1 DYASON S KLIP SOLAR ENERGY FACILITY 1 (PTY) LTD. STORMWATER MANAGEMENT PLAN Reference: A43448 Prepared for: ATLANTIC RENEWABLE ENERGY PARTNERS (Pty) Ltd Revision: 1 3 November 2014
2 Document control record Document prepared by: Aurecon South Africa (Pty) Ltd Aurecon Centre 1 Century City Drive Waterford Precinct Century City, Cape Town, 7441 T F E W capetown@aurecongroup.com A person using Aurecon documents or data accepts the risk of: a) Using the documents or data in electronic form without requesting and checking them for accuracy against the original hard copy version. b) Using the documents or data for any purpose not agreed to in writing by Aurecon. Document control Report title STORMWATER MANAGEMENT PLAN Document ID A43448/SMP/1 Dyason s Klip Project number A43448 File path Client P:\Projects\_RSK Projects\PRCPTENE03\A43448 Solek Solar Site Transport Studies\03 PRJ Del\6 REP\Dyasonsklip\A43448 DyasonsKlipSolarEnergyFacility1_StormwaterManagementPlan_Oct2014-R1.docx ATLANTIC RENEWABLE ENERGY PARTNERS (Pty) Ltd Client contact Thys van der Hout Rev Date Revision details/status Prepared by Author Verifier Approver 0 30 October 2014 Draft HS HS JHBC JHBC 1 3 November 2014 Final HS HS JHBC JHBC Current Revision 1 Approval Author signature Name Title Approver signature Name Title 3 November 2014 Revision 1
3 DYASON S KLIP SOLAR ENERGY FACILITY 1 (PTY) LTD. STORMWATER MANAGEMENT PLAN Date 3 November 2014 Reference A43448 Revision 1 Aurecon South Africa (Pty) Ltd Aurecon Centre 1 Century City Drive Waterford Precinct Century City, Cape Town, 7441 T F E W capetown@aurecongroup.com 3 November 2014 Revision 1
4 Contents DYASON S KLIP SOLAR ENERGY FACILITY 1 (PTY) LTD. 3 1 INTRODUCTION 1 2 DEFINITIONS / ASSUMPTIONS 3 3 SITE STORMWATER Climate and Land Use Drainage Characteristics Stormwater Calculation Proposed Measures for Stormwater Management 11 4 CONCLUSION 13 Figures Figure 1: Key Plan 1 Figure 2: Typical Vegetation 4 Figure 3: Average Rainfall 5 Figure 4: Average Temperature 5 Figure 5: Drainage Characteristics 6 Figure 6: PV Area Main Catchment Areas. 7 Figure 7: Flow Distribution Facility 9 Figure 8: Access Road - Drainage 10 Figure 9: Typical Detail Berm 11 Figure 10: Typical Detail Outlet with Erosion Protection 12 Tables Table 1: Catchment Areas 7 Table 2: Runoff Coefficient 8 Table 3: Runoff Calculations 9 3 November 2014 Revision 1 Page 1
5 1 INTRODUCTION Atlantic Renewable Energy Partners (Pty) Ltd has engaged Aurecon to prepare a Stormwater Management Plan for the proposed Dyason s Klip Solar Energy Facility 1 (Pty) Ltd. approximately 22km south-west of Upington on the Rem of Farm 454 Dyason s Klip next to the N14. The site location is indicated on the Key Plan below: NAMIBIA N14 VRYBURG N10 PRIESKA KAKAMAS Dyason s Klip Solar Energy Facility 1 (Pty) Ltd. Rem of Farm 454 KENHARDT Figure 1: Key Plan The solar site will be developed to 75 MW capacity. 3 November 2014 Revision 1 Page 1
6 The scope of the study is to prepare a conceptual Stormwater Management Plan (SMP) to support the Environmental Assessment Process of the proposed Dyason s Klip Solar Energy Facility 1 (Pty) Ltd. The scope of the Stormwater Management Plan (SMP) includes inter alia: Determine catchment area for the project site. Estimate floods expected for the catchment. Confirm existing drainage pattern and streams. Propose drainage elements such as side drains, outlets and other mitigation measures to accommodate the flows. Prepare a conceptual drainage layout plan and strategy for the project site. 3 November 2014 Revision 1 Page 2
7 2 DEFINITIONS / ASSUMPTIONS The following assumptions are made (guided by the client requirements): The flood calculation method used Rational Method. The recurrence period normally applied for this type of development to reduce risk of increased maintenance during the operational phase, is 1:50 years. As a principle to minimise earthworks and to minimise changes to the existing drainage patterns, the drainage layout was based on the existing contours. The adjustments to grade and angle for the PV panels is assumed to be taken up by adjustments in the foundation levels. 3 November 2014 Revision 1 Page 3
8 3 SITE STORMWATER 3.1 Climate and Land Use The proposed site is located in a semi-arid area with typically Karoo type of vegetation. Figure 2: Typical Vegetation The main economic activity in the area is agriculture with cattle, sheep and goat farming as well as table grapes and dates, but game farming is also popular. 3 November 2014 Revision 1 Page 4
9 The area experiences summer rainfall in the form of thunderstorms with a Mean Annual Precipitation of below 183mm per annum. Figure 3: Average Rainfall The monthly distribution of average daily maximum temperatures shows that the average midday temperatures for Upington range from 23 C in June to almost 40 C in January. The region is the coldest during July when the mercury drops close to 0 C during the night. Figure 4: Average Temperature 3 November 2014 Revision 1 Page 5
10 3.2 Drainage Characteristics The proposed site is generally flat with gradients ranging from below 0,5% to 1,0% through the site. The PV area generally drains towards the South-East. Dyason s Klip Solar Energy Facility 1 (Pty) Ltd. Figure 5: Drainage Characteristics 3 November 2014 Revision 1 Page 6
11 3.2.1 Drainage Patterns PV Area A1 A2 A3 Dyason s Klip Solar Energy Facility 1 (Pty) Ltd. Figure 6: PV Area Main Catchment Areas. It should be noted that in absence of detailed topographical information, 1:50000 topographical map data was used to establish the drainage patterns. The catchment areas identified are: Table 1: Catchment Areas Catchment ID Area (km²) A A A Access Road Since the access road is directly off the Provincial road, no provision for drainage is expected except for provision at the intersection. 3 November 2014 Revision 1 Page 7
