Multidirectional_scaffolding MP
|
|
- Jesse Charles
- 6 years ago
- Views:
Transcription
1
2 Multidirectional_scaffolding MP 162
3 Company Projects Products Scaffoldings and Coverings MP MULTIDIRECTIONAL SCAFFOLDING The MP multidirectional system is the modern solution that reflects in an industrialized way all the flexibility of tube and joint scaffolding. The special washer welded to the vertical uprights has 4-ways for the orthogonal fastening of stringers and diagonals and other 4-ways slotted that allow the fastening with changeable angle to cover almost 360. In addition to its extreme flexibility, the type of hooking with a wedge and washer is very fast and shortens considerably the assembly and disassembly operations. The MP multidirectional scaffolding is the Pilosio s system with most flexibility and highest possibilities of use even in complex situations thanks to the characteristics of quick assembly, great modularity, extreme adaptability and high load capacity. STRENGTHS the MP modular system consists of simple modular components full range of accessories to meet any needs on site simple, fast and intuitive, the assembly and disassembly operations are very quick it can be combined with other models of prefabricated scaffolding in case of curved structures and with no linear shapes the MP structures are used to replace any other system of shoring, towers and contrast systems the MP multidirectional scaffolding is the perfect combination between the productivity of the frame scaffolding and universal flexibility of the tube and joint system a temporary aluminium guardrail is available for the safe assembly of scaffolding without having to use uncomfortable personal protection equipment against falls. 163
4 Multidirectional_scaffolding MP The technological nature of the MP multidirectional scaffolding allows lining an architectural structure. The boards have been used in vertical position to create a volume temporarily enclosed. Pilosio has designed special parts for this particular project. 164
5 Company Projects Products Scaffoldings and Coverings SPACINGS The spacing of 83 cm with steps up to 300 cm for maintenance with maximum capacity of 150 kg/m 2 on the most loaded surface. Spacing of 115 cm with spacing up to 250 cm for construction with maximum capacity of 300 kg/m 2 on the most loaded floor. CHARACTERISTICS Steel pipes with ø of 48.3 mm. Hot galvanization finishing. 165
6 Multidirectional_scaffolding MP 166
7 Company Projects Products Scaffoldings and Coverings MANY FIELDS OF APPLICATION It is used in residential, industrial, restoration, marine, aviation, oil, entertainment, archaeological sites, bridges, and in the viaduct sectors as well as in hanged or movable structures. POSSIBLE USES scaffolding for maintenance and construction of façades scaffoldings with driveways and pier stops unloading scaffoldings service stairs for job sites structures with high capacity for works at a height towers with very high capacity to support heavy loads at a height hanged structures when there is no possibility to start from the bottom contrast systems movable towers on wheels or carts boarding structures for entertainment and audio-video towers structures for warehousing and storage bearing structures of any kind to be lined with another material stage designing With the MP multidirectional scaffolding it is possible to create also mobile towers with swiveling wheels for special maintenance and restoration. Even in particular cases such as, for example, maintenance of the lateral and lower parts of bridges and viaducts, when it is not possible to build the scaffolding from the bottom for the presence of water or for a too high altitude, a sliding tower is used to lower down the MP multidirectional scaffolding with related work floors to reach the sections where to operate.
8 Multidirectional_scaffolding MP 168
9 Company Projects Products Scaffoldings and Coverings MP MULTIDIRECTIONAL SCAFFOLDING FOR THE NAVAL INDUSTRY The high flexibility of MP multidirectional scaffolding allows numerous advantages for the naval industry, both for construction and for maintenance. The scaffolding can be equipped with swiveling wheels. The use of brackets allows working safely close to the hull of the ship and without the need for invasive fastenings. 169
10 Multidirectional_scaffolding MP <300x MP multidirectional scaffolding 83/ cm. 170
11 Company Projects Products Scaffoldings and Coverings / /1150 Internal and external bracket. MP carriage entrance. 171
12 Multidirectional_scaffolding MP MP MULTIDIRECTIONAL SCAFFOLDING DIAGRAMS tower of support (Fig. 1) unloading scaffoldings (Fig. 2) service stairs for job sites (Fig. 3) structure for slab support (Fig. 4) circular scaffolding (Fig. 5) MP structure with temporary aluminium covering (Fig. 6) Fig. 1 Fig. 2 Fig
13 Scaffoldings and Coverings Company Projects Products Fig. 4 Fig. 5 Fig impa_ponteggieng013.indd /04/
14 Multidirectional_scaffolding MP LOADING AREA 174
