SAMSUNG Energy Plant: All-in-One Solution for Floating Power Plants with Gas-fired Combined Cycle Gas Turbines
|
|
- Gregory Richard
- 6 years ago
- Views:
Transcription
1 SAMSUNG Energy Plant: All-in-One Solution for Floating Power Plants with Gas-fired Combined Cycle Gas Turbines Myung-Kwan Song, Yongseok Song, Jeong Oh Hwang, Changwoo Lee, and Wonkyu Lee 5 th April 2017 Samsung Heavy Industries Co., Ltd.
2 Contents Introduction System Overview Power Plant System LNG Fuel Supply System LNG Containment System Power Transmission System Mooring System Structural Reliability Concluding Remarks 2
3 Introduction Advantages of Floating Gas-fired Power Plant LNG Terminal + Regasification Unit + Gas-fired Power Plant + Floater Advantages: Clean energy of natural gas and Back-up of the operational flexibility of renewables All-in-One FGPP, SAMSUNG Energy Plant Advantages over Onshore Power Plants Shorter construction time Delivered as ready to operate Less occupied area & infrastructure needs Easy to relocate / Quick installation Avoid NIMBY (Not In My Back Yard) Construction on controlled shipyard Compatible LCOE due to less CAPEX and similar level of OPEX Who needs SEP? Who needs power but, Suffered from shortage and outage Not enough space for site : islands, mountains, poor soil conditions, etc. Exposed to hazards : earthquake, floods, war, internal terror, etc. Too much NIMBY issue Need to retrofit old power plant (it generally takes years) 3
4 System Overview Concept LNG Carrier LNG loading to SEP (170K) Power Transmission Tower gantry structure Power export to grid SEP-T600GC Power generation (604MW, ISO) LNG storage (200K) and fuel supply (regasification) Jetty Mooring fixed and access way Gas supply to onshore (if needed) 4
5 System Overview System Outline Specifications SEP-T600GC Power Capacity (MW) 604 (ISO) LOA (m) 260 Breadth (m) 52 Hull Depth (m) 32 Draught (m) 12 Power Generation Power Distribution LNG Containment LNG Loading Fuel Supply Gas Turbine OTSG Steam Turbine Transformer Gas Insulated Switchgear Membrane-type (GTT MK-III) Cryogenic Hose HP Pump Vaporizer LP Compressor 5
6 Power Plant System Configurations Gas Turbines : Siemens SGT-800 Combined Cycle : 56%, ISO Power Packages : (4 GT + 1 ST) 2 Heat Recovery Steam Gen. : 4 OTSG 2 < Siemens SGT-800 Gas Turbine (52MW, ISO) > OTSG (Once Through Steam Generator) < One set of Power Block (4 GT + 1 ST) > < Heat and Mass Balance for One set of Power Block > 6
7 LNG Fuel Supply System LNG Fuel Supply and Power Generation Process 7
8 LNG Fuel Supply System Characteristics and Advantages Characteristics Advantages Large BOG recondensing capacity All operational BOG are used as fuel(vented only in an emergency). Loading time is fast or insulation thickness of CCS is thin. Fuel is pumped to gas turbine through vaporizer. Cost of recondensing and pumping is lower than that of direct compressing. Low OPEX, Low CAPEX Minimization of BOG handling equipment To handle the excessive BOG during loading operation, only LP equipment is added. Low CAPEX, Low OPEX Maximization of power and regasification efficiency Power output is increased by cooling inlet air using sub-cooled seawater. High operability LNG regasification efficiency is improved by using heated seawater. Low CAPEX Eco-friendly seawater system Heated seawater is mixed with unheated seawater by seawater mix pumps to be discharged to sea. Eco-friendly 8
9 LNG Containment System LNG CCS: Membrane-type Storage capacity: 200,000m 3 Membrane-type Tank: GTT MK-III Requirements Any-filling condition Verification for sloshing load (SLOPE-2D, ABS) < Normalized Sloshing Pressure > (a) LNGC < Sloshing at 30%H > (b) SEP 9
10 Power Transmission System Power Export to Grid Gas insulated switchgear, step-up transformer (130MVA / 110MWA) Overhead line through gantry tower to onshore grid Power Distribution Onboard Normal operation: power generated from GT (auxiliary step-down transformer) Emergency: power from onshore grid or emergency engine onboard < Key Single Line Diagram of Power System > < Overhead Line > 10
11 Mooring System Concept For the position keeping for sea environments To secure the serviceability of main machineries Normal operation: jetty mooring LNG loading: ship-to-ship mooring Environmental Condition Designed for mild sea condition in sheltered area Additional systems for more severe condition : Breakwater, spud mooring, GBS, turret, etc. SEP LNGC < Definition of Coordinate System > (a) Jetty Mooring (b) Side-by-side Mooring < Mooring Arrangement for Jetty Mooring > 11
