1 Management Report and KPIs Report for the General Assembly 29 October 2014
2 KPIs, Q3 2014: Content Note: Data prior to August 2014 is not available.
3 KPIs, Q3 2014: Mapping
4 KPIs, Q3 2014: Customer Relations This represents data from the end of August only (meaning 5 weeks). It has extracted from Freshdesk and does not present data on contacts made outside of Freshdesk.
5 KPIs, Q3 2014: Customer Service Freshdesk Statistics (1) The following table provides information on Q3, with the red or green arrows and percentages comparing the data to Q2. SLA was set generally for 1 calendar day for responding and 3 calendar days for resolving the inquiry. This has been adjusted from the start of Q4 to use business days rather than calendar days.
6 KPIs, Q3 2014: Customer Service Freshdesk Statistics (2)
7 KPIs, Q3 2014: Human Resources
8 KPIs, Q3 2014: Implementation & Education (1)
9 KPIs, Q3 2014: Implementation & Education (2) The number of open issues dropped significantly with the July release. The number of issues is likely to continue to rise and then drop again at the next release.
10 KPIs, Q3 2014: Applications & Architecture
11 KPIs, Q3 2014: Infrastructure Uptime (2)
12 Q3 UPDATES BY LINE OF BUSINESS
13 Content Development, Mapping & Translation (1) Key work items planned for the remainder of 2014: Completion of SCT to ICD-10 Mapping. Due 12/14 successful completion of pilot, and mapping is progressing to schedule LOINC Observables development. Due 10/14 Technology Preview release containing two subsets (expression and LOINC parts) Microbiology Lab reporting editorial guidance is being finalized on X species, changes will be included in the Jan 2015 release Problem list: updated version of SCT to meet needs of problem list use case. Due 12/14 routine release alignment Work on the development of content related to functioning, to commence 10/14 and continue into Initial work will be focused on stakeholder involvement Candidate baseline of GP/FP subsets and SNOMED CT to ICPC-2 map, following feedback on Technical Preview. Due 09/14 Commencement of external review of anatomy model by the University of Washington, to continue until mid-2015 Continuation of ICD-11 chapter reviews and subsequent content enhancements, completion due in late Six initial reviews have been completed, with eternal reviews as scheduled
14 Content Development, Mapping & Translation (2) Key items delivered in Q3: Consultant Terminologist Programme is progressing on schedule, with a successful face-to-face group meeting, and allocation of a group project Publication of alpha release of substance redesign work 2 alpha releases have now been published, with work progressing on the alignment of content with ChEBI Documentation is being finalized for dose form which is an essential requirement for the drug alpha release Publication of medical devices release and GMDN map GMDN content formally in extension has been added to International Release, and simple duplicates removed. GMDN map has been updated against the latest GMDN release Publication of GP/FP subset, and SCT/ICPC-2 mapping table technology preview feedback has been received and updating of subsets and ICP-2 map completed Reviews of ICD-11 chapters, and subsequent content enhancements - Six initial reviews have been completed, with external reviews in progress Key Risks to 2014 delivery: Ensuring we develop the required skills in the team to meet the challenging times ahead Ensuring successful allocation of resources (internal and external) to deliver the large number of projects in pipeline Ensuring that we receive useful feedback on the alpha releases and technology previews
15 Customer Relations Management Key work items planned for 2014: Key items delivered in Q3: Define a Customer Relations Strategy for IHTSDO Due 09/14 DONE Deploy CRM and Customer Enquiry System 03/14 DONE Provide Customer Relationship Management support for Americas, EMEA and APAC regions Due 06/14 Americas CRM starting Oct 25 th. DONE Deliver SCT benefits realization study Due 05/14 delayed, to be completed in 10/14 Customer Relations Operational Plan finalized Americas Customer Relations Manager recruited New member on-boarding training material developed (piloted with on-boarding India in August 2014) Participation at 5 major international/regional conferences, good outcomes ehealth Forum; WOHIT; HIC 2014; MIE 2014; HIMSS AsiaPac 2014 and INFOLAC (Oct 2014). KPIs in place Member country content survey completed Inventory IHTSDO products and services completed Key risks to 2014 delivery: IHTSDO s current core delivery capacity that is centralized in Europe is not scalable to support members in Asia Pacific and Americas regions. Insufficient resources to scale up the engagement with vendors internationally Low risk of non-payment of Member fee by one country
