Contracting Conundrums: Evaluating Procurement Options for Construction and Purchasing
|
|
- Charles Reeves
- 6 years ago
- Views:
Transcription
1 COMMUNITY COLLEGE FACILITY COALITION PRE-CONFERENCE WORKSHOP Contracting Conundrums: Evaluating Procurement Options for Construction and Purchasing November 13, 2017 Hyatt Regency Sacramento Table of Contents Learning Objectives 3 Standard Purchasing Procedures 4 6 Force Account; Day Labor 7-8 Special Services 9 Special Services;Architectural & Engineering Services Information Technology Procurement 12 Piggyback Procurement CUPCCAA Emergency Contracts Job Order Contracting Questions for Discussion
2 Learning Objectives What can be procured by alternative purchasing procedures? What are standard purchasing procedures? What is scope of labor, materials/equipment,services authorized/prohibited by alternative purchasing procedures? How to implement an alternative purchasing procedure Compliance with legal/statutory requirements District Board Policies/Administrative Procedures Procurement documents Contract documents 3 Standard Purchasing Procedures Public Contract Code What can be procured; by standard purchasing procedures? Sale or lease equipment, materials, supplies non-construction services repairs and non-public project maintenance construction services How are standard procurement procedures implemented? Bidding process if in excess of statutory non-bid limits non-construction purchases, $50K with annual adjustments construction services, $15K Bidding requirements in accordance with any[board] requirements board action, contract award to lowest responsible bidder bid security mandatory for construction services contract bid security as the board requires for non-construction services/goods Bidding requirement exemptions professional services or advice, insurance services purchase or service otherwise exempt day labor or by force account work pursuant to Public Contract Code
3 Standard Purchasing Procedures Change Order Limits Public Contract Code If any change or alteration of a contract governed by the provisions of this article is ordered by the governing board of the community college district, such change or alteration shall be specified in writing and the cost agreed upon between the governing board and the contractor. The board may authorize the contractor to proceed with performance of the change or alteration without the formality of securing bids, if the cost so agreed upon does not exceed the greater of: (a) The amount specified in Section or 20655, whichever is applicable to the original contract; or (b) Ten percent of the original contract price. 5 Standard Purchasing Procedures Change Orders Exceeding 10% Obtain bids per Board Resolution of Necessity Authorizing Change Order Exceeding 10% describe legal authority to contract without bidding describe statutory 10% limit under for change orders without bidding establish that bidding for change order work exceeding 10% is benefit to District describe need for existing contractor to perform change order work authorize/approve change order exceeding 10% 6 3
4 Force Account; Day Labor What Can Be Procured? Facilities repairs, alterations, additions, painting, decorating Repair or build apparatus or equipment Improvements to school grounds Construct new buildings Maintenance Public Contract Code [T]he governing board may make repairs, alterations, additions, or painting, repainting, or decorating upon school buildings, repair or build apparatus or equipment, make improvements on the school grounds, erect new buildings, and perform maintenance as defined in Section by day labor, or by force account, whenever the total number of hours on the job does not exceed 350 hours. 7 Force Account; Day Labor How is Force Account Work Implemented? What is force account? Construction Industry Force Account v. Amador Water Agency, 71 Cal.App.4 th 810 (1999). There is no evidence the Legislature used the term force account in the Public Contract Code with the same narrow meaning given by the Attorney General s analysis of prevailing-wage laws or the State Controller s rules for county budget reports, which is to say a definition limited to the use of a public agency's own employees. (See fn. 3, ante.) Indeed, to the extent the Legislature has considered the definition at all in connection with water agencies, it includes both an agency s own workers and outside personnel working under the agency's supervision. (Ibid.) Thus, force account, as used in section 21451, limited in effect to the Agency's contracts, would apply to contracts with outside personnel working under the Agency's supervision. Procuring Force Account Work Excluded from Section standard procurement bidding procedures (c) This section shall not apply to professional services or advice, insurance services, or any other purchase or service otherwise exempt from this section, or to any works done by day labor or by force account pursuant to Section Board Policy/Administrative Procedures? Authorization for staff procurement of force account within statutory limits Effort to obtain multiple quotes; authorize procurement without obtaining quotes if quotes delay necessary work or not in best interests of District Staff authority to award subject to Board ratification; award to lowest priced quote from responsible bidder Force Account Limits Limits based on time to complete procured services; not dollar value CCD 350 hour limit Public Contract Code 20655(a). [W]henever the total number of hours on the job does not exceed 350 hours. Hours on job include supervision, coordination, administrative, clerical, other support services? What if the hour limits are exceeded? Do other public works requirements apply? 8 4
5 Special Services Excluded from Section standard procurement bidding procedures (c) This section shall not apply to professional services or advice, insurance services, or any other purchase or service otherwise exempt from this section, or to any works done by day labor or by force account pursuant to Section What can be procured? Special services and advice: Financial, accounting, engineering, legal, administrative, payroll services Government Code The legislative body of any public or municipal corporation or district may contract with and employ any persons for the furnishing to the corporation or district special services and advice in financial, economic, accounting, engineering, legal, or administrative matters if such persons are specially trained and experienced and competent to perform the special services required. Special Services Procurement Without Bidding Process Cobb v. Pasadena City Board of Education, 134 Cal.App.2d 93(1955): That statute [Government Code 53060] removes all question of the necessity of advertising for bids for special services by a person specially trained and experienced and competent to perform the special services required. Now, a board may pay from any available funds a fair compensation to capable and worthy persons for special services. 9 Special Services; Architectural and Engineering Services Competitive Selection Process Notwithstanding Government Code reference to engineering as special service, procurement of architectural and engineering services subject to Prop 35 (2000) and Prop 35 enactment of Government Code Scope of services subject to Prop 35 Government Code For purposes of Article XXII of the California Constitution and this act, the term architectural and engineering services shall include all architectural, landscape architectural, environmental, engineering, land surveying, and construction project management services. Fair, Competitive Selection Process Government Code All architectural and engineering services shall be procured pursuant to a fair, competitive selection process which prohibits governmental agency employees from participating in the selection process when they have a financial or business relationship with any private entity seeking the contract, and the procedure shall require compliance with all laws regarding political contributions, conflicts of interest or unlawful activities. 10 5