12 Mooring System Application of Spud Mooring SEP-T200GC (GT Combined Cycle) Harsh condition, e.g. typhoon/hurricane Free from tidal levels, etc. Application of Grounding (GBS) SEP-T100E (DF Engine) Harsh condition, e.g. typhoon/hurricane Free from sea environments, e.g. wave Spud Roller Platform Anchor Rock dumping (Protection against scour) 12
13 Mooring System Turret Mooring (preliminary) Position keeping, power export, fuel supply in offshore environmental condition Configurations Electric cable + Gas Line Electric cable + Gas Line Electric cable Turret Model Weather vaning Power export 120 Partial Cable reel Turret Fuel supply In-line swivel + Utility swivel Cryogenic hose reel - 13
14 Structural Reliability Structural Safety Trim & Stability for Intact/Damage Analysis of Topside Structures Cargo Hold Analysis for Scantlings < GT Supports > < ST Supports> < Web section > < Analysis Model > < Boundary Condition > < Analysis Results (VM-stress) > 14
15 Structural Reliability Serviceability of Gas Turbines Observation Points of Motion GT1 Assessment Results of Serviceability Requirements GT2 Condition Operation Transit Motion Serviceability Margin (%, Percentage) No Mooring Mooring (ship-to-jetty) Mooring (ship-to-ship) Check Inclination Roll OK Inclination Pitch OK Acceleration X OK Acceleration Y OK Acceleration Z OK Inclination Roll OK Inclination Pitch OK Acceleration X OK Acceleration Y OK Acceleration Z OK 15
16 Concluding Remarks The 600MW-class floating power plant of SAMSUNG Energy Plant (SEP-T600GC) has been proposed and optimized by using gas-fired combined cycle gas turbines. Unique fuel supply system considering BOG management during LNG loading & normal operation has also been proposed and verified. All detailed technical verification has been carried out for hull structures, fuel cargo containment system, E&I system, moorings, and topside structures, etc. The applicability of gas turbines on waters, which are commonly applied on land, has also been verified by computational methods. Based on SHI s engineering know-how gained through the development of SEP- T600GC, SHI can also propose FGPP of any power capacity corresponding to various environmental conditions and location requirements. 16
17 Thank you! Samsung Heavy Industries Co., Ltd. Q & A Contact: Myung-Kwan Song Principal Engineer, Ph.D./P.E., Mechanical Systems Research, Central Research Institute, Samsung Heavy Industries Co., Ltd., Republic of Korea mgkn.song@samsung.com, Office:
SAMSUNG Energy Plant: All-in-One Solution for Floating Power Plants with Gas-fired Combined Cycle Gas Turbines
SAMSUNG Energy Plant: All-in-One Solution for Floating Power Plants with Gas-fired Combined Cycle Gas Turbines GASTECH 2017 4-7 April, 2017 Chiba, Tokyo, Japan Myung-Kwan Song 1, Yongseok Song 2, Jeong
More informationClassification of the Largest Ever Floating Storage Regasification Unit
NH GRAND HOTEL KRASNAPOLSKY AMSTERDAM 3-5 APRIL 2017 Classification of the Largest Ever Floating Storage Regasification Unit Philippe CAMBOS Bureau Veritas AGENDA 1. Introduction 2. The project 3. Liquid
More informationTHE TRANSFER OF LNG IN OFFSHORE CONDITIONS. SAME SONG NEW SOUND
THE TRANSFER OF LNG IN OFFSHORE CONDITIONS. SAME SONG NEW SOUND Leendert Poldervaart Business Development Manager James Ellis Business Development Manager Single Buoy Moorings Gas Business Development
More informationDesign Concept and Features of the Mitsubishi LNG-FPSO (Floating Production, Storage and Offloading Unit)
7 Design Concept and Features of the Mitsubishi LNG-FPSO (Floating Production, Storage and Offloading Unit) YOSHIKAZU FUJINO *1 AKIRA ZAITSU *1 YASUHIKO HINATA *2 HIROTOMO OTSUKA *1 In recent years, floating
More information6th Annual LNG Transport Handling & Storage 2016 Forum. FSRU as The Pivotal Point for Effective LNG Distribution
6th Annual LNG Transport Handling & Storage 2016 Forum FSRU as The Pivotal Point for Effective LNG Distribution Bali, 15 th September 2016 PGN LNG Business at FSRU Lampung Maximum capacity of sales gas:
More informationClean LNG fuel for Black Sea-Danube-Rhine corridor
Clean LNG fuel for Black Sea-Danube-Rhine corridor SAGAU MIHAI Engineering and Environmental Sciences Department Maritime University of Constanta Constanta, Mircea street 104, PC 900663 ROMANIA mihai.sagau@yahoo.com
More informationAnatomy of LNG Shipping & Operations
Anatomy of LNG Shipping & Operations 13-17 May 2018 The Møller Centre Cambridge Organised by Cambridge Academy of Transport 48 Whittlesford Road Little Shelford Cambridge CB22 5EW Tel: +44 (0)1223 845242
More informationFLOATING LNG OVERVIEW