16 Collaboration Key work items planned in 2014: Key items delivered in Q3: Development of collaboration framework Due 04/14 Develop database of existing collaboration agreements Due 04/14 Collation of lessons learned and evidence of best practice Due 10/14 Strengthen governance structures for collaborative working (ongoing) Collaborative agreements will be updated/completed with agreed list Clinical engagement strategy and processes defined and in place to support content review Agreement signed with ICN and joint work progressed linking SNOMED CT and ICNP Agreement signed with HL7 and work started on joint work plan Collaboration discussions started with INSERM (Orhpanet), IPCC/IUPAC (NPU) RSNA (RadLex) Contribution to related ISO ballots and collation of all ISO activity on Trello External clinical experts engaged and participated in reviewing SNOMED CT/ ICD-11 content work for 6 chapters Completed securing leadership of professional SIGs chairs and vice chairs. Agreed work areas and first draft of updated terms of reference
17 Implementation and Education Key work items planned for 2014: Training resource development including online training ongoing releases started in 04/14 Foundation course - materials ready 12/14 first iteration to start 02/15 Advanced implementation course materials complete 04/15 first iteration to start 05/15 (follow on from Foundation) Adopting, Adapting and Sharing Ref Sets 12/14 Prototype delayed by decision to merge as part of Refset Manager tool SNOMED CT in information models, terminology binding and analytics, 12/14 With specifications of various query, binding & constraint requirements for delivery in stages 10/14 to 12/14 LOINC-SNOMED CT Implementation Guidance Completion 10/14 Key items delivered in Q3: E-Learning Reference Group for Members input to E- Learning development established Detailed plans for E-Learning courses developed with draft course content On site training delivered in India and Singapore NRC Starter Guide complete (final review) Vendor Guide initial draft (committee review) Guidance on using SNOMED CT and LOINC Together (in final review) Showcase program with education tutorials on key topics Revised compositional grammar specification (community-wide review) Note: this is the foundation for consistent set of SNOMED CT query/constraint specifications in development Key risks to 2014 delivery: Refset sharing prototype delayed to merge with Refset Manager tooling E-Learning development delayed by immediate organizational priorities
18 Applications and Architecture (1) Open Tooling Framework to include online beta RefSet Management Tool and Mapping Tool Due Q1, 2014 and regular releases thereafter SNOMED CT Browser release due Q4/2014 Member Licensing & Distribution Service (MLDS) Q4, 2014 Drug match tooling due Q3, 2014 Key work items planned for 2014: Continued enhancements to IHTSDO Workbench - V3.4 release date 07/2014 Key work items planned in 2015: Authoring/Content Tooling Services throughout 2015 Translation Tooling - Q Collabnet Replacement - Q Project Status: RefSet Management Service (RMS) IN DEV Member Licensing & Distribution Service (MLDS) IN UAT User Experience (UX) - DONE Translation Tooling Market Analysis ON HOLD Workbench Enhancements #2 IN UAT Mapping Service v1.0 DONE Web Site In Dev IHTSDO Browser v1.0 DONE
19 Applications and Architecture (2) Key items delivered in Q3: IHTSDO Mapping Tool v1.0 in production UAT of Member Licensing & Distribution Service IHTSDO SNOMED CT Browser out of beta, with all available extensions aside from Canada & NL Multi-English SCT Extension browser for AU, UK & UK Members drugmatch utility completed Ongoing development of new IHTSDO web site IHTSDO Brand Guidelines and new logo completed Reporting platform for organization-wide KPIs in IHTSDO JIRA Key risks to 2014 delivery: Small, limited resource group of external developers, and quality thereof, is leading to delays in delivery and future dependencies. This has been acutely felt with the Refset Management Tool
20 Delivery Key work items planned for 2014: SNOMED CT Releases Jun 2014, Dec 2014 Continuous release capability (12/14) Domain-based release capability (12/14) Standardize the release quality validation rules (12/14) Key items delivered in Q3: SNOMED CT Spanish Edition completed ahead of schedule SNOMED CT Medical Devices update delivered in September Productization of release service is on track; was used for GMDN & Spanish Edition New Product Development Process: delivered internally in September IHTSDO Formal Document policy: delivered internally in September Key risks to 2014 delivery: Release manager hired; begins to mitigate risk to release production capability
IHTSDO Management Progress Report As of June 30 th 2014
IHTSDO Management Progress Report As of June 30 th 2014 Execu.ve Summary This Report summarises IHTSDO acaviaes in 2014 and provides an update to the presentaaon in April to show our progress at the halfway
More informationManagement Report and KPIs. Report to the Management Board on Q Produced January and February 2015
Management Report and KPIs Report to the Management Board on Q4 2014 Produced January and February 2015 KEY PERFORMANCE INDICATORS Content Request Submissions Target completed (including not accepted)
More informationManagement Report and KPIs. Report to the General Assembly and Management Board on Q Produced April 2015
