The Prophotonix (Irl) Ltd Quality manual
|
|
- Noah Hines
- 6 years ago
- Views:
Transcription
1 The Prophotonix (Irl) Ltd Quality manual Date: October 2013 Revision: D 3020 Euro Business Park, Little Island, Cork, Ireland Tel: +353 (0) Fax: +353 (0) info@prophotonix.com Page 1 of 36 Date : Oct 2013
2 Page 2 of 36 Date : Oct 2013
3 QUALITY POLICY STATEMENT Page 3 of 36 Date : Oct 2013
4 COMPANY PROFILE Prophotonix (IRL) Limited is located at 3020 Euro business Park Little Island, Cork and is a subsidiary of ProPhotonix, which is headquartered in Salem, New Hampshire, USA. (see : Prophotonix was founded in 1946 as Stocker & Yale, Inc. StockerYale introduced diverse lighting applications to the optical and metrology industries. Today, Prophotonix is an independent designer and manufacturer of structured light lasers, and LED technologies. Through this diverse product mix, the company serves a wide range of markets including the machine vision, industrial inspection, defense, telecommunication, sensors, and medical markets. The company in Cork was set up in 1994 (originally known as CorkOpt) and was acquired by StockerYale Corp in 2000 in order to provide LED solutions to the illumination side of the StockerYale business. To remain an innovative leader, and to continue growing its high-technology markets, Prophotonix invests a significant portion of its earnings into research and development. The company is committed to growing its photonics based business solutions so that its worldwide customers can successfully compete in today's highly competitive technology markets. Prophotonix operates a paperless filing system called the Alpha System. This system was designed to give the following benefits: 1. Supports our business model. The system has been designed to follow our processes and strategies. 2. Customer focused. By having the customer at the top of the filing tree ensures that all documents, design work, etc. are customer specific. 3. Quality orientated. By having master documents released as PDF s. Then by linking to these released documents in the BOM ensures that the released documents can t be modified and prevents duplication. 4. Flexible. It is an evolving system that can be easily adapted to the company s changing needs. It also standardises the filing of any documents relating to the design / production of all products. 5. Easy to use. By having all folders created automatically, means that each set of folders follow the same structure. In addition document templates, such as BOM s, are also automatically placed in their relevant folder. Scope Design, Development and Manufacture of Optoelectronic Components and solutions. Page 4 of 36 Date : Oct 2013
5 1 Scope 1.1 General The quality manual outlines the policies, procedures and requirements of the Quality Management System. The system is structured to comply with the conditions set forth in the International Standard ISO 9001: Application Where any requirement of ISO 9001:2008 can not be applied due to the nature of our organization, its activities and its products, they will be considered for exclusion. An ISO 9001: 2008 requirement may be excluded only when both of the following conditions are met: The requirement must be within ISO 9001 clause 7, Product Realization. The exclusion may not affect our ability, nor absolves us from the responsibility, to provide product that meets customer and applicable regulatory requirements. Prophotonix Ltd has determined that the following requirements are not applicable to the operations at this site and are documented as exclusions: 1. Exclusion: ISO 9001: 2008 section , Validation of Processes for Production and Service Provision. Justification: There are no processes that can be validated prior to release. Page 5 of 36 Date : Oct 2013
6 2.0 Normative references The following documents were used as reference during the preparation of the Quality Management System: ISO9000:2005 Quality management Systems Fundamentals and vocabulary. Page 6 of 36 Date : Oct 2013
7 3.0 Terms and definitions Definitions unique to Prophotonix Ltd. Customer owned property - Any type of instrumentation, accessories, manuals, or shipping containers that belong to a customer. Customer supplied product - Any type of service or material supplied to be utilized in the manufacture, modification or repair of customer-owned property. Product The end item result of meeting all contract terms and conditions. Quality Records Documentation of those activities wherein records of said activities must be maintained will be specified in the procedure or work instruction level documents, as applicable. Page 7 of 36 Date : Oct 2013
8 Section 4: Quality management system Page 8 of 36 Date : Oct 2013
9 4.1 General Requirements Prophotonix Ltd. has established, documented and implemented a Quality Management System (QMS) in accordance with the requirements of ISO 9001:2008. The system is maintained and continually improved through the use of the quality policy, quality objectives, audit results, analysis of data, corrective and preventive action and management review. To design and implement the QMS Prophotonix Ltd. has: a) The processes needed for the QMS and their application throughout the organization have been determined, b) The sequence and interaction of these processes has been determined, c) Determined criteria and methods needed to ensure that the operation and control of the processes are effective. d) Ensured the continuing availability of resources and information necessary to achieve planned results and continual improvement of these processes. e) Established systems to monitor, measure and analyze these processes where applicable, and f) Established processes to identify and implement actions necessary to achieve planned results and continual improvement of these processes. The type and extent of control applied to any outsourced processes or services is defined within the Quality Management System. Page 9 of 36 Date : Oct 2013
10 4.2 Documentation requirements General The QMS documentation includes: A documented Quality Policy. This Quality Manual. Documented Procedures and records required by ISO9001:2008 Documents identified as needed for the effective planning, operation and control of our processes, and Quality Records. Document Control Index Documentation control procedure (QP-0002) Page 10 of 36 Date : Oct 2013
11 4.2.2 Quality manual This Quality Manual has been prepared to describe the Prophotonix Ltd QMS. Each section of the manual references documented QMS procedures relating to the requirements outlined in that section Control of Documents All of the QMS documents are controlled according to the Document & data Control Procedure. This procedure defines the process for: Approving documents for adequacy prior to issue Reviewing and updating as necessary and re-approving documents Ensuring that changes and current revision status of documents are identified. Ensuring that relevant versions of applicable documents are available at points of use. Ensuring that documents remain legible and readily identifiable. Ensuring that documents of external origin are identified and their distribution controlled, and Preventing the unintended use of obsolete documents and to apply suitable identification to them if they are retained for any purpose. Documentation Control Procedure (QP-0002) Control of records Quality records are maintained to provide evidence of conformity to requirements and of the effective operation of the QMS. The records are maintained according to the Control of Quality Records Procedure. This procedure requires that quality records remain legible, readily identifiable and retrievable. The procedure defines the controls needed for identification, storage, protection, retrieval, retention time and disposition of quality records. Control of Quality Records (QP-0016) Page 11 of 36 Date : Oct 2013
12 Section 5: Management Responsibility Page 12 of 36 Date : Oct 2013
13 5.1 Management Commitment The managing Director and the Group Quality manager are actively involved in implementing and maintaining the quality management system (QMS). The Management Group has provided the vision and strategic direction for the growth of the QMS and established quality objectives and the quality policy. To continue to provide leadership and show commitment to the improvement of the QMS, management will do the following. Communicate the importance of meeting customer, statutory, and regulatory requirements. Establish quality objectives Establish the quality policy. Conduct monthly management reviews. Conduct an in depth annual Quality management review. Ensure the availability of resources. Quality Management Review (QP-0010) Quality Objectives (QF-0017) 5.2 Customer focus Prophotonix Ltd. strives to identify current and future customer needs to meet customer requirements and exceed customer expectations. The sales team ensures that customer requirements are understood and met, through compliance with documented customer communication procedures. Customer requirements are determined, converted into internal requirements, and communicated to the appropriate people in our organization. Customer Satisfaction form (QF-0044) Sales Process Procedure (QP-0012) 5.3 Quality Policy Top management ensures that the quality policy is communicated to all employees. It is included in new employee training and training on the QMS. It is posted in prominent positions throughout the offices, production areas and in reception. Management reviews the Quality policy at each annual Quality Management Review meeting to determine the policy s continuing suitability for our organization. The Quality Policy is documented at page 3 of this document, Quality Policy Statement. Page 13 of 36 Date : Oct 2013
