
EuroMaintenance 2014 CONGRESS PROCEEDINGS May 5 7, Helsinki, Finland 22 nd European Congress & Expo on Maintenance and Asset Management 6 th World Congress & Global Forum on Maintenance and Asset Management
More informationTexas Department of Human Services Project Management & Repository System (PMRS) 1
Texas Department of Human Services Project Management & Repository System (PMRS) 1 Nomination Form Title of Nomination: Project Management and Repository System (PMRS) Project/System Manager: Jerry Olson
More informationUNIVERSITY EFFICIENCY HUB SELF-EVALUATION QUESTIONNAIRE PART 1. EFFICIENCY LEADERSHIP, GOVERNANCE AND STRATEGY
UNIVERSITY EFFICIENCY HUB SELF-EVALUATION QUESTIONNAIRE PART 1. EFFICIENCY LEADERSHIP, GOVERNANCE AND STRATEGY 1.1 Is efficiency or effectiveness specifically addressed or referenced in the strategic plan
More informationDOCUMENTS AND RECORDS MANAGEMENT COMPLIANCE
DOCUMENTS AND RECORDS MANAGEMENT COMPLIANCE SECTOR / ADMINSTRATION AND SECRETARIAL NON-TECHNICAL & CERTIFIED TRAINING COURSE This programme covers the strategies, tools, and technologies used to capture,
More informationScope Management. 2. Meetings 2. Requirements Management Plan 3. EEF 4.OPA
Scope Management 5.1 Plan Scope Management: The process of creating scope management plan that documents how project scope will be defined, validated and controlled # Requirement: Condition or capability
More informationProvisionally registered with the Department of Higher Education and Training as a private higher education institution under the Higher Education
Provisionally registered with the Department of Higher Education and Training as a private higher education institution under the Higher Education Act, 1997 Provisional Registration Certificate No.: 2014/HE07/007).
More informationEnergy Culture. Low hanging fruit for businesses? Evert Bevernage 1 December 2011
Low hanging fruit for businesses? Evert Bevernage Introduction Det Norske Veritas Energy Efficiency Consultant: - Technical assessments - Non-technical assessments Based in Antwerp, Belgium 2 Savings potential
More informationGlobal Aviation Safety Roadmap Focus Area 7: Inconsistent use of Safety Management Systems (SMS)
Global Aviation Safety Roadmap Focus Area 7: Inconsistent use of Safety Management Systems (SMS) Step 1 Step 2 Step 3 Step 4 Select the Region for Analysis Key Stakeholders Determine the Safety Strengths
More informationTOGAF 9.1 Phases E-H & Requirements Management
TOGAF 9.1 Phases E-H & Requirements Management By: Samuel Mandebvu Sources: 1. Primary Slide Deck => Slide share @ https://www.slideshare.net/sammydhi01/learn-togaf-91-in-100-slides 1. D Truex s slide
More informationEnvironmental Management System Guidance
Environmental Management System Guidance Table of Contents Environmental Management System Guidance 1 Introduction 3 2 Gap Analysis 4 3 Implementation & Development 6 4 About Your Organization 7 4.1 Organizational
More informationPureEngage Cloud Reporting Guide. Reporting in the cloud
PureEngage Cloud Reporting Guide Reporting in the cloud 7/19/2018 Contents 1 Reporting in the cloud 1.1 What kind of reports are available in Genesys PureEngage Cloud? 1.2 How can I access real-time information?
More informationChapter 8: THE MARKETING PLAN. Chapter 11: Strategic Leadership
Chapter 8: THE MARKETING PLAN Learning outcomes After reading this chapter, you will be able to: Plan segmentation, targeting, and positioning Plan direction, objectives and marketing support Develop marketing
More informationStrategic Marketing is a 15-credit mandatory module which sits within the suite of Level 6 modules.
Module Specification: Strategic Marketing Strategic Marketing is a 15-credit mandatory module which sits within the suite of Level 6 modules. To gain the CIM Level 6 Diploma in Professional Marketing a
More informationSFJ HI1. Plan, implement and manage the sharing of knowledge and. practice to inform innovation and improve service delivery
good practice to inform innovation and improve service Overview This standard is about sharing knowledge and good practice within and between organisations to inform and improve practice and service. It
More informationMeasuring and Improving Process Capabilities Best Practices
Measuring and Improving Process Capabilities Best Practices Jyoti M Bhat, (mailto:jyotimb@infy.com) Anoop Kumar (mailto:anoop_kumar@infy.com) Infosys Technologies Limited Electronics City, Bangalore 561
More informationBRICKENDON QUALITY MATURITY MODEL AND KEY PERFORMANCE INDICATORS BRICKENDON
BRICKENDON QUALITY MATURITY MODEL AND KEY PERFORMANCE INDICATORS BRICKENDON CHALLENGES OF TRADITIONAL APPROACH TO SOFTWARE QA LONG TIME TO MARKET Traditional approach to software development means long
More informationTranslate stakeholder needs into strategy. Governance is about negotiating and deciding amongst different stakeholders value interests.