6 Special Services; Architectural and Engineering Qualifications Based Selection Process Not Mandatory QBS process mandatory for state agencies QBS process discretionary for local agencies. Government Code (a) When the selection is by a state agency head the following procedures shall apply: (1) The state agency head shall negotiate a contract with the best qualified firm for architectural, landscape architectural, engineering, environmental, land surveying, and construction project management services at compensation which the state agency head determines is fair and reasonable to the State of California or the political subdivision involved. (2) Should the state agency head be unable to negotiate a satisfactory contract with the firm considered to be the most qualified, at a price the agency head determines to be fair and reasonable to the State of California or the political subdivision involved, negotiations with that firm shall be formally terminated. The state agency head shall then undertake negotiations with the second most qualified firm. Failing accord with the second most qualified firm, the state agency head shall terminate negotiations. The state agency head shall then undertake negotiations with the third most qualified firm. (3) Should the state agency head be unable to negotiate a satisfactory contract with any of the selected firms, the state agency head shall select additional firms in order of their competence and qualification and continue negotiations in accordance with this chapter until an agreement is reached. (b) When the selection is by a local agency head, the local agency head may undertake the procedures described in subdivision (a). 11 Information Technology Procurement; Small Businesses & DVBEs Public Contract Code What Can Be Procured? Goods, Services and Information Technology (a): the governing board of a community college district may award a contract for the acquisition of goods, services, or information technology that has an estimated value of greater than five thousand dollars ($5,000), but less than two hundred fifty thousand dollars ($250,000) How Is Small Business/DVBE Procurement Implemented? Bidders Limited to Small Businesses/DVBEs (a): to a certified small business, including a microbusiness, or to a disabled veteran business enterprise Multiple Quotes (a): if the community college district obtains price quotations from two or more certified small businesses, including microbusinesses, or from two or more disabled veteran business enterprises. Basis for Award of Contract Not defined in Section Award limited to lowest priced quote or discretion to award to any bidder? Board Policy/Administrative Procedure defining basis for award 12 6
7 Piggyback Procurement What Can Be Procured? DGS/CMAS Purchases; Multiple Award Schedules Purchase materials, equipment or supplies through DGS Public Contract Code Nothing in this code shall preclude the governing board of any community college district from purchasing materials, equipment or supplies through the Department of General Services pursuant to Section of the Government Code. Purchase materials, supplies, equipment, automobiles, tractors, personal property through other public agencies Public Contract Code [T]he governing board of any community college district without advertising for bids, and when that board has determined it to be in the best interests of the district, may authorize by contract, lease, requisition, or purchase order, any public corporation or agency, including any county, city, town, or district, to lease data-processing equipment, purchase materials, supplies, equipment, automotive vehicles, tractors, and other personal property for the district in the manner in which the public corporation or agency is authorized by law to make the leases or purchases. UC/CSU Contracts Public Contract Code Nothing in this code shall preclude the governing board of a community college district from purchasing materials, equipment, supplies, or services under the same terms and conditions as are specified in a contract lawfully awarded by the University of California or the California State University. 13 Piggyback Procurement What Can Be Procured? Limitations Attorney General Opinion No (2006) We therefore conclude that a school district may not, without advertising for bids, contract with another public agency to acquire factory-built modular building components for installation on a permanent foundation. Steelgard, Inc. v. Jannsen, 171 Cal.App.3d 79 (1985) It is a reasonable conclusion that these portable classrooms are within the definition of materials or supplies which involve only incidental on-site installation and that they are therefore not within the purview of the State Contract Act. They are prefabricated in factories. Only a small portion of the time, cost, and labor involves on-site installation. Both by statutory definition and in reality, the buildings are easily relocatable, installed on wood rather than permanent foundations. 14 7
8 Piggyback Procurement How Are Piggyback Procurements Implemented? Piggybackable Bid Does a public agency bid allow other public agencies to piggyback purchase from the successful bidder? Is my District included in the public agencies allowed to piggyback purchase? Was the piggyback contract bid in compliance with applicable bidding requirements? Did the agency issuing the piggyback contract bid award the piggyback contract in accordance with applicable law and bid criteria? What is the duration of the piggyback back; can the piggyback purchase be completed prior to expiration of the piggyback? Piggyback Contract Is the scope of purchase under the piggyback contract an allowable piggyback bid for my District? Do the products offered under the piggyback contract conform to purchasing objective? Is pricing for products offered under the piggyback contract fair and reasonable? Are the terms of the piggyback contract acceptable to my District; are the contract terms consistent with my District s procurement/contract requirements? Does the piggyback bid allow other agencies to modify the terms of the piggyback contract? Is there an administrative fee or other charge due the originating agency for use of a piggyback contract? 15 CUPCCAA The California Uniform Public Construction Cost Accounting Act ( CUPCCAA or Act ) was established in (Pub. Contract Code 22000, et seq.) Local agencies may opt into CUPCCAA entirely voluntary Cities and Counties Community College Districts School Districts Special Districts 16 8
9 Some Reasons to Opt Into CUPCCAA Allows participating agencies to: Proceed without bidding on projects costing up to $45,000 Use informal bid process for projects of $45, to $175,000 Use formal bid process for projects over $175,000 Use agency employees force account labor in specific circumstances 17 CUPCCAA Getting Started Special rules apply for agencies under CUPCCAA. (Pub. Contract Code 22030, et seq.) To opt into CUPCCAA, local agencies must take the following steps: Adopt the uniform cost accounting procedures by resolution and notify the state Controller; Board must enact an informal bidding ordinance to govern selection of contractors for projects subject to informal bidding; Compile a list of contractors by category of work - trade. (Pub. Contract Code 22030, 22032, ) 18 9
10 Projects up to $45,000: No bid process required; No Bid and Informal Bid Projects No public notice notice inviting bids required; Agency may perform the work by negotiated contract with a contractor of choice, or by purchase order, or using its own employees - force account. (Pub. Contract Code 22032, subd. (a).) Projects over $45,000 up to $175,000 require compliance with adopted informal bidding ordinance AND applicable notice requirements. The agency MAY maintain a list of qualified contractors by category of work pursuant to minimum criteria established by the Commission and mail, fax or notices inviting bids not less than 10 calendar days before bids are due ; OR mail, fax, or a notice inviting informal bids to all construction trade journals specified in Section (Pub. Contract Code 22034(a).) Notably, no time limit is set in Section (suggest compliance with 15 calendar days before bid deadline set by Section 22037). 19 Informal Bid Projects (cont.) Board may delegate authority to award informally bid contracts to the public works director, general manager, purchasing agent, or other appropriate person. (Pub. Contract Code 22304(c).) If all bids received are over $175,000 and the agency s cost estimate was reasonable, the Board may by 4/5ths vote pass a resolution and award a contract up to $187,500 or less to the lowest responsible bidder. (Pub. Contract Code 22034(d).) 20 10
11 Projects Over $175,000: Formal Bid Process Required The agency s Board or designated representative must adopt plans, specifications, and working details for all projects subject to the formal bidding process. (Pub. Contract Code ) Notice inviting formal bids must be published in a newspaper and sent electronically, if available, and mailed to all construction trade journals. (14 calendar days and 15 calendar days, respectively) (Pub. Contract Code ) If the agency elects to award a contract, it must be awarded to the lowest responsible bidder. (Pub. Contract Code, 22038(b).) The agency may reject all bids presented if it determines that the project may be performed more economically by its own employees. (Pub. Contract Code, 22038(a).) If the agency does reject all bids, it may abandon the project, re-advertise the project for bid, or, by 4/5 vote of the Board, declare that the project may be performed more economically by its own employees. (Pub. Contract Code, 22038(a).) 21 General CUPCCAA Procedural Requirements Agencies must award to the lowest responsible bidder, or may reject all bids. (Pub. Contract Code 22038(b).) The agency may reject all bids if it determines that the project may be more economically performed by its own employees. (Pub. Contract Code, 22038(a).) If the agency does reject all bids, it may abandon the project, re-advertise the project for bids, or, by 4/5 vote of its Board, declare that the project may be performed more economically by its own employees. (Pub. Contract Code, 22038(a).) If no bids are received through the formal or informal bid process, the project may be performed by employees of the agency, by force account or by negotiated contract with a contractor of the agency s choice. (Pub. Contract Code, 22038(c).) 22 11
