1 Zero Energy Building Example in Estonia Tõnu Mauring University of Tartu, Estonia Jan , Riga
2 Site location Põlva, Estonia (58 N, 27 E) Long-term average dry bulb temperature for inland part of Estonia is in: December -2,5 C, January -3,0 C, February -5,2 C. [Kalamees and Kurnitski 2006] [Kalamees and Vinha 2004] Corresponding long-term average daily minimum values are from November to March below -10,0 C, For January below -14,3 C. Temperature falls Occasionally below -30,0 C, Frequently below -15,0 C [Kalamees 2006] [Estonian Meteorological and Hydrological Institute 2002]
3 Monthly average ambient air temperature
4 Sunshine duration hours in month
5 Sunshine duration
6
7 Põlva, Estonia
8
9
10 Architects Martha Enriquez Reinberg and Georg W. Reinberg Treated floor area (PHPP) 280,6 m 2 Number of rooms 6 Construction time Mixed wood and concrete
11
12 Thermal envelope Wall 400 mm cellulose fiber, 94 mm KLH Massive wood, U = 0,105 W/(m 2 K) Ceiling 500 mm EPS, 102 mm KLH U = 0,079 W/(m 2 K) Wall, underground 500 mm EPS, 200 mm concrete U = 0,066 W/(m 2 K) Floor 300 mm XPS, 300 mm concrete, 100 mm EPS U = 0,086 W/(m 2 K)
13 Wall construction U = 0,105 W/(m 2 K) Ψ -0,046 W/(mK) THERM 7.1 THERM 6.3
14 Wall construction U = 0,105 W/(m 2 K) Ψ -0,014 W/(mK) THERM 7.1
15 Window SmartWin fixed U frame 0,57 W/(m 2 K) ψ spacer 0,026 W/(mK) ψ installation 0,010 W/(mK) SmartWin opening U raam 0,77 W/(m 2 K) ψ spacer 0,026 W/(mK) ψ installation 0,010 W/(mK) U glas 0,54 W/(m 2 K) g-value 0,50
16 Window Outside insulation Ψ = 0,014 W/(mK) SmartWin Ψ = 0,050 W/(mK) Comparison: not insulated
17
18
19
20
21
22 Ventilation unit Paul Novus 300 Heat recovery 93% (PHI def) Paul Sole Defroster SD-550, 226 m long 40 mm pipe
23 airtightness n 50 = 0,31 h -1
24 Heat loss and heat gains in kwh/month Building heat balance in kwh/month Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Net space heat demand Utilised internal heat gains Utilised solar gains Non-utilised internal heat gains Non-utilised solar gains Heat losses PHPP 2007, ISO 13790
25 Heat losses and gains in heating period in kwh/a Exterior Wall to Ambient Exterior Wall to Conservatory Exterior Wall to Ground Roof to Ambient Floor slab Windows (incl. thermal bridges) Exterior Door Linear thermal bridges (external dim.) Ventilation and infiltration Utilised solar heat gain Utilised internal heat gain Annual net space heat demand Building heat balance in kwh/a PHPP 2007, ISO 13790
26 Window heat balance in kwh/a Heat losses Utilised solar gains Non-utilised solar gains West South East North Heat loss and gain for the heating period in kwh/a PHPP 2007, ISO 13790
27 2 x 1000 L Solar thermal system, calculated annual production 4900 kwh
28 12 m 2 roof integrated solar thermal collectors for warm water Sonnenkraft SK IMK
29 separate array of solar thermal collectors 13 m 2 for heating and warm water integrated to southern façade and optimized for the winter operation
30 Ground source heat pump Viessmann Vitocal 300 G BWC 5,9 kw COP = 4,5 2 x 80 m deep vertical boreholes
31 Wall heating 2 x 1000 L 39/33ºC supply/return temperture
32 Summer night ventilation
33
34
35
36
37
38 Space heating + warm water heating balance in kwh/a Calculated values Net space heating demand Production Heat pump Solar thermal Losses of space heat distribution (non-utilised) Demand Space heating DHW DHW losses Net energy demand for domestic hot water (DHW) production Losses of DHW storage and distribution (non-utilised) Energy demand and production (kwh/a) Energy demand covered by GSHP (vertical ground source heat pump) Useful energy production by solar-thermal system for space heating and DHW
39 Aim: net zero energy house 90 m 2 PV panels SolarWorld Sunmodule Plus SW 196 Vario poly Calculated annual production of the system kwh
40 Electricity kwh/a Electricity demand and production in kwh/a Calculated values: Photovoltaic Domestic appliances, lighting, sauna equipment etc. Technical installations (ventilators, pumps etc.) GSHP (vertical ground source heat pump) 0 Demand Production