Principles Principle 1 - Meeting stakeholder needs The governing body is ultimately responsible for setting the direction of the organisation and needs to account to stakeholders specifically owners or
More informationJanuary 2017 INTEGRATED REPORTING
January 2017 INTEGRATED REPORTING INTRODUCTION The reality, and not merely the economic one, that we are experiencing is made up of an increasing number of dimensions that are mutually linked and intertwined
More informationPeter Way PSM Chair NAMS.AU - IPWEA Implementing ISO to Enhance Management of Assets
Engineering Management Peter Way PSM Chair NAMS.AU - IPWEA Implementing ISO 55000 to Enhance Management of Assets Implementing ISO 55000 to enhance Management of Assets Can these new ISO Standards help
More informationAnatomy of a firm. Strategic Plan write-up and implementation. Role of systems. Strategy process
Anatomy of a firm Strategic Plan write-up and Al Lee tangible Policies Legal docs Capabilities Resources People Will Vision Enterprise intangible Direction Goal Reason for being Structure Systems Sub-systems
More informationTHEFUTURERAILWAY THE INDUSTRY S RAIL TECHNICAL STRATEGY 2012 WHOLE-SYSTEM APPROACH
65 WHOLE-SYSTEM APPROACH Specifying assets in a whole-system context and a whole-life perspective, they will initially cost more......but the components will work well together, the system will be reliable
More informationChecklist for Internal Audit Organisational Set Up
Checklist for Internal Audit Organisational Set Up Objective Procedures to check and correct activities are a crucial part of every management system also within the Integrated Management System. One of
More informationChecklist for Internal Audit Organisational Set Up
Checklist for Internal Audit Organisational Set Up Objective Procedures to check and correct activities are a crucial part of every management system also within the Integrated Management System. One of
More informationFOR PUBLIC TRANSPORT
TAIT UNIFY SOLUTIONS UNIFYING CRITICAL COMMUNICATIONS FOR PUBLIC TRANSPORT Tait Limited 2017. MAKING EVERY JOURNEY MATTER Public Transport brings a vital service to communities, providing safe, affordable
More informationUsing Metrics to Improve Your Third-Party Risk Management Program
Using Metrics to Improve Your Third-Party Risk Management Program Presented by Randy Stephens & Michael Volkov Copyright 2017 NAVEX Global, Inc. All Rights Reserved. Page 0 Agenda NAVEX Global s 2017 Third-Party
More informationCertified Internal Auditor - Part 1, The Internal Audit Activity's Role in Governance, Risk, and Control
IIA IIA-CIA-Part1 Certified Internal Auditor - Part 1, The Internal Audit Activity's Role in Governance, Risk, and Control https://killexams.com/pass4sure/exam-detail/iia-cia-part1 Question: 555 During
More informationSAP Benchmarking and Best Practices Program Overview
SAP Benchmarking and Best Practices Program Overview SAP Benchmarking Designed to get Actionable Results Strategic Service by SAP Value Engineering,launched end of 2004 jointly with ASUG (America s SAP
More informationManagement Job Evaluation Management Job Evaluation Plan (MJEP)
Management Job Evaluation Management Job Evaluation Plan (MJEP) 1 Job Evaluation What is Job Evaluation? Job evaluation is a systematic review and analysis of job responsibilities, relationships and requirements
More informationCHAPTER 5 (Study unit 5) Evaluating Work: Job Evaluation
COMPENSATION MANAGEMENT CHAPTER 5 (Study unit 5) Evaluating Work: Job Evaluation Chapter Topics Job-Based Structures: Job Evaluation Defining Job Evaluation: Content, Value, and External Market Links How-to
More informationCOPYRIGHTED MATERIAL. Systems fundamentals 1. Systems characteristics and considerations 33. Introduction 2. Business processes 34
Contents About the authors iii Preface xi Part 1 Systems fundamentals 1 chapter 1 Introduction 2 Introduction 3 1.1 What is an accounting information system? 4 Accounting 4 1.2 Data and information explained
More informationSafety Perception / Cultural Surveys
Safety Perception / Cultural Surveys believes in incorporating safety, health, environmental and system management principles that address total integration, thus ensuring continuous improvement, equal
More informationISO Your implementation guide
ISO 55001 Your implementation guide Optimize the value from your assets with ISO 55001 Don t let the management of costly and complex assets become a burden to your organization.. ISO 55001 can help you
More informationLong-Term Digital Preservation (LTDP) Assessment from Audit to Maturity Model
Long-Term Digital Preservation (LTDP) Assessment from Audit to Maturity Model Shimon Agassi, Matthew Callery, Michael Factor, Dalit Naor, Shahar Ronen September 2008 http://www.haifa.il.ibm.com/projects/storage/ltdp/index.shtml
More informationGateway to European Rail Infrastructure. UIC ebusiness Conference. October 12 th 2006
Gateway to European Rail Infrastructure UIC ebusiness Conference October 12 th 2006 1 The Association RailNetEurope is an Association of European Infrastructure Managers to promote international railway
More informationEnterprise Risk Management
