CONTRACT DOCUMENTS AND SPECIFICATIONS

Size: px
Start display at page:

Download "CONTRACT DOCUMENTS AND SPECIFICATIONS"

Transcription

1 CONTRACT DOCUMENTS AND SPECIFICATIONS FOR AMISTAD COMMUNITY HEALTH CENTER ELEVATOR AND SECOND FLOOR RESTROOM RENOVATION CORPUS CHRISTI, TEXAS June, 2016 LNV PROJECT NO As Prepared By: 801 Navigation, Suite 300 Corpus Christi, Texas (361)

2

3 SECTION TABLE OF CONTENTS AMISTAD COMMUNITY HEALTH CENTER ELEVATOR AND SECOND FLOOR RESTROOM RENOVATION CORPUS CHRISTI, TEXAS CONTRACT DOCUMENTS DIVISION 00 PROCUREMENT AND CONTRACTING REQUIREMENTS SECTION List of Drawing Sheets Advertisements and Invitation for Bids Request for Proposal Instructions to Bidders Performance Bond Payment Bond General Conditions Supplementary Conditions TECHNICAL SPECIFICATIONS DIVISION 01 GENERAL REQUIREMENTS SECTION Summary of Work Submittal Procedures Alteration Project Procedures Definitions Reference Standards Quality Control Temporary Facilities & Controls Product Requirements Execution & Closeout Requirements Cutting & Patching Federal Requirements for Construction Contracts DIVISION 02 Not Used DIVISION 03 Not Used DIVISION 04 Not Used DIVISION 05 Not Used DIVISION 06 EXISTING CONDITIONS CONCRETE MASONRY METALS WOOD, PLASTICS AND COMPOSITES LNV (160054) Page 1 of 2 Table of Contents Section

4 Not Used DIVISION 07 Not Used DIVISION 08 Not Used DIVISION 09 Not Used DIVISION 10 Not Used DIVISION 11 Not Used DIVISION 12 Not Used DIVISION 13 Not Used DIVISION 14 Not Used DIVISION 21 Not Used DIVISION 22 Not Used DIVISION 23 Not Used DIVISION 25 Not Used DIVISION 26 Not Used DIVISION 27 Not Used DIVISION 28 Not Used DIVISION 31 Not Used DIVISION 32 Not Used DIVISION 33 Not Used THERMAL AND MOISTURE PROTECTION OPENINGS FINISHES SPECIALTIES EQUIPMENT FURNISHINGS SPECIAL CONSTRUCTION CONVEYING EQUIPMENT FIRE SUPPRESSION PLUMBING HEATING, VENTILATION AND AIR CONDITIONING (HVAC) INTEGRATED AUTOMATION ELECTRICAL COMMUNICATIONS ELECTRONIC SAFETY AND SECURITY EARTHWORK EXTERIOR IMPROVEMENTS UTILITIES END OF SECTION LNV (160054) Page 2 of 2 Table of Contents Section

5 SECTION LIST OF DRAWING SHEETS ARCHITECTURAL A-1 Floor Plans and General Notes A-2 Schedules, Details, Interior Elevations MECHANICAL M-1 HVAC Demolition Plan and Floor Plan M-2 HVAC General Notes and Schedules M-3 HVAC Specifications M-4 HVAC Specifications PLUMBING P-1 Plumbing Demolition Plan and Floor Plan P-2 Plumbing Details and Schedules P-3 Plumbing Specifications ELECTRICAL E-1 Electrical Demolition Plan and Floor Plan E-2 Electrical Specifications END OF SECTION LNV (160054) Page 1 of 1 List of Drawing Sheets Section

6

7 SECTION ADVERTISEMENT AND INVITATION FOR BIDS A PREBID CONFERENCE WILL BE HELD AT AMISTAD COMMUNITY HEALTH CENTER ON THURSDAY, JULY 14, 2016 AT 10:00 A.M., TO WALK THROUGH THE PROPOSED CONSTRUCTION AREAS. QUESTIONS CONCERNING THE ELEVATOR AND SECOND FLOOR RESTROOM RENOVATION PROJECT, SCHEDULING, AND COORDINATION OF WORK WILL BE DISCUSSED AT THE MEETING. IT IS HIGHLY RECOMMENDED THAT THE PRIME CONTRACTORS BIDDING THE PROJECT BE IN ATTENDANCE. Sealed bids addressed to "Amistad Community Health Center Elevator and Second Floor Restroom Renovation" located at 1533 Brownlee, Corpus Christi, Texas 78404, in accordance with the plans and specifications, dated June 2016, will be received at Amistad Community Health Center, 1533 Brownlee Blvd., Corpus Christi, TX 78404, at the hour of 2:00 p.m., Thursday, July 26, Bids will be opened by the owner s representative at the time the bids are received. Any bid received after the time noted in the letter shall returned unopened. No electronic bids will be accepted. This project is being funded by the City of Corpus Christi and the U.S. Department of Housing and Urban Development Community Development Block Grants funds and is subject to the following Federal requirements: Executive Order 11246; Clause 3 of the HUD Act of 1968; and Section 109 of the Housing and Community Development Act of Contractors and subcontractors must comply with the requirements of the Secretary of Labor in accordance with the Davis-Bacon Act as amended, the provisions of the Contract Work and Safety Standards Act as amended and all other applicable Federal, state and local laws and regulations pertaining to labor standards. This project will require 5% Bid Bond, Performance and Payment Bond in an amount equal to 100% of the accepted bid. Failure to provide required performance and payment bonds for this contract will result in forfeiture of the 5% bid bond to the Owner. The Owner reserves the right to hold all bids for 30 days from the date of bid opening without action, to reject any and all bids, to waive irregularities, and to require attachments or evidence of bidder's qualifications, including financial statements. Plans and Specifications may be obtained from the Architect at the address below for $100 deposit per set. A pre-bid conference will be held at Amistad Community Health Center, on Thursday, July 14, 2016 at 10:00 a.m. LNV, Inc. 801 Navigation, Suite 300 Corpus Christi, TX Publication Dates: Corpus Christi Caller-Times July 03, 2016 July 10, 2016 END OF SECTION LNV (160054) 1 of 2 Advertisement and Invitation for Bids Section

8

9 SECTION REQUEST FOR PROPOSAL SUBMITTED BY: TO: RE: Ms. Catherine Threatt Amistad Community Health Center 1533 Brownlee Corpus Christi, Texas Elevator and Second Floor Restroom Renovation Corpus Christi, Texas Gentlemen: In compliance with your instructions, the undersigned hereby proposed to furnish all labor, materials and perform all work for the General Construction of the Elevator and Second Floor Restroom Renovation at Amistad Community Health Center, Corpus Christi, Texas, in accordance with the Specifications dated June 2016, and the Drawings and Details mentioned therein, for the consideration of the following amounts: BASE BID New Construction and Site Work $ Dollars ALTERNATES: Acknowledge Addenda Bidder represents that, prior to preparing this bid, they have carefully read the Contract Documents, examined the Site of the Project, and made an investigation such that they are fully informed of the conditions, facilities, difficulties, restrictions and requirements which they will, or may, encounter in the completion of the Project in accordance with the terms of the Contract Documents, LNV (160054) 1 of 3 Request for Proposal Section

10 State number of days required to commence construction: The completed project shall be delivered to Owner on or before December 30, 2016, except as such date may be extended by delays approved by Architect in accord with the terms of the Contract Documents governing the construction of such Project. Completion date of project shall be determined by the Contract and shall be used by the Owner in making final selection. Upon award of Contract, this figure shall become part of the Contractor s contractual obligation. General Contractor By: Address: PREPARATION AND SUBMISSION OF BIDS A. Bids shall be submitted on a Bid Form following the wording and arrangement of the sample furnished by the Architect and shall be signed in ink. Erasures or other changes in a Bid must be explained in full, or noted over the signature of the Bidder. Bids containing any conditions, omission, unexplained erasures or alterations, or items not called for in the proposal, or irregularities of any kind, will be rejected by the Owner as being incomplete. Bids must include all alternates to be considered complete. B. Each Bid must give the full business address of the Bidder and be signed by him with his usual signature. Bids by partnerships must be signed in the partnership name by one of the members of the partnership or by an authorized representative, followed by the signature and designation of the person signing. Bids by corporation must be signed with the legal name of the corporation, followed by the name of the Station of Incorporation and the signature and designation of the president, secretary, or other person authorized to bind it in the matter. The name of each person signing shall also be typed or printed below the signature. A bid by a person who affixed to his signature the word "President", "Secretary", "Agent" or other designations, without disclosing his principal, may be held to be the Bid of the individual signing. When requested by the Owner, satisfactory evidence of the authority of the officer signing in behalf of the corporation shall be furnished. LNV (160054) 2 of 3 Request for Proposal Section

11 C. Provide ten copies of the bid and sub-bids received. These shall be reviewed by the building committee along with the General Contractor and Architect. Based upon this review, the final list of sub-contractors will be determined along with the project cost. AWARD OF CONTRACTS A. The contracts will be awarded within thirty (30) days of acceptance by the Owner. B. The Bid for alternates shall be submitted with the understanding that it is guaranteed for a period of one hundred twenty (120) days after the scheduled closing time for receipt of bids. C. The Owner reserves the right to waive any formality, defect or irregularity in the Bids received when such waiver is in the interest of the Owner; also to accept any item in the Bid, unless otherwise specified by the Owner of the Bidder. REJECTION OF BIDS The Owner reserves the right to reject any and all Bids when such rejection is in the interest of the Owner, and to reject the Bid of a Bidder who is not in a position to perform the Contract. A. The Owner reserves the right to reject any sub-bid and will reimburse the Contractor for any increase in cost. The Contractor shall submit a list of sub-contractors to the Owner before contract is signed. EXAMINATION OF SITE AND CONTRACT DRAWINGS The General Contractor and his sub-contractors shall visit the site of the proposed work, fully acquaint and familiarize themselves with conditions as they exist and the character of the operations to be carried on under the proposed contract, and make such investigations as they may see fit so that they shall fully understand the facilities, difficulties and restrictions attending the work under Contract. Each bidder shall also thoroughly examine and become familiar with all the Contract Documents, including the Drawings, Addenda, Details and Specifications. By submitting a proposal to the General Contractor and Owner, the Bidder covenants and agrees that they have carefully examined the Drawings, Details and Specifications and Addenda, if any, and the site, and that from their own investigations they have satisfied themselves on all matters which may in any way affect the work or its performance, and purpose thereof and their obligations to, damages because of any misinterpretation or misunderstanding of the Contract because of any lack of information. END OF SECTION LNV (160054) 3 of 3 Request for Proposal Section

12

13 SECTION INSTRUCTIONS TO BIDDERS BIDS Sealed bids in duplicate for the work described will be received by "Amistad Community Health Center" of Corpus Christi, at time, date and at place stated in the Invitation for Bids. The Bidders shall submit their Bids on a Bid Form following the wording and arrangement of the sample furnished by the Architect. BID GUARANTEE The Bid for construction shall be submitted with the understanding that it is guaranteed for a period of sixty (60) days after the scheduled closing time receipt of bids. Bid must be enclosed in a sealed opaque envelope, plainly marked on the outside with the name of the bidder and the name of the project as follows: TO: RE: Ms. Catherine Threatt Amistad Community Health Center 1533 Brownlee Corpus Christi, Texas Elevator and Second Floor Restroom Renovation Corpus Christi, Texas SUBMITTED BY: (Name of Bidder) END OF SECTION LNV (160054) 1 of 1 Instructions to Bidders Section

14

15 SECTION PERFORMANCE BOND Any singular reference to Contractor, Surety, Owner or other party shall be considered plural where applicable. CONTRACTOR (Name and Address): SURETY (Name and Principal Place of Business): OWNER: Ms. Catherine Threatt Amistad Community Health Center 1533 Brownlee Corpus Christi, Texas CONSTRUCTION CONTRACT Date: Amount: Description (Name and Location): BOND Date (Not earlier than Construction Contract Date): Amount: Modifications to this Bond Form: CONTRACTOR AS PRINCIPAL SURETY Company: (Corp. Seal) Company: (Corp. Seal) Signature: Name and Title: Signature: Name and Title: CONTRACTOR AS PRINCIPAL SURETY Company: (Corp. Seal) Company: (Corp. Seal) Signature: Name and Title: Signature: Name and Title: EJCDC No A (1984 Edition) Prepared through the joint efforts of The Surety Association of America, Engineers' Joint Contract Documents Committee, The Associated General Contractors of America, and the American Institute of Architects.

16 1. The Contractor and the Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors and assigns to the Owner for the performance of the Construction Contract, which is incorporated herein by reference. 2. If the Contractor performs the Construction Contract, the Surety and the Contractor shall have no obligation under this Bond, except to participate in conferences as provided in Subparagraph If there is no Owner Default, the Surety's obligation under this Bond shall arise after: 3.1. The Owner has notified the Contractor and the Surety at its address described in Paragraph 10 below, that the Owner is considering declaring a Contractor Default and has requested and attempted to arrange a conference with the Contractor and the Surety to be held not later than fifteen days after receipt of such notice to discuss methods of performing the Construction Contract. If the Owner, the Contractor and the Surety agree, the Contractor shall be allowed a reasonable time to perform the Construction Contract, but such an agreement shall not waive the Owner's right, if any, subsequently to declare a Contractor Default; and 3.2. The Owner has declared a Contractor Default and formally terminated the Contractor's right to complete the contract. Such Contractor Default shall not be declared earlier than twenty days after the Contractor and the Surety have received notice as provided in Subparagraph 3.1; and 3.3. The Owner has agreed to pay the Balance of the Contract Price to the Surety in accordance with the terms of the Construction Contract or to a contractor selected to perform the Construction Contract in accordance with the terms of the contract with the Owner. 4. When the Owner has satisfied the conditions of Paragraph 3, the Surety shall promptly and at the Surety's expense take one of the following actions: 4.1. Arrange for the Contractor, with consent of the Owner, to perform and complete the Construction Contract; or 4.2. Undertake to perform and complete the Construction Contract itself, through its agents or through independent contractors; or 4.3. Obtain bids or negotiated proposals from qualified contractors acceptable to the Owner for a contract for performance and completion of the Construction Contract, arrange for a contract to be prepared for execution by the Owner and the contractor selected with the Owner's concurrence, to be secured with performance and payment bonds executed by a qualified surety equivalent to the bonds issued on the Construction Contract, and pay to the Owner the amount of damages as described in Paragraph 6 in excess of the Balance of the Contract Price incurred by the Owner resulting from the Contractor's default; or 4.4. Waive its right to perform and complete, arrange for completion, or obtain a new contractor and with reasonable promptness under the circumstances: 1. After investigation, determine the amount for which it may be liable to the Owner and, as soon as practicable after the amount is determined, tender payment therefor to the Owner; or 2. Deny liability in whole or in part and notify the Owner citing reasons therefor. 5. If the Surety does not proceed as provided in Paragraph 4 with reasonable promptness, the Surety shall be deemed to be in default on this Bond fifteen days after receipt of an additional written notice from the Owner to the Surety demanding that the Surety perform its obligations under this Bond, and the Owner shall be entitled to enforce any remedy available to the Owner. If the Surety proceeds as provided in Subparagraph 4.4, and the Owner refuses the payment tendered or the Surety has denied liability, in whole or in part, without further notice the Owner shall be entitled to enforce any remedy available to the Owner. 6. After the Owner has terminated the Contractor's right to complete the Construction Contract, and if the Surety elects to act under Subparagraph 4.1, 4.2, or 4.3 above, then the responsibilities of the Surety to the Owner shall not be greater than those of the Contractor under the Construction Contract, and the responsibilities of the Owner to the Surety shall not be greater than those of the Owner under the Construction Contract. To the limit of the amount of this Bond, but subject to commitment by the Owner of the Balance of the Contract Price to mitigation of costs and damages on the Construction Contract, the Surety is obligated without duplication for: 6.1. The responsibilities of the Contractor for correction of defective work and completion of the Construction Contract; 6.2. Additional legal, design professional and delay costs resulting from the Contractor's Default, and resulting from the actions or failure to act of the Surety under Paragraph 4; and 6.3. Liquidated damages, or if no liquidated damages are specified in the Construction Contract, actual damages caused by delayed performance or non-performance of the Contractor. 7. The Surety shall not be liable to the Owner or others for obligations of the Contractor that are unrelated to the Construction Contract, and the Balance of the Contract Price shall not be reduced or set off on account of any such unrelated obligations. No right of action shall accrue on this Bond to any person or entity other than the Owner or its heirs, executors, administrators, or successors. 8. The Surety hereby waives notice of any change, including changes of time, to the Construction Contract or to related subcontracts, purchase orders and other obligations. 9. Any proceeding, legal or equitable, under this Bond may be instituted in any court of competent jurisdiction in the location in which the work or part of the work is located and shall be instituted within two years after Contractor Default or within two years after the Contractor ceased working or within two years after the Surety refuses or fails to perform its obligations under this Bond, whichever occurs first. If the provisions of this Paragraph are void or prohibited by law, the minimum period of limitation available to sureties as a defense in the jurisdiction of the suit shall be applicable. 10. Notice to the Surety, the Owner or the Contractor shall be mailed or delivered to the address shown on the signature page. 11. When this Bond has been furnished to comply with a statutory or other legal requirement in the location where the construction was to be performed, any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted herefrom and provisions conforming to such statutory or other legal requirement shall be deemed incorporated herein. The intent is that this Bond shall be construed as a statutory bond and not as a common law bond. 12. Definitions Balance of the Contract Price: The total amount payable by the Owner to the Contractor under the Constriction Contract after all proper adjustments have been made, including allowance to the Contractor of any amounts received or to be received by the Owner in settlement of insurance or other claims for damages to which the Contractor is entitled, reduced by all valid and proper payments made to or on behalf of the Contractor under the Construction Contract Construction Contract: The agreement between the Owner and the Contractor identified on the signature page, including all Contract Documents and changes thereto Contractor Default: Failure of the Contractor, which has neither been remedied nor waived, to perform or otherwise to comply with the terms of the Construction Contract Owner Default: Failure of the Owner, which has neither been remedied nor waived, to pay the Contractor as required by the Construction Contract or to perform and complete or comply with the other terms thereof. EJCDC No A (1984 Edition) Prepared through the joint efforts of The Surety Association of America, Engineers' Joint Contract Documents Committee, The Associated General Contractors of America, and the American Institute of Architects.

17 SECTION PAYMENT BOND Any singular reference to Contractor, Surety, Owner or other party shall be considered plural where applicable. CONTRACTOR (Name and Address): SURETY (Name and Principal Place of Business): OWNER: Ms. Catherine Threatt Amistad Community Health Center 1533 Brownlee Corpus Christi, Texas CONSTRUCTION CONTRACT Date: Amount: Description (Name and Location): BOND Date (Not earlier than Construction Contract Date): Amount: Modifications to this Bond Form: CONTRACTOR AS PRINCIPAL SURETY Company: (Corp. Seal) Company: (Corp. Seal) Signature: Name and Title: Signature: Name and Title: CONTRACTOR AS PRINCIPAL SURETY Company: (Corp. Seal) Company: (Corp. Seal) Signature: Name and Title: Signature: Name and Title: EJCDC No B (1984 Edition) Prepared through the joint efforts of the Surety Association of America, Engineers Joint Contract Documents Committee, The Associated General Contractors of America, American Institute of Architects, American Subcontractors Association, and the Associated Specialty Contractors. Reprinted 10/90

18 1. The Contractor and the Surety, jointly and severally bind themselves, their heirs, executors, administrators, successors and assigns to the Owner to pay for labor, materials and equipment furnished for use in the performance of the Construction Contract, which is incorporated herein by reference. 2. With respect to the Owner, this obligation shall be null and void if the Contractor: 2.1. Promptly makes payment, directly or indirectly, for all sums due Claimants, and 2.2. Defends, indemnifies and holds harmless the Owner from claims, demands, liens or suits by any person or entity whose claim, demand, lien or suit is for payment for labor, materials or equipment furnished for use in the performance of the Construction Contract, provided the Owner has promptly notified the Contractor and the Surety (at the address described in Paragraph 12) of any claims, demands, liens or suits and tendered defense of such claims, demands, liens or suits to the Contractor and the Surety, and provided there is no Owner Default. 3. With respect to Claimants. This obligation shall be null and void if the Contractor promptly makes payment, directly or indirectly, for all sums due. 4. The Surety shall have no obligation to Claimants under this Bond until: 4.1. Claimants who are employed by or have a direct contract with the Contractor have given notice to the Surety (at the address described in Paragraph 12) and sent a copy, or notice thereof, to the Owner, stating that a claim is being made under this Bond and, with substantial accuracy, the amount of the claim Claimants who do not have a direct contract with the Contractor: 1. Have furnished written notice to the Contractor and sent a copy, or notice thereof, to the Owner, within 90 days after having last performed labor or last furnished materials or equipment included in the claim stating, with substantial accuracy, the amount of the claim and the name of the party to whom the materials were furnished or supplied or for whom the labor was done or performed; and 2. Have either received a rejection in whole or in part from the Contractor, or not received within 30 days of furnishing the above notice any communication from the Contractor by which the Contractor has indicated the claim will be paid directly or indirectly; and 3. Not having been paid within the above 30 days, have sent a written notice to the Surety (at the address described in Paragraph 12) and sent a copy, or notice thereof, to the Owner, stating that a claim is being made under this Bond and enclosing a copy of the previous written notice furnished to the Contractor. 5. If a notice required by Paragraph 4 is given by the Owner to the Contractor or to the Surety that is sufficient compliance. 6. When the Claimant has satisfied the conditions of Paragraph 4, the Surety shall promptly and at the Surety's expense take the following actions: 6.1. Send an answer to the Claimant, with a copy to the Owner, within 45 days after receipt of the claim, stating the amounts that are undisputed and that basis for challenging any amounts that are disputed Pay or arrange for payment of any undisputed amounts. 7. The Surety's total obligation shall not exceed the amount of this Bond, and the amount of this Bond shall be credited for any payments made in good faith by the Surety. 8. Amounts owed by the Owner to the Contractor under the Construction Contract shall be used for the performance of the Construction Contract and to satisfy claims, if any, under any Construction Performance Bond. By the Contractor furnishing and the Owner accepting this Bond, they agree that all funds earned by the Contractor in the performance of the Construction Contract are dedicated to satisfy obligations of the Contractor and the Surety under this Bond, subject to the Owner's priority to use the funds for the completion of the work. 9. The Surety shall not be liable to the Owner, Claimants or others for obligations of the Contractor that are unrelated to the Construction Contract. The Owner shall not be liable for payment of any costs or expenses of any Claimant under this Bond, and shall have under this Bond no obligations to make payments to, give notices on behalf of, or otherwise have obligations to Claimants under this Bond. 10. The Surety hereby waives notice of any change, including changes of time, to the Construction Contract or to related subcontracts, purchase orders and other obligations. 11. No suit or action shall be commenced by a Claimant under this Bond other than in a court of competent jurisdiction in the location in which the work or part of the work is located of after the expiration of one year from the date (1) on which the Claimant gave the notice required by Subparagraph 4.1 or Clause 4.2 (iii), or (2) on which the last labor or service was performed by anyone or the last materials or equipment were furnished by anyone under the Construction Contract, whichever of (1) or (2) first occurs. If the provisions of this Paragraph are void or prohibited by law, the minimum period of limitation available to sureties as a defense in the jurisdiction of the suit shall be applicable. 12. Notice to the Surety, the Owner or the Contractor shall be mailed or delivered to the address shown on the signature page. Actual receipt of notice by Surety, the Owner or the Contractor, however accomplished, shall be sufficient compliance as of the date received at the address shown on the signature page. 13. When this Bond has been furnished to comply with a statutory or other legal requirement in the location where the construction was to be performed, any provision in the Bond conflicting with said statutory or legal requirement shall be deemed deleted herefrom and provisions conforming to such statutory or other legal requirement shall be deemed incorporated herein. The intent is, that this Bond shall be construed as a statutory bond and not as a common law bond. 14. Upon request by any person or entity appearing to be a potential beneficiary of this Bond, the Contractor shall promptly furnish a copy of this Bond or shall permit a copy to be made. 15. DEFINITIONS Claimant: An individual or entity having a direct contract with the Contractor or with a subcontractor of the Contractor to furnish labor, materials or equipment for use in the performance of the Contract. The intent of this Bond shall be to include without limitation in the terms "labor, materials or equipment" that part of water, gas, power, light, heal, oil, gasoline, telephone service or rental equipment used in the Construction Contract, architectural and engineering services required for performance of the work of the Contractor and the Contractor's subcontractors, and all other items for which a mechanic's lien may be asserted in the jurisdiction where the labor, materials or equipment were furnished Construction Contract: The agreement between the Owner and the Contractor identified on the signature page, including all Contract Documents and changes thereto Owner Default: Failure of the Owner, which has neither been remedied nor waived, to pay the Contractor as required by the Construction Contract or to perform and complete or comply with the other terms thereof. EJCDC No B (1984 Edition) Prepared through the joint efforts of the Surety Association of America, Engineers Joint Contract Documents Committee, The Associated General Contractors of America, American Institute of Architects, American Subcontractors Association, and the Associated Specialty Contractors. Reprinted 10/90