15 Company Projects Products Scaffoldings and Coverings MP LOADING AREA Specific unloading scaffoldings with floors staggered, carried out by using MP multidirectional system are used to supply the various floors of a building with construction and finishing materials and various equipment. They are structured so that the load lifted by a crane is placed on the unloading area at the level of the desired floor and then moved inward the building. It is essential to ensure that the displacement of areas is performed so that the crane can place the load without obstacle. The majority of areas have a size of 2.50x2.50 m with an operating load up to 5 kn/m 2. For special needs, unloading scaffoldings can be carried out with a different number of areas, measures and capacities. Cantilever MP loading areas with landing of 180x250 cm: 10 kn/m 2 (capacity of area with composite truss, scantling and wooden planking). 175
16 Multidirectional_scaffolding MP LOADING AREA 176
17 Unloading scaffolding with landings of 250x250 cm: 3 kn/m 2 (capacity with reinforced crossbeam and galvanized boards). 5 kn/m 2 (capacity of area with composite truss and galvanized boards). 177
18 Multidirectional_scaffolding MP service STAIRS Backstairs 250x150 cm. 178
19 Company Projects Products Scaffoldings and Coverings MP SERVICE STAIRS To secure easily and safely climbing at a height, instead of using a trapdoor with rung ladders available only to workers, the comfortable external service stairs manufactured with MP scaffolding with aluminium climbing stairs are used. The advantage is to make accessible the high altitude climbing at a height or accessing excavations both for transportation of material and small equipment and for site inspections by personnel not involved in the work. These stairs can be directly anchored from the scaffolding to the building, but they are an independent element. The standard sizes are 250x250 cm, top view, with modular height of 200 cm that perfectly combines with the landing of all existing scaffolding models on the market both multidirectional and with prefabricated frames. 179
20 Multidirectional_scaffolding MP service STAIRS Fig. 1 Fig
21 Company Projects Products Scaffoldings and Coverings A simpler solution is to build a climbing stair leaning against the façade scaffolding that uses the scaffolding floor as a landing (Fig. 1). A service stair sized 300x550 cm and spacing of 200 cm and landings of 150x150 cm is the perfect solution to access the site by personnel with bulky equipment and and safety personnel for passage of a possible stretcher (Fig. 2). With the MP system it is possible to build also stairs open to the public for the civil sector (entertainment, sporting events, various events) that comply with the safety standards of the sector (Fig. 3). Fig
22 Multidirectional_scaffolding MP TECHNICAL CHARACTERISTICS Art. dim. mm kg Art. dim. mm kg Art. dim. mm kg MP standard (A) (B) (C) (D) (E) (F) (G) 1.9 Spigotless standard (A) (B) (C) (D) (E) (F) 1.5 Gudgeon pin for standards Base of standard A b c d e f g A b c d e f Base of standard for lattice beam Galvanized base plate Galvanized adjustable base plate Z Z Z Z
23 TECHNICAL CHARACTERISTICS Company Projects Products Art. dim. mm kg Art. dim. mm kg Art. dim. mm kg Galvanized adjustable swivel base jack T28 adjustable base plate of 60 Bushing for fork Scaffoldings and Coverings Z MP ledger Double clamp Transom Reinforced transom Vertical brace x x x x x x x x x x x
24 Multidirectional_scaffolding MP TECHNICAL CHARACTERISTICS Art. dim. mm kg Art. dim. mm kg Art. dim. mm kg Horizontal brace x x x x x x x x x x x x x T 2500x Bracket for working platform Bracket for working platform Galvanized scaffold board x x x x x x x x Aluminium board with trap door A 660x A 660x A 660x Ledger board Galvanized toe-board x x x x x x x x Wooden toe-board x x x x x x x x
25
26 Multidirectional_scaffolding MP TECHNICAL CHARACTERISTICS Art. dim. mm kg Art. dim. mm kg Art. dim. mm kg Side guardrail Gravel guard Lattice beam complete with N 2 screw M14x70 UNI 5737 galvanized N 2 screw nut M14 UNI 5588 galvanized N 2 washer 15x28 UNI 6592 galvanized N 2 washer UNI 8842-A14 (jagged) Lattice beam Carriage entrance beam Safety hook Mobile washer Clamp with single coupler MP clamp with end coupler
27 TECHNICAL CHARACTERISTICS Company Projects Products Art. dim. mm kg Art. dim. mm kg Art. dim. mm kg Swivel castor Complete aluminium stairway Scaffoldings and Coverings (A) 6.5 of 500 Kg (B) 10.4 of 1000 Kg A 2500x720x2000 (A) 29.4 (middle stairway) x720x2000 (B) 15.0 (handrail for stairway) x720x2000 (C) 4.5 (landing handrail) b c A c b A Ledger between guardrail and boards Ledger between landing and upper stepboards (working site) Ledger between landing and lower stepboards x2000 (A) 42.2 (stairway ramp sied) x2000 (B) 16.9 (right toe-board for stairway) x2000 (C) 16.9 (left toe-board for stairway) x2000 (A) 2.5 (toe-board top element for stairway) b c Ledger between landing and lower stepboards (pubblic) Ledger between guardrail and boards A 187
28 Multidirectional_scaffolding MP TECHNICAL CHARACTERISTICS Art. dim. mm kg Art. dim. mm kg Art. dim. mm kg Stairway guardrail x Stairway ramp side x Guardrail Assembly guardrail Tube with pin for scaffold anchorage Hook anchorage Steel anchoring plug ø 50 (A) ø 23 (B) 0.2 Universale container for boards boards of boards of 330 Tubular container x800x870 (H) 44.1 A b 188
29 TECHNICAL CHARACTERISTICS Art. dim. mm kg Art. dim. mm kg Wire container Wire gabion Company Projects Products Scaffoldings and Coverings x800x600 (H) x1000x500 (H)
