EarthGuard Fiber Matrix
|
|
- Magdalen Shelton
- 6 years ago
- Views:
Transcription
1 EarthGuard Fiber Matrix Special Provisions THE SPECIAL PROVISIONS DESCRIBED WITHIN IS AN ATTEMPT TO COVER MOST DESIGN ASPECTS OF UTILIZING THE EARTHGUARD FIBER MATRIX EROSION CONTROL SYSTEM. THIS DOCUMENT IS INTENDED TO BE UTILIZED AS A GUIDELINE, WHICH CAN BE CUSTOMIZED BY THE USER TO MEET SPECIFIC PROJECT REQUIREMENTS. THIS PROVISION DOES NOT ATTEMPT TO ADDRESS ALL ASPECTS OF EROSION CONTROL DESIGN. A PROFESSIONAL ENGINEER RESPONSIBLE FOR DESIGN SHOULD CHECK THE INFORMATION PRESENTED IN DETAIL. CONSULT YOUR EARTHGUARD REPRESENTATIVE FOR MORE INFORMATION. SOME SITUATIONS WITH: SANDY-SANDY LOAM SOILS, VERY LITTLE ORGANIC MATTER IN THE SOIL, POORLY COMPACTED SLOPES, HEAVY RAINFALL LOCATIONS (OVER 19 INCHES PER YEAR), VERY INTENSE RAIN STORMS (2-3 INCHES AT A TIME), HIGH WIND EXPOSURE, ETC. MAY REQUIRE INCREASING THE EARTHGUARD AND/OR FIBER. WHEN SWPPPS, BMPS OR OTHER PLANS ARE BEING WRITTEN, CONTACT YOUR EARTHGUARD REPRESENTATIVE AT (888) FOR MORE SPECIFIC RATE RECOMMENDATIONS BASED ON SOIL TYPE, RAINFALL, SLOPE AND OTHER CONDITIONS.
2 1. GENERAL 1.1. Work Included. EarthGuard Fiber Matrix shall be furnished and applied as shown on the drawings and as required for proper installation and functioning of the product. 2. MATERIALS 2.1. Soil Stabilizing Blend. The soil stabilizing emulsion blend to be applied shall be EarthGuard as manufactured by Terra Novo Inc (888) It must be a true emulsion consisting of two completely immiscible liquids, in which minute globules of one liquid are dispersed but not dissolved throughout the other liquid. The blend must also be manufactured exclusively with GENERALLY REGARDED AS SAFE (GRAS) materials. The soil stabilizing emulsion blend to be used shall consist of at least (3) three different linear anionic copolymer of acrylamide/sodium acrylate in water-in-oil emulsions, lending distinct molecular weights greater than 12x10 6 and anionic mole percentages (charge density) greater than 25%, within one emulsion. The blend must be guaranteed to contain 30% (+/- 1%) active polymer, in which all of the active particles are ultra fine in size. The blend shall also be guaranteed to have 500 ppm or less of residual acrylamide. The soil stabilizing emulsion shall be nontoxic to plant and animal life. It must also be registered and licensed by the State of California, Department of Food and Agriculture, as an auxiliary soil amendment. EarthGuard can be stored for 6 months. Always thoroughly mix before using. Always close or seal containers after use. Store in a dry insulated location to avoid moisture and freezing. If frozen, thaw and completely remix the solution Fiber. The fiber to be used shall be either of wood fiber, paper fiber or a combination of the two and shall be produced from natural or recycled (pulp) fiber, such as wood chips or similar wood materials or from newsprint, and shall be free of synthetic or plastic materials. Fiber shall not contain more than 7 percent ash as determined by the Technical Association of the Pulp and Paper Industry (TAPPI) Standard T 413, shall contain less than 250 parts per million boron and shall be otherwise nontoxic to plant or animal life. Fiber shall have a water-holding capacity by mass of not less than 1200 percent as determined by the procedure designated in the Caltrans Final Report, CA-DOT-TL , "Water-Holding Capacity for Hydrofiber," available at the Caltrans Laboratory. Fiber shall be of such character that the fiber will disperse into a uniform slurry when mixed with water. Water content of the fiber before mixing into slurry shall not exceed 15 percent of the dry mass of the fiber. The percentage of water in the fiber shall be determined by California Test 226. Fiber shall have the moisture content of the fiber marked on the package. Fiber shall be colored to contrast with the area on which the fiber is to be applied, and shall not stain concrete or painted surfaces. A Certificate of Compliance for fiber shall be furnished to the Engineer.
