1 Reviews and Revisions Safe System of Work Policy Action Date Reason Reviewer Safe System of Work Policy 1
2 1. Introduction Campus Services manage and deliver a wide range of activities, accommodation, catering, maintenance of University grounds, the security, maintenance and cleaning of all buildings and event management, conferencing and sports provision (the construction and alteration of new or existing buildings). As the landlord of premises, the Director of Campus Services has a statutory and social duty to ensure, so far as is reasonably practicable, the health, safety and welfare of all employees whilst at work; this duty extends to ensuring that activities undertaken by or on behalf of the Department do not endanger others. The University and Campus Services Health and Safety Policies recognise these duties and provide for specific arrangements to be made to deal with specific risks. The purpose of this document is to assist staff and contractors to work safely on University sites and abide by University requirements and should be read in conjunction with Campus Services Health & Safety Policy and the University s Construction (Design & Management) Policy. The policy has 9 procedures for high risk work which should be consulted and the appropriate approvals obtained prior to work commencing. 2. Definitions 2.1 Contractor Any organisation(s)/consultant(s)/person(s), etc that Campus Services engages to undertake work who is not an employee of the University; (this includes work of a non construction or building nature). Work undertaken by a contractor includes but is not limited to: design and related services; repair, clean, service or maintain equipment or structures (e.g. boiler plant, vending machines, sports equipment) commission or decommission equipment or plant install, inspect or test equipment or plant construction, alteration or redecoration of structures dismantling or demolition of structures utility related work road works, civil engineering gardening and grounds maintenance pest control NOTE: this does not apply to those who supply goods only. Safe System of Work Policy 2
3 2.2 Construction work The carrying out of any building, civil engineering or engineering construction work and includes but is not limited to: the construction, alteration, conversion, fitting out, commissioning, renovation, repair, upkeep, redecoration, maintenance (including cleaning involving the use of water/abrasive at high-pressure or corrosive/toxic substances), decommissioning, demolition or dismantling of a structure; preparation, site clearance, exploration, investigation (but not site survey), excavation and foundation work; installation, commissioning, maintenance, repair or removal of mechanical, electrical, gas, compressed-air, hydraulic, telecommunications, computer or similar services which are normally fixed within or to a structure; assembly or disassembly of prefabricated units forming a structure; removal of structures or parts of structures or waste resulting from demolition, dismantling or disassembly of structures or parts of structures. 2.3 Campus Services Representative The person for whom a project (construction or non construction) is carried out, or who manages any of the works identified above whether it is carried out by a contractor or in-house staff. 3. Roles & Responsibilities Responsibility for safe working cannot be left entirely to contractors or subcontractors. Campus Services Representatives have a duty to ensure, so far as is reasonably practicable, that contractors have safe working procedures and adhere to them. The Campus Services Representative is responsible for: appointing competent contractors (those with adequate resources, training, experience and knowledge for the work for which they will be employed); selecting contractors who are compliant with The Contractors Health and Safety Assessment Scheme (CHAS) or equivalent; ensuring that contractors provide appropriate site/job specific health and safety information; contractors not listed on CHAS or equivalent will also be required to provide general health and safety management information prior to each project; providing access to relevant University/Campus Services health and safety information pertaining to the work area to allow the contractors to take adequate measures to protect his employees, and others who may be affected; carrying out contractor induction when necessary; All contractors must be informed of the signing in/out procedures prior to commencement ensuring that any necessary permits to work are issued; monitoring the performance and reporting any shortcomings of the contractor s activities while executing the work; Safe System of Work Policy 3
4 ensuring that any areas in which contractor employees are expected to work are maintained safe and free from hazards which may be caused by University staff or operations; liaising with University staff or representative who may be affected by the works, or by any change in conditions caused by the works; informing Faculties or Service Departments of intended works by issuing the Contractors on site notification. NOTE: Full details of CHAS can be found at 4. Procedure 4.1 Management Due to the nature of the University estate and the activities carried out by Schools and Service Departments, there are a number of high risk areas that fall under the management of Campus Services. 4.2 Identifying Hazards It is important that all staff consider these particular hazards and make themselves aware of the associated policies and how the University controls the risks arising from these hazards. It is also necessary to consider how these hazards may affect Contractors on site and therefore all relevant information must be passed to contractors working in these areas to allow them to plan their work as safely as possible. 4.3 Construction (Design & Management) Policy The Construction (Design and Management) Regulations 2007 (the CDM Regulations) focus attention on the planning and management of construction projects and are intended to reduce risks to those who build, use and maintain buildings. They replaced all previous construction legislation and they impose duties on virtually everyone involved in any construction work. The University Policy summarizes those duties and defines how the University will comply with the legislation. Follow this link to the policy 4.4 Asbestos Management Policy Asbestos poses a risk to human health if fibres are released into the air and breathed in. Due to this risk the University manages exposure to working with asbestos containing materials (ACMs) and has developed a comprehensive management policy for controlling exposure to asbestos. Anyone, employee or contractor working on University Buildings who could disturb ACMs in the building fabric must (prior to any work) consult the Asbestos Management Policy which can be found at the following link. Campus Services have committed to a comprehensive rolling programme of training for all staff who may come into contact with Asbestos Containing Materials. Safe System of Work Policy 4