Enterprise Risk Management A Roadmap For Implementation June 12, 2018 Presented by: Speaker Name Marianne Turnbull CohnReznick LLP 4 Becker Farm Road Roseland, NJ 07068 P: 973-228-3500 E:marianne.turnbull@cohnreznick.com
More informationBachelor of Business International Hotel & Resort Management
Bachelor of Business International Hotel & Resort Unit Name Unit Purpose campus Hours Scheduled classes Credit points BBC 101 Accounting Fundamentals BBC 102 & Leadership BBC 103 Business Communication
More informationQuality Management System Guidance. ISO 9001:2015 Clause-by-clause Interpretation
Quality Management System Guidance ISO 9001:2015 Clause-by-clause Interpretation Table of Contents 1 INTRODUCTION... 4 1.1 IMPLEMENTATION & DEVELOPMENT... 5 1.2 MANAGING THE CHANGE... 5 1.3 TOP MANAGEMENT
More informationProcess Management Framework
Process Management Framework Responsible Owner: Business Improvement Coordinator Date: February 2013 UNCONTROLLED DOCUMENT WHEN PRINTED Please refer to the BMS for the latest version Executive Summary
More informationQUALITY - THE END OR JUST THE BEGINNING?
The Sixth QHE Seminar The End of Quality? Birmingham, 25 26 May, 2001 QUALITY - THE END OR JUST THE BEGINNING? 1 INTRODUCTION This paper builds on the work of the author and a consortium of collaborators
More informationStructural Diagram Design chart Model 2.pdf. Table of contents
Structural Diagram Design chart Model 2.pdf Table of contents 1. Organizational chart Model 2 1 1.1. Model graphic: 1 1.2. Objects 2 1.2.1. CPA & Law Firm 2 1.2.2. Data Security & Intelligence 2 1.2.3.
More informationThe Course Modules for TOGAF Online Certification Training: 1. Introduction. TOGAF Structure. 2. Core Concepts
The Course Modules for TOGAF Online Certification Training: 1. Introduction An introduction to TOGAF TOGAF Structure 2. Core Concepts Definition of key concepts and terms Architecture Framework 3. ADM
More informationCIBSE Certification Guide to the Energy Savings Opportunity Scheme (ESOS) April 2018
CIBSE Certification Guide to the Energy Savings Opportunity Scheme (ESOS) Contents What is ESOS?... 1 Does my organisation need to comply?... 1 What do organisations need to do to comply with ESOS?...
More informationJohn Liuzzi, CBCP, CBRITP National Director, Business Continuity Southern Glazer s Wine and Spirits
John Liuzzi, CBCP, CBRITP National Director, Business Continuity Southern Glazer s Wine and Spirits johnliuzzi@sgws.com Introduction So how do you gain alignment and executive support? With the ever-increasing
More informationLeveraging Predictive Analytics to Turn Big Data into Operations Improvement
Leveraging Predictive Analytics to Turn Big Data into Operations Improvement Pete Nelson Solutions Architect, Quintiq Radnor, PA Key presentation takeaways Key presentation takeaways Predictive analytics
More informationMake FM Count. TITLE (MAIN) Chris Hodges, P.E., CFM, FRICS, IFMA Fellow. Title (sub) Mark Sekula, CFM, FMP, SFP, IFMA Fellow
Make FM Count Mark Sekula, CFM, FMP, SFP, IFMA Fellow TITLE (MAIN) Chris Hodges, P.E., CFM, FRICS, IFMA Fellow Title (sub) The environment facility managers serve is fundamentally changing. It s your role
More informationSFJHI1 - SQA Unit Code F33C 04 Plan, implement and manage the sharing of knowledge and good practice to inform innovation and improve service delivery
Plan, implement and manage the sharing of knowledge and good practice to inform innovation and improve service delivery Overview This Unit is about sharing knowledge and good practice both within organisations
More informationIntegrated School Information System
Integrated School Information System December 2011 ISIS OVERVIEW ISIS is a school management software, developed by DataRays; the program provides the computerization and automation of the various tasks
More informationand the Digital Domain The value of the company is depending on the context of data
and the Digital Domain The value of the company is depending on the context of data Vision The internet is a digital ecosystem. A festival or dj and it s or his fans are all digitally connected and influence
More informationThe Information Systems Interoperability Maturity Model (ISIMM): Towards Standardizing Technical Interoperability and Assessment within Government
I.J. Information Engineering and Electronic Business, 2012, 5, 36-41 Published Online October 2012 in MECS (http://www.mecs-press.org/) DOI: 10.5815/ijieeb.2012.05.05 The Information Systems Interoperability
More informationAPI 1173: Starting at the Beginning
25 years strategies for complex organizations API 1173: Starting at the Beginning AGA PSMS Workshop March 1-2, 2016 Dallas, TX Davies Consulting Risk & Asset Management Infrastructure Investment Analysis
More informationFive Tips: How to measure the value of your internal audit department
Five Tips: How to measure the value of your internal audit department By Connie Valencia CIA, CCSA, principal with Elevate Consulting and Gaurav Kapoor COO with MetricStream Measuring the performance of
More informationContinuous Improvement Toolkit. Improvement Roadmaps. Continuous Improvement Toolkit.