3 2.3. Seed (OPTIONAL SPECIFY TYPE IF REQUIRED). The seed to be applied in combination with the EarthGuard Fiber Matrix shall be of Type as shown in the plans and specified within these Special Provisions. Seed shall be labeled by the vendors supplying the seed. Seed shall have been tested for purity and germination not more than 12 months prior to the application of the seed. Seed testing results shall be delivered to the Engineer prior to applying the seed. Seed labels furnished by the seed supplying vendor shall indicate the purity, germination and pure live seed as determined by testing. Seed with a germination rate lower than the minimum rate specified may be used when approved by the Engineer in writing. Seed specified without a germination requirement, at the time of sowing, shall be from the previous or current year's harvest, and shall be labeled to include the name date (month and year) collected and the name and address of the seed supplier Compost (OPTIONAL SPECIFY TYPE IF REQUIRED). The compost to be applied in combination with the EarthGuard Fiber Matrix shall be as shown in the plans 2.5. Fertilizer (OPTIONAL SPECIFY TYPE IF REQUIRED). The fertilizer to be applied in combination with the EarthGuard Fiber Matrix shall be as shown in the plans 2.6. Pre-Emergent (OPTIONAL SPECIFY TYPE IF REQUIRED). The pre-emergent to be applied in combination with the EarthGuard Fiber Matrix shall be as shown in the plans 3. EARTHGUARD FIBER MATRIX EarthGuard Fiber Matrix shall consist of a combination of EarthGuard, water, and wood and or paper fiber mixed in the following proportions. Seed can be added to the blend for long-term or permanent erosion control. Consult your EarthGuard Sales Representative and/or product manufacturer Terra Novo Inc at (888) for the appropriate project specific application rates. Maximum Rainfall of 20" (480 mm) SLOPE 6:1 5:1 4:1 3:1 2:1 1.5:1 1:1 EARTHGUARD (gals/acre) Fiber 1,500 1,500 1,500 1,800 2,000 2,500 3,000 SEED
4 Maximum Rainfall of > 20" (480 mm) SLOPE 5:1 4:1 3:1 EARTHGUARD (gals/acre) MULCH 2,000 2,500 3,000 SEED 4. BLENDING Correct mixing and proper application are key factors in obtaining satisfactory performance. Prior to blending, thoroughly mix the EarthGuard in its container. A hydroseeding vessel shall be filled with water to at least 1/3 capacity (high enough to cover agitators) prior to adding any EarthGuard. Continue to fill vessel with water and slowly add the EarthGuard while agitators are in motion. Once the accurate amount of EarthGuard is in solution, add fiber, seed (if specified), compost (if specified), fertilizer (if specified) and pre-emergent (if specified).continue to mix tank a minimum of 10 minutes prior to application. If the hydroseeding unit has separate pump and agitator controls (example: Finns), minimize agitator speed once the slurry is completely mixed and before application. This will help increase application rate. 5. APPLICATION The soil to which the EarthGuard Fiber Matrix slurry shall be applied must be graded to remove any pre-existing rills and shall be compacted to meet project specifications. Track-walking or some other soil imprinting devise is recommended to roughen the slope to slow water flows during a storm event. Slope Interruption Devices, such as fiber rolls, should be applied prior to the application of EarthGuard Fiber Matrix if desired. Slope Interruption Devices, if installed should be placed on the slope contour perpendicular to the flow of water. The EarthGuard Fiber Matrix slurry shall be applied at a minimum rate of 3000 gallons/acre (2800 liters/acre) evenly over the entire area to be treated. Caution should be taken to avoid creating puddles or runoff. It is recommended to spray the slurry from multiple directions and angles to ensure proper coverage. Treated areas shall not be disturbed after application. EarthGuard Fiber Matrix shall be applied 24 hours prior to or following a storm event.
5 6. REPAIR OF DAMAGED AREA Any damaged area shall be repaired utilizing the exact blend and application procedure as specified above. 7. PAYMENT EarthGuard Fiber Matrix will be paid for by the square foot of area treated. The price shall include full compensation furnishing all labor, materials, tools, equipment, and incidentals, and for doing all EarthGuard Fiber Matrix work, complete in place, as shown on the plans, and as specified in these special provisions, and as directed by the Engineer.
HYDROSTRAW GUAR PLUS HYDRAULIC MULCH
SECTION XXXXX HYDROSTRAW GUAR PLUS HYDRAULIC MULCH PART 1: GENERAL 1.1 SUMMARY A. This section specifies the use of HydroStraw Guar Plus as an allowable hydraulic fiber mulch for use in temporary cover
More informationHYDROSTRAW BONDED FIBER MATRIX
SECTION XXXXX HYDROSTRAW BONDED FIBER MATRIX PART 1: GENERAL 1.1 SUMMARY A. This section specifies the use of HydroStraw Bonded Fiber Matrix as an allowable Bonded Fiber Matrix for use in temporary cover
More informationHYDROSTRAW SECTION XXXXX ALL IN 1 GUAR PLUS
HYDROSTRAW SECTION XXXXX ALL IN 1 GUAR PLUS PART 1: GENERAL 1.1 SUMMARY A. This section specifies the use of HydroStraw All IN 1 GUAR PLUS as an allowable All IN 1 GUAR PLUS for use in temporary cover
More informationBindex BFM HYDRAULICALLY APPLIED EROSION CONTROL PRODUCT SPECIFICATION
PART I - GENERAL 1.01 Summary Bindex BFM HYDRAULICALLY APPLIED EROSION CONTROL PRODUCT SPECIFICATION A. The hydraulically applied Bindex BFM (Bonded Fiber Matrix) is made from natural wood fibers (including
More information1. Furnishing and applying hydromulch seeding including all materials and equipment required for the specified method of lawn installation.
