STRESS TESTS ACTION PLAN LEONTI CHALOYAN DEPUTY CHIEF ENGINEER ON MODERNIZATION
|
|
- Lawrence Tucker
- 5 years ago
- Views:
Transcription
1 STRESS TESTS ACTION PLAN LEONTI CHALOYAN DEPUTY CHIEF ENGINEER ON MODERNIZATION VIENNA MARCH 27-29,
2 ANPP * The ANPP is located in the western part of Ararat valley, 30 km west of Yerevan, close to Metsamor town 2
3 The ANPP consists of two WWER-440 (V-270) power units, seismically upgraded V-230 models Unit 1 was commissioned in 1976 and Unit 2 in 1980, respectively Units 1 and 2 were shutdown in1989, February and March correspondingly In 1993 the Government of Armenia made a decision on restart of the ANPP Unit 2 Unit 2 was connected into power grid in 1995 Unit 1 remains in long-term shutdown The design lifetime of Unit 2 expired in September On April 19, 2012, the Government of Armenia adopted a Decision on the ANPP Unit 2 lifetime extension Decision is taken to built new nuclear unit at the same site 3
4 40% 18% 42% Thermal (gas) Nuclear Hydro 4
5 Due to the known objective reasons, the construction of a new NPP in Armenia may be launched no earlier than Usually the duration of such facilities construction is around 6-7 years, i.e., the commissioning of the ANPP's replacing capacity is not expected before In this situation, in order to refrain from repetition of the energy crisis, on April 2012, the Government of Armenia adopted a Decision on the ANPP Unit 2 lifetime extension. 5
6 In 2012 the ANPP submitted to ANRA a request for Life Time Extension (LTE), and ANRA issued requirements for LTE (Governmental Decree N1085-N). The first stage of the LTE process, i.e., a feasibility study and the ANPP complex investigation process, started in The summary assessment of the current technical condition of the irreplaceable components and their residual life, as well as the ANPP Unit 2 safety condition, didn t reveal fundamentally insolvable problems which would prevent the decision-making on the ANPP Unit 2 lifetime extension outside its design life. In regard to the scheduled activities and availability of safety upgrading programs, ensuring the required safety of the ANPP Unit 2 outside its design life seems to be quite realistic. 6
7 An agreement was reached with the Regulatory Authority for the following: Temporary permissions will be granted for operation in the period from 2016 to May Temporary permissions will be granted for operation in the period from June 2017 to June An updated SAR complying with current requirements of the Government Decree N2013-N will be submitted to ANRA in The final decision on license for operation is planned to be issued by ANRA in the beginning of
8
9 In August 2015, ANRA submitted to the EC s Directorate- General for Energy its NR for the EU PR. The Revision 1 of this NR National Report Stress Test for Armenian Nuclear Power Plant issued on 17/03/2016 has been the basis for the PR. EU PRT was established by EC, based on ENSREG Members proposals on 02 March 2016 The country visit of the PRT (Country Review) to Armenia took place from 20 to 24 June
10 Based on the stress test results, the following conclusions were made: The minimum value of HCLPF, determined on the basis of the results of the SSEL complete scope review, constitutes 0,57g. The minimum level of seismic resistance for the ANPP structures, ensuring the integrity of the confinement is ~ 0,74g. This value corresponds to reinforcement of the pipeline penetrations from the confinement. 10
11 Based on the stress test results, the following conclusions were made: The flooding of ANPP site due to external natural phenomena is not possible. The flooding of DGS basement area can be considered as the main hazard during the heavy rainfalls. The probability of any serious consequences during heavy rainfall is negligibly low. The analysis revealed that the plant has some weak points and the implementation of measures to increase the robustness is desirable. 11
12 Based on the stress test results, the following conclusions were made: The ANPP project did not consider all possible natural phenomena as it required by modern standards ( tornados, dusty storms). The standard values of characteristics of weather conditions considered in the design ensure the plant operation under extreme weather conditions during wind load, snow load, high temperature, low temperature. From additionally (related to the project) considered natural phenomena the dusty storm combined with strong wind can create a threat. There is no analysis of influence of tornado on the plant 12
13 The ANPP design has a number of provisions aimed at prevention of the core damage in case of loss of electric power and loss of ultimate heat sink. All these provisions ensure time margins for recovery actions. Failures of these provisions represent potential cliff-edges, which could result in irreversible core damage. All available options either for loss of power supply or loss of ultimate heat sink, or both are sufficiently described in the National Report. Despite the robustness of power plant design, some safety improvements are recommended. 13
14 Despite of various programs of international aid and support, the progress in SAM program development and implementation is quite slow and delayed in respect to the original schedules. In respect to SAM the current level of safety of the ANPP is clearly lower than the EU average. However, this level will be increased in near term due to the introduction of SAMGs expected in The ANPP employed general WESTINGAUSE Owner Group (WOG) methodology for the SAMG development. Only in the mid-term, with the implementation of the activities pursuant to "Stress Tests" recommendations, the ANPP can reach an acceptable level. 14
15 The improvements implemented "post-fukushima" at the Armenian NPP were aimed to address three challenges: 1. Protections of the unit lower (basement) rooms against flooding due to damage of water containing vessels and pipelines. 2. Provision with emergency reserve of cooling water. 3. Upgrading the reliability of the first and second category emergency power supply systems. 15