FLOATING LNG OVERVIEW The global demand for LNG in 2016 was ca. 260 MTPA. This is projected to double to over 500 MTPA by 2030. As the market grows, the composition and characteristics of demand are changing,
More informationLNG Plant Overview. Seminar with Supplier Association Murmanshelf Murmansk, 15 May 2012 Jostein Pettersen
LNG Plant Overview Seminar with Supplier Association Murmanshelf Murmansk, 15 May 2012 Jostein Pettersen Table of Content Part 1 : LNG plant overview (Jostein) Part 2 : Main equipment units (Jostein) Part
More informationProcessing LNG Offshore: Maximizing Reliability, Performance & Safety. By Inga Bettina Waldmann at KANFA Aragon FLNG World Congress 28 th June 2016
Processing LNG Offshore: Maximizing Reliability, Performance & Safety By Inga Bettina Waldmann at KANFA Aragon FLNG World Congress 28 th June 2016 FLNG World Congress 2016 Agenda I. About KANFA Aragon
More informationNoriyuki Kokubun a, Kiyohiko Ko b and Masahiko Ozaki c *
Available online at www.sciencedirect.com Energy Procedia 37 (2013 ) 3160 3167 GHGT-11 Noriyuki Kokubun a, Kiyohiko Ko b and Masahiko Ozaki c * a Chiyoda Corporation, 4-6-2, Minatomirai, nishi-ku, Yokohama
More informationLNG market developments. 12 th of February 2015 Jonathan Raes development EXMAR LNG Infrastructure
LNG market developments 12 th of February 2015 Jonathan Raes development EXMAR LNG Infrastructure Introduction EXMAR & LNG EXMAR Company Introduction Shipping & Energy Infrastructure Provider 1829 shipbuilding
More informationON LIQUEFIED NATURAL GAS (LNG 17) 17 th INTERNATIONAL CONFERENCE & EXHIBITION ON LIQUEFIED NATURAL GAS (LNG 17)
17 th INTERNATIONAL CONFERENCE & EXHIBITION ON LIQUEFIED NATURAL GAS (LNG 17) 17 th INTERNATIONAL CONFERENCE & EXHIBITION ON LIQUEFIED NATURAL GAS (LNG 17) HOW TO DEVELOP AN ECONOMICAL SMALL CAPACITY FLOATING
More informationTechnical Innovation for Floating LNG. Bengt Olav Neeraas & Jostein Pettersen, Statoil ASA
Technical Innovation for Floating LNG Bengt Olav Neeraas & Jostein Pettersen, Statoil ASA Table of contents Relevant know how for FLNG FLNG concept development Technology development & innovation Conclusions
More informationFloating Regasification The Aegean LNG terminal
Energy and Shipping Athens, March 2013 Floating Regasification The Aegean LNG terminal George Polychroniou Division Head, Strategy & Corporate Development Contents The growing role of FSRUs The case of
More information3 rd LNG SUPPLY, STORAGE AND TRANSPORTATION PHILLIPINES FORUM 2016 SMX AURA, MANILA
3 rd LNG SUPPLY, STORAGE AND TRANSPORTATION PHILLIPINES FORUM 2016 SMX AURA, MANILA Growing the market for LNG to Power (L2P) Projects through the Conversion of Existing LNG Carriers Nor Aslam Khan Director
More informationEnabling safe and reliable offshore LNG transfer operations By Vincent Lagarrigue, Marketing & Project Manager within Trelleborg Industrial Solutions
Enabling safe and reliable offshore LNG transfer operations By Vincent Lagarrigue, Marketing & Project Manager within Trelleborg Industrial Solutions Executive Summary Moving liquefied natural gas (LNG)
More informationPetronet LNG Ltd., India. LNG Terminal Design- Major Design Considerations
Petronet LNG Ltd., India LNG Terminal Design- Major Design Considerations OVERVIEW 1. What is LNG and LNG Chain 2. Project Development & Site Selection 3. Studies Required 4. Marine Facilities 5. Storage
More informationBenefits of a cylindrically shaped floater for an FPSO application in cyclone exposed environments
Benefits of a cylindrically shaped floater for an FPSO application in cyclone exposed environments Presentation by: Fredrik Major, CBDO, Sevan Marine ASA for INTSOK DEEP WATER CONFERENCE Thursday 14 November
More informationConceptual Design of CO 2 Transportation System for CCS
Available online at www.sciencedirect.com Energy Procedia 37 (2013 ) 2989 2996 GHGT-11 Conceptual Design of CO 2 Transportation System for CCS Abstract Takakazu Suzuki a *, Makoto Toriumi b, Takuya Sakemi
More informationMEETING THE EXECUTION CHALLENGES OF SHELL PRELUDE FLNG
MEETING THE EXECUTION CHALLENGES OF SHELL PRELUDE FLNG Alain Poincheval Executive Project Director Technip, France Jun Cheol Kim EVP, FLNG Project Management Offshore Production Facilities Business Unit
More informationExcelerate Energy: Efficient And Cost-Effective Solutions for the Global Gas Market
Excelerate Energy: Efficient And Cost-Effective Solutions for the Global Gas Market 14 January 2014 Copyright Excelerate Energy L.P. Who We Are: Pioneer and world leader in innovative LNG midstream solutions.