5 4.5 Legionella Policy Legionella bacteria can be found in water systems such as cooling towers, hot and cold water services and where water may lay dormant and be subject to heat. Legionella bacteria can survive low temperatures and thrive at temperatures between 20C to 45C particularly where there is a presence of nutrients such as scale and rust. The University has a legal obligation to control the risks from legionella and you should co-operate with efforts to actively identify, assess and control sources of risk. The Deputy Director (Operations) is the Responsible Person for the maintenance and management of all water systems including the swimming pool. The Legionella policy can be accessed at the following link. 4.6 Electrical Safety Policy The Electrical Safety Policy has been developed for the protection of those persons, whose employment involves them in using or carrying out work on Northumbria University s electrical systems and equipment and any person, who may be affected by the activity. This policy is in accordance with the requirement of: - The Health and Safety at Work etc. Act 1974 and, The Electricity at Work Regulations Electricity Supply Regulations RIDDOR Workplace (Health, Safety and Welfare) Regulations BS th Ed IEE Wiring Regulations The policy can be found here. 4.7 Gas Safety Policy The Gas Safety (Installation and Use) Regulations 1998 require all engineers involved in the installation, inspection, servicing, maintenance and repair of domestic gas appliances to be registered under a Health and Safety Executive (HSE) approved scheme. Campus Services staff must ensure that any contractor engaged to work on gas fittings is Gas Safe registered, and appropriately qualified for the work to be done. The policy can be found here. 4.8 Fire Safety Policy Campus Services has a number of responsibilities in managing Fire Safety across the University. In particular; Providing advice on all fire systems in the University Installing fire systems and equipment and maintaining them in working order Carrying out the recommendations contained in the Fire Risk Assessments Ensuring the routine testing of fire equipment and installation as specified in each building fire precautions logbook Ensuring that anyone working in any building has due regard for the safety of the occupants by ensuring that emergency escape routes and final exits are freely available and smoke/heat detectors are not compromised by the works etc. Safe System of Work Policy 5
6 This is detailed further in the Fire Policy. 5. Safe Working Procedures & Permits to Work In order to ensure that high risk activities are being carried out in a safe manner both by Campus Services staff and Contractors on site, the Department has developed a number of safe operating procedures and in some areas of work operates a Permit to Work procedure. These can be found in the following appendices. 1 Roof Access Procedures 2 Confined Spaces Procedures 3 Hot Work Procedure 4 Working at Heights Procedure 5 Pressure Systems Procedure 6 Lifts and Lifting Equipment Procedure 7 Swimming Pool Water Hygiene Procedures 8 Excavations Procedure 9 Contractors on Site Procedure 6. Permits to Work 6.1 Permits to work are required where specified within the relevant procedures. 6.2 Permits to Work clearly set out: The work to be done Who will supervise the work Who is to carry out each section of the work The safety precautions that have been taken The precautions which still need to be taken by the member of staff before commencing the work, for example, affixing physical locking devices and danger signs A time limit (if applicable) within which a check needs to be carried out to see if the working environment is still safe. 6.3 Permits to Work will be issued by Campus Services Facilities Management staff only, in conjunction with other Faculty/Department staff as appropriate. An Authorised Person should sign the Permit to say it is safe for work to commence and also sign to cancel the permit. 6.4 The person carrying out the work should sign the permit signifying that they understand the tasks and precautions to be taken. 6.5 The Expiry time for a permit must be the same working day that work commences. Safe System of Work Policy 6
7 6.6 If the permit is not returned at the Expiry time the Authoriser must investigate immediately and make every effort to contact the permit holder. This is to ensure that no-one is injured or ill and unable to raise assistance. 7. Restricted Access 7.1 Areas designated to have restricted access shall be locked off with a suited key held by the Facilities Management section of Campus Services. 7.2 Line managers shall determine the appropriateness of other persons requiring access and provide Safe Systems of Work procedures as necessary. Alternatively an authorised person may accompany the person who wishes to gain access 7.3 Areas of restricted access will include: Boiler rooms Electrical switch rooms Plant rooms Lift motor rooms Roof areas/voids Electrical and mechanical service risers and ducts Controlled areas such as Chemical Labs, Laser labs, areas with Radioactive Sources or anywhere that displays a hazardous substance materials sign (i.e. yellow back ground and black warning) Only authorised staff/contractors can enter an area designated as Restricted Access. Safe System of Work Policy 7
Local Rule: Engaging External Service Providers
Local Rule: Engaging External Service Providers 1. Significant Hazards Engaging incompetent Service Providers, failing to exchange appropriate health and safety information with them failing to adequately
More informationManagement of Contractors Procedure
Management of Contractors Procedure Version Control Sheet Version Date Reviewed By Revision Details 1.0 28/08/2015 Louise Newsham Changes to job titles and roles. Reviewed to include recent legislative
More informationSafe Management of Contractors Policy
Safe Management of Contractors Policy Stour Federation Stour Federation Safe Management of Contractors, Page 1 1.! INTRODUCTION 1.1! Shipston-on-Stour Primary School and Acorns Primary School accept the
More informationCuro Group HEALTH & SAFETY POLICY: CONSTRUCTION SAFETY MANAGEMENT & CDM PROCEDURE
Curo Group HEALTH & SAFETY POLICY: CONSTRUCTION SAFETY MANAGEMENT & CDM PROCEDURE Introduction Curo Group have a statutory duty to ensure that construction projects and works are managed effectively in
More informationWILTSHIRE POLICE FORCE PROCEDURE
Form 535 Template v3 WILTSHIRE POLICE FORCE PROCEDURE MANAGEMENT OF CONTRACTORS PROCEDURE Date of Publication: September 2017 Version: 6.0 Next Review Date: September 2018 TABLE OF CONTENTS PROCEDURE OVERVIEW...