16 To prevent the EDGS flooding, an opening of 0,5m height, 50m length was made on the outlet channel wall ensuring water removal from the EDGS in case of the channel overfill; The basement rooms of diesel generator station were fenced to prevent penetration of water in the basement rooms from outside; The basement rooms of diesel generator station were equipped with the water detection alarm, movable pumps for water pumping out, and the procedures on personnel actions in irregular situations were reviewed; At the minus elevations of the turbine hall the doors to the boron rooms of the Units 1 and 2 have been bricked-up; Check valves have been installed on the drainage pipelines to prevent water flow from the turbine hall to the cable tunnels. 16
17 A circuit have been installed for the Essential Consumers Cooling System ponds makeup by diesel pumps from the outlet circulating channel; Seismic enforcements were performed for pipelines and specific components of the Unit 1 storage pool cooling system; Three wells were drilled and additional cooling water system has been installed. It is planned to drill six more wells in 2017; The Demineralized Water Storage Tanks make-up circuit with fire trucks has been installed. 17
18 Seismic enforcement of the diesel fuel emergency reserve tanks ensuring the DG operation more than 72 hours; Load of the direct current system accumulator battery have been decreased (approximately for 30%), and a temporary arrangement have been implemented (until mobile DG is procured) for recharge of accumulator batteries from a separate DG used for make-up of the physical protection system. 18
19 Identification of the SSC required strengthening using the Seismic PSA The seismic PSA was developed by the Bulgarian company Risk Engineering within the EC assistance program. Implementation of Emergency gas removal system The design is developed. The remaining issues will be solved within the LTO program. The ANPP plans to install the system and implement it in the period of Seismic margin evaluation of the fire extinguishing system and issue the recommendations. Contract is concluded with TsKTI VIBROSEISM, Russia Seismic upgrading of the I&C equipment and seismic monitoring system: Reactor Protection Seismic Protection and Monitoring The high priority activity is included in the tender specification for new OSA. 19
20 Implementation of the technical solution in order to avoid damage of the DG building window in case of extreme wind conditions. Will be implemented in Review of the PSA level 1 taking into account the following: Description and justification of extreme natural phenomena; Justified choice of combinations of different natural factors; Meteorological characteristics for different frequencies of excess; Possible impact of tornado. Implementation is planned for Study of the need of filtering devices on air inlets of diesel generators. Implementation is included in the new OSA activity program for
21 Review of the existing symptom-based operating procedures. Develop personnel training programs. Under implementation in the framework of US DOE assistance program. Documentation package is submitted to the Regulatory Authority for consideration. Performance of analyses of the Units 1&2 SFP cooling and implementation of additional measures based on the performed analyses. Completed analyses of options for implementation. Implementation is planned for Implementation of logics (systems) of water supply to primary circuit, Unit 1&2 SFP s, SGs 1-6, DWSTs 1-4 from alternative water sources. Completed analyses of options for implementation. Implementation is planned for
22 Replacement of all reversible motor generators with inverters. To be implemented in 2018 in the framework of LTO program. Purchase of autonomous alternative power supply sources. Implementation is planned for Purchase of autonomous alternative means (Boron injection, SG make-up, SFP 1&2 cooling, ESWS and DWST 1-4 water supply). Analyses and relevant calculations were performed in the framework of OSA program. Characteristics of required equipment were specified. Implementation is planned for
23 Analysis of MCP shaft sealing. Assure MCP seals long-term (more than 24 hours) operation in case of cooling failure. Implementation is planned for Development of a full set of severe accident management guidelines. Under implementation in the framework of US DOE assistance program. Implementation is planned for Modernization of Emergency Core Cooling System. To be implemented in 2019 in the framework of LTO program. Design activities are under implementation Modernization of the spray system. To be implemented in 2018 in the framework of LTO program. Design activities are under implementation 23
24 Improvement of containment tightness. The activities will be performed in the framework of EC assistance АР17 program. Measuring of hydrogen concentration in containment. Under implementation in the framework of US DOE assistance program. Implementation is planned for Installation of afterburners and passive autocatalytic hydrogen recombines. Implementation is planned for Detailed analysis of possible hydrogen accumulation in rooms outside the containment. Implementation is planned for
25 Perform detailed safety margin assessment in terms of rainfall flooding of the ANPP site and calculations aimed to prove that protection measures are enough to prevent mudflows impact on the ANPP systems. Implementation is planned for It is recommended to implement detailed analysis for lightning impact on the ANPP. Implementation is planned for During the "cold" shutdown and refueling the DGLS (Diesel Generator Load Sequencer) program is not foreseen. Implement DGLS program for "cold" shutdown and refueling modes. Implementation is planned for
26 Development of the ANPP Unit 2 seismic safety evaluation program for new design-basis earthquake level (DBE) = 0.42g. The program will be developed in Analysis and assessment of the ANPP Unit 2 volcanic hazard for those volcanic effects for which the protection is possible (according to SSG-21): ballistic projectiles tephra fallout It is expected to implement recommendations in Seismic reassessment of the Stand-by DGES structure components. The activity will be implemented in Seismic assessment of the fire trucks garage building and issue of recommendations. The activity will be implemented in