41 Calculated electricity demand heat pump household auxilliary kwh/a Calculated PV electricity production 90 m 2 SolarWorld Sunmodule Plus SW 196 Vario poly Calculated production: Balance kwh/a
42 electrical energy in kwh Measured values in 2013 PV generated grid traffic Sold to grid Bought from grid Sold to grid Bought from grid July Aug Sept Okt Nov Dez Sold to grid (blue) Bought from grid (red) July Aug Sept Okt Nov Dez
43 Monitoring Window and door position sensors (4) for night cooling and CO 2 Indoor air temperature and humidity sensors (6) for indoor climate on all floors and different room types CO 2 (2) for indoor climate in two bedrooms Massive wall temperature sensors (12) for temperature on different sides and heigths of wall Ventilation system (including defroster) temperature and humidity sensors (5) Outside air temperture and humidity sensors Wall construction temperature and humidity sensors (5) Wall heat flux sensor Global radiation sensor
44
45 Temperature cource in massive wall regular temperature increase 7 K in 6,5 hr due to passive solar no additional heating in March 2013
46
47 Measured indoor air relative humidity % 1 st floor bedroom 50% 30% 1 month period: Aug 24 to Sept
48 Measured indoor air CO 2 concentration 1 st floor bedroom 1000 ppm 400 ppm 1 month period: Aug 24 to Sept
49 Thank you! Parties involved in the project: Architects: Martha Enriquez Reinberg and Georg W. Reinberg, Architekturbüro Reinberg ZT GmbH, Wien, Austria. Consulters: Tõnu Mauring, Jaanus Hallik and Kristo Kalbe, University of Tartu (building physics, monitoring), Johannes Riebenbauer, Graz (static engineer), S&P Climadesign GmbH (technical systems), Margus Valge, Sense OÜ (project management and site supervision), PassiveHouse OÜ Estonia and Passive House Institute Darmstadt (certification).
A prototype architecture for passive and plus energy building in Estonia
A prototype architecture for passive and plus energy building in Estonia Tõnu Mauring, Jaanus Hallik, Margus Valge, Kristo Kalbe University of Tartu, Institute of Technology Georg W. Reinberg, Architekturbüro
More informationLOW-ENERGY HOUSING ESTATE SUNDAYS
LOW-ENERGY HOUSING ESTATE SUNDAYS Werner Weiß Christian Fink Alexander Thür AEE - Arbeitsgemeinschaft ERNEUERBARE ENERGIE Feldgasse 19 A-8 Gleisdorf AUSTRIA Tel.: +43-311 - 5886 Fax.: +43-311 5886-18
More informationAalborg Universitet. CLIMA proceedings of the 12th REHVA World Congress Heiselberg, Per Kvols. Publication date: 2016
Aalborg Universitet CLIMA 2016 - proceedings of the 12th REHVA World Congress Heiselberg, Per Kvols Publication date: 2016 Document Version Publisher's PDF, also known as Version of record Link to publication
More informationMID-RISE APARTMENT BUILDING PROTOTYPE HIGH PERFORMANCE PV Genera on Poten al 10.8 kbtu/ 2/yr
MID-RISE APARTMENT BUILDING PROTOTYPE HIGH PERFORMANCE 50 kbtu/sf/yr 45.1 PROJECT INFORMATION 40 kbtu/sf/yr 30 kbtu/sf/yr 20 kbtu/sf/yr 10 kbtu/sf/yr 0 kbtu/sf/yr 13.0 kbtu/ft2/yr Baseline 10.8 kbtu/ft2/yr
More informationFuture tree planting on the two acre lot will offset remaining lifetime carbon emissions.
Luxury Net-Zero Home by Rockwood Custom Homes 47 Grandview Place, Calgary AB T3Z A8 by Grant Bremner A Net-Zero Emissions (NZE) home is carbon neutral where carbon credits fully offset emissions. An NZE
More informationAssignment 3 Integrated Energy Design
Assignment 3 Integrated Energy Design AAR4926 Marco Rimensberger Shabnam Arbab Shangyi Sun May 2012 Page 0 Contents 1 Introduction... 2 2 Background... 2 3 Design Progress... 2 3.1 Available Energy Sources...
More informationPV Generation Potential 17.1 kbtu/ft2/yr 15.4
TOWNHOME PROTOTYPE HIGH PERFORMANCE 60 kbtu/sf/yr 50 kbtu/sf/yr 40 kbtu/sf/yr 30 kbtu/sf/yr 20 kbtu/sf/yr 10 kbtu/sf/yr 0 kbtu/sf/yr 54.4 Baseline 21.8 kbtu/ 2/yr 15 MMBtu 12 MMBtu 9 MMBtu 6 MMBtu 3 MMBtu
More informationZero Energy House in Japan: Actual results and future target. Isamu Ohta Misawa Homes Institute of Research & Development CO., LTD.