19 GENERAL CONTRACT CONDITIONS 1. Contract and Contract Documents a) The project to be constructed pursuant to this contract and is subject to all applicable Federal, State, and local laws and regulations. b) The Plans, Specifications and Addenda shall form part of this contract and the provisions thereof shall be as binding upon the parties hereto as if they were herein fully set forth. 2. Definitions Whenever used in any of the contract Documents, the following meanings shall be given to the terms here in defined: a) The term "Contract" means the Contract executed between the Owner, hereinafter called the Locality and Contractor, of which these GENERAL CONDITIONS, form a part. b) The term "Project Area" means the area within which are the specified Contract limits of the Improvements contemplated to be constructed in whole or in part under this contract. c) The term "Architect" means LNV, Architect in charge, serving the Locality with engineering services, his successor, or any other person or persons, employed by the Locality for the purpose of directing or having in charge the work embraced in this Contract. d) The term "Contract Documents" means and shall include the following: Executed Contract, Addenda (if any), Invitation for Bids, Instructions to Bidders, Signed Copy of Bid, General Conditions, Special Conditions, Technical Specifications, and Drawings (as listed in the Schedule of Drawings). 3. Supervision by Contractor a) Except where the Contractor is an individual and gives his personal supervision to the work, the Contractor shall provide a competent superintendent, satisfactory to the Local Public Agency and the Architect, on the work at all times during working hours with full authority to act for him. The Contractor shall also provide an adequate staff for the proper coordination and expediting of his work. b) The Contractor shall lay out his own work and he shall be responsible for all work executed by him under the Contract. He shall verify all figures and elevations before proceeding with the work and will be held responsible for any error resulting from his failure to do so. 4. Subcontracts a) The Contractor shall not execute an agreement with any subcontractor or permit any subcontractor to perform any work included in this contract until he has verified the subcontractor(s) as eligible to participate in federally funded contracts. b) No proposed subcontractor shall be disapproved by the Owner except for cause. c) The Contractor shall be as fully responsible to the Owner for the acts and omissions of his subcontractor(s) and of persons either directly or indirectly employed by them. LNV (160054) 1 of 17 General Conditions Section

20 d) The Contractor shall cause appropriate provisions to be inserted in all subcontracts relative to the work and required compliance by each subcontractor with the applicable provisions of the Contract. e) Nothing contained in the Contract shall create any contractual relation between any subcontractor and the Locality. 5. Fitting and Coordination of Work The Contractor shall be responsible for the proper fitting of all work and for the coordination of the operations of all trades, subcontractors, or material suppliers engaged upon this Contract. 6. Payments to Contractor a) Partial Payments The Contractor shall prepare his requisition for partial payment as of the last day of the month and submit it, with the required number of copies, to the Architect for his approval. The amount of the payment due the Contractor shall be determined by adding to the total value of work completed to date, the value of materials properly stored on the site and deducting (1) ten percent (10%) of the total amount, to be retained until final payment and (2) the amount of all previous payments. The total value of work completed to date shall be based on the estimated quantities of work completed and on the unit prices contained in the agreement. The value of materials properly stored on the site shall be based upon the estimated quantities of such materials and the invoice prices. Copies of all invoices shall be available for inspection of the Architect. Monthly or partial payments made by the Locality to the Contractor are moneys advanced for the purpose of assisting the contractor to expedite the work of construction. The Contractor shall be responsible for the care and protection of all materials and work upon which payments have been made until final acceptance of such work and materials by the Locality. Such payments shall not constitute a waiver of the right of the Locality to require the fulfillment of all terms of the Contract and the delivery of all improvements embraced in this Contract complete and satisfactory to the Locality in all details. b) Final Payment After final inspection and acceptance by the Locality of all work under the Contract, the Contractor shall prepare his requisition for final payment which shall be based upon the careful inspection of each item of work at the applicable unit prices stipulated in the Agreement. The total amount of the final payment due the Contractor under this contract shall be the amount computed as described above less all previous payments. The Locality before paying the final estimate, shall require the Contractor to furnish releases or receipts from all subcontractors having performed any work and all persons having supplied materials, equipment (installed on the Project) and services to the Contractor, if the Locality deems it necessary in order to protect its interest. The Locality may, if it deems such action advisable, make payment in part or in full to the Contractor without requiring the furnishing of such releases or receipts and any payments made shall in no way impair the obligations of any surety or sureties furnished under this Contract. LNV (160054) 2 of 17 General Conditions Section

21 Any amount due the Locality under Liquidated Damages, shall be deducted from the final payment due the contractor. c) Payments Subject to Submission of Certificates Each payment to the Contractor from the Locality is subject to submission of all written certifications required of the Contractor and his subcontractors. d) Withholding Payments The Locality may withhold from any payment due the Contractor whatever is deemed necessary to protect the Locality, and if so elects, may also withhold any amounts due from the Contractor to any subcontractors or material dealers, for work performed or material furnished by them. The foregoing provisions shall be construed solely for the benefit of the Locality and will not require the Locality to determine or adjust any claims or disputes between the Contractor and his subcontractors or material dealers, or to withhold any moneys for their protection unless the Locality elects to do so. The failure or refusal of the Locality to withhold any moneys from the Contractor shall in no way impair the obligations of any surety or sureties under any bond or bonds furnished under this Contract. 7. Changes in the Work a) The Locality may make changes in the scope of work required to be performed by the Contractor under the Contract without relieving or releasing the Contractor from any of his obligations under the Contract or any guarantee given by him pursuant to the Contract provisions, and without affecting the validity of the guaranty bonds, and without relieving or releasing the surety or sureties of said bonds. All such work shall be executed under the terms of the original Contract unless it is expressly provided otherwise. Additionally, all such change orders must be approved by the TCDP staff prior to execution of same. b) Except for the purpose of affording protection against any emergency endangering health, life, limb or property, the Contractor shall make no change in the materials used or in the specified manner of constructing and/or installing the improvements or supply additional labor, services or materials beyond that actually required for the execution of the Contract, unless in pursuance of a written order from the Locality authorizing the Contractor to proceed with the change. No claim for an adjustment of the Contract Price will be valid unless so ordered. c) If applicable unit prices are contained in the Agreement, the Locality may order the Contractor to proceed with desired unit prices specified in the Contract; provided that in case of a unit price contract the net value of all changes does not increase the original total amount of the agreement by more than twenty-five percent (25%) or decrease the original the total amount by eighteen percent (18%) for counties or twenty-five percent (25%) for cities. d) Each change order shall include in its final form: A detailed description of the change in the work. The Contractor's proposal (if any) or a confirmed copy thereof. A definite statement as to the resulting change in the contract price and/or time. The statement that all work involved in the change shall be performed in accordance with contract requirements except as modified by the change order. The procedures as outlined in this Section for a unit price contract also apply in any lump sum contract. LNV (160054) 3 of 17 General Conditions Section

22 8. Claims for Extra Cost a) If the Contractor claims that any instructions by Drawings or otherwise involve extra cost or extension of time, he shall, within ten days after the receipt of such instructions, and in any event before proceeding to execute the work, submit his protest thereto in writing to the Locality, stating clearly and in detail the basis of his objections. No such claim will be considered unless so made. b) Claims for additional compensation for extra work, due to alleged errors in ground elevations, contour lines, or bench marks, will not be recognized unless accompanied by certified survey data, made prior to the time the original ground was disturbed, clearly showing that errors exist which resulted, or would result, in handling more material, or performing more work, than would be reasonably estimated from the Drawings and maps issued. c) Any discrepancies which may be discovered between actual conditions and those represented by the Drawings and maps shall be reported at once to the Locality and work shall not proceed except at the Contractor's risk, until written instructions have been received by him from the Locality. d) If, on the basis of the available evidence, the Locality determines that an adjustment of the Contract Price and/or time is justifiable, a change order shall be executed. 9. Termination, Delays, and Liquidated Damages a) Right of the Locality to Terminate Contract. In the event that any of the provisions of this contract are violated by the Contractor, or by any of his subcontractors, the Locality may serve written notice upon the Contractor and the Surety of its intention to terminate the contract. The notices shall contain the reasons for such intention to terminate the contract, and unless such violation or delay shall cease and satisfactory arrangement of correction be made within ten days, the contract shall, upon the expiration of said ten (10) days, cease and terminate. In the event of any such termination, the Locality shall immediately serve notice thereof upon the Surety and the Contractor. The Surety shall have the right to take over and perform the contract. Provided, however, that if the Surety does not commence performance thereof within ten (10) days from the date of the mailing to such Surety of notice of termination, the Locality may take over the work and complete the project by bid/contract or by force account at the expense of the Contractor and his Surety shall be liable to the Locality for any excess cost incurred. In such event the Locality may take possession of and utilize in completing the work, such materials, appliances, and plant as may be on the site of the work and necessary therefore. b) Liquidated Damages for Delays. If the work is not completed within the time stipulated in the applicable bid for Lump Sum or Unit Price Contract provided, the Contractor shall pay to the Locality as fixed, agreed, and liquidated damages (it being impossible to determine the actual damages occasioned by the delay) the amount of $ for each calendar day of delay, until the work is completed. The Contractor and his sureties shall be liable to the Locality for the amount thereof. c) Excusable Delays. The right of the Contractor to proceed shall not be terminated nor shall the Contractor be charged with liquidated damages for any delays in the completion of the work due to: LNV (160054) 4 of 17 General Conditions Section

23 Any acts of the Government, including controls or restrictions upon or requisitioning of materials, equipment, tools, or labor by reason of war, national defense, or any other national emergency; Any acts of the Locality; Causes not reasonably foreseeable by the parties to this Contract at the time of the execution of the Contract which are beyond the control and without the fault or negligence of the Contractor, including, but not restricted to, acts of God or of the public enemy, acts of another Contractor in the performance of some other contract with the Locality, fires, floods, epidemics, quarantine, restrictions, strikes, freight embargoes, and weather of unusual severity such as hurricanes, tornadoes, cyclones and other extreme weather conditions. Provided, however, that the Contractor promptly notifies the Locality within ten (10) days in writing of the cause of the delay. Upon receipt of such notification, the Locality shall ascertain the facts and the cause and extent of delay. If, upon the basis of the facts and the terms of this contract, the delay is properly excusable, the Locality shall extend the time for completing the work for a period of time commensurate with the period of excusable delay. 10. Assignment or Novation The Contractor shall not assign or transfer, whether by an assignment or novation, any of its rights, duties, benefits, obligations, liabilities, or responsibilities under this Contract without the written consent of the Locality; provided, however, that assignments to banks or other financial institutions may be made without the consent of the Locality. No assignment or novation of this Contract shall be valid unless the assignment or novation expressly provides that the assignment of any of the Contractor's rights or benefits under the Contract is subject to a prior lien for labor performed, services rendered, and materials, tools, and equipment supplied for the performance of the work under this Contract in favor of all persons, firms, or corporations rendering such labor or services or supplying such materials, tools, or equipment. 11. Disputes a) All disputes arising under this Contract or its interpretation except those disputes covered by FEDERAL LABOR STANDARDS PROVISIONS whether involving law or fact or both, or extra work, and all claims for alleged breach of contract shall, within ten (10) days of commencement of the dispute, be presented by the Contractor to the Locality for decision. Any claim not presented within the time limit specified in this paragraph shall be deemed to have been waived, except that if the claim is of a continuing character and notice of the claim is not given within ten (10) days of its commencement, the claim will be considered only for a period commencing ten (10) days prior to the receipt of the Locality. b) The Contractor shall submit in detail his claim and his proof thereof. c) If the Contractor does not agree with any decision of the Locality, he shall in no case allow the dispute to delay the work but shall notify the Locality promptly that he is proceeding with the work under protest. 12. Technical Specifications and Drawings Anything mentioned in the Technical Specifications and not shown on the Drawings or vice versa, shall be of like effect as if shown on or mentioned in both. In case of difference between Drawings and Technical Specifications, the Drawings shall govern. In case of any discrepancy in Drawings, or Technical Specifications, the matter shall be immediately submitted to the Locality, without whose decision, said discrepancy shall not be adjusted by the Contractor, save only at his own risk and expense. LNV (160054) 5 of 17 General Conditions Section

24 13. Shop Drawings a) All required shop drawings, machinery details, layout drawings, etc. shall be submitted to the Architect in five (5) copies for approval sufficiently in advance of requirements to afford ample time for checking, including time for correcting, resubmitting and rechecking if necessary. The Contractor may proceed, only at his own risk, with manufacture or installation of any equipment or work covered by said shop drawings, etc. until they are approved and no claim, by the Contractor, for extension of the contract time shall be granted by reason of his failure in this respect. b) Any drawings submitted without the Contractor's stamp of approval will not be considered and will be returned to him for proper resubmission. If any drawings show variations from the requirements of the Contract because of standard shop practice or other reason, the Contractor shall make specific mention of such variation in his letter of transmittal in order that, if acceptable, suitable action may be taken for proper adjustment of contract price and/or time, otherwise the Contractor will not be relieved of the responsibility for executing the work in accordance with the Contract even though the drawings have been approved. c) If a shop drawing is in accordance with the contract or involves only a minor adjustment in the interest of the Locality not involving a change in contract price or time; the Architect may approve the drawing. The approval shall not relieve the Contractor from his responsibility for adherence to the contract or for any error in the drawing. 14. Requests for Supplementary Information It shall be the responsibility of the Contractor to make timely requests of the Locality for any additional information not already in his possession which should be furnished by the Locality under the terms of this Contract, and which he will require in the planning and execution of the work. Such requests may be submitted from time to time as the need approaches, but each shall be filed in ample time to permit appropriate action to be taken by all parties involved so as to avoid delay. Each request shall be in writing, and list the various items and the latest date by which each will be required by the Contractor. The first list shall be submitted within two weeks after Contract award and shall be as complete as possible at that time. The Contractor shall, if requested, furnish promptly any assistance and information the Architect may require in responding to these requests of the Contractor. The Contractor shall be fully responsible for any delay in his work or to others arising from his failure to comply fully with the provision of this section. 15. Materials and Workmanship a) Unless otherwise specifically provided for in the technical specifications, all workmanship, equipment, materials and articles incorporated in the work shall be new and the best grade of the respective kinds for the purpose. Where equipment, materials, articles or workmanship are referred to in the technical specifications as "equal to" any particular standard, the Architect shall decide the question of equality. b) The Contractor shall furnish to the Locality for approval the manufacturer's detailed specifications for all machinery, mechanical and other special equipment, which he contemplates installing together with full information as to type, performance characteristics, and all other pertinent information as required, and shall likewise submit for approval full information concerning all other materials or articles which he proposes to incorporate. c) Machinery, mechanical and other equipment, materials or articles installed or used without such prior approval shall be at the risk of subsequent rejection. LNV (160054) 6 of 17 General Conditions Section

25 d) Materials specified by reference to the number or symbol of a specific standard, shall comply with requirements in the latest revision thereof and any amendment or supplement thereto in effect on the date of the Invitation for Bids, except as limited to type, class or grade, or modified in the technical specifications shall have full force and effect as though printed therein. e) The Locality may require the Contractor to dismiss from the work such employee or employees as the Locality or the Architect may deem incompetent, or careless, or insubordinate. 16. Samples, Certificates and Tests a) The Contractor shall submit all material or equipment samples, certificates, affidavits, etc., as called for in the contract documents or required by the Architect, promptly after award of the contract and acceptance of the Contractor's bond. No such material or equipment shall be manufactured or delivered to the site, except at the Contractor's own risk, until the required samples or certificates have been approved in writing by the Engineer. Any delay in the work caused by late or improper submission of samples or certificates for approval shall not be considered just cause for an extension of the contract time. b) Each sample submitted by the Contractor shall carry a label giving the name of the Contractor, the project for which it is intended, and the name of the producer. The accompanying certificate or letter from the Contractor shall state that the sample complies with contract requirements, shall give the name and brand of the product, its place of origin, the name and address of the producer and all specifications or other detailed information which will assist the Architect in making a prompt decision regarding the acceptability of the sample. It shall also include the statement that all materials or equipment furnished for use in the project will comply with the samples and/or certified statements. c) Approval of any materials shall be general only and shall not constitute a waiver of the Locality's right to demand full compliance with Contract requirements. After actual deliveries, the Architect will have such check tests made as he deems necessary in each instance and may reject materials and equipment and accessories for cause, even though such materials and articles have been given general approval. If materials, equipment or accessories which fail to meet check tests have been incorporated in the work, the Architect will have the right to cause their removal and replacement by proper materials or to demand and secure such reparation by the Contractor as is equitable. d) Except as otherwise specifically stated in the Contract, the costs of sampling and testing will be divided as follows: The Contractor shall furnish without extra cost, including packing and delivery charges, all samples required for testing purposes, except those samples taken on the project by the Architect; The Contractor shall assume all costs of re-testing materials which fail to meet contract requirements; The Contractor shall assume all costs of testing materials offered in substitution for those found deficient; The Locality will pay all other expenses. 17. Permits and Codes a) The Contractor shall give all notices required by and comply with all applicable laws, ordinances, and codes of the Local Government. All construction work and/or utility installations shall comply LNV (160054) 7 of 17 General Conditions Section

26 with all applicable ordinances, and codes including all written waivers. Before installing any work, the Contractor shall examine the drawings and technical specifications for compliance with applicable ordinances and codes and shall immediately report any discrepancy to the Locality. Where the requirements of the drawings and technical specifications fail to comply with such applicable ordinances or codes, the Locality will adjust the Contract by Change Order to conform to such ordinances or codes (unless waivers in writing covering the difference have been granted by the governing body or department) and make appropriate adjustment in the Contract Price or stipulated unit prices. b) Should the Contractor fail to observe the foregoing provisions and proceed with the construction and/or install any utility at variance with any applicable ordinance or code, including any written waivers (notwithstanding the fact that such installation is in compliance with the drawings and technical specifications), the Contractor shall remove such work without cost to the Locality. c) The Contractor shall at his own expense, secure and pay for all permits for street pavement, sidewalks, shed, removal of abandoned water taps, sealing of house connection drains, pavement cuts, buildings, electrical, plumbing, water, gas and sewer permits required by the local regulatory body or any of its agencies. d) The Contractor shall comply with applicable local laws and ordinances governing the disposal of surplus excavation, materials, debris and rubbish on or off the Project Area and commit no trespass on any public or private property in any operation due to or connected with the Improvements contained in this Contract. e) The Contractor will be required to make arrangements for and pay the water, electrical power, or any other utilities required during construction. f) During construction of this project, the Contractor shall use every means possible to control the amount of dust created by construction. Prior to the close of a day s work, the Contractor, if directed by the Locality, shall moisten the bank and surrounding area to prevent a dusty condition. 18. Care of Work a) The Contractor shall be responsible for all damages to person or property that occur as a result of his fault or negligence in connection with the prosecution of the work and shall be responsible for the proper care and protection of all materials delivered and work performed until completion and final acceptance. b) The Contractor shall provide sufficient competent watchmen, both day and night, including Saturdays, Sundays, and holidays, from the time the work is commenced until final completion and acceptance. c) In an emergency affecting the safety of life, limb or property, including adjoining property, the Contractor, without special instructions or authorization from the Locality is authorized to act at his discretion to prevent such threatened loss or injury, and he shall so act. He shall likewise act if instructed to do so by the Locality. d) The Contractor shall avoid damage as a result of his operations to existing sidewalks, streets, curbs, pavements, utilities (except those which are to be replaced or removed), adjoining property, etc., and he shall at his own expense completely repair any damage thereto caused by his operations. LNV (160054) 8 of 17 General Conditions Section