SECTION 32 92 13 HYDROMULCH SEEDING PART 1 GENERAL 1.1 SCOPE A. Refer to the Drawings, Schedules and Details for type and locations of work required herein. Furnish all labor, materials, equipment and
More informationHYDROSTRAW ORIGINAL HYDRAULIC MULCH
SECTION XXXXX HYDROSTRAW ORIGINAL HYDRAULIC MULCH PART 1: GENERAL 1.1 SUMMARY A. This section specifies the use of HydroStraw Original as an allowable hydraulic fiber mulch for use in temporary cover by
More informationSECTION 603 SEEDING I. GENERAL 1.1 DESCRIPTION OF WORK
SECTION 603 SEEDING I. GENERAL 1.1 DESCRIPTION OF WORK The Contractor shall furnish all labor, supervision, material (except as herein provided), tools, equipment, supplies, and services; and, shall perform
More informationPost Construction Erosion Controls
Post Construction Erosion Controls Erosion Control Permanent Controls Native Vegetation Preservation Hydroseeding & Soil Stabilizers Soil Roughening Soil Stabilizers Geotextiles Vegetation is the Best
More informationHYDRAULIC EROSION CONTROL PRODUCTS
Supplemental Technical Specification for HYDRAULIC EROSION CONTROL PRODUCTS SCDOT Designation: SC-M-815-11 (04/11) 1.0 Hydraulic Erosion Control Products This supplemental specification replaces sections
More informationSECTION 70 SEEDING. This work consists of preparing a seedbed and furnishing and planting seed on disturbed areas within limits of the work.
SECTION 70 SEEDING 70.1 DESCRIPTION A. General This work consists of preparing a seedbed and furnishing and planting seed on disturbed areas within limits of the work. B. Related Work Section 71 Fertilizing
More informationKANSAS CITY METROPOLITAN CHAPTER OF THE AMERICAN PUBLIC WORKS ASSOCIATION
KANSAS CITY METROPOLITAN CHAPTER OF THE AMERICAN PUBLIC WORKS ASSOCIATION CONSTRUCTION AND MATERIAL SPECIFICATIONS Section 2400 Seeding and Sodding DIVISION II CONSTRUCTION AND MATERIAL SPECIFICATIONS
More informationBlock or Log forms of PAM and PAM blends are manufactured for specific use in drainage waterways to remove suspended particulates from runoff.
Technical Guidance for the Use of Polyacrylamides (PAM) and PAM Blends for Soil Erosion Control and Storm Water clarification (Courtesy of Applied Polymer Systems, Inc.) Practice Description PAM is a water-soluble
More informationSpecifications for SEEDING FOR EROSION CONTROL
Specifications for SEEDING FOR EROSION CONTROL 1. GENERAL 1.1. SCOPE Provide all supervision, labor, materials, tools, equipment and related items required for preparing ground, providing for sowing of
More informationDIVISION II SEEDING SECTION 02933
Subdivision Requirements Manual Page 1 of 5 PART I - GENERAL 1.1 Related Work.1 Rough Grading : Section 02211.2 Topsoil and Finish Grading : Section 02212.3 Hydraulic Seeding : Section 02934 1.2 Scope
More informationFIBER REINFORCED MATRIX (FRM)
Supplemental Technical Specification for November 9, 2008 FIBER REINFORCED MATRIX (FRM) SCDOT Designation: SC-M-815-4 (11/08) 1.0 Fiber Reinforced Matrix (FRM) This supplemental specification replaces
More informationCITY OF FARGO SPECIFICATIONS TURF ESTABLISHMENT
TURF ESTABLISHMENT PART 1 DESCRIPTION OF WORK This work to be done under this section of the Specifications and the accompanying plans consists of establishing turf on boulevards, slopes, ditches, or other
More informationCITY OF FARGO SPECIFICATIONS SEEDING
SEEDING PART 1 DESCRIPTION OF WORK This work to be done under this section of the Specifications and the accompanying plans consists of topsoiling and seeding boulevards, slopes, ditches, or other locations
More informationPolyacrylamide. Rough graded soils that will be inactive for a period of time. Temporary haul roads prior to placement of crushed rock surfacing.