12 3.2.2 Runoff Characteristics The scares vegetation in combination with flat grades and semi-permeable soils yield low runoff coefficients. 3.3 Stormwater Calculation Method and Assumptions For purposes of the SMP the rational method was used. The runoff parameters were based on the following: Return Period A 1:50 year return period was considered. It should be stated that normally a 1:20 year return period should limit risks but a 1:50 year return period will reduce risk for damage and higher maintenance effort further with up to 25% Runoff Coefficient The runoff coefficient was based on the following: Table 2: Runoff Coefficient Slope % Area Permeability % Applied Vegetation % Applied < 3% 100% Very Dense Woods 3% to 10% Permeable 50% Cultivated land 50% 10% to 30% Semi Permeable 50% Grassland 50% >30% Non-permeable Rock The runoff coefficient calculated and used in the flood estimation was 0, Time of Concentration Time of concentration is calculated by the widely used USBR stream flow formula: = 0, Where = Time of Concentration [hours], = Length of waterway [km], = average slope Point Intensity Point intensity is based on standard time of concentration rain fall depth graphs. 3 November 2014 Revision 1 Page 8
13 3.3.2 Runoff PV Area The runoff distribution for the respective catchment areas will be dictated by the layout of the PV area as well as internal roads and channels. However the PV area (which is normally a combination of blocks of similar size) should preferably be orientated in such a way, to minimise impact on natural drainage patterns. A typical configuration (subject to a final site development plan) is indicated in the following figure: LEGEND Drainage Ditch Existing Watercourse Roads Crossing Figure 7: Flow Distribution Facility There are three dominant watercourses crossing through the site and into the main Helbrandkloof stream butting the site on the southern side. These watercourses should be kept clear to ensure minimum interference with drainage patterns. The 1:50 year runoff per catchment area is indicated in the following table: Table 3: Runoff Calculations Time of Peak Runoff Intensity Area Catchment ID Concentration Flow Coefficient (mm/h) (min) (km²) (m3/s) A A A November 2014 Revision 1 Page 9
14 Access Road The position of the access road was not finalised at compilation of this report. However the recommended access is the existing access from N14/4 at km located on Farm 454 Dyason s Klip only. The route follows the watershed for a significant part of the road with only a few small streams crossing at regular intervals. Crossings should be at approximately 500m intervals. The only major crossing is at the entrance to the proposed solar facility where the Helbrandkloof stream needs to be crossed. The approach to stormwater management for the alternative routes (if selected) will be similar. The catchment area for the access road is indicated in the following figure: Legend National Road Provincial Road New Road On Existing Dyason s Klip Solar Energy Facility 1 (Pty) Ltd. Figure 8: Access Road - Drainage Flow and Outlet Conditions The flow velocity and depth at the various outlets will have to be confirmed during detail design stage. Generally, for slopes of between 0,5% and 1%, the average velocity is in the order of 1,2 m/s to 1,6 m/s with depths of 0,3m to 0,5m deep. The flows would generally not cause any serious erosion but appropriate measures should be implemented at outlets to reduce any risk of damage. 3 November 2014 Revision 1 Page 10
15 3.4 Proposed Measures for Stormwater Management General The existing drainage patterns and characteristics should be preserved as far as possible. To that end it is suggested that existing contours (and vegetation) be retained as far as possible and that internal roads are kept to minimum standards. Drainage structures would generally be small diameter pipes (encased in concrete because of the low fill anticipated) or concrete drifts Side Drains In general open drains will be provided along the proposed internal roads or between PV panels. The open drains would be gravel drains with concrete protection at crossings where required Access Road Road drainage at access position to suit existing drainage in National road reserve would be required. Side drains will be provided along some sections of the access road channelling water to the nearest drainage crossing Berms Berms are proposed to prevent external water from entering the PV area and directing flow to suitable areas of release. Figure 9: Typical Detail Berm Outlets All culverts located on the access road have concrete outlets with erosion protection. Side drain outlets should be terminated with suitable erosion protection to reduce the velocity and flow depth. 3 November 2014 Revision 1 Page 11
16 Figure 10: Typical Detail Outlet with Erosion Protection 3 November 2014 Revision 1 Page 12
17 4 CONCLUSION The proposed Stormwater Management Plan presents a proposed strategy for drainage elements required to accommodate the stormwater through the site, between the PV panels and for the access road to the facility. It follows the existing contours to minimise impacts on the existing drainage patterns. The proposed drainage elements should be included in the detailed design to ensure effective management of the stormwater. 3 November 2014 Revision 1 Page 13
18 Aurecon South Africa (Pty) Ltd Aurecon Centre 1 Century City Drive Waterford Precinct Century City, Cape Town, 7441 T F E capetown@aurecongroup.com W Aurecon offices are located in: Angola, Australia, Botswana, China, Ethiopia, Ghana, Hong Kong, Indonesia, Lesotho, Libya, Malawi, Mozambique, Namibia, New Zealand, Nigeria, Philippines, Qatar, Singapore, South Africa, Swaziland, Tanzania, Thailand, Uganda, United Arab Emirates, Vietnam.