Management Report and KPIs Report to the General Assembly and Management Board on Q1 2015 Produced April 2015 Contents KPIs Content Education HR CRM & Collaborations Delivery Applications & Architecture
More informationThe work program consists of a combination of one year and multi-year work items
2016 Work Plan Executive Summary IHTSDO completes an annual work planning process involving its members to establish a program of work for each financial year. Financial years run from 1 st Jan to 31 st
More informationLeading healthcare terminology, worldwide
Leading healthcare terminology, worldwide Table of Contents 3 Chairman s Report 4 CEO Report 6 Background 7 Development in Activities and Financial Position 8 Strategy, Objectives, and Future Prospects
More informationManagement Report UK Entity. Quarter 3 September 2017
Management Report UK Entity Quarter 3 September 2017 TABLE OF CONTENTS Executive Summary i. Key Achievements ii. Key Performance Indicators iii. Looking Ahead @Snomedct 2017 IHTSDO 2 EXECUTIVE SUMMARY
More informationInformation Paper. MAKING USE OF SNOMED CT: KEY QUESTIONS and STATUS as of SEPTEMBER 2013
Information Paper MAKING USE OF SNOMED CT: KEY QUESTIONS and STATUS as of SEPTEMBER 2013 1. Introduction This document aims at explaining in a synthetic way why certain Member States (MS) have decided
More informationSNOMED CT to ICD-10 Project
SNOMED CT to ICD-0 Project Mapping Tool Feature Highlights, Demonstration and Adaptation for Other Mapping Work IHTSDO Implementation Showcase Sydney 3 October 20 20-0-20 Content Introduction and Background
More informationSNOMED Clinical Terms National Release Centre of Ireland. Governance Group Strategy for 2018
SNOMED Clinical Terms National Release Centre of Ireland Governance Group Strategy for 2018 December 2017 Document Management Document Control The controlled copy of this document is maintained by the
More informationAgenda. Background SNOMED International Collaborations developments Information models Extensions
Agenda Background SNOMED International Collaborations 2018 developments Information models Extensions SNOMED International International not-for-profit association, based in the UK Owns and maintains SNOMED
More informationThe role of SNOMED CT in healthcare systems across the world Jan-Eric Slot MB MSc MBA CEO IHTSDO
The role of SNOMED CT in healthcare systems across the world Jan-Eric Slot MB MSc MBA CEO IHTSDO International Health Terminology Standards Development Organisation www.ihtsdo.org 1 Outline What is the
More informationSTI ecr Learning Community: Webinar 2. April 27, 2017 Noon 1 p.m. EDT
STI ecr Learning Community: Webinar 2 April 27, 2017 Noon 1 p.m. EDT STI ecr Learning Community Webinar 2 Please use the link below to register for the webinar: https://attendee.gotowebinar.com/register/1084681796879085313
More informationADM The Architecture Development Method
ADM The Development Method P Preliminary Phase Preliminary Phase Determine the Capability desired by the organization: Review the organizational context for conducting enterprise architecture Identify
More informationThe European OHDSI Initiative: Why are we here? Peter Rijnbeek Department of Medical Informatics Erasmus MC Rotterdam
The European OHDSI Initiative: Why are we here? Peter Rijnbeek Department of Medical Informatics Erasmus MC Rotterdam Performing multi-database studies in Our Goals: We want to generate real-world evidence
More informationHOUSE OF REPRESENTATIVES KNOTT COMMITTEE ROOM 116 OCTOBER 24, 2018
HOUSE OF REPRESENTATIVES KNOTT COMMITTEE ROOM 116 OCTOBER 24, 2018 3 FACILITATOR: MELISSA TURNER 4 FACILITATOR: MELISSA TURNER 5 FACILITATORS: DAYMON JENSEN, RACHAEL LIEBLICK, MELISSA TURNER Budget FY
More informationENABLE DIGITAL - % COMPLETE ENGAGED WORKFORCE - % COMPLETE
Each commitment listed below consists of one or more projects, and has at least one performance measure. Every year, targets are established to track progress towards the measure(s). The status shown on
More informationTrial Master File Reference Model. Project Charter. Review, Testing, and Ratification of the etmf Exchange Mechanism Standard, Version 1
Trial Master File Reference Model Project Charter Review, Testing, and Ratification of the etmf Exchange Mechanism Standard, Version 1 Prepared by The Exchange Mechanism Standard Subgroup of the TMF Reference
More informationAPPENDIX O CONTRACTOR ROLES, RESPONSIBILITIES AND MINIMUM QUALIFICATIONS
APPENDIX O CONTRACTOR ROLES, RESPONSIBILITIES AND MINIMUM QUALIFICATIONS Shared denotes whether a Contractor Resource may be responsible for that in addition to another identified. Contractor Required
More informationICD Revision Process: Beta Phase and Finalization
JHA Annual Report 2013 - ANNEX 1 ICD Revision Process: Beta Phase and Finalization This document summarizes the ICD Revision Process, in particular, in terms of the timelines for the finalization date
More informationICD Revision Process
Committee for the Coordination of Statistical Activities SA/2013/12/Add.1 Twenty-second Session 3 September 2013 4-6 September 2013 Items for discussion and decision: Item 8 of the provisional agenda ==============================================================================
More informationEnterprise Technology Projects Fiscal Year 2012/2013 Fourth Quarter Report