More informationSafety Management System
Safety Management System Title: Management of Asbestos Reference: SSC-PR-#002 Issue date: April 2010 Revision: Review date: Revision History Originator Changes 0.0 S.Toseland April 10 Authorised by: Approved
More informationASBESTOS POLICY & MANAGEMENT PLAN UNIVERSITY OF ESSEX HUMAN RESOURCES / ESTATE MANAGEMENT SERVICE
ASBESTOS POLICY & MANAGEMENT PLAN UNIVERSITY OF ESSEX HUMAN RESOURCES / ESTATE MANAGEMENT SERVICE Version 04.04.2017 Issue 1.2 (updated 17.01.2018) Approved by USG 10.10.17 1 CONTENTS 1 POLICY STATEMENT...1
More informationCDM 2015 In Practice. Craig Foyle CFIOSH IMaPS / Raymond Bone CMIOSH CFaPS. Version 1.0
CDM 2015 In Practice Craig Foyle CFIOSH IMaPS / Raymond Bone CMIOSH CFaPS Version 1.0 Speakers Craig Foyle Involved in engineering construction / construction projects for over twenty years working in
More informationConstruction (Design & Management) Regulations 2015 Briefing Note
construction Construction (Design & Management) Regulations 2015 Briefing Note Introduction The Construction (Design & Management) Regulations 2015 ("CDM 2015") are in force on 6 April 2015 (Regulation
More informationOVER 25 YEARS PROVIDING EFFECTIVE AND EFFICIENT HEALTH AND SAFETY ADVICE AND TRAINING TO THE CONSTRUCTION INDUSTRY AND OTHERS
OVER 25 YEARS PROVIDING EFFECTIVE AND EFFICIENT HEALTH AND SAFETY ADVICE AND TRAINING TO THE CONSTRUCTION INDUSTRY AND OTHERS WWW.CALLSAFE-SERVICES.CO.UK IS CDM2015 APPLICABLE TO FACILITIES MAINTENANCE?
More informationConstruction (Design and Management Regulations An Introduction for Clients wishing to undertake Construction Work
Construction (Design and Management Regulations 2007 An Introduction for Clients wishing to undertake Construction Work The Regulations The Construction (Design and Management) Regulations 2007 (CDM2007)
More informationContractor safety for schools and services. Guidance
Health and safety services Health and safety services Contractor safety for schools and services Guidance Updated September 2008 and amended March/May 2009 Contents 1.0 Planning the work 1.1 Minor alterations
More informationSafety Management System
Safety Management System Title: Reference: SSC-PR-#003 Issue date: April 2010 Revision 1.0 Review date: Revision History Originator Changes 0.0 Simon Toseland April 2010 1.0 Authorised by: Approved by:
More informationPROCEDURE (Essex) / Linked SOP (Kent) Asbestos Management. Number: U 1005 Date Published: 22 July 2015
1.0 Summary of Changes 1.1 This is a new joint procedure/sop for Essex Police and Kent Police. 2.0 What this Procedure is about 2.1 This document identifies how Essex Police and Kent Police shall manage
More informationCDM Kirstie Phillips
CDM 2015 Kirstie Phillips INTRODUCTIONS A bit about me and what I do! WORKING IN CONJUNCTION Fire fighting! WITH Auditing Assisting current safety officers HS & E management systems 90001, 18001(45001),
More informationHealth and Safety Policy and Procedures
1 Health and Safety Policy and Procedures 2 This page is intentionally blank. Wadham College Contents General Policy A declaration of our intent to provide and maintain, so far as is reasonably practicable,
More informationHEALTH AND SAFETY POLICY AND PROCEDURES
HEALTH AND SAFETY POLICY AND PROCEDURES Relevant Legislation The Health and Safety At Work Act 1974 The Management of Health and Safety At Work Regulations 1999(as amended) All associated Health and Safety
More informationCDM REGULATIONS 2015 KEY CLAUSES
Regulation 4 Client duties for managing projects (1) A client must make suitable arrangements for managing a project, including the allocation of sufficient time and other resources. (2) Arrangements are
More informationHealth & Safety Policy & Management Systems. Guidance Note 13
Health & Safety Policy & Management Systems Guidance Note 13 1 Health & Safety Policy & Management Systems Introduction This Guidance Note gives practical information regarding basic health and safety
More informationHealth and Safety Policy Statement. LONDONGUILD Ltd ELECTRICAL CONTRACTORS. The Palmerston Centre Oxford Road Wealdstone Harrow Middlesex HA3 7RG