Zero Energy House in Japan: Actual results and future target Isamu Ohta Misawa Homes Institute of Research & Development CO., LTD. Energy consumption of Japanese houses Japanese government has announced
More informationStrategies for energy efficiency improvement in residential and office buildings: their role at building and country scale
The Future Role of Energy Storage in South Eastern Europe Enlargement and Integration Action Workshop Strategies for energy efficiency improvement in residential and office buildings: their role at building
More informationProject Description. Projected build start date 01 Mar 2010 Projected date of occupation 01 Aug Energy target.
http://lowenergybuildings.org.uk Project name Larch House, Ebbw Vale, Wales Project summary The Larch House, designed by bere:architects, is the UKs first zero carbon (code 6), low cost, Certified Passivhaus,
More informationLOW-RISE APARTMENT BUILDING PROTOTYPE HIGH PERFORMANCE PV Genera on Poten al 17.9 kbtu/ 2/yr
LOW-RISE APARTMENT BUILDING PROTOTYPE HIGH PERFORMANCE 40 kbtu/sf/yr 35 kbtu/sf/yr 30 kbtu/sf/yr 25 kbtu/sf/yr 20 kbtu/sf/yr 15 kbtu/sf/yr 10 kbtu/sf/yr 5 kbtu/sf/yr 0 kbtu/sf/yr 11.9 kbtu/ft2/yr 36.0
More informationVerified net Zero Energy Building with air source heat pumps for SME
Verified net Zero Energy Building with air source heat pumps for SME Field measurements were conducted on a net zero energy building designed for small to medium enterprises (SMEs). Energy flow and comfort
More informationPV Generation Potential 17.1 kbtu/ft2/yr 15.4
TOWNHOME PROTOTYPE BASELINE 60 kbtu/sf/yr 50 kbtu/sf/yr 40 kbtu/sf/yr 30 kbtu/sf/yr 20 kbtu/sf/yr 10 kbtu/sf/yr 0 kbtu/sf/yr 54.4 Baseline 54.4 kbtu/ 2/yr 21.8 High Performance 18.2 PHIUS - IES 60 MMBtu
More informationSOLCER HOUSE ENERGY POSITIVE - LOW CARBON - LOW COST
SOLCER HOUSE ENERGY POSITIVE - LOW CARBON - LOW COST BACKGROUND The Welsh School of Architecture has designed and built Wales first low cost energy positive house. The Solcer House is capable of exporting
More informationEnergy-Efficient Passive House using thermal mass to achieve high thermal comfort
Energy-Efficient Passive House using thermal mass to achieve high thermal comfort Loa Andersson Managing Director RLI Byggdata AB rli@termodeck.com Alexander Engström Technical Director RLI Byggdata AB
More informationDI (FH) Dieter Herz - Herz & Lang GmbH. House of the Future
DI (FH) Dieter Herz - Herz & Lang GmbH House of the Future Office Overview Overall planning old/new build Architechture + Technical planning Building measurement+ expert advice PH-Consulting + Certification
More informationSolar Energy Technologies
1 Solar Energy Technologies ME 430 Queen s University The Solar Energy Resource Varies over day and year, (i.e., intermittent) Generally non-dispatchable Ottawa average for year ~4 kwh/m 2 per day e.g.,
More informationHere Comes The Sun Applications of Solar Energy. Marc Rosenbaum, P.E. South Mountain Company West Tisbury, MA
Here Comes The Sun Applications of Solar Energy Marc Rosenbaum, P.E. South Mountain Company West Tisbury, MA Learning objectives 1 Participants will learn how to quantify the amount of sun reaching a surface
More informationProject name Gentoo Retrofit Bid 1 Project summary Refurbishment of 2no. Semi Detached houses using Passivhaus principles
http://lowenergybuildings.org.uk Project name Gentoo Retrofit Bid 1 Project summary Refurbishment of 2no. Semi Detached houses using Passivhaus principles Project Description Projected build start date
More informationTHE SOLAR AKTIVHAUS A BUILDING EXAMPLE
THE SOLAR AKTIVHAUS A BUILDING EXAMPLE Georg W. Reinberg (author and architect) Architekturbüro Reinberg ZT GmbH, www.reinberg.net Summary On behalf of the solar power company Sonnenkraft a new type of
More informationApartment building Sodastraße 40 in Ludwigshafen, DE
Apartment building Sodastraße 40 in Ludwigshafen, DE PROJECT SUMMARY Renovation of an apartment building with exposed brickwork, built in 1892. 78% reduction of annual heat energy demand with interior
More informationPASSIVE HOUSE OBJECT DOCUMENTATION
PASSIVE HOUSE OBJECT DOCUMENTATION Rua do Mar House B, single family house, Ílhavo Portugal (Passive House project database: ID 2403) 2.1 PROJECT OVERVIEW Project designer: João Marcelino, Homegrid (www.homegrid.pt)
More informationProject Description. Projected build start date 15 Aug 2011 Projected date of occupation 19 Dec Existing external wall construction
http://lowenergybuildings.org.uk Project name Redlands Project summary Deep retrofit of 1955 brick house in Devon based on EnerPHit standard. House had old gas boiler, double glazing, cavity wall insulation
More informationEuroPHit. Outlines for training modules for designer
EuroPHit Outlines for training modules for designer Zeno Bastian Passive House Institute Darmstadt, Germany www.europhit.eu The EuroPHit Project With the EnerPHit Standard as the goal and Passive House