27 e) The Contractor shall shore up, brace, underpin, secure, and protect as maybe necessary, all foundations and other parts of existing structures adjacent to, adjoining, and in the vicinity of the site, which may be in any way affected by the excavations or other operations connected with the construction of the improvements included in this Contract. The Contractor shall be responsible for the giving of any and all required notices to any adjoining or adjacent property Locality or other party before the commencement of any work. The Contractor shall indemnify and save harmless the Locality from any damages on account of settlements or the loss of lateral support of adjoining property and from all loss or expense and all damages for which the Locality may become liable in consequence of such injury or damage to adjoining and adjacent structures and their premises. 19. Accident Prevention a) No laborer or mechanic employed in the performance of this Contract shall be required to work in surroundings or under working conditions which are unsanitary, hazardous, or dangerous to his health or safety as determined under construction safety and health standards promulgated by the Secretary of Labor. b) The Contractor shall exercise proper precaution at all times for the protection of persons and property and shall be responsible for all damages to persons or property, either on or off the site, which occur as a result of his prosecution of the work. c) The Contractor shall maintain an accurate record of all cases of death, occupational disease, or injury requiring medical attention or causing loss of time from work, arising out of and in the course of employment on work under the Contract. The Contractor shall promptly furnish the Locality with reports concerning these matters. d) The Contractor shall indemnify and save harmless the Locality from any claims for damages resulting from property damage, personal injury and/or death suffered or alleged to have been suffered by any person as a result of any work conducted under this contract. e) The Contractor shall provide trench safety for all excavations more than five feet deep prior to excavation. House Bill 1569 concerning trench safety legislation are made a part of these contract documents for Contractor s reference. All OSHA Standards for trench safety must be adhered to by the Contractor. f) The Contractor shall at all time conduct his work in such a manner as to insure the least possible inconvenience to vehicular and pedestrian traffic. At the close of the work each day, all streets where possible in the opinion of the Owner, shall be opened to the public in order that persons living in the area may have access to their homes or businesses by the use of the streets. Barricades, warning signs, and necessary lighting shall be provided to the satisfaction of the Locality at the expense of the Contractor. 20. Sanitary Facilities The Contractor shall furnish, install and maintain ample sanitary facilities for the workmen. As the needs arise, a sufficient number of enclosed temporary toilets shall be conveniently placed as required. Drinking water shall be provided from an approved source, so piped or transported as to keep it safe and fresh and served from single service containers or satisfactory types of sanitary drinking stands or fountains. All such facilities and services shall be furnished in strict accordance with existing and governing health regulations. 21. Use of Premises LNV (160054) 9 of 17 General Conditions Section

28 a) The Contractor shall confine his equipment, storage of materials, and construction operations to the contract limits as shown on the drawings and as prescribed by ordinances or permits, or as may be desired by the Locality, and shall not unreasonably encumber the site or public rights of way with his materials and construction equipment. b) The Contractor shall comply with all reasonable instructions of the Locality and all existing state and local regulations regarding signs, advertising, traffic, fires, explosives, danger signals, and barricades. 22. Removal of Debris, Cleaning, Etc. The Contractor shall, periodically or as directed during the progress of the work, remove and legally dispose of all surplus excavated material and debris, and keep the Project Area and public rights of way reasonably clear. Upon completion of the work, he shall remove all temporary construction facilities, debris and unused materials provided for work, and put the whole site of the work and public rights of way in a neat and clean condition. 23. Inspection a) All materials and workmanship shall be subject to inspection, examination, or test by the Locality and Architect at any and all times during manufacture or construction and at any and all places where such manufacture or construction occurs. The Locality shall have the right to reject defective material and workmanship or require its correction. Unacceptable workmanship shall be satisfactorily corrected. Rejected material shall be promptly segregated and removed from the Project Area and replaced with material of specified quality without charge. If the Contractor fails to proceed at once with the correction of rejected workmanship or defective material, the Locality may by contract or otherwise have the defects remedied or rejected materials removed from the Project Area and charge the cost of the same against any Monies which may be due the Contractor, without prejudice to any other rights or remedies of the Locality. b) The Contractor shall furnish promptly all materials reasonably necessary for any tests which may be required. All tests by the Locality will be performed in such manner as not to delay the work unnecessarily and will be made in accordance with the provisions of the technical specifications. c) The Contractor shall notify the Locality sufficiently in advance of back filling or concealing any facilities to permit proper inspection. If any facilities are concealed without approval or consent of the Locality, the Contractor shall uncover for inspection and recover such facilities at his own expense, when so requested by the Locality. d) Should it be considered necessary or advisable by the Locality at any time before final acceptance of the entire work to make an examination of work already completed by uncovering the same, the Contractor shall on request promptly furnish all necessary facilities, labor, and material. If such work is found to be defective in any important or essential respect, due to fault of the Contractor or his subcontractors, the Contractor shall defray all the expenses of such examination and of satisfactory reconstruction. If, however, such work is found to meet the requirements of the Contract, the actual cost of labor and material necessarily involved in the examination and replacement, shall be allowed the Contractor and he shall, in addition, if completion of the work of the entire Contract has been delayed thereby, be granted a suitable extension of time on account of the additional work involved. e) Inspection of materials and appurtenances to be incorporated in the improvements included in this Contract may be made at the place of production, manufacture or shipment, whenever the quantity justifies it, and such inspection and acceptance, unless otherwise stated in the technical LNV (160054) 10 of 17 General Conditions Section

29 specifications, shall be final, except as regards (1) latent defects, (2) departures from specific requirements of the Contract, (3) damage or loss in transit, or (4) fraud or such gross mistakes as amount to fraud. Subject to the requirements contained in the preceding sentence, the inspection of materials as a whole or in part will be made at the Project Site. f) Neither inspection, testing, approval nor acceptance of the work in whole or in part, by the Locality or its agents shall relieve the Contractor or his sureties of full responsibility for materials furnished or work performed not in strict accordance with the Contract. 24. Review By Locality The Locality and its authorized representatives and agents shall have access to and be permitted to observe and review all work, materials, equipment, payrolls, personnel records, employment conditions, material invoices, and other relevant data and records pertaining to this Contract, provided, however that all instructions and approval with respect to the work will be given to the Contractor only by the Locality through its authorized representatives or agents. 25. Final Inspection When the Improvements included in this Contract are substantially completed, the Contractor shall notify the Locality in writing that the work will be ready for final inspection on a definite date which shall be stated in the notice. The Locality will make the arrangements necessary to have final inspection commenced on the date stated in the notice, or as soon thereafter as is practicable. 26. Deduction for Uncorrected Work If the Locality deems it not expedient to require the Contractor to correct work not done in accordance with the Contract Documents, an equitable deduction from the Contract Price will be made by agreement between the Contractor and the Locality and subject to settlement, in case of dispute, as herein provided. 27. Insurance The Contractor shall not commence work under this Contract until he has obtained all the insurance required under this paragraph and such insurance has been approved by the Locality. Each insurance carrier shall be licensed to operate in the State of Texas and listed with the Texas State Board of Insurance. a. Definitions: Certificate of coverage (certificate). A copy of a certificate of insurance, a certificate of authority to self-insure issued by the commission, or a coverage agreement (TWCC-81, TWCC-82, TWCC-83, OR TWCC 84), showing statutory workers compensation insurance coverage for the person s or entity s employees providing services on a project, for the duration of the project. Duration of the project includes the time from the beginning of the work on the project until the Contractor s/person s work on the project has been completed and accepted by the governmental entity. Persons providing services on the project ( subcontractor in para ) includes all persons or entities performing all or part of the services the Contractor has undertaken to perform on the project, regardless of whether that person contracted directly with the Contractor and regardless of whether that person has employees. This includes, without limitation, independent contractors, LNV (160054) 11 of 17 General Conditions Section

30 subcontractors, leasing companies, motor carriers, owner-operators, employees of any such entity, or employees of any entity which furnishes persons to provide services on the project. Services include, without limitation, providing, hauling, or delivering equipment or materials, or providing labor, transportation, or other service related to a project. Services does not include activities unrelated to the project, such as food/beverage vendors, office supply deliveries, and delivery of portable toilets. b. The Contractor shall provide coverage, based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirements of Texas labor Code, Section (44) for all employees of the Contractor providing services on the project, for the duration of the project. c. The Contractor must provide a certificate of coverage to the governmental entity prior to being awarded the contract. d. If the coverage period shown on the Contractor s current certificate of coverage ends during the duration of the project, the Contractor must, prior to the end of the coverage period, file a new certificate of coverage with the governmental entity showing that coverage has been extended. e. The Contractor shall obtain from each person providing services on a project, and provide to the governmental entity: (1) a certificate of coverage, prior to that person beginning work on the project, so the governmental entity will have on file certificates of coverage showing coverage for all persons providing services on the project; and (2) no later than seven (7) days after receipt by the Contractor, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project. f. The Contractor shall retain all required certificates of coverage for the duration of the project and for one year thereafter. g. The Contractor shall notify the governmental entity in writing by certified mail or personal delivery, within 10 days after the Contractor knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project. h. The Contractor shall post on each project site a notice, in the test, form and manner prescribed by the Texas Workers Compensation Commission, informing all persons providing services on the project that they are required to be covered, and stating how a person may verify coverage and report lack of coverage. i. The Contractor shall contractually require each person with whom it contracts to provide services on a project, to: (1) provide coverage, based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirements of Texas labor Code, Section (44) for all of its employees providing services on the project, for the duration of the project; (2) provide to the Contractor, prior to that person beginning work on the project, a certificate of coverage showing that coverage is being provided for all employees of the person providing services on the project, for the duration of the project; LNV (160054) 12 of 17 General Conditions Section

31 (3) provide the Contractor, prior to the end of the coverage period, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project; (4) obtain from each other person with whom it contracts, and provide to the Contractor: (a) a certificate of coverage, prior to the other person beginning work on the project; and (b) a new certificate of coverage showing extension of coverage, prior to the end of the coverage period. If the coverage period shown on the current certificate of coverage ends during the duration of the project; (5) retain all required certificates of coverage on file for the duration of the project and for one year thereafter; (6) notify the governmental entity in writing by certified mail or personal delivery, within 10 days after the person knew or should have known, of any change that materially effects the provision of coverage of any person providing services on the project; and (7) contractually require each person with whom it contracts, to perform as required by paragraphs (1) - (7), with the certificates of coverage to be provided to the person for whom they are providing services. j. By signing this contract or providing or causing to be provided a certificate of coverage, the Contractor is representing to the governmental entity that all employees of the Contractor who will provide services on the project will be covered by workers compensation coverage for the duration of the project, that the coverage will be based on proper reporting of classification codes and payroll amounts, and that all coverage agreements will be filed with the appropriate insurance carrier or, in the case of a selfinsured, with the Commission s Division of Self-Insurance Regulation. Providing false or misleading information may subject the Contractor to administrative penalties, criminal penalties, civil penalties, or other civil actions. k. The Contractor s failure to comply with any of these provisions is a breach of contract by the Contractor which entitles the governmental entity to declare the contract void if the Contractor does not remedy the breach within ten days after receipt of notice of breach from the governmental entity. A. Compensation Insurance: The Contractor shall procure and shall maintain during the life of this Contract Worker's Compensation Insurance as required by the State of Texas for all of his employees to be engaged in work at the site of the project under this Contract and, in case of any such work sublet, the Contractor shall require the subcontractor similarly to provide Worker's Compensation Insurance for all of the employees to be engaged in such work unless such employees are covered by the protection afforded by the Contractor's Worker's Compensation Insurance. B. Contractor's Public Liability and Property Damage Insurance and Vehicle Liability Insurance: The Contractor shall procure and shall maintain during the life of this Contract Contractor's Public Liability Insurance, Contractor's Property Damage Insurance and Vehicle Liability LNV (160054) 13 of 17 General Conditions Section

32 Insurance in the following amounts: Public Liability: $100,000 for injuries to 1 person. $300,000 for each occurrence. In addition to these requirements, the owner requires an additional $1,000,000. Property Damage: $250,000. Automobile Property Damage: $250,000. Automobile Public Liability: $500,000 for injuries to 1 person. $500,000 for each occurrence. NOTE: Automobile insurance shall cover all automobiles and trucks owned by the CONTRACTOR. For terms covered under this Contract, (owner and address) and LNV, Inc., 801 Navigation, Suite 300, Corpus Christi, Texas shall be named as additional insured with respect to general liability. Proper certificates of insurance shall be filed with the ARCHITECT prior to the execution of the Contract. C. Proof of Insurance: 28. Warranty of Title The Contractor shall furnish the Locality with certificates showing the type, amount, class of operations covered, effective dates and date of expiration of policies. Such certificates shall also contain substantially the following statement: "The insurance covered by this certificate will not be canceled or materially altered, except after thirty (30) days written notice has been received by the Locality. No material, supplies, or equipment to be installed or furnished under this Contract shall be purchased subject to any chattel mortgage or under a conditional sale, lease-purchase or other agreement by which an interest is retained by the seller or supplier. The Contractor shall warrant good title to all materials, supplies, and equipment installed or incorporated in the work and upon completion of all work, shall deliver the same together with all improvements and appurtenances constructed or placed by him to the Locality free from any claims, liens, or charges. Neither the Contractor nor any person, firm, or corporation furnishing any material or labor for any work covered by this Contract shall have any right to a lien upon any improvement or appurtenance. Nothing contained in this paragraph, however, shall defeat or impair the right of persons furnishing materials or labor to recover under any law permitting such persons to look to funds due the Contractor in the hands of the Locality. The provisions of this paragraph shall be inserted in all subcontracts and material contracts and notice of its provisions shall be given to all persons furnishing materials for the work when no formal contract is entered into for such materials. 29. Warranty of Workmanship and Materials Neither the final certificate of payment nor any provision in the Contract nor partial or entire use of the improvements included in this Contract by the Locality or the public shall constitute an acceptance of work not done in accordance with the Contract or relieve the Contractor of liability in respect to any express warranties or responsibility for faulty materials or workmanship. The Contractor shall LNV (160054) 14 of 17 General Conditions Section

33 promptly remedy any defects in the work and pay for any damage to other work resulting therefrom which shall appear within a period of twelve (12) months from the date of final acceptance of the work. 30. Compliance with Air and Water Acts a) In compliance with the Clean Air Act, as amended, 41 U.S.C. Sec et. seq., and the regulations of the Environmental Protection Agency with respect thereto, the Contractor agrees that: Any facility to be utilized in the performance of this contract or any subcontract shall not be a facility listed on the EPA List of Violating Facilities pursuant to 40 CFR He will comply with all requirements of Section 114 of the Clean Air Act, as amended. Materials utilized in the project shall be free of any hazardous materials, except as may be specifically provided for in the specifications. b) If the Contractor encounters existing material on sites owned or controlled by the or in material sources that are suspected by visual observation or smell to contain hazardous materials, the Contractor shall immediately notify the Engineer and the Locality. The Locality will be responsible for testing for and removal or disposition of hazardous materials on sites owned or controlled by the Locality. The Locality may suspend the work, wholly or in part during the testing, removal or disposition of hazardous materials on sites owned or controlled by the Locality. 31. Equal Employment Opportunity a) The Contractor will not discriminate against any employee or the applicant for employment because of race, color, religion, sex, or national origin. The Contractor will take affirmative action to ensure that applicants are employed, and that employees are treated during employment, without regard to their race, color, religion, sex, or national origin. Such action shall include, but not be limited to the following: employment, promotion, demotion, or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. The Contractor agrees to post in conspicuous places, available to employees and applicants for employment, notices to be provided by the Locality. b) The Contractor will, in all solicitations or advertisements for employees placed by or on behalf of the Contractor, state that all qualified applicants will receive consideration for employment without regard to race, color, religion, sex, or national origin. c) The Contractor will cause the foregoing provisions to be inserted in all subcontracts for any work covered by this contract so that such provisions will be binding upon each subcontractor, provided that the foregoing provisions shall not apply to contracts or subcontracts for standard commercial supplies or raw materials. d) The goals and timetables for minority and female participation, are as follows: Goals for Minority Participation Goals for Female Participation 0% for Each Trade 0% in Each Trade e) These goals are applicable to all the Contractor's construction work (whether or not it is federal or federally assisted) performed in the covered area. LNV (160054) 15 of 17 General Conditions Section

34 f) The Contractor shall take affirmative actions to ensure equal employment opportunity. The evaluation of the Contractor's compliance with these specifications shall be based upon its effort to achieve maximum results from its actions. g) Contractors are encouraged to participate in voluntary associations which assist in fulfilling their affirmative action obligations. h) A single goal for minorities and a separate single goal for women have been established. The Contractor, however, is required to provide equal employment opportunity and to take affirmative action for all minority groups, both male and female, and all women, both minority and nonminority. i) The Contractor shall not use the goals and timetables or affirmative action standards to discriminate against any person because of race, color, religion, sex, or national origin. j) The Contractor shall not enter into any Subcontract with any person or firm debarred from Government contracts. k) Nothing herein provided shall be construed as a limitation upon the application of other laws which establish different standards of compliance or upon the application of requirements for the hiring of local or other area residents. 32. Affirmative Action for Handicapped Workers The Contractor will not discriminate against any employee or applicant for employment because of physical or mental handicap in regard to any position for which the employee or applicant for employment is qualified. The Contractor agrees to take affirmative action to employ, advance in employment and otherwise treat qualified handicapped individuals without discrimination based upon their physical or mental handicap in all employment practices such as the following: employment, promotion, demotion or transfer, recruitment, advertising, layoff or termination, rates of pay or other forms of compensation, and selection for training, including apprenticeship. 33. Section 109 of the Housing and Community Development Act of 1974 No person in the United States shall on the ground of race, color, national origin, or sex be excluded from participation in, be denied the benefits of, or be subjected to discrimination under any program or activity funded in whole or in part with funds made available under this title. 34. The Provision of Local Training, Employment, and Business Opportunities a) To the greatest extent feasible opportunities for training and employment be given lower income residents of the project area and contracts for work in connection with the project be awarded to business concerns which are located in, or owned in substantial part by persons residing in the area of the project. b) The Contractor will include this clause in every subcontract for work in connection with the project. 35. Non Segregated Facilities The Contractor certifies that he does not and will not maintain or provide for his employees any segregated facilities at any of his establishments, and that he does not and will not permit his employees any segregated facilities at any of his establishments, or permit his employees to perform LNV (160054) 16 of 17 General Conditions Section

35 their services at any location, under his control, where segregated facilities are maintained. As used in this paragraph the term "segregated facilities" means any waiting rooms, work areas, rest rooms and washrooms, restaurants and other eating areas, time clocks, locker rooms and other storage or dressing areas, parking lots, drinking fountains, recreation or entertainment areas, transportation, and housing facilities provided for employees which are segregated by explicit directive or are in fact segregated on the basis of race, creed, color, or national origin, because of habit, local custom, or otherwise. 36. Job Offices a) The Contractor and his subcontractors shall maintain such office and storage facilities on the site as are necessary for the proper conduct of the work. These shall be located so as to cause no interference to any work to be performed on the site. The Locality shall be consulted with regard to locations. b) Upon completion of the improvements, or as directed by the Locality, the Contractors shall remove all such temporary structures and facilities from the site, and leave the site of the work in the condition required by the Contract. 37. Partial Use of Site Improvements a) The Locality may give notice to the Contractor and place in use those sections of the improvements which have been completed, inspected and can be accepted as complying with the technical specifications and if in its opinion, each such section is reasonably safe, fit, and convenient for the use and accommodation for which it was intended, provided: b) The use of such sections of the Improvements shall in no way impede the completion of the remainder of the work by the Contractor. c) The Contractor shall not be responsible for any damages or maintenance costs due directly to the use of such sections. d) The period of guarantee stipulated in the Section herein, shall not begin to run until the date of the final acceptance of all work which the Contractor is required to construct under this Contract. 38. Contract Documents and Drawings The Local Public Agency will furnish the Contractor without charge five (5) copies of the Contract Documents, including Technical Specifications and Drawings. Additional copies requested by the Contractor will be furnished at cost. 39. Contract Period The work to be performed under this contract shall commence within the time stipulated by the Locality in the Notice to Proceed, and shall be fully completed within the time stipulated in the Contractor s bid. 40. Liquidated Damages Since the actual damages for any delay in completion of the work under this contract are impossible to determine, the Contractor and his Sureties shall be liable for and shall pay to the Locality the sum of Two Hundred Dollars ($200.00) as fixed, agreed and liquidated damages for each calendar day of delay from the above stipulated time for completion. LNV (160054) 17 of 17 General Conditions Section

36

37 SECTION SUPPLEMENTARY CONDITIONS DESCRIPTION OF WORK: Elevator and Public Restroom Renovation. The Contractor shall furnish all labor, materials, equipment, tools, services and supervision necessary to perform all the work as described in the Proposal and shall deliver the work complete in all respects and in full accordance with the Contract Documents. All incidental services and materials which may be reasonably inferred as necessary to accomplish the intended end result shall be provided by the Contractor whether or not specifically shown on the Drawings or itemized in the Specifications. CONSTRUCTION SEQUENCE: Within ten (10) days after receiving a written Notice to Proceed the Contractor will be expected to pursue continuous progress of the overall Project from beginning of the work to completion. The Contractor will, in general, be left to schedule his work as he sees fit in so far as the Owner remains satisfied that an orderly progress is being made on the project to the extent of finishing within the stated contract time. The Contractor will, however, be required to coordinate the sequencing of this work with the Owner and various utility companies, and any other individual or entity which may suffer inconvenience or damage as a result of a lack of cooperation in the construction of the project. TIME OF COMPLETION: Construction time is to start ten (10) days after receipt of a written Notice to Proceed. All items of work contemplated in these Specifications and the accompanying drawings are to be fully complete in the number of days specified in the bid proposal. After the notification of final completion and a final inspection, Contractor shall have thirty (30) days to remedy any incomplete or defective work. PROJECT MEETINGS: Prior to starting work, the Contractor shall attend a Pre-Construction Conference to review the Contractor s schedules, to establish procedures for processing applications for payment, and to establish a working understanding between Owner, Architect and Contractor. Representatives of all parties shall be in attendance. Other meetings will be scheduled during the construction as need dictates. LIQUIDATED DAMAGES FOR DELAY: The Contractor agrees that a delay in substantial completion of the project beyond the total number of days anticipated for substantial completion plus such extensions to the allotted time as may be provided for in the General Conditions shall cause a damage to the Owner and that the Owner may withhold, permanently, from the Contractor s total compensation a sum of two hundred dollars ($200.00) per calendar day as the stipulated damages for such delay. GUARANTEES: The Contractor shall provide a warranty which shall guarantee work against defective materials and workmanship for a period of one (1) year from the date of issue of certificate of acceptance. Neither final acceptance nor final payment or any provision in the contract documents will relieve LNV (160054) 1 of 5 Supplementary Conditions Section