Statement LONDONGUILD Ltd ELECTRICAL CONTRACTORS The Palmerston Centre Oxford Road Wealdstone Harrow Middlesex HA3 7RG Contents 1 General Statement of Policy 2 Organisation and Roles and Responsibilities
More informationDerbyshire Constabulary ASBESTOS MANAGEMENT POLICY POLICY REFERENCE 10/301. This policy is suitable for Public Disclosure
Derbyshire Constabulary ASBESTOS MANAGEMENT POLICY POLICY REFERENCE 10/301 This policy is suitable for Public Disclosure Owner of Doc: Head of Department, Finance and Administration. Date Approved: October
More informationClient Assessment of Requirements to make Particular Safety & Health Appointments
Client Assessment of Requirements to make Particular Safety & Health Appointments > Contents Form 1...... Client Checklist - Does the project involve Construction Work? Form 2...... Client Checklist -
More informationContractor and Supplier Expectations
Contractor and Supplier Expectations GUI/1548 Issue 15 Page 1 of 10 16 September 2016 Contents 1. INTRODUCTION AND SCOPE 3 2. RICARDO ENERGY & ENVIRONMENT POLICIES 3 3. SUSTAINABILITY 4 4. MANAGEMENT OF
More informationA2B. Construction (Design and Management) Regulations 2015 PRE CONSTRUCTION INFORMATION PACK (V ) PROJECT:
A2B. Construction (Design and Management) Regulations 2015 PRE CONSTRUCTION INFORMATION PACK (V.2 10.5.17) PROJECT: Oakdale Primary School, Peterborough Extension, Refurbishments and Associated Works.
More informationHealth & Safety Policy Statement Organisation & Responsibilities
Health & Safety Policy Statement Organisation & Responsibilities Prepared by: Barry Harden Joint Managing Director Temple Lifts Limited Regency House, 33-49 Farwig Lane, Bromley, Kent, BR1 3RE. Tel: 020
More informationAsbestos Management Policy
Asbestos Management Policy December 2017 1. Purpose Manningham Housing Association has a legal duty to ensure the health and safety of its employees, tenants, leaseholders and other stakeholders in relation
More informationCHAS Assessment Standards
CHAS Assessment Standards Section 1 - All Prosecutions or Enforcement Notices The Supplier has provided details of any enforcement notices or prosecutions served on them in the last three years by the
More informationPolicy. Paul Stephenson, Vice President Human Resources Effective date: October 2018 Review date: October 2021
Policy Operational Owner: Clive Parkinson, Director of Executive Owner: Paul Stephenson, Vice President Human Resources Effective date: Review date: October 2021 Related documents: Policy; Hazardous working
More informationTECHNICAL SUPPORT ASSOCIATES HEALTH AND SAFETY POLICY STATEMENT
TECHNICAL SUPPORT ASSOCIATES HEALTH AND SAFETY POLICY STATEMENT Technical Support Associates 57-59 High Street Bagshot Surrey GU19 5AH Tel: 01276 476237 Email: enquiries@tsaservices.co.uk Website: www.tsaservices.co.uk
More informationPICS Health and Safety Policy and Arrangements
PICS Health and Safety Policy and Arrangements H&S Manual 2016 page 1 of 16 Date issued: November 2016 Contents Policy Statement & Organisation Details... 3 Health and Safety Policy Statement... 4 Health
More informationPolicy, Responsibilities & Procedures
Health and Safety Services Policy, Responsibilities & Procedures for the management of Asbestos Containing Materials 1 Contents 1 Introduction... 3 2 Asbestos Policy... 4 2.1. Statement of Intent... 4
More informationat work Health and safety p o l i c y d o c u m e n t
Employees & visitors Safety Champion Supporting teams Roles & responsibilities Health and safety at work p o l i c y d o c u m e n t The Health and Safety at Work Policy provides a framework to ensure
More informationLevel 2 NVQ in Heating and Ventilating Industrial and Commercial Installation (6088)
Level 2 NVQ in Heating and Ventilating Industrial and Commercial Installation (6088) National occupational standards and Assessment and evidence requirements www.city-and-guilds.co.uk Final version October
More informationWATER SAFETY POLICY. Deputy Director of Estates & Facilities & Tetra Consulting. This Policy applies to the Estates and Facilities Department.