Enterprise Technology Projects Fiscal Year 2012/2013 Fourth Quarter Report Enterprise Projects Fiscal Year 2012/2013 Fourth Quarter The Enterprise Program Investment Council (EPIC) is responsible for governance
More informationThe Future of Health Data Interoperability is on FHIR: the Argonaut Project
The Future of Health Data Interoperability is on FHIR: the Argonaut Project Charles Jaffe, MD, PhD CEO, Health Level 7 British Computer Society 10 November 15 The principles underlying FHIR development
More informationCurrent Development of Medical Terminology
Current Development of Medical Terminology Yun Sik Kwak, MD, PhD Dept Med. Info.,Kyungpook Nat l Univ Sch Med ISO/TC 215, Health Informatics APAMI HL7-Korea (yskwak@knu.ac.kr) October 27, 2006 APAMI MIC2006
More informationHR & Payroll Solution for Small Medium Enterprises & Corporate. India I UAE I UK I USA Canada
HR & Payroll Solution for Small Medium Enterprises & Corporate Dynamics of engaging people are changing War for Right Talent Workplace Complexity Evolving Workforce 2 HR Priorities ATTRACT & RETAIN TALENT
More informationRPO Market Summary... Page 2 NEAT Evaluation for RPO... Page 5 Vendor Analysis Summary for ADP.. Page 9
NEAT EVALUATION FOR ADP: RPO RPO Market Summary... Page 2 NEAT Evaluation for RPO.... Page 5 Vendor Analysis Summary for ADP.. Page 9 NelsonHall 2016 1 July 2016 RPO Market Summary Overview A healthy market
More informationIs your customer experience making an impact?
Is your customer experience making an impact? Or not? Workshops to help you accelerate to your next great customer experience Your CX Trek 1 2 3 Getting Started: Digital Foundation Increasing Momentum:
More informationStrategy Analysis. Chapter Study Group Learning Materials
Chapter Study Group Learning Materials 2015, International Institute of Business Analysis (IIBA ). Permission is granted to IIBA Chapters to use and modify this content to support chapter activities. All
More informationNICE Customer Engagement Analytics - Architecture Whitepaper
NICE Customer Engagement Analytics - Architecture Whitepaper Table of Contents Introduction...3 Data Principles...4 Customer Identities and Event Timelines...................... 4 Data Discovery...5 Data
More informationOracle Taleo Business Edition Implementation Fixed Scope Offerings
Oracle Taleo Business Edition Implementation Fixed Scope Offerings Date Email Website : Dec-2015 : info@kovaion.com : www.kovaion.com Kovaion Consulting Kovaion A Snapshot Oracle Alliance Certified Consultants
More informationICD-10 Lessons Learned and a Look Forward A Tale of Two States
ICD-10 Lessons Learned and a Look Forward A Tale of Two States September 9, 2013 Kimberly Beckendorf Deloitte Consulting LLP kbeckendorf@deloitte.com Matt Galletta State of Maine, Office of MaineCare Services
More informationDa Vinci. Program Overview. August 15, 2018
Da Vinci Program Overview August 15, 2018 Interim Antitrust Policy ANSI Antitrust Policy ANSI neither develops standards nor conducts certification programs but instead accredits standards developers and
More informationRequirements Analysis and Design Definition. Chapter Study Group Learning Materials
Requirements Analysis and Design Definition Chapter Study Group Learning Materials 2015, International Institute of Business Analysis (IIBA ). Permission is granted to IIBA Chapters to use and modify this
More information[International] Source of Value-Creating Capability: Diversifying the Portfolio on a Global Basis
[International] Source of Value-Creating Capability: Diversifying the Portfolio on a Global Basis Diversifying the portfolio on a global basis Progress and future strategy Tim Andree Director and Executive
More informationISO 31000:2009(E):Risk Management Principles and Guidelines
International Organization for Standardization ISO 31000:2009(E):Risk Management Principles and Guidelines Sections 4 through Section 5 First Edition: November 15, 2009 2 International Organization for
More informationSEMANTIC DATA PLATFORM FOR HEALTHCARE. Dr. Philipp Daumke
SEMANTIC DATA PLATFORM FOR HEALTHCARE Dr. Philipp Daumke ABOUT AVERBIS Founded: 2007 Location: Team: Focus: Current Sectors: Freiburg, Germany Domain & IT-Experts Leverage structured & unstructured information
More informationAnalytics With Hadoop. SAS and Cloudera Starter Services: Visual Analytics and Visual Statistics
Analytics With Hadoop SAS and Cloudera Starter Services: Visual Analytics and Visual Statistics Everything You Need to Get Started on Your First Hadoop Project SAS and Cloudera have identified the essential
More information2019 Project Prioritization and Budgeting Process
2019 Project Prioritization and Budgeting Process Brian Hurysz Manager, Market Products Budget and Priorities Working Group May 10, 2018, Krey Corporate Center Agenda Project Prioritization Process Project
More informationOperationalizing" Excellence with ERM. Wesley Morgan Andrew Bent
Operationalizing" Excellence with ERM Wesley Morgan Andrew Bent Presenters Wesley Morgan Case Team Leader, Wilson, Perumal and Company Andrew Bent Regional Risk Manager (North America), Sage Software Inc.
