1 RFP Microsoft Dynamics 365 Implementation Services and Managed Services Questions and Answers 1. In the scope of the work there was no mention of security. Do you have advanced security requirements? Our Security requirements are common to most utility businesses. We have customers, employees, salary data, vendors, purchase cards, energy data, investment/bond debt banking information, etc. We expect the Azure environment and Dynamics environment to meet our system security requirements. GRDA must undergo a financial audit each year, as well as a North American Electric Reliability Corporation (NERC) Critical Infrastructure Protection (CIP) and 693 (Transmission assets) audit every 3 years. In Section E.7 - GRDA Security Policies. Bidder, and all of bidders personnel (including subcontractors, if any have been approved by GRDA), will be required to successfully complete a Personnel Risk Assessment (PRA) prior to obtaining authorized cyber access or authorized unescorted physical access to certain restricted GRDA assets. PRA forms are available from GRDA upon request. Bidder must also comply at all times with all of GRDA s policies regarding physical and cyber access to restricted assets. 2. For payroll, is the only state in scope Oklahoma or are there employees working in other states? If so, do those state have reciprocity? Oklahoma only. 3. How many legal entities are included in the roll-out? Need more information on what is considered a "legal entity". 4. Did you discovery of D365 for payroll indicate D365 was a good fit for your listed requirements? Yes, our Payroll processing is quite complex due to an in-house written system. However, we are eager to streamline and utilize more standard configurations, where feasible. We are seeking a partnership with a vendor to help us evolve our processes to better align with out of the box functionality with industry standard practices. 5. You mention a 3rd party add-on for debt/investment management. Are there any other 3rd party requirements per your discovery with Microsoft? When D365 was demonstrated, we understood that the debt/investment management was not a built-in feature. Therefore, we are seeking a vendor who is experienced with add-on products that work well with integration with D365 environment for this functionality. 6. Did your discovery of D365 result in a fit for customer contract management requirements? Yes, our customer contract management is not overly complex. 1
2 7. In reference to B.4.4.4, how should we handle the possibility of needing 3rd party addons but won't know for certain until discovery is performed? Respond as best you can by noting that 3rd party products may be a better fit than out of the box D Are you expecting a multi-phase roll-out or a big-bang approach to the roll-out? We believe that a multi-phased rollout would be most feasible for our environment, where an implemented module can build upon the previous module. However, this is a first-ever enterprise wide implementation of this magnitude, and we are seeking guidance from an experienced implementation team to guide us to success. 9. What is the application & platform version GRDA has purchased? The Microsoft Dynamics 365 for Operations software licenses and Microsoft Azure Commercial hosted infrastructure have already been acquired by GRDA. 10. How many hosted infrastructure GRDA has provisioned? I believe we plan for 3 provisions - Test, Dev, and Production. However, we have yet to initialize the licenses and we are seeking guidance from an experienced implementation team to guide us to success. 11. There are 30 interfaces listed on page 14, can you please provide more info includes (a) Volume of the data (b) Frequency. See answer in table on page One of the data migration task is to migrate data from "Pay Maintenance (in-house)", what kind of database does "Pay Maintenance (in-house)" use? MS SQL Server 2000 running on Windows Server 2003 R RFP-42017_Final_1 states most of the data migration will include 3 historical data. May we know the approx. data volume? See answer in table on page What are some of the major paint points of current systems, including Dynamics SL and other legacy systems? Chart of Accounts, Project Accounting, Budget Management, Customer Contract Management, Payroll, HR, Time & Attendance, Purchasing, Inventory. 15. What version of Microsoft Dynamics SL GRDA has now? Dynamics SL 2011 FP1 - Professional. Version ( ). 16. Did you buy licenses for VSTS (visual studio team server)? Not that we are aware of. We can if necessary. 17. Can we have a copy of GRDA organization structure? If necessary and requested, we will provide this to the successful bidder. 2