A member of: Association of UK University Hospitals WATER SAFETY POLICY POLICY NUMBER TPRHS170 POLICY VERSION V.2 RATIFYING COMMITTEE Estates & Facilities Executive Group DATE RATIFIED 24 October 2016
More informationLevel 2 NVQ in Heating and Ventilating Ductwork Installation (6088)
Level 2 NVQ in Heating and Ventilating Ductwork Installation (6088) National occupational standards and Assessment requirements www.city-and-guilds.co.uk Version 1 August 2003 Publications and enquiries
More informationAnnex I: Summary of duty holders
The Construction (Design and Management) Regulations 2007: Industry Guidance Annex I: Summary of duty holders Summary of key changes in CDM 2007 Regulations are re-ordered to group duties together by duty
More informationReview date Edition no ID code. Yes No Yes No. Yes No Yes No. External queries relating to the document to be referred in the first instance to the
Asbestos Policy 1 Document title Asbestos Policy Document author and department Jonathan Latter Health & Safety Compliance Manager Approving body Host Manager and department Fiona Bell Director of Estates
More informationReview date Edition no ID code. Yes No Yes No Y. Yes No Yes No. External queries relating to the document to be referred in the first instance to the
Asbestos Policy 1 Document title Asbestos Policy Document author and department Jonathan Latter Health & Safety Compliance Manager Approving body Host Manager and department Fiona Bell Director of Estates
More informationAsbestos Management Policy
Asbestos Management Policy Reference No. UHB 072 Version No. 2 Previous UHB / LHB Ref No: T/114 Documents to read alongside this Policy, Procedure etc UHB Operational Procedures for the Control of Asbestos
More informationThe following is a description of the type of work that our Company undertakes:
Health & Safety Introduction K9 Patrol is committed to providing a workplace that is healthy and safe for our employees and anyone who interacts with us e.g. customers and members of the public. Conformance
More informationAsbestos Management Plan
Health and Safety Services Asbestos Management Plan Policy, Organisation and Arrangements Sean Callaghan Issue number 2 April 2013 Contents Contents 1.1. Introduction... 4 1.2. Policy Statement... 4 2
More informationWorking Together. Lone Working. Policy and Procedure. July Uncontrolled Copy. Lone Working Policy and Procedure
Lone Working Policy and Procedure Lone Working Working Together Policy and Procedure July 2016 Borders College 6/9/2016 1 Working Together Lone Working Policy and Procedure History of Changes Version Description
More informationBowmer. & Kirkland. Kirkland. & Accommodation. Health & Safety Policy.
Bowmer Kirkland & Kirkland & Accommodation Health & Safety Policy December 2013 www.bandk.co.uk Index Policy Statement Page 3 Interaction of Health and Safety Responsibilities Page 5 Organisation Page
More informationHealth Safety and Welfare Policy
Health Safety and Welfare Policy For IDG Tool Repair and Electrical Testing Ltd 19 Bourne Way Swanley Kent BR8 7HX David Griffiths CONSULTANT HSWS LTD 01322 662363 Section 1 Statement of General Policy
More informationHEALTH AND SAFETY POLICY
SECTION 1. GENERAL POLICY STATEMENT: Director Responsible for Safety: A.C. Appleton The Director responsible for safety will ensure the adoption and maintenance of proper standards of safety, health and
More informationManagement of Contractors Policy
Management of Contractors Policy Date of Issue: February 2017 Review Date: February 2020 Approved by the Full Governing Body on 22nd March 2017 Audience: Frequency of Review: Postholder responsible for
More informationCorporate Health and Safety Policy
Appendix 1 Corporate Health and Safety Policy Part C - Section 8 Asbestos Management V4 Page 1 of 23 Appendix 1 CONTENTS 1. PURPOSE 2. ASBESTOS 2.1 What is it? 2.2 What are the dangers? 2.3 How can it
More informationUNIVERSITY OF LEICESTER ESTATES & FACILITIES MANAGEMENT DIVISION ASBESTOS MANAGEMENT PLAN
UNIVERSITY OF LEICESTER ESTATES & FACILITIES MANAGEMENT DIVISION ASBESTOS MANAGEMENT PLAN Revision Date Nature of Revision Prepared by Approved by 1 July 2014 Approved Plan Jon Fahie This, the University
More informationContractor Management of Notifiable Construction Projects, Non Notifiable Construction Projects, Non Construction Projects (BAU)
Title Contractor Management of Notifiable Construction Projects, Non Notifiable Construction Projects, Non Construction Projects (BAU) Reference Number AR-RMD-HSMS17 DOCUMENT HISTORY Review dates Issue
More informationGUIDANCE NOTES - CONSTRUCTION DESIGN AND MANAGEMENT (CDM) 3
GUIDANCE NOTES - CONSTRUCTION DESIGN AND MANAGEMENT (CDM) 3 Page 1 Page 2 GUIDANCE NOTES - CONSTRUCTION DESIGN AND MANAGEMENT (CDM) ROLES AND RESPONSIBILITIES The CLIENT must: 1. Be satisfied that all
More informationAsbestos Management Plan