DYASON S KLIP SOLAR ENERGY FACILITY 1 (PTY) LTD. TRANSPORT STUDY AND TRAFFIC MANAGEMENT PLAN
DYASON S KLIP SOLAR ENERGY FACILITY 1 (PTY) LTD. TRANSPORT STUDY AND TRAFFIC MANAGEMENT PLAN Reference: A43448 Prepared for: ATLANTIC RENEWABLE ENERGY PARTNERS (Pty) Ltd Revision: 1 4 November 2014 Document
More informationAPPENDIX C. Draft Erosion and Sediment Control Plan
APPENDIX C Draft Erosion and Sediment Control Plan Waikato Power Plant Draft Erosion and Sediment Control Plan Nova 20 June 2016 Revision: 1 Reference: 241157 Document control record Document prepared
More information17 September 2014 Revision: 1 Reference:
Project name Good Practice Notes: Treated Effluent Usage as a Non-Potable Water Source in Century City Building Developments Century City Properties Owners Association (CCPOA) 17 September 2014 Revision:
More informationProject: MOE Nationwide FLS - Avalon Block Accessibility Report
Project: MOE Nationwide FLS - Avalon Block Accessibility Report Reference: 246313 Prepared for: Ministry of Education Revision: A 28 September 2015 Document Control Record Document prepared by: Aurecon
More informationProject: MOE FLS Reference Designs for Standard Classroom Upgrade 2-storey Nelson Block
Project: MOE FLS Reference Designs for Standard Classroom Upgrade 2-storey Nelson Block Accessibility Report Reference: 246313 Prepared for: Ministry of Education Revision: D 2 September 2016 Document
More informationFonterra Studholme. Lighting Design Report
Fonterra Studholme Lighting Design Report Reference: 245718 Prepared for: Fonterra Revision: C 24 April 2015 Document Control Record Document prepared by: Aurecon New Zealand Limited Level 1, 102 Customhouse
More informationUMLALAZI-NKANDLA SMART GROWTH DEVELOPMENT CENTRE PROVISION OF CIVIL ENGINEERING SERVICES
UMLALAZI-NKANDLA SMART GROWTH DEVELOPMENT CENTRE PROVISION OF CIVIL ENGINEERING SERVICES PROPOSED STORMWATER RETICULATION DESIGN AND MANAGEMENT DATE: OCTOBER 2011 PREPARED FOR: PREPARED BY: DEPARTMENT
More information10(a) Bridge and culvert design information
10(a) Bridge and culvert design information The following information is required to accompany resource consent applications for bridges or culverts on waterways. Please answer all questions if possible.
More informationTemporary Watercourse Crossing: Culverts
Temporary Watercourse Crossing: Culverts DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent Symbol
More informationChapter 6. The Empirical version of the Rational Method
Chapter 6 The Empirical version of the Rational Method The Empirical version is named because the parameters it uses (apart from rainfall data) are arbitrary and are generally based on experience or observation
More informationThe Islamic University of Gaza- Civil Engineering Department Sanitary Engineering- ECIV 4325 L5. Storm water Management
The Islamic University of Gaza- Civil Engineering Department Sanitary Engineering- ECIV 4325 L5. Storm water Management Husam Al-Najar Storm water management : Collection System Design principles The Objectives
More informationTemporary Watercourse Crossing: Fords
Temporary Watercourse Crossing: Fords DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1]
More informationSTORM WATER MANAGEMENT REPORT
Silvercreek Junction STORM WATER MANAGEMENT REPORT Howitt Creek at the Silvercreek Parkway Site Guelph, Ontario August, 2008 TSH File 22304A-04 August 19, 2008 STORMWATER MANAGEMENT REPORT Howitt Creek
More informationMODULE 1 RUNOFF HYDROGRAPHS WORKSHEET 1. Precipitation
Watershed MODULE 1 RUNOFF HYDROGRAPHS WORKSHEET 1 A watershed is an area of land thaaptures rainfall and other precipitation and funnels it to a lake or stream or wetland. The area within the watershed
More informationCaulfield to Dandenong Level Crossing Removal Project
Large-scale digital evolution Caulfield to Dandenong Level Crossing Removal Project Melbourne At the crossing between paper and digital There s always a crossroad, a point in time where there s a noticeable