3 18. Does GRDA already have the ERP program structure? If so, can we have a copy of this as well? Need more information on what is considered an "ERP Program Structure". We have an ERP Steering Committee and Project Team members, currently under development. However, we are seeking guidance from an experienced implementation team to guide us to success. 19. Are there resources residency requirements (H1b, Green Card & Citizen?) Are there any restrictions on offshore resources? GRDA prefers only US citizens for this project, specifically a vendor who can meet the eligibility requirements in A.3. Successful bidder must also comply with Section E, specifically E.5 regarding E-Verify program. 20. Should the RFP include the cost of the 5-year term Managed Services? Yes, preferably a separate and distinct line item. 21. Why are some of the deliverables on page 8 listed as draft? The word (draft) was meant to state that this would be the deliverables first pass or creation effort. Once the project progresses, these deliverables would be finalized. 22. Can you elaborate on the reporting scope? Standard Reports as well as Customized reports will be assessed and determined during the Planning Phase. 23. On page 9, what is meant by prototypes? Do you mean proof of concept demonstrations? Yes. This would be especially helpful during the Education Workshop within the Planning Phase. 24. Can QA testing be performed off site? Need more information of what is considered "off-site"? Our ERP environment will be on Microsoft's Azure environment, which is off-site. 25. What is your expectation on remote work? Remote work can be considered for certain instances. However, this is a first-ever enterprise wide implementation of this magnitude, and we are seeking guidance from an experienced implementation team to guide us to success. Onsite work is going to be mostly preferred with remote work accomplishing weekly meetings, checking status, reviewing module functionality, and other minor tasks. 26. OCM is normally integrated into an ERP project before the Testing Phase. Do you want us to adhere to your request or quote per best practice? Best Practice. 27. In a RACI scenario, who is responsible and accountable for end user training? GRDA expects the Implementation Vendor to guide us through the testing phase, jointly developing test scripts that are feasible to test our environment for user acceptance, however GRDA shall coordinate the test users, timing, and other logistics. 3
4 28. What is the timeline for vendor selection and projected start of engagement? Please see the Schedule of Events. GRDA is targeting to begin this project fall Are you willing to share budget expectations or a budget range for this project? GRDA prefers all vendors carefully review the RFP language, all Sections, Terms and Conditions and to complete the Price Sheet to best prepare their bid for this project effort. 30. How many competitors do you expect for this RFP? Unknown. Source System Data Element Years Retained Volume of Data MS Dynamics Financial balances and budgeted values (rollover balances plus 3 summary level balances and transaction ) GRDA would prefer 9 years of historical mapped monthly trial balance amounts AND 3. Pay Maintenance (in-house) MS Dynamics Payroll, HR, and Absence Purchase Orders Vendor File, Payment History, and Invoice History Fixed Assets Accounts Receivable All Active vendors and 3 year for those vendors No available in either system; only Excel spreadsheets About 30,000 transactions with 160,000 total lines in the past 3 years. Roughly 392,000 account/subaccount combinations. About 660 active employees, 1,855 employees total that have been tracked in HR/Payroll system since its inception Roughly 34,000 POs in the last 3 years and 1,800 active POs, 5,000 RFQs in the last 3 years, 700 active RFQs, 8,400 PRs in the last 3 years and 170 active PRs, Approximately 5,200 total vendors in Dynamics SL, 12,200 companies in, 28,101 invoices in the last 3 years and 370 active Invoices Roughly 5,600 batches in the past 3 years 4
5 MS Dynamics SQL database Accounts Payable Purchase Orders and receiving Vendor Registrations Listing Roughly 3,300 batches in the past 3 years Roughly 34,000 POs in the last 3 years and 1800 active POs Active vendors (about 3000); GRDA to refine 5
Fixed Scope Offering for Oracle Fusion Procurement. Slide 1
Fixed Scope Offering for Oracle Fusion Procurement Slide 1 Today s Business Challenges Adopt leading Global SCM practices & strategies across the entire enterprise value chain to move into the future.
More informationQueen Anne s County. ADDENDUM NO. 1 July 31, 2015
Queen Anne s County County Commissioners: James J. Moran, At Large Jack N. Wilson, Jr., District 1 Stephen Wilson, District 2 Robert Charles Buckey, District 3 Mark A. Anderson, District 4 OFFICE OF BUDGET,
More informationQuestion 1: How many users would be accessing the replacement tool?