Asbestos Management Plan Purpose: In accordance with the Work Place Health and Safety regulations this Asbestos Management Plan must remain available on site at all times Building address 775 Kingsford
More informationESTATES DEPARTMENT. Management of Asbestos Policy and Procedures Document. Rev 9
ESTATES DEPARTMENT Management of Asbestos Policy and Procedures Document Rev 9 Contents SECTION 1: Estates Management of Asbestos Policy 1.1 Introduction 1.2 Policy Statement 1.3 Legal Requirements 1.4
More informationClient Requirements to make Particular Safety & Health Appointments
Client Requirements to make Particular Safety & Health Appointments REVISED IN ACCORDANCE WITH THE SAFETY HEALTH AND WELFARE AT WORK (CONSTRUCTION) REGULATIONS 2013. > Contents Form 1...... Client Checklist
More informationCampus Services Construction (Design and Management) Guidance June 2017
Campus Services Construction (Design and Management) Guidance June 2017 Reviews and Revisions Date Reason Reviewer Next review date Approved by 26/06/2017 New Document Stuart Hewes 25/06/2018 Emrys Pritchard
More informationVersion: 3. Date adopted: 17 May publication: Review date: September Expiry date: March Target audience: All staff
Asbestos Policy The Asbestos Policy provides guidance to ensure that all appropriate steps are taken to comply with the duty to manage asbestos and comply with asbestos related legislation, codes of practice
More informationPOLICY FOR SAFE WORKING WITH ASBESTOS AT THE CANADA SCIENCE AND TECHNOLOGY MUSEUM CORPORATION
POLICY FOR SAFE WORKING WITH ASBESTOS AT THE CANADA SCIENCE AND TECHNOLOGY MUSEUM CORPORATION October 2010 1. FOREWARD 1.1. This document specifies the Canada Science and Technology Museum Corporation
More informationTraining Standard Draft Only
Title Duration Purpose/ Scope Occupational Relevance Health and Safety in Construction (Site Manager) Minimum 5 days of 6 learning hours per day Purpose: The purpose of training delivered against this
More informationHEALTH & SAFETY POLICY
Deeds not words - Be the best you can be HEALTH & SAFETY POLICY Updated: Spring 2018 Approved by Governors Resource Management Committee: 13 February 2018 NEXT REVIEW 2020 WHITLEY ACADEMY HEALTH AND SAFETY
More informationCORPORATE HEALTH AND SAFETY POLICY
CORPORATE HEALTH AND SAFETY POLICY Foreword Hawthorn Leisure is a pub group overseeing the management of a large group of pubs as well as providing statutory compliance services to tenanted pubs. At Hawthorn
More informationAB 14. RIBA stage AB AB 14 ESTABLISH HEALTH AND SAFETY STRATEGY 1. DEFINITION 2. PURPOSE
THE UNIVERSITY of EDINBURGH Estates & Buildings ESTATE DEVELOPMENT ISSUE/REVISION 14 LAST MODIFIED 19 November 2010 DATE PRINTED 14 ESTLISH HEALTH AND SAFETY STRATEGY 1. DEFINITION The Construction (Design
More informationWork Health & Safety Procedure
1 PURPOSE This procedure explains the process for qualification of Contractors at Port of Newcastle (PON). It outlines the responsibilities for PON Representatives and Contractors. It also provides a system
More informationHealth, Safety and Environmental Policy
Health, Safety and Environmental Policy REVISION HISTORY Description of Change Author Effective Date First Revision MB Health & Safety Ltd August2011 Second Revision MBHS November 2012 Purpose The purpose
More informationHEALTH & SAFETY POLICY Of JMC Mechanical Electrical & Air Conditioning Ltd
HEALTH & SAFETY POLICY Of JMC Mechanical Electrical & Air Conditioning Ltd Company Trading Address 242 Fort Austin Avenue Crownhill Plymouth PL6 5NZ Tel: 01752 657227 Fax: 01752 657227 Email: enquiries@jmc-sw.com
More informationThe Health & Safety Policy
The Health & Safety Policy April 2014 Issue: 3 Page 1 of 16 Review Date: April 2015 Introduction This document sets out the Health & Safety arrangements for Astra Signs Ltd and represents our commitment
More informationAsbestos Management Plan
Health and Safety Services Asbestos Management Plan Policy, Organisation and Arrangements Sean Callaghan Issue number 6 October 2016 Issue Date Nature of revision Prepared by Approved by 2 April 2013 First
More informationCorporate Health and Safety Policy July 2012
Corporate Health and Safety Policy July 2012 Contents Page General Statement of Health and Safety Policy and Intent 2 1. ORGANISATION 3 1.1 Elected Members 3 1.2 Cabinet Members 3 1.3 Governing Bodies
More informationManaging health and safety in construction
Managing health and safety in construction Construction (Design and Management) Regulations 2015 Guidance on Regulations The Construction (Design and Management) Regulations 2015 (CDM 2015) came into force
More informationContractors Safety Code of Practice
Document Control Revision No. Date Document Reviewed 8 October 2017 Publication on Web Site November 2017 Date of next Review October 2019 or following any changes Summary of main changes Change in format
More informationThis document sets out the rules applicable to all contract companies and their personnel when working on a CF Fertilisers UK Limited (CF) site.