Continuous Improvement Toolkit Improvement Roadmaps 0 1 2 3 The Continuous Improvement Map Managing Risk FMEA Understanding Performance Check Sheets Data Collection PDPC RAID Log* Risk Assessment* Fault
More informationUK S APPROACH TO MEETING THE REQUIREMENTS OF ARTICLE 8 ENERGY SAVINGS OPPORTUNITY SCHEME (ESOS) IAN BOYLAN CEM CEA CMVP C.ENG
UK S APPROACH TO MEETING THE REQUIREMENTS OF ARTICLE 8 ENERGY SAVINGS OPPORTUNITY SCHEME (ESOS) IAN BOYLAN CEM CEA CMVP C.ENG ENERGY SAVINGS OPPORTUNITY SCHEME (ESOS) Transposes Article 8 Energy Audits
More informationOAK FOUNDATION GOVERNANCE ASSESSMENT TOOL SECTION 1 GUIDELINES FOR USE
OAK FOUNDATION GOVERNANCE ASSESSMENT TOOL SECTION 1 GUIDELINES FOR USE What is the tool? It is a framework that can be applied during the due diligence process to gain an overview and understanding of
More informationRisk Advisory SERVICES. A holistic approach to implementing effective governance, managing risk and maintaining compliance
Risk Advisory SERVICES A holistic approach to implementing effective governance, managing risk and maintaining compliance Contents Weaver's Risk Advisory Services 1 Enterprise Risk Management 4 Assessing
More informationChapter 17. Outline programme design
OUTLINE PROGRAMME DESIGN Chapter Outline programme design The outline programme design is a rapidly produced plan of action for the selected sanitation sectors. This is developed by key agency staff and
More informationMicrosoft Office Project 2010 Basic Course 01: Getting Started
Microsoft Office Project 2010 Basic Course 01: Getting Started Slide 1 Topic A Project Management Concepts Slide 2 Project Constraints Slide 3 Phases of Project Management The initial Phase Initiating
More informationRealizing Development Objectives of the IP System: LDC Priority Needs for Technical and Financial Cooperation
Realizing Development Objectives of the IP System: LDC Priority Needs for Technical and Financial Cooperation WTO Strategic Planning Workshop WIPO s Contribution to the Elaboration and Implementation of
More informationLa Niaque A Vehicle Drives Top Notch Performance
A Complete Process Excellence Life Cycle S. Rangaraj* & B. Jayadevan** Key words: Active Process Management, Command Center, Global Process Model, Diamond KPI, Overall Asset Effectiveness, Benchmarking.
More informationProject Management Auditing Guide
Project Management Auditing Guide Index Page 1.0 Objective 4 2.0 Risks 4 3.0 Safeguards and Controls 3.1.Project Characteristics 4 3.2.Quality in Project Management Process 4 3.3.Strategic Processes 5
More informationThe SAM Optimization Model. Control. Optimize. Grow SAM SOFTWARE ASSET MANAGEMENT
The Optimization Model Control. Optimize. Grow The Optimization Model In an ever-changing global marketplace, your company is looking for every opportunity to gain a competitive advantage and simultaneously
More informationDISTRIBUTION SYSTEM ASSET MANAGEMENT APPROACH
EB-0-0 Exhibit D Schedule Page of DISTRIBUTION SYSTEM ASSET MANAGEMENT APPROACH This document provides a summary of THESL s asset management approach. The first two sections introduce the scope of asset