Based on the above, maximum distances between balustrade posts were determined as follows: BALUSTRADE MAX. SPACING OF POSTS WIND ZONE L
|
|
- Everett Godwin Grant
- 6 years ago
- Views:
Transcription
1 aximum spacing between posts: Based on the above, maximum distances between balustrade posts were determined as follows: Balustrade, surface mounted: 10mm TOUGENED BLUSTRDE X. SPCING OF POSTS 1350 Balustrade, face fixed: 10mm TOUGENED BLUSTRDE X. SPCING OF POSTS
2 Pool fence, surface mounted: mm TOUGENED POOL FENCE X. SPCING OF POSTS Pool fence, face fixed: mm TOUGENED POOL FENCE X. SPCING OF POSTS
3 Windbreak, surface mounted: 10mm TOUGENED WINDBREKS X. SPCING OF POSTS B 10mm TOUGENED WINDBREKS X. SPCING OF POSTS B
4 Windbreak, face fixed: 10mm TOUGENED WINDBREKS X. SPCING OF POSTS B 10mm TOUGENED WINDBREKS X. SPCING OF POSTS B
5 Floating deck face fixed balustrade: 10mm TOUGENED FLOTING DECK 200mm X. FIXED DECK FLOTING DECK BLUSTRDE X. SPCING OF POSTS Values below take into consideration: Imposed loading for occupancy categories, B, C3 and E as defined in S/NZS 11.1 (for balustrades only) Wind loads calculated in accordance with S/NZS 11.2.
6 Base connection details: Concrete: EDGE DISTNCE 45mm 12mm TK. BSEPLTE WIT 15mm DI OLES FIXING BRCKET 4-12 GRDE 8.8 TREDED STUDS ON EPCON C6 BY RSET EBEDENT 110mm mm IN 2-12 GRDE 8.8 TREDED STUDS ON EPCON C6 BY RSET EBEDENT 110mm mm IN IN 20Pa CONCRETE 60 OVERSIZED WSER IN 20Pa CONCRETE FOR SURFCE-OUNTED SYSTE (CONCRETE) FOR FCE-FIXED SYSTE (CONCRETE) SUPPORTING STRUCTURE
7 Steel: EDGE DISTNCE 18mm 12mm TK. BSEPLTE WIT 15mm DI OLES BSEPLTE TO BE FULLY SUPPORTED ON STEEL FIXING BRCKET 4-12 GRDE 8.8 BOLTS WIT WSERS 45 SUPPORTING STEELWORK TK. OF TOP FLNGE 10mm 2-12 GRDE 8.8 BOLTS WIT WSERS mm IN 50 OVERSIZED WSER SUPPORTING STEELWORK TK. OF WEB 10mm FOR SURFCE-OUNTED SYSTE (STEEL) FOR FCE-FIXED SYSTE (STEEL) SUPPORTING STRUCTURE
8 Timber surface mounted: 12mm TK. BSE PLTE LONG EDGE PRLLEL TO BLUSTRDE 12mm TK. BSE PLTE SORT EDGE PRLLEL TO BLUSTRDE 4/ SCREWS WIT 30SQ 3 WSERS SG 8 TIBER DRY IN SERVICE 2 45mm WIDE DRY IN SERVICE COC BOLTS WET IN SERVICE COC BOLTS SG 8 TIBER 2 45mm WIDE FOR SURFCE-OUNTED SYSTE (TIBER-OPTION 2) FOR SURFCE-OUNTED SYSTE (TIBER-OPTION 3) SUPPORTING STRUCTURE
9 SG 8 TIBER DRY IN SERVICE 2 45mm WIDE FULLY TREDED CSK. SCREW BY SPX ED FLUS WIT TOP OF TIBER 4/ COC BOLTS 1 PLN VIEW 12mm TK. BSE PLTE LONG EDGE PRLLEL TO TE BLUSTRDE FULLY TREDED CSK. SCREW BY SPX ED FLUS WIT TOP OF TIBER 4/ COC BOLTS SG 8 TIBER DRY IN SERVICE 2 45mm WIDE FOR SURFCE-OUNTED SYSTE (TIBER-OPTION 1) 1-1 SUPPORTING STRUCTURE
10 12mm TK. BSE PLTE LONG EDGE PRLLEL TO TE BLUSTRDE 4-12 GRDE 8.8 TREDED STUDS ON NUPLEX K80 EPOXY EBEDENT mm SG 8 TIBER 2 45mm WIDE FOR SURFCE-OUNTED SYSTE (TIBER-OPTION 4)
11 Timber face fixed: FIXING BRCKET FIXING BRCKET 2/ COC BOLTS mm IN GRDE 8.8 BOLTS WIT 50mm SQ 5mm WSERS mm IN COC BOLTS SG 8 TIBER FOR FCE-FIXED SYSTE (TIBER-OPTION 1) FOR FCE-FIXED SYSTE (TIBER-OPTION 2) SUPPORTING STRUCTURE
12 FIXING BRCKET GRDE 8.8 TREDED STUDS ON NUPLEX K2005 EPOXY EBEDENT 95mm 50 SG 8 TIBER FOR FCE-FIXED SYSTE (TIBER-OPTION 3)
FRAMED GLASS BALUSTRADES
CONTENTS 1. Product Introduction 2. General Notes 3. Connection Type 1 Timber Side Fix (Coach Screws) 4. Connection Type 2 Bolt Side-Fix 5. Connection Type 3 Timber Top-Fix 6. Connection Type 4 Timber
More informationTECHNICAL INSTALLATION
THE F IN N S B A L US T R A DE TECHNICAL INSTALLATION Producer Statement [ PS1 ] T H E F I N N S // T E C H N I C A L I N S TA L L AT I O N S P E C S [ P S1] W W W. E D G E S M I T H.G LO B A L JOB NO:
More informationMOE FLEXIBLE LEARNING SPACE NELSON 2-STOREY BLOCK AUCKLAND - OPTION 2
MOE FLEXIBLE LERNING SPCE NELSON 2-STOREY BLOCK UCKLN - Plot ate: 18/08/201 5:3:35 p.m. Office: Filename: C:\Users\Nick.Maciver\ocuments\24313-MOE-NELSON BLOCK CENTRL FILE 201 - CONCRETE-_UCKLN_nick.maciver.rvt
More informationHOMESTEAD. VIKING Aluminium and Glass Balustrade or Pool Fencing System. Aluminium Prefabricated Balustrade System.