30 5000ENG rev _13 built build to Pilosio SpA Via E. Fermi, Feletto Umberto - Tavagnacco (UD) - Italy Tel Fax info@pilosio.com cover_stesaeng 013.indd 1 05/04/
scaffoldings/ coverings
scaffoldings/ coverings 198 MDS 222 temporary covers Scaffoldings / Coverings 197 SCAFFOLDINGS / COVERINGS MDS MDS multidirectional scaffolding The MDS multidirectional scaffolding is the modern solution
More informationMP MULTIDIRECTIONAL SYSTEM
MP MULTIDIRECTIONAL SYSTEM MP MULTIDIRECTIONAL SYSTEM THE COMPANY About Pilosio 03 Pilosio in the world, services, certifications 04 Wide range of products and services 06 MP MULTIDIRECTIONAL SYSTEM Ringlock
More informationbuilt build to FORMWORKS CLIMBING, RETAINING WALLS, SPECIAL
uilt build to FORMWORKS Company Projects Products CLIMBING SYSTEMS Pilosio s CLIMBING SYSTEM with mechanical handling enable vertical construction joints to be created in succession without the aid of
More informationbuilt build to slabs SLABFORM
uilt build to slabs slabform SLABS Company Projects Products It is a modular system of formworks in aluminium for the execution of monolithic or lightened concrete slabs cast in place. is a fully It
More informationmodular scaffolding R+
modular scaffolding R+ 1. Stand 6. Transverse U-transom Stand is the main element of modular scaffolding. Made of 48.2x3.2 mm steel pipe. Every 0,5m on the whole stand length are installed steel plates
More informationSLABS. Formworks for slabs
SLABS Liteform 338 Slabform 352 Linear 366 Simplex table 374 ST50 table 378 ST110 table 382 Support structures for slabs Props 390 T28 towers 398 T40 towers 404 MP shoring structures 409 MP high load capacity
More informationBRIO Modular scaffolding
BRIO Modular scaffolding // Versatile and multifunctional // Table of content Features Benefits Solutions Basic components 2 4 6 13 // Features BRIO Modular Scaffolding covers the different configurations
More informationdistribution Modular Scaffolding
Modular Scaffolding Modular scaffolding PDM Universal scaffolding system plettac-pl PDM Application A characteristic feature of plettac PDM system is the use of wedge joint which provides quick and safe
More informationBRIO Modular scaffolding
BRIO Modular scaffolding // Versatile and multifunctional // Table of content Features Benefits Solutions Basic components 2 4 6 13 // Features BRIO Modular Scaffolding covers the different configurations
More informationmodular scaffolding R+
modular scaffolding R+ 1. Stand 6. Transverse U-transom Stand is the main element of modular scaffolding. Made of 48.2x3.2 mm steel pipe. Every 0,5m on the whole stand length are installed steel plates
More informationModular Scaffolding MEKA 48
Modular Scaffolding MEKA 48 MODULAR SCAFFOLDING MEKA 48 MODULAR SCAFFOLDING The Modular Scaffolding MEKA 48 is designed to adapt to the most complex scaffold structures. Its versatility offers a wide range
More informationUSER S MANUAL HAKI UNIVERSAL ALUMINIUM
USER S MANU HAKI UNIVERS UMINIUM HAKI AB 2005 Important information HAKI s product liability and erection instructions apply only to scaffolds that are entirely composed of components that have been made
More informationPERI PD 8 The cost-effective shoring for slab tables and high loads
PERI PD 8 The cost-effective shoring for slab tables and high loads Edition 06/2010 PERI GmbH Formwork Scaffolding Engineering P.O. Box 1264 89259 Weissenhorn Germany Tel +49 (0)7309.950-0 Fax +49 (0)7309.951-0
More informationSince it was established in 1989, with a small manufacturing base in Qwa Qwa, Uni-Span has grown to become one
access scaffolding Since it was established in 1989, with a small manufacturing base in Qwa Qwa, Uni-Span has grown to become one of the major players in the scaffolding and formwork industry in South
More informationRINGLOCK Introduction Ringlock is world most widely used scaffold system. It is a fully galvanized multi purpose steel scaffold system suitable for pr
RINGLOCK ACCESS SCAFFOLD SYSTEM 9 RINGLOCK Introduction Ringlock is world most widely used scaffold system. It is a fully galvanized multi purpose steel scaffold system suitable for providing general access
More informationUSER S MANUAL HAKI PUBLIC ACCESS STAIR
USER S MANUAL HAKI PUBLIC ACCESS STAIR HAKI AB 2017 Important information HAKI s product liability and user s manuals apply only to scaffolds that are entirely composed of components that have been made
More informationModular Scaffold MEKA 48
Modular Scaffold MEKA 48 Imperial units NA MODULAR SCAFFOLD MEKA 48 MODULAR SCAFFOLD The Modular Scaffold MEKA 48 is designed to adapt to the most complex scaffold structures. Its versatility offers a
More informationUSER S MANUAL HAKI CONTINENTAL
USER S MANUAL HAKI CONTINENTAL HAKI AB 2003 HAKI User s Manual and product liability applies only to scaffolding containing components manufactured and supplied by HAKI. Building scaffolding using components
More informationRosette Modular Scaffolding System
Rosette Modular Scaffolding System The rosette modular security scaffolding system to be used in facades, has been produced in accordance with the structural design conditions stated by the following applicable
More informationASSEMBLY.