27
DESIGN AND SAFETY PRINCIPLES LEONTI CHALOYAN DEPUTY CHIEF ENGINEER ON MODERNIZATION
DESIGN AND SAFETY PRINCIPLES LEONTI CHALOYAN DEPUTY CHIEF ENGINEER ON MODERNIZATION VIENNA OKTOBER 3-6, 2016 1 ANPP * ANPP is located in the western part of Ararat valley 30 km west of Yerevan close to
More information6-9. June 2017, Paks Gábor Volent director of safety and security. Severe accident management at Paks NPP
6-9. June 2017, Paks Gábor Volent director of safety and security Severe accident management at Paks NPP The MVM Paks Nuclear Power Plant the only nuclear power plant in Hungary belongs to the MVM Hungarian
More informationStress tests specifications Proposal by the WENRA Task Force 21 April 2011
Stress tests specifications Proposal by the WENRA Task Force 21 April 2011 Introduction Considering the accident at the Fukushima nuclear power plant in Japan, the Council of the European Union declared
More informationAnswers to Questions on the National Report
Status of the National Action Plan at the Paks NPP in Hungary on the implementation actions decided upon lessons learned from Fukushima Daiichi accident Answers to Questions on the National Report András
More informationPOST-FUKUSHIMA STRESS TESTS OF EUROPEAN NUCLEAR POWER PLANTS CONTENTS AND FORMAT OF NATIONAL REPORTS
HLG_p(2011-16)_85 POST-FUKUSHIMA STRESS TESTS OF EUROPEAN NUCLEAR POWER PLANTS CONTENTS AND FORMAT OF NATIONAL REPORTS This document is intended to provide guidance for the European Nuclear Regulators
More informationNational Action Plan
NATIONAL ACTION PLAN Page 1/45 EUROPEAN STRESS TESTS Kozloduy NPP National Action Plan of Bulgaria Nuclear Regulatory Agency January 2014 NATIONAL ACTION PLAN Page 2/45 INTRODUCTION...4 PART І...8 TOPIC
More informationFinal 14 TH September Stress test peer review Follow-up fact finding site visit. Germany
Final 14 TH September 11.30 Stress test peer review Follow-up fact finding site visit Germany 1. BACKGROUND/INTRODUCTION In the context of the ENSREG action plan to follow-up the implementation of safety
More informationUpdated National Action Plan of
EUROPEAN STRESS TESTS Kozloduy NPP Updated National Action Plan of the Republic of Bulgaria following the accident at the Fukushima NPP Nuclear Regulatory Agency December 2014 C:\USERS\JOHN\DESKTOP\UNAP_FINAL4.DOC
More informationSAM strategy&modifications and SA simulator at Paks NPP
Technical Meeting on Verification and Validation of SAMGs for Nuclear Power Plants 12-14 December 2016, Vienna, Austria SAM strategy&modifications and SA simulator at Paks NPP Éva Tóth Group Leader Safety
More informationWolsong-1 Stress Test
PHWR Safety 2014/CANSAS-2014 Wolsong-1 Stress Test June 23, 2014 Geun-Sun Auh Korea Institute of Nuclear Safety Table of Contents 1. Stress Test Definition 2. EU Stress Test 3. Stress Test of Korea 4.
More informationINPRO Criterion Robustness of Design Position of the EPR TM reactor Part 3. Franck Lignini Reactor & Services / Safety & Licensing
INPRO Criterion 1.1.1 Robustness of Design Position of the EPR TM reactor Part 3 Franck Lignini Reactor & Services / Safety & Licensing 0 E.P?.?.?.? Robustness against External Hazards 1 External Hazards
More informationImprovements on French Nuclear Power Plants Taking Into Account the Fukushima Accidents
Improvements on French Nuclear Power Plants Taking Into Account the Fukushima Accidents Jean BARBAUD IAEA, August 2013 1 1 Context - Timeline 6 fields assessed : Earthquake Flooding Loss of heat sink LHS
More informationNational Action Plan
NATIONAL ACTION PLAN Page 1/38 EUROPEAN STRESS TESTS Kozloduy NPP National Action Plan of Bulgaria Nuclear Regulatory Agency December 2012 NATIONAL ACTION PLAN Page 2/38 INTRODUCTION...4 PART І...7 TOPIC
More informationMeetings for Sharing International Knowledge and Experience on Stress Tests
Meetings for Sharing International Knowledge and Experience on Stress Tests Presented by: Peter Hughes, Ovidiu Coman, Javier Yllera Department of Nuclear Safety and Security Division of Nuclear Installation
More informationCompilation of recommendations and suggestions
Post- Fukushima accident Compilation of recommendations and suggestions Peer review of stress tests performed on European nuclear power plants 26/07/2012 Compilation of Recommendations and Suggestions
More informationImplementation of Lessons Learned from Fukushima Accident in CANDU Technology
e-doc 4395709 Implementation of Lessons Learned from Fukushima Accident in CANDU Technology Greg Rzentkowski Director General, Power Reactor Regulation Canadian Nuclear Safety Commission on behalf of CANDU
More informationImprovements in defense in depth on French NPPs following Fukushima Accidents
Improvements in defense in depth on French NPPs following Fukushima Accidents Xavier Pouget-Abadie Jean BARBAUD IAEA, October 2013 1 Copyright EDF 2013 1 Context -Timeline 6 fields assessed : Earthquake
More informationEU Peer Review Report of the Armenian Stress Tests. EU Peer Review Report of the Armenia Stress Tests
EU Peer Review Report of the Armenia Stress Tests June 2016 1 Contents 1 INTRODUCTION and BACKGROUND...4 2 EU STRESS TESTS AND FOLLOW-UP...5 2.1 Mandate... 5 2.2 Methodology... 5 2.3 Invitation to neighbouring
More informationRegulatory Actions and Follow up Measures against Fukushima Accident in Korea
Int Conference on Effective Nuclear Regulatory Systems, April 9, 2013, Canada Regulatory Actions and Follow up Measures against Fukushima Accident in Korea Seon Ho SONG* Korea Institute of Nuclear Safety
More informationSAFARI-1 Safety Reassessment and Modifications in light of Fukushima Daiichi Accident
SAFARI-1 Safety Reassessment and Modifications in light of Fukushima Daiichi Accident Sammy Malaka NESCA, SAFARI-1 Research Reactor SOUTH AFRICA 18 th IGORR Conference and IAEA Workshop on Safety Reassessment
More informationEuropean level recommendations Sect. in NAcP 2 Generic recommendation for WENRA, Finland participates and follows the work.