More informationPassivHaus/ EnerPHit Introduction. Maiia Guermanova behalf of
PassivHaus/ EnerPHit Introduction Maiia Guermanova behalf of Email: maiia.guermanova@sturgis.co.uk PassivHaus/ EnerPHit What is a PassivHaus/ Passive House? Passivhaus is not a brand name but a building
More informationProject Description. Projected build start date 19 Apr 2010 Projected date of occupation 30 Sep
http://lowenergybuildings.org.uk Project name LB Greenwich - How low can we go? Project summary Our project has sought to produce a retrofit solution which is practical to build, easy to run and maintain,
More informationProject name SOLAR HOUSE 80/50 Project summary
http://lowenergybuildings.org.uk Project name SOLAR HOUSE 80/50 Project summary Project Description Projected build start date 01 Mar 2010 Projected date of occupation 19 Jul 2010 Project stage Under construction
More informationSustainable Building Façade and Advanced Fenestration Systems
Workshop on Potential Technological Developments for Zero Carbon Buildings 16-17 Oct 2013 Sustainable Building Façade and Advanced Fenestration Systems Tin-Tai Chow Building Energy & Environmental Technology
More informationOKO House by YOUMEHESHE architects
OKO House by YOUMEHESHE architects The OKO House The OKO House is a modular pre-fabricated design aimed initially at the European and North American housing market and to be developed for other global
More informationPassiv Haus Institut. Certification as "Quality Approved Passive House" Criteria for Non-Residential Passive House Buildings
Passiv Haus Institut Dr. Wolfgang Feist Rheinstr. 44/46 D-64283 Darmstadt www.passiv.de Certification as "Quality Approved Passive House" Criteria for Non-Residential Passive House Buildings Passive Houses
More informationBalta Eco-Project crit3
Balta Eco-Project crit3 Maxime Bergé Mathieu Bicego Aurélie Charton Astrid Hanrot 1 hourly heating requirements : Hourly solar energy available When summing hourly energy for one day in each month: 3000
More informationD3.9_Overall Refurbishment Plan DRAFT CS03. Hotel Restaurant Valcanover
D3.9_Overall Refurbishment Plan DRAFT CS03 Hotel Restaurant Valcanover INTELLIGENT ENERGY EUROPE II Energy efficiency and renewable energy in buildings IEE/12/070 EuroPHit [Improving the energy performance
More informationSome Performance Results and Lessons Learned from EQuilibriumTM Housing Monitoring Avalon Discovery 3
Some Performance Results and Lessons Learned from EQuilibrium Housing Monitoring TM 2011 BCBEC AGM & Conference Allan Dobie MEDes, MRAIC Sr. Research Consultant, Research and Information Transfer, CMHC
More informationPassive House: Overview
Passive House: Overview Wexford Local Development Maurice Falvey MosArt Passive House Academy 3,000 BC Increasing energy standards... Conventional energy standard (65kWh/m 2 /year for space heating) Low
More informationNYSERDA High Performance Development Challenge Energy Monitoring Report Hudson Passive Project
NYSERDA High Performance Development Challenge Energy Monitoring Report Hudson Passive Project The participating home is a single family detached home in Hudson, NY. The house was completed and occupied
More informationNext Generation District Heating
Next Generation District Heating FVB: Ulrika Ottosson, Heimo Zinko Lund University: Janusz Wollerstrand, Patrick Lauenburg, Marek Brand (DTU) a project The Swedish District Heating Association s R&D programme
More informationBruck an der Mur. Project summary. Energy concept: Background for the renovation reasons
Bruck an der Mur Project summary Energy concept: Background for the renovation reasons The aim of this project was to gather information and experiences of the pilot project and the research, so that those
More informationWHOLE HOUSE ENERGY DESIGN
WHOLE HOUSE ENERGY DESIGN AND SOLAR HOT WATER OPTIONS Better Buildings By Design Conference February 13, 2008 Andrew R. Cay, A. R. Cay Company, Inc. (603) 363-4888/101 cayco@verizon.net 1 WHOLE HOUSE ENERGY
More information2 x BPE studies of Passivhaus domestic projects
bere:architects 73 The Poets MuseRoad London 54A Newington N5 2SH Green T London +44(0)20 N16 7359 9PX 4503 www.bere.co.uk T +44 (0)20 7241 1064 www.bere.co.uk Building Better Buildings / UCL / Technology
More informationProject Description. Projected build start date 01 May 2010 Projected date of occupation 01 Nov Belfast, County Antrim, Northern Ireland
http://lowenergybuildings.org.uk Project name Eco-Energy Retrofit, Grove Housing Association, Belfast Project summary The mid terrace solid wall house built in 1896, is located in North Belfast and owned
More informationNearly Zero Energy Building in Lecco Modern technological building compared to an ancient Villa
Nearly Zero Energy Building in Lecco Modern technological building compared to an ancient Villa Matteo BRASCA *, Oscar Luigi PAGANI **, Kanza RAUF*** * partner - AIACE S.r.l. società di ingegneria, contract