ASSEMBLY www.proscaf.com ASSEMBLY SECTION Points to Consider These assembly instructions are generic and may not apply to all applications. If you have questions regarding specific applications contact
More informationCOLD DEFORMATION: A STRONGER ALTERNATIVE
COLD DEFORMATION: A STRONGER ALTERNATIVE LOAD TEST: ALUFASE Vs WELDING Load (Tons) / Deformation (mm) 7 6 The cold deformation system has been proven to be 3 times stronger than the traditional welding
More informationUSER S MANUAL HAKI UNIVERSAL
USER S MANUAL HAKI UNIVERSAL Suspended scaffolding HAKI AB 2012 Important information HAKI s product liability and erection instructions apply only to scaffolds that are entirely composed of components
More informationErection manual. Tube-Lock Concept. van Thiel United b.v Page: 1 of 15
Erection manual Tube-Lock Concept 2013-02 Page: 1 of 15 Contents Subject Page Illustration of Tube-Lock Concept 3 Parts of Tube-Lock concept 4 Legislation 5 Erecting a Tube-Lock Concept scaffold 6 Technical
More informationUSER S MANUAL HAKI PUBLIC ACCESS STAIR
USER S MANUAL HAKI PUBLIC ACCESS STAIR HAKI AB 2018 Important information HAKI s product liability and user s manuals apply only to scaffolds that are entirely composed of components that have been made
More informationUSER S MANUAL HAKI COMPACT STAIR TOWER
USER S MANUAL HAKI COMPACT STAIR TOWER HAKI AB 2018 Important information HAKI s product liability and user s manuals apply only to scaffolds that are entirely composed of components that have been made
More informationQUICK ALLY SCAFFOLD SPECIFICATIONS Standards: 1.0 m, 1.5 m, 2.0 m, 2.5 m, 3.0 m, 4.0 m. Ledgers: 0.5 m, 0.7 m, 1.2 m, 1.8 m, 2.4 m, 3.0 m. Polypropylene platforms: 0.7 m, 1.2 m, 1.8 m, 2.4 m, 3.0 m. Also
More informationNote. Floor beams can also be made from wooden beams put through the holes in the longitudinal beam and boards nailed to it.
Assembly instructions for HAKI IV These assembly instructions are designed for the construction of sectional HAKI IV scaffolding approved in accordance with the technical standards TP 73-05-60/020/83.
More informationBajaj Products.
+91-8048763600 Bajaj Products https://www.bajajpro.com/ We are designers, manufacturers & exporters of Centering,Shuttering & Staging systems (Scaffolding & Formwork). We have design based turnkey solutions
More informationUSER S MANUAL HAKI STAIR TOWER
USER S MANUAL HAKI STAIR TOWER HAKI AB 2018 Important information HAKI s product liability and user s manuals apply only to scaffolds that are entirely composed of components that have been made and supplied
More informationINDEX. introduction 4. access scaffolding 5. selflock system 16. wall system 17. column boxes 29. slab system 31. props 36. contact details 40
PRODUCT BROCHURE INDEX introduction 4 access scaffolding 5 selflock system 16 wall system 17 column boxes 29 slab system 31 props 36 contact details 40 INTRODUCTION Augusta Manufacturing was established
More informationIndustrial Aluminium Towers
Industrial Aluminium Towers SINGLE WIDTH LADDERSPAN & VERTICAL LADDER ERECTION MANUAL TO BS-EN 1004-2004 Using 2 rung frames (Recommended) Using guardrail frames HORIZONTAL BRACE 1.8m (2040) 2.7m (2041)
More informationSTABILO. System Parts Facade Scaffold. Vertical Frame (Steel) Vertical Frame (Aluminium) Vertical Frame. Vertical Frame (Aluminium) (Steel)
STABILO STABILO ø 48.3 x 4.0 mm Weight kg 6,0 14,0 19,0 Art.-No. 700193 700186 700179 Vario Equipped with exchangeable stabilizer Weight kg 3,5 6,0 8,0 Art.-No. 700223 700216 700209 Vario ø 48.3 x 4.0
More informationReliant Holdings Ltd Safety Management System
Preparation: Safety Mgr Authority: President Issuing Dept: Safety Page: Page 1 of 7 Purpose The purpose of this program is to prevent injuries due to falls from elevated work areas and ensure employees
More informationHeIGHT ACCESS SOLUTIONS EQUIPMENT CATALOGUE
HeIGHT ACCESS SOLUTIONS EQUIPMENT CATALOGUE EDITION 1.3 ROOF SAFETY RAIL SYSTEMS Ever wished that roof edge protection could be used for more than stopping staff from falling? Look no further... The Easy
More informationSales Hire Erections
LTD www.scafhire.ie Sales Hire Erections Scaffolding Specialists Company History Since its modest inception in 1980 Scafhire Ltd has progressed to a position of very high prominecnce and respectability
More informationLayher. Aluminium Rolling Towers. Layher SuperKlaxTower. Instructions for Assembly and Use
Mobile access and working towers in accordance with: HD 1004; DIN 4422, Part 1 (Version 8/92) Working platform 2.8 x 2.8 m and 2.8 x 1.95 m Max. working height: in closed rooms 13.95 m, outdoors 10.0 m
More informationCOMPONENT SCHEDULE SINGLE WIDTH SPAN TOWERS WITH LADDER FRAMES TO BSEN RUNG STARTER FRAMES