Cross reference table of ENSREG and Extraordinary CNS recommendations and national actions 1(16) 2.1 European guidance on assessment of natural hazards and margins The peer review Board recommends that
More informationAccident Management Programme for Indian Pressurized Heavy Water Reactors Chander Mohan Bhatia Nuclear Power Corporation of India Limited
Accident Management Programme for Indian Pressurized Heavy Water Reactors Chander Mohan Bhatia Nuclear Power Corporation of India Limited cmbhatia@npcil.co.in Presentation Contents Indian nuclear power
More informationEletronuclear ( Brazil) Fukushima Response Plan
Eletronuclear ( Brazil) Fukushima Response Plan Edmundo Selvatici Site Manager Mario de Mello Ferreira Junior Manager, Materials Engineering Technical Meeting on Operational Experience with Implementation
More informationSUMMARY OF SE NNEGC ENERGOATOM PERFORMANCE IN POST-FUKUSHIMA PERIOD
МИНИСТЕРСТВО ЭНЕРГЕТИКИ И УГОЛЬНОЙ ПРОМЫШЛЕННОСТИ УКРАИНЫ НАЦИОНАЛЬНАЯ АТОМНАЯ ЭНЕРГОГЕНЕРИРУЮЩАЯ КОМПАНИЯ SUMMARY OF SE NNEGC ENERGOATOM PERFORMANCE IN POST-FUKUSHIMA PERIOD D.V. Biley Inspector General
More informationInternational Atomic Energy Agency. Impact of Extreme Events on Nuclear Facilities following Fukushima. Dr C H Shepherd Nuclear Safety Consultant, UK
Impact of Extreme Events on Nuclear Facilities following Fukushima by Dr C H Shepherd Nuclear Safety Consultant, UK CRA PSA/HFA Forum 8-9 September 2011, Warrington Contents of the Presentation IAEA views
More informationOverview of Fukushima accident. Nov. 9, 2011 Orland, Florida
Overview of Fukushima accident Nov. 9, 2011 Orland, Florida Nuclear Power Plants in Japan Japan Nuclear Japan Energy Nuclear Energy Safety Safety Organization Japan Atomic Industrial Forum, Inc. -Tohoku
More informationSYSTEMATIC AND DESIGN SAFETY IMPROVEMENTS OF NPPS IN CZECH REPUBLIC
SYSTEMATIC AND DESIGN SAFETY IMPROVEMENTS OF NPPS IN CZECH REPUBLIC 3.10.2016 ČEZ, a. s. Meeting at IAEA Vienna Overview of topics ČEZ nuclear fleet (basic features) Systematic measures targeted to improve
More informationDevelopment and use of SAMGs in the Krško NPP
REPUBLIC OF SLOVENIA Development and use of SAMGs in the Krško NPP Tomaž Nemec Slovenian Nuclear Safety Administration tomaz.nemec@gov.si IAEA TM on the Verification and Validation of SAMGs, Vienna, 12
More informationPost- Fukushima accident. Ukraine. Peer review country report. Stress tests performed on European nuclear power plants. Stress Test Peer Review Board
Post- Fukushima accident Ukraine Peer review country report Stress tests performed on European nuclear power plants Stress Test Peer Review Board 1 GENERAL QUALITY OF NATIONAL REPORT AND NATIONAL ASSESSMENTS...