More informationProject Description. Projected build start date 12 Apr 2010 Projected date of occupation 28 Feb
http://lowenergybuildings.org.uk Project name PassivHaus Retrofit - Octavia Housing Project summary PassivHaus retrofit of a three storey solid brick Victorian terraced house in a conservation area. Produce
More informationImpact of Distributed Solar Generation in Low Energy Housing on the Electrical Grid
Impact of Distributed Solar Generation in Low Energy Housing on the Electrical Grid Wasim Saman, David Whaley and Lachlan Mudge Barbara Hardy Institute University of South Australia - Mawson Lakes SA,
More informationHamilton Way - Case Study of a High Performance Community in a Cold Climate
March 11, 2010 Northeast Sustainable Energy Association Conference Peter Baker, P.Eng. Building Science Corporation Chris Nelson Nelson Construction Hamilton Way - Case Study of a High Performance Community
More informationPassive House Project documentation
Passive House Project documentation Architecture: CadViz: Building physics: ehaus, Cyril Vibert Building Services: ehaus, Cyril Vibert Craftsperson: ehaus A compact two level family home with 4 bedrooms
More informationPotential of ventilative cooling in German residential buildings
Potential of ventilative cooling in German residential buildings QUALICHeCK-Webinar, 2016-12-01 Auf Wissen bauen Fraunhofer IBP Introduction Background Highly insulated buildings with almost completely
More informationPassive houses for the Northern climate
Passive houses for the Northern climate Jyri Nieminen Customer Manager VTT Technical Research Centre of Finland Finland Jyri.Nieminen@vtt.fi Jouko Knuutinen Regional Director TA Yhtymä Finland Jouko.Knuutinen@TA.fi
More informationSURNA Grow Facility: Systems Comparison - IEA
SURNA Grow Facility: Systems Comparison - IEA May 2016 SURNA Grow Facility This analysis provides the projected energy and associated cost comparison between the Surna proposed facility in comparison to
More informationHeat Pump Field Trials and Implications for Design
Heat Pump Field Trials and Implications for Design GSHPA 26 th June 2012 Chris Laughton Managing Director The Solar Design Company 1 Contents German Fraunhofer trials 2011 Comparison with UK Heat Pump
More information4.2.3 MINERGIE ORIGIN AND ORGANISATION
As described earlier, the energy performance of a building is calculated and compared with the requirements for the chosen Minergie system. The calculations are then sent to a Minergie administrator who
More informationPassive House: Overview
Passive House: Overview Wexford Local Development Maurice Falvey MosArt Passive House Academy 3,000 BC Increasing energy standards... Conventional energy standard (65kWh/m 2 /year for space heating) Low
More informationAUTARKIC COOLING VIA BUILDING SKINS - RESULTS FROM COOLSKIN-PROJECT COOSLKIN This project is funded by the Austrian Klima- und Energiefonds
AUTARKIC COOLING VIA BUILDING SKINS - RESULTS FROM COOLSKIN-PROJECT COOSLKIN This project is funded by the Austrian Klima- und Energiefonds within the programme e!mission 1st Call 2014 Tim Selke Solar
More informationEnergy Audit. Project: ENergy Efficiency and Renewables SUPporting Policies in Local level for EnergY (ENER-SUPPLY) Work Package 4
Project: ENergy Efficiency and Renewables SUPporting Policies in Local level for EnergY (ENER-SUPPLY) Work Package 4 Energy Audit Date: Country: SERBIA Partner: University of Novi Sad (UNS) Building: Health
More informationPassivhaus Projects and Benefits
Passivhaus Projects and Benefits Andrew T. Arthur MPH CMCIEH Arthur Associates Passivhaus not Passive House Need to make distinction between: this and this Passivhaus Standard which was developed in Germany
More informationBuilt examples and project certification. Zeno Bastian, Passive House Institute
Built examples and project certification Zeno Bastian, Passive House Institute Passive House Standard for Retrofits? Photo Passive House Institute Shape Graphic Passive House Institute Thermal Bridges
More informationDeep Energy Retrofit of a HighRise MURB
Deep Energy Retrofit of a HighRise MURB COLIN SHANE M.Eng., P.Eng. RDH BUILDING SCIENCES INC. SAN FRANCISCO, CA AIA Credits National Institute of Building Sciences Provider #G168 Credit(s) earned on completion
More informationDienstleistung. Certification as "Quality Approved Passive House" Criteria for Residential-Use Passive Houses
Passiv Haus Institut Passivhaus Dienstleistung GmbH Dr. Wolfgang Feist Rheinstr. 44/46 Rheinstr. 44/46 D-64283 Darmstadt D-64283 Darmstadt www.passiv.de www.passivhaus-info.de Certification as "Quality
More informationProject Description. Projected build start date 02 Aug 2010 Projected date of occupation 03 Dec
http://lowenergybuildings.org.uk Project name Hounslow Council Passivhaus Retrofit - and the development of a decision making matrix Project summary The house is a 3-bedroom semi-detached single-family