VIKING Aluminium and Glass Balustrade or Pool Fencing System HOMESTEAD Aluminium Prefabricated Balustrade System www.juralcobalustrades.co.nz VIKING BALUSTRADE PRODUCT FEATURES AND BENEFITS Designed and
More informationCreate a clear vision
Create a clear vision with Glass Vice Create a clear vision and bring the view to you Glass Vice Products design and manufacture frameless glass solutions to compliment and enhance landscape, residential
More informationCROSSING PLANKS SHALL BE SOFTWOOD MIN. 6096mm (20') LONG PLANKS ENDS TO BE BEVELED (SEE DETAIL1)
TOP OF CROSSING BEVEL TO BE OFFSET MIN. 508mm (0") FROM THE EDGE OF CROSSINGS TO HVE SUITBLE PPROCHES ON EITHER SIDE WITH DEQUTE SIGHTLINES MIN. 508 (TYPICL) C L CROSSING CROSSING PLNKS SHLL BE SOFTWOOD
More informationOpen mono-stringer. design elements
Open mono-stringer design elements M2 Open mono-stringer M2 design The open tread mono-stringer is now an industry standard, due in no small part to Arden Architectural Staircases optimising this design
More informationBids JANUARY 25, 2017 AT 2:00 P.M. (EASTERN TIME) (Estimated Cost: $3,600,000)
General Info Number: PROJECT NO. 43-7-05 Description: BRIDGE DECK REPAIR AND REHABILITATION, BOSTON MILLS ROAD OVER OHIO TURNPIKE M.P. 78.0, OLDE EIGHT ROAD OVER OHIO TURNPIKE M.P. 79.5, NICHOLS ROAD OVER
More informationUS Pool Lift Model #114 (Independence) Installation Guide
US Pool Lift Model #114 (Independence) Installation Guide This manual has been provided to assist with lift installation. For further assistance please contact your authorized US Pool Lift dealer. Toll
More informationFrameless Glass Balustrade and Pool Fencing Systems
JURALCO EDGETEC Frameless Glass Balustrade and Pool Fencing Systems www.juralcobalustrades.co.nz EDGETEC MINI POST 12mm Toughened Glass Designed and Assembled in New Zealand Available in Wide Range of
More informationCode Compliance Research Report CCRR 0277
Code Compliance Research Report CCRR 0277 Issue Date: 05 21 2018 Renewal Date: 05 21 2019 DIVISION: 05 00 00 METALS Section: 05 52 00 Metal Railings REPORT HOLDER: Eastern Wholesale Fence LLC. 274 Middle
More informationChemset Reo 502. Chemical Anchoring - Rebar to AS GENERAL INFORMATION CHEMICAL INJECTION ANCHORING
Chemset Reo 502 23.1-2 CHEMICAL INJECTION ANCHORING AVAILABLE IN AUSTRALIA ONLY 23.1 GENERAL INFORMATION Product ChemSet Reo 502 is a extra heavy duty pure epoxy anchoring adhesive. Benefits, Advantages
More informationREPORT HOLDER: GLASS VICE HOLDINGS LTD. POST OFFICE BOX MAIRANGI BAY, AUCKLAND 0754 NEW ZEALAND EVALUATION SUBJECT:
0 Most Widely Accepted and Trusted ICC ES Evaluation Report ICC ES 000 (800) 423 6587 (562) 699 0543 www.icc es.org ESR 3563 Reissued 01/2018 This report is subject to renewal 01/2019. DIVISION: 05 00
More informationExterior Wall Solutions Building Shell
A strong, water tight and thermally insulated building shell will ensure the buildings sustainability of usage over time. The Exterior Shell is the most important factor of protection to ensure that the
More informationALSPEC ALUMINIUM SYSTEMS TECHNICAL MANUAL
ALSPEC ALUMINIUM SYSTEMS TECHNICAL MANUAL HR500 HIGH PERFORMANCE BALUSTRADE COPYRIGHT This Technical manual remains the property of Aluminium Specialties Group Pty Limited and contains privileged information