14 5.4 Planning Quality Objectives Quality objectives are established to support our organization s efforts in achieving our quality policy and reviewed annually for suitability. Quality objectives are measurable, and reviewed against performance goals at each management review meeting. Quality Objectives (QF-0017) Quality management system planning The quality system has been planned and implemented to meet our quality objectives and the requirements of 4.1 of the ISO 9001 standard. Quality planning takes place as changes that affect the quality system are planned and implemented. 5.5 Responsibility, Authority and communication Responsibility and authority An organization chart has been established to show the interrelation of personnel in the organization. Job descriptions define the responsibilities and authorities of each of the positions on the organizational chart. Job descriptions and the organizational chart are reviewed and approved by top management for adequacy. These documents are available throughout the organization to help employees understand responsibilities and authorities. Ref docs:- Org Chart See Appendix Management representative The Group Quality Assurance Manager has responsibility and authority that includes: Ensuring that processes needed for the quality management system are established and implemented. Report to top management on the performance of the quality management system, and note needed improvements. Promote awareness of customer requirements throughout the organization. Act as a liaison with external parties such as customers or auditors on matters relating to the QMS. The QA organisation has the authority to ensure that that non-compliant material/product is segregated and that appropriate disposition action is taken. Page 14 of 36 Date : Oct 2013
15 5.5.3 Internal communication Processes are established for communication within the organization. Methods of communicating the effectiveness of the QMS include department and management meetings, management review, circulation of minutes of management review meetings, Internal Audit Closing meetings, and other routine business communication. 5.6 Management review General Management reviews the QMS Monthly. This review assesses the continuing QMS for suitability, adequacy and effectiveness, identifying opportunities for improvement and needed changes. Records are maintained for each management review meeting. Quality Management Review (QP-0010) Quality Objectives (QF-0017) Review input Assessment of the QMS is based on a review of information inputs to management review. These inputs include the following: Results of audits Status of preventive and corrective actions Customer Feedback Process/service performance Follow-up actions from previous management reviews Planned changes that could affect the quality management system Recommendations for improvement Quality Management Review (QP-0010) Page 15 of 36 Date : Oct 2013
16 5.6.3 Review output During these review meetings, management will identify appropriate actions to be taken regarding the following issues: Improvement of the effectiveness of the quality management system and its processes. Improvement of product related to customer requirements. Improvement in the level of service provided to our customers. Resource needs. Establishment of Company Objectives and Improvement plan. Responsibility for required actions is assigned to members of the management review team. Any decisions made during the meeting, assigned actions, and their due dates are recorded in the minutes of management review. Quality Management Review (QP-0010) Page 16 of 36 Date : Oct 2013
17 Section 6: Resource Management Page 17 of 36 Date : Oct 2013
18 6.1 Provision of resources Prophotonix Ltd. has implemented a Quality Management System that complies with the ISO 9001:2008 standard and enhances levels of customer satisfaction. This implementation was achieved with management commitment and with sufficient resources for the implementation. To effectively maintain and continually improve the system, management determines and provides necessary resources. 6.2 Human resources General To ensure competence of our personnel, job descriptions have been prepared identifying the qualifications required for each position that affects product quality. Qualifications include requirements for skills and experience. Appropriate qualifications, along with required training, provide the competence required for each position Competence, training and awareness Qualifications are reviewed upon employment, when an employee changes positions or the requirements for a position change. Human Resources maintain records of employee qualifications. If any differences between the employee s qualifications and the requirements for the job are found, training or other action is taken to provide the employee with the necessary competence for the job. All employees are trained on the relevance and importance of their activities and how they contribute to the achievement of the quality objectives. Training and evaluation are conducted according to the Training Policy and procedure. Training Policy and Procedure (QP-0024) Page 18 of 36 Date : Oct 2013
19 6.3 Infrastructure The Managing Director with the assistance of the management team will determine, manage and provide suitable facilities to perform appropriate business tasks and functions. The degree of adequacy with which the current business Infrastructure meets requirements is assessed on an on-going basis & at management review meetings. Facilities are defined below:- Total accommodation = 910m² Office accommodation & Meeting rooms = 320m² Production/Assembly/Stores/Areas = 364m² Common areas = 140m² Engineering Dev Lab = 84m² 1. Air conditioning Office, stores and Assembly areas. 2. Desk top computers Sufficient for all office staff and for all production/stores staff to have easy access as and when required. 3. Computer server. 4. Miscellaneous test equipment, jigs, tooling and sufficient workstations. 5. All usual services. 6. Secure stores. Equipment Maintenance Log 6.4 Work environment The Work Environment is to comply with all current and relevant health and safety legislation. In addition the working environment must be appropriate for the expected tasks. Whilst Office and general areas have no specific environmental requirements beyond those required by National Legislation the assembly and stores areas are required to meet the following standards:- 1. Temperature control To be maintained within normally accepted levels for the work place. 2. Humidity Is not controlled. 3. Clean room Std No specific clean room standard is applied but through daily general cleaning and weekly programmed workstation cleaning the assembly and stores areas are maintained at an appropriate level of cleanliness 4. Lighting Sufficient and appropriate lighting to allow all staff to accomplish tasks comfortably. Page 19 of 36 Date : Oct 2013
20 Section 7: Product Realization Page 20 of 36 Date : Oct 2013
21 7.1 Planning of product realization Planning is required before new products are implemented. This planning may take place as a design project, or according to the Design review procedure (QP-0008). During this planning, management or assigned personnel identify: The quality objectives and requirements for the product Processes, documentation and resources required Verification, validation, monitoring, inspection and test requirements Criteria for product acceptance. The output of quality planning may include documented quality plans, processes, Procedures and other design outputs. Product Specification Form (QF-0008) Enquiry Review Form (QF-0009) Design Review Procedure (QP-0008) Design Review Form (QF-0012) 7.2 Customer related processes Determination of requirements related to the product Prophotonix Ltd. determines customer requirements before acceptance of an order. Customer requirements include those: Requested by the customer Required for delivery and post-delivery activities Not stated by the customer but necessary for specified use or known and intended use Statutory and regulatory requirements related to the product Additional requirements determined by Prophotonix Ltd. Customer requirements are determined according to the Sales Process Procedure (QP- 0012). Sales Process Procedure (QP-0012) Enquiry Review Form (QF-0009) Design Review Procedure (QP-0008) Page 21 of 36 Date : Oct 2013
22 7.2.2 Review of requirements related to the product Prophotonix Ltd. has a process in place for the review of requirements related to the product. The review is conducted before the order is accepted. The process ensures that: Product requirements are defined. Contract or order requirements differing from those previously expressed are resolved. Prophotonix Ltd. has the ability to meet the defined requirements Records are maintained showing the results of the review and any actions arising from the review. Where a customer does not provide a documented statement of requirement, the customer requirements are confirmed before acceptance When product requirements are changed, Prophotonix Ltd. communicates changes to relevant personnel and amends relevant documents. Contract Review Form (QF-0010) Design Review Procedure (QP-0008) Customer communication Prophotonix Ltd. has implemented an effective procedures for communicating with customers in relation to: Product Information Inquiries, contracts and order handling, including amendments Customer feedback, including customer complaints 7.3 Design and development Design and development planning The Design Review Procedure (QP-0008) details the process for controlling the development process. The applicable department plans the design and development according to this procedure. The design plan includes: Design and development stages Required design reviews Verification and validation methods appropriate to each design and development stage Responsibilities and authorities for design and development Identification of the technical interfaces required for the project Updating of the design plan as the project progresses Ref Docs :- Design Review Procedure (QP-0008) Page 22 of 36 Date : Oct 2013