More informationPost- Fukushima accident. Peer review country report. Czech Republic. Stress tests performed on European nuclear power plants
Post- Fukushima accident Czech Republic Peer review country report Stress tests performed on European nuclear power plants Stress Test Peer Review Board 1 GENERAL QUALITY OF NATIONAL REPORT AND NATIONAL
More informationFormat and Content of the Safety Analysis Report for Nuclear Power Plants - Core Set -
Format and Content of the Safety Analysis Report for Nuclear Power Plants - Core Set - 2013 Learning Objectives After going through this presentation the participants are expected to be familiar with:
More informationLessons Learned from Fukushima-Daiichi Accident (Safety Measures and PSA Utilization)
PSAM12 2013 Tokyo Lessons Learned from Fukushima-Daiichi Accident (Safety Measures and PSA Utilization) April 15, 2013 Akio Komori (Takafumi Anegewa) Tokyo Electric Power Company All Rights Reserved 2013The
More informationEuropean Nuclear Stress Test
European Nuclear Stress Test - Peer Review Process and Results - 9. St. Galler Energietagung Oskar Grözinger Symposium : The Fukushima accident and the future of nuclear energy in Europe Den Haag, 23.11.2012
More informationConvention on Nuclear Safety. National Report. Republic of Armenia
Convention on Nuclear Safety National Report of Republic of Armenia Prepared for Second CNS Extraordinary Meeting (August 2012) Yerevan, 2012 Contents Introduction... 3 1. External Events... 3 2. Design
More informationIndia s HWR Activities S.G.Ghadge Executive Director (Reactor Safety & Analysis) Nuclear Power Corporation of India Limited
India s HWR Activities S.G.Ghadge Executive Director (Reactor Safety & Analysis) Nuclear Power Corporation of India Limited 13 th Meeting of the Technical Working Group on Advanced Technologies for HWRs
More informationOVERVIEW ON FINAL STRESS TEST REPORT CERNAVODA NPP Dumitru DINA CEO Nuclearelectrica. 16 th of May 2012 Nuclear 2012 Pitesti, Romania
OVERVIEW ON FINAL STRESS TEST REPORT CERNAVODA NPP Dumitru DINA CEO Nuclearelectrica 16 th of May 2012 Nuclear 2012 Pitesti, Romania 1 PREAMBLE On 25 March, 2011, European Council decided that nuclear
More informationFrom the Accident at the Fukushima Daiichi NPS: Efforts to Improve Safety
From the Accident at the Fukushima Daiichi NPS: Efforts to Improve Safety Luc OURSEL President and CEO, AREVA Tokyo, April 19, 2012 Agenda Safety assessments in the EU and in France AREVA Safety of our
More informationIAEA International Conference on Topical Issues in Nuclear Installation Safety
IAEA International Conference on Topical Issues in Nuclear Installation Safety Guidance on the Implementation of Modifications to Mitigate Beyond Design Basis Accidents Fred Dermarkar Vice President Engineering
More informationPHWR Group of Countries Implementation of Lessons Learned from Fukushima Accident in CANDU Technology
Implementation of Lessons Learned from Fukushima Accident in CANDU Technology Greg Rzentkowski Director General Directorate of Power Reactor Regulation Canadian Nuclear Safety Commission on behalf of CANDU
More informationPost Fukushima actions in India. Mukesh Singhal, Chief Engineer, Reactor Safety & Analysis Directorate NPCIL
Post Fukushima actions in India Mukesh Singhal, Chief Engineer, Reactor Safety & Analysis Directorate NPCIL 14 th Meeting of IAEA-TWG on advance technologies, IAEA, Vienna, June 18-20, 2013 Presentation
More informationCNE Cernavoda Response to Fukushima Event/EU Stress Test Requirements
CNE Cernavoda Response to Fukushima Event/EU Stress Test Requirements Sorin Holostencu IAEA Technical Meeting on Operational Experience with Implementation of Post-Fukushima Actions in Nuclear Power Plants,
More informationUpdated National Action Plan upon Stress-Test Results
upon Stress-Test Results State Nuclear Regulatory Inspectorate of Ukraine Kyiv 2017 INTRODUCTION In June 2011, Ukraine joined the European initiative of conducting stress tests at nuclear power plants
More informationRussian regulatory approach to evaluation of passive systems used for specific BDBA S (SBO, loss of UHS) during safety review of NPP
Federal Environmental, Industrial and Nuclear Supervision Service Scientific and Engineering Centre for Nuclear and Radiation Safety Member of Russian regulatory approach to evaluation of passive systems
More informationIAEA-J4-TM TM for Evaluation of Design Safety
Canadian Nuclear Utility Principles for Beyond Design Basis Accidents IAEA-J4-TM-46463 TM for Evaluation of Design Safety Mark R Knutson P Eng. Director of Fukushima Projects Ontario Power Generation Overview
More informationEPR Safety in the post-fukushima context
EPR Safety in the post-fukushima context October 19 th 2011 Jürgen Wirkner, Peter Volkholz EPR safety approach An accident is a complex series of events: NEED THE MEANS TO REMAIN IN CONTROL OF THE SITUATION,
More informationActivities on Safety Improvement of Czech NPPs in Solution of Severe Accident Issues
Activities on Safety Improvement of Czech NPPs in Solution of Severe Accident Issues Jiří Duspiva ÚJV Řež, a. s. Division of Nuclear Safety and Reliability Dept. of Severe Accidents and Thermomechanics
More informationStructural Integrity and NDE Reliability II
Structural Integrity and NDE Reliability II NDE Experience and Lessons Learnt from Recent EU Projects Focused on Assistance to the Armenian NPP L. Horacek, Nuclear Research Institute, Czech Republic ABSTRACT
More informationSafety enhancement of NPPs in China after Fukushima Accident
Safety enhancement of NPPs in China after Fukushima Accident CHAI Guohan 29 June 2015, Brussels National Nuclear Safety Administration, P. R. China Current Development of Nuclear Power Mid of year 2015
More informationSwedish action plan. for nuclear power plants
Swedish action plan for nuclear power plants Response to ENSREG s request December 2012 Page 2 (48) Abstract Following the severe accidents which started in the Fukushima Dai-ichi nuclear power plant,
More informationRegulatory Review Aspects of Post-Fukushima Safety Enhancements in Indian NPPs
Regulatory Review Aspects of Post-Fukushima Safety Enhancements in Indian NPPs RAHUL PORWAL Atomic Energy Regulatory Board Mumbai, INDIA Outline Introduction AERB Safety Review Methodology Safety Observations