More information04 November LNG Ready Capabilities
04 November 2015 LNG Ready Capabilities Ships Fuel in Transition? Reminiscent of coal to oil. could it be oil to LNG next? Conventional wisdom: status quo (i.e. LSFO in ECA only) until IMO decides when
More informationFloating Production / Offshore solutions for tough challenges
Floating Production / Offshore solutions for tough challenges siemens.com/answers Siemens Sectors and Divisions Energy Healthcare Industry Infrastructure & Cities Divisions Fossil Power Generation Wind
More informationTECHNICAL CHALLENGES ASSOCIATED WITH ARCTIC LNG DEVELOPMENTS: A CLASS SOCIETY APPROACH
TECHNICAL CHALLENGES ASSOCIATED WITH ARCTIC LNG DEVELOPMENTS: A CLASS SOCIETY APPROACH Philippe Cambos Alexey Dudal Diane Ruf Bureau Veritas, Paris KEYWORDS: arctic polar class LNG ships risk analysis
More informationFloating Wind Power in Deep Water Competitive with Shallow-water Wind Farms?
Floating Wind Power in Deep Water Competitive with Shallow-water Wind Farms? a report by Eystein Borgen Sway AS Pioneering projects with a few bottom-mounted wind turbines in shallow water were first installed
More informationMLNG DUA DEBOTTLENECKING PROJECT
MLNG DUA DEBOTTLENECKING PROJECT Yahya Ibrahim Senior General Manager Malaysia LNG Malaysia yahyai@petronas.com.my Tariq Shukri LNG Consultant Foster Wheeler Energy Limited Reading, U.K. Tariq_shukri@fwuk.fwc.com
More informationFloating LNG: Origins and Future Impact on the LNG Industry
Floating LNG: Origins and Future Impact on the LNG Industry SPE Gulf Coast Region Ing. Paul Sullivan SVP Global LNG + FLNG - Worley Parsons 13 th July 2016 WP LNG Centres Vancouver LNG Marine I&E Houston
More informationSMALL SCALE LNG FOR SHIPPING. Go LNG Conference Vilnius, 26th of April 2016 Managing Director Knut Førland, Liquiline LNG
SMALL SCALE LNG FOR SHIPPING Go LNG Conference Vilnius, 26th of April 2016 Managing Director Knut Førland, Liquiline LNG Company Profile A Norwegian based gas technology company with history back to 2005.
More informationWe deliver gas infrastructure
We deliver gas infrastructure We are Uniper We are a leading international energy company with operations in more than 40 countries and around 13,000 employees. We combine a balanced portfolio of modern
More informationTRAINING CATALOGUE. Academy Korea SAFER, SMARTER, GREENER
TRAINING CATALOGUE Academy Korea SAFER, SMARTER, GREENER 0001 Introduction to Shipbuilding 3 DAYS Shipbuilding, Shipping & Operation statistics Organization of maritime regime, Rules & Regulations, Class
More informationCOMPLETING THE LNG VALUE CHAIN
COMPLETING THE LNG VALUE CHAIN Reidar Strande, Director, LNG, Wärtsilä Oil & Gas Systems Tord Johnsson, Area Business Development Manager, Oil and Gas Business, Wärtsilä Power Plants [ ENERGY & MARINE
More informationINTERNATIONAL CONFERENCE & EXHIBITION ON
17 th INTERNATIONAL CONFERENCE & EXHIBITION ON LIQUEFIED NATURAL GAS (LNG 17) 17 th INTERNATIONAL CONFERENCE & EXHIBITION ON LIQUEFIED NATURAL GAS (LNG 17) DESIGN OF THE EVOLUTIONARY LNG CARRIER SAYAENDO
More informationOperational, economic and environmental benefits of electrically driven LNG with a combined cycle power plant
Operational, economic and environmental benefits of electrically driven LNG with a combined cycle power plant Dr. Edwin Lerch Principal Expert Power System Dynamics Siemens AG Erlangen, Germany edwin.lerch@siemens.com
More informationLifting Appliances of Ships and Offshore Installations
CCS Rule Change Notice For: Lifting Appliances of Ships and Offshore Installations Version: May, 2016. RCN No.1 Effective date: 19 May, 2016 Beijing CONTENTS Chapter 3 CRANES, LIFTS, RAMPS AND SELF-LOADING
More informationFloating storage and regasification barges
Floating storage and regasification barges A FLEXIBLE AND MOVABLE SOLUTION BRINGING LNG TO AREAS WITH SITE LIMITATIONS CONCEPTS ADAPTABLE TO CUSTOMER NEEDS OF F S H OR E S E R V I C E V E S SE L (OS V)
More informationPackaged AHR (Advanced Heat Recovery) Systems for Engines, Gas Turbines, & Industrial Waste Heat. Tom Pierson
Packaged AHR (Advanced Heat Recovery) Systems for Engines, Gas Turbines, & Industrial Waste Heat Tom Pierson Last Field Erected CHP Project- Calpine Clear Lake, TX 1999 Evolution of Packaged Concept 500,000+
More informationLNG PUMPS FOR FLOATING STORAGE AND REGAS UNIT
4661 Eaker Street North Las Vegas, Nevada, 89081 USA Tel: +1 702 643 4900 Fax: +1 702 643 0391 nci.marketing@nikkisocryo.com http://www.nikkisocryo.com 1 Introduction. Lower capital costs, shorter on-stream
More informationLNG Small Scale Bunkering & Transport Solutions. Go LNG Study trip to Bergen 18th of May 2017 Managing Director Knut Førland, Liquiline LNG
LNG Small Scale Bunkering & Transport Solutions Go LNG Study trip to Bergen 18th of May 2017 Managing Director Knut Førland, Liquiline LNG Company Profile A Norwegian based gas technology company with
More informationFull electrical LNG-plant: Highest availability and energy efficiency trough overall system design