Polyacrylamide EC-13 Objectives EC SE TR WE NS WM Erosion Control Sediment Control Tracking Control Wind Erosion Control Non-Stormwater Management Control Waste Management and Materials Pollution Control
More informationConstruction Stormwater Best Management Practices
Marin County Stormwater Pollution Prevention Program San Rafael, California November 12, 2015 Construction Stormwater Best Management Practices The mention or image of any product or service is for illustrative
More informationHYDROSTRAW BONDED FIBER MATRIX - CERTIFICATE OF COMPLIANCE
DESCRIPTION- HydroStraw Bonded Fiber Matrix is designed to be more cost effective than blankets and cost less to apply per acre than conventional BFM mulches on difficult sites, slopes and adverse soil
More informationSection 1I-3 - Bioswales
BIOSWALES (Numbering pending) These specifications compliment the bioswale design portion of the Iowa Stormwater Management Manual in Chapter 2, Section 2I-3. Sections of the following documents, as referenced
More informationITEM 252 IN-PLACE FULL DEPTH COLD FLEXIBLE PAVEMENT RECYCLING
AFTER NOVEMBER 1, 2008 ITEM 252 IN-PLACE FULL DEPTH COLD FLEXIBLE PAVEMENT RECYCLING 252.1 Description. This work shall consist of a stabilized base course composed of a mixture of the existing bituminous
More informationSection GRASSING
CCU Engineering Specifications Section 002930 GRASSING Effective Date: Nov. 1st, 2011 Page 1 of 9 PART 1 - GENERAL The following specification is intended for use for the selection of materials, and installation
More informationTECHNICAL SPECIFICATION
TECHNICAL SPECIFICATION ITEM 00252 IN-PLACE FULL DEPTH COLD FLEXIBLE PAVEMENT RECYCLING 252.1 Description. This work shall consist of a stabilized base course composed of a mixture of the existing bituminous
More informationDOCUMENT SPECIAL PROVISIONS
DOCUMENT 00813 SPECIAL PROVISIONS ADDENDUM NO. 1, DECEMBER 16, 2016 PRICE ADJUSTMENTS FOR STRUCTURAL STEEL AND REINFORCING STEEL FOR CONTRACTS BID ON OR AFTER APRIL 5, 2011 ENGLISH UNITS December 12, 2016
More informationSECTION 806 WATER COURSE AND SLOPE EROSION PROTECTION
Change No. 7 SECTION 806 WATER COURSE AND SLOPE EROSION PROTECTION 806.1 DESCRIPTION This work is furnishing, placement and maintenance of soil erosion control material of the type indicated. 806.2 MATERIAL
More information902 TEMPORARY EROSION AND SEDIMENT CONTROL SECTION 902 TEMPORARY EROSION AND SEDIMENT CONTROL
SECTION 902 TEMPORARY EROSION AND SEDIMENT CONTROL 902.1 DESCRIPTION Install, maintain and remove temporary erosion and pollution control devices as required during the construction of the project. BID
More informationFlexamat Tied Concrete Block Mats
Flexamat Tied Concrete Block Mats 1. DESCRIPTION 2. MATERIALS Flexamat Tied Concrete Block Erosion Control Mats This work shall consist of furnishing and placing the Flexamat system in accordance with
More informationITEM 260 LIME TREATMENT FOR MATERIALS USED AS SUBGRADE (ROAD MIXED)
ITEM 260 LIME TREATMENT FOR MATERIALS USED AS SUBGRADE (ROAD MIXED) 260.1. Description. This Item shall govern for treating the new or existing subgrade, the existing pavement structure or a combination
More informationSection Hydraulically-Applied Erosion Control: Flexible Growth Medium
Section 31 25 14.13 Hydraulically-Applied Erosion Control: Flexible Growth Medium High Performance- GENERAL 1.01 SUMMARY A. This section specifies a hydraulically-applied, 100% biodegradable, High Performance-
More informationConstruction Specification 28 Lime Treated Earthfill
Construction Specification 28 Lime Treated Earthfill 1. Scope The work consists of furnishing lime, mixing lime with soil, curing, and placing the lime treated soil. 2. Material Soil material shall be
More information1993 Specifications CSJ'S & SPECIAL SPECIFICATION ITEM Tree Preservation and Treatment
1993 Specifications CSJ'S 0912-71-554 & 0912-71-555 SPECIAL SPECIFICATION ITEM 1016 Tree Preservation and Treatment 1. Description. This section specifies the requirements for protecting trees and related
More informationMATERIALS A Concrete A.1 Concrete Walk... Mix No. 3F52. A.2 Concrete Walk, Exposed Aggregate Finish... Mix No.
2521 WALKS 2521.1 DESCRIPTION This work consists of constructing concrete or bituminous walks. Concrete walks include concrete median walk and concrete truck aprons. 2521.2 MATERIALS A Concrete... 2461
More informationSection 216. Seeding, Fertilizer, Sodding
Section 216 Seeding, Fertilizer, Sodding PRECONSTRUCTION In preparation for dry seeding verify that all openers on seed drills are in good working condition and that the row spacing does not exceed specifications.
More informationThis silt fence system is composed of geotextile filter fabric and steel posts.
Supplemental Technical Specification for SILT FENCE SYSTEMS SCDOT Designation: SC-M-815-2 (03/08) 1.0 Silt Fence Systems This Supplemental Specification replaces Sections 815.2.5 and 815.4.6, Silt Fences,
More informationThis silt fence system is composed of geotextile filter fabric and steel posts.