More informationEUROPEAN STRESS TESTS FOR NUCLEAR POWER PLANTS
EUROPEAN STRESS TESTS FOR NUCLEAR POWER PLANTS National Report of Bulgaria Nuclear Regulatory Agency December 2011 Table of Content INTRODUCTION...5 1. GENERAL DATA FOR KOZLODUY NPP...6 1.1 KOZLODUY NPP
More informationNATIONAL REPORT Stress Test for Armenian Nuclear Power Plant
NATIONAL REPORT Stress Test for Armenian Nuclear Power Plant Armenian Nuclear Regulatory Authority July 2015 Armenian Nuclear Regulatory Authority #4 Tigran Mets Yerevan 0010, Republic of Armenia Tel/fax:
More informationMonitoring of the EU Stress test improvement actions in neighbouring countries
Monitoring of the EU Stress test improvement actions in neighbouring countries Public Workshop: Five Years Fukushima, Thirty Years Chernobyl 26 th February 2016 Approach Review & monitoring of post Fukushima
More informationIbero-American Forum of Radiological and Nuclear Regulators, FORO. Complementary Safety Assessments of the Iberoamerican FORO Countries
Ibero-American Forum of Radiological and Nuclear Regulators, FORO IAEA Technical Meeting on EVALUATION OF NUCLEAR POWER PLANT DESIGN SAFETY IN THE AFTERMATH OF THE FUKUSHIMA DAIICHI ACCIDENT 26 29 August
More informationAP1000 European 16. Technical Specifications Design Control Document
16.3 Investment Protection 16.3.1 Investment Protection Short-term Availability Controls The importance of nonsafety-related systems, structures and components in the AP1000 has been evaluated. The evaluation
More information3 Steps Approach : KHNP s Implementation of Post Fukushima Actions. ST(Sung-Tae) Yang. General Manager Corporate Safety Department KHNP
3 Steps Approach : KHNP s Implementation of Post Fukushima Actions ST(Sung-Tae) Yang General Manager Corporate Safety Department KHNP Status of Nuclear Power Plants (As of Jan 2016) In Operation Under
More informationThe present report summarizes the progress made on the stress-tests action plan in the nuclear power plants of Doel and Tihange since 2011.
1 2 Executive Summary As a consequence of the accident that occurred on 11 March 2011 at the Japanese Fukushima- Daiichi nuclear power plant, a wide-scale targeted safety reassessment program was set up
More informationCNSC Fukushima Task Force Nuclear Power Plant Safety Review Criteria
CNSC Fukushima Task Force E-doc 3743877 July 2011 Executive Summary In response to the March 11, 2011 accident at the Fukushima Daiichi Nuclear Power Plant (NPP), the CNSC convened a Task Force to evaluate
More informationPreliminary Lessons Learned from the Fukushima Daiichi Accident for Advanced Nuclear Power Plant Technology Development
Preliminary Lessons Learned from the Fukushima Daiichi Accident for Advanced Nuclear Power Plant Technology Development A. Introduction The IAEA Report on Reactor and Spent Fuel Safety in the Light of
More informationPost- Fukushima accident. Belgium. Peer review country report. Stress tests performed on European nuclear power plants. Stress Test Peer Review Board
Post- Fukushima accident Belgium Peer review country report Stress tests performed on European nuclear power plants Stress Test Peer Review Board 1 GENERAL QUALITY OF NATIONAL REPORT AND NATIONAL ASSESSMENTS...
More informationTS1-5: Revision of NS-G-2.15 and Its Implementation for Verification and Validation of Severe Accident Management Guidelines
Technical Meeting on Verification and Validation of Severe Accident Management Guidelines for Nuclear Power Plants 12-14 December 2016, Vienna, Austria TS1-5: Revision of NS-G-2.15 and Its Implementation
More informationSTRESS TEST METHODOLOGY FOR NUCLEAR POWER PLANTS IN THE WAKE OF THE FUKUSHIMA ACCIDENT
STRESS TEST METHODOLOGY FOR NUCLEAR POWER PLANTS IN THE WAKE OF THE FUKUSHIMA ACCIDENT Frank Nuzzo IAEA Nuclear Power Engineering f.nuzzo@iaea.org ENSREG High Level Requirements Following the extreme events
More informationPost-Fukushima Actions in Korea
Post-Fukushima Actions in Korea IAEA TWG-LWR Vienna, June 18-20, 2013 Presented by Jong-Tae Seo 1. Impacts on National Energy Policy and NPP Plan 2. Actions Taken after Fukushima Accident 3. Findings and
More informationReport Regulatory Aspects of Passive Systems - A RHWG report for the attention of WENRA 01 June 2018
Report Regulatory Aspects of Passive Systems - A RHWG report for the attention of WENRA 01 June 2018 Table of Content - 00 Foreword 3 01 Introduction / Goal of the report 5 02 Scope of the Report 6 03
More informationELETRONUCLEAR s Response to the Fukushima Dai-ichi Nuclear Accident
s Response to the Fukushima Dai-ichi Nuclear Accident Rio de Janeiro, July 3 rd, 2012 Paulo Vieira First Actions Taken by Eletronuclear Establishment of a Corporate Working group Follow up of the event,
More informationImplementation of the EU stress test in European nuclear power plants
Implementation of the EU stress test in European nuclear power plants Dr. Cord-Henrich Lefhalm Nuclear Regulation and Licensing RWE Power AG Essen, Germany RWE Power 15.10.2012 PAGE 1 The Fukushima nuclear
More informationSeismic Margin Assessment for Nuclear Facilities of Kozloduy NPP
Proceedings of the 10 th International Conference on Nuclear Option in Countries with Small and Medium Electricity Grids Zadar, Croatia, 1-4 June 2014 Paper No. 121 Seismic Margin Assessment for Nuclear
More informationInsights from PSA for the operating Nuclear Power Plants in Korea
Insights from PSA for the operating Nuclear Power Plants in Korea Hojun Jeon 1, Seokwon Hwang 2, Janghwan Na 3 1 Central Research Institute of Korea Hydro & Nuclear Power Co.,Ltd., 70, 1312-gil, Yuseong-daero,
More informationPakistan s HWR Activities
14 th Meeting of the Technical Working Group on Advanced Technologies of Heavy Water Reactors (TWG-HWR) Vienna, Austria 18-20 June 2013 Pakistan s HWR Activities by Shahid Saghir, Senior Manager (Technical)
More informationRomanian National Action Plan post - Fukushima
ROMANIA National Commission for Nuclear Activities Control Romanian National Action Plan post - Fukushima Table Of Contents Introduction..........................................................................