Full electrical LNG-plant: Highest availability and energy efficiency trough overall system design Dr. Edwin Lerch Principal Expert Power System Dynamics Siemens AG Erlangen, Germany edwin.lerch@siemens.com
More informationEfficient and Flexible AHAT Gas Turbine System
Efficient and Flexible AHAT Gas Turbine System Efficient and Flexible AHAT Gas Turbine System 372 Jin ichiro Gotoh, Dr. Eng. Kazuhiko Sato Hidefumi Araki Shinya Marushima, Dr. Eng. OVERVIEW: Hitachi is
More informationPES ESSENTIAL. PES: Europe
PES ESSENTIAL 96 PES: Europe The cost of wind Like other renewable energy technologies, wind is capital intensive, but has no fuel costs. The key parameters governing wind power economics are the investment
More informationWhen bigger is better Prelude FLNG, the world s biggest floating structure
When bigger is better Prelude FLNG, the world s biggest floating structure Photo: Shell Global Solutions International Imagine the largest LNG carrier in the world then multiply the size by a factor of
More informationHigh Efficient Peak Power on Demand
High Efficient Peak Power on Demand Page 1 POWER-GEN Middle East, February 6-8, 2012, Qatar, Doha Jan Dirk Beiler Senior Performance Engineer Development Lead for Wet Compression Modernization and Upgrade
More informationsmall to mid-scale LNG solutions LNG-TO-POWER
small to mid-scale LNG solutions LNG-TO-POWER strong partnership between sister companies LNG-TO-POWER Combining small to mid-scale LNG Floating Storage and Regasification Units (FSRU) with floating power
More informationSevan Marine ASA Floating LNG FPSO -how to put the gas into exportable parcels. Carnegie ASA Shippingklubben, Oslo January 28, 2008
Sevan Marine ASA Floating LNG FPSO -how to put the gas into exportable parcels Carnegie ASA Shippingklubben, Oslo January 28, 2008 1 ORGANISATION Sevan Marine ASA 100% 100% 100% 100% Sevan Production AS
More informationCapturing growth through global systems integration
Energy Solutions: Capturing growth through global systems integration Javier Cavada, President, Energy Solutions, Executive Vice President 1 Wärtsilä 29 September 2016 Javier Cavada Renewables rapidly
More informationQUALITY CONTROL Prepared: V. van Gastel / team TenneT Reviewed: M. Müller Approved: F. Wester BACKGROUND MATERIAL...
POSITION PAPER STAKE HOLDER CONSULTATION PROCESS OFFSHORE GRID NL Type: Position paper Work stream Technical Topic: T.1 Voltage level Filename ONL15-058-T1_Voltage level_pp_v1 Version 1 - release for Expert
More informationRosemount Custody Transfer System. Accuracy driven profit
Rosemount Custody Transfer System Accuracy driven profit Built on Emerson s existing and widely used Overflow Control technology, the new Rosemount Custody Transfer System is the most accurate and reliable
More informationWP Future opportunities for geothermal and energy system integrated
WP 2018-2020 Future opportunities for geothermal and energy system integrated Horizon 2020 WP 2018-2020 14:00 15:00 16:00 Deep geothermal underground RES1, RES11, RES14, RES28 Shallow geothermal RES1 &
More informationDry Flexicycle power plants a closed loop combined cycle with unique operational flexibility
Power-Gen Middle East 2014 Dry Flexicycle power plants a closed loop combined cycle with unique operational flexibility Mr. Risto Paldanius, Director, Business Development, Wärtsilä Power Plants Mr. Kristian
More informationCurrent trends for the floating liquefied natural gas (FLNG) technologies
Korean J. Chem. Eng., 31(5), 732-743 (2014) DOI: 10.1007/s11814-014-0047-x REVIEW PAPER INVITED REVIEW PAPER pissn: 0256-1115 eissn: 1975-7220 Current trends for the floating liquefied natural gas (FLNG)
More informationBenchmarking of power cycles with CO 2 capture The impact of the chosen framework
Benchmarking of power cycles with CO 2 capture The impact of the chosen framework 4 th Trondheim Conference on CO 2 Capture, Transport and Storage Kristin Jordal, 1 The benchmarking activity at SINTEF/NTNU
More informationFloating LNG. Solutions. Floating LNG solutions Catalogue TRELLEBORG FLUID HANDLING SOLUTIONS
EN Floating LNG Solutions Floating LNG solutions Catalogue www.trelleborg.com/oilandmarinehoses TRELLEBORG FLUID HANDLING SOLUTIONS Trelleborg group, leader in polymer solutions Trelleborg is a world leader
More informationNatural gas saving opportunities in gas supply system of Iran. 22 April 2014
Natural gas saving opportunities in gas supply system of Iran 22 April 2014 PROJECTS New design of gas compressor stations Energy integration in the existing compressor stations Power recovery by Turbo
More informationSmall Scale LNG From Concept to Reality. Chris Johnson, General Manager, LNG New Markets, Shell
Small Scale LNG From Concept to Reality Chris Johnson, General Manager, LNG New Markets, Shell 0 Table of Contents Table of Contents... 1 Background... 1 Aims... 4 Methods... 5 Results... 11 Conclusions...