Supplemental Technical Specification for SILT FENCE SYSTEMS SCDOT Designation: SC-M-815-2 (7/18) 1.0 Silt Fence Systems This Supplemental Specification replaces Sections 815.2.5 and 815.4.6, Silt Fences,
More informationSECTION GRASSING. Contents PART 1 - GENERAL Section Includes Unit Prices Performance Requirements...
Article SECTION 02920 - GRASSING Contents Page PART 1 - GENERAL... 1 1.01 Section Includes... 1 1.02 Unit Prices... 1 1.03 Performance Requirements... 1 1.04 Maintenance... 1 PART 2 - PRODUCTS... 2 2.01
More informationTable 1: Minimum Perimeter Control Performance Requirements. Physical Property* Test Method Required Value
Supplemental Technical Specification for PERIMETER CONTROL SCDOT Designation: SC-M-815-17 (08/13) 1.0 Perimeter Control This Supplemental Technical Specification maybe used as an alternative to Sections
More informationDivision of Water Quality (701)
Division of Water Quality (701) 328-5210 stormwater@nd.gov March April 2018 1 Construction Permit Permit #: NDR10-0000 Reissued April 1, 2015 Expires March 31, 2020 2 Discharges Covered Stormwater Discharges
More informationOKLAHOMA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISIONS FOR SUBGRADE STABILIZATION
326-1(a-j) 99 OKLAHOMA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISIONS FOR SUBGRADE STABILIZATION These Special Provisions revise, amend and where in conflict, supersede applicable sections of the 1999
More informationErosion Control State Standards Sampling of Material Innovations
Erosion Control State Standards Sampling of Material Innovations Greg Halverson Brock White Company Geosynthetics Product Manager 32 nd Annual North Central Local Roads Conference Rapid City, SD - October
More informationItem Name Description Unit of Measure Mobilization Per WSDOT Lump Sum
Page 1 of 6 DESIGN STANDARDS FOR: MEASUREMENT AND PAYMENT Where bids are utilities for construction, repair or alteration for Public Work park projects, the following bid item descriptions and units of
More informationSACRAMENTO COUNTY ASPHALT RUBBER HOT MIX-GAP GRADED (ARHM-GG):
SACRAMENTO COUNTY ASPHALT RUBBER HOT MIX-GAP GRADED (ARHM-GG): ARHM-GG shall conform to the provisions for Type "A" asphalt concrete in Section 39, "Asphalt Concrete," of the State Standard Specifications
More informationCITY OF CHICO. Erosion and Sediment Control Plan (ESCP) Worksheet for Small Construction Projects. Project Address: Building Permit Number:
CITY OF CHICO Erosion and Sediment Control Plan (ESCP) Worksheet for Small Construction Projects Project Address: Building Permit Number: What is this document for? The City s Phase II MS4 NPDES General
More informationCity of West Sacramento Erosion and Sediment Control Plan (ESCP) Worksheet for Small Construction Projects
Erosion and Sediment Control Plan (ESCP) Worksheet for Small Construction Projects Project Name: Page intentionally left blank. - 2 - What is this document for? The City s Phase II MS4 NPDES General Permit
More informationFlexamat Erosion Control Mat
Flexamat Erosion Control Mat 1. DESCRIPTION 2. MATERIALS Furnish and install Flexamat Erosion Control Mats. Submit manufacturer s performance research results and calculations in support of the Flexamat
More informationThe Construction General Permit and Erosion Prevention and Sedimentation Control
The Construction General Permit and Erosion Prevention and Sedimentation Control Presented at the Tennessee Gas Association Conference April 23, 2008 More than thirty years ago, two-third of the nation's
More informationThe specified emulsion for chip seal shall conform to the following applicable requirements:
ASPHALT EMULSION SEAL COAT Asphalt emulsion seal coat consist of applying asphaltic emulsion and screenings on the pavement where shown on the plans, as specified in these specifications and the special
More informationITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS
ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS 701-1 DESCRIPTION 701-1.1 This item shall consist of the construction of pipe culverts, and storm drains, removal of existing storm pipes, connections to existing
More informationList walls, planters, etc.., to which the anti-graffiti coating will be applied. Delete this note from the Contract Specifications.