More informationLearnings from residential PH design and procurement in Australia. Luc Plowman
Learnings from residential PH design and procurement in Australia Luc Plowman Summary Stakeholder education Expectations Materials & documentation Heating & cooling Costs Documentation requirements The
More informationProject Description. Projected build start date 03 May 2010 Projected date of occupation 06 Aug
http://lowenergybuildings.org.uk Project name Retrofit - Appledore, Ashford Project summary The key project approach is to develop a solution that uses complementary technologies and techniques, and primarily
More informationProject Description. Projected build start date 23 May 2016 Projected date of occupation 27 Feb 2017
http://lowenergybuildings.org.uk Project name Loudon Buildings, Godinton Estate Project summary Conversion of a modern concrete framed straw barn into low energy 4 bedroom house, approved under Class Q
More informationAssessment of Climate Change Robustness of a Deep Energy Retrofit Design of an Existing Day Care Centre
Assessment of Climate Change Robustness of a Deep Energy Retrofit Design of an Existing Day Care Centre Amin Moazami, Salvatore Carlucci, Stig Geving Faculty of Engineering Science and Technology Department
More informationDipl.-Ing. Edmond D. Krecké, Luxembourg. 1. Starting position
Air conditioning of buildings by near-surface geothermal energy Print from the Structural Engineering Yearbook 2005 issued by Verein Deutscher Ingenieure (VDI = Association of German Engineers) Dipl.-Ing.
More informationStudent Modeling Competition
Student Modeling Competition Design and Simulation of a Near-zero Energy Building Building Simulation 2013 Apoorv Goyal agoyal@gsd.harvard.edu Arta Yazdanseta ayazdans@gsd.harvard.edu Keojin Jin kjin@gsd.harvard.edu
More informationENERGETIC MONITORING AND OPTIMIZATION OF A SOLAR HOUSE
Bulletin of the Transilvania University of Braşov Vol. 3 (52) - 2010 Series I: Engineering Sciences ENERGETIC MONITORING AND OPTIMIZATION OF A SOLAR HOUSE M. MOLDOVAN 1 I. VIŞA 1 A. DUŢĂ 1 Abstract: Into
More informationMicrogeneration Installation Standard : MCS 024 SOLAR DOMESTIC HOT WATER ENERGY CALCULATION. to be used in conjunction with MIS 3001:
Microgeneration Installation Standard : MCS 024 SOLAR DOMESTIC HOT WATER ENERGY CALCULATION to be used in conjunction with MIS 3001: REQUIREMENTS FOR CONTRACTORS UNDERTAKING THE SUPPLY, DESIGN, INSTALLATION,
More informationState Of The Art Office Building & Campus For Maharashtra Energy Development Agency(MEDA) At AUNDH, PUNE
State Of The Art Office Building & Campus For Maharashtra Energy Development Agency(MEDA) At AUNDH, PUNE Architectural Design Basis: 2 o The sole motive and mission of MEDA is to Promote Energy Conservation,
More informationAdvanced Design and Building Information Modeling February. Would you like to develop a BIM model of this project? no
ARCH 3691 2013 Your Name: Name of Project: Preference: Advanced Design and Building Information Modeling February Amal Hashem Canada House Would you like to develop a BIM model of this project? no Use
More informationProject Description. Projected build start date 24 Dec 2004 Projected date of occupation. Energy target. Existing external wall construction
http://lowenergybuildings.org.uk Project name Withy Cottage Project summary Timber Frame & Straw Bale self build with thermal bridge free construction (other than door and window frames). Simple flat raft
More informationEffects of the use of DIN on the energetic assessment of residential buildings reflection on the calculation
Abstract Effects of the use of DIN 18599 on the energetic assessment of residential buildings reflection on the calculation approaches The research report was financially supported by the research initiative
More informationDanish national plans for Nearly Zero Energy Buildings
Danish national plans for Nearly Zero Energy Buildings ENERGY SEMINAR IN ESPOO 5 NOVEMBER 2014 KIRSTEN ENGELUND THOMSEN DANISH BUILDING RESEARCH INSTITUTE, SBi AALBORG UNIVERSITY COPENHAGEN Agenda Political
More informationExperimental Study to Evaluate the Performance of Iraqi Passive House in Summer Season
Journal of Energy and Power Engineering 9 (2015) 386-392 doi: 10.17265/1934-8975/2015.04.008 D DAVID PUBLISHING Experimental Study to Evaluate the Performance of Iraqi Passive House in Summer Season Ghanim
More informationIEA HPT Annex 49 Vögelebichl Innsbruck Monitoring and simulation of two multi-family houses with heat pump, PV and collectors
IEA HPT Annex 49 Vögelebichl Innsbruck Monitoring and simulation of two multi-family houses with heat pump, PV and collectors Fabian Ochs, Georgios Dermentzis, Alexandra Ksiezyk Rotterdam 15.05.2016 Part
More informationWelsh Future Homes. Developer: United Welsh Housing Association. Project Description. Architect: bere:architects. Location: Ebbw Vale, Wales