More informationSAFETY BENEFITS 18. Tide-independence 18 Rapid ballasting 19 Integrated hydraulic Ro-Ro ramps 20 Safety features, the future and engineering 22
HYDRO DECK CONTENTS OVERVIEW 3 DESIGN 4 OVERVIEW OF KEY FEATURES 6 DESIGN BENEFITS 8 Versatile 8 High capacity ballast system 9 High deck strength and space 10 Integrated mooring system 11 Adaptable 12
More informationThe future of LNG Carriers
The future of LNG Carriers - Probability of Further Upsizing and Fuel-Efficiency Improvements Takeshi Hashimoto Member of the Board Senior Managing Executive Officer Mitsui O.S.K. Lines, Ltd. 5 th April,
More informationPOWER RECOVERY IN FLOATING LNG REGASIFICATION PLANTS
POWER RECOVERY IN FLOATING LNG REGASIFICATION PLANTS Arindom Goswami Senior Principal Engineer M. W. Kellogg Ltd Greenford, UB6 0JA, U.K. arindom.goswami@mwkl.co.uk Hans E. Kimmel Executive Director R&D
More informationSMALL LNG SOLUTIONS FOR INDONESIA
SMALL LNG SOLUTIONS FOR INDONESIA P.T GoLNG Indonesia January 2017 believes in Corporate Social Responsibilities. We are Committed to our firm belief that there is no job so URGENT that it cannot be done
More informationSmall scale boil off gas (BOG) re-liquefaction systems
Small scale boil off gas (BOG) re-liquefaction systems As presented by Francesco Dioguardi at the 7 th Gas Fuelled Ships Conference, Hamburg, November 17, 2016 1 DH Industries BV Based in Eindhoven, The
More informationStorage Tank Explosion Frequencies on FPSOs
Storage Tank Explosion Frequencies on FPSOs John Spouge, Principal Consultant, DNV GL, Vivo Building, 30 Stamford Street, London SE1 9LQ Introduction This paper presents a new estimate of the frequency
More informationADVANCED PROCESS CONTROL QATAR GAS ONE YEAR EXPERIENCE
ADVANCED PROCESS CONTROL QATAR GAS ONE YEAR EXPERIENCE Bouchebri El-Hadi Senior Process Engineer Benmouley Abdelkader Head of Process Qatar Liquefied Gas Company Limited. Ras Laffan Industrial Area, Doha,
More informationDominion Cove Point Export Project Platts 16 th Annual Liquefied Natural Gas February 9, 2017
Dominion Cove Point Export Project Platts 16 th Annual Liquefied Natural Gas February 9, 2017 Note to Investors This presentation contains certain forward-looking statements, including projected future
More informationENERGY SOLUTIONS FOR THE OIL AND GAS INDUSTRY POWERING THE FUTURE
ENERGY SOLUTIONS FOR THE OIL AND GAS INDUSTRY POWERING THE FUTURE TAP INTO DECADES OF UNMATCHED EXPERTISE For over 60 years, Solar Turbines has made products essential to powering the oil and gas industry.
More informationSHIP DESIGN AND BUILDING
SHIP DESIGN AND BUILDING Seung Kyun Park Samsung Heavy Industry, Korea Keywords: Ship design, cargo, bulk carries, tanker, container ship, car carrier, gas carrier, naval architectural knowledge, buoyancy,
More informationThe Offshore Way. WIPOS Wind power offshore substation. Answers for energy.