23 7.3.2 Design and development inputs Inputs relating to product requirements are determined and documented according to the Design review Procedure (QP-0010). All inputs are reviewed for adequacy and completeness and to resolve any ambiguous inputs. Inputs include: Functional and performance requirements Applicable statutory and regulatory requirements Where applicable, information derived from previous similar designs Other requirements essential for design and development Product Specification Form (QF-0008) Enquiry Review Form (QF-0009) Design Review Procedure (QP-0008) Design Review Form (QF-0012) Design and development outputs Outputs of design and development are documented according to the Design review Procedure (QP-0010). They are documented in a format that enables verification against the inputs, and are approved prior to release. Outputs include: Meet the input requirements Provide appropriate information for purchasing, production and for service provision Contain or reference product acceptance criteria Specify the characteristics of the product that are essential for its safe and proper use. Design Review Procedure (QP-0008) Design Review Form (QF-0012) Design and development review The design plan specifies suitable stages of the project to conduct design and development review. Reviews take place according to the design and development procedure; results of design review are recorded in minutes of the design review meetings which are maintained as a quality record. Design reviews: Evaluate the results of design and development activities and determine if they fulfil requirements. Identify any problems and propose necessary actions. Include representatives of functions concerned with the design and development stage being reviewed. Design Review Procedure (QP-0008) Design Review Form (QF-0012) Page 23 of 36 Date : Oct 2013
24 7.3.5 Design and development verification Design verification is planned and performed to ensure that the design and development outputs have satisfied the design and development input requirements. Records of the results of the verification and any necessary actions are maintained according to the design Review procedure (QP-0010). Design Review Procedure (QP-0008) Design Review Form (QF-0012) Design and development validation Design and development validation is performed according to the design plan to ensure that the resulting product is capable of fulfilling the requirements for the specified or known intended use or application. Validation is completed prior to delivery whenever practicable. Records of the validation activities are maintained according to the Design Review Procedure (QP-0010). Design Review Procedure (QP-0008) Design Review Form (QF-0012) Control of design and development changes The Drawing Control Procedure (QP-0007) defines a process for identifying, recording, verifying, validating and approving design changes. The review of design and development changes includes an evaluation of the effect of the changes on constituent parts and delivered product. Records are maintained to show the results of the review and any necessary actions identified during the review. Documentation Control Procedure (QP-0002) Page 24 of 36 Date : Oct 2013
25 7.4 Purchasing Purchasing process A documented procedure (QP-0011) is followed to ensure that purchased product conforms to the specified purchase requirements. The procedure outlines the extent of control required for suppliers. Suppliers are evaluated and selected based on their ability to supply product in accordance with requirements as outlined in the procedure. Criteria for selection, evaluation and re-evaluation are documented in the procedure. Records of the evaluation and any necessary actions are maintained as quality records. Purchasing Procedure (QP-0011) Purchasing information Purchasing information describes the product to be purchased, including where appropriate: Requirements for approval of product, processes and equipment Requirements for qualification of personnel Quality management system requirements The purchasing documents are reviewed to ensure the adequacy of requirements before orders are placed with the supplier. Purchasing Procedure (QP-0011) Verification of purchased product The Purchasing procedure (QP-0011) describes the process used to verify that purchased product meets specified purchase requirements. If Prophotonix Ltd or the customer, perform verification at the supplier s premises, the verification arrangements and method of product release are documented in the purchasing information. Purchasing Procedure (QP-0011) Page 25 of 36 Date : Oct 2013
26 7.5 Production and service provision Control of production and service provision Prophotonix Ltd. plans and carries out production and service provision under controlled conditions according to documented procedures. Controlled conditions include, as applicable: The availability of information that describes the characteristics of the product The availability of work instructions The use of suitable equipment The availability and use of monitoring and measuring devices The implementation of monitoring and measurement The implementation of release, delivery and post-delivery activities Validation of processes for production and service provision Prophotonix Ltd. validates any processes for production and service provision where the resulting output cannot be verified by subsequent monitoring or measurement. This includes any processes where deficiencies become apparent only after the product is in use or the service has been delivered. Validation demonstrates the ability of these processes to achieve planned results. Prophotonix Ltd. has documented the process for validation including: Defined criteria for review and approval of the processes Approval of equipment and qualification of personnel Use of specific methods and procedures Requirements for records Revalidation Identification and Management of special processes (QP-0025) Page 26 of 36 Date : Oct 2013
27 7.5.3 Identification and traceability All Product is identified with respect to monitoring and measurement requirements. Prophotonix Ltd. controls and records the identification of the product/material throughout product realisation where ever traceability is a specified requirement. Example Product Traveller Card below Page 27 of 36 Date : Oct 2013
28 7.5.4 Customer property Prophotonix Ltd. exercises care with customer property while it is under the organization's control or being used. Customer property is managed in accordance with Customer Property procedure (QP-0026) which details the Identification, verification, protection and safeguarding of customer property. If any customer property is lost, damaged or otherwise found to be unsuitable for use, this is reported to the customer and records maintained. Control of Customer Property (QP-0026) Preservation of product Prophotonix Ltd. preserves the conformity of product during internal processing through to delivery to the intended destination. This preservation includes identification, handling, packaging, storage and protection. Preservation also applies to the constituent parts of a product. Preservation instructions are detailed in product work instructions and Procedure for packing finished product including customer specific labeling (SOP-0008) (SOP-0008) Procedure for packing finished product including customer specific labeling Page 28 of 36 Date : Oct 2013
29 7.6 Control of monitoring and measuring equipment A documented procedure (QP-0022) details the process used to ensure that the control of monitoring and measurement equipment is managed and carried out in a manner that is consistent with the monitoring and measurement requirements. Where necessary to ensure valid results, measuring equipment is: Calibrated or verified or both at specified intervals, or prior to use, against measurement standards traceable to international or national measurement standards. Adjusted or re-adjusted as necessary. Identified to enable the calibration status to be determined. Safeguarded from adjustments that would invalidate the measurement result. Protected from damage and deterioration during handling, maintenance and Storage. In addition, a review is carried out to assess records the validity of the previous measuring results when the equipment is found not to conform to requirements. Prophotonix Ltd. takes appropriate action on the equipment and any product affected. Records of the results of calibration and verification are maintained. When used in the monitoring and measurement of specified requirements, the ability of computer software to satisfy the intended application is confirmed. This shall be undertaken prior to initial use and reconfirmed as necessary. Calibration Procedure (QP-0022) Page 29 of 36 Date : Oct 2013
30 Section 8: Measurement, Analysis and Improvement Page 30 of 36 Date : Oct 2013