X0321865 ANTI-GRAFFITI PROTECTION SYSTEM Effective: June 7, 2011 Revised: March 3, 2016 Description: This work shall consist of furnishing, and applying an anti-graffiti coating on all exposed faces of
More informationStanford University Facilities Design Guidelines SECTION SEAL COATS. C. Section : Traffic Striping and Pavement Markings
SECTION 32 12 36 SEAL COATS PART 1 GENERAL 1.1 RELATED WORK A. Section 31 10 00: Site Preparation B. Section 32 12 00: Flexible Paving C. Section 32 17 23 01: Traffic Striping and Pavement Markings 1.2
More informationMIDLAND COUNTY ROAD COMMISSION
MIDLAND COUNTY ROAD COMMISSION BID FORM Sealed Proposals will be received at the office of the Board of Road Commissioners, County of Midland, at 2334 N. Meridian Road, Sanford, Michigan, 48657, until:
More informationSECTION A1 EXCAVATION AND BACKFILL GENERAL
SECTION A1 EXCAVATION AND BACKFILL GENERAL The work under this section shall include all excavation to such width and depth as shown on the drawings, specified herein, or ordered by the Engineer. Such
More informationCurlex Bloc An American Made Alternative to Coir Logs SPECIFICATION
Curlex Bloc An American Made Alternative to Coir Logs SPECIFICATION PART I - GENERAL 1.01 Summary A. The Curlex Bloc contains excelsior wood fiber for the purpose of shoreline and streambank stability
More informationCity of El Centro. Erosion and Sediment Control Plan Review Checklist. Reviewer: Review Date:
City of El Centro Erosion and Sediment Control Plan Review Checklist Project: Reviewer: Review Date: If an item below is marked No, the Erosion and Sediment Control Plan (Plan) either does not provide
More informationB. Install storm drain inlet protection to prevent clogging of the stormsewer and sediment loads to downstream stormwater facilities or waterbodies.
The language provided in these specifications is meant to serve as a reminder and provide a generic example of the type of language that should be provided in final construction documents. This language
More informationSEGMENTAL BLOCK RETAINING WALLS. Comply with Division 1 - General Provisions and Covenants, as well as the following:
SEGMENTAL BLOCK RETAINING WALLS PART 1 - GENERAL 1.01 SECTION INCLUDES Segmental Block Retaining Walls 1.02 DESCRIPTION OF WORK Constructing segmental block retaining walls. 1.03 SUBMITTALS Comply with
More informationLOWER MILL DIRT HAUL AND PLACEMENT PROJECT
SPECIAL PROVISIONS FOR CONSTRUCTION LOWER MILL DIRT HAUL AND PLACEMENT PROJECT LOWER HANEL MILL - AIRPORT HOOD RIVER COUNTY, OREGON GRADING AND DRAINAGE AT TWO SITES: LOWER HANEL MILL 3335 NEAL CREEK MILL
More informationSECTION EMBANKMENT
02260-1 of 8 SECTION 02260 EMBANKMENT 02260.01 GENERAL A. Description 1. Embankment shall be formed of suitable material obtained from General, Structure, Borrow, Trench, and other excavations included
More information17 Seeding. Types of Seeding. Preparation. Application Rate of Fertilizer. Application of Seed. Seasonal Limitation. Mulching
17 Seeding Types of Seeding Preparation Application Rate of Fertilizer Application of Seed Seasonal Limitation Mulching Placement Method A Method B Method C Method D Method E Acceptance of Materials Measurement
More informationSECTION 903 EROSION CONTROL
SECTION 903 EROSION CONTROL Delete this Section in its entirety and replace with the following: SECTION 903 EROSION CONTROL 903-1 DESCRIPTION: This work consists of providing all; administrative, labor,
More informationChapter 1 THE EFFECT OF MULCH TYPE ON TURFGRASS ESTABLISHMENT ON PLASTIC ABSTRACT
Chapter 1 THE EFFECT OF MULCH TYPE ON TURFGRASS ESTABLISHMENT ON PLASTIC ABSTRACT The germination and establishment of Lolium perenne (bunch type) and Poa supina (stoloniferous) within a refined wood fiber
More informationESTIMATE OF QUANTITIES
ESTIMATE OF QUANTITIES STATE OF PROJECT SOUTH DAKOTA 083S-351 SHEET TOTAL NO. SHEETS 2 9 ESTIMATED QUANTITIES The below quantities are based on the rates shown in the Rates of Materials. This is only an
More informationITEM 750 ROCK FILTER DAMS
AFTER MARCH 1, 2012 ITEM 750 ROCK FILTER DAMS 750.1 Description. This work shall consist of the installation of temporary erosion protection and sediment control rock filter dams utilized during construction
More informationUNHSC Bioretention Soil Specification February, SOIL PREPARATION (PERFORMANCE SPECIFICATION) for Bioretention Systems
SOIL PREPARATION (PERFORMANCE SPECIFICATION) for Bioretention Systems PART 1 - GENERAL 1.1 SUMMARY A. Section includes soil media for the bioretention systems and rain gardens specified according to performance
More informationAsphalt Rubber Chip Sealing DRAFT MAINTENANCE SPECIFICATION. March 22, 2007
Asphalt Rubber Chip Sealing DRAFT MAINTENANCE SPECIFICATION March 22, 2007 Description: This work consists of furnishing and applying asphalt rubber binder followed by an application of treated cover aggregate
More informationSECTION SITE GRADING. Part 1 - General Work Included Related Requirements Reference Standards...
SECTION 02210 - SITE GRADING CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement and Payment...