More informationFrameless Glass Balustrade and Pool Fencing Systems
EDGETEC Frameless Glass Balustrade and Pool Fencing Systems FOR FREE MEASURE AND QUOTE CALL 0800 466 375 www.homeplus.co.nz EDGETEC MINI POST 12mm Toughened Glass Designed and Assembled in New Zealand
More informationINCLINATOR ELEVETTE. Planning Guide. CABLE DRUM 1000 lb. (454 Kg) AMERICA S MOST CUSTOMIZABLE ELEVATOR
INCLINATOR ELEVETTE Planning Guide CABLE DRUM 1000 lb. (454 Kg) AMERICA S MOST CUSTOMIZABLE ELEVATOR Introduction It started over 90 years ago with a passion to help an ailing friend access his multi-level
More informationTEST REPORT. Rendered to: SENTINEL FENCE AND RAIL. For: 120 in by 42 in Fully-Welded Aluminum Guardrail Assembly with Intermediate Support Post
TEST REPORT Rendered to: SENTINEL FENCE AND RAIL For: 120 in by 42 in Fully-Welded Aluminum Guardrail Assembly with Intermediate Support Post Report No: Report Date: 10/23/12 130 Derry Court York, PA 17406-8405
More informationCUBOID GLAZING CHANNEL SYSTEM. Glass Fittings Ltd. MULTIPLE SITES. 02-Mar-17
PROJECT NO.: 13155 PROJECT TTLE: CUBOD GLAZNG CHANNEL SYSTEM CLENT: Glass Fittings Ltd. STE ADDRESS: MULTPLE STES DATE: 2-Mar-17 elaborated by: Paul Milewski Meng (Hons) CPEng MPENZ ntpe (NZ/AU) Ceng MCE
More informationSPECIFICATION FOR TUBULAR STEEL LIGHTING COLUMN. Reference is made in this Specification to the following:
SPECIFICATION FOR TUBULAR STEEL LIGHTING COLUMN 1. SCOPE This specification covers the design, fabrication and testing of tubular section, galvanised steel friction fit jointed street light columns of
More information2005 ERRATA to the Edition of. the Allowable Stress Design (ASD) Manual for Engineered Wood Construction (printed version dated M)
AMERICAN FOREST & PAPER ASSOCIATION American Wood Council Engineered and Traditional Wood Products June 2005 2005 ERRATA the Allowable Stress Design (ASD) Manual for Engineered Wood Construction 93 In
More informationSTARTRAC BUILDING ORDER BUILDING INFORMATION
Page 2 BUILDING: Geometry Width: 60'-0" Dist to Ridge: 30'-0" Length: 200'-0" Bay Spacing: 10@20'-0" Eave Height : Eave Height C: 24'-0" 24'-0" Roof Slope : Roof Slope C: 2.00 2.00 :12 :12 Col Location
More informationBUILDERS TIMBER DECKING GUIDE TO
BUILDERS GUIDE TO TIMBER DECKING WWW.TDCA.ORG.UK 1 2 3 4 BUILDERS GUIDE TO TIMBER DECKING TIMBER DECKS CAN EITHER BE ATTACHED TO A PROPERTY OR FREE-STANDING. THE COMPLEXITY OF BUILD VARIES DEPENDING ON
More informationGeneral Info. Number: PROJECT NO
General Info Number: PROJECT NO. 43-16-04 Description: BRIDGE DECK REPLACEMENT AND REHABILITATION, RAKER-BARDEN ROAD (CR. 7-2) OVER OHIO TURNPIKE M.P. 41.9, DELTA-SANTEE ROAD (CR. 7) OVER OHIO TURNPIKE
More informationChemical Anchoring Reinforcing Bar Anchorage
Introduction CHEMICAL ANCHORING - REINFORCING BAR ANCHORING Chemical Anchoring Reinforcing Bar Anchorage The following section applies to reinforcing bar in anchorage applications. For structural post-installed
More informationLength. Gauge. mm 11. Application Example of Bracket WFL/WFLO... Application Example of Bracket WFL/WFLO... Application Example of Bracket WFC/WFCO...