CONTRACTOR EHS REQUIREMENTS FOR ON-SITE WORK Issued by:: EHS Page No: Issue No: Issue Date: Authorised By: Review date: 1 of 8 3 July 2016 N Cook July 2020 1. INTRODUCTION This document sets out the rules
More informationManaging Contractors (Scotland)
Managing Contractors (Scotland) University Health and Safety Policy Author: Health & Safety Services 1 Managing Contractors Procedures (Scotland) to support University Health and Safety Policy CONTENT
More informationFACT SHEET CONSTRUCTION (DESIGN AND MANAGEMENT) REGULATIONS 2015 THE PROPERTY PROFESSIONALS AUGUST 2016
MANAGEMENT) REGULATIONS forget the Legal Helpline ( members only) uk/uksi//51/pdfs/ uksi_0051_en.pdf CONTEXT The Management) (CDM) Regulations came into force on 6 April and replace the 2007 Regulations.
More informationCONTROLLING CONTRACTORS (Completely Rewritten)
CONTROLLING CONTRACTORS (Completely Rewritten) 1.0 Purpose To ensure that the Health, Safety and Environmental risks associated with the employment of contractors are controlled through compliance with
More informationMedway NHS Foundation Trust Corporate Policy: Health and Safety
Medway NHS Foundation Trust Corporate Policy: Health and Safety Author/Reviewer: Document Owner: Health & Safety Practitioner Head of Health and Safety Revision No: 8 Document ID Number Approved By: Trust
More informationHealth Safety and Welfare Policy & Arrangements For Fullbrook School
Health Safety and Welfare Policy & Arrangements For Fullbrook School To comply with the Health and Safety at Work etc Act 1974, Section 3: (3) it shall be the duty of every employer to prepare and as often
More informationUNIVERSITY COLLEGE LONDON STANDARD ASBESTOS MANAGEMENT PLAN
UNIVERSITY COLLEGE LONDON STANDARD ASBESTOS MANAGEMENT PLAN Revision Date Nature of Revision Prepared by Approved by 1 15-02-05 First Issue Ian Oram HSMT 2 02-03-09 Revised to incorporate Control of Asbestos
More informationAsbestos Policy. October Also available in large print (16pt) and electronic format. Ask Student Services for details.
Asbestos Policy October 2017 Also available in large print (16pt) and electronic format. Ask Student Services for details. www.perth.uhi.ac.uk Perth College is a registered Scottish charity, number SC021209.
More informationPhoenix Energy Holdings Gas Ltd Health & Safety Policy
Phoenix Energy Holdings Gas Ltd Health & Safety Policy July 2017 Phoenix Energy Holdings Ltd Health & Safety Policy July 2017 Contents 1.0 Introduction 2.0 Purpose 3.0 Scope 4.0 References 5.0 Definitions
More informationAsbestos Management Plan - Organisation Arrangements
Asbestos Management Plan - Organisation Arrangements Reviews and Revisions Date Reason Reviewer Next review date Approved by 14/06/2018 Full Review. Implementation of individually defined Asbestos Policy
More informationDance Centre, Jacobs Wells Road, Bristol, BS8 1DX
Asbestos Management Plan for, Jacobs Wells Road, Bristol, BS8 1DX 01/02/17 Page 1 Contents Page 3 Item 1.0 Introduction Item 1.1 Bristol City Council Asbestos Policy Page 3 Item 2.0 Responsibilities Page
More informationHealth and Safety Policy STATEMENT OF INTENT
Health and Safety Policy STATEMENT OF INTENT East Kent Housing is committed to achieving a high standard of health and safety compliance in all service areas through effective, proactive management and
More informationHealth & Safety Policy
Health & Safety Policy Introduction Health & Safety Policy Kirkstone House School is committed to ensuring the safety, health and welfare of its employees, pupils, the public and others working at, or
More informationHealth and Safety Policy
Paragon Asra Housing Limited Health and Safety Policy November 2017 Owning manager Chris Whelan, Executive Director Development & Sales Department Business Development Approved by Board - 24 November 2017
More informationC D M R e g u l a t i o n s
C D M R e g u l a t i o n s 2 0 1 5 CDM Consultancy - Support for Client - Principal Designer - Principal Contractor c l a r i t y t h r o u g h s i m p l i c i t y Reducing the risk to health and safety