31 8.1 General Prophotonix Ltd. plans and implements the monitoring, measurement, analysis and improvement processes as needed. To demonstrate conformity of the product. To ensure conformity of the quality management system. To continually improve the effectiveness of the quality management system. These processes include determination of applicable methods, including statistical techniques, and the extent of their use. 8.2 Monitoring and measurement Customer Satisfaction As one of the measurements of the performance of the quality management system, Prophotonix Ltd. monitors information relating to customer perception. The method for obtaining and using this information is detailed in the Customer Satisfaction Survey Procedure (QP-0027). Further analysis is carried out of customer complaints and returned goods data. Customer Satisfaction Survey Procedure (QP-0027) Monitoring and measurement Prophotonix Ltd. conducts internal audits at planned intervals to determine whether the quality management system: Conforms to the planned arrangements (see 7.1) to the requirements of this International Standard and to the quality management system requirements established by the organization. Is effectively implemented and maintained. An audit program has been designed and implemented. The audit criteria, scope, frequency, methods, responsibilities and requirements for planning and conducting audits, and for reporting and maintaining results, are defined and documented in the Quality Audit procedure (QP-0015). The management responsible for the area being audited is responsible for ensuring that actions are taken without undue delay to eliminate detected non-conformities and their causes. Follow-up activities include the verification of the actions taken and the reporting of verification results. Quality Audit Procedure (QP-0015) Page 31 of 36 Date : Oct 2013
32 8.2.3 Monitoring and measurement of processes Prophotonix Ltd. applies suitable methods for monitoring and, where applicable, measurement of the quality management system processes. These methods demonstrate the ability of the processes to achieve planned results. When planned results are not achieved, correction and corrective action is taken, as appropriate, to ensure conformity of the product. The determination of suitable methods is carried out as part of the design review process. Ref docs:- Design Review Procedure (QP-0008) Monitoring and measurement of product Prophotonix Ltd. monitors and measures the characteristics of the product to verify that product requirements are fulfilled. This is carried out at appropriate stages of the product realization process identified in Work Instructions or traveller cards. Evidence of conformity with the acceptance criteria is maintained. Records indicate the person authorizing release of product. Product release and service delivery does not proceed until all the planned arrangements have been satisfactorily completed, unless otherwise approved by a relevant authority, and where applicable by the customer. Ref docs:- See para above Monitoring and Measuring of Process Data in Production (QP-0018) 8.3 Control of non-conforming product Prophotonix Ltd. ensures that product which does not conform to product requirements is identified and controlled to prevent its unintended use or delivery. The controls and related responsibilities and authorities for dealing with nonconforming product are defined in the documented procedures. Ref docs:- Non-Conformance Control Procedure (QP-0005) Page 32 of 36 Date : Oct 2013
33 8.4 Analysis of data Prophotonix Ltd. determines, collects and analyses appropriate data to demonstrate the suitability and effectiveness of the quality management system and to evaluate where continual improvement of the quality management system can be made. Appropriate data includes data generated as a result of monitoring and measurement and from other relevant sources. The analysis of data provides information relating to Customer satisfaction Conformance to product requirements Characteristics and trends of processes and products including opportunities for preventive action Suppliers Ref docs:- Management Review (QP-0010) 8.5 Improvement Continual Improvement Prophotonix Ltd continually improves the effectiveness of the quality management system through the use of the quality policy, quality objectives, audit results, analysis of data, corrective and preventive actions and management review Corrective action Prophotonix Ltd. takes action to eliminate the cause of nonconformities in order to prevent recurrence. Corrective actions are appropriate to the effects of the nonconformities encountered. A documented procedure (QP-0014) defines requirements for Reviewing nonconformities (including customer complaints Determining the causes of nonconformities Evaluating the need for action to ensure that nonconformities do not recur Determining and implementing action needed Records of the results of action taken (see 4.2.4) Reviewing corrective action taken Ref docs:- Corrective and Preventive Action Procedure (QP-0014) Page 33 of 36 Date : Oct 2013
34 8.5.3 Preventive action Prophotonix Ltd. determines action to eliminate the causes of potential nonconformities in order to prevent their occurrence. Preventive actions are appropriate to the effects of the potential problems. A documented procedure (PPXP 003) defines requirements for: Determining potential nonconformities and their causes Evaluating the need for action to prevent occurrence of nonconformities Determining and implementing action needed Records of results of action taken Reviewing preventive action taken Ref docs:- Corrective and Preventive Action Procedure (QP-0014) Page 34 of 36 Date : Oct 2013
35 9 Appendix 1 - ORGANISATION CHART Simon Stanley Managing Director Kevin Lee Finance/ HR Direct or Simon Stanley Sales & Marketing Breda Stanley Accounts Adm inistrator Aoif e Chapm an T echnicial Product Manager Anna Monaghan Accounts Assistant Aine Long Marketing Executive Sean O'Sullivan Operations Direct or K en R ey nolds Business & Development Manager New Product Engineers Karol Murphy Sales Applicat ions Engineer John Brett Mechanical Design Engineer Jan Kievits Electronic Design Engineer Malik Hocine Optical Design Engineer John Sexton Electronics Engineer Jen Feeley I nt ernal Sales Adm inist rat or R ac hel F er r it er W eb D es ign Adrian Zagoneanu S enior Mechanical Design E ngineer Peter Panek Electronic Design Engineer Gary Cunningham Technician Kieran Lynch Optical Design Engineer Alan McDavid PCB Layout Engineer Linda McCormack Production Manager Production Operators x15 Default Technician Stores Goods Receiving Eileen McCarthy Production & Purchasing Administrator John Herbert Process Engineer Paul W hart on Qualit y Manager Mark W helan Quality Engineer Anna Badenska QA Inspector Page 35 of 36 Date : Oct 2013
36 Page 36 of 36 Date : Oct 2013
Continental Steel & Tube Co. Quality Manual
312 SE 22 nd Street Fort Lauderdale, FL 33316 Mailing address P.O. Box 030040 Fort Lauderdale, FL 33303-0040 954-332-2290 Fax 954-332-2296 info@continentalsteel.com www.continentalsteel.com Introduction
More informationQUALITY MANUAL. Number: M-001 Revision: C Page 1 of 18 THIS DOCUMENT IS CONSIDERED UNCONTROLLED UNLESS ISSUED IDENTIFIED AS CONTROLLED
Page 1 of 18 THIS DOCUMENT IS CONSIDERED UNCONTROLLED UNLESS ISSUED IDENTIFIED AS CONTROLLED Page 2 of 18 REVISION HISTORY DATE CHANGE DESCRIPTION 10/11/06 Original release 10/21/09 Revised to ISO9001:2008
More informationAS 9100 Rev C Quality Systems Manual AS-050C-QM
AS 9100 Rev C Quality Systems Manual AS-050C-QM Innovative Control Systems, Inc. 10801 N. 24 th Ave. Suite 101-103 Phoenix, AZ 85029 U.S.A. www.icsaero.com +01-602-861-6984 VOICE +01-602-588-9440 FAX Table
More informationISO 9001:2008 Quality Management System QMS Manual
2501 Kutztown Road Reading, PA, 19605 Tel. 610-929-3330 Fax 610-921-6861 ISO 9001:2008 Quality Management System QMS Manual The information contained in this document is Fidelity Technologies Corporation
More informationISO 9001: 2000 (December 13, 2000) QUALITY MANAGEMENT SYSTEM DOCUMENTATION OVERVIEW MATRIX
In completing your Documented Quality Management System Review, it is important that the following matrix be completed and returned to us as soon as possible. This will save time during the review and
More informationUPGRADE ASSESSMENT CHECKLIST
Checklist Instructions : Prior to auditing each element, the auditor shall review the documentation and mark a 0 in each box where functions /departments are referenced. As each function/department is
More information25 D.L. Martin Drive Mercersburg, PA (717)
QUALITY MANUAL D. L. MARTIN CO. 25 D.L. Martin Drive Mercersburg, PA 17236 (717) 328-2141 Revision 14 August 2012 Michael A. White Manager, QA & Engineering D.L. Martin Co. Quality Manual UNCONTROLLED
More information4. Quality Management System 4.1 GENERAL REQUIREMENTS
Checklist Instructions : Prior to auditing each element, the auditor shall review the documentation and mark an 0 in each box where functions /departments are referenced. As each function/department is
More informationQuality Systems Manual
Quality Systems Manual ISO9001:2008 Prepared By: Date: 06/28/2013 President Approved by: Date: 06/28/2013 Quality Assurance Manager Introduction Cal-Tron Corp has developed and implemented a Quality Management
More informationISO9001:2008. Quality Manual. Hyundai Heavy Industries South Huron Drive Santa Ana, CA USA. Quality Manual QM001 Revision A Page 1
ISO9001:2008 Quality Manual Hyundai Heavy Industries 2230 South Huron Drive Santa Ana, CA 92704 USA Quality Manual QM001 Revision A Page 1 Table of Contents Description Page Introduction 4 Company Description
More informationISO9001 QUALITY POLICY MANUAL
1 OF 26 Metalife Industries, Inc. Serial No.: Master Revision: 1 Issue Date: October 14, 2011 Originator: Becky Wentling ISO9001 QUALITY POLICY MANUAL Prepared By (Document Controller): Becky Wentling
More informationQuality Manual QM -07 Approval: D. Wheeler. AARD Spring & Stamping Quality Manual. Quality Manual. Page 1 of 24
Quality Manual Page 1 of 24 ISO 9001:2015 Standard to Quality Manual Section Matrix ISO 9001:2015 Quality Manual Section 1 Scope 1 Scope 1.1 General 4 Context of the organization 4 Quality management system
More informationNMT Specialized Machining Inc & NMT General Machining Inc AS 9100 Rev C Quality Systems Manual
NMT Specialized Machining Inc & NMT General Machining Inc AS 9100 Rev C Quality Systems Manual 290 Shoemaker Street Kitchener, Ontario Canada N2E 3E1 Table of Contents Introduction 5 Documentation Scheme..