WF/WFO,5x9 60 WF/WFO... ength eight WF/WFO 170 1 0, 71 WF/WFO1 1 0,37 7115 WF/WFO0 70 1 0,3 71 WF/WFO0 370 1 0,58 71 WF/WFO0 70 1 0,7 71 WF/WFO0 570 1 0,85 71 7-11x6 15 - For ssembly ldders bove wide use
More informationTown of Kingsville. Building Department
Town of Kingsville Building Department GUIDE TO ACCESSORY STRUCTURES AND DECKS FOR BUILDING PERMITS www.kingsville.ca 2017 Disclaimer: The fees and by-law information compiled within this guide are for
More informationBLOCKWORK All reinforced concrete blockwork is be constructed in accordance with AS 3700 and a relevant engineers report. A damp proof course ( DPC ) is to be provided 150mm above ground. BRICKWORK All
More informationEVERLAST KWILA/MERBAU GL17S ENGINEERED MAGNA BEAMS & KWILA/MERBAU GL13 ENGINEERED MAGNA POSTS
Version 1 EVERLAST KWILA/MERBAU GL17S ENGINEERED MAGNA BEAMS & KWILA/MERBAU GL13 ENGINEERED MAGNA POSTS DRAFT SAFE LOAD TABLES MARCH 2012 Page 0 Page 1 Contents Introduction Page 3 Engineering Certification
More informationJANUARY 4, 2017 AT 2:00 P.M. (EASTERN. (Estimated Cost: $4,600,000) Bids J D WILLIAMSON CONSTRUCTION CO INC $3,799,476.25
General Info Number: PROJECT NO. 43-17-03 Description: BRIDGE DECK REPAIR AND REHABILITATION, ARLINGTON ROAD OVER OHIO TURNPIKE M.P. 122.3, JOPPA ROAD OVER OHIO TURNPIKE M.P. 128.5, DEAN ROAD OVER OHIO
More informationStructural Calculations for standard BALCONY 1 system handrail using 55mm diameter posts (48.3mm x 5mm CHS) & 150 x 150 x 15mm base plates
Balcony 1 system handrail PAGE 1 (B1NB55150150BP061016) Structural Calculations for standard BALCONY 1 system handrail using 55mm diameter posts (48.3mm x 5mm CHS) & 150 x 150 x 15mm base plates Our ref:
More informationEPCON C6. Chemical Anchoring - Anchor Studs 9.1. Principal Applications CHEMICAL INJECTION ANCHORING 9.1 GENERAL INFORMATION
9.1 CHEMICAL INJECTION ANCHORING 9.1 GENERAL INFORMATION Product Epcon C6 is a versitile pure epoxy anchoring adhesive Benefits, Advantages and Features Features Superior strength in shallow embedment.
More informationEPCON C6 Series. Chemical Anchoring - Reinforcing Bar Anchorage 17.1 CHEMICAL INJECTION ANCHORING 17.1 GENERAL INFORMATION
17.1 CHEMICAL INJECTION ANCHORING 17.1 GENERAL INFORMATION Product Epcon C6 is a versitile pure epoxy anchoring adhesive Benefits, Advantages and Features Features Superior strength in shallow embedment.
More informationrondo accessories CONTENTS:
rondo accessories SUMMARY Rondo has a range of accessories to complement our steel wall and ceiling systems, which includes Top Hats, Reveal Beads and Angles, as well as a rod bending tool for suspended
More informationAPPENDIXB PHOTOGRAPHS B - 1
APPENDIXB PHOTOGRAPHS B - 1 Photo B-1: Overall view of Pier 40, looking southeast. Photo B-2: Overall view of the Finger Pier Extension with one-story shed, looking southeast. B-2 Photo B-3: View of typical
More informationF500 Steeplechase Waterjump with Valve Option
Gill Athletics www.gillathletics.com Phone: (800) 367-3090 Fax: (217) 367-8440 Excavation F500 Steeplechase Waterjump with Valve Option Installation Guide Read all instructions before installing!!! Establish
More informationAS The External Waterproofing Membranes Standard
AS 4654-2 The External Waterproofing Membranes Standard NOTE This external waterproofing standard contains solutions for problems which have not been addressed in other countries. CONFORMANCE CONDITIONS
More informationDesign Calculations Date: 27/04/2017
Date: 27/04/2017 Client: Scaffolding Contractor: BARRATT HOMES City Scaffolding Title: Mezzanine storage area on stacked containers with staircase Location: - Generic - Calculation Number: C.9488 Revision:
More informationDURApanel. Fencing was the best we have seen very nice to use, brilliant finish, the boss is pleased, we re stoked and will be always recommending it.