More informationHealth, Safety and Welfare Policy
Health, Safety and Welfare Policy Contents Introduction Our objectives Health and Safety Policy Statement Health and safety organogram Responsibilities for health, safety and welfare 2 3 4 5 6 13 Arrangements
More informationSafety Statement Including Risk Assessment
Safety Statement Including Risk Assessment Health and Safety Authority 6th March 2012 Health & Safety Policy I / We of am / are committed to working in accordance with the provisions of the Safety, Health
More informationCONTRACTOR WHS SYSTEM STANDARD RISK MANAGEMENT EXTERNAL USE ONLY
CONTRACTOR WHS SYSTEM STANDARD RISK MANAGEMENT EXTERNAL USE ONLY Principles in the Optus Contractor WHS management process CONTRACTOR MANAGEMENT STAGES PRINCIPLES THIS STANDARD REQUISITION Requisition
More informationHEALTH AND SAFETY AT WORK ACT 1974 HEALTH AND SAFETY POLICY OF:
HEALTH AND SAFETY AT WORK ACT 1974 HEALTH AND SAFETY POLICY OF: D J MACAULAY (CONSTRUCTION) LTD. The Health and Safety at Work Act 1974 places an obligation on all Employers to make every reasonable effort
More informationContractors Code of Practice
Estates and Facilities Department of the University of Bradford In partnership with ICT Services Contractors Code of Practice Issue Date Comments 1 st Draft 2 nd Draft Issued 19/5/2010 Distributed as per
More informationSolihull Metropolitan Borough Council. Corporate Health and Safety Policy For Core Council Staff. September 2015
Solihull Metropolitan Borough Council Corporate Health and Safety Policy For Core Council Staff Version Control: September 2015 Version Date Author Sent to Reason 1.1 June 2015 Steve Dean ( Health and
More informationOPTUS SUPPLIER WORK HEALTH & SAFETY POLICY
OPTUS SUPPLIER WORK HEALTH & SAFETY POLICY 1. Introduction 1.1 SCOPE & PURPOSE This policy (which includes this document and the work health and safety standards, policies, procedures and safety control
More informationProperty Management. Making the difference...
Property Management 2018 Making the difference... Contents Executive Summary 3 Who We Are 4 Our Values 5 Property Management 6 Property Advisors 7 24/7 Support Line 8 Compliance Services 9 Condition Survey
More informationASBESTOS CONTAINING MATERIALS POLICY
ASBESTOS CONTAINING MATERIALS POLICY DOCUMENT CONTROL: Version: 4 Ratified by: Risk Management Sub Group Date ratified: 16 December 2015 Name of originator/author: Head of Estates and Facilities Name of
More informationPOLICY /PROCEDURE: CONTROL OF ASBESTOS
SECTION: 16 HEALTH & SAFETY POLICY /PROCEDURE: 16.10 NATURE AND SCOPE: SUBJECT: POLICY AND PROCEDURE - TRUST WIDE CONTROL OF ASBESTOS This Policy has been produced in line with the health and safety requirements
More informationAB 14 ISSUE/REVISION LAST MODIFIED 15 November 2012 DATE PRINTED
THE UNIVERSITY of EDINBURGH Estates & Buildings ESTATE DEVELOPMENT 14 ISSUE/REVISION LAST MODIFIED 15 November 2012 DATE PRINTED RIBA stage 14 ESTLISH HEALTH AND SAFETY STRATEGY 1. DEFINITION The Construction
More informationHEALTH & SAFETY POLICY
1. Policy Statement CONTENTS 1. Policy Statement 2. Responsibilities 3. In Practice 3.1 Risk Assessments 3.2 COSHH 3.3 PPE 3.4 Safety Training 3.5 Accident Procedure 3.6 Emergency Procedure 3.7 Site Audits
More informationHealth and Safety Policy Tom Devonport, Health and Safety Manager
Health and Safety Policy 2016-2017 Tom Devonport, Health and Safety Manager Contents Change history... 3 1.General Statement... 3 2.Scope... 3 3. Aims and Objectives... 4 In particular, 3aaa will:... 4
More informationNORTHERN EDUCATION TRUST HEALTH AND SAFETY DOCUMENT OF POLICIES
NORTHERN EDUCATION TRUST HEALTH AND SAFETY DOCUMENT OF POLICIES Contents Policy on Health and Safety COSHH Policy Working with VDU's Policy Management of Health and Safety at Work Policy The Workplace
More informationWellhouse - The Place To Be
POLICY ASBESTOS (MAINTENANCE) Wellhouse - The Place To Be Policy Created: February 2016 Date of Review: May 2017 Date of Next Review May 2020 1 Section Content Pages 1. Vision and values 2. Governance
More information