The Offshore Way WIPOS Wind power offshore substation Answers for energy. WIPOS configuration flexibility to meet every challenge With the new wind power offshore substation WIPOS, Siemens has created
More informationENERGY USE ONBOARD LNG DFDE SHIPS E. E. Attah and R. Bucknall
ENERGY USE ONBOARD LNG DFDE SHIPS E. E. Attah and R. Bucknall Department of Mechanical Engineering, University College London, Torrington Place, London WC1E 7JE, UK ABSTRACT Dual Fuel Diesel Electric (DFDE)
More informationDr. Konstantinos Galanis
Dr. Konstantinos Galanis Operations & Technical Senior Manager Seanergy Maritime Holdings Corp. To describe the different kinds of ships that are in common use The employment they are engaged in The kind
More informationNew York State Offshore Wind Master Plan. October 20, 2017
New York State Offshore Wind Master Plan October 20, 2017 2 Offshore Wind Master Plan A comprehensive State roadmap for advancing development of offshore wind in a cost-effective and responsible manner
More informationLow temperature cogeneration using waste heat from research reactor as a source for heat pump
National Centre for Nuclear Research in Poland Low temperature cogeneration using waste heat from research reactor as a source for heat pump Anna Przybyszewska International Atomic Energy Agency 14-16
More informationSGT-8000H gas turbine series proven in commercial operations
High efficiency, low emissions, fast start-up capability SGT-8000H gas turbine series proven in commercial operations siemens.com/gasturbines SGT-8000H turbine series: Proven, efficient, reliable The proven
More informationImproving Flexibility of the Combined Cycle Power Plant Hamm Uentrop to Cover the Operational Profiles of the Future
Improving Flexibility of the Combined Cycle Power Plant Hamm Uentrop to Cover the Operational Profiles of the Future Dr. Martin Buschmeier, Trianel Gaskraftwerk Hamm GmbH & Co. KG Thomas Kleinwächter,
More informationShip to Ship Transfer (POAC/Superintendent) for Liquefied Natural Gas and Liquefied Petroleum Gas (LNG or LPG) (3 days) (OCIMF)
2017-2018 Ship to Ship Transfer (POAC/Superintendent) for Liquefied Natural Gas and Liquefied Petroleum Gas (LNG or LPG) (3 days) (OCIMF) This training program was created based on the 2013 OCIMF, CDI,
More informationA COMPLICATED PROJECT FOR POWER AND WATER CO- GENERATION: THE RAF SITE
A COMPLICATED PROJECT FOR POWER AND WATER CO- GENERATION: THE RAF SITE Authors: Presenter: M. Garzoglio, L. Riccardo M. Garzoglio [Process Senior Eng. Fisia Italimpianti Italy] Abstract The Ras Abu Fontas
More informationLNG IMPORT TERMINALS RECENT DEVELOPMENTS
LNG IMPORT TERMINALS RECENT DEVELOPMENTS Janusz Tarlowski John Sheffield M. W. Kellogg Ltd United Kingdom Charles Durr David Coyle Himanshu Patel KBR Houston, Texas Abstract There has been a recent renewal
More informationThe Low Motion FPSO (LM-FPSO) The SCR and TTR Friendly Floater in Harsh Environment
The Low Motion FPSO (LM-FPSO) The SCR and TTR Friendly Floater in Harsh Environment Alaa Mansour, Ph.D Marine Engineering Manager Outlines Slide 2 Field Development Challenges The Low Motion FPSO (LM-FPSO)
More informationFloating LNG Business A breakthrough in offshore gas monetization
Floating LNG Business A breakthrough in offshore gas monetization LNG Malaysia Forum 2013 19-21 March, Kuala Lumpur Allan Magee, Ph.D. R&D Manager, Offshore Product Line and Technologies, Technip Geoproduction
More informationMarine Transportation of LNG. Intertanko Conference March 29, 2004 Bob Curt Ship Acquisition Manager, QatargasII Development
Marine Transportation of LNG Intertanko Conference March 29, 2004 Bob Curt Ship Acquisition Manager, QatargasII Development Marine Transportation of LNG Topics What is LNG? History of LNG Marine Transportation
More informationDevelopment of Ocean Energy Test Field in China. Operation & Project Management Department, National Ocean Technology Center, Tianjin , China
Journal of Shipping and Ocean Engineering 5 (2015) 44-49 doi: 10.17265/2159-5879/2015.01.005 D DAVID PUBLISHING Development of Ocean Energy Test Field in China Chenhua Ni Operation & Project Management
More informationLoading Master for Oil, LNG/Gas and Petrochemical Terminals
An Intensive 5 Day Training Course Loading Master for Oil, LNG/Gas and Petrochemical Terminals 30 Sep - 04 Oct 2018, Dubai 14-FEB-18 This course is Designed, Developed, and will be Delivered under ISO
More informationMembrane CCS for LPG Carrier
Membrane CCS for LPG Carrier INTERTANKO 04/04/2017 Disclaimer This document is strictly confidential. Any unauthorised access to, appropriation of, copying, modification, use or disclosure thereof, in
More informationProcess Compressors. Designed to optimize your business. Answers for energy.