More informationNamib Lead & Zinc. Hydrological Assessment Report No S6-V1. December 2012
Namib Lead & Zinc Hydrological Assessment 733.14012.00001 December 2012 Namib Lead & Zinc Mining (Pty) Ltd 84 Dr Frans Indongo St, Windhoek West PO Box 81162, Olympia DOCUMENT INFORMATION Title Namib Lead
More informationAPPENDIX E ESTIMATING RUNOFF FROM SMALL WATERSHEDS
ESTIMATING RUNOFF FROM SMALL WATERSHEDS June 2011 THIS PAGE LEFT BLANK INTENTIONALLY. June 2011 TABLES Table E.1 Table E.2 Return Frequencies for Roadway Drainage Design Rational Method Values June 2011
More informationDRAINAGE & DESIGN OF DRAINAGE SYSTEM
Drainage on Highways DRAINAGE & DESIGN OF DRAINAGE SYSTEM P. R.D. Fernando Chartered Engineer B.Sc.(Hons), M.Eng. C.Eng., MIE(SL) Drainage Requirement of Highway Drainage System Introduction Drainage means
More informationWhat is runoff? Runoff. Runoff is often defined as the portion of rainfall, that runs over and under the soil surface toward the stream
What is runoff? Runoff Runoff is often defined as the portion of rainfall, that runs over and under the soil surface toward the stream 1 COMPONENTS OF Runoff or STREAM FLOW 2 Cont. The types of runoff
More informationBridge Planning Updates. Bridge Planning Practitioners Workshop April 2012
Bridge Planning Updates Bridge Planning Practitioners Workshop April 2012 Bridge Website Bridge Website Bridge Website Bridge Website BPG 11 Stormwater Management at Rural Bridges Released July 2010 Documents
More informationAPPENDIX I. Plan Reviewer Checklist
APPENDIX I Plan Reviewer Checklist PLAN REVIEW CHECKLIST Annual Standards and Specifications The ESC/SWM Plan clearly indicates the version of Virginia Tech Annual Standards and Specifications applicable.
More informationHighway Drainage 1- Storm Frequency and Runoff 1.1- Runoff Determination
Highway Drainage Proper drainage is a very important consideration in design of a highway. Inadequate drainage facilities can lead to premature deterioration of the highway and the development of adverse
More informationWater Resources Management Plan
P L Y M O U T H M I N N E S O T A Appendix D: The developed a to analyze and minimize the impact of existing and future development on the City s natural resources. It is important to the City to have
More informationCONSTRUCTION PLAN CHECKLIST
CONSTRUCTION PLAN CHECKLIST The design engineer is responsible for ensuring that plans submitted for city review are in accordance with this checklist. It is requested that the executed checklist be submitted
More informationAPPENDIX E APPENDIX E ESTIMATING RUNOFF FOR SMALL WATERSHEDS
APPENDIX E ESTIMATING RUNOFF FOR SMALL WATERSHEDS March 18, 2003 This page left blank intentionally. March 18, 2003 TABLES Table E.1 Table E.2 Return Frequencies for Roadway Drainage Design Rational Method
More informationTOWN OF MANCHESTER PLANNING AND ZONING COMMISSION Subdivision Application Minimum Submission Requirements
TOWN OF MANCHESTER PLANNING AND ZONING COMMISSION Subdivision Application Minimum Submission Requirements This checklist is to be completed and submitted with all Subdivision Applications. The Town reserves
More informationTemporary Stream Crossing
Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Objective
More informationTemporary Stream Crossing
Temporary Stream Crossing NS-4 Objectives EC Erosion Control SE Sediment Control TR Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution
More informationPRELIMINARY DRAINAGE STUDY
PRELIMINARY DRAINAGE STUDY For 34 th & J Residences 3402 J St. San Diego, CA 92102 A.P.N 545-250-08 Prepared By: Kenneth J. Discenza, P.E. Site Design Associates, Inc. 1016 Broadway, Suite A El Cajon,
More informationStorm Sewer Design - Introduction
Class 4 [1] Storm Sewer Design - Introduction As urban drainage can not be expected to accommodate all rainfall events, the first step in the design procedure is to select an appropriate design storm.