More informationDocument Number: QM001 Page 1 of 19. Rev Date: 10/16/2009 Rev Num: 1. Quality Manual. Quality Manual. Controlled Copy
QM001 Page 1 of 19 Quality Manual QM001 Page 2 of 19 Table of Contents Page Company Profile 4 Approval 4 Revision History 4 Distribution List 4 1.0 Scope 5 Section 2: Normative Reference 6 2.0 Quality
More informationISO9001:2008 SYSTEM KARAN ADVISER & INFORMATION CENTER QUALITY MANAGEMENT SYSTEM SYSTEM KARAN ADVISER & INFORMATION CENTER
SYSTEM KARAN ADVISER & INFORMATION CENTER QUALITY MANAGEMENT SYSTEM WWW.SYSTEMKARAN.COM 1 www.systemkaran.org Foreword... 5 Introduction... 6 0.1 General... 6 0.2 Process approach... 6 0.3 Relationship
More informationPOLYCRAFT INCORPORATED QUALITY MANUAL Quality Manual QM -10 Approval: D. Wheeler.
Polycraft, Inc. QM - 10 Title: Polycraft, Inc. Quality Manual Copy Approval: D. Wheeler This Quality Manual is the sole property of Polycraft, Inc. and intended for exclusive use by the organization. This
More informationQUALITY SYSTEM MANUAL
QUALITY SYSTEM MANUAL This Manual is a Proprietary Document and any Unauthorized Reproduction is prohibited. ISSUE DATE July 26, 2012 AUTHORIZED BY: Quality Management Representative Eric Hoff Managing
More informationOPERATIONS MANUAL ISO 9001 Quality Management System
OPERATIONS MANUAL * ISO 9001 Quality Management System Page: 1 of 19 Revision History Date Change Notice Change Description 5/30/2012 Original Original Release. 9/20/2012 005 Clarify post-delivery exclusion
More informationThe following is an example systems manual from a low volume (TE, but not an automotive supplier) company.
The following is an example systems manual from a low volume (TE, but not an automotive supplier) company. You will note that this is essentially a copy of ISO 9001:2000. I take this path because long
More informationINTERNATIONAL STANDARD
INTERNATIONAL STANDARD ISO 9001 Third edition 2000-12-15 Quality management systems Requirements Systèmes de management de la qualité Exigences Reference number ISO 9001:2000(E) ISO 2000 Contents Page
More informationLuminus Devices, Inc Quality Management Systems Manual ISO 9001:2008
Luminus Devices, Inc Quality Management Systems Manual ISO 9001:2008 This document belongs to Luminus Devices, Inc. It cannot be reproduced without authorized authority. Area: Quality System Document Page
More informationQuality Manual. AARD Spring & Stamping Quality Manual
Quality Manual Page 1 of 25 AARD Spring & Stamping QM/5.0 Title: QM 5.0 AARD Spring & Stamping Quality Manual Copy Approval Date: 1/27/2011 Reviewer(s): Sign / Print Title Date Dan Wheeler Document Originator
More informationQuality Commitment. Quality Management System Manual
Quality Commitment Quality Management System Manual This printed copy is uncontrolled Page 1 of 30 Thor Machining Quality Management System Manual Section 1 TABLE OF CONTENTS Page # 1 Introduction 5 2
More informationOdyssey Electronics, Inc Fairlane Livonia, MI 48150
12886 Fairlane Livonia, MI 48150 Table of Contents Section Topic 1 Revision history 2 Review and approval 3 Organizational chart 4 Quality management system 4.1 General requirements 4.2 Documentation requirements
More informationINTERNATIONAL STANDARD
INTERNATIONAL STANDARD ISO 9001 Quality management systems Requirements Systèmes de management de la qualité Exigences Fourth edition 2008-11-15 Reference number ISO 9001:2008(E) ISO 2008 PDF disclaimer
More informationQuality Assurance Manual, Revision F Page 1 of 20
Quality Assurance Manual, Revision F Page 1 of 20 AUTOMATION TECHNOLOGY QUALITY ASSURANCE MANUAL Prepared By: Joseph Pollard Date: 7/6/2015 Quality Assurance Manager Quality Management System Representative
More informationAtlantic Technical Systems, Inc. 415 Headquarters Drive # 2 Millersville, MD USA Office: (410) Fax: (410)
ISO 9001 Page: 1 of 29 Quality Assurance Manual ISO 9001:2008 Atlantic Technical Systems, Inc. 415 Headquarters Drive # 2 Millersville, MD 21108 USA Office: (410) 507-2779 Fax: (410) 451-9609 APPROVALS
More informationCHAPTER 8 INTEGRATION OF QMS AND LMS
152 CHAPTER 8 INTEGRATION OF QMS AND 8.1 QUALITY MANAGEMENT SYSTEM There are various reasons for implementing a quality system that conforms to an ISO standard. The primary reason is that customers are
More informationRULES FOR A QUALITY STANDARDS SYSTEM (QSS) IN MARITIME ACADEMIES/INSTITUTIONS
RULES FOR A QUALITY STANDARDS SYSTEM (QSS) IN MARITIME ACADEMIES/INSTITUTIONS I. Introduction 1. Background The international Convention on Standards of Training, Certification and Watchkeeping (STCW)
More informationAPS Cleaning Quality Management System Scope of Certification The provision of commercial and industrial cleaning services throughout Queensland.
Quality Management System Scope of Certification The provision of commercial and industrial cleaning services throughout Queensland. Table of Contents Contents 1. Introduction... 3 1.1. Process Approach...
More informationINTERNATIONAL STANDARD
INTERNATIONAL STANDARD ISO 9001 Third edition 2000-12-15 Quality management systems Requirements Systèmes de management de la qualité Exigences Reference number ISO 9001:2000(E) ISO 2000 PDF disclaimer
More informationMachined Integrations, LLC
QUALITY MANUAL Machined Integrations, LLC ISO9001: 2008 Electronically Controlled by Quality Representative, Rev2, January 2014 Page 2 of 25 TABLE OF CONTENTS SECTION ELEMENT PAGE No A Revision and Approval
More informationQuality Manual In support of ISO 9001:2015 ANSI/NCSL Z , ISO/IEC17025 ISO10012
Quality Manual In support of ISO 9001:2015 ANSI/NCSL Z540.3-2006, ISO/IEC17025 ISO10012 Date: 8-Sep-17 Page 1 of 19 Table of Contents 1. Quality manual presentation 1.1 Control of the manual 1.2 Distribution
More informationSensor Scientific, Inc.