DURApanel Smart fencing for homes, pools, and schools Fencing was the best we have seen very nice to use, brilliant finish, the boss is pleased, we re stoked and will be always recommending it. Nelson
More informationSECTION ANCHOR SYSTEMS
SECTION 05 05 00 ANCHOR SYSTEMS PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Anchor bolts. B. Requirement: 1. Furnish all materials, labor and equipment required to provide anchor systems not specifically
More informationTERRACE FACTORY - TYPE A1
TERRACE FACTORY - TYPE A1 Total Built-up Size: 3,401 sq ft No. of Units: 24 TERRACE FACTORY - TYPE A1 Total Built-up Size: 3,401 sq ft No. of Units: 24 SPECIFICATION FACTORY HEIGHT Approximately 6.6 meters
More informationBILL SUMMARY. March 15, 2018 BILL No. DESCRIPTION AMOUNT
PROJECT: CONSTRUCTION OF NEW TIMBER WHARF, SOUTHERN BILL No. DESCRIPTION AMOUNT 1 PRELIMINARIES 2 DEMOLISHION WORKS 3 TIMBER WHARF CONSTRUCTION 4 CATWALK CONSTRUCTION BILL SUMMARY 5 CONCRETE WALKWAY CONSTRUCTION
More informationAcronem Consulting Australia Pty Ltd
Acronem Consulting Australia Pty Ltd April 29, 2016 Peak Products Corporation C/- 27 Zilla Court Dandenong VIC 3175 To whom it may concern: CERTIFICATE OF COMPLIANCE: Peak Aluminium Balustrade & Peak Aluminium
More informationFIRE RATING MATERIAL FIXING NOTES
FIRE RATING MATERIAL FIXING NOTES FIRE RATING MATERIAL FIXING NOTES... 1 External Wall Systems... 2 Non load bearing steel stud walls... 3 LOAD-BEARING STEEL STUD WALLS... 3 NON LOAD-BEARING TIMBER STUD
More informationEPCON C8. Chemical Anchoring - Anchor Studs 8.1 CHEMICAL INJECTION ANCHORING 8.1 GENERAL INFORMATION
8.1 CHEMICAL INJECTION ANCHORING 8.1 GENERAL INFORMATION Product is a High Performance Pure Epoxy Anchoring adhesive for use in Cracked and Non-Cracked concrete. For structures subject to external exposure,
More informationLORONG K, TELUK KURAU 4 STOREY STRATA-TITLE APARTMENT WITH LIFT & SWIMMING POOL. At Lorong K, Teluk Kurau, Singapore
Design, Fabrication & Supply of Materials: LORONG K, TELUK KURAU 4 STOREY STRATA-TITLE APARTMENT WITH LIFT & SWIMMING POOL At Lorong K, Teluk Kurau, Singapore CONTENT PROJECT INFORMATION 2 W&A BUILDING
More informationEPCON C8. Chemical Anchoring - Reinforcing Bar Anchorage 16.1 CHEMICAL INJECTION ANCHORING
16.1 CHEMICAL INJECTION ANCHORING 16.1 GENERAL INFORMATION Product is a High Performance Pure Epoxy Anchoring adhesive for use in Cracked and Non-Cracked concrete. For structures subject to external exposure,
More informationBuilding/Zoning Permit Fee Structure
SECTION A - Calculation of Fees 1. Square Foot Basis The square footage shall be calculated on the out-to-out dimensions of the building or structure and shall include all areas, whether finished or unfinished,
More informationStandardised Foundation Bolt Kits
with cages Standardised Foundation Kits Over the last few years, eedi and the Australian Institute of Steel Construction, now the Australian Steel Institute [ASI], in a joint initiative, have worked to
More informationTHOMAS. Buffalo Saddles. Tap In Products PIPE PRODUCTS. Universal Live Tap In Saddles for All Rigid Pipe Materials.
THOMAS PIPE PRODUCTS Tap In Products Buffalo Saddles Universal Live Tap In Saddles for All Rigid Pipe Materials A1 TAP IN PRODUCTS KITWE VALLEY - Copper Belt Province - Zambia PROJECT Kitwe Valley Pivot
More informationEME6325D WIND-DRIVEN RAIN RESISTANT STATIONARY LOUVER
PATENT PENDING 3900 Dr. Greaves Rd. Kansas City, MO 64030 (816) 761-7476 FAX (816) 765-8955 EME6325D WIND-DRIVEN RAIN RESISTANT STATIONARY LOUVER MIAMI-DADE APPROVED MIAMI-DADE COUNTY, FLORIDA NOTICE OF
More informationInternal Partitions - Timber Studs Internal Partitions - Steel Stud
Timber Studs PH Internal Partitions - Steel Stud / hour fire rating, integrity and insulation in accordance with the criteria of BS : Part and AS 0: Part. Nominal thickness of partition: mm PROMATECT -H
More informationTrailer Stage. Structural design calculations. 2nd September [00]
Trailer Stage 2nd September 2016. 2975. [00] 90 Walcot Street. Bath BA1 5BG. 01225 444194 103 Timber Yard. Drysdale Street. London N1 6ND. 020 77396939 www.momentumengineering.com Contents This document
More informationRough-in frame and flush-mount panel installation instructions
Welch Allyn, Inc. 3 State Street Road Skaneateles Falls, NY 33 USA Rough-in frame and flush-mount panel installation instructions 726080 DIR 8002869 Ver. A Revised 206- The Welch Allyn In-Floor Scale models
More informationTRENCH 1. CLAY WALL EXTENDS A MINIMUM OF 1'-0" INTO UNDISTURBED SOIL ON EACH SIDE AND ON BOTTOM OF TRENCH.