More informationRegulators REALLY DO CARE about Trade Reporting Data Quality
DerivOps North America Sample Regulators REALLY DO CARE about Trade Reporting Data Quality Lloyd Altman Scope. Present the regulatory time line for the next 3 Years Explore how the Regulators are looking
More informationOverview of EIC-ICD11 Strategic Work Plan Activities & Challanges for Implementation
Overview of EIC-ICD11 Strategic Work Plan Activities & Challanges for Implementation Huib Ten Napel WHO-FIC NL Collaborating Centre WHO-FIC Education & Implementation Committee e-mail: huib.ten.napel@rivm.nl
More informationThis report can be found on CNSC s website at:
2002 Report of the Canadian Nuclear Safety Commission in response to The Report of the Auditor General entitled Canadian Nuclear Safety Commission Power Reactor Regulation This document has been prepared
More informationJob Description. Job Title: Department: Reports To:
Job Title: Department: Reports To: Director, Communications & Marketing Cooperative Education & Career Action Executive Director, Cooperative Education Jobs Reporting: Salary Grade: USG 14 Effective Date:
More informationMonitoring and Evaluation in the GEF: How Country Stakeholders Get Involved. GEF Expanded Constituency Workshops Group Work
Monitoring and Evaluation in the GEF: How Country Stakeholders Get Involved GEF Expanded Constituency Workshops Group Work Group Exercise Work with the group at your table as a team to provide input to
More informationMonitoring and Evaluation in the GEF: How Country Stakeholders Get Involved. GEF Expanded Constituency Workshops Group Work
Monitoring and Evaluation in the GEF: How Country Stakeholders Get Involved GEF Expanded Constituency Workshops Group Work Group Exercise Work with the group at your table as a team to provide input to
More informationEHR4CR DEPLOYING INNOVATIVE CLINICAL TRIAL SERVICES. Brecht Claerhout, Custodix NV on behalf of the EHR4CR Consortium
EHR4CR DEPLOYING INNOVATIVE CLINICAL TRIAL SERVICES Brecht Claerhout, Custodix NV on behalf of the EHR4CR Consortium Electronic Health Records for Clinical Research Re-use of EHR data for optimizing Clinical
More informationSolution Evaluation. Chapter Study Group Learning Materials
Chapter Study Group Learning Materials 1 2015, International Institute of Business Analysis (IIBA ). Permission is granted to IIBA Chapters to use and modify this content to support chapter activities.
More informationThe Ins and Outs of Recruiting for Microsoft in Germany. Georg Bachmaier Thursday, November 18 th 2010 HR Manager
The Ins and Outs of Recruiting for Microsoft in Germany Georg Bachmaier Thursday, November 18 th 2010 HR Manager Recruitment for Microsoft in Germany Background to Staffing at Microsoft Evolution of the
More informationBELGIAN USE CASE BASED APROACH AND APPROACH TO TRANSLATION
Federal Public Service of Health, Food Chain Safety and Environment Directorate-General Health Care Department Datamanagement Arabella D Havé, chief of Terminology, Classification, Grouping & Audit arabella.dhave@health.belgium.be
More informationReflections on Improving the Interoperability and Use of the Data Dividend
Reflections on Improving the Interoperability and Use of the Data Dividend Betsy L. Humphreys Acting Director National Library of Medicine National Institutes of Health Department of Health and Human Services
More informationThink Locally, Connect Nationally
Think Locally, Connect Nationally Didi Davis Director of Testing www.sequoiaproject.org 1 2017 The Sequoia Project. All rights reserved. The Sequoia Project s Role The Sequoia Project is a trusted, independent
More informationSmall modular reactors deployment and their applications for embarking countries
Small modular reactors deployment and their applications for embarking countries Many developing countries with smaller electricity grids are interested in small modular nuclear reactors (SMRs) as part
More informationCustomer Success Services. Services you need for successful digital transformation
Customer Success Services Services you need for successful digital transformation What Separates our Customer Success from the Rest We understand customer needs by driving thought leadership in digital
More informationThe Path to Digital. Catherine Michel Chief Technology Officer Sigma Systems
The Path to Digital Catherine Michel Chief Technology Officer Sigma Systems Joseph Johnson VP, Enterprise Architecture & Transformation Windstream Communications 2017 TM Forum 1 AGENDA Catalog-Driven Agile
More informationAgenda Item 3 CX/ASIA 12/18/3 August 2012
E Agenda Item 3 CX/ASIA 12/18/3 August 2012 JOINT FAO/WHO FOOD STANDARDS PROGRAMME FAO/WHO COORDINATING COMMITTEE FOR ASIA 18 th Session Tokyo, Japan, 5 9 November 2012 DRAFT STRATEGIC PLAN OF THE CODEX