Sensor Scientific, Inc. 6 Kings Bridge Road Fairfield, New Jersey Quality Manual Revised: 26 September, 2012 Authorized By: G. R. Brinley Page 1 of 21 Table of Contents Page 1. Introduction 3 2. Purpose
More informationISO 9001:2000 The International Quality Management Business System
ISO 9001:2000 The International Quality Management Business System Table of Contents What is ISO 9000? Page 1 The Benefits of ISO 9001:2000 Page 1 Why an ISO 9001:2000 System? Page 2 Major Steps to Implementation
More informationISO 9001:2000 Revision G
ISO 9001:2000 Revision G 1531 W. 17 th Street, Tempe AZ 85281 Table of contents Section Title Page Index 1 Revision History and Distribution 2 Introduction 3 Quality Policy / Mission Statement 4 Organizational
More informationRailroad Friction Products Corporation
Railroad Friction Products Corporation Our Quality Philosophy: "At Railroad Friction Products Corporation we will consistently provide products that meet and exceed customer and regulatory requirements
More informationQuality System Manual
Page:1 of 20 Quality System Page:2 of 20 1 About this This manual was developed and is maintained by the Arrow Manufacturing Company Management Representative. Requests for changes should be submitted
More informationQuality Manual ISSUED JANUARY Approved By: January 12, 2004 (President & Chief Executive Officer)
Quality Manual ISSUED JANUARY 2004 Approved By: January 12, 2004 (President & Chief Executive Officer) (Date) Quality Policy To be the industrial control industry's most preferred supplier of sensor integration
More information14620 Henry Road Houston, Texas PH: FX: WEB: QUALITY MANUAL
14620 Henry Road Houston, Texas 77060 PH: 281-447-3980 FX: 281-447-3988 WEB: www.texasinternational.com QUALITY MANUAL ISO 9001:2008 API Spec Q1, 9th Edition API Spec 8C 5 Th Edition MANUAL NUMBER: Electronic
More informationMALAYSIAN STANDARD. Licensed to UNIMAP LIBRARY / Downloaded on : 22-Dec :14:03 PM / Single user license only, copying and networking prohibited
MALAYSIAN STANDARD MS ISO 9001:2008 QUALITY MANAGEMENT SYSTEMS - REQUIREMENTS (FIRST REVISION) (ISO 9001:2008, IDT) (PUBLISHED BY STANDARDS MALAYSIA IN 2009) ICS: 03.120.10 Descriptors: quality management,
More informationISO 9001:2015. Quality Management System. Manual
ISO 9001:2015 Quality Management System Manual Introduction Company has made the Strategic Business Decision to develop and implement an effective Quality Management Systems (QMS) across all areas of the
More informationEagle Machining, Inc.
Quality Control Manual REVISIONS DATE DESCRIPTION REVIEWED APPROVED REVISION 01/29/2010 Modification/Formatting JV, HL, DN JV Rev. A 01/26/2014 Updated company information JV, HL JV Rev. B Table of Contents...
More informationQuality Management System Manual
SpecSys, Inc. recognizes its responsibility as a provider of quality products and services. To this end, SpecSys, Inc. has documented, implemented and maintains a System that complies with ISO 9001 2000.
More informationMALAYSIAN STANDARD QUALITY MANAGEMENT SYSTEMS - REQUIREMENTS (FIRST REVISION) (ISO 9001:2008, IDT) (PUBLISHED BY STANDARDS MALAYSIA IN 2009)
MALAYSIAN STANDARD MS ISO 9001:2008 QUALITY MANAGEMENT SYSTEMS - REQUIREMENTS (FIRST REVISION) (ISO 9001:2008, IDT) (PUBLISHED BY STANDARDS MALAYSIA IN 2009) ICS: 03.120.10 Descriptors: quality management,
More informationQUALITY MANUAL ECO# REVISION DATE MGR QA A 2/25/2008 R.Clement J.Haislip B 6/17/2008 T.Finneran J.Haislip
UHV SPUTTERING INC Page 1 of 18 ECO REVISION HISTORY ECO# REVISION DATE MGR QA 1001 A 2/25/2008 R.Clement J.Haislip 1017 B 6/17/2008 T.Finneran J.Haislip 1071 C 1/13/2011 R.Clement J.Haislip 1078 D 5/15/2013
More informationRevision. Quality Manual. Multilayer Prototypes. Compliant to ISO / AS9100 Rev C
1 of 29 Quality Manual Multilayer Prototypes Compliant to ISO 9001-2008 / AS9100 Rev C This Quality Manual sets forth the quality system policies and Defines compliance with the ISO 9001-2008 SAE AS 9100
More informationQUALITY MANAGEMENT SYSTEM MANUAL ISO 9001:2008
QUALITY MANAGEMENT SYSTEM MANUAL ISO 9001:2008 Revision: 9 Issue Date: 28 April 2014 CONTROLLED COPY Number: Issued to: UNCONTROLLED COPY A.M.S. Electronics, Inc. 113 Pillow Street, Butler, PA 16001 (724)
More informationProject Procedure 1.0 PURPOSE 2.0 SCOPE 3.0 REFERENCES 4.0 DEFINITIONS. No.: P /21/2012 PAGE 1 OF 8 INTERNAL QUALITY AUDITS
Project Procedure INTERNAL QUALITY AUDITS 09/21/2012 PAGE 1 OF 8 1.0 PURPOSE The purpose of this procedure is to establish the requirements for a comprehensive system of planned and documented internal
More informationCERTIFICATE OF REGISTRATION
03/31/2017 CERTIFICATE OF REGISTRATION This Certificate bears witness that Great Western Registrar LLC (An ANAB-accredited CB) has assessed the management system of: INTEGRATED IDEAS & TECHNOLOGIES, INC.
More informationStanley Industries, Inc. ISO 9001:2008 Quality Policy Manual
Stanley ISO 9001:2008 Table of Contents and STANLEY Document Reference Related STANLEY Section Page Procedure(s) 1. Introduction 1 None 2. Scope 1 None 3. Organizational Structure & 1 STANLEY Company History
More informationAwareness to ISO 9001:2000
Awareness to ISO 9001:2000 Tutor s Introduction Course Objectives Be able to understand and interpret the requirements of the standard Planning to implement the requirements of the standard Course Structure
More informationMonroe Engineering is committed to customer satisfaction; we strive for Continuous Improvement in our products and our people.
Title: AS9100D Quality Manual Revision Date.: 05/04/2018 Page 1 of 22 The Quality Policy of Monroe Engineering is defined in the following statement: Monroe Engineering is committed to customer satisfaction;
More informationProprietary Document Disclosure Restricted To Employees and Authorized Holders
Revision Level: A Page 1 o f 33 Revision Level: A Page 2 o f 33 (This page left blank intentionally.) Revision Level: A Page 3 o f 33 S i g n a t u r e P a g e Reviewed By Management Representative: 1
More informationBeaver Machine. Quality Manual
Beaver Machine Quality Manual This manual has been written to the ISO 9001:2000 International Quality Standard Beaver Machine Inc. 5273 Hanson Court Minneapolis, MN 55429 763-535-2204 www.beavermachine.com
More informationQuality Manual. This manual has been written to the ISO 9001:2000 International Quality Standard
Sceptre CNC Machining Inc. Quality Manual This manual has been written to the ISO 9001:2000 International Quality Standard Sceptre CNC Machining Inc. Unit 401 1485 Coast Meridian Road Port Coquitlam, B.C.