COMPONENT SCHEDULE SINGLE WIDTH SPAN TOWERS WITH LADDER S TO BSEN 1004-2004 STARTER S PLATFORM HEIGHT METRIC 2.4 2.9 3.4 3.9 4.4 4.9 5.4 5.9 6.4 6.9 7.4 7.9 DESCRIPTION IMPERIAL 7 10 9 6 11 2 12 10 14
More informationPROFESSIONAL ROLLING TOWER SYSTEMS
Relax. It s an Altrex. ROLLING TOWER SYSTEMS Rolling tower Folding frame Relax. It s an Altrex. Working at height has several risks. Choosing Altrex is choosing safety, quality and durability. Altrex access
More informationALBLItZ 70 S INSTRUCTION FOR ERECTION AND USE
ALBLItZ 70 S INSTRUCTION FOR ERECTION AND USE Approval No. Z-8.1-864 Standard Version (as of ) C O N T E N T S 1. General...1 2. Erecting the scaffold...3 2.1 General requirements...3 2.2 Erecting the
More informationSpeedyScaf System. Layher SpeedyScaf System. Catalogue Edition Quality management certified according to ISO 9001:2008 by German TÜV-CERT
C o m p l e t e. Quality management certified according to ISO 9001:2008 by German TÜV-CERT S a f e. 8102.253 Q u i c k. Catalogue Edition 01.04.2012 SpeedyScaf System Layher SpeedyScaf System u Contents
More informationIndustrial Aluminium Towers
Industrial Aluminium Towers SINGLE WIDTH LADDERSPAN & VERTICAL LADDER ERECTION MANUAL HORIZONTAL BRACE 1.8m (2040) 2.7m (2041) REVISED EDITION TOE BOARD 1.8m (2065) 2.7m (2067) LADDERSPAN TRAP PLATFORM
More informationRolling Towers. Layher Rolling Towers Uni Wide. Safety Structure Instructions for Assembly and Use. Mobile working platforms to DIN EN 1004:
Layher Rolling Towers Uni Wide Safety Structure Instructions for Assembly and Use Mobile working platforms to DIN EN 1004:2005-03 Working platform 1.5 x 2.85 m Rolling Towers max. working height: indoors
More informationUSER S MANUAL HAKI COMPACT STAIR TOWER
USER S MANUAL HAKI COMPACT STAIR TOWER HAKI AB 2018 Important information HAKI s product liability and user s manuals apply only to scaffolds that are entirely composed of components that have been made
More informationUSER S Manual. HAKI Bridge System (HBS)
USER S Manual HAKI Bridge System (HBS) HAKI AB 2018 Important information HAKI s product liability and user s manuals apply only to scaffolds that are entirely composed of components that have been made
More informationCLIMA 3T. Mobile Aluminium Tower with Climbing Frame 1450/850 3T - Through the Trapdoor Method USER GUIDE
CLIMA 3T Mobile Aluminium Tower with Climbing Frame 1450/850 3T - Through the Trapdoor Method USER GUIDE Safety First Mobile Towers - 3T Method Introduction Please read this user guide carefully. Please
More informationPERI UP Easy * The lightweight and fast frame scaffold for safe working on facades
PERI UP Easy * The lightweight and fast frame scaffold for safe working on facades Product Brochure * If approval is required for the scaffolding system PERI UP Easy to be placed on the market in a country,
More informationRolling Towers. Layher Uni Light Tower Instructions for Assembly and Use. Mobile working platforms according to DIN EN 1004:
Instructions for ssembly and Use Mobile working platforms according to DIN EN 00:00-03 Working platform 0.7 x.8 m max. working height: indoors.3 m outdoors.3 m Rolling Towers Load bearing capacity.0 kn/m
More informationCLIMA AGR. Mobile Aluminium Tower with Climbing Frames 1450/850 Camlock Advanced Guardrail USER GUIDE
CLIMA AGR Mobile Aluminium Tower with Climbing Frames 1450/850 Camlock Advanced Guardrail USER GUIDE Contents Safety First Safety Checklist Quantity Schedules Assembly and Dismantling Procedure Toe Boards
More informationLADDERSPAN 3T USER GUIDE. Mobile Aluminium Tower 1450/850 Ladderspan. 3T - Through the Trapdoor Method
LADDERSPAN 3T Mobile Aluminium Tower 1450/850 Ladderspan 3T - Through the Trapdoor Method USER GUIDE Safety First Mobile Towers - 3T Method INTRODUCTION Please read this user guide carefully. Please note
More informationLADDERSPAN AGR. BoSS Camlock Advance Guardrail Mobile Aluminium Tower 1450/850 Frames USER GUIDE
LADDERSPAN AGR BoSS Camlock Advance Guardrail Mobile Aluminium Tower 1450/850 Frames USER GUIDE Contents Safety First Safety Checklist Quantity Schedules Assembly and Dismantling Procedure Toe Boards Stabilisers
More informationIndustrial Aluminium Towers
HORIZONTAL 1.8m (2040) 2.7m (2041) TOE BOARD 1.8m (2066) 2.7m (2068) Industrial Aluminium Towers DOUBLE WIDTH SPAN & VERTICAL ASSEMBLY GUIDE TO BS-EN 1004-2004 Using the 3T (Through the Trap ) Assembly
More informationMK SYSTEM. // Pieces that can be easily assembled with minimal tools. Numerous configurations with standard components
MK SYSTEM Numerous configurations with standard components // Pieces that can be easily assembled with minimal tools // Table of contents Product description MK Systems Basic components MK SYSTEM product
More informationAllround Scaffolding. Layher Allround Bridging System Instructions for Assembly and Use. Modular truss system for wide spans