Questions and Answers Discoverer Replacement RFCSP # 1469 Updated April 20, 2017 Questions and Answers will be updated on this document as they are received Question 1: How many users would be accessing
More informationREQUEST FOR PROPOSAL PROFESSIONAL SERVICES AUTOMATION SOLUTION. Submittal Date: April 22, 11:00 AM (PST)
REQUEST FOR PROPOSAL PROFESSIONAL SERVICES AUTOMATION SOLUTION Submittal Date: April 22, 2016 @ 11:00 AM (PST) Issued by: Southern California Coastal Water Research Project 3535 Harbor Blvd., Suite 110
More informationTable of Contents. Executive Summary...3. Overview of Division...5. Summary of Accomplishments...6
Finance Division Table of Contents Executive Summary...3 Overview of Division...5 Summary of Accomplishments...6 Smart Goals... 7 Outcomes and Performance Measures 2 Executive Summary MISSION STATEMENT
More informationDATE: May 9, 2018 Submission of second round questions to Cathy Colbert,
Please note, a second round of Q&A has been added to the RFP process and the final submission date for proposals has been updated. Changes to original RFP noted in red below: DATE: May 9, 2018 Submission
More informationBig Bang Theory: PeopleSoft HCM 9.2 and PeopleSoft Financials 9.2 Upgrade in Seven Months
Big Bang Theory: PeopleSoft HCM 9.2 and PeopleSoft Financials 9.2 Upgrade in Seven Months 10/25/2015 Matt Peterman Grant Thornton Senior Solution Architect, Kansas City Beth Geer Empire District Electric
More informationORACLE HOSPITALITY CLOUD CONSULTING SERVICE DESCRIPTIONS October 19, 2017
ORACLE HOSPITALITY CLOUD CONSULTING SERVICE DESCRIPTIONS October 19, 2017 TABLE OF CONTENTS Service Offerings CONSULTING SERVICE OFFERINGS Part Number ORACLE HOSPITALITY FOOD AND BEVERAGE POINT OF SALE
More informationORACLE HOSPITALITY HOTEL CONSULTING SERVICE DESCRIPTIONS November 3, 2017
ORACLE HOSPITALITY HOTEL CONSULTING SERVICE DESCRIPTIONS November 3, 2017 TABLE OF CONTENTS Service Offerings CONSULTING SERVICE OFFERINGS Part Number ORACLE HOSPITALITY HOTEL PROPERTY MANAGEMENT SYSTEM
More informationADDENDUM NO. 1 November 16, Bid# CL16-GN-0030, Tririga Work Order Implementation Services Project for the University of Massachusetts Lowell
ADDENDUM NO. 1 November 16, 2015 To all Bidders on the Project Titled: Bid# CL16-GN-0030, Tririga Work Order Implementation Services Project for the University of Massachusetts Lowell UNIVERSITY OF MASSACHUSETTS
More informationEDR Update School Board Workshop July 21, 2015
EDR Update School Board Workshop July 21, 2015 Where We Total Decline of $143 million since 2007-08 Have Been? Where We Have Been Original Contract & Amendments Timeline 7/16/02 Original Contract License
More informationIntegration Solution for the Enterprise. Powered by
Integration Solution for the Enterprise Powered by Vision What it is AXON is an integration platform with the key objective to support end to end flow of business processes across multiple systems whilst
More informationCloud Services Offering. Fixed Scope Offering for Implementation of Oracle Fusion HCM in Cloud
Cloud Services Offering Fixed Scope Offering for Implementation of Oracle Fusion HCM in Cloud 1 Executive Summary Hexaware is pleased to present to you this fixed scope offering for implementation of Oracle
More informationCity of Normandy Park Request for Proposal for Municipal Financial Software System. February, Responses to RFP are due by March 20, 2009
City of Normandy Park Request for Proposal for Municipal Financial Software System February, 2009 Responses to RFP are due by March 20, 2009 The Request for Proposals (RFP) is presented in the following
More informationDigital Strategic Plan and Enterprise Resource Planning NOVEMBER 15, 2016 CITY COUNCIL WORK SESSION
Digital Strategic Plan and Enterprise Resource Planning NOVEMBER 15, 2016 CITY COUNCIL WORK SESSION 1 Digital Strategic Plan (DSP) AGENDA 1. DSP Goals & Objectives 2. DSP Findings & Opportunities 3. DSP
More informationIDEAS Product Overview
Product Overview P2 s is an international oil and gas venture management software. handles financial management, supplier relationship management, partner relationship management, operations management,
More informationSTATEMENT OF WORK #1 Between North Carolina Department of Environment and Natural Resources, Division of Marine Fisheries And Pegasystems Inc.
SOW NUMBER: NCDENR DMF1 STATEMENT OF WORK #1 Between North Carolina Department of Environment and Natural Resources, Division of Marine Fisheries And Pegasystems Inc. This Statement of Work #1 ( SOW )
More informationREQUEST FOR EXPRESSION OF INTEREST FOR THE
REQUEST FOR EXPRESSION OF INTEREST FOR THE SUPPLY, INSTALLATION, CONFIGURATION, TESTING, TRAINING OF USERS AND COMMISSIONING OF AN ENTERPRISE RESOURCE PLANNING (ERP) SYSTEM FOR CHAI SACCO SOCIETY LTD 1
More informationExecutive Steering Committee Meeting. Department of Revenue Building 2, Room 1250 July 27, 2016
Executive Steering Committee Meeting Department of Revenue Building 2, Room 1250 Roll Call and Opening Remarks Facilitator: Robert (Budd) Kneip, Chair Review of June 2016 Meeting Minutes Facilitator: Robert
More informationState of West Virginia TABLE OF CONTENTS
Request for Best and Final Offer for Enterprise Resource Planning (ERP) Software and Services August 5, 2011 TABLE OF CONTENTS SECTION ONE: GENERAL INFORMATION... 1 1.1 Purpose... 1 1.2 Relationship to
More informationRFP Restructuring Advisory Committee: Water and Sewer Question and Answer. Question Cut-Off 2/13/17
RFP 2017-0007 Restructuring Advisory Committee: Water and Sewer Question and Answer Question Cut-Off 2/13/17 1. What is the estimated value of the sewer system? Determining an appropriate valuation of
More informationStat Production Services for Oracle E-Business Suite (Onsite and Remote)
Stat Production Services for Oracle E-Business Suite (Onsite and Remote) Description The Stat Production Services for Oracle E-Business Suite is designed to assist the customer with the implementation
More informationSanjay Srinivas PH:
Microsoft Dynamics AX 2012 Training course Content [Financials I, II, and Fixed Assets] Financials I Financials I course introduces the student to the Microsoft Dynamics AX 2012 General Ledger Accounting
More informationPinnacle Data Integration Services
Pinnacle Data Integration Services Acquire with Integrate Connectelligence Automate In Partnership with: Report Contents Data Integration Problems An outline of two issues we have encountered in the past.