More informationTHE SMART WAY TO CONTROL OPEN CHANNEL FLOW COUNCIL CASE STUDIES. Greg Farrell & Josh Lopez. Geofabrics Australasia Pty Ltd
THE SMART WAY TO CONTROL OPEN CHANNEL FLOW COUNCIL CASE STUDIES Paper Presented by: Greg Farrell & Josh Lopez Authors: Greg Farrell, Development Manager, Josh Lopez, Technical Support Engineer, Geofabrics
More informationGold Coast. Rapid Transit. Hydrology and Hydraulics
Gold Coast Rapid Transit 19 Hydrology and Hydraulics Contents 1. Introduction 19 1 2. Source Data 19 2 3. Methodology 19 3 3.1 Drainage Upgrades 19 3 3.2 Period of Closure 19 6 4. Description of the Existing
More informationSTORM DRAINAGE DESIGN MANUAL
Appendix I STORM DRAINAGE DESIGN MANUAL by: SUNGATE DESIGN GROUP, P.A. GEN ERAL DESIGN STAN DARDS AN D POLICIES 1. STREET AND LOCAL DRAINAGE Discharge estimates for specified design storms shall be calculated
More informationLow Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control [1] Soil Treatment Permanent
Slope Drains DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control [1] Soil Treatment Permanent [1] Slope drains can act as outlet
More informationLow Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control [1] Soil Treatment Permanent
Slope Drains DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control [1] Soil Treatment Permanent [1] Slope drains can act as outlet
More informationZONING ORDINANCE FOR THE ZONED UNINCORPORATED AREAS ARTICLE 1500 OF PUTNAM COUNTY, WEST VIRGINIA Page 149 ARTICLE 1500 DRAINAGE AND STORM SEWERS
OF PUTNAM COUNTY, WEST VIRGINIA Page 149 ARTICLE 1500 DRAINAGE AND STORM SEWERS 1500.01 GENERAL REQUIREMENTS 1500.02 NATURE OF STORM WATER FACILITIES 1500.03 DRAINAGE EASEMENTS 1500.04 STORM WATER MANAGEMENT
More informationLAKE COUNTY HYDROLOGY DESIGN STANDARDS
LAKE COUNTY HYDROLOGY DESIGN STANDARDS Lake County Department of Public Works Water Resources Division 255 N. Forbes Street Lakeport, CA 95453 (707)263-2341 Adopted June 22, 1999 These Standards provide
More information3.5 Hydrology & Hydraulics
3.5 Hydrology & Hydraulics 3.5.1 Purpose The purpose of this section is to provide results from the analysis and assessment of the impact of the proposed Carmichael Rail Alignment (Option 11 Revision 1)
More informationReport. Inflow Design Flood Control System Plan St. Clair Power Plant St. Clair, Michigan. DTE Energy Company One Energy Plaza, Detroit, MI
Report Inflow Design Flood Control System Plan St. Clair Power Plant St. Clair, Michigan DTE Energy Company One Energy Plaza, Detroit, MI October 14, 2016 NTH Project No. 62-160047-04 NTH Consultants,
More informationSURFACE DRAINAGE SYSTEM FOR ROADS. Components of Surface Drainage System
Lecture Hour-49 UNIT 8 10CV755 HGD SURFACE DRAINAGE SYSTEM FOR ROADS Components of Surface Drainage System The surface water from the roadway and the adjoining land is to be collected and then disposed
More informationUnderstanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS)
Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS) Definitions SWPPP: Storm Water Pollution Prevention Plan BMP: Best Management Practice(s) to control pollution IDNR: Iowa Department
More informationDetailed Stormwater Management Report David Manchester Road
Detailed Stormwater Management Report David Manchester Road Prepared for: Nortrax Canada Inc. 189 Cardevco Road Carp, Ontario K0A 1L0 Prepared by: McIntosh Perry Consulting Engineers Ltd. 115 Walgreen
More informationAGRICULTURAL DRAINAGE CRITERIA
Drainage Order No. 535.100-2 November 2002 AGRICULTURAL DRAINAGE CRITERIA Introduction These criteria were developed to describe the level of drainage required to allow for good on-farm drainage. The criteria
More informationDESIGN BULLETIN #16/2003 (Revised July 2007) Drainage Guidelines for Highways Under Provincial Jurisdiction in Urban Areas.
Drainage Guidelines for Highways Under Provincial Jurisdiction in Urban Areas. July 2007 Update to Design Bulletin #16/2003: Added under Design Criteria Culverts of 600mm diameter are commonly used to
More informationCHAPTER 3 Environmental Guidelines for WATERCOURSE CROSSINGS GOVERNMENT OF NEWFOUNDLAND AND LABRADOR DEPARTMENT OF ENVIRONMENT AND LABOUR
GOVERNMENT OF NEWFOUNDLAND AND LABRADOR DEPARTMENT OF ENVIRONMENT AND LABOUR CHAPTER 3 Environmental Guidelines for WATERCOURSE CROSSINGS WATER RESOURCES MANAGEMENT DIVISION Water Investigations Section
More information6.0 Runoff. 6.1 Introduction. 6.2 Flood Control Design Runoff
October 2003, Revised February 2005 Chapter 6.0, Runoff Page 1 6.1 Introduction 6.0 Runoff The timing, peak rates of discharge, and volume of stormwater runoff are the primary considerations in the design
More informationPeer review of options for proposed crossings of Leongatha rail reserve, Clyde Railway Station and associated train stabling
Peer review of options for proposed crossings of Leongatha rail reserve, Clyde Railway Station and associated train stabling Peer Review Overview Report Reference: 239201.01 Prepared for: Metropolitan
More informationNames: ESS 315. Lab #6, Floods and Runoff Part I Flood frequency
Names: ESS 315 Lab #6, Floods and Runoff Part I Flood frequency A flood is any relatively high flow of water over land that is not normally under water. Floods occur at streams and rivers but can also
More informationLearning objectives. Upon successful completion of this lecture, the participants will be able to describe:
Solomon Seyoum Learning objectives Upon successful completion of this lecture, the participants will be able to describe: The different approaches for estimating peak runoff for urban drainage network
More informationAppendix 16 - Erosion and sediment control guidelines for earthworks