Layher Allround Bridging System Instructions for Assembly and Use Modular truss system for wide spans Certification according to DIN ISO 9001/EN 29 001 by TÜV-CERT Allround Scaffolding } CONTENT 1. Introduction...3
More informationPRODUCT MANUAL
toronto 2800 Skymark Ave, Ste, 203 Mississauga, ON L4W 5A6 [T] 416 783 70 Edmonton 12900-148TH Street, Edmonton, AB T5L 2H8 [T] 780 747 1670 hamilton 1620 Claybar Road, Ancaster, ON L9G 3L4 [T] 905 692
More informationIndustrial Aluminium Towers
Industrial Aluminium Towers SINGLE WIDTH LADDERSPAN & VERTICAL LADDER ASSEMBLY GUIDE TO BS-EN 1004-2004 Using 2 rung frames (Recommended) Using Guardrail frames HORIZONTAL BRACE 1.8m (2040) 2.7m (2041)
More informationCLIMA 3T. Mobile Aluminium Tower with Climbing Frame 1450/850 3T - Through the Trapdoor Method USER GUIDE
CLIMA 3T Mobile Aluminium Tower with Climbing Frame 1450/850 3T - Through the Trapdoor Method USER GUIDE Safety First Mobile Towers - 3T Method INTRODUCTION Please read this Userguide carefully. Please
More informationROOM-MATE. 3T - Through the Trapdoor USER GUIDE
ROOM-MATE 3T - Through the Trapdoor USER GUIDE Safety First Introduction Please read this user guide carefully. Please note that diagrams are for illustrative purposes only. User guides are also available
More informationAllround Scaffolding System
Quality management certified according to ISO 9001:2008 by German TÜV-CERT L i m i t l e s s. S t r o n g. 8116.221 I n g e n i o u s. Catalogue Edition 01.04.2012 Allround Scaffolding System Layher Allround
More informationMOBILE ACCESS TOWER INSTRUCTION MANUAL SHALLOW BRACE. Incorporating the 3T method of assembly
MOBILE ACCESS TOWER Incorporating the 3T method of assembly SHALLOW BRACE INSTRUCTION MANUAL 2 INTRODUCTION This instruction manual contains all the information required to correctly assemble the OCTO
More informationConfiguration. User Guide. Version: Copyright 2017 Computer and Design Services Ltd GLOBAL CONSTRUCTION SOFTWARE AND SERVICES
Configuration User Guide Version: 2018.0 Copyright 2017 Computer and Design Services Ltd GLOBAL CONSTRUCTION SOFTWARE AND SERVICES Contents Introduction... 1 Create a new project... 2 Open the configuration...
More informationMobile Towers - 3T Method
Safety First Safety First INTRODUCTION SAFE USE Mobile Towers - 3T Method Please read this guide carefully. Please note that diagrams are for illustrative purposes only. User guides are also available
More informationSOUTH AFRICAN NATIONAL STANDARD
ICS 91.220 ISBN 0-626-15672-6 SOUTH AFRICAN NATIONAL STANDARD The design, erection, use and inspection of access scaffolding Part 1: Steel access scaffolding Published by Standards South Africa 1 dr lategan
More informationUSER S MANUAL HAKI UNIVERSAL
USER S MANUAL HAKI UNIVERSAL International version HAKI AB 2015 Important information HAKI s product liability and user s manuals apply only to scaffolds that are entirely composed of components that have
More informationGRIDFLEX The flexible slab formwork with safe accessible grid elements
GRIDFLEX The flexible slab formwork with safe accessible grid elements 07044 Edition 04 2011 PERI GmbH Formwork Scaffolding Engineering P.O. Box 1264 89259 Weissenhorn Germany Tel +49 (0)7309.950-0 Fax
More informationBrochure All Solutions at a Glance. All Solutions. All Solutions at a Glance. v2013/10en
Brochure All Solutions at a Glance All Solutions All Solutions at a Glance v2013/10en Scaffolding, formwork, and shoring There s always a solution 02 The product range at Scafom-rux is extensive, very
More informationUSER S manual HAKI UNIVERSAL. International version
USER S manual HAKI UNIVERSAL International version HAKI AB 2014 Important information HAKI s product liability and erection instructions apply only to scaffolds that are entirely composed of components
More informationLAYHER EVENT SYSTEMS CATALOGUE
LAYHER EVENT SYSTEMS CATALOGUE Edition 04.2015 Ref. No. 8111.227 Quality management certified according to ISO 9001:2008 by German TÜV-CERT Layher QUALITY MADE BY LAYHER Headquarters in Eibensbach Plant
More informationUSER S MANUAL. HAKI Loading Tower
USER S MANUAL HAKI Loading Tower HAKI AB 2018 Important information HAKI s product liability and user s manuals apply only to scaffolds that are entirely composed of components that have been made and
More informationCusters. Camino CHIMNEY SCAFFOLDING ASSEMBLY AND USER S INSTRUCTIONS. Nov. 2003
ASSEMBLY AND USER S INSTRUCTIONS Custers Camino CHIMNEY SCAFFOLDING 9505.903.001 ENG / (9505.202.015/016) Nov. 2003 CUSTERS HYDRAULICA B.V. Smakterweg 33, 5804 AE VENRAY NL Telephone : +31 (0) 478 55 30
More informationSCAFFOLDING PROCEDURE
SCAFFOLDING PROCEDURE 1 Table of Contents 1 PURPOSE... 3 2 PROGRAM COMPLIANCE... 3 3 SCOPE... 3 4 DEFINITIONS... 3 5 RESPONSIBILITES... 4 6 SCAFFOLD INSPECTION... 5 7 SCAFFOLD USE... 5 8 SCAFFOLD REQUIREMENTS...