More informationIssued by ISO Management Representative Signature/Date: Ken Hicks 11/09/06 GOWANDA. Electronics. PO Box 111 One Magnetics Parkway Gowanda NY, 14070
The Only Name in Magnetics Document: QM AS9100 AEROSPACE QUALITY MANUAL Revision: Issued by ISO Management Representative Signature/Date: Ken Hicks 11/09/06 J Page: 1 of 38 Approved by Chief Operating
More informationEverest Engineering Works ISO REVISION DATE ISSUE
Page 1 of 28 QUALITY MANAGEMENT MANUAL ISSUED BY : MANAGEMENT REPRESENTATIVE (MR) ISSUED TO : ALL AUTHORIZED BY : Proprietor OFFICE & FACTORY G/3,Sudama Industrial Estate,Dharam Kanta, Mira-Bhayndar Road,
More informationQUALITY MANUAL ISO 9001 QUALITY MANAGEMENT SYSTEM
QUALITY MANUAL ISO 9001 QUALITY MANAGEMENT SYSTEM APPROVED BY: JOSE ALBERTO APPROVED ON: 08/10/2017 Rev.: 1 M001 QUALITY MANAGEMENT SYSTEM PAGE: 1 of 20 TABLE OF CONTENTS SECTION TITLE PAGE Table of Contents
More informationThe Skyworks Quality Management System strives to:
Skyworks has embraced a workplace where Quality is the number one differentiator to achieve Customer Loyalty. Skyworks has adopted a single Quality Management System which drives efficiency, consistency
More informationTOOL ENGINEERING OLD GROVE RD. SAN DIEGO, CA
Page 1 of 42 VERTECHS ENTERPRISES, INC. Dba LUCHNER TOOL ENGINEERING 10051 OLD GROVE RD. SAN DIEGO, CA 92131 Ph No. 1-858-578-3900. Fax No. 1-858-578-2910 Reviewed and Approved By: Geosef (Joey) Straza
More informationUNCONTROLLED DOCUMENT
Rheem Manufacturing Company Fort Smith, Arkansas Original Release: 4/06/09 Revision Date: 10/25/16 Quality Management System D. Presley 05 1 of 1 Manual Contents A. Johnson 10/25/16 0 Section Title Revision
More informationKEVLIN CORPORATION DIVISION OF COBHAM DEFENSE ELECTRONIC SYSTEMS
1.doc KEVLIN CORPORATION DIVISION OF COBHAM DEFENSE ELECTRONIC SYSTEMS QUALITY POLICY MANUAL QPM 4. 596 Lowell St Methuen, MA 01844 USA 2.doc TABLE OF CONTENTS Clauses Procedure Description of Contents
More informationHarmony Castings LLC Aluminum V-Process Castings Quality Manual Section: Page 1 of 27
Harmony Castings LLC Page 1 of 27 Approval Signature: Andy Renkey, President Mark Fallen, Plant Manager Gary Dindinger, Quality Manager 1.0. Scope. Harmony Castings LLC s quality system is manufacture
More informationQuality Systems Manual Rev. NC Issued July 9 / 2018
NMT Specialized Machining Inc 290 Shoemaker Street Kitchener, Ontario Canada N2E 3E1 Quality Systems Manual Rev. NC Issued July 9 / 2018 Conforms to AS9100 Rev D and ISO 9001:2015 Table of Contents Introduction
More informationCORPORATE MANUAL OF INTEGRATED MANAGEMENT SYSTEM
CORPORATE MANUAL OF INTEGRATED MANAGEMENT SYSTEM SIAD Macchine Impianti, the Company leader of SIAD Group's Engineering Pag. 1 di 20 Contents INTRODUCTION... 4 FOREWORD... 4 1. SCOPE... 5 2. REFERENCES...
More informationReliance Aerospace Solutions
Reliance Aerospace Solutions Quality Manual The information contained in this document is the property of Reliance Aerospace Solutions, a division of Reliance Steel & Aluminum Company This manual is a
More informationSCHEDULE M-III [See Rule 76]
SCHEDULE M-III [See Rule 76] QUALITY MANAGEMENT SYSTEM FOR NOTIFIED MEDICAL DEVICES AND IN-VITRO DIAGNOSTICS 1. General This schedule specifies requirements for a quality management system that shall be
More informationCORPORATE QUALITY MANUAL
Corporate Quality Manual Preface The following Corporate Quality Manual is written within the framework of the ISO 9001:2008 Quality System by the employees of CyberOptics. CyberOptics recognizes the importance
More informationPRINTED COPY IS NOT CONTROLLED
Quality Manual We Deliver Quality on Time Form 1217 (01.16.2018) Rev. 12 SOR Inc. sorinc.com SOR QUALITY MANUAL Page 1 of 18 Table of Contents Quality Manual 8701-001 Revision 12 Introduction....4 1.0
More informationAEROSPACE STANDARD. Quality Systems - Aerospace - Model for Quality Assurance in Design, Development, Production, Installation and Servicing
AEROSPACE STANDARD AS9100 Technically equivalent to AECMA pren 9100 Issued 1999-11 Revised 2001-08 Superseding AS9100 REV. A Quality Systems - Aerospace - Model for Quality Assurance in Design, Development,
More informationGTG Inc. ISO 9001:2008 QMS Manual. Continuous Improvement
GTG Inc. ISO 9001:2008 QMS Manual Technology & Innovation Customer Satisfaction Continuous Improvement Title: QMS Manual & Procedures Rev: C Page: 2 of 39 Table of Contents 1.0 QMS System 2.0 Scope 2.1
More informationQMS Team: MR and all HODs (Internal Auditors) MR March 10. Quality policy Define quality policy The Steering committee Objectives and targets
QMS Roles, Responsibility and Authority Process Clause Activities Records Required Responsibility Authority Deadline Clause 4: Process Development 4.1 Develop processes and sequence, operation controls
More informationA Division of Research Products Corporation
A Division of Research Products Corporation Quality Manual ISO 9001:2008 Table of Contents Page Number Approvals 2 Table of Contents 3 Revision History 4 Distribution List - Controlled Copies 5 Introduction,
More informationQuality Manual ISO 9001:2008 ISO 9001:2015
Quality Manual ISO 9001:2008 ISO 9001:2015 SAE CIRCUITS, INC. 4820 63 rd Street Suite 100 Boulder, CO 80301 USA www.saecircuits.com Table of Contents 1. Company Information 3 2. QMS Scope and Exclusions
More informationQUALITY MANAGEMENT SYSTEM QUALITY MANUAL
AERO SUPPLY USA 21941 US HWY 19 NORTH Clearwater, FL. 33765 USA P.(727) 754-4915 F.(727) 754-4920 Website: www.aerosupplyusa.com Email: sales@aerosupplyusa.com QUALITY MANAGEMENT SYSTEM QUALITY MANUAL
More information<Full Name> Quality Manual. Conforms to ISO 9001:2015. Revision Date Record of Changes Approved By
Conforms to ISO 9001:2015 Revision history Revision Date Record of Changes Approved By 0.0 [Date of Issue] Initial Issue Control of hardcopy versions The digital version of this document is
More informationExternal approval and/or acknowledgment requirements apply prior to issuance or revision of this document: Yes No. Yes PROPRIETARY DOCUMENT No
TITLE: EECTIVE DATE: 09/18/2014 External approval and/or acknowledgment requirements apply prior to issuance or revision of this document: Yes No Yes PROPRIETARY DOCUMENT No TABLE O CONTENTS QUALITY POLICY
More informationQuality System Manual - Section 00
Quality System Manual - Section 00 INDEX AND REVISION STATUS Issued by: Quality Assurance Eff. Date: 06/10/2014 Rev.: A Pg. 1 of 4 QUALITY SYSTEM MANUAL SECTION 0 - INDEX AND REVISION STATUS SECTION 1
More informationQuality Management System Manual
1 of 28 Quality Management System ClosedMold Carbon Composites Production LLC. Approval: 9/26/05 Ron Nelson, President Date ClosedMold Carbon Composites Production LLC. 34 West Louise Ave. Salt Lake City,
More informationQUALITY MANUAL BAGLIETTO S.R.L.