More informationTechnical potentialities of integration of reactor vessel external cooling in operating WWER-440 plant - Assessment results
Technical potentialities of integration of reactor vessel external cooling in operating WWER-440 plant - Assessment results Speaker Pantyushin S.I. ERMSAR-2013 02-04.10.2013 1. Introduction. Current status
More informationRusatom Service experience in LTO of VVER units
Rosatom State Atomic Energy Corporation Rusatom Service experience in LTO of VVER units Nikolay Skirda Plzen, Czech Republic 12.04.2016 Shareholders: transfer of competences Rosenergoatom Electric power
More informationEDF NPPs Post-Fukushima Complementary Safety Assessments
EDF NPPs Post-Fukushima Complementary Safety Assessments Jean-Luc Provost NNP Operation Division EDF-Generation December 2011 - Global Copyright EDF 1 - Context and issues Fukushima Accident on March 11,
More informationNPP Safety in the aftermath of the Fukushima Accident. UK Response August 2013
Health and Safety Executive NPP Safety in the aftermath of the Fukushima Accident Dr. Gary Cook UK Response 26-29 August 2013 Overview ONR response to Fukushima ENSREG stress tests Specification and process
More informationUpdating on NPP Life Management, Long Term Operation and post-fukushima Issues in Spain
IAEA Technical Working Group on Life Management of Nuclear Power Plants (TWG-LMNPP) Vienna, February 22-24, 2017 Updating on NPP Life Management, Long Term Operation and post-fukushima Issues in Spain
More informationWestinghouse Small Modular Reactor Development Overview
Westinghouse Small Modular Reactor Development Overview Small Modular Reactor Development Team Westinghouse Electric Company Dr. Nick Shulyak Presentation to IAEA July 4, 2011 1 SMR Product Specifications
More informationEU STRESS TESTS: SPANISH RESULTS ON SEISMIC EVENTS IAEA, International Experts Meeting on External Events
IAEA (Vienna) 4-7 September, 2012 EU STRESS TESTS: IAEA, International Experts Meeting on External Events INDEX 1. NUCLEAR FLEET IN SPAIN UNDER STRESS TESTS 2. PURPOSE AND SCOPE OF EU STRESS TESTS 3. SPECIFIC
More informationUse of PSA to Support the Safety Management of Nuclear Power Plants
S ON IMPLEMENTATION OF THE LEGAL REQUIREMENTS Use of PSA to Support the Safety Management of Nuclear Power Plants РР - 6/2010 ÀÃÅÍÖÈß ÇÀ ßÄÐÅÍÎ ÐÅÃÓËÈÐÀÍÅ BULGARIAN NUCLEAR REGULATORY AGENCY TABLE OF CONTENTS
More informationSMART Standard Design Approval inspection result July. 4 th
SMART Standard Design Approval inspection result 2012. July. 4 th Content Ⅰ. Inspection outline. 1 Ⅱ. Inspection proceedings 2 Ⅲ. SMART Standard Design features. 3 Ⅳ. Standard Design inspection result
More informationURESANDACTIONSCROSS-BORDERNETHER
ARTHQUAKESICEGERMANYMINIMUMTECH ICALSAFE TYREQUIREMENTSCZECHREPUB ICMUEHLEBERGSLOVAKRE PUBLICCOMPA ATIVECRITERIAFLOODINGNUCLEARACCID NTINFUKUSHIMABELGIUMNATURALDISAS ERSEXTREMECOLDEXTREMEHEATDAMA INGEFFECTSGOESGENSNOWEUWIDETEST
More informationEuropean stress tests
European stress tests for nuclear power plants National progress report Sweden September 15, 2011 Abstract In the light of the Fukushima accident in Japan, the European Council of March 24 th and 25 th
More information1. General Data about the Barrow Site Brief Description of the Site Characteristics Use of PSA as part of the safety assessment 3
Contents Executive Summary 1. General Data about the Barrow Site 1 1.1 Brief Description of the Site Characteristics 1 1.2 Use of PSA as part of the safety assessment 3 2. Earthquakes 4 2.1 Design Basis
More informationMEETING THE OBJECTIVES OF THE VIENNA DECLARATION ON NUCLEAR SAFETY: LICENSING OF NEW NUCLEAR POWER PLANTS IN PAKISTAN
MEETING THE OBJECTIVES OF THE VIENNA DECLARATION ON NUCLEAR SAFETY: LICENSING OF NEW NUCLEAR POWER PLANTS IN PAKISTAN N.MUGHAL Email: nasir.mughal@pnra.org F.MANSOOR J.AKHTAR Abstract In the aftermath
More informationCJSC «HAEK» UNITS 1-2
CJSC «HAEK» UNITS 1-2 STRESS TEST SELF-ASSESSMENT REPORT OF THE ARMENIAN NPP CONTRIBUTIONS TO THE ARMENIAN NUCLEAR POWER PLANT (ANPP) OPERATOR FOR THE IMPLEMENTATION OF THE STRESS TESTS AT ANPP STRESS
More informationKHNP s strategies for Multi-unit Extreme Hazards Response
KHNP s strategies for Multi-unit Extreme Hazards Response Jang Hwan Na 2018. 5. 8 Safety Technology Center Central Research Institute, KHNP Contents 1 Post Fukushima Safety Measures 2 Stress Tests 3 Integrated
More informationArab Journal of Nuclear Science and Applications, 48(3), ( ) 2015
Specific Considerations in the Safety Assessment of Predisposal Radioactive Waste Management Facilities in Light of the Lessons Learned from the Accident at the Fukushima-Daiichi Nuclear Power Plant A.