38 Contractor of above guarantee. Failure to repair or replace defect upon notice entitles Owner to repair or replace same and recover reasonable cost thereof from the Contractor and/or his surety. PERMITS AND RIGHT-OF-WAY: The Owner will provide right-of-way for the purpose of construction without cost to the Contractor by securing permits in areas of public dedication or by obtaining easements across privately owned property. It shall be the responsibility of the Contractor prior to the initiation of construction on easements through private property, or upon areas of public dedication, to familiarize himself with the requirements of the pertinent easement or permit and to abide by all of the stated terms of such easements or permits. The Contractor shall give notice of intent to begin construction on privately owned property or permitted areas as required by the relevant easement or permit but in no case less than 48 hours before commencing work. MATERIALS AND EQUIPMENT: Incorporate into work only new materials and equipment of domestic manufacture unless otherwise designated. Store these materials and equipment in manner to protect them from damage. REPAIR OF DAMAGE: Driveways, curbs, culverts, yards or items of private or public ownership, if damaged during the course of construction of this project, shall be, to the greatest extent practicable, repaired or replaced to the condition of such items before their being damaged, at no cost. SITE MAINTENANCE AND CLEAN-UP: Maintain work site during construction neat and free of trash, rubbish or other debris. In cleanup operations, remove from site temporary structures, rubbish and waste materials, and leave site in a neat and presentable condition throughout. Dispose of excavated material beyond that which is needed to bring site to required final elevations. MEASUREMENT AND PAYMENT: Estimated quantities shown in the Contract Documents are provided solely for the purpose of allowing a uniform comparison of submitted bids. Payment will be made on either the basis of actual measured quantities or a lump sum as may be relevant to the particular item. For those items for which payment is based on actual measured quantities, the Contractor shall verify all measurements at the site and shall be responsible for the correctness of same. Unit prices shall then be used to calculate payment. Methods of measurement shall be given in the Technical Specifications for each measured item. RETAINAGE: The Owner will retain from the Contractor s monthly estimate and request for payment an amount equal to 5% of the invoice amount. This 5% shall be retained by the Owner until final acceptance of the total project and then paid to the Contractor. PAYMENT FOR MATERIALS ON SITE: Contractor shall present to the Owner with his monthly estimate of production and request for payment a list of all material delivered to the project site, but not installed, with the total invoice cost of that material and the Owner shall pay to the Contractor the invoice cost of such material as has been verified by the Engineer to be on site, less a 5% retainage. On site shall mean on or immediately adjacent to the work area or point of material installation, or a central storage yard or office area which has been set up for the project in the immediate project area. This does not LNV (160054) 2 of 5 Supplementary Conditions Section

39 include material in transit to the job site, material stored in yards or areas located in other towns, or materials stored in a manufacturer s warehouse, even though Contractor may have been invoiced for such material. Materials considered as consumables, i.e. chlorine for disinfection, testing pipe and equipment, etc., shall not be considered as material on-site, and only principle material items shall be considered for payment for material on-site. TAX EXEMPTION: The improvements proposed for construction under the terms of these Contract Documents shall become a part of the utility system of the Owner. The Owner qualifies as an exempt organization under the Limited Sales Excise. Tax Rules and Regulations of the State of Texas. Since the Owner and the Contractor shall be exempt from the state sales tax, the state sales tax shall not be included in the Bid. AMISTAD COMMUNITY HEALTH CENTER, INCORPORATED CORPUS CHRISTI, TX. According to the records of the Comptroller of Public Accounts, the following exemption(s) from Texas taxes apply to the above organization(s): Franchise tax, as of Sales and use tax, as of (Provide Texas sales and use tax exemption certificate Form to vendor) Amistad Community Health Center, Inc. is a tax exempt entity; their Tax ID number is Prior to the execution of the Contract, the Contractor shall obtain a Limited Sales Tax Permit and shall show evidence of this permit when signing the Contract. The Contractor shall then issue Resale Certificates in lieu of payment of the sales tax, on material purchased for incorporation into the project. These instructions are in strict compliance with the State Sales Tax Code, Section The Contractor is assumed to be fully aware of the sales tax regulations and agrees to cooperate fully with the Owner claiming its lawful exemption from the state sales tax. TRAFFIC CONTROL: It will be the Contractor s responsibility to adequately provide for the safety of the public during the course of the construction of the project to include flagmen. He shall provide a traffic control plan approved by the Architect and if necessary, the Texas Dept. of Transportation to adequately provide for the safety of the public during the course of construction of the project. No separate compensation will be paid to the Contractor for traffic control. MATERIALS TESTING: The Owner will provide for the initial testing of materials to be incorporated into the project to such extent as may be desired including the testing of concrete samples taken at the time of concrete placement. The Contractor shall be responsible for supplying samples of materials as may be required for testing. Any re-testing required shall be at the Contractor s expense as stated in the General Conditions. WATER FOR CONSTRUCTION: Water used for the mixing of concrete, jetting or flooding trenches, or testing, or any other purposes incidental to this project, will be furnished by the Contractor. If water is obtained from the Owner s water supply, the Contractor shall make the necessary arrangements for securing and transporting such water and shall take such water in a manner and at such times that will not produce a harmful LNV (160054) 3 of 5 Supplementary Conditions Section

40 drain or decrease pressure in the Owner s water system. There will be no charge to Contractor for water used in the construction of this project. LINES AND GRADES: The Contractor shall hire and pay a registered Engineer to set control stakes (both horizontal and vertical), and detailed construction staking shall be the full responsibility of the Contractor. LOCATION OF AND DAMAGE TO EXISTING UTILITIES: The Contractor shall be solely responsible for all above ground utilities, structures, and appurtenances in regard to protection and replacement or repair of same. The Contractor shall also be solely responsible for visible below ground utilities, structures and appurtenances that may be accurately located by removing manhole covers, valve box covers, and other access point coverings, with a reasonable effort on the part of two workmen, using hand tools for such removal and inspection. The cost of protecting, replacing, or repairing the utilities, structures, and appurtenances covered by this paragraph shall be borne solely by the Contractor and shall be included in the prices bid for the various affected items in the Contract. The Contractor shall notify all private and public utilities 48 hours prior to performing any work in the vicinity of said utilities. Such 48-hour notice shall not include Saturdays, Sundays and holidays. In those instances where faults, caverns or subsidence zones are encountered during construction, the design engineer will make the necessary adjustments and/or modifications to ensure proper installation. This subject is further defined in the detailed specification list which governs this project. CONTRACTOR S FIELD ADMINISTRATION STAFF: The Contractor shall employ for this project, as its field administration staff, superintendents and foremen who are careful and competent and acceptable to the Owner. The criteria upon which the Owner shall make this determination shall include the following: A. The superintendent shall have at least five (5) years experience in the day-to-day field management and oversight of projects of a similar size and complexity to the project which is the subject of this Contract. This experience shall include, but is not limited to, scheduling of manpower and materials, safety, coordination of subcontractors, and familiarity with the submittal process, federal and state wage rate requirements, and contract close-out procedures. B. The foreman shall have at lease five (5) years experience in oversight and management of the work of various subcontractors and crafts. Should the scope of the project be such that a foreman is not required, the Contractor s superintendent shall assume the responsibilities of a foreman. Documentation concerning these matters shall be reviewed by the Owner. The Contractor s field administration staff, and any subsequent substitutions or replacements thereto, shall be approved by the Owner in writing prior to such superintendent or foreman assuming responsibilities on the project. Such written approval of field administration staff is a prerequisite to the Owner s obligation to execute a contract for this project. If such approval is not obtained, the award may be rescinded. Further, such written approval is also necessary prior to a change in field administration staff during the term of this Contract. If the Contractor fails to obtain prior written approval of the Owner concerning any substitutions or replacements in its field administration staff for this project, the award may be rescinded. Further, such written approval is also necessary prior to a change in field administration staff during the term of this Contract. If the Contractor fails to obtain prior written LNV (160054) 4 of 5 Supplementary Conditions Section

41 approval of the Owner concerning any substitutions or replacements in its field administration staff for this project during the term of the Contract, such a failure will constitute a basis to annul the Contract. CHARACTER OF WORKMEN AND CONDITION OF EQUIPMENT: The Contractor shall employ such superintendents, foremen, and workmen as are careful and competent and the Architect may demand the dismissal of any person or persons employed by the Contractor, in, about or on the work who shall misconduct himself or be incompetent or negligent in the proper performance of his or their duties or neglect or refuse to comply with the directions of the Architect, and such person or persons shall not be employed thereon again without the written consent of the Architect. All workmen shall have sufficient skill and experience to perform properly the work assigned them. The Contractor shall furnish such equipment as is considered necessary for the prosecution of the work in an acceptable manner and at a satisfactory rate of progress. All equipment, tools and machinery used for handling materials and executing any part of the work shall be subject to the approval of the Engineer and shall be maintained in a satisfactory working condition. Equipment on any portion of the work shall be such that no injury to the work or adjacent property will result from its use. AS-BUILT DRAWINGS: Contractor shall maintain daily a set of As-Built drawings detailing the location and depths of new and existing utilities. The completed set of As-Builts shall be submitted to the ARCHITECT at the completion of the project. WAGE RATES: a. Section 1606 of the Recovery Act requires that all laborers and mechanics employed by contractors and subcontracts on projects funded directly by or assisted in whole or in part by and through the Federal Government pursuant to the Recovery Act shall be paid wages at rates not less than those prevailing on projects of a character similar in the locality as determined by the Secretary of Labor in accordance with subchapter IV of chapter 3I of title 40, United States code. b. Pursuant to Reorganization Plan No. 14 and the Copeland Act, 40 USC 3145,. The Department of Labor has issued regulations at 29 CFR Parts 1, 3, and 5 to implement the Davis-Bacon and related Acts. Regulations in 29 CFR 5.5 instruct agencies concerning application of the standard Davis-Bacon contract clauses set forth 1nthat section. Federal agencies providing grants, cooperative agreements and loans under the Recovery Act shall ensure that the standard Davis-Bacon contract clauses found in 29 CFR 5.5(a) are incorporated in any resultant covered contracts that arc in excess of $2000 for construction, alteration or repair (including painting and decorating). c. Standard award term when awarding Recovery act funds for construction, alteration, maintenance or repair of a public building or public work that DOES NOT involve iron, steel and or manufactured goods covered under international agreements. END OF SECTION LNV (160054) 5 of 5 Supplementary Conditions Section

42

43 SECTION SUMMARY OF WORK PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, apply to this Section. 1.2 PROJECT/WORK IDENTIFICATION: A. Name of Project is Amistad Community Health Center Elevator and Second Floor Restroom Renovation on contract documents prepared by LNV, Inc. with plans and project specifications dated June List of drawings included in this package are found in Section Drawing Index. B. Contract Documents indicate the work of Contract, and related provisions of project which may include but are not necessarily limited to the following: 1. Existing site conditions. The site is within a functioning medical office building. Hours of operation are from 8:00 am to 5:00pm. 2. Existing site restrictions. No demolition or new construction methods used shall create objectionable noise, excess dust or debris or any other by product of construction that will interfere with the functioning of the existing medical practice during hours of operation. a. Objectionable noise and activities shall be any type of construction activities that would have a negative outcome to adjacent support spaces. C. Existing buildings. The existing building is a steel and concrete structure. Existing partitions to be demolished are metal stud drywall. Existing corridors bordering the area to receive work are to remain open and unobstructed. D. Summary by References: Work of Contract can be summarized by reference to the Contract General Conditions, Supplementary General Conditions, Specification Sections as listed in the "Index of Specification Sections" bound herewith Drawings as listed in Schedule of Drawings" bound herewith, Addenda and Modifications to the Contract Document issued subsequent to the initial printing of this project manual, and including but not necessarily limited to printed matter referenced by any of these. It is recognized that work of Contract is also unavoidably affected or influenced by governing regulations, natural phenomenon including weather conditions, and other forces outside the Contract Documents. E. Abbreviated Written Summary: Briefly, and without force and effect upon contract documents, work of Contract can be summarized as follows: 1. Minor demolition or removal of existing walls, partitions, casework, cabinetry, countertops, doors, door frames, ceilings, ceiling grid system, window treatment, flooring, mechanical, electrical, and plumbing system components, etc., as required to facilitate the installation of new elements. Patching and repair of LNV (160054) 1 of 4 Summary of Work Section

44 existing construction. Installation of gypsum board drywall partitions, casework, cabinetry, countertops, doors, door frames, floor, wall and ceiling finishes, and mechanical, plumbing and electrical system components, etc., as indicated in the Construction Documents and as required for full and complete operation. 2. The work includes renovations to the second floor and elevator of the interior of the existing building. Landscape development, utilities, paving and other site work are not required. Phasing of construction to allow continued operation of the surrounding area will not be required. 3. The work includes normal interior finishes including woodwork and painting. 4. The work also includes certain items of equipment including plumbing fire protection, heating-ventilating-air conditioning, electrical systems, lighting, and communication -alarm-signal systems. 1.3 ALTERATIONS AND COORDINATION A. General: The work of this Contract includes coordination of entire work of project, including preparation of general coordination drawings/diagrams/ schedules, and control of site utilization; from the beginning of activity, through the project close- out and warranty periods. B. Location of all pipes, ducts, outlets, appliances, etc., as shown on the Drawings arc approximate only and are understood to be subject to such revisions as may prove necessary or desirable at the time the work is installed. Each Contractor will be required to install his work with relation to existing building conditions and shall be entirely responsible for the correctness of his work with reference lo finished elevations, etc. C. The Drawings show the arrangement of piping and ductwork. Should local conditions necessitate any rearrangement or if the piping or ductwork can be installed to better advantage in a different manner, the Contractor shall, before proceeding with the work, prepare and submit five (2) copies of Drawings of the proposed arrangement for the Architect's review. D. If the Contractor proposes to install equipment, including piping and ductwork, requiring space conditions other than those shown, or to rearrange the equipment, he shall assume full responsibility for the rearrangement of the space and shall have the Architect review the change before proceeding with the work. The request for such changes shall be accomplished by Shop Drawings of the space in question. E. Contractor is responsible for the proper location and size of all slots, holes or openings in the building structure pertaining to his work, and for the correct location of pipe sleeves. F. Contractor shall so coordinate the work of the several various trades that it may be installed in the most direct and workmanlike manner without hindering or handicapping the other trades. Piping interferences shall be handled by giving precedence to pipe lines, which require a slated grade for proper operation. Sewer lines and condensate piping shall take precedence over water lines in determination of elevations. Where there is interference between sewer lines and condensate lines, the sower lines shall have precedence and provisions shall be made in the condensate lines for looping them around the sewer lines. In all cases, lines requiring a stated elevation for their proper operation shall have precedence over electrical conduit and ductwork. LNV (160054) 2 of 4 Summary of Work Section

45 G. All piping and ductwork in finished areas, except where noted to the contrary, shall be installed in chases, furred spaces, above ceiling, etc. In all cases, pipes and ducts shall be installed as high as possible. Runs of piping shall he grouped whenever it is feasible to do so. H. All oiling devices and all parts of equipment requiring adjustments shall be easily accessible. I. Alterations: Where applicable, requirements of contract documents apply for alteration work in same manner as for new work. 1.4 MISCELLANEOUS AND GENERAL PROVISIONS A. Cutting and Patching: 1. Definition: Includes cutting and patching of both previously existing work and nominally completed portions of Contract work. Excludes shop fabrication of work and normal installation procedures including the drilling of holes to install fasteners. Excludes special categories of work identified as alterations, demolition, cleaning, removal/ replacement of non-complying work and similar activities although some of these activities may require cutting and patching. 2. General: Specific requirements and limitations for cutting and patching are shown and specified for certain types of work, and specified in other sections of Division 1 as required quality control procedures for general application to performance of the work. B. Mechanical/Electrical Requirements of General Work: 1. General: Except as otherwise indicated, comply with applicable requirements of Division 15 sections for mechanical provisions within units of general work, and comply with applicable requirements of Division 16 sections for electrical provisions within units of general work. Refer to Division 15 and Division 16 sections for characteristics of mechanical and electrical services to be connected to units of general work, and provide units manufactured/fabricated for proper connection and utilization of available services as indicated. a. Service Connections: Except as otherwise indicated, final connection of mechanical services to general work is defined as mechanical work, and final connection of electrical services to general work is defined as electrical work. 2. Mechanical and Electrical Requirements: Provide all equipment, material, labor and services necessary for the insta1lation of a complete electrical system. The drawings show in schematic fom1 the quantity, general location, size, and interconnection of the items required to complete the system. Locations not dimensioned arc approximate and placement should be coordinated with other trades and maintenance considerations. a. Except as otherwise indicated, comply with applicable provisions of NEC and standards by NEMA for electrical components of general work. Provide UL listed and labeled products where applicable. b. Electrical components are recognized to include, but not by way of limitation, motors, motor starters, internal equipment wiring, integral LNV (160054) 3 of 4 Summary of Work Section

46 control switches and similar electrical devices, electrical heating coils integrated lighting equipment, electronic equipment, electrical sensors and signals, communication equipment, scientific devices and similar electrical components. c. Contractor shall pay all fees for licenses, deposits, inspection and permits required in connection with the work. d. Mechanical and electrical work shall be performed under the supervision of a competent superintendent who cannot be removed from the project without the owners approval or request. e. Where work penetrates waterproofing, including waterproof concrete, the method of installation shall be as approved by the Architect before work proceeds. Contractor shall furnish all necessary sleeves, caulking and flashing required to make openings absolutely watertight. f. It is imperative that clinic utilities and other services be maintained at all times except for scheduled interruptions. Should emergency repairs be required to systems that exist within construction limits the contractor shall cooperate with the owner to insure that these services are restored as soon as possible, Provide necessary temporary services and connections required to provide uninterrupted continuance of building services except as otherwise permitted by owner. g. Necessary shutdown of any utility shall be approved by the Hospital and Owner's representative as least 24 hours in advance. If necessary, work must be performed at night, over the weekend, or during holidays to avoid interruption during regular working hours, no extra payment will be made for such work, END OF SECTION LNV (160054) 4 of 4 Summary of Work Section

47 SECTION PROJECT MANAGEMENT AND COORDINATION PART 1 GENERAL 1.1 SECTION INCLUDES A. Coordination. B. Field engineering. C. Cutting and patching. D. Preconstruction conference. E. Site mobilization conference. F. Progress meetings. G. Pre-installation conferences. 1.2 COORDINATION A. Coordinate scheduling, submittals, and Work of the various Sections of specifications to assure efficient and orderly sequence of installation of interdependent construction elements, with provisions for accommodating items installed later. B. Verify that utility requirement characteristics of operating equipment are compatible with building utilities. Coordinate work of various Sections having interdependent responsibilities for installing, connecting, and placing in service, such equipment. C. Coordinate space requirements and installation of mechanical and electrical work which are indicated diagrammatically on Drawings. Follow routing shown for pipes, ducts, and conduit, as closely as practicable; place runs parallel with line of building. Utilize spaces efficiently to maximize accessibility for other installations, for maintenance, and for repairs. D. In finished areas except as otherwise indicated, conceal pipes, ducts, and wiring within the construction. Coordinate locations of fixtures and outlets with finish elements. E. Coordinate completion and cleanup of Work of separate Sections in preparation for Substantial Completion. F. After Owner occupancy of premises, coordinate access to site for correction of defective Work and Work not in accordance with Contract Documents, to minimize disruption of Owner's activities. LNV (160054) Page 1 of 3 Project Management and Coordination Section

48 1.3 CUTTING AND PATCHING A. Refer to Section PRECONSTRUCTION CONFERENCE A. Owner will schedule a conference after Notice of Award. B. Attendance Required: Owner, Architect/Engineer, and Contractor, and major subcontractors. C. Agenda: 1. Distribution of Contract Documents. 2. Submission of list of Subcontractors, list of products, Schedule of Values, and progress schedule. 3. Designation of personnel representing the parties in Contract, and the Architect/Engineer. 4. Procedures and processing of field decisions, submittals, substitutions, applications for payments, proposal request, Change Orders and Contract closeout procedures. 5. Scheduling. 1.5 SITE MOBILIZATION CONFERENCE A. Architect/Engineer may schedule a conference at the Project site prior to Contractor occupancy. B. Attendance Required: Owner, Architect/Engineer, and Contractor Contractor's Superintendent, and major Subcontractors. C. Agenda: 1. Use of premises by Owner and Contractor. 2. Owner's requirements. 3. Construction facilities and controls provided by Owner. 4. Temporary utilities provided by Owner. 5. Survey and building layout. 6. Security and housekeeping procedures. 7. Schedules. 8. Procedures for testing. 9. Procedures for maintaining record documents. 10. Requirements for start-up of equipment. 11. Inspection and acceptance of equipment put into service during construction period. 1.6 PROGRESS MEETINGS A. Schedule and administer meetings throughout progress of the Work as determined by the Architect. 1.7 PREINSTALLATION CONFERENCES LNV (160054) Page 2 of 3 Project Management and Coordination Section

49 A. When required in individual specification Section, convene a pre-installation conference at work site prior to commencing work of the Section. Obtain final confirmation of Architect for necessity of meeting. B. Require attendance of parties directly affecting, or affected by, work of the specific Section. C. Notify Architect/Engineer four days in advance of meeting date. D. Review conditions of installation, preparation and installation procedures, and coordination with related work. PART 2 PART 3 PRODUCTS (Not Used) EXECUTION (Not Used) END OF SECTION LNV (160054) Page 3 of 3 Project Management and Coordination Section

50

51 SECTION SUBMITTAL PROCEDURES PART 1 GENERAL 1.1 SECTION INCLUDES A. Submittal procedures. B. Construction progress schedules. C. Product and Design data. D. Shop Drawings. E. Samples. F. Test reports. G. Certificates. H. Manufacturer's instructions. I. Manufacturer's field reports. J. Erection Drawings. K. Operation and Maintenance Manuals L. Other submittals. M. Contractor review. N. Architect review. 1.2 SUBMITTAL PROCEDURES A. Scheduling and Handling 1. Contractor shall identify all critical path items and schedule submittals sufficiently in advance of the need for the material or equipment to expedite Project construction. Provide submittals on the critical path (i.e. long lead) items as soon as possible to avoid impacting or delaying construction schedule. Coordinate submission of related items. 2. Develop a submittal schedule that allows sufficient time for initial review, correction, resubmission and final review of all submittals. Allow time for fabrication, purchase, testing, and delivery of material or equipment once submittal is approved. 3. The Architect will review and return submittals to the Contractor as expeditiously as possible but the amount of time required for review will vary depending on the complexity and quantity of data submitted. For each submittal for review, allow 15 calendar days excluding delivery time to and from Contractor/Architect. This time for review shall in no way be justification for delays or additional compensation to the Contractor. 4. Distribute copies of reviewed submittals as appropriate. Instruct parties to promptly report inability to comply with requirements. LNV (160054) Page 1 of 6 Submittal Procedures Section