Case Study 03 Welsh Future Homes Developer: United Welsh Housing Association Architect: bere:architects Location: Ebbw Vale, Wales Building Types: Residential Community Renewable & Low Carbon Technologies
More informationDISCOVERIES AT NET ZERO. Michael Leckman Diamond Schmitt Architects Chris Piche Integral Group
DISCOVERIES AT NET ZERO Michael Leckman Diamond Schmitt Architects Chris Piche Integral Group DISCOVERIES AT NET ZERO So, what is a Net Zero Energy building? A building achieves Net Zero Energy when it
More informationBuilding a Home for a Zero Carbon Lifestyle
Building a Home for a Zero Carbon Lifestyle Eco Farm Day 23 February 2013 Chris Weissflog BSc, MSc, MBA CPHC, CanSIA, RASDT, RHDT EcoGen Energy Inc, Kemptville MATH AHEAD Global Carbon Emissions www.co@now.org
More informationProject Description. Projected build start date 02 Aug 2010 Projected date of occupation 03 Dec Existing external wall construction
http://lowenergybuildings.org.uk Project name Tower Hamlets - naturally ventilated Passivhaus Retrofit Project summary The property is a 3 bedroom mid terrace single family residence built in the 1960
More informationPrincedale Road Post Occupancy Evaluation
Post Occupancy Evaluation Prepared by: Eight Associates The Old School House London SW1W 8UP Prepared for: Lewis Lowe Octavia Housing Date: 04.10.12 Our Ref: E453-POE-1210-04jp Issue Status Prepared by:
More information14.8 kwh/(m²a) Project Documentation. 1 Abstract. R-951 Residence: Three Family Passive House Building. 1.1 Data of building. Year of construction
Project Documentation 1 Abstract R-951 Residence: Three Family Passive House Building 1.1 Data of building Year of construction U-value external wall/ U-Wert Außenwand 2013 0.112 W/(m²K) Space heating
More informationCOMPARISON OF ENERGY USE INDICATORS OF A NON-RESIDENTIAL PASSIVE HOUSE WITH ASHRAE 90.1 BUDGET BUILDING
COMPARISON OF ENERGY USE INDICATORS OF A NON-RESIDENTIAL PASSIVE HOUSE WITH ASHRAE 90.1 BUDGET BUILDING ABSTRACT F. Bagheri 1, M. Fakoor 1, B. Young 1, C. Cranswick 1 1 BC Building Science Ltd. 611 Bent
More informationINFLUENCE OF HIGH PERFORMANCE FAÇADE ON HEATING/COOLING LOAD IN OFFICE BUILDINGS IN LONDON AND HONGKONG
INFLUENCE OF HIGH PERFORMANCE FAÇADE ON HEATING/COOLING LOAD IN OFFICE BUILDINGS IN LONDON AND HONGKONG Wei Wang and Chanakya Arya Department of Civil, Environmental & Geomatic Engineering, University
More informationAchieving the nearly zero energy building concept - A study based on practical experience
Achieving the nearly zero energy building concept - A study based on practical experience SIMON PESCARI, VALERIU STOIAN, DANIEL DAN, DAN STOIAN Department of Civil Engineering and Equipment, Faculty of
More informationSolar active school in Lajen (Italy) EURAC research - Institute for Renewable Energy Alexandra Troi
Solar active school in Lajen (Italy) EURAC research - Institute for Renewable Energy Alexandra Troi Agenda Introduction: Net Zero Energy Building Lajen Ried Primary School: the building and the energy
More informationEnergy Audit. Project: ENergy Efficiency and Renewables SUPporting Policies in Local level for EnergY (ENER-SUPPLY) Work Package 4
Project: ENergy Efficiency and Renewables SUPporting Policies in Local level for EnergY (ENER-SUPPLY) Work Package 4 Energy Audit Date: Country: SERBIA Partner: University of Novi Sad (UNS) Building: Pre-school
More informationMicrogeneration Installation Standard : MCS 024 SOLAR DOMESTIC HOT WATER ENERGY CALCULATION. to be used in conjunction with MIS 3001:
Microgeneration Installation Standard : MCS 024 SOLAR DOMESTIC HOT WATER ENERGY CALCULATION to be used in conjunction with MIS 3001: REQUIREMENTS FOR CONTRACTORS UNDERTAKING THE SUPPLY, DESIGN, INSTALLATION,
More informationHomesol Passive House Design Process
Homesol Passive House Design Process Passive Houses are residential, commercial and institutional buildings in which a comfortable temperature can be achieved year round with a 75% 85% reduction in energy
More informationD3.9_Overall Refurbishment Plan DRAFT CS15. André Tournon-sur-Rhône
D3.9_Overall Refurbishment Plan DRAFT CS15 André Tournon-sur-Rhône INTELLIGENT ENERGY EUROPE II Energy efficiency and renewable energy in buildings IEE/12/070 EuroPHit [Improving the energy performance
More informationCOMPARATIVE SUMMER THERMAL AND COOLING LOAD PERFORMANCE OF NATURAL VENTILATION OF CAVITY ROOF UNDER THREE DIFFERENT CLIMATE ZONES
COMPARATIVE SUMMER THERMAL AND COOLING LOAD PERFORMANCE OF NATURAL VENTILATION OF CAVITY ROOF UNDER THREE DIFFERENT CLIMATE ZONES Lusi Susanti 1, Hiroshi Matsumoto 2, and Hiroshi Homma 2 1 Department of
More informationProject Report: SunMaxx Commercial Case Studies
Project Report: 7 x ThermoPower-VHP30 Total Gross Surface Area: 369.25 sq.ft Azimuth: 10 Incl.: 37 1200 gal/day 120 F Gas Boiler - 9 150 kbtu/hr StorMaxx NP Vol:1500 gal Existing Hot Water Heater Vol:600
More informationTwenty-first Century Building Design: Getting to Net-Zero Energy?