Process Compressors Designed to optimize your business Answers for energy. Turbocompressors from Siemens covering the complete spectrum Siemens offers a full range of turbocompressors to meet the needs
More informationOperational flexibility enhancements of combined cycle power plants
Operational flexibility enhancements of combined cycle power plants Reprint from Power-Gen Europe 2007 Authors: Dr. Norbert Henkel, Siemens Energy, Germany Erich Schmid, Siemens Energy, Germany Edwin Gobrecht,
More informationSeismic Analysis of an SPB Tank Installed in the Offshore GBS LNG Terminal
Vol. 4 No. 2 August 27 Seismic Analysis of an SPB Tank Installed in the Offshore GBS LNG Terminal MANABE Hideo : Manager, Project Engineering Department, Engineering Division, IHI Marine United Inc. SAKURAI
More informationIndustrial Power. SGT-800 Gas Turbine. Power Generation: (ISO) 47.5 MW(e) / 50.5 MW(e) / energy
Industrial Power SGT-800 Gas Turbine Power Generation: Simple Cycle Combined Cycle 2x1 (ISO) 47.5 MW(e) / 50.5 MW(e) (ISO) 135.4 MW(e) / 143.6 MW(e) www.siemens.com / energy Nomenclature SC: CC: SCC: DLE:
More informationShipboard Operational Energy Efficiency: Strategy for Success
Shipboard Operational Energy Efficiency: Strategy for Success Thomas Kirk Director, Environmental Programs Stamford, CT 18 March 2013 INTERTANKO North American Panel Meeting Overview IMO regulations on
More informationWaste Heat Recovery at Compressor Stations
Waste Heat Recovery at Compressor Stations The path towards novel and high-impact technologies and their implementation Gas Electric Partnership Houston, TX Feb 10-11 2010 Presented by Southwest Research
More informationDevelopment of 5-MW Downwind Turbine and Floating Substation Facility for Offshore Wind Power
938 Hitachi Review Vol. 65 (16), No. Featured Articles Development of 5-MW Downwind Turbine and Floating Substation Facility for Offshore Wind Power Soichiro Kiyoki Kiyoshi Sakamoto, Dr. Eng. Shingo Inamura,
More informationTomakomai CCS Demonstration Project
1 Tomakomai CCS Demonstration Project CSLF TECHNICAL GROUP MEETING October 4, 2016 Japan CCS Co., Ltd. (JCCS) 2 Overview of Tomakomai Demonstration Project Hokkaido Is. Tomakomai TOKYO Tomakomai CCS Demonstration
More informationCOMBINED CYCLE OPPORTUNITIES FOR SMALL GAS TURBINES
19 TH SYMPOSIUM OF THE INDUSTRIAL APPLICATION OF GAS TURBINES COMMITTEE BANFF, ALBERTA, CANADA OCTOBER 17-19, 2011 11-IAGT-204 COMBINED CYCLE OPPORTUNITIES FOR SMALL GAS TURBINES Michael Lucente Found
More informationAppendix A: Project Characteristics
Gorgon Fourth Train Expansion Proposal Appendix A: Project Characteristics Appendices Project Characteristics A Key Characteristics table has been prepared to describe the elements of the Foundation Project
More informationCO 2 Capture Utilization and Sequestration (CCUS)
Siemens AG - Energy Sector CO 2 Capture Utilization and Sequestration (CCUS) Copyright Answers for energy. Drivers of CCUS Development Global electricity market : demand for (fossil) electricity still
More informationSaudi Aramco General Bid Slates (GBS)
Saudi Aramco General Bid Slates (GBS) Copyright 2015, Saudi Aramco. All rights reserved. Agenda Saudi Aramco Contracting Strategy Saudi Aramco General Bid Slate (GBS) General Bid Slate Work Types 2 Saudi
More informationNeuStream -EOR. Supplying Field Deployable Systems for CO 2 and Power Generation for the Enhanced Oil Recovery Market
NeuStream -EOR Supplying Field Deployable Systems for CO 2 and Power Generation for the Enhanced Oil Recovery Market Ryan Sears, PhD Senior Principal Engineer, Program Manager JP Feve, PhD VP Business
More informationCoTE Presentation LNG to Power Stornoway s Renard Mine Canada LNG Export 2015 May 19, 2015
CoTE Presentation LNG to Power Stornoway s Renard Mine Canada LNG Export 2015 May 19, 2015 Agenda SNC-Lavalin / Kentz Brief overview Global LNG presence LNG in Canada Stornoway Diamond Corporation Brief
More informationHiOx - Emission Free Gas Power A technology developed by Aker Maritime
Second Nordic Minisymposium on Carbon Dioxide Capture and Storage,. available at http://www.entek.chalmers.se/~anly/symp/symp2001.html HiOx - Emission Free Gas Power A technology developed by Aker Maritime
More informationNorwegian LNG Network
Norwegian LNG Network Distribution and Use of LNG for a Cleaner Environment Presentation of the Network LNG Norway with Go LNG Interreg Project Bergen 18 th May 2017 Egil Rensvik, Project Manager, Network
More informationFIRST LNG BUNKERING VESSEL TO SUPPLY THE LNG BUNKERING MARKET FROM ZEEBRUGGE
FIRST LNG BUNKERING VESSEL TO SUPPLY THE LNG BUNKERING MARKET FROM ZEEBRUGGE Martial CLAUDEPIERRE Business Development Manager LNG BUREAU VERITAS Laurent RAMBAUD - Vice President Business Development Retail
More informationClean Energy Systems, Inc. Zero Emissions Baseload TriGen and Load Balancing Power Plants Presentation at AWMA Meeting at SCAQMD 28 February 2013
Clean Energy Systems, Inc. Zero Emissions Baseload TriGen and Load Balancing Power Plants Presentation at AWMA Meeting at SCAQMD 28 February 2013 Keith Pronske President & CEO CES 3035 Prospect Park Dr.
More information