More informationErosion Control Solutions. By: Cathy Wall, Frank Lauro, Marc Theisen Quality Seeds Ltd., Profile Products LLC
Erosion Control Solutions By: Cathy Wall, Frank Lauro, Marc Theisen Quality Seeds Ltd., Profile Products LLC Introduction Evolution of Erosion Control Technologies Goals Material Categories Performance
More informationSEEDING SECTION T-901
SECTION T-901 {Instruction to Consultants: The Master Specification must only be considered to be general guidelines as it is not prepared for a Specific Project. If the items described in the Master Specification
More informationCITY OF LETHBRIDGE SECTION INFRASTRUCTURE SERVICES Page 1 of 7 GRANULAR BASE PREP
INFRASTRUCTURE SERVICES Page 1 of 7 1.0 GRANULAR BASE AND SUB-BASE 1.1 DESCRIPTION.1 This section specifies requirements for supplying, producing, hauling placing and compacting processed gravel or quarried
More informationStanford University Facilities Design Guidelines SECTION ASPHALT UNIT PAVING. A. ASTM C-33 Standard Specification for Concrete Aggregates.
SECTION 32 14 23 ASPHALT UNIT PAVING PART 1 GENERAL 1.1 DESCRIPTION Work Included: All labor, materials, appliances, tools, equipment, facilities, transportation, and services for and incidental to performing
More informationROLLED EROSION CONTROL PRODUCTS (RECP)
Supplemental Technical Specification for ROLLED EROSION CONTROL PRODUCTS (RECP) SCDOT Designation: SC-M-815-9 (07/17) 1.0 Rolled Erosion Control Products (RECP) This Supplemental Specification replaces
More informationBMP-5. A temporary sediment barrier consisting of a synthetic filter fabric stretched across and attached to supporting posts and entrenched.
BMP-5 BMP: SILT FENCE Definition A temporary sediment barrier consisting of a synthetic filter fabric stretched across and attached to supporting posts and entrenched. Purposes To intercept and detain
More informationCITY OF FARGO SPECIFICATIONS AGGREGATE BASES
AGGREGATE BASES PART 1 DESCRIPTION OF WORK The work to be done under this section of the Specifications and the accompanying plans consists of all labor, material, accessories, and equipment necessary
More informationSECTION 10 - SEEDING Related requirements specified in other Sections of the Specifications. A. Section 7 - General Construction Standards
SECTION 10 - SEEDING 10.1 GENERAL 10.1.1 Related requirements specified in other Sections of the Specifications. A. Section 7 - General Construction Standards B. Section 9 - Trenching & Backfilling 10.1.2
More informationSECTION EXCAVATION AND FILL
SECTION 312300 EXCAVATION AND FILL PART 1 - GENERAL 1.1 SUMMARY A. Excavate, backfill, compact, and grade the site to the elevations shown on the Drawings, as specified herein, and as needed to meet the
More informationTECHNICAL SPECIFICATION
TECHNICAL SPECIFICATION ITEM 00223 LIME-FLYASH OR FLYASH STABILIZED SUBGRADE 223.1 Description. This item shall consist of treating the subgrade by the pulverizing, addition of lime flyash and/or flyash,
More informationSECTION 28 AGGREGATE BASE COURSE (FAA P-208) [For base course under runway and taxiway surfaces, use Section 29, FAA Item P-209.]
28-1 GENERAL SECTION 28 AGGREGATE BASE COURSE (FAA P-208) The Contractor shall perform all work required by the plans and specifications for construction of aggregate base course for, use under runway
More informationErosion Control Product Testing
Utah State University DigitalCommons@USU Reports Utah Water Research Laboratory January 1979 Erosion Control Product Testing C. Earl Israelsen Eugene K. Israelsen Joel E. Fletcher Jerald S. Fifield Ronald
More informationPREPARING FOR BIG RAIN EVENTS. Eddie Snell Applied Polymer Systems, Inc.