More informationERP Needs Assessment Report CITY OF GEORGETOWN, TX MAY, 2017
; ERP Needs Assessment Report CITY OF GEORGETOWN, TX MAY, 2017 Table of Contents 1. Executive Summary... 2 1.1 Project Background... 2 1.2 Project Goals & Objectives... 2 1.3 Assessment Scope... 3 1.4
More informationTurn Your Business Vision into Reality with Microsoft Dynamics SL
Turn Your Business Vision into Reality with Microsoft Dynamics SL You have worked hard to build a vision for your business. With Microsoft Dynamics SL, you can turn that vision into reality with a solution
More informationERP Selection for Multi-faceted Higher Education Systems in the Software-as-a-Service Era
ERP Selection for Multi-faceted Higher Education Systems in the Software-as-a-Service Era Steven Fulkerson, President s Delegate, ERP Selection Committee, The University of Arkansas System David Hemingson,
More informationCity of Placentia Request for Proposal Permit Tracking System
City of Placentia Request for Proposal Permit Tracking System Question and Answer Sheet #1 The following were questions posed by interested parties and submitted to the City. The answers below are made
More informationORACLE RESPONSYS PROFESSIONAL SERVICES DESCRIPTIONS
ORACLE RESPONSYS PROFESSIONAL SERVICES DESCRIPTIONS (January 25, 2018) RESPONSYS CONSULTING SERVICES PACKAGES... 3 Responsys Basic SmartStart Implementation Service Remote... 3 Responsys Premium SmartStart
More informationSYSPRO Product Roadmap Q Version 03
SYSPRO Product Roadmap Q4 2017 Version 03 This roadmap is intended for use as a guideline and for information purposes only, and represents SYSPRO s current view of our product direction. Due to the dynamic
More informationUpdated Aug FLASH Whitepaper Distribution Financials for Office 365 Distribution Inclusions
Updated Aug 2017 FLASH Whitepaper Distribution Financials for Office 365 Distribution Inclusions Table of Contents Overview... Are there any pre-requisites.... Who s involved.... What s included.. Project
More informationRequest for Proposal (RFP) For an Enterprise Resource Planning (ERP) System And Implementation Services For Summit County, CO
Request for Proposal (RFP) For an Enterprise Resource Planning (ERP) System And Implementation Services For Summit County, CO RFP QUESTIONS (The questions below were received after the pre-bid conference
More informationBuilding a Hosted Statistical Computing Environment: Is it Possible?
PharmaSUG2011 - Paper DM01 Building a Hosted Statistical Computing Environment: Is it Possible? John Leveille, d-wise Technologies, Raleigh, NC, USA ABSTRACT Small pharmaceutical companies face a large
More informationFMI Self Service in Finance at ESDC
FMI Self Service in Finance at ESDC November 27, 2014 Agenda Introduction Approach Our Solution A Self Serve System Key Challenges What s Next 2 Our Approach 3 About the Enabling Services Renewal Program
More informationmunis a tyler erp solution
munis a tyler erp solution Munis Financial Management Integrated Applications for Powerful Performance 1 A Single Solution That Improves the Way You Work Designed specifically for the public sector, Tyler
More informationInfor VISUAL. Introduction. Statement of direction
Statement of direction Infor VISUAL Introduction Infor VISUAL continues to change the way that manufacturers especially those who specialize in complex, make-to-order sales tackle the challenges of a global
More informationAll vendors are to accept the information contained herein as the official response of IPTC.