TRENCH ' ' CLY ERTH MTERIL PIPELINE 2 FT. OR S DETERMINED BY GEOTECHNICL ENGINEER LIMITS OF TRENCH '-0" PIPELINE LIMITS OF CLY CUT-OFF WLL ' 3' O-RING OR WTERSTOP GSKET REQUIRED WITH PVC PIPE NOTES:. CLY
More informationDECKING INSTALLATION GUIDE
DECKING INSTALLATION GUIDE It is very important to follow the manufacturer s instructions when installing Outback Decking. Fluctuations in climatic temperatures can cause an issue with how the decking
More informationInstallation Guide for Domestic Decking in Recycled Plastic
Daisy Mill (Gate 3), Unit B Daisy Street, Waterside Colne, Lancashire, BB8 8ER T: 01282 861325 E: sales@kedeltrade.co.uk W: www.kedeltrade.co.uk Installation Guide for Domestic Decking in Recycled Plastic
More information11/2 HOUR UL CLASSIFIED CURTAIN TYPE (D)IBD2, (D)IBD2SS AND IBDT FIRE DAMPERS
3900 Dr. Greaves Rd. Kansas City, MO 64030 (816) 761-7476 FAX (816) 765-8955 INSTALLATION INSTRUCTIONS 11/2 HOUR UL CLASSIFIED CURTAIN TYPE (D)IBD2, (D)IBD2SS AND IBDT FIRE DAMPERS APPLICATION The fire
More informationChemSet Reo 502. Chemical Anchoring - Reinforcing Bar Anchorage 15.1 CHEMICAL INJECTION ANCHORING 15.1 GENERAL INFORMATION.
15.1 CHEMICAL INJECTION ANCHORING 15.1 GENERAL INFORMATION Product is an extra heavy duty pure epoxy anchoring adhesive. Benefits, Advantages and Features Greater productivity: Anchors in dry, damp, wet
More informationINSTALLATION INSTRUCTIONS SORIC INTEGRATION CENTER
INSTLLTION INSTRUCTIONS SORIC INTEGRTION CENTER TEC-F-0018 REV2 3/11 SITE CONDITIONS Shipping Weight SORIC-72 950lbs. SORIC-48 675lbs. Rough Opening Recessed applications require a 74 W x 79 H x 30 D rough-in
More information.1 ANSI/ASME B31.1, Power Piping, (SI Edition)..2 American Society for Testing and Materials (ASTM)
Fitness Facility Addition Page 1 PART 1 GENERAL 1.1 RELATED SECTIONS.1 Section 03300 - Cast-in-Place Concrete.2 Section 05121 - Structural Steel for Buildings.3 Section 05500 - Metal Fabrications 1.2 REFERENCES.1
More informationCode Compliance Research Report CCRR-0187
Code Compliance Research Report CCRR-0187 Issue Date: 11-29-2012 Revision Date: 07-24-2018 Renewal Date: 02-28-2019 DIVISION: 06 00 00 WOOD, PLASTICS AND COMPOSITES Section: 06 63 00 Plastic Railings REPORT
More informationGUIDELINES FOR SOLAR WATER HEATERS INSTALLATION
REPUBLIC OF RWANDA RWANDA UTILITIES REGULATORY AGENCY GUIDELINES FOR SOLAR WATER HEATERS INSTALLATION November, 2012 TABLE OF CONTENTS PURPOSE OF THIS DOCUMENT... 3 1. CITATION... 3 2. TERMS AND DEFINITIONS...
More informationBS 6180: 1999: Barriers in and about buildings Code of practice - Domestic Use Clause 6.4.1
RICHARD BURBIDGE LIMITED Our Ref: Whittington Road Date: 23 rd December 2009 Oswestry Delivery Date: 21 st December 2009 Shropshire Test Dates: 22 nd December 2009 SY11 1HZ For the attention of Tony Jones
More informationOUTBACK DECKING INSTALLATION GUIDE CONTENTS. Let s have a look at what you will find in this installation guide.