Appendix 16 - Erosion and sediment control guidelines for earthworks Contents Page 1.0 Introduction... 3 2.0 General guidelines... 3 3.0 Runoff control methods... 4 4.0 Sediment control methods... 5 5.0
More informationChapter 4. Drainage Report and Construction Drawing Submittal Requirements
4.0 Introduction The requirements presented in this section shall be used to aid the design engineer or applicant in the preparation of drainage reports, drainage studies, and construction drawings for
More informationTECHNICAL BULLETIN. Synthetic Turf Athletic Field Drainage Design Assistance
TECHNICAL BULLETIN Synthetic Turf Athletic Field Drainage Design Assistance The SportsEdge HQ geocomposite strip drain products are engineered specifically for use in synthetic turf athletic field base
More informationJEFFERSON COUNTY STORM WATER MANAGEMENT
JEFFERSON COUNTY STORM WATER MANAGEMENT B-210 Courthouse, Birmingham, Alabama 35203 Telephone: (205) 325-8741 Erosion and Sedimentation Control Measures for Commercial Projects (Plans Requirements) -All
More informationCIE4491 Lecture. Quantifying stormwater flow Rational method
CIE4491 Lecture. Quantifying stormwater flow Rational method 27-5-2014 Marie-claire ten Veldhuis, Watermanagement Department Delft University of Technology Challenge the future Robust method stationary
More informationManage Centre. Manage your IT operations from a single graphical interface
Manage Centre Manage your IT operations from a single graphical interface One place where you can see all your technology Technology services are getting more complex all the time. Hybrid IT and cloud
More informationConstruction Site Erosion Control and Phase II of the Stormwater Permit Program
Construction Site Erosion Control and Phase II of the Stormwater Permit Program Robert Pitt Department of Civil, Construction, and Environmental Engineering University of Alabama Tuscaloosa, AL In Georgia,
More informationState highway 1 Clarence to Oaro safety and amenity improvements Business case for implementation executive summary overlay NZ Transport Agency
State highway 1 Clarence to Oaro safety and amenity improvements Business case for implementation executive summary overlay NZ Transport Agency 27 June 2017 Revision: 1.0 Reference: 255928 Document control
More informationConstruction Site Erosion Control and Phase II of the Stormwater Permit Program
Construction Site Erosion Control and Phase II of the Stormwater Permit Program Robert Pitt Department of Civil, Construction, and Environmental Engineering University of Alabama Tuscaloosa, AL In Georgia,
More informationENVIRONMENTAL IMPACT ASSESSMENT: PROPOSED PHOTOVOLTAIC ENERGY PLANT ON FARM KLIPGATS PAN NEAR COPPERTON, NORTHERN CAPE
ENVIRONMENTAL IMPACT ASSESSMENT: PROPOSED PHOTOVOLTAIC ENERGY PLANT ON FARM KLIPGATS PAN NEAR COPPERTON, NORTHERN CAPE 1 MAY 2012 DEA REF. NO. 12/12/20/2501 NEAS REF. NO. DEAT/EIA/0000611/2011 EXECUTIVE
More informationCOOPER STREET, EPPING STORMWATER MANAGEMENT STRATEGY. May Cooper Street Pty Ltd
415-425 COOPER STREET, EPPING STORMWATER MANAGEMENT STRATEGY May 2017 Cooper Street Pty Ltd Disclaimer Dalton Consulting Engineers Pty Ltd This report has been prepared solely for the benefit of Cooper
More informationUPDATE OF ARC TP108 RUN-OFF CALCULATION GUIDELINE
UPDATE OF ARC TP108 RUN-OFF CALCULATION GUIDELINE Bodo Hellberg, Stormwater Action Team, Auckland Regional Council Matthew Davis, Stormwater Action Team, Auckland Regional Council ABSTRACT This paper focuses
More informationSTATE OF VERMONT PUBLIC SERVICE BOARD PREFILED TESTIMONY AND EXHIBITS OF IAN A. JEWKES
STATE OF VERMONT PUBLIC SERVICE BOARD Docket No. Petition of Dairy Air Wind, LLC for a certificate of public good, pursuant to 0 V.S.A., for the installation of a single turbine,. MW wind-powered electric
More informationA bylaw to regulate standards and specifications for the design and installation of drainage systems.
TOWN OF CRESTON Consolidated to February 23, 2016 BYLAW NO. 1417 A bylaw to regulate standards and specifications for the design and installation of drainage systems. WHEREAS the Municipal Act allows Council,
More informationIntroduction to Storm Sewer Design
A SunCam online continuing education course Introduction to Storm Sewer Design by David F. Carter Introduction Storm sewer systems are vital in collection and conveyance of stormwater from the upstream
More informationNEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL
NEW CASTLE CONSERVATION DISTRICT through (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL Office use only: Received by Municipality: Received by
More informationDrainage Report. New Braunfels Municipal Airport. Master Plan Update 2005
Drainage Report Master Plan Update 2005 General The Texas Department of Transportation (TxDOT), Aviation Division, retained the consulting engineering team of Parkhill, Smith & Cooper, Inc. (PSC), to prepare
More informationCountry CAPEXIL Description HS Codes Value Qty AFGHANISTAN TIS Asbestos cement pipes
Country-wise and Item-wise Exports of Cement, Clinkers and Asbestos Cement Products Value Rs. Lakh Quantity in '000 Unit: Kgs Source: MoC Export Import Data Bank Country CAPEXIL Description HS Codes Value
More informationDRAINAGE REVIEW: Berwick Health and Education Precinct. for. Victorian Planning Authority
DRAINAGE REVIEW: Berwick Health and Education Precinct for Victorian Planning Authority April 2017 Document history Revision: Revision no. 03 Author/s Jonathon McLean Approved Jonathon McLean Distribution:
More information4.0 STORMWATER CONTENTS. Section 4 Stormwater
4.0 STORMWATER CONTENTS 4.0 STORMWATER... I 4.1 Introduction... 4-1 4.1.1 Objectives... 4-1 4.1.2 Stormwater Management Hierarchy... 4-1 4.1.3 Level of Service... 4-2 4.1.4 Alteration to Existing Infrastructure...