More informationDevelopment of SAMG Verification and Validation for Kashiwazaki-Kariwa(KK) Nuclear Power Station
Development of SAMG Verification and Validation for Kashiwazaki-Kariwa(KK) Nuclear Power Station December 12-14, 2016 Toshinobu KITA TEPCO Holdings, Inc. Japan BWRs SAMG Development History 1 Original
More informationOperating Nuclear Reactors in Ukraine: Enhancement of Safety and Performance
IAEA-CN-164-6S05 Operating Nuclear Reactors in Ukraine: Enhancement of Safety and Performance S. Bozhkoa, G. Gromovb, S. Sholomitskyb, O.Sevbob, G. Balakanc a State Nuclear Regulatory Authority of Ukraine,
More informationSpecific Design Consideration of ACP100 for Application in the Middle East and North Africa Region
Specific Design Consideration of ACP100 for Application in the Middle East and North Africa Region IAEA Technical Meeting on Technology Assessment of Small Modular Reactors for Near Term Deployment 2 5
More information1. Introduction Development of the national stress test action plan Status of the stress test actions Enhancement of the
1 1. Introduction... 3 2. Development of the national stress test action plan... 6 3. Status of the stress test actions... 8 3.1. Enhancement of the protection against external hazards... 8 3.1.1. Earthquake...
More informationThe EU-Stresstest Dr. Christoph Pistner
The EU-Stresstest Dr. Christoph Pistner 23.10.2015 Nuclear power plants in Europe as of 25.05.2014 Reactors in operation: Europe (West): 117 KKW 113,5 GW el. Europe (Middle and east): 68 KKW 48,6 GW el.
More informationImprovements Needed in Nuclear Power Plant Probabilistic Risk Assessments: Lessons Learned from Fukushima
Improvements Needed in Nuclear Power Plant Probabilistic Risk Assessments: Lessons Learned from Fukushima Mohammad Modarres Professor of Nuclear Engineering Department of Mechanical Engineering University
More informationScenarios of Heavy Beyond-Design-Basis Accidents in HTGRs N.G. Kodochigov, Yu.P. Sukharev
Scenarios of Heavy Beyond-Design-Basis Accidents in HTGRs N.G. Kodochigov, Yu.P. Sukharev IAEA Technical Meeting on the Safety of High Temperature Gas Cooled Reactors in the Light of the Fukushima Daiichi
More informationENVIRONMENTAL SAFETY OF NUCLEAR POWER PLANTS OF RUSSIAN DESIGN
International Journal of Mechanical Engineering and Technology (IJMET) Volume 9, Issue 11, November 2018, pp. 172 176, Article ID: IJMET_09_11_019 Available online at http://www.iaeme.com/ijmet/issues.asp?jtype=ijmet&vtype=9&itype=11
More informationBrazilian Operator s Response to Fukushima Daiichi Accident Luiz Soares Technical Director
Simposyum Siting of New Nuclear Power Plants and Irradiated Fuel Facilities Buenos Aires Argentina 24-28 June 2013 Panel Fukushima Daiichi s Impact in Nuclear Power Programs Worldwide Brazilian Operator
More informationin China Nuclear and Radiation Safety Center, Ministry i of Environmental Protection, ti P. R. China August , Vienna
Post-Fukushima Safety Improvement Measures for NPPs in China ZHENG Lixin Nuclear and Radiation Safety Center, Ministry i of Environmental Protection, ti P. R. China August 26-2929 2013, Vienna 1 Background
More informationThe Nuclear Safety Authority (ASN - Autorité de Sûreté Nucléaire),
REPUBLIQUE FRANÇAISE ASN Resolution 2014-DC-0406 of 21 th January 2014 instructing Electricité de France - Société Anonyme (EDF-SA) to comply with additional prescriptions applicable to the Gravelines
More informationEfforts for the restoration at Fukushima Daiichi Nuclear Power Plants
PF3-2013-000001 PSN-2013-0069 Efforts for the restoration at Fukushima Daiichi Nuclear Power Plants January 31, 2013 Executive Officer, Corporate Senior Vice president Chief Technology Executive, Power
More informationModule 05 WWER/ VVER (Russian designed Pressurized Water Reactors)
Module 05 WWER/ VVER (Russian designed Pressurized Water Reactors) 1.3.2016 Prof.Dr. Böck Technical University Vienna Atominstitut Stadionallee 2, 1020 Vienna, Austria ph: ++43-1-58801 141368 boeck@ati.ac.at
More informationRecent Developments in Risk Assessment: Future Perspectives
Recent Developments in Risk Assessment: Future Perspectives Mohammad Modarres Minta Martin Professor of Engineering Director, Reliability Engineering Program Department of Mechanical Engineering University
More information