June 14, 2017 To: All Vendors of Record Re: Addendum #1 All vendors are to accept the information contained herein as the official response of IPTC. TO ALL BIDDERS OF RECORD AND TO WHOM IT MAY CONCERN:
More informationGetting to Know Microsoft Dynamics 365
Getting to Know Microsoft Dynamics 365 light users Team Members Apps full users Plans Financials Sales* Financials Sales* Marketing* Future Apps* Marketing* Future Apps* Light use, knowledge sharing &
More informationREPORT 2015/170 INTERNAL AUDIT DIVISION. Audit of the implementation of Umoja in the Economic and Social Commission for Western Asia
INTERNAL AUDIT DIVISION REPORT 2015/170 Audit of the implementation of Umoja in the Economic and Social Commission for Western Asia Overall results relating to the audit of the implementation of Umoja
More informationDigital Strategic Plan (DSP) and Enterprise Resource Planning Annual Update
Digital Strategic Plan (DSP) and Enterprise Resource Planning Annual Update SEPTEMBER 19, 2017 CITY COUNCIL WORK SESSION PRESENTERS: JOVAN GROGAN SAVITA CHAUDHARY TASHA TERVALON 1 AGENDA / Slides Summary
More informationEXHIBIT K: PROJECT ASSUMPTIONS GENERAL AND PROJECT ADMINISTRATION ASSUMPTIONS
EXHIBIT K: PROJECT ASSUMPTIONS CGI has specified general project assumptions as well as assumptions associated with specific tasks, activities, roles and responsibilities. These additional assumptions
More informationAppendix 1 LifeCycle Packaged Implementations. RightNow LifeCycle Packaged Implementation Overview. Project Critical Success Factors.
RightNow LifeCycle Packaged Implementation Overview The following pages are the standard statement of work for RightNow s packaged LifeCycle Implementations. Since RightNow s project management methodology
More informationIBM TRIRIGA Version 10 Release 5.2. Procurement Management User Guide IBM
IBM TRIRIGA Version 10 Release 5.2 Procurement Management User Guide IBM Note Before using this information and the product it supports, read the information in Notices on page 29. This edition applies
More informationINTEGRATION BASICS...
Contents INTRODUCTION... 1 Software Editions Supported... 1 INTEGRATION BASICS... 2 MODES OF SYNCHRONIZATION... 3 INTEGRATION RULES... 3 INTEGRATION SETTINGS... 4 DATA INTEGRATION... 5 INITIAL INTEGRATION...
More informationPeoples Steel Mills Ltd.
Peoples Steel Mills Ltd. REQUEST FOR PROPOSALS ( RFP ) for Oracle EBS Expansion through Multi-org (MO) Implementation May 03, 2015 Table Of Contents SECTION 1 - INTRODUCTION 1 1.1 Title 1 1.2 Overview
More informationTurbo-Charge Your Accounting With the Release 12 Subledger Accounting Engine
Turbo-Charge Your Accounting With the Release 12 Subledger Accounting Engine Alyssa Johnson Rolta The new Subledger Accounting Engine represents a major shift in architecture for the accounting component
More informationWorkforce HR and Workforce Payroll 7.0
Learning Path Workforce HR and Workforce Payroll 7.0 Key: Traditional Classroom Virtual Classroom Web Based Training w/virtual lab On-site Training KnowledgePass Course Level: Introductory Intermediate
More informationOracle Taleo Business Edition Implementation Fixed Scope Offerings
Oracle Taleo Business Edition Implementation Fixed Scope Offerings Date Email Website : Dec-2015 : info@kovaion.com : www.kovaion.com Kovaion Consulting Kovaion A Snapshot Oracle Alliance Certified Consultants
More informationJuly 9. Course Catalog. Camstar Semiconductor Suite Release 6 CONFIDENTAL
July 9 Course Catalog 2015 Camstar Suite Release 6 CONFIDENTAL Contents General Information... 1 Available Training Camstar Suite v6... 2 Course Names and Descriptions... 3 Exploring Camstar Suite... 3
More informationOracle Consulting Midsize Services Descriptions 11/10/16
Table of Contents: Oracle Consulting Midsize Services Descriptions 11/10/16 Oracle Sales and Service Cloud... 8 B85483 Oracle Consulting Core Implementation Pack for Oracle Sales Cloud for Midsize... 8
More informationTurn Your Business Vision into Reality with Microsoft Dynamics GP
Turn Your Business Vision into Reality with Microsoft Dynamics GP You have worked hard to build a vision for your business. With a business solution from Microsoft, you can turn that vision into reality.