More informationAppendix 16 Erosion and sediment control guidelines for earthworks
Appendix 16 Erosion and sediment control guidelines for earthworks Contents Page 1.0 Introduction... 3 2.0 General guidelines... 3 3.0 Runoff control methods... 4 3.1 Diversion bunds/channels...4 3.2 Contour
More informationTABLE OF CONTENTS PART III - MINIMUM DESIGN STANDARDS Section 105 DRAINAGE SYSTEM DESIGN SPECIFICATIONS AND SCOPE 105.1
TABLE OF CONTENTS PART III - MINIMUM DESIGN STANDARDS Section 105 DRAINAGE SYSTEM DESIGN SECTION TITLE PAGE 105.1. SPECIFICATIONS AND SCOPE 105.1 105.2. METHODS OF ANALYSIS 105.1 105.2.1. Rational Method
More informationStorm water Catchment Analysis
Storm water Catchment Analysis Analysis index 1. Storm water attenuation tank sizing method 2. Consent notices for storm water attenuation tanks 3. Summary of sub catchments 4. Hydrological Analysis for
More informationSTORM DRAINS AND IRRIGATION
TABLE OF CONTENTS PART III - MINIMUM DESIGN STANDARDS Section 105 STORM DRAINS AND IRRIGATION 105.1. STORM DRAINS... 105.1 105.2. METHODS OF ANALYSIS... 105.1 105.2.1. Rational Method... 105.1 105.2.2.
More informationRETENTION BASIN EXAMPLE
-7 Given: Total Tributary Area = 7.5 ac o Tributary Area within Existing R/W = 5.8 ac o Tributary Area, Impervious, Outside of R/W = 0.0 ac o Tributary Area, Pervious, Outside of R/W = 1.7 ac o Tributary
More informationFlow Diversion Banks: General
Flow Diversion Banks: General DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1] Flow diversion
More informationMorton West, Dacland. Hydrology / Stormwater Management Report Permit Application
Morton West, Dacland Hydrology / Stormwater Management Report Permit Application February 2014 Document history Revision: Revision no. Author/s R01 Jonathon McLean Approved Jonathon McLean Distribution:
More informationTraining on Roads for Water and Resilience
Training on Roads for Water and Resilience ROADS AND FLOODS Floods have costs and benefits Costs: damage to infrastructure and houses, lost lives and crops Benefits: sedimentation provides fertile lands,
More informationStormwater Erosion Control & Post-Construction Plans (Stormwater Quality Plans)
Stormwater Erosion Control & Post-Construction Plans (Stormwater Quality Plans) Allen County Stormwater Plan Submittal Checklist The following items must be provided when applying for an Allen County Stormwater
More informationGRASS-LINED CHANNEL (acre) CODE 840
NATURAL RESOURCES CONSERVATION SERVICE ILLINOIS URBAN MANUAL PRACTICE STANDARD GRASS-LINED CHANNEL (acre) CODE 840 (Source: NC Erosion and Sediment Control Field Manual) DEFINITION A natural or constructed
More information3.0 Planning and Submittal Requirements
October 2003, Revised February 2005 Chapter 3.0, Planning and Submittal Requirements Page 1 3.0 Planning and Submittal Requirements 3.1 Drainage Studies and Drawings The City of Greenwood Village (Village)
More informationA Stormwater Management Plan and Sediment Control Plan are required for all proposed developments within the City of Richmond.
Engineering Page 3-1 3.0 STORM DRAINAGE 3.1 GENERAL Good drainage is vital to flat urban areas such as Lulu Island. It is essential that every storm sewer must be designed accurately minimizing conflicts
More informationProject: Auckland Central Access Plan
Project: Auckland Central Access Plan Peer Review Reference: 250887 Prepared for: Auckland Transport Revision: 3 11 April 2016 h Project 250887 File Auckland Central Access Plan PBC Peer Reviewv3.docx
More informationYorkton Rona Commercial and Industrial development. Concept Plan and Serviceability Report
Yorkton Rona Commercial and Industrial development Concept Plan and Serviceability Report Prepared for: 101242326 Sask Ltd. Box Ft Quappelle, SK Canada S0G 1S0 Prepared by: Stantec Consulting Ltd. 302-1345
More informationReport. Inflow Design Flood Control System Plan Belle River Power Plant East China, Michigan. DTE Energy Company One Energy Plaza, Detroit, MI
Report Inflow Design Flood Control System Plan Belle River Power Plant East China, Michigan DTE Energy Company One Energy Plaza, Detroit, MI October 14, 2016 NTH Project No. 62-160047-04 NTH Consultants,
More informationROOF AND PROPERTY DRAINAGE
CHAPTER 4 ROOF AND PROPERTY DRAINAGE 4.1 INTRODUCTION... 4-1 4.2 ROOF DRAINAGE SYSTEM... 4-1 4.3 ROOF DRAINAGE DESIGN PROCEDURE... 4-2 4.3.1 Catchment Area... 4-2 4.3.2 Design Average Recurrence Intervals...