2013 BAGLIETTO S.R.L. PAG. 2 OF 28 Head office and factory: Via Castelgazzo 11 15067 Novi Ligure (Al) Tel. +39 0143 318000 COPY CHECKED COPY NOT CHECKED ASSIGNS : DATE : 01/11/13 4 UPDATE COMPANY DATA
More informationSpecification for Quality Programs for the Petroleum, Petrochemical and Natural Gas Industry
Addendum 1 June 2010 Effective Date: December 1, 2010 Specification for Quality Programs for the Petroleum, Petrochemical and Natural Gas Industry ANSI/API SPECIFICATION Q1 EIGHTH EDITION, DECEMBER 2007
More informationWebster - Hoff Corporation. Quality Manual
Registered to ISO 9001:2008 ANSI/ISO/ASQ Q9001-2008 QM-1 Page 2 of 35 TABLE OF CONTENTS Section Name Page Management Approval Of / List of Exclusions 3 Corporate Quality Policy 4 Webster-Hoff Corporation,
More informationCAPITAL AVIONICS, INC. Quality Manual
CAPITAL AVIONICS, INC. Issued 31 July 2018 Conforms to ISO 9001:2015 2018 ; all rights reserved. This document may contain proprietary information and may only be released to third parties with approval
More information1050 Day Hill Road Windsor, Connecticut Telephone (860) Fax (860) SUPPLIER SURVEY DATE OF SURVEY TYPE OF SURVEY
1050 Day Hill Road Windsor, Connecticut 06095-4728 Telephone (860) 688-0888 Fax (860) 285-8514 SUPPLIER SURVEY DATE OF SURVEY TYPE OF SURVEY POTENTIAL SUPPLIER INITIAL SURVEY ON-SITE EXISTING SUPPLIER
More informationDEC STD ISO Quality Systems - Model for Quality Assurance in Design /Development, Production, Installation and Servicing
Digital Internal Use Only DEC STD 017-1 - ISO 9001 - Quality Systems - Model for Quality Assurance in Design /Development, Production, Installation and Servicing DOCUMENT IDENTIFIER: A-DS-EL00017-01-0000
More informationISO 9001:2015 QUALITY MANAGEMENT SYSTEM POLICIES AND PROCEDURES
ISO 9001:2015 QUALITY MANAGEMENT SYSTEM POLICIES AND PROCEDURES Origination Date: XXXX Document Identifier: Date: Document Revision: QMS-00 Policies and Procedures Latest Revision Date Abstract: This handbook
More informationQUALITY MANUAL. This document defines the requirements, processes, structure and documentation for the Teledyne DGO Quality Management System.
Page 1 of 13 1. PURPOSE This document defines the requirements, processes, structure and documentation for the Teledyne DGO Quality Management System. 2. SCOPE The Teledyne DGO Quality Management System
More informationElectronics. Document: QUALITY MANUAL. Revision: W. Date: 08/22/2016
Document: QUALITY MANUAL Revision: W Date: 08/22/2016 Electronics Gowanda Electronics One Magnetics Parkway Gowanda, NY 14070 Ph: 716-532-2234 Fax: 716-532-2702 www.gowanda.com Table of Contents Table
More informationPRECISE INDUSTRIES INC. Quality Manual
PRECISE INDUSTRIES INC Revision N Issued July 5, 2017 Conforms to AS9100 Rev. D and ISO 9001:2015 Copyright Year2017 [PRECISE INDUSTRIES INC]; all rights reserved. This document may contain proprietary
More informationISO 9001:2015 AWARENESS
ISO 9001:2015 AWARENESS All rights reserved. 2017 SIRIM STS Sdn Bhd COURSE AGENDA 0900-1030 am : Introduction to ISO 9001:2015 1030-1045 am : Tea Break 1045 0100 pm : Understanding of ISO 9001:2015 requirements
More informationQuality Management System MANUAL. SDIX, LLC Headquarters: 111 Pencader Drive Newark, Delaware 19702
Quality Management System MANUAL SDIX, LLC Headquarters: 111 Pencader Drive Newark, Delaware 19702 Doc. No. G5500 Rev. 11 Status : APPROVED Effective: 09/07/2017 Page 2 of 32 Quality Manual Table of Contents
More informationQuality management systems Requirements
BSI Standards Publication NO COPYING WITHOUT BSI PERMISSION EXCEPT AS PERMITTED BY COPYRIGHT LAW raising standards worldwide Quality management systems Requirements Incorporating corrigendum July 2009
More informationEPICOR, INCORPORATED QUALITY ASSURANCE MANUAL
EPICOR, INCORPORATED QUALITY ASSURANCE MANUAL Revision: 6 Date 05/18/09 EPICOR, INCORPORATED 1414 E. Linden Avenue P.O. Box 1608 Linden, NJ. 07036-0006 Tel. 1-908-925-0800 Fax 1-908-925-7795 Table of Contents:
More informationUR Startup Inc. ISO Audit Checklist. conducted for. Conducted on (Date and Time) 02 Aug :06 PM. Inspected by Andy Dion
ISO 22000 Audit Checklist conducted for UR Startup Inc. Conducted on (Date and Time) 02 Aug 2018 03:06 PM Inspected by Andy Dion Location Chemin de sous le Clos 16 1232 Confignon Switzerland (46.1758650103172,
More informationQuality Manual. Manasota Optics, Inc & 1749 Northgate Boulevard Sarasota, FL Issue # 7 dated 05/10/2018
Quality Manual Manasota Optics, Inc. 1743 & 1749 Northgate Boulevard Sarasota, FL 34234 Issue # 7 dated 05/10/2018 Schedule QM-01 Page:- 1 of 34 Issue Number:- 7 Effective Date:- 05/10/18 This document
More informationPCA ELECTRONICS, INC. Quality Manual
PCA ELECTRONICS, INC. Conforms to ISO 9001:2015 (c) 2018 PCA Electronics, Inc.; all rights reserved. This document may contain proprietary information and may only be released to third parties with approval
More informationDOCUMENT NO: QM-01 TITLE: QUALITY MANUAL TOTAL PAGES: 39 PREPARED BY: Barry Scott INITIAL ISSUE: REVISION DATE: 3/1/13 REVISION NO: 28
DOCUMENT TYPE: POLICY DOCUMENT NO: QM-01 TITLE: QUALITY MANUAL TOTAL PAGES: 39 PREPARED BY: Barry Scott INITIAL ISSUE: 4-22-98 REVISION DATE: 3/1/13 REVISION NO: 28 SCREW-MATIC CORP. DBA: SMC Aerospace
More informationSupplier Quality Survey. 1. Type of Business: g) Commodities supplied? Supplier Changes/comments: 2. Headcount breakdown by group: Purchasing
Supplier: Phone: Prime Contact/Title: Sales Contact/Title: Address: Fax: e-mail address e-mail address Quality Contact/Title: e-mail address 1. Type of Business: a) Number of years in business? b) Company
More informationQuality Systems Manual
Quality Systems Manual This manual was developed to support ISO 9001 elements 1445 Oakland Drive, San Jose, CA 95112-2702 - Tel: (408) 294-9897 - Fax: (408) 297-1540 http://www.gorillacircuits.com Reference
More information