More informationA Shipbuilder s Enterprise Resource Planning (ERP) & Earned Value Management (EVM) System
A Shipbuilder s Enterprise Resource Planning (ERP) & Earned Value Management (EVM) System 1 Agenda I. Overview Primary labor planning & cost management functions Menu bar selections Tool bar selections
More informationSRTA Solicitation No RFQC for Customer Service System and Operations March 13, 2017
SRTA Solicitation No. 17-043 RFQC for Customer Service System and Operations March 13, 2017 Question #1: Section 4.9-Is proof of insurance actually required or simply proof that the firm has the financial
More informationVENDOR BACKGROUND QUESTIONNAIRE
VENDOR BACKGROUND QUESTIONNAIRE To be completed by Implementer - 1. Name of Company: 2. Company s DNB (D&B) Number: 3. Please state the date your company started in the business of implementing Electronic
More informationDynamics GP Tips and Tricks. Ben Atkinson, Consultant Jeff Smith, Senior Client Success Manager
Dynamics GP Tips and Tricks Ben Atkinson, Consultant Jeff Smith, Senior Client Success Manager Session Objectives Provide you with tips and tricks to help you maximize the value you get from your investment
More informationRequest for Proposal For: 2018 American Bar Association Temporary Services
Table of Contents Bid Timetable [2] 1.0 General Bid Information [3] 2.0 Proposal Requirements [5] 3.0 Criteria for Selection [7] 4.0 Specifications and Work Statement [7] Appendix A: Bidder Response Sheet
More informationThis addendum forms a part of the Request for Proposals documents for the Electronic Document and Agenda Management System RFP #
REQUEST FOR PROPOSALS (RFP No 654-17) Electronic Document and Agenda Management System January 10, 2017 General Addendum No. 1 To: All Prospective Respondents From: City of Lancaster 44933 Fern Avenue
More informationDynamics 365. Microsoft Dynamics 365, Business edition. Licensing Guide. July 2017
Dynamics 365 Microsoft Dynamics 365, Business edition Licensing Guide July 2017 The Microsoft Dynamics 365, Business edition Licensing Guide October 2016 Contents Introduction to Microsoft Dynamics 365...
More informationmunis a tyler erp solution
munis a tyler erp solution $ Munis:The Integrated ERP Solution for the Public Sector Munis Connects Your Organization Managing the fiscal operations of a municipality or school district requires vision
More informationAVANTUS TRAINING PTE LTD
[MS10979]: Microsoft Azure Fundamentals Length : 2 Days Audience(s) : IT Professionals Level : 100 Technology : Azure Delivery Method : Instructor-led (Classroom) Course Overview This course provides the
More informationOBSERVATIONS, RECOMMENDATIONS AND RESPONSES CONTRACTOR SELECTION - QUOTE SOLICITATION In thirteen of the projects reviewed, the files lacked documentation to support that PPD solicited at least three quotes.
More informationCHAPTER 2: IMPLEMENTATION PHASES AND OFFERINGS
CHAPTER 2: IMPLEMENTATION PHASES AND OFFERINGS Objectives Introduction The objectives are: Describe the purpose of the phase planning activity, preconditions, and deliverables in the implementation methodology.
More informationSample Delivery Schedule
Sample Delivery Schedule The following model delivery schedule will provide the list of expected s with their proposed due date, and an illustration of a possible financial consequence. The milestones
More informationPROGRESS ON THE COMMUNITY COLLEGES SYSTEM ERP PLAN, DESIGN AND IMPLEMENTATION PROGRAM. A Report to the:
PROGRESS ON THE COMMUNITY COLLEGES SYSTEM ERP PLAN, DESIGN AND IMPLEMENTATION PROGRAM A Report to the: Joint Legislative Oversight Committee on Information Technology Submitted By NC Community College
More informationADDENDUM 03 RFP Maintenance Management Software (MMS) Information Technology
ADDENDUM 03 RFP 14-032 Maintenance Management Software (MMS) Information Technology Carolyn Estes, C.P.M., Purchasing Specialist Boise City Purchasing Phone (208) 384-3778 Fax (208) 384-3995 cestes@cityofboise.org
More informationFINANCIALS EPM SUBJECT MODULE AND REPORTING TABLES Last Updated March 13, 2017
General Ledger Subject Area Detail Payroll Financials View (CTW_DET_PAYFN_VW) This table is a view version of the EPM Payroll reporting table, CTW_DET_PAYROLL that returns detailed payroll data for only
More informationREQUEST FOR PROPOSALS
Announcement REQUEST FOR PROPOSALS ESRI GIS Implementation Services The Madison Metropolitan Sewerage District (MMSD or district ) seeks proposals from qualified vendors to implement Esri s geographic
More informationWelcome to the course on the working process across branch companies.
Welcome to the course on the working process across branch companies. In this course we will review the major work processes across branch companies. We will start with the intercompany trade process.