52 5. Submittals not requested will not be recognized nor processed. 6. Incomplete, improperly packaged, and submittals from sources other than the Contractor will not be accepted or reviewed. Complete submittals for each item are required. Delays resulting from incomplete submittals are not the responsibility of Architect. B. Transmittal Form and Numbering 1. Transmit each submittal with Transmittal Letter. Group submittals of related products in a single submission but each submittal shall only contain related types of work, material, product, or equipment. Unrelated mixed/combined submittals will not be accepted. 2. Sequentially number transmittal forms. Mark revised submittals with original number and sequential alphabetic suffix. 3. Identify: Date, Project Name and Number, Contractor, Subcontractor and supplier, pertinent Drawing and detail number, and Specification Section number appropriate to submittal. 4. Apply Contractor's stamp, signed or initialed, certifying that review, approval, verification of products required, field dimensions, adjacent construction Work, and coordination of information is according to requirements of the Work and Contract Documents, except as noted by any requested variance. 5. Identify any deviations from the Contract Documents and product or system limitations that may be detrimental to successful performance of completed Work. 6. Allow space on submittals for Contractor and Architect review stamps. 7. When revised for resubmission, identify changes made since previous submission. 1.3 CONSTRUCTION PROGRESS SCHEDULES A. At least 3 days prior to the pre-construction conference, submit preliminary construction schedule defining planned operations for the Work. B. At least 3 days prior to the monthly construction meeting, submit updated construction progress schedule. C. Construction Progress Schedule shall include: 1. Overall percent complete, projected and actual. 2. Completion progress by listed activity and sub-activity, to within 5 days prior to submittal. 3. Changes in Work scope and activities modified since submittal. 4. Delays in submittals or resubmittals, deliveries, or Work. 5. Adjusted or modified sequences of Work. 6. Other identifiable changes. 7. Revised projections of progress and completion. 1.4 PRODUCT AND DESIGN DATA A. Submit to Architect for review for assessing conformance with information given and design concept expressed in Contract Documents. Provide product and design data such as manufacturer's brochures, catalog pages, illustrations, diagrams, tables, performance charts, and other material which describe appearance, size, attributes, code and standard compliance, ratings, and other product characteristics. Provide all critical information such as design strengths, mixes, reference standards, performance characteristics, capacities, power requirements, wiring and piping diagrams, controls, component parts, finishes, dimensions, and required clearances. B. Where required by specification sections provide basic calculations, analyses, and data to support design decisions and demonstrate compliance with specified requirements. State assumptions and define parameters. Give general formulas and references. Provide sketches as required to illustrate design method and application. Arrange calculations and data in a LNV (160054) Page 2 of 6 Submittal Procedures Section

53 logical manner with suitable text to explain assumptions, procedures and order. Indicate name, title, and telephone number of individual performing design and include Professional Architect s seal, registered in the state the project is located in, where applicable or required. C. Submit number of hard copies Contractor requires, plus two (2) hard copies Architect/Owner will retain, unless specified otherwise in the individual specification sections. Deliver hard copies of submittals to Architect at business address. D. Submit one (1) electronic submittals via as PDF electronic files. E. Mark each copy to identify applicable products, models, options, and other data. Supplement manufacturers' standard data to provide information specific to this Project. F. Indicate product utility and electrical characteristics, utility connection requirements, and location of utility outlets for service for functional equipment and appliances. 1.5 SHOP DRAWINGS A. Submit to Architect for assessing conformance with information given and design concept expressed in Contract Documents. B. Indicate special utility and electrical characteristics, utility connection requirements, and location of utility outlets for service for functional equipment and appliances. C. When required by individual Specification Sections, provide Shop Drawings signed and sealed by a Professional Architect, registered in the state the Project is located, responsible for designing components shown on Shop Drawings. 1. Include signed and sealed calculations to support design. 2. Submit Shop Drawings and calculations in form suitable for submission to and approval by authorities having jurisdiction. 3. Make revisions and provide additional information when required by authorities having jurisdiction. 1.6 SAMPLES A. Submit to Architect for assessing conformance with information given and design concept expressed in Contract Documents. B. Submit Samples to illustrate functional and aesthetic characteristics of products, with integral parts and attachment devices. Include full range of manufacturer s standard finishes, indicating colors, textures, finishes and patterns for Architect s selection. Coordinate Sample submittals for interfacing work. C. Include identification on each Sample, with full Project information. D. Submit number of Samples specified in individual Specification Sections; Architect will retain one (1) Sample. 1.7 TEST REPORTS A. Submit reports for Architect's knowledge as Contract administrator or for Owner. B. Submit test reports for information for assessing conformance with information given and design concept expressed in Contract Documents. LNV (160054) Page 3 of 6 Submittal Procedures Section

54 1.8 CERTIFICATES A. Submit certification of compliance by manufacturer, installation/application Subcontractor, or Contractor to Architect. B. Indicate material or product conforms to or exceeds specified requirements. Submit supporting reference data, affidavits, and certifications as appropriate. C. Certificates may be recent or previous test results on material or product but must be acceptable to Architect. 1.9 MANUFACTURER'S INSTRUCTIONS A. Submit manufacturer's installation instructions for Architect's knowledge as Contract administrator or for Owner. B. Submit printed instructions for delivery, storage, assembly, installation, startup, adjusting, and finishing, to Architect. C. Indicate special procedures, perimeter conditions requiring special attention, and special environmental criteria required for application or installation MANUFACTURER'S FIELD REPORTS A. Submit reports for Architect's knowledge as Contract administrator or for Owner. B. Submit report within 5 days of observation to Architect for information. C. Submit reports for information for assessing conformance with information given and design concept expressed in Contract Documents ERECTION DRAWINGS A. Submit Drawings for Architect's knowledge as Contract administrator or for Owner. B. Submit Drawings for information assessing conformance with information given and design concept expressed in Contract Documents. C. Data indicating inappropriate or unacceptable Work may be subject to action by Architect or Owner OPERATIONS AND MAINTENANCE MANUALS A. Where required by specification section , provide operation and maintenance manuals. B. Submission: 1. O&M manuals should be submitted electronically when possible. The size of the file shall determine delivery method. 2. Submit for review one draft copy 30 days prior to need date or as otherwise specified. This copy will be returned after review with Architect's comments. Revise content as required. LNV (160054) Page 4 of 6 Submittal Procedures Section

55 3. Once approved, submit three (3) copies of complete, final operation and maintenance manuals. All manuals shall be submitted prior to or in conjunction with equipment startup. C. Contents: 1. Equipment list (name and schedule #) as provided in drawings. 2. Operating instructions (normal and emergency), including diagnostic checks. 3. Preventive Maintenance Schedule. 4. Installation instructions and pre-operational checks for equipment and other products. 5. Equipment start-up sheets (by vendor in field). 6. Recommended spare parts list. 7. Wiring diagrams, as applicable. 8. Shop drawings, as applicable. 9. Test and balance (T&B) reports, and other field quality reports. 10. Statement of General Contractor s one-year warranty 11. Copies of extended warranties, as applicable. 12. Calibration procedures, if applicable. 13. Installation, maintenance and care instructions for hardware, coverings and finishes. 14. Other material and information as indicated in individual specification sections and as necessary for operation and maintenance. D. Form: 1. Manuals shall be 8-1/2 x 11 inch text pages bound in three ring expansion binders with a hard durable cover with clear plastic pocket on front for title page. 2. Prepare binder covers with printed subject title of manual, title of project, date, and volume number when multiple binders are required. Printed project information shall be on face and spine. 3. Internally subdivide the binder contents with divider sheets with typed tab titles under reinforced plastic tabs. Place dividers at beginning of each chapter, part, section, and appendix. 4. All items in previous sub-section shall be placed in specification section order and shall be placed in tabs for associated equipment or products. 5. Provide pocket folders for folded sheets and/or shop drawings. 6. Provide a table of contents for each volume, with directory listing on sub-sequent pages. Directory listing shall have names addresses, and telephone numbers of Contractor, subcontractors, equipment suppliers, and nearest service representatives, and design consultant as appropriate OTHER SUBMITTALS A. Closeout Submittals: Comply with Section Execution and Closeout Requirements. B. Submit informational data for Architect's knowledge as Contract administrator or for Owner. C. Submit information for assessing conformance with information given and design concept expressed in Contract Documents CONTRACTOR REVIEW A. Review for compliance with Contract Documents and approve submittals before transmitting to Architect. B. Contractor shall be responsible for: 1. Determination and verification of materials including manufacturer's catalog numbers. 2. Determination and verification of field measurements and field construction criteria. LNV (160054) Page 5 of 6 Submittal Procedures Section

56 3. Checking and coordinating information in submittal with requirements of Work and of Contract Documents. 4. Determination of accuracy and completeness of dimensions and quantities. 5. Confirmation and coordination of dimensions and field conditions at Site. 6. Construction means, techniques, sequences, and procedures. 7. Safety precautions. 8. Coordination of submittals to avoid conflicts between various items of Work and performance of Work of all trades. C. Stamp, sign or initial, and date each submittal to certify compliance with requirements of Contract Documents. D. Do not fabricate products or begin Work for which submittals are required until approved submittals have been received from Architect ARCHITECT REVIEW A. The Architect s review of submittals covers only general conformity to the Drawings and Specifications. The Contractor is responsible for quantity determination and no quantities will be verified by the Architect. The Contractor is responsible for any errors, omissions, or deviations from the Contract Documents and Architect s review of submittals in no way relieves the Contractor from his obligation to furnish required items according to the Drawings and Specifications. No material or equipment shall be incorporated into the Work or included in monthly pay requests until submittal has been reviewed and approval has been obtained in the specified manner. B. Do not make "mass submittals" to Architect. "Mass submittals" are defined as six (6) or more submittals or items in one day or twelve (12) or more submittals or items in one week. If "mass submittals" are received, Architect's review time stated above will be extended as necessary to perform proper review. Architect will review "mass submittals" based on priority determined by Architect after consultation with Owner and Contractor. C. Informational submittals and other similar data are for Architect's information, do not require Architect's responsive action, and will not be reviewed or returned with comment. D. Submittals made by Contractor that are not required by Contract Documents may be returned without action. E. Submittal approval does not authorize changes to Contract requirements unless accompanied by Change Order. F. Owner may withhold monies due to Contractor to cover additional costs beyond the second submittal review. PART 2 PRODUCTS - Not Used PART 3 EXECUTION - Not Used END OF SECTION LNV (160054) Page 6 of 6 Submittal Procedures Section

57 SECTION ALTERATION PROJECT PROCEDURES PART 1 - GENERAL 1.1 SECTION INCLUDES A. Products and installation for patching and extending Work. B. Transition and adjustments. C. Repair of damaged surfaces, finishes, and cleaning. 1.2 RELATED SECTIONS A. Section Project Management and Coordination: Work sequence, owner occupancy, and maintenance of utility services. Cutting and patching. B. Section Temporary Facilities and Controls: Temporary enclosures, protection of installed work, and cleaning during construction. PART 2 - PRODUCTS 2.1 PRODUCTS FOR PATCHING AND EXTENDING WORK A. New Materials: As specified in product sections; match existing Products and work for patching and extending work. B. Type and Quality of Existing Products: Determine by inspecting and testing Products where necessary, referring to existing Work as a standard. PART 3 - EXECUTION 3.1 EXAMINATION A. Verify that demolition is complete and areas are ready for installation of new Work. B. Beginning of restoration Work means acceptance of existing conditions. 3.2 PREPARATION A. Cut, move, or remove items as necessary for access to alterations and renovation Work. Replace and restore at completion. B. Remove unsuitable material not marked for salvage, such as rotted wood, corroded metals, and deteriorated masonry and concrete. Replace materials as specified for finished Work. C. Remove debris and abandoned items from area and from concealed spaces. D. Prepare surface and remove surface finishes to provide for proper installation of new work and LNV (160054) 1 of 3 Alteration Project Procedures Section

58 finishes. E. Close openings in exterior surfaces to protect existing work from weather and extremes of temperature and humidity. Insulate duct work and piping to prevent condensation in exposed areas. 3.3 INSTALLATION A. Coordinate work of alterations and renovations to expedite completion and to accommodate Owner occupancy. B. Remove, cut, and patch Work in a manner to minimize damage and to provide a means of restoring Products and finishes to original condition in accordance with Section C. Refinish visible existing surfaces to remain in renovated rooms and spaces, to specified condition for each material, with a neat transition to adjacent finishes in accordance with Section D. Designated areas, Rooms and spaces, and Finishes: Complete including operational mechanical and electrical work. E. In addition to specified replacement of equipment and fixtures restore existing plumbing, ventilation, air conditioning, and electrical, systems to full operational condition. F. Re-cover and refinish Work that exposes mechanical and electrical work exposed accidently during the work. G. Install Products as specified in individual sections. 3.4 TRANSITIONS A. Where new Work abuts or aligns with existing, perform a smooth and even transition. Patch Work to match existing adjacent Work in texture and appearance. B. When finished surfaces are cut so that a smooth transition with new Work is not possible, terminate existing surface along a straight line at a natural line of division and make recommendation to Architect/Engineer. 3.5 ADJUSTMENTS A. Where removal of partitions or walls results in adjacent spaces becoming one, rework floors, walls, and ceilings to a smooth plane without breaks, steps, or bulkheads. B. Where a change of plane of 1/4 inch or more occurs, submit recommendation for providing a smooth transition for Architect/Engineer review and request instructions from Architect/Engineer. C. Trim existing doors as necessary to clear new floor finish. Refinish trim as required. D. Fit work at penetrations of surfaces as specified in Section REPAIR OF DAMAGED SURFACES LNV (160054) 2 of 3 Alteration Project Procedures Section

59 A. Patch or replace portions of existing surfaces which are damaged, lifted, discolored, or showing other imperfections. B. Repair substrate prior to patching finish. 3.7 FINISHES A. Finish surfaces as specified in individual Product sections. B. Finish patches to produce uniform finish and texture over entire area. When finish cannot be matched, refinish entire surface to nearest intersections. 3.8 CLEANING A. In addition to cleaning specified in Section clean Owner occupied areas of work. END OF SECTION LNV (160054) 3 of 3 Alteration Project Procedures Section

60

61 SECTION DEFINITIONS PART 1 GENERAL 1.1 SUMMARY A. This section specifies administrative requirements for compliance with governing regulations, codes, and standards. B. Requirements include obtaining permits, licenses, inspections, releases, and similar documentation as well as payments, statements, and similar requirements associated with regulations, codes, and standards DEFINITIONS A. General: Definitions contained in this article are not necessarily complete but are general to the extent that they are not defined more explicitly elsewhere in the Contract Documents. B. Indicated: Indicated refers to graphic representations, notes, or schedules on the drawings; other paragraphs or schedules in the specifications; and similar requirements in the Contract Documents. Where terms such as shown, noted, and specified are used, it is to help locate the reference; no limitation on location is intended except as specifically noted. C. Directed: Terms such as directed, requested, authorized, selected, approved, required, and permitted mean directed by the Engineer, requested by the Engineer, and similar phrases. However, no implied meaning will be interpreted to extend the Engineer s responsibility into the Contractor s area of construction supervision. D. Approved: The term approved, where used in conjunction with the Engineer s action on the Contractor s submittals, applications, and requests, is limited to the responsibilities and duties of the Engineer stated in the General and Special Conditions. Such approval will not release the Contractor from responsibility to fulfill Contract Document requirements unless otherwise provided in the Contract Documents. E. Regulations: The term regulations includes laws, statutes, ordinances, and lawful orders issued by authorities having jurisdiction as well as rules, conventions, and agreements within the construction industry that control performance of the work, whether they are lawfully imposed by authorities having jurisdiction or not. F. Furnish: The term furnish is used to mean supply and deliver to the Project site, ready for unloading, unpacking, assembly, installation, and similar operations. G. Install: The term install is used to describe operations at the Project site including the actual unloading, unpacking, assembly, erection, placing, anchoring, applying, working to dimension, finishing, curing, protecting, cleaning and similar operations. H. Provide: The term provide means to furnish and install, complete and ready for the intended use. LNV (160054) Page 1 of 3 Definitions Section

62 I. Installer: An installer is an entity engaged by the Contractor, either as an employee, subcontractor, or sub-subcontractor, for performance of a particular construction activity including installation, erection, application, and similar operations. Installers are required to be experienced in the operations they are engaged to perform. J. Project Site: That space made available by the Engineer to the Contractor for performance of the Work either exclusively or in conjunction with others performing other construction as part of the Project. The overall extent of the Project site is shown on the drawings. K. Testing Laboratories: A testing laboratory is an independent entity engaged to perform specific inspections or tests, either at the Project site or elsewhere, and to report on and, if required, interpret results of those inspections or tests INDUSTRY STANDARDS A. Applicability of Standards: 1. Except where the Contract Documents include more stringent requirements, applicable construction industry standards have the same force and effect as if bound or copied directly into the Contract Documents. Such standards are made a part of the Contract Documents by reference. 2. Referenced standards take precedence over standards that are not referenced but recognized in the construction industry as standard practice. B. Publication Dates: Where compliance with an industry standard is required, comply with the standard in effect as of the date of the Contract Documents. C. Conflicting Requirements: 1. Where compliance with two or more standards is specified, and they establish different or conflicting requirements for minimum quantities or quality levels, the most stringent requirement will be enforced unless the Contract Documents indicate otherwise. Refer requirements that are different but apparently equal and uncertainties as to which level is more stringent to the Engineer for a decision before proceeding. 2. Minimum Quantities or Quality Levels: In every instance, the quantity or quality level shown or specified will be the minimum to be provided or performed. The actual installation may comply exactly, within specified tolerances, with the minimum quantity or quality specified, or it may exceed that minimum within reasonable limits. In complying with these requirements, indicated numeric values are minimum or maximum values as noted or appropriate for the context of the requirements. Refer instances of uncertainty to the Engineer for decision before proceeding. D. Copies of Standards: Each entity engaged in construction on the project is required to be familiar with industry standards applicable to that entity s construction activity. Copies of applicable standards are listed but not included with the Contract Documents. Also refer to paragraph 1.03-A-1 of this Section. E. Abbreviations and Names: Trade association names and titles of general standards are frequently abbreviated. Where acronyms or abbreviations are used in the specifications or other Contract Documents, they mean the recognized name of the trade association, standards generating organization, authority having jurisdiction, or other entity applicable to the context of the text provision. LNV (160054) Page 2 of 3 Definitions Section

63 PART 2 PRODUCTS (Not Used) PART 3 EXECUTION (Not Used) PART 4 MEASUREMENT & PAYMENT (Not Used) END OF SECTION LNV (160054) Page 3 of 3 Definitions Section

64

65 SECTION REFERENCE STANDARDS PART 1 - GENERAL 1.1 SECTION INCLUDES A. Quality assurance. B. Schedule of references. 1.2 RELATED SECTIONS A. Document - General Conditions: Reference Standards. 1.3 QUALITY ASSURANCE A. For products or workmanship specified by association, trade, or Federal Standards, comply with requirements of the standard, except when more rigid requirements are specified or are required by applicable codes. B. Conform to reference standard by date of issue current on date of Contract Documents or date specified in Product Sections. C. Obtain copies of standards when required by Contract Documents. D. Maintain copy at jobsite during submittals, planning, and progress of the specific work, until Substantial Completion. E. Should specified reference standards conflict with Contract Documents, request clarification from Architect/Engineer before proceeding. F. The contractual relationship of the parties to the Contract shall not be altered from the Contract Documents by mention or inference otherwise in any reference document. 1.4 SCHEDULE OF REFERENCES AA AABC AASHTO Aluminum Association 818 Connecticut Avenue, N.W. Washington, DC Associated Air Balance Council 1000 Vermont Avenue, N.W. Washington, DC American Association of State Highway and Transportation Officials 444 North Capitol Street, N.W. Washington, DC LNV (160054) 1 of 7 Reference Standards Section

66 ACI ADC AGC AI AIA AISC AISI AITC AMCA ANSI APA ARI American Concrete Institute Box Reford Station Detroit, MI Air Diffusion Council 230 North Michigan Avenue Chicago, IL Associated General Contractors of America 1957 E Street, N.W. Washington, DC Asphalt Institute Asphalt Institute Building College Park, MD American Institute of Architects 1735 New York Avenue, N.W. Washington, DC American Institute of Steel Construction 400 North Michigan Avenue Eighth Floor Chicago, IL American Iron and Steel Institute th Street, N.W. Washington, DC American Institute of Timber Construction 333 W. Hampden Avenue Englewood, CO Air Movement and Control Association 30 West University Drive Arlington Heights, IL American National Standards Institute 1430 Broadway New York, NY American Plywood Association Box Tacoma, WA Air-Conditioning and Refrigeration Institute 1501 Wilson Boulevard Arlington, VA LNV (160054) 2 of 7 Reference Standards Section

67 ASHRAE ASME ASPA ASTM AWI AWPA AWS AWWA BIA CDA CLFMI CRSI American Society of Heating, Refrigerating and Air Conditioning Engineers 1791 Tullie Circle, N.E. Atlanta, GA American Society of Mechanical Engineers 345 East 47th Street New York, NY American Sod Producers Association 4415 West Harrison Street Hillside, IL American Society for Testing and Materials 1916 Race Street Phildelphia, PA Architectural Woodwork Institute 2310 South Walter Reed Drive Arlington, VA American Wood-Preservers' Association 7735 Old Georgetown Road Bethesda, MD American Welding Society 550 LeJeune Road, N.W. Miami, FL American Water Works Association 6666 West Quincy Avenue Denver, CO Brick Institute of America Commerce Park Drive Reston, VA Copper Development Association 57th Floor, Chrysler Building 405 Lexington Avenue New York, NY Chain Link Fence Manufacturers Institute 1101 Connecticut Avenue, N.W. Washington, DC Concrete Reinforcing Steel Institute 933 Plum Grove Road Schaumburg, IL LNV (160054) 3 of 7 Reference Standards Section

68 DHI EJCDC EJMA FGMA FM FS GA ICBO IEEE IMIAC Door and Hardware Institute 7711 Old Springhouse Road McLean, VA Engineers' Joint Contract Documents Committee American Consulting Engineers Council th Street, N.W. Washington, DC Expansion Joint Manufacturers Association 25 North Broadway Tarrytown, NY Flat Glass Marketing Association 3310 Harrison White Lakes Professional Building Topeka, KS Factory Mutual System 1151 Boston-Providence Turnpike P.O. Box 688 Norwood, MA Federal Specification General Services Administration Specifications and Consumer Information Distribution Section (WFSIS) Washington Navy Yard, Bldg. 197 Washington, DC Gypsum Association 1603 Orrington Avenue Evanston, IL International Conference of Building Officials 5360 S. Workman Mill Road Whittier, CA Institute of Electrical and Electronics Engineers 345 East 47th Street New York, NY International Masonry Industry All-Weather Council International Masonry Institute th Street, N.W. Washington, DC LNV (160054) 4 of 7 Reference Standards Section

69 MBMA MFMA MIL ML/SFA NAAMM NCMA NEBB NEMA NFPA NFPA NSWMA NTMA Metal Building Manufacturer's Association 1230 Keith Building Cleveland, OH Maple Flooring Manufacturers Association 60 Rivere Drive Northbrook, IL Military Specification Naval Publications and Forms Center 5801 Tabor Avenue Philadelphia, PA Metal Lath/Steel Framing Association 221 North LaSalle Street Chicago, IL National Association of Architectural Metal Manufacturers 221 North LaSalle Street Chicago, IL National Concrete Masony Association P.O. Box 781 Herndon, VA National Environmental Balancing Bureau 8224 Old Courthouse Road Vienna, VA National Electrical Manufacturers' Association 2101 'L' Street, N.W. Washington, DC National Fire Protection Association Battery March Park Quincy, MA National Forest Products Association 1619 Massachusetts Avenue, N.W. Washington, DC National Solid Wastes Management Association 1730 Rhode Island Ave., N.W. Washington, DC National Terrazzo and Mosaic Association 3166 Des Plaines Avenue Des Plaines, IL LNV (160054) 5 of 7 Reference Standards Section