More informationK stage System Scaffold
K stage System Scaffold Product Manual Coronet Group Suzhou Co.,Lt Email : Coronet@coronet scaffold.com TEL :+86 512 85557000 400 770 9995 FAX :+86 512 85557111 Addres:#1505 SIFC,SIP,SUZHOU,CHINA Coronet
More informationLAYHER SPEEDYSCAF SYSTEM CATALOGUE
LAYHER SPEEDYSCAF SYSTEM CATALOGUE Edition 04.2013 8102.254 Quality management certified according to ISO 9001:2008 by German TÜV-CERT Layher QUALITY MADE BY LAYHER // Main plant in Eibensbach // Plant
More informationT-60 Shoring Robust shoring
T-60 Shoring Robust shoring // Fast assembled heavy-duty falsework // Table of content Features Benefits Solutions Basic components 2 3 4 7 // Features Solution for shoring requirements in Building Construction
More informationBASIC SCAFFOLDING KNOWLEDGE QUESTIONS
Garnsworthy Square 46, 62 & 64 Garnsworthy St Springvale rth Victoria 3171 Updated on 22/02/08 STC105 Name BASIC SCAFFOLDING KNOWLEDGE QUESTIONS THE PROFESSIONAL Scaffold Tools Scaffold Belts Couplers
More informationBoSS Climalite Camera and lighting tower
Contents Safety First Safety First Quantity Schedules Toeboard 2 9 13 33 INTRODUCTION Please read this guide carefully. Please note that diagrams are for illustrative purposes only. User guides are also
More informationBoSS. Mobile Aluminium Tower 1450/850 Ladderspan. 3T - Through the Trapdoor Method
BoSS Mobile Aluminium Tower 1450/850 Ladderspan 3T - Through the Trapdoor Method USER GUIDE Edition November 2011 Safety First Mobile Towers - 3T Method INTRODUCTION Please read this guide carefully. Please
More informationSafety First Mobile Towers - 3T Method INTRODUCTION
Safety First Mobile Towers - 3T Method INTRODUCTION Safety First SAFE USE BoSS Mobile Aluminium Tower 1450/850 Ladderspan 3T - Through the Trapdoor Method Please read this guide carefully. Please note
More information3T - Through The Trapdoor Method
ALTO MEDIUM DUTY STAIRWELL TOWER Aluminium Access Tower ISSUE 3 Instruction Manual EN 1298-IM-EN The ALTO MD Stairwell Tower 3T - Through The Trapdoor Method Lakeside Industries Ltd www.altoaccess.com
More informationJuly Climbing Scaffold with retractable formwork Instructions for erection and use
July 2008 Climbing Scaffold with retractable formwork Instructions for erection and use Contents Page Important remarks 2 Product features 2 Overview of climbing system Components 4 11 Assembly 25 Climbing
More informationMOBILE SCAFFOLDINGS MP-126 MP-102 MP-127 MP-103
3 MP-126 Supporting frame: 2.00 x 1.50 m Weight: 13.25 kg Vertical supporting aluminium frame 1.50 m wide and 2.00 m high for attachment of platform and braces. Antislip rungs of finned surface provide
More informationDeck Design Guide. 67 Sharp Road, Brighton, Ontario P.O. Box 189 K0K 1H0 Tel: Fax: Web:
Deck Design Guide The Municipality of Brighton 67 Sharp Road, Brighton, Ontario P.O. Box 189 K0K 1H0 Tel: 613-475-1162 Fax: 613-475-3453 Web: www.brighton.ca This guide is for informational purposes only.
More informationRAPID Column Formwork For the highest requirements on concrete surfaces and edge formation. Product Brochure Issue 10/2017
For the highest requirements on concrete surfaces and edge formation Product Brochure Issue 10/2017 Content System advantages 5 For the highest requirements on concrete surfaces and edge formation 8 For
More informationAssembly and Usage Instructions Z 600 S-PLUS mobile scaffold tower with stabilisers Z 600 S-PLUS folding scaffold unit COMPACT
09/2016 No. 291358 en Assembly and Usage Instructions Z 600 S-PLUS mobile scaffold tower with stabilisers Z 600 S-PLUS folding scaffold unit COMPACT 2 Contents en 1 General information... 4 1.1 Introduction...4
More informationSafety First Mobile Towers - 3T Method INTRODUCTION. Please read this guide carefully. Please note that diagrams are for illustrative purposes only.