Twenty-first Century Building Design: Getting to Net-Zero Energy? National Conference of State Legislators Paul A. Torcellini, Ph.D., PE June 23, 2009 www.highperformancebuildings.gov NREL is a national
More informationHouse Pillon Year of construction (2008), Caldaro (IT)
Energy production by RES (kwh/(m2*year) Operational success story GENERAL INFORMATIONS Owner: Architect: Design office: Use: Heated surface*: Gross volume*: 600,52m 3 Built in: 2008/09 Cost (only construction)
More informationAnalysis of Heating Energy of Ventilation and Underground Heat Exchanger in North European Passive Houses
Issue 1, Volume 6, 2012 92 Analysis of Heating Energy of Ventilation and Underground Heat Exchanger in North European Passive Houses Hendrik Voll, Erkki Seinre, Mati Sööt Abstract-- The paper is taking
More informationProject Report: SunMaxx Commercial Case Studies
Project Report: 14 x ThermoPower-VHP30 Total Gross Surface Area: 738.50 sq.ft Azimuth: 10 Incl.: 37 2100 gal/day 130 F Gas Boiler - 9 150 kbtu/hr StorMaxx NP Vol:2500 gal Existing Hot Water Heater Vol:1000
More informationProject Report: SunMaxx Commercial Case Studies
Project Report: 5 x ThermoPower-VHP30 Total Gross Surface Area: 263.75 sq.ft Azimuth: 10 Incl.: 37 900 gal/day 120 F Gas Boiler - 9 100 kbtu/hr StorMaxx NP Vol:1200 gal Existing Hot Water Heater Vol:400
More information27/10/15. Rod Hughes Architect Director 2030 architects ltd. Penrith
Rod Hughes Architect Director 2030 architects ltd. Penrith We specialise in high quality low carbon development, retrofit and community led design We often work with community groups to develop consensus
More informationProject name Fulford Passivhaus, York Project summary New-build singe-family detached house for individual clients. Certified as Passivhaus Plus.
http://lowenergybuildings.org.uk Project name Fulford Passivhaus, York Project summary New-build singe-family detached house for individual clients. Certified as Passivhaus Plus. Project Description Projected
More informationPassive House in Canada: Case Studies on a Near EnerPHit Retrofit and Post-Occupancy Research
Passive House in Canada: Case Studies on a Near EnerPHit Retrofit and Post-Occupancy Research Brittany Coughlin, RDH Building Science Inc. 224 W 8 th Ave, Vancouver, BC Canada Phone: +011 604 873 1181;
More informationGAS FOR HEATING & COOLING. POLICY WORKSHOP 14 June 2016, European Parliament
GAS FOR HEATING & COOLING POLICY WORKSHOP 14 June 2016, European Parliament 1 Why gas? System considerations for heating & cooling and future opportunities Eva Hennig 14 June 2016 Thüga Partnership Model:
More informationHolistic Design Approach For Energy Efficiency ASHRAE TECHNOLOGY AWARD CASE STUDIES
ASHRAE TECHNOLOGY AWARD CASE STUDIES This article was published in ASHRAE Journal, June 2018. Copyright 2018 ASHRAE. Posted at www.ashrae.org. This article may not be copied and/or distributed electronically
More informationPASSIVE HOUSE. is a building, which doesn t need an active type of heating. Dr. Ing Mihail Stancu
PASSIVE HOUSE is a building, which doesn t need an active type of heating Dr. Ing Mihail Stancu PASSIVE HOUSE 1991 Darmstadt, dr. Wolfgang Feist THERMAL BILANCE THERMAL LOSES - Transmission thermal losses
More information