o u t b a c k d e c k i n g. c o m. a u OUTBACK DECKING INSTALLATION GUIDE CONTENTS Let s have a look at what you will find in this installation guide. Page. 2 BEFORE YOU START Things you need to know
More informationHurricane wind shelter retrofit room standards for existing houses
Safety and Security Engineering 653 Hurricane wind shelter retrofit room standards for existing houses N. Yazdani 1, T. Townsend 1 & D. KilCollins 2 1 Florida A & M University- Florida State College of
More informationINSTALLATION GUIDE DUOFUSE DECKING
INSTALLATION GUIDE DUOFUSE DECKING We recommend reading through the entire installation instructions before starting, and check the website for the latest installation instructions. Plastivan disclaims
More informationMondol Fabrics Ltd. Nayapara,kasimpur, Gazipur ( N, E0) 8th March 2014
Mondol Fabrics Ltd Nayapara,kasimpur, Gazipur (23.990028N, 90.317336E0) 8th March 2014 1 2 Observations 3 Column Stresses in Toilet Area North of Building Cursory calculations indicate that column size
More informationSwimming Pool Fence & Gate Specifications
2 Swimming Pool Fence & Gate Specifications Phone 0800 353 500 info@warnerfences.co.nz www.warnerfences.co.nz Freephone 0800 353 500 www.warnerfences.co.nz INTRODUCTION HY ARNER warner is a name you can
More informationunder under x o under
LEGEND 4000 BUILDER TO PROVIDE FLASHING/TRIMS & ENSURE WATERPROOFING IN ACCORDANCE WITH THE NCC 1160 80 1720 80 960 900 WINDOW & DOOR SCHEDULE W1 W2 W3 SD 600W x 600D OPERABLE GLASS LOUVRES 1800W x 900D
More informationSCREW PILE APPLICATION SHEETS
SCREW PILE APPLICATION SHEETS Advantages of screw piles Exceptionally fast installation rate up to 2... linear metres of pile installed per minute Load bearing capacities of over 300kN SWL Load bearing
More information2012 International Building Code 2011 National Electrical Code Local amendments to the codes are in Chapter 6 of the Code of City Ordinances
Sign Permit Zoning requirements Staff recommends always verifying the zoning requirements for your project before deciding to build. Warrensburg has eleven separate zoning districts, each with minimum
More informationTEST REQUIREMENTS : RESULT : BS 6180: 1999: Barriers in and about buildings Code of practice - Communal domestic use Clauses 6.4.1
Richard Burbidge Ltd Our Ref.: Whittington Road Date: 27/03/06 Oswestry Date delivered: 01/12/05 Shropshire Date of tests: 03/12/05 SY11 1HZ For the attention of Mr Kevin Jones SAMPLE(S) FOR TEST : One,
More informationWinged steel blade stanchions supporting glass panels
Winged steel blade stanchions supporting glass panels design elements W4 Min 1000 Winged steel blade stanchions supporting glass panels W4 design The W4 stanchions are an implementation of a toughened
More informationCHAIRMAN S QUIZ QUESTIONS
CHAIRMAN S QUIZ 2013 20 QUESTIONS QUESTION 1 AN AGREED SURVEYOR IS APPOINTED BY A. ONE OF THE PARTIES B. INDEPENDENTLY BY EACH OF THE PARTIES. C. BY AGREEMENT BETWEEN THE PARTIES QUESTION 2 THE END COTTAGE
More informationThe Structural Redesign of Boyds Bear Country and its Related Systems. Boyds Bear Country, Pigeon Forge, Tennessee
The Structural Redesign of Boyds Bear Country and its Related Systems Included in this Presentation: Background and Existing System Proposal Problem / Solution Structural System Redesigns Pre-cast Concrete
More informationIRON WOODS ROOF DECK, DECK TILE AND PEDESTAL SYSTEM UPLIFT MASTER PLAN (HIGH WIND)
IRON WOODS ROOF DECK, DECK TILE AND SYSTEM UPLIFT MASTER PLAN (HIGH WIND) DECK TILE OPTIONS ITAUBA X IPE X X 8 X 7 TYP. x WOOD PANEL DESIGN ORIDA BUILDING CODE 6TH EDITION (07) ASCE 70 MAXIMUM WIND SPPED
More informationInstallation, Operation and Maintenance Manual
Document 474644 EHH-601D Channel Installation with VCD-40 Damper Installation, Operation and Maintenance Manual Please read and save these instructions for future reference. Read carefully before attempting
More informationLiving on the edge. 20 Australian Standards for the design and construction of handrails and balustrades
Living on the edge 20 Australian Standards for the design and construction of handrails and balustrades 181 children under the age of five in QLD were reported to have fallen from a balcony between 1998
More informationEPCON C8. Cracked Concrete - Anchor Studs 43.1 CRACKED CONCRETE - CHEMICAL INJECTION 43.1 GENERAL INFORMATION
43.1 CRACKED CONCRETE - CHEMICAL INJECTION 43.1 GENERAL INFORMATION Product is a High Performance Pure Epoxy ing adhesive for use in Cracked and Non-Cracked concrete. For structures subject to external
More informationBuilding use, location etc. Option 1 Domestic type Pitched Roof 15, insulation at rafter line (heated habitable room) UV001 NOV 2015 (V2)
U-Value & Condensation Risk calculation request form Due to high demand for our free calculation service, priority will be given to U-values requested via correctly completed forms as below. Please complete
More informationLAYOUT CONSIDERATIONS
1-800-447-2838 Installation Instructions Vanishing Lid System Layout Cover-Pools Vanishing Lid design is an adjustable, tray-support system for any kind or style of deck material you prefer to use for