70 NWMA PCA PCI PS RIS RCSHSB SDI SDI SIGMA SJI SMACNA SSPC National Woodwork Manufacturers Association 205 W. Touhy Avenue Park Ridge, IL Portland Cement Association 5420 Old Orchard Road Skokie, IL Prestressed Concrete Institute 201 North Wells Street Chicago, IL Product Standard U. S. Department of Commerce Washington, DC Redwood Inspection Service One Lombard Street San Francisco, CA Red Cedar Shingle and Handsplit Shake Bureau th Avenue Bellevue, WA Steel Deck Institute P.O. Box 9506 Canton, OH Steel Door Institute 712 Lakewood Center North Detroit Avenue Cleveland, OH Sealed Insulating Glass Manufacturers Association 111 East Wacker Drive Chicago, IL Steel Joist Institute th Avenue North Suite A Myrtle Beach, SC Sheet Metal and Air Conditioning Contractors' National Association 8224 Old Court House Road Vienna, VA Steel Structures Painting Council 4400 Fifth Avenue Pittsburgh, PA LNV (160054) 6 of 7 Reference Standards Section

71 TCA UL WCLIB WWPA Tile Council of America, Inc. Box 326 Princeton, NJ Underwriters' Laboratories, Inc. 333 Pfingston Road Northbrook, IL West Coast Lumber Inspection Bureau 6980 S.W. Varns Road Box Portland, OR Western Wood Products Association 1500 Yeon Building Portland, OR PART 2 PRODUCTS (Not Used) PART 3 EXECUTION (Not Used) END OF SECTION LNV (160054) 7 of 7 Reference Standards Section

72

73 SECTION QUALITY CONTROL PART 1 GENERAL 1.1 SECTION INCLUDES A. Quality assurance and control of installation. B. References. C. Field samples. D. Mock-up. (See required mock-up for this project described under 1.6.) E. Inspection and testing laboratory services. F. Manufacturers' field services and reports. 1.2 RELATED SECTIONS A. Section Submittal Procedures: Submission of Manufacturers' Instructions and Certificates. B. Section Product Requirements: Requirements for material and product quality. 1.3 QUALITY ASSURANCE/CONTROL OF INSTALLATION A. Monitor quality control over suppliers, manufacturers, Products, services, site conditions, and workmanship, to produce Work of specified quality. B. Comply fully with manufacturers' instructions, including each step in sequence. C. Should manufacturers' instructions conflict with Contract Documents, request clarification from Architect/Engineer before proceeding. D. Comply with specified standards as a minimum quality for the Work except when more stringent tolerances, codes, or specified requirements indicate higher standards or more precise workmanship. E. Perform work by persons qualified to produce workmanship of specified quality. F. Secure Products in place with positive anchorage devices designed and sized to withstand stresses, vibration, physical distortion or disfigurement. 1.4 REFERENCES A. Conform to reference standard by date of issue current on date of Contract Documents or date specified in product Sections. LNV (160054) 1 of 3 Quality Control Section

74 B. Obtain copies of standards when required by Contract Documents. C. Should specified reference standards conflict with Contract Documents, request clarification from Architect/Engineer before proceeding. D. The contractual relationship of the parties to the Contract shall not be altered from the Contract Documents by mention or inference otherwise in any reference document. 1.5 FIELD SAMPLES A. Install field samples at the site as required by individual specifications Sections for review. B. Acceptable samples represent a quality level for the Work. C. Where field sample is specified in individual Sections to be removed, clear area after field sample has been accepted by Architect/Engineer. 1.6 MOCK-UP A. Tests will be performed under provisions identified in this section. B. Assemble and erect specified items, with specified attachment and anchorage devices, flashings, seals, and finishes if mock-up is required by section. C. Where mock-up is specified in individual Sections to be removed, clear area after mock-up has been accepted by Architect/Engineer. D. Construct 4 w. section, full hgt., of the exterior wall finish to face of the plywood barrier surfaced plywood sheathing at left front corner of bldg. 1.7 INSPECTION AND TESTING LABORATORY SERVICES A. Contractor will appoint, employ, and pay for services of an independent firm to perform inspection and testing to be paid for by testing allowance. Submit itemized testing cost (major items) for approval. B. The independent firm will perform inspections, tests, and other services specified in individual specification Sections and as required by the Architect/Engineer. C. Reports will be submitted by the independent firm to the Owner, Architect/Engineer, and Contractor in duplicate, indicating observations and results of tests and indicating compliance or non-compliance with Contract Documents. D. Cooperate with independent firm; furnish samples of materials, design mix, equipment, tools, storage and assistance as requested. 1. Notify Architect/Engineer and independent firm 24 hours prior to expected time for operations requiring services. 2. Make arrangements with independent firm and pay for additional samples and tests required for Contractor's use. LNV (160054) 2 of 3 Quality Control Section

75 E. Retesting required because of non-conformance to specified requirements shall be performed by the same independent firm on instructions by the contractor or Architect/Engineer. Such additional testing cost will be paid for by Contractor and not covered within allowance. 1.8 MANUFACTURERS' FIELD SERVICES AND REPORTS A. Submit qualifications of observer to Architect/Engineer 30 days in advance of required observations. Observer subject to approval of Architect/Engineer. B. When specified in individual specification Sections, require material or Product suppliers or manufacturers to provide qualified staff personnel to observe site conditions, conditions of surfaces and installation, quality of workmanship, start-up of equipment, test, adjust, and balance of equipment as applicable, and to initiate instructions when necessary. C. Individuals to report observations and site decisions or instructions given to applicators or installers that are supplemental or contrary to manufacturers' written instructions. D. Submit report in duplicate within 15 days of observation to Architect/Engineer for review. PART 2 PRODUCTS (Not Used) PART 3 EXECUTION (Not Used) PART 4 CODE 4.1 GENERAL A. The 2009 Edition of the International Building Code (IBC) is the code utilized for this project. This code requires certain performance standards relative to fire resistance, wind uplift, and other matters and recognizes test results from recognized and approved testing agencies such as Underwriters Laboratories. END OF SECTION LNV (160054) 3 of 3 Quality Control Section

76

77 SECTION TEMPOARY FACILITIES AND CONTROLS PART 1 GENERAL 1.1 SECTION INCLUDES A. Temporary Utilities: Electricity, lighting, heat, ventilation, telephone service, water, and sanitary facilities. B. Temporary Controls: Barriers, enclosures and fencing, protection of the Work, and water control. C. Construction Facilities: Access roads, parking, progress cleaning, project signage, and temporary buildings. 1.2 RELATED SECTIONS A. Section Contract Closeout: Final cleaning. 1.3 TEMPORARY ELECTRICITY A. Contractor may use existing electric power where available at no cost to the Contract. 1.4 TEMPORARY LIGHTING A. Maintain lighting and provide routine repairs. B. Permanent building lighting may be utilized during construction. 1.5 TEMPORARY VENTILATION A. Ventilate enclosed areas to assist cure of materials, to dissipate humidity, and to prevent accumulation of dust, fumes, vapors, or gases. 1.6 TEMPORARY WATER SERVICE A. Contractor may use existing water service where available at no cost to the Contract. 1.7 TEMPORARY SANITARY FACILITIES A. Provide and maintain required facilities and enclosures. 1.8 BARRIERS A. Provide barriers to prevent unauthorized entry to construction areas. Size and LNV (160054) 1 of 3 Temporary Facilities and Controls Section

78 location of construction fencing per discretion of contractor and per contractor s liability insurance and OSHA requirements. B. Protect non-owned vehicular traffic, stored materials, site and structures from damage. 1.9 EXTERIOR ENCLOSURES A. Provide temporary weather-tight closure of exterior openings to accommodate acceptable working conditions and protection for Products, to allow for temporary heating and maintenance of required ambient temperatures identified in individual specification Sections, and to prevent entry of unauthorized persons. Provide access doors with self-closing hardware and locks PROTECTION OF INSTALLED WORK 1.11 SECURITY A. Protect installed Work and provide special protection where specified in individual specification Sections. B. Provide temporary and removable protection for installed Products. Control activity in immediate work area to minimize damage. C. Provide protective coverings at walls, projections, jambs, sills, and soffits of openings. D. Protect finished floors, stairs, and other surfaces from traffic, dirt, wear, damage, or movement of heavy objects, by protecting with durable sheet materials. E. Prohibit traffic or storage upon waterproofed or roofed surfaces. If traffic or activity is necessary, obtain recommendations for protection from waterproofing or roofing material manufacturer. A. Provide security and facilities to protect Work, from unauthorized entry, vandalism, or theft ACCESS ROADS A. Provide and maintain access to fire hydrants, free of obstructions PROGRESS CLEANING A. Maintain areas free of waste materials, debris, and rubbish. Maintain site in a clean and orderly condition. B. Remove debris and rubbish from pipe chases, plenums, attics, crawl spaces, and other closed or remote spaces, prior to enclosing the space. C. Broom and vacuum clean interior areas prior to start of surface finishing, and LNV (160054) 2 of 3 Temporary Facilities and Controls Section

79 continue cleaning to eliminate dust. D. Remove project generated waste materials, debris, and rubbish from site weekly and dispose off-site in lawful manner FIELD OFFICES AND SHEDS A. Provide: 1. Office: Weather-tight, with lighting. 2. Locate offices and sheds a minimum distance of 30 feet from existing and new structures REMOVAL OF UTILITIES, FACILITIES, AND CONTROLS PART 2 PRODUCTS (Not Used) A. Remove temporary above grade or buried utilities, equipment, facilities, materials, prior to Substantial Completion inspection. B. Remove underground installations to a minimum depth of 2 feet. Grade site as indicated. C. Clean and repair damage caused by installation or use of temporary work. D. Restore existing facilities used during construction to original condition. Restore permanent facilities used during construction to specified condition. PART 3 EXECUTION (Not Used) END OF SECTION LNV (160054) 3 of 3 Temporary Facilities and Controls Section

80

81 SECTION PRODUCT REQUIREMENTS PART 1 GENERAL 1.1 SECTION INCLUDES A. Products. B. Transportation and handling. C. Storage and protection. D. Product options. E. Substitutions. 1.2 RELATED SECTIONS A. Document - Supplementary General Conditions: Substituted Materials Products, Methods or Services B. Section Quality Control: Product quality monitoring. 1.3 PRODUCTS A. Products: Means new material, machinery, components, equipment, fixtures, and systems forming the Work. Does not include machinery and equipment used for preparation, fabrication, conveying and erection of the Work. Products may also include existing materials or components required for reuse. B. Do not use materials and equipment removed from existing premises, except as specifically permitted by the Contract Documents. C. Provide interchangeable components of the same manufacturer, for similar components. 1.4 TRANSPORTATION AND HANDLING A. Transport and handle products in accordance with manufacturer's instructions. B. Promptly inspect shipments to assure that products comply with requirements, quantities are correct, and products are undamaged. C. Provide equipment and personnel to handle products by methods to prevent soiling, disfigurement, or damage. LNV (160054) 1 of 3 Product Requirements Section

82 1.5 STORAGE AND PROTECTION A. Store and protect products in accordance with manufacturer's instructions, with seals and labels intact and legible. Store sensitive products in weather-tight, climate controlled enclosures. B. For exterior storage of fabricated products, place on sloped supports, above ground. C. Provide off-site storage and protection when site does not permit on-site storage or protection. D. Cover products subject to deterioration with impervious sheet covering. Provide ventilation to avoid condensation. E. Store loose granular materials on solid flat surfaces in a well-drained area. Provide mixing with foreign matter. F. Provide equipment and personnel to store products by methods to prevent soiling, disfigurement, or damage. G. Arrange storage of products to permit access for inspection. Periodically inspect to assure products are undamaged and are maintained under specified conditions. 1.6 PRODUCT OPTIONS A. Products Specified by Reference Standards or by Description Only: Any product meeting those standards or description. B. Products Specified by Naming One or More Manufacturers: Submit a request for substitution for any manufacturer not named. 1.7 SUBSTITUTIONS A. Requests for Substitutions during the bidding process will be considered and approval of Substitution must be obtained prior to its inclusion in final pricing. Written substitution request(s) for equal or better will be submitted to Architect prior to five (5) calendar days before the time set for opening bids. Architect will then provide answers via an Addendum to all Bidders. B. Substitutions may be considered when a product becomes unavailable through no fault of the Contractor. C. Document each request with complete data substantiating compliance of proposed Substitution with Contract Documents. D. A request constitutes a representation that the requestor: 1. Has investigated proposed product and determined that it meets or exceeds the quality level of the specified product. 2. Will provide the same warranty for the Substitution as for the specified product. 3. Will coordinate installation and make changes to other Work which may be LNV (160054) 2 of 3 Product Requirements Section

83 PART 2 PRODUCTS (Not Used) required for the Work to be complete with no additional cost to project. 4. Waives claims for additional costs or time extension which may subsequently become apparent. E. Substitutions will not be considered when they are indicated or implied on shop drawing or product data submittals, without separate written request, or when acceptance will require revision to the Contract Documents. F. Substitution Submittal Procedure: 1. Submit two copies of request for Substitution for consideration. Limit each request to one proposed Substitution. 2. Submit shop drawings, product data, and certified test results attesting to the proposed product equivalence. 3. Bidder will be notified by means of formal Addenda if product is accepted. If product is not noted in Addenda, the product has not been accepted. PART 3 EXECUTION (Not Used) END OF SECTION LNV (160054) 3 of 3 Product Requirements Section

84

85 SECTION EXECUTION AND CLOSEOUT REQUIREMENTS PART 1 GENERAL 1.1 SECTION INCLUDES A. Closeout procedures. B. Final cleaning. C. Adjusting. D. Project record documents. E. Operation and maintenance data. F. Warranties. G. Spare parts and maintenance materials. 1.2 CLOSEOUT PROCEDURES A. Submit written certification that Contract Documents have been reviewed, Work has been inspected, and that Work is complete in accordance with Contract Documents and ready for inspection. B. Provide submittals that are required by governing or other authorities. C. Submit final Application for Payment identifying total adjusted Contract Sum, previous payments, and sum remaining due. 1.3 FINAL CLEANING A. Execute final cleaning prior to final inspection. B. Clean interior and exterior glass and surfaces exposed to view; remove temporary labels, stains and foreign substances, polish transparent and glossy surfaces, vacuum carpeted and soft surfaces. C. Clean equipment and fixtures to a sanitary condition. D. Replace filters of operating equipment. E. Clean debris from roofs, gutters, downspouts, and drainage systems. F. Clean site; sweep paved areas, rake clean landscaped surfaces. G. Remove waste and surplus materials, rubbish, and construction facilities from the site. LNV (160054) 1 of 4 Execution and Closeout Requirements Section

86 1.4 ADJUSTING A. Adjust operating Products and equipment to ensure smooth and unhindered operation. 1.5 PROJECT RECORD DOCUMENTS A. Maintain on site, one set of the following record documents; record actual revisions to the Work: 1. Contract Drawings. 2. Specifications. 3. Addenda. 4. Change Orders and other Modifications to the Contract. 5. Reviewed shop drawings, product data, and samples. B. Store Record Documents separate from documents used for construction. C. Record information concurrent with construction progress. D. Specifications: Legibly mark and record at each Product section description of actual Products installed, including the following: 1. Manufacturer's name and product model and number. 2. Product substitutions or alternates utilized. 3. Changes made by Addenda and Modifications. E. Record Documents and Shop Drawings: Legibly mark each item to record actual construction including: 1. Measured depths of foundations in relation to finish main floor datum. 2. Measured horizontal and vertical locations of underground utilities and appurtenances, referenced to permanent surface improvements. 3. Measured locations of internal utilities and appurtenances concealed in construction, referenced to visible and accessible features of the Work. 4. Field changes of dimension and detail. 5. Details not on original Contract Drawings. F. Submit documents. 1.6 OPERATION AND MAINTENANCE DATA A. Submit two sets prior to final inspection, bound in 8-1/2 x 11 inch text pages, three D side ring capacity expansion binders with durable plastic covers. B. Prepare binder covers with printed title "OPERATION AND MAINTENANCE INSTRUCTIONS", title of project, and subject matter of binder when multiple binders are required. C. Internally subdivide the binder contents with permanent page dividers, logically organized as described below; with tab titling clearly printed under reinforced laminated plastic tabs. D. Contents: Prepare a Table of Contents for each volume, with each Product or LNV (160054) 2 of 4 Execution and Closeout Requirements Section

87 system description identified type on 24 pound white paper. E. Part 1: Directory, listing names, addresses, and telephone numbers of Architect/Engineer, Contractor, Subcontractors, and major equipment suppliers. F. Part 2: Operation and maintenance instructions, arranged by system and subdivided by specification section. For each category, identify names, addresses, and telephone numbers of Subcontractors and suppliers. Identify the following: 1. Significant design criteria. 2. List of equipment. 3. Parts list for each component. 4. Operating instructions. 5. Maintenance instructions for equipment and systems. 6. Maintenance instructions for finishes, including recommended cleaning methods and materials and special precautions identifying detrimental agents. G. Part 3: Project documents and certificates, including the following: 1. Shop drawings and product data. 2. Air and water balance reports. 3. Certificates. 4. Photocopies of warranties. H. Submit one copy of completed volumes in final form 15 days prior to final inspection. This copy will be returned after final inspection, with review comments. Revise content of documents as required prior to final submittal. I. Submit final volumes revised, within ten days after final inspection. 1.7 WARRANTIES A. Provide duplicate notarized copies. B. Execute and assemble documents from Subcontractors, suppliers, and manufacturers. C. Provide Table of Contents and assemble in three D side ring binder with durable plastic cover. D. Submit prior to final Application for Payment. E. For items of Work delayed beyond date of Substantial Completion, provide updated submittal within ten days after acceptance, listing date of acceptance as start of warranty period. 1.8 CERTIFICATES A. Provide Certificate of Occupancy if required by Government. B. If project is located within a windstorm region, Contractor shall provide Windstorm Inspection & Certification in accordance with the Texas Department of Insurance Windstorm Program as applicable to the project. LNV (160054) 3 of 4 Execution and Closeout Requirements Section

88 1.9 SPARE PARTS AND MAINTENANCE MATERIALS A. Provide products, spare parts, maintenance and extra materials in quantities specified in individual specification Sections. B. Deliver to Project site and place in location as directed; obtain receipt prior to final payment. PART 2 PRODUCTS (Not Used) PART 3 EXECUTION (Not Used) END OF SECTION LNV (160054) 4 of 4 Execution and Closeout Requirements Section

89 SECTION CUTTING AND PATCHING PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes procedural requirements for cutting and patching. B. Related Sections include the following: 1. Divisions 02 through 49 Sections for specific requirements and limitations applicable to cutting and patching individual parts of the Work. 1.3 DEFINITIONS A. Cutting: Removal of in-place construction necessary to permit installation or performance of other Work. B. Patching: Fitting and repair work required to restore surfaces to original conditions after installation of other Work. 1.4 QUALITY ASSURANCE PART 2 - PRODUCTS A. Structural Elements: Do not cut and patch structural elements in a manner that could change their load-carrying capacity or load-deflection ratio. B. Operational Elements: Do not cut and patch operating elements and related components in a manner that results in reducing their capacity to perform as intended or that results in increased maintenance or decreased operational life or safety. C. Miscellaneous Elements: Do not cut and patch miscellaneous elements or related components in a manner that could change their load-carrying capacity, that results in reducing their capacity to perform as intended, or that results in increased maintenance or decreased operational life or safety. D. Visual Requirements: Do not cut and patch construction in a manner that results in visual evidence of cutting and patching. Do not cut and patch construction exposed on the exterior or in occupied spaces in a manner that would, in Architect's opinion, reduce the building's aesthetic qualities. Remove and replace construction that has been cut and patched in a visually unsatisfactory manner. 2.1 MATERIALS A. General: Comply with requirements specified in other Sections. LNV (160054) 1 of 3 Cutting and Patching Section

90 PART 3 - EXECUTION B. In-Place Materials: Use materials identical to in-place materials. For exposed surfaces, use materials that visually match in-place adjacent surfaces to the fullest extent possible. 1. If identical materials are unavailable or cannot be used, use materials that, when installed, will match the visual and functional performance of in-place materials. 3.1 EXAMINATION A. Examine surfaces to be cut and patched and conditions under which cutting and patching are to be performed. 1. Compatibility: Before patching, verify compatibility with and suitability of substrates, including compatibility with in-place finishes or primers. 2. Proceed with installation only after unsafe or unsatisfactory conditions have been corrected. 3.2 PREPARATION A. Temporary Support: Provide temporary support of Work to be cut. B. Protection: Protect in-place construction during cutting and patching to prevent damage. Provide protection from adverse weather conditions for portions of Project that might be exposed during cutting and patching operations. C. Adjoining Areas: Avoid interference with use of adjoining areas or interruption of free passage to adjoining areas. D. Existing Utility Services and Mechanical/Electrical Systems: Where existing services/systems are required to be removed, relocated, or abandoned, bypass such services/systems before cutting to minimize interruption to occupied areas. 3.3 PERFORMANCE A. General: Employ skilled workers to perform cutting and patching. Proceed with cutting and patching at the earliest feasible time, and complete without delay. 1. Cut in-place construction to provide for installation of other components or performance of other construction, and subsequently patch as required to restore surfaces to their original condition. B. Cutting: Cut in-place construction by sawing, drilling, breaking, chipping, grinding, and similar operations, including excavation, using methods least likely to damage elements retained or adjoining construction. If possible, review proposed procedures with original Installer; comply with original Installer's written recommendations. 1. In general, use hand or small power tools designed for sawing and grinding, not hammering and chopping. Cut holes and slots as small as possible, neatly to size required, and with minimum disturbance of adjacent surfaces. Temporarily cover openings when not in use. 2. Finished Surfaces: Cut or drill from the exposed or finished side into concealed surfaces. 3. Concrete and Masonry: Cut using a cutting machine, such as an abrasive saw or a diamond-core drill. 4. Excavating and Backfilling: Comply with requirements in applicable Division 31 LNV (160054) 2 of 3 Cutting and Patching Section