12 Additional CUPCCAA Procedural Requirements According to Public Contract Code section 22038: (a) In its discretion, the public agency may reject any bids presented, if the agency, prior to rejecting all bids and declaring that the project can be more economically performed by employees of the agency, furnishes a written notice to an apparent low bidder. The notice shall inform the bidder of the agency's intention to reject the bid and shall be mailed at least two business days prior to the hearing at which the agency intends to reject the bid. If after the first invitation of bids all bids are rejected, after reevaluating its cost estimates of the project, the public agency shall have the option of either of the following: (1) Abandoning the project or re-advertising for bids in the manner described by this article. (2) By passage of a resolution by a four-fifths vote of its governing body declaring that the project can be performed more economically by the employees of the public agency, may have the project done by force account without further complying with this article. 23 In Case of Bid Protest Contractors may protest the agency s decision regarding award of contract. Best Practices: Include a bid protest procedure in the bid documents Hold bid opening early enough to allow time for handling of bid protest and potential rebid Forward protest to other contractors involved for their responses Always respond in writing Consult with legal counsel promptly after receipt Observe all applicable procedures Consider option to reject all bids Notice of non-responsiveness Due process hearing for non-responsibility 24 12
13 What Can Be Procured? Emergency Contracts Public Contract Code Repairs, alterations, work or improvement for any facility Emergency work necessary for: (i) continuation of existing classes; (ii) mitigate/eliminate potential personal/property damage Public Contract Code 20654(a). In an emergency when any repairs, alterations, work, or improvement is necessary to any facility of the college, or to permit the continuance of existing college classes, or to avoid danger to life or property, the board may by unanimous vote, with the approval of the county superintendent of schools, do either of the following: How Are Emergency Procurements Implemented? Unanimous Board vote; declaration of emergency and authorization to procure required services/work under emergency procurement procedures of COE Superintendent approval to proceed with emergency procurement What Alternative Procedures Can Be Used For Emergency Work/Services? Contract for emergency work/services without bidding process Emergency work/services completed by force account 25 What is an Emergency? Public Contract Code 1102 Emergency, as used in this code, means a sudden, unexpected occurrence that poses a clear and imminent danger, requiring immediate action to prevent or mitigate the loss or impairment of life, health, property, or essential public services
14 What Can Be Procured? Emergency Contracts CUPCCAA Emergency Contracting Equipment, services and supplies Emergency work necessary to repair or replace public facilities Other directly related and immediate action required by emergency Public Contract Code 22050(a)(1). In the case of an emergency, a public agency, pursuant to a four-fifths vote of its governing body, may repair or replace a public facility, take any directly related and immediate action required by that emergency, and procure the necessary equipment, services, and supplies for those purposes, without giving notice for bids to let contracts. How Are Emergency Procurements Implemented? Required Actions 4/5 Board vote; declaration of emergency Board finding that bidding process will delay implementation of necessary emergency actions Board authority to delegate emergency actions to District staff Public Contract Code 22050(a)(2). Before a governing body takes any action pursuant to paragraph (1), it shall make a finding, based on substantial evidence set forth in the minutes of its meeting, that the emergency will not permit a delay resulting from a competitive solicitation for bids, and that the action is necessary to respond to the emergency. What Alternative Procedures Can Be Used For Emergency Work/Services? Contract for emergency work/services without bidding process Continuing Board review and authorization of emergency actions; Board termination of emergency actions Public Contract Code 22050(c)(1). If the governing body orders any action specified in subdivision (a), the governing body shall review the emergency action at its next regularly scheduled meeting and, except as specified below, at every regularly scheduled meeting thereafter until the action is terminated, todetermine, by a four-fifths vote, that there is a need to continue the action. 27 AB 618 CCD Job Order Contracting; Job Order Contracting Defined; Legislative Objectives Indefinite quantity contract for public works or maintenance projects over a fixed period of time with fixed unit pricing (d): Job order contract most qualified bidder who is licensed, bonded and general liability insured Fixed time Fixed unit prices Applicable to public works and maintenance projects (c): Job order means a firm, fixed priced, lump sum order issued by the school district to a job order contractor for a definite scope of work as compiled from the unit price catalog to be performed pursuant to a job order contract. Legislative Intent ( (b)(c)(d)) Expedite project completion; cost reduction; streamlined alternative bid/contract process Effective January 1, 2018; Sunset January 1, 2022 ( ) 28 14
15 PLA/PSA REQUIRED AB 618 CCD Job Order Contracting; Essential Requirements (f): It is further the intent of the legislature that districts use the job order contract process pursuant to this article only if the district has entered into a project labor agreement that meets the requirements of Section 2500 for all its public works projects (a): The community college district may utilize job order contracting pursuant to this article only if the community college district has entered into a project labor agreement or agreements that will apply to all public works awarded through job order contracting and to all other public works of the community college district that exceed a monetary threshold set by the community college district through at least December 31, 2021, regardless of what contracting procedure is used to award that work (f): All work performed under a job order contract shall be covered by a project labor agreement (d): The community college district shall designate one individual to act as a monitor to inspect job sites for labor compliance violations at the request of the designated labor representative in its project labor agreement (b)(1)(A): The prequalified bidders shall be in compliance with a community college district s project labor agreement. 29 AB 618 CCD Job Order Contracting; Essential Requirements MAINTENANCE PROJECTS EXECUTION PLAN (b): The community college district shall prepare an execution plan for all modernization projects that may be eligible for job order contracting pursuant to this article. The community college district shall select from that plan a sufficient number of projects to be initiated as job order contracts during each calendar year and shall determine for each selected project that job order contracting will reduce the total cost of that project. Job order contracting shall not be used if the community college district finds that it will increase the total cost of the project. UNIT PRICE CATALOG DEFINE TASKS, PRICING & SPECIFICATIONS Unit Price Catalog ( (q)): book containing specific construction tasks and unit prices to install or demolish that construction. The listed tasks shall be based on generally accepted industry standards for various items of work to be performed by the job order contractor. The prices shall include the cost of materials, labor, and equipment for performing the items of work. The prices shall not include overhead and profit. All unit prices shall be developed using local prevailing wages