More informationMain Contractors, Builders and Developers
Main Contractors, Builders and Developers What Is The Risk Of Using Non-Compliant Suppliers? Construction Products Regulation 305/2011 Supply Chain Compliance to CE Marking Standard EN 1090-1:2009+A1:2011
More informationSolar Panel Installation in the NT
Solar Panel Installation in the NT Over the last 4 years, Heiner Structural Engineering Consultancy (HSEC) has assisted its clients with over 500 solar installations in the NT. HSEC has become one of the
More informationBS 6180: 1999: Barriers in and about buildings Code of practice - General Contract use Clauses 6.4.1
RICHARD BURBIDGE LTD Our Ref.: Whittington Road Date: 27 th April 2009 Oswestry Date delivered: 4 th March 2009 Shropshire Date of tests: 2 nd April 2009 SY11 1HZ For the attention of Mr Tony Jones SAMPLE(S)
More informationTRANSFORM YOUR GARDEN WITH COMPOSITE DECKING
TRANSFORM YOUR GARDEN WITH COMPOSITE DECKING Slip resistant Can be worked just like timber Will not rot, splinter, crack or warp Will never require staining or painting Ecological and 100% recyclable Easy
More informationAlfresco Floors Hard Landscaping, Made Easy
Alfresco Floors Hard Landscaping, Made Easy Data Sheet: The Grad Hidden Fixing Deck System Company Introduction: Alfresco Floors are based in West London and work nationwide. We concentrate exclusively
More informationResidential Portfolio
Shop, 9 Hill Street, YEPPOON QLD 43 P.O. BOX 734, YEPPOON QLD 43 Ph: 07 495077 Fax: 07 49395808 Shop 3, 7 High Street, ROCKHAMPTON QLD 4 Ph: 07 496070 Fax: 4960737 Residential Portfolio Conceptual Designs
More informationESD-435X. Florida Product Approved Drainable Blade Louver. Application and Design. Standard Construction. Qualified Shapes
Application and Design Florida Product Approved Drainable Blade Louver is a Florida Product Approved stationary drainable blade extruded aluminum louver designed to protect air intake and exhaust openings
More informationSub-construction for ridgelight
modular skylights Sub-construction for ridgelight Sub-construction for ridgelight at 25-40 pitch modular skylights installed in a ridgelight solution are build on a sub-construction made of steel or concrete.
More informationLintels and Beams: Engineering Basis
Lintels and Beams: Engineering Basis The calculator is intended for the design of lintels and beams in timber- framed buildings generally within the scope of NZS 3604. However, the range of applications,
More informationUltraEasy Fence Installation Guide. v
UltraEasy Fence Installation Guide v20170726 IMPORTANT: Read All Sections Before You Start For the most up to date information, please visit our website @ www.newtechwood.com Prior to installing any composite
More informationEVEREST CLADDING, WALL & PRE-ENGINEERED BUILDINGS FOR GREEN BUILDING SOLUTIONS
EVEREST CLADDING, WALL & PRE-ENGINEERED BUILDINGS FOR GREEN BUILDING SOLUTIONS What makes a building Green? A Green building, also know as a Sustainable building, is a structure that is designed, built,
More informationGypLyner IWL Independent wall lining system
Independent wall lining system Photograph courtesy of Philip Brier 0 Independent wall lining system independent wall lining is a lightweight, nonloadbearing drylining which is erected independently of
More informationUNIVERSAL BRACKET. Shown in red color for illustration purposes. Bracket can be painted to match panels.
US PATENT PENDING #62/536,219 Shown in red color for illustration purposes. Bracket can be painted to match panels. (15) 79-6500 1515 VALLEJO ST, SAN FRANCISCO, CA 9109 17 3 17 SIMPLE, EFFICIENT, FLEXIBLE
More informationI.C.E. BLOCK (U.S. Patent No. 4,223,501) Detail Manual
I.C.E. BLOCK (U.S. Patent No. 4,223,501) Detail Manual An energy efficient - cost effective building system, designed for contractors and property owners alike. 1 TYPICAL WOOD FRAME TO CONCRETE FLOOR 1"
More informationIntroduction. Applications. Everest Facade Advantages
EVEREST FACADE Everest Façade with Endura Everest Industries Limited Introduction The Everest Commercial Facade System provides a versatile and durable façade which is suitable for an extensive range of
More informationWILLIAM HARE LIMITED CELLSHIELD LIMITED HEALTH AND SAFETY DEPARTMENT
WILLIAM HARE LIMITED CELLSHIELD LIMITED HEALTH AND SAFETY DEPARTMENT BASIC INSTRUCTION MANUAL FOR CELLSHIELD 2 SAFETY BARRIER SYSTEM WI 72 Written by Approved by Signature Date B Hughes B Hughes 17 04
More informationHygrometric removal of the concrete; Thermo dilatation of the deck; Wind actions; Slowing down actions; Seismic actions.
EXPANSION JOINTS The EXPANSION JOINTS are structural components that perform a continuity function on the rolling surface and enable movements between the decks. Indeed, the structural joints are necessary
More informationCONSTRUCTION SUMMARY REPORT
Edison Engineers Inc. 89 King Street W. Suite 3 Dundas (Hamilton) Ontario Canada L9H 1V1 Info@edisonengineers.ca CONSTRUCTION SUMMARY REPORT To: Halton Condominium Corporation No. 70 c/o Wilson Blanchard
More information