91 Sections where required by cutting and patching operations. 5. Mechanical and Electrical Services: Cut off pipe or conduit in walls or partitions to be removed. Cap, valve, or plug and seal remaining portion of pipe or conduit to prevent entrance of moisture or other foreign matter after cutting. 6. Proceed with patching after construction operations requiring cutting are complete. C. Patching: Patch construction by filling, repairing, refinishing, closing up, and similar operations following performance of other Work. Patch with durable seams that are as invisible as possible. Provide materials and comply with installation requirements specified in other Sections. 1. Inspection: Where feasible, test and inspect patched areas after completion to demonstrate integrity of installation. 2. Exposed Finishes: Restore exposed finishes of patched areas and extend finish restoration into retained adjoining construction in a manner that will eliminate evidence of patching and refinishing. a. Clean piping, conduit, and similar features before applying paint or other finishing materials. b. Restore damaged pipe covering to its original condition. 3. Floors and Walls: Where walls or partitions that are removed extend from one finished area into another, patch and repair floor and wall surfaces in the new space. Provide an even surface of uniform finish, color, texture, and appearance. Remove in-place floor and wall coverings and replace with new materials, if necessary, to achieve uniform color and appearance. a. Where patching occurs in a painted surface, apply primer and intermediate paint coats over the patch and apply final paint coat over entire unbroken surface containing the patch. Provide additional coats until patch blends with adjacent surfaces. 4. Ceilings: Patch, repair, or rehang in-place ceilings as necessary to provide an even-plane surface of uniform appearance. 5. Exterior Building Enclosure: Patch components in a manner that restores enclosure to a weathertight condition. D. Cleaning: Clean areas and spaces where cutting and patching are performed. Completely remove paint, mortar, oils, putty, and similar materials. END OF SECTION LNV (160054) 3 of 3 Cutting and Patching Section

92

93

94

95

96

97

98

99

100

101

102

103

104

105

106

107

108

109

110

111

112

113

114

115

116

117

118

119

120

121

122

123

124

125

126

127

128

129

130

131

132

133

134

135

136

137

138

139

140

Bidding Conditions. March 22, (Project# 0192) at the. Fresno Chaffee Zoo. Project : Warthog Exhibit. Located at. 894 West Belmont Avenue

Bidding Conditions. March 22, (Project# 0192) at the. Fresno Chaffee Zoo. Project : Warthog Exhibit. Located at. 894 West Belmont Avenue Bidding Conditions March 22, 2018 (Project# 0192) at the Fresno Chaffee Zoo Project : Warthog Exhibit Located at 894 West Belmont Avenue Fresno, CA 93728 Page 1 of 8 DEFINITIONS Addendum - A document issued

More information

Bidding Conditions Attachment C

Bidding Conditions Attachment C Bidding Conditions Attachment C REV Date: November 9, 2018 Project Name (Permit Nos. xxx) at the Fresno Chaffee Zoo Project No. xxxx Located at 894 West Belmont Avenue Fresno, CA 93728 Page 1 of 8 DEFINITIONS

More information

DAG Architects, Inc. July South Walton Fire District Fleet Maintenance/Logistics Building & Training Tower

DAG Architects, Inc. July South Walton Fire District Fleet Maintenance/Logistics Building & Training Tower DOCUMENT 001153 - REQUEST FOR QUALIFICATIONS 1.1 PURPOSE, LAWS, AND REGULATIONS A. The purpose of the Prequalification Procedure described in this Document is to provide Owner with a mechanism to evaluate

More information

INSTRUCTIONS TO BIDDERS

INSTRUCTIONS TO BIDDERS INSTRUCTIONS TO BIDDERS CONTENTS I. Bid Documents II. Ethical Business Practices III. Contractor Qualifications IV. Performance and Quality Standards V. Bid Evaluation VI. Contract Award VII. Work Operations

More information

Document B252TM 2007

Document B252TM 2007 Document B252TM 2007 Standard Form of Architect s Services: Architectural Interior Design for the following PROJECT: (Name and location or address) This document has important legal consequences. Consultation

More information

BIDDING INFORMATION FOR HOLLY HILL ADMINISTRATION COMPLEX RENOVATION AND ADDITION. for the COUNTY OF ORANGEBURG. Project Number: FY

BIDDING INFORMATION FOR HOLLY HILL ADMINISTRATION COMPLEX RENOVATION AND ADDITION. for the COUNTY OF ORANGEBURG. Project Number: FY BIDDING INFORMATION FOR HOLLY HILL ADMINISTRATION COMPLEX RENOVATION AND ADDITION for the COUNTY OF ORANGEBURG Project Number: FY13-1206 October 18, 2012 1180 Columbia Avenue Suite 201 29063 (803) 781-1451

More information

The Home Depot U.S.A., Inc. Instructions to Bidders

The Home Depot U.S.A., Inc. Instructions to Bidders The Home Depot U.S.A., Inc. Instructions to Bidders Home Depot Page 1 of 5 Article 1 Definitions 1.1 Bidding Documents include the Bidding Requirements and the proposed Contract Documents. The Bidding

More information

CONTRACT DOCUMENTS AND BID FORM. FPL Remediation and Redevelopment PROJECT IDENTIFICATION:

CONTRACT DOCUMENTS AND BID FORM. FPL Remediation and Redevelopment PROJECT IDENTIFICATION: CONTRACT DOCUMENTS AND BID FORM PROJECT IDENTIFICATION: THIS BID IS SUBMITTED TO: MANDATORY PRE-BID CONFERENCE: FPL Remediation and Redevelopment City of Biddeford c/o Brian Phinney Environmental Codes

More information

1997 Part 2. Document B141. Standard Form of Architect's Services: Design and Contract Administration TABLE OF ARTICLES

1997 Part 2. Document B141. Standard Form of Architect's Services: Design and Contract Administration TABLE OF ARTICLES TM Document B141 Standard Form of Architect's Services: Design and Contract Administration 1997 Part 2 TABLE OF ARTICLES 2.1 PROJECT ADMINISTRATION SERVICES 2.2 SUPPORTING SERVICES 2.3 EVALUATION AND PLANNING

More information

Project Manual April 20, 2015

Project Manual April 20, 2015 Project Manual April 20, 2015 Bozeman School District No. 7 Bozeman, Montana 2015 Roof Replacement Project for: Set Number PROJECT MANUAL BOZEMAN SCHOOL DISTRICT No.7 ROOF REPLACEMENT 2015 Comprised of

More information

PROJECT MANUAL for Phantom Canyon Tunnel Repair Project. Location On Fremont County Road miles North of Intersection US Highway 50 with FCR 67

PROJECT MANUAL for Phantom Canyon Tunnel Repair Project. Location On Fremont County Road miles North of Intersection US Highway 50 with FCR 67 August 28, 2018 PROJECT MANUAL for Phantom Canyon Tunnel Repair Project Location On Fremont County Road 67 7.5 miles North of Intersection US Highway 50 with FCR 67 Fremont County, Colorado OWNER: Fremont

More information

Document B101 TM. Standard Form of Agreement Between Owner and Architect

Document B101 TM. Standard Form of Agreement Between Owner and Architect Document B101 TM 2007 Standard Form of Agreement Between Owner and Architect AGREEMENT made as of the day of in the year (In words, indicate day, month and year.) BETWEEN the Architect s client identified

More information

Document B Standard Form of Agreement Between Owner and Architect, Construction Manager as Adviser Edition

Document B Standard Form of Agreement Between Owner and Architect, Construction Manager as Adviser Edition Document B132 2009 Standard Form of Agreement Between Owner and Architect, Construction Manager as Adviser Edition AGREEMENT made as of the in the year (In words, indicate day, month and year.) BETWEEN

More information

DESIGN/BUILD CRITERIA MANUAL. For YOST FIELD - RESTROOM AND PAVILION. City of Mount Pleasant Isabella County, MI

DESIGN/BUILD CRITERIA MANUAL. For YOST FIELD - RESTROOM AND PAVILION. City of Mount Pleasant Isabella County, MI DESIGN/BUILD CRITERIA MANUAL For YOST FIELD - RESTROOM AND PAVILION City of Mount Pleasant Isabella County, MI OHM - Advisors 2502 University Park Drive Suite D-200 0075-12-0031 Mount Pleasant, MI 48858

More information

SPECIFICATIONS FOR SIDEWALK REPLACEMENT PROGRAM

SPECIFICATIONS FOR SIDEWALK REPLACEMENT PROGRAM SPECIFICATIONS FOR SIDEWALK REPLACEMENT PROGRAM CITY OF GALENA 101 GREEN STREET GALENA, IL 61036 MAY 2016 Project must be completed between 5 th and 30 th September 2016 CONTENTS Page # ADVERTISEMENT FOR

More information

Sunnycrest Manor Roosevelt Street Dubuque, IA Sunnycrest Manor Kitchen Ventilation MEP Engineers Project #1735

Sunnycrest Manor Roosevelt Street Dubuque, IA Sunnycrest Manor Kitchen Ventilation MEP Engineers Project #1735 Sunnycrest Manor 2375 Roosevelt Street Dubuque, IA 52001 Sunnycrest Manor Kitchen Ventilation MEP Engineers Project #1735 Sunnycrest Manor Kitchen Ventilation SUNNYCREST MANOR KITCHEN VENTILATION 2375

More information

NOTICE TO BIDDERS FOR

NOTICE TO BIDDERS FOR CITY OF SAN LEANDRO STATE OF CALIFORNIA ENGINEERING AND TRANSPORTATION DEPARTMENT NOTICE TO BIDDERS FOR MONARCH BAY DRIVE BRIDGE REPAIR PROJECT NO. 12-144-38-324 BID NO. 12-13.013 1. BID OPENING: The bidder

More information

DEAN + TYLER + BURNS ARCHITECTURE

DEAN + TYLER + BURNS ARCHITECTURE DEAN + TYLER + BURNS ARCHITECTURE May 17, 2017 Community Safe Room for the City Springville 580 Indian Crest Drive Indian Springs, AL 35124 tel.: 205.427.7890 email: m@rchitecture-e.com ADDENDUM NO. 3

More information

AGREEMENT BETWEEN OWNER AND ENGINEER FOR PROFESSIONAL ENGINEERING SERVICES FOR WATERMAIN EXTENSION FROM CASPIAN AVENUE CITY OF VOLGA, SOUTH DAKOTA

AGREEMENT BETWEEN OWNER AND ENGINEER FOR PROFESSIONAL ENGINEERING SERVICES FOR WATERMAIN EXTENSION FROM CASPIAN AVENUE CITY OF VOLGA, SOUTH DAKOTA AGREEMENT BETWEEN OWNER AND ENGINEER FOR PROFESSIONAL ENGINEERING SERVICES FOR WATERMAIN EXTENSION FROM CASPIAN AVENUE CITY OF VOLGA, SOUTH DAKOTA This Agreement, made and entered into this day of, 2018,

More information

NOTICE INVITING SEALED BIDS East Campus Vet Tech Portable X-ray Room Renovation

NOTICE INVITING SEALED BIDS East Campus Vet Tech Portable X-ray Room Renovation Bid No. B18/9998 05/09/2018 NOTICE INVITING SEALED BIDS East Campus Vet Tech Portable X-ray Room Renovation Sealed Bids will be received until 3:00 P.M. (Tucson Time), June 5, 2018, by Pima County Community

More information

This is EXHIBIT A, consisting of [ ] pages, referred to in and part of the Task Order dated [ ]. Engineer's Services for Task Order

This is EXHIBIT A, consisting of [ ] pages, referred to in and part of the Task Order dated [ ]. Engineer's Services for Task Order This is EXHIBIT A, consisting of [ ] pages, referred to in and part of the Task Order dated [ ]. Engineer's Services for Task Order [Introductory Note to User: The following text as published describes

More information

MR GLOBAL LOGISTICS TERMS & CONDITIONS OF SERVICE

MR GLOBAL LOGISTICS TERMS & CONDITIONS OF SERVICE MR GLOBAL LOGISTICS TERMS & CONDITIONS OF SERVICE These terms and conditions of service constitute a legally binding contract between the "Company" and the "Customer". In the event MR Global Logistics

More information

700 CMR: MASSACHUSETTS DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 700 CMR 14.00: PREQUALIFICATION OF CONTRACTORS FOR HORIZONTAL CONSTRUCTION

700 CMR: MASSACHUSETTS DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 700 CMR 14.00: PREQUALIFICATION OF CONTRACTORS FOR HORIZONTAL CONSTRUCTION 700 CMR 14.00: PREQUALIFICATION OF CONTRACTORS FOR HORIZONTAL CONSTRUCTION Section 14.01: Definitions 14.02: Application for Prequalification of Contractors 14.03: Aggregate Bonding Capacity and Single

More information

Attachment 1 Architectural Services

Attachment 1 Architectural Services A. Phase 1, Programming and Schematic Design: 1. Ascertain the requirements for each project through a meeting with the COUNTY, and a review of an existing schematic layout of each project, if such layout

More information

CITY OF PANAMA CITY BEACH WWTF INFLUENT SCREENS REPLACEMENT April 14, 2017

CITY OF PANAMA CITY BEACH WWTF INFLUENT SCREENS REPLACEMENT April 14, 2017 CITY OF PANAMA CITY BEACH WWTF INFLUENT SCREENS REPLACEMENT April 14, 2017 ADDENDUM NO. 1 (This Form Must Be Signed and Submitted With Bid Form) Addendum No. 1 addresses the following issues: QUESTIONS

More information

1. DEFINITIONS 2. ORDERS, PRICES AND FEES

1. DEFINITIONS 2. ORDERS, PRICES AND FEES Exhibit C GENERAL TERMS AND CONDITIONS - INTERNATIONAL The following are the Terms and Conditions under which TRANSCORE, LP, a Limited Partnership chartered in Delaware, United States of America or its

More information

AGREEMENT BETWEEN ARCHITECT AND OWNER

AGREEMENT BETWEEN ARCHITECT AND OWNER AGREEMENT BETWEEN ARCHITECT AND OWNER By this AGREEMENT, effective this day of, 201, by and between Vail Unified School District No. 20 ("Owner"), an Arizona unified school district organized and operating

More information

2018 AASHE Bulletin Advertising Agreement

2018 AASHE Bulletin Advertising Agreement 2018 AASHE Bulletin Advertising Agreement This AASHE Bulletin Advertising Agreement (the Agreement ) is made by and between the Association for the Advancement of Sustainability in Higher Education ( AASHE

More information

GYMNASIUM RENOVATION WASHINGTON HIGH SCHOOL

GYMNASIUM RENOVATION WASHINGTON HIGH SCHOOL PROJECT MANUAL FOR CONSTRUCTION OF GYMNASIUM RENOVATION WASHINGTON HIGH SCHOOL WASHINGTON COMMUNITY SCHOOLS Washington, Indiana PROJECT MANUAL FOR CONSTRUCTION OF GYMNASIUM RENOVATION WASHINGTON HIGH SCHOOL

More information

Chapter 2 Parties to the Contract

Chapter 2 Parties to the Contract Chapter 2 Parties to the Contract 2.1 Introduction Construction work may include building of a new structure, additions, alterations, expansion, replacement, dismantling, erection, commissioning, rehabilitation,

More information

Professional Practice 544

Professional Practice 544 February 22, 2016 February 29, 2016 Professional Practice 544 AIA-B101 Owner - Architect Agreement Michael J. Hanahan Schiff Hardin LLP 233 S. Wacker, Ste. 6600 Chicago, IL 60606 312-258-5701 mhanahan@schiffhardin.com

More information

NOTICE INVITING SEALED BIDS East Campus Exterior EIFS and Painting Project

NOTICE INVITING SEALED BIDS East Campus Exterior EIFS and Painting Project Bid No. B17/9963 April 11, 2017 NOTICE INVITING SEALED BIDS East Campus Exterior EIFS and Painting Project Sealed Bids will be received until 3:00 P.M. (Tucson Time), May 4, 2017, by Pima County Community

More information

STANDARD CONTRACT DOCUMENTS. and TECHNICAL SPECIFICATIONS. for. Ultraviolet Disinfection Replacement. Northfield, Minnesota

STANDARD CONTRACT DOCUMENTS. and TECHNICAL SPECIFICATIONS. for. Ultraviolet Disinfection Replacement. Northfield, Minnesota STANDARD CONTRACT DOCUMENTS and TECHNICAL SPECIFICATIONS for Ultraviolet Disinfection Replacement Northfield, Minnesota 2016 City Project #WSTR2016-J07 Bolton & Menk Project #M23.112089 ENGINEERING STANDARD

More information

BERRYESSA UNION SCHOOL DISTRICT PURCHASING DEPARTMENT 1376 PIEDMONT RD SAN JOSE, CA OFC FAX

BERRYESSA UNION SCHOOL DISTRICT PURCHASING DEPARTMENT 1376 PIEDMONT RD SAN JOSE, CA OFC FAX BERRYESSA UNION SCHOOL DISTRICT PURCHASING DEPARTMENT 1376 PIEDMONT RD SAN JOSE, CA 95132 408-923-1871 OFC 408-926-8329 FAX PREQUALIFICATION PACKAGE INSTRUCTIONS FOR PROSPECTIVE MEP SUBCONTRACTORS FEBRUARY

More information

CITY OF DE PERE PROJECT VOYAGEUR PARK PLAYGROUND BID DATE: FEBRUARY 1, 1:00 PM

CITY OF DE PERE PROJECT VOYAGEUR PARK PLAYGROUND BID DATE: FEBRUARY 1, 1:00 PM CITY OF DE PERE PROJECT 18-12 VOYAGEUR PARK PLAYGROUND BID DATE: FEBRUARY 1, 2018 @ 1:00 PM Bid documents, including plans and specifications, are available for download at www.questcdn.com. The QuestCDN

More information

Midlands Technical College Wade Martin Chiller Replacement

Midlands Technical College Wade Martin Chiller Replacement Midlands Technical College Wade Martin Chiller PROJECT # H59-N975-FW September 12, 2017 CONSTRUCTION DOCUMENTS A/E PROJECT # 17053.01 TABLE OF CONTENTS 2016 Edition PROJECT NAME: Midlands Technical College

More information

Spartanburg, South Carolina

Spartanburg, South Carolina PROJECT MANUAL FOR Hodge Center Cooling Tower Replacement Spartanburg, South Carolina Project No. H34-9544 October 21, 2016 TABLE OF CONTENTS 2016 Edition PROJECT NAME: Hodge Center Cooling Tower Replacement

More information

REVISED BID FORM. To Procurement Services, Room 1104, 900 East Broad Street, Richmond, Virginia:

REVISED BID FORM. To Procurement Services, Room 1104, 900 East Broad Street, Richmond, Virginia: REVISED BID FORM SEALED BIDS WILL BE RECEIVED at the Department of Procurement Services, City Hall, 900 E. Broad Street, Rm. 1104, Richmond, Virginia 23219, UNTIL BUT NOT LATER THAN 2:30 P.M. ON February

More information

Oxford & Area Trails Association River Philip Bridge Construction, Oxford, N.S Project No.: OATA003 SECTION 1.0 INSTRUCTION TO BIDDERS

Oxford & Area Trails Association River Philip Bridge Construction, Oxford, N.S Project No.: OATA003 SECTION 1.0 INSTRUCTION TO BIDDERS 1.1 INSTRUCTION TO BIDDERS Oxford & Area Trails Association River Philip Bridge Construction, Project No.: OATA003 INSTRUCTIONS TO BIDDERS August 7, 2015 SECTION 1.0 INSTRUCTION TO BIDDERS 1.2 TENDER DOCUMENTS

More information

BILLBOARD RENTAL AGREEMENT P.O. BOX 6502 LAUREL, MS (601) (601) fax ~FOR OFFICE USE ONLY~ Cust. Key: New Renewal Effective Dat

BILLBOARD RENTAL AGREEMENT P.O. BOX 6502 LAUREL, MS (601) (601) fax ~FOR OFFICE USE ONLY~ Cust. Key: New Renewal Effective Dat BILLBOARD RENTAL AGREEMENT P.O. BOX 6502 LAUREL, MS 39441 (601) 428-4014 (601) 428-1948 fax ~FOR OFFICE USE ONLY~ Cust. Key: New Renewal Effective Date: From: To: This Billboard Rental Agreement is made

More information

SECTION 50 CONTROL OF WORK

SECTION 50 CONTROL OF WORK SECTION 50 CONTROL OF WORK 50-01 AUTHORITY OF THE ENGINEER. The Engineer shall decide any and all questions which may arise as to the quality and acceptability of materials furnished, work performed, and

More information

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ SPECIAL CONDITIONS Definitions: a) OWNER: Union County Vocational-Technical Schools UCVTS b) CITY or TOWN: Scotch Plains, New Jersey c) ARCHITECT: Netta Architects 1084 Route 22 West Mountainside, New

More information

Document B101 TM. Standard Form of Agreement Between Owner and Architect

Document B101 TM. Standard Form of Agreement Between Owner and Architect Document B101 TM 2007 Standard Form of Agreement Between Owner and Architect AGREEMENT made as of the day of in the year Two Thousand and BETWEEN the Architect s client identified as the Owner: Capitol

More information

Construction Contract Basics

Construction Contract Basics PDHonline Course P120 (2 PDH) Construction Contract Basics Instructor: Kevin D. Waddell, P.E. 2012 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax, VA 22030-6658 Phone & Fax: 703-988-0088 www.pdhonline.org

More information

PROJECT MANUAL FOR: CP AGRICULTURAL ENGINEERING RAIN TOWER REPAIRS CP HULSTON HALL STAIR TOWER REPAIRS

PROJECT MANUAL FOR: CP AGRICULTURAL ENGINEERING RAIN TOWER REPAIRS CP HULSTON HALL STAIR TOWER REPAIRS ADDENDUM #01 DATE: MAY 6, 2016 Page 1 of 2 TO CONTRACT DOCUMENTS ENTITLED: PROJECT MANUAL FOR: CP151322 AGRICULTURAL ENGINEERING RAIN TOWER REPAIRS CP160372 HULSTON HALL STAIR TOWER REPAIRS AT UNIVERSITY

More information

Both envelopes must have the following information in the lower left hand corner:

Both envelopes must have the following information in the lower left hand corner: SECTION 001116 INVITATION TO BID The City of Morgantown is requesting a bid for masonry restoration for the City Hall Building in Morgantown, WV. The Project is for building envelope rehabilitation including

More information

AGREEMENT FOR ARCHITECTURAL SERVICES

AGREEMENT FOR ARCHITECTURAL SERVICES AGREEMENT FOR ARCHITECTURAL SERVICES This Agreement for ( Agreement ) is dated XX XX, 20XX for reference purposes only and is made by and between SANTA MONICA-MALIBU UNIFIED SCHOOL DISTRICT, a California

More information

This Addendum is directed to all prime Contract Bidders, and all others to whom Drawings and Specifications have been issued by the Architect.