BoSS Mobile Aluminium Tower 0/80 Ladderspan T - Through the Trapdoor Method Safety First Mobile Towers - T Method INTRODUCTION Please read this guide carefully. Please note that diagrams are for illustrative
More informationConstruction Safety Education Forum. 6 March Scaffolding. Dimitri Barlas, State Coordinator Construction Work Health and Safety Division DRAFT
Construction Safety Education Forum 6 March 2013 Scaffolding Dimitri Barlas, State Coordinator Construction Work Health and Safety Division DRAFT SRWSD in confidence 1 Presentation Outline Introduction
More informationBoSS Clima USER GUIDE. Mobile Aluminium Tower with Climbing Frame 1450/850. 3T - Through the Trapdoor Method
BoSS Clima Mobile Aluminium Tower with Climbing Frame 1450/850 3T - Through the Trapdoor Method USER GUIDE Edition April 2009 Safety First Mobile Towers - 3T Method INTRODUCTION Please read this guide
More informationFALSEWORK SOLUTIONS: SLAB SHORING SYSTEM - ROYALFRAME50 SERIES
ROYALFRAME50 SLAB SHORING SYSTEM ROYAL FRAME 50 ROYALframe50 is a lightweight, improved alternate formwork shoring frame. It has galvanised tube legs, each with a 51mm outside diameter and a safe work
More informationHEAVY DUTY ALUMINIUM MOBILE TOWERS. PLATFORM SIZE (Length x Width)
Product Guide Introduction Lightweight yet heavy duty (675kg) aluminium scaffolding reshaping the way you build. Versatile, safer and stronger scaffolding gives you the fortitude and stability you need
More informationPORTABLE LADDER SAFETY
LADDER AND SCAFFOLD SAFETY PLAN Ladder & Scaffold Safety Falls can result in serious injury or death. Falls from a higher elevation account for approximately 10% of workplace fatalities and 5.2% of nonfatal
More informationMobile Tower 3T Method (Through The Trapdoor) Please read this guide carefully. Please note that diagrams are for illustrative purposes only.
Mobile Tower 3T Method (Through The Trapdoor) INTRODUCTION Please read this guide carefully. Please note that diagrams are for illustrative purposes only. LOYAL mobile aluminium towers are light-weight
More informationDoor Type Light Weight Frame System
2442 7002 SCAFFORM Door Type Light Weight Frame System Door Frame LF2112 LF1912 LF1712 LF1512 LF2209 LF2109 LF2009 LF1909 LF1809 LF1709 LF2207 LF2107 LF1707 SIZE A SIZE B 2100 1930 1700 2200 2000 1930
More information2017 AT-PAC RINGLOCK SAFETY MANUAL & USER GUIDES UNITED KINGDOM
2017 AT-PAC RINGLOCK SAFETY MANUAL & USER GUIDES UNITED KINGDOM Table of Contents INTRODUCTION... 4 RINGLOCK QUALITY FACTORS... 5 DESIGNATION OF RINGLOCK... 5 SAFETY GUIDELINES AND SAFE USE... 6 NEVER...
More informationEXCEL MODULAR STANDARD SCAFFOLD COMPONENT TECHNICAL MANUAL
EXCEL MODULAR STANDARD SCAFFOLD COMPONENT TECHNICAL MANUAL EMSLC-TSM-1001 Engineering Approval: Lance Smith Manual Release Date: 04/25/2017 Release Authorization: ECN EMSLC-0191 Revision: AK TABLE OF
More informationTubes & Couplers Scaffolding
Introduction Scaffold couplers are essentially the fundamental component that is used to assemble tube-and-coupler scaffolding. Tube-and-coupler scaffolding is defined as 'a scaffold in which individual
More informationMAXIMO MXH Heated Formwork The cost-effective solution for concreting operations at low temperatures. Product brochure
MAXIMO MXH Heated Formwork The cost-effective solution for concreting operations at low temperatures Product brochure Product advantages MAXIMO MXH Heated Formwork The cost-effective solution for concreting
More informationMiniMax USER GUIDE. Mobile Aluminium Trade Quality Access Tower System. 3T - Through The Trapdoor Method
MiniMax Mobile Aluminium Trade Quality Access Tower System 3T - Through The Trapdoor Method USER GUIDE Contents Safety First Component Diagram Component Quantity & Safety Data Schedule Build Method Pre-use
More informationENGINEERING INFORMATION
ENGINEERING DATA ENGINEERING INFORMATION CONFIGURATION DESCRIPTION Bending Moment Test -- Rotational load applied to Ledger, secured to Rosette with Wedge SAFE WORKING LOAD (F.S. = 4:1) 6,154 lb-in Vertical
More informationMARCEGAGLIA. steel building the world
MARCEGAGLIA steel building the world 1 Marcegaglia is a worldwide leading industrial group in the steel processing sector, with a yearly output of 5 million tons. With a specific know-how in the building
More informationINSTRUCTIONmanual. BoSS COMPACT SIDE CANTILEVER TOWER SCAFFOLD 3T Method - Through the Trap Door
INSTRUCTIONmanual BoSS COMPACT SIDE CANTILEVER TOWER SCAFFOLD 3T Method - Through the Trap Door Drawn: 26/02/2018 Issue: E Page: 2 OF 21 CONTENTS Safety First Component Diagram Component Quantities & Safety
More information