More informationLab Results Interface (LRI) The Flexible Implementation Guide (IG) Standards and Interoperability Framework Initiative (ONC)
Lab Results Interface (LRI) The Flexible Implementation Guide (IG) Standards and Interoperability Framework Initiative (ONC) Ken McCaslin, FHL7 Director, Healthcare Standards Quest Diagnostics Co-chair
More informationFujitsu UGN. Keith Moore: Fujitsu Head Of Hybrid IT & Digital. Nadia Bendjedou: Oracle Vice President Product Strategy, Oracle EBS
DRAFT Fujitsu UGN Reduce IT Cost, Increase Performance And Functionality Moving to Oracle Cloud Infrastructure Keith Moore: Fujitsu Head Of Hybrid IT & Digital Nadia Bendjedou: Oracle Vice President Product
More informationServiceNow Custom Training and Adoption
ServiceNow Custom Training and Adoption Overview... 3 Adoption Toolkit Deliverables... 3 Change Enablement Deliverables... 4 Custom Training Deliverables... 5 Custom Training Applications by Business Function...
More informationCIMI/IHTSDO DCM tooling ecosystem thoughts
/ DCM tooling ecosystem thoughts Thomas Beale openehr Foundation Stan Huff, MD Intermountain Healthcare Introduction These slides describe a possible semantic health modelling environment for /, featuring:
More informationHow to Plan for a Successful Deployment
How to Plan for a Successful Deployment FOR GROWING ORGANIZATIONS WITH LIMITED RESOURCES, EVERY DECISION MATTERS. Deploying new enterprise technology that impacts the core of your business doesn t have
More informationThe pink lines detail the updating made. Dim 1 Dimension 2 Dimension 3
European e-competence Framework (e-cf) Version 3.0 - DRAFT CWA The white lines contain the e-cf v 2.0 content, The green lines contain the update. Changes are highlighted in red. The pink lines detail
More informationCarahsoft End-User Computing Solutions Services
Carahsoft End-User Computing Solutions Services Service Description Horizon View Managed Services Gold Package Managed Services Packages Options # of Desktops to be Managed Desktop Type Duration of Services
More informationIntroduction to the Identification of Medicinal Products ( IDMP)
Content Introduction to the Identification of Medicinal Products ( IDMP)... 2 What is the legal base for IDMP?... 2 Who is affected by IDMP?... 2 Current regulations in the US and Europe... 2 Implications
More informationDirector, IT Program and Project Management
Director, IT Program and Project Management Location: [Global] Category: Information Technology *Position location to be determined by home country of the successful candidate within a jurisdiction (US
More informationG4 DEVELOPMENT. Document 2 of 12 Statistics: Quantitative Online Feedback. Second G4 Public Comment Period: Submissions.
G4 DEVELOPMENT Document 2 of 12 Statistics: Quantitative Online Feedback February 2013 INTRODUCTION ABOUT THE SUBMISSIONS DOCUMENTS In 2010 GRI began the development of the fourth generation of its Sustainability
More informationCurriculum Vitae. Alena Pultarová Date of birth Telephone number
Curriculum Vitae Name Alena Pultarová Date of birth 13.3.1985 Nationality Czech Education Master s Degree Telephone number +971 52 872 4699 E-mail Alena@Pultarova.com Skype ID alenapultarova Website www.pultarova.com
More informationMcGill ITS Strategic Plan
McGill Strategic Plan Context: Our 5 Year Roadmap Approved in April 205 Focuses on improvements to the following areas Teaching and Learning Research Student systems Campus Administration Must be cyclically
More informationHOUSE OF REPRESENTATIVES KNOTT COMMITTEE ROOM 116 NOVEMBER 28, 2018
HOUSE OF REPRESENTATIVES KNOTT COMMITTEE ROOM 116 NOVEMBER 28, 2018 3 FACILITATOR: RYAN WEST, CHAIR 4 FACILITATOR: MELISSA TURNER 5 FACILITATORS: CAROLYN HICKS, ANGIE ROBERTSON, MELISSA TURNER Florida
More informationJob Posting Program Coordinator - Canada Programs
Job Posting Program Coordinator - Canada Programs Closing Date: July 28, 2017 Organization: Department/Division: Work location: Right To Play International Promoting Life-skills in Aboriginal Youth (PLAY)
More informationhttp://www.connectingforhealth.nhs.uk/lra Semantic Interoperability I got your message I can understand it I know what you mean I believe you I know what I will do I got your message I understand it Syntax
More informationTO MEMBERS OF THE FINANCE AND CAPITAL STRATEGIES COMMITTEE: DISCUSSION ITEM EXECUTIVE SUMMARY BACKGROUND
Office of the President TO MEMBERS OF THE FINANCE AND CAPITAL STRATEGIES : For Meeting of UCPATH UPDATE DISCUSSION ITEM EXECUTIVE SUMMARY This report provides a brief update on the recently-completed UCPath
More informationChoosing a TMS Plus Managed Services Provider. Making the Most of Your RFP
Choosing a TMS Plus Managed Services Provider Making the Most of Your RFP IN BRIEF Implementing a transportation management system (TMS) and want to make sure you maximize the return on investment (ROI)?