16 AB 618 CCD Job Order Contracting; Bidding Job Order Contracts PRE-QUALIFIED BIDDERS (c)(1): A community college district shall establish a procedure to prequalify job order contractors using a standard questionnaire that includes, at a minimum, the issues covered by the standardized questionnaire and model guidelines for rating bidders developed by the Department of Industrial Relations pursuant to subdivision (a) of Section REQUEST FOR BID TO PRE-QUALIFIED BIDDERS (b): Based on the documents prepared under subdivision (a), [ unit price catalog and preestablished unit prices, job order contract technical specification, and any other information deemed necessary to describe adequately the school district s needs] a community college district shall prepare a request for bid that invites prequalified job order contractors to submit competitive sealed bids in the manner prescribed by the community college district. AWARD OF JOB ORDER CONTRACTS (b)(1)(A): The pre-qualified job order contractors, as determined by a community college district, shall bid one or more adjustment factors to the unit prices listed in the unit price catalog based on the job order contract technical specifications. Awards shall be made to the prequalified bidders that the community college district determines to be the most qualified based upon preestablised criteria made by a community college district. The prequalified bidders must be in compliance with a community college district s project labor agreement. 31 AB 618 CCD Job Order Contracting; Job Order Contracts TERM 1 year with maximum 2-1 year renewals, subject to dollar limits (b): Job order contracts may be executed for an initial contract term of no more than 12 months, with the option of extending or renewing the job order contract for two 12-month periods. The term of the job order contract shall be for the contract term or whenever the maximum dollar value of the contact is achieved, whichever is less. All extensions or renewals shall be priced as provided in the request for bids. The extension or renewal shall be mutually agreed to by the community college district and the job order contractor. DOLLAR LIMITS $5M 1 st Term; $10M maximum for renewal terms; $1M maximum per project (a): The maximum total dollar amount that may be awarded under a single job order contract shall not exceed five million dollars ($5,000,000) in the first term of the job order contract and, if extended or renewed pursuant to subdivision (b), a maximum of ten million dollars ($10,000,000) over the subsequent two terms of the job order contract (c): No single job order contract shall exceed one million dollars ($1,000,000) (g): Any change or alteration to a job order [contract] shall be in compliance with Section
17 AB 618 CCD Job Order Contracting; Job Order Projects; Estimate; Pricing Verification; Alternative Delivery DISTRICT ESTIMATE & CONTRACTOR PROPOSED PRICING (a): Prepare for each individual order developed under a job order contract an independent community college district estimate. The estimate will be prepared prior to receipt of the contractor s offer to perform work and will be compared to the contractor s proposed price to determine the reasonableness of that price before issuance of any job order. The basis for any adjustment to the community college district estimate is to be documented. If the contractor s proposal for a given job order is found to be unreasonable, not cost effective, or undesirable, the community college district is under no obligation to issue the job order to the job order contractor, and may instead utilize any other available procurement procedures. MANAGEMENT REVIEW (b): The community college district shall not issue a job order until the job order has been reviewed and approved by the appropriate level of management. 33 Questions for Discussion Common Contracting Pitfalls Maria, can you please share the top common facilities contracting pitfalls that your observe in your Purchasing role? Jerry, what can Facilities Departments do to anticipate or respond to these challenges? 34 17
18 Questions for Discussion Bidding What are the options? The work can t wait for three months to bid. I don t want to deal with a low bid contractor. Can t we just sole source it? Do we have to include an or equal provision in our specifications? How do we ensure we get what we want? 35 Questions for Discussion In emergency situations, when the District becomes an Emergency Operation Center, is the public agency still bound by the bid threshold limit? A District issues a Request for Qualifications and Proposals to provide a Design-Build approach for network cabling infrastructure. Can they use Design- Build, or is that for new construction only? Is the work subject to DIR prevailing wage monitoring? 36 18
19 Questions for Discussion Does all our work have to be prevailing wage? The Facilities Department is cutting some trees inhouse. They will hire a vendor to bring a wood chipper to chip the wood. Is this service subject to DIR prevailing wage monitoring, or is it a general service? 37 PANEL CONTACT INFORMATION Maria Bernardino San Joaquin Delta College Director of Purchasing and Contract Services mbernardino@deltacollege.edu Patrick A. Gunn Attorney at Law patrickgunnesq@gmail.com Jerry Marchbank Coast Community College District Senior Director, Facilities/Planning/Construction jmarchbank@mail.cccd.edu Sherman Wong Public Agency Law Group Attorney swong@palg.net 38 19
Information for Contractors Regarding Public Works Projects
Information for Contractors Regarding Public Works Projects Page 1 Table of Contents 1. INTRODUCTION...3 WHAT IS CUPCCAA?...3 BENEFITS OF CUPCCAA...3 2. TRADITIONAL BIDDING VS. MCC IMPLEMENTED CUPCCAA...4
More informationUnderstanding Public Bid Law La. R.S. 38:
Understanding Public Bid Law La. R.S. 38:2211-2293 E R I N D A Y, A S S I S T A N T A T T O R N E Y G E N E R A L L O U I S I A N A D E P A R T M E N T O F J U S T I C E Application All Political Subdivisions
More informationInformation for Contractors Regarding Public Works Projects
Information for Contractors Regarding Public Works Projects Table of Contents INTRODUCTION...2 WHAT IS CUPCCAA?...2 BENEFITS OF CUPCCAA...2 TRADITIONAL BIDDING VS. MCC IMPLEMENTED CUPCCAA...3 ADOPTION
More informationConstruction 101. C.A.S.H. 36 th Annual Conference February 23-25, 2015 Sacramento Convention Center
Construction 101 C.A.S.H. 36 th Annual Conference February 23-25, 2015 Sacramento Convention Center This training is provided for educational, compliance and loss-prevention purposes only and, absent the
More informationBID AND PURCHASING LAWS/BEST PRACTICES
BID AND PURCHASING LAWS/BEST PRACTICES BEFORE YOU DO ANYTHING, ASK YOURSELF THIS QUESTION. Is this purchase or contract for goods or services exempt from the bid laws? Exemptions: Piggy back off a contract
More informationUniversity of Kansas Procurement Services
University of Kansas Procurement Services PURCHASING PROCEDURES MANUAL 1 Contents 1.0 DEPARTMENTAL PURCHASING AUTHORITY... 4 1.1 Introduction... 4 1.2 Use of Mandatory Contracts and Preferred Agreements...
More informationDate: Telephone: Company Name: Address: City: State: Zip Code: Contact Person: Title: Authorized Signature:
SUBMISSION INFORMATION Kenton County Fiscal Court P.O. Box 792 303 Court Street, Room 207 Covington, Kentucky 41012-0792 QUALIFICATION: Radio Project Phase II RFQ OPENING DATE: December 7, 2015 TIME: 2:00
More informationDocument B252TM 2007
Document B252TM 2007 Standard Form of Architect s Services: Architectural Interior Design for the following PROJECT: (Name and location or address) This document has important legal consequences. Consultation
More informationYou Passed Your Bond Now What? a Part 3: Multi-Prime and Design-Build Project Delivery Methods and Project Labor Agreements
You Passed Your Bond Now What? a Part 3: Multi-Prime and Design-Build Project Delivery Methods and Project Labor Agreements January 25, 2017 Presented By: Deidree Sakai Cameron Ward SAN FRANCISCO LONG
More informationState Historic Preservation Office. Bidding, Contracting, and Construction Guidelines for the Historic Restoration Fund
State Historic Preservation Office Bidding, Contracting, and Construction Guidelines for the Historic Restoration Fund April 2014 Table of Contents Conflict of Interest... 3 Floodplains... 3 Hazardous
More informationThis policy will outline the requirements for competitive bids on goods and services purchased by the College.
Policy Name: Procurement Sole Source/Competitive Bid Policy Updated/Reviewed: August 10, 2017 Effective Date: November 15, 2010 Office with Primary Responsibility: Procurement Services Offices with Secondary
More informationSalt Lake Community College Policies and Procedures
COLLEGE PROCUREMENT POLICY Board of Trustees Approval: 04/12/2017 POLICY 10.01 Page 1 of 1 I. POLICY All products and services purchased by the College shall be procured in compliance with applicable statutes,
More informationMain Building Auditorium
Main Building Auditorium Theatre and Lighting Upgrade Moberly Area Community College 101 College Avenue Moberly, Missouri This document contains all necessary instructions and specifications to perform
More informationADVERTISEMENT FOR DESIGN BUILDER PREQUALIFICATION
ADVERTISEMENT FOR DESIGN BUILDER PREQUALIFICATION Subject to conditions prescribed by the University of California, San Diego, responses to the University's prequalification documents for a Design Build
More informationHouse Bill 4086 Ordered by the House February 21 Including House Amendments dated February 21
th OREGON LEGISLATIVE ASSEMBLY--0 Regular Session A-Engrossed House Bill 0 Ordered by the House February Including House Amendments dated February Introduced and printed pursuant to House Rule.00. Presession
More informationPurchasing, Bidding, and Contract Management Mini-Workshop. Association of Government Accountants Central Washington Chapter May 16, 2007
Purchasing, Bidding, and Contract Management Mini-Workshop Association of Government Accountants Central Washington Chapter May 16, 2007 Intergovernmental Purchases (Piggybacking) John W. Carpita, P.E.