PREPARING FOR BIG RAIN EVENTS Eddie Snell Applied Polymer Systems, Inc. FAILING TO PLAN IS PLANNING TO FAIL THEY DIDN T PLAN ON IT RAINING THEY DIDN T PLAN ON IT RAINING THEY DIDN T PLAN ON IT RAINING
More informationSECTION V CHAPTER 12 STORMWATER POLLUTION PREVENTION POLICY
1. PURPOSE: SECTION V CHAPTER 12 STORMWATER POLLUTION PREVENTION POLICY The purpose of this policy is to establish procedures to facilitate compliance with federal, state and local stormwater regulations
More informationThe GREENBOOK 2015 Standard Specifications for Public Works Construction
203-3.4.4 Rubberized Polymer Modified Emulsion (RPME). 203-4.4.4.1 General. RPME shall consist of a mixture of emulsified asphalt, crumb rubber, and latex. RMPE shall contain between 0.55 pounds per gallon
More informationSingle Family Residential Construction Erosion/Sediment Control Standards
Single Family Residential Construction Erosion/Sediment Control Standards Introduction: This booklet contains standard plans and procedures sufficient for typical building construction. It is not intended
More informationITEM 481 MONOLITHIC REINFORCED CONCRETE BOX SEWERS
AFTER FEBRUARY 1, 2011 ITEM 481 MONOLITHIC REINFORCED CONCRETE BOX SEWERS 481.1 Description. This specification shall govern for the construction of monolithic, reinforced concrete box sewers of the size,
More informationITEM 706 PIPE SLOPE DRAIN
AFTER NOVEMBER 1, 2008 ITEM 706 PIPE SLOPE DRAIN 706.1 Description. This work shall consist of the installation of temporary erosion protection and sediment control pipe slope drains, utilized during construction
More informationSECTION 705 SEEDING AND SODDING FOR TURF AREAS
SECTION 705 SEEDING AND SODDING FOR TURF AREAS 705.01 DESCRIPTION Seeding: This work shall consist of soil preparation, seeding, mulching, overseeding and mowing all areas designated for turf establishment
More informationSection Hydroseeding Tender No. [ ] Page 1
Tender No. [ ] Page 1 1.0 GENERAL 1.1 REFERENCES.1 Provide hydroseeding in accordance with the following standards (latest revision) except where specified otherwise..2 Government of Canada.1 Seeds Act
More information1) Zone: Commercial, Min. Lot Size 0.5 Ac. Min. Fontage 100' Setbacks = 50' Front, 15' Side, 20' Rear Permitted Lot Coverage 75% 2) Existing Use: Retail Convenience Store with Fuel, and Dunkin Donuts Drive-Thru
More informationSURFACINGS AND PAVEMENTS SECTION 37: BITUMINOUS SEALS 37-2 SLURRY SEAL
SURFACINGS AND PAVEMENTS SECTION 37: BITUMINOUS SEALS 37-2 SLURRY SEAL 37-2.01 DESCRIPTION This work shall consist of mixing asphaltic emulsion, aggregate, set-control additives and water and spreading
More informationConstruction Best Management Practices Handbook BEST MANAGEMENT PRACTICES
BEST MANAGEMENT PRACTICES 34 Construction Best Management Practices Handbook EROSION AND SEDIMENT CONTROL IN THIS CHAPTER: 4.1 Soil Preparation and Roughening 4.2 Rolled Erosion Control Products 4.3 Hydraulic
More informationSECTION CONCRETE SEGMENTAL RETAINING WALL SYSTEM
SECTION 02832 CONCRETE SEGMENTAL RETAINING WALL SYSTEM PART 1.: GENERAL 1.01 WORK INCLUDED A. This section includes the following: The Specifications on furnishing the design, materials and labor required
More informationChairperson: Approved by the Belmont Planning Board SITE PLAN ENGINEERING & SEPTIC DESIGNS B.C.R.D. BOOK 2954 PAGE 780
Dry Well/ Catch Basin Approved by the Belmont Planning Board Approval Date: Chairperson: SUBMITTED BY: CHECKED BY: MEM MEM SCALE N/A DRAWING #: 1 of 2 DRN. BY: LOCATION: MAP 122 / LOT 58, LACONIA ROAD,
More informationNon-Vegetative Stabilization
Categories EC Erosion Control SE Sediment Control TR Tracking Control WE Wind Erosion Control NS Non-Stormwater Management Control WM Waste Management and Materials Pollution Control Legend: Primary Category
More informationHydraulic Mulch Products
Hydraulic Mulch Products The Standard of Erosion Control since 1965 Offered by: Sitework, Erosion & Seeding Supply Company 209 Cane Creek Rd, Fletcher NC 28732 828-654-8990 - www.sesscompany.com Industry-leading
More informationStraw Bale Barrier. - Along the face and at grade breaks of exposed and erodible slopes to shorten slope length and spread runoff as sheet flow
Straw Bale Barrier SE-9 Objectives EC Erosion Control SE Sediment Control TR Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control
More informationTargeted Constituents Sediment Nutrients Trash Metals Bacteria Oil and Grease Organics. Potential Alternatives. EC-5 Soil Binders
Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Category
More informationOrganic Filter Tubes. Fe= (Depends on soil type)
3.6 Sediment Control Description: Organic filter tubes are comprised of an open weave, mesh tube that is filled with a filter material (compost, wood chips, straw, coir, aspen fiber, or a mixture of materials).
More informationBest Management Practice (BMP) Guidance Manual
Best Management Practice (BMP) Guidance Manual INTRODUCTION BMP examples in this guide provide ways to meet erosion and sediment control requirements. Best Management Practices are not limited to these
More informationSUDAS Revision Submittal Form
SUDAS Revision Submittal Form Status Date: As of 3/15/2018 Topic: General Permit No. 2 updates Manual: Design Manual Location: Sections 7A-1 and 7B-1 Requested Revision: Section 7A-1 (General Information),
More informationItem P-219 Recycled Concrete Aggregate Base Course
Item P-219 Recycled Concrete Aggregate DESCRIPTION 219-1.1 This item consists of a base course composed of recycled concrete aggregate, crushed to meet a particular gradation, constructed on a prepared
More information