More informationHighway Surface Drainage
Highway Surface Drainage R obert D. M iles, Research Engineer Joint Highway Research Project, and Assistant Professor of Highway Engineering, School of Civil Engineering Purdue University IN T R O D U
More informationChapter 2: Selecting Best Management Practices (BMPs)
Chapter 2: Selecting Best Management Practices (BMPs) 2.1 - Temporary versus Permanent BMPs The same level of care should be taken to select both temporary BMPs and permanent BMPs. The same level of care
More informationNAU DRAINAGE PLAN NAU WATER BUFFALO ENGINEERING JIANGNAN YI CONNOR KLEIN YUZHI ZHANG YI YANG
NAU DRAINAGE PLAN NAU WATER BUFFALO ENGINEERING JIANGNAN YI CONNOR KLEIN YUZHI ZHANG YI YANG 1 PROJECT BACKGROUND Drainage Study on NAU s Northern Campus on Eastburn Education (Bldg 27), Cline Library
More informationDURBAN INVEST Presentation by Eskom
DURBAN INVEST Presentation by Eskom 14 March 2011 Content 1. Brief overview of Eskom and its future positioning 2. Eskom Build program 3. Opportunities in SADC 4. Conclusion 2 The global challenge: To
More informationEROSION AND SEDIMENTATION CONTROL SECTION 1 - GENERAL 1.1 SUMMARY
31 25 00 EROSION AND SEDIMENTATION CONTROL SECTION 1 - GENERAL 1.1 SUMMARY A. Erosion and sedimentation control shall be provided by the Contractor for all areas of the site denuded or otherwise disturbed
More informationa. Title of Report Example: Final Hydrologic and Hydraulic Drainage Report For Tract #### (or Planning and Zoning Permit ##-###-###)
CITY OF OXNARD ENGINEERING DIVISION REQUIRED FORMAT AND CONTENTS HYDROLOGIC AND HYDRAULIC DRAINAGE REPORTS This report will provide a basis for design of the drainage system for the subject project. The
More informationStormwater Management Report Bachman Terrace Residential Development
Stormwater Management Report Bachman Terrace Residential Development Project # 160401069 Prepared for: Tega Developments Prepared by: Stantec Consulting Ltd. April 14, 2014 Sign-off Sheet This document
More informationFORT COLLINS STORMWATER CRITERIA MANUAL Hydrology Standards (Ch. 5) 1.0 Overview
Chapter 5: Hydrology Standards Contents 1.0 Overview... 1 1.1 Storm Runoff Determination... 1 1.2 Design Storm Frequencies... 1 1.3 Water Quality Storm Provisions... 2 1.4 Design Storm Return Periods...
More informationEnvironmental goods in southern and eastern Africa. Trade patterns, tariffs and non-tariff barriers Willemien Viljoen 5 December 2011
Environmental goods in southern and eastern Africa Trade patterns, tariffs and non-tariff barriers Willemien Viljoen 5 December 2011 The problem of dual-use goods Trade patterns in southern and eastern
More informationThe Town of Chester Stormwater Mapping Report
The Town of Chester Stormwater Mapping Report Prepared by the Warren County Soil & Water Conservation District December 2013 Table of Contents Introduction and Location 3 Stormwater Runoff 3 Assessment
More informationPreface. MNR # Queen s Printer for Ontario, 2012 ISBN (PRINT) ISBN (PDF)
Preface In 2008, the inter-agency Drainage Act & Section 28 Regulations Team (DART) was established by the Ministry of Natural Resources (MNR) and the Ministry of Agriculture, Food and Rural Affairs (OMAFRA)
More informationTargeting adaptation needs using the Climate Vulnerability Index
Targeting adaptation needs using the Climate Vulnerability Index Dr Caroline Sullivan, Associate Professor of Environmental Economics and Policy, Southern Cross University, Australia The need for Vulnerability
More informationSECTION 6 STORMWATER AND LAND DRAINAGE
SECTION 6 STORMWATER AND LAND DRAINAGE Final Version, Approved September 2003 Section 6 and Land Drainage Contents 6.1 PERFORMANCE STANDARDS... 2 6.1.1 General... 2 6.2 MEANS OF COMPLIANCE... 3 6.2.1 General...
More informationComparison of Rational Formula Alternatives for Streamflow Generation for Small Ungauged Catchments
ENGINEER - Vol. XXXXIV, No. 04, pp, [29-36], 2011 The Institution of Engineers, Sri Lanka Comparison of Rational Formula Alternatives for Streamflow Generation for Small Ungauged s W.M.D.Wijesinghe and
More informationSuitable Applications Where concentrated flow of surface runoff must be conveyed down a slope in order to prevent erosion.
Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Objective
More information