More informationADDITIONAL QUESTIONS AND ANSWERS
ADDITIONAL QUESTIONS AND ANSWERS Tender number: CORP/2017/02 Tender description: PROVISION OF ERP SOLUTION INCLUDING IMPLEMENTATION, INFRASTRUCTURE AND HOSTING NB: Questions in black; Answers in red Please
More informationIMPLEMENTATION QUESTIONNAIRE
IMPLEMENTATION QUESTIONNAIRE emaint CMMS Initial Assessment, Introductions & Services www.emaint.com (239) 494-8928 sales@emaint.com Contents emaint CMMS Functionality Flow Chart Introduction Purpose and
More informationHow well does your procurement measure up?
How well does your procurement measure up? Find out how KPMG and Coupa can help you achieve smarter spend management. May 2017 kpmg.com/us/coupa How well does your procurement measure up? 1 Optimizing
More informationMICROSOFT DYNAMICS GP. Product Capabilities and Business Ready Licensing Module Guide. Solutions
MICROSOFT DYNAMICS GP Product Capabilities and Business Ready Licensing Module Guide Solutions Become a Dynamic Business with Microsoft Dynamics GP For more than 25 years, Microsoft Dynamics GP has delivered
More informationDEPARTMENT OF REVENUE BUILDING 2 DECEMBER 13, 2017
DEPARTMENT OF REVENUE BUILDING 2 DECEMBER 13, 2017 3 ROLL CALL AND OPENING REMARKS FACILITATOR: RYAN WEST, CHAIR 4 REVIEW OF NOVEMBER 1, 2017 MEETING MINUTES FACILITATOR: MELISSA TURNER 5 FLORIDA PALM
More informationInception. Describe the vision and business case for this project. Determine if the enterprise should build or buy the necessary system.
Inception What needs to be done? Describe the vision and business case for this project. Determine if the project is feasible. Determine if the enterprise should build or buy the necessary system. Make
More informationTxDOT s Compass Project. September 29, 2009
TxDOT s Compass Project September 29, 2009 Agenda I. Project Background II. Part 1 Maintenance Management Study III. Part 2 Maintenance Management System Selection IV. Part 3 The Compass Project V. Questions
More informationQuestion: Payroll. By institution if they differ, please outline your payroll calendar as-is and to-be. Answer: No difference
Vermont State Colleges Request for Proposals Payroll. Are each of the institutions on the same payroll calendar? If not, are the institutions considering adopting the same calendar? Yes same calendar,
More informationGOVERNANCE AES 2012 INFORMATION TECHNOLOGY GENERAL COMPUTING CONTROLS (ITGC) CATALOG. Aut. / Man. Control ID # Key SOX Control. Prev. / Det.
GOVERNANCE 8.A.1 - Objective: Information Technology strategies, plans, personnel and budgets are consistent with AES' business and strategic requirements and goals. Objective Risk Statement(s): - IT Projects,
More informationWorkforce HR and Workforce Payroll 7.0
Learning Path Workforce HR and Workforce Payroll 7.0 Key: Traditional Classroom Virtual Classroom Web Based Training w/virtual lab On-site Training KnowledgePass Course Level: Introductory Intermediate
More informationUNIQ FINANCIAL. Transforming the Accounting profession
UNIQ FINANCIAL Transforming the Accounting profession An integrated view of your business processes, financial positions, and performance, in real time at an effective cost. A UniQ Soft Technology Solution
More informationReliability Assurance Initiative. Sonia Mendonca, Associate General Counsel and Senior Director of Enforcement
Reliability Assurance Initiative Sonia Mendonca, Associate General Counsel and Senior Director of Enforcement Agenda Reliability Assurance Initiative (RAI) Overview 2015 ERO CMEP Implementation Plan Inherent
More informationFast Start Business Analytics with Power BI
Fast Start Business Analytics with Power BI Accelerate Through classroom, challenging, training and a quick proof of concept, learn about Power BI and how it can help speed up your decision making and
More informationSIMATIC IT Maintenance Program. An innovative software maintenance concept
An innovative software maintenance concept Realize innovation. 01 Introduction General Overview Realize innovation. A broad concept of the SIMATIC IT Customer Care Evaluation of the Customer needs and
More informationREPORTING FUNDAMENTALS FOR PROGRAMMERS
RSM TECHNOLOGY ACADEMY Syllabus and Agenda REPORTING FUNDAMENTALS FOR PROGRAMMERS FOR MICROSOFT DYNAMICS AX Course Details 3 Audience 3 Course Cancellation Policy 3 Guaranteed to Run 4 Travel Guide 4 Hosted
More informationJan Product Features Mambo Software Business ERP
Jan 2015 Product Features Mambo Software Business ERP Table of Contents 1.1. Features of Mambo Software Business ERP... 3 1.1.1. Company Information... 3 1.1.2. Chart of Accounts... 3 1.1.1. Customers...