More informationEXECUTIVE COMMITTEE OF THE HIGH COMMISSIONER S PROGRAMME. UNHCR s INFORMATION AND COMMUNICATIONS TECHNOLOGY: STRATEGY AND IMPLEMENTATION THEREOF
EXECUTIVE COMMITTEE OF THE HIGH COMMISSIONER S PROGRAMME Distr. RESTRICTED 5 September 2005 STANDING COMMITTEE 34th meeting Original: ENGLISH UNHCR s INFORMATION AND COMMUNICATIONS TECHNOLOGY: STRATEGY
More informationRSNA Image Share Validation Testing
RSNA Image Share Validation Testing An initiative of 1 2017-2018 The Sequoia Project. All Rights Reserved. How Do I Participate Today? Your Participation Open and close your control panel Join audio: Choose
More informationEnabling consistent employee experience through HR Shared Services
Enabling consistent employee experience through HR Shared Services Enable Consistent Great Employee Experience The Client is an American multinational technology company headquartered in Redmond, Washington,
More informationPMI-MN will be recognized globally as a premier, best-in-class, innovative community of project managers who embrace world class practices.
PMI-MN Mission VISION PMI-MN will be recognized globally as a premier, best-in-class, innovative community of project managers who embrace world class practices. MISSION PMI-MN s mission is to provide
More informationGlobal Workforce Analytics: The Next Big Thing? Featuring: Linda E. Amuso Radford Dan Weber Radford
Global Workforce Analytics: The Next Big Thing? Featuring: Linda E. Amuso Radford Dan Weber Radford Session Agenda Creating a Foundation for Analytics People & Spend Analytics Performance & Spend Analytics
More informationIndiana Youth Group Strategic Plan
Indiana Youth Group Strategic Plan 2011-2014 1 Table of Contents MISSION AND VISION 3 HUMAN CAPITAL 4 GOAL 4 OBJECTIVES 4 METRICS 5 FACILITY 5 GOAL 5 OBJECTIVES 5 METRICS 5 RESOURCES 5 GOAL 5 OBJECTIVES
More informationGenomics and SNOMED CT (the way ahead) Ian Green Customer Relations Lead, Europe and Clinical Engagement Business Manager
Genomics and SNOMED CT (the way ahead) Ian Green Customer Relations Lead, Europe and Clinical Engagement Business Manager Agenda The changing face of medicine The Genomics standards landscape Accessing
More informationNiceLabel 2017 Label Management System (LMS)
NiceLabel 2017 Label Management System (LMS) Rolf Giesbertz Software engineer 21.10.2016 Agenda 1 2 3 NiceLabel overview Your challenges Solution: LMS 1. Introduction 2. Why does NiceLabel exist? 3. Our
More informationAoC and Organizational Reviews: Supporting ICANN Accountability. ICANN53 24 June 2015
AoC and Organizational Reviews: Supporting ICANN Accountability ICANN53 24 June 2015 Agenda Proposed Schedule and Improvements for AoC and Organizational Reviews AoC Reviews Implementation Update Upcoming
More informationAn Overview of the AWS Cloud Adoption Framework
An Overview of the AWS Cloud Adoption Framework Version 2 February 2017 2017, Amazon Web Services, Inc. or its affiliates. All rights reserved. Notices This document is provided for informational purposes
More informationNational Center For Healthcare Leadership. Leadership Webcast: Formal Mentoring Program: Learning From Baxter Healthcare.