This Addendum is directed to all prime Contract Bidders, and all others to whom Drawings and Specifications have been issued by the Architect. North Campus Entrance and related work Wallace State Community College ADDENDUM 3 PART 1 - GENERAL Project: North Campus Entrance and related work [B.C. # 2016259] Owner: Wallace State Community College

More information

IRVINE UNIFIED SCHOOL DISTRICT CONTRACTOR S PREQUALIFICATION QUESTIONNAIRE, 20

IRVINE UNIFIED SCHOOL DISTRICT CONTRACTOR S PREQUALIFICATION QUESTIONNAIRE, 20 CONTRACTOR S PREQUALIFICATION QUESTIONNAIRE, 20 The Irvine Unified School District ( District ) has determined that bidders on an annual basis must be prequalified prior to submitting a bid on a project

More information

INTERNATIONAL AIR TRANSPORT ASSOCIATION CARGO AGENCY AGREEMENT

INTERNATIONAL AIR TRANSPORT ASSOCIATION CARGO AGENCY AGREEMENT INTERNATIONAL AIR TRANSPORT ASSOCIATION IATA SERVICE CENTRE EUROPE TORRE EUROPA PASEO DE LA CASTELLANA 95 28046 MADRID SPAIN CARGO AGENCY AGREEMENT AN AGREEMENT made this....... BETWEEN each IATA Member

More information

CITY OF DE PERE PROJECT HVAC MAINTENANCE RE-BID BID DATE: MAY 5, 1:00 PM

CITY OF DE PERE PROJECT HVAC MAINTENANCE RE-BID BID DATE: MAY 5, 1:00 PM CITY OF DE PERE PROJECT 16-10 HVAC MAINTENANCE RE-BID BID DATE: MAY 5, 2016 @ 1:00 PM Bid documents, including plans and specifications, are available for download at www.questcdn.com. The QuestCDN website

More information

ADDENDUM NO. 3. Item 3 NOTICE OF OPPORTUNITY - REPLACE in its entirety with the attached ***REVISED 08/03/2018

ADDENDUM NO. 3. Item 3 NOTICE OF OPPORTUNITY - REPLACE in its entirety with the attached ***REVISED 08/03/2018 Construction Contracts Administration, Procurement Contracts & Materials Management (PCMM) Oregon State University 644 SW 13 th Ave. Corvallis, Oregon 97333 P 541-737-4261 F 541-737-5546 oregonstate.edu

More information

G , Request for Proposal Land Survey

G , Request for Proposal Land Survey G601 1994, Request for Proposal Land Survey AIA Document G601 1994 allows owners to request proposals from a number of surveyors based on information deemed necessary by the owner and architect. G601 1994

More information

NTA Metropolitan Mass Transit System. To: All Bidders Re: Tender 055/2017 for the Signaling and Train Control of the Red Line Project. Addendum No.

NTA Metropolitan Mass Transit System. To: All Bidders Re: Tender 055/2017 for the Signaling and Train Control of the Red Line Project. Addendum No. Date: 12 th July 2017 #1069265 To: All Bidders Re: Tender 055/2017 for the Signaling and Train Control of the Red Line Project Addendum No. 5 Addendum no. 5 is issued for inclusion into the tender documents.

More information

City of Eagle Point 2017 Paving Instruction to Bidders

City of Eagle Point 2017 Paving Instruction to Bidders City of Eagle Point 2017 Paving Instruction to Bidders Issued: August 2, 2017 Closing Date and Time: Wednesday August 16, 2016 at 2:00 pm Project Summary The City of Eagle Point is requesting bids for

More information

ATTACHMENT D SCOPE OF SERVICES

ATTACHMENT D SCOPE OF SERVICES ATTACHMENT D SCOPE OF SERVICES OBJECTIVE Owner s Capital Improvement Program (major capital, minor construction, repair, and rehabilitation projects) includes numerous construction and renovation projects.

More information

TABLE OF CONTENTS. INVITATION TO BID thru INSTRUCTIONS TO BIDDERS thru

TABLE OF CONTENTS. INVITATION TO BID thru INSTRUCTIONS TO BIDDERS thru TABLE OF CONTENTS PAGE INVITATION TO BID...00050-1 thru 00050-2 INSTRUCTIONS TO BIDDERS...00200-1 thru 00200-9 BID FORM...00400-1 thru 00400-8 Attachments: Bid Bond (EJCDC Form C-430)...00400.A-1 thru

More information

PW # 2-18 TENDER FOR SUPPLY & APPLY CRUSHED GRANITE

PW # 2-18 TENDER FOR SUPPLY & APPLY CRUSHED GRANITE Tender Number: PW #2-18 Sealed Tenders will be clearly marked and received by: Corporation of the Township of Ryerson 28 Midlothian Road Burk s Falls, Ontario P0A 1C0 (705) 382-3232 Closing Date: THURSDAY

More information

TRADESHOW SERVICES AGREEMENT

TRADESHOW SERVICES AGREEMENT Appendix 5 TRADESHOW SERVICES AGREEMENT This TRADESHOW SERVICES AGREEMENT ( Agreement ), dated August ----, 2014. is by and between the Paris office of Japan External Trade Organization at 27, Rue de Berri

More information

State Historic Preservation Office. Bidding, Contracting, and Construction Guidelines for the Historic Restoration Fund

State Historic Preservation Office. Bidding, Contracting, and Construction Guidelines for the Historic Restoration Fund State Historic Preservation Office Bidding, Contracting, and Construction Guidelines for the Historic Restoration Fund April 2014 Table of Contents Conflict of Interest... 3 Floodplains... 3 Hazardous

More information

FIRE ALARM BID PACKAGE FOR: CHESTERFIELD JUDICIAL CENTER CHESTERFIELD, SC PMH No PMH

FIRE ALARM BID PACKAGE FOR: CHESTERFIELD JUDICIAL CENTER CHESTERFIELD, SC PMH No PMH PROJECT MANUAL FIRE ALARM BID PACKAGE FOR: CHESTERFIELD, SC PMH No. 13045 ALLIANCE CONSULTING ENGINEERS 1201 Main Street, Suite #2020 Columbia, SC 29201-3297 PMH PIKE McFARLAND HALL ASSOCIATES, INC. ARCHITECTS

More information

PUBLIC CONTRACT CODE SECTION

PUBLIC CONTRACT CODE SECTION PUBLIC CONTRACT CODE SECTION 22160 22169 22160. (a) The Legislature finds and declares that the design build method of project delivery, using a best value procurement methodology, has been authorized

More information

Faculty Student Association

Faculty Student Association State University of New York College at Fredonia 280 Central Ave. Fredonia, New York 14063 PROJECT SPECIFICATIONS BID SET CHAINTREUIL JENSEN STARK ARCHITECTS, LLP 54 SOUTH UNION ST. ROCHESTER, NEW YORK

More information

INVITATION TO BID (Request for Proposal)

INVITATION TO BID (Request for Proposal) INVITATION TO BID (Request for Proposal) February 16, 2017 PROJECT Facilities Master Plan - Phase 1 Interior Renovations PROJECT DESCRIPTION The Topeka and Shawnee County Public Library is a 21st-century,

More information

Document B105. Standard Form of Agreement Between Owner and Architect for a Residential or Small Commercial Project

Document B105. Standard Form of Agreement Between Owner and Architect for a Residential or Small Commercial Project TM Document B105 2007 Standard Form of Agreement Between Owner and Architect for a Residential or Small Commercial Project AGREEMENT made as of the in the year (In words, indicate day, month and year.)

More information

Coastal Carolina University RE-BID WILLIAMS BRICE RENOVATION AND REPAIR Conway, South Carolina

Coastal Carolina University RE-BID WILLIAMS BRICE RENOVATION AND REPAIR Conway, South Carolina Project Manual for Coastal Carolina University RE-BID WILLIAMS BRICE RENOVATION AND REPAIR Conway, South Carolina DWG Consulting Engineers 1009 Anna Knapp Blvd. Suite 202 Mt Pleasant, South Carolina 29464

More information

ADDENDUM #3. GRW Project No.: Date: March 19, 2019 Subject: City of Nicholasville Fire Station #4

ADDENDUM #3. GRW Project No.: Date: March 19, 2019 Subject: City of Nicholasville Fire Station #4 ADDENDUM #3 GRW Project No.: Date: March 19, 2019 Subject: City of Nicholasville Fire Station #4 Please address inquiries to: Aaron R. Nickerson GRW, Inc. anickerson@grwinc.com TO ALL PROSPECTIVE BIDDERS:

More information

LICENSE MC B CHOICE TRANSPORT, LLC COLUMBUS, NE

LICENSE MC B CHOICE TRANSPORT, LLC COLUMBUS, NE U.S. Department of Transportation Federal Motor Carrier Safety Administration 400 7th Street SW Washington, DC 20590 SERVICE DATE February 08, 2007 LICENSE MC-587619-B CHOICE TRANSPORT, LLC COLUMBUS, NE

More information

JAMES HALL FAÇADE & LEAK REPAIRS PROJECT MANUAL PROJECT NO March 16, 2018

JAMES HALL FAÇADE & LEAK REPAIRS PROJECT MANUAL PROJECT NO March 16, 2018 JAMES HALL FAÇADE & LEAK REPAIRS PROJECT MANUAL PROJECT NO. 77030 March 16, 2018 Engineer: Joseph B. Callaghan, Inc. 1655 Suburban Station Building 1617 John F. Kennedy Blvd. Philadelphia, PA 19103 jbciengineers.com

More information

AGREEMENT FOR CONSTRUCTION MANAGEMENT SERVICES

AGREEMENT FOR CONSTRUCTION MANAGEMENT SERVICES AGREEMENT FOR CONSTRUCTION MANAGEMENT SERVICES This Agreement, approved on January 20 th, 2009 by and between the Monroe County Community School Corporation, 315 North Drive, Bloomington, Indiana (hereinafter

More information

Standard Trading Conditions

Standard Trading Conditions Standard Trading Conditions 1. Definitions Company means Radius Global Solutions Inc. dba Radius Logistics. Conditions means the individual terms and conditions within these Standard Trading Conditions.

More information

This Addendum Number One forms part of the Contract Documents and modifies the original Bidding Documents dated June 8, 2016.

This Addendum Number One forms part of the Contract Documents and modifies the original Bidding Documents dated June 8, 2016. ADDENDUM NUMBER ONE - June 15, 2016 CITY OF CLARKSVILLE TO: All Bidders of Record This Addendum Number One forms part of the Contract Documents and modifies the original Bidding Documents dated June 8,

More information

[JURISDICTION] S AMENDMENTS TO AIA DOCUMENT B , STANDARD FORM OF ARCHITECT S SERVICES: DESIGN AND CONTRACT ADMINISTRATION

[JURISDICTION] S AMENDMENTS TO AIA DOCUMENT B , STANDARD FORM OF ARCHITECT S SERVICES: DESIGN AND CONTRACT ADMINISTRATION [JURISDICTION] S AMENDMENTS TO AIA DOCUMENT B141-1997, STANDARD FORM OF ARCHITECT S SERVICES: DESIGN AND CONTRACT ADMINISTRATION ARTICLE 2.1. PROJECT ADMINISTRATION SERVICES. Paragraph 2.1.2. Paragraph

More information

INSTRUCTIONS FOR USING THE MICHIGAN SCHOOL BUSINESS OFFICIALS ( MSBO ) PROTOTYPE FORM OWNER/ARCHITECT AGREEMENT WITH CONSTRUCTION MANAGER COORDINATION

INSTRUCTIONS FOR USING THE MICHIGAN SCHOOL BUSINESS OFFICIALS ( MSBO ) PROTOTYPE FORM OWNER/ARCHITECT AGREEMENT WITH CONSTRUCTION MANAGER COORDINATION INSTRUCTIONS FOR USING THE MICHIGAN SCHOOL USINESS OFFICIALS ( MSO ) PROTOTYPE FORM OWNER/ARCHITECT AGREEMENT WITH CONSTRUCTION MANAGER COORDINATION Please be advised that the purpose of this Instruction

More information

CONTROL OF WORK 1.02 AUTHORITY AND DUTIES OF THE ENGINEER S AUTHORIZED REPRESENTATIVE

CONTROL OF WORK 1.02 AUTHORITY AND DUTIES OF THE ENGINEER S AUTHORIZED REPRESENTATIVE 1.01 AUTHORITY OF THE ENGINEER CONTROL OF WORK A. The work included in the contract is to be done to the complete satisfaction of the Engineer, and the decision of the Engineer as to the true construction

More information

LS3P SECU - Williamston Branch Additions and Renovations Addendum 2 November 28, 2017

LS3P SECU - Williamston Branch Additions and Renovations Addendum 2 November 28, 2017 ADDENDUM II Date of Addendum: November 28, 2017 Project Name: Williamston Branch Additions and Renovations PROJECT INFORMATION A. Owner: State Employees' Credit Union B. Architect: LS3P C. Architect Project

More information

REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE. St. Charles County Ambulance District

REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE. St. Charles County Ambulance District REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE St. Charles County Ambulance District Base 3 & Training Facility Construction 4169 Old Mill Parkway St. Peters, MO 63376 September

More information

Maintenance and Operations 1302 Service Road Tustin, California (714) CONTRACTOR S PREQUALIFICATION QUESTIONNAIRE, 20

Maintenance and Operations 1302 Service Road Tustin, California (714) CONTRACTOR S PREQUALIFICATION QUESTIONNAIRE, 20 Maintenance and Operations 1302 Service Road Tustin, California 92780 (714) 730-7515 CONTRACTOR S PREQUALIFICATION QUESTIONNAIRE, 20 The Tustin Unified School District ( District ) has determined that

More information

00010ACT CARRIER BROKER CONTRACT

00010ACT CARRIER BROKER CONTRACT 00010ACT CARRIER BROKER CONTRACT I. IDENTIFICATION OF PARTIES AGREEMENT Made this day of 2011 by and between. hereinafter referred to as a CARRIER, and USA LOGISTICS, INC. with address at: P.O. Box 666,

More information

TABLE OF CONTENTS THE CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS BRIGHAM YOUNG UNIVERSITY-IDAHO STANDARD CONTRACT REQUIREMENTS INVITATION TO BID

TABLE OF CONTENTS THE CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS BRIGHAM YOUNG UNIVERSITY-IDAHO STANDARD CONTRACT REQUIREMENTS INVITATION TO BID TABLE OF CONTENTS THE CHURCH OF JESUS CHRIST OF LATTER-DAY SAINTS BRIGHAM YOUNG UNIVERSITY-IDAHO STANDARD CONTRACT REQUIREMENTS I. INVITATION TO BID II. NOTICE TO BIDDERS III. FORM OF PROPOSAL IV. INSTRUCTIONS

More information

BID Addenda No. Date Issued Addenda No. Date Issued

BID Addenda No. Date Issued Addenda No. Date Issued BID - 004113 BID TO: THE CITY AND BOROUGH OF JUNEAU 1. The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with the OWNER in the form included in the Contract

More information

ACKNOWLEDGMENT OF RECEIPT OF ADDENDUM NO.

ACKNOWLEDGMENT OF RECEIPT OF ADDENDUM NO. Philadelphia Regional Port Authority 3460 North Delaware Ave. 2 nd Floor Philadelphia, PA 19134 February 19, 2019 To: All Bidders From: Kate Bailey Director of Procurement Re: ADDENDUM NO. 4 Project 19-011.3

More information

Date: Telephone: Company Name: Address: City: State: Zip Code: Contact Person: Title: Authorized Signature:

Date: Telephone: Company Name: Address: City: State: Zip Code: Contact Person: Title: Authorized Signature: SUBMISSION INFORMATION Kenton County Fiscal Court P.O. Box 792 303 Court Street, Room 207 Covington, Kentucky 41012-0792 QUALIFICATION: Radio Project Phase II RFQ OPENING DATE: December 7, 2015 TIME: 2:00

More information

CONSIGNMENT AGREEMENT for ARTWORK. Whereas, Consignor wishes to display Artwork for sale at the Visitor Center or City Hall,

CONSIGNMENT AGREEMENT for ARTWORK. Whereas, Consignor wishes to display Artwork for sale at the Visitor Center or City Hall, PAAC/City CONSIGNMENT AGREEMENT for ARTWORK This Consignment Agreement (the Agreement ) is made this date: * by and between * (the Consignor ), The City of Twentynine Palms (the City ), to provide the

More information

PROJECT. at the UNIVERSITY OF ILLINOIS CAMPUS Project Number: Bid Date:

PROJECT. at the UNIVERSITY OF ILLINOIS CAMPUS Project Number: Bid Date: PROJECT THE BIDDING AND CONTRACT PROVISIONS Document 00 40 00 - Bid (Standard Contract Set) at the UNIVERSITY OF ILLINOIS CAMPUS Project Number: To: The Board of Trustees of the University of Illinois

More information

Model Employment Contract

Model Employment Contract Model Employment Contract Adapt this Model Employment Contract for use at your own workplace. MODEL EMPLOYMENT CONTRACT HR managers in any part of the country can adapt this Model Employment Contract for

More information

OAK PARK HIGH SCHOOL. Planetarium Upgrade from Analog to Digital

OAK PARK HIGH SCHOOL. Planetarium Upgrade from Analog to Digital PROJECT MANUAL For OAK PARK HIGH SCHOOL Planetarium Upgrade from Analog to Digital OWNER: OAK PARK SCHOOLS 13900 Granzon Oak Park, MI 48237 ARCHITECT: 65 Market Street Mount Clemens, MI 48043 P. (586)

More information

City of Eagle Point South Shasta Pedestrian Bridge Instruction to Bidders

City of Eagle Point South Shasta Pedestrian Bridge Instruction to Bidders City of Eagle Point South Shasta Pedestrian Bridge Instruction to Bidders Issued: November 15, 2017 Closing Date and Time: January 16, 2018, at 2:00 pm Project Summary The City of Eagle Point is requesting

More information

DEMOLITION BID. BID OPENING November 20, 2018, 8:00pm. Village of Germantown 306 Prairie St. Germantown, IL 62245

DEMOLITION BID. BID OPENING November 20, 2018, 8:00pm. Village of Germantown 306 Prairie St. Germantown, IL 62245 DEMOLITION BID BID OPENING November 20, 2018, 8:00pm Village of Germantown 306 Prairie St. Germantown, IL 62245 Important Bids will not be reviewed without the following information fully completed and

More information

1. Provide a revised bid form that reflects revisions to Bidder Responsiveness Section(attached)

1. Provide a revised bid form that reflects revisions to Bidder Responsiveness Section(attached) Philadelphia Regional Port Authority 3460 North Delaware Ave. 2 nd Floor Philadelphia, PA 19134 October 17, 2018 To: All Bidders From: Kate Bailey Director of Procurement Re: ADDENDUM NO. 1 Project 18-074.1

More information

MEMORANDUM. Taylor Schoel with Walter Schoel Engineering. DATE: August 29, Addendum 1 - Green Drive Culvert Replacement.

MEMORANDUM. Taylor Schoel with Walter Schoel Engineering. DATE: August 29, Addendum 1 - Green Drive Culvert Replacement. MEMORANDUM TO: FROM: Bidders Taylor Schoel with Walter Schoel Engineering DATE: August 29, 2013 SUBJECT: Addendum 1 - Green Drive Culvert Replacement The following is part of Addendum 1 and should be included

More information

Educational Use Only S A M P L E S A M P L E

Educational Use Only S A M P L E S A M P L E CONSENSUSDOCS 240 STANDARD FORM OF AGREEMENT BETWEEN OWNER AND ARCHITECT/ENGINEER This document was developed through a collaborative effort of entities representing a wide cross-section of the construction

More information

INVITATION FOR BID. HVAC Equipment Replacement for Black Box Theatre at Nordlof Center. Issued June 14, Name of Bidding Firm:

INVITATION FOR BID. HVAC Equipment Replacement for Black Box Theatre at Nordlof Center. Issued June 14, Name of Bidding Firm: INVITATION FOR BID HVAC Equipment Replacement for Black Box Theatre at Nordlof Center Issued June 14, 2017 Name of Bidding Firm: Address: City: State: Zip: Phone: Fax Bid Opening Time and Date: Bid Deposit/Bid

More information

A D D E N D U M. REPLACE: Project Summary with attached revised Project Summary. 1 Specification Section Project Summary

A D D E N D U M. REPLACE: Project Summary with attached revised Project Summary. 1 Specification Section Project Summary A D D E N D U M 1 TO All Plan Holders ISSUE DATE 20 January 2017 PROJECT # 15-028 REGARDING Switchgear Replacement NARRATIVE PAGES 1 15-02812 KVa Switchgear Replacement Project SPECIFICATION PAGES 10 DRAWING

More information

Fill material and Top Soil

Fill material and Top Soil CITY OF CONWAY SOUTH CAROLINA BID PACKAGE: 7-2018 Fill Material and Top Soil Fill material and Top Soil BID OPENING: 2:00 PM at Conway Public Works Complex 2940 Jerry Barnhill Blvd Conway SC Thursday,

More information

BOILER REPLACEMENT AT SCHOOL OF ENGINEERING FOR ALABAMA A&M UNIVERSITY. Normal, Alabama

BOILER REPLACEMENT AT SCHOOL OF ENGINEERING FOR ALABAMA A&M UNIVERSITY. Normal, Alabama BOILER REPLACEMENT AT SCHOOL OF ENGINEERING FOR ALABAMA A&M UNIVERSITY Normal, Alabama MIMS ENGINEERING, INC., 112B Southside Square, Huntsville, AL 35801 May 2, 2018 BOILER REPLACEMENT AT SCHOOL OF ENGINEERING

More information

2. Provide a revised bid form which includes revised language in Section II, Bidder Responsiveness Section. (attached to this Addendum 1)

2. Provide a revised bid form which includes revised language in Section II, Bidder Responsiveness Section. (attached to this Addendum 1) Philadelphia Regional Port Authority 3460 North Delaware Ave. 2 nd Floor Philadelphia, PA 19134 October 30, 2018 To: All Bidders From: Kate Bailey Director of Procurement Re: ADDENDUM NO. 1 Project 18-110.1

More information

City of Northfield Engineering Department

City of Northfield Engineering Department City of Northfield Engineering Department 801 Washington Street * Northfield, MN 55057 Engineering Standard Specifications City of Northfield, Minnesota May 2017 ENGINEERING STANDARD SPECIFICATIONS CITY

More information

Invitation for Bid - Standard Office Furniture / Task Chair

Invitation for Bid - Standard Office Furniture / Task Chair Invitation for Bid - Bid#2016-09-001 Instructions to Bidders 1. General Information Rice University is issuing this Invitation for Bid (IFB) for the procurement of goods and/or trade services as described

More information

LOS RIOS COMMUNITY COLLEGE DISTRICT 1919 Spanos Court, Sacramento, CA Phone (916) FAX (916) Purchasing Department

LOS RIOS COMMUNITY COLLEGE DISTRICT 1919 Spanos Court, Sacramento, CA Phone (916) FAX (916) Purchasing Department Addendum 1 Text 5-9-17 LOS RIOS COMMUNITY COLLEGE DISTRICT 1919 Spanos Court, Sacramento, CA 95825 Phone (916) 568-3071 FAX (916) 568-3145 Purchasing Department Sacramento City College American River College

More information