More informationThe Mysore paper Mills Ltd.,
The Mysore paper Mills Ltd., Regd. Office : 16 / 4, Ali Asker Road Bangalore 5660 052 Karnataka State Factory : Paper Town Bhadravati 577302 Karnataka State EXPRESSION OF INTEREST (EOI) For Study, Design,
More informationAddendum I to Intranet Redesign
Purchasing Department (O) 864.299.4000 (F) 864.277.5852 561 Mauldin Rd. Greenville, SC 29607 www.rewaonline.org Addendum I to Intranet Redesign Posting Date: January 19, 2018 In published Request for Proposal
More informationDynamics 365 for Finance & Operations
Dynamics 365 for Finance & Operations Carri Lesatz, ERP Practice Director (North America) Carri.Lesatz@hcl-powerobjects.com 920-819-9107 Kaitlyn Bowden, Finance Consultant Kaitlyn.Bowden@hcl-powerobjects.com
More informationHFTP Hospitality Financial and Technology Professionals
About our Sample Accounting Jobs Descriptions for Clubs: The HFTP Americas Research Center, with guidance from members of the HFTP Club Advisory Council, has developed example job descriptions for accounting
More informationCAPPS Finance or HR/Payroll Production Analyst
TEXAS COMPTROLLER OF PUBLIC ACCOUNTS invites applications for the position of: CAPPS Finance or HR/Payroll Production Analyst JOB POSTING #: 3E04.16 STATE CLASSIFICATION #: 0257 STATE CLASSIFICATION TITLE:
More informationAnswers To Vendor Questions Related to the Permit & Project Tracking RFP City of San Mateo 11/9/2012
Answers To Vendor Questions Related to the Permit & Project Tracking RFP City of San Mateo 11/9/2012 Question Answer Notes 1. What data would the City like converted?(i.e. permits, inspections, code cases,
More informationCourse 80534A Finance Essentials in Microsoft Dynamics NAV 2013
Course 80534A Finance Essentials in Microsoft Dynamics NAV 2013 Duration: 2 days ILT About this Course This two-day course provides students with the tools to set up the financial management application
More informationBusiness Process Services: A Value-Based Approach to Process Improvement and Delivery
WHITE PAPER Business Process Services: A Value-Based Approach to Process Improvement and Delivery In this white paper, we examine how your business can be improved through business process services. Business
More informationAssociation of Energy Services Professionals (AESP) Request for Proposal Market Research Services
Association of Energy Services Professionals (AESP) Request for Proposal Market Research Services BACKGROUND Founded in 1989 as a not-for-profit industry association, AESP is a member-based association
More informationThe XA Update and Solve Problems Conference! ** Description of the Sessions by Topic and Room **
The XA Update and Solve Problems Conference! ** Description of the Sessions by Topic and Room ** GENERAL and TECHNICAL Topics and Sessions in the Grand Room 8:30 9:50 Main Tent Sessions (for All Attendees)
More informationFinancial Transfer Guide DBA Software Inc.
Contents 3 Table of Contents 1 Introduction 4 2 Why You Need the Financial Transfer 6 3 Total Control Workflow 10 4 Financial Transfer Overview 12 5 Multiple Operating Entities Setup 15 6 General Ledger
More informationWelcome to an introduction to SAP Business One.
Welcome to an introduction to SAP Business One. 1 In this topic, we will answer the question: What is Business One? We define SAP Business One and discuss the options and available platforms for running
More informationAlabama State Port Authority
M. Barlow/IT Re: Purchase and Install Business Intelligence Platform KM-lb 8/1/16 ALABAMA STATE PORT AUTHORITY INSURANCE REQUIREMENTS FOR CONTRACT WORK Information Technology Alabama State Port Authority
More informationBusiness and Application Architecture
Nordic Smart Government Report on Business and Application Architecture v.1.0.3 March 15, 2018 Table of contents 1 Introduction... 2 2 Scope and deliverables... 3 3 Summary... 3 4 Business and application
More informationADVERTISING & DISTRIBUTION e-erp MANAGE YOUR BUSINESS MORE EFFICIENTLY WITH OPTIMUM THE TOTAL SOLUTION SYSTEM FOR YOUR BUSINESS
MANAGE YOUR BUSINESS MORE EFFICIENTLY WITH OPTIMUM Advertising & Distribution Unlimited Distribution Customer Contracts ADVERTISING & DISTRIBUTION e-erp THE TOTAL SOLUTION SYSTEM FOR YOUR BUSINESS OPTIMUM
More informationOakland County Department of Information Technology Project Scope and Approach
Oakland County Department of Information Technology Project Scope and Approach Project Name: Asset Management / Configuration Management Database Program Project ID: DR4181C2 Leadership Group: IT Steering
More information