National Center For Healthcare Leadership Leadership Webcast: Formal Mentoring Program: Learning From Baxter Healthcare October 15, 2010 Agenda Welcome & Introduction NCHL Guest Speakers Timothy Aleck
More informationConverting Waste Plastics into Diesel Fuel: Resource Conservation and GHG Emissions Reduction
UNEP-DTIE-IETC Project on: Converting Waste Plastics into Diesel Fuel: Resource Conservation and GHG Emissions Reduction (Waste Plastics Recycling in Developing Countries through Environmentally Sound
More informationACHIEVING PARITY AT GLOBAL LEADERSHIP
ACHIEVING PARITY AT GLOBAL LEADERSHIP In the World Economic Forum s latest Global Gender Gap report, it is estimated that the gender gap will still take more than 100 years to close. As an accelerator
More informationCHAPTER 4 PRODUCT DEVELOPMENT LIFE CYCLE
CHAPTER 4 PRODUCT DEVELOPMENT LIFE CYCLE 1 Learning Objectives Review the Systems Development Life Cycle (SDLC). Examine the problems and alternatives with SDLC. Know the key issues in ERP implementation
More informationEconomic and Social Council
United Nations E/CN.3/2018/14* Economic and Social Council Distr.: General 20 December 2017 Original: English Statistical Commission Forty-ninth session 6 9 March 2018 Item 3 (k) of the provisional agenda**
More informationAligning Process Redesign and Change Management with Project Management (System Implementation Projects)
Aligning Redesign and Change Management with Project Management (System Implementation Projects) Kim Brant-Lucich Director of Redesign St. Joseph Health System Information Services HIMSS 2009: Project
More informationYour guide to ICD-10 success
Your guide to ICD-10 success This sample contains pages from 3M s ICD-10 eguide. Click here to download the full version. How to use this guide This ICD-10 eguide provides a basic overview of steps hospitals
More informationSchneider Electric Integrated Management System (IMS) Management Systems for Enterprise Compliance
Schneider Electric Integrated Management System (IMS) Management Systems for Enterprise Compliance NAEM 2015 EHS Compliance Excellence Conference 20-21 May2015 Atlanta, GA 1 Agenda > Introduction to Schneider
More informationEnabling Efficiency in Stores to Improve the Customer Experience. Presented by Andrei Cotunoaei
Enabling Efficiency in Stores to Improve the Customer Experience Presented by Andrei Cotunoaei Map updated in August 2012 Vodafone World Presence Vodafone Romania Over 8 million customers 279 stores 1
More informationSpecialist Diploma in Strategy & Planning
Specialist Diploma in Strategy & Planning SPECIALIST 30-48 HOURS www.kmdc.com.my Validated by the Industry Advisory Council. Including members from ONLINE / CLASS Content Specialist Diploma in Digital
More informationNiceLabel 2017 Label Management System (LMS)
NiceLabel 2017 Label Management System (LMS) Name Job Title 25.8.2016 Agenda 1 2 3 4 NiceLabel overview Your challenges Solution: LMS Q&A, next steps 1. Introduction 1. Key business drivers 1. LMS overview
More informationContinuous Process Improvement Organizational Implementation Planning Framework
Continuous Process Improvement Organizational Implementation Planning Framework This implementation planning framework can be used by any organization from a military service or other major organization
More informationFor personal use only
Integrated Research Limited 19 August 2014 ABN: 76 003 558 449 9 of the top 10 US banks 5 of the world s 10 largest companies 4 of the 8 biggest stock exchanges www.ir.com 8 of the 10 biggest telcos 4
More informationImplementing Veeva Align Technical Overview. Ben Lawson Practice Manager Network & Align Services, Europe
Implementing Veeva Align Technical Overview Ben Lawson Practice Manager Network & Align Services, Europe 1 How is Veeva Align implemented? 2 How can Veeva Align be deployed? 3 What does a typical project
More informationClinical Decision Support for. Medical Imaging 12-1pm
Work Group on a Standard Imaging Order Clinical Decision Support for Update on activities July 23, 2015 Medical Imaging 12-1pm Agenda 1. Welcome 2. A little background refresher 3. Current progress 4.
More informationFive Guiding Principles of a Successful Center of Excellence
Five Guiding Principles of a Successful Center of Excellence What is a Center of Excellence? At some point in their life cycle, most companies find it beneficial to develop a Center of Excellence (CoE).
More informationCORE RESOURCE: REPLICATION APPLICATION ADDENDUM
CORE RESOURCE: REPLICATION APPLICATION ADDENDUM National Association of Charter School Authorizers 105 W. Adams Street, Suite 3500 Chicago, IL 60603-6253 www.qualitycharters.org Table of Contents Instructions...3
More informationHow to Drive Business Value with Capacity Management
How to Drive Business Value with Capacity Management 18 July 2017 Your Presenter Jim Smith The Building Blocks Executive Buy-in Benefits realization Assessment Roles and responsibilities Strategy Toolset
More informationCorporate Functions & Business Operations
Corporate Functions & Business Operations BlackRock was founded by eight entrepreneurs who wanted to start a very different company. One that combined the best of a financial leader and a technology pioneer.
More information