More informationATTACHMENT D SCOPE OF SERVICES
ATTACHMENT D SCOPE OF SERVICES OBJECTIVE Owner s Capital Improvement Program (major capital, minor construction, repair, and rehabilitation projects) includes numerous construction and renovation projects.
More information700 CMR: MASSACHUSETTS DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 700 CMR 14.00: PREQUALIFICATION OF CONTRACTORS FOR HORIZONTAL CONSTRUCTION
700 CMR 14.00: PREQUALIFICATION OF CONTRACTORS FOR HORIZONTAL CONSTRUCTION Section 14.01: Definitions 14.02: Application for Prequalification of Contractors 14.03: Aggregate Bonding Capacity and Single
More informationArchitect or Engineer? Which One Your District Needs Depends on Project s Nature, Cost
Architect or Engineer? Which One Your District Needs Depends on Project s Nature, Cost A question we at commonly receive (but, frankly, one that is not asked frequently enough) is whether a school district
More informationDAG Architects, Inc. July South Walton Fire District Fleet Maintenance/Logistics Building & Training Tower
DOCUMENT 001153 - REQUEST FOR QUALIFICATIONS 1.1 PURPOSE, LAWS, AND REGULATIONS A. The purpose of the Prequalification Procedure described in this Document is to provide Owner with a mechanism to evaluate
More informationHOUSING AUTHORITY OF THE CITY OF BOULDER (dba Boulder Housing Partners)
HOUSING AUTHORITY OF THE CITY OF BOULDER (dba Boulder Housing Partners) SOLICITATION TYPE: DESCRIPTION: Request For Proposals Paperless Invoice Automation Software ISSUE DATE: 04/03/2018 DUE DATE: 04/20/2018
More informationREQUEST FOR PROPOSAL. HRIS Human Resources Information Software Fort Morgan, Colorado
REQUEST FOR PROPOSAL HRIS Human Resources Information Software Fort Morgan, Colorado October 7, 2014 Michael Boyer Director, Human Resources and Risk Management CITY OF FORT MORGAN P.O. BOX 100 FORT MORGAN,
More informationCommunity-Based Renewable Energy
Community-Based Renewable Energy This Act directs the state public utilities commission to set up a pilot program to encourage developing community-based renewable energy facilities. The Act permits the
More informationARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT CONSULTANT SELECTION PROCEDURES FOR ENGINEERING AND DESIGN RELATED SERVICES
ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT CONSULTANT SELECTION PROCEDURES FOR ENGINEERING AND DESIGN RELATED SERVICES Section I Application (These procedures do not apply to Design-Build Contracts.)
More informationCommonwealth of Massachusetts DEPARTMENT OF HOUSING & COMMUNITY DEVELOPMENT Deval L. Patrick, Governor Aaron Gornstein, Undersecretary FOR
1 23 Commonwealth of Massachusetts DEPARTMENT OF HOUSING & COMMUNITY DEVELOPMENT Deval L. Patrick, Governor Aaron Gornstein, Undersecretary REQUEST FOR RESPONSES (RFR) FOR WEB-BASED BID DOCUMENT DISTRIBUTION
More informationBID THRESHOLD AND QUOTES
April 27 th & 28 th, 2016 As Presented By: Matthew Cavallo, Township Manager for the Township of Verona & Gerald T Reiner Jr., Purchasing Agent for the County of Bergen BID THRESHOLD AND QUOTES Jurisdiction
More informationCONTRACT / CONSTRUCTION REQUIREMENTS FOR PUBLIC SCHOOLS PROJECTS. August 2005
CONTRACT / CONSTRUCTION REQUIREMENTS FOR PUBLIC SCHOOLS PROJECTS August 2005 Projects Requiring Licensed Architect / Engineer: *Project Cost Threshold New Construction or Additions $135,000 + Major Repairs
More informationCommonwealth of Virginia
Commonwealth of Virginia Alternative Project Delivery Division April 2017 Virginia Department of Transportation TABLE OF CONTENTS INTRODUCTION... 2 1.0 DEFINITIONS... 3 2.0 PRELIMINARY PROJECT SELECTION...
More information1997 Part 2. Document B141. Standard Form of Architect's Services: Design and Contract Administration TABLE OF ARTICLES
TM Document B141 Standard Form of Architect's Services: Design and Contract Administration 1997 Part 2 TABLE OF ARTICLES 2.1 PROJECT ADMINISTRATION SERVICES 2.2 SUPPORTING SERVICES 2.3 EVALUATION AND PLANNING
More informationBILL NO. 23. (as passed, with amendments) 3rd Session, 61st General Assembly Nova Scotia 60 Elizabeth II, Government Bill
BILL NO. 23 (as passed, with amendments) 3rd Session, 61st General Assembly Nova Scotia 60 Elizabeth II, 2011 Government Bill Public Procurement Act CHAPTER 12 OF THE ACTS OF 2011 The Honourable Percy
More information33025 ADOPTED BOARD OF TRUSTEES COMMUNITY COLLEGE DISTRICT NO. 508 AUGUST 4, 2016
33025 ADOPTED BOARD OF TRUSTEES COMMUNITY COLLEGE DISTRICT NO. 508 AUGUST 4, 2016 BOARD OF TRUSTEES OF COMMUNITY COLLEGE DISTRICT NO. 508 COUNTY OF COOK AND STATE OF ILLINOIS RESOLUTION TO ADOPT REVISIONS
More informationBOROUGH OF BERLIN. Municipal Planning Board Engineer. Term: January 1, 2018 to December 31, 2018.
BOROUGH OF BERLIN REQUEST FOR QUALIFICATIONS FOR MUNICIPAL ATTORNEY, MUNICIPAL AUDITOR, MUNICIPAL BOND COUNSEL, MUNICIPAL ENGINEER, MUNICIPAL WATER & SEWER ENGINEER, MUNICIPAL PROSECUTOR, MUNICIPAL PUBLIC
More informationPURCHASING POLICY. Code: Policy 5.1. Date of Coming into Force: June Number of Pages: 10. Finance Department
REGISTER OF POLICIES, PROCEDURES AND BY-LAWS PURCHASING POLICY Code: Policy 5.1 Date of Coming into Force: June 2009 Number of Pages: 10 Origin: Finance Department Operator and Storage Site: Finance Department
More informationDocument B101 TM. Standard Form of Agreement Between Owner and Architect
Document B101 TM 2007 Standard Form of Agreement Between Owner and Architect AGREEMENT made as of the day of in the year (In words, indicate day, month and year.) BETWEEN the Architect s client identified
More informationREQUEST FOR PROPOSALS
REQUEST FOR PROPOSALS December 15, 2014 Secured Document Shredding Services Project 2014-2015 Due 10:00 AM CST/CDT Tuesday, January 20, 2015 Company Name: Contact Information: Printed Name & Title Address,
More informationSAN JOSE / EVERGREEN COMMUNITY COLLEGE DISTRICT DOCUMENT BID PROPOSAL
DOCUMENT 00 41 13 BID PROPOSAL TO: SAN JOSE / EVERGREEN COMMUNITY COLLEGE DISTRICT, a California Community College District, acting by and through its Board of Trustees ("the District"). FROM: (Name of
More informationFinance & Technology Administrator (815) ext 223
2017 PAVING IMPROVEMENTS BID PACKET Due: Location: April 26, 2017 by 10:00 am Oregon Park District Fairgrounds Park 607 Fair Park Drive Oregon, IL 61061 Bid Proposal: 2017 Paving Improvements Administrative
More informationPROCUREMENT OVERVIEW. State of Louisiana Division of Administration Office of State Procurement
PROCUREMENT OVERVIEW State of Louisiana Division of Administration Office of State Procurement PURPOSE Guidelines (laws, rules, policies, executive order) Methods of Procurement Competitive Process Emergency
More informationCONTRACTOR PREQUALIFICATION REQUIREMENTS DATA CONTRACTORS FOR THE
CONTRACTOR PREQUALIFICATION REQUIREMENTS DATA CONTRACTORS FOR THE AZUSA UNIFIED SCHOOL DISTRICT 1 TABLE OF CONTENTS Filing of PreQualifications Submittals 3 PREQUALIFICATION QUESTIONNAIRE 6 Page Part I:
More informationBy-Law Number 9 Concerning Procurement Contracts for Goods, Services and Construction
By-Law Number 9 Concerning Procurement Contracts for Goods, Services and Construction Approved by the Board of Directors June 26, 2012 Amended by resolution 93-S-2-A March 11, 2014 TABLE OF CONTENTS Article
More informationSeattle Public Schools Office of Internal Audit. Internal Audit Report Construction Management Practices
Seattle Public Schools Office of Internal Audit Issue Date: December 5, 2017 Introduction and Background In accordance with the fiscal year 2018 capital audit plan, we have completed an audit of the district
More informationCreative Advertising and Audio Visual - Interactive Production Services Invitation to Qualify (ITQ) Part I Statement of Work
Creative Advertising and Audio Visual - Interactive Production Services Invitation to Qualify (ITQ) Part I Statement of Work OVERVIEW The purpose of the Creative Advertising and Audio Visual - Interactive
More informationTORONTO MUNICIPAL CODE CHAPTER 67, FAIR WAGE SCHEDULE A, FAIR WAGE POLICY SCHEDULE A FAIR WAGE POLICY
SCHEDULE A FAIR WAGE POLICY 67-A1. Definitions. 67-A2. City of Toronto Council references. 67-A3. Purpose and history of Fair Wage Policy. 67-A4. Intent of Fair Wage Policy. 67-A5. Application. 67-A6.
More informationAP 515 PURCHASING. Administrative Procedures Manual AP Purchasing
AP 515 PURCHASING BACKGROUND The purchase of goods and services for Saskatoon Public Schools shall be conducted in accordance with the most current version and amendments of The Education Act, of the Province
More informationREQUEST FOR PROPOSALS EXECUTIVE SEARCH SERVICES. Issuance Date November 27, 2017
REQUEST FOR PROPOSALS EXECUTIVE SEARCH SERVICES Issuance Date November 27, 2017 Submittal Deadline January 8, 2018 Page Is Blank For Photocopying MARIN LAFCO 2 TABLE OF CONTENTS Section Page Number I.
More informationInvitation to Negotiate
Invitation to Negotiate Programming, Design, and Consulting Services Lisa Daws 4/3/2012 CLERKS OF COURT OPERATIONS CORPORATION Table of Contents Agency Background... 3 Statement of Purpose... 3 Scope of
More informationREQUEST FOR QUALIFICATIONS CIVIL ENGINEERING PROFESSIONAL SERVICES VILLAGE OF BARTLETT COUNTRY CREEK LIFT STATION PROJECT
REQUEST FOR QUALIFICATIONS CIVIL ENGINEERING PROFESSIONAL SERVICES VILLAGE OF BARTLETT COUNTRY CREEK LIFT STATION PROJECT DATED FEBRUARY 19, 2015 REQUEST FOR QUALIFICATIONS CIVIL ENGINEERING PROFESSIONAL
More informationProcurement Process: Architects & Professional Engineering Services. Procurement.
Procurement Process: Architects & Professional Engineering Services Procurement www.novascotia.ca/tenders Updated: February 2017 Table of Contents Contents INTRODUCTION:... 3 APPLICATION:... 3 SCOPE of
More informationSTATE OF NEW JERSEY. ASSEMBLY, No th LEGISLATURE. Sponsored by: Assemblyman CRAIG J. COUGHLIN District 19 (Middlesex)
ASSEMBLY, No. STATE OF NEW JERSEY th LEGISLATURE INTRODUCED MARCH, 0 Sponsored by: Assemblyman CRAIG J. COUGHLIN District (Middlesex) SYNOPSIS Workplace Democracy Enhancement Act. CURRENT VERSION OF TEXT
More informationThe North-Atlantic Free Trade Agreement and the Trans-Pacific Partnership: Side-by-Side Comparison. NAFTA Chapter 10: Government Procurement
The North-Atlantic Free Trade Agreement and the Trans-Pacific Partnership: Side-by-Side Comparison NAFTA Chapter 10: Government Procurement Chapter Ten: Government Procurement Chapter Fifteen: Government
More informationPublic Procurement Act
Public Procurement Act CHAPTER 12 OF THE ACTS OF 2011 as amended by 2014, c. 34, ss. 35-38 2016 Her Majesty the Queen in right of the Province of Nova Scotia Published by Authority of the Speaker of the
More informationDEPARTMENT OF THE TREASURY
STATE OF NEW JERSEY DEPARTMENT OF THE TREASURY DIVISION OF PURCHASE & PROPERTY CONTRACT COMPLIANCE AND AUDIT UNIT EEO MONITORING PROGRAM PUBLIC AGENCY Guidelines for Administering Equal Employment Opportunity
More informationCOMMUNITY COLLEGE DISTRICT OF JEFFERSON COUNTY, MISSOURI REQUEST FOR PROPOSAL: WINDOW, DOOR, AND FRAME REPLACEMENT
COMMUNITY COLLEGE DISTRICT OF JEFFERSON COUNTY, MISSOURI REQUEST FOR PROPOSAL: WINDOW, DOOR, AND FRAME REPLACEMENT RFP # 1710002 Sheree Bell Due Date: November 30, 2017 Procurement Coordinator Not later
More informationDocument B Standard Form of Agreement Between Owner and Architect, Construction Manager as Adviser Edition
Document B132 2009 Standard Form of Agreement Between Owner and Architect, Construction Manager as Adviser Edition AGREEMENT made as of the in the year (In words, indicate day, month and year.) BETWEEN
More informationI. Procurement. Procurement Authority. Ethical Conduct, Conflict of Interest. DU Procurement Policy
I. Procurement Procurement of goods and services for the university must be conducted in an open and competitive environment to ensure that prices paid are fair and reasonable. Purchasing activities are
More informationTitle: PROCUREMENT Last Update: March 24, Responsible Officer: Mark Savoff I. POLICY SUMMARY
Page 1 of 21 Subject Matter Expert: Mark Chapman Responsible Officer: Mark Savoff Approved By: Corporate Compliance Committee Approval Date: May 31, 2001 I. POLICY SUMMARY This policy outlines the guidelines
More informationBEST PRACTICES RFQs & RFPs
BEST PRACTICES RFQs & RFPs Sonja Blinka Director of Purchasing Section 3-2 Salon C 2:00 2:50 Knock Out The Acronym Guess RFB Request for Bid RFQ Request for Quote RFP Request for Proposal RFCSP Request
More informationThank you for coming this morning and learning about us.
Thank you for coming this morning and learning about us. Government agencies are one of the largest consumers of goods and services in the country. As you likely know, selling to government agencies is
More informationNavigating California AB 1825 Compliance An inside look at how Ah-Ha! Media s harassment program meets your training mandate
7288.0 Sexual Harassment Training and Education (a) Definitions. For purposes of this section: (1) Contractor is a person performing services pursuant to a contract to an employer, meeting the criteria
More informationQUALITY COUNTS! QUALIFICATIONS BASED SELECTION (QBS) PROFESSIONAL SERVICES PROCUREMENT PROCESS
UPDATED FALL 2017 QUALITY COUNTS! QUALIFICATIONS BASED SELECTION (QBS) PROFESSIONAL SERVICES PROCUREMENT PROCESS Kane County Division of Transportation 41W011 Burlington Road St. Charles, IL 60175 Phone:
More informationSTATE OF NEW JERSEY DEPARTMENT OF THE TREASURY
STATE OF NEW JERSEY DEPARTMENT OF THE TREASURY DIVISION OF PURCHASE AND PROPERTY CONTRACT COMPLIANCE AND AUDIT UNIT EEO MONITORING PROGRAM Vendor/Contractor Guidelines for Awarded Public Contracts Pursuant
More informationAGENDA STAFF REPORT. CLERK OF THE BOARD Pending Review COUNTY COUNSEL REVIEW. Approved Agreement to Form. Current Year Cost: NI A
Agenda Item AGENDA STAFF REPORT ASR Control 16-001333 MEETING DATE: 02/14/ 17 LEGAL ENTITY TAKING ACTION: Board of Supervisors BOARD OF SUPERVISORS DISTRICT(S): 2 SUBMITTING AGENCY/DEPARTMENT: John Wayne
More informationNIGP OA 4 ACCREDITATION CRITERIA FORM
NIGP OA 4 ACCREDITATION CRITERIA FORM Agency Name: E-mail: Agency Contact Person: Phone: A. MISSION and STRATEGIES Yes No 1. Does the Procurement Agency have its own Mission statement? 2. Does the Procurement
More informationProfessional Practice 544
February 22, 2016 February 29, 2016 Professional Practice 544 AIA-B101 Owner - Architect Agreement Michael J. Hanahan Schiff Hardin LLP 233 S. Wacker, Ste. 6600 Chicago, IL 60606 312-258-5701 mhanahan@schiffhardin.com
More informationVillage of Algonquin Request for Proposals Accounting Services
Village of Algonquin Request for Proposals Accounting Services Issue Date: February 1, 2018 Submission Deadline: March 2, 2018 5:00 p.m. CST PROPOSALS RECEIVED AFTER THE SUBMISSION DEADLINE WILL BE RETURNED
More informationThe following was adopted as Policy by Resolution No at the Regular Council Meeting held on January 17, 2012.
Purchasing & Tendering Policy No. 12.124 District of Lake Country 10150 Bottom Wood Lake Road Lake Country, BC V4V 2M1 t: 250 766 5650 f: 250 766 0116 lakecountry.bc.ca Date The following was adopted as
More informationRailroad Commission of Texas Mentor Protégé Program
Railroad Commission of Texas Mentor Protégé Program December 3, 2002 1 1.0 Description The Railroad Commission of Texas Mentor/Protégé Program is developed in accordance with Government Code 2161.065 and
More informationSB 854 DIR CONTRACTOR REGISTRATION DLSE PREVAILING WAGE RATE ENFORCEMENT & MONITORING
SB 854 DIR CONTRACTOR REGISTRATION DLSE PREVAILING WAGE RATE ENFORCEMENT & MONITORING T: 310-640-0800 F: 310-640-0818 Sherman Wong KEY CHANGES DIR REGISTRATION DLSE PWR MONITORING & ENFORCEMENT All public
More informationRequest For Proposal Of Printing and Design Services. Marketing Department
Request For Proposal Of Printing and Design Services Marketing Department Released on June 3, 2016 Mosaic Youth Theatre of Detroit Printing and Design Services REQUEST FOR PROPOSAL (RFP) BACKGROUND Mosaic
More informationBoth envelopes must have the following information in the lower left hand corner:
SECTION 001116 INVITATION TO BID The City of Morgantown is requesting a bid for masonry restoration for the City Hall Building in Morgantown, WV. The Project is for building envelope rehabilitation including
More informationREQUEST FOR PROPOSAL. Construction Management Services Not at Risk
REQUEST FOR PROPOSAL Construction Management Services Not at Risk The St. Charles County Ambulance District proposes to retain a qualified firm/team for the Construction Management Services Not at Risk
More informationREQUEST FOR COUNCIL ACTION
REQUEST FOR COUNCIL ACTION Date: 8/10/09 Item No.: 1.b Department Approval Acting City Manager Approval Item Description: Discussion of Revised Professional Services Policy 1 6 7 8 9 BACKGROUND The City
More informationLB 889 The Political Subdivisions Construction Alternatives Act
1 LB 889 The Political Subdivisions Construction Alternatives Act What cities, villages, counties, state colleges, community colleges, and school districts need to know about their construction options.
More informationREQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE. St. Charles County Ambulance District
REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE St. Charles County Ambulance District Base 3 & Training Facility Construction 4169 Old Mill Parkway St. Peters, MO 63376 September
More informationTsawwassen First Nation Procurement Policy. February, 2010
Tsawwassen First Nation Procurement Policy February, 2010 TFN Procurement Policy Page 0 of 10 Table of Contents 1. Authority... 2 2. Purpose and Scope... 2 3. Principles... 2 4. Purchasing authority and
More informationREQUEST FOR PROPOSALS: CEO COMPENSATION AND EVALUATION SERVICES. Issue Date: April 30, Due Date: June 6, 2014
REQUEST FOR PROPOSALS: CEO COMPENSATION AND EVALUATION SERVICES Issue Date: April 30, 2014 Due Date: June 6, 2014 In order to be considered, proposals must be signed and returned via email to rwhitmore@wested.org
More informationINVITATION TO BID CITY OF HOPKINSVILLE
INVITATION TO BID CITY OF HOPKINSVILLE Office of the Procurement Specialist 715 South Virginia Street P. O. Box 707 Hopkinsville, Kentucky 42241-0707 TITLE: DESIGN BUILD BUIDLING FOR THE CITY OF HOPKINSVILLE,
More informationGENERAL ASSEMBLY OF NORTH CAROLINA SESSION 2017 H 1 HOUSE BILL 366. Short Title: Retail Workers' Bill of Rights. (Public)
GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 0 H 1 HOUSE BILL Short Title: Retail Workers' Bill of Rights. (Public) Sponsors: Referred to: Representatives Brockman, Fisher, Harrison, and Holley (Primary
More informationAVIATION AUTHORITY POLICY
PURPOSE: To establish a policy for the selection of development related professional services firms, including design-build firms for professional services and the Consulting Engineer, pursuant to the
More informationC.1.10 (Policy) Tax Abatements and Tax Increment Financing Tax Abatement Agreements Guidelines and Criteria for Tax Abatement Agreements
Tax Abatement Agreements The College District has elected to become eligible to participate in tax abatement agreements as permitted by Chapter 312 of the Texas Tax Code. Guidelines and Criteria for Tax
More informationEnergy Auction for the CPV Sentinel Generating Facility
Energy Auction for the CPV Sentinel Generating Facility Energy Auction Instructions and Terms and Conditions of Participation Updated June 11, 2013 A. GENERAL A.1. Company ( SCE ) seeks to sell, by this
More informationREQUEST FOR PROPOSALS
REQUEST FOR PROPOSALS UTILITY BILLING SOFTWARE DUE DATE: NO LATER THAN 5:00 PM EASTERN TIME, MARCH 11, 2016 QUESTIONS: JESSICA MARTIN-LANE JESSICA@MARTIN-MCGILL.COM NOTE: THE COUNTY OF HARNETT RESERVES
More informationRequest for Proposal For: 2018 American Bar Association Temporary Services
Table of Contents Bid Timetable [2] 1.0 General Bid Information [3] 2.0 Proposal Requirements [5] 3.0 Criteria for Selection [7] 4.0 Specifications and Work Statement [7] Appendix A: Bidder Response Sheet
More informationREQUEST FOR PROPOSAL (RFP) LEGAL SERVICES. Submission Date: November 28, :00 p.m.
COLTS NECK TOWNSHIP BOARD OF EDUCATION 70 CONOVER ROAD, COLTS NECK, NJ 07722 REQUEST FOR PROPOSAL (RFP) LEGAL SERVICES Submission Date: November 28, 2017 4:00 p.m. The Colts Neck Township School District
More informationCONSTRUCTION PROCUREMENT REQUIREMENTS
CONSTRUCTION PROCUREMENT REQUIREMENTS OCTOBER 12, 2017 HRS 103D-203 CHIEF PROCUREMENT OFFICERS This section of the procurement code designates chief procurement officers for State entities and counties.
More informationSEMINOLE TRIBE OF FLORIDA INVITATION TO BID
Solicitation #: ITB 151-2017 Title: Description: SEMINOLE TRIBE OF FLORIDA INVITATION TO BID General Home Repairs (Big Cypress Reservation) The Housing Department of the Seminole Tribe of Florida is requesting
More informationPSAB Supplement 13 Purchasing
PSAB Supplement 13 Purchasing MANUAL OF PROCEDURES PSAB SUPPLEMENT 13 PURCHASING TABLE OF CONTENTS PURCHASING FOR PUBLIC SCHOOL DISTRICTS AND CHARTER SCHOOLS... 1 PURPOSE... 1 NEW MEXICO PROCUREMENT CODE...
More informationManager, Sourcing Supply and Contracts, Grid Projects Approved By:
Procurement Policy ISSUE DETAILS Effective Date: 1 Policy Owner: Chief Executive Officer Written By: Manager, Sourcing Supply and Contracts, Grid Projects Approved By: Transpower Board of Directors Minute
More informationLabor & Employment Law Update
, California 92260-4305 Mandatory Supervisory Harassment Training: Status of the Regulations Timothy L. Davis, Esq. * and Kelly A. Trainer, Esq. ** California employers have been waiting for the Fair Employment
More informationCasework Technical Support (Social Welfare - Project Management)
Casework Technical Support (Social Welfare - Project Management) Request for Tenders for Services to MABS NATIONAL DEVELOPMENT The latest date for receipt of tenders is 09 June 2017 Commercial House Westend
More informationRequest for Proposals (RFP) Information Technology Independent Verification and Validation RFP No IVV-B ADDENDUM NO.
Request for Proposals (RFP) Information Technology Independent Verification and Validation ADDENDUM NO. 2 Questions and Answers RFP Amendments September 2015 Contained herein are the responses to the questions
More informationUNITED NATIONS COMMISSION ON INTERNATIONAL TRADE LAW (UNCITRAL)
UNITED NATIONS COMMISSION ON INTERNATIONAL TRADE LAW (UNCITRAL) UNCITRAL Model Law on Procurement of Goods, Construction and Services with Guide to Enactment CONTENTS PREAMBLE CHAPTER I. GENERAL PROVISIONS
More informationOverview of Colorado Municipal Home Rule
Overview of Colorado Municipal Home by Sam Mamet, Executive Director and Rachel Allen, Staff Attorney Colorado Municipal League Information CML periodicals and the CML website www.cml.org keep members
More informationREQUEST FOR PROPOSALS FOR PROFESSIONAL ENGINEERING SERVICES
SEDA-COUNCIL OF GOVERNMENTS REQUEST FOR PROPOSALS FOR PROFESSIONAL ENGINEERING SERVICES ENGINEERING, DESIGN, AND BIDDING 119 SOUTH LOCUST STREET DEMOLITION BOROUGH OF MOUNT CARMEL NORTHUMBERLAND COUNTY,
More informationGeneral Policy - Purchasing
General Policy - Purchasing Policy: All purchases of commodities (supplies, materials, equipment, printing, insurance, and leases of equipment) and services (furnishing of labor and time and effort by
More informationThis Policy is entitled the "Purchasing and Tendering Policy".
Approved December 16, 2014 PAGE 1 of 17 Title This Policy is entitled the "Purchasing and Tendering Policy". PART 1 - INTRODUCTORY Interpretation 1.1. In this Policy: (1) alternative procurement practice
More informationOverview of Colorado Municipal Home Rule By Rachel Allen, Staff Attorney Colorado Municipal League
Overview of Colorado Municipal Home Rule By Rachel Allen, Staff Attorney Colorado Municipal League Your source for advocacy, information and training. The views expressed at this forum are those solely
More informationSECTION 2 RECRUITMENT, SELECTION, APPOINTMENT RECRUITMENT: Department of Job & Family Services 2.05 EMPLOYMENT ELIGIBILITY
SECTION 2 RECRUITMENT, SELECTION, APPOINTMENT 2.01 RECRUITMENT 2.02 RECRUITMENT: Department of Job & Family Services 2.03 SELECTION 2.04 SELECTION PROCESS RECORDKEEPING 2.05 EMPLOYMENT ELIGIBILITY 2.06
More informationGuide to Procurement. Ministry of Central Services Procurement Services. Last updated: April 2014 Page 1 of 11
Ministry of Central Services Procurement Services Last updated: April 2014 Page 1 of 11 Table of Contents Purpose of guide... 3 Authority for procurement... 3 Applicability - Who is covered by The Purchasing
More informationUNIVERSITY HOSPITAL POLICY
UNIVERSITY HOSPITAL POLICY SUBJECT: Responsible Executive: SUPPLY CHAIN MANAGEMENT Executive Director for Supply Chain Management TITLE: Responsible Office: WAIVER OF BIDS Supply